HomeMy WebLinkAboutSEPA EPIC-05-88 - CITY OF TUKWILA - FILLCITY OF TUKWILA
FILL PROJECT
DISPOSE OF
EXCAVATION MATERIAL
53RD AVE. & 144T" ST.
EPIC 5 -88
F
R '',r
SUBJECT 0.014, ...e),/ /G/ i / J,S/ DATE /ir/
MESSAGE -
I,� .� �J L i
I/WR ?8198.9
SIGN
i:I~(,ai€ itJ Litt
REPLY
SIGNED
4S 472
SEND PARTS 1 AND-3 INTACT -
PART 3 WILL BE RETURNED WITH REPLY.
carbon /ess POLY PAK• (50 SETS) 4P472
ANDREA BEATTY RINIKER
Director
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Mail Stop PV -11 • Olympia, Washington 98504 -8711 • (206) 459-6000
April 15, 1988
Ted W. Freemire
City of Tukwila
605 Minkier Boulevard
Tukwila, Washington 98188
Dear Mr. Freemire:
APR 18 1988
Ct TY OF I evVILA,
pl._AN; NiNG nEi'T.
Andy MacMillan and I visited the site on 53rd Ave. south of
144th to determine whether or not it was a wetland and to
evaluate wetland values and functions.
The area we looked at is a valuable and diverse wetland with
open water and palustrine emergent and scrub -shrub
vegetation. The area provides valuable habitat for
wildlife; we observed red - winged blackbirds in the cattails
and mallards landing on the ponded area while we were on-
site. The wetland also provides a valuable water quality
function for the city, with wetland vegetation acting as a
filter for sediment and nutrient running off adjacent
slopes. Urbanization of adjacent areas has decreased
impermeable surfaces in the area, and the wetland provides
stormwater retention.
We recommend development of this wetland be avoided. It is
valuable to the city aesthetically and as a green space.
Utilizing the area as an interpretive center or natural
education focus for school children would provide many
benefits to the community. Filling of this wetland would
require state and federal permits, notably a 404 permit from
the U.S. Army Corps of Engineers.
Thank you for soliciting our comments as a component of
advanced planning. If I can be of future assistance, my
phone number is 459 -6765.
cc: Kathy Kunz, EPA
cerely,
Al ..;:K
/ Amy
Y.-Michelle L. Stevens
Wetland Ecologist
Shorelands & Coastal Zone
Management Program
CITY OF .TUKWILA
CENTRAL PERMIT SYSTEM
ENVIRONMENTAL REVIEW ROUTING FORM:
TO: SLOG rLNG.
PROJECT TCJ/< c,J ! c-A
E EWED
MAR °11988
TUKWILA
1
CN
EPIC - 5 - g 8
FILE
IRE FT POLICE F9 R
IN SSAVe /44' - ",. FILE NO. LOCATIONw� s
DATE TRANSMITTED 3/1 /6)8
RESPONSE REQUESTED BY _ e /88
STAFF COORDINATOR 462.M0n! (y ,c i1-C.2 RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT '1
i`�'A :3 -= #( 0 - \ f c, Z P xf■ IY I s RIa4 04) Puss (R t 1 A
1ZV -�►� i \Vo V11 lTk WW1 t N S
__may
_..
— : p c s OFF S3+firGt- (t 12-r-4)0 DkFc:Ivl-1c N
aN ? 1k.eaQO S4 \
DATE -7/5M 'a COMMENTS PREPARED BY
C.P.S. Form 11
CITY OF TUKWILA
CENTRAL PERMIT SYSTEM
•
III `Y � w J.
CN
EPIC — 5- &8
FILE
ENVIRONMENTAL REVIEW ROUTING FORM:
TO: FT BLDG 14.NG P. W. IRE 1711-COL IC & R
PROJECT 70/< ;cJ /LA L
LOCATION.or s S -]2 ,� SE� or SI Ave /444'= —``S(. FILE NO.
DATE TRANSMITTED /6)8
STAFF COORDINATOR kn _o,j
RESPONSE REQUESTED BY 3/6/85
RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT
DATE COMMENTS PREPARED BY_____________________________________ .
C.P.S. Form 11
CITY OF TUKWILA
CENTRAL PERMIT SYSTEM
CN-
EPIC - 5- g8
FILE
ENVIRONMENTAL REVIEW ROUTING FORM:
TO: j ' LNG [7(W. IRE L POLICE P b R
PROJECT T0, i L i4 F
LOCATION 4_0 - s s -12
SE14 of 53�DAVE'744''`S.: FILE NO.
DATE TRANSMITTED 3 /( /S)(5
RESPONSE REQUESTED BY J',/8/88
STAFF COORDINATOR (/G7z.v0A ✓' (1, 1c rfC. RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT
/ 1� // ,0 1
*Ce5E 3' /oct f L / iY��C1 Tn ad,/ //ekehs duct
ocrnirollecl //,/, I i s4 // k a 49'47 a u), ,w� //t'ycle/i/ 4s'
fAiP! /, d i/ au r/ zet a pi4 'r gra ,rot
ate.
/ r j
-1-A or f "S 4.(4,A eiri of 4`r y 14210 ►' / br/5' e
c
%ire Ct/r -c a2vL covpitis
L� eibi/
1410( ca 44.5 cf ra r(a L
CJ
DATE ��rg
/ /
COMMENTS PREPARED BY
C.P.S. Form 11
CITY OF TUKWILA • • CN
CENTRAL PERMIT SYSTEM EPIC - S - 8
FILE
ENVIRONMENTAL REVIEW ROUTING FORM:
TO: BLDG rPLNG. Q P.W.
PROJECT - 7-Cifi c, l / c,4 L L
FTALICE & R
LOCATION Lo s S -12 IN SC 4 or .5-_?!!? Ave//-4-4-7-:%-i.- FILE NO.
-DATE TRANSMITTED 3 /a RESPONSE REQUESTED BY 2/6/65
STAFF COORDINATOR UG "iz,voA, (///t/c7-1-L2 RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT
,Zs -Mee - eCG'144'4") /194 /AZ- 4.4-.0 "r49A �o
m r -i4 // /4A Grw / t444
o'
Gh°ve% 1),%i .i,A9 /G mii., Gu/e / /in fl .S ad 604o,,na a tl (iaz /O
,1 /SSaE.
DATE COMMENTS PREPARED BY
C.P.S. Form 11
• •
ENVIRONMENTAL CHECKLIST
Purpose of Checklist:
The State Environmental Policy Act (SEPA), chapter 43.21C RCW, requires all
governmental agencies to consider the environmental impacts of a proposal
before making decisions. An environmental impact statement (EIS) must be
prepared for all proposals with probable significant adverse impacts on the
quality of the environment. The purpose of this checklist is to provide
information to help you and the agency identify impacts from your proposal
(and to reduce or avoid impacts from the proposal, if it can be done) and
to help the agency decide whether an EIS is required.
Instruction for Applicants:
This environmental checklist asks you to describe some basic information
about your proposal. The City uses this checklist to determine whether the
environmental impacts of your proposal are significant, requiring prepara-
tion of an EIS. Answer the questions briefly, with the most precise infor-
mation known, or give the best description you can.
You must answer each question accurately and carefully, to the best of your
knowledge. In most cases, you should be able to answer the questions from
your own observations or project plans without the need to hire experts.
If you really do not know the answer, or if a question does not apply to
your proposal, write "do not know" or "does not apply ". Complete answers
to the questions now may avoid unnecessary delays later.
Some questions ask about_ governmental regulations, such as zoning, shore-
line, and landmark designations. Answer these questions if you can. If
you have problems, the City staff can assist you.
The checklist questions apply to all parts of your proposal, ,even if you
plan to do them over a period of time or on different parcels of land.
Attach any additional information that will help describe your proposal or
its environmental effects. The City may ask you to explain your answers or
provide additional information reasonably related to determining if there
may be significant adverse impact.
Use of checklist for nonproject proposals:
Nonproject proposals refer to actions which are different or broader than a
single site specific development project, such as plans, policies''.and
programs.
Complete this checklist for nonproject proposals, even though questions may
be answered "does not apply." In addition, complete the supplemental
sheet for nonproject actions (part D).-
For nonproject actions, the references in the checklist to the words
"project," "applicant," and "property or site" should read as "proposal,"
"proposer," and "affected geographic area," respectively.
Core1 No.
Epic File No.
Fee $100.00 Receipt No.
ENVIRONMENTAL CHECKLIST
A. BACKGROUND l
1. Name of proposed project, if applicable: �/ SA / ��
2. Name of applicant: TEj
3. Address and phone number of applicant and contact person: 3 3-/?6 J
2?l0.r)
4. Date checklist prepared:
5. Agency requesting Checklist:
a -
City of Tukwila
6. Proposed timing or schedule (including phasing, if applicable):
is =o
7. Do you have any plans for future additions, expansion, or further activity
related to or connected with this proposal? If yes, explain. „6,4f)
8. List any environmental information you know about that has been prepared, or will
be prepared, directly related to this proposal. ,(',p,v e-
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes,
explain. "Jo
•
10. List any government approvals or permits that will be needed for your proposal.
11. Give brief, complete description of your proposal, including the proposed use
and the size of the project and site. There are several questions later in thi.
checklist that ask you to describe certain aspects of your proposal. You do no .
need to repeat those answers on this page. Section E requires a complete
description of the objectives and alternatives of your proposal and should not be
summarized here.
s 11� .e1
Ai
/S 02
,
12. Location of the proposal. Give sufficient information for a person to understand
the precise location of your proposed project, including a street address, if
any, and section, township, and range, if known. If a proposal would occur over
a range of area, provide the range or boundaries of the site(s). Provide a legal
description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any permit applica-
tions related to this checklist. //
u) . J°. _ y 4/4F T,c°�c71s �m /S
S, z, 7,
13. Does the proposal lie within an area designated on the City's Comprehensive Land
Use Policy Plan Map as environmentally sensitive?
.%O
TO BE COMPLETED BY APPLIC•
B. ENVIRONMENTAL ELEMENTS
1. Earth
• Evaluation for
Agency Use Only
a. General description of the site (circle one): Flat,
rol ingP hilly, steep lopes, mountainous) other
�!4 svi/( S�o d m,)
b. What is the steepest slope on the site (approximate
percent slope)? 20 - 23 c>o
c. What general types of soils are found on the site
(for example, clay, sand, gravel, peat, muck)? If
you know the classification of agricultural soi15,
specify them and note any prime farmland. 62,40,t;
d. Are there surface indications or history of unstable
soils in the immediate vicinity? If so, describe.
e. Describe the purpose, type, and approximate quanti-
ties of any filling or grading proposed. Indicat
source f fill. ,,37,0,re" ,447 c teAle .c)
30, o0 AmoS °e y4.F..c°
f.. Could erosion occur as a result of clearing,
construction, or use? If so, generally describe.
,two
g. About what percent of the site will be covered with
impervious surfaces after project construction (for
example., asphalt or buildings)?
h. Proposed measures to reduce or control erosion, or
other impacts to the earth, if any: f
5/< — /A) ig-p1 4 s A.■°
2. Air
a. What types of emissions to the air would result from
the proposal (i.e., dust, automobile odors,
industrial wood smoke) during construction and when
the project is completed? If any, generally
describe and give approximate quantities if known.
gym,
b. Are.there•any off -site sources of emissions or odor
that may affect your proposal? If so, generally
describe. •V a
c. Proposed measures to reduce or control emissions or
other impacts to air, if any: 424%4)877
3. Water
a. Surfacer
1) Is there any surface water body on or in the
immediate vicinity of the site (including year -
round and seasonal streams, saltwater, lakes,
ponds, wetlands)? If yes, describe type and
provide names. If appropriate, sta e what
stream or river it flews into. d,
Evaluation for
Agency Use Only
•
• Evaluation for
Agency Use Only
2) Will the project require any work over, in, or
adjacent to (within 200 feet) the described
waters? If yes, .lease d-scribe and attach
available plans.
104'
3) Estimate the amount of fill and dredge material
that would be placed in or removed from surface
water or wetlands and indicate the area of the
site that would be affected. Indicate the
source of fill material./414:
, 247 iy "G], 24/AF-5 �/gi
4) Will the proposal require surface water
withdrawals or diversions? Give general
description, purpose, and approximate quan-
tities, if known.
5) Does the proposal lie within a 100 -year
floodplain? If so, note location on the site
plan. ,C,a
6) Does the proposal involve any discharges of
waste materials to surface waters? If so,
describe the type of waste and anticipated
volume of discharge. L'-p
b. Ground:
1) Will ground water be withdrawn, or will water be
discharged to ground water? Give general
description, purpose, and approximate quan-
tities, if known. /10
2) Describe waste materials that will be discharged
into the ground from septic tanks or other sour-
ces, if any (for example: Domestic sewage;
industrial, containing the following
chemicals...; agricultural; etc.) Describe the
general size of the system, the number of such
systems, the number of houses to be served (if
applicable), or the number of animals or humans
the system(s) are expected to serve. dt1 r7,c�E
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm
water) and method of collection and disposal, if
any (include quantities, if known). Where will
this water flow? Will this water flow int
other wa ers? If so, describe.
Evaluation for
Agency Use Only
• • Evaluation for
Agency Use Only
2) Could waste materials enter ground or surface
waters? If so, generally describe. ,C}Z7
d. Proposed measures to reduce or control surface,
ground, and runoff water impacts,
— any:
E_ 5-74A A/ArIc
4. Plants
a. Check or circle types of vegetation found on the
site:
deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
shrubs
grass
pasture
_ crop or grain
wet soil plants: cattail, buttercup, bullrush,
skunk cabbage, other
_ water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed
or altered? 7'r4// I'jl} 'S
c. List threatened or endangered species known to be on
or near the site. .lwx)
•
• Evaluation for
Agency Use Only
d. Proposed landscaping, use of native plants, or other
measures to preserve or jrhance vegetation on the
site, if any: AvAg e
5. Animals
a. Circle any birds and animals which have been
observed on or near the site or are known to be on
or near the site:
birds: hawk, heron, eagle, songbirds, other:
mammals: deer, bear, elk, beaver, other:
fish: bass, salmon, trout, herring, shellfish,
other: 04,25-4.9 0) Tam
b. List any threatened or endangered species known to
be on or near the site.
c. Is the site part of a migration route? If so,
explain. Af.A c
d. Proposed measures to preserve or enhance wildlife,
if any: 12r_ ‘
• • Evaluation for
Agency Use Only
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil,
wood stove, solor) will be used to meet the
completed project's energy needs? Describe whether
it will be used for ��� g, manufacturing, etc.
b. Would your project affect the potential use of solar
energy by adjacent proper 2 s? If so, generally
describe. AV/
c. What kinds of energy conservation features are
included in the plans of this proposal? List other
proposed measures to reduc or control energy
impacts, if any: ,(f��
7. Environmental Health
a. Are there any environmental health hazards,
including exposure to toxic chemicals, risk of fire
and explosion, spill, or hazardous waste, that could
occur as a result of this proposal? If so,
describe.
1) Describe special emergency ervices that might
be required.
2) Proposed measures to reduce or control environ-
mental health hazards, if any: je, _�
Evaluation for
Agency Use Only
b. Noise
1) What types of noise exist in the area which may
affect your project (for example: traffic,
equipment, operation, other)? ,rio,0e)
2) What types and levels of noise would be created
by or associated with the project on a short -
term or a long -term basis (for example: traf-
fic, construction, operation, other)? Indicate
what hours noise would cope from the site.
3) Proposed measures to reduce or control noise
impacts, if any: 1.91P,v
8. Land and Shoreline Use
a. What is the current use of he site and ad'acent
/
properties? I t- I sA
b. Has the site been used for agriculture? If so,
describe. 210
c. Describe any structures on the site.
•
• Evaluation for
Agency Use Only
d. Will any structures be demolished? If so, what?
e. What is the current zoning classification of the
site? .f • /E 4...s'.
f. What is the current comprehensive lan d signation
of the site? S.r� /� 1701
If applicable, what is the current shoreline master
program designation of the site? ,v %¢
g.
h. Has any part of the site been classified as an
"environmentally sensitive" area? If so, specify.
.moo
i. Approximately how many people would reside or work
in the completed project? ,r)
j. Approximately how many people w uld the completed
project displace?
k. Proposed measures to avoid or rgduce displacement
impacts, if any: ILI
1. Proposed measures to ensure the proposal is com-
patible with existing and projected land uses and
plans, if any:
aEvaluation for
9. Housing
a. Approximately how many units would be provided, if
any? Indicate whether high, middle, or low - income
housing? iv /04"
b. Approximately how many units, if any, would be eli-
minated? Indicate whether high, middle, or low -
income housing.
c. Proposed measures to reduce or control housing
impacts, if any:
A/1/2'
10. Aesthetics
a. What is the tallest height of any proposed
structure(s), not including antennas; what is the
principal exterior building material(s) proposed?
■l1 /J
b. What views in the immediate vicinity would
altered or obstructed? ,t//
c. Proposed measures to reduce or control aesthetic
impacts, if any: d/4
Agency Use Only
Evaluation for
Agency Use Only
11. Light and Glare
a. What type of light or glare will the proposal
produce? What time of day would it mainly occur?
b. Could light or glare from the finished project be a
safety hazard or interfere with views?
c. What existing off -site sources o light or glare may
affect your proposal? ic)
d. Proposed measures to reduce light and
glare impacts, if any:
12. Recreation
a. What designed and informal recreational oppor-
tunities are in the immediate vicinity?
b. Would the proposed project displace any existing .
recreational uses? If so, describe.
c. Proposed measures to reduce or control impacts on
recreation, including recreation opportunities to be
provided by the project or applicant, if any:
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or pro-
posed for, national, state, or local preservation
registers known to be on or next to the site? If
so, generally describe. ■e10
b. Generally describe any landmarks or evidence of
historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
dol-
c. Proposed measures to reduf a or control impacts, if
any: 2J/41
14. Transportation
a. Identify public streets and highways serving the
site, and describe proposed accss to the existing
street system. Show on site plans, if any.
7
9) /5/ .:jri s f 9 ffeoE�/ di e �Ji c�9
k r s S, /
b. Is the site currently served by public transit? If
not, what is the approximate distance to the nearest
transit stop? yf'S
c. How many parking spaces would the completed project
have ? - How many would the project eliminate?
Evaluation for
Agency Use Only
•
d. Will the proposal require any new roads or streets,
or improvements to existing roads or streets, not
including driveways? If so, generally describe
(indicate whether public or private). We3
e. Will the project use (or occur in the immediate
vicinity of) water, rail, or air transportation ? - If
so, generally describe.
f. How many vehicular trips per day would be generated
by the completed project? If know, indicate when
peak volumes would occur. AL) •
g. Proposed measures to reduce or cotrol transpor-
tation impacts, if any: At/
15. Public Services
a. Would the project result in an increased need for
public services (for example: fire protection,
police protection, health care, schools, other)? If
so, generally describe.
L a
b. Proposed measures to reduce or control direct
impacts on public services, if any.
Af
Evaluation for
Agency Use Only
• Evaluation for
Agency Use Only
16. Utilities
a. Circle utilities currently available at the site:
e ec r c y, na ura gas,
telephone, sanitary sewer septic system, other.
b. Describe the utilities that are proposed for the
project, the utility providing the service, and the
general construction activities on the site or in
the immediate vicinity which ,might be needed.
C. Signature
The above answers are true and complete to the best of
my knowledge. I understand that the lead agency is
relying on them to make its decision.
Signature:
Date Submitted: 02 - ff'
PLEASE CONTINUE TO THE NEXT PAGE.
TO BE COMPLETED BY APPLI•T
• Evaluation for
Agency Use Only
0. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(do not use this sheet for project actions)
Because these questions are very general, it may be helpful
to read them in conjunction with the list of the elements of
the environment.
When answering these questions, be aware of the extent the
proposal, or the types of activities likely to result from
the proposal, would affect the item at a greater intensity
or at a faster rate than if the proposal were not imple-
mented. Respond briefly and in general terms.
1. How would the proposal be likely to increase discharge
to water; emissions to air; production, storage, or
release of toxic or hazardous substances; or production
of noise?
Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, ani-
mals, fish, or marine life?
Ws 4
Proposed measures to protect or conservg�lants, ani-
mals, fish, or marine life are: /
Evaluation for
Agency Use Only
3. How would the proposal be likely to deplete energy or
natural resources?
Proposed measures to protect or conserve energy and
natural resources are:
it) fal
4. How would the proposal be likely to use or affect
environmentally sensitive areas or areas designated (or
eligible or under study) for governmental protection;
such as parks, wilderness, wild and scenic rivers,
threatened or endangered species habitat, historic or
cultural sites, wetlands, floodplains, or prime
farmlands?
Proposed measures to protect such resources or to avoid
or reduce impacts are: �
5. How would the proposal be likely to affect land and
shoreline _use, incl4ing whether it would allow or
encourage land or shoreline us s incompatible with
existing plans?
-19-
Evaluation for
Agency Use Only
Proposed measures to avoid or reduce shoreline and land
use impacts area:
How does the proposal conform to the Tukwila Shoreline
Master Plan?
6. How would the proposal be likely to increase demands on
transportation or public services and utilities?
Proposed measures to reduce or respond to such demand(s)
are:
7. Identify, if possible, whether the proposal may conflict
with local, state, or federal laws or requirements for
the protection of the environment.
%
1 •
8. Does the proposal conflict with policies of the Tukwila
Comprehensive Land Use Policy Plan? If so, what poli-
cies of the Plan?
Proposed measures to avoid or reduce the conflict(s)
are:
Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLI•IT
1 Evaluation for
Agency Use Only
E. SUPPLEMENTAL SHEET FOR ALL PROJECT AND NON PROJECT
PROPOSALS
The objectives and the alternative means of reaching the
objectives for a proposal will be helpful in reviewing the
aforegoing items of the Environmental Checklist. This
information provides a general overall perspective of the
proposed action in the context of the environmental infor-
mation provided and the submitted plans, documents, suppor-
tive information, studies, etc.
1. What are the objective(s) of the proposal?
#9,e—Akne.9745
2. What are the alternative means of accomplishing these
objectives?
3. Please compare the alternative means and indicate the
preferred course of action:
Evaluation for
Agency Use Only
4. Does the proposal conflict with policies of the Tukwila
Comprehensive land Use Policy Plan? If so, what poli-
cies of the Plan?
Proposed measures to avoid or reduce the conflict(s)
are:
-23-
VG
RCLOC.T /o,u of S reE,q, £J, // 8E
Do,,a 8.F' 4 ' 760.911
• F,l/,.7 w, // ragDUA/ ova' _ "or .7' Are it e
� "'" �la:JCia:'.Y�_. ^etm� .. u "_..u• .... C: s:a �i ._L.�.�E•:.1 �:nS�i'. -y
1. • a..m . ., . .... f•i:fx .T :;3e;:,,:�:1:;5 vv it • ..i -+: �'..:.
,...... •
3
,Q �)rf• ?'._ 1. t y . +1 ::1. _ '
I_'�' y �'1 . a • — {��! 71a 1 �ron.,u: F '?�•i'... a�"`..�og :r g,:k f..%;_.^'C .:=r 7t'. 1. ..:.b.�..::t., .. :- +•'ih: '•nbe a ` ,: rte -::- - ,.. w't�' • : vy .a.. �.H .�.v . •t•: 1y .
_ - _ �
iW.r...•..- .. t ��).. �
a s, _.a.e� 'tom .,.'.y�.. -�
i..r'�._•a_.l�' �_ 't..- .�;.- ,
7 `
i i
?
D:a � 1 82. k .a i_ . {) k t- .
1 `' w � ....•4 ..
;'