HomeMy WebLinkAboutSEPA EPIC-06-88 - SOUTHCENTER MALL - FOOD COURTFOOD COURT
SOUTHCENTER MALL
REMODEL EXISTING MALL
INTO SEVEN IN -LINE
TENANTS & FOOD COURT
STRANDER BLVD. -
SOUTHCENTER MALL
EPIC 6 -88
WAC 197 -11 -970
• DETERMINATION OF NONSIGNIFICANCE
Description of Proposal Reconfigure 47,253 sq. ft. of existing interior mall space
into seven in -line tenants and a food court with 14 tenants, support facilities
and seating for 500 people
Proponent Center Ridge Design
Location of Proposal, including street address, if any Southcenter Mall
Lead Agency: City of Tukwila File No. EPIC _6_88
The lead agency for this proposal has determined that it does not have a probable
significant adverse impact on the environment. An environmental impact statement
(EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after
review of a completed environmental checklist and other information on file with the
lead agency. This information is available to the public on request.
[[ There is no comment period for this DNS
[->Tcl This DNS is issued under 197 -11- 340(2). Comments must be submitted by
. The lead agency will not act on this
proposal for 15 days from the date below.
Responsible Official
Position /Title
Address
Date
Rick Beeler
Planning Director
6200 Southcenter Boulevard, Tu
Signature
Phone 433 -1846
You may appeal this determination to the City Clerk at City Hall, 6200 Southcenter
Boulevard, Tukwila, WA 98188 no later than 10 days from the above date by written
appeal stating the basis of the appeal for specific factual objections. You may be .
required to bear some of the expenses for an appeal.
Copies of the procedures for SEPA appeals are available with the City Clerk and
Planning Department.
FM.DNS
•
Av4.1
JACOBS, VISCONSI & JACOBS CO.
25425 CENTER RIDGE ROAD, CLEVELAND, OHIO 44145 -4122
216 - 871 -4800
FEDERAL EXPRESS
July 22, 1988
The City of Tukwila
Building Department
6200 Southcenter Boulevard
Tukwila, WA 98188
RE: Southcenter Food Court
Building Permit Application
Gentlemen:
This letter will serve to formally amend our building permit application
for the above referenced project in the following respect:
We will contribute one -half, not to exceed $50,000, of the cost of a
four -way traffic signal at the intersection of our southeast entrance to
Southcenter Shopping Center from Strander Boulevard. Our payment shall be
made at such time as said traffic signal is installed. In the event said
traffic signal has not been installed at the time additional building permits
are requested in connection with a major expansion of Southcenter Shopping
Center, and installation of said traffic signal is required as a part of
transportation impact mitigation for such major expansion, then the $50,000
limitation herein shall not be applicable to such mitigation as may be
required by the City of Tukwila in connection with such major expansion.
Very truly yours,
JACOBS, VISCONSI & JACOBS CO.
Thomas P. Schmitz, P.E.
TPS /blv
cc: ilaL R•igc kaBe e l er-- ---
R. Earnst, P.E.
•
6/21/88
Rebecca,
These are my comments on the Food Court traffic study.
1. No indication that the study was done by a licensed traffic
engineer with sufficient experience. At the very least, a
P.E. stamp should accompany traffic generation estimate.
2. The 6,284 s.f. of "Miscellaneous" area created includes
areas necessary to support lease area operations and should
therefore be included in the gross area calculations as
specified in the ITE manual.
=r. The "Food court seating" area (8,040 s.f.) is used as the
independent trip generation variable. Does this include
the food preparation and serving area? All such areas
should be included in using ITE trip generation rates.
4. A comparison of trip generation numbers indicates that the
rate for "peak hour of adjacent streets" was used. This is
not appropriate here, where the noon hour traffic is equal
to the F.M. traffic peak and the generator (Food Court) can
be expected to have its peak traffic during the noon hour.
Therefore the "peak hour of generator" rate should be used.
This is 2.2/1,000 g.s.f. versus 10.5/1,000 g.s.f.
I conclude that items 2 to 4 raise questions which should be
clarified and that all subsequent analyses be done by an
accredited traffic engineer.
aloha,
Vernon
C ; F-DcR-r
r 6
• •
G0,1 visz-
6952- 64ffe ` Ala l D, S
67. ®8K1 t 7 C g�
>-sCoc>t‘17 - $rs
ass ® 126,386
70-7A c 6$7;
e57
%(S-cou,..,7-
CS'(
R.- -r.4«- 8 c S'
To -rot (- esr-
14 c
d( 55 i. -fL.r � _DrSCpvnr7 ,eer rot
_C
33 % ReS7if" 4-, r
3' it % co2,21 PO 2
6 5' 7 3, 71'
70. 1 t -W"
S80 7c.
/057 5-63
/5, 7
8.82
- Fool coo k`r_._ Poo b ?geP ?
•
;pan,
Architects
Planners
June .20, 1988
meadatsa
A Professional Service Corporation
Ms. Rebecca Fox
Tukwila Planning Department
City of Tukwila
6200 Southcenter Blvd.
Tukwila, Wa. 98188
JUN 2 0 1988
87 -118
RE: Southcenter Food Court
Parking Requirement Summary for the Southcenter Shopping Center
Dear Rebecca:
Enclosed please find the most current summary of available versus
required parking for the entire center.
With this information and the revised traffic study (submitted under
separate cover) I hope that we have helped to answer your questions
confirming traffic impact from the proposed Food Court.
Sincerely,
Allen C. Wyttenbach,
Project Manager
ACW : j r
Newport Corporate Center
3625 132nd Ave. S.E. Suite 100
Bellevue, WA 98006 -1399
(206) 644 -4000
• •
PARKING REDUIREMFNT SijMMARy
SOUTHCENTER SHOPPING CENTER
MAY 6, 1988
EXISTING DEVELOPMENT
****** * * * * * * * ***** * * * * * * * * ******* * ***
•
(REFER TO MARCH 17, 1987 SUMMARY)
C,t r.
SCPARKII
RETAIL - 5.0 CARS /1,000 SF GROSS LEASABLE AREA
LESS 4.0 CARS /1,000 SF FOOD SERVICE AREA
OFFICE - 2.5 CARS /1,000 SF FLOOR AREA
POST OFFICE - 3,0 CARS /1,000 SF FLOOR AREA
THEATRE - 0 /FIRST 750 SEATS + 3/100 REMAINING SEAT
MOTEL - 1 /ROOM + 1 /100 SF DINING AREA .4-1/4 OCC.UNIT CONF. ROOM
RETAIL AREAS GLA
NORDSTROM 164,750
THE BON 235,601
J.C. PENNEY 229,750
IBA 20,989
FREDERICK & NELSON 164,121
MALL SHOPS 323,802
UNION OIL 1,610
TOTAL SF 1,140,623
REQUIRED PARKING
RETAIL 1,140,623 SF X 5.0 RATIO =
LESS (52,084) X 4.0 RATIO =
5,704
-208 (F00D SERVICE AREA)
••wassr•
TOTAL REQUIRED PARKING
OFFICE
PUDGET SOUND MUTUAL 4256 X 2.5 •
THEATRE:FIRST 750 SEATS
REMAINING 450 SEATS X 3/100 •
POST OFFICE 4650 X 3.0
MOTEL
200 ROOMS 0 1 /ROOM 200
15,980 SF DINING 0 1/100 SF 165
270 OCC. UNIT 0 1 /4-OCC.UNIT 70
TOTAL MOTEL
TOTAL REQUIRED PARKING
TOTAL EXISTING
5,496
11
0
14
14
• •
RuhloParcff o ° em osdatee
Architects
Planners
June 10, 1988
A Professional Service Corporation
JUN 131988
Ms. Rebecca Fox
Tukwila Planning Department
City of Tukwila
6200 Southcenter Boulevard
Tukwila, Washington 98188
87 -118
RE: Southcenter Food Court - Traffic Study
Dear Rebecca,
Please find enclosed the response to your request for clarifications
to the Traffic Study prepared by Barton - Aschman Associates, Inc.
As we are all most anxious to resolve this issue, please let me know
if I can be of any further assistance in providing additional information.
Sincerely,
R•iP " & AS OCIATE
�9
a
)allen Wyttenbach
Project Manager
AW:nk
Enclosures
Newport Corporate Center
3625 132nd Ave. S.E. Suite 100
Bellevue, WA 98006 -1399
(206) 644 -4000
June 8,
City of Tukwila
6200 Southcenter Boulevard
Tukwila Washington 98188
(206) 433 -1800
Gary L. VanDusen, Mayor
1988
Mr. Richard U. Chapin
Law Offices, Ferguson & Burdell
29th Floor, One Union Square
Seattle, WA 98101
RE: Proposed Embassy Suites Hotel - Questions with 'Regards to
Flood Control Zone Permit Approvals (FIRM panel 1 of 2,
community panel 5300910001B, effective date August 3,
1981).
Dear Mr. Chapin:
In response to your May 12. 1988 letter I have discussed the
questions you have with Carl Cook of FEMA. With respect to the
closest flood hazard elevation area adjacent to your property,
noted is that a Zone "AH" (elevation of 21) is identified on the
FIRM (Flood Insurance Rate Map) just to the south of your
property. This critical elevation is properly determined to
apply to the entire area delineation between the railroad tracks,
West Valley Highway and South 158th Street.
The City council has recently passed a new flood ordinance which
you will find enclosed. Per "Definitions ", Item J, "Flood plain -
Relatively flat areas lowlands adjoining the channel of a river,
stream, watercourse or other body of water which has been or may
be covered by flood water... ". Your property is considered to be
within the flood plain. Past topographies of your site would
indicate at least part of the development is below the 100 year
flood elevation.
Per the second paragraph of your letter you request placing
parking at an elevation of 18 and the habitable portions of the
hotel at an elevation of 23. Per the current (August 31, 1981)
FIRM, elevation 23 or above would be acceptable as the lowest
floor elevation, being two feet above the base flood elevation
for 100 year flood tributary to the P1 channel (assume MGVD datum
and designated reference benchmarks as identified on the FIRM
identified above).
Mr. Richard U. Chapin
June 8, 1988
page 2
Per your proposal to provide a parking facility at elevation 18.
it is noted in the flood ordinance, Section 16.52.070, B,2
"Nonresidential Construction" - the following: "New construction
and substantial improvement of any commercial, industrial or
other nonresidential structure shall either have the lowest
floor, including basement, elevated to a minimum of one foot
above the level of the base flood elevation
Also, under the definitions portion of the ordinance, Item N
"Lowest Floor" means the lowest floor of the lowest enclosed area
(including the basement). An unfinished or flood resistant
enclosure, usable solely for parking of vehicles, building access
or storage, in an area other than a basement area, is not
considered a building's lowest floor, provided that such
enclosure is not built so as to render structure in violation of
applicable non elevation design requirements of this chapter..."
Per this definition and my discussion with Carl Cook, the use for
parking at elevation 18 is an acceptable use provided that the
parking facility is constructed in such a manner as to completely
floodproof the parking facility.
Since parking is the intended sole use of this sub floor,
required will be posting in a highly visible place of permanent
signs permanently attached to the wall of the parking facility to
indicate the following: "This floor is below the 100 year flood
elevation. Its use is limited to a parking facility only." The
reason that this signage is necessary is due to the potential
problem for uses or tenant improvements normally considered for
such dwelling spaces, where the flood ordinance obviously
disallows such use in the future.
If you have any further questions or I can be of further
assistance do not hesitate to call me at 433 -0179.
Sincerely,
Phil Fraser, . Senior Engineer
Enclosures: 2
ac:
Carl Cook, FEMA
Duane Griffin
Becky Davis
Moira Bradshaw
CD:DISK 6
CHAPIN.LTR
City o•
f Tukwila
PLANNING DEPARTMENT
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -1849
June 6, 1988
Mr. Allen Wyttenbach
Ruhl Parr and Associates
Newport Corporate Center
3625 - 132nd Avenue N.E., #100
Bellevue, WA 98006 -1399
Subject: SEPA MITIGATION FOR FOOD COURT TRAFFIC IMPACTS
Dear Mr. Wyttenbach:
Per our telephone conversation, I wanted to confirm that the City of
Tukwila plans to require a traffic signal at the intersection of Baker
Boulevard. This will serve as the primary environmental mitigation for
the traffic impacts of the Southcenter Food Court and other development
impacts.
We are eager to resolve the environmental review issues, as I'm sure you
are, so that building permit review can proceed. Accordingly, please for-
ward the additional trip generation information as requested in our letter
of May 11, 1988 to you.
Please call me at 433 -1845 if I can provide further information.
Sincerely,
Cam_
if-05‹
Rebecca Fox
Tukwila Planning Department
RF /sjn
• •
Barton - Aschman Associates, Inc.
820 Davis Street Evanston, Illinois 60204
JUne 3, 1988
Thomas P. Schmitz, P.E.
Center Ridge Design Services inc. P.A.
25425 Center Ridge Road
Cleveland, CR 44145 -4122
Re: Scuthcenter Food Court; Tukwila, Washhingtcn
Dear 'Itra:
312- 491 -1000
At your request, this letter summarizes our responses to the Planing
Department's concerns expressed in their letter dated May 11, 1988,
regarding So.zth ter's proposed food court.
The first concern expressed by city staff was that our memorandum showed a
(conservative) 20 percent increase in tripe generated and might require
mitigation measures at Andover Park West and Baker Boulevard. Contrary to
this conclusion, our traffic study at April 6, 1988, indicated that we
felt the proposed food court would generate minimal traffic based on our
research and firsthand )oxcwledrp. In fact, our analyses concluded that
there would be a 22 percent decrease in traffic generated by this remodeled
section of the mall because of the less interisive use. With the lower
projected traffic volumes, traffic mitigation measures would not be
necessary We estimated food court traffic generation from published
sources and available marketing data. Surveys showed that less than 20
percent of food cast =stcat rs specifically visit a food court in a given
year. Based on that information, a primary assumption used in our analyses
was that 20 pert of food court custarP..rs on any one day would be making a
specific trip to the food court only.
The second concern expressed was the zit for a clarification in the net
decrease of approximately 20,000 square feet of gross leasable area and its
impact on trip generation. The mall's plan for remodeling sections "D" and
"E" shows a net loss of 18,834 square feet of leasable area as shown in
Table 1 of our April 6, 1988 memorsndtmt. A breakdown of the area is as
follows:
Food court seating
Additional mall hallways
Miscellaneous
8,040 square feet
4,510
3.284
18,834 square feet
• •
Barton- Aschman Associates, Inc.
Mr. was P. Schmitz, P.E.
June 3, 1988
Page 2
The miscellaneous area consists of previously leasable area converted to
restroans, utility rooms, maintenance corridors, and stowage space to meet
the needs of the new stores and which will not generate new traffic.
Additional space provided to hallways was needed to access the increase in
the number of stores (6 existing versus 24 new stores) . The food court
seating area was not included because (1) food court seating areas are not
typically included for trip generation calculations of shopping centers, and
(2) the City of T k i la zoning code recognizes that restaurants within
Shopping centers exceeding 600,000 square feet do not generate 100 percent
new traffic by allowing an 80 percent reduction in parking requirements.
If we recalculated the traffic generation including the food court seating
area and summarized our results below. Even if the food court seating area
is included, there still, is a net decrease in traffic volumes of seven
percent.
Existing stores (145,220 square feet)
Proposed stores (126,386 square feet)
Food Curt seating (8,040 square feet)
[8,040 sf x 52 trips /1,000 sf x 20 %]
(1)
Assuming free-standing restaurant (ITE)
P. M.
INUJOur
586 Tripe
459 Trips
84
543 Trips
(1)
To restate our conclusions, from review of available data and literature,
food courts derive the majority of their patrons fran existing mall traffic.
When ITE trip generation data for freestanding fast food facilities is
adjusted to reflect mall conditions used to estimate the traffic generation,
there is a net reduction in traffic volumes when existing retail and food
stores are replaced with a food court.
If you have any additional questions on this matter, please feel free to
call me at your convenience.
Sincerely,
OorvarFU1
Associate
SBC:cae
BELLEVUE OFFICE
KOLL CENTER BELLEVUE
500 - 108TH AVENUE N.E.
SUITE 2100
BELLEVUE, WA 96004
TELEX:32.1087 FAX: (206)454-5719
(206) 453-1711
RICHARD U. CHAPIN
BELLEVUE OFFICE
LAW OFFICES OF
FERGUSON & BURDELL
29T" FLOOR, ONE UNION SOUARE
SEATTLE, WASHINGTON 98101
TELEX: 32-0382 FAX: (206) 682.6078
(206) 622-1711
May 12, 1988
Mr. Phil Fraser
Department of Public Works
City of Tukwila
Tukwila, WA
Re: Proposed Embassy Suites Hotel
Dear Phil:
ANCHORAGE OFFICE
FERGUSON, BURDELL & RUSKIN
RESOLUTION TOWER
1031 WEST 4TH AVENUE
SUITE 500
ANCHORAGE, ALASKA 99501
FAX: (907) 272-1710
(907) 277 -1711
RECEIVED
MAY 1 7 1988
TUKWILA
01JOLiC WORK.`
This letter will confirm our earlier discussion concerning
the possible impact of the flood plain on the proposed hotel
project. It is my understanding that the current FEMA maps
do not show that the subject property is located within
a flood plain. However, adjacent properties which are in
the flood plain appear to have elevations similar to some
of those on the subject property. For that reason, it is
necessary that we determine whether or not the elevations
proposed for the project will cause any problems insofar
as flood plain restrictions are concerned.
We propose to place the parking at an elevation of
18 and the habitable portions of the hotel at an elevation
of 23. These would be the lowest elevations.
I would appreciate it if you would proceed with necessary
review and consultation with appropriate governmental agencies
so that you can confirm for me whether these elevations
are acceptable. As always, time is of the essence, and
we are in a real "crunch" situation. Your earliest possible
response would be appreciated. Incidentally, we would be
happy to have our engineer participate in discussions with
other governmental agencies if that is appropriate.
I look forward to hearing from you.
Sincerely,
FERGUSON & BURDELL
By:
RUC:rim
I4 41
cc: Dean Powell
Lynn Bock
Richard U. Chapin
City of Tukwila
PLANNING DEPARTMENT
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -1849
May 11, 1988
Mr. Allen Wyttenbach
Ruhl Parr and Associates
Newport Corporate Center
3625 - 132nd Ave. N.E., #100
Bellevue, WA 98006 -1399
Dear Mr. Wyttenbach:
At the Development Review Committee meeting of May 5, 1988, staff from
several Tukwila departments reviewed the peak hour trip generation data
for the Southcenter Food Court, which was prepared by Barton - Aschman
Associates. The staff felt that projections of a 20% increase in trips
generated was conservative, and that mitigation might be needed at Andover
Park West and Baker Boulevard.
It was noted that current peak -hour trip generation estimates of 586 were
based on 145,220 square feet without the Food Court. Projected peak -hour
trip generation estimates of 459 were based on a total of 126,386 square
with the Food Court. Please account for the decrease of 20,000 square feet
of usable, trip - generating space at Southcenter, and provide additional
information on the usage mix. Please also recalculate trips generated
using comparable square footage figures. The staff felt that if the area
were comparable, then the trips generated would also be comparable.
Please call me at 433 -1845 if I can provide further information.
Sincerely,
Rebecca Fox
Tukwila Planning Department
RF /sjn
•
RmaLoPasfrf
Architects
Planners
April 11, 1988
Mr. Duane Griffin
Building Official
City of Tukwila
6200 Southcenter Blvd.
Tukwila, WA 98188
•
° M2ISCfs°aftSe roY I //r
A Professional Service Corporation pJVtd.1`�
ru1-121
87 -118
RE: Southcenter Food Court - Mechanical Design Criteria and Food
Court Traffic Study by Barton - Aschman Associates.
Dear Duane,
Enclosed for your review and approval is a copy of the "Mechanical
Design Criteria" around which the mechanical system will be developed
for the Project.
In addition please find enclosed a copy of the Traffic Study prepared
for the Food Court Project by Barton - Aschman Associates, Inc. This
study, along with the Southcenter Food Court Design Criteria dated
March 30, 1988, should fully explain both food court functions and
impacts.
Duane, if you have any questions, please do not hesitate giving me a
call.
Sincerely,
L'PARR & ASSOC TES
Allen C. Wyt
Project Manager
ACW:vw
Enclosures
Newport Corporate Center
3625 132nd Ave. S.E. Suite 100
Bellevue, WA 98006 -1399
(206) 644 -4000
011svo
W./ '0,2,14 12 c
Gyy- goo
• •
SOUTHCENTER MALL FOOD COURT AND SPLIT
TENANT AND MALL COMMON AREA
MECHANICAL bESIGN CRITERIA
SPRINKLER SYSTEM
1. Mall Common Area (Food Court Seating area, mall walkway,
public toilet rooms and hallway, food court support area)
and the Food CouJ. t tenants apr inner ayatem rio'et is will ue
fed from an existing 8" overhead feed main.
2. Separate risers for the Mall Common Area and the Food
Court tenants will be provided. Each riser will have it's
own F.M. approved shut -off isolation valve and be central
station monitored for tamper. Each riser will have
separate flow switches for local and.remote (central
station) annunciation. Alarm check valves will not be
necessary due to the use of the flow switches.
3. Food Court tenants will be provided a sprinkler system
connection via a blind flange arrangement. The landlord
will provide the "bulk main" piping between the tenants.
Tenants will provide their own sprinkler systems based on
NFPA -13 ordinary hazard occupancy with sprinkler heads
only required below ceilings. After the tenant has
installed and tested his system he will be permitted to
connect to the tenant "bulk main" system.
4. Sprinkler heads in the fire corridor behind the tenant
spaces will be fed from the tenant "bulk main" system.
5. Fire Hose Cabinets with 2 -1/2" hose connections (with
local hose threads) will be provided within the mall at
the entrance to exit passages or exit corridors which
includes the entrance. Hose cabinets will be fed from the
tenant "bulk main" system.
6. Design drawings for the Mall Common Area sprinklers will
indicate sprinkler heads only. Sprinkler head spacing
will be designed per NFPA -13 guidelines for Ordinary
Hazard and Factory Mutual requirements. The successful
sprinkler contractor will be responsible for designing the
sprinkler piping which is to feed the sprinkler heads.
This piping will be designed per the Ordinary Hazard pipe
sizing table in NFPA -13. The sprinkler contractor will
then be required to submit the plans to the engineers, all
the required code agencies and insurance carriers for
their approvals prior to the start of any piping.
7. Sprinkler heads (temporary sprinkler systems) will not be
required in unoccupied tenant spaces as long as the unit
remains free from any storage, clean and the door locked.
Page 1 of 2
• •
TENANT MECHANICAL (HVAC) SYSTEMS & MISC. REQUIREMENTS
1. Each tenant will provide a separate HVAC unit for
temperature control within their unit. The tenant design
criteria will require the tenant to have a smoke detector
installed within the return air section of their HVAC unit
per section 1009. of the UMC. This detector, when
activated, is to shut down the tenant's HVAC unit.
2. Food Court tenants which have hoods over their ranges,
fryers, etc. are required to install a fire suppression
system within the hood as required by the UMC. Unless
specifically required to by the code officials, the
tenants will not be required to have this hood fire
suppression system central station monitored.
3. All hood exhaust ductwork and construction will be per the
1985 UMC.
4. Open area smoke detection systems within the tenant spaces --
will not be required.
MALL COMMON AREA MECHANICAL (HVAC) REQUIREMENTS
1. Mall HVAC units will have smoke detectors installed within
the return air portion of the HVAC unit. Upon detection
of smoke the unit's supply air fan, heating and cooling
will be locked out and the unit's relief air fan will be
started for smoke relief. In addition, local and remote
(central station) annunciation will start. Smoke relief
quantities will be based on six (6) air changes per hour
to a height of 12 feet.
2. Each Mall HVAC unit's smoke relief system will have the
capability of being manually controlled from a central
location within the Food Court Area (possibly the -
sprinkler room).
3. If the water flow is detected in the sprinkler riser
serving Mall Common Area by the sprinkler flow switch, the
smoke relief systems within each Mall HVAC unit will be
energized and local and remote (central station)
annunciation will start.
4. The HVAC unit for the public toilet rooms and food court
support areas will also include smoke relief capabilities
as noted above except that during a smoke relief sequence
the HVAC unit shall shut down and the support area exhaust
fans shall continue to operate (or start if during
unoccupied hours). These exhaust fans will be sized with
the minimum required smoke exhaust quantity in mind.
Page 2 of 2
ENTRANCO ENGINEERS, INC.
April 7, 1988
LAKE WASHINGTON PARK BUILDING (206) 827 -1300
5808 LAKE WASHINGTON BOULEVARD N.E., KIRKLAND. WA 98033
Mr. Paul A. Grodecki
Center Ridge Design Services Inc., P.A.
Architects and Engineers
25425 Center Ridge Road
Cleveland, Ohio 44145
fP - OP T-]\ij ,
n
APR 1 1 1988 1
PLANNING C)EPT.'
Re: Traffic Study for Southcenter Expansion:
Preliminary Scoping
Dear Paul:
Thank you, Paul, and Tom Schmitz, for your call regarding the proposed
traffic study.
As noted in our March 28 call, on March 22 I met at the Tukwila Department
of Public Works with City Engineer, Ross Ernst and Brian Shelton, regarding
study scope, available data, and other elements important to defining the
scope and level of effort. Ross and Brian were most helpful. At Ross's
suggestion I contacted Tukwila's Senior Planner, Jack Pace, to obtain
additional information regarding proposed nearby development projects which
Ross and Brian had identified as potentially significant to near -term
traffic conditions in the vicinity.
Highlights of the meetings are presented below.
1. Traffic Analysis Cases (Preliminary)
These three cases should be developed.
a. Current conditions (1987 -88)
b. 1990 without Southcenter Expansion
c. 1990 with Southcenter Expansion
An issue is "background" traffic growth associated with other area
development in this time frame and is discussed further below. (Our
recommended analysis cases are presented in Section 8.)
2. Programmed Street Improvments
These projects are of significance for the Southcenter Expansion and
may be assumed in place for the 1990 analyses:
EVERETT OFFICE- 516 SEATTLE -FIRST NATIONAL BANK BUILDING (206) 258 -6202
1602 HEWITT AVENUE, EVERETT. WA 98201
Mr. Paul A. Grodecki
April 7, 1988
Page 2
Minkler Boulevard Extension: Southcenter Parkway to Andover Park
West (APW). Assume in -place for 1990 studies.
Strander Boulevard Extension: From Tukwila /Renton boundary at West
Valley Highway (SR 181) to align into S.W. 27th Street southeast of
Longacres Race Track in Renton. An extension of S.W. 27th Street
east to tie into a new interchange with SR 167 is also programmed.
The Renton 6 -year Transportation Improvement Program (TIP) shows a
$7.6 million City of Renton project cost, exclusive of a $7.0
million estimate for WSDOT to construct the interchange per the
Green River Valley Transportation Action Plan. This project could
delay past 1990, although the City of Renton has a high priority
for this project. (Please see further discussion under Section 6
below.)
57th Avenue South: South 180th Street to South 200th. Widening to
three lanes initially (five lanes ultimate) and some realignment
segments. Entranco Engineers completed the preliminary design
studies for this project. The alternatives for realigned segments
are under city review. Assume in -place for 1990 studies.
South 168th Street: Southcenter Parkway to APW. Implementation
status uncertain. Entranco Engineers has completed the drafts for
the design report and EIS. The draft final EIS is under city
review. Significant issues are impacts on adjacent buildings near
the Southcenter Parkway end of the project and impact on Tukwila
Pond. (See also 58th Avenue South project, below.)
58th Avenue South: Strander Boulevard to proposed South 168th
Street. Implementation schedule will depend on Tukwila Pond site
development situation. Ross Ernst noted this possible scenario:
construction of South 168th Avenue eastward to the 58th Avenue
South alignment at the west edge of the Tukwila Pond property.
This would provide an alternate connection between Strander
Boulevard and the Southcenter Parkway south of Strander which
"bypasses" the Strander /Southcenter Parkway signal.
In connection with our "Lot 1 Spring Ridge Short Plat Traffic
Impact Study ",* which addressed the portion of the Tukwila Pond
site north of the pond, options considered for the 58th Avenue
South junction with Strander Boulevard included alignments into
Southcenter Mall's Doubletree driveway or its "Tunnel" driveway to
the east.
*For Commercial Design Associates, Inc., February 1985.
Mr. Paul A. Grodecki
April 7, 1988
Page 3
Andover Park West: The city has programmed widening the four -lane
APW to provide five 12 -foot lanes from Minkler Boulevard to Tukwila
Parkway. The northern segment from Strander Boulevard to Tukwila
Parkway is scheduled to begin construction this year.
Southcenter Boulevard Extension: 62nd Avenue South to Grady Way.
Upgrade to five lanes and extension to the Grady Way /Interurban
Avenue by 1990. Entranco Engineers prepared the design study for
this project. The segment between 62nd Avenue South and T -Line
Bridge is now under construction.
T -Line Bridge: Widening to be completed by 1990.
3. Roadway Development Standards
The city requires a 12 -foot lane width standard for new or widened
arterial projects. This standard would apply to Strander Boulevard and
APW. Sidewalks around the Southcenter Mali "superblock" (Southcenter
Parkway /Tukwila Parkway /APW /Strander Boulevard) are required by
ordinance, and missing sidewalk segments will be constructed by 1990
along with associated provisions for landscape strips adjacent to
sidewalks. Primary sidewalk needs are on Strander Boulevard and APW.
4. Major Developments
Several planned /pending private development projects were identified
which warrant consideration in the 1990 impact analysis time frame:
- - Marriott Hotel (on APW south of Strander; under construction)
- - Tukwila Pond property (Strander /APW)
- - Seafirst property (existing bank, Tukwila Parkway /APW)
-- Segale property (Strander /APW)
- - Penny's warehouse and The Bon warehouse (properties on Southcenter
Parkway south of Strander)
Marriott Hotel: A traffic impact study will be made available from
the Department of Public Works. This routine- business -trip-
oriented hotel will not have significant conference /restaurant
facilities.
Tukwila Pond Property: City staff have not been contacted by the
developer (Spieker Partners) regarding traffic impact scoping and
the city lacks firm site plan information. Some 160,000 - 175,000
gross square feet of floor area (gfa) of development is believed
likely in one of two scenarios. (1) A junior department store
(Target ?) at 150,000 gfa plus 10,000- 15,000 gfa strip retail.
• •
Mr. Paul A. Grodecki
April 7, 1988
Page 4
(2) All strip retail (small uses). In the Springridge Lot 1
proposal, cited previously, our traffic study addressed a 171,000
gfa development, of which 40,000 gfa was office and 131,000 gfa was
small retail /restaurants. Traffic generation volume will of course
vary with specifics of the site use plan.
Seafirst Bank Property: Located at the southeast corner of Tukwila
Parkway at APW, this site includes the existing Seafirst Bank. No
site studies have been submitted to the city, but it is believed
that an "envelope" study has or may commence which will address a
range of 196,000 gfa to 413,000 gfa for a mid -rise office building
with structured parking and restaurant. Both the low -end gfa value
and the range in gfa are obviously quite significant for traffic
generation loads. For purposes of our study it was suggested that
a mid -point gfa value be considered (roughly 300,000 gfa).
Seagale Property: Vacant property at the southeast corner of the
Strander Boulevard /APW intersection. There is no public
information about size and character of proposed development.
There is essentially no zoning -based limit as to the amount of gfa
that could be developed. The adverse soils conditions which
heavily condition the Southcenter vicinity's development (and
redevelopment) economics is a potentially significant factor for
this property and the other properties addressed herein.
Penney's and Bon Warehouses: These facilities are located on
Southcenter Parkway between the proposed alignments for the South
168th extension project on the north and Minkler Boulevard
extension on the south. They are considered prime sites for
eventual intensive redevelopment which might feature offices and /or
possibly a junior deparment store such as Mervyn's. As in the case
of the Segale property above, there is "no theoretical" constraint
to the density and uses of potential redevelopment on these
properties.
The redevelopment of the Penney's and Bon warehouse property and the
development of the Segale property could generate comparable large
volumes of new traffic in the study area. A reasonable assumption for
purposes of our study would be to assume at most that only one of these
three developments may be in -place for our 1990 analyses. The Segale
property development was suggested as this candidate owing to its close
location relative to the Southcenter expansion's orientation to Andover
Park West, and the Tukwila Pond property across the street.
A question was raised about the status of the Doubletree Inn: how long
will that property continue in its present use and character?
• •
Mr. Paul A. Grodecki
April 7, 1988
Page 5
5. Impact Analysis Geography
The traffic impact analysis should address all street and driveway
intersections on the Southcenter Mall "superblock" streets (Southcenter
Parkway, Tukwila Parkway, Andover Park West (APW), and Strander
Boulevard) and several adjacent street segments. The study street
segments and intersections are listed below. Also, please see the
attachment ( "Southcenter Mall Existing Site Plan "):
Street Segments
1. Southcenter Parkway: Strander Boulevard to Tukwila Parkway
2. Tukwila Parkway: Southcenter Parkway to APW
3. Andover Park West: Tukwila Parkway to Strander Boulevard
4. Strander Boulevard: APW to Southcenter Parkway
5. S -Line Bridge: Tukwila Parkway to Southcenter Boulevard
6. Southcenter Boulevard: S -Line Bridge west to Macadam Road
Intersections (* = signalized intersections)
1. Southcenter Parkway at Strander Boulevard*
2. Southcenter Parkway at I -5 Off -ramp to southbound Southcenter
Parkway
3. Southcenter Parkway at Klickitat Drive /Southcenter Nordstrom
Driveway*
4. Southcenter Parkway at Southcenter West Theatre Driveway
5. Tukwila Parkway at Southcenter North Theatre Driveway (there is a
programmed access revisions here)
6. Tukwila Parkway at S -Line Bridge*
7. Tukwila Parkway at NB ( "EB ") I -405 on- ramp /Southcenter Seafirst
Driveway*
8. Tukwila Parkway at Andover Park West*
9. Andover Park West at Southcenter Union '76 Driveway
10. Andover Park West at Baker Boulevard /Southcenter Penney's Driveway
(* pending)
11. Andover Park West at Southcenter Post Office Driveway
12. Andover Park West at Strander Boulevard
13. Strander Boulevard at Southcenter Tunnel Driveway (* pending)
14. Strander Boulevard at Southcenter Doubletree Driveway (* pending)
15. Southcenter Boulevard at S -Line Bridge*
16. Southcenter Boulevard at Macadam Road*
Analysis of the street segments and intersections should include other
driveways along the study street segments as appropriate. In this
regard the Department of Public Works has noted several driveways not
specifically listed above: the Doubletree Inn's driveways; several
• •
Mr. Paul A. Grodecki
April 7, 1988
Page 6
secondary driveways on the southbound APW approach to Strander
Boulevard (the Firestone store, post office, and Puget Sound Mutual
Savings Bank); Union '76 driveways; and driveways along Southcenter
Boulevard from S -Line Bridge west to Macadam Road..
Internal Circulation: Modifications stemming from the Southcenter
expansion should also be addressed, with consideration of potential
impact upon nearby public street intersections as well as general
orderliness and safety of movement of motor traffic and pedestrians
on -site. Two locations of concern are the Southcenter Union '76
driveway's intersection with: (a) APW and (b) the north -south mall
ring road along the east faces of the existing Penney's store and
proposed new (fifth) department store. (The new department store is to
be located to the north of the Penney's store and an eastward extension
of the "mall shops ".)
Other proposed revisions in internal circulation elements such as the
"T" treatment for Southcenter Doubletree and "Tunnel" drives at the
south ring road, were identified for appropriate traffic impact review.
High Occupancy Vehicle Transportation: HOV elements should be included
in the traffic study for Southcenter expansion. This includes transit
bus and rideshare (carpool and vanpool modes) and associated pedestrian
movements. Ross recommended that study of the existing on -site transit
stop at the northeast corner of The Bon be included in this task
element.
A question was raised regarding plans and implementation schedule for
any northward expansion of The Bon and associated replacement parking
via new structured parking north of the present Bon building (i.e.,
potential parking decks over The Bon's existing ".lower level parking"
north of The Bon.) Particularly relevant here is the inclusion in the
city's current six -year Transportation Improvement Plan (TIP) of an
extension of the S -Line Bridge roadway southward from Tukwila Parkway
to the east -west ring road (which connects the Southcenter West Theatre
entrance to the Southcenter Union '76 entrance.) The current TIP
schedules a revision of the S -Line Bridge /Tukwila Parkway signal in the
1991 -93 period in connection with this S -Line extension. Local
improvement district funding support is assumed for the signal and
associated intersection channelization revisions.
6. Tukwila Comprehensive Transportation Plan and Strander Boulevard
Extension
The new comprehensive transportation planning study has gotten underway
and is in the inventory stage. The plan will update the previous
comprehensive transportation plan prepared by Entranco Engineers in
Paul A. Grodecki
April 7, 1988
Page 7
1979 and will have a greater emphasis on longer range traffic
elements. A computerized traffic forecast model will be developed.
The long range plan element is scheduled for completion in September
and will include traffic forecasts for the year 2000 and /or 2010.....or
10 to 20 years beyond the 1990 analysis year for the proposed
Southcenter expansion.
The plan may not, therefore, offer ready means for testing the
near -term (1990) impact of the proposed eastward extension of Strander
Boulevard to S. W. 27th Street in Renton. That extension may result in
a considerable increase in through /intercommunity arterial traffic use
of Strander Boulevard adjacent to Southcenter and alteration of traffic
volume turning movements at the study locations listed above.
Assessment of the year -to -year .profile of those traffic volume and
pattern changes also presents some difficulties for the nearer -term
(1990) study for Southcenter expansion.
We recommend, therefore, that the 1990 analysis be performed without.
the Strander extension. This would present the clearest and most
reliable assessment of the traffic impact of the Southcenter expansion
upon the existing network. Traffic generated by the expanded
Southcenter would be at a maximum in terms of its percentage of total
traffic and would therefore represent a maximum case for impact upon
the study area streets with the firmly programmed City of Tukwila
street improvements (such as the five - laning of APW) in place.
7. P.m. and Noon Peak Hour Analysis
The city desires an analysis of both p.m. peak hour and noon peak
traffic impacts. The Institute of Transportation's "Trip Generation
Manual (4th ed.; 1987), which is the generally accepted guideline for
estimating traffic generation for impact studies, does not contain noon
peak hour trip rate data. Special studies will be necessary to
estimate noon traffic generation for Southcenter Mall expansion and the
several planned major developments noted in Item 4.
8. Incremental Impact Analysis
Based on the foregoing we recommend the following cases for traffic
analysis:
a. Current conditions case (1987/88 data)
b. Traffic Impact Cases (1990)
Mr. Paul A. Grodecki
April 7, 1988
Page 8
(1) With general background traffic increase only. This would be
based on current trends in annual percentage traffic increases
on study area streets and excludes any of the planned /pending
major developments of Section 4 other than the Marriot Hotel.
(2) With Southcenter Mall expansion added to (1).
(3) With Southcenter Mall expansion, plus general background
traffic growth, plus other major developments per Section 4.
9. Available Traffic Data
We will request available traffic data from the city. New traffic
counts will be performed where existing counts are unavailable or out
of date.
10. Scope of Work Outline
Based on the above we propose the following scope of work for the
Southcenter Mall Expansion Traffic Study.
a. Inventory and Review
(1) Project Mobilization and Inventories: Review available studies
and data and gather new data. Perform any needed new traffic
counts. Conduct traffic and roadway field reconnaissance of
traffic and roadway conditions of the on -mall and off -mall
study elements.
(2) Analyze Existing Conditions: Traffic volumes, level of service
(capacity), and other traffic operation elements including
high- accident problem areas.
(3) Develop and Assess 1990 Traffic Conditions with General
Background Traffic Growth Only on Existing /Committed Street
System (the Strander Boulevard extension is not assumed in this
task nor in the tasks below).
b. 1990 Traffic Impact Analysis
(1) 1990 With Southcenter Mall Expansion: Assess level of service
and traffic operations such as turn lane stacking (queuing),
weaving, and safety; address pedestrian and transit elements.
Identify and evaluate potential roadway and traffic control
improvements to mitigate traffic impacts. (On -site traffic
impacts will also be included here as appropriate.)
• •
Mr. Paul A. Grodecki
April 7, 1988
Page 9
(2) 1990 With Southcenter Mall Expansion and Other Major
Developments: Impact and mitigation analysis as in (b.1)
above. Other major developments consist of four projects:
Marriott Hotel, Tukwila Pond site, Seafirst site, and Segale
site.
c. Documentation, Coordination, Meetings.
(1) Prepare draft and final study report.
(2) Review of findings with client and City of Tukwila staff.
We look forward to your comments, Paul, and commencing work. We note our
thanks to the city's Ross Ernst, Brian Shelton, and Jack Pace for their
valuable input to development of this scope of work.
Sincerely,
ENTRANCO ENGINEERS, INC.
Dennis R. Neuzil, P.E., D. Eng.
Associate
DRN:gmw
cc: Ross Ernst
Brian Shelton
Jack Pace
Attachment: Southcenter Mall Area Map
A
_*\
O10 -2n NP •ro •io9
f it.1EA pay
t1--s
ANNAN.. PA.CLL
-�
MALI
A•
■ALL
.TORE.
M
MALL
4
Al
VIC
rA
M EON
r.w ...MA
W
.70A.. MALL
°
0
r
r12ONNOtA
NILSON
w.a u.M.
MALL
w
I.1
(SEAARST)
.�l
II]
MALI
°
_' _IIIIIID
I ft i
CN
SIMI WINK
6,11 s1.140
_ r,
()Alto 7,,f
t.
mow;
• .M
11.011 CVOS
�t..LOPIa .AAC.
Q R°HNSYS r
Q L\
I
II P:....A.11".
O
i'1
O = 6XLSnt Sl6NA -L.
ANNCt:cs: LK1121404coantu
3/88
BAKCZ
iiss L.vD
..•...•r ...Ip •••.■
•
N
A
CI I
2
n
•
SITE
T.)KLUIlp Po ND
�SEGzfLE)
Barton - Aschman Associates, Inc.
820 Davis Street Evanston, Illinois 60204
MEMORANDUM TO: Thomas P. Schmitz, P.E.
Center Ridge Design Services, Inc.
FROM: Stephen 8. Corcoran
Barton- Aschman Associates, Inc.
DATE: April 6, 1988
SUBJECT: Southcenter Mall
Tukwila, Washington
312-491-1000
This memorandum summarizes the results of our research and analysis to estimate the trip gener-
ation characteristics of the proposed food court facility within Southcenter Mall in Tukwila, Wash-
ington. As we understand It, Jacobs, Vlsconsi & Jacobs proposes to remodel Sections 0 and E of
the mall, which are currently occupied by a supermarket and drugstore, and replace these uses
with a food court. As part of thls study, we reviewed available literature on the operational and trip
generation characteristics of food courts and, based on this information, we estimated the net
traffic generation volumes of the proposed facility.
The Institute of Transportation Engineers Trip Generation Manual (3rd and 4th Editions) revealed
no available data on food courts. Other sources, including the shopping center Industry publica-
tions, were then researched to locate articles on food courts. Marketing data was obtained from
Jacobs, Vlsconei & Jacobs on the characteristics of food court users. From the available articles
and marketing data, several conclusions can be made:
1. Food courts are essential to satisfy a customer's hunger and serve as a resting place so that
customers will stay in a shopping center longer and spend more money.'
2. Several articles indicated that the majority of food court patrons are shoppers at the stores with-
in the shopping center and avail themselves of the food court services during the same trip.
3. A recent study of food court users at the Parkdale Mall In Beaumont, Texas, showed that In the
last year only 18.7 percent of the food court users made only one trip destined strictly to the
food court.
Another factor to be considered in the trip generation estimate Is the convenience of the food
court to the patrons. For discussion purposes, we will consider two patrons: one who is already in
the mall on a shopping trip and another who Is on the street system near the mall and wishes to
visit a fast food establishment.
' "Those Perplexing Food Courts," Shopping Centers Today, May 1987.
•
Barton- Aschmen Associates, Inc.
The first patron Is already In the mall and just has a short walk to reach the food court.
It is unlikely that this patron would drive to another similar facility located outside the
mall because of the inconvenience and the time element.
The second patron has the choice of using the food court within the mall or a fast food
restaurant located on the surrounding street system. In order to reach the food court, a
potential customer would have to drive to the mall lot, park, and walk several hundred
feet to the mall entrance and further into the mall, depending on the location of the
food court and which entrance was used. Once the meal is finished, the patron would
have to repeat the procedure in reverse. The faster and easier alternative would be to
drive to a facility located on the street, park next to the building, and walk a few feet to
the building. If the facility has a drive-through window, the customer would not even
have to leave the car.
Discussions with the mall management indicated that there are four freestanding fast
food restaurants near Southcenter Mall: Wendy's, McDonald's, Taco Time, and Subway
Sandwiches.
From our research and firsthand knowledge, we are of the opinion that the food court
would generate very few new trips to and from the mall. This conclusion is based on the
fact that the majority of food court users are customers at the mall, as well as the incon-
venience of going to the food court only, as compared to visiting a freestanding facility.
While we feel that the food court will generate minimal new traffic, we took the avail-
able trip generation information on freestanding fast food establishments and the Park -
dale marketing information and projected a worst case net trip generation estimate.
The trip generation rates per thousand square feet from the ITE Trip Generation Manual
(4th Edition) were applied to the existing and proposed store sizes to estimate the total
generation rates during the P.M. peak hour. Based on the Parkdale data, we conserva-
tively assumed that 20 percent of the trips on any one day were food -court -only or new
trips. The results of our analyses are shown in Table 1 and Indicates that there will be a
net reduction In weekday P.M. peak -hour two -way volumes of 127 trips, or 22 percent.
Barton•Aschman data on supermarkets and fast food restaurants shows that the net re-
duction Is conservatively low.
In conclusion, from our review of available data and literature, food courts generate the
majority of their patrons from existing mall traffic. Also, food courts keep mall patrons in
the mall for longer periods, so they may actually miss the commuter rush hour. When the
trip generation data for freestanding facilities was used to estimate the traffic genera-
tion, there was still a net reduction In traffic volumes with the replacement of the exist-
ing stores with a food court.
2
Barton - Aschman Associates, Inc.
Table 1
TRIP GENERATION ESTIMATE
Use
Existing Stores
Lucky Store
Drugstore
Retail Shops
Total
Proposed Stores
Food Court
Retail Shops •
Total
Size ITE Total P.M. Peak -Hour Total P.M.
Trip Generation Rate Peak•Hour hips
(square feet)
21,200
21,500
102,520
145,220
8.82 per 1,000 square feet
3.22 per 1,000 square feet
3.22 per 1,000 square feet
7,250 52.00 per 1,000 square feet
119,138 3.22 per 1,000 square feet
128,388.
187
89
330
588
75'
384
459
' Assumes 20 percent of trips are new.
3
•
City of Tukwila
PLANNING DEPARTMENT
6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -1849
April 5, 1988
Allen Wyttenbach
Ruhl -Parr & Associates
3625 - 132nd Ave., S.E.
Suite 100
Bellevue, WA 98006 -1399
Dear Mr. Wyttenbach:
Please provide us with traffic information and expanded project
definition, as requested in your pre - application meeting with staff
on 3/17/88. Until we receive this data, we cannot proceed with
review of your environmental checklist for the Southcenter Mall Food
Court. (EPIC- 6 -88).
Sincerely,
Rebecca Fox
Tukwila Planning Department
RF:br
r.
• •
.-A • CENTER RIDGE DESIGN SERVICES INC. P.A.
ARCHITECTS AND ENGINEERS
FEDERAL EXPRESS
March 30, 1988
City of Tukwila
Mr. Dwayne Griffin
6200 Southcenter Blvd.
Tukwila, WA 98188
RE: Southcenter Food Court
•
Design Criteria
Dear Mr. Griffin:
In our Pre - Application Review meeting held in your offices on Thursday,
March 17, 1988, it became apparent that further description of the Food Court
and what its impacts truly are, is desirable. Hopefully this will help all
parties concerned more fully understand this new feature at Southcenter.
First of all, the Food Court is nothing more than a remodel of the mall and
the area that it will take up simply replaces existing retail sales space.
The Food Court proper is comprised of tables, chairs and landscaping features.
Secondly, people do not come to the Food Court to eat and leave again. They
cane to the Mall toffs clop .
The Food Court services people who are already in the Mall to shop. Section
18.56.050 of the Tukwila Zoning Code recognizes this fact by the (eighty
percent) 80% reduction in required parking spaces for restaurant floor area in
shopping centers having an excess of 600,000 square feet. There is,
therefore, no increase in the overall shopping center occupancy and /or
off -site traffic. Since the Food Court decreases the amount of retail area in
the center, the required parking should then diminish.
Lastly, the physical occupant load in the Food Court is, or should be,
calculated the same as it would be for any other area of the Mall due to the
fact that the Foeii,Court is merely part of the Mall and not a defined "dining
establishmesenis=re4rred to the U.B.C. Table 33 -A. The Food Court does not
have limitin :Malls, entrances, or sitting areas. The occupants are, in fact,
Mall occupants. Spatial separation by means of physical barriers (i.e., walls
or partitions) is not possible /partical.
Very truly yours,
CENTER RIDGE DESIGN S RVICES, INC.
Larry A/. Kuns, AI
Architect
25425CEN7EP =iDGE 04.D Z.. 4a'45 2'61971 -4900
MEETING
NOTES
PROJECT.: Southcenter Food Court
SUBJECT: Pre - Application Design Review Meeting
MEETING DATE: March 17, 1988
LOCATION: Tukwila City Hall
FROM: Allen Wyttenbach
JOB NO: 87 -118
PRESENT: Jack Pace - Tukwila Planning Department
Ross Ernst - Tukwila Public Works Department
Duane Griffith - Tukwila Building Department
David Ray - Tukwila Fire Department
Nick Olivas - Tukwila Fire Marshall
Becky Davis - Tukwila Permit Coordinator
Butch Burbage - Jacobs, Visconsi & Jacobs
Dave Fagerhaug - Jacobs, Visconsi & Jacobs
Allen Wyttenbach - Ruhl 'Parr & Associates
GENERAL •
1. Written comments are being prepared by each department and will be
transmitted as soon as they are complete. The Fire Department
comments are attached.
*2. In order to fully explain to the City what a "Food Court" is, a
written description of its function, operation, and impact should
be prepared and presented to the City as soon as possible. Many of
the following comments and concerns should be resolved through this
explanation.
PUBLIC WORKS COMMENTS
1. Heavily grease trap the food preparation areas. Individual traps
at each preparation area are acceptable.
2. The Food Court will "draw" additional people to the Mall and will
impact both parking and traffic.
Ruhl -Parr & Associates
Architects Planners A Professional service Corporation
3625 132nd Ave. SE. suite 100
Bellevue, WA 980064399 (2061 644-4000
• •
Meeting Minutes March 17, 1988
Southcenter Food Court Page 2
The City was receptive to the position that the Food Court's
function was to serve the mall user and that being simply an
extension of the Mall, the Court would actually require fewer
parking spaces than the retail areas that it replaced.
*The Food Court explanation should resolve this issue.
3. The environmental checklist will be held until the Food Court
explanation is received.
PLANNING DEPARTMENT COMMENTS
1. A parking review should be made of the total parking at the Mall to
verify that sufficient space is available to support the Food
Court. Allow 1 stall for every 50 s.f. of gross floor area.
(Tukwila zoning requirement for fast food facilities.)
*The Food Court explanation should resolve this issue.
BUILDING DEPARTMENT COMMENTS
1. Building code is the '85 UBC; City will review using Appendix
Chapter 7, Covered Malls.
2. Comply with Washington Energy Code - Submit calculations stamped
by a Washington state engineer.
3. Construction documents must be stamped by a Washington state
architect.
4. Structural calculations must be stamped by a Washington state
engineer.
5. Roof mounted equipment will require structural calculations.
6. Mahan and DeSalvo Structural Engineers will review the structural
drawings.
7. Plumbing will be reviewed by King County Health.
8. Food Court preparation areas will be approved by King County Health
prior to review by Tukwila.
9. Structural concrete and steel installations will require review by
an independent testing company hired by the Owner. The City
requires that it be notified as to which company will do the
testing.
10. The Building Department is considering classifying the Food Court
as an "assembly area ".
*The Food Court explanation should resolve this issue.
11. No exiting will be allowed through a store room unless the exit is
through a one -hour rated corridor.
12. Since the UBC does not address smoke removal requirements and
deduction when return air is less than 10,000 cfm, a system should
be proposed for use in the facility will be reviewed and approved
by the City Building Department and Fire Department.
Meeting Minutes March 17, 1988
Southcenter Food Court
Page 3,
13. Standby power is not required.
14. New toilets shall comply with the Handicapped Code.
15. To keep the Mall open during construction, a "tunnel" 20 feet wide
x 7 feet high, fully sprinklered, must be built along the path of
exit. The "tunnel" construction can be 2x4's with 5/8" gypsum
board on the traffic side. The tunnel must be covered with a
protective roof if only work is going on overhead.
16. The existing methane vents should be retained because it is
easier to retain than prove that they are not needed.
17. Submit copy of Soils Report with Building Permit drawings.
FIRE DEPARTMENT COMMENTS
1. The Fire Department suggested that the range hood monitors be
connected directly to the Fire Department notification system
to insure quick response.
2. The additional occupant load of the Food Court will necessitate a
3rd exit.
*The Food Court explanation should resolve this issue.
3. Maintain existing Fire Lanes.
4. Additional information on layout and exiting of the 2nd floor Mall
Office area was requested. See Fire Department Comment Sheet #6.
5. The Fire Department, as well as the Building Department, would like
a copy of a typical Food Court preparation area.
6. If the Food Court is designated as an "assembly area ", an assembly
permit will be required.
The above minutes are intended to be a general summary of the key
points discussed in the meeting. If there are any errors and /or
omissions, please notify me and I will make revisions where necessary.
1 Allen . 'yttenbach
Project anager
cc: All Attendees
z.
City of Tukwila May VanDusen
Fire Department 444 Andover Park East, Tukwila, Washington 98188 (206) 575 -4404
Control# G;.07 -98
FOR STAFF USE ONLY
Site Address ( 56u//-wi2 - /`L(iz.C_.
Occupancy Group Project LJeu.' e4 i- 4.1
INSPECTIONS REQUIRED BY FIRE DEPARTMENT
[I 1. Underground fire line from vault
to riser
a. Thurst block and rodding
b. Type of pipe
c. Depth of cover.
d. Flush ,
e. Hydrostatic test
f. Fire Dept. approved plans
g. Materials and test certi-
ficate
0 2. Overhead sprinkler piping
a. Hydrostatic test
b. Trip test
c. Alarm system monitoring
test
d. Fire Dept. approved plans
e. Sprinkler head location
and spacing
3. Underground tank
a. location
b. Distance between tanks
c. Distance to property line
d. Depth of cover
e. Vent piping, swing joints,
fill piping, discharge
piping
f. Anchoring
g. Hydrostatic test
h. Separate Fire Dept.
approved plans
w5. Fire alarm
a. .Acceptance test
b. Fire Dept. approved plans
M 6. Hood and duct inspections
a. Installation
b. Trip test
(] 7. Spray Booth
a. Location
b, Fire protection
c.: Ventilation
d. Permit
Q 8. Flammable liquid room
a. Location
b. Fire protection
'c. Permit
. Rack storage
a, Permit
b. Mechanical smoke removal
c. Rack sprinklers
d, Aisle width
10. Fire doors and fire dampers
a. Installation
b. Drop testing
11. Fire final
a. Fire Dept. access
b. Bldg, egress and occupancy
load
c: Hydrants
d. Bldg. address
e,•Fite protection systems
(1) Halon systems
(2) Standpipes
.(3) Hose Stations
(4) Fire Doors
(5) Fire Dampers
. .(6) Fire Extinguishers
12. Other
a.
b.
c.
d.
e.
f.
go
Checklist prepared by (staff):
(PREAPP4.A)
Date 3/7- 8S/
•
City of Tukwila
Gary VanDusen
Mayor
Fire Department 444 Andover Park East, Tukwila, Washington 98188(206) 575-4404
Control# 80 7 -81(
FOR STAFF USE ONLY
Site Address d7ou�`�'%eote,h(.
Occupancy Group 451R Project /t e c' t„` ( ce.
CONTRUCTION INFORMATION
The City of Tukwila has adopted the 1985 Uniform Fire Code. This and other
nationally recognized standards will be used during construction and operation of
this project. (TMC 16.16.120)
[J 2. Fire hydrants will be required. (City Ord. #729)
O 3. Required fire hydrants shall be approved for location by the Fire Department,
approved for purity by the Water Department, and fully in service prior to start
of construction. A fire hydrant must be no further than 150 feet from a struc-
ture; and no portion of a structure to be over 300 feet from fire hydrant. (UFC
10.301 and City Ord. #729)
E 4. Automatic fire sprinklers are required for this project. Sprinkler systems to
comply with N.F.P.A. #13. Sprinkler plans shall be submitted to Washington State
Surveying and Rating Bureau, Factory Mutual or Industrial Risk Insurers for appro-
val prior to being submitted to Tukwila Fire Marshal for approval. Submit three
(3) sets of sprinkler drawings. This includes one for our file, one for company
file, and one for the job site. (City Ord. #1141)
Q 5. Maximum grade is 15% for all projects.
[j 6. Hose stations are required. (City Ord. #1141)
• 7. A fire alarm system is required for this project. (City Ord. #1327) Plans shall
be submitted to the Tukwila Fire Marshal for approval, prior to commencing any
alarm system work. Submit three (3) sets of complete drawings. This includes one
for our file, one for company file, and one for the job site.
(l 8. Special installations of fixed extinguisher systems, fire alarm systems, dust
collectors, fuel storage, etc. require separate plans and permits. Plans to be
submitted to the Fire Marshal prior to start of installation. (UFC 10.301)
5d 9. Portable fire extinguishers will be
#10. (Minimum rating 2A, 10 BC)
0 10. Buildings utilizing storage of high
cal smoke removal per
[[ 11. During construction, an all- weather
the building. (UFC 10.301)
E[ 12.
required in finished buildings per N.F.P.A.
piled combustible stock will require mechani-
Section 81 of the 1985 UFC.
access will be required to within 150 feet of
No building will be occupied, by people or merchandise, prior to approval, and
inspection by Fire and Building Departments.
0 13. Adequate addressing - is required. Number size will be determined by setback of
building from roadway. Four inch numbers . are minimum. Numbers will be in color
which contrasts to background. (UFC 10.208)
g[ 14. Designated fire lanes may be required for fire and emergency access. This
requirement may be established at the time of occupancy and/or after the facility
is in operation. (UFC 10.207 as amended)
15 Special Fire Department permits are required for such things as: storage of
compressed gas, cryogens, dry cleaning plans, repair garages, places of assembly,
storage of hazardous materials, flammable or combustible liquids or solids, LPG,
welding and cutting operations, spray painting, etc. (UFC 4.101)
[[ 16. Mis ellaneous,requirements
!b
r0v4
Checklist prepared by (staff):
(PREAPP3.A)
Date o3
•
ENVIRONMENTAL CHECKLIST
V V111.1 V 1 11V.
EpiiihFile No.
Fee 5100.00 Receipt No.,2 N/O
A. BACKGROUND
1. Name of proposed project, if applicable: Food Court - Southcenter Mall
2. Name of applicant: Center Ridge Design
3. Address and phone number of applicant and contact person: (216) 871 -4800
Richard Vanderburg, 25425 Center Ridge Road,. Westlake, Ohio 44145
4. Date checklist prepared: February - 1988
5. Agency requesting Checklist: City of Tukwila
6. Proposed timing or schedule (including phasing, if applicable):
Start Remodel Construction - July 1. 1988
7. Do you have any plans for future additions, expansion, or further activity
related to or connected with this proposal? If yes, explain.
No future addition or expansion is directly related to or impacted by this proposal.
8. List any environmental information you know about that has been prepared, or will
be prepared, directly related to this proposal.
No other information directly:related to this proposal.
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes,
explain. No.
• •
' 10.. List any government approvals or permits that will be needed for your proposal.
Building, HVAC, Plumbing, Electrical, Sprinkler,Health
11. Give brief, complete description of your proposal, including the proposed use
and the size of the project and site. There are several questions later in thi.
checklist that ask you to describe certain aspects of your proposal: You do no-.
need to repeat those answers on this page. Section E requires a complete
description of the objectives and alternatives of your proposal and should not be
summarized here.
The scope of wort. consists of reconfiguring 47.253 square feet of existing
interior mal] space into seven in -line tenants and a food court with ..14. tenants,
sunvort facilities and seating to accommodate 500 people.
12. Location of the proposal. Give sufficient information for a person to understand
the precise location of your proposed project, including a street address, if
any, and section, township, and range, if known. If a proposal would occur over
a range of area, provide the range or boundaries of the site(s). Provide a legal
description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any permit applica-
tions related to this checklist.
The remodeling will Q
and L
1- -
1' u..
• .
•
• - 1 1
•
•-.
•- •
• • -•
n•
1 •
13. Does the proposal lie within an area designated on the City's Comprehensive Land
Use Policy Plan Map as environmentally sensitive?
Po-
-3-
•
8. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one): Flat,
rolling, hilly, steep slopes, mountainous, other
N.A. - no change
b. What is the steepest slope on the site (approximate
percent slope)? 2%
C. What general types of soils are found on the site
(for example, clay, sand, gravel, peat, muck)? If
you know the classification of agricultural soils,
specify them and note any prime farmland.
Clay /Peat
d_ Are there surface indications or history of unstable
soils in the immediate vicinity? If so, describe.
Yes - existing bldn. is on piles due to poor
soil conditions
e. Describe the purpose, type, and approximate quanti-
ties of any filling or grading proposed. Indicate
source of fill. None .anticipated.
f. • Could erosion occur as a result of clearing,
construction, or use? If so, generally describe.
No.
g-
About what percent of the site will be covered with
impervious surfaces after project construction (for
example, asphalt or buildings)?
No increase from existing condition.
QvaIuai. iun ror
Agency Use Only
%.1,(111.0(11. 1V1$ IVf
Agency Use Only
h. Proposed measuFes to reduce or control erosion, or
other impacts to the earth, if any:
None
2. Air
a. What types of emissions to the air would result from
the proposal (i.e., dust, automobile odors,
industrial wood smoke) during construction and when
the project is completed? If any, generally
describe and give approximate quantities if known.
No significant increase in emissions to air during
construction. Increased antn traffic will not genet -ate
any ndnrs dissimilar to thos currently existing.
b. Are there any off -site sources of emissions or odor
that may affect your proposal? If so, generally
describe. Nn
Proposed measures to reduce or control emissions or
other impacts to air, if any:
None requirer—
3. Water
a. Surface:
1) Is there any surface water body on or in the
immediate vicinity of the site (including year -
round and seasonal streams, saltwater, lakes,
ponds, wetlands)? If yes, describe type and
provide names. If appropriate, state ,what
stream or river it flows into.
Nn
-5-
2) Will the Po ject require any work over, it or
adjacent to (within 200 feet) the described
waters? If yes, please describe and attach
available plans.
No.
3) Estimate the amount of fill and dredge material
that would be placed in or removed from surface
water or wetlands and indicate the area of the
site that would be affected. Indicate the
source of fill material.
None
4) Will the proposal require surface water
withdrawals or diversions? Give general
description, purpose, and approximate quan-
tities, if known.
No.
5) Does the proposal lie within a 100 -year
floodplain? If so, note location on the site
plan.
No
6) Does the proposal involve any discharges of
waste materials to surface waters? If so,
describe the type of waste and anticipated
volume of discharge.
No
-6-
l v Iuu Ivn [Ur
Agency Use Only
b. Ground:
• •
1) Will ground water be withdrawn, or will water be
discharged to ground water? Give general
description, purpose, and approximate quan-
tities, if known.
No.
2) Describe waste materials that will be discharged
into the ground from septic tanks or other sour-
ces, if any (for example: Domestic sewage;
industrial, containing the following
chemicals...; agricultural; etc..) Describe the
general size of the system, the number of such
systems, the number of houses to be served (if
applicable), or the number of animals or humans
the system(s) are expected to serve.
None
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm
water) and method of collection and disposal, if
any (include quantities, if known). Where will
-this water flow? Will this water flow into
other waters? If so, describe.
No change from existing Conditions.
-7-
-. -... .. ...v.� I JI
Agency Use Only
2) Could wait materials enter ground or surface
waters? If so, generally describe.
Not applicable
d. Proposed measures to reduce or control surface,
ground, and runoff water impacts, if any:
Not applicable
4.. Plants
a. Check or circle_ types of vegetation found on the
site:
deciduous tree:. alder, maple, aspen, other
_ evergreen tree: fir, cedar, pine, other
_ shrubs
�. grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bullrush,
skunk cabbage, other .
water plants: water lily, eelgrass, milfoil,.other
_ other types of vegetation
b. What kind and amount of vegetation will be removed
or altered?
None
c. List threatened or endangered species known to be on
or near the site. None known to exist on site.
-8-
6valuaLIun Tor
Agency Use Only
d. Proposed landsling, use of native plants, Aker
measures to preserve or enhance vegetation on the
site, if any:No change from existing condition,
5. Animals
a. Circle any birds and animals which have been
observed on or near the. site or are known to be on
or near the site:
birds: hawk, heron, eagle, songbirds, other:
N.A.
mammals: deer, bear, elk, beaver, other:
N.A.
fish: bass, salmon, trout, herring, shellfish,
other: N.A.
b. List any threatened or endangered species known to
be on or near the site.
N.A.
c.. Is the site part of a migration route? If so,
explain.
d. Proposed measures to preserve or enhance wildlife,
if any:
None
-9-
Agency Use Only
6.' Energy and Natural 41!
esources
a. What kinds of energy (electric, natural gas, oil,
wood stove, solor) will be used to meet the
completed project's energy needs? Describe whether
it will be used for heating, manufacturing, etc.
Natural Gas /Electricity to be used for heating,
cooltpg, lighting, cooking.
•
b. Would your project affect the potential use of solar
energy by adjacent properties? If so, generally
describe. No.
c. What kinds of energy conservation features are
included in the plans of this proposal? List other
proposed measures to reduce or control energy
impacts, if any: Remodel to meet building Code
Pwilli rPmPnts _
7. Environmental Health
a. Are there any environmental health hazards,
including exposure to toxic_ chemicals, risk of fire
and explosion, spill, or hazardous waste, that could
occur as a. result of this proposal? If so,
describe. None
1) Oescribe special emergency services that might
be required. None
2) Proposed measures to reduce or control environ-
mental health hazards, if any: N;A°
-10-
evaluJation for
Agency Use Only
b. Noise
•
tvaivation for
• Agency Use Only
1) What types of noise exist in the area which may
affect your project (for example: traffic,
equipment, operation, other)? None
2) What types and levels of noise would be created
by or associated with the project on a short -
term or a long-term-basis (for example: traf-
fic, construction, operation, other)? Indicate
what hours noise would come fro the site.
Short Term - Minimal construction nie
Long Term - No change from existing condition
3) Proposed measures to reduce or control noise
impacts, if any: None
8. Land and Shoreline Use
a. What is the current use of the site and adjacent
properties? Rpginnal PncloSjnall - adjacent
property l cayar erci a1
b. Has the site been used for agriculture? If so,
describe. Nn_
c. Describe any structures on the site..
1 lavp1 pnrinspd shopping mall with three attached 3
level department stores and 1 attached 4 level •
apartment store.
•
d. Will any str ures be demolished? If so, Oat?
nmmalitinn of exietina structure will be limited
to interior partitions., roof penetrations and
exterior wall demolition associated with new
exterior entrance.
e. What is the current zoning classification of the
site? C -P District Planned Business Center
f. What is the current comprehensive plan designation
of the site? Commercial
If applicable, what is the current shoreline master
program designation of the site? N.A.
g-
h. Has any part of the site been classified as an
"environmentally sensitive" area? If so, specify.
No
i . Approximately how many people would reside or work
in the completed project?
j.. Approximately how many people would the completed
project displace?
NnnQ
k. Proposed measures to avoid or reduce displacement
impacts, if any:
Nona
1. Proposed measures to ensure the proposal is com-
patible with existing and projected land uses and
plans, if any:
Not applicable
-12-
Agency Use Only
• Housing •
a. Approximately how many units would be provided, if
any? Indicate whether high, middle, or low- income
housing? N.A.
b. Approximately how many units, if'any, would be eli-
minated? Indicate whether high, middle, or low -
income housing. N.A. '
c. Proposed measures to reduce or control housing
impacts, if any: N.A.
10. Aesthetics
a.. What is the tallest height of any proposed_
structure(s), not including antennas; what is the
principal exterior building material(s) proposed?
PJpw mall PntrancP - +/- 43' -(l" above finish floor.
b. What views in the immediate vicinity would
altered or obstructed? None
c. Proposed measures to reduce or control aesthetic
impacts, if any: -
Apsthptic appearance will be improved.
-13-
Agency Use Only
;11. Light and Glare
•
a. What type of light or glare will the proposal
produce? What time of day w y1d it mainly occur?
No changes from existing condition
b. Could light or glare from the finished project be a
safety hazard or interfere with views?
No
c. What existing off -site sources of light or glare may
affect your proposal?
None
d. Proposed measures to reduce or control light and .
glare impacts, if any:
None
12. Recreation
a. What designed and informal recreational oppor-
tunities are in the immediate vicinity?
N.A.
b. Would the proposed project displace any existing .
recreational uses? If so, describe.
No
c. Proposed measures to reduce or control impacts on
recreation, including recreation opportunities to be
provided by the project or applicant, if any:
None
-14-
LVQIU01.1un ror
Agency Use Only
• .
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or pro-
posed for, national, state, or local preservation
registers known to be on or next to the site? If
so, generally describe.
No
b. Generally describe any. landmarks or evidence of
historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
None Known
c. Proposed measures to reduce or control impacts, if
any: None
14. Transportation
a. Identify public streets and highways serving the
site, and describe proposed accss to the existing
street system. Show on site plans, if any.
Strander Blvd:. Sbuthcenter Parkway.
Tukwila Parkway, Andover Park Wei:
b. Is the site currently served by public transit? If
not, what is the approximate distance to the nearest
transit stop? Yes
c. How many parking spaces would the completed project
have? How many would the project eliminate?
No change to existing parking
-15-
tvaivation ror
Agency Use Only
d. Will the pro1al require any new roads or stets,
or improvements to existing roads or streets, not
including driveways? If so, generally describe.
(indicate whether public or private).
No improvements required
e. Will the project use (or occur in the immediate
vicinity of) water, rail, or air transportation? If
so, generally describe.
No
f. How many vehicular trips per day would be generated
by the completed project? If known, indicate when
peak volumes would occur.
SinrP this projett is a remodel of existing retail
cpAcP which rPdures the square footage of gross
reasoaahla area, no additional vehicular trips
to the site will result.
g
Proposed measures to reduce or control transpor-
tation impacts, if any: None requried
15. Public Services
a. Would the project 'result in an increased need for
public services (for example: fire protection,
police protection, health care, schools, other)? If
so, generally describe.
Nn
b. Proposed measures to reduce or control direct
impacts on public services, if any.
Nnne
-16-
Agency Use Only
. Utilities
a. Circle utilities currently
electricity, natural gas,
telephone, sanitary sewer,
Private refuse service
•;
available at the site:
water, refuse service,
septic system, other.
b. Describe the utilities that are proposed for the
project, the utility providing the service, and the
general construction activities on the site or in
the immediate vicinity which might be needed.
Natural gas - Washington Natural Gas
Flertririty - Puget Sound Power & Light Co.
Water - City of Tukwila
Telephone - Pacific Northwest Bell
C. Signature
The above answers are true and complete to the best of
my knowledge. I understand that the lead agency is
relying on them to made "ts decision.
Signature:
Date Submitted
PLEASE CONTINUE TO THE NEXT PAGE.
-17-
Agency Use Only
\4bOUNCIL tGENDA
SYNOPSIS
AGENDA ITEM TITLE
CAS NO.
NEW FLOOD PLAIN MANAGEMENT ORDINANCE
(Rescind Ordinances 1220 and 1225)
Original Agenda Date 11/9/87
Original Sponsor: Council' /Adsin. Public Wks.Apprvd.
Timeline Regular Council meetina 42438. -
Purpose of It and Objective of Sponsor:
PURPOSE: Bring the City of Tukwila into compliance with new federal
regulations and state legislation for flood plain management through
the local jurisdiction.
OBJECTIVE: Rescind Ordinances Nos. 1220 and 1225 and substitute
with a new ordinance, to meet the new federal regulations, effective
October 1, 1986, for flood plain management and model flood damaQe
prevention policies as required of jurisdictions participating in
the National Flood Insurance program.
Sponsor's Recon. ended Action: Rescind ordinance 1220. and. as 1asr
amended by Ordinance 1225 and substitute with a new ordinance.
Alternative Action:
(1) Delay action
(2)
Committee Remmodatlons: 4/4/88 Utility Committee meeting -
forward to C.O.W.
AdalnistratfeD Recommendations: Same as Committee's recommendation
RECORD OF COUNCIL ACTION
Oats Action
.5"-.2- 88 _ Forward to Comm cite t of the. 1WhoIe.
COST IMPACT (if known)
FUND SOURCE (if known)
APPENDICES
CAS
Final draft ordinance
•
CITY OF TUKWILA
WASHINGTON
ORDINANCE NO.
AN ORDINANCE OF THE CITY OF TUKWILA, WASHINGTON,
REPEALING QRDINANCE NOS. 1220 AND 1225 AND AMENDING
CHAPTER 16.52 OF THE TUKWILA MUNICIPAL CODE TO MEET
THE NEW FEDERAL REGULATIONS, EFFECTIVE OCTOBER 1,
1986, FOR FLOOD PLAIN MANAGEMENT AND MODEL FLOOD
DAMAGE PREVENTION POLICIES AS REQUIRED OF JURISDIC-
TIONS PARTICIPATING IN THE NATIONAL FL000 INSURANCE
PROGRAM.
WHEREAS, the legislature of Washington State, in Title 86 of the Re-
vised Code of Washington, has authorized local governmental agencies to regulate
use and development of flood- hazard areas within their jurisdictions in order to
reduce such hazards, and
WHEREAS, continued participation by the City of Tukwila in the National
Flood Insurance Program requires adoption of flood plain management standards
and a flood plan construction permit process, now, therefore,
THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, DO ORDAIN AS
FOLLOWS:
Section 1. Repealer. Ordinances 1220 and 1225 of the City of Tukwila
are hereby repealed.
Section 2. Flood Plain Management. Chapter 16.52 of the Tukwila Muni-
cipal Code is hereby amended to read as follows:
16.52.010 FINDINGS
The CitirCasuncil of the City of Tukwila finds that:
A. Thar City has entered into the Green River Management Agreement +itn
other jurisdictions to create policies and requirements for the manage-
ment of drainage into the Green River.
B. The City is committed in cooperation with other agencies to a dike /levee
program for the protection of adjacent low lying properties.
C. The City is committed to carrying out the local responsibilities for :he
flood insurance program to assist eligibility for flood insurance.
D. The City is committed to securing /obtaining right -of -way easements
future dike /levee protection system to assure maintenance.
E. The City is committed to adequate bank protection of properties.
16.52.020 PURPOSE
It is the purpose of this chapter to promote the public health, safety,
general welfare, and to minimize public and private losses due to f in specific areas by enacting provisions designed to:
A. Protect life, health and property by controlling the use of lands
the 100 year flood plain in flood zone area #2;
8. Minimize business interruptions;
• •
FLOOD ZONE ORDINANCE
Page 2
C. Ensure that those who occupy the areas of special flood hazard assume
responsibility for their actions at the time of development or substan-
tial redevelopment of their properties;
0. Protect downstream or surrounding property from higher velocities or
higher flood levels which may be caused by loss of holding capacity in
the flood plain;
E. Minimize the expenditure of public money for remedial flood control
measures;
F. Minimize the need.for rescue and relief efforts associated with flooding
which are generally undertaken at the expense of the general public;
G. Minimize damage to public facilities and utilities such as water and gas
mains, electric, telephone and sewer lines, streets and bridges located
over and under the floodway;
H. Qualify the City of Tukwila and existing homes and businesses for par-
ticipation in the federal flood insurance program; and,
I. Implement local, state and federal flood protection programs;
J. Comply with the storm water policies City of Tukwila Comprehensive Land
Use Policy Plan (Adopted by Ord. 1039).
16.52.030 POLICIES FOR REDUCING FL000 LOSSES
In order to accomplish its purpose, this chapter includes policies to:
A. Establish restrictions and regulations to assure new and substantiii
,redevelopments are adequately flood - proofed and qualify for the flood
insurance program.
8. Control local runoff by the establishment and enforcement of policies
which allow for runoff and rates of runoff most compatible with the
hydrology of the Green River.
C. Establish levee /dike requirements including levee /dike /bank protection
standards and a dike /levee improvement plan (Green River Manageme ^t
P1
0. Ta more adequate levees /dikes are provided throughout the City.
E. Require easements and rights -of -way to maintain future dike /levee iv,-
terns.
F. To preserve natural river bank barriers, control filling, grade a.
dredging and other development which will unnaturally divert floodwa! °es
or which may increase flood hazards in other areas.
16.52.040 DEFINITIONS
Unless specifically defined below, words or phrases used in this cha]• "
shall be interpreted so as to give them the meaning they have in
usages and to give this chapter its most reasonable application.
A. "Areas of shallow flooding." means a designated "AO" or "AH" zone VI
Flood Insurance Rate Map (FIRM). The base flood depth range from
three feet; "A" clearly defined channel does not exist; the oa'.•+
flooding is unpredictable and. indeterminate; and, velocity flow
evident. "A0" is characterized as sheet flow and "AH" ind!:3•-,
ponding.
8. "Areas of special flood hazard" means the land in the flood plain „i_ -,,
a community subject to a one percent or greater chance of floodi•+a •1
any given year. Oesignation on maps always includes the letter "A.,.
• •
FLOOD ZONE ORDINANCE
Page 3
C. "Base flood elevation" means the flood having a one percent chance of
being equalled or exceeded in any given year and as designated by a
flood elevation on the FIRM and floodway maps; also referred to as the
"100 year flood ". Designation on maps always includes the letter "A ".
D. "City" means the City of Tukwila or the City Council of Tukwila.
E. "Development" means any man -made change of improved or unimproved real
estate, including but not limited to buildings or other structures,
mining, dredging, filling, grading, paving, excavation or drilling
operations located within flood hazard areas.
F. "Director" means the director of the Department of Public Works or his
designee.
G. "Flood" or "Floodin " means a general and temporary condition of partial
or complete inun ation of normally dry land areas from:
1. The overflow of inland waters and /or
2. The unusual and rapid accumulation of runoff of surface waters from
any source.
H. "Flood Insurance Rate Map (FIRM)" means the official map on which
the Federal Insurance Administration has delineated both the areas
of special flood hazards and the risk premium zones applicable to the
community.
I. "Flood Control Zone (FCZ) Permit" means a permit, issued by the City,
authorizing the applicant to develop within the Flood Control Zone. a
Flood Control Zone Permit is not a building or development permit.
J. " Floodplain" means the relatively flat areas of lowlands adjoining the
channel of a river, stream, watercourse, or other body of water, which
have been or may be covered by floodwater. For the purpose of this
chapter, "floodplain" includes those areas now or hereafter included
within the City of Tukwila defined as "land within a community subject
to a one percent or greater chance of flooding in any given year" and as
indicated on the flood profiles and the flood boundary and floodway Taos
included in the 1981 Flood Insurance Study. In the areas not included
is sad reports, the floodplain includes all areas subject to floods at
staatlow rates comparable to those set forth in the 1981 Flood Insur_
ancikStudy and Maps as constituting the base flood level. The location
ot.floodplain may be revised by the Director of Public Works, based
on•condttions which may alter its location. Any such revisions may be
based upon:
1. Date utilized by the 1982 flood Insurance Study;
2. Changes in elevations of areas within the floodplain, occurri-
since the last revision affecting such areas;
3. Channel changes.
K. "Flood Zone Insurance Study" means the official report (Exhibit A) , -t
documents provided by the Federal Insurance Administration that
flood profiles, the flood boundary - floodway map, and the water iUr''"�
elevation of the base flood.
L. " Floodway" means the established dike channel or other watercours . t
the adjacent land areas that must be reserved in order to discharo.e
base flood without cumulatively increasing the water surface ela +3_
more than 0.2 of a foot. The floodway is the regular channel
lished by an existing dike system plus that portion of the flood 313 ,
which has been defined as floodway and delineated on maps by the Fede -3
Insurance Administration or by The Corps of Engineers as designated >i
FEMA.
FL000 ZONE ORDINANCE
. • Page 4
M. " Floodway Fringe" means that portion of the floodplain from the floodway
to the 100 -year regulatory floodplain.
N. "Lowest Floor" means the lowest floor of the lowest enclosed area (in-
cluding basement). An unfinished or flood resistant enclosure, usable
solely for parking of vehicles, building access or storage, in an area
other than a basement area, is not considered a building's lowest floor,
provided that such enclosure is not built so as to render the structure
in violation of the applicable non - elevation design requirements of this
chapter found at Section 16.52.070(b)(1)(6).
0. "New construction" means structures for which the "start of construc-
tion" commenced on or after the effective date of this ordinance.
P. "Start of construction" includes substantial improvement, and means the
date the building permit was issued, provided the actual start of con-
struction, repair, reconstruction, placement or other improvement was.
within 180 days of the permit date. The actual start means either the
first placement of permanent construction of a structure on a site, such
as the pouring of slab or footings, the installation of piles, the con-
struction of columns, or any work beyond the stage of excavation; or the
preparation, such as clearing, grading and filling. It does not include
the installation of streets and /or walkways; nor does it include the
installation on the property of accessory buildings such as garages or
sheds not occupied as dwelling units or not part of the main structure.
"Structure" means a walled and roofed building. "Structure" also means
a gas oriiquid storage tank that is principally above ground.
R. "Substantial improvement" means any repair, reconstruction, or improve-
ment of a structure, the cost of which equals or exceeds 50 percent of
the assessed value of the structure either:
1. Before the improvement or repair is started, or
2. If the structure has been damaged and is being restored, before the
damage occurred. For the purposes of this definition "substantial
improvement• is considered to occur when the first alteration of any
wall, ceiling, floor, or other structural part of the building com-
mences, whether or not that alteration affects the external
dimensions of the structure.
Miters does not, however, include:
e... Any project for improvement of a structure to comply with
.existing state of local health, sanitary, or safety code speci-
fications which are solely necessary to assure safe living
conditions, or
b. Any alteration of a structure listed on the national Registry of
Historic Places or a state inventory of historic places.
Q•
16.52.050 THE FLOOD CONTROL ZONE PERMIT PROCESS - GENERAL PROVISIONS
A. Lands to which this chapter applies. This chapter shall apply to
areas of special flood hazards within the jurisdiction of the Cit,
Tukwila.
8. Basis for establishing the areas of special flood hazard. The areas •=
special flood hazard identified by the Federal Insurance Admini;trr ,
in a scientific and engineering report entitled "The Flood Insuri-
Study for the City of Tukwila ", with the latest versions of accompa1+:•:
flood insurance maps is hereby adopted by reference and declared to J. i
part of this chapter. The flood insurance study is on file at T,k,.1:1
Public Works Department.
•
• FL000 ZONE ORDINANCE
Page 5
C. Abrogation and greater restrictions. This chapter is not intended to
repeal, abrogate, or impair any existing easements, covenants, or deed
restrictions. However, where this chapter and another ordinance, ease-
ment, covenant or deed restriction conflict or overlap, whichever im-
poses the more stringent restrictions shall prevail.
0. Authority. The City of Tukwila, through the Public Works Department,
shall consider and interpret information produced by the Army Corps of
Engineers and the Federal Emergency Management Agency to determine the
location of flood plains, floodways, or floodway fringes.
E. Maps shall be adopted. Flood hazard areas shall be shown and defined on
city floodway (flood boundary„ FIRM and floodway maps) maps which shall
become a part of this Chapter by adoption of the City Council, as they
are amended. Copies of the maps shall be maintained for inspection by
the public in the Public Works Department.
F. Information to be obtained and maintained. The City will obtain from
the applicant, and maintain a record of, the actual elevation (in rela-
tion to NGVD datum, mean sea level) of substantially improved structures
within a flood hazard area and whether or not the structure contains a
basement.
G. Interpretation. In the interpretation and application of this chapter,
all provisions shall be considered as minimum requirements, and deemed
neither to limit nor repeal any other powers granted under the state
statutes.
H. Warning and disclaimer of liability. The degree of flood protection
required by this chapter is considered reasonable for regulatory pur-
poses and is based on scientific and engineering considerations. Larger
floods can and will occur on rare occasions. Flood heights may be
increased by man -made or natural causes. This chapter does not imply
that land outside the area of special flood hazards or uses permitted
within such areas will be free from flooding or flood damages. This
chapter shall not create liability on the part of the City of Tukwila,
any officer or employee thereof, or the Federal Insurance Administra-
tion, for any flood damages that result from reliance on this ordinance
or any administration decision lawfully made hereunder.
I. Administration of Flood Control Zone Permit
1., Amaral Requirements
Tice initial step in receipt of the application from the developer
is for the Public Works Department to determine if the property
is or is not in a flood hazard area. The developer shall be not'.
fied, in writing, of this determination. If it appears the property
lies within the floodway or floodway fringe, or any other floo.i
hazard area, then required submittals as outlined in this ordinance.'
including surveys, plans and supporting documents necessary :)
determine the applicability of City regulations to the propos ?m
structure, development or use shall be provided as requested by
City.
2. Establishment of development flood control zone permit.
A Flood Control Zone (FCZ) permit shall be obtained before cons:-.: -
tion or development begins within any area of special flood size•
established in Section 16.52.050(8). The permit shall be fir ,
structures as set forth in the "definitions ", and for all dev. -
ment including fill and other activities, also as set forth
"definitions
3. Application for flood control zone permit.
A Flood Control Zone Permit application shall be filed with the
for all developments at the time of filing grading or fill oer-+.',
building permit, tenant improvement or shoreline permit. No
or license for structures or the development or use of land s13 :1
•
FLOOD ZONE ORD[r!ANCE
Page 6
be issued by the City within a flood hazard area unless approved
by the Department of Public Works. Such approval shall be based
on a review of the provisions set forth in this chapter and the
technical findings and recommendations of the appropriate city
departments. Compliance with the provisions of this chapter does
not obviate the need to obtain other permits which may be required
pursuant to state or federal law including approvals required from
the Washington State Department of Social and Health Services and /or
ecology relating to water and /or sewer systems which ensure that
water and sewer systems will be designed to avoid infiltration,
inflow or impairment.
Application for a development Flood Control Zone permit shall be
made on forms furnished by the Director of Public Works and may
include but not be limited to four sets of plans recommended to
20 scale, showing the nature, location, dimensions, and elevations
of the area in questions; existing or proposed structures, fill,
storage of materials and drainage facilities. Specifically, the
following information is required:
a. Elevation in relation to mean sea level, NGVD datum, of the
lowest floor (including basement) of all structures;
b. Elevation in relation to mean sea level, NGVD datum, to which
any structure has been floodproofed;
c. Certification by a registered Professional Engineer or 3
licensed architect that the floodproofed methods for any non-
residential structure shall meet the floodproofing criteria in
Section 16.52.070(8)(2)
d. Description of the extent to which a watercourse will be altered
or relocated as a result of proposed development.
The Director or his (her) designee shall, after other required
agency reviews are completed, indicate approval or disapproval of
the requested flood control zone permit, and if approved, the flood
zone control permit will be issued, with copies to appropriate age^ -
cies. If resubmittal of plans is required, the submitted plans 4ill
be returned.
4. - 4s19nation of the Director of Public Works
,TM Director of Public Works is hereby appointed to administer ana
Implement this chapter by granting or denying development (FCZ)
permit applications in accordance with its provisions.
5. Duties and responsibilities of the Director of Public Works
Duties of the Director of Public Works shall include, but
limited to.the following:
a. Permit review
(1) Establish and manage a Flood Control Zone (FCZ) develoo,�
Permit review procedure, publish such and make availao'4
all developers through a flood control zone permit sys-.?-.
(2) Review all FCZ development permits to determine that
permit requirements of this ordinance have been satisf, -,!.
(3) Coordinate with the Planning Department to assure that , '
development permits located in the floodway meet
requirements of tnis chapter and assure that the encr'n:,-
ment. provision of Section 16.52.070(C)(1)(Floodways),
met.
not ,e
• •
FL000 ZONE ORDINANCE
Page 7
b. Use of Other Base Flood Data
When base flood elevation data has not been provided in accord-
ance with Section 16.52.050(I)(2), the Public Works Director
will obtain, review and reasonably utilize any base flood eleva-
tion and floodway data. - available from a federal, state or other
source, in order to administer Section 16.52.070.
c. Information to be obtained and maintained
(1) Where base flood elevation is provided through the flood
insurance study or required as in Section 16.52.050(I)(4)(b)
obtain and record the actual elevation (in relation to the
mean sea level, NGVO of the lowest floor (including bas�-
ment) of all new or substantially improved structures, and
whether or not the structure contains a basement.
(2) For all new or substantially improved structures:
(a) Verify and record the actual elevation relation to mean
sea level, NGVD), and
(b) Maintain the floodproofing certification required in
Section 16.52.050(I)(2)(c).
(3) Maintain for public inspection all records pertaining to the
provisions of this ordinance.
d. Alteration of watercourses
(1) Notify adjacent communities and the Washington State Depart-
ment of Ecology prior to any alteration or relocation of s
watercourse, and submit evidence of such notification to !tie
Federal Insurance Administration, obtain necessary approvals
for change in the water course through FEMA, prior to auth-
orizing any development to carry out a development .obit,
will change any water course.
(2) Require that maintenance is provided within the altered or
relocated portion of said watercourse so that the f:io.i
carrying capacity is not diminished.
1 Interpretation of FIRM boundaries
Make interpretations where needed as to exact location or 'he
:boundaries of the areas of special flood hazards (i.e., .me-e
there appears to be a conflict between a mapped boundary 1,11
actual field conditions). The person contesting the location )f
the boundary shall be given a reasonable opportunity to aooeal
the interpretation as provided in Section 16.52.060.
6. Outy to Obtain Other Permits
The flood control zone development permit process as outline1
this ordinance shall not constitute a license or permit to undo
substantial construction as provided in the state shoreline
ment act of 1971, nor shall said (FCZ) development permit b= : -
sidered an authorization to construct under the uniform b', •1
code as adopted by Chapter 16.04 of the Tukwila Municipal
Nothing in this chapter shall relieve the applicant from ob! ' -1
all required permits, licenses and approvals required for tle
posed project under applicable federal, state and local prov•; • ^s
of law.
•
16.52.060 APPEALS
111/ FL000 ZONE ORDINANCE
Page 3
A. Administrative Appeals
1. When it is alleged by the applicant that there is an error in any
requirement, interpretation, or determination made by the Director
of Public Works in the interpretation enforcement or administration
of this chapter, those aggrieved by the decision may appeal such
interpretation or determination to the Mayor. Thereafter, any
appeal shall be to the King County Superior Court by filing an
appropriate action within ten (10) days after the decision is ren-
dered.
16.52.070 PROVISIONS FOR FLOOD HAZARD REDUCTION
A. General. Standards.
1. In all areas of special flood hazards, the following standards are
required:
a. Construction Materials and Methods
1. All new construction and substantial improvements shall be
constructed with materials and utility materials resistant
to flood damage.
2. All new construction and substantial improvements shall oe
constructed using methods and practices that minimize flood
damage.
3. Interior electrical, heating, ventilation, plumbing, Ind
air - conditioning equipment and other service facilities
shall be designed and /or otherwise elevated or located so as
to prevent water from entering or accumulating within the
components during conditions of flooding.
4. All new construction and substantial improvements shall
designed to minimize or eliminate infiltration of fioo•1
waters into the system.
bUti1ities
1.. All new and replacement water supply systems shall be re-
signed to minimize or eliminate infiltration of flood Kati -,
into the system;
2. New and replacement sanitary sewage systems shall oe
designed to minimize or eliminate infiltration of fi,ol
waters into the systems and discharge from the systems 'At,
flood waters; and,
3. On -site waste disposal systems shall be located to ail.)
impairment to them or contamination from them during f;, -!_
ing.
c. Subdivision Proposals
1. All subdivision proposals shall be consistent with the - �1
to minimize flood damage;
2. All subdivision proposals shall have public utiliti.s
facilities such as sewer, gas, electrical, and water s,s
located and constructed to minimize flood damage;
3. All subdivision proposals shall have adequate drainage .n-
vided to reduce exposure to flood damage; and,
4. Where base flood elevation data has not been provided )e
not available from another authoritative source, it shalt D?
generated for all subdivision proposals.
•
• Fi000 ZONE ORDINANCE
Page 9
d. Review of Building Permits
Where elevation data is not available either through the flood
insurance study or from another authoritative source applica-
tions for building permits shall be reviewed to assure that
proposed construction will be reasonably safe from flooding.
The test of reasonableness is a local judgment and includes use
of historical data, high water marks, photographs of past flood-
ing, etc., where available. Failure to elevate to at least two
feet above grade in these zones may result in higher insurance
rates.
2. In addition to the General Standards applicable to all areas under
subsection (1), in all areas adjacent to the Green River the follow-
ing standards are required:
a. Construction /Reconstruction of Dikes /levees
As part of the floodproofing for developments adjacent to the
Green River through Tukwila, construction or reconstruction of
the dike /levee system in accordance with dike /levee plans and
engineering studies, and in accordance with the Green River
Management Agreement (A.G. #85 -043), will be required as part
of the plan submittal. If dike /levee improvements are not
required, and the natural river bank is allowed as bank protec-
tion, then a river bank stabilization analysis shall be provided
to the Public Works Department for review as part of the plan
submittal.
. Dedication of levee /dike /river bank access construction and
maintenance easements on all properties adjacent to the Green
River shall as part of their development dedicate construction
and maintenance easements for access and maintenance of existing
or future dikes /levees /and river banks along the Green River as
part of their plan submittal. These easements shall be provided
in such a manner so that immediate access is allowed from other
public rights -of -way for maintenance and construction of dikes/ -
levees.
B. Specific Standards
1 , op: areas of special flood hazards where base blood elevation
Ras been provided as set forth in Section 16.52.050 or Section
1 o .070,•the following provisions are required:
1. Residential Construction
a. New construction and substantial improvement of any residential
structure shall have the lowest floor, including basement,
elevated to a minimum of one foot above the level base flood
elevation.
b. Fully enclosed areas below the lowest floor that are subject !)
flooding are prohibited, or shall be designed to automatical'v
equalize hydrostatic flood forces on exterior walls by allor,i ^o
for the entry and exit of floodwaters. Designs for mee!i ^•o
this requirement must either be certified by a Registered ? -,.
fessional Engineer or a licensed architect or must' lee!
exceed the following minimum criteria:'
(1) A minimum of two openings having a total net area of -
less than one square inch for every square foot of enc'' -1
areas subject to flooding shall be provided.
(2) The bottom of all openings shall be no higher than one `-o!
above grade.
(3) Openings may be equipped with screens, louvers, or o*1e'
coverings or devices provided that they permit the automat•:
entry and exit of floodwaters.
•
FLOOD ZONE ORDINANCE
• Page 10
2. Nonresidential Construction
New construction and substantial improvement of any commercial,
industrial or other nonresidential structure shall either have the
lowest floor, including basement, elevated to a minimum of one foot
above the level of the base flood elevation; or, together with
attendant utility and sanitary facilities, shall:
a. Be floodproofed so that the structure is water tight one foot
above the base flood level, with walls substantially impermeable
to the passage of water;
b. Have structural components capable of resisting hydrostatic and
hydrodynamic loads and effects of buoyancy; and
c. Be certified by a Registered Professional Engineer or licensed
architect that the design and methods of construction are in
accordance with accepted standards of practice for meeting pro
vision of this subsection based on their development and /or
review of the structural design, specifications and plans. Such
certification shall be provided to the official as set forth in
Section 16.52.050(I)(4)(C)(2).
d. Non residential structures that are elevated, not floodproofed,
must meet the same standards for space below the lowest floor as
described in Section 16.52.070(B)(1)(b). :
e. Applicants floodproofing nonresidential buildings shall be noti-
fied that flood insurance premiums will be based on rates that
are one foot below the floodproofed level (e.g., a building
constructed to the base flood level will be rated as one foot
below that level).
C. Floodways
1. Located within areas of special flood hazard established in Section
16.52.050 are areas designated as floodways. Since the floodway is
an extremely hazardous area due to the velocity of flood waters
which carry debris, potential projectiles, and erosion potential,
the following provisions apply:
as, .Prohibit encroachment including fill, new construction, substan-
tial improvements and other developments unless certification
by a registered Professional Engineer or licensed architect is
provided demonstrating that encroachments shall not result in
any increase in flood levels during the occurrence of the base
flood discharge.
b. If Section 16.52.070(C)(1) is satisfied, all new construction
and substantial improvements shall comply with all applicable
flood hazard reduction provisions of Section 16.52.070.
2. Construction or reconstruction of residential structures is prooi-
bited within designated floodways, except for
a. repairs, reconstruction, or improvements to a structure which !)
not increase the ground floor area; and
b. repairs, reconstruction or improvements to a structure the
of which does not exceed 50 percent of the market value of
structure either
(1) before the repair, reconstruction, or repair is started, ;r
(2) if the structure has been damaged, and is being restores,
before the damage occurred. Work done on Structures
comply with existing health, sanitary, or safety codes :r
to structures identified as historic places shall not
included in the fifty percent determination.
• •
FLOOD ZONE ORDINANCE
Page 11
. Encroachments
The cumulative effect of any proposed development, when combined with
alt other existing and anticipated development, shall not increase the
water surface elevation of the base flood more than 0.2 of a foot at any
point along the river course.
1. Flood Control Zone Permits and Licenses - Approvals
A Flood Control Zone Permit application shall be filedfor all deve-
lopments at the time of filing the building permit and /or shoreline
permit, whichever is first. No permit or license for structures or
the development or use of land shall be issued by the City within a
flood hazard area unless a Flood Control Zone Permit has been issued
by the City. Such approval shall be based on a review of the provi-
sions set forth in this ordinance and the technical findings and
recommendations of the appropriate City departments. Compliance
with the provisions of this ordinance does not obviate the need to
obtain other permits which may be required pursuant to state or
federal law including approvals required from the Washington State
Department of Social and Health Services and /or ecology relating to
water and /or sewer systems which ensure that water and sewer systems
will be designed to avoid infiltration, inflow or impairment.
The Director or designee shall, within a reasonable time, after
other required agency reviews are completed, indicate approval or
disapproval of the requested flood control zone permit, with copies
to appropriate agencies, including D.O.E.
Whenever any alteration or relocation of any watercourse is pro-
posed, the Department of Public Works shall notify adjacent
communities prior to such relocation or alteration and submit such
notifications to the Federal Emergency Management Agency.
16.52.080 PENALTIES FOR NON- COMPLIANCE
No structure or land shall hereafter be constructed, located, extended,
converted, or altered without full compliance with the terms of this chapter
and other applicable regulations. Violation of the provisions of this chan-
ter by tal lure to comply with any of its requirements (including violation
of c tons and safeguards established in connection with conditions)
shall itute a misdemeanor. Any person who violates this chapter or
fails itl`co■ ply with any of its requirements shall upon conviction thereof
be fined" not more than 5500.00 or imprisoned for more than 6 months, for
each violation, and in addition shall pay all costs and expenses involved in
the case. Nothing herein contained shall prevent the City of Tukwila from
taking such other lawful action as is necessary to prevent or remedy any
violation.
16.52.090 SEVERABILITY
If any section, sentence, clause, or phase of this chapter shall be "e'l
to be invalid or unconstitutional by a court of competent jurisdicti^n.
such invalidity or unconstitutionality shall not affect the validity ,-
constitutionality of any other section, sentence, clause, or phrase of •1 .
chapter.
Section 3. Effective Date. This ordinance shall take effect and -
full force five (5) days after publication of the attached summary whin
hereby approved.
PASSED BY THE CITY COUNCIL OF THE CITY OF TUKWILA, WASHINGTON, at a
regular meeting thereof this day of 1988.
• FL000 ZONE ORDINANCE
Page 1?
APPROVED:
Gary L. Van Dusen, Mayor
Approved as to Form Attest /Authenticated
Office of the City Attorney
FILED WITH THE CITY CLERK:
PASSED BY THE CITY COUNCIL:
PUBLISHED RECORD CHRONICLE:
EFFECTIVE GATE:
ORDINANCE NO.
Maxine Anderson, City Clerk
•
AN ORDINANCE OF THE CITY OF TUKWILA, WASHINGTON,
REPEALING ORDINANCE NOS. AND 1225 AND AMENDING
CHAPTER 16.52 OF THE TUKW MUNICIPAL CODE TO MEET
THE NEW FEDERAL REGULATIONS, EFFECTIVE OCTOBER 1,
1986, FOR FLOOD PLAIN MANAGEMENT AND MODEL FLOOD
DAMAGE PREVENTION POLICIES AS REQUIRED OF JURISDIC-
TIONS PARTICIPATING IN THE NATIONAL FLOOD INSURANCE
PROGRAM.
On , 1988, the City Council of the City
of Tukwila passed Ordinance No. which provides as
follows: for the repeal of the City of Tukwila Ordinances
1220 and 1225; for the amendment of Chapter 16.52 of the
Tukwila Muncipal Code establishing flood plain management and
providing for severability; and establishes an effective
date.
The full text of this ordinance will be mailed without
charge to-anyone who submits a written request to the City
Clerk of the City of Tukwila of a copy of the text.
APPROVED by the City Council at their meeting of
, 1988.
MAXINE ANDERSON, CITY CLERK
01: =08 /jg
3
z
oi
(3 •
r
c.
r
0
e-
r
0
• 0
0
z
0
O
z
0
O
r
r
n
0
o
0
.3!
o
o
a
./.1°
`. •
X
0
O
m
z
r,..,
• •.. ..• •••-••••,-AA•
•:•''■••••••••• ,
3
m
0
0
m
0
0
m
0
0
V
r
r
• .
•
1
• ,,--:".:‘,.4•Z,17.[:::7P-:,,,....A..,..*•••••;1 :t~.0.‘to,-.. ... • . • •
r • • .- • •
,,FEIOUT,HCENTEIR: MALL
WABHINGTON
. •.-.
•
JACOBS. VISCONSI & JACOBS CO.
DIPtiOptin wapAGtin
EMIR FOG( IRMO
(1110.,15 01.0 QM W.
FOOD COURT
PLAN
CENIER RIDGE DESIGN SERVICE oNE p
• . . 254250,,tr R■ocr Pkup
0,"" 4.45
ARCNrIECIS ENGINFE%
C,V, 12151071 MO
GAME ROOM
a..n0(4Y7:+
0
w
•;:W
11.
w
0
0
0
it di
. 0
N
2
z
J
a
Ayr 4,•c■wT. ro•.
JAM. 28,198
w,. a 6 o ¢ Mao Fa4 a —
REFLECTED CEILING PLA1
T +'r'f,'�' Id ds "�° �a?`n :. ,.rw�o ��`, -:, '1"�`r- �"*.�o- ro�•�''�" `°�..:�'� Xt.��°7� - >m�^.• tL 1..: •S� � .S,r .,i..... ° ^!r_�
°FRC PAN
Cell ABB FIBER'.
RBINF., CONC:]'.
=B XIBT'O SOFFIT
PROPOSED FOOD COURT FOR
SOUT!- ICENTER MALI-
- }_Y TUKWILA, WAHMINOTON
51n
°-'A
`!ARCHITECTS "'
5
E,—
•
-
1►
it •.
N •J
141.2
rt. u0.4. d
•
• .• ^"G A?- :•.••
JACOBS. VISCONSI & JACOBS CO.
DEVELOPERS - MANAGERS
OM COMER Nmcr NN
ELEYDAN. OMNE MIR WV
ANA
ANA
Ana Cade 21•471-4.00
FLOOR PLAN .
•
'BOUTHCENTER MALL
TUKWILA,WASHINGTON. -
CENTER RIDGE DESIGN SERVICES INC. PA
25425 CENTER RIDGE ROAR • •
CEErvEWD. OHO 44145
AHCHEECIS ANO ENGINEERS _
12101011 1000
•
•
3
JACOBS- VISCONSI & JACOBS CO.
O1nI..tn • MANACEO
CENTER RIDGE DESIGN SERVICES INC. PA
25425 CENIE4 MOE ROAD
CIEKIANO. DIM 44145
M08IECT9 END PIONEERS
UM SII 4600
�/
y
Q.