HomeMy WebLinkAboutSEPA EPIC-23-87 - CITY OF TUKWILA / PARKS AND RECREATION - FOSTER GOLF COURSE MAINTENANCE FACILITYFOSTER GOLF COURSE
MAINTENANCE FACILITY
OFFICE & EQUIPMENT
STORAGE SPACE
13900 INTERURBAN AVE. S.
EPIC -23 -87
40" City of Tukwila
PLANNING DEPARTMENT
?6200 Southcenter Boulevard
Tukwila, Washington 98188
(206) 433 -1849
/908 •
TO STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
ADDRESS ENVIRONMENTAL REVIEW
MAIL STOP PV -11
OLYMPIA, WA 98504
ATTENTION KAREN BEATTY
DATE OCTOBER 19, 1987
REGARDING FOSTER GOLF COURSE - EPIC -23 -87
HALVORSEN /LINDELL - EPIC -24 -87
PARKING LOT 3E+ ST IIS)
EPIC 25-87
WE ARE SENDING YOU THE FOLLOWING
Attached Q Under separate cover
COPIES DESCRIPTION
3 DFCIARATTON nF NnN5TGNTFICANCE THESE ARE TRANSMITTED
3 FNVTRONMFNTAI rNECK]TSTS Q For approval
Q For review and comment
XQ( For your use and information
Q As requested
Q Other
COMMENTS ENCLOSED PLEASE FIND ENCLOSED .31 DNiSiAFNVTQfNMFNTAI curio I$TS.FoQ THE
ABOVE NAMED PROJECTLSL_
SHOULD YOU HAVE ANY QIIFSTTONS nR fFSTRF ANY FURTHER IDIFORMATION,
P1 FASF CAI 1 AT 433 -1R4Q_
SIGNED
JOANNE JOHNSON
(23 /P4.LTRANS)
AFFIDAVIT
I, JOANNE JOHNSON
J Notice of Public Hearing
[( Notice of Public Meeting
[� Board of Adjustment Agenda Packet
J Board of Appeals Agenda Packet
0 Planning Commission Agenda Packet
J Short Subdivision Agenda Packet
O Notice of Application for
Shoreline Management Permit
El Shoreline Management Permit
OF DISTRIBUTION
hereby declare that:
X Xr
Determination of Nonsignificance
Q Mitigated Determination of Non -
significance
O Determination of Significance
and Scoping Notice
Q Notice of Action
[� Official Notice
[[ Other
[[ Other
was mailed to each of the following addresses on OCTOBER 19, 1987 , 19 .
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
ENVIRONMENTAL REVIEW
MAIL STOP PV -11
OLYMPIA, WA 98504
ATTN: KAREN BETTY
Name of Project
File Number
Fp /C— c,23
WAC 197 -11 -970
DETERMINATION OF NONSIGNIFICANCE
Description of Proposal FOSTER GOLF COURSE MANTENANCE FACILITY
Proponent
CITY OF TUKWILA PARKS DEPARTMENT
Location of Proposal, including street address, if any SOUTHWEST CORNER OF
FOSTER GOLF COURSE APPROXIMATELY 300 FEET EAST OF INTERURBAN AVENUE SOUTH.
ADDRESS: 13900 INTERURBAN AVENUE SOUTH
Lead Agency: City of Tukwila File No. EPIC-23-87
The lead agency for this proposal has determined that it does not have a probable
significant adverse impact on the environment. An environmental impact statement
(EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after
review of a completed environmental checklist and other information on file with the
lead agency. This information is available to the public on request.
There is no comment period for this DNS
[[ This DNS is issued under 197 -11- 340(2). Comments must be submitted by
. The lead agency will not act on this
proposal for 15 days from the date below.
Responsible Official Rick Beeler
Position /Title
Address 6200 Southcenter Boulevard, Tuktra 98188
Date Signature
Planning Director
Phone 433 -1845
You may appeal this determination to the City Clerk at City Hall, 6200 Southcenter
Boulevard, Tukwila, WA 98188 no later than 10 days from the above date by written
appeal stating the basis of the appeal for specific factual objections. You may be
required to bear some of the expenses for an appeal.
Copies of the procedures for SEPA appeals are available with the City Clerk and
Planning Department.
FM.DNS
CITY OF TUKWILA CN
CENTRAL PERMIT SYSTEM
ENVIRONMENTAL REVIEW ROUTING FORM:
EPIC - 23 -67
FILE i31-/v -L-
TO: n BLDG n PLNG n P.W. n FIRE n POLICE n P & R
PROJECT Tv,fk -t' yo/6 Cov.,j e /Ytfifr,% 14rrCe 7wc: /,/
LOCATION 1-'1k/ yor Covife FILE NO. 97-/O -.
DATE TRANSMITTED /o/4„/87 RESPONSE REQUESTED BY /0///2/6'7
STAFF COORDINATOR Re6ec6a_ RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT
DATE 7.0 2-1e7•
COMMENTS PREPARED BY 42,1e-
C.P.S. Form 11
CITY OF TUKWILA
CENTRAL PERMIT SYSTEM
CN
EPIC" 23-67
FILE .53 "7- /v -
ENVIRONMENTAL REVIEW ROUTING FORM:
TO: [j BLDG [j PLNG ,l./ 1 P.W. FIRE n POLICE n P & R
� /l
PROJECT
I%7°`6 Co tf /Pr ks -7 (t. w Li/iy/
FILE NO. 97- /o -tee
LOCATION /fk/ yo1, Cou fe
DATE TRANSMITTED ,o/4, % 7
STAFF COORDINATOR ReheceA
RESPONSE REQUESTED BY /0/ /2 /97
RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT
DATE /p /Jp.
dry
COMMENTS PREPARED BY vr._..
C.P.S. Form 11
• CITY OF TUKWILA CN
CENTRAL PERMIT SYSTEM EPIC- 23-67
FILE X31 -fo -
ENVIRONMENTAL REVIEW ROUTING FORM:
TO: n BLDG n PLNG n P.W. n FIRE ri POLICE [j P & R
PROJECT yo /6 Co ✓T,j e /• /f r? kcrtafr1 aG, r /
LOCATION iskt 7o/, Cod/,re FILE NO. 87-/0 -e
DATE TRANSMITTED /0/% %7 RESPONSE REQUESTED BY /0 /z/d7
STAFF COORDINATOR Re6ecc,. /x RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMEN
DATE
COMMENTS PREPARED BY
C.P.S. Form 11
CITY OF TUKWILA CN
CENTRAL PERMIT SYSTEM EPIC— 23-67
FILE ?I- /v -fx_
ENVIRONMENTAL REVIEW ROUTING FORM:
TO: [j BLDG 1J PLNG [] P.W. ri FIRE 0 POLICE n P & R
PROJECT 766 Cov,f'e /'f 7 kptan [z. 7WC4 / y
LOCATION Tsk' for CO r//fe' FILE NO. 97- /o
DATE TRANSMITTED /0/(0/57 RESPONSE REQUESTED BY /042 f6'%
STAFF COORDINATOR ,'ef ecc4 ? x RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT
�o car,Ir
DATE ( (/ 3 D/-G-)
COMMENTS PREPARED BY
C.P.S. Form 11
CITY OF TUKWILA
CENTRAL PERMIT SYSTEM
CN
EPIC- 2i -67
FILE i31 -/v -/.
ENVIRONMENTAL REVIEW ROUTING FORM:
TO: n BLDG PLNG [] P.W. [ FIRE ri POLICE n P & R
PROJECT 7o /6 Coal• e �7'lf��rkYraoce
LOCATION ifk 7or Cov /fe FILE NO. 97-10 -.e
DATE TRANSMITTED /0/4 %7 RESPONSE REQUESTED BY leViZ fv'%
STAFF COORDINATOR Rehecc'g. / c RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
'CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT
/ A Fi ;A ,Qeitiff'nvle.'t, eP"r✓►i ! iC- ee$'lk -ed tCr
ro u) 57; r 5. (/ )v)
DATE COMMENTS PREPARED BY
C.P.S. Form 11
A. BACKGROUND
Control No.
Epic File No.
Fee $100.00 Receipt No. 9T7
ENVIRONMENTAL CHECKLIST
►1' AIIANN �.L>u
or ru tfr
1. Name of proposed project, if applicable:
2. Name of applicant:
3. Address
.f •
and phone number of applicant and contact person: x765( UNIVt/?1`(Ill'r
OS'— i.: • ilk, V
11 _
4. Date checklist prepared: • -?.4631 /'"1
5. Agency requesting Checklist:
City of Tukwila
6. Proposed timin. or schedule (including phasing, if applicable):
J. 6.0 #1-1 0
t'
J
7. Do you have any plans for future additions, expansion, or further activity
related to or connected with this proposal? If yes, explain. 1■1161j
8. List any environmental information you know about that has been prepared, or will
be prepared, directly related to this roposal.
IiirCa14,4110/1 AS f -to /fir U 1 ti t /1���'
Arplie„A n s0 tauG A 1�
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes,
explain.
10. List any government approvals or permits that will be needed for your proposal.
11. Give brief, complete description of your proposal, including the proposed use
and the size of the project and site. There are several questions later in thi.
checklist that ask you to describe certain aspects of your proposal. You do no.
need to repeat those answers on this page. Section E requires a complete
. description of the objectives and alternatives of your proposal and should not be
summarized here.
'ub tqv - 4 A c -'1'L•v1.1
•CAr49 �IL A - 1-u ! 1 r* -
C / A•1 %(.. -� -� _ �� �. • 11.4'm,JAIJcm
r44 d?7
- q. ar [1) tJ OE- r- .
12. Location of the proposal. Give sufficient information for a person to understand
the precise location of your proposed project, including a street address, if
any, and section, township, and range, if known. If a proposal would occur over
a range of area, provide the range or boundaries of the site(s). Provide a legal
description, site plan, vicinity map, and topographic map, if reasonably
available. While you should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any permit applica-
tions related to this checklist.
_ i U 1ztS�.rJ
...
ZG�l. uM 3$� i1 ��• i,-r rJ
. t_. W 5r t r71.& - - meEws tyro uR AL Altos'.
13. Does the proposal lie within an area designated on the City's Comprehensive Land
Use Policy Plan Map as environmentally sensitive?
No
TO BE COMPLETED BY APPLICANT
B. ENVIRONMENTAL ELEMENTS
1. Earth
a. General description of the site (circle one):`.
rolling, hilly, steep slopes, mountainous, other
b. What is the steepest slope on the site (approximate
percent slope)? /2
c. What general types of soils are found on the site
(for example, clay, sand, gravel, peat, muck)? If
you know the classification of agricultural soils,
specify them and note any prime farmland.
d. Are there surface indications or history of unstable
soils in the immediate vicinity? If so, describe.
e. Describe the purpose, type, and approximate quanti-
ties of any filling or grading proposed. Indicate
source of fill.
l3
_ _ /L !/
as L .i/
f. Could erosion occur as a result of clearing,
construction, or use? If so, generally describe.
r-o ii Gd l ol.S
rripur 150-,c2s1 AO ea) pooject-
g. About what percent of the site will be covered with
impervious surfaces after project construction (for
example, asphalt or buildings)? :
r
t' o(t''i WI u. to
kt.__LAd UI auS su m
Evaluation for
Agency Use Only
Evaluation for
Agency Use Only
h. Proposed measures to reduce or control erosion, or
other impacts to the earth, if any: cja/J -
Goufizoc. 61J10a -01J Iu .ej ,ar/oIJ
drvtA4 • - LIJOhci -OrAi AW2
2. Air
• _ Ji :'. . !L — • .
a. What types of emissions to the
the proposal (i.e., dust,
industrial wood smoke) during
the project is completed?
describe and give approximate
11- , 0
air would result from
automobile odors,
construction and when
If any, generally
quantities if known.
IJG�_Uj lIJ5r
b. Are there any off -site sources of emissions or odor
that may affect your proposal? If so, generally
describe. 1,(j
c. Proposed measures to reduce or control emissions or
other impacts to air, if any: 15u1142
Wjc.Q
li-Y�I Uro
ra U L- 1-1 461740, 1=1M65 WILL. 130 015s74,,4'm7
3. Water
a.
Surface:
1) Is there any surface water body on or in the
immediate vicinity of the site (including year -
round and seasonal streams, saltwater, lakes,
ponds, wetlands)? If yes, describe type and
provide names. If appropriate, state what
s eam or river it flows into.
U WA M
2) Will the project require any work over, in, or
adjacent to (within 200 feet) the described
waters? If yes, phase describe and attach
available plans. N
3) Estimate the amount of fill and dredge material
that would be placed in or removed from surface
water or wetlands and indicate the area of the
site that would be affected. Indicate the
source of fill material. Nolier
4) Will the proposal require surface water
withdrawals or diversions? Give general
description, purpose and approximate quan-
tities, if known.
5) Does the proposal lie within a 100 -year
floodplain? If so, note location on the site
p1 an.
►�Fs c,vItl ` tK1.
# L?AflnN 1s s-
o pL off- 443,6•u-
/00 %Maiz. aarr PtAI /.l
6) Does the proposal involve any discharges of
waste materials to surface waters? If so,
describe the type of waste and anticipated
volume of discharge. h]()
Evaluation for
Agency Use Only
Evaluation for
Agency Use Only
b. Ground:
1) Will ground water be withdrawn, or will water be
discharged to ground water? Give general
description, purpose and approximate quan-
tities, if known.
2) Describe waste materials that will be discharged
into the ground from septic tanks or other sour-
ces, if any (for example: Domestic sewage;
industrial, containing the following
chemicals...; agricultural; etc.) Describe the
general size of the system, the number of such
systems, the number of houses to be served (if
applicable), or the number of animals or humans .
the system(s) are expected to serve.
c. Water Runoff (including storm water):
1) Describe the source of runoff (including storm
water) and method of collection and disposal, if
any (include quantities, if known). Where will
this water flow? Will this water flow into
other waters? If so, describe.
•f:./ t.L
10 bpit vf5
_ -- _- s Aar, cep- 4
u4Jo ,e-1- P I LSLA
113444 07 A 1(
2raq U S 1 L (U.,. ee2P SSG "jam
Ad nat./ U tz _� t L
gogi,e)11�C xoi o skin y
ut
Evaluation for
Agency Use Only
2) Could waste materials enter ground or surface
waters? If so, generally describe.
d. Proposed measures to reduce or control surface,
ground, and runoff water impacts, if any:
`3 U�1'�7�-ZUIJC� •
4. Plants
a. Check or circle types of vegetation found on the
site:
_ deciduous tree: alder, maple, aspen, other
_ evergreen tree: fir, cedar, pine, other 1
shrubs S Pte+
grass �al.�
_ pasture
crop or grain '�
_ wet soil plants: cattail, buttercup, bullrush,
skunk cabbage, other
_ water plants: water lily, eelgrass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed
or altered?
c. List threatened or endangered species known to be on
or near the site.
d. Proposed landscaping, use of native plants, or other,
measures to preserve or enhance vegetation on the
site, if any: re5t U/It_t_
_(..601-1W1-4— IP 1114 (1 ni/&.
5. Animals
a. Circle any birds and animals which have been
observed on or near the site or are known to be on
or near the site:
birds:
eagle,
songbirds
other:
mammals: deer, bear, elk, beaver, other:
fish: bass, 41mon rou herring, shellfish,
other:
b. List any threatened or endangered species known to
be on or near the site.
c. Is the site part of a migration route? If so,
explain.
d. Proposed measures to preserve or enhance wildlife,
if any:
MtN014 Urn
Evaluation for
Agency Use Only
Evaluation for
Agency Use Only
6. Energy and Natural Resources
a. What kinds of energy .electric,, natural gas oil,
wood stove, solor) wi •e use o meet the
completed project's energy needs? Describe whether
it will be used for heattiinng, manufacturing, etc.
(l'—i' FOIATi
• peFutzeot_.
b. Would your project affect the potential use of solar
energy by adjacent properties? If so, generally
describe.
c. What kinds of energy conservation features are
included in the plans of this proposal? List other
proposed measures to reduce or control energy
impacts, if any:
l ALL)
0657 dJ WORM eP P3
7. Environmental Health
a. Are there any environmental health hazards,
including exposure to toxic chemicals, risk of fire
and explosion, spill, or hazardous waste, that could
occur as a result of this proposal? If
describe.
so,
Tc z. izr7,141
i s I Sot -
1
1) Describe special emergency services that might
be required. 0
s 45gs
2) Proposed measures to reduce or control environ-
mental health hazards, if any: _ '( Sf1
Gull t� t Ldly173l .
Wi4J e5.44) 15.40/7709...)/
-10-
b. Noise
Evaluation for
Agency Use Only
1) What types of noise exist in the area which may
affect your project (for example: traffic,
equipm nt, operation, other)?
2) What types and levels of noise would be created
by or associated with the project on a short -
term or a long -term basis (for example: traf-
fic, construction, operation, other)? Indicate
what hours noise would come from the site.
lr else c71 4
/1141 r747fl J 14 itles — 1Vi &VIP)
IJAMc N.)6 , /�rq)�12CSSo1Z . pU z. nj6 Pa^ .rp
fertin IJAINbf•)LDW t►dlse l.f S — 011_ 1 rv4
3) Proposed measures to reduce or control noise
impacts, if any:
Most- 4ct►vt t i6' c� I s
W l LL- fve Hod snen ids fits Bt4P6y
8. Land and Shoreline Use
a. What is the current use of the site and adjacent
properties? s1- h
b. Has the site been used for agriculture? If so,
describe.
c. Describe any structures on the site.
� IJJ0 eLtAPHOUSW t .
Evaluation for
Agency Use Only
d. Will any structures be demolished? If so, what?
e. What is the current zoning classification of the
site ?_ .-•� It D14-t�/,Y.�C___
f. What is the current comprehensive plan designation
of the site? c01%.4J 114C.
g. If applicable, what is the current horeline master
program designation of the site? f4/4
h. Has any part of the site been classified as an
"environmentally sensitive" area? If so, specify.
i. Approximately how many people would reside or work
in the completed project? G4--� 02A �'�
15— ZO PURAIJ o C�7�� S sQN
Approximately how many people would the completed
project displace?�
•
k. Proposed measures to avoid or reduce displacement
pac. ts if any:
1. Proposed measures to ensure the proposal is com-
patible with existing and projected land uses and
plans, if any:
rriez_)-r. (mu, GoMpLj- wi
jest use
-12-
9. Housing
a. Approximately how many units would be provided, if
any? Indicate whether high, middle, or low - income
housing?
J
b. Approximately how many units, if any, would be eli-
minated? Indicate whether high, middle, or low -
Ire housing.
‘,
c. Proposed measures to reduce or control housing
impacts, if any:
JgoLLIG
10. Aesthetics
a. What is the tallest height of any proposed
structure(s), not including antennas; what is the
principal exterior building material(s) proposed?
b. What views in the immediate vicinity would be
altered or obstructed?
ONE
c. Proposed measures to reduce or control aesthetic
impacts, if any:
IN
IMp/�GTO� - rT7
st4r -gou 1uh,1.6
Evaluation for
Agency Use Only
11. Light and Glare
Evaluation for
Agency Use Only
a. What type of light or glare will the proposal
produce? What time of day would it mainly occur?
14
"1 4L— LI �1 rwG? gf 4;444'
1Af tom CNl
liffizawrieAnYiller
b. Could light or glare from the finished project be a
safety hazard or interfere with views?
1`/O
c. What existing off -site sources of light or glare may
affect your proposal?
KlopE
d. Proposed measures to reduce or control light and
glare impacts, if any:=�
r r .-1' Wain"
sUi �/9i1 Ko j t
12. Recreation
a. What designed and informal recreational oppor-
tunities are in the immediate vicinity?
Ii i IS
b. Would the proposed project displace any existing .
recreational uses? If so, describe.
c. Proposed measures to reduce or control impacts on
recreation, including recreation opportunities to be
provided by the project or applicant, if any:
-14-
Evaluation for
Agency Use Only
13. Historic and Cultural Preservation
a. Are there any places or objects listed on, or pro-
posed for, national, state, or local preservation
registers known to be on or next to the site? If
so, generally describe.
0
b. Generally describe any landmarks or evidence of
historic, archaeological, scientific, or cultural
importance known to be on or next to the site.
c. Proposed measures to reduce or control impacts, if
any:
14. Transportation
a. Identify public streets and highways serving the
site, and describe proposed accss to the existing
street system. Show on site plans, if any.
V . S'--- f1 cum,
Li 1 E _L ;G
b. Is the site currently served by public transit? If
not, what is the approximate distance to the nearest
transit stop? ''
c. How many parking spaces would the completed project
have? How many would the project eliminate?
Evaluation for
Agency Use Only
d. Will the proposal require any new roads or streets,
or improvements to existing roads or streets, not
including driveways? If so, generally describe
(indicate whether public or private).
�.�o
e. Will the project use (or occur in the immediate
vicinity of) water, rail, or air transportation? If
so, generally describe.
f. How many vehicular trips per day would be generated
by the completed project? If known, indicate when
peak volumes would occur.
IL lx
g. Proposed measures to reduce or control transpor-
tation �impacts, if any:
15. Public Services
a. Would the project result in an increased need for
public services (for example: fire protection,
police protection, health care, schools, other)? If
so, generally describe.
b. Proposed measures to reduce or control direct
imilLon public services, if any.
Evaluation for
Agency Use Only
16. Utilities
a. Circle utilities" currently available at the site:
�ec�ric�t atural ! . a er,) " efuse service)
e ep one anitary sewer, s , other.
b. Describe the utilities that are proposed for the
project, the utility providing the service, and the
general construction activities on the site or in
the immediate vicinity which might be needed.
_ ice_ Pv��' �r 1 -�___ ►� -{fit
v PH-cue-
c'r'c 1uckik
C. Signature
The above answers are true and complete to the b -st of
my knowledge. I understand that the le .. ag cy is
relying on them to make its dec'si
Signature:
Date Submitted:
PLEASE CONTINUE TO THE NEXT PAGE.