HomeMy WebLinkAboutSEPA EPIC-234-84 - SANFT AL - 43RD PLACE STREET VACATION143 PL STREET VACATION
EPIC-234-84
WAC 197 -11 -1350
DECLARATION OF NONSIGNIFICANCE
Description of proposal Vacation of Easterly Portion 143rd P1. S.
Proponent Al & Bernie Sanft
Location of proposal Easterly 240 of 143rd Pl. S.
Lead Agency City of Tukwila File No. EPIC - 234 -84
This proposal has been determined not to have a probable significant
adverse impact on the environment. An environmental impact statement (EIS)
is not required under RCW 43.21C.030(2)(c). This decision was made after
review by the lead agency of a completed environmental checklist and other
information on file with the lead agency. This information is available to
the public on request.
There is no comment period for this DNS.
Responsible official Brad Collins
Position /title Planning Director
Address and phone 6200 Southcenter. Blvd., Tukwila, WA 98188 433 -1845
Date zS 1' 8f Signature
This Declaration is subject to adequate easement provisions being made for
existing utilities and access to fire hydrants.
WAC 197 -11 -1350
DECLARATION OF NONSIGNIFICANCE
Description of proposal VAt 1.00 OF "�Rb / fbrztioN X43 rz D S •
Proponent At_. (LIUIE �PCA�! 1__
Location of proposal 961'EZL'1 -24p Fr n I430-p nL. S.
Lead Agency GCC`( OF- -1\..).uJ ILA File No. L-:-="--PVC.:.--234-t4
This proposal has been determined not to have a probable significant
adverse impact on the environment. An environmental impact statement (EIS)
is not required under RCW 43.21C.030(2)(c). This decision was made after
review by the lead agency of a completed environmental checklist and other
information on file with the lead agency. This information is available to
the public on request.
There is no comment period for this DNS.
Responsible official $r1.-P513 COL - -WS
Position /title pu}, 01.u2-
Address and phone
Date Signature
S pE.C. 12. yn,00 SU L ' TrD 810 1°M SIO U
laa MPS tt . IM,KSCa ks.00 p;C.S,S
FI P V-akTS,
- =--I.TY OF TUKWILA
CENTRAL PERMIT SYSTEM
•
ENVIRONMENTAL REVIEW ROUTING FORM
TO:
BLDG
PLNG
P.W.
FIRE
CN 84^-«v
EPIC 234-- 84
FILE
POLICE I/I P & R
PROJECT ∎(6c..Z.aN (¢3 PL1
LOCATION •l/01--e 6 ht-Q-(1 fNteS 6LOU (Sh10-1) F I LE NO.
5(171
DATE TRANSMITTED ,511((84"
STAFF COORDINATOR s
RESPONSE REQUESTED BY
RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION.. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT
DATE COMMENTS PREPARED BY
C.P.S. Form 11
411111TY OF TUKWILA
CENTRAL PERMIT SYSTEM
•
ENVIRONMENTAL REVIEW ROUTING FORM
TO: F[ BLDG
PLNG
P.W.
FIRE
• CN
EPIC 23 4 9 `t-
FILE
POLICE 1 P & R
PROJECT \( c N) 14-15114 PL,
LOCATION (iJL.,`I c Pst_l_SI Me.n5LS (BLOC./ (stFi) FILE NO.
DATE TRANSMITTED rj I. ( ( 4' 8 RESPONSE REQUESTED BY 5(171
RESPONSE RECEIVED
STAFF COORDINATOR 15,
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR., COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT
DATE
COMMENTS PREPARED BY
C.P.S. Form 11
- -tITY OF TUKWILA
CENTRAL PERMIT SYSTEM •
ENVIRONMENTAL REVIEW ROUTING FORM
CN ` 1c)
*Pic 234- -84
FILE
TO: [l BLDG PLNG [ 1 P.W. FIRE POLICE. P & R
PROJECT \(.6-c_Pgri,WN 1¢3114 PL,
LOCATION tj L 6p buss e 5 IBoc (tp) FILE N0.
DATE TRANSMITTED 4(184' RESPONSE REQUESTED BY
STAFF COORDINATOR f-_C 15, RESPONSE RECEIVED ,3
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
64.
ITEM COMMENT
The propbsed. vacation would have no impact on Police services. 5/15/84 PJL
DATE COMMENTS PREPARED BY
C.P.S. Form 11
' CITY OF TUKWILA
CENTRAL PERMIT SYSTEM
ENVIRONMENTAL REVIEW ROUTING FORM
TO: - BLDG 1 PLNG I 1 P.W.
PROJECT \( rtdj) 12P5m10 PL,
LOCATION U3L>e CPP AUSS M R LS eiLO(4 FILE NO.
DATE TRANSMITTED rj 11((i314-' RESPONSE REQUESTED BY 51 1713
EPIC 3 � `t'
�---
FILE
ECEPIE
POL I ii P MAY •14 1984
RtKWILA FIRE PREVENTION BUREAU
STAFF COORDINATOR i --Cc1i - 150,
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
RESPONSE RECEIVED
ITEM
COMMENT
1444 1 e S j 41, ern Al al a/ `
")'° 9(/ 4' e G o., )in ✓ c cc e s s O
tti A e 01 714-i 04 744 is
5 ac f i o n D S 0. /* Jr ,�%% c E' ? z4,
91 4S 7tioll Sh 0,',/at le-- 4g.s w t g_ 7c0
ai • cep's; J ';/joi
/'-c v es C S e
/1,
DATE 5"---144-11(
--1,b -11(
COMMENTS PREPARED BY
C.P.S. Form 11
' CITY OF TUKWILA
CENTRAL PERMIT SYSTEM
•
ENVIRONMENTAL REVIEW ROUTING FORM
TO:
BLDG
PLNG W P.W.
FIRE
CN g c 7 v
EPIC 23
+- -84(
FILE
POLICE
P &R
PROJECT \ c .J 14: 11-00 (k_
LOCATION 1/UL> OBl-0C.1 (50k0F1) FILE NO.
1-718't
DATE TRANSMITTED .611(I$4'
RESPONSE REQUESTED BY 51
STAFF COORDINATOR • 15, RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT
/ G' "1 O f 2 r, rsn -c t /zr&—if 74 Foz j/ / e 714u L- L -L
MA-7 MA-7 b 7.1 % � max/ s 71/ -R 6-L)
DATE f COMMENTS PREPARED BY
C.P.S. Form 11
CITY OF TUKWILA
CENTRAL PERMIT SYSTEM
•
ENVIRONMENTAL REVIEW ROUTING FORM
• CN
EPIC 23 4--84-
FILE
TO: BLDG kT rPLNG fir( P.W. �f IRE POLICE
&R
. PROJECT \(6‹._, uQ J A -3 r4-40 PLr.
LOCATION Lul_`f cyp All-L& fM S l_IDc (stpr) FILE NO.
RESPONSE REQUESTED BY 5( 1-7184-
STAFF COORDINATOR f-3 $ , RESPONSE RECEIVED
DATE TRANSMITTED 11(1 84'
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW, AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
DATE , J
COMMENTS PREPARED B
C.P.S. Form 11
CLS 4- -(?
(` Z34—
•
CITY OF TUKWILA RECEIVED
CITY OF TUKWILA
ENVIRONMENTAL CHECKLIST FORM
MAY 111984
euu, mmi
This questionnaire must be completed and submitted with the appIicat'ToN for
permit. This questionnaire must be completed by all persons applying for a
permit from the City of Tukwila, unless it is determined by the Responsible
Official that the permit is exempt or unless the applicant and Responsible
Official previously agree an Environmental Impact Statement needs to be completed.
A fee of $60.00 must accompany the filling of the Environmental Questionnaire
to cover costs of the threshold determination.
I. BACKGROUND
1. Name of Proponent: AL 4 .RE,eN/E a09 -A/Jr
. 2. Address and Phone Number of Proponent: y7 /Z. #4i920,2y. 04, S
-SEA- TT? 604 -S ��% pg CZoc) 4 2 2 - 22 / 8
3. Date Checklist Submitted: ,22/5' (C)/e//5%8V
4. Agency Requiring Checklist: PANN /Ny bep7.
5. Name of Proposal, if applicable: )(/ /,g
6. Nature and Brief Description of the Proposal (including but not limited
to its size, general design elements, and other factors that will give
an accurate understanding of its scope and nature):
cb C.)F Tai J « rn o S T' e4,5715A2LAi Pe7az,; on z) x. 7h e i� J
• r lotor eyhT / GOA-y AZ
7. Location of Proposal (describe the physical setting of the proposal, as
well as the extent of the land area affected by any environmental im-
pacts, including any other information needed to give an accurate under-
standing of the environmental setting of the proposal):
4-pP ro (No S /y y i . sr ,/c-k cu i n a (,J4 -sh ,
8. Estimated Date for Completion of the Proposal: 0.14,y
9. List of all Permits, Licenses or Government Approvals Required for the
Proposal (federal, state and local):
(a) Rezone, conditional use, shoreline permit, etc.
(b) King County Hydraulics Permit
(c) Building permit
YES NO
YES NO--
YES NO
• •-
(d) Puget Sound Air Pollution Control Permit
(e) Sewer hook up permit
(f) Sign permit
(g) Water hook up permit
(h) Storm water system permit
(i) Curb cut permit
(j) Electrical permit (State of Washington)
(kr Plumbing permit (King County)
.(1) Other: S7a2 E, €r (Y,g -c v-79
YES NO --
YES NO,
YES NO
YES NO
YES NO---
YES NO/
YES N0'—
YES NO/
10. Do you have any plans for future additions, expansion, or futher activity
related to or connected with this proposal? If yes, explain:
N/4
11. Do you know of any plans by others which may affect the property covered by
your proposal? If yes, explain:
A/o
12.- Attach any other application form that has been completed regarding the pro-
posal; if none has been completed, but is expected to be filed at some future
date, describe the nature of such application form:
N�A
II. ENVIRONMENTAL IMPACTS -
(Explanations of all "yes" and "maybe" answers are required)
1 Earth. Will the proposal result in:
(a) Unstable earth conditions or in changes in geologic
substructures?
(b) Disruptions, displacements, compaction or overcover-
ing of the soil?
(c) Change in topography or ground surface relief fea-
tures?
(d) The destruction, covering or modification of any
unique geologic or physical features?
-2
YES MAYBE NO
•
(e) Any increase in wind or water erosion of soils,
either on or off the site?
(f) Changes in deposition or erosion of beach sands, or
changes in siltation, deposition or erosion which
may modify the channel of a river or stream or the
bed of the ocean or any bay, inlet or lake?
Explanation:
2. Air. Will the proposal result in:
(a) Air emissions or deterioration of ambient air
quality?
(b) The creation of objectionable odors?
(c) Alteration of air movement, moisture
or temperature, or any change in climate, either
locally or regionally?
Explanation:
3 Water. Will the proposal result in:
(a) Changes in currents, or the course or direction
of water movements, in either marine or fresh
waters?
(b) Changes in absorption rates, drainage patterns,
or the rate and amount of surface water runoff?
(c) Alterations to the course or flow of flood waters?
(d) Change in the amount of surface water in any water
body?
(e) Discharge into surface waters, or in any alteration
of surface water quality, including but not limited
to temperature, dissolved oxygen or turbidity?
(f) Alteration of the direction or rate of flow of
ground waters?
(g) Change in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations?
-3
YES MAYBE NO
• •
(h) Deterioration in ground water quality, either
through direct injection, or through the seepage
of leachate, phosphates, detergents, waterborne
virus or bacteria, or other substances into the
ground waters?
(i) Reduction in the amount of water otherwise avail-
able for public water supplies?
Explanation:
4. Flora. Will the proposal result in:
(a) Change in the diversity of species, or numbers
of any species of flora (including trees, shrubs,
grass, crops, microflora and aquatic plants)?
(b) Reduction of the numbers of any unique, rare or
endangered species of flora?
'(c) Introduction of new species of flora into an area,
or in a barrier to the normal replenishment of
existing species?
(d) Reduction in acreage of any agricultural crop?
Explanation:
5. Fauna. Will the proposal result in:
(a) Changes in the diversity of species, or numbers
of any species of fauna (birds, land animals
including reptiles, fish and shellfish, benthic
organisms, insects or microfauna)?
(b) Reduction of the numbers of any unique, rare or
endangered species of fauna?
(c) Introduction of new species of fauna into an
area, or result in a barrier to the migration
or movement of fauna?
(d) Deterioration to existing fish or wildlife
habitat?
Explanation:
YES MAYBE NO
• •
6. Noise. Will the proposal increase existing noise
levels?
Explanation:
7. Light and Glare. Will the proposal produce new
light or glare?
Explanation:
8. Land Use. Will the proposal result in the altera-
tion of the present or planned land use
of an area?
Explanation:
9. Natural Resources. Will the proposal result in:
(a) Increase in the rate of use of any natural
resources?
(b) Depletion of any nonrenewable, natural
resource?
Explanation:
10. Risk of Upset. Does the proposal involve a risk of an
explosion or the release of hazardous
substances (including, but not limited
to, oil, pesticides, chemicals or radi-
ation) in the event of an accident or
upset conditions?
Explanation:
YES MAYBE NO
• •
YES MAYBE NO
11. Population. Will the proposal alter the location,
distribution, density, or growth rate
of the human population of an area?
Explanation:
12. Housing. Will the proposal affect existing housing,
or create a demand for additional housing? ✓�
Explanation:
13. Transportation /Circulation. Will the proposal result in:
(a) Generation of additional vehicular movement?
(b) Effects on existing parking facilities, or
demand for new parking?
(c) Impact upon existing transportation systems?
(d) Alterations to present patterns of circulation
or movement of people and /or goods?
(e) Alt'erations to waterborne, rail or air traffic?
(f) Increase in traffic hazards to motor vehicles,
bicyclists or pedestrians?
Explanation:
14. Public Services. Will the proposal have an effect upon,
or result in a need for new or altered
governmental services in any of the
following areas:
(a) Fire protection?
(b) Police protection?
(c) Schools?
(d) Parks or other recreational facilities?
(e) Maintenance of public facilities, including
roads?
-6-
• •
(f) Other governmental services?
Explanation:
15. Energy. Will the proposal result in:
(a) Use of substantial amounts of fuel or energy?
(b) Demand upon existing sources of energy, or
require the development of new sources of
energy?
Explanation:
16. Utilities. Will the proposal result in a need for
new systems, or alterations to the
following utilities:
(a) Power or natural gas?
(b) .Communications systems?
(c) Water?
(d) Sewer or septic tanks?
(e) Storm water drainage?
(f) Solid waste and disposal?
Explanation:
17. Human Health. Will the proposal result in the crea-
tion of any health hazard or potential
health hazard (excluding mental health)?
Explanation:
YES MAYBE NO
• •
18. Aesthetics. Will the proposal result in the obstruc-
tion of any scenic vista or view open to
the public, or will the proposal result
in the creation of an aesthetically of-
fensive site open to public view?
Explanation:
19. Recreation. Will the proposal result in an impact
upon the quality or quantity of exist -'
ing recreational opportunities?
Explanation:
20. Archeological /Histroical. Will the proposal result in
an alteration of a signifi-
cant archeological or his -
torical site, structure,
object or building?
Explanation:
CERTIFICATION BY APPLICANT:
YES MAYBE NO
I, the undersigned, state that to the best of my knowledge the above
information is true and complete. It is understood that the lead agency
may withdraw any declaration of non - significance that it might issue in
reliance upon this checklist should there be any willful misrepresentation
or willful lack of full disclosure on my part.
Signature and Title Date .
AVON ON FOR UCAT I ON OF STR•S
Pursuant to RCW 35.79.010
TO THE TUKWILA CITY COUNCIL:
1. The undersigned petitioners hereby request the vacation of the following
described portion of right -of -way located in the City of Tukwila.
That 240 Ft. of the most Easterly portion of the 12Foot alley right -of -way
be vacated and the turn around be moved 2.40 feet west which will still be
on our property.
2. The name and address of all owners of property abutting on said portion
are as follows:
NAME ADDRESS
All property surronding requested property vacation is owned by us.
3. In accordance with Section 18.10.010, Ordinance "1006, the $150.00 fee
for street vacation has been received.
.3 9- 81v 993
DATE RECEIPT NO.
(
CLERK
4. The undersigned petitioners constitute more than two - thirds of the owners
of real estate abutting on the above described property.
. RESPECTFULLY SUBMITTED,
Al Santf
Barney Santf
l
NAME ADDRESS
4716 Airport Way So. Seattle, Wa. 98108
4716 Airport, Way So. Seattle, Wash. 98108
//'
•
•
C
/
•
A
4. 1
5P
100 —
r'!�.
1
•
_ M
Y
Virip441,
;