Loading...
HomeMy WebLinkAboutSEPA EPIC-233-84 - SEATTLE RENDERING - UNCLASSIFIED USE PERMITSEATTLE RENDERING 5795 S 130' PLACE EPIC - 233 -84 WAC 197 -11 -1350 DECLARATION'OF NONSIGNIFICANCE Description of proposal Unclassified Use Permit Proponent Seattle Rendering Location of proposal 5795 S. 130th P1. Lead Agency City of Tukwila File No. EPIC - 233 -84 This proposal has been determined not to have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review by the lead agency of, a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. There is no comment period for this DNS. Responsible official Brad Collins Position /title Planning Director Address and phone 6200 Southcenter Blvd., Tukwila, WA 98188 433 -1845 Date 5= IC-kV Signature This declaration is conditioned upon approval of the septic tank and drainfield system by the King County Health Department. To • • From • • Vc. Speed Message Subjectt Pc b(2 P t1■)Li \ \E1Yrs Date .44 f t o ,19 g5.4 MeN - ' 4t cumtvtissicv ice--e\o, ()› Necsv r2Q- 1►ia ...� j +r[ i i I 1 jY. �rrl t1 r -4/4 tie 7 I f) j vrf PL D t t u I,ii,m -r / -707 igned �""" WilsonJones GRAYLINE FORM 44-900 ART 01983• PRINTED IN U.S • Seattle, . RENDERING "WORKS, Inc. • May 23, 1984 Tukwila Planning Commission 6200 Southcenter Boulevard Tukwila, WA 98188 Dear Mr. Rick Beeler: In regards to the question of attaching the proposed building to the existing septic system, we at Seattle Rendering have retained Central Engineers, Inc. 201 S. Division, Suite A, Auburn, WA 98001, to study and plan this project. The engineer in charge is Mr. Chuck Bull and he can be reached at 941 -2750 for any questions. The King County Health Department has also been advised, and we are taking the necessary steps to comply with the health code. The inspector that we have contacted is Mrs. Liz Kvest. Her office hours are 7:30am - 9:OOam and she can be reached at 228 -2620 Monday - Friday. If you wish any further information, please advise. Sincerely, Seattle Rendering Works, Inc. Charlie Frame Representative 5795 S. 130th PLACE • SEATTLE, WA 98178 P. 0. BOX 58368 • SEATTLE, WA 98188 (206) 243 -7387 U L Vim.._._..... , ... . MAY 231984 CITY OP `i i✓;:'v °1 ";�,� PLANNING DEPT. '43.21C.075 . Tit3 RCW: State Government Executii party seeking review to pay for additional portions of the written transcript. (c) Judicial review under this chapter shall without exception be of the governmental action together with,its acconwznying environmental determinations. (7) Jurisdiction over the review of determinations un- der this chapter in an appeal before an agency or supe- rior court shall upon consent of the parties be transferred in whole or part to the shorelines hearings board. The shorelines hearings board shall hear the matter and sign the final order expeditiously. The supe- rior court shall certify the final order of the shorelines hearings board and said certified final order may only be appealed to an appellate court. '(8) For purposes of this section and RCW 43.21C- .080, the words "action ", "decision ", and "determina- tion" mean substantive agency action .including any accompanying procedural determinations under this chapter (except where the word "action" means "ap- peal' in RCW 43.21C.080(2) and (3)). The word "ac- tion in this section and RCW 43.21C.080•does not mean a procedural determination by itself made under this chapter. The word "determination" includes any en- : vironmental document required by this chapter and state or local implementing rules. The word "agency" refers to any state or local unit of government. The word "ap- peal' refers to administrative, legislative, or judicial appeals. (9) The court in its discretion may award reasonable attorney's fees of up to one thousand dollars in the ag- gregate to the prevailing party, including a governmental agency, on issues arising out of this chapter if the court makes specific findings that the legal position of a party is frivolous and without reasonable basis. [1983 c 117 § 4.) = -- ::.. Notice .: of action by governmental agency How publicized Form Time limita- tion for commencing challenge to action. (1) Notice of any action taken by a governmental agency may be publicized by the acting governmental agency, the appli- cant for, or the proponent of such action, in substantially the form as set forth in subsection (3) of this section and in the following manner: • • .(a) By publishing notice on.•the same day of each week for two consecutive weeks in a legal newspaper of general circulation in the area where the property which is the subject of the action is located; (b). By filing notice of such action .with the depart- ment of ecology at its main- office in Olympia prior to the date of the last newspaper publication; and (c) Except for those actions which are of a nonproject nature, by one of the following methods which shall be accomplished prior to . the date of last newspaper publication; (i) Mailing to the latest recorded real property own- ers. as shown by the records of the county treasurer, who share a common boundary line with the property upon which the project is proposed through United States mail, first class, postage prepaid. [Title 43 RCW—p )02) (ii) Posting of the notice in a conspicuous manner on the property upon which the project is to be constructed, •(2) (a) Any action to set aside, enjoin, review, or otherwise challenge any such governmental action for which notice is given as provided in subsection (1) of this section on grounds of noncompliance with the provi- sions of this chapter shall be commenced within thirty days from the date of last newspaper publication of the notice pursuant to subsection (1) of this section, or be barred: Provided, however, That the time period within which an action shall be commenced shall be ninety days (1) for projects to be performed by a governmental agency or to be performed under government contract, or (ii) for thermal power plant projects: Provided fur- ther, That any subsequent governmental action on the proposal for which notice has been given as provided in subsection (1) of this section shall not be set aside, en- joined, reviewed, or otherwise challenged on grounds of noncompliance with the provisions of RCW 43.21C.030(2)(a) through (h) unless there has been a substantial change in the proposal between the time of the first governmental action and the subsequent gov- ernmental action, or unless the action now being consid- ered was identified in an earlier detailed statement or declaration of nonsignificance as being one which would require further environmental evaluation: (b) Any action to challenge a subsequent governmental action based upon any provisions of this chapter shall be commenced within thirty days from the date of last newspaper pub- lication of the subsequent governmental action except (i) for projects to be performed by a governmental agency or to be performed under 'governmental contract, or (ii) for thermal power plant projects which shall be chal- lenged within ninety days from the date of last newspa- per publication of the subsequent governmental action, or be barred. . (3) The form for such notice of action shall be issued by the department of ecology and shall be made.avail- able by the governmental agency taking an action sub- ject to being publicized pursuant to . this section, by the county auditor, and /or the city clerk to the project ap- plicant or proposer. The form of such notice shall be substantially as follows: NOTICE OF ACTION BY (Government agency or entity) Pursuant to the provisions of chapter 43.21C RCW, notice is hereby given that: The (Government agency or entity) did on (date), take the action described below. Any action to set aside, enjoin, review, or otherwise challenge such action on the grounds of noncompliance with the provisions of chapter 43.21C RC \'V (State En- vironmental Policy Act) shall be commenced within days or be barred. The action taken by (Government agency or entity), notice of which is hereby given, was 25 follows: (19E3 E43 NOTICE OF ACTION BY c-t-t'`f OP- 1) t L.A Pursuant to the provisions of chapter 43.21C RCW, notice is hereby given that: Ut`f OF 5..\/\(lLb\ The did on (date), take the action described below. Any action to set aside, enjoin, review, or otherwise challenge such action on the grounds of noncompliance with the provisions of chapter 43.21C RCW (State Environmental Policy Act) shall be commenced within 3C) days or be barred. The action taken by C1'fi�( O� rtz LA[V tl.A notice of which is hereby given, was as follows: (1) (Here insert description of action taken such as: Adoption Ordinance No Issued Building Permit; Approved preliminary (or final) plat, etc.) (2) (Here insert brief description of the complete project or proposal.) (3) Said action pertained to property commonly known as: (Sufficient description to locate property, but complete legal description not required) (4) Pertinent documents may be examined during regular business hours at the office of - PLPs-Ok \ t C t- t located at: (2( ���tL� C Y c�(L iS(Y )l_VP'S LO , iU �N.11(P ,"(A . (Name of proponent, or applicant giving notice) Filed by (Signature of individual and capacity in which such individual is signing) CITY OF TUKWILA CENTRAL PERMIT SYSTEM. ENVIRONMENTAL REVIEW ROUTING FORM TO: ti<1 BLDG PLNG PROJECT (6.Qp amu'/JG LOCATION 5-7q5- S. J3€-)&/. DATE TRANSMITTED 54/36/ STAFF COORDINATOR '(�J P.W. FIRE "" CN 8y -/56 EPIC V3,2-211 FILE POLICE I I P & R FILE NO. RESPONSE REQUESTED BY RESPONSE RECEIVED S /�i /by THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART- MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM. ITEM COMMENT DATE J —�-- �7' COMMENTS PREPARED BY C.P.S. Form 11 CITY OF TUKWILA CENTRAL PERMIT SYSTEM ENVIRONMENTAL. REVIEW ROUTING FORM TO: BLDG g PLNG PROJECT it tit AIOLUAL/Q LOCATION 5795 5. 43e)=)421. DATE TRANSMITTED 57813'/ STAFF COORDINATOR ja'afivj P.W. FIRE EPIC ?32 22% FILE POLICE P &R FILE NO. RESPONSE REQUESTED BY RESPONSE RECEIVED THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART- MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM. ITEM COMMENT �po:JS, DATE gel COMMENTS PREPARED BY C.P.S. Form 11 CITY OF TUKWILA CENTRAL PERMIT SYSTEM. ENVIRONMENTAL REVIEW ROUTING FORM TO: BLDG I PLNG I ( FIRE PROJECT olQap4/GUAL/G LOCATION 57q5" .5. J3)&/. DATE TRANSMITTED 578%8'/ STAFF COORDINATOR k7j'(/ CN gy15 - EPIC :732-2411 FILE POLICE P &R FILE NO. RESPONSE REQUESTED BY RESPONSE RECEIVED THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART- MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM. ITEM COMMENT .11 C., 5:0c wA w o■n -TIZIi-C.117 w y TLS ^DL-vu vO PAUCC - -Lo o / S H-v P. �c l_ ft' 1� 0,;1^n c.--kc:?) • l 1 L6--) T , DATE COMMENTS PREPARED BY C.P.S. Form 11 CITY OF TUKWILA CENTRAL PERMIT SYSTEM ENVIRONMENTAL. REVIEW ROUTING FORM [I:CEP/END 8y -,56-- BY MAY TUKWILA FIRE PRE TO: BLDG I PLNG ( 1 P.W. PROJECT (6_Q (,p d/AideG LOCATION fr/qtr J. /36 v-- )421. J DATE TRANSMITTED .578/84/ STAFF COORDINATOR aCk2J FIRE EPIC V32-1-/ BURENIUI LE POLICE P & R FILE NO. RESPONSE REQUESTED BY :0/ /lFy RESPONSE RECEIVED THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART- MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM. ITEM COMMENT / 1 ,�vi d iti I.A// �- !" /j t. r' e c! pr a, ,l C w�� 7-17 44-#1 4k ?'1- AP, 4) fi�K 57.57L-�M, ' o 9 � 57 J -Co, 4 7L- �li 9,1 71 1 74--- ..f/ # • q J cow) S-71; j We- • o r ' 7I, Q fr s c-- h4t4Pdo /;9,J s Qr- / a'- f0 he / the-- 4//4 k r� -.� f be p-ok;cied 14e; i mg/ Y-oki R 7�/ f ig/' c. .5 ,r j v ,4J -e r5 DATE COMMENTS PREPARED BY C.P.S. Form 11 , CITY OF TUKWILA. CENTRAL PERMIT SYSTEM. ENVIRONMENTAL REVIEW ROUTING FORM CN 8N -,56 EPIC V32-2q FILE TO: BLDG PLNG 1 P.W. pi FIRE POLICE 1 P & R 1 PROJECT j(, p jam dlid /)� LOCATION 5795 .5. /3 L Q ./ DATE TRANSMITTED S /elcq STAFF COORDINATOR ? 'OeJ FILE NO. S / /i /fy RESPONSE REQUESTED BY RESPONSE RECEIVED THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART- MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM. ITEM COMMENT DATE COMMENTS PREPARED BY C.P.S. Form 11 CITY OF TUKWILA CENTRAL PERMIT SYSTEM ENVIRONMENTAL. REVIEW ROUTING FORM TO: BLDG I I PLNG I I P. W. PROJECT ti —.p Ji?kICILILL9Q LOCATION -795 J. J3t K-)Qi. DATE TRANSMITTED 5,8484, STAFF COORDINATOR 16',42J FIRE • C N Sq -/5 EPIC o?,32 4ii FILE POLICE '�P & R FILE NO. RESPONSE REQUESTED BY 57 ///ey RESPONSE RECEIVED THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART- MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM. ITEM COMMENT DATE c� ? —/ 7' COMMENTS PREPARED BY C.P.S. Form 11 CITY OF TUKWILA PERMIT NUMBER CONTROL NUMBER g4-/S5- CENTRAL PERMIT SYSTEM - ROUT RIG FORM TO: (] BLDG. a PLNG. P.W. a FIRE a POLICE a P. & R. PROJECT Ojazaj, 0/ 41/ ADDRESS 57Q5- /36 u-i- . DATE TRANSMITTED 57846,/ RESPONSE REQUESTED BY 51/1/3 y C.P.S. STAFF COORDINATOR kj1�� RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE SPACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINE(S) ON WHICH THAT CONCERN IS NOTED: a a a a a a D.R.C. REVIEW REQUESTED a PLAN SUBMITTAL REQUESTED [� PLAN APPROVED (� P'L "Ncrm- HE-e DATE COMMENTS PREPARED BY,_--tr C.P.S. FORM 2 CITY OF TUKWILA CENTRAL PERMIT SYSTEM ENVIRONMENTAL REVIEW ROUTING FORM TO: [BLDG [ rPLNG PROJECT j,QtLp 1141 �' / j19 LOCATION 5795' .5. Amy- . DATE TRANSMITTED s /8/8'/ STAFF COORDINATOR Aj'CkJ 41,N 8t/ -/56 EPIC. v3.2-2L/ FILE FIRE [ OLICE &R FILE NO. RESPONSE REQUESTED BY s/ ///W RESPONSE RECEIVED THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART- MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM. ITEM COMMENT DATE COMMENTS PREPARED BY C.P.S. Form 11 CITY OF TUKWILA • . PERMIT NUMBER • CONTROL NUMBER jj1/- /55 CENTRAL PERMIT SYSTEM - ROUTING FORM TO: Q BLDG. .Q PLNG. Q P.W. Q FIRE Q POLICE EA P. & R. PROJECT .:r(., kkf7d/AJ'i2C ADDRESS 57Q5- . DATE TRANSMITTED 57Ver../ RESPONSE REQUESTED. BY 5/11/59 C.P.S. STAFF COORDINATOR /2/.6', RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS, IN THE SPACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINE(S) ON WHICH THAT CONCERN IS NOTED: D.R.C. REVIEW REQUESTED Q PLAN SUBMITTAL REQUESTED [J PLAN APPROVED [� PLAN CHECK DATE COMMENTS PREPARED BY C.P.S. FORM 2 CITY OF TUKWILA •1 L : J �.7. MAY 3 1984 ENVI RONMENTAL CHECKLI ST FORM CITY CAF TUK0,I .A PLANNING DEPT. This questionnaire must be completed and submitted with the application for permit. This questionnaire must be completed by all persons applying for a permit from the City of Tukwila, unless it is determined by the Responsible Official that the permit is exempt or unless the applicant and Responsible Official previously agree an Environmental Impact Statement needs to be completed. A fee of $60.00 must accompany the filling of the Environmental Questionnaire to cover costs of the threshold determination. I. BACKGROUND 1. Name of Proponent: CF e. >9r tl - . 2. Address and Phone Number .of Proponent: ,S794" ,S� x, go X)/ac T AAu�, //a . A 9�/6 7V 73r7 3. Date Checklist Submitted: ,"1..3/r�fZ/ 4. Agency Requiring Checklist: Ala or- 722AvAA., 5. Name of Proposal , if applicable: /1/4aj OroCJl, " c ',1u,o A.i/cJ ,,a 6. Nature.and Brief Description of the Proposal (including but not limited to its size, general design elements, and other factors that will give an accurate understanding of its scope and nature): 47115 -h', c 3'' s i 'A/J.2 1 ✓, L/ Una �� �e /mil fee i- r .O 40446'P ;psi "4, AnTr leter404 410 .r4e-kA exi c�►-3- 4.e Aaal J ' 7. Location of Proposal (describe the physical setting of the proposal, as well as the extent of the land area affected by any environmental im- pacts, including any other information needed to give an accurate under- - standing of the environmental setting of the proposal): J J _- fer942/Je- eir 1ft/ 8. Estimated Date for Completion of the Proposal: �4EP 1 Jew r'uhl:1,0/ /ind5'. 9. List of all Permits, Licenses or Government Approvals Required for the Proposal (federal, state and local): (a) Rezone, conditional use, shoreline permit, etc. YES NO (b) King County Hydraulics Permit YES NO (c) Building permit YES y/ NO • • (d) Puget Sound Air Pollution Control Permit YES NO y" (e) Sewer hook up permit YES NO v, (f) Sign permit YES NO ,y' (g) Water hook up permit YES NO!/ (h) Storm water system permit YES NO it" (i) Curb cut permit YES NO A/' (j) Electrical permit (State of Washington) YES /NO (k) Plumbing permit (King County) YES fr' NO (1) Other: 10. Do you have any plans for future additions, expansion, or futher activity related to or connected with this proposal? If yes, explain: d) 11. Do you know of any plans by others which may affect the property covered by your proposal? If yes, explain: RIP 12. Attach any other application form that has been completed regarding the pro- posal; if none has been completed, but is expected to be filed at some future date, describe the nature of such application form: II. ENVIRONMENTAL IMPACTS (Explanations of all "yes" and "maybe" answers are required 1. Earth. Will the proposal result in: (a) Unstable earth conditions or in changes in geologic substructures? (b) Disruptions, displacements, compaction or overcover- ing of the soil? (c) Change in topography or ground surface relief fea- tures? (d) The destruction, covering or modification of any unique geologic or physical features? -2 YES MAYBE NO (e) Any increase in wind or water erosion of soils, either on or off the site? (f) Changes in deposition or erosion of beach sands, or changes in siltation, deposition or erosion which may modify the channel of a river or stream or the bed of the ocean or any bay, inlet or lake? Explanation: 2. Air. Will the proposal result in: (a) Air emissions or deterioration of ambient air quality? (b) The creation of objectionable odors? (c) Alteration of air movement, moisture or temperature, or any change in climate, either locally or regionally? Explanation: .• Water. Will the proposal result in: (a) Changes in currents, or the course or direction of water movements, in either marine or fresh waters? (b) Changes . in absorption rates, drainage patterns, or the rate and amount of surface water runoff? (c) Alterations to the course or flow of flood waters? (d) Change in the amount of surface water in any water body? (e) Discharge into surface waters, or in any alteration of surface water quality, including but not limited to temperature, dissolved oxygen or turbidity? Gf) Alteration of the direction or rate of flow of ground waters? (g) Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations? -3- YES MAYBE NO 14, (h) Deterioration in ground water quality, either through direct injection, or through the seepage of leachate, phosphates, detergents, waterborne virus or bacteria, or other substances into the ground waters? (i) Reduction in the amount of water otherwise avail- able for public water supplies? Explanation: 4. Flora. Will the proposal result in: (a) Change in the diversity of species, or numbers of any species of flora (including trees, shrubs, grass, crops, microflora and aquatic plants)? (b) Reduction of the numbers of any unique, rare or endangered species of flora? kr (c) Introduction of new species of flora into an area, or in a barrier to the normal replenishment of existing species? YES MAYBE NO (d) Reduction in acreage of any agricultural crop? Explanation: 5. Fauna. Will the proposal result in: (a) Changes in the diversity of species, or numbers of any species of fauna (birds, land animals including reptiles, fish and shellfish, benthic organisms, insects or microfauna)? (b) Reduction of the numbers of any unique, rare or endangered species of fauna? (c) Introduction of new species of fauna into an area, or result in a barrier to the migration or movement of fauna? (d) Deterioration to existing fish or wildlife habitat? Explanation: 6. Noise. Will the proposal increase existing noise levels? Explanation: 7. Light and Glare. Will the proposal produce new light or glare? Explanation: 8. Land Use. Will the proposal result in the altera- tion of the present or planned land use of an area? Explanation: 9. Natural Resources. Will the proposal result in: (a) Increase in the rate of use of any natural resources? (b) Depletion of any nonrenewable, natural resource? Explanation: 10. Risk of Upset. Does the proposal involve a risk of an explosion or the release of hazardous substances (including, but not limited to, oil, pesticides, chemicals or radi- ation) in the event of an accident or upset conditions? Explanation: YES MAYBE NO 7 7 11. Population. Will the proposal alter the location, distribution, density, or growth rate of the human population of an area? Explanation: 12. Housing. Will the proposal affect existing housing, or create a demand for additional housing? Explanation: 13. Transportation /Circulation. Will the proposal result in: (a) Generation of additional vehicular movement? (b) Effects on existing parking facilities, or demand for new parking? (c) Impact upon existing transportation systems? (d) Alterations to present patterns of circulation or movement of people and /or goods? (e) Alterations to waterborne, rail or air traffic? (f) Increase in traffic hazards to motor vehicles, bicyclists or pedestrians? Explanation: 14. Public Services. Will the proposal have an effect upon, or result in a need for new or altered governmental services in any of the following areas: (a) Fire protection? (b) Police protection? (c) Schools? (d) Parks or other recreational facilities? (e) Maintenance of public facilities, including roads? YES MAYBE NO _z 17. (f) Other governmental services? Explanation: 15. Energy. Will the proposal result in: (a) Use of substantial amounts of fuel or energy? (b) Demand upon existing sources of energy, or require the development of new sources of energy? Explanation: YES MAYBE. NO v 16. Utilities. Will the proposal result in a need for new systems, or alterations to the following utilities: (a) Power or natural gas? (b) .Communications systems? (c) Water? (d) Sewer or septic tanks? •(e) Storm water drainage? (f) Solid waste and disposal? Explanation: /0 (,Lhh7L /eS &X 4.0.0. ! .4sr e ,k /f?',12. Leh) /Pies, #0 1rl'cw va /urns add e/ 7 Ula r ,fep71/c SJcslicrr/J 4,5 S-�aauk ,,S GGdrvcht// "er(oreoed /r'J Og,cc 17. Human Health. Will the proposal result in the crea- tion of any health hazard or potential health hazard (excluding mental health)? Explanation: YES MAYBE NO 18. Aesthetics. Will the proposal result in the obstruc- tion of any scenic vista or view open to the public, or will the proposal result in the creation of an aesthetically of- fensive site open to public view? Explanation: 19. Recreation. Will the proposal result in an impact upon the quality or quantity of exist- ing recreational opportunities? Explanation: 20. Archeological /Histroical. Will the proposal result in an alteration of a signifi- cant archeological or his- torical site, structure, object or building? Explanation: CERTIFICATION BY APPLICANT: I, the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaration of non - significance that it might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of full disclosure on my part. 1 84( Signature and Title Date . 4/ • -9Niy3aNsy h% tv or _L V A 14.1 _1 S en t ) 4,4:P7 • y , ' : • . • • • • 74/ l I /✓OR TN_ El f YRTJot/ \5 T // _ L /_ ✓4 .:V A/ • -a 0 3 2 3 0 2 3 Vilma ta Wu! Dow SHOWER uoi. LA V F1.001 PLAd 14" 2 1.0.)11400u-I CROSS SECTION ASPHALT SHINGLES PRE-ENGINEERED TRUSS i