Loading...
HomeMy WebLinkAboutSEPA E2000-015 - SABEY CORPORATION - EXODUS TI OF EXISTING WAREHOUSE FOR WEBE2000 -015 EXODUS- SEATTLE 3 SABEY CORPORATION 3355 S. 120 '° ST. 1 City of ThkwII Steven M. Mullet, Mayor Department of Community Development Steve Lancaster, Director August 9, 2000 NOTICE OF DECISION To: Laurent Poole, Applicant for Sabey Corporation Steve Black, Contact for Sabey Corporation King County Assessor, Accounting Division State Department of Ecology, SEPA Division This letter serves a notice of decision that the application to designate the tenant improvement and associated fuel tanks and backup generators for Exodus Communications as a planned action is issued pursuant to TMC 21.04.156. PROJECT BACKGROUND FILE NUMBER: E2000 -015 Planned Action APPLICANT: Laurent Poole, Sabey Corporation REQUEST: Determine that the construction activities fall under the Manufacturing/ Industrial Center planned action criteria and therefore no additional SEPA review is required. LOCATION: 3355 S. 120"' Place, International Gateway East PROJECT DESCRIPTION: Tenant improvement to an existing high bay warehouse building to convert it to an interne hosting business. A new 2nd and 3`d floor will be added within the existing building envelope. Mechanical and electrical systems will be upgraded, including new HVAC equipment and emergency electrical generators with associated fuel tanks. DETERMINATION: Project is designated as a planned action. The decision is final with no administrative appeal. ZONING /COMPREHENSIVE PLAN DESIGNATION: MIC/H 6300 Southcenter Boulevard, Suite #100 0 Tukwila, Washington 98188 0 Phone: 206 - 431 -3670 0 Fax: 206 - 431 -3665 • Notice of Decision Page 2 Project materials including the application, any staff reports, and other studies related to the permits are available for inspection at the Tukwila Department of Community Development; 6300 Southcenter Boulevard; Suite 100; Tukwila, WA; from Monday through Friday, between 8:30 AM and 5:00 PM. The project planner is Nora Gierloffwho may be contacted at (206) 431- 3670 for further information. Property owners affected by this decision may request a change in valuation for their property tax purposes notwithstanding any program of revaluation. Steve Lancaster City of Tukwila DCD Director SEPA Responsible Official • CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 FAX (206) 431 -3665 E -mail: tukplan@atukwila.wa.us SEPA PLANNED ACTION APPLICATION FOR STAFF USE UNLY Sierra Type: P -PACT Planner: / / File Number: G�vw -, 0/6 Application Complete: (Date: ) Project File Number: ie - 0°-.Uj s Application Incomplete: (Date: ) MIC Planned Action EIS File Number: E96 -0034 Other File Number: DAvv0 - aOg 1 i'D„Wvc)-, 6.' RFCIFIVFD CITY OF TUKWILA NAME OF PROJECT/DEVELOPMENT: r X0 L)S s teNTTLE : 3 AUG - 1 2000 pFRAAIT CFNTFR LOCATION OF PROJECT/DEVELOPMENT: Give street address or, if vacant, indicate lot(s), block and subdivision, access street, and nearest intersection. LIST ALL TAX LOT NUMBERS. S. 1i0-114 ST. Ta'A Lax" N'- '• ID Quarter: Section: l Township: n Iv Range: 1-61 (This information :• be found on your tax statement.) W f2 OF S.W. 4 s cPoN to DEVELOPMENT COORDINATOR: r +l2 OF Se. �¢ 5 ef. i o 0 o� The individual who • has decision making authority on behalf of the applicant in meetings with City staff, • has full responsibility for identifying and satisfying all relevant and sometimes overlapping development standards, and • is the primary contact with the City, to whom all notices and reports will be sent. Name: S'T&.I SAb-1 AR-C i CU Address: 122.0I w ( LA • 1101 UJJ irn 0 ?J — c5 on> erri4 lrz Phone(Olp) 2,1— 00 FAX: 02040) 2 $1- 0 so Signature: Date: 8- 1-00 INCOMPLETE LTR# G :IAPPHANILANDUSE.APPlsplan.doc, 06/13/00 t1t2ocoI8I - JUN -29 -00 11:09 PM JGL ACOUSTICS 42649077 P.O. RECEIVED CITY OF TUKWILA AUG - 1 2000 PERMIT CENTER To Steve Black Sabey From Jerry Lilly JGL OCOUS11C5.IOC Consulting Services in Sound & Vibration Control levy G. Lilly, P.E. Precicknt Fare (206) 281 -0920 Pages: 3 Phone: (206) 281 -8700 Date: 06/29/00 Re: Exodus Seattle - III CC: 0 Urgent Steve: x For Review 0 Please Comment 0 Please Reply 0 Please Recycle Here is what I have to offer you right now regarding the noise from Exodus Seattle III. I am missing a lot of information (e.g. building sections, mechanical drawings, mechanical equipment selections. Toad bank noise data, etc.), but this is 8111 can give you until I receive more information. The property line is 100 feet to the south & west and 80 feet to the east. The zoning is industrial, so the noise ordinance limit is 70 dBA. We need to meet the noise ordinance with all rooftop equipment running and one generator running at full load in each generator room. 1 have also evaluated the condition with five of the six generators running in each room to simulate a power failure condition. This analysis does not include any load bank noise. (I have not heard back from Avtron) Figure 1 presents the predicted noise level at the south property line from a single generator room without noise control (other than an engine muffler). The expeded noise level is 88 dBA with a single generator and 95 dBA with five generators. Cleariy, the generator rooms will need to be fully enclosed in order to meet the 70 dBA noise ordinance limit during testing. Figure 2 presents the predicted noise level at the south property line including 100 rooftop AC units, 50 Aerovent model 66W724 exhaust fans, and 30 Caterpillar 3516B diesel generators with noise control. This analysis assumes the following recommended noise control measures: 1. Provide IAC model 7LFS sound attenuators at the radiator exhaust louvers and IAC model 5LFS sound attenuators at the air intake opening into each generator room from the air intake tunnel. 2. Provide a Maxim M -41 primary silencer and a Maxim FPE secondary silencer on each engine. 3. Provide 4,000 square feet of acoustical panels (equal to Empire M -90) in each engine room, and 20,000 square feet of acoustical panels in the air intake tunnel. Distribute panels uniformly. I can't evaluate sound transmission to the east and west property lines accurately until I receive noise data onfthe rooftop AC units and a building section showing the elevation of the roof, rooftop units, and building parapet. We may need to use the building parapet to shield the rooftop equipment from the commercial property to the east. INCOMPLETE 5266 NW Village Park Drive, Issaquah, WA 98027 Phone: (425) 649 -9344 Fix: (4 ?5) 649 -0737 JUN -29 -00 11:10 PM 120 110 100 JCL ACOUSTICS 4256490737 P.02 Exodus Seattle - III Fig. 1. Predicted Generator Noise at South Property Line (without noise control - one engine room) m 90 m 0 H 80 d • %0 60 50 40 63 125 250 500 1000 2000 4000 8000 Octave Band Center Frequency (Hz) —�- One Generator ON (88 dBA) —B-- Five Generators ON (95 dBA) s CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard Tukwila, WA 98188 Telephone: (206) 431 -3670 FAX (206) 431 -366 E -mail: tukplannci.tukwila.wa.us AFFIDAVIT OF OWNERSHIP AND HOLD HARIII.ESS PERMISSION TO ENTER PROPERTY RECEIVED CITY OF TUKWILA AUG - 1 2000 PERMIT CENTER STATE OF WASHL`1GTON COUNTY OF KING The undersigned being duly sworn and upon oath states as follows: 1. I am the current owner of the property which is the subject of this application. 2. All statements contained in the applications have been prepared by me or my agents and are true and correct to the best of my knowledge. 3. The application is being submitted with my knowledge and cor.sent. 4. Owner grants the City, its employees, agents, engineers, contractors or other representatives the right to enter upon Owner's real property located at 3355 SOUTH 120TH PL. ,- TUKWILA, WA . for the purpose of application review, for the limited time necessary to complete that purpose. 5. Owner agrees to hold the City harmless for any loss or damage to persons or property occurring on the private property during the City's entry upon the property unless the loss or damage is the result of the sole negligence of the City. 6. The City shall, at its discretion , cancel the application without refund of fees, if the applicant does not respond to specific requests for items on the "Complete Application Checklist" within ninety (90) days. 7. Non - responsiveness to a City information request for ninety (90) or more days, shall be cause to cancel the application(s) without refund of fees. SS EXECUTED at SEATTLE (city) WA (state), on MAY 22. 2000 LAURENT D. POOLE C/0 INTERNATTONAT, GATEWAY LLC (Print Name) 12201 TUKWILA INTERNATIONAL BLVD. (Address) SEATTLE, WA 98168 -5121 .' 2O.6/281 -8700 (Phone Number) P`t On this day personally appeared before me LAURENT D. POOLE to me known to be the individual who executed the foregoing instrument and acknowledged that he/sb0(signed the same as his/peivoluntary act and deed for the uses and purposes mentioned therein. SUBSCRIBED AND SWORN TO BEFORE ME MARY A. HALL STATE OF 'WASHINGTON NOTARY - - - -- PURL IC MY C0}.I i SSIGi1 EXPIRES 12 -19 -01 INCOMPLETE Lra 22ND Ldf th SEATTL Y OF 2000 NOTARY a State of Washington residing at My Commission expires on 12/19/01 G: W.PPHAL,'LtVDUSE.:APP. 'lm' 11.Joc. 12/0699 2 MIz000IBI • Purpose of Checklist: Rte. Itil 1 2000 ENVIRONMENTAL CHECKLIST The state Environmental Policy Act (SEPA), Chapter 43.21C RCW, requires all govemmental agencies to consider the environmental impacts of a proposal before making decisions. An environmental impact statement (EIS) must be prepared for all proposals with probably significant adverse impacts on the quality of the environment. The purpose of this checklist is to provide information to help you and the agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency decide whether an EIS is required. Instruction for Applicants: This environmental checklist asks you to describe some basic information about your proposal. The City uses this checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most precise information known, or give the best description you can. You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you should be able to answer the questions from your own observations or project plans without the need to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know" or "does not apply." Complete answers to the questions now may avoid unnecessary delays later. Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations. Answer these questions if you can. If you have problems, the City staff can assist you. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attached any additional information that will help describe your proposal or its environmental effects. The City may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. Use of checklist for nonproject proposals: Nonproject proposals refer to actions which are different or broader than a single site specific development project, such as plans, policies and programs. Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." In addition, complete the supplemental sheet for nonproject actions (part D). For nonproject actions, the references in the checklist to the words "project ", "applicant ", and "property or site" should read "proposal ", "proposer", and "affected geographic area ", respectively. Control No. Epic File No. Fee: $ 325 Receipt No. ENVIRONMENTAL CHECKLIST A. BACKGROUND 1. Name of proposed project, if applicable: EXODUS COMMUNICATIONS - SEATTLE 3 FUEL SYSTEM 2. Name of applicant: Sabey Corporation 3. Address and phone number of applicant and contact person:, 12201 Tukwila International Blvd, Fourth Floor, Seattle WA 98168 -5121. 206 - 281 -8700 Steve Black, Project Manager 4. Date Checklist prepared: August 1, 2000 5. Agency requesting Checklist: City of Tukwila . 6. Proposed timing or schedule (including phasing, if applicable): PHASE 1- COMPLETE 9/15/00 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. PHASES 2 -5, SCHEDULED TO COMPLETE PHASE 5 SPRING OF 2001 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. GENERATOR SUBMITTAL(INCLUDING EMISSIONS DATA), ACOUSTICAL REPORT 9. Do you know whether applications are pending for govemmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. TENANT IMPROVEMENT BUILDING PERMIT 10. List any govemment approvals or permits that will be needed for your proposal. MISCELANEOUS USE PERMIT, FIRE DEPARTMENT APPROVAL. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. Section E requires a complete description of the objectives and altematives of your proposal and should not be summarized here. INSTALL SIX (6) 40,000 GALLON DOUBLE WALL FIBERGLASS UNDERGROUND STORAGE TANKS AND ASSOCIATED FLEX DOUBLE WALL FUEL PIPING CONTAINED IN A CONCRETE UTILITY CORRIDOR, INCLUDING ALL REQUIRED MONITORING SYSTEMS TO COMPLE PHASE 1 OF THIS PROJECT. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 3355 S. 120TH STREET TUKWILA, WA 98168. 13. Does the proposal lie within an area designated on the City's Comprehensive Land Use Policy Plan Map as environmentally sensitive? YES. -2- TO BE COMPLETED BY APPLICANT • Evaluation for Agency Use Only B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): Flat, rolling, hilly, steep slopes, mountainous, other b. What is the steepest slope on the site (approximate percent slope)? 45 %. c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. THIS SECTION OF THE SITE CONTAINS SILTY SAND AND FILL. BENEATH THE FILLS ARE INTERBEDDED SOFT SOILS AND PEATS. BENEATH THESE SOILS ARE SANDS WHICH UNDERLIE THE ENTIRE SITE. d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. NO e. Describe the purpose, type, and approximate quantities of any filling or grading proposed. Indicate source of fill. THERE WILL BE APPROXIMATELY 4,100 CUBIC YARDS OF 5/8" DRAINAGE GRAVEL AND SELECT FILL SURROUNDING THE UNDERGROUND STORAGE TANKS. GRADING WILL BE TO A LIMITED TO APPROXIMATELY 6,200 SQUARE FOOT AREA THAT IS TO RECEIVE AN 8" THICK CONCRETE SLAB. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. NO 9. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: DEWATERING OF FUEL PIT DURING CONSTRUCTION. 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. DURING CONSTRUCTION THERE WILL BE EXHAUST FROM CONSTRUCTION VEHICALS AND DUST DUE TO EXCAVATION. DURING OPERATION EXHAUST FROM GENERATORS b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. NO c. Proposed measures to reduce or control emissions or other impacts to air, if any: GENERATORS ARE EQUIPPED WITH EMISSIONS CONTROLS THAT MEET FEDERAL EPA REQUIMENTS. • • 3. Water a. Surface 1) Is there any surface water body on or in the immediate vicinity of the site (including year -round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. THERE IS A CLASS 1 STREAM THAT RUNS ALONG THE SOUTH AND WEST SIDES OF THE BUILDING. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. NO 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. NONE 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities, if known. NO 5) Does the proposal lie within a 100 -year floodplain? If so, note location on the site plan. NO 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. NO b. Ground: 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quantities, if known. DURING CONSTRUCTION DE- WATERING WILL BE REQUIRED WHEN EXCAVATING THE UNDERGROUND STORAGE TANK PIT. THIS WATER WILL BE PUMPED INTO A CONTAINER AND HAULED OFF -SITE FOR DISPOSAL. 2) Describe waste materials that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals...; agriculture; etc.) Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. NONE c. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. SURFACE WATER WILL BE COLLECTED BY CATCH BASINS CONTAINED WITHIN THE EXISTING STORM WATER SYSTEM. - 4 - Evaluation for Agency Use Only • • 2) Could waste materials enter ground or surface waters? If so, generally describe. NO. d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: UTILIZE EXISTING STORM WATER SYSTEM. 4. Plants a. Check or circle types of vegetation found on the site: ® deciduous tree: alder, maple, aspen, other ❑ evergreen tree: fir, cedar, pine, other ® shrubs ® grass ❑ pasture ❑ crop or grain ® wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other ❑ water plants: water lily, eelgrass, milfoil, other ❑ other types of vegetation b. What kind and amount of vegetation will be removed or altered? NONE c. List threatened or endangered species known to be on or near the site. NONE d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: NONE 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other b. List any threatened or endangered species known to be on or near the site. SALMON c. Is the site part of a migration route? If so, explain. NO d. Proposed measures to preserve or enhance wildlife, if any: PROTECTION OF RIVERTON CREEK BY MEANS OF CONSTRUCTION FENCE WITH SILT FABRIC. DAILY VISUAL INSPECTION OF STREAM AND CLEAN -UP AS REQUIRED. 6. Energy and Natural Resources Evaluation for Agency Use Only • • a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. PRIMARY SERVICE IS ELECTRIC, DEISEL FUEL FOR BACK -UP GENERATORS. b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. NO. c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: NONE. 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. DEISEL FUEL LEAK. 1) Describe special emergency services that might be required. STATE DEPARTMENT OF ECOLOGY AND FEDERAL EPA SPILL NOTIFICATION AND CLEAN -UP PROCEDURES IN CASE OF TANK FAILURE. 2) Proposed measures to reduce or control environmental health hazards, if any: DOUBLE WALL (BRINE FILLED) FIBERGLASS UNDERGROUND STORAGE TANKS. ALL FUEL PIPING IS TO BE FLEXIBLE DOUBLE WALL PIPING CONTAINED WITHIN A CONCRETE UTILITY CORRIDOR. ENTIRE SYSTEM IS MONITORED FOR LEAK DETECTION. b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? NONE. 2) What types and levels of noise would be created by or associated with the project on a short -term or a long -term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. CONSTRUCTION AND TRAFFIC DURING CONSTRUCTION. TESTING OF GENERATORS DURING NORMAL OPERATION. 3) Proposed measures to reduce or control noise impacts, if any: SOUND ATTENUATION AT BOTH THE AIR INTAKE AND EXHAUST SIDE OF GENERATOR ROOMS. 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? INDUSTRIAL, MANUFACTURING, COMMERCIAL, TRUCK REPAIR AND STORAGE. Evaluation for Agency Use Only • • Evaluation for Agency Use Only b. Has the site been used for agriculture? If so, describe. UNKOWN. SITE HAS MAINTAINED ITS CURRENT USE FOR THE PAST 15 YEARS. c. Describe any structures on the site. SIX BUILDINGS BUILT AS PART OF OLD BOEING RESEARCH AND DEVELOPMENT, MANUFACTURING & ASSEMBLY PLANT. THE OLD BOEING BUILDING #5 IS AFFECTED BY THE PROJECT. d. Will any structures be demolished? If so, what? NO. e. What is the current zoning classification of the site? MIC /H f. What is the current comprehensive plan designation of the site? MIC /H. PROCESSING /INDUSTRIAL ON MIC IMPLEMENTAION. g. If applicable, what is the current shoreline master program designation of the site? N/A h. Has any pare of the site been classified as an "environmentally sensitive" area? If so, specify. YES. RIVERTON CREEK WHICH PASSES ALONG THE SOUTH AND WEST SIDES OF THE BUILDING. i. Approximately how many people would reside or work in the completed project? 190 j. Approximately how many people would the completed project displace? NONE k. Proposed measures to avoid or reduce displacement impacts, if any: NONE I. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: N/A 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing? N/A b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low- income housing. N/A c. Proposed measures to reduce or control housing impacts, if any: N/A 10 Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? 97'. PRECAST CONCRETE PANELS AND PREFABRICATED METAL SIDING. b. What views in the immediate vicinity would be altered or obstructed? NONE. c. Proposed measures to reduce or control aesthetic impacts, if any: NONE. 11. Light and Glare a. What type of light or glare will the proposal produce? What time of day would it mainly occur? N/A b. Could Tight or glare from the finished project be a safety hazard or interfere with views? NO. c. What existing off -site sources of light or glare may affect your proposal? N/A d. Proposed measures to reduce or control light and glare impacts, if any: N/A 12. Recreation a. What designed and informal recreational opportunities are in the immediate vicinity? NONE. b. Would the proposed project displace any existing recreational uses? If so, describe. NO. c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: N/A 13. Historic and Cultural Preservation a. Are there any places or objects listed on, or proposed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. NONE. b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. N/A c. Proposed measures to reduce or control impacts, if any: N/A 14 Transportation a. Identify public streets and highways serving the site, and describe proposed access to the existing street system. Show on site plans, if any. ACCESS TO SITE VIA SOUTH 120TH ST AND SOUTH 124TH STREET. BOTH STREETS ACCESSIBLE FROM EAST MARGINAL WAY. b. Is the site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? NO. APPROXIMATELY 800 FEET TO NEAREST TRANSIT STOP. c. How many parking spaces would the completed project have? How many would the project eliminate? PROJECT WILL HAVE 100 UNRESERVED STALLS PLUS THE ADDITION OF APPROXIMATELY 75 NEW PARKING STALLS AT THE SOUTH END OF THE BUILDING. • • Evaluation for Agency Use Only d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). NO. e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. NO. f. How many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. VEHICULAR TRAFFIC WILL BE MINIMAL. THIS OPERATION IS A 24/7 OPERATION WITH TRAFFIC OCCURING TYPICALLY FROM 7AM - 12AM. g. Proposed measures to reduce or control transportation impacts, if any: ACCESS TO SITE VIA EAST MARGINAL WAY TO SOUTH 120TH OR SOUTH 124TH STREETS. 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. NO. b. Proposed measures to reduce or control direct impacts on public services, if any. NONE. 16. Utilities a. Circle utilities currently available at the site: electricity, natural gas, water, refuse service, telephone, sanitary sewer, septic system, other ELECTRIC - SEATTLE CITY LIGHT; GAS - PUGET ENERGY; WATER - VALVUE SEWER; TELEPHONE - USWEST. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. ELECTRIC, WATER, TELEPHONE. C. Signature The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date Submitted: PLEASE CONTINUE TO THE NEXT PAGE. TO BE COMPLETED BY APPLICANT D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (do not use this sheet for project actions) Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not implemented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? THERE WILL BE ADDITIONAL EMMISIONS TO AIR DUE TO THE PERIODIC EXCERCISING OF THE BACK -UP GENERATORS. Proposed measures to avoid or reduce such increases are: GENERTAORS AR E EQUIPPED WITH EMISSIONS CONTROL. 2. How would the proposal be likely to affect plants, animals, fish, or marine life? N/A Proposed measures to protect or conserve plants, animals, fish, or marine life are: N/A 3. How would the proposal be likely to deplete energy or natural resources? N/A Proposed measures to protect or conserve energy and natural resources are: N/A 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for govemmental protection; such as parks, wildemess, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? N/A Proposed measures to protect such resources or to avoid or reduce impacts are: NA 5. How would the proposal be likely to affect land and shoreline use, including whether it would allow or encourage land or shoreline uses incompatible with exiting plans? N/A Proposed measures to avoid or reduce shoreline and land use impacts are: N/A How does the proposal conform to the Tukwila Shoreline Master Plan? N/A 6. How would the proposal be likely to increase demands on transportation or public services and utilities? N/A Proposed measures to reduce or respond to such demand(s) are: N/A 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. N/A • • 8. Does the proposal conflict with policies of the Tukwila Comprehensive Land Use Policy Plan? If so, what policies of the Plan? NO. Proposed measures to avoid or reduce the conflict(s) are: N/A Evaluation for Agency Use Only TO BE COMPLETED BY APPLICANT • Evaluation for Agency Use Only E. SUPPLEMENTAL SHEET FOR ALL PROJECT AND NONPROJECT PROPOSAL The objectives and the altemative means of reaching the objectives for a proposal will be helpful in reviewing the aforegoing items of the Environmental Checklist. This information provides a general overall perspective of the proposed action in the context of the environmental information provided and the submitted plans, documents, supportive information, studies, etc. 1. What are the objective(s) of the proposal? TO CONSTRUCT THE REQUIERD INFRASTRUCTURE FOR THE BACK -UP GENERATORS, UNDERGROUND STORAGE TANKS AND FUEL PIPING DISTRIBUTION. 2. What are the altemative means of accomplishing these objectives? PROVIDE 24HOUR ON CALL DELIVERY OF FUEL TRUCKS TO SITE TO SUPPORT THE REQUIRED 240,000 GALLONS OF FUEL REQIURED TO PROVIDE EMERGENCY BACK -UP GENERATION. 3. Please compare the alternative means and indicated the preferred course of action: THE PRACTICALITY OF ON SITE STORAGE CLEARLY OUTWEIGHS THE COMPLEXITY OF COORDINATING 24HOUR ON CALL FUEL DELIVERIES. AS A 24/7 OPERATION, THE OPERATOR IS NOT IN A POSITION TO WAIT FOR A DELIVERY TRUCK IN CASE OF A POWER FAILURE OR NATURAL DISASTER. BY PROVIDING ON SITE STORAGE, THE OPERATOR AND ITS CUSTOMERS ARE GUARENTEED THAT THE SERVICE PROVIDED, WILL BE UNITERUPTED IN THE EVENT OF POWER FAILURE OR CERTAIN NATURAL DISASTERS. 4. Does the proposal conflict with policies of the Tukwila Comprehensive Land Use Policy Plan? If so, what policies of the Plan? N0. Proposed measures to avoid or reduce the conflict(s) are: N/A • • PLANNING DIVISION COMMENTS DATE: July 28, 2000 PROJECT NAME: Exodus Underground Storage Tanks PLAN CHECK NO.: MI2000 -181 Plan Reviewer: Contact Nora Gierloff at (206) 431 -3670 if you have any questions regarding the following comments. Prior to permit issuance a determination that the project qualifies as a Planned Action under Tukwila's MIC Implementation Plan is required. Please submit a Planned Action checklist for review. Shown with Optional Equipment • CAT® DIESEL GENERATOR SETS Factory designed, certified prototype tested;:;::' with torsional analysis. Production tested and ;' delivered to you in a package that is ready to be connected to your fuel and power lines.. EPG Designer computer sizing available.::– Supported 100% by your Caterpillar dealer with warranty on parts and labor. Extended 2 warranty available in some areas. The generator set was designed and manufactured in an ISO 9001 compliant facility. Generator.. set and components meet or exceed the :1.. following specifications: ABGSM TM3, AS1359, AS2789, BS4999, BS5000, BS5514, DIN6271, DIN6280, EGSA101P, IEC 34/1,:: 1503046/1, 1508528, JEM1359, NEMA MG1-22, VDE0530, 89/392 /EEC, 89/336/EEC. Generator 3516B Set 1800 rpm 2000 kW 60 Hz Standby Power CATERPILLAR' ENGINE SPECIFICATIONS V -16, 4- Stroke -Cycle Watercooled Diesel Bore — mm (in) 170 (6.7) Stroke — mm (in) 190 (7.5) Displacement — L (cu in) 69 (4210) Compression ratio 14:1 Oil CF -4 RECEIVED crry OF TUKWILA PEfi. mn CENTER ▪ RELIABLE, FUEL EFFICIENT DIESEL The compact, four- stroke -cycle diesel engine combines durability with minimum weight while providing dependability and economy. The fuel system operates on a variety of fuels. • CATERPILLAR' SR4B GENERATOR Single bearing, wye connected, static regulated, brushless self excited generator designed to match the performance and output characteristics of the Caterpillar diesel engine that drives it. • EXCLUSIVE CATERPILL VOLTAGE REGULATO Three -phase sensing regulation give. pre loading, and con operating ran CATERPILLAR® SR4B GENERATOR Type Brushless, revolving field, solid -state exciter Construction Single bearing, close coupled Three phase Wye connected Insulation Class H with tropicalization and antiabrasion Enclosure Drip proof IP 22 Alignment Pilot shaft Overspeed capability 150% Wave form Less than 5% deviation Paralleling capability standard with adjustable voltage droop Voltage regulator 3 -phase sensing with Volts- per -Hertz Voltage regulation Less than ± 1/2% Voltage gain Adjustable to compensate for engine speed droop and line loss r• 18 TIF • • • •d� �� . Leb an 50 THE .. ,. thap 3% C E L RONTROL PANEL'-,.' 24Xo t DC Control = -',., Terminal box rnbUnted, Vibration isolated NEMA 1 /IP 23 enclosure Electrically dead front Lockable hinged door Generator instruments meet ANSI C -39 -1 Voltages Available 60 Hz 999; 480, 699; en 41-GO (Adjustable a minimum of ±1O %) Other voltages available - consult your Caterpillar dealer. Some voltages t INCOMPILETE e ire era ing. PtL__i o CATERPILLAR* STANDARD EQUIPMENT Engine Aftercooler Air cleaner regular duty Breather, crankcase Cooler, lubricating oil Exhaust fitting and flange Filters, right hand fuel and lubricating oil Flywheel housing SAE No. 00 standard rotation Fuel system electronic controlled unit injectors Governor ADEM electronic control Manifold, exhaust, dry Oil pan, shallow Pumps, fuel transfer; aftercooler water, jacket water, and lubricating oil - gear driven Radiator Rails, mounting Shutoff, manual Starting, electric, 24 Volt DC Turbochargers Vibration damper Generator SR4B brushless permanent magnet excited wit VR3 bc�ltQ -t yulalvl Space heaters ELECTRONIC MODULAR CONTROL PANEL (EMCP) Standard generator controls and monitoring: Ammeter /voltmeter phase selector switch Digital ammeter, voltmeter, and frequency meter Voltage adjust rheostat Standard engine controls and monitoring: Automatic /manual start-stop control Engine control switch for: off /reset, auto start, manual start, stop, cooldown timer, cycle cranking, emergency stop pushbutton Safety shutoff protection and LED indicators for: High coolant temp. Low oil pressure Overcrank Overspeed Emergency stop pushbutton 3516B GENERATOR SET STANDBY POWER ATTACHMENTS Engine Km.eleeiters Charging systems Cooling sterw3 fees; elrpeneier - tertlte Control systems geverrtert. Woodward 2.36-114 load share Exhaust system fittings, elbows, flanges, muffler 1 .gym + et ttin9 -state to Cterting•syeter, Generator fro- Fillers - Digital voltage regulator X1.1 . ..1•_ -. r 1�crli \ /f 3 Control Panel Auxiliary relay Ertellestire• N A4 g11r .1 w Illuminating lights 1 49+e4 d s c .J 3 Low coolant level Provision for: N1-PA alarm module - NFPA 110 Ctartingeid 3witele Caterpillar® EMCP II Electronic Modular Control Panel The Electronic Modular Control Panel (EMCP II) is a generator- mounted control panel, available on all Caterpillar packaged generator sets. It utilizes environmentally sealed, solid- state, microprocessor - based modules for engine control and AC metering. This new application of mature, high - tech electronics to generator monitoring provides more features, accuracy, and reliability than present electromechanical and many competitive panel systems. 1A The EMCP II provides these standard control and monitoring features, many of which are options on other panels: • Automatic /manual start-stop engine control with programmable safety shutdowns and associated flashing LED indicators for low oil pressure, high coolant temperature, overspeed, overcrank, and emergency stop • Cycle cranking - adjustable 1 -60 second crank/rest periods • Cooldown timer - adjustable 0 -30 minutes • Energized to run or shutdown fuel control systems • LCD digital readout for: engine oil pressure, coolant temperature, engine rpm, system DC volts, engine running hours, system diagnostic codes, generator AC volts, generator AC amps, and generator frequency • Engine control switch • Ammeter - voltmeter phase selector switch • Emergency stop pushbutton • Indicator /display test switch • Voltage adjust potentiometer • Rugged NEMA 1 /IP 23 capirie; T_�'a tt �-;'r'1� i ir11 TT PACKAGE SET PERFORMANCE 3516B DI TA SC DRY MANF TURBO QTY 4 PARALLEL ADEM GOV DM1394 -10 PGS STANDBY 60 HERTZ EMISSIONS STRATEGY A/C TEMP: DEG F 140. GEN 2000.0 W/F EKW 2060.0 W/0 F EKW W/F BHP 2876 W/O F BHP @ 1800 RPM GENERAL PERFORMANCE DATA GEN PER ENG ENG S FUEL FUEL INTAKE INTAKE INTAKE EXH EXH EXH W/F CENT PWR BMEP CONSUM RATE MANF T MANF P AIR FL MANF T STK T GAS FL EKW LOAD BHP PSI LB /BHP -HR GPH DEG F IN -HG CFM DEG F DEG F CFM 2000.0 100 2847 298 .357 145.4 186 81.6 6172 1245 963 17051 1800.0 90 2565 268 .354 129.6 181 75.5 5918 1162 893 15512 1600.0 80 2285 239 .350 114.3 175 67.7 5565 1090 838 13979 1500.0 75 2146 224 .349 107.0 172 63.4 5360 1058 815 13209 1400.0 70 2007 210 .348 99.8 169 58.9 5138 1028 794 12440 1200.0 60 1730 181 .350 86.4 164 49.7 4647 978 772 11027 1000.0 50 1454 152 .353 73.4 159 40.5 4138 928 750 9636 800.0 40 1183 124 .361 60.9 155 31.4 3619 875 728 8277 600.0 30 908 95 .373 48.4 152 22.6 3086 805 702 6903 500.0 25 769 80 .384 42.2 151 18.2 2818 764 687 6215 400.0 20 629. 66 .401 36.0 149 14.1 2567 718 665 5544 200.0 10 346 36 .483 '23.9 147 8.0 2207 595 570 4357 SOUND (NOISE) DATA - EXHAUST @ 4.9 FEET GEN PER OVERALL OBCF OBCF OBCF OBCF OBCF OBCF OBCF OBCF W/F CENT SOUND 63HZ 125HZ 250HZ 500HZ 1000HZ 2000HZ 4000HZ 8000HZ EKW LOAD DB(A) DB DB DB DB DB DB DB DB 2000.0 100 116 107 •121 117 109 108 109 109 107 SOUND (NOISE) DATA - MECHANICAL @ 3.2 FEET GEN PER OVERALL OBCF OBCF OBCF OBCF OBCF OBCF OBCF OBCF W/F CENT SOUND 63HZ 125HZ 250HZ 500HZ 1000HZ 2000HZ 4000HZ 8000HZ EKW LOAD DB(A) DB DB DB DB DB DB DB DB 2000.0 100 111 113 . 123 114 105 101 101 99 103 EMISSIONS DATA * * REFERENCE NOTES - NOMINAL EMISSIONS DATA MEASUREMENT IS CONSISTENT WITH THOSE DESCRIBED IN EPA CFR 40 PART 86 SUBPART D AND ISO 8178 -1 FOR MEASURING HC, CO, CO2 AND NOX. THESE PROCEDURES ARE VERY SIMILAR TO THE METHODS DESCRIBED IN EPA CFR 40 PART 60 APPENDIX A METHOD 25A FOR HYDROCARBONS, METHOD 10 FOR CO, METHOD 7E FOR NOX. DATA SHOWN IS BASED ON STEADY STATE ENGINE OPERATING CONDITIONS OF 77 DEG F, 28.42 IN HG AND NUMBER 2 DIESEL FUEL WITH 35 DEG API AND LHV OF 18,390 BTU /LB. THE DATA SHOWN IS SUBJECT TO INSTRUMENTATION, MEASUREMENT, FACILITY AND ENGINE TO ENGINE VARIATIONS. 20 3U3liti i ii-►L it 1(LQ .£.) 02 (DRY) GEN ENG NOX TOTAL PART IN EXH SMOKE BOSCH PWR % PWR (AS NO2) CO HC CO2 MATTER (VOL) OPAC SMOKE EKW LOAD BKW * * * * * * * G/HP-HR ***** ** % % NO. 2000.0 100 2123.4 5.46 .35 .13 1466.4 .103 9.90 2.1 1.28 1500.0 75 1600.4 5.44 .35 .19 1076.9 .119 11.70 2.1 1.28 1000.0 50 1083.9 5.42 .47 .25 737.7 .171 12.70 2.7 1.28 500.0 25 573.5 6.49 .73 .32 423.9 .230 14.10 2.9 1.28 AT RATED: WET EXHAUST MASS 28175 LB/HR WET EXHAUST FLOW ( 963 DEG F STACK TEMP ) 17068 CFM WET EXHAUST FLOW RATE ( 32 DEG F AND 29.98 IN HG )5898 STD CFM DRY EXHAUST FLOW RATE ( 32 DEG F AND 29.98 IN HG )5389 STD CFM FUEL FLOW RATE 144.5 GAL/HR 21 A/ IDITTAI RECEIVED CITY OF TUKWILA AUG - 1 Z000 PERMIT CENTER 1�1COINPVTE LT R# S BEY AkCNITICTUII MIMS ON MI • e Exoous pre re w Mr .was wa .Y /_ wr-rw VI.. It Pww Awes AU Cr . nr0 MW Ma 5077 MM WO TOW • 1O-M1 r +� W-.. WO•IOW. i�' p as - '- „1,16.4- i t -\ /� ;11 Y lg I I I I• I• 1• I. I I 1• I 1• I •t[ _J L_J L_L_JL_L_LJ L_ (S nfJ a fl. • . a 1173 11•123 . 2 II FOUNDATION PI1, TM O CPT. OM MYL L •-53 • .m. a•M m Mar -r Coll ICC O MC. .ML r< •3 SO-41. PA. 10-1 71-00 L LM., !!L M ai71 rues I Itll 1l MN0M aye i MNlw•n a•- iu POLvat.1 MgCHANICAL FRAM*" LAN I.1 TOP n •j• COG MO MT. PM ( - SON PM r•0 CO MIL CDC. WY SOP DRAWINGS •• M1 MS Or MS r MO PPM a M Ml 0 MM.. UMlO myu. .1M RIMl.tall O MLIW M.S MM.• PAM PO COMM Ma I.D. TO POMP MC.. San I.m..MM• S.L. L.1l M`PAMr MGM 3 P.W. WC SI�mO� kW at1 m OPT Or tut PP DC IMIM•3 IWNOLITS MO 1011-4•004. MP w •neap M MILT Mil Ai WM. Mi. 1.1 MOOLD MO M M DYMa .CIF ROOM 101 MI•I! O M Taal COMM M MCC MMM4m•1Mm M rot OOMM D yes m M. WIN e� P.M AT UPI OPTIOL SPECIAL COMM CONDITIONS W MM I a.1MM r M MO AM MALL MCC ALCM. RCM MA TOT W.M4� Or NA I�yD MAWS 10 M IAM°6• . MM. NOTE TO MECHANICAL AND ELECTRICAL TRADES maw. Ift. Waal Pun wawa Loft LW um 10.1•0 O ALT PADS W MSS MOMDIU.AOOOMM 7 LCMfJLaIM. SPA i0 •1 OM Ma1Mf1 0.• M r I o MM PP.. MC MITI M M IMMD m Iaml /w RCM POOR 61.61.1.1° Of WI O 0W PPMMI, 1u PTA. O puma MS OP MOM MS OW Rif AMTS OCl•CS 0 COMM TO M SOM. r0 COMM MO 0 n M W MO Ml Or C P .M� M1 r MC •O4IaSM MOWS n a SC I a AT WPMMTO Od MMI DO MM. • n5013 cuSOl�r a.a ir.° -n Oft VD • PT 1 ails all wMa�as • It O CM. Cllvud OM as OR Low WM. MOW. SM.L •S.•anw Li CM rMT 11.1'. •• OM Cr room MPS Rt. !•�0 O aY°LMl a m u.LMMM O COt WPO AT OMWM (CAA 0 *AMC IMPS S vita • SPFl x Mm M. • •m u0 YN. - WOO CM MS • CO M r M M•.P nun MOM OFICIATS GENERAL NOTE 1. WOWS APPLY MIST MP COMM MI IMO Mt TO RI PIM COM L . w •MA Mr - 1414 rrM. MP MOM. � hirr�Ci P.../Y.�l • TM PC CORM MO •TM LM Mme. ...Y SS PP DO(W) M MM Y .• MM• Y Y Time M YW. L• S.:B ARCIIITI ra • •�•�M �tltl� w FOUNDATION •1 iaeM4i Ma SOLI ovli •n ( -aw-17 M. aio•n MC. ni Kwtl • :WW COMM. TO CI MAIM M M.& MI SP WM r PPM • 0007 PO 0*5*0ican MI IMMO In talIMP rpm COML. OA MWmn TM .•O NOMA TO M COMM. ti pall 4.14.1 Mmrm•Tm COMM mQ MM.M maTip .0* mmiro 4:.M. ® ro4.'am m tar MTV O roc `.: Ra fa O.0 COMM 0 IMP O TIM MO. MOM MO �{ PM • 0•11011 IMMO O YO a OT M Mm 07 7••1 TM.L/MO f0. ▪ 1•6110 MNN UM[ tO .min R!714.1 COMM OYa<I Ni AM POTMAMOT. aPn�O� Al MT MO A OMOM t sal PPM MO MAO MOMS 7. IMMO 5MML M Mw° ®° 0 MI 0615 MO • OM wtln w tl O IMADT urns MOD .m Mal i .1a.C.. M • .o4°'4i.. °Ie1tea SOP ONMS MuWPOO• OM m IMPIL m SOMM.C•0* 1.Y M. 1* 0*00O *50W 0 PM 4411 COMM MGM sMMOLM NOMSOU4W PPM LOC. • WAS POI PPS m MCP M 7. f ✓OQ.4 .. 4WM 10.0 • Mr. MP. p i..0∎ -Y ZAP. C 0""of •• MA M. O a[ 1 PIP MOM.O St.10•C N OMP. PLC PLC 11011 PM NM N SOAP Lq IMYY MOM WT MM. CONCRETE rM. MOTAMP OS S Flats M.10 P.1 CPC MO w ML moan S1W.nMI iaem Mr. •11 4• MY. ar .4 COMM .L• IMOION Or 1441 Mu M rM MN MLCC SO p� MOM ° n1..°pill males mw%o SS CMLASPOPS IC Mod.' AN M IMO M M. LLCMS./01 f try MOM PCP IMSZL LIMMIM CO MM.. MOM m. Dm • L MP wr ML MOM COMO M. 10 WPM MMO a m•• ro .MIU[. V C Of MP SO MCA S W es .elm TO MS MAO Mr TM l M .TIM tl.• YIDMINT h WL.m.O MO m P.M Al T• MEM MM.. O MMM . m1OCCM a m MIMST • M0 0 v Ml0 M •0011M M CO • II M•T1 ro OMO nm•W CO LOX.. F *i M PRO[CI 3.010 u CS 1OnMMCmOCaMO NO3 COD MCA .COMM M. w TOM ••• IMO.0l aLO QW Cl.C. OCT CM 1a W m WMMMMWICT.MO.1CTA!u AM PICK O WV Tor.1wuM 00*of PM W* mMW MP w MM.•M..•W O TM a .CPO MOM m 1.1 TM III PC MOM IMa r0 MOMW MMAMTIO REINFORCING STEEL .l MA COMIC (MOM meM•I Cam O M. OM w IOMM4tM.pM(�M� PP ASV MOM. C O tl M MA O•f0 MMO O... 'M.• S MMlO •f MOaLM.rM n0.1 00 0 i1Mm MCI. O 01.1.6 MOMS MCP. SIMMS. MOLD Oa m mrpr Mn Ya .ltl M.•Mma Mahn m mwT na ALCM r N0°`MrWMai 0 M OM • 0® MMpO La LCCM1 O M OMR TO MM MrD.°a.lmM PM O MM. ;coal Mt. IMMIMOTOP • CM MIT-X47 REINFORCING STEEL WELDING ▪ Ya•1• eMM4 TO (0 • w dme TOW ID IC - IwP 1410010 ‘• , P.-pp •SM•CI. % MLO. CM - I MO m -� WO MM Mallet. MIMES MOM m AMMO - W MOMS .mr.1.OMOMP110070 'MOM IMPS MCAT u0 MISS Qa4L11M O COMM M.MMOIIP11.�7 Mop MCI MO CO OM MM TO N OM MIS Mt CO N171 MDOMT MOO O WAS m IMO LPL Wa MU T m MOT COM MN MIA NW Mail L�m°OM °°°`MUU OEM Iri 61.1.0 SM. - O▪ P MOM rOrIaW.MPMWOPMM MOM P000L RERAR DOWEL INSTALLATION - m0 1 M•0 ra .MRS • •IC WIN OM O 1010..1/ MDMMO ATWO MY.nO0• MOO Co m7CO MO•MMC.l LTA Ow R7 1 • 0,00 OuC MMp M IM.MM5 IN MI MtnO n OP MOM W0MM.MQ WIT .0 MOOTR WY STRUCTURAL STEEL AND MISCELLANEOU$MSTEEL MOM O• [O•CP KTam0 MAMAS MCI HMM�•M. STL..L S® Mu 2.1:-W41 ii0W W4DMl Oats 1 f M�11II[G0.0•iM43 M.DI aI O opal yfl uyOS14Mn.7irons a PAM IAA •111.0 m COM MA AM PI MC MW ROM. MMDMM C OMmf. MP of OME p OW ALL .M CHAR oTM 1® C.MOt7 0 WMM MOM Q0E1 MM. I OR L WI LRO PICIOi 1.01.0 Mrnl ..• IM 0 MI TO AA PMTUEECM F0* 0O yTMMIR MMCO IOWaP O YWWMM O WL COL5MM 1. Na P MHO ••K• rIMI•. PTI t.0 014 „'M1` °.: I!aM�.M saMLatta Mn4.:[ ak 10 FP TM PCP. MC 1M COMM MUM ...11 0 PAM CO MOM WU ON Mao W0 INSPECTIONS • 61441. Ma m M on M m0 Ma4Arm elan mmaaweemalNn Di yMaa .011 MMC.D4M4 40. PPM. PM m SW MADAM Yl 401010*• TO MCP ROM OLMMO W CMaoC M.901. WPM MCI MOO MOO WMM P.Wmram SWCM.L O AL T� 070101 CMPASY MMUL Mall MW .M SMOG. HOOD 07 5(0.1 MCOMM MOM. COMM OMt T• nIMOPa D IRO d 00M MC. MUM WMa O MOP FOR n puma 115 M01I .L MMWOa M Mn®r AMMO .w T MM.COMM MOON ON MAO MP m OP MPS m PA MOO NM COMM°'•a(.Oi FFM••OalOM. am ImoaA MOM • AO ▪ M MMI• um MOSOMOLi°MOM 01w1MDLi.aLM MGM EXODUS SEA TENANT IIAPRI wpr r(AM. KCM -- w M1100 Ms COMM . O RIMS °00150070 Md5ML MT 101 WM MOM MIA MO CIaaC0PM. t CP CM NOT M IMS M0 •1a MM. 0011..0.0 C00 M4 MM. •0T •O • .IM 1ICW Ma 61•41 MWMO GENIIRtl