Loading...
HomeMy WebLinkAboutCOW 2011-06-13 Item 4D - Bid Award - RL Alia Company for Interurban Avenue South Gravity Sewer for $746,176.80 CO UNCIL AGENDA SYNOPSIS Initials ITEM NO. Meeting Date Prepared by Mayo 'n Council review �r I 06/13/11 I BG I Al r 06/20/11 I BG ITEM INFORMATION TAFF SPONSOR: BOB GIBERSON I ORIGINAL AGENDA ATE: CAS NUMBER: 11-060 STAFF A D 6 13 11 AGENDA ITEM TITLE Bid Award for Interurban Ave South Gravity Sewer Project CATEGORY Disczu Motion Resolution Ordinance Bid Award Public Hearing Other Mtg Date 06/13/11 Mtg Date Mtg Date Mtg Date Mtg Date 06120111 Mtg Date Mtg Date SPONSOR Council Mayor Adm Svcs DCD Finance Fire Legal P&R Police PW SPONSOR This project will remove Sewer Pump Station No. 7 and replace it with sewer pipe fed by SUMMARY gravity along Interurban Ave South. The project was advertised for bids on April 14 and 21 and 5 bids were opened on April 28, 2011. The low bid of $746,176.80 was from R.L. Alia Company. Alia's references have been checked and found to be satisfactory. Council is being asked to award this construction contract to R.L. Alia Company in the amount of $746,176.80. REVIEWED BY COW Mtg. CA &P Cmte F &S Cmte Transportation Cmte Utilities Cmte Arts Comm. Parks Comm. Planning Comm. DATE: 5/24/11 COMMITTEE CHAIR: DE'SEAN QUINN RECOMMENDATIONS: SPONSOR /ADMIN. Public Works COMMITTEE Unanimous Approval; Forward to Committee of the Whole COST IMPACT F. VND SOURCE EXPENDI'T'URE REQUIRED AMOUNT BUDGETED APPROPRIATION REQUIRED $746,176.80 $923,000.00 $0.00 Fund Source: 402 SEWER FUND (PAGE 120, 121, 2011 CIP PAGE 277, 2011 -2012 BUDGET) Comments: WTG.DATE-1 RECORD OF COUNCIL ACTION 6/13/11 6/20/11 WO DATE ATTACHMENTS 6/13/11 Informational Memorandum dated 5/20/11 Map of construction area Bid Tabulation [Minutes from the Utilities Committee meeting of 05/24/11 6/20/11 I 161 162 City of Tukwila Jim Haggerton, Mayor INFORMATIONAL MEMORANDUM TO: Mayor Haggerton UTILITIES COMMITTEE FROM: Public Works Director DATE: May 20, 2011 SUBJECT: Interurban Avenue South Gravity Sewer Project No. 90440208 Bid Award ISSUE Award the bid for the Interurban Avenue South Gravity Sewer Project (see attached map for project location). BACKGROUND The sewer system on Interurban Avenue South was installed in 1967 under L.I.D. No. 12. The present condition of the sewer lift station is very poor and the proposed project will eliminate the need for the lift station, reducing city maintenance staff time since pumps will not be required and the system will operate strictly by gravity. ANALYSIS The project was advertised for bids on April 14 and 21 and 5 bids were opened April 28, 2011. The bids were reviewed and tabulated and one error was found in the sales tax in the amount of $0.02 for Titan Earthworks, LCC. R. L. Alia Company submitted the apparent low bid with $746,176.80. R.L. Alia's references have been checked and found to be satisfactory. The Engineer's estimate was $680,000.00. Expenditures Fundinq Budget Bid Award Contract Alia 746,176.80 Construction 750,000.00 Contingency (11 82,079.45 2011 Sewer Repair 75,000.00 360 Networks Conduit Relocation 20,000.00 Station Painting 15,000.00 Construction Mgmt (10 74,617.68 Construction Mgmt 80,000.00 Repair of Sewer Mains 3.000.00 Total 922,873.93 Total 923 000.00 The project budget includes $75,000 from the 2011 C.I.P. line item for the Annual Sewer Repair Program, $15,000 from the Sewer Utility for pump station painting (402.01.535.800.48.01) and $3,000 from the Sewer Utility for repairs (402.01.535.800.48.03). The use of the funds from other line items is required because of the poor condition of the existing lift station. If the lift station should fail, the cost of the repairs will be at a very high cost. When the 2011 -2016 budget process was completed in August of 2010, the project construction budget was $750,000.00. This past winter the price of diesel fuel increased 38 gasoline increased 26% and PVC pipe increased 61 All of these price increases would account for the higher construction bid. RECOMMENDATION The Council is being asked to award the construction of the Interurban Avenue South Gravity Sewer Project to the R.L. Alia Company in the amount of $746,176.80 and consider this item at the June 13, 2011 Committee of the Whole and subsequent June 20, 2011 Regular Meeting. Attachments: Map Bid Tabulation WAPW EngTROJECTSW SW Projects104sw08 Interurban Sewer UpgradesVnfo Menw Bid Award 050211 gl- sb.doc 163 164 14 t� t It N 1 j ttr t OP t �g tt vet Ah tY f i �lr `s t k 1V i., 1 f rl N Photo Date: 2009 w E Interurban Ave S Gravity Sewer s Work Zone Not to Scale 5 166 9 8 8 8 8 S 8 9 8 8 8 8 g 8 8 g 8 8 8 8 8 8 8 g S 8 8 9 8 8 92. Cl) m m N S n ci Oc t a N N N N- N N N N N- N N N N N- N N N N N N N N N N N N N N N N N N N N N N« 8 8 8 8 8 S 8 8 9 m m N«« F m 'o a N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 8 8 8 m 8 8 8 6 8 6 8 6 8 6 8 N 8 S m m S w m n 8 —o o S a N N N N N N N N— N N N N— N N N NNN N N N N N Nw W N p N N N N N N N N N N N N .n N N 8 8 8 8 8 8 8 8 8 8 8 8 8 8 S 8 m S O 3 �a 8888 8888 T �o z 8 8 4 2 a m o a N N N N N i N N N N N N N N N N m N N N N N N N N N N N N N N N N N N N a o 8 9 8 8 8 8 8 8 8 g S m S S S m 8 g d w m ry n m d m m d m 8 n N m m 8 m w m m w«« m m m w m -g 888 g g g 88 8889 8 8898 o S S 8 8 m m 8 8 8 2 8 d m m n m S d e m w S d e a °n N N N N N N N N N N N N N N N N N N N N m N N N N N N N N N N N N m N N NN N m a g 6 m n m m g m m 1 m N m w m m m n I d m m d w m N m ry w n $o r Q N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N 8 8 8 8 8 8 8 8 8 8 8 d 8 8 8 8 8 8 9 9 8 9 8 w m m m m N d^ m m m ry o m n N9 r 'a 8 8 8 8 8 8 8 8 8 8 8 8 8 8 9 9 9 8 8 8 9 8 8 8 o o z oiizoara. °z z „z�° z a a a Fa aoa a¢a o N a a a G m m 3 o S G i a i o zo a a o S o Y a 3 o a f a z a 3 S W 3 w m m i x 8 i f z z a i a w 6 0 5 i a 5 o o LL o i N a N a _d m f —3 8888 8888 8888 8888 z 167 City of Tukwila Utilities Committee UTILITIES COMMITTEE Meeting Minutes May 24, 2011 5:00 p.m. Conference Room #1 PRESENT De'Sean Quinn, Chair; Dennis Robertson and Kathy Hougardy Staff: Bob Giberson, Frank Iriarte, Robin Tischmak, Mike Cusick, and Gail Labanara CALL TO ORDER: Committee Chair Quinn called the meeting to order at 5:01 p.m. I. PRESENTATIONS No Presentations II. BUSINESS AGENDA A. Bid Award: Interurban Avenue South Gravity Sewer Staff is seeking full Council approval to award a bid in the amount of $746,176.80 to R.L. Alia Company for the construction of the Interurban Avenue South Gravity Sewer project. This project will eliminate Pump Station No. 7, and replace it with sewer pipe fed by gravity. The removal of the pump station will lower maintenance costs and the gravity sewer Iine is expected to last approximately 50 years. Staff discussed receiving high bids and Committee Member Robertson inquired if this project was the best use of the limited sewer funds that are available. Mike Cusick stated that the bidding climate is starting to worsen due to recent fuel price increases and the lack of raw materials (that may be going to rebuild Japan after the earthquake). Smaller contractors are also having problems securing bid bonds. However, not going through with this project poses a greater risk if the sewer pumps should break down, which would result in an emergency repairs that could cost approximately $500,000 to $750,000. The project's contingency is only I I% but staff is looking at a potential change in the project. that would reduce costs. If the project costs increase over contingency, staff will return to Council and look at the Sewer's Ending Fund Balance or a possible interfund loan. Committee Chair Quinn questioned the effect of the gravity sewer in case of a flood and the response was that it would be the same liability as the pump station. UNANIMOUS APPROVAL. FORWARD TO JUNE 13 COW FOR DISCUSSION. III. MISCELLANEOUS B. Update on Southcenter Pkwy Extension and TUC Access (Klickitat) projects. Meeting adjourned at 5:29 p.m. Next meeting: Tuesday, June 14, 2011 5:00 p.m. Conf. Room No. 1. 40 Committee Chair Approval Minutes by.GL, Reviewed by 8G, MC and KAM. 168