Loading...
HomeMy WebLinkAboutSEPA EPIC-221-84 - CITY OF TUKWILA / PARKS AND RECREATION - CHRISTENSEN TRAIL IIICHRISTENSEN TRAIL III EPIC - 221 -84 y-t NOTICE OF ACTION BY THE CITY OF TUKWILA Pursuant to the provisions of chapter 43.21C RCW, notice is hereby given that the City of Tukwila did on March 21, 1984 take the action described below. Any'.action to set aside, enjoin, review, other otherwise challenge such action on the grounds of noncompliance with the provisions of chapter 43.21C RCW (State Environmental Policy Act) shall be commenced within 90 days or be barred. _The action taken by the City of Tukwila notice of which is hereby given, was: Final Declaration of Nonsignificance for shoreline management sub- stantial development permit and review by Board of Architectural Review to construct trail, signs, retaining walls and landscaping Said action pertained to property at: Along the Green River - So. 180th St. to southcenter city limits Pertinent documents may be examined during regular business hours at City Hall, 6200 Southcenter Blvd., City of Tukwila. Filed by Brad .Collins, Planning Department Published: Record Chronicle, /t/ $� 1984 NOTICE OF ACTION BY THE CITY OF TUKWILA Pursuant to the provisions of chapter 43.21C RCW, notice is hereby given that the City of Tukwila did on March 21, 1984 take the action described below. Any action to set aside, enjoin, review, other otherwise challenge such action on the grounds of noncompliance with the provisions of chapter 43.21C RCW (State Environmental Policy Act) shall be commenced within 90 days or be barred. The action taken by the City of Tukwila notice of which is hereby given, was: Final Declaration of Nonsignificance for shoreline management sub- stantial development permit and review by Board of Architectural Review to construct trail, signs, retaining walls and landscaping Said action pertained to property at: Along the Green River - So. 180th St. to southcenter city limits Pertinent documents may be examined during regular business hours at City Hall, 6200 Southcenter Blvd., City of Tukwila. Filed by Brad Collins, Planning Department Published: Record Chronicle, March 25, 1984 A F F• A V I T I, Becky L. Kent 11 OF 0! STR I410UTI ON hereby declare that: [1 Notice of Public Hearing Notice of Public Meeting 1 1 Notice of Application for Shoreline Management Substantial Development Permit [[ Declaration of Significance and Scoping Notice. Declaration of Nonsignificance 1 X [ Notice of Action 1 X( was mailed to each of the following addresses on March 23, 1984 David Parrot 5425 S. 178th St. Seattle, WA 98188 Mario Segale P.O. Box 88050 Tukwila, WA 98188 Rudolf Woelfl 23819 Park Belmonte Calabasas, CA 91302 Union Pacific Corp. P.O. Box 2500 Broom field, CO 80020 Tri -land Corp. 1411 4th Ave., Suite 1120 Seattle, WA 98101 Shasta Beverages 26901 Industrial Blvd. Hayward, CA 94545 Joeshphine Pang C/0 Irene Seto P.O. Box 25526 Lake City Station Seattle, WA 98125 City of Tukwila 6200 Southcenter Blvd. Tukwila, WA 98188 HAND DELIVER William Boeing, Jr. 1411 4th Ave. Bldg Seattle, WA 98101 Rabel Leight & Star Machine 241 S. Lander St. Seattle, WA 98124 BNSF Burlington Northern Inc. 810 3rd Ave. Tax Dept. 208 CTRL Seattle, WA 98104 Randall Weitzel 1908 SW 43rd St. Renton, WA 98055 CHU CHI -TAI 4431 N.E. 23rd CT Renton, WA 98055 Paul Rehn 7011 S. 182nd St. Kent, WA 98031 CAM Properties 18250 68th Ave. S. Kent, WA 98031 Corporate Properties Investors 230 Park Ave., Suite 1225 New York, NY 10169 Everard Wylde & Mergenthale 18475 Olympic Ave. S. Seattle, WA 98188 Anixter Brothers, Inc. 4711 Golf Rd. Skokie, IL 60676 Name of Project Christensen Trail III File Number EPIC - 221 -84 Le_ai Signature , 1984. David Bolger Bolger Revocable Trust 79 Chestnut Ridgewood, NJ 07450 Bat Holdings, INC. Attn: David Heilman 2000 Citizens Plaza Louisville, KY 40202 Sound Bldg. Assn. Sound Floor Coverings P.O. Box 58488 Seattle, WA 98188 Pacific Metal Co. 3400 S.W. Bond Ave. Portland, OR 97201 90' WAC 197 -11 -1350 • • DECLARAT -ION OF NONSIGNIFICANCE Description of proposal Construct trail, signs, retaining walls and landscaping Proponent City of Tukwila Location of proposal Green River - S. 180th St. to southerly city limits Lead Agency City of Tukwila File No. EPIC- 221 -84 This proposal has been determined not to have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43- 21C.020(c). This decision was made after review by the lead agency of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. Responsible official Brad Collins Position /title Planning Director Address and phone 6200 Southcenter Blvd., Tukwila, WA 98188 433 -1845 Date 3 -zi - 8 if Signature %.-1-40...t31141) Published: Record Chronicle Date: March 2&, 1984 CITY OF TUKWILA PERMIT NUMBER jj(,- AW/VI CONTROL NUMBER CENTRAL PERMIT SYSTEM - ROU* FORM • TO: [] BLDG. PLNG. P.W. Q FIRE [1 POLICE a P_ & R. PROJECT cu ADDRESS D . /SQ' DATE TRANSMITTED •••,53/8y RESPONSE REQUESTED BY E /$4 C.P.S. STAFF COORDINATOR ,pj4' RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE SPACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINE(S) ON WHICH THAT CONCERN • NOTED: a a i /AAP-LA-ALA. AL / //� ., • ,ii!:•.2:i.L., 3 2-'t frille �aa D.R.C. REVIEW REQUESTED a� / ' • .. PLAN CHECK DATE PLAN SUBMITTAL REQUESTED 0 COMMENTS PREPARED BY PLAN APPROVED C.P.S. FORM 2 CITY OF TUKWILA . PERMIT NUMBER jr,- 7,;(1-inir CONTROL NUMBER 4“1-0(.0/ CENTRAL PERMIT SYSTEM - ROUT• FORM • TO: a BLDG. a PLNG. P.W. a FIRE a POLICE a P_ & R. PROJECT eft/Li� - 17.„5.61{} ADDRESS j.. MOP" DATE TRANSMITTED ij itYy RESPONSE REQUESTED BY 4l'4J(44/ C.P.S. STAFF COORDINATOR e av RESPONSE RECEIVED PLEASE REVIEW THE. ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE SPACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINE(S) ON WHICH THAT CONCERN IS NOTED: D.R.C. REVIEW REQUESTED 0 PLAN SUBMITTAL REQUESTED 0 PLAN APPROVED a PLAN CHECK DATE COMMENTS PREPARED BY 3/1 ;'g 1i 0 C.P.S. FORM 2 kt PMOJECT Al AWDRESS . Di-.7.;TE TRANSMITTED( / g STAFF COORD NA-OR C•TY or TUKWILA PERMIT NUMBER 7-g27)F.-/ CONTROL NUMBER 39-0697 'CENTRAL PERMIT SYSTEM - ROUTO FORM 111 TD:: BLDG. 0 PLNG. P.W. ErFIRE POLICE El/P. & R. RESPONSE REQUESTED BY RESPONSE RECEIVE:L:32.4 PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE SWACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINE(S) ON WHICH TriiAT CONCERN IS NOTED: • • • • • D.;..R.C. REVIEW REQUESTED . PLAN CHECK DATE PL.-' SUBMITTAL REQUESTED EI COMMENTS PREPARED BY PL.-All APPROVED 0 C.P.S. FORM 2 CITY OF TUKWILA PERMIT NUMBER Lo1( ;- . 1 CONTROL NUMBER &fcf-0(0/ CENTRAL PERMIT SYSTEM - ROUT. FORM TO: 25 BLDG. Q PLNG. P.W. Q FIRE E POLICE Q P. & R. PROJECT elt/4 / . - erA.51..GU / i15u ,L47- ADDRESS ado) )4L` DATE TRANSMITTED tWgil RESPONSE REQUESTED BY A1/0"11 C.P.S. STAFF COORDINATOR eek RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE SPACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINE(S) ON WHICH THAT CONCERN IS NOTED: D.R.C. REVIEW REQUESTED 0 PLAN SUBMITTAL REQUESTED 0 PLAN APPROVED PLAN CHECK DATE COMMENTS PREPARED BY C.P.S. FORM 2 CITY OF TUKWILA CENTRAL PERMIT SYSTEM - ROUTS FO TO: a BLDG. a PLNG. PROJECT G'%?/I,I.Jt-PJ?..5 iti rizu ADDRESS Q . _/"R2 DATE TRANSMITTED STAFF COORDINATOR ek PERMIT NUMBER LoIr,- Z;fJ- f CONTROL NUMBER if'- /-CXp/ RM • E D n P.W. jg FIRE a POLICE E4 P- 8AR 8 1984 BY JUKWILA FIRE PREVENTION BIJRFATJ RESPONSE REQUESTED BY RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COP1ME NTS IN THE SPACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINE(S) ON WHICH THAT CONCERN IS NOTED: a t\)° c.4M "e1 a N a a D.R.C. REVIEW REQUESTED 0 PLAN SUBMITTAL REQUESTED [l PLAN APPROVED PLAN CHECK DATE COMMENTS PREPARED BY C.P.S. FORM 2 CITY .OF TUKWILA PERMIT NUMBER oj(,_ %4d /"?I`j CONTROL NUMBER -Up/ CENTRAL PERMIT SYSTEM - ROU, FORM • TO: [I BLDG. a PLNG. Li: P.W. a FIRE a POLICE PROJECT eli/Lij /PJ1.-5•LAU ADDRESS .18D ` DATE TRANSMITTED .W.Yz/ RESPONSE REQUESTED BY !1'd P. & R. C.P.S. STAFF COORDINATOR , / �' RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN: THE SPACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINES) ON WHICH THAT CONCERN IS NOTED: a a 0 0 a J , y ,,I '.3 720- co•Zr s.4 e ✓.ieodm.A •.d .,41W ` �....� awT // ro �► i� dc��'- /^i' fJQ v oCr� i- T� a0 a a .. 0 0 a 0 0 0 a D.R.C. REVIEW REQUESTED 0 PL.AU CI4EEIF DATE 3 — / -= 8'S/ PLAN SUBMITTAL REQUESTED 0 0 COMMENTS PREPARED PLAN APPROVED [[ 0 C.P.S. FORM 2 CITY OF TUKWILA PERMIT NUMBER �O) - ) CONTROL NUMBER 87-1-0497 CENTRAL PERMIT SYSTEM - ROUTS FORM TO: [`BLDG. Q PLNG. P.W. [`FIRE Q POLICE Ll P. & R. PROJECT efri j,te".S.CIti ADDRESS j.0 , JS O DATE TRANSMITTED 5/04/ RESPONSE REQUESTED BY /144/ C.P.S. STAFF COORDINATOR ,61/.6k RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE SPACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINE(S) ON WHICH THAT CONCERN IS NOTED. Q D.R.C. REVIEW REQUESTED 0• PLAN CHECK DATE PLAN SUBMITTAL REQUESTED 0 COMMENTS PREPARED BY PLAN APPROVED 0 C.P.S. FORM 2 JOL?i`!,j,,',Ij''1r_��1 CITY OF TUKWILA i.;--;„ ') p� • ^,nit ENVIRONMENTAL CHECKLIST FORM AS 1 1_u^A, o 1-01 i -ka-i s- •- ques-tTanrrai re -must be completed and submitted with the application for permit. This questionnaire must be completed by all persons applying for a permit from the City of Tukwila, unless it is determined by the Responsible Official that the permit is exempt or unless the applicant and Responsible Official previously agree an Environmental Impact Statement needs to be completed. A fee of $60.00 must accompany the filling of the Environmental Questionnaire to cover costs of the threshold determination. • Exhibit A I. BACKGROUND 1. Name of Proponent: City of Tukwila, Parks and Recreation Department 2. Address and Phone Number of Proponent: 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1843 3. Date Checklist Submitted: �t�e__ d/1ry 4. Agency Requiring Checklist: City of Tukwila, Planning Division 5. Name of Proposal, if applicable: Christensen Greenbelt Park Phase III 6. Nature and Brief Description of the Proposal (including but not limited to its size, general design elements, and other factors that will give an accurate understanding of its scope and nature): Extension of the Christensen Greenbelt pedestrian /bicycle trail. Project includes approximately 7,980 lineal feet of asphalt trail, signage, bollards, retaining walls and landscaping. 7. Location of Proposal (describe the physical setting of the proposal, as well as the extent of the land area affected by any environmental im- pacts, including any other information needed to give an accurate under- standing of the environmental setting of the proposal): The project is located along the west bank of the Green River between S. 180th and the river. An existing bridge located south of S. 180th provides access across the river. The project continues along the east side of the river to the City of Tukwila south boundary line.(approx 1.5 miles) 8. Estimated Date for Completion of the Proposal: September 1984 9. List of all Permits, Licenses or Government Approvals Required for the Proposal (federal, state and local): (a) Rezone, conditional use,1shoreline permit, (b) King County Hydraulics Permit (c) Building permit etc. YES X NO YES x NO YES NO X (d) Puget Sound Air Pollution Control Permit (e) Sewer hook up permit (f) Sign permit (g) Water hook up permit (h) Storm water system permit (i) Curb cut permit (j) Electrical permit (State of Washington) (k) Plumbing permit (King County) (1) Other: YES NO X YES NO X YES NO X YES NO X YES NO X YES NO X YES NO X YES NO X 10. Do you have any plans for future additions, expansion, or futher activity related to or connected with this proposal? If yes, explain: Recreational opportunities within the existing Christensen Greenbelt Park may be expanded at a later date. 11. Do you know of any plans by others which may affect the property covered by your proposal? If yes, explain: Yes, future agreements between King County and the City of Tukwila may require dike improvements. The proposed trail is located on top of this dike. The flood control permit will cover this work. 12. Attach any other application form that has been completed regarding the pro- posal; if none has been completed, but is expected to be filed at some future date, describe the nature of such application -form: N/A II. ENVIRONMENTAL IMPACTS (Explanations of all "yes" and "maybe" answers are required) 1. Earth. Will the proposal result in: (a) Unstable earth conditions or in changes in geologic substructures? air YES MAYBE NO (b) Disruptions, displacements, compaction or overcover- ing of the soil? X (c) Change in topography or ground surface relief fea- tures? x (d) The destruction, covering or modification of any unique geologic or physical features? X X • • YES MAYBE NO (e) Any increase in wind or water erosion of soils, either on or off the site? X (f) Changes in deposition or erosion of beach sands, or changes in siltation, deposition or erosion which may modify the channel of a river or stream or the bed of the ocean or any bay, inlet or lake? Explanation: The proposed 8' wide trail will consist of an impervious asphalt surface. Minimal grading will occur to provide a level sub base for the trail. The existing elevation of the dike will be raised in several locations to a minimum of 2' to meet freeboard standards. 2. Air. Will the proposal result in: (a) Air emissions or deterioration of ambient air quality? (b) The creation of objectionable odors? (c) Alteration of air movement, moisture or temperature, or any change in climate, either locally or regionally? Explanation: 3. Water. Will the proposal result in: (a) Changes in currents, or the course or direction of water movements, in either marine or fresh waters? (b) Changes in absorption rates, drainage patterns, or the rate and amount of surface water runoff? X (c) Alterations to the course or flow of flood waters? (d) Change in the amount of surface water in any water - body? (e) Discharge into surface waters, or in any alteration of surface water quality, including but not limited to temperature, dissolved oxygen or turbidity? (f) Alteration of the direction or rate of flow of ground waters? (g) Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations? X X X X X • • (h) Deterioration in ground water quality, either through direct injection, or through the seepage of leachate, phosphates, detergents, waterborne virus or bacteria, or other substances into the . ground waters? YES MAYBE NO (i) Reduction in the amount of water otherwise avail- able for public water supplies? Explanation: The proposed 8 foot wide asphalt trail will insignificantly increase the rate of surface water runoff. This amount of runoff will be absorbed by the vegetated trail shoulders as opposed to the current situation of loose gravel and rock. 4. Flora. . Will the proposal result in: (a) Change in the diversity of species, or numbers of any species of flora (including trees, shrubs, grass, crops, microflora and aquatic plants)? (b) Reduction of the numbers of any unique, rare or endangered species of flora? (c) Introduction of new species of flora into an area, or in a barrier to the normal replenishment of existing species? (d) Reduction in acreage of any agricultural crop? X X X X Explanation: The existing riverbank understory shrubs and grasses will be removed along the trail. Disturbed planting areas located adjacent to the trail will be replaced with natural erosion control seed and domestic shade tree species. 5. Fauna. Will the proposal result in: (a) Changes in the diversity of species, or numbers of any species of fauna (birds, land animals including reptiles, fish and shellfish, benthic organisms, insects or microfauna)? X (b) Reduction of the numbers of any unique, rare or endangered species of fauna? X (c) Introduction of new species of fauna into an area, or result in a barrier to the migration or movement of fauna? X (d) Deterioration to existing fish or wildlife habitat? X Explanation:. • • YES MAYBE NO . Noise. Will the proposal increase existing noise levels? X Explanation: 7. Light and Glare. Will the proposal produce new light or glare? X Explanation: 8. Land Use. Will the proposal result in the altera- tion of the present or planned land use of an area? Explanation: 9. Natural Resources. Will the proposal result in: (a) Increase in the rate of use of any natural resources? (b) Depletion of any nonrenewable natural resource? Explanation: 10. Risk of Upset. Does the proposal involve a risk of an explosion or the release of hazardous substances (including, but not limited to, oil, pesticides, chemicals or radi- ation) in the event of an accident or upset conditions? Explanation: X X X 11. Population. Explanation: • • Will the proposal alter the location, distribution, density, or growth rate of the human population of an area? 12. Housing. Will the proposal affect existing housing, or create a demand for additional housing? Explanation: YES MAYBE NO X X 13. Transportation /Circulation. Will the proposal result in: (a) Generation of additional vehicular movement? X (b) Effects on existing parking facilities, or demand for new parking? X (c) Impact upon existing transportation systems? X . (d) Alterations to present patterns of'circulation or movement of people and /or goods? X (e) Alterations to waterborne, rail or air traffic? X (f) Increase in traffic hazards to motor vehicles, bicyclists or pedestrians? Explanation: Increase in Christensen Greenbelt Park users could increase the demand for parking. There is an existing parking lot located off of Interurban Avenue that accommodates 10 cars. 14. Public Services. Will the proposal have an effect upon, or result in a need for new or altered governmental services in any of the following areas: (a) Fire protection? (b) Police protection? (c) Schools? (d) Parks or other recreational facilities? (e) Maintenance of public facilities, including roads? X X X X X • • (f) Other governmental services? YES MAYBE NO X Explanation: The development of Christensen Phase III may increase the demand for police protection. The addition of this trail may increase the Parks Department Maintenance activities. 15. Energy. Will the proposal result in: (a) Use of substantial amounts of fuel or energy? (b) Demand upon existing sources of energy, or require the development of new sources of energy? Explanation: X 16. Utilities. Will the proposal result in a need for new systems, or alterations to the following utilities: (a) Power or natural gas? X (b) Communications systems? X (c) Water? X (d) Sewer or septic tanks? X (e) Storm water drainage? X (f) Solid waste and disposal? X Explanation: 17. Human Health. Will the proposal result in the crea- tion of any health hazard or potential health hazard (excluding mental" health)? Explanation: X • • 18. Aesthetics. Will the proposal result in the obstruc- tion of any scenic vista or view open to the public, or will the proposal result in the creation of an aesthetically of- fensive site open to public view? Explanation: 19. Recreation. Will the proposal result in an impact upon the quality or quantity of exist- ing recreational opportunities? YES MAYBE NO 1 Explanation: The addition of Christensen Greenbelt Park Phase III will increase the recreational opportunity along the Green River. Additional recreational use will occur along the existing Christensen Greenbelt Phases I and II. 20. Archeological /Histroical. Will the proposal result in an alteration of a signifi- cant archeological or his- torical site, structure, object or building? Explanation: CERTIFICATION BY APPLICANT: I, the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaration of non - significance that it might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of full disclosure on my part. Signature and Title Date X X CITY OF TUfILA Central Permit stem MASTER LAND DEVELOPMENT APPLICATION FORM PLEASE WRITE .ACCEPTED FOR Ifl - 7.2/49 li;11 Dk-.3-54/ FEB 28 1984 CITY. LEGIBLY �R TYPE ALL. REQUESTED -.1-14F811:14ta U4121-LAPETE APPLICATIONS WILL. NOT BE PROCESSING. SECTION I: GENERAL. DATA TYPE OF APPLICATION: pesip DoJ1T SUBDIVISION SHORELINE PLAT PERMIT PRD 0 PMUD.: BAR 1 NTERUrREIAI 0 CONDITIONAL OUNCLASS. 0 VARIANCE OCHG. OF riCOMM PLAN USE USE ZONING LJAMENOMENT 1) APPLICANT: NAME City of Tukwila-Parks & Recreation TELEPHONE ( 206) ADDRESS 6200 Southcenter Blvd, Tukwila, WA ZIP NAME See Legal Description Exhibit B TELEPHONE ( ) ADDRESS Same as above N/A PROJECT LOCATION: (STREET ADDRESS, GEOGRAPHIC, UM/Mak:M) The project 2) 3) PROP. OWNER: 433-1843 98188 Same ZIP Same is located along the west bank of the Green River between S. 180th & the.river. An existing south ot 180th._providetTacces.vaertss.the river.,,.The:project-continuesi side of the.river to the. City ot Tukwila's south boundary line. -SEE EXH1B1 SECTION II:, PROJECT INFORMATION Construct an extension of 'an-8! wide pedestrian 4) ,.DESCRIBE BRIEFLY THE PROJECT YCA) PROPOSE_ bicycle trail. approximately.1.5 miles in length PrOjedt elements indlude an asphalt trail, bollards,, signage, retaining walls & landscaping -5.):-ANTICIPATED PERIOD:OF cousTRucTioN: FROM - June 1984 To September 1984 6) W I LL. PROJECT BE DEVELOPED I N PHASES? YES El NO I F YES • DESCR I BE bridge located along.theYeast T A. , • • 74..P.ROJECT.STATISTICS.._ • . .A) ACREAGE OF PROJECT SITE B.). FLOORS OF CONSTRUCTION: • - 8) . - C1 SITE UTILIZATION:.-"- ZON I NG DES I GNAT I Ofsl COMP . PLAN DESIGNATION BUILDING FOOTPRINT AREA LANDSCAPE. AREA PAVING AREA , TOTAL PARK' NG STALLS : - STANDARD S ZE - COMPACT SIZE - HAND I CAPPED S I ZE. TOTAL LOAD I NG SPACES • • -• NET 5.5 acres GROSS 5.5 acres EASEMENTS-See Exhibit B TOTAL # moms N/A I NCLUDES BASEMENT MEZZAI4 I NE TOTAL GROss N/A • I NCLUDES : BASEMENT MEZZAPAI I NE FLOOR AREA - .EXISTING PROPOSED C-M/M-1 C-M/M-1 See Exhibit E parks, &open sapce. same. N/A o N/A o N/A o 30,000 SF° erosion control N/A o 7,980 LF o of an 8' wide trail 10 • 0 N/A A/A AVER.SLOPE OF.PARKING AREA.. N/A N/A AVER: SLOPE OF SITE :less than 2% Same Slope of site will not change . . :IS THIS SITE DESIGNATEDPORSPECIALCONSIDERATION See Exhibit D for location MAP? -El YES 0 NO ON THE CITY'S ENVIRONMENTAL"BASE SECTION 1I1:' APPLICANT'S AFFIDAVIT Gary L. Van Dusen, Mayor , BEING DULY SWORN, DECLAHE THAT : AM TKE CONTRACT PURCHASER OR OWNER OF THE PROPERTY INVOLVED IN THIS APPLICATION AND THAT THE FORE- GOING STATEMENTS AND ANSWERS HEREIN CONTAINED AND THE INFORMATION HER ITH SUBMITTED ARE IN ALL RESPECTS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE DATE 1/28/84 SUBSCRIBED AND SWORN BEFORE ME THIS 28th DAY OF February , 19 84 ;" . • I!: 0:—.4L- .".../4 T .R PUBLIC 1AND FOR THE STATE OF WASHINGTON Tukwila. RESIDING AT Alo E •F CONTRACT PURCHASER OR OWNER)