Loading...
HomeMy WebLinkAboutCAP 2016-09-12 COMPLETE AGENDA PACKETCity of Tukwila Comm unity Affairs & Parks Committee O De'Sean Quinn, Chair O Kathy Hougardy O Thomas McLeod AGENDA Distribution: Recommended Action D. Quinn C. O'Flaherty K. Hougardy R. Turpin T. McLeod L. Humphrey J. Duffle T. Gallaway D. Robertson R. Still Mayor Ekberg R. Bianchi D. Cline J. Pace MONDAY, SEPTEMBER 12, 2016 — 5:30 PM HAZELNUT CONFERENCE ROOM (formerly known as CR #3) at east entrance of City Hall Item Recommended Action Page 1. PRESENTATION(S) 2. BUSINESS AGENDA a. Amendment to contract ( #15 -166) with Public a. Forward to 9/19 Pg.i Health — Seattle and King County regarding the Consent Agenda. Partnership for Improving Community Health grant (PICH) and the "'Healthy Tukwila" project. Tracy Gallaway, Parks & Recreation Manager b. Parks & Recreation Department's 2017 -2022 b. Forward to 9/26 Pg.11 Capital Improvement Program (CIP) budget. C.O.W. Mtg. Rick Still, Parks & Recreation Director c. Update on Municipal Arts Fund. c. Information only. Pg.29 Rick Still, Parks & Recreation Director d. Status on Tukwila Works system. d. Information only. Pg.31 Rachel Bianchi, Communications and Government Relations Manager e. Status on vehicle parking ordinance e. Information only. Pg.41 implementation. Jack Pace, Community Development Director 3. ANNOUNCEMENTS 4. MISCELLANEOUS Next Scheduled Meeting: Monday, September26, 2016 SThe City of Tukwila strives to accommodate those with disabilities. Please contact the City Clerk's Office at 206 - 433 -1800 ( TukwilaCityClerk @TukwilaWA.gov) for assistance. City of Tukwila Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: Community Affairs and Parks Committee FROM: Rick Still, Parks and Recreation Director BY: Tracy Gallaway, Parks and Recreation Manager CC: Mayor Ekberg DATE: September 7, 2016 SUBJECT: Partners in Community Health Grant ISSUE King County Public Health - Partners in Community Health grant award contract amendment BACKGROUND In early February 2015 Parks and Recreation staff applied for and received a King County Public Health (KPCH) "Partners in Community Health" (PICH) grant. The grant is a portion of a larger grant KCPH received through the Centers for Disease Control (CDC). KCPH is distributing portions of their funding to further the goals of the award. The funding was broken into 3 funding cycles: • Year 1: 5/1/2015-9/29/15. Parks and Recreation was allocated $30,000. • Year 2: 9/30/15-9/29/16. Parks and recreation received an initial allocation of $30,000, and in April 2016 received an additional allocation of $7,500. Total Year 2 allocation was $37,500. • Year 3: 9/30/16-8/29/17. Parks and recreation was allocated $35,000. Total PICH grant allocation: $102,500 DISCUSSION The PICH funding has enabled staff to implement The Healthy Tukwila project and further the Department's 2016 work plan by addressing the goal of improving citizen's awareness towards making healthier lifestyle choices. The Healthy Tukwila project includes an education program (internal and external), public awareness campaign and the creation of City administrative policy changes to encourage a healthy food and beverage environment for employees, program participants, rental customers and community center visitors. FINANCIAL IMPACT Matching funds are not required for this award, but a budget amendment will be necessary to account for expenditures that will be reimbursed through the PICH grant. RECOMMENDATION The Committee is being asked to forward this item to the Consent Agenda at the September 19, 2016 Regular Meeting to authorize the Mayor to sign the contract amendment. ATTACHMENTS A — PICH Accomplishments B — Scope of Work (Year 3) — Healthy Tukwila Project ATTACHMENT A PICH Accomplishments Staff Training: • November 2015— Parks and Recreation Department Leadership Team, 25 FT staff - Introduction to PICH/ Healthy Tukwila • February 2016— Parks and Recreation youth program staff, 15 PT staff - Introduction to PICH /Healthy Tukwila • April 2016— Recreation staff, 13 FT /PT staff- A Closer Look at the Childhood Obesity Epidemic: Viewing of Fed Up • June 2016— Recreation and Tukwila Community Center staff, 16 PT staff- A Closer Look at the Childhood Obesity Epidemic: Viewing of Fed Up • June 2016 — Parks and Rec Administration and Rec staff, 10 FT staff, Assessing our Food and Beverage Environment and Setting Goals for Improvement • June 2016 — Recreation youth program staff, 40 seasonal staff- How PICH is changing our environment and How to Be a Healthy Role Model Preschool: • Revised snack handout Revised snack policy Provided nutrition curriculum for use in fall Rec Time- youth recreation component in partnership with TSD summer school: • Proved 2 parent newsletters (hydration and healthy beverages) Camp Tukwilly Summer Camp: • Provided 10 weeks of healthy cooking lessons for kids facilitated by camp staff directors and teen Leaders in Training • Provided 10 weeks of nutrition activities for kids • Provided 10 weeks of parent newsletters on healthy eating • Integrated fruit and vegetable promotion into art activity Teen Night: • Hosted a taste testing of healthier food options for concession stand • Provided list of healthy snack and concession options to program supervisor Seniors: • Planning healthy cooking classes (4) • Partnering with the Tuesday Latino program to provide nutrition activities, games and education (beginning September) • Providing new healthy eating materials in Spanish for the Latino program 3 Rental Program: • Created a flyer for rental groups with healthy meeting suggestions, activity break ideas and walking path information. Community: • Created and signed up 1000 people including City staff, the business community, and families for a Healthy Tukwila Newsletter including tips and resources for Good, Healthy, Fun • Piloted family fitness series • Created list of healthy meal and snack offerings for community and special events • Hosted Healthy Tukwila community booth with interactive educational activities for all ages at 9 community events • Planning Family Wellness Workshops to begin in October which will include family fitness and cooking activities • Collaborated with Tukwila School District Food Services Director to identify a packet of educational resources for - educators related to fruits and vegetables • Investigating further partnership with Tukwila School District to explore nutrition education in schools • Partnered with Sounders 2 soccer team to encourage parents and youth of sports families to drink more water by giving away water bottles and free S2 tickets to families that signed a pledge to "ReThink Your Drink" Environment and Policy: • Removed 3 soda machines from TCC Installed 3 water - fountain /bottle refilling stations Changed contents of vending machine to include healthier options with less sugar, more whole ingredients, less salt. Dedicated one bulletin board in TCC lobby to USDA ten tip nutrition series and other healthy eating info. El To help make the healthy choice the easy choice for you, we've changed our vending options. Before Now 5 A ATTACHMENT B Exhibit B Scope of Work Amendment City of Tukwila Parks and Recreation (Healthy Tukwila project) Background: The U.S. Centers for Disease Control and Prevention (CDC) recently awarded Public Health — Seattle & King County (Public Health), Seattle Children's Hospital and the Healthy King County Coalition (HKCC) a Partnerships to Improve Community Health (PICH) grant. The three -year, $9 million grant will support efforts related to obesity prevention and tobacco prevention in order to improve the health of youth, families and communities. We will be working in King County and partnering with communities in Southeast Seattle and South King County. Obesity and tobacco are two of the leading causes of premature illness, death and health care costs across the nation and in King County. The PICH grant builds on previous Healthy Communities work by Public Health ( http:// www .kingcounty.gov /healthservices/ health /about /healthycommunities.aspx) as well as current community efforts to increase access to healthy foods and physical activity, reduce exposure to unhealthy foods and beverages, and reduce exposure to tobacco products. Public Health's Healthy Communities work focuses on health equity to ensure all King County residents have a fair chance to live long, healthy lives. Contractors will propose a set of activities that are designed to change organizational practices, policies and environments to make the healthy choice the easier choice. The activities are also designed to build new ways for various sectors such as education, housing, food systems, businesses etc. to interact in order to create healthier communities. Funding Period: The PICH grant is a three year project with three distinct periods of performance. This scope is for year 3. • Year 1: ending 9/29/2015 • Year 2: 9/30/2015- 9/29/2016 • Year 3: 9/30/2016 - 8/29/2017 The contract is renewed at the end of each period of performance contingent upon renewal of Public Health's federal award as well as contractor performance. Each period of performance has its own specific budget amount. Unused funds from one period of performance may not be carried forward to a subsequent period of performance. Final Year of PICH: This period of performance (September 30, 2016 - August 29, 2017) is the third and final year of the PICH grant. Below are key dates for this final year: June 1, 2017- The last day to submit a request to amend the year 3 contract. September 15, 2017- The fourth quarter progress report and any additional end of year reports are due to Public Health. • September 20, 2017- Final Invoice is due to Public Health. Project Summary: The Healthy Tukwila program will serve a Tukwila resident community of 19,000 and a business community of over 10,000, by providing the opportunity for the City of Tukwila Parks and Recreation Department to develop an education program, public awareness campaign and work toward policy changes to create a healthy food and beverage environment. CDIP4007- Amendment _-City of Tukwila Parks and Recreation Page 1 VA Method of Accountability: The Healthy Tukwila staff will meet in person or by phone with the Public Health project staff on a monthly basis, or more frequently as needed, to review project status using the Project Work plan (see below). Healthy Tukwila will complete progress reporting as described in this contract. Description of Contract Outcomes Outcome 1: The Healthy Tukwila program will train a total of 60 Tukwila Parks and Recreation Staff and Community Leaders to increase the awareness of harmful effects of sugar in foods and beverages of participants of Tukwila Parks and Recreation programs by September 29, 2017. Outcome 1 Milestones: Year 3 Milestones- Not final until contract is renewed for year 3 1. Develop and implement three "lunch and learn" workshops for City employees. 2. Develop two "healthy habits" workshops for part time /seasonal staff. 3. Implement plan to educate new staff upon hiring (on- boarding) regarding the Healthy Tukwila project (goals and outcomes). 4. Work with the Tukwila School District to identify and assess what strategies each organization is doing to promote a healthy food and beverage environment in the Tukwila community; determine how the organizations could partner to make improvements. Outcome 2: The Healthy Tukwila program will implement at least one policy change within the City of Tukwila Parks and Recreation department to improve the food and beverage environment for over 250 staff and over 10,000 participants by September 29, 2017. Outcome 2 Milestones: Year 3 Milestones- Not final until contract is renewed for year 3 1. Outcome achieved in Year 2. Outcome 3: The Healthy Tukwila program will conduct an education and awareness campaign regarding harmful effects of sugar in foods and sugary drinks reaching 8,000 Tukwila residents by September 29, 2017. Outcome 3 Milestones: Year 3 Milestones- Not final until contract is renewed for year 3 1. Develop and implement three family wellness workshops that are accessible and represent Tukwila's unique cultural makeup. 2. Conduct 5 community outreach and education activities with the Healthy Tukwila toolkit. 3. Develop and implement a business outreach plan that identifies and recognizes local businesses that support the Healthy Tukwila project. 4. Continue to implement customized toolkits to recreation program participants and park visitors. 5. Beginning in January 2017 dedicate one page of our quarterly Recreation Activities Guide to Healthy Tukwila (10,000 copies distributed three times per year). CDIP4007- Amendment _-City of Tukwila Parks and Recreation Page 2 Rl Additional Deliverables and Expectations: Report Monthly on Work Plan Progress The Healthy Tukwila program will provide a progress report on the agreed work plan to Public Health each month and will discuss progress with staff by phone or in person monthly. Healthy Tukwila and Public Health staff will meet in person at least quarterly. Healthy Tukwila will complete a final report at the end of the project period and complete other reporting as required by CDC per Public Health - for example, semi - annual reports. Work collaboratively and receive technical assistance Public Health, Healthy King County Coalition, and Seattle Children's Hospital will provide and coordinate technical assistance to support the outcomes in this contract. Healthy Tukwila will work with PICH staff to incorporate appropriate technical assistance into work plans and to identify assistance as needed as the project progresses. Examples of areas of technical assistance are: health equity, building partnerships, communications, evaluation, policy development, adapting or identifying evidence -based practices, and outcome - specific assistance. The three PICH agencies may provide assistance directly, coordinate assistance from a national CDC provider, coordinate peer -to -peer networks, and, in some cases, identify additional technical assistance providers. Participate in coalitions and task forces As it relates to the outcomes in this contract, Healthy Tukwila will work with Public Health staff to identify coalitions and task forces and participate as it benefits the work. The Healthy King County Coalition focuses on systems, policies, and environment issues in King County that affect healthy eating, active living, and tobacco use and exposure. Healthy Tukwila is invited to join HKCC and participate in a work group. Other organizations, coalitions, individuals or groups working on obesity, nutrition, physical activity or tobacco prevention may also participate on the HKCC. CDIP4007- Amendment _-City of Tukwila Parks and Recreation Page 3 n Communicate to advance Healthy Communities work Communications is a tool to support healthy community change among stakeholders, community partners and the public. Communication activities will be part of Healthy Tukwila work plans and should be linked specifically to each grantee's program objectives. Healthy Tukwila will co- develop communications plans. Healthy Tukwila should include budget for communications planning and activities. Healthy Tukwila will work with Public Health Communications staff to develop stories that reflect the successes of the policy, systems and environment changes taking place as a result of their accomplishments. In addition, Healthy Tukwila is encouraged to develop a communications plan when its work plan is finalized. A Communications Plan will identify: 1) A communications goal such as raising awareness of a potential policy change or promoting community actions, 2) Your target audience(s) 3) Key messages 4) Appeal or style of communication that will be most effective for reaching your audience 5) Channel(s) to effectively reach various audiences 6) Cultural and linguistic considerations to ensure your messages reach your audiences and 5) A plan to assess your efforts. Public Health Communications staff, along with support from Seattle Children's and the Healthy King County Coalition, are available to provide technical assistance as grantees develop and implement communications activities. Participate in other initiative -wide activities Healthy Tukwila will be invited to participate in initiative -wide activities, such as an annual Healthy Communities summit. Participate in evaluation activities Healthy Tukwila will name a person who will lead evaluation activities for this contract. Healthy Tukwila and the PICH Evaluation Team will work collaboratively to track the strengths and challenges of implementing PICH funded activities. Grantees will be expected to evaluate policy, systems and environmental changes and short - term outcomes (that happen during the contract period). The evaluation protocol and set of outcomes for the activities in this contract will be co- developed with input from stakeholders and is intended to provide Healthy Tukwila and PICH leadership with useful information for decision - making, planning and project management. Healthy Tukwila and PICH evaluator will develop evaluation activities that Healthy Tukwila will include in work plans and the budget. Healthy Tukwila will provide project data using agreed upon methods. These methods may include interviews, surveys, recording observations, tracking logs, estimates of use, and using documents to provide evidence of policy implementation. PICH evaluators will provide ongoing technical support. Invoice and report how PICH funds are spent Healthy Tukwila must have a financial system that is able to prepare reports and separate PICH funds from other organization expenses. Healthy Tukwila will bill Public Health for reimbursement of PICH expenses. Public Health cannot pay ahead for expenses. Documentation of all costs must be kept by Healthy Tukwila. CDIP4007- Amendment _-City of Tukwila Parks and Recreation Page 4 10 City of Tukwila Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: Community Affairs and Parks Committee FROM: Rick Still, Parks & Recreation Director BY: Robert Eaton, Parks & Recreation Manager CC: Mayor Ekberg DATE: September 7, 2016 SUBJECT: Parks & Recreation CIP Budget ISSUE Parks & Recreation Capital Improvement Program (CIP) Budget for 2017 — 2022. BACKGROUND During this cycle of the CIP budget, Parks & Recreation (P &R) staff have revamped the P &R portion of the CIP Budget. This was done to clean -up, simplify, and clarify the various plans in the budget. The changes are noted in this memo. A summarized list of the six changes includes; 1) some projects removed from the plan, 2) reordered existing project list, 3) name changes to existing projects, 4) new photos and /or maps on the CIP pages, 5) new CIP projects identified, and 6) reallocation of funds within the projects to better meet the City's and PROS Plan goals and current needs within the city. DISCUSSION In order of the list above, please find additional information on each of the changes made to the Parks & Recreation 301 Fund budget for the 2017 — 2022 cycle of the CIP (Attachment A). 1. In efforts to clean -up the P &R portion of the CIP budget, six project pages were removed from the plan. These projects were either relocated into the Public Works Department CIP Budget or removed as they were no longer applicable, merged with other projects or are not in the city's priorities for this 2017 — 2022 cycle. These projects include the following; "WRIA 9 Watershed Planning," "Duwamish Gardens," "Black River Trails Connector," "Ryan Hill Park," and "Nelson Salmon Habitat Side Channel." 2. Also in efforts to clean -up and simplify the P &R portion of the CIP budget, the list of projects was reordered so the more current and timely projects are listed first. 3. Two project pages were renamed to better reflect the intent of the project or plan however, currently neither of these have monies allocated to them. These projects are "Tukwila Pond Trail & Boardwalk" (pg. 39) and "Open Space Improvements" (pg. 43). 4. All pages also have new pictures and /or maps to provide better visual reference to the projects. 5. There are four new sheets added to the CIP budget plan for 2017 — 2022. These are, "Park Acquisition" (pg. 31), "Park Improvements" (pg. 33), "Municipal Arts Fund" (pg. 35), and "Dog Park Projects" (pg. 37). These were added as they reflect several of the City's and PROS Plan goals, and address some longstanding and current issues in Tukwila's Parks, Trails, & Open Space System. 11 INFORMATIONAL MEMO Page 2 6. As staff revamped and reviewed in detail the plans of the P&R CIP Budget there was significant reallocation of funds to reflect the priorities and meet identified goals of the City and PROS Plan. These reallocations will also help address the needs of Tukwila's aging Parks, Trails, & Open Space System. FINANCIAL IMPACT The overall budget is $4.46M over the next six years for the P&R portion of the 301 Fund CIP Plan. All of the funds in the plan come from the following funding sources; Grants, King County Levy, Mitigation, and REET 1. There is no general fund contribution to the P&R 301 Fund CIP Plan. RECOMMENDATION The Community Affairs and Parks Committee is being asked to review and forward the Parks & Recreation Capital Improvement Program 301 Fund section of the 2017-2018 Biennial Budget to the Committee of the Whole. ATTACHMENTS A. Proposed Parks & Recreation 2017 — 2022 CIP Budget for 301 Funds 12 WA2016 Info MernWP&R CIP Budget (9-7-16) MEMO.doc City of Tukwila CAPITAL IMPROVEMENT PROGRAM for 2017-2022 PARKS & RECREATION 301 Fund CIP Page # PROJECT TITLE 2017 2018 2019 2020 2021 2022 TOTAL * *Other Sources After Six Years Parks and Trails 30 Lake to Sound Trail 75 0 0 0 0 0 75 0 0 31 Park Acquisition 378 0 62 62 0 0 502 124 0 32 Multipurpose Trails 115 62 0 0 0 0 177 177 150 33 Park Improvements 330 330 295 220 220 220 1,615 70 220 34 Fort Dent Park 125 125 125 125 125 125 750 0 0 35 Municipal Arts Fund 50 0 0 0 0 0 50 306 0 36 Duwamish Hill Preserve * 26 24 18 30 30 10 138 78 7,997 37 Dog Park Projects 40 40 0 0 0 0 80 0 0 38 Parks, Recreation & Open Space Plan 0 0 125 0 0 0 125 0 0 39 Tukwila Pond Trail & Boardwalk * 0 0 0 0 0 0 0 0 3,664 40 Tukwila South Trail 0 0 1,000 0 0 0 1,000 1,000 0 41 Hand Boat Launches 0 0 0 0 0 0 0 0 1,821 42 Macadam Winter Garden & Wetland 0 0 0 0 0 0 0 0 1,000 43 Open Space Improvements 0 0 0 0 0 0 0 0 1,125 Grand Total 1,139 581 1,625 437 375 355 4,512 1,755 15,977 * Park Impact Fee List Projects (fees must be used within 10 years). ** Denotes other funding sources, grants, or mitigation. Park Impact Fees were effective January 1, 2009, per Ordinance 2366 Project sheets scheduled beyond 2022 can be found in the City's website under Changes from 2015 to 2017 CIP: Public Works Capital Improvement Program. New: 31 Park Acquisition 33 Park Improvements 35 Municipal Arts Fund 36 Dog Park Projects 43 Changed Open Space 5800 S 152nd St to Open Space Improvements Deleted: WRIA 9 Watershed Planning, moved to 412 Surface Water Duwamish Gardens, completed in 2016. See Chinook Wind in 412 Surface Water Salmon Habitat Restoration, folded into Green the Green in 412 Surface Water Black River Trail Connector, informal trail now exists and is part of Lake to Sound Trail. Ryan Hill Park, will be reevaluated with PROS Plan, see new Park Acquisition page 33 Nelson Salmon Habitat Side Channel, moved to 412 Surface Water 2017 - 2022 Capital Improvement Program 29 9/7/20161 3 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Lake to Sound Trail Project No. 91130101 Segment A of the regional Lake to Sound Trail that connects Lake Washington to Puget Sound. This DESCRIPTION: project features trail construction and improvements between Fort Dent Park and Monster Rd in Renton. Future trail planned along Southcenter Blvd. JUSTIFICATION: Meets PROS plan goal of a connected system. King County is paying for the design, construction management, and construction. City is paying for permit fees and tree relocation, as needed. STATUS: King County has finished design and has submitted construction permits in 2016. MAINT. IMPACT: To be determined. COMMENT: 1 % Municipal Arts fund for City funded construction costs to be included. FINANCIAL Through Estimated (in $000'sl 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Permits 11 50 61 Land (R /W) 0 Const. Mgmt. 0 Construction 25 25 TOTAL EXPENSES 1 0 11 1 75 1 0 0 0 0 0 0 86 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 REET 1 Funds 0 11 75 0 0 0 0 0 0 86 TOTAL SOURCES 1 0 11 1 75 1 0 0 0 0 0 0 86 1 4201 7 - 2022 Capital Improvement Program 30 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Park Acquisition Project No. 90930102 DESCRIPTION: Acquisition of land to preserve open space or park land for future generations. JUSTIFICATION: Provides for increased access to play spaces and helps to preserve green spaces for future generations. STATUS: Allows implementation of PROS Plan. Received $152k from the 2008 -13 KC Levy funds; and the next cycle 2014 -2019 of levy funds will be received through 2020. MAINT. IMPACT: To be determined COMMENT: If the next KC Levy funds renew in 2020 -2025, the acquisition program will continue. FINANCIAL Through Estimated (in $000'-1 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design - Land (R /W) 330 378 62 62 832 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 1 0 330 1 378 1 0 62 1 62 1 0 1 0 0 832 FUND SOURCES Awarded Grant 0 KC Parks Levy 152 62 62 276 Mitigation Actual 0 Mitigation Expected 0 REET 1 Funds 0 178 378 0 0 0 0 0 0 556 TOTAL SOURCES 0 330 378 0 62 62 0 0 0 832 2017 - 2022 Capital Improvement Program 31 15 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Multipurpose Trails Project No. 99930104 DESCRIPTION: Wide array of necessary trail improvements to the existing trail system infrastructure. JUSTIFICATION: Goal of the City in the PROS Plan is to provide parks and facilities that are safe and well maintained. STATUS: Preliminary work scheduled to begin in 2017. King County Levy funds will be utilized these improvements. MAINT. IMPACT: To be determined. COMMENT: Beyond includes geo -tech design and improvements. FINANCIAL Through Estimated (in Snnn'cl 2n15 2n16 2n17 2n1R 2n19 2n2n 2n21 2n22 RFYOND TOTAL EXPENSES Design 22 15 10 47 Land (R /W) 0 Const. Mgmt. 0 Construction 100 62 140 302 TOTAL EXPENSES 1 22 1 0 115 1 62 1 0 0 0 0 150 1 349 FUND SOURCES Awarded Grant 12 12 Proposed Grant 0 King County Levy 5 115 62 182 Mitigation Expected 0 REET 1 Funds 5 0 0 0 0 0 0 0 150 155 TOTAL SOURCES 22 0 115 62 0 0 0 0 150 349 1 6201 7 - 2022 Capital Improvement Program 32 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Park Improvements Project No. 91630103 DESCRIPTION: Park improvements at City parks throughout the system. May include play equipment replacement, shelters, park security cameras, and neighborhood play areas. JUSTIFICATION: Replacement and improvement of amenities in various parks throughout the City. STATUS: New project for 2017 - 2022 CIP. Program is scheduled to begin in 2017. MAINT. IMPACT: To be determined. COMMENT: REET funds to be used for this project. FINANCIAL Through Estimated (in $000'sl 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 30 30 25 20 20 20 20 165 Land (R /W) 0 Const. Mgmt. 0 Construction 300 300 270 200 200 200 200 1670 TOTAL EXPENSES 0 0 330 330 295 220 220 220 220 1,835 FUND SOURCES Awarded Grant 0 KC Parks Levy 70 70 Mitigation Actual 0 Mitigation Expected 0 REET1 Funds 0 0 330 260 295 220 220 220 220 1,765 TOTAL SOURCES 1 0 0 330 1 330 1 295 1 220 1 220 1 220 1 220 1 1,835 2017 - 2022 Capital Improvement Program 33 17 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Fort Dent Park Project Nos. 90330107 DESCRIPTION: 52 -acre regional park requires ongoing capital and maintenance improvements. King County transferred Fort Dent Park to the City in 2003. Concessionaire agreement with Starfire Sports to operate the complex. JUSTIFICATION: City is responsible for maintenance of the picnic area, parking lot, trail, pond, and all major park repairs and infrastructure. Funding of approximately $125K per year through 2022 is for a phased approach to parking lot repairs STATUS: in conjunction with the City's Annual Overlay and Repair Program, curbs and drainage. Project also includes sewer /water projects such as $992K designated for the BNSF Railroad sewer relocation (2016/17), $1,158M designated for Lift Station #6 (2019), and $634K designated for waterline replacement (2022). MAINT. IMPACT: Approximately 1,750 staff hours per year. COMMENT: 1 % Municipal Arts Fund for City funded construction costs to be included. FINANCIAL Through Estimated (in $000'-1 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 343 10 10 10 10 10 10 10 413 Land (R /W) 0 Const. Mgmt. 15 15 15 15 15 15 15 105 Construction 1,477 100 100 100 100 100 100 100 2,177 TOTAL EXPENSES 1 1,820 1 125 125 1 125 125 1 125 1 125 1 125 1 0 2,695 FUND SOURCES Awarded Grant 694 694 Parking Taxes 50 50 Mitigation Actual 0 Mitigation Expected 0 REET 1 Funds 1,076 125 125 125 125 125 125 125 0 1,951 TOTAL SOURCES 1,820 125 125 125 125 125 125 125 0 2,695 1 $2017 - 2022 Capital Improvement Program 34 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Municipal Arts Fund Project No. 91630105 DESCRIPTION: The Municipal Arts Fund captures 1 % of qualifying Capital Improvement Project funds not otherwise integrated into Capital Projects. JUSTIFICATION: Tukwila Municipal Code 2.30.050 STATUS: TMC 2.30.050 further defined the Municipal Arts Fund, a Public Arts Plan will be established in 2017. MAINT. IMPACT: To be determined. COMMENT: The Arts Commission is developing a Request for Proposals for a Public Arts Plan with funding in 2016/2017. FINANCIAL Through Estimated (in $000's1 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAI EXPENSES Permits 20 50 70 Land (R /W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 0 20 50 0 0 0 0 0 0 70 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Municipal Arts Fund Transfer 70 184 122 376 Mitigation Expected 0 REET 1 Funds 0 (50) (134) (122) 0 0 0 0 0 (306) TOTAL SOURCES 0 20 50 0 0 0 0 0 0 70 2017 - 2022 Capital Improvement Program 35 19 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Duwamish Hill Preserve Project No. 90330109 10.36 -acre parcel of open space allows for restoration of this site. Site is culturally and historically significant. DESCRIPTION: Partnership with Forterra (formerly Cascade Land Conservancy) to preserve the site. JUSTIFICATION: Meets the Parks and Open Space Plan providing cultural and historical value along the City's shoreline. Phase I development was completed in 2010. Phase II development to be completed in 2019, with future STATUS: work to possibly include a shelter. MAINT. IMPACT: Approximately 250 staff hours per year. 10 Phase 11 is on Park Impact Fee list for $2.51M with an 80/20 split. Sound Transit mitigation of $313K for use of the COMMENT: site. Grants of $765K ($50K KCD, $500 HCPF, $15 HCF, $200K 4Culture) with REET funds as a match. 1% 10 Municipal Arts fund for City funded construction costs to be included. Formerly known as Duwamish Riverbend 920 Hill, Poverty Hill, and Grandmother's Hill. FINANCIAL Through Estimated (in $000'sl 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 602 10 10 10 10 10 10 10 920 1,592 Land (R/W) 2,036 450 2,486 Const. Mgmt. 6 927 933 Construction 742 207 16 14 8 20 20 5,700 6,727 TOTAL EXPENSES 1 3,386 1 217 1 26 1 241 18 1 30 1 30 1 10 1 7,997 1 11,738 FUND SOURCES Awarded Grant 1,977 162 16 14 8 2,177 Proposed Grant 20 20 1,000 1,040 KC Parks Levy 599 599 Mitigation 313 313 Park Impact Fees 243 243 Park Impact Fees Expected 2,500 2,500 REET 1 Funds 254 55 10 10 10 10 10 10 4,497 4,866 TOTAL SOURCES 3,386 1 217 1 26 1 24 181 30 1 30 1 10 1 7,997 1 11,738 2 02017 - 2022 Capital Improvement Program 36 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Dog Park Projects Project No. 90930102 DESCRIPTION: Provide a dog park within Tukwila where resident can take their dogs off leash. The public has expressed a need for a dog park or off -leash dog area. PROS Plan identifies expanding JUSTIFICATION: opportunities within our current parks to meet the need of the community. It also recommends identifying a preferred location of an off -leash dog park. STATUS: During our 2015 -16 "See You in the Park" events, Crestview and Duwamish neighbors expressed interest. Further outreach will be needed to identify site and develop recommended amenities. MAINT. IMPACT: To be determined. COMMENT: King County Levy funds will be used towards this project along with City funds. 1 % Municipal Art fund for City funded construction costs to be included. FINANCIAL Through Estimated (in $000'sl 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 5 5 10 Land (R /W) 0 Const. Mgmt. 0 Construction 35 35 70 TOTAL EXPENSES 1 01 0 1 40 1 40 1 0 1 01 0 1 01 01 80 FUND SOURCES Awarded Grant 0 KC Parks Levy 0 Mitigation Actual 0 Mitigation Expected 0 REET 1 Funds 0 0 40 40 0 0 0 0 0 80 TOTAL SOURCES 0 0 40 40 0 0 0 0 0 80 2017 - 2022 Capital Improvement Program 37 21 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Parks, Recreation & Open Space Plan Project No. 81330101 DESCRIPTION: Prepare a citywide Parks, Recreation and Open Space Plan. JUSTIFICATION: A current six -year Open Space Plan is required to be eligible to apply for any state and federal park grants, and also serves as a planning document for the Parks department. STATUS: Most recent PROS Plan was adopted by City Council on 2/18/14. Next update in 2019 for 2020 adoption. MAINT.IMPACT: None. COMMENT: Planning tool to assist with the entire parks and recreation system. FINANCIAL Through Estimated (in $000'-1 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 98 125 223 Land (R /W) 0 Const. Mgmt. 0 Construction 0 TOTAL EXPENSES 98 0 0 0 125 0 0 0 0 223 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 REET 1 Funds 98 0 0 0 125 0 0 0 0 223 TOTAL SOURCES 98 0 0 0 125 0 0 0 0 223 Project Location., ', Entire System u i� 222017 - 2022 Capital Improvement Program 38 0 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Tukwila Pond Trail & Boardwalk Project No. 90330110 Phase 1 -III 90930101 Phase IV DESCRIPTION: The Tukwila Pond Concept Plan identified development to extend viewing platforms, construct trail and boardwalk and other amenities. JUSTIFICATION: Provides improved access to open spaces, gathering places, and enhances the Tukwila Urban Center. Phase I completed 2006. Phase II was completed in 2009 and included 50% design for park amenities and STATUS: feasibility study and design for water quality improvements. Phase III includes design of park improvements and buffer enhancement along Andover Park West. Phase IV includes final design and construction of park amenities. MAINT. IMPACT: To be determined. Wetland mitigation of $86,000 from WIG Properties and a 2008 King County grant for buffer enhancement. COMMENT: Phase IV is on Park Impact Fee list for $3 million with an 80 %/20% split. The goal is to start construction of the trail and boardwalk. 1 % Municipal Arts Fund for City funded construction included. FINANCIAL Through Estimated (in S000'sl 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 240 300 540 Land (R /W) 0 Const. Mgmt. 0 Construction 3,364 3,364 TOTAL EXPENSES 240 0 0 0 0 0 0 0 3,664 3,904 FUND SOURCES Awarded Grant 8 8 Proposed Grant 1,150 1,150 Mitigation Actual 86 86 Park Impact Fees 18 18 Park Impact Fees Expected 2,400 2,400 REET 1 Funds 128 0 0 0 0 0 0 0 114 242 TOTAL SOURCES 240 0 0 0 0 0 0 0 3,664 3,904 2017 - 2022 Capital Improvement Program 39 23 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Tukwila South Trail Project No. 91130101 DESCRIPTION: Construct trails along the Green River in the Tukwila South area. Trail provides a connected park and trail system and promotes healthy and active living for walking JUSTIFICATION: and biking. Improves trail access for those that will live, work, and play in the Tukwila South area. Easements to be received from developer. Developer should leave the easements near the final grade STATUS: for the trail. MAINT. IMPACT: To be determined. Tukwila South development has contributed $500K, but requires City matching funds and potential COMMENT: grant funding. FINANCIAL Through Estimated (in $000'sl 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 85 85 Land (R /W) 0 Const. Mgmt. 115 115 Construction 800 800 TOTAL EXPENSES 1 0 0 0 - 1 1,000 1 0 0 0 0 1,000 FUND SOURCES Awarded Grant 0 Proposed Grant 500 500 Mitigation Actual 0 Mitigation Expected 500 500 REET 1 Funds 0 0 0 0 0 0 0 0 0 0 TOTAL SOURCES 1 0 0 0 0 1,000 1 0 0 0 0 1,000 242017 - 2022 Capital Improvement Program 40 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Hand Boat Launches Project No. 90830101 DESCRIPTION: Construction of boat launches to provide access to the Green /Duwamish River for non - motorized craft. Launches will be constructed at Codiga Park, Christianson Road, and Fort Dent Park. JUSTIFICATION: The Parks, Recreation and Open Space Plan and the Shoreline Master Plan promote and encourage additional public access to the Green River. STATUS: Codiga Park will be the first hand boat launch constructed of these different proposed sites. MAINT. IMPACT: To be determined. COMMENT: Grant is Washington State Community Trade and Economic Development (CTED) for $20,000 for Codiga. FINANCIAL Through Estimated (in $000'sl 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 213 213 Land(R /W) 500 500 Const. Mgmt. 185 185 Construction 923 923 TOTAL EXPENSES 0 0 0 0 0 0 0 0 1,821 1,821 FUND SOURCES Awarded Grant 20 20 Proposed Grant 0 Donation 0 Park Impact Fees 0 City Oper. Revenue 0 0 0 0 0 0 0 0 1,801 1,801 TOTAL SOURCES 0 0 0 0 0 0 0 0 1,821 1,821 Project Location: r Entire System 2017 - 2022 Capital Improvement Program 41 J11-1 25 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: Macadam Winter Garden & Wetland Project No. 90330108 A small winter garden area on this 11 acre site with educational exhibits related to the wetland was completed DESCRIPTION: in 2007. Entire site purchased with 1989 King County Open Space funds with habitat cleanup recommended. JUSTIFICATION: To utilize this preserved area to educate and provide a small garden area to improve the wetland area. The Winter Garden was constructed in 2007. Phase II in beyond will include a trailhead from the Winter STATUS: Garden, a trail system, boardwalk, and kiosks. MAINT. IMPACT: To be determined. Received a $15,000 grant from Starbucks and Home Street Bank contributed $2,500 for signage. The COMMENT: remaining balance from Phase I came from extra REET funds collected in 2007. FINANCIAL Through Estimated (in $000'-1 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 50 80 130 Land (R/W) 0 Const. Mgmt. 120 120 Construction 374 800 1,174 TOTAL EXPENSES 424 0 0 0 0 0 0 0 1,000 1,424 FUND SOURCES Awarded Grant 18 18 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 REET 1 Funds 406 0 0 0 0 0 0 0 1,000 1,406 TOTAL SOURCES 424 0 0 0 0 0 0 0 1,000 1,424 2 6201 7 - 2022 Capital Improvement Program 42 PROJECT: DESCRIPTION: JUSTIFICATION: STATUS: MAINT. IMPACT: COMMENT: CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 Open Space Improvements Project No. 90930102 Acquisition of land to preserve open space or park land for future generations. To provide open space that provides linkage from a densely populated area to Tukwila Elementary School and a recreation area for the neighborhood. Acquisition of the 1.75 acre parcel was completed in November 2008. Future trails throughout this open space may be considered. Approximately 100 staff and 100 volunteer hours per year. FINANCIAL Through Estimated (in $000's1 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 90 90 Land(R /W) 150 150 Const. Mgmt. 135 135 Construction 900 900 TOTAL EXPENSES 150 1 0 1 0 1 0 0 1 0 0 1 0 1,125 1 1,275 FUND SOURCES Awarded Grant 0 Proposed Grant 0 Mitigation Actual 0 Mitigation Expected 0 REET 1 Funds 150 0 0 0 0 0 0 0 1,125 1,275 TOTAL SOURCES 150 0 0 0 0 0 0 0 1,125 1,275 ` Project Location: �. °'" ,Entire System 2017 - 2022 Capital Improvement Program 43 M 0 27 W. City of Tukwila Allan Ekberg, Mayor TO: Community Affairs and Parks FROM: Rick Still, Parks and Recreation Director CC: Mayor Ekberg DATE: September 7, 2016 SUBJECT: Municipal Arts Fund Update ISSUE An update regarding the Municipal Arts Fund. BACKGROUND The Tukwila Municipal Code was updated in 2014 to include section 2.30.050 Creation of Municipal Arts Fund for Capital Arts Projects. This title is commonly called the 1 % Art Fund where 1 % of all qualifying Capital Improvement Project funds are transferred to the fund if art not included within the project. For example, the construction costs for the Duwamish Hill Preserve (DHP) Phase II capital project were $494,746, 1 % equals $4,947. The City's funded portion of the project was $155,246, 1% equals $1,552. The City's contribution towards the artwork installed as part of this project was $12,635 ($28,329 total artwork costs Forterra contributed the balance) which is approximately 8% of the construction. The intent of the fund is to integrate artwork into capital projects, however where it is not possible then a contribution is made to the Municipal Arts Fund. DISCUSSION The Arts Commission is preparing a scope of work for a consultant to establish a city-wide Public Arts Plan to assist in the implementation of the Municipal Arts Fund. A Public Arts Plan will provide guidance on how to support artwork throughout the City that enhances quality of life while influencing the identity and image of the City. The scope will likely include an assessment of current artwork throughout the City and provide recommendations for how to implement the 1 % Art Fund. The scope may also include guidance for artwork criteria, selection process, and installation locations. The 301 Fund now includes a sheet for the Municipal Arts Fund, (page 40). FISCAL IMPACT Contract approval for a consultant to prepare the Public Arts Plan with our community may be coming to the City Council before the end of the year. It is anticipated that this project will be completed within current budget authorization however a budget amendment may be needed. RECOMMENDATION For information only CAP 9-12-16 29 30 FIRST QUARTER UPDATE COMMUNITY AFFAIRS AND PARKS SEPTEMBER 12, 2016 Overview Web and app -based portal for constituents to report issues Traditional ways of reporting issues remain, phone, email, in- person, etc. Cost was $11,712 for 12 months 197 issues reported as of September 7, 2016 134 were acknowledged; average time to acknowledge was 1.4 days 149 were closed; average time to close was 6.2 days Users 105 users to date, not including City staff Top non -City staff reporter has flagged eight issues Most people have reported a small handful Some users have not reported but are commenting Comment threads have allowed staff to gain and share more information Top reporting neighborhoods McMicken — 20% Tukwila Hill — 17% Cascade View — 15% Foster — 13% Riverton — 9% Thorndyke — 6% Allentown — 5% Duwamish — 4% Tukwila Urban Center — 4% Lowest repor Foster Point Intergate Interurban Avenue Corridor North Tukwila Ryan Hill Tukwila South i ng neighborhoods All reflect 6% of total issues reported Issues reported Illegal parking — 19% Other — 18% Code Enforcement (private Garbage /Debris — 11% Traffic signal /sign — 10% Speeding /traffic — 5% Pothole — 4% Overgrown brush — 4% Stormwater /sewer — 4% Camping — 4% 12% Graffiti — 3% Park issue — 2% Code Enforcement (public) — 2% Animal Control —1% Rental property concern —1% How people are repor City website — 29% !Phone — 28% Android — 19% City - initiated — 14% SeeClickFix website — 8% Mobile website — 2% i ng What we've learned Tweaks made to assignees, how issues are reassigned Worked with SeeClickFix to make Code Enforcement issues on private property private so that only the person reporting the issue and staff can see the report Continued outreach planned O Hazelnut O Utility bill insert • Spanish language flyers posted at Saar's, etc. O Ms. Gamboa's civics class Questions? .s City of Tukwila Allan Ekberg, Mayor TO: Community Affairs and Parks Committee FROM: Jack Pace, Community Development Director BY: Mary Hulvey, Code Enforcement Officer Hoa Mai, Code Enforcement Officer CC: Mayor Ekberg DATE: August 26, 2016 SUBJECT: Update on Parking Ordinances 2494 and 2495 ISSUE Update on parking ordinance implementation. BACKGROUND On February 1, 2016, the City Council approved a new parking ordinance no. 2494, which repealed Tukwila Municipal Code Section 9.28.020 — Commercial vehicles in residential areas. Also in 2016, City Council approved Ordinance no. 2495, which amended Tukwila Municipal Code Section 8.25.020 — Parking limitations. This ordinance states: "No more than six motor vehicles shall be parked on a single - family residential property of 13,000 square feet or less outside of a carport or enclosed garage for a period of more than 48 hours. For purposes of this section, "single- family residential property" means any parcel containing a single family residence or multiple parcels combined containing one single - family residence, typically identified by a single address located in the Low Density zone. The parking limitations in this subsection shall apply to all motor vehicles as defined by state law with the exception of motorcycles and mopeds." DISCUSSION Ord. 2494 — This year there have been 2 complaints about commercial vehicles parking in the driveway of a residential property. TMC 9.28.020 had previously prohibited the parking of commercial vehicles, such as semi - tractor trailers, in the parking lots of apartments and condominiums. This code also limited the number of commercial vehicles allowed to be parked on residential properties. The complaints were closed as there are no longer parking rules specific to commercial vehicles. Ord. 2495 — This code has only been used once since adoption. All other number of vehicle complaints involved properties that have over 13,000 square feet of property and /or vehicles parking on unimproved surfaces such as grass or dirt. The majority of the parking violations are for vehicles parked on unimproved surfaces on smaller lots. TMC 8.25.020 only allows 1,200 square feet or 10% of the lot surface, whichever is greater, to be used for approved durable parking surface. Tukwila has many residents with extended families, therefore, finding enough approved parking surfaces can be a problem. Also, many of our residents are economically disadvantaged and are unable to put in the required approved surface for parking. 41 INFORMATIONAL MEMO Page 2 This section will also need to be reconciled with the upcoming Low Impact Development (LID) stormwater regulations that seek to limit impervious surfaces, including both buildings and parking areas, to 75% of residential lots. FINANCIAL IMPACT None. RECOMMENDATION Review this standard and combine with other LDR standards for lot coverage, impervious surfaces and total parking permitted. 42 WA2016 Info Mernos\parklng.doc