HomeMy WebLinkAboutCOW 2016-09-26 Item 3B - Contract Supplement #5 - South 144th Street Phase II Design and Rebid with KPG Inc for $78,250.38COUNCIL AGENDA SYNOPSIS Meetin Date Prepared by Ma or's review "I review 09/26/16 BG- F] Resolution Mtg Date F-1 Ordinance Mtg Date 10/03/16 BG ❑ Other Mtg Date SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&R ❑ Police ® PWI SPONSOR'S This Supplemental Agreement No. 5 with KPG is for additional design work and rebidding SUMMARY of the South 144th St Phase II Project. Additional design will incorporate cost saving measures as well as contract coordination with Tukwila Village and Seattle City Light. Council is being asked to approve Supplemental Agreement No. 5 to Contract #14 -103 with KPG for $78,250.38. REVIEWED BY ❑ COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte ® Transportation Cmte ❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm. DATE: 09/19/16 COMMITTEE CHAIR: DENNIS ROBERTSON RECOMMENDATIONS: SPONSOR/ADMIN. Public Works COMMIT rrE Unanimous Approval; Forward to Committee of the Whole COST IMPACT / FUND SOURCE EXPENDITURI? REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $78,250.38 $1,607,000.00 $0.00 Fund Source: 104 ARTERIAL STREETS (PAGES 14, PROPOSED 2017 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 09/26/16 ITEM INFORMATION ITEMNO. CAS NUMBER: STAFF SPONSOR: BOB GIBERSON ORIGINAL AGENDA DATE: 09/26/16 AGENDA ITEMTITL,E South 144th St Phase II Project (42nd Ave S to Tukwila Int'I Blvd) Supplemental Agreement No. 5 with KPG CATI''?GOItY ®Discussion Mtg Date 09126116 ®Motion Mtg Date 10103116 F] Resolution Mtg Date F-1 Ordinance Mtg Date ❑ Bidlvard Mtg Date F-1 Public Hearing Mtg Date ❑ Other Mtg Date SPONSOR ❑ Council ❑ Mayor ❑ HR ❑ DCD ❑ Finance ❑ Fire ❑ IT ❑ P&R ❑ Police ® PWI SPONSOR'S This Supplemental Agreement No. 5 with KPG is for additional design work and rebidding SUMMARY of the South 144th St Phase II Project. Additional design will incorporate cost saving measures as well as contract coordination with Tukwila Village and Seattle City Light. Council is being asked to approve Supplemental Agreement No. 5 to Contract #14 -103 with KPG for $78,250.38. REVIEWED BY ❑ COW Mtg. ❑ CA &P Cmte ❑ F &S Cmte ® Transportation Cmte ❑ Utilities Cmte ❑ Arts Comm. ❑ Parks Comm. ❑ Planning Comm. DATE: 09/19/16 COMMITTEE CHAIR: DENNIS ROBERTSON RECOMMENDATIONS: SPONSOR/ADMIN. Public Works COMMIT rrE Unanimous Approval; Forward to Committee of the Whole COST IMPACT / FUND SOURCE EXPENDITURI? REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $78,250.38 $1,607,000.00 $0.00 Fund Source: 104 ARTERIAL STREETS (PAGES 14, PROPOSED 2017 CIP) Comments: MTG. DATE RECORD OF COUNCIL ACTION 09/26/16 10/03/16 MTG. DATE ATTACHMENTS 09/26/16 Informational Memorandum dated 09/16/16 KPG Supplemental Agreement No. 5 to Contract #14 -103 S 144th St Phase II CIP page 14, Proposed 2017 Minutes from the Transportation Committee meeting of 9/19/16 10/03/16 13 14 City of Tukwila Allan Ekberg, Mayor A - TO: Transportation Committee V I FROM: Bob Giberson, Public Works Director B!J BY: Cyndy Knighton, Senior Program Manager CC: Mayor Ekberg DATE: September 16, 2016 SUBJECT: S 144 St Phase 11 Project Project No. 99510402, Contract No. 14-103 Supplement Agreement No. 5 ISSUE Approve Supplemental Agreement No. 5 with KPG for additional design work and rebidding of the S 144th St Phase 11 Project in the amount of $78,250.38. BACKGROUND KPG completed design for the S 144th St Phase 11 Project in early 2016 and the project was advertised for construction bids. Bids were opened on June 7, 2016 with only two bids received. Both bidswere over budget and subsequently rejected by Council by Resolution No. 1885. DISCUSSION KPG's Supplemental Agreement No. 5 includes the redesign work necessary to bring this project to a second advertisement in late fall of 2016 for a 2017 construction window. The redesign work will incorporate cost saving measures as well as updated contract specifications that outline coordination between the City's roadway improvement project and the ongoing construction of Tukwila Village and King County Library. Design for Seattle City Light's (SCL) facilities, which SCL wishes to upgrade concurrent with the City's project, is also included in the supplement. This work is reimbursable from SCL and will be brought forward in a future Memorandum of Agreement that is currently being finalized. Financial Impact Supplement No. 5 is for $78,250.38 and includes $29,563.90 (reimbursable) for Seattle City Light design work and $48,686.48 in Tukwila redesign/rebidding costs. Staff is proposing to use a portion of the currently budgeted 2016 construction funding (CIP sheet attached) to proceed with this redesign work. The proposed 2017 budget sheet (attached) will reestablish a complete budget and includes approximately $362,000 in additional Traffic Impact Fees that are anticipated to be collected for the Tukwila Village site development. RECOMMENDATION Council is asked to approve Supplemental Agreement No. 5 with KPG in the amount of $78,250.38 for the S 144th St Phase 11 Project and consider this item at the September 26, 2016 Committee of the Whole and subsequent October 3, 2016 Regular Meeting. Attachments: Supplemental Agreement No. 5 CIP Sheets (2) wApw eng\projects\a- rw & rs projects\s 144th st phase 1i tib - 42nd ave s (99510402 95-rw02)\design\mfo memo kpg sup #5 09-16-16.docx 15 16 City of Tukwila Agreement Number: • 6200 Southcenter Boulevard, Tukwila WA 98188 CONTRACT FOR SERVICES Amendment #5 Between the City of Tukwila and KPG Inc. That portion of Contract No. 14-103 between the City of Tukwila and KPG Inc. is amended as follows: Section 2: Scope of Services shall be supplemented with the following: The Consultant agrees to perform the services, identified on Exhibit A-5 attached hereto, including the provision of all labor, materials, equipment and supplies. Section 4: Payment shall be modified as follows: A. Payment for the work provided by the Consultant shall be made as provided in Exhibit B-5, attached hereto, provided that the total amount of payment to the Consultant for this work shall not exceed $78,250.38 without express written modification of the Agreement signed by the City. The new total contract shall not exceed $425,404.35 without express written modification of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this day of CITY OF TUKWILA Allan Ekberg, Mayor ATTEST /AUTHENTICATED City Clerk CA: 2012 04111 CONTRACTOR Printed Name/Title: mffl ' • •vkni City Attorney Page I of I 17 EXHIBIT A -5 City of Tukwila S 144th Street Phase II Project 42nd Avenue S to Tukwila International Boulevard Supplement No. 5 — SCL Design, Tukwila Village Coordination, and Re -Bid KPG Scope of Work August 15, 2016 PURPOSE: Bids received for the S 144th Street Phase II were rejected due to a lack of bidder interest and high prices in summer 2016. This Supplement is provided to perform Seattle City Light design, provide ongoing coordination for right of way improvements performed by the Tukwila village developer, additional right of way services, and to complete Plans, Specifications, and Estimates for re -bid and construction of the S 144th Street Phase II Project and incorporate the following new elements of work: • Construction of Tukwila Village improvements within the S 144th Street Right of Way has required additional coordination, design, and survey updates to reflect recently constructed right of way improvements into the project bid documents. Seattle City Light (SCL) has requested duct and vault design to be incorporated into the City project. Costs for this design is anticipated to be paid by SCL under an agreement that is being prepared between the City and SCL. The total estimated cost for SCL design services is $29,563.90 as identified in Task 6.10 of this supplement. • The City would like to provide retrofit water quality treatment to the extent feasible for the project area. The total estimated cost for water quality retrofit is $5,110.54 as identified in Task 6.9 of this Supplement. Additional title work is required to complete the right of way acquisition necessary for this project. • Update of bid documents for re -bid in November 2016 and provide bid period City of Tukwila Page 1 of 3 KPG 18 S 144th Street Phase H Project Supplement No. 5 811512016 SCOPE OF WORK: Task 2 Survey and Base Mapping. 2.7 The Consultant shall perform field utility locates and survey features installed by the recent Tukwila Village project within the S 144th Street right of way. Field Survey and Note Reduction. Perform note reduction of the field survey data. No survey updates are anticipated outside of the right of way as this area is currently under construction and constantly changing. 2.8 The Consultant shall update mapping work to prepare 1"=20' topographic base map and digital terrain model (DTM) in AutoCAD format to include the recent improvements described above. Task 3 Public Outreach 3.5 The Consultant shall provide ongoing coordination with Tukwila Village construction activities within the S 144th Street right of way and create a plan sheet to be included in the bid documents outlining key coordination elements and schedule constraints. This may include attendance at meetings, review and comment on developer utility plans and other services requested by the City. Coordination plan sheet will be updated to reflect conditions at time of re-bid. Task 6 Final Plans, Specifications and Estimates 6.9 The Consultant shall analyze feasibility and provide final design for water quality treatment facilities to retrofit the entire project site to the maximum extent feasible utilizing Modular Wetland or similar type facilities. 6.10 Seattle City Light (SCL) and the City have agreed to install new underground facilities within the project limits. The Consultant shall prepare final plans, specifications, and estimates for SCL duct and vault plans. This task shall include coordination meetings, preliminary design submittal, and incorporation of SCL comments into the final design. The SCL work will be included as a separate bid schedule in the City project. 6.11 The City will provide any comments on the previous bid set for inclusion in the final bid documents. Update Plans, Specifications, and Estimates for Re-bid of project in November, 2016. Updates are anticipated to include current developer coordination status, traffic control revisions / detour plan developed in collaboration with the City, and planter revisions in front of the former library site as requested by the City. City of Tukwila Page 2 of 3 KPG S 144th Street Phase H Project Supplement No. 5 811512016 19 6.12 Bid documents will be uploaded to bxwa.com for advertisement by the City. The Consultant shall provide bid period services to include responses to bidder inquiries, preparation of addenda, attendance at bid opening, preparation of bid tabulation, and recommendation to award or reject the apparent low bidder. The budget assumes a straight forward review process with the low bidder receiving the contract award. Task 8 Right of Way Calculations 8.7 Three (4) additional title reports are required to complete right of way determination compared to original scoping. The Consultant shall obtain the necessary title reports, review, and incorporate into mapping as required. Additional Services The City may require additional services of the Consultant in order to advance all or portions of the project corridor through final design and construction. This work may include items identified in the current task authorizations as well other items, which may include, but are not necessarily limited to the following: ♦ Condemnation support ♦ Additional design / developer coordination ♦ Providing additional permitting or environmental studies ♦ Providing construction services These services will be authorized under a future contract supplement if necessary. At the time these services are required, the Consultant shall provide a detailed scope of work and an estimate of costs. The Consultant shall not proceed with the work until the City has authorized the work and issued a notice to proceed. City of Tukwila Page 3 of 3 KPG 20 S 144th Street Phase 11 Project Supplement No. 5 811512016 HOUR AND FEE ESTIMATE Project: City of Tukwila S 144th Street Phase 11 42nd Avenue S to Tukwila International Boulevard Supplement No. 5 - SCL Design and Tukwila Village Coordination EXHIBIT B -5 KPG • Architecture • Landscape Architecture • Civil Engineering • Task1 - Manactement/coordination /administration No changes to this task 0 0 0 0 0 0 0 0 0 - $ - Mileage 2 4 0 20 Reproduction 0 0 0 $ 2,737.40 Utility locate service $ 100.00 Reproduction $ - Task Totals 0 1 0 0 0 0 0 0 0 0 $ - Task 2 - Survey and Ma in 2.7 Additional mapping for Town Center improvements 0 2 4 0 0 0 20 0 0 $ 3,547.76 2.8 Base map and DTM updates 0 2 4 0 20 0 0 0 0 $ 2,737.40 Utility locate service $ 100.00 Reproduction $ - Mileage $ - Task Total 8 16 80 0 16 $ - Reproduction 0 8 $ 16,623.98 Task Total 0 0 0 0 ( $ - Task Totals 0 4 8 0 20 0 20 0 1 0 1$ 6,285.16 Task 3 - Public Outreach 3.5 Developer coordination during construction 8 16 80 0 16 16 0 0 8 $ 16,523.98 Mileage $ 100.00 Reproduction _ $ - Task Total 8 16 80 0 16 16 0 0 8 $ 16,623.98 Task 4 - Traffic Analysis No changes to this task 0 0 0 0 0 0 0 0 0 $ - Mileage $ - Reproduction _ $ - Task Total 0 0 0 0 0 0 0 0 0 $ - Task 5 - Geotechnical Report No changes to this task 0 0 0 0 0 0 0 0 0 $ - GeoDesign $ - Mileage _ $ - Reproduction $ - Task Total 0 0 0 0 0 0 0 0 0 $ - 8/15/2016 IIV HOUR AND FEE ESTIMATE Project: City of Tukwila S 144th Street Phase II 42nd Avenue S to Tukwila International Boulevard Supplement No. 5 - SCL Design and Tukwila Village Coordination EXHIBIT B -5 KPG • Architecture • Landscape Architecture • Civil Engineering • Task 6 - Final Plans, Specifications, and Estimates 6.9 Water Quality Retrofit design 0 8 24 0 12 0 0 0 0 $ 5,110.54 6.10 Prepare SCL Plans, specs, and estimate 8 40 80 0 60 80 0 0 4 $ 29,563.90 6.11 Update plans, specs and estimate for re -bid 4 24 40 0 20 20 0 0 2 $ 12,638.25 6.12 Bid period services 4 8 8 4 8 0 0 0 2 $ 4,236.39 Mileage 6 0 0 0 0 0 0 $ 2,692.15 _ $ 100.00 Reproduction $ 1,000.00 Task Total 16 80 152 4 100 100 0 0 8 $ 52,649.08 Task 7 - Environmental No changes to this task 0 0 0 0 0 0 0 0 0 $ - Mileage $ - Reproduction Reproduction $ - Task Total 0 0 0 0 0 0 0 0 0 $ - Task 8 - Riaht of Wav Calculations 8.1 Additional title research 0 0 6 0 0 0 0 0 0 $ 692.15 Additional title reports (4) $ 2,000.00 $ - Mileage Reproduction $ - Task Total 0 0 6 0 0 0 0 0 0 $ 2,692.15 * Hourly rates are based on the following: Direct Salary Costs Overhead Rate Fixed Fee Total Estimated Fee: $ 78,250.38 $ 65.00 $ 52.06 $ 41_83 $ 45.67 $ 36.06 145.78% $ 31.25 $ 50.75 $ 40.87 $ 26.92 30% Totals $ 27,939.07 $ 40, 729.58 $ 8,381.72 8/15/2016 CITY K3FTUKW|LA CAPITAL PROJECT SUMMARY FINANCIAL Through Estimated . (in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 345 97 442 Land (R/W) 31 crl( 38 69 0-) S Const. Mgmt. 350 091, 350 Construction 2,248 rop, 2,248 FUND SOURCES Awarded Grant 186 964 1,150 Sea City Light 29 206 235 Frontage/SSWM 781 781 Traffic Impact Fees 190 22 321 533 @ Project Location ro/r'2u22Capital Improvement Program 14 ���� ~-~ 2017 to 2022 PROJECT: S 144 St Phase N (42 AveS - TukVvi|a Kmt'| Bh/d) ° Project No. 99510402 Zone DESCRIPTION: Construct curb, gutter, sidewalk, bike lanes, pavement restoration, illumination, drainage and utility undergrounding from Tukwila Ind Blvd to 42nd Ave S. Also add a signal at 42nd Ave S. JUSTIFICATION: Provide pedestrian and vehicle safety, drainage and neighborhood revitalization. STATUS: Phase |- Tukwila |nt'| Blvd to Military Rd, project completed in2Oo7 for o31 million with $1 million ingrants. Phase ||-42 Ave GN Tukwila International Blvd. K0A]NT.|K0PACT: Reduce pavement, drainage repairs, and maintenance costs. Awarded Tnanopo��ion|mpmvemer�Board's A�eha||mpmvomon1Pmgnam(\|P)gmntof$1 million. . Project is on Impact Fee list. Design and construction related to the Tukwila Village project. FINANCIAL Through Estimated . (in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Design 345 97 442 Land (R/W) 31 crl( 38 69 0-) S Const. Mgmt. 350 091, 350 Construction 2,248 rop, 2,248 FUND SOURCES Awarded Grant 186 964 1,150 Sea City Light 29 206 235 Frontage/SSWM 781 781 Traffic Impact Fees 190 22 321 533 @ Project Location ro/r'2u22Capital Improvement Program 14 ���� ~-~ FINANCIAL Through Estimated EXPENSES CITY OFTUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: S 144 St Phase U| (42 Ave S - Tmkm/ila Umt'| Blvd) ° Project No. 99510402 Zone DESCRIPTION: Construct curb, gutter, sidewalk, bike lanes, pavement restoration, illumination, drainage and utility undergrounding from Tukwila Int'l Blvd to 42nd Ave S. Also add a signal at 42nd Ave S. JUSTIFICATION: Provide pedestrian and vehicle safety, drainage and neighborhood revitalization. 345 Phase |- Tukwila |nt'| Blvd yo Military Rd, project completed in2OO7 for n3J million with $1 million ingrants. Phase STATUS: U-42 Ave 8to Tukwila International Blvd. MA|NT IMPACT: Reduce pavement, drainage repairs, and maintenance costs. Awarded Tranopo��ion|mpmvamentBoard's A�aha||mpmvemer�Pmgmm(A|P)gmnt��$1miUion. �OK0K0�NT' ' Project is on Impact Fee list. Design and construction related to the Tukwila Village project. FINANCIAL Through Estimated EXPENSES Design 345 55 400 Const. Mgmt. 350 350 Construction 2,325 2,325 FUND SOURCES Awarded Grant 186 964 1,150 Sea City Light 26 206 232 Frontage/SSWM 781 781 Traffic Impact Fees 190 22 321 533 ;7roject Location 242017 - 2022 Capital Improvemen Program 14 TRANSPORTATION COMMITTEE Meeting Minutes City Council Transportation Committee September 19, 2016 - 5:30 p.m. - Foster Conference Room, 6300 Building Councilmembers: Dennis Robertson, Chair; Verna Sea[, De'Sean Staff: David Cline, Bob Giberson, Pat Brodin, Robin,Tschrnak, Jaimie Reavis, Minnie Dhakwal, Scott Bates, Gait Labanara, Peggy McCarthy, 4'Vjcky Carlsen, Laurel Humphrey CALL TO ORDER: Acting Committee Chair Robertson, e"d; th e meeting to order at�, m 1. PRESENTATIONS 14 g $48,686.48 in TukwiL6,,"r,-edesigh,/,,,,,"r"'i"6"bi, f%ng costs Finds for the supplement will come from the 20' budget has been revised to include $362,000 in /a Tukwila Village. UNANIMOUS APPROVAL. FORWARD TO 5MBER 26, 261 COMMlTEE OF THE WHOLE. The C' ffifnittee continu&-discussion of the draft Transit Network Plan. The next step for the Plan is to solicit addition' t./j ublic feedback regarding the conclusions and recommendations, and then present a reutsd draft to the Committee at a later date. The Committee requested no additional chanesrat this time. COMMITTEE DISCUSSION ONLY. 25