Loading...
HomeMy WebLinkAboutSEPA EPIC-234-84 - SANFT AL - 43RD PLACE STREET VACATION143 PL STREET VACATION EPIC-234-84 WAC 197 -11 -1350 DECLARATION OF NONSIGNIFICANCE Description of proposal Vacation of Easterly Portion 143rd P1. S. Proponent Al & Bernie Sanft Location of proposal Easterly 240 of 143rd Pl. S. Lead Agency City of Tukwila File No. EPIC - 234 -84 This proposal has been determined not to have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review by the lead agency of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. There is no comment period for this DNS. Responsible official Brad Collins Position /title Planning Director Address and phone 6200 Southcenter. Blvd., Tukwila, WA 98188 433 -1845 Date zS 1' 8f Signature This Declaration is subject to adequate easement provisions being made for existing utilities and access to fire hydrants. WAC 197 -11 -1350 DECLARATION OF NONSIGNIFICANCE Description of proposal VAt 1.00 OF "�Rb / fbrztioN X43 rz D S • Proponent At_. (LIUIE �PCA�! 1__ Location of proposal 961'EZL'1 -24p Fr n I430-p nL. S. Lead Agency GCC`( OF- -1\..).uJ ILA File No. L-:-="--PVC.:.--234-t4 This proposal has been determined not to have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review by the lead agency of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. There is no comment period for this DNS. Responsible official $r1.-P513 COL - -WS Position /title pu}, 01.u2- Address and phone Date Signature S pE.C. 12. yn,00 SU L ' TrD 810 1°M SIO U laa MPS tt . IM,KSCa ks.00 p;C.S,S FI P V-akTS, - =--I.TY OF TUKWILA CENTRAL PERMIT SYSTEM • ENVIRONMENTAL REVIEW ROUTING FORM TO: BLDG PLNG P.W. FIRE CN 84^-«v EPIC 234-- 84 FILE POLICE I/I P & R PROJECT ∎(6c..Z.aN (¢3 PL1 LOCATION •l/01--e 6 ht-Q-(1 fNteS 6LOU (Sh10-1) F I LE NO. 5(171 DATE TRANSMITTED ,511((84" STAFF COORDINATOR s RESPONSE REQUESTED BY RESPONSE RECEIVED THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD DETERMINATION.. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART- MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM. ITEM COMMENT DATE COMMENTS PREPARED BY C.P.S. Form 11 411111TY OF TUKWILA CENTRAL PERMIT SYSTEM • ENVIRONMENTAL REVIEW ROUTING FORM TO: F[ BLDG PLNG P.W. FIRE • CN EPIC 23 4 9 `t- FILE POLICE 1 P & R PROJECT \( c N) 14-15114 PL, LOCATION (iJL.,`I c Pst_l_SI Me.n5LS (BLOC./ (stFi) FILE NO. DATE TRANSMITTED rj I. ( ( 4' 8 RESPONSE REQUESTED BY 5(171 RESPONSE RECEIVED STAFF COORDINATOR 15, THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART- MENT THROUGH THE ABOVE STAFF COORDINATOR., COMMENTS REGARDING THE PROJECT YOU WISH CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM. ITEM COMMENT DATE COMMENTS PREPARED BY C.P.S. Form 11 - -tITY OF TUKWILA CENTRAL PERMIT SYSTEM • ENVIRONMENTAL REVIEW ROUTING FORM CN ` 1c) *Pic 234- -84 FILE TO: [l BLDG PLNG [ 1 P.W. FIRE POLICE. P & R PROJECT \(.6-c_Pgri,WN 1¢3114 PL, LOCATION tj L 6p buss e 5 IBoc (tp) FILE N0. DATE TRANSMITTED 4(184' RESPONSE REQUESTED BY STAFF COORDINATOR f-_C 15, RESPONSE RECEIVED ,3 THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART- MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM. 64. ITEM COMMENT The propbsed. vacation would have no impact on Police services. 5/15/84 PJL DATE COMMENTS PREPARED BY C.P.S. Form 11 ' CITY OF TUKWILA CENTRAL PERMIT SYSTEM ENVIRONMENTAL REVIEW ROUTING FORM TO: - BLDG 1 PLNG I 1 P.W. PROJECT \( rtdj) 12P5m10 PL, LOCATION U3L>e CPP AUSS M R LS eiLO(4 FILE NO. DATE TRANSMITTED rj 11((i314-' RESPONSE REQUESTED BY 51 1713 EPIC 3 � `t' �--- FILE ECEPIE POL I ii P MAY •14 1984 RtKWILA FIRE PREVENTION BUREAU STAFF COORDINATOR i --Cc1i - 150, THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART- MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM. RESPONSE RECEIVED ITEM COMMENT 1444 1 e S j 41, ern Al al a/ ` ")'° 9(/ 4' e G o., )in ✓ c cc e s s O tti A e 01 714-i 04 744 is 5 ac f i o n D S 0. /* Jr ,�%% c E' ? z4, 91 4S 7tioll Sh 0,',/at le-- 4g.s w t g_ 7c0 ai • cep's; J ';/joi /'-c v es C S e /1, DATE 5"---144-11( --1,b -11( COMMENTS PREPARED BY C.P.S. Form 11 ' CITY OF TUKWILA CENTRAL PERMIT SYSTEM • ENVIRONMENTAL REVIEW ROUTING FORM TO: BLDG PLNG W P.W. FIRE CN g c 7 v EPIC 23 +- -84( FILE POLICE P &R PROJECT \ c .J 14: 11-00 (k_ LOCATION 1/UL> OBl-0C.1 (50k0F1) FILE NO. 1-718't DATE TRANSMITTED .611(I$4' RESPONSE REQUESTED BY 51 STAFF COORDINATOR • 15, RESPONSE RECEIVED THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART- MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM. ITEM COMMENT / G' "1 O f 2 r, rsn -c t /zr&—if 74 Foz j/ / e 714u L- L -L MA-7 MA-7 b 7.1 % � max/ s 71/ -R 6-L) DATE f COMMENTS PREPARED BY C.P.S. Form 11 CITY OF TUKWILA CENTRAL PERMIT SYSTEM • ENVIRONMENTAL REVIEW ROUTING FORM • CN EPIC 23 4--84- FILE TO: BLDG kT rPLNG fir( P.W. �f IRE POLICE &R . PROJECT \(6‹._, uQ J A -3 r4-40 PLr. LOCATION Lul_`f cyp All-L& fM S l_IDc (stpr) FILE NO. RESPONSE REQUESTED BY 5( 1-7184- STAFF COORDINATOR f-3 $ , RESPONSE RECEIVED DATE TRANSMITTED 11(1 84' THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE REVIEW, AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART- MENT THROUGH THE ABOVE STAFF COORDINATOR.. COMMENTS REGARDING THE PROJECT YOU WISH CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM. DATE , J COMMENTS PREPARED B C.P.S. Form 11 CLS 4- -(? (` Z34— • CITY OF TUKWILA RECEIVED CITY OF TUKWILA ENVIRONMENTAL CHECKLIST FORM MAY 111984 euu, mmi This questionnaire must be completed and submitted with the appIicat'ToN for permit. This questionnaire must be completed by all persons applying for a permit from the City of Tukwila, unless it is determined by the Responsible Official that the permit is exempt or unless the applicant and Responsible Official previously agree an Environmental Impact Statement needs to be completed. A fee of $60.00 must accompany the filling of the Environmental Questionnaire to cover costs of the threshold determination. I. BACKGROUND 1. Name of Proponent: AL 4 .RE,eN/E a09 -A/Jr . 2. Address and Phone Number of Proponent: y7 /Z. #4i920,2y. 04, S -SEA- TT? 604 -S ��% pg CZoc) 4 2 2 - 22 / 8 3. Date Checklist Submitted: ,22/5' (C)/e//5%8V 4. Agency Requiring Checklist: PANN /Ny bep7. 5. Name of Proposal, if applicable: )(/ /,g 6. Nature and Brief Description of the Proposal (including but not limited to its size, general design elements, and other factors that will give an accurate understanding of its scope and nature): cb C.)F Tai J « rn o S T' e4,5715A2LAi Pe7az,; on z) x. 7h e i� J • r lotor eyhT / GOA-y AZ 7. Location of Proposal (describe the physical setting of the proposal, as well as the extent of the land area affected by any environmental im- pacts, including any other information needed to give an accurate under- standing of the environmental setting of the proposal): 4-pP ro (No S /y y i . sr ,/c-k cu i n a (,J4 -sh , 8. Estimated Date for Completion of the Proposal: 0.14,y 9. List of all Permits, Licenses or Government Approvals Required for the Proposal (federal, state and local): (a) Rezone, conditional use, shoreline permit, etc. (b) King County Hydraulics Permit (c) Building permit YES NO YES NO-- YES NO • •- (d) Puget Sound Air Pollution Control Permit (e) Sewer hook up permit (f) Sign permit (g) Water hook up permit (h) Storm water system permit (i) Curb cut permit (j) Electrical permit (State of Washington) (kr Plumbing permit (King County) .(1) Other: S7a2 E, €r (Y,g -c v-79 YES NO -- YES NO, YES NO YES NO YES NO--- YES NO/ YES N0'— YES NO/ 10. Do you have any plans for future additions, expansion, or futher activity related to or connected with this proposal? If yes, explain: N/4 11. Do you know of any plans by others which may affect the property covered by your proposal? If yes, explain: A/o 12.- Attach any other application form that has been completed regarding the pro- posal; if none has been completed, but is expected to be filed at some future date, describe the nature of such application form: N�A II. ENVIRONMENTAL IMPACTS - (Explanations of all "yes" and "maybe" answers are required) 1 Earth. Will the proposal result in: (a) Unstable earth conditions or in changes in geologic substructures? (b) Disruptions, displacements, compaction or overcover- ing of the soil? (c) Change in topography or ground surface relief fea- tures? (d) The destruction, covering or modification of any unique geologic or physical features? -2 YES MAYBE NO • (e) Any increase in wind or water erosion of soils, either on or off the site? (f) Changes in deposition or erosion of beach sands, or changes in siltation, deposition or erosion which may modify the channel of a river or stream or the bed of the ocean or any bay, inlet or lake? Explanation: 2. Air. Will the proposal result in: (a) Air emissions or deterioration of ambient air quality? (b) The creation of objectionable odors? (c) Alteration of air movement, moisture or temperature, or any change in climate, either locally or regionally? Explanation: 3 Water. Will the proposal result in: (a) Changes in currents, or the course or direction of water movements, in either marine or fresh waters? (b) Changes in absorption rates, drainage patterns, or the rate and amount of surface water runoff? (c) Alterations to the course or flow of flood waters? (d) Change in the amount of surface water in any water body? (e) Discharge into surface waters, or in any alteration of surface water quality, including but not limited to temperature, dissolved oxygen or turbidity? (f) Alteration of the direction or rate of flow of ground waters? (g) Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations? -3 YES MAYBE NO • • (h) Deterioration in ground water quality, either through direct injection, or through the seepage of leachate, phosphates, detergents, waterborne virus or bacteria, or other substances into the ground waters? (i) Reduction in the amount of water otherwise avail- able for public water supplies? Explanation: 4. Flora. Will the proposal result in: (a) Change in the diversity of species, or numbers of any species of flora (including trees, shrubs, grass, crops, microflora and aquatic plants)? (b) Reduction of the numbers of any unique, rare or endangered species of flora? '(c) Introduction of new species of flora into an area, or in a barrier to the normal replenishment of existing species? (d) Reduction in acreage of any agricultural crop? Explanation: 5. Fauna. Will the proposal result in: (a) Changes in the diversity of species, or numbers of any species of fauna (birds, land animals including reptiles, fish and shellfish, benthic organisms, insects or microfauna)? (b) Reduction of the numbers of any unique, rare or endangered species of fauna? (c) Introduction of new species of fauna into an area, or result in a barrier to the migration or movement of fauna? (d) Deterioration to existing fish or wildlife habitat? Explanation: YES MAYBE NO • • 6. Noise. Will the proposal increase existing noise levels? Explanation: 7. Light and Glare. Will the proposal produce new light or glare? Explanation: 8. Land Use. Will the proposal result in the altera- tion of the present or planned land use of an area? Explanation: 9. Natural Resources. Will the proposal result in: (a) Increase in the rate of use of any natural resources? (b) Depletion of any nonrenewable, natural resource? Explanation: 10. Risk of Upset. Does the proposal involve a risk of an explosion or the release of hazardous substances (including, but not limited to, oil, pesticides, chemicals or radi- ation) in the event of an accident or upset conditions? Explanation: YES MAYBE NO • • YES MAYBE NO 11. Population. Will the proposal alter the location, distribution, density, or growth rate of the human population of an area? Explanation: 12. Housing. Will the proposal affect existing housing, or create a demand for additional housing? ✓� Explanation: 13. Transportation /Circulation. Will the proposal result in: (a) Generation of additional vehicular movement? (b) Effects on existing parking facilities, or demand for new parking? (c) Impact upon existing transportation systems? (d) Alterations to present patterns of circulation or movement of people and /or goods? (e) Alt'erations to waterborne, rail or air traffic? (f) Increase in traffic hazards to motor vehicles, bicyclists or pedestrians? Explanation: 14. Public Services. Will the proposal have an effect upon, or result in a need for new or altered governmental services in any of the following areas: (a) Fire protection? (b) Police protection? (c) Schools? (d) Parks or other recreational facilities? (e) Maintenance of public facilities, including roads? -6- • • (f) Other governmental services? Explanation: 15. Energy. Will the proposal result in: (a) Use of substantial amounts of fuel or energy? (b) Demand upon existing sources of energy, or require the development of new sources of energy? Explanation: 16. Utilities. Will the proposal result in a need for new systems, or alterations to the following utilities: (a) Power or natural gas? (b) .Communications systems? (c) Water? (d) Sewer or septic tanks? (e) Storm water drainage? (f) Solid waste and disposal? Explanation: 17. Human Health. Will the proposal result in the crea- tion of any health hazard or potential health hazard (excluding mental health)? Explanation: YES MAYBE NO • • 18. Aesthetics. Will the proposal result in the obstruc- tion of any scenic vista or view open to the public, or will the proposal result in the creation of an aesthetically of- fensive site open to public view? Explanation: 19. Recreation. Will the proposal result in an impact upon the quality or quantity of exist -' ing recreational opportunities? Explanation: 20. Archeological /Histroical. Will the proposal result in an alteration of a signifi- cant archeological or his - torical site, structure, object or building? Explanation: CERTIFICATION BY APPLICANT: YES MAYBE NO I, the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaration of non - significance that it might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of full disclosure on my part. Signature and Title Date . AVON ON FOR UCAT I ON OF STR•S Pursuant to RCW 35.79.010 TO THE TUKWILA CITY COUNCIL: 1. The undersigned petitioners hereby request the vacation of the following described portion of right -of -way located in the City of Tukwila. That 240 Ft. of the most Easterly portion of the 12Foot alley right -of -way be vacated and the turn around be moved 2.40 feet west which will still be on our property. 2. The name and address of all owners of property abutting on said portion are as follows: NAME ADDRESS All property surronding requested property vacation is owned by us. 3. In accordance with Section 18.10.010, Ordinance "1006, the $150.00 fee for street vacation has been received. .3 9- 81v 993 DATE RECEIPT NO. ( CLERK 4. The undersigned petitioners constitute more than two - thirds of the owners of real estate abutting on the above described property. . RESPECTFULLY SUBMITTED, Al Santf Barney Santf l NAME ADDRESS 4716 Airport Way So. Seattle, Wa. 98108 4716 Airport, Way So. Seattle, Wash. 98108 //' • • C / • A 4. 1 5P 100 — r'!�. 1 • _ M Y Virip441, ;