HomeMy WebLinkAboutCAP 2016-09-26 Item 2A - Resolution - 2017 Permit Fee Schedule: Community Development and Public WorksCity of Tukwila Allan Ekberg, Mayor INFORMATIONAL MEMORANDUM TO: Community Affairs and Parks Committee FROM: Jack Pace, DCD Director BY: Nora Gierloff, Deputy DCD Director CC: Mayor Ekberg DATE: September 19, 2016 SUBJECT: Updated DCD and PW Permit Fees ISSUE Should Tukwila increase its land use permit fees and hourly inspection rates to reflect increased costs to provide development review services? BACKGROUND Salaries for represented employees will increase in 2017 by 90% of the increase in CP1—W (June) 2015-16. The CPI-W for that period is 2% and benefit costs have increased by an even higher percentage. The City's costs for processing credit card payment for permit applications have been increasing steadily to a projected $25,000 in 2016. This is expected to sharply increase over the next few years as we begin to allow online permit applications. DISCUSSION Staff is suggesting that the flat land use fees increase at the rate of the City's labor and benefit costs. Some other permit fees are based on the valuation of the work which itself reflects inflation so no adjustment is needed for them. A reduced fee is proposed for temporary sign permits. We have heard that the current fee is a barrier to small businesses in complying with the sign code. We have examined our processing of these permits and a reduction is justified and hopefully will increase compliance rates. The Finance and Technology Services Departments have reviewed the issue of passing through credit card fees as a surcharge to the applicant. They have decided to start with a 3% convenience fee and evaluate after the first year. FINANCIAL IMPACT The proposed fee increases will keep pace with the City's costs to provide these necessary services. RECOMMENDATION The Council is being asked to approve the resolution and consider this item at the October 10 2016 Committee of the Whole meeting and subsequent October 17 Regular Meeting Consent agenda. ATTACHMENT Draft Building /Electrical /Plumbing /Mechanical Permit Fee Resolution A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, REPEALING RESOLUTION NO. 1867, AND ADOPTING A CONSOLIDATED PERMIT FEE SCHEDULE. WHEREAS, the City Council adopted Resolution No. 1867 in 2015, establishing the City's current consolidated construction fee schedule; and WHEREAS, the City intends to update permit fees on an annual basis, with any increases tied to growth in City expenses for providing permit services; and WHEREAS, the City Council wishes to recover a portion of the City's costs for review and processing of permit applications; and WHEREAS, the City has adopted a biennial budget process; and WHEREAS, the City's primary cost for permit processing is employee salaries and benefits-, and WHEREAS, the Seattle Consumer Price Index (CPI-W) was 2% for the June 2015- 2016 period; and WHEREAS, the cost for employee benefits has risen by an even larger percentage; and WHEREAS, increasing the flat fee for permits by 2% will enable revenues to track with City costs; and WHEREAS, as more permit applicants are paying by credit card, the surcharge on these transactions has become a significant budget impact, and WHEREAS, the City intends to pass this convenience fee through to the permit applicants; and WHEREAS, the City will evaluate its surcharge procedures after a one year trial period; WAWord Processing\Resolutions\Consolidated permit fee schedule 2017-2018 9-15-16 NG:bjs Page 1 of 13 NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, HEREBY RESOLVES AS FOLLOWS: Section 1. Repealer. Resolution No. 1867 is hereby repealed, effective January 1, 2017. Section 2. For 2017 and 2018, the Technology Fee shall be set at 5% of the applicable permit fee. Section 3. Public Works fees will be charged according to the following schedule: PUBLIC WORKS FEE SCHEDULE PERMIT DESCRIPTION FEE Type A (Short-Term Non-profit) $ 50.00 +Technology Fee Type B (Short-Term Profit) $100.00 + Technology Fee Type C $250.00 application base fee, Technology Fee, plus (Infrastructure and Grading on Private Property four components based on construction value: and City Right-of-Way and Disturbance of City 1) Plan Review Right-of-Way) 2) Construction Inspection 3) Pavement Mitigation 4) Grading Plan Review See Public Works Bulletin Al for fee schedule. Type D (Long-Term) $100.00 + Technology Fee Type E (Potential Disturbance of $100.00 + Technology Fee Cit y Right-of-Wa y) Type F (Blanket Permits) $250.00 processing fee, plus $5,000.00 cash deposit, withdraw $100.00 per instance for inspection Franchise — Telecommunications $5,000.00 administrative fee Franchise — Cable $5,000.00 plus 5% of total revenue Street Vacation $1,200.00 Latecomer's Agreements $500.00 processing fee, plus 17% administrative fee, plus $500.00 segregation fee Flood Zone Control Permit $50.00 + Technology Fee WAWord Processing\Resolutions\Consolidated permit fee schedule 2017-2018 9-15-16 NG:bjs Page 2 of 13 El Section 4. Land use permit and processing fees will be charged according to the following schedule: LAND USE FEE SCHEDULE All peer review fees will be passed through to the applicant per TIVIC Section 18.50.200. Plus 2015 2016 2017 2018 Hearing Plus Decision Type Fees Fees Fee Fee Examiner Technology Fees Fee (TF) Type 1, 2 and 4 Decisions $5-94 $602 $614 $626 + TF SEPA MDNS Appeal $5-94 UQ $614 626 + TF Appeal of Sign Code Decision $9194 $602 $ql 4 IQ26 + TF Impact Fee Appeals: Fire $594 $642 $614 1626 + TF Pole/Banner Annual Renewal Parks $594 $602 $614 j626 + TF New Billboard Transportation $594 $602 $614 $626 + TF Master Sign Program—Admin Permanent $24-3 $249 $253 $258 + TF Temporary $406 $449 $40 41 + TF Pole/Banner Initial Application $243 $24-9 $253 $258 + TF Special Event $4-06 $409 $110 $112 + TF Pole/Banner Annual Renewal $53 $54 $55 56 + TF New Billboard $51791 $602 $614 626 + TF Master Sign Program—Admin $2473 $2-�-6 $2,260 R 3_06 + TF Master Sign Program—BAR $3T47-9 $3764-9 $3,620 $3,692 + TF W:\Word Processing\Resolutions\Consolidated permit fee schedule 2017-2018 9-15-16 NG:bjs Page 3 of 13 Administrative Public Hearing Major Modification Minor Modification $2,236 $2,281 $4,()()6 $4,086 $1,370 $1,397 $&22- $635 $2,327 $2,373 $4,168 $4,251 I'lus 11-453 $648 2015 2016 2017 2018 Hearing Plus Decision Type Fees Fees Fee Fee Examiner Technology (Type 3—TMC Section 18.56.140) Fees Fee (TF) Parking Standard for use not specified $57-9 $594 $603 $615 TUC Zone, Modifications + TF (TMC 18.28.250 D.4. d.1 and TMC 18.56. 100) Modification to TUC Corridor Standards $5-94 $602 $614 $626 Residential Parking Reduction + TF (TMC Section 18.28.130. C) $626 +HE + TF (TMC Section 18.56.065) Modification to TUC Open Space Regulations $5994 $6.0.2 $614 $626 Shared, covenant, Complementary Parking + TF (TMC Section 18.28.250 D.4.d) $626 + TF Reduction (TMC Section 18.56.070) Transit Reduction to Parking Requirements $554 $692 $614 $626 Parking Lot Restriping + TF (TMC Section 18.28.260. B. 5. b) $626 + TF (TMC Section 18.56.120) Administrative Public Hearing Major Modification Minor Modification $2,236 $2,281 $4,()()6 $4,086 $1,370 $1,397 $&22- $635 $2,327 $2,373 $4,168 $4,251 $1,425 11-453 $648 $661 • TF • TF • TF • TF Administrative Parking Variance $5-94 $682 $614 J626 +HE + TF (Type 2—TMC Section 18.56.140) Parking Variance $9M $1,008 $1,028 +HE + TF (Type 3—TMC Section 18.56.140) Parking Standard for use not specified $57-9 $594 $603 $615 + TF (TMC 18.28.250 D.4. d.1 and TMC 18.56. 100) Residential Parking Reduction W4 $602 $614 $626 +HE + TF (TMC Section 18.56.065) Shared, covenant, Complementary Parking $6.02 $614 $626 + TF Reduction (TMC Section 18.56.070) Parking Lot Restriping $51-94 $602 $614 $626 + TF (TMC Section 18.56.120) Variances $2,825 $2,882 $2,940 $2,998 +HE + TF (TMC Section 18.72) Environmentally Sensitive Areas Deviation, $44-95 $1,525 $1,556 $1,587 + TF Buffer Reduction (TMC Chapter 18.45) Reduced fee for LDR homeowners, no $594 $602 $614 $626 associated short plat Reasonable Use Exception $2,991 $3050 $3,111 $3,173 +HE + TF (TMC Section 18.45.180) Exception from Single Family Design Standard $584 $602 $614 $626 + TF (TMC Section 18.50.050) Special Permission Cargo Container $594 $602 $614 $626 + TF (TMC Section 18.50.060) Landscape Perimeter Averaging $594 $602 $614 $626 + TF (TMC Section 18.52.060) Tree and Landscape Modification Permit and $445 $447 $109 $111 + TF Exceptions (TMC Chapter 18.54) WAWord Processing\Resolutions\Consolidated permit fee schedule 2017-2018 9-15-16 NG:bjs Page 4 of 13 Plus 2015 2010 2017 2018 Hearing Plus | Decision Type | Foo» Fees | F�� | Fee | Examiner | Technology | | ~ | | | | Foes | Fee 0F | Boundary Line Adjustment $1,677 $1,710 $1,744 $1,779 + TF (TMC Chapter 17.08) Lot Consolidation $62-2 $6,35 $648 $661 + TF (TMC Chapter 17.08) $5-94 $6Q $614 M26 + TF (TMC Chapter 17.12) $4,986 $5,085 $5,187 $5,290 + TF Binding Site Improvement Plan $3,817 $3,893 $3,971 $4,050 +TF Planned Residential Development: Administrative (TMC Section 18.46. 110) $2,173 $2-,24-6 $2,260 12_306 + TF Minor Modification (TMC Section 18.46. 130) $544 $&Q2 $614 Jq26 + TF Major Modification (TMC Section 18.46.130) $2,425 $2,473 $2,522 $2,573 + TF Checklist $1,709 $1,743 $1,778 11_813 + TF SEPA Planned Action $594 $6Q $614 L626 + TF SEPA Addendum $5-94 $6Q $614 M26 + TF Sensitive Area Master Plan Overlay (TMC 18.45.160) $4,986 $5,085 $5,187 $5,290 + TF vx:\WnrdPmceso permit fee schedule 2017-2018 9-15-16 Page 5 of 13 Plus 2015 2010 2017 2018 nmunng *vua | Decision Type | Fouo Fees | Feu | Fee | Examiner | Technology| Fees Fee (TF) Substantial Development Permit: (TMC Chapter 18.44) Permit Exemption Letter, Shoreline $3,879 $243 $2-4-9 $253 $258 $4,117 + TF + TF (TMC Section 18.64.020) Conditional Use Permit, Shoreline $a797-9 $3,957 $4,036 $4,117 +HE + TF (TMC 18.44,050) + TF (TMC Chapter 18.66) Shoreline Tree Permit $4-07 $109 $111 + TF (TMC Chapter 18.44) $1,008 $1,028 + HE + TF (TMC Section 18.41.060) Shoreline Environment Redesignation $2,991 $3,050 $3,111 $3,173 + TF Conditional Use Permit $3,879 $3,957 $4,036 $4,117 +HE + TF (TMC Section 18.64.020) Unclassified Use Permit $4,986 $5,085 $5,187 $5,290 + TF (TMC Chapter 18.66) TSO Special Permission Use $96-9 $1,008 $1,028 + HE + TF (TMC Section 18.41.060) Compreherishie Plan Changes (TMC, Chapter 18. 8'4) Zoning Code Text Amendment $4,533 $4,624 $4,716 14_8 1_1 + TF Miscellaneous SeNices� and Charges Development Agreement $4T9-94 $2,034 $2,075 $2,116 + TF Code Interpretation (TMC Section 18.90.010) $348 $-z55 $362 JqQ9 + TF Zoning Verification Letter $-z&5 $362 1�69 + TF Legal Lot Verification $55-9 $57-0 $581 $593 + TF Preapplication Meeting $495 $4-94 $504 $514 + TF Mailing Fee to Generate Labels, per project $458 $467 $476 $486 Public Notice Mailing Fee per address for each $1 $1 $1 $1 mailing vvmword permit fee schedule zn17-2o189-1u1s Ell Page 6 of 13 Section 5. Building permit fees will be charged according to the following schedule: BUILDING PERMIT FEE SCHEDULE Total Valuation Building Permit Fees $1 to $500 $65.00 $66.30 + Technology Fee $501 to $2,000 $65.00 $66.30 for the first $500, plus $4.,�G_$:j.39 for each additional $100, or fraction thereof, to and including $2,000, + Technology Fee $2,001 to $25,000 $129:59 - $132.09 for the first $2,000, plus %-19 -60_$19.99 for each additional $1,000, or fraction thereof, to and including $25,000, + Technology Fee $25,001 to $50,000 $600A0­-_j612.41 for the first $25,000, plus $4-5-.�_$15.61 for each additional $1,000, or fraction thereof, to and including $50,000, + Technology Fee $50,001 to $100,000 $993-25 -_j1 002.92 for the first $50,000, plus $40-60_110.81 for each additional $1,000, or fraction thereof, to and including $100,000, + Technology Fee $100,001 to $500,000 541.83 for the first $100,000, plus $8:511$8.67 for each additional $1,000, or fraction thereof, to and including $500,000, + Technology Fee $500,001 to $1,000,000 O4.43 for the first $500,000, plus $7-.--00-a7.14 for each additional $1,000, or fraction thereof, to and including $1,000,000, + Technology Fee $1,000,001 to $5,000,000 $8-_443-25-_a8 61 2.12 for the first $1,000,000, plus $4:7-0 $4.79 for each additional $1,000, or fraction thereof, to and including $5,000,000, + Technology Fee $5,000,001 and up $27-,243725- $27,788.12 for the first $5,000.000, plus $4-59 $4.59 for each $1,000 or fraction thereof, + Technology Fee A. Non-Structural Plan Review Fee. A non-structural plan review fee shall be paid at the time of submitting plans and specifications for review. The non-structural plan review fee shall be 65% of the calculated permit fee as set forth in the permit fee schedule. The non-structural plan review fee specified herein is a separate fee from the permit fee and is in addition to the permit fee. B. Structural Plan Review Fee. Where a structural plan review is deemed necessary, a structural plan review fee shall be charged. The structural plan review fee shall be 35% of the calculated non-structural plan review fee. 10YOF NAME mm 17,4 • V im. WAWord Processing\Resolutions\Consolidated permit fee schedule 2017-2018 9-15-16 NG:bjs Page 7 of 13 9 deferral of all or • it • • of a required bufldiRg permit fee for - may ♦- provided the following Griteria are ••- a. The property owner must submit a teGhn*Gally GOrnplete building permit r • r • Glearly - . r • • - . • 11 and pay all required plaR review fees. • + building permit - being • • r + + . • deferral must be greater than $300,000. b. Before issuanGe of the building permit, the property owner must submit triffn-& + r r .r Mm \ i • . • r . + gff." RM \ • • 4 111111 + 0• .- •• .- - - - •� . •. r- •. - - .� . .- .. ••. . -. •. . r r •• - • r. •• i u u i r + • 0 • - - + a + a • . i - • r . • • r • • - • - • + • - • - • - . - - •. - • .+ - -.. . - r • •.+ - • • • • interest of the City, andloF te PrOteGt the publiG welfare, 3. The budding permit fee may be deferred up to 24 months after issuanGe-ef the building permit and must be paid before the City will issue a GertifiGate • • for • - building. I interest shall • +• • • deferred . permit fee. The interest rate shall be the same as the stated interest r • the Two Year +- Treasury • r • r building • - i . date . + . r intere-St shall be- GOMpounded aRRually and shall begin i a i . 'suanGe ef - building permit. WAWord Processing\Resolutions\Consolidated permit fee schedule 1 1 NG:bjs Page i of 10 5. The building permit +a, fra -sic -&acia�nMa, fee deferral A ­;+k agreemeRt be -a firn may GeRSOlid—ated &r -&nrL- ivawnn+ fn,=c -no zai+1iW!,n,&i-&, %I . . ......... 111111 1W ROURVERM MOZAPM12wit MONSO Fee $250 or less Section 6. Mechanical permit fees will be charged according to the following schedule: MECHANICAL PERMIT FEE SCHEDULE Valuation of • ON F7.9rTS110W.1112 "I"MON." mv Mechanical Permit Fee Contract Amount) 111111 51 Fee $250 or less + Technology Fee $251 to $500 $65-.00-_1§6.30 for first $250, plus $7-.83 $7.99 for each $100 or fraction ME $501 to $1,000 %84:6 $86..�29 for the first $500, plus $9.70_1q 8.7 for each $100 or fraction thereof, to and including $1,000, + Technology Fee Section 6. Mechanical permit fees will be charged according to the following schedule: MECHANICAL PERMIT FEE SCHEDULE Valuation of Work (Total Mechanical Permit Fee Contract Amount) $32—K-_113.15 for issuance of each permit (base fee) + Technology Fee $250 or less + Technology Fee $251 to $500 $65-.00-_1§6.30 for first $250, plus $7-.83 $7.99 for each $100 or fraction thereof, to and including $500, + Technology Fee $501 to $1,000 %84:6 $86..�29 for the first $500, plus $9.70_1q 8.7 for each $100 or fraction thereof, to and including $1,000, + Technology Fee $1,001 to $5,000 $424 19_$13Q.66 for the first $1,000, plus $-9-65_59.84 for each $1,000 or fraction thereof, to and including $5,000, + Technology Fee $5,001 to $50,000 $466-.7G-_$j70.03 for the first $5,000, plus $10..-05 $10.25 for each $1,000 or fraction thereof, to and including $50,000, + Technology Fee $50,001 to $250,000 $63s3 20 651.98 for the first $50,000, plus $8-40_$8.57 for each $1,000 or fraction thereof, to and including $250,000, + Technology Fee $250,001 to $1,000,000 $2,3-- 2-0 for the first $250,000, plus "__$L55 for each $1,000 or fraction thereof, to and including $1,000,000, + Technology Fee $1,000,001 and up $74_ 6s3 2-0 _J8,026.58 for the first $1,000,000, plus $6_70_16_.83 for each $1,000 or fraction thereof, + Technology Fee WAWord Processing\Resolutions\Consolidated permit fee schedule 2017-2018 9-15-16 NG:bjs Page 9 of 13 11 Section 7. Plumbing permit fees will be charged according to the following schedule: PLUMBING PERMIT FEE SCHEDULE Permit Issuance—Issuance of each permit (base fee) -.50--a33.15 + Technology Fee Unit Fee Schedule (in addition to base fee above: For one plumbing fixture (a fixture is a sink, toilet, bathtub, etc.) W700-_$66.30 + Technology Fee For each additional fixture $44-.00-_$14.28 + Technology Fee For each building sewer and each trailer park sewer $221-80-_125.30 + Technology Fee Rain water system - per drain (inside building) $44-.�08_114.28 + Technology Fee For each water heater and/or vent $44-.00--j14.28 + Technology Fee For each industrial waste pretreatment interceptor, including its $2970-0-_$28.56 + Technology Fee trap and vent, except for kitchen type grease interceptors For each grease interceptor for commercial kitchens $2-9:10 $29.68 +Technology Fee For each repair or alteration of water piping and/or water treating + Technology Fee equipment, each occurrence For each repair or alteration of drainage or vent piping, each $14.00-_$14.28 + Technology Fee fixture For each medical gas piping system serving one to five $92-40-_$�a3.64 + Technology Fee inlets/outlets for a specific gas For each additional medical gas inlets/outlets $4-6._116.52 + Technology Fee For each lawn sprinkler system on any one (1) meter including $249-..�_$29.68 + Technology Fee backflow protection devices therefor. For atmospheric-type vacuum breakers not included in lawn sprinkler backflow protection: 1 to 5 ........$14.00 + Technology Fee Over 5.......$14.00 for first 5 plus $3.25 for each additional + Technology Fee For each backflow protective device other than atmospheric type vacuum breakers: 2-inch diameter and smaller....... $29.10 + Technology Fee Over 2-inch diameter: ....... ........ $32.25 + Technology Fee WAWord Processing\Resolutions\Consolidated permit fee schedule 2017-2018 9-15-16 NG:bjs Page 10 of 13 12 Section 8. Fuel Gas Piping permit fees will be charged according to the following schedule: FUEL GAS PIPING PERMIT FEE SCHEDULE Permit Issuance For issuing each permit (base fee): ($0 if permit is in conjunction with a plumbing permit for an appliance with both plumbing and gas connection.) $32.50 $33.15 + Technology Fee Unit Fee Schedule O"dd4ion4o4ten44n-svbparagraph-7-. 1) For each gas piping system of one to five outlets + Technology Fee For each additional gas piping system outlet, per outlet $14.0)-_$14.28 + Technology Fee Section 9. Electrical permit fees will be charged according to the following schedule: ELECTRICAL PERMIT FEE SCHEDULE 1. NEW SINGLE-FAMILY DWELLINGS New single-family dwellings (including a garage) $1,55-0-8-5, _$155.91 +Technology Fee Garages, pools, spas and outbuildings $91:9-0-_$8_3.54 + Technology Fee Low voltage systems $59-65-_J61.05 + Technology Fee 2. SINGLE-FAMILY REMODEL AND SERVICE CHANGES Service change or alteration—no added/altered circuits $84-.9-0-_J83.54 + Technology Fee Service change $8 -1.90- $83.54 with added/altered circuits, plus $�-.94- $83.54 + Technology Fee $11.55 _$�00 for each added circuit (maximum permit fee $4&285 $156.00 ) Circuits added/altered without service change (includes up to $54,60.._K5.69 + Technology Fee 5 circuits) Circuits $5460-$55.69 added/altered without service change $54�0-_$55.69+ Technology Fee (more than 5 circuits); $7.65 for each added circuit (maximum permit fee $9&770 $1010.00 + Technology Fee� Meter/mast repair $66 .25-_J69.62 + Technology Fee Low voltage systems $53-9.Z5 -_$61.05 + Technology Fee WAWord Processing\Resolutions\Consolidated permit fee schedule 2017-2018 9-15-16 NG:bjs Page 11 of 13 13 3. MULTI-FAMILY AND COMMERCIAL (including low voltage) Valuation of $65&-.O�_$�6.30 + Technology Fee Work (Total Permit Fee Contract Amount) $8&-.25- $87.98 + Technology Fee $250 or less $65,-G0-_jq6.30 + Technology Fee • Base fee thereof, to and including $1,000, + Technology Fee • Each concession fee $4-G-W-_jj 1.02 + Technology Fee • Each ride and generator truck fraction thereof, to and including $5,000, + Technology Fee Inspections or plan review not specified elsewhere (one-half hour $66_5G�1§7 83/hour minimum). Safety_inspe��Visions. fraction thereof, to and including $50,000, + Technology Fee Adult family home inspection (paid at the time of scheduling the $66.5 )_$§7.83 inspec fraction thereof, to and including $250,000, + Technology Fee Disaster recovery emergency repair permit (residential structures $20.00 or fraction thereof, to and including $1,000,000, + Technology Fee Over $1,000,000 $10,ZIA47G-_��49�.51 plus 0.5% of cost over $1,000,000, + Technology Fee 4. MISCELLANEOUS ELECTRICAL PERMIT FEES Temporary service (residential) $65&-.O�_$�6.30 + Technology Fee Temporary service/generators $80-.90- $82.52 + Technology Fee Manufactured/mobile home parks and RV park sites, each service $8&-.25- $87.98 + Technology Fee and feeder • Base fee + Technology-Fee • Each concession fee $4-G-W-_jj 1.02 + Technology Fee • Each ride and generator truck $4-0� $11.02 + Technology Fee Inspections or plan review not specified elsewhere (one-half hour $66_5G�1§7 83/hour minimum). Safety_inspe��Visions. Adult family home inspection (paid at the time of scheduling the $66.5 )_$§7.83 inspec Disaster recovery emergency repair permit (residential structures $20.00 vvmvom permit fee schedule 2017-2018 9-15-16 NG:bjs Page 12 of 13 Section 10. Other inspections and fees will be charged according to the following schedule: OTHER INSPECTIONS AND FEES Inspections outside of normal business hours (three hour minimum charge) $100. 0Q_$102.00/hour Re-inspection fee $67.83 hour Inspection for which no fee is specifically indicated—investigations or safety $66-50 $67.83/hour inspections Additional plan review required by changes, additions, or revisions to approved $66-50 $67.83/hour plans (minimum charge one-half hour) Work commencing before permit issuance shall be subject to an investigation fee 100% of the permit fee equal to 100% of the permit fee. Plan review fee—Mechanical, Plumbing, Fuel Gas Piping and Electrical: The fee for review shall be 25% of the total calculated permit fee. The plan review fee is a separate fee from the permit fee and is required when plans are required in order to document compliance with the code. Work covered without inspection or work not ready at the time of inspection may be charged a re-inspection fee of $66.50. Expired permit final — includes two inspections $133.00 Expired permit final — each additional inspection $66-.68 _$67.83 Minor residential remodel plan review and permit (projects up to $20,000) $20.00 Section 11. Credit Card Surcharge. If payment is made by credit card, a processing fee of 3% will be added to the total order. Section 12. Effective Date. This resolution and the fee schedules contained herein shall be effective as of January 1, 2017. PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a Regular Meeting thereof this day of 7 2016. ATTEST /AUTHENTICATED: Christy O'Flaherty, MMC, City Clerk APPROVED AS TO FORM BY: Rachel B. Turpin, City Attorney Joe Duffie, Council President Filed with the City Clerk: Passed by the City Council: Resolution Number: WAWord Processing\Resolutions\Consolidated permit fee schedule 2017-2018 9-15-16 NG:bjs Page 13 of 13 15