Department of Community Development
NOTICE OF COMPLETE APPLICATION
December 4, 2006
Donald Marcy
524 Second Ave, Suite 500
Seattle, WA 98104 -2323
Steven M. Mullet, Mayor
Steve Lancaster, Director
RE: Conditional Use Permit for the Group Health Cooperative Administrative Main Building
L06 -082
E06 -020
Dear Mr. Marcy:
Your application for the Conditional Use Permit for Group Health Cooperative Administrative
Main Building located at 12400 E. Marginal Way South has been found to be complete on
December 4, 2006 for the purposes of meeting state mandated time requirements. The project has
been tentatively scheduled for a public hearing before the Planning Commission on February 22,
2007.
The next step is to contact Fastsigns at (206) 575 -2110. They will need the site address and a
payment of $365 to install the notice board within 14 days of the date of this letter. Once the notice
board has been installed I will post it with a laminated copy of the Notice of Application and the
comment period will start.
This determination of complete application does not preclude the ability of the City to require that
you submit additional plans or information, if in our estimation such information is necessary to
ensure the project meets the substantive requirements of the City or to complete the review process.
I will be contacting you soon to discuss this project. If you wish to speak to me sooner, feel free to
call me at (206) 433 -7166.
Sincerely,
max..
Kathryn Devlin
Assistant Planner
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665
RECEIVED
RECEIAD 'NOV 14
2006
NOV. 14 2006 ° crop a'E yr
COMMUNITY SEPA
DEVELOP
"VVIRONMENTAL
REVIEW
CITY OF TUKWILA
Department of Community Development
6300 Sou hcenter Boulevard, Tukwila, 1')j4 98188
Telephone.: (206) 431- 3671) FAX (206) 131 -3665
E -mail: tukplan(eki.tukwila.wa.us
APPLICATION
NAME OF PROJECT/DEVELOPMENT: Group Health Cooperative --
Administrative Main Building
• LOCATION OF PROJECT/DEVELOPMENT: Give street address or, ifvncant, indicate iot(s),
Klock and subdivision. access street. and nearest intersection.
12400 E. Marginal Way South
LIST ALL TAX LOT NUMBERS' (this information may be found on your tax statement).
734060 - 0480 -00
:DEVELOPMENT COORDINATOR :
The individual who:
• has decision making authority on behalf of the owner /applicant in meetings with City staff,
• has full responsibility for identifying and satisfying all relevant and sometimes overlapping development
standards, and
• is the primary contact with the City to whom all notices and reports will be sent.
Name: Donald Marcy
Address: 524 Second Avenue, Ste. 500
Phone: 206 - 587 -0700
a
E -mail: dma (a�cirncross.com
10,
Signature:
FAX: 206 - 587 -2308
Date: /`/1 2-0 .0
P:\ Planning Forms\ Applications \SEPA_App - June 2006.doc June 19,
201)6
FOR STAFF USE ONLY Permits Phis TYPE P -SEPA
Planner:
File Number: j Q(O _ Q Z.Q
Application Complete
(Date:
)
Project File Number:
Application Incomplete
(Date:
)
Other File Numbers:
NAME OF PROJECT/DEVELOPMENT: Group Health Cooperative --
Administrative Main Building
• LOCATION OF PROJECT/DEVELOPMENT: Give street address or, ifvncant, indicate iot(s),
Klock and subdivision. access street. and nearest intersection.
12400 E. Marginal Way South
LIST ALL TAX LOT NUMBERS' (this information may be found on your tax statement).
734060 - 0480 -00
:DEVELOPMENT COORDINATOR :
The individual who:
• has decision making authority on behalf of the owner /applicant in meetings with City staff,
• has full responsibility for identifying and satisfying all relevant and sometimes overlapping development
standards, and
• is the primary contact with the City to whom all notices and reports will be sent.
Name: Donald Marcy
Address: 524 Second Avenue, Ste. 500
Phone: 206 - 587 -0700
a
E -mail: dma (a�cirncross.com
10,
Signature:
FAX: 206 - 587 -2308
Date: /`/1 2-0 .0
P:\ Planning Forms\ Applications \SEPA_App - June 2006.doc June 19,
201)6
RECEIVED
NOV 14 2006+
DEVELOPMENT
City of Tukwila
Endangered Species Act Screening Checklist
Date: November 8, 2006
Applicant Name: Group Health Cooperative
Street Address: 12400 E. Marginal Way South
City, State, Zip: Tukwila, WA 98168
Telephone: 206- 988 -2763
Directions
This Screening Checklist has been designed to evaluate the potential for your project to
result in potential "take" of Chinook salmon, Coho salmon, or Cutthroat trout as defined by
Section 9 of the Endangered Species Act. The checklist includes a series of "Yes" or "No"
questions about your project, organized into four parts. Starting with Part A on Page 1, read
each question carefully, circle "Yes" or "No," and proceed to the next question as
directed by the checklist. To answer these questions, you may need to refer to site plans,
grading and drainage plans, critical areas studies, or other documents you have prepared for
your project. The City will evaluate your responses to determine if "take" is indicated.
P: \Planning Forms \Applications \SEPA_App - June 2006.doc
June 19, 2006
Part A: Please review and answer each question carefully. Consider all phases of your project
including, but not limited to, construction, normal operation, potential emergency operation, and
ongoing and scheduled maintenance. Continue to the next question as directed for each No or Yes
answer.
141
Will the project require any form of grading? Grading is defined as any excavating, filling,
clearing, or creation of impervious surface, or any combination thereof, which alters the
existing ground surface of the earth (TMC 18.06.370). Please circle appropriate response.
CO Continue to Question 2 -0
YES - Continue to Question 1 -1 (Page 3)
2 -0
Will the project require any form of clearing? Clearing means the removal or causing to be
removed, through either direct or indirect actions, any vegetation from a site (18.06.145).
Please circle appropriate response.
Continue to Question 3 -0
YES - Continue to Question 2 -1 (Page 4)
3 -0
Will the project require work, during any time of the project, below the ordinary high water
mark of a watercourse or the Green/Duwamish or Black Rivers or in wetlands? Ordinary high
water mark is the mark that is found by examining the bed and banks of a stream and
ascertaining where the presence and action of waters are so common and usual as to distinctly
mark the soil from that of the abutting upland, in respect to vegetation (see TMC Chapter 18.06,
Page 18 -15). Please circle appropriate response.
4 Continue to Question 4 -0
YES - Continue to Question 3 -1 (Page 5)
4 -0
Will the project result in the processing or handling, storage, or treatment of hazardous
substances? This does not include the proper use of fuel stored in a vehicle's fuel tank.
Hazardous substances are any liquid, solid, gas, or sludge, including any material, substance,
product, commodity, or waste. regardless of quantity, that exhibits the characteristics or criteria
of hazardous waste as defined by Washington Administrative Code 173 -303 (TMC 18.06.385).
This includes fuel or other chemicals stored on -site during construction. Please circle
appropriate response.
CI Continue to Question 5 -0
YES - Continue to Question
5-0
Will the project result in the withdrawal, injection, or interception of groundwater? Examples
of projects that may affect groundwater include, but are not limited to: construction of a new
well, change in water withdrawals from an existing well, projects involving prolonged
construction dewatering, projects installing French drains or interceptor trenches, and sewer
lines. For the purpose of this analysis, projects that require a geotechnical report pursuant to
the requirements of TMC 18.45.060 or would require a geotechnical report if not exempt
should answer Yes. Please circle appropriate response.
CI Continue to Question 6 -0
YES - Continue to Question 6 -0
P: \Planing Forms \ Applications \SEPA_App - June 2006.doc
June 19, 2006
•
City of Tukwila cSA Screening Checklist
Part A (continued)
6 -0 Will the project involve landscaping or re- occurring outdoor maintenance that includes the
regular use of fertilizers, pesticides, or herbicides? This does not include the one -time use of
transplant fertilizers. Landscaping means natural vegetation such as trees, shrubs, groundcover,
and other landscape materials arranged in a manner to produce an aesthetic effect appropriate
for the use of the land (TMC 18.06.490). For the purpose of this analysis, this includes the
establishment of new lawn or grass. Please circle appropriate response.
— Checklist Complete
YES — Checklist Complete
Part B: Please answer each question below for projects that include grading. Review each
question carefully, considering all phases of your project including, but not limited to construction,
normal operation, potential emergency operation, and ongoing and scheduled maintenance.
Continue to the next question as directed for each No or Yes answer.
1 -1
Will the project involve the modification of a watercourse bank or bank of the
Green/Duwamish or Black Rivers between the ordinary high water mark and top of bank? This
includes any projects that will require grading on any slope leading to a river or stream, but will
not require work below the ordinary high water mark. Work below the ordinary high water
mark is covered in Part C. Please circle appropriate response.
NO - Continue to Question 1 -2
YES - Continue to Question 1 -2
1 -2 Could the construction, operation, or maintenance of the project result in sediment transport off
site or increased rates of erosion and/or sedimentation in watercourses, the Green/Duwamish
rivers, or the Black River? Most projects that involve grading have the potential to result in
increased erosion and/or sedimentation as a result of disturbances to the soil or earth. If your
project involves grading and you have not prepared a Temporary Erosion and Sedimentation
Control Plan specifically designed to retain 100 percent of the runoff (including during
construction) from impervious surface or disturbed soils, answer Yes to this question. If your
project is normally exempt under the Tukwila Municipal Code and would not require the
preparation of a Temporary Erosion and Sedimentation Control Plan, BUT may still result in
erosion or sediment transport off site or beyond the work area, answer Yes to this question.
Please circle appropriate response.
NO - Continue to Question 1 -3
YES - Continue to Question 1 -3
1 -3 Will the project result in the construction of new impervious surfaces? Impervious surfaces
include those hard surfaces which prevent or restrict the entry of water into the soil in the
manner that such water entered the soils under natural conditions prior to development; or a
hard surface area that causes water to run off the surface in greater quantity or at an increased
rate of flow from the flow presented under natural conditions prior to development. Such areas
include, but are not limited to, rooftops, asphalt or concrete paving, compacted surfaces, or
other surfaces that similarly affect the natural infiltration or runoff patterns existing prior to
development (TMC 18.06.445). Please circle appropriate response.
NO - Continue to Question 2 -0 (Page 2)
YES - Continue to Question 1 -4
City of Titkwili t A Screening Checklist
Part B (continued)
1 -4 Will your project generate stormwater from the creation of impervious surfaces that will not be
infiltrated on site? For the purpose of this analysis, infiltration includes the use of a stonnwater
treatment and management system intended to contain all stormwater on site by allowing it to
seep into pervious surface or through other means to be introduced into the ground. If your
project involves the construction of impervious surface and does not include the design of a
stormwater management system specifically designed to infiltrate stonnwater, answer Yes to
this question. Please circle appropriate response.
NO - Continue to Question 2 -0 (Page 2)
YES - Continue to Question 2 -0 (Page 2)
Part C: Please review each question below for projects that include clearing. Review each question
carefully, considering all phases of your project including, but not limited to construction, normal
operation, potential emergency operation, and ongoing and scheduled maintenance. Continue to
the next question as directed for each No or Yes answer.
2 -1
Will the project involve clearing within 200 feet of the ordinary high water mark of a
watercourse or the Green/Duwamish or Black Rivers? Please circle appropriate response.
NO - Continue to Question 3 -0 (Page 2)
YES - Continue to Question 2 -2
2 -2
Will the project involve clearing of any trees within 200 feet of the ordinary high water mark of
a watercourse or the Green /Duwamish or Black Rivers? A tree is defined by TMC 18.06.845 as
any self - supporting woody plant, characterized by one main trunk, with a potential diameter -
breast- height of 2 inches or more and potential mininnun height of 10 feet. Please circle
appropriate response.
NO - Continue to Question 2 -3
YES - Continue to Question 2 -3
2 -3
Will the project involve clearing of any evergreen trees from within 200 feet of the ordinary
high water mark of a watercourse or the Green /Duwamish or Black Rivers? For the purpose of
this analysis evergreen means any tree that does not regularly lose all its leaves or needles in the
fall. Please circle appropriate response.
NO - Continue to Question 2 -4
YES - Continue to Question 2 -4
2 -4
Will the project involve clearing within 100 feet of the ordinary high water mark of a
watercourse or the Green/Duwamish or Black Rivers? Please circle appropriate response.
NO - Continue to Question 3 -0 (Page 1) .
YES - Continue to Question 2 -5
2 -5
Will the project involve clearing within 40 feet of the ordinary high water mark of a
watercourse or the Green/Duwamish or Black Rivers? Please circle appropriate response.
NO - Continue to Question 3 -0 (Page 2)
YES - Continue to Question 3 -0 (Page 2)
• City of TukwilSA Screening Checklist
Part D: Please review each question below for projects that include work below the ordinary high
water mark of watercourses or the Duwamish /Green or Black Rivers or in wetlands. Review each
question carefully, considering all phases of your project including, but not limited to,
construction, normal operation, potential emergency operation, and ongoing and scheduled
maintenance. Continue to the next question as directed for each No or Yes answer.
3 -1
Will the project involve the direct alteration of the channel or bed of a watercourse, the
Green/Duwamish rivers, or Black River? For the purpose of this analysis, channel means the
area between the ordinary high water mark of both banks of a stream, and bed means the stream
bottom substrates, typically within the normal wetted -width of a stream. This includes both
temporary and permanent modifications. Please circle appropriate response.
NO - Continue to Question 3 -2
YES - Continue to Question 3 -2
3 -2
Will the project involve any physical alteration to a watercourse or wetland connected to the
Green/Duwamish River? For the purpose of this analysis, "connected to the river means"
flowing into via a surface connection or culvert, or having other physical characteristics that
allow for access by salmonids. This includes impacts to areas such as sloughs, side channels,
remnant oxbows, ditches formed from channelized portions of natural watercourses or any area
that may provide off channel rearing habitat for juvenile fish from the Duwamish River. This
includes both temporary construction alterations and permanent modifications. Watercourses
or wetlands draining to the Green/Duwamish River that have a hanging culvert, culvert with a
flap gate, diversion, or any entirely man -made or artificial structure that precludes fish access
should answer Yes to this question. Please circle appropriate response.
NO - Continue to Question 3 -3
YES - Continue to Question 3 -3
3 -3
Will the project result in the construction of a new structure or hydraulic condition that could be
a barrier to salmonid passage within the watercourse or the Green/Duwamish or Black Rivers?
For the purpose of this analysis, a barrier means any artificial or human modified structure or
hydraulic condition that inhibits the natural upstream or downstream movement of salmonids,
including both juveniles and adults. Please circle appropriate response.
NO - Continue to Question 3 -4
YES - Continue to Question 3 -4
3 -4
Will the project involve a temporary or permanent change in the cross - sectional area of a
watercourse or the Green/Duwamish or Black Rivers? For the purpose of this analysis, the
cross - sectional area is defined as a profile taken from the ordinary high water mark on the right
bank to the ordinary high water mark on the left bank. Please circle appropriate response.
NO - Continue to Question 3 -5
YES - Continue to Question 3 -5
3 -5
Will the project require the removal of debris from within the ordinary high water mark of a
watercourse or the Green/Duwamish or Black Rivers? For the purpose of this analysis, debris
includes, but is not limited to fallen trees: logs, shrubs, rocks, piles, rip -rap, submerged metal,
and broken concrete or other building materials. Projects that would require debris removal
from a watercourse or the Green/Duwamish or Black Rivers as part of a maintenance activity
should answer Yes to this question. Please circle appropriate response.
City of TilkwIASA Screening Checklist
NO - Continue to Question 3 -6
YES - Continue to Question 3 -6
3 -6 Will the project result in impacts to watercourses or wetlands that have a surface connection to
another watercourse or the Green/Duwamish or Black Rivers but do not contain habitat
conditions that support salmonid use? Such areas may include, but not be limited to hillside
seeps and wetlands isolated from the watercourse or river that have a surface water connection
to the watercourse or river but are not assessable, nor would be assessable to salmonids under
natural conditions. Wetlands with a "functions and values" rating for baseflow /groundwater
support of 9 and above (or moderate) as described in Cooke (1996) should be included. Please
circle appropriate response.
NO - Continue to Question 3 -7
YES - Continue to Question 3 -7
3 -7 Will the project include the construction of artificial waterways or wetlands connected to a
watercourse containing salmonids? For the purpose of this analysis, the construction of
artificial waterways or wetlands includes wetlands, channels, sloughs, or other habitat feature
created to enhance wildlife use, particularly waterfowl use, or may be attractive to wildlife,
particularly waterfowl. Please circle appropriate response.
NO - Continue to Question 3 -8
YES - Continue to Question 3 -8
3 -8 Will the project include bank stabilization? For the purpose of this analysis, bank stabilization
includes, but is not limited to, rip -rap, rock, log, soil, or vegetated revetments, concrete
structures, or similar structures. Please circle appropriate response.
NO - Continue to Question 4 -0 (Page 2)
YES - Continue to Question 4 -0 (Page 2)
• RECEIVED
'NOV 14 2006
COMMUNITY
DEVELOPMENT
STATE ENVIRONMENTAL CHECKLIST
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses:
A. BACKGROUND
1. Name of proposed project, if applicable:
Group Health Cooperative -- Administrative Main Building
2. Name of Applicant:
Group Health Cooperative
3. Date checklist prepared:
November 8, 2006
Agency requesting checklist:
City of Tukwila
5. Proposed timing or schedule (including phasing, if applicable):
Fall of 2006
6. Do you have any plans for future additions, expansion, or further activity
related to or connected with this proposal? If yes, explain.
No
7. List any environmental information you know about that has been
prepared, or will be prepared, directly related to this proposal.
None
Agency Comments
8. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes, explain.
No other applications are pending 1_�O�A o� - ;�,�vs, GA
P: \Planting Forms \ Applications \ SEPA_App - June 2006.doc June 19, 2006
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
9. List any government approvals or permits that will be needed for your proposal.
Conditional Use Permit
10. Give brief, complete description of your proposal, including the proposed uses and the size
of the project and site. There are several questions later in this checklist that ask you to
describe certain aspects of your proposal. You do not need to repeat those answers on this
page.
The proposal is to obtain a conditional use permit to convert
90,808 square feet of legal nonconforming office use to an approved
conditional use. There are also 19,999 square feet of legally
permitted office use at the facility.
.11. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, the tax lot number, and
section, township, and range. If a proposal would occur over a range of area, provide the
range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and
topographic map, if reasonably available. While you should submit any plans required by
the agency, you are not required to duplicate maps or detailed plans submitted with any
permit applications related to this checklist.
12400 E. Marginal Way South
Tax parcel: 734060 - 0480 -00
12. Does the proposal.lie within an area designated on the City's Comprehensive Land Use
Policy Plan Map as environmentally sensitive'?
No
•
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses:
B. ENVIRONMENTAL ELEMENTS
Agency Comments
1 Earth
a. General description of the site (circle one): Flat rolling, hilly, steep slopes,
mountainous, other:
The majority of the site is flat, but there are slopes on the southern
part of the site.
b. What is the steepest slope on the site (approximate percent slope)?
N/A
c. What general types of soils are found on the site (for example, clay, sand, gravel,
peat, muck)? If you know the classification of agricultural soils, specify them and
note any prime farmland.
N/A
d. Are there surface indications or history of unstable soils in the immediate vicinity?
If so, describe.
No
e. Describe the purpose, type, and approximate quantities of any filling or grading
proposed. Indicate source of fill.
N/A
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
f. Could erosion occur as a result of clearing, construction, or use?
If so, generally describe.
N/A
g.
About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
No additional impervious surfaces will be added.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
N/A
2. Air
a. What types of emissions to the air would result from the proposal (for example, dust,
automobile odors, industrial wood smoke) during construction and when the project is
completed? If any, generally describe and give approximate quantities if known.
None, the use is existing.
b. Are there any off -site sources of emissions or odor that may affect your proposal? If so;
generally describe.
None
• •
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
N/A
3. Water
a. Surface:
1. Is there any surface water body on or in the immediate vicinity of the site
(including year -round and seasonal streams, saltwater, lakes, ponds, wetlands)?
If yes, describe type and provide names. If appropriate, state what stream or
river it flows into.
No
2. Will the project require any work over, in, or adjacent to (within 200 feet) the
described waters? If yes, please describe and attach available plans.
No
3. Estimate the amount of fill and dredge material that would be placed in or
removed from surface water or wetlands and indicate the area of the site that
would be affected. Indicate the source of fill material.
N/A
• •
Please respond.to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
4. Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities, if known.
No
5. Does the proposal lie within a 100 -year floodplain? If so, note location on the site plan.
No
6. Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
No
b. Ground:
1. Will ground water be withdrawn, or will water be discharged to ground water? Give
general description, purpose, and approximate quantities, if known.
No
• •
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
2. Describe waste materials that will be discharged into the ground from septic tanks or
other sources, if any (for example: Domestic sewage; industrial, containing the
following chemicals...; agricultural; etc). Describe the general size of the system, the
number of such systems, the number of houses to be served (if applicable), or the
number of animals or humans the system(s) are expected to serve:
None
c. Water Runoff (including storm water):
1. Describe the source of runoff (including storm water) and method of collection and .
disposal, if any (include quantities, if known). Where will this water flow? Will this
water flow? Will this water flow into other waters? If so, describe.
No modifications to the existing stormwater collection and disposal
system will occur.
2. Could waste materials enter ground or surface waters? If so, generally describe.
No
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any:
N/A
•
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses:
4. Plants
a. Check or circle types of vegetation found on the site:
c '
Deciduous tree: alder, maple, aspen, other
,
Evergreen tree : fir, cedar, pine, other
,/
Shrubs
Grass
Pasture
Crop or grain
Wet soil plants: cattail, buttercup, bulrush,
skunk cabbage, other
Water plants: water lily, eelgrass, milfoil, other ,
,/
Other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
None
c. List threatened or endangered species known to be on or near the site.
None
d. Proposed landscaping, use of native plants, or other measures to preserve or
enhance vegetation on the site, if any:
No change to existing landscaping is proposed.
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses:
5. Animals
a. Circle any birds or animals which have been observed on or near the site or are
known to be on or near the site:
Birds:
Mammals
Fish
Other
aw heron, eagle songbirds other:
Deer, bear, elk, beaver, other:
Bass, salmon, trout, herring, shellfish, other:
b. List any threatened or endangered species known to be on or near the site.
None
c. Is the site part of a migration route'? If so, explain.
No
d. Proposed measures to preserve or enhance wildlife, if any:
N/A
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to
meet the completed project's energy needs? Describe whether it will be used for
heating, manufacturing, etc.
Electricity and natural gas are used for heating, cooling and lighting.
Agency Comments
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
b. Would your project affect the potential use of solar energy by adjacent properties? If
so, generally describe.
No
c. What kinds of energy conservation features are included in the plans of this
proposal? List other proposed measures to reduce or control energy impacts, if any:
None
7. Environmental Health
a. Are there any environmental health hazards, including exposure to toxic chemicals,
risk of fire and explosion, spill, or hazardous waste, that could occur as a result of
this proposal? If so, describe.
No
Describe special emergency services that might be required.
N/A
2. .Proposed measures to reduce or control environmental health hazards, if any:
N/A
•
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
b. Noise
1. What types of noise exist in the area which may affect your project (for
example: traffic, equipment, operation, other)?
Traffic noise occurs but will not affect the project.
2. What types and levels of noise would be created by or associated with the
project on a short -term or long -term basis (for example: traffic, construction,
operation, other)? Indicate what hours noise would come from the site.
Noise from traffic entering and leaving the site but the noise
exists today and will not change as a result of the conditional
use approval.
3. Proposed measures to reduce or control noise impacts, if any:
None
Land and Shoreline Use
a. What is the current use of the site and adjacent properties?
Light industrial and office uses; and transportation corridors.
b. Has the site been used for agriculture? If so, describe.
The site may have been used for agriculture many years ago but
not in recent history.
• •
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
c. Describe any structures on the site.
There is a concrete tilt -up building on the site that contains
approximately 326,788 square feet and a parking structure that
contains three levels and 608 stalls.
d. Will any structures be demolished? If so, what?
No
e. What is the current zoning classification of the site?
MIC /L
f. What is the current comprehensive plan designation of the site?
MIC /L
g. If applicable, what is the current shoreline master program designation of the site'?
N/A
h. Has any part of the site been classified as an "environmentally sensitive" area? If so,
specify.
No
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
i. Approximately how many people would reside or work in the completed project?
Approximately 1,200 people work at the facility.
j. Approximately how many people would the completed project displace?
None
k. Proposed measures to avoid or reduce displacement impacts, if any:
None
I. Proposed measures to ensure the proposal is compatible with existing and projected
land uses and plans, if any:
Conditional use permit has been requested.
9. Housing
a. Approximately how many units would be provided, if any'? Indicate whether high,
middle, or low- income housing?
None
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low- income housing.
None
c. Proposed measures to reduce or control housing impacts, if any:
None
10. Aesthetics
a. What is the tallest height of any proposed structure(s), not including antennas; what
is the principal exterior building material(s) proposed?
Existing building height is 28 feet, and the principal exterior
building material is concrete.
b. What views in the immediate vicinity would be altered or obstructed?
None
c. Proposed measures to reduce or control aesthetic impacts, if any:
None
•
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
11. Light and Glare
a. What type of light or glare will the proposal produce? What time of day would it
mainly occur?
None
b. Could light or glare from the finished project be a safety hazard or interfere with
views?
No
c. What existing off -site sources of light or glare may affect your proposal?
None
d. Proposed measures to reduce or control light and glare impacts, if any:
None
12. Recreation
a. What designed and informal recreational opportunities are in the immediate
vicinity?
A fitness center is located in the building.
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
b. Would the proposed project displace any existing recreational uses? If so, describe.
No
c. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
None
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or proposed for, National, State, or Local
preservation registers known to be on or next to the site? If so, generally describe.
No
b. Generally describe any landmarks or evidence of historic, archaeological, scientific,
or cultural importance known to be on or next to the site.
None
c. Proposed measures to reduce or control impacts, if any:
None
• •
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
14., Transportation
a. Identify public streets and highways serving the site, and describe proposed access
to the existing street system. Show on site plans, if any.
E. Marginal Way South
b. Is the site currently served by public transit? If not, what is the approximate distance
to the nearest transit stop?
Yes: approximately 1,000 feet.
c. How many parking spaces would the completed project have? How many would the
project eliminate?
No changes to the existing_parking is proposed.
d. Will the proposal require any new roads or streets, or improvements to existing
roads or streets, not including driveways? If so, generally describe (indicate whether
public or private).
No
e. Will the project use (or occur in the immediate vicinity of) water, rail, or air
transportation? If so, generally describe.
No
• •
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
f. How many vehicular trips per day would be generated by the completed project? If
known, indicate when peak volumes would occur.
No new trips will be generated. All traffic associated with the
proposal exists today.
g. Proposed measures to reduce or control transportation impacts, if any:
None
15. Public Services
a. Would the project result in an increased need for public services (for example: fire
protection, police protection, health care, schools, other)? If so, generally describe.
No
b. Proposed measures to reduce or control direct impacts on public services, if any.
None
16. Utilities
a. Circle utilities currently available at the site:
atural eas • �� - e
system
other:
use
servic
telephon, at-wary sewe , septic
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses:
b. Describe the utilities that are proposed for the project, the utility providing the
service, and the general construction activities on the site or in the immediate
vicinity which might be needed.
No change to existing utilities is proposed.
C. SIGNATURE
The above answers are true and complete to the best of my knowledge. I understand that the
lead agency is Shying on them to make its decision.
Signature:
Date Submitted:
(NON - PROJECT PROPOSALS (E.G., SUBURBAN PLANS AND
ZONING CODE TEXT CHANGES) MUST COMPLETE THE
FOLLOWING PAGES).
Agency Comments
• •
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses: Agency Comments
D. SUPPLEMENTAL SHEET FOR NON-PROJECT PROPOSALS
(do not use this sheet for project actions)
Because these questions are very general, it may be helpful to read them in
conjunction with the list of elements of the environment.
When answering these questions, be aware of the extent the proposal, or
the types of activities likely to result from the proposal, would affect the
item at a greater intensity or at a faster rate than if the proposal were not
implemented. Respond briefly and in general terms.
L How would the proposals be likely to increase discharge to water; emissions
to air; production, storage, or release of toxic or hazardous substances; or
production of noise?
Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, animals, fish, or marine
life?
Proposed measures to protect or conserve.plants, animals, fish, or marine life
are:
• •
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses:
3. How would the proposal be likely to deplete energy or natural resources?
Proposed measures to protect or conserve energy and natural resources are:
4. How would the proposal be likely to use or affect environmentally sensitive
areas or areas designated (or eligible or under study) for governmental
protection; such as parks, wilderness, wild and scenic rivers, threatened or
endangered species habitats, historic or cultural sites, wetlands, floodplains, or
prime farmlands?
Proposed measures to protect such resources or to avoid or reduce impacts
are:
5. How would the proposal be likely to affect land and shoreline use; including
whether it would allow or encourage land or shoreline uses incompatible
with . existing plans?
Agency Comments
•
Please respond to all questions. Use separate sheets as necessary.
Applicant Responses:
Proposed measures to avoid or reduce shoreline and land use impacts are:
6. How would the proposal be likely to increase demands on transportation or
public service and utilities?
Proposed measures to reduce or respond to such demand(s) are:
7. Identify, if possible, whether the proposal may conflict with Local, State, or
Federal laws or requirements for the protection of the environment.
Agency Comments