HomeMy WebLinkAboutSEPA EPIC-01-89 - CITY OF TUKWILA / COMMUNITY DEVELOPMENT - PROFESSIONAL OFFICE ZONE: BARBER / BEAUTY SHOPSAMENDMENT TO THE
PROFESSIONAL OFFICE
ZONE OF THE TUKWILA
ZONING CODE TO ALLOW
BEAUTY /BARBER SHOPS
CITY -WIDE
EPIC 1 -89
WAC 197 -11 -970
•
DETERMINATION OF NONSIGNIFICANCE
Description of Proposal Nonproject proposal to amend the Professional Office (PO)
Zone of the Tukwila Zoning Code to allow barber/ beauty shops.
Proponent Don Crisp, City of Tukwila
Location of Proposal, including street address, if any Not applicable Citywide
Lead Agency: City of Tukwila File No. EPIC -1-9?
The lead agency for this proposal has determined that it does not have a probable
significant adverse impact on the environment. An environmental impact statement
(EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after
review of a completed environmental checklist and other information on,file with the
lead agency. This information is available to the public on request.
[X There is no comment period for this DNS
[� This DNS is issued under 197 -11- 340(2). Comments must be submitted by
. The lead agency will not act on this
proposal for 15 days from the date below.
Responsible Official Rick Beeler
Position /Title
Address
Date
Planning Director „- -Phone 433 -1846
6200 Southcenter Boulevard
, Ti WA 981,:
Signature ,A,Ar„gk_ —
You ay appeal t 's determination to the City Clerk at City Hall, 6200 Southcenter
Boulevard, Tukwila, WA 98188 no later than 10 days from the above date by written
appeal stating the basis of the appeal for specific factual objections. You may be
required to bear some of the expenses for an appeal.
Copies of the procedures for SEPA appeals are available with the City Clerk and
Planning Department.
FM.DNS
•
A. BACKGROUND
ENVIRONMENTAL CHECKLIST
1. Name of proposed project, if applicable:
2. Name of applicant:
Col No.
Epic File No.
Fee $100.00 Receipt No.
of -rw ► 04-
3. Address and phone number of applicant and _contact person:
41111111W or dp
410 di do
4. Date checklist prepared: /!7 MA-a 17 .
,5_r Agency requesting Checklist: City of Tukwila
Proposed timing 44r schedule including phasing, if applicable):
ter/ • !_ C . ill/ & • lip _d Ilia i.41 at 1S •' /. • / ! 1. i� l�'.I <!
7. Do you have any plans for future additions, expansion, or further activity
related to or connected with this proposal? If yes, explain. 'J
8. List any environmental information you know about that has been prepared, or will
be prepared, directly related to this proposal.
9. Do you know whether application's are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes,
explain. no
10. List aj y government approvals or pe mits that wi,1 be needed for yo r proposal.
/
11. Give brief, complete description of your proposal, including the proposed use
and the size of the project and site. There are several questions later in thl .
checklist that ask you to describe certain aspects of your proposal. You do no .
need to repeat those answers on this page. Section E requires a complete
description of the objectives and alternatives of your proposal and should not be
summarized here.
v
12. Location of the proposal. Give sufficient information for a person to understand
the precise location of your proposed project, including a street address, if
any, and section, township, and range, if known. If a proposal would occur over
a range of area, provide the range or boundaries of the site(s). Provide a legal
description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any permit applica-
tions related to this checklist.
' ' eo_r, V' l )1
MOD.
13. Does the proposal lie within an area designated on the City's Comprehensive Land
Use Policy Plan Ma as environmentally sensitiv ?
-3-
TO BE COMPLETED BY APPLI•T
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one): Flat,
rolling, hilly, ste p slopes, •mountainous'/ othett y,
b. What is the steepes slope on the site (approximate
percent slope)? 11D eifie:- 5)
c. What general types of soils are found on the site
(for example, clay, sand, gravel, peat, muck)? If
you know the classification of agricultural soils,
specify them and note any prime farmland.
Aifq-
d. . Are there surface indications or history of unstable
soils in the immediate vicinity? If so, describe.
e. Describe the purpose, type, and approximate quanti-
ties of any filling or grading proposed. Indicate
source of fill. /U-
f.• Could erosion occur as a result of clearing,
construction or use? If so, generally describe.
About what percent of.the site will be covered with
impervious surfaces after project construction (for
example, asphalt or buildings)? AJ —
Evaluation for
Agency Use Only
1
h. Proposed measures to reduce or control erosion, or
other impacts to the earth, if any: AJA-
2. Air
a. What types of emissions to the air would result from
the proposal (i.e., dust, automobile odors,
industrial wood smoke) during construction and when
the project is completed? If any, generally
describe and give approximate quantities if kno n.
no r f1' O t 1 rL 41: . 1
b. Are there any off -site sources of emissions or odor
that may affect your proposal? If so, generally.
describe. /iffy
c. Proposed measures to reduce or control emissions or
other impacts to air, if any: Aft%"
3. Water
a. Surface:
1) Is there any surface water body on or in the
immediate vicinity of the site (including year -
round and seasonal streams, saltwater, lakes,
ponds, wetlands)? If yes, describe type and
provide names. If appropriate, state what
stream or river it flows into. AM-
Evaluation for
Agency Use Only
•
2) Will the project require any work over, in, or
adjacent to (within 200 feet) the described
waters? If yes, please de,Ac^ribe and attach
available 'lan . 1 /'C MOS
/ •�'/, . 11 / ;d
3) Estimate the amount of fill and dredge material
that would be placed in or removed from surface
water or wetlands and indicate the area of the
site that would be affected. Indicate the
source of fill material.
4) Will the proposal require surface water
withdrawals or diversions? Give general
description, purpose, and approximate quan-
tities, if known.
5) Does the proposal lie within a 100 -year
floodplain? f„so, note location on the site
plan.
6) Does the proposal involve any discharges of
waste materials to surface waters? If so,
describe the type of waste and anticipated
volume of discharge. A4-
Evaluation for
Agency Use Only
•
b. Ground:
1) Will ground water be withdrawn, or will water be
discharged to ground water? Give general
description, purpose, and approximate quan-
tities, if known.
2) Describe waste materials that will be discharged
into the ground from septic tanks or other sour-
ces, if any (for example: Domestic sewage;
industrial, containing the following
chemicals...; agricultural; etc.) Describe the
general size of the system, the number of such
systems, the number of houses to be served (if
applicable), or the number of animals or humans
the system(s) are expected to serve. N
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm
water) and method of collection and disposal, if
any (include quantities, if known). Where will
this water flow? Will this water flow into
other waters? If so, describe.
Evaluation for
Agency Use Only
Evaluation for
Agency Use Only
2) Could waste materials enter ground or surface
waters? If so, generally describe. ,/X1—
d. Proposed measures to reduce or control surface,
ground, and runoff water impacts, if any:____A/4
4. Plants
a. Check or circle types of vegetation found on the
site:
AM-
deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
shrubs
_ grass
_ pasture
_ crop or grain
wet soil plants: cattail, buttercup, bullrush,
skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed
or altered? ,t/A—
c. List threatened or endanger eecies known to be on
or near the site.
•
d. Proposed landscaping, use of native plants, or other
measures to preserve or enhance vegetation on the
site, if any:
5. Animals
a. Circle any birds and animals which have been
observed on or near the site or are known to be on
or near the site:
ar
birds: hawk, heron, eagle, songbirds, other:
mammals: deer, bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shellfish,
other:
b. List any threatened or endang red species known to
be on or near the site.
c. Is the site part of a migration route? If so,
explain.
A1k
d. Proposed measures to preserve or enhance wildlife,
if any:
Evaluation for
Agency Use Only
!IN 410 Evaluation for
Agency Use Only
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil,
wood stove, solor) will be used to meet the
completed project's energy needs? Describe whether
it will be used for heating, manufacturing, etc.
b. Would your project affect the potential use of solar
energy by adjacent properties? If so, generally
describe. lAJ
c. What kinds of energy conservation features are
included in the plans of this proposal? List other
proposed measures to _reduce or control energy
impacts, if any: ��1.�
7. Environmental Health
a. Are there any environmental health hazards,
including exposure to toxic chemicals, risk of fire
and explosion, spill, or hazardous waste, that could
occur as a resul A of this proposal? If so,
describe.
1) Describe special emergency services that might
be required.
2) Proposed measures to reduce or control environ-
mental health hazards, if any:
II0 411 Evaluation for
Agency Use Only
b. Noise
1) What types of noise exist in the area which may
affect your project (for example: traffic,
equipment, operation, other)? ___40k.
2) What types and levels of noise would be created
by or associated with the project on a short -
term or a long -term basis (for example: traf-
fic, construction, operation, other)? Indicate
what hours noise would come from the site.
3) Proposed measures to reduce or control noise
impacts, if any:
8. Land and Shoreline Use
a. What is the current use of the site and adjacent
properties?
b. Has the site been sed for agriculture? If so,
describe. Ap
c. Describe any structures on the site. AA
•
• Evaluation for
Agency Use Only
d. Will any structurgs be demolished? If so, what?
AJD
e. What is the current zoning classification of the
site?
f. What is the current comprehensive plan designation
of the site? /U4
g. If applicable, what is the current shoreline master
program designation of the site? Oft
h. Has any part of the site been classified as an
"environmentally sensitive" area? If so, specify.
A)4
i. Approximately how many people would reside or work
in the completed project? AM-
j. Approximately how many people would the completed
project displace ?*
k. Proposed measures to avoid or reduce displacement
impacts, if any:
1. Proposed measures to ensure the proposal is com-
patible with existing and •rojected land u es a�nd
p l . s, if any: . ' '. de] 49/ 1./ /.� �LEK_
602017 .
• Evaluation for
Agency Use Only
9. Housing N P(
a. Approximately how many units would be provided, if
any? Indicate whether high, middle, or low- income
housing?
b. Approximately how many units, if any, would be eli-
minated? Indicate whether high, middle, or low -
income housing.
c. Proposed measures to reduce or control housing
impacts, if any:
10. Aesthetics Or
a. What is the tallest height of any proposed
structure(s), not including antennas; what is the
principal exterior building material(s) proposed?
b. What views in the immediate vicinity would be
altered or obstructed?
c. Proposed measures to reduce or control aesthetic
impacts, if any:
•
• Evaluation for
Agency Use Only
11. Light and Glare la(
a. What type of light or glare will the proposal
produce? What time of day would it mainly occur?
b. Could light or glare from the finished project be a
safety hazard or interfere with views?
c. What existing off -site sources of light or glare may
affect your proposal?
d. Proposed measures to reduce or control light and
glare impacts, if, any:
12. Recreation irk
a. What designed and informal recreational oppor-
tunities are in the immediate vicinity?
b. Would the proposed project displace any existing .
recreational uses? If so, describe.
c. Proposed measures to reduce or control impacts on
recreation, including recreation opportunities to be
provided by the project or applicant, if any:
•
• Evaluation for
Agency Use Only
13. Historic and Cultural Preservation Or
a. Are there any places or objects listed on, or pro-
posed for, national, state, or local preservation
registers known to be on or next to the site? If
so, generally describe.
b. Generally describe any landmarks or evidence of
historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
c. Proposed measures to reduce or control impacts, if
any:
14. Transportation
a. Identify public streets and highways serving the
site, and describe proposed accss to the existing
street system. Show on sit- plans, if any.
! _e1.%/%. /1/ r ! iii Q %' /% l
%P
b. Is the site currently served by public transit? If
not, what is the approximate distance to the nearest
transit stop? 09-
c. How many parking spaces would the completed project
have? How many would the project eliminate? /t/,4
•
• Evaluation for
Agency Use Only
d. Will the proposal require any new roads or streets,
or improvements to existing roads or streets, not
including driveways? If so, generally describe
(indicate whether public or private). n/AI"
e. Will the project use (or occur in the immediate
vicinity of) water, rail, or air transportation? If
so, generally describe. Ajtae
f. How many vehicular trips per day would be generated
by the completed project? If known, indicate when
peak voluI9es would occur. c21/ rd5
Proposed measures to reduce or control trapspor-
tation impacts, if any: /) 01/2; ,prZ2oS2d.
15. Public Services
a. Would the project result in an increased need for
public services (for example: fire protection,
police protection, health care, schools, other)? If
so, generally describe. 0C9
b. Proposed measures to reduce or control direct
impacts on public services, if any. /20711_
16. Utilities
A14
•
• Evaluation for .
Agency Use Only
a. Circle utilities currently available at the site:
electricity, natural gas, water, refuse service,
telephone, sanitary sewer, septic system, other.
b. Describe the utilities that are proposed for the
project, the utility providing the service, and the
general construction activities on the site or in
the irtyned iate vicinity which might be needed.
C. Signature
The above answers are true and complete to the best of
my knowledge. I understand that the lead agency is
relying on them to make its decision
�f
Signature:
Date Submitted:
PLEASE CONTINUE TO THE NEXT PAGE.
TO BE COMPLETED BY APPLIT
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(do not use this sheet for project actions)
• Evaluation for
Agency Use Only
Because these questions are very general, it may be helpful
to read them in conjunction with the list of the elements of
the environment.
When answering these questions, be aware of the extent the
proposal, or the types of activities likely to result from
the proposal, would affect the item at a greater intensity
or at a faster rate than if the proposal were not imple-
mented. Respond briefly and in general terms.
1. How would the proposal be likely to increase discharge
to water; emissions to air; production, storage, or
release of toxic or haz. dous substances; or production
of noise? ; �E *1' 1 / AU. .w .`
I 9
ha -a nos ?. A
•
c
vICP S .
Proposed measures to avoid or reduce such increases are:
1✓l�i^
2. How would the proposal be likely to fect plants, ani-
mals, fish, or marine life? 49 4-
Proposed measures to protect or conserve plants, ni-
mals, fish, or marine life are: Akyu YUpl7se
. Evaluation for
Agency Use Only
3. How would the proposal be likely to deplete energy or
natural resources? lUOJ -J, p
Proposed measures to protect or conserve energy and
natural resourses are:
4. Now would the proposal be likely to use or affect
environmentally sensitive areas or areas designated (or
eligible or under study) for governmental protection;
such as parks, wilderness, wild and scenic rivers,
threatened or endangered species habitat, historic or
cultural sites, wetlands, floodpl• ins, r prime
farmlands? f . .. *.. o 'I_ Lk /A/ Ali i- ♦ i
'..1111111M2715 :if A7.11/117,27476/1ffit.
mUIP
Proposed measures to protect such resources or to avoid
or reduce impacts are: ( apy /t
5. How would the proposal be likely to affect land and
shoreline use, inclduing whether it would allow or
encourage land or shoreline uses in ompatible with
existi g plans ..b A ` :.u. 41. j, I /.
er
'A BMW PEMITORIMMIEMIRMIIIWAINI
ALQ tai • E 4. r .• a /� ! �► 1. ■�
' • 3irieT f uiu : ' j
• Evaluation for
Agency Use Only
Proposed measures to avoid or reduce shoreline and land
use impacts area:
How does the proposal conform to the Tukwila Shoreline
Master Plan? /074 -6 f �'P1.th/la,
6. How would the proposal be likely to increase demands on
transportation or public services and utilitie ?
0,( G i / / ice/ 4. Ud 4 Amu
in " need t'-' 5 erv/zeS 71-fa •el'ria iii a'K-
Proposed measures to reduce or respond to such demand(s)
are:
7. Identify, if possible, whether the proposal may conflict
with local, state, or federal laws or re uirements for
the protection of the environment. Ai
•
• Evaluation for
Agency Use Only-
8. Does the proposal conflict with policies of the Tukwila
Comprehensive Land Use Policy P1 n? If so, what poli-
cies of the Plan?
44eW f 4n rem
beitueeri relevI and r d 5, h?2L = �r��
,41 ._ i.AI ! / •. ,41,0 • !� . //. 04: (&t6 4/
Gens,demd j',1( '01W ro. Wirth hrth -
%'' • dp (1. 2074. a i an rs i fs
Proposed measures to avoid or reduce the conflict is)
are:
- _ i 12 ... te!s+n� . •
1
TO BE COMPLETED BY APPLIST
• Evaluation for
Agency Use Only
E. SUPPLEMENTAL SHEET FOR ALL PROJECT AND NON PROJECT
PROPOSALS
The objectives and the alternative means of reaching the
objectives for a proposal will be helpful in reviewing the
aforegoing items of the Environmental Checklist. This
information provides a general overall perspective of the
proposed action in the context of the environmental infor-
mation provided and the submitted plans, documents, suppor-
tive information, studies, etc.
1. What are the objective(s) of the proposal?
T 1 o4zie barbel'a
!. v ./ *J/_ l A _ •
S
2. What are the alternative means of accomplishing these
objectives?
in `-IN C- Vi • 4-0 —LOG IS.
.2! t. / - &yr lbw - 941.1.1)0.
•
3. Please compare the alternative means and indicate the
preferred course of action:
a//au) CAar -',Y1. 1ni wCedi
Pvfase 1/ /, ZenyL-.
Evaluation for
Agency Use Only
4. Does the proposal conflict with policies of the Tukwila
Comprehensive Land Use Policy Plan? If so, what poli-
cies of the Plan? 6e.e tq ,
Proposed measures to avoid or reduce the conflicts)
are: enj.( ` ptfait1 cY 01-241 6 a,7
6 /4,-
-23-