HomeMy WebLinkAboutSEPA EPIC-07-88 - CITY OF TUKWILA - SANITARY SEWER EXTENSION (LID #32)SOUTHCENTER PKWY
SANITARY SEWER EXTENSION
LID #32
MINKLER BLVD.
TO STRANDER BLVD.
EPIC 7 -88
WAC 197 -11 -970
DETERMINATION OF NONSIGNIFICANCE
Description of Proposal PROVIDE A GRAVITY SANITARY SEWER IN SOUTHCENTER PARKWAY, FROM
MINKLER BLVD. TO STRANDER BLVD TO ALLOW ELIMINATION OF A SERIES OF PRIVATE PUMP SIAIIONS
CURRENTLY SERVING PRIVATE PROPERTIES, AND ALSO ALLOW FOR ULTIMATE DEVELOPMENT OF THIS
AREA. (LID #32)
Proponent CITY OF TUKWILA
Location of Proposal, including street address, if any MINKLER BLVD TO STRANDER BLVD
Lead Agency: City of Tukwila File No. EPIC -7 -88
The lead agency for this proposal has determined that it does not have a probable
significant adverse impact on the environment. An environmental impact statement
(EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after
review of a completed environmental checklist and other information on file with the
lead agency. This information is available to the public on request.
0 There is no comment period for this DNS
[[ This DNS is issued under 197 -11- 340(2). Comments must be submitted by
. The lead agency will not act on this
proposal for 15 days from the date below.
Responsible Official Rick Beeler
Position /Title Planning Director
Address
Dat
one 433 -1846
6200 Southcenter Boulevard, Tuk il.er98188
oG Signature '
You may appeal this determination to the City Clerk at City Hall, 6200 Southcenter
Boulevard, Tukwila, WA 98188 no later than 10 days from the above date by written
appeal stating the basis of the appeal for specific factual objections. You may be
required to bear some of the expenses for an appeal.
Copies of the procedures for SEPA appeals are available with the City Clerk and
Planning Department.
FM.DNS
C C A..EQ . No. "Pt�0 -swoa�
Control No.
Epic File No. 104:- -7
Fee $100.00 Receips;Nq r aD t j 1l
ENVIRONMENTAL CHECKLIST 1988
I; ,
A. BACKGROUND C' n�c(� i ( ;; + u i?A LA
6lcr -H-c l 1 i• \ l/� tt `^a ��' � 5 fA.' F i.{ DEPT.
1. Name of proposed project, if applicable: x e\A3o< > — LA,041-
2. Name of applicant: CIT •a-F 710-,DILq
3. Address and phone number of applicant and contact person: ('_ t-rti r, ► (UKW\lA
— ?A-It 1nAs — 4 —U 1 �01
4. Date checklist prepared: 3/ 10 /8zS
5. Agency requesting Checklist: City of Tukwila
6. Proposed timing or schedule (including phasing, if applicable):
Cc, r(S `tali cri — S tlrti, v . 8B
7. Do you have any plans for future additions, expansion, or further activity
related to or connected with this proposal? If yes, explain.
No_
8. List any environmental information you know about that has been prepared, or will
be prepared, directly related to this proposal.
1984 C vv.() 11 r14.1s(vF SMAA Pu-try - C'rr' a TutLv,,i+✓�
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes,
explain.
Ltl) PAo onus t< PLA -c1NC; Fit O 174 PL 11-‘---/
I'T(c.1044r10-1,- (-)r Druk_LoPmp ■rt- -12yizq Aviv/
•
Ham.
• 1
10. List any government approvals or permits that will be needed for your proposal.
F N'P AbV Pc(
v • 1 ' :, b nt vi .,, 'T6t,Y1.ci ( 744/14) t c cP
Q-rr'f
�Au dAi
'17osstR> ;_ ? c ' _
11. Give brief, complete description of your proposal, including the proposed use
and the size of the project and site. There are several questions later in thi .
checklist that ask you to describe certain aspects of your proposal. You do no .
need to repeat those answers on this page. Section E requires a complete
description of the objectives and alternatives of your proposal and should not be
summarized here.
12. Location of the proposal. Give sufficient information for a person to understand
the precise location of your proposed project, including a street address, if
any, and section, township, and range, if known. If a proposal would occur over
a range of area, provide the range or boundaries of the site(s). Provide a legal
description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any permit applica-
tions related to this checklist.
F,.F m;nf -ti- ''9
13. Does the proposal lie within an area designated on the City's Comprehensive Land
Use Policy Plan Map as environmentally sensitive?
N�
-3-
, TO COMPLETED BY APPLICANT Evaluation for
Agency Use Only
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one): Flat,
rolling, hilly, steep slopes, mountainous, Fiyff-
b. What is the steepest slope on the site (approximate
percent slope)?
c. What general types of soils are found on the site
(for example, clay, sand, gravel, peat, muck)? If
you know the classification of agricultural soils,
specify them and note any prime farmland.
-Top a Fl- UARAN) lt-iPkoiM ; Limn US/MS
Lori vv% 9 ss of ,s►L rs
d. Are there surface indications or history of unstable
soils in the immediate vicinity? If so, describe.
Nom_
e. Describe the purpose, type, and approximate quanti-
ties of any filling or grading proposed. Indicate
source of fill.
NoNr prP
f.. Could erosion occur as a result of clearing,
construction, or use? If so, generally describe.
ND.
g.
About what percent of the site will be covered with
impervious surfaces after project construction (for
example, asphalt or buildings)?
N0 cE+4c\ /W1'0r1 tit 01/S sjApjats
r.
Evaluation for
Agency Use Only
h. Proposed measures to reduce or control erosion, or
other impacts to the earth, if any:
NA-
2. Air
a. What types of emissions to the air would result from
the proposal (i.e., dust, automobile odors,
industrial wood smoke) during construction and when
the project is completed? If any, generally
describe and give approximate quantities if known.
I L1. S `mac i i� a ST E=Y1y n i S S 1•o1r.. %
As PAkT O��t,n,e 1'►Lllcj�pi.�� It/��
b. Are .there any off -site sources of emissions or odor
that may affect your proposal? If so, generally
describe.
1 D .
c. Proposed measures to reduce or control emissions or
other impacts to air, if any:
NW
3. Water
a. Surface:
1) Is there any surface water body on or in the
immediate vicinity of the site (including year -
round and seasonal streams, saltwater, lakes,
ponds, wetlands)? If yes, describe type and
provide names. If appropriate, state what
stream or river it flows into.
FLLYQ d? t Pr yt Ovi
74=11 ( �1� ►t t��
2) Will the project require any work over, in, or
adjacent to (within 200 feet) the described
waters? If yes, please describe and attach
available plans.
KIJA-
3) Estimate the amount of fill and dredge material
that would be placed in or removed from surface
water or wetlands and indicate the area of the
site that would be affected. Indicate the
source of fill material.
nN /A
4) Will the proposal require surface water
withdrawals or diversions? Give general
description, purpose, and approximate quan-
tities, if known.
N IA
5) Does the proposal lie within a 100 -year
floodplain? If so, note location on the site
plan.
6) Does the proposal involve any discharges of
waste materials to surface waters? If so,
describe the type of waste and anticipated
volume of discharge.
-TPinPok44-t Ni ,s-,.c N Dt-cuov tIIN1�-
1) 1 \ t'J(^ C 7'.3( -flat 71ow Y± 11 (5
TZEcm p VIT
Evaluation for
Agency Use Only
Evaluation for
Agency Use Only
b. Ground:
1) Will ground water be withdrawn, or will water be
discharged to ground water? Give general
description, purpose, and approximate quan-
tities, if known.
A ALOd\ P rt1. 6
2) Describe waste materials that will be discharged
into the ground from septic tanks or other sour-
ces, if any (for example: Domestic sewage;
industrial, containing the following
chemicals...; agricultural; etc.) Describe the
general size of the system, the number of such
systems, the number of houses to be served (if
applicable), or the number of animals or humans
the system(s) are expected to serve.
't 1f
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm
water) and method of collection and disposal, if
any (include quantities, if known). Where will
this water flow? Will this water flow into
other waters? If so, describe.
Evaluation for
Agency Use Only
2) Could waste materials enter ground or surface
waters? If so, generally describe.
14
d. Proposed measures to reduce or control surface,
ground, and runoff water impacts, if any:
IN) 14-
4. Plants
a. Check or circle types of vegetation found on the
site:
deciduous tree: alder, maple, aspen, other
_ evergreen tree: fir, cedar, pine, other
X shrubs
x grass
_ pasture
crop or grain
_ wet soil plants: cattail, buttercup, bullrush,
skunk cabbage, other
water plants: water lily, eelgrass, milfoil, other
X other types of vegetation = L✓iti/1S'c- OP(■4- IN 345 +v -ess rpg_opotTilr._(
b. What kind and amount of vegetation will be removed
or altered? np I U- '1p 2r7N-L4TA ►mil
ar (Wclh-,nr-4-i•)) (000 L LD'wih15
7_311 SINS LAN9 <CP PI 1\1r
c. List threatened or endangered species known to be on
or near the site. N �►�.,�__
Evaluation for
Agency Use Only
. Proposed landscaping, use of native plants, or other
measures to preserve or enhance vegetation on the
site, if any: S b b pOtc,t -7 R ��
5. Animals
a. Circle any birds and animals which have been
observed on or near the site or are known to be on
or near the site:
birds: hawk, heron, eagle
mammals: deer, bear, elk, beaver, other:
S
fish: bass, salmon, trout, herring, shellfish,
other:
I'o N�
b. List any threatened or endangered species known to
be on or near the site. N
c. Is the site part of a migration route? If so,
explain.
d. Proposed measures to preserve or enhance wildlife,
if any:
0�i
Evaluation for
Agency Use Only
6. Energy and Natural Resources
a. What kinds of energy (electric, natural gas, oil,
wood stove, solor) will be used to meet the
completed project's energy needs? Describe whether
it will be used for heating, manufacturing, etc.
.)oNV'
b. Would your project affect the potential use of solar
energy by adjacent properties? If so, generally
describe. t\h
c. What kinds of energy conservation features are
included in the plans of this proposal? List other
proposed measures to reduce or control energy
impacts, if any: N/A
7. Environmental Health
a. Are there any environmental health hazards,
including exposure to toxic chemicals, risk of fire
and explosion, spill, or hazardous waste, that could
occur as a result of this proposal? If so,
describe. Nona
1) Describe special emergency services that might
be required. wp■c Tbuct-
1u1- C11 g s'( itu cTt lam C-I aD oni
At jr S 11N- Pos ry w1-
- Au _ '► t\- -Cf Ovs Tt11� L�
2) Proposed measures to reduce or control environ-
mental health hazards, if any:
H1S&
Evaluation for
Agency Use Only
b. Noise
1) What types of noise exist in the area which may
affect your project (for example: traffic,
equipment, operation, other)?
Ti'mP• co brCT41-C[cji�l�l t D)oL f
2) What types and levels of noise would be created
by or associated with the project on a•short-
term or a long -term basis (for example: traf-
fic, construction, operation, other)? Indicate
what hours noise would come from the site.
—POIA ('. C7 C67,Qgril. r t NtN s e
lea
3) Proposed measures to reduce or control noise
impacts, if any:
NETT ji(s
75
8. Land and Shoreline Use
a. What is the current use of the site and adjacent
properties? _P1,101-e }-� 'i •S �T _
b. Has the site been used for agriculture? If so,
describe. y bNp LOOT
Sr rru� u 13 7tiv�
c. Describe any structures on the site.
12-6A0 w 1A-A4 s - CTlb )N l i u.)rj rl &HUI avy:3,
Lip r «Trt ---\
Evaluation for
Agency Use Only
d. Will any structures be demolished? If so, what?
No
e. What is the current zoning classification of the
site? t21ca 172-E1,3,\U- a o.o cm
f. What is the current comprehensive plan designation
of the site? -gU g /NE-S S
g.
If applicable, what is the current shoreline master
program designation of the site?
N /A-
h. Has any part of the site been classified as an
"environmentally sensitive" area? If so, specify.
No
i. Approximately how many people would reside or work
in the completed project? o g
j. Approximately how many people would the completed
project displace? -LION IS,
k. Proposed measures to avoid or reduce displacement
impacts, if any:
1. Proposed measures to ensure the proposal is com-
patible with existing and projected land uses and
plans, if any: i °o Aoc c,) Ftj L&Sl
or 1) Mq -It^S
Evaluation for
Agency Use Only
9. Housing
a. Approximately how many units would be provided, if
any? Indicate whether high, middle, or low- income
housing? kton,-r
b. Approximately how many units, if any, would be eli-
minated? Indicate whether high, middle, or low -
income housing. Nov-E
c. Proposed measures to reduce or control housing
impacts, if any:
10. Aesthetics
a. What is the tallest height of any proposed
structure(s), not including antennas; what is the
principal exterior building material(s) proposed?
b. What views in the immediate vicinity would be
altered or obstructed? NON L3
c. Proposed measures to reduce or control aesthetic
impacts, if any: 4ip04:_
l.�vr► vijf 0)N e>F L(FTSTAS t
km it ‘w pr'nvq
Evaluation for
Agency Use Only
11. Light and Glare
a. What type of light or glare will the proposal
produce? What time of day would it mainly occur?
m1 e
b. Could light or glare from the finished project be a
safety hazard or interfere with views?
c. What existing off -site sources of light or glare may
affect your proposal?
Nlri
d. Proposed measures to reduce or control light and
glare impacts, if any:
Nl�
12. Recreation
a. What designed and informal recreational oppor-
tunities are in the immediate vicinity?
b. Would the proposed project displace any existing .
recreational uses? If so, describe.
c. Proposed measures to reduce or control impacts on
recreation, including recreation opportunities to be
provided by the project or applicant, if any:
N1A
Evaluation for
Agency Use Only
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or pro-
posed for, national, state, or local preservation
registers known to be on or next to the site? If
so, generally describe.
b. Generally describe any landmarks or evidence of
historic, •archaeological, scientific, or cultural
importance known to be on or next to the site.
>aom KNOti
c. Proposed measures to reduce or control impacts, if
any:
14. Transportation
a. Identify public streets and highways serving the
site, and describe proposed accss to the existing
street system. Show on site plans, if any.
ui i Cg r7tk T w
4 Ot P rp')ea l 'P"
b. Is the site currently served by public transit? If
not, what is the approximate distance to the nearest
transit stop? N l2o,
c. How many parking spaces would the completed project
have? How many would the project eliminate?
N
Evaluation for
Agency Use Only
d. Will the proposal require any new roads or streets,
or improvements to existing roads or streets, not
including driveways? If so, generally describe
(indicate whether public or private).
NO..
e. Will the project use (or occur in the immediate
vicinity of) water, rail, or air transportation? If
so, generally describe.
N
f. How many vehicular trips per day would be generated
by the completed project? If known, indicate when
peak volumes would occur.
Mt,
g. Proposed measures to reduce or control transpor-
tation impacts, if any:
.A (V Av (Tf :4-\A:4-\ .
P 1-1'u ( r3 M Pd K3FEN e P 5- 7111/1 -p t i
15. Public Services
a. Would the project result in an increased need for
public services (for example: fire protection,
police protection, health care, schools, other)? If
so, generally describe.
No
b. Proposed measures to reduce or control direct
impacts on public services, if any.
1 f At 13 6'-y 7VLI DS
c-)F �T L4 FT sills__
16. Utilities
a. Circle utilities currently available at the site:
electricity, natural gas, water, refus-0) service,
telephone, sanitary sewer , septic system, other.
s
TY c or V M\1 i:er
b. Describe the utilities that are proposed for the
project, the utility providing the service, and the
general construction activities on the site or in
the immediate vicinity which might be needed.
C. Signature
The above answers are true and complete to the best of
my knowledge. I understand that the lead agency is
relying on them to make decision.
Signature:
Date Submitted: � /0/82
PLEASE CONTINUE TO THE NEXT PAGE.
Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICANT Evaluation for
Agency Use Only
D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS
(do not use this sheet for project actions)
Because these questions are very general, it may be helpful
to read them in conjunction with the list of the elements of
the environment.
When answering these questions, be aware of the extent the
proposal, or the types of activities likely to result from
the proposal, would affect the item at a greater intensity
or at a faster rate than if the proposal were not imple-
mented. Respond briefly and in general terms.
1. How would the proposal be likely to increase discharge
to water; emissions to air; production, storage, or
release of toxic or hazardous substances; or production
of noise?
Proposed measures to avoid or reduce such increases are:
2. How would the proposal be likely to affect plants, ani-
mals, fish, or marine life?
Proposed measures to protect or conserve plants, ani-
mals, fish, or marine life are:
Evaluation for
Agency Use Only
3. How would the proposal be likely to deplete energy or
natural resources?
Proposed measures to protect or conserve energy and
natural resourses are:
4. How would the proposal be likely to use or affect
environmentally sensitive areas or areas designated (or
eligible or under study) for governmental protection;
such as parks, wilderness, wild and scenic rivers,
threatened or endangered species habitat, historic or
cultural sites, wetlands, floodplains, or prime
farmlands?
Proposed measures to protect such resources or to avoid
or reduce impacts are:
5. How would the proposal be likely to affect land and
shoreline use, inclduing whether it would allow or
encourage land or shoreline uses incompatible with
existing plans?
Evaluation for
Agency Use Only
Proposed measures to avoid or reduce shoreline and land
use impacts area:
How does the proposal conform to the Tukwila Shoreline
Master Plan?
6. How would the proposal be likely to increase demands on
transportation or public services and utilities?
Proposed measures to reduce or respond to such demand(s)
are:
7. Identify, if possible, whether the proposal may conflict
with local, state, or federal laws or requirements for
the protection of the environment.
Evaluation for
Agency Use Only
8. Does the proposal conflict with policies of the Tukwila
Comprehensive Land Use Policy Plan? If so, what poli-
cies of the Plan?
Proposed measures to avoid or reduce the conflict(s)
are:
TO BE COMPLETED BY APPLICANT
E. SUPPLEMENTAL SHEET FOR ALL PROJECT AND NON PROJECT
PROPOSALS
The objectives and the alternative means of reaching the
objectives for a proposal will be helpful in reviewing the
aforegoing items of the Environmental Checklist. This
information provides a general overall perspective of the
proposed action . in the context of the environmental infor-
mation provided and the submitted plans, documents, suppor-
tive information, studies, etc.
1. What are the objective(s) of the proposal?
2. What are the alternative means of accomplishing these
objectives?
3. Please compare the alternative means and indicate the
preferred course of action:
Evaluation for
Agency Use Only
Evaluation for
Agency Use Only
4. Does the proposal conflict with policies of the Tukwila
Comprehensive Land Use Policy Plan? If so, what poli-
cies of the Plan?
Proposed measures to avoid or reduce the conflict(s)
are:
-23-
L.I.D. NO. �2
SOUTHCENTER PARKWAY
R/W AND UTILITY LOCATIONS
FROM CITY RECORDS
1_, 19 UALE
I FOR . MEN
R/W :EQUIPMENT
I 15' UTIL. ESMT. 36' R/W
43'
45 OPaN r-zoR
TRAFFIC. DURING
COKIST R. UCT ION.
36' R/W
43'
R/W
15' UTIL. ESMT.
LANDSCAPE
4" GAS
TEL. O
O
•
3_ STORM O ELEC.
42 " -12 "STORM -1L
30'
-30'.
SIDE
WALK
10I
Z. A.0 . CLASS 5
CPISIDE_ SEWER.
4" Al
4" CR. GR,
28'
'-t-- SELEC -f GRAVEL
BAC,.i,F I LL . MECN.
COMPAQ 110 N -TO
95% pR.O GTO
FIFE bEC:C)ING
PIPE FOUNDATION
r
42 " -36" STORM
PLANNED LOCATION, DEPEt�Ir.�1NU
ON UTILITY cL»JFLIGTS.
ALT r-NATE Loc,AT(O»4 , IF NO
UTILIT Y COIJFI -IG T S.
JET FUEL ELEC. TEL-
4' G
O
RECEIVE
MAR r1196
TUKWILA
'UBLIC WORK ..
SPECIAL BENEFIT STUDY
OF
PROPOSED SEWER L.I.D. #32
DATE OF APPRAISAL: FEBRUARY 1, 1988
CLIENT:
CITY OF TUKWILA
PUBLIC WORKS DEPARTMENT
6300 SOUTHCENTER BOULEVARD
TUKWILA, WASHINGTON 98188
PREPARED BY:
WASHINGTON APPRAISAL SERVICES, INC.
10232 N.E. 10TH STREET
BELLEVUE, WASHINGTON 98004
453 -1456
W.A.S. 88 -8
WASHINGTON APPRAISAL SERVICES, INC.
10232 N.E. 10th STREET - BELLEVUE, WA. 98004 -4289 - (206) 453-1456
February 17, 1988
City of Tukwila
Public Works Department
6300 Southcenter Boulevard
Tukwila, Washington 98188
ATTN: Phil Fraser, Senior Engineer
RE: Special Benefit Study on proposed sewer L.I.D.
project number 32
W.A.S. 88 -8
Dear Mr. Douglas:
Pursuant to your request, this office has competed a
Special /Benefit Study of the above reference property. The
purpose of this report was to estimate the amount of special
benefits, if any, attaching to the properties within the LID
district by reason of the completed LID.
Special Benefits are defined as:
The difference between the Fair Market Value of the property
immediately after the special benefits have attached, and
the Fair Market Value of the property before benefits have
attached.
Fair Market Value is defined as:
The price it will bring when offered for sale by one who
desires but is not required to sell and sought by one who
desires but is not required to buy after due consideration
of all elements reasonably affecting value. The term price
is synonymous with the terms amount in cash and amount in
money.
This report was made under the methods and techniques approved by
the American Institute of Real Estate Appraisers and the Society
of Real Estate Appraisers. The Code of Ethics of these
organizations has been observed.
City of Tukwila
February 17, 1988
Page Two
After careful consideration of all factors affecting value,
together with other data gathered during the preparation of this
report, it is the opinion of the appraiser that the Special
Benefits occurring to the subject parcels by reason of sewer
L.Z.D. number 32 was:
SPECIAL BENEFIT $399,200.00
Sincerely yours,
9 .James M. Lema
MAI, SRA, SR /WA
IDENTIFICATION
CLIENT:
City of Tukwila
LID STUDY AREA:
Southcenter Parkway from Strander Blvd to Minkler Blvd.
THE PURPOSE OF THE REPORT:
The purpose of this report is to estimate the Special
Benefits, if any, that will accrue to the ownership of the
above referenced properties.
SUMMATION OF THE APPRAISAL PROBLEM:
The amount of special benefits, if any, attaching to the
property by reason of local improvement, is the difference
between the Fair Market Value of the property immediately
after the Special Benefits have attached, and the Fair
Market Value of the property before the benefits have
attached.
Fair Market Value is defined as:
The price it will bring when . offered for sale by
one who desires but is not required to sell and
sought by one who desires but is not required to
buy after due consideration of all elements
reasonably affecting value. The term price is
synonymous with the terms amount in cash and
amount in money.
In the valuation process, the appraiser assumes the property
to be owned in fee simple. The appraiser will measure the
amount of special benefits, if any, that attach to the
subject parcels by exploring the following areas: analysis
of comparable sales in the Bellevue area; and to traffic
patterns before and after the LID.
1
RELEVANT DEFINITIONS:
Local Improvement District - These districts are activated
under state law by the local city and county or by vote of
the inhabitants of a particular geographical area. Upon
activation, the district becomes a separate legal entity
governed by a board of directors and possessing many of the
characteristics of a city, particularly in the field of
taxation. As a rule, the district issues its own bonds to
finance particular improvements such as water distribution
systems, drainage structures, irrigation works, parking
facilities and a host of other types of developments. to
repay the funds borrowed through the issuance of bonds,
these districts have the power to assess all lands included
in the district on an ad valorem basis. Such assessments
constitute liens on the land until paid. these liens can be
foreclosed by sale similar to a tax sale and are prior to
private property interest.
General Benefits - The benefits which accrue to the
community at large, to the area adjacent to the improvement,
or to other property similarly situated as that taken but
which property is not taken.
Special Benefits - The amount of special benefits attaching
to property by reason of a local improvement is the
difference between the Fair Market Value of the property
immediately after the special benefits have attached, and
the Fair Market Value of the property before the benefits
have attached.
Fee Simple - An absolute fee; a fee without limitation to
any particular class of heirs or restrictions, but subject
to the limitations of eminent domain, escheat, police power,
and taxation. An inheritable estate.
ASSUMPTIONS AND LIMITING CONDITIONS:
The Appraisal Report, of which this statement is a part, is
expressly subject to the following conditions:
That the legal description as given is assumed correct. No
survey or search of title of the property has been made for
this report and no responsibility for legal matters is
assumed.
The report assumes good merchantable title and any liens or
encumbrances that may exist have been disregarded.
The Appraisers herein, by reason of this report, is not
required to give testimony or attendance in court or at any
governmental hearing with reference to the property in
question, unless arrangements have been previously made.
The Appraiser has no present or contemplated interest in the
subject property and their employment to make this report is
in no manner contingent upon the value reported.
The Appraiser herein certifies that to the best of his
knowledge and belief the statements and opinions set forth
in the report, subject . to the limiting conditions herein
stated, are correct.
Possession of this report, or a copy thereof, does not carry
with it the right of publication, nor may it be used for any
purpose by any but the applicant without the previous
written consent of the Appraiser or applicant and in any
event, only with proper qualification.
3
■
■
■
■
The opinions and values shown in the report apply to the
subject parcels only. No attempt has been made to relate
the conclusions of this report to any other LID's, past,
present, or future.
Neither all nor any part of the contents of this report
shall be conveyed to the public through advertising, public
relations, news, sales, or other media without the written
consent and the approval of the author, particularly as to
the valuations, the identity of the Appraiser or firm with
which he is connected or any reference to the American
Institute of Real Estate Appraisers or to the Society of
Real Estate Appraisers.
4
■
■
■
■
■
■
■
Location Map
5
NEIGHBORHOOD
The subject neighborhood is located within the city of Tukwila.
The area lies just south of Interstate 405 and east of Interstate
5. The Southcenter regional mall lies approximately 1/2 mile
north of the project area. The subject neighborhood is bordered
on the north by Strander Blvd., on the south by South 188th
Street, on the west by Southcenter Parkway, and on the east by
Andover Park West.
The northern boundary of the subject neighborhood, along Strander
Blvd., consists of various commercial uses including the
Southcenter regional shopping mall as well as hotels and various
other retail outlets. Along the southern boundary of the subject
neighborhood, South 188th Street, development varies slightly
between the north and the south sides of the street. Along the
northern side development consists mainly of retail outlets,
warehouses, discount houses, and other similar structures. The
southern side of this street is somewhat less densely developed
and includes some vacant land as well as a bank aid various
office buildings. Along the eastern boundary of the subject
neighborhood, Andover Park West, development consists of
warehouse distribution centers for national and regional
distributors as well as several office buildings, including the
Southland Piaza Office Park and the Southcenter Corporate Square
office buildings. The western boundary of the subject
neighborhood is the most densely developed portion. Development
along Southcenter Parkway consists mainly of one story commercial
and retail buildings. Examples of development along Southcenter
Parkway include various restaurants, discount houses, retail
strip uses, a movie theatre, and an occasional office building.
The major development in the subject area along this street is
the Parkway Piaza shopping mall.
Overall, land use in the subject neighborhood is mainly office
6
and /or retail in nature. Portions of the project area represent
somewhat of a "island" of land used for industrial /warehouse
purposes, which is surrounded on all sides by commercial, retail,
and /or office uses. As development continues in the area it is
expected that increased office /retail activity will take place.
As this happens, the industrial /warehouse uses will be "squeezed
out" in favor of more intense commercial development.
7
AREA DESCRIPTION (BEFORE)
•
Roads and Access:
The main access route in the area is I -5 which is located on
the western edge of the neighborhood. Local arterials in the
area are Southcenter Blvd, Strander Blvd and S. 180th St.
Land Use and Zoning:
•
The area is mainly zoned for retail and commercial uses.
The development in the area falls into three general
categories: retail, commercial, and industrial warehouse.
The one portion zoned residential is considered to have a
commercial use potential.
Topography and Drainage:
The area is mostly level and at grade with adjacent streets.
Properties on the west side of Southcenter Blvd slope
steeply up to I -5 on their western boundaries. The northern
end on the project near Strander Blvd is higher in elevation
than the southern end on the project area.
Utilities:
Basic utilities: water, telephone, electric, and natural gas
are available to properties within the project area. Sewer
service: parcels 1 thur 3 are served by a private system,
parcels 7 thur 9 are served by a private system, and parcels
11 thur 13 are served by a private system. The eastern half
of parcel 10,outside of the boundary, is served by service
in the Minkler right of Way.
8
Defined as that use which, at the time of appraising
the property, is most likely to produce the greatest
net return to the land and /or the building over a given
period of time. The use must be legal and in
compliance with regulations and ordinances within the
policy power of the county and state, including health
regulations, zoning ordinances, building code
requirements, and other regulations. (Washington Real
estate Practices, Alan N. Tonnon, 1981, page 216).
Most of the properties in the area are already developed.
The principally permitted uses in the C -M district include
any principally permitted uses in the C -1 and C -2 districts,
as well as additional manufacturing uses. Thus, commercial
uses allowed under the C -1 and C -2 districts are also
allowed in the C -M district. According to Rebecca Fox with
the City of Tukwila Planning Department, the current
comprehensive plan reflects little change in the area
zoning.
As touched upon in the neighborhood description, the area
is primarily commercial /retail in nature, with several
office developments as well. It is expected that the future
trend in the area will be towards increased commercial,
retail, and office development.
After considering the current zoning, comprehensive plan,
development trends, location, access and other relevant
data, it is the opinion of the appraiser that the highest
and best use for the subject sites is for an office and /or
retail use.
9
■
DESCRIPTION OF THE L.I.D.
The existing public service in the area consists of a 12"
line in the south side of the Minkler Blvd. right of way
with a crossing at Southcenter Parkway to the Wendy's
property. Parcels 7 thur 9 have private pump station that
pumps into the line at Minkler. Parcels 11 thur 13 have a
private pump station that pumps north to Strander Blvd.
Parcels 1 & 2 have a private pump station that pumps north
to Strander Blvd. It is assumed that parcel 3 also is served
by this private station. The proposed new service will
extend north along the east side of Southcenter Blvd. from
Minkler Blvd. to a- point in front of parcel 10. At this
point the line will cross the street to parcel 7 or 8. The
line will extend north along Southcenter Parkway to a point
adjacent to parcel 1. There will also be a crossing to
parcels 11 thur 13 provided and extension easterly to the
private pump station.
Effect of the L.I.D.:
The major effect of the L.I.D. will be to improve the sewer
service in the area. The private pump stations in the
project are will be no longer needed. New service will be
available to parcels 5 & 6. Service will also be available
to the Puget Power parcel(4). The area included that is
parcel ten represents excess land that could be developed to
its highest and best use. Service to this area of the
Penneys parcel will be greatly enhanced. The parcels with
private pump stations will gain the benefit of public
service. The private stations cost money to run and
maintain, repair when broken, and potential loss of retail
income if the station is down for a day or two. Most of the
10
•
ownerships with private stations have restaurants located on
the properties. The typical lease agreements are often based
on an base rent with a percentage of gross sales over the
base. When sewer service is not available due to breakdowns,
it is very difficult to run a restaurant or food service
business. Overall the project will provide necessary utility
service to the area.
11
MEASURE OF SPECIAL BENEFITS
The measure of Special Benefits is the difference between the
Fair Market Value of the property immediately after the Special
Benefits have attached, and the fair Market Value of the property
before benefits have attached. there are many factors which lead
to this change in value: zoning changes,, shorter development
time, decreased development costs, reduced operating expenses,
and property enhancement.
The following are the primary factors utilized in establishing
the benefits that accrue to reach property:
1. Physical inspection of the existing facilities and all
properties contained in the study. General inspection of
the surrounding properties and neighborhood.
2. Base study of market values in the subject neighborhood for
all parcels. Said base study included sales with
characteristics of each LID project.
3. Consideration of the location, utilities, zoning, and
physical characteristics of each LID parcel.
4. Consideration of utility improvements and access
utilities for each parcel before completion of the LID.
to
5. Consideration of utility improvements and access to
utilities for each parcel after completion of the LID.
6. An analysis was made of each property based on before and
after sales to establish the probable value change of each
parcel as a result of the completion of the LID project.
Individual variation in benefits occur due to differences in
physical and locational characteristics.
12
Sale
No.
Location
OPARABIE SALES CHART
Ealing Size
Sale
Date
Sale Price
Price Pier /SF
1 Interurban Ave South C -2
2 West Valley Road C -2
3 11809 Renton Ave North C-G
4 14221 Interurban Ave South C -2
5 51st Avenue South C-2
6 NWCI West Valley & Strarder C -2
7 NWC,'1 West Valley & Strarder C -2
8 92nd Ave S. & S of SW 16th L1
9 300 & 410 Andover Parkway CM
10 West Valley & Strarder Blvd. IND
11 West Valley Read IND
12 108th SE, Renton 9•1
13 NEC SE 10th St. & Lind Ave B-1
14 1202 West Meeker GC
15 710 Rainier Ave, Renton B-1
16 SWC SW 41st St & E. Valley Rd. B-1
44,070
265,000
11,850
50,035
72,155
91,476
193,406
30,932
570,726
33,671
98,485
66,410
37,391
44,431
31,900
59,417
13
05-JUn-87
18- 7u1 -85
29-Dec-86
24 -Dec-86
30-Oct -87
17- Tan-85
17- Jan-85
08-Apr -86
30- Dec -86
15- Dec-87
24- Dec -86
03- ,7u1 -85
20 May -87
01-Oct -86
01-Am-85
07- May-85
$134,500.00
$1,750,000.00
$150,000.00
$290,000.00
$774,250.00
$862,488.00
$1,400,000.00
$250,000.00
$2,332,440.00
$450,000.00
$434,000.00
$422,500.00
$336,519.00
$485,000.00
$371,447.00
$410,000.00
$3.05
$6.60
$12.66
$5.80
$10.73
$9.43
$7.24
$8.08
$4.09
$13.36
$4.41
$6.36
$9.00
$10.92
$11.64
$6.90
■
■
■
■
■
■
■
■
■
■
The appraiser has made a search for comparable before and after
sales in the general Tukwila /Valley area. The results of the
search has provided 16 comparable sales for analysis purposes.
Actual details on the sales are retain in the appraiser files. A
summary of the Sales is included on the opposite page.
The appraiser has estimated the "Before" and "After" land values
for the subject properties using comparable sales. The
improvements were noted, however, said improvements were not
valued in this report. The appraiser made a preliminary analysis
of the noted improvements to determine if the contribution value
of said improvements were effected by the project. If the
improvements were found to be not effected, then the improvements
were not specifically valued in this report. The Special benefits
generally run with the land only. The improvements located on
the properties will receive only a general benefit from the
project. Site improvements are subject to physical change,
economic obsolescence and functional inadequacy. Also,
improvements tend to vary greatly from property to property.
Each represents varying degrees of highest and best use and some
show no economic value. Thus, for purposes of analysis, the
Special Benefits are considered to be part of the land only.
The Special Benefit Study has resulted in recommended assessments
which meet the following tests:
1. The assessment on each parcel is less than the Special
Benefit received, due to the project's completion.
2. Each assessment is proportionate to the special Benefit
enjoyed by each parcel and to that of all other parcels
within the L.I.D.
The final opinion and conclusions set forth in this report are
supported by the available data. In conclusion, it is the
14
■
opinion of the appraiser that the amount of Special Benefits
accruing to the subject properties after the construction of the
proposed LID will be:
Land Value, After LID $ 12,261,900.00
Land Value, Before LID $ 11,862,700.00
Special Benefits $ 399,200.00
The opinions and values shown in this report apply only to the
subject. parcels.
15
SOUTHCENTER PARKWAY
R/W AND UTILITY LOCATIONS
FROM CITY RECORDS
9' U SAi3LE
FOR :MEIN.
R/W EQUIPMENT
15' UTIL. ESMT. 36' R/W
43'
45.." f OR
t TRAFFIC... OURINC
GONTR:UCT ION. R/W
36' R/W 15' UTIL. ESMT.
43'
LANDSCAPE
4" GAS
TEL. --0
0
8" STORM
SIDE
WALK
30'
IO
ELEC.
42" -12 "STORM _ _ -_
LvIIS10e-
Z A.0 . CLASS 5
- - -- qn AT 15
'-1-- SELECT GRAVEL T
/ E ACK, FILL. MECN,
COMPACTION TO
95% pR.00TOe.,
PIPE E,EDIDING
PIPE FOUNDATION
30'
28'
1
42 " -36" STORM
4" G
0
0 0
10" WATER JET FUEL. EL C. TEL.
0
y ;2
is
r 7 p
•
i. Ii�TM ST, •.
• ••• •••l.I 4144•
n. y 336
PCL I
•
toe
11 111111 '
44
•.
PCL • 2
EXHIBIT A
Page 2
ea.
so
0\ ..'.
SQ1y0r
I� 'III �I�I IIIIIII��YiiN IIIII'�IIIII��I
AGN
1 Q.'.21!
—.4. • PcL y.
f REAL PROPERTY
PUMP
TOYS R
US
. •i
129
•44 4••
.rt
29 ,91't .
bl
•4. ••
32 •
3J
•3•
'33
•
••• ••
36
Yy•
41 NII•14P•P
PHOENIX
MUTUAL
LIFE
INS. CO.
EXIST. j
PUMP
w
a
LL
0
z
0
0
—J
BON .
MARCHE
1
lilir NIMtlIAIlnIIff
cr
a
PENNEYS
.4
• •• ••
39
•n
•
•u
TU SP eo.45•SS - ei0604O707
L• / r
•
PROPOSED
LID 32
.• S.
LLIT ur IUKWILA LAPIIAL PROJECT REQUEST 1988 -1993
1. Project Title Sanitary Sewer Extension - Southcenter Parkwy
2. CIP Reference Number PW 87 -SW02 ENR # '87 -5045
('88 -5297)
3. Status: New X Changed_ No Change Delete
In Approved Plan? Yes X No
4. Fund 4C3 -SEWER
Dept. PUBLIC WORKS
Bud. Proj.# --
Plan Name and Page # SCP PROJECT NO.. 18 - Pg. VI -t
5. Project Location: SOUTHCENTER PARKWAY, FROM MINKLER BLVD TO STRANGER BLVD.
6. Project Description: 1,800 L.F. of 10" diameter gravity sewer line extending
from existing sewer main in Southcenter Parkway at Minkler Blvd. - to the North.
** *Includes costs to form /administer L.I.D.
CITY OF TUKWILA NON -CITY TOTAL
7. Estimated Total Costs ($ 000's) Operating G.O. & Rev. Grant, LID &
Revenues Bonds Other Sources
BARS #
(41) Planning /Design /Engineering $ $ $ 34,000 * ** $ 34,000 * **
(61) Land /Real Property $_ $
(62) Building Improvement $ $
(63) Non - Building Improvement $ $
(64) Machinery & Equipment $ $
Miscellaneous Materials, etc. $
TOTAL $
8. Yearly Costs
($ 000's)
BARS #
(41) Planning
(61) Land
(62) Building
Improvement.
(63) Non - Building
Improvement
(64) Equipment
Misc. Materials,
etc.
TOTAL
$
$ $
$ $
$102,000 $ 102,000
$ $
$ 136.000 * ** $136,000 * **
Prior
Years*
Program
Year
FY'88
Progran
Year
FY'89
Program
Year
FY'90
Program
Year
FY'91
Program
Year
FY'92
Prograrr
Year
FY'93
After
Sixth
Year
- CTRL **
34,000
34,000
102,000
102,000
136,000
136,000.
*Actuals through 1986 and 1987 Budgeted
* *1989....1993 Inflated 3'
a
y of Tukw1a.
COMPREHENSIVE. SEWER PLAN
APRIL 1914
PREPARED
HORTO
CONSU
SEATT
DENNIS €3c ASSOC.. i
TINE ENGINEERS.
E, /1/A $ H 1 NG T O N`
i®wwooror o
It is recommended that Pump Station No. 8 be monitored and, when
redevelopment buildout conditions incur excessively high cycle ratios on
Pump Station No. 8, the economics of these alternatives be re- evaluated.
Since the station services no upstream areas, and its current operation is
adequate and anticipated to be so for some time to come, it is taken to
be a low priority project.
The area adjacent to Southcenter Parkway and north of Minkler Boulevard
is currently serviced primarily through private pump stations. Construction
of a 10 -inch sewer to the existing line at the intersection of Minkler and
Southcenter Parkway would facilitate ultimate development in this area,
as well as eliminating private pump stations (See Project 18 on Figure 28 ).
Project No. 18 - Gravity Sewer to an Area Along Southcenter Parkway
North of Minkler Boulevard
1,800' of 10" sewer @ $40 /LF = $ 72,000
45% Allied Costs = 32,400
TOTAL ESTIMATED PROJECT COST = $104,400
Priority for this project should be high in light of the possible pump
station eliminations, associated overflows and maintenance problem. This
project should be a prerequisite to further development in this area.
South Service Area Basin
This basin, being outside current City limits, lies between I -5, the Green River,
South 188th Street and South 204th Street. The area lying in King County (appro-
ximately 315 acres) presently is zoned primarily for agriculture and surbaban
estate, with about 54 acres of heavy industry. Approximately 30 acres of
this basin are designated wetland, which essentially precludes development
under the King County Sensitive Areas Ordinance No. 4365. Army Corps of Engi-
neers Flood Mitigation.Plans, in conjunction with a document published by King
County and adopted by surrounding municipalities, entitled "The River of Green"
provides for substantial construction setbacks from the Green River banks (on
the order of 200'). In conjunction with Soil Conservation Service G- Channel
(Green River) Construction Plans, 70 acres of marsh and agricultural lands
VI -40
CITY OF TUKWILA
BASIN 12
VI- 30
RECOMMENDED IMPROVEMENTS
PROJECT NO. FIGURE ?a
CITY OF TUKWILA
OFFICE OF COMMUNITY DEVELOPMENT
XXXXXXXIMNAK PROPOSED
DECLARATION OF NON- SIGNIFICANCE
Description of proposal Comprehensive Sewer Plan
Proponent City of Tukwila Public Works Department
Location of Proposal
Tukwila Planning Area
Lead Agency City of Tukwila File No. EPIC- 199 -82
This proposal has been determined to (0446 /not have) a significant
adverse impact upon the environment. An EIS (ik /is not) required
under RCW 43.21C.030(2)(c). This decision was made after review
by the lead agency of a completed environmental checklist and other
information on file with the lead agency.
Responsible Official
Position /Title
Brad Collins
Planning Director
Date 27 December 1982 Signature 6.a-gA 6,41-(2A-p.,2
COMMENTS:
This Declaration of Non - Significance applies only to the legislative act
of adopting the Comprehensive Sewer. Plan. Separate environmental assessment
shall be conducted for any project which implements the Comprehensive Sewer
Plan.