City of ThkwII
Steven M. Mullet, Mayor
Department of Community Development Steve Lancaster, Director
August 9, 2000
NOTICE OF DECISION
To: Laurent Poole, Applicant for Sabey Corporation
Steve Black, Contact for Sabey Corporation
King County Assessor, Accounting Division
State Department of Ecology, SEPA Division
This letter serves a notice of decision that the application to designate the tenant improvement
and associated fuel tanks and backup generators for Exodus Communications as a planned action
is issued pursuant to TMC 21.04.156.
PROJECT BACKGROUND
FILE NUMBER: E2000 -015 Planned Action
APPLICANT: Laurent Poole, Sabey Corporation
REQUEST: Determine that the construction activities fall under the Manufacturing/
Industrial Center planned action criteria and therefore no additional SEPA review is required.
LOCATION: 3355 S. 120"' Place, International Gateway East
PROJECT DESCRIPTION: Tenant improvement to an existing high bay warehouse building to
convert it to an interne hosting business. A new 2nd and 3`d floor will be added within the
existing building envelope. Mechanical and electrical systems will be upgraded, including new
HVAC equipment and emergency electrical generators with associated fuel tanks.
DETERMINATION: Project is designated as a planned action. The decision is final with no
administrative appeal.
ZONING /COMPREHENSIVE
PLAN DESIGNATION: MIC/H
6300 Southcenter Boulevard, Suite #100 0 Tukwila, Washington 98188 0 Phone: 206 - 431 -3670 0 Fax: 206 - 431 -3665
•
Notice of Decision
Page 2
Project materials including the application, any staff reports, and other studies related to the
permits are available for inspection at the Tukwila Department of Community Development;
6300 Southcenter Boulevard; Suite 100; Tukwila, WA; from Monday through Friday, between
8:30 AM and 5:00 PM. The project planner is Nora Gierloffwho may be contacted at (206) 431-
3670 for further information. Property owners affected by this decision may request a change in
valuation for their property tax purposes notwithstanding any program of revaluation.
Steve Lancaster
City of Tukwila
DCD Director
SEPA Responsible Official
•
CITY OF TUKWILA
Department of Community Development
6300 Southcenter Boulevard, Tukwila, WA 98188
Telephone: (206) 431 -3670 FAX (206) 431 -3665
E -mail: tukplan@atukwila.wa.us
SEPA
PLANNED
ACTION
APPLICATION
FOR STAFF USE UNLY Sierra Type: P -PACT
Planner: / /
File Number: G�vw -, 0/6
Application Complete: (Date:
)
Project File Number: ie - 0°-.Uj s
Application Incomplete: (Date:
)
MIC Planned Action EIS File Number: E96 -0034
Other File Number:
DAvv0 - aOg 1 i'D„Wvc)-, 6.' RFCIFIVFD
CITY OF TUKWILA
NAME OF PROJECT/DEVELOPMENT: r X0 L)S s teNTTLE : 3 AUG - 1 2000
pFRAAIT CFNTFR
LOCATION OF PROJECT/DEVELOPMENT: Give street address or, if vacant, indicate lot(s), block
and subdivision, access street, and nearest intersection. LIST ALL TAX LOT NUMBERS.
S. 1i0-114 ST. Ta'A Lax" N'- '• ID
Quarter: Section: l Township: n Iv Range: 1-61
(This information :• be found on your tax statement.)
W f2 OF S.W. 4 s cPoN to
DEVELOPMENT COORDINATOR: r +l2 OF Se. �¢ 5 ef. i o 0 o�
The individual who
• has decision making authority on behalf of the applicant in meetings with City staff,
• has full responsibility for identifying and satisfying all relevant and sometimes overlapping
development standards, and
• is the primary contact with the City, to whom all notices and reports will be sent.
Name: S'T&.I SAb-1 AR-C i CU
Address: 122.0I w ( LA • 1101 UJJ irn 0 ?J — c5 on> erri4 lrz
Phone(Olp) 2,1— 00 FAX: 02040) 2 $1- 0 so
Signature: Date: 8- 1-00
INCOMPLETE
LTR#
G :IAPPHANILANDUSE.APPlsplan.doc, 06/13/00
t1t2ocoI8I
- JUN -29 -00 11:09 PM JGL ACOUSTICS
42649077 P.O.
RECEIVED
CITY OF TUKWILA
AUG - 1 2000
PERMIT CENTER
To Steve Black Sabey From Jerry Lilly
JGL
OCOUS11C5.IOC
Consulting Services
in Sound & Vibration
Control
levy G. Lilly, P.E.
Precicknt
Fare (206) 281 -0920 Pages: 3
Phone: (206) 281 -8700 Date: 06/29/00
Re: Exodus Seattle - III CC:
0 Urgent
Steve:
x For Review
0 Please Comment 0 Please Reply 0 Please Recycle
Here is what I have to offer you right now regarding the noise from Exodus Seattle III. I am missing a
lot of information (e.g. building sections, mechanical drawings, mechanical equipment selections. Toad
bank noise data, etc.), but this is 8111 can give you until I receive more information. The property line is
100 feet to the south & west and 80 feet to the east. The zoning is industrial, so the noise ordinance
limit is 70 dBA. We need to meet the noise ordinance with all rooftop equipment running and one
generator running at full load in each generator room. 1 have also evaluated the condition with five of
the six generators running in each room to simulate a power failure condition. This analysis does not
include any load bank noise. (I have not heard back from Avtron)
Figure 1 presents the predicted noise level at the south property line from a single generator room
without noise control (other than an engine muffler). The expeded noise level is 88 dBA with a single
generator and 95 dBA with five generators. Cleariy, the generator rooms will need to be fully enclosed
in order to meet the 70 dBA noise ordinance limit during testing.
Figure 2 presents the predicted noise level at the south property line including 100 rooftop AC units, 50
Aerovent model 66W724 exhaust fans, and 30 Caterpillar 3516B diesel generators with noise control.
This analysis assumes the following recommended noise control measures:
1. Provide IAC model 7LFS sound attenuators at the radiator exhaust louvers and IAC model 5LFS
sound attenuators at the air intake opening into each generator room from the air intake tunnel.
2. Provide a Maxim M -41 primary silencer and a Maxim FPE secondary silencer on each engine.
3. Provide 4,000 square feet of acoustical panels (equal to Empire M -90) in each engine room, and
20,000 square feet of acoustical panels in the air intake tunnel. Distribute panels uniformly.
I can't evaluate sound transmission to the east and west property lines accurately until I receive noise
data onfthe rooftop AC units and a building section showing the elevation of the roof, rooftop units, and
building parapet. We may need to use the building parapet to shield the rooftop equipment from the
commercial property to the east.
INCOMPLETE
5266 NW Village Park Drive, Issaquah, WA 98027 Phone: (425) 649 -9344 Fix: (4 ?5) 649 -0737
JUN -29 -00 11:10 PM
120
110
100
JCL ACOUSTICS
4256490737 P.02
Exodus Seattle - III
Fig. 1. Predicted Generator Noise at South Property Line
(without noise control - one engine room)
m
90
m
0
H 80
d
• %0
60
50
40
63 125 250 500 1000 2000 4000 8000
Octave Band Center Frequency (Hz)
—�- One Generator ON (88 dBA) —B-- Five Generators ON (95 dBA)
s
CITY OF TUKWILA
Department of Community Development
6300 Southcenter Boulevard Tukwila, WA
98188
Telephone: (206) 431 -3670 FAX (206) 431 -366
E -mail: tukplannci.tukwila.wa.us
AFFIDAVIT OF OWNERSHIP AND HOLD HARIII.ESS
PERMISSION TO ENTER PROPERTY
RECEIVED
CITY OF TUKWILA
AUG - 1 2000
PERMIT CENTER
STATE OF WASHL`1GTON
COUNTY OF KING
The undersigned being duly sworn and upon oath states as follows:
1. I am the current owner of the property which is the subject of this application.
2. All statements contained in the applications have been prepared by me or my agents and are true and correct to the best of my
knowledge.
3. The application is being submitted with my knowledge and cor.sent.
4. Owner grants the City, its employees, agents, engineers, contractors or other representatives the right to enter upon Owner's real
property located at 3355 SOUTH 120TH PL. ,- TUKWILA, WA .
for the purpose of application review, for the limited time necessary to complete that purpose.
5. Owner agrees to hold the City harmless for any loss or damage to persons or property occurring on the private property during the
City's entry upon the property unless the loss or damage is the result of the sole negligence of the City.
6. The City shall, at its discretion , cancel the application without refund of fees, if the applicant does not respond to specific
requests for items on the "Complete Application Checklist" within ninety (90) days.
7. Non - responsiveness to a City information request for ninety (90) or more days, shall be cause to cancel the application(s) without
refund of fees.
SS
EXECUTED at SEATTLE (city) WA (state), on MAY 22. 2000
LAURENT D. POOLE C/0 INTERNATTONAT, GATEWAY LLC
(Print Name)
12201 TUKWILA INTERNATIONAL BLVD.
(Address) SEATTLE, WA 98168 -5121
.' 2O.6/281 -8700
(Phone Number)
P`t
On this day personally appeared before me LAURENT D. POOLE to me known to be the individual who
executed the foregoing instrument and acknowledged that he/sb0(signed the same as his/peivoluntary act and deed for the uses and
purposes mentioned therein.
SUBSCRIBED AND SWORN TO BEFORE ME
MARY A. HALL
STATE OF 'WASHINGTON
NOTARY - - - -- PURL IC
MY C0}.I i SSIGi1 EXPIRES 12 -19 -01
INCOMPLETE
Lra 22ND
Ldf th SEATTL
Y OF
2000
NOTARY a State of Washington
residing at
My Commission expires on 12/19/01
G: W.PPHAL,'LtVDUSE.:APP. 'lm' 11.Joc. 12/0699
2 MIz000IBI
•
Purpose of Checklist:
Rte. Itil 1 2000
ENVIRONMENTAL CHECKLIST
The state Environmental Policy Act (SEPA), Chapter 43.21C RCW, requires all govemmental agencies to
consider the environmental impacts of a proposal before making decisions. An environmental impact statement
(EIS) must be prepared for all proposals with probably significant adverse impacts on the quality of the
environment. The purpose of this checklist is to provide information to help you and the agency identify impacts
from your proposal (and to reduce or avoid impacts from the proposal, if it can be done) and to help the agency
decide whether an EIS is required.
Instruction for Applicants:
This environmental checklist asks you to describe some basic information about your proposal. The City uses this
checklist to determine whether the environmental impacts of your proposal are significant, requiring preparation of
an EIS. Answer the questions briefly, with the most precise information known, or give the best description you
can.
You must answer each question accurately and carefully, to the best of your knowledge. In most cases, you
should be able to answer the questions from your own observations or project plans without the need to hire
experts. If you really do not know the answer, or if a question does not apply to your proposal, write "do not know"
or "does not apply." Complete answers to the questions now may avoid unnecessary delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark designations.
Answer these questions if you can. If you have problems, the City staff can assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on
different parcels of land. Attached any additional information that will help describe your proposal or its
environmental effects. The City may ask you to explain your answers or provide additional information
reasonably related to determining if there may be significant adverse impact.
Use of checklist for nonproject proposals:
Nonproject proposals refer to actions which are different or broader than a single site specific development
project, such as plans, policies and programs.
Complete this checklist for nonproject proposals, even though questions may be answered "does not apply." In
addition, complete the supplemental sheet for nonproject actions (part D).
For nonproject actions, the references in the checklist to the words "project ", "applicant ", and "property or site"
should read "proposal ", "proposer", and "affected geographic area ", respectively.
Control No.
Epic File No.
Fee: $ 325 Receipt No.
ENVIRONMENTAL CHECKLIST
A. BACKGROUND
1. Name of proposed project, if applicable: EXODUS COMMUNICATIONS - SEATTLE 3 FUEL SYSTEM
2. Name of applicant: Sabey Corporation
3. Address and phone number of applicant and contact person:, 12201 Tukwila International Blvd, Fourth Floor, Seattle
WA 98168 -5121. 206 - 281 -8700 Steve Black, Project Manager
4. Date Checklist prepared: August 1, 2000
5. Agency requesting Checklist: City of Tukwila .
6. Proposed timing or schedule (including phasing, if applicable): PHASE 1- COMPLETE 9/15/00
7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If
yes, explain. PHASES 2 -5, SCHEDULED TO COMPLETE PHASE 5 SPRING OF 2001
8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this
proposal. GENERATOR SUBMITTAL(INCLUDING EMISSIONS DATA), ACOUSTICAL REPORT
9. Do you know whether applications are pending for govemmental approvals of other proposals directly affecting the
property covered by your proposal? If yes, explain. TENANT IMPROVEMENT BUILDING PERMIT
10. List any govemment approvals or permits that will be needed for your proposal. MISCELANEOUS USE PERMIT,
FIRE DEPARTMENT APPROVAL.
11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site.
There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do
not need to repeat those answers on this page. Section E requires a complete description of the objectives and
altematives of your proposal and should not be summarized here. INSTALL SIX (6) 40,000 GALLON DOUBLE
WALL FIBERGLASS UNDERGROUND STORAGE TANKS AND ASSOCIATED FLEX DOUBLE WALL FUEL
PIPING CONTAINED IN A CONCRETE UTILITY CORRIDOR, INCLUDING ALL REQUIRED MONITORING
SYSTEMS TO COMPLE PHASE 1 OF THIS PROJECT.
12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed
project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over
a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map,
and topographic map, if reasonably available. While you should submit any plans required by the agency, you are
not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 3355
S. 120TH STREET TUKWILA, WA 98168.
13. Does the proposal lie within an area designated on the City's Comprehensive Land Use Policy Plan Map as
environmentally sensitive? YES.
-2-
TO BE COMPLETED BY APPLICANT • Evaluation for
Agency Use Only
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one): Flat, rolling, hilly, steep
slopes, mountainous, other
b. What is the steepest slope on the site (approximate percent slope)? 45 %.
c. What general types of soils are found on the site (for example, clay, sand,
gravel, peat, muck)? If you know the classification of agricultural soils, specify
them and note any prime farmland. THIS SECTION OF THE SITE CONTAINS
SILTY SAND AND FILL. BENEATH THE FILLS ARE INTERBEDDED SOFT
SOILS AND PEATS. BENEATH THESE SOILS ARE SANDS WHICH
UNDERLIE THE ENTIRE SITE.
d. Are there surface indications or history of unstable soils in the immediate
vicinity? If so, describe. NO
e. Describe the purpose, type, and approximate quantities of any filling or grading
proposed. Indicate source of fill. THERE WILL BE APPROXIMATELY 4,100
CUBIC YARDS OF 5/8" DRAINAGE GRAVEL AND SELECT FILL
SURROUNDING THE UNDERGROUND STORAGE TANKS. GRADING WILL
BE TO A LIMITED TO APPROXIMATELY 6,200 SQUARE FOOT AREA THAT
IS TO RECEIVE AN 8" THICK CONCRETE SLAB.
f. Could erosion occur as a result of clearing, construction, or use? If so,
generally describe. NO
9.
About what percent of the site will be covered with impervious surfaces after
project construction (for example, asphalt or buildings)?
h. Proposed measures to reduce or control erosion, or other impacts to the earth,
if any: DEWATERING OF FUEL PIT DURING CONSTRUCTION.
2. Air
a. What types of emissions to the air would result from the proposal (i.e., dust,
automobile odors, industrial wood smoke) during construction and when the
project is completed? If any, generally describe and give approximate
quantities if known. DURING CONSTRUCTION THERE WILL BE EXHAUST
FROM CONSTRUCTION VEHICALS AND DUST DUE TO EXCAVATION.
DURING OPERATION EXHAUST FROM GENERATORS
b. Are there any off -site sources of emissions or odor that may affect your
proposal? If so, generally describe. NO
c. Proposed measures to reduce or control emissions or other impacts to air, if
any: GENERATORS ARE EQUIPPED WITH EMISSIONS CONTROLS THAT
MEET FEDERAL EPA REQUIMENTS.
• •
3. Water
a. Surface
1) Is there any surface water body on or in the immediate vicinity of the site
(including year -round and seasonal streams, saltwater, lakes, ponds,
wetlands)? If yes, describe type and provide names. If appropriate, state
what stream or river it flows into. THERE IS A CLASS 1 STREAM THAT
RUNS ALONG THE SOUTH AND WEST SIDES OF THE BUILDING.
2) Will the project require any work over, in, or adjacent to (within 200 feet)
the described waters? If yes, please describe and attach available plans.
NO
3) Estimate the amount of fill and dredge material that would be placed in or
removed from surface water or wetlands and indicate the area of the site
that would be affected. Indicate the source of fill material. NONE
4) Will the proposal require surface water withdrawals or diversions? Give
general description, purpose, and approximate quantities, if known. NO
5) Does the proposal lie within a 100 -year floodplain? If so, note location on
the site plan. NO
6) Does the proposal involve any discharges of waste materials to surface
waters? If so, describe the type of waste and anticipated volume of
discharge. NO
b. Ground:
1) Will ground water be withdrawn, or will water be discharged to ground
water? Give general description, purpose, and approximate quantities, if
known. DURING CONSTRUCTION DE- WATERING WILL BE
REQUIRED WHEN EXCAVATING THE UNDERGROUND STORAGE
TANK PIT. THIS WATER WILL BE PUMPED INTO A CONTAINER AND
HAULED OFF -SITE FOR DISPOSAL.
2) Describe waste materials that will be discharged into the ground from
septic tanks or other sources, if any (for example: Domestic sewage;
industrial, containing the following chemicals...; agriculture; etc.)
Describe the general size of the system, the number of such systems, the
number of houses to be served (if applicable), or the number of animals
or humans the system(s) are expected to serve. NONE
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm water) and method of
collection and disposal, if any (include quantities, if known). Where will
this water flow? Will this water flow into other waters? If so, describe.
SURFACE WATER WILL BE COLLECTED BY CATCH BASINS
CONTAINED WITHIN THE EXISTING STORM WATER SYSTEM.
- 4 -
Evaluation for
Agency Use Only
• •
2) Could waste materials enter ground or surface waters? If so, generally
describe. NO.
d. Proposed measures to reduce or control surface, ground, and runoff water
impacts, if any: UTILIZE EXISTING STORM WATER SYSTEM.
4. Plants
a. Check or circle types of vegetation found on the site:
® deciduous tree: alder, maple, aspen, other
❑ evergreen tree: fir, cedar, pine, other
® shrubs
® grass
❑ pasture
❑ crop or grain
® wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
❑ water plants: water lily, eelgrass, milfoil, other
❑ other types of vegetation
b. What kind and amount of vegetation will be removed or altered? NONE
c. List threatened or endangered species known to be on or near the site. NONE
d. Proposed landscaping, use of native plants, or other measures to preserve or
enhance vegetation on the site, if any: NONE
5. Animals
a. Circle any birds and animals which have been observed on or near the site or
are known to be on or near the site:
birds: hawk, heron, eagle, songbirds, other:
mammals: deer, bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shellfish, other
b. List any threatened or endangered species known to be on or near the site.
SALMON
c. Is the site part of a migration route? If so, explain. NO
d. Proposed measures to preserve or enhance wildlife, if any: PROTECTION OF
RIVERTON CREEK BY MEANS OF CONSTRUCTION FENCE WITH SILT
FABRIC. DAILY VISUAL INSPECTION OF STREAM AND CLEAN -UP AS
REQUIRED.
6. Energy and Natural Resources
Evaluation for
Agency Use Only
• •
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used
to meet the completed project's energy needs? Describe whether it will be used
for heating, manufacturing, etc. PRIMARY SERVICE IS ELECTRIC, DEISEL
FUEL FOR BACK -UP GENERATORS.
b. Would your project affect the potential use of solar energy by adjacent
properties? If so, generally describe. NO.
c. What kinds of energy conservation features are included in the plans of this
proposal? List other proposed measures to reduce or control energy impacts, if
any: NONE.
7. Environmental Health
a. Are there any environmental health hazards, including exposure to toxic
chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur
as a result of this proposal? If so, describe. DEISEL FUEL LEAK.
1) Describe special emergency services that might be required. STATE
DEPARTMENT OF ECOLOGY AND FEDERAL EPA SPILL
NOTIFICATION AND CLEAN -UP PROCEDURES IN CASE
OF TANK FAILURE.
2) Proposed measures to reduce or control environmental health hazards, if
any: DOUBLE WALL (BRINE FILLED) FIBERGLASS UNDERGROUND
STORAGE TANKS. ALL FUEL PIPING IS TO BE FLEXIBLE DOUBLE
WALL PIPING CONTAINED WITHIN A CONCRETE UTILITY
CORRIDOR. ENTIRE SYSTEM IS MONITORED FOR LEAK
DETECTION.
b. Noise
1) What types of noise exist in the area which may affect your project (for
example: traffic, equipment, operation, other)? NONE.
2) What types and levels of noise would be created by or associated with
the project on a short -term or a long -term basis (for example: traffic,
construction, operation, other)? Indicate what hours noise would come
from the site. CONSTRUCTION AND TRAFFIC DURING
CONSTRUCTION. TESTING OF GENERATORS DURING NORMAL
OPERATION.
3) Proposed measures to reduce or control noise impacts, if any: SOUND
ATTENUATION AT BOTH THE AIR INTAKE AND EXHAUST SIDE OF
GENERATOR ROOMS.
8. Land and Shoreline Use
a. What is the current use of the site and adjacent properties? INDUSTRIAL,
MANUFACTURING, COMMERCIAL, TRUCK REPAIR AND STORAGE.
Evaluation for
Agency Use Only
• •
Evaluation for
Agency Use Only
b. Has the site been used for agriculture? If so, describe. UNKOWN. SITE HAS
MAINTAINED ITS CURRENT USE FOR THE PAST 15 YEARS.
c. Describe any structures on the site. SIX BUILDINGS BUILT AS PART OF OLD
BOEING RESEARCH AND DEVELOPMENT, MANUFACTURING &
ASSEMBLY PLANT. THE OLD BOEING BUILDING #5 IS AFFECTED BY THE
PROJECT.
d. Will any structures be demolished? If so, what? NO.
e. What is the current zoning classification of the site? MIC /H
f. What is the current comprehensive plan designation of the site? MIC /H.
PROCESSING /INDUSTRIAL ON MIC IMPLEMENTAION.
g. If applicable, what is the current shoreline master program designation of the
site? N/A
h. Has any pare of the site been classified as an "environmentally sensitive" area?
If so, specify. YES. RIVERTON CREEK WHICH PASSES ALONG THE
SOUTH AND WEST SIDES OF THE BUILDING.
i. Approximately how many people would reside or work in the completed project?
190
j. Approximately how many people would the completed project displace? NONE
k. Proposed measures to avoid or reduce displacement impacts, if any: NONE
I. Proposed measures to ensure the proposal is compatible with existing and
projected land uses and plans, if any: N/A
9. Housing
a. Approximately how many units would be provided, if any? Indicate whether
high, middle, or low- income housing? N/A
b. Approximately how many units, if any, would be eliminated? Indicate whether
high, middle, or low- income housing. N/A
c. Proposed measures to reduce or control housing impacts, if any: N/A
10 Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas;
what is the principal exterior building material(s) proposed? 97'. PRECAST
CONCRETE PANELS AND PREFABRICATED METAL SIDING.
b. What views in the immediate vicinity would be altered or obstructed? NONE.
c. Proposed measures to reduce or control aesthetic impacts, if any: NONE.
11. Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it
mainly occur? N/A
b. Could Tight or glare from the finished project be a safety hazard or interfere with
views? NO.
c. What existing off -site sources of light or glare may affect your proposal? N/A
d. Proposed measures to reduce or control light and glare impacts, if any: N/A
12. Recreation
a. What designed and informal recreational opportunities are in the immediate
vicinity? NONE.
b. Would the proposed project displace any existing recreational uses? If so,
describe. NO.
c. Proposed measures to reduce or control impacts on recreation, including
recreation opportunities to be provided by the project or applicant, if any: N/A
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or proposed for, national, state, or
local preservation registers known to be on or next to the site? If so, generally
describe. NONE.
b. Generally describe any landmarks or evidence of historic, archaeological,
scientific, or cultural importance known to be on or next to the site. N/A
c. Proposed measures to reduce or control impacts, if any: N/A
14 Transportation
a. Identify public streets and highways serving the site, and describe proposed
access to the existing street system. Show on site plans, if any. ACCESS TO
SITE VIA SOUTH 120TH ST AND SOUTH 124TH STREET. BOTH STREETS
ACCESSIBLE FROM EAST MARGINAL WAY.
b. Is the site currently served by public transit? If not, what is the approximate
distance to the nearest transit stop? NO. APPROXIMATELY 800 FEET TO
NEAREST TRANSIT STOP.
c. How many parking spaces would the completed project have? How many
would the project eliminate? PROJECT WILL HAVE 100 UNRESERVED
STALLS PLUS THE ADDITION OF APPROXIMATELY 75 NEW PARKING
STALLS AT THE SOUTH END OF THE BUILDING.
• •
Evaluation for
Agency Use Only
d. Will the proposal require any new roads or streets, or improvements to existing
roads or streets, not including driveways? If so, generally describe (indicate
whether public or private). NO.
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe. NO.
f. How many vehicular trips per day would be generated by the completed
project? If known, indicate when peak volumes would occur. VEHICULAR
TRAFFIC WILL BE MINIMAL. THIS OPERATION IS A 24/7 OPERATION
WITH TRAFFIC OCCURING TYPICALLY FROM 7AM - 12AM.
g.
Proposed measures to reduce or control transportation impacts, if any:
ACCESS TO SITE VIA EAST MARGINAL WAY TO SOUTH 120TH OR SOUTH
124TH STREETS.
15. Public Services
a. Would the project result in an increased need for public services (for example:
fire protection, police protection, health care, schools, other)? If so, generally
describe. NO.
b. Proposed measures to reduce or control direct impacts on public services, if
any. NONE.
16. Utilities
a. Circle utilities currently available at the site:
electricity, natural gas, water, refuse service, telephone, sanitary
sewer, septic system, other ELECTRIC - SEATTLE CITY LIGHT; GAS -
PUGET ENERGY; WATER - VALVUE SEWER; TELEPHONE - USWEST.
b. Describe the utilities that are proposed for the project, the utility providing the
service, and the general construction activities on the site or in the immediate
vicinity which might be needed. ELECTRIC, WATER, TELEPHONE.
C. Signature
The above answers are true and complete to the best of my knowledge. I understand
that the lead agency is relying on them to make its decision.
Signature:
Date Submitted:
PLEASE CONTINUE TO THE NEXT PAGE.
TO BE COMPLETED BY APPLICANT
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(do not use this sheet for project actions)
Because these questions are very general, it may be helpful to read them in conjunction with
the list of the elements of the environment.
When answering these questions, be aware of the extent the proposal, or the types of
activities likely to result from the proposal, would affect the item at a greater intensity or at a
faster rate than if the proposal were not implemented. Respond briefly and in general terms.
1. How would the proposal be likely to increase discharge to water; emissions to air;
production, storage, or release of toxic or hazardous substances; or production of
noise? THERE WILL BE ADDITIONAL EMMISIONS TO AIR DUE TO THE PERIODIC
EXCERCISING OF THE BACK -UP GENERATORS.
Proposed measures to avoid or reduce such increases are: GENERTAORS AR E
EQUIPPED WITH EMISSIONS CONTROL.
2. How would the proposal be likely to affect plants, animals, fish, or marine life? N/A
Proposed measures to protect or conserve plants, animals, fish, or marine life are:
N/A
3. How would the proposal be likely to deplete energy or natural resources? N/A
Proposed measures to protect or conserve energy and natural resources are: N/A
4. How would the proposal be likely to use or affect environmentally sensitive areas or
areas designated (or eligible or under study) for govemmental protection; such as
parks, wildemess, wild and scenic rivers, threatened or endangered species habitat,
historic or cultural sites, wetlands, floodplains, or prime farmlands? N/A
Proposed measures to protect such resources or to avoid or reduce impacts are: NA
5. How would the proposal be likely to affect land and shoreline use, including whether it
would allow or encourage land or shoreline uses incompatible with exiting plans? N/A
Proposed measures to avoid or reduce shoreline and land use impacts are: N/A
How does the proposal conform to the Tukwila Shoreline Master Plan? N/A
6. How would the proposal be likely to increase demands on transportation or public
services and utilities? N/A
Proposed measures to reduce or respond to such demand(s) are: N/A
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws
or requirements for the protection of the environment. N/A
• •
8. Does the proposal conflict with policies of the Tukwila Comprehensive Land Use Policy
Plan? If so, what policies of the Plan? NO.
Proposed measures to avoid or reduce the conflict(s) are: N/A
Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICANT • Evaluation for
Agency Use Only
E. SUPPLEMENTAL SHEET FOR ALL PROJECT AND NONPROJECT PROPOSAL
The objectives and the altemative means of reaching the objectives for a proposal will be
helpful in reviewing the aforegoing items of the Environmental Checklist. This information
provides a general overall perspective of the proposed action in the context of the
environmental information provided and the submitted plans, documents, supportive
information, studies, etc.
1. What are the objective(s) of the proposal? TO CONSTRUCT THE REQUIERD
INFRASTRUCTURE FOR THE BACK -UP GENERATORS, UNDERGROUND
STORAGE TANKS AND FUEL PIPING DISTRIBUTION.
2. What are the altemative means of accomplishing these objectives? PROVIDE
24HOUR ON CALL DELIVERY OF FUEL TRUCKS TO SITE TO SUPPORT THE
REQUIRED 240,000 GALLONS OF FUEL REQIURED TO PROVIDE EMERGENCY
BACK -UP GENERATION.
3. Please compare the alternative means and indicated the preferred course of action:
THE PRACTICALITY OF ON SITE STORAGE CLEARLY OUTWEIGHS THE
COMPLEXITY OF COORDINATING 24HOUR ON CALL FUEL DELIVERIES. AS A
24/7 OPERATION, THE OPERATOR IS NOT IN A POSITION TO WAIT FOR A
DELIVERY TRUCK IN CASE OF A POWER FAILURE OR NATURAL DISASTER. BY
PROVIDING ON SITE STORAGE, THE OPERATOR AND ITS CUSTOMERS ARE
GUARENTEED THAT THE SERVICE PROVIDED, WILL BE UNITERUPTED IN THE
EVENT OF POWER FAILURE OR CERTAIN NATURAL DISASTERS.
4. Does the proposal conflict with policies of the Tukwila Comprehensive Land Use Policy
Plan? If so, what policies of the Plan? N0.
Proposed measures to avoid or reduce the conflict(s) are: N/A
• •
PLANNING DIVISION COMMENTS
DATE: July 28, 2000
PROJECT NAME: Exodus Underground Storage Tanks
PLAN CHECK NO.: MI2000 -181
Plan Reviewer: Contact Nora Gierloff at (206) 431 -3670 if you have any questions
regarding the following comments.
Prior to permit issuance a determination that the project qualifies as a Planned Action under
Tukwila's MIC Implementation Plan is required. Please submit a Planned Action checklist for
review.
Shown with
Optional Equipment
• CAT® DIESEL GENERATOR SETS
Factory designed, certified prototype tested;:;::'
with torsional analysis. Production tested and ;'
delivered to you in a package that is ready to
be connected to your fuel and power lines..
EPG Designer computer sizing available.::–
Supported 100% by your Caterpillar dealer
with warranty on parts and labor. Extended 2
warranty available in some areas. The
generator set was designed and manufactured
in an ISO 9001 compliant facility. Generator..
set and components meet or exceed the :1..
following specifications: ABGSM TM3,
AS1359, AS2789, BS4999, BS5000, BS5514,
DIN6271, DIN6280, EGSA101P, IEC 34/1,::
1503046/1, 1508528, JEM1359, NEMA MG1-22,
VDE0530, 89/392 /EEC, 89/336/EEC.
Generator 3516B
Set
1800 rpm
2000 kW 60 Hz
Standby Power
CATERPILLAR' ENGINE SPECIFICATIONS
V -16, 4- Stroke -Cycle Watercooled Diesel
Bore — mm (in) 170 (6.7)
Stroke — mm (in) 190 (7.5)
Displacement — L (cu in) 69 (4210)
Compression ratio 14:1
Oil CF -4
RECEIVED
crry OF TUKWILA
PEfi. mn CENTER
▪ RELIABLE, FUEL EFFICIENT DIESEL
The compact, four- stroke -cycle diesel engine
combines durability with minimum weight
while providing dependability and economy.
The fuel system operates on a variety of fuels.
• CATERPILLAR' SR4B GENERATOR
Single bearing, wye connected, static
regulated, brushless self excited generator
designed to match the performance and
output characteristics of the Caterpillar diesel
engine that drives it.
• EXCLUSIVE CATERPILL
VOLTAGE REGULATO
Three -phase sensing
regulation give. pre
loading, and con
operating ran
CATERPILLAR® SR4B GENERATOR
Type Brushless, revolving field,
solid -state exciter
Construction Single bearing, close coupled
Three phase Wye connected
Insulation Class H with tropicalization
and antiabrasion
Enclosure Drip proof IP 22
Alignment Pilot shaft
Overspeed capability 150%
Wave form Less than 5% deviation
Paralleling capability standard with
adjustable voltage droop
Voltage regulator 3 -phase sensing with
Volts- per -Hertz
Voltage regulation Less than ± 1/2%
Voltage gain Adjustable to compensate
for engine speed droop and line loss
r•
18
TIF • • • •d� �� . Leb an 50
THE ..
,. thap 3%
C E L RONTROL PANEL'-,.'
24Xo t DC Control = -',.,
Terminal box rnbUnted,
Vibration isolated
NEMA 1 /IP 23 enclosure
Electrically dead front
Lockable hinged door
Generator instruments meet ANSI C -39 -1
Voltages Available
60 Hz
999; 480, 699; en 41-GO
(Adjustable a minimum of ±1O %)
Other voltages available - consult your Caterpillar dealer.
Some voltages t
INCOMPILETE
e ire era ing.
PtL__i o
CATERPILLAR*
STANDARD EQUIPMENT
Engine
Aftercooler
Air cleaner
regular duty
Breather, crankcase
Cooler, lubricating oil
Exhaust fitting and
flange
Filters, right hand
fuel and lubricating
oil
Flywheel housing
SAE No. 00
standard rotation
Fuel system
electronic controlled
unit injectors
Governor
ADEM electronic
control
Manifold, exhaust, dry
Oil pan, shallow
Pumps,
fuel transfer;
aftercooler water,
jacket water, and
lubricating oil -
gear driven
Radiator
Rails, mounting
Shutoff, manual
Starting, electric,
24 Volt DC
Turbochargers
Vibration damper
Generator
SR4B brushless
permanent magnet
excited wit VR3
bc�ltQ -t yulalvl
Space heaters
ELECTRONIC MODULAR
CONTROL PANEL (EMCP)
Standard generator
controls and monitoring:
Ammeter /voltmeter
phase selector switch
Digital ammeter,
voltmeter, and
frequency meter
Voltage adjust rheostat
Standard engine controls
and monitoring:
Automatic /manual
start-stop control
Engine control switch
for:
off /reset, auto start,
manual start, stop,
cooldown timer,
cycle cranking,
emergency stop
pushbutton
Safety shutoff protection
and LED indicators for:
High coolant temp.
Low oil pressure
Overcrank
Overspeed
Emergency stop
pushbutton
3516B GENERATOR SET
STANDBY POWER ATTACHMENTS
Engine
Km.eleeiters
Charging systems
Cooling sterw3
fees; elrpeneier - tertlte
Control systems
geverrtert. Woodward
2.36-114 load share
Exhaust system
fittings, elbows,
flanges, muffler
1 .gym
+ et ttin9 -state to
Cterting•syeter,
Generator
fro- Fillers -
Digital voltage regulator
X1.1 . ..1•_ -. r 1�crli \ /f 3
Control Panel
Auxiliary relay
Ertellestire•
N A4 g11r .1 w
Illuminating lights
1 49+e4 d s c .J 3
Low coolant level
Provision for:
N1-PA
alarm module -
NFPA 110
Ctartingeid 3witele
Caterpillar® EMCP II
Electronic Modular Control Panel
The Electronic Modular Control Panel (EMCP II) is a
generator- mounted control panel, available on all
Caterpillar packaged generator sets. It utilizes
environmentally sealed, solid- state, microprocessor -
based modules for engine control and AC
metering. This new application of mature, high -
tech electronics to generator monitoring provides
more features, accuracy, and reliability than
present electromechanical and many competitive
panel systems.
1A
The EMCP II provides these standard control and
monitoring features, many of which are options on
other panels:
• Automatic /manual start-stop engine control
with programmable safety shutdowns and
associated flashing LED indicators for low oil
pressure, high coolant temperature, overspeed,
overcrank, and emergency stop
• Cycle cranking - adjustable 1 -60 second
crank/rest periods
• Cooldown timer - adjustable 0 -30 minutes
• Energized to run or shutdown fuel control
systems
• LCD digital readout for: engine oil pressure,
coolant temperature, engine rpm, system DC
volts, engine running hours, system diagnostic
codes, generator AC volts, generator AC amps,
and generator frequency
• Engine control switch
• Ammeter - voltmeter phase selector switch
• Emergency stop pushbutton
• Indicator /display test switch
• Voltage adjust potentiometer
• Rugged NEMA 1 /IP 23 capirie; T_�'a tt
�-;'r'1� i ir11 TT
PACKAGE SET PERFORMANCE
3516B DI TA SC DRY MANF TURBO QTY 4 PARALLEL ADEM GOV
DM1394 -10 PGS STANDBY 60 HERTZ EMISSIONS STRATEGY A/C TEMP: DEG F 140.
GEN 2000.0 W/F EKW 2060.0 W/0 F EKW W/F BHP 2876 W/O F BHP @ 1800 RPM
GENERAL PERFORMANCE DATA
GEN PER ENG ENG S FUEL FUEL INTAKE INTAKE INTAKE EXH EXH EXH
W/F CENT PWR BMEP CONSUM RATE MANF T MANF P AIR FL MANF T STK T GAS FL
EKW LOAD BHP PSI LB /BHP -HR GPH DEG F IN -HG CFM DEG F DEG F CFM
2000.0 100 2847 298 .357 145.4 186 81.6 6172 1245 963 17051
1800.0 90 2565 268 .354 129.6 181 75.5 5918 1162 893 15512
1600.0 80 2285 239 .350 114.3 175 67.7 5565 1090 838 13979
1500.0 75 2146 224 .349 107.0 172 63.4 5360 1058 815 13209
1400.0 70 2007 210 .348 99.8 169 58.9 5138 1028 794 12440
1200.0 60 1730 181 .350 86.4 164 49.7 4647 978 772 11027
1000.0 50 1454 152 .353 73.4 159 40.5 4138 928 750 9636
800.0 40 1183 124 .361 60.9 155 31.4 3619 875 728 8277
600.0 30 908 95 .373 48.4 152 22.6 3086 805 702 6903
500.0 25 769 80 .384 42.2 151 18.2 2818 764 687 6215
400.0 20 629. 66 .401 36.0 149 14.1 2567 718 665 5544
200.0 10 346 36 .483 '23.9 147 8.0 2207 595 570 4357
SOUND (NOISE) DATA - EXHAUST @ 4.9 FEET
GEN PER OVERALL OBCF OBCF OBCF OBCF OBCF OBCF OBCF OBCF
W/F CENT SOUND 63HZ 125HZ 250HZ 500HZ 1000HZ 2000HZ 4000HZ 8000HZ
EKW LOAD DB(A) DB DB DB DB DB DB DB DB
2000.0 100 116 107 •121 117 109 108 109 109 107
SOUND (NOISE) DATA - MECHANICAL @ 3.2 FEET
GEN PER OVERALL OBCF OBCF OBCF OBCF OBCF OBCF OBCF OBCF
W/F CENT SOUND 63HZ 125HZ 250HZ 500HZ 1000HZ 2000HZ 4000HZ 8000HZ
EKW LOAD DB(A) DB DB DB DB DB DB DB DB
2000.0 100 111 113 . 123 114 105 101 101 99 103
EMISSIONS DATA * * REFERENCE NOTES - NOMINAL
EMISSIONS DATA MEASUREMENT IS CONSISTENT WITH THOSE DESCRIBED IN EPA CFR 40
PART 86 SUBPART D AND ISO 8178 -1 FOR MEASURING HC, CO, CO2 AND NOX. THESE
PROCEDURES ARE VERY SIMILAR TO THE METHODS DESCRIBED IN EPA CFR 40 PART 60
APPENDIX A METHOD 25A FOR HYDROCARBONS, METHOD 10 FOR CO, METHOD 7E FOR NOX.
DATA SHOWN IS BASED ON STEADY STATE ENGINE OPERATING CONDITIONS OF 77 DEG F,
28.42 IN HG AND NUMBER 2 DIESEL FUEL WITH 35 DEG API AND LHV OF 18,390 BTU /LB.
THE DATA SHOWN IS SUBJECT TO INSTRUMENTATION, MEASUREMENT, FACILITY AND
ENGINE TO ENGINE VARIATIONS.
20
3U3liti i ii-►L it 1(LQ .£.)
02 (DRY)
GEN ENG NOX TOTAL PART IN EXH SMOKE BOSCH
PWR % PWR (AS NO2) CO HC CO2 MATTER (VOL) OPAC SMOKE
EKW LOAD BKW * * * * * * * G/HP-HR ***** ** % % NO.
2000.0 100 2123.4 5.46 .35 .13 1466.4 .103 9.90 2.1 1.28
1500.0 75 1600.4 5.44 .35 .19 1076.9 .119 11.70 2.1 1.28
1000.0 50 1083.9 5.42 .47 .25 737.7 .171 12.70 2.7 1.28
500.0 25 573.5 6.49 .73 .32 423.9 .230 14.10 2.9 1.28
AT RATED:
WET EXHAUST MASS 28175 LB/HR
WET EXHAUST FLOW ( 963 DEG F STACK TEMP ) 17068 CFM
WET EXHAUST FLOW RATE ( 32 DEG F AND 29.98 IN HG )5898 STD CFM
DRY EXHAUST FLOW RATE ( 32 DEG F AND 29.98 IN HG )5389 STD CFM
FUEL FLOW RATE 144.5 GAL/HR
21 A/
IDITTAI
RECEIVED
CITY OF TUKWILA
AUG - 1 Z000
PERMIT CENTER
1�1COINPVTE
LT R#
S BEY
AkCNITICTUII
MIMS
ON MI
•
e
Exoous
pre re w Mr
.was wa .Y
/_ wr-rw
VI.. It
Pww
Awes
AU
Cr .
nr0 MW Ma 5077 MM
WO TOW • 1O-M1
r +�
W-.. WO•IOW.
i�' p as - '- „1,16.4- i t
-\ /� ;11
Y
lg
I I I I• I• 1• I. I I 1• I 1• I •t[ _J L_J L_L_JL_L_LJ L_ (S nfJ a fl. • . a 1173 11•123 .
2 II
FOUNDATION PI1,
TM O CPT. OM MYL
L
•-53 • .m. a•M m
Mar -r
Coll
ICC O
MC. .ML
r<
•3
SO-41. PA.
10-1
71-00
L
LM.,
!!L
M ai71 rues
I Itll 1l
MN0M
aye
i
MNlw•n
a•-
iu POLvat.1
MgCHANICAL FRAM*" LAN
I.1 TOP n •j• COG MO MT. PM ( - SON PM
r•0 CO MIL
CDC. WY
SOP DRAWINGS
•• M1 MS Or MS r MO PPM a M Ml 0 MM.. UMlO
myu. .1M RIMl.tall O MLIW M.S MM.• PAM PO
COMM Ma I.D. TO POMP MC.. San I.m..MM• S.L.
L.1l M`PAMr MGM 3 P.W. WC SI�mO� kW at1 m OPT Or tut
PP DC IMIM•3 IWNOLITS MO 1011-4•004. MP
w •neap M MILT Mil Ai WM. Mi. 1.1 MOOLD MO
M M DYMa .CIF ROOM 101 MI•I! O M Taal COMM M MCC
MMM4m•1Mm M rot OOMM D yes m M. WIN e� P.M AT UPI OPTIOL
SPECIAL
COMM CONDITIONS W MM I a.1MM r M MO AM MALL MCC ALCM.
RCM MA TOT W.M4� Or NA I�yD MAWS 10 M IAM°6• . MM.
NOTE TO MECHANICAL AND ELECTRICAL TRADES
maw. Ift. Waal Pun wawa Loft LW um 10.1•0 O ALT PADS W
MSS MOMDIU.AOOOMM 7 LCMfJLaIM. SPA i0 •1 OM
Ma1Mf1 0.• M r I o MM PP.. MC MITI M M IMMD m Iaml
/w RCM POOR 61.61.1.1° Of WI O 0W PPMMI, 1u
PTA. O puma MS OP MOM MS OW Rif AMTS OCl•CS 0
COMM TO M SOM. r0 COMM MO 0 n M W MO Ml
Or C P .M� M1 r MC •O4IaSM MOWS n a SC I a AT WPMMTO Od
MMI DO MM.
• n5013 cuSOl�r a.a ir.° -n Oft VD
• PT
1 ails all wMa�as • It O CM. Cllvud OM
as OR Low WM. MOW. SM.L •S.•anw
Li
CM rMT 11.1'. •• OM Cr room MPS
Rt. !•�0 O aY°LMl a m u.LMMM
O COt WPO AT OMWM
(CAA 0 *AMC IMPS S vita • SPFl x Mm
M. • •m u0 YN. - WOO CM
MS
• CO M r
M M•.P nun
MOM
OFICIATS
GENERAL NOTE
1. WOWS APPLY MIST MP COMM
MI IMO Mt TO RI PIM COM
L . w •MA Mr - 1414 rrM. MP MOM.
�
hirr�Ci P.../Y.�l • TM PC
CORM MO
•TM LM Mme.
...Y
SS PP DO(W) M MM Y .• MM• Y Y Time
M YW. L•
S.:B
ARCIIITI
ra
•
•�•�M
�tltl� w
FOUNDATION
•1 iaeM4i Ma SOLI ovli •n ( -aw-17 M. aio•n MC. ni Kwtl •
:WW COMM. TO CI MAIM M M.& MI SP WM r PPM •
0007 PO 0*5*0ican MI IMMO In talIMP
rpm COML. OA MWmn TM .•O NOMA TO M COMM. ti
pall 4.14.1 Mmrm•Tm COMM mQ MM.M
maTip .0* mmiro 4:.M. ® ro4.'am m tar MTV O roc `.:
Ra fa O.0 COMM 0 IMP O TIM MO. MOM MO �{
PM • 0•11011 IMMO O YO a OT M Mm 07 7••1 TM.L/MO f0.
▪ 1•6110 MNN UM[ tO .min R!714.1 COMM OYa<I Ni
AM POTMAMOT. aPn�O� Al MT MO A OMOM t sal PPM MO MAO MOMS
7. IMMO 5MML M Mw° ®° 0 MI 0615 MO • OM
wtln w tl O IMADT urns MOD .m
Mal i .1a.C.. M • .o4°'4i.. °Ie1tea
SOP ONMS MuWPOO• OM m
IMPIL m SOMM.C•0* 1.Y M. 1* 0*00O *50W 0 PM 4411
COMM MGM sMMOLM NOMSOU4W PPM LOC. • WAS POI PPS m
MCP M
7. f ✓OQ.4
.. 4WM 10.0 • Mr. MP.
p i..0∎ -Y ZAP. C
0""of •• MA M. O a[
1 PIP MOM.O St.10•C N OMP. PLC PLC 11011 PM NM N SOAP Lq IMYY
MOM WT MM.
CONCRETE
rM.
MOTAMP OS S Flats M.10 P.1 CPC MO w ML moan
S1W.nMI iaem
Mr. •11 4• MY. ar .4 COMM .L•
IMOION Or 1441 Mu M rM MN MLCC SO p�
MOM ° n1..°pill males mw%o SS CMLASPOPS IC Mod.' AN
M IMO M M. LLCMS./01 f try MOM
PCP IMSZL LIMMIM CO MM.. MOM m. Dm
• L MP wr ML MOM COMO M. 10 WPM MMO a m••
ro .MIU[. V C Of MP SO MCA S W es .elm
TO MS MAO Mr TM l M .TIM tl.•
YIDMINT h WL.m.O MO m P.M Al T• MEM MM..
O MMM . m1OCCM a m MIMST • M0 0 v Ml0 M •0011M
M CO • II M•T1 ro OMO nm•W CO LOX.. F *i M PRO[CI 3.010 u
CS 1OnMMCmOCaMO NO3 COD MCA .COMM M. w TOM ••• IMO.0l aLO
QW Cl.C. OCT CM 1a W m WMMMMWICT.MO.1CTA!u
AM PICK O WV Tor.1wuM 00*of PM W* mMW MP w MM.•M..•W O TM a .CPO MOM m 1.1 TM III PC
MOM IMa r0 MOMW MMAMTIO
REINFORCING STEEL .l
MA COMIC (MOM meM•I Cam O M. OM w IOMM4tM.pM(�M� PP ASV MOM. C O tl M MA O•f0 MMO O... 'M.• S MMlO •f MOaLM.rM n0.1 00 0
i1Mm MCI. O 01.1.6 MOMS MCP. SIMMS. MOLD Oa
m mrpr Mn Ya .ltl M.•Mma Mahn m mwT na
ALCM r N0°`MrWMai 0 M OM • 0® MMpO La LCCM1 O M
OMR TO MM MrD.°a.lmM
PM O MM. ;coal
Mt. IMMIMOTOP • CM MIT-X47
REINFORCING STEEL WELDING
▪ Ya•1• eMM4 TO (0 • w dme TOW ID IC -
IwP
1410010 ‘• , P.-pp •SM•CI. % MLO. CM -
I MO m -� WO MM Mallet. MIMES MOM m AMMO -
W MOMS .mr.1.OMOMP110070
'MOM IMPS MCAT u0 MISS Qa4L11M O COMM
M.MMOIIP11.�7 Mop MCI MO CO OM MM TO N OM MIS Mt CO
N171 MDOMT MOO O WAS m IMO LPL Wa MU T m MOT
COM MN MIA NW Mail L�m°OM °°°`MUU OEM Iri 61.1.0 SM. -
O▪ P MOM rOrIaW.MPMWOPMM MOM P000L
RERAR DOWEL INSTALLATION -
m0 1 M•0 ra .MRS • •IC WIN OM O 1010..1/ MDMMO ATWO
MY.nO0• MOO Co m7CO MO•MMC.l LTA Ow R7 1 • 0,00
OuC MMp M IM.MM5 IN MI MtnO n OP
MOM W0MM.MQ WIT .0 MOOTR WY
STRUCTURAL STEEL AND MISCELLANEOU$MSTEEL
MOM O• [O•CP KTam0 MAMAS MCI
HMM�•M. STL..L S® Mu 2.1:-W41 ii0W W4DMl Oats
1 f M�11II[G0.0•iM43
M.DI aI O opal yfl uyOS14Mn.7irons a PAM IAA •111.0 m
COM MA AM PI MC MW ROM. MMDMM C OMmf. MP of
OME p OW ALL .M CHAR oTM 1® C.MOt7 0 WMM MOM
Q0E1 MM. I OR L WI LRO PICIOi 1.01.0 Mrnl ..• IM 0 MI TO AA PMTUEECM F0* 0O yTMMIR MMCO IOWaP O YWWMM O WL COL5MM 1. Na P MHO ••K• rIMI•. PTI t.0 014 „'M1` °.: I!aM�.M saMLatta Mn4.:[ ak 10 FP TM PCP.
MC 1M COMM MUM ...11 0 PAM CO MOM WU ON Mao
W0
INSPECTIONS
• 61441. Ma m M on M m0 Ma4Arm elan mmaaweemalNn Di yMaa
.011 MMC.D4M4 40. PPM. PM m SW
MADAM Yl 401010*• TO MCP ROM OLMMO W CMaoC
M.901. WPM MCI MOO
MOO WMM P.Wmram SWCM.L
O AL T� 070101 CMPASY MMUL Mall MW
.M SMOG. HOOD 07 5(0.1 MCOMM
MOM. COMM OMt T• nIMOPa D IRO
d 00M MC. MUM WMa O MOP FOR n puma
115 M01I .L MMWOa M Mn®r AMMO .w
T MM.COMM MOON ON MAO MP m OP MPS m
PA
MOO NM COMM°'•a(.Oi FFM••OalOM. am ImoaA MOM •
AO ▪ M MMI• um MOSOMOLi°MOM 01w1MDLi.aLM
MGM
EXODUS SEA
TENANT IIAPRI
wpr r(AM.
KCM
-- w
M1100 Ms COMM . O RIMS °00150070 Md5ML MT 101 WM
MOM MIA MO CIaaC0PM. t CP CM NOT
M IMS M0
•1a MM. 0011..0.0 C00 M4 MM. •0T
•O • .IM
1ICW Ma 61•41 MWMO
GENIIRtl