HomeMy WebLinkAboutCAP 2016-10-10 Item 2G - Budget Review - 2017-2018 Biennial Budget: Urban Renewal, General Government Improvement Fund and Fire Improvement FundCity of Tukwila
Allan Ekberg, Mayor
TO:
Community Affairs and Parks Committee
FROM:
Derek Speck, Economic Development Administrator
DATE:
October 5, 2016
SUBJECT:
Fund 302 Proposed Budget for 2017 -2018
ISSUE
As provided for in the budget process approved by the Finance and Safety Committee, Council
Committees are reviewing budget sections prior to review by the full Council. This memo
provides a description of the proposed budget for Fund 302.
BACKGROUND
Until this year, the 302 Fund was called the "Facilities Fund" or "Facilities Replacement Fund"
and it included expenditures related to general government building replacement and major
enhancements. In the past years, the main expenditures in the 302 Fund were for development
of a facilities plan, Tukwila Village, and the purchase and demolition of the motels on Tukwila
International Boulevard.
Due to the Public Safety Plan, the City has now created Fund 306 as the City Facilities fund to
account for costs associated with major reconstruction of City facilities including the Public
Works shops. Accordingly, Fund 302 has been renamed "Urban Renewal' and will continue to
be used for tracking significant property transactions such as Tukwila Village, the motels, the
Longacres Parcel, or other properties if they arise.
DISCUSSION
Tukwila Village:
The proposed budget for Tukwila Village estimates $46,000 of expenditures through 2018 and
revenues from selling the property of $3,483,000 in 2017 and $2,061,000 in 2018. The land sale
revenue estimates for phases 1, 2 and 3 are based on the formula in the Disposition and
Development Agreement. Land sale revenue from the Gregor House and Newporter site are
based on a conservative estimates of $250,000 and $775,000, respectively.
TIB Redevelopment (Motels):
The proposed budget for the TIB Redevelopment (Motels) project estimates $50,000 of
expenditures through 2018 and revenue of $2,250,000 from selling the property in 2018.
RECOMMENDATION
Staff recommends that the Community Affairs and Parks Committee forward this section of the
budget on to the Committee of the Whole for review. If there are no recommended changes,
staff request Council consensus to move this Fund budget forward to the final budget package
in November.
ATTACHMENTS
Proposed Fund 302 budget for 2017 -2018
Proposed Capital Improvement Plan budget for Tukwila Village ( #90030222)
Proposed Capital Improvement Plan budget for TIB Redevelopment/Motels ( #91330201)
63
DEPARTMENT:
FUND: Urban Renewal FUND NUMBER: 302
RESPONSIBLE MANAGER: Bob Giberson POSITION: Director
Description:
The Urban Renewal fund has been established to provide future funding needs to encourage
redevelopment in specific areas throughout the City.
2015 -2016 Accomplishments
Sold property to the King County Library System for the new Tukwila library.
Sold parcels C and E to Tukwila Village developer and construction began.
Executed site use agreement with Tukwila Village developer.
Completed purchase of four motels and smoke shop for the TIB redevelopment project.
2017 -2018 Outcome Goals
Complete Tukwila Village.
Determine future use for the TIB redevelopment site (motels).
Determine future use for the former Newporter Motel property.
2017 -2018 Indicators of Success
Complete construction of phase I and II of Tukwila Village.
Council decision on development of the redevelopment project.
Council decision on development of the Newporter Motel site.
65
Revenue and Expenditure Summary
Urban Renewal
W%
2014
2015
2016
2016
2017
2018
2016 -17
2017 -18
Actual
Actual
Projected
Budget
Budget
Budget
%Change %Change
Operating Revenue
Miscellaneous Revenue
Investment Earnings
$ 1,216
$ 868
$ 5,198
$ 3,602
$ 3,600
$ 3,600
-0.06%
0.00%
Total Miscellaneous Revenue
1,216
868
5,198
3,602
3,600
3,600
-0.06%
0.00%
Total Operating Revenue
1,216
868
5,198
3,602
3,600
3,600
-0.06%
0.00%
Capital Project Revenue
Sale of Tukwila Village /KC Library
-
500,000
-
-
-
-
0.00%
0.00%
Sale of Tukwila Village /Phase 1
-
4,325,000
2,230,000
- 48.44%
0.00%
Sale of Tukwila Village /Phase 2
-
1,003,000
0.00%
0.00%
Sale of Tukwila Village /Phase 3
-
-
1,286,000
0.00%
0.00%
Sale of Longacres
1,600,000
-
-
0.00%
0.00%
Sale of Gregor House
-
250,000
-
0.00%
0.00%
Sale of Newporter
-
775,000
0.00%
0.00%
Sale of Motels
2,250,000
0.00%
0.00%
Gain/Loss on Invest of Cap. Asset
-
-
0.00%
0.00%
Interfund Loan
1,900,000
-
0.00%
0.00%
Bond/Line of Credit
3,850,000
2,250,000
0.00%
0.00%
Total Capital Project Revenue
5,750,000
2,750,000
-
5,925,000
3,483,000
4,311,000
41.22%
23.77%
Transfers In
-
-
-
-
-
-
0.00%
0.00%
Total Revenue
5,751,216
2,750,868
5,198
5,928,602
3,486,600
4,314,600
- 41.19%
23.75%
Capital Projects
Tukwila Village
15,571
14,538
25,907
75,000
35,000
11,000
- 53.33%
- 68.57%
City Facilities
138,024
14,534
117,295
2,250,000
-
-
0.00%
0.00%
TIB Redevelopment
3,663,770
1,968,703
680,835
15,000
25,000
25,000
66.67%
0.00%
Total Capital Projects
3,817,365
1,997,775
824,037
2,340,000
60,000
36,000
- 97.44%
- 40.00%
Interfund Load Repayment
1,900,000
-
-
-
-
-
0.00%
0.00%
Transfer to General Fund
1,000,000
500,000
-
2,075,000
1,800,000
6,050,000
- 13.25%
236.11%
Total Expenses
6,717,365
2,497,775
824,037
4,415,000
1,860,000
6,086,000
- 57.87%
227.20%
Beginning Fund Balance
1,902,602
936,453
1,189,546
1,873,602
370,706
1,997,306
- 80.21%
438.78%
Change in Fund Balance
(966,149)
253,093
(818,839)
1,513,602
1,626,600
(1,771,400)
7.47%
- 208.90%
Ending Fund Balance
$ 936,453
$ 1,189,546
$ 370,706
$ 3,387,204
$ 1,997,306
$ 225,906
41.03%
- 88.69%
W%
Expenditure Detail - Supplies, Services and Other
Services include costs associated with the Public Safety Plan, consulting, and engineering. Capital
includes the purchase of property and costs associated with urban renewal projects.
Urban Renewal
67
2014
2015
2016
2016 2017 2018
Account Number
Actual
Actual
Projected
Budget Budget Budget
302.98.518.200.31.00
Supplies - Office & Operating
$ 2,833
$ 436
$
$ $ $
302.98.518.200.31.01
Supplies - Office & Operating
170
-
302.98.559.300.31.00
Supplies - Office & Operating
-
3,925
302.98.594.180.31.00
Supplies - Office & Operating
-
-
118
Total Supplies
3,003
4,361
118
302.98.518.200.41.00
Prof Svcs - Feasibility study
155,689
116,249
-
302.98.518.200.43.00
Travel - Mileage, parking
11
-
302.98.518.200.44.00
Advertising - Bid ads
20
302.98.518.200.45.00
Rental - Services
10,832
302.98.518.200.47.00
Public Utilities - Tukwila Village
11,274
302.98.518.200.48.00
R &M - Tukwila Village
1,533
-
-
302.98.518.200.49.00
Misc - Tukwila Village
985
3,222
(250)
302.98.559.300.41.00
Prof Svcs - Consulting, engineering
-
200,621
-
302.98.559.300.44.00
Advertising - Bid ads
681
302.98.559.300.45.00
Rental - TIB redevelopment
7,583
302.98.559.300.47.00
Public Utilities - TIB redevelopment
2,155
302.98.559.300.47.21
Public Utilities - TIB redevelopment
3,437
302.98.559.300.47.22
Public Utilities -11B redevelopment
436
302.98.559.300.47.25
Public Utilities - TIB redevelopment
6,471
302.98.559.300.47.26
Public Utilities - TIB redevelopment
9,230
302.98.559.300.47.28
Public Utilities - 11B redevelopment
145
302.98.559.300.49.00
Misc - T1B redevelopment
4,890
-
- - -
302.98.594.180.41.00
Prof Svcs - Consulting, engineering
-
246,813
5,000 25,000 25,000
302.98.594.180.45.00
Rental - Rental ofequipment
1,530
- -
302.98.594.180.47.00
Public Utilities - Motels
69
8,500
302.98.594.180.47.21
Electricity - Motels
105
-
302.98.594.180.48.00
R &M - Motels
-
1,500
302.98.594.180.49.00
Misc - Recording fees
692
-
302.98.594.190.47.22
Utilities - Gas
177
302.98.594.190.47.25
Utilities - Water /sewer
545
302.98.594.190.47.26
Utilities - Surface water
-
-
6,067
Total Services
180,344
355,121
255,748
15,000 25,000 25,000
302.98.594.180.61.00
Capital - Land
1,369,500
-
-
35,000 11,000
302.98.594.590.61.00
Capital - Land
-
620,500
- -
302.98.594.180.62.00
Capital - Buildings & Structures
2,200,500
-
-
302.00.594.180.62.00
Capital - Buildings & Structures
-
-
75,000
302.98.594.190.65.00
Capital - Construction projects
-
491,789
-
302.98.594.590.62.00
Capital - Buildings & Structures
-
1,011,298
-
- - -
TotalOther
3,570,000
1,631,798
491,789
75,000 35,000 11,000
Total Supplies, Services and Other
$ 3,753,347
$1,991,280
$ 747,655
$ 90,000 $ 60,000 $ 36,000
67
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2017-2022
URBAN RENEWAL
302 Fund
CIP **Other After Six
Page art PROJECT TITLE 2017 2018 2019 2020 2021 2022 TOTAL Sources Years
46 Tukwila Village 35 11 0 0 0 0 46 5,544 0
47 TIB Redevelopment (Motels) 25 25 0 0 0 0 50 2,250 0
Grand Total 60 36 0 0 0 0 96 7,794 0
** Denotes other funding sources, grants, or mitigation.
Changes from 2015 to 2017 CIP:
Changed 302 Fund from Facilities to Urban Renewal
2017 - 2022 Capita! Improvement Program 45 9/26/2016
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Tukwila Village Project No. 90030222
DESCRIPTION: The City owns 5.76 acres of property at Tukwila International Boulevard and South 144th Street that is intended
for a mixed -use development including a library, plaza, police neighborhood resource center, and other amenities.
JUSTIFICATION: The new development will help revitalize the neighborhood.
STATUS: In 2012, the City signed a Disposition and Development Agreement with Tukwila Village Development Associates.
Construction began in 2014 and will be completed in phases with the final phase in 2018.
MAINT. IMPACT:
COMMENT: Land sales reflect the Library in 2015, Phase 1, Phase 2 and the Gregor House in 2017, with Phase 3
and the Newporter site in 2018.
FINANCIAL Through Estimated
tin $000'-,1 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Engineering
1,706
5
1,711
Land (R/W)
7,580
45
35
11
7,671
Construction
230
0
230
TOTAL EXPENSES
9,516
50
35
11
0
0
0
0
0
9,612
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Land Sale
500
3,483
2,061
6,044
Bonds
5,550
5,550
City Oper. Revenue
3,466
50
(3,448)
(2,050)
0
0
0
0
0
(1,982)
TOTAL SOURCES
1 9,516
50
1 35
11
0
01
01
01
01
9,612
2017 - 2022 Capital Improvement Program 46
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: TIB Redevelopment (Motels) Project No. 91330201
DESCRIPTION: Tukwila International Blvd (TIB) Redevelopment Project is for the acquisition and disposition of properties
within and adjacent to the City's Urban Renewal Area.
JUSTIFICATION: Improve the neighborhood's safety by eliminating the high amounts of crime associated with the motel properties.
Traveler's Choice Motel, Boulevard Motel, Great Bear Motel and the Spruce Motel.
STATUS: City has completed the purchase and demolition of the four motels and smoke shop.
MAINT. IMPACT: Upkeep of property until development.
COMMENT: Debt service costs are not shown (see Attachment A).
FINANCIAL Through Estimated
tin tonn'al 2015 2016 2017 2019 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Engineering
353
105
25
25
508
Land (RMI)
5,205
5,205
Const. Mgmt.
2
100
102
Construction
710
710
"TOTAL EXPENSES
5,560
1 915
25
251
0
0
0
01
0
6,525
FUND SOURCES
Awarded Grant
0
Land Sale
2,250
2,250
Bonds
6,100
6,100
City Oper. Revenue
(540)
915
25
(2,225)
0
0
0
0
0
(1,825)
TOTAL SOURCES
5,560
915
25
25
01
01
0
01
01
6,525
2017 - 2022 Capital Improvement Program ' 47
70
City of Tukwila
Allan Ekberg, Mayor
TO: Community Affairs and Parks Committee
FROM: Peggy McCarthy, Finance Director
BY: Vicky Carlsen, Deputy Finance Director
DATE: October 5, 2016
SUBJECT: General Government Improvement Fund 2017-2018 Proposed Budget
ISSUE
As provided for in the budget process approved by the Finance and Safety Committee, Council
Committees will be reviewing budget sections prior to review by the full Council. The General
Government Improvement fund section of the budget is ready for review by the Community
Affairs and Parks Committee.
BACKGROUND
The General Government Improvement fund is used for improvements, additions, or other
miscellaneous minor capital projects not provided for elsewhere. Projects that benefit multiple
departments or functions are given priority.
DISCUSSION
The proposed budget for the General Government Improvement fund are as follows:
• A transfer in of $200 thousand each year is budgeted. This is consistent with the past
several years.
• No specific projects are planned for this fund; expenditures would be costs to complete
any projects started but not finished in 2016 and repairs or improvements deemed
necessary during the biennium.
RECOMMENDATION
Staff recommends that the Community Affairs and Parks Committee forward this section of the
budget on to the Committee of the Whole for review. If there are no recommended changes,
Council consensus will be requested to move this departmental budget forward to the final
budget package in October.
ATTACHMENTS
Draft General Government Improvement fund 2017-2018 Proposed Budget
Draft CIP
71
72
DEPARTMENT: N/A
FUND: General Government Improvement FUND NUMBER: 303
RESPONSIBLE MANAGER: Bob Giberson POSITION: Director
Description:
The General Government Improvement fund is used for improvements, additions, or other miscellaneous
minor capital projects not provided for elsewhere. Projects which benefit multiple departments or
functions will be given priority.
2015-2016 Accomplishments
♦ Remodeled Fire Station #51 Emergency Operations.
♦ Installed as-built drawers and carpet at PW Engineering.
♦ Installed fire engine exhaust ducting at Fire Station #51 and Fire Station #54.
♦ Replaced water service line at 6300 building.
2017-2018 Outcome Goals
♦ Improve conditions of existing facilities.
73
Revenue and Expenditure Summary
General Government Improvements
74
2014
2015
2016
2016
2017
2018
2016 -17
2017 -18
Actual
Actual
Projected
Budget
Budget
Budget
%Change
%Change
Operating Revenue
Miscellaneous Revenue
Investment Earnings
$ 421
$ 502
$ 834
$ 500
$ 500
$ 500
0.00%
0.00%
Total Miscellaneous Revenue
421
502
834
500
500
500
0.00%
0.00%
Total Operating Revenue
421
502
834
500
500
500
0.00%
0.00%
Transfers In
200,000
200,000
200,000
200,000
200,000
200,000
0.00%
0.00%
Total Revenue
200,421
200,502
200,834
200,500
200,500
200,500
0.00%
0.00%
Operating Expenses
Salaries & Wages
32,957
47,753
18,298
101,487
105,085
107,187
3.55%
2.00%
Personnel Benefits
10,986
15,917
6,100
29,153
35,709
37,406
22.49%
4.75%
Total Operating Expenses
43,943
63,670
24,398
130,640
140,794
144,593
7.77%
2.70%
Projects
City Hall Campus Wayfinding
21,193
-
-
-
-
-
0.00%
0.00%
Fire Marshall Office Remodel
114,795
52,666
0.00%
0.00%
6300 Conf. Room #5 Remodel
16,745
0.00%
0.00%
6300 Police Recarpet
33,077
44
-
0.00%
0.00%
PW As -Built Drawers
-
21,467
178
0.00%
0.00%
Fire Station #51 Exhaust Ducting
39,361
-
0.00%
0.00%
Council Chambers Amplifiers
21,058
-
0.00%
0.00%
Fire Station #51 EOC Remodel
5,342
3,902
0.00%
0.00%
Police Vehicle Evidence Storage
-
39,566
0.00%
0.00%
6300 Water Service Replace.
45,375
0.00%
0.00%
City Hall Siding /Roof Repairs
30,000
0.00%
0.00%
TCC Siding /Roof Repairs
80,000
0.00%
0.00%
City Hall Card Access /ADA
10,000
0.00%
0.00%
TCC Concrete Repairs
25,000
-
-
-
0.00%
0.00%
Misc projects
8,289
13,995
5,100
200,000
150,000
150,000
- 25.00%
0.00%
Total Projects
194,099
153,933
239,121
200,000
150,000
150,000
- 25.00%
0.00%
Total Expenses
238,042
217,603
263,519
330,640
290,794
294,593
- 12.05%
1.31%
Beginning Fund Balance
451,755
414,133
397,033
379,950
334,348
244,054
- 12.00%
- 27.01%
Change in Fund Balance
(37,622)
(17,101)
(62,685)
(130,140)
(90,294)
(94,093)
- 30.62%
4.21%
Ending Fund Balance
$ 414,133
$ 397,033
$ 334,348
$ 249,810
$ 244,054
$ 149,962
- 2.30%
- 38.55%
74
Expenditure Detail -Salaries and Benefits
Salaries are based on actual costs for existing positions and include a cost of living adjustment per
contractual agreements.
General Government Improvements
Position
Description
2016
FTE
2017
FTE
2017 Budgeted
Salaries Benefits
2018
FTE
2018 Budgeted
Salaries Benefits
Project Manager
1
1
$ 105,085 $ 35,709
1
$ 107,187 $ 37,406
Department Total
1
1
$ 105,085 $ 35,709
1
$ 107,187 $ 37,406
Expenditure Detail - Supplies, Services and Other
All budgeted expenditures in the 2017 -2018 biennium is anticipated to be capital project related.
General Government knprovements
75
2014 2015
2016
2016 2017 2018
Account Number
Actual Actual
Projected
Budget Budget Budget
303.98.518.200.31.00 Supplies - Office & Operating
$ - $ 15,455
$
$ - $ $ -
303.98.518.300.31.00 Small Tools - Repair related
9,394 -
- -
303.98.522.100.31.00 Supplies - Office & Operating
- 357
-
-
303.98.594.110.31.00 Supplies - Office & Operating
25
-
- -
303.98.594.110.35.00 Supplies - Office & Operating
20,925
-
-
303.98.594.180.31.00 Supplies - Office & Operating
-
249
303.98.594.210.31.00 Supplies - Office & Operating
32 163
-
303.98.594.240.31.00 Small Tools - Capital project related
16,327 2,222
-
Total Supplies
25,753 39,148
249
-
303.98.518.200.41.00 Prof Svcs - Consulting, etc
16,839 2,499
-
-
303.98.518.200.48.00 R &M - PW drawer project
- 3,513
-
303.98.518.300.41.00 Prof Svcs - Consulting, etc
22,201 1,750
- - -
303.98.518.300.48.00 R &M - Duwamish room modifications
1,874 -
-
- - -
303.98.522.100A8.00 R &M - EOC room modifications
- 4,503
-
-
303.98.594.180.41.00 Prof Svcs - General services
-
17,000
20,000 20,000 20,000
303.98.594.180.48.00 R &M - Repair to various City facilities
-
43,467
- - -
303.98.594.210.41.00 Prof Svcs - Police storage costs
- 240
-
-
303.98.594.240.41.00 Prof Svcs - Fire Marshall's office
- 3,438
-
-
30198.594.240.48.00 R &M - Fire Marshall's office
- 240
-
- - -
Total Services
40,914 16,183
60,467
20,000 20,000 20,000
303.97.594.180.64.00 Capital - Howard Hanson Dam
(19,022) -
-
- - -
303.98.521.500.65.00 Capital - Police carpet
8,596
-
- - -
303.98.594.180.65.00 Capital - Various minor construction
- -
144,611
180,000 130,000 130,000
303.98.594.210.65.00 Capital - Police carpet
23,086 6,461
-
- - -
303.98.594.220.65.00 Capital - Fire Station exhaust system
- 39,125
30198.594.240.65.00 Capital - Fire Marshall's office
84,284 43,373
-
- - -
303.98.594.240.65.00
96,943 88,960
144,611
180,000 130,000 130,000
Total Supplies, Services and Other
$ 163,610 $ 144,291
$ 205,328
$ 200,000 $150,000 $150,000
75
City of Tukwila
CAPITAL IMPROVEMENT PROGRAM
for
2017 -2022
GENERALIMPROVEMENTS
303 Fund
CIP —Other After Six
Page* PROJECT TITLE 2017 2018 2019 2020 2021 2022 TOTAL Sources Years
51 Facility Improvements 150 150 300 300 300 300 1,500 0 300
Grand Total 150 150 300 300 300 300 1,500 0 300
** Denotes other funding sources, grants, or mitigation.
Chanoes from 2015 to 2017 CIP:
2017 - 2022 Capital Improvement Program 49
76
, W812016
CITY OF TUKWILA CAPITAL PROJECT SUMMARY
2017 to 2022
PROJECT: Facility Improvements Project No. Various
DESCRIPTION: Yearly improvements and required maintenance to City facilities that are located throughout the City.
JUSTIFICATION: Maintenance of existing facilities and required updating and improvements.
STATUS:
Ongoing.
MAINT.IMPACT:
None.
COMMENT:
Ongoing project, only one year actuals are shown in first column.
FINANCIAL Through Estimated
rin Snnn'al 2015 2n16 2n17 2016 2019 2020 2021 2022 BEYOND TOTAL
EXPENSES
Engineering
95
20
20
20
50
50
50
50
50
405
Land (RAAO
0
Construction
123
180
130
130
250
250
250
250
250
1,813
TOTAL EXPENSES
218
200
150
150
300
300
300
300
300
2,218
FUND SOURCES
Awarded Grant
0
Proposed Grant
0
Mitigation Actual
0
Mitigation Expected
0
City Oper. Revenue
218
200
150
150
300
300
300
300
300
2,218
TOTAL SOURCES
1 2181
2001
1501
1501
300
1 3001
300
1 3001
3001
2,218
20`17 - 2022 Capital Improvement Program 51
77
W
City of Tukwila
Allan Ekberg, Mayor
INFORMATIONAL MEMORANDUM
TO: Community Affairs and Parks Committee
FROM: Peggy McCarthy, Finance Director
BY: Vicky Carlsen, Deputy Finance Director
DATE: October 5, 2016
SUBJECT: Fire Improvement Fund 2017-2018 Proposed Budget
ISSUE
As provided for in the budget process approved by the Finance and Safety Committee, Council
Committees will be reviewing budget sections prior to review by the full Council. The Fire
Improvement fund section of the budget is ready for review by the Community Affairs and Parks
Committee.
BACKGROUND
This program provides fire department capital improvements and apparatus specific to the fire
department through impact fees at a 90%/10% split.
DISCUSSION
The proposed budget for the Fire Improvement fund are as follows:
Fire impact fees are budgeted at $32 thousand for 2017 and $50 thousand for 2018.
This does not include the mitigation fees from the Tukwila South agreement. These are
recorded in a new fund (305) for the Public Safety Plan.
Since the Public Safety Plan includes funding to reconstruct 3 fire stations and replace
apparatus and equipment for the next 20 years, there are no budgeted expenditures in
this fund for the upcoming biennium.
The fund retains a healthy fund balance through the biennium.
RECOMMENDATION
Staff recommends that the Community Affairs and Parks Committee forward this section of the
budget on to the Committee of the Whole for review. If there are no recommended changes,
Council consensus will be requested to move this departmental budget forward to the final
budget package in October.
ATTACHMENTS
Draft Fire Improvement fund 2017-2018 Proposed Budget
"W,
:1
DEPARTMENT: N/A
FUND: Fire Improvement FUND NUMBER: 304
RESPONSIBLE MANAGER: Jay Wittwer POSITION: Fire Chief
Description:
The program provides fire department capital improvements and apparatus through Fire Impact Fees at
a 90% / 10% split.
Impact fees are transferred to Public Safety fund to pay for improvements specific to the fire department.
Revenue and Expenditure Summary
Fire Improvement Fund
i
Actual
Projected
Budget
2016 -17
2017 -18
2014
2015
2016
2016
2017
2018
% Change
% Change
Operating Revenue
Miscellaneous Revenue
Investment Earnings
$ 416
$ 528
$ 643
$ 100
$ 100
$ 100
0.00%
0.00%
Total Miscellaneous Revenue
416
528
643
100
100
100
0.00%
0.00%
Capital Project Revenue
Fire Impact Fees
66,862
46,406
93,554
50,000
32,000
50,000
- 36.00%
56.25%
Total Revenue
67,278
46,934
94,197
50,100
32,100
50,100
- 35,93%
56.07%
Total Expenditures
-
-
-
-
-
-
0.00%
0.00%
Beginning Fund Balance
437,222
504,500
551,434
500,100
645,631
677,731
29.10%
4.97%
Change in Fund Balance
67,278
46,934
94,197
50,100
32,100
50,100
- 35.93%
56.07%
Ending Fund Balance
$ 504,500
$ 551,434
$ 645,631
$ 550,200
$ 677,731
$ 727,831
23.18%
7.39%