HomeMy WebLinkAboutSEPA EPIC-244-84 - THE TECTON COMPANY - RIVERVIEW PLAZA STORAGE SHEDRIVERVIEW PLAZA
16000 CHRISTENSON RD
EPIC- 244 -84
NOTICE OF ACTION
I
ai -110
gli Notice is given under SEPA, RCW 43.21C.080, that City of Tukwila took the action
described below on October IS , 1984.
•
•
Any action to set aside, enjoin, review, or otherwise challenge such action the
grounds of non - compliance with the provisions of Chapter 43.21C RCW (State
Environmental Policy Act) shall be commenced on or before November 29, 1984
Description of agency action: Approve Shoreline Management Substantial Development
Permit No. `84= 28 =SMP to construct a 147.5 square foot storage shed.
Description of proposal:
Location of proposal: 16000 Christensen Road
Type of environmental- review under SEPA: Determination of Nonsiqnificance was issued
September 25, 1984, VI C= 244-841)
Documents may be exanii nea`-duri ng regular business hours at the Planning Department,
City Hall, 6200 SZduthcenter\Boulevard, Tukwila, WA.
Name of agency, proponent, or applicant giving notice: City of Tukwila
This notice is filed by: Rick Beeler, Associate Planner
Date \October 18, 1984
•
Published: Record Chronicle, October 21 and October 28, 1984
cc: .Applicant
City Clerk
Mayor
Department of Ecology
File
AFFIDAVIT OF DISTRIBUTION
I, Becky L. Kent
Hereby declare that:
❑ Notice of Public Hearing ❑ Notice of Public Meeting ❑Notice of
Application for Shoreline Management Substantial Development Permit
Notice of Action
was . mailed to each of the following addresses on October 19
BNSF Burlington Northern Inc.
Glacier Park Co.
810 3rd Ave. Tax Dept.
208 Central
Seattle, WA 98104
R.W. Peterson
290 Andover Park East
Tukwila, WA 98188
Tri -Land Corp.
505 Baker Blvd.
Tukwila, WA 98188
Albert Rosellini
230 Andover Park East
Tukwila, WA 98188
Tri -Land Corp.
220 Andover Park East
Tukwila, WA 98188
Dojac Corporation
130 Andover Park. East
Tukwila, WA 98188'
Raymond Feichtmeir
16000 Christensen Rd: #105
Tukwila, WA 98188
City of Seattle Water Dept.
County City Building
Seattle, WA 98104
Name of Project Tecton Company
File Number
West Valley Associates
1313 East Prospect
Seattle, WA 98112
Pam Morlan
Tecton Co.
16300 Christensen Rd. #114
Tukwila, WA 98188
Adrew Polich
531 Strander Blvd.
Tukwila, WA 98188
Bob Chen
512 Strander Blvd.
Tukwila, WA 98188
Jemma Assoc.
345 Andover Park East
Tukwila, WA 98188
84- 28 -SMP
,1984.
Signature
NOTICE OF ACTION •
Notice is given under SEPA, RCW 43.21C.080, that City of Tukwila took the action
described below on October IS , 1984.
Any action to set aside, enjoin, review, or otherwise challenge such action the
grounds of non - compliance with the provisions of Chapter 43.21C RCW (State
Environmental Policy Act) shall be commenced on or before November 29, 1984
Description of agency action: Approve Shoreline Management Substantial Development
Permit No. 84- 28 -SMP to construct a 147.5 square foot storage shed.
Description of proposal:
Location of proposal: 16000 Christensen Road
Type of environmental review under SEPA: Determination of Nonsignificance was issued
September 25, 1984, [EPIC- 244 -84)
Documents may be examined during regular business hours at the Planning Department,
City Hall, 6200 Southcenter Boulevard, Tukwila, WA.
Name of agency, proponent, or applicant giving notice: City of Tukwila
This notice is filed by: Rick Beeler, Associate Planner
Date October 18, 1984
Published: Record Chronicle, October 21 and October 28, 1984
cc: Applicant'
City Clerk
Mayor
Department of Ecology
File
ry . • NOTICE OF ACTION •
Notice is given under SEPA, RCW 43.21C.080, that City of Tukwila took the action
described below on October 18 , 1984.
Any action to set aside, enjoin, review, or otherwise challenge such action the
grounds of non - compliance with the provisions of Chapter 43.21C RCW (State
Environmental Policy Act) shall be commenced on or before November 29, 1984 •
Description of agency action: Approve Shoreline Management Substantial Development
Permit No. 84- 28 -SMP to construct a 147.5 square foot storage shed.
Description of proposal:
Location of proposal: 16000 Christensen Road
Type of environmental review under SEPA: Determination of Nonsignificance was issued
September 25, 1984, (EPIC- 244 -84)
Documents may be examined during regular business hours at the Planning Department,
City Hall, 6200 Southcenter Boulevard, Tukwila, WA.
Name of agency, proponent, or applicant giving notice: City of Tukwila
This notice is filed by: Rick Beeler, Associate Planner
Date October 18, 1984
Published: Record Chronicle, October 21 and October 28, 1984
cc: Applicant.
City Clerk
Mayor
Department of Ecology
File
• NOTICE OF ACTION
Notice is given under SEPA, RCW 43.21C.080, that City of Tukwila took the action
described below on October 18 , 1984.
Any action to set aside, enjoin, review, or otherwise challenge such action the
grounds of non - compliance with the provisions of Chapter 43.21C RCW (State
Environmental Policy Act) shall be commenced on or before November 29, 1984
Description of agency action: Approve Shoreline Management Substantial Development
Permit No. 84- 28 -SMP to construct a 147.5 square foot storage shed.
Description of proposal:
Location of proposal: 16000 Christensen Road
Type of environmental review under SEPA: Determination of Nonsignificance was issued
September 25, 1984, LEPIC- 244 -84)
Documents may be examined during regular business hours at the Planning Department,
City Hall, 6200 Southcenter Boulevard, Tukwila, WA.
Name of agency, proponent, or applicant giving notice: City of Tukwila
This notice is filed by: Rick Beeler, Associate Planner
Date October 18, 1984
Published: Record Chronicle, October 21 and October 28, 1984
cc: Applicant'
City Clerk
Mayor
Department of Ecology
File
WAC 197 -11 -1350
•DECLARATION OF NONSIGNIFICANCE
Description of proposal Construction of 147.5 square foot storage shed.
Proponent The Tecton Company
Location of proposal 16000 Christenson Road
Lead Agency City of Tukwila
File No. EPIC - 244 -84
This proposal has been determined not to have a probable significant
adverse impact on the environment. An environmental impact statement (EIS)
is not required under RCW 43.21C.030(2)(c). This decision was made after
review by the lead agency of a completed environmental checklist and other
information on file with the lead agency. This information is available to
the public on request.
lliextx1xxmoxammextxuerximMixxxxttxtoMex
Responsible official Bradley J. Collins
Position /title Planning Director /Responsible Official
Address and phone 6200 Southcenter Boulevard, Tukwila, WA 98188
Date
Ce -•0 Signature
----CITY OF TUKWILA
CENTRAL PERMIT SYSTEM
TO;
•
REVIEW ROUTING FORM
BLDG
PLNG
I
PROJECT 1?1\,\AQ6G p1
LOCATION 140 c%AZIST iS
DATE TRANSMITTED J](p , -4172(Na `T RESPONSE REQUESTED BY (k, 3 ( l i 4
STAFF COORDINATOR pct._ RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
CN 84 Z9'0
• 4 4 - 4 2-- 4
FILE 84'- j -Vtke
FIRE I ( POLICE
P
FILE NO.
ITEM COMMENT
DATE
C 0
COMMENTS PREPARED BY
C.P.S. Form 11
CITY OF TUKWILA PERMIT NUMBERS 22 -gMf CONTROL NUMBER g4 -2-q3
CENTRAL PERMIT SYSTEM - ROLA FORM
TO: a BLDG. Q PLNG. [ . P.W. a FIRE a ;POLICE a P. & R.
PROJECT ?1,\ItiZ4t tJ Pl.ps2 .
ADDRESS 16000 C_- ZISila) .S rW
DATE TRANSMITTED jCt , -2-7)1 I q,g4
C.P.S. STAFF COORDINATOR6"1�'�
RESPONSE REQUESTED BY__L Aa ?,( t 9 S4
RESPONSE RECEIVED
PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE
SPACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINE(S) ON WHICH
THAT CONCERN IS NOTED:
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
a
D.R.C. REVIEW REQUESTED El
PLAN SUBMITTAL REQUESTED EI
PLAN APPROVED [�
PLAN CHECK DATE
COMMENTS PREPARED BY
C.P.S. FORM 2
A1'
CITY OF TUKWILA
ENVIRONMENTAL CHECKLIST FORM
r
2
'This questionnaire must be completed and submitted with th'e °a pp-hfi ea .i:oq;: for j
permit. This questionnaire must be completed by all persons applying for a
permit from the City of Tukwila, unless it is determined .by the Responsible
Official that the permit is exempt or unless the applicant and Responsible
Official previously agree an Environmental Impact Statement needs to be completed.
A fee of $60.00 must accompany the filling of the Environmental Questionnaire
to cover costs of. the threshold determination.
I. BACKGROUND
1. Name of, Proponent: le
2. Address and Phone Number• of Proponent: A;a 9 C///p 6577- 27/09.iU R,D; os-
7- am /.0 // AJ /.vA . 9X/ ,?7 - .5_//7
3. Date Checklist Submitted: R
4. Agency Requiring 'Checklist: e/7//9/= 77,4ezw2. �4
- 5. 'Name of. Proposal, if applicable:
.6. Nature and,Brief Description,of the Proposal (including but not.limited.'.
to.its size, general design elements, and other factors that 'will give
an accurate understanding of its scope and nature): A 9' ��' /S / /c3)744AGE
SHED PDR GAROE.ULNG` .i i s AND /Y/A /i1/TENANG'E EQL/ /P/nE�v r 70 .SF s 'i..r
ALITACEN7- T4 EX /S'7 /NG 7/?. .98.1-/ E/j/CLO'SI.IR2, 1 z/ F //1/ /cSH .14 "9Q4A' /A/G
/Y/ATE/4 /ALS (.51// ALL //MATCH T #DSE aF g.e /S'r//UG DPP/& . DrvE 0) 4 /Gy517"
PLLE "v /Lc_ AF BFLOCIA1TED AA) Fx)ST%NG LkA iDSCA P /NG `•
AS LJ T7LE AS POSSI SLE.,
'7. Location of Proposal '(describe' the physical setting of the proposal, as
well as the extent of the land area affected by'any environmental im-
pacts, including any other'.information needed to give an accurate under-
standing of the environmental setting of the proposal):
L
•
4 i
8. Estimated Date for Completion of the Proposal:
9. List of all. Permits, Licenses or Government Approvals Required for the
Proposal (federal, state and local):
(a) Rezone, conditional use, shoreline permit, etc. YES /NO
(b). King County Hydraulics Permit YES NO
(c) Building permit YES1/ NO
•
(d) Puget Sound Air Pollution Control Permit YES NO4/
(e) Sewer hook up permit YES NO t/
(f) Sign permit YES NO c/
(g) Water hook up permit YES, NO c�
(h) Storm water system permit YES NOt.---
(i) Curb cut permit YES NO
(j) Electrical permit (State of Washington) YES ENO
(k) Plumbing permit (King County) YES NO
(1) Other:.
10. Do you have any plans fob future additions, expansion, or futher activity
related•to or connected with this proposal? If yes, explain:
401
11. Do you. know of any plans by others.which may affect the property covered by
• your proposal? If yes, explain:
12. Attach any other application form that has been completed regarding the pro -
posal; if none has been completed, but is expected to be filed at some future
date, describe the nature of such application form:
II. ENVIRONMENTAL IMPACTS
(Explanations of all "yes" and "maybe" answers are required)
1. Earth. Will the proposal result in.:
(a) Unstable earth conditions or in changes in geologic
substructures?
(b) Disruptions, displacements, compaction or overcover-
i ng of the soil? C6 #QT FLO9RLNG FoR Sff'D
(c) Change in topography or ground surface relief fea-
tures?
The destruction, covering or modification of any
unique geologic or physical features?.
(
-2-
Or
YES MAYBE NO
x
(e) Any increase in wind. or water erosion of soils,
either on or off the site?
(f) Changes in deposition or erosion of beach sands, or
changes in siltation, deposition or erosion which
may modify the channel of a river or stream or the
bed of the ocean or any bay, inlet or lake?
Explanation:
2. Air. Will the proposal rdsult.in:
(a) Air emissions or deterioration of ambient air
quality?
(b) The creation of objectionable odors?
(c) Alteration of air movement, moisture
or temperature, or any change in climate, either
locally or regionally?
Explanation:
3. Water. Will the proposal result in:
(a) Changes in currents, or the course or direction
of water movements, in either marine or fresh
waters?
(b) Changes in absorption rates, drainage patterns,
or the rate and amount of surface water runoff?
(c) Alterations to the course or flow of flood waters?
(d) Change in the amount of surface water in any water
body?
(e) Discharge into surface waters, or in any alteration
of surface water quality, including but not limited
to temperature, dissolved oxygen or turbidity?
(f) Alteration of the direction or rate of flow of
ground waters?
Change in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations?
(g)
-3
YES MAYBE NO
x
x
•
(h). Deterioration in ground water quality, either
through direct injection, or through the seepage
of leachate, phosphates, detergents, waterborne
virus or bacteria, or other substances into the
ground waters?
(i) Reduction in the amount of water otherwise avail-
able for public water supplies?
Explanation:
4. Flora. .Will the proposal result in:
(a) Change in the diversity of species, or numbers
of any species of'flora (including trees, shrubs,
grass, crops, microflora and aquatic plants)?
(b) Reduction of the numbers of any unique, rare or
endangered species of flora?
(c) Introduction of new species of flora into an area,
or in a barrier to the normal replenishment of .
existing species?
(d) Reduction in acreage of any agricultural crop?
Explanation:
5. Fauna. Will the proposal result in:
(a) Changes in the diversity"of species, or numbers
of any species of fauna (birds, land animals
including reptiles, fish and shellfish, benthic
organisms, insects or microfauna)?
(b) Reduction of the numbers of any unique, rare or
endangered species of fauna?
(c) Introduction of new species of fauna into an
area, or result in a barrier to the migration
or movement of fauna?
(d) Deterioration to existing fish or wildlife
habitat?
Explanation:
YES MAYBE NO
6. Noise. Will the proposal increase existing noise
levels?
Explanation:
7. Light and Glare. Will the proposal produce new
light or glare?
Explanation:
8. Land Use— Will the proposal result in the altera-
tion of the present or planned land use
of an area?
Explanation:
9. Natural Resources. Will the proposal result in:
(a) Increase in the rate of use of any natural
resources?
(b) Depletion of any nonrenewable natural
resource?
Explanation:
10. Risk of Upset. Does the proposal involve a risk of an
explosion or the release of hazardous
substances (including, but not limited
to, oil, pesticides, chemicals or radi-
ation) in the event of an accident or
upset conditions?
Explanation:
YES MAYBE NO
X
• •
11. Population. Will the proposal alter the location,
distribution, density, or growth rate
of the human population of an area ?..
Explanation:
12. Housing. Will the proposal affect existing housing,
or create a demand for additional housing?
Explanation:
13. Transportation /Circulation. Will the proposal result in:
(a) Generation of additional vehicular movement?
• (b) Effects on.existing parking facilities, or
demand for new parking?
(c) Impact upon existing transportation systems?
(d) Alterations to present patterns of circulation
or movement of people and /or goods?
(e) Alterations to waterborne, rail or air traffic?
(f) Increase in traffic hazards to motor vehicles,
bicyclists or pedestrians?
• Explanation:
14. Public Services. Will the proposal have an effect upon,
or result in a need for new or altered
governmental services in any of the
following areas:
(a) Fire protection?
(b) Police protection?
(c) Schools?
(d) Parks or other recreational facilities?
(e) Maintenance of public facilities, including
roads?
YES MAYBE NO
•
(f) Other governmental services?
Explanation:
15. Energy. Will the proposal result in:
(a) Use of substantial amounts of fuel or energy?
(b) Demand upon existing sources of energy, or
require the development of new sources of
energy?
Explanation:
16. Utilities. Will the proposal result in a need for
new systems, or alterations to the
following utilities:
(a) Power or natural gas?
(b) Communications systems?
(c) Water?
(d) Sewer or septic tanks?
• (e) Storm water drainage?
(f) Solid waste and disposal?
Explanation : -(4) MOUE J Ito-NT POLE
17. Human Health. Will the proposal result in the crea-
tion of any health hazard or potential
health hazard (excluding mental health)?
Explanation:
YES MAYBE NO
19,,r%
-lr4e-
larley,E.Jensen
rchitect A.1.A.
51,ta'fayette Circle
sfeyette,:CA 94545
455) 284.4393
ri.)AzA
ai4��.
,r14 41
7 -10 -A4
ACV) Mt!-
iza2F 7o
1MTctt
iHTTTJTTTF
is
1{
i
•
• k1012-r H
ft 411
NC: Wt..
,levf to'.
• 41AY.H b414-e4
kf
?1 •
t.etosJRE
6tyo }J
H
GHAT'
t:,�C]hrrN
e.44 1451.,P E
nom.
r.1E "ttUt'o
Ftr4tH to
MN cold
1 't 1of -Pi
VAT to ti~!
F-iarlcyEJensen
Architect' A.LA. •
• 251 ' Lafayette Circler
Lafayette,.CA 94549
(415) 284.439?
r2 N �v t v✓ P14Z4
' o P -,4 '4# ft7 •
TEUtat.1 Gott 04 1,1
G�FPI +irN N : t
rp 5y
IA Fit
KA-1-61-t I
(6 ) f
141 pLyvia
04 •
7roc.6,0 •
ove42. A-frocce
vintp evtg
112,"
4
MAlatzy e7
2*1- i-,•;(6.-rfe; PC-4-e.
LAFA-(E-rre- 14G41
• k)
orP•rpa•Atate,' .-160
11-t com
e-1-112.1i2ret,le.4.1 • 9.4•6.0 .
WA_
•
:p 0 .
•
• - •
•igexe>4.61e--
. _
t12.01e-ti•-ry LI hie.
A-,&
LL
c2- t.i.A42/
7" 14-14+. H Viler fr-L-
f 21
"
C
C
a
• I';,tQ 1 -a—U41,11
W:01 +I hn J417*
A-Ve'lar4 aca
1+41911 19r4 • 40pIN
‘721, V A N j4 alF4,4
.41—rbefrriAriel GZ c rtd
• V-dricto-i21-; H
.1.1 !no -*tig cra *el:J(3340 cA
.LNgvid 1047g [Ni%cer4)-r+IvIti Nve s.
Ciq -19Wa_te-7 „ 47)-11.
•
•i
.1
-21/-(-0,-16/6/
CITY OF TUK•ILA
Central Permit System
MASTER LAND DEVELOPMENT APPLICATION FORM
0Q;
PLEASE WRITE LEGIBLY OR TYPE ALL REQUESTED INFORMATION-'- INCOMPLETE
(
,z 2T �1
APPLICATIONS
ACCEPTED FOR PROCESSING.
SECTION I: GENERAL DATA
TYPE OF APPLICATION: D BSIP
I) APPLICANT:
OSHORT
PLAT
DCONDITIONAL
USE
0 SUBDIVISION
DUNCLASS.
USE
NAME /99/%%ELA / /O/44H/V
WSHOREL
PERMIT
PRD DPMUD INTERURBAN
D VARIANCE D CHG. OF
ZONING
DCOMP. PLAN
AMENDMENT
TELEPHONE (..W6) 2# / 578%
ADDRESS//, &)(5 EW/9 /STEA) SEi1) /%,c. # //y 72'/'/L4 J /4)A ZIP Cj 9M )
PROP . OWNER: NAME R.11,21.0 5,(7/4472 TELEPHONE (2e)6 ) 2'// -z/ ICI
ADDRESS_ /bQCXZoe,Y /aVE�i L ZIP 4 ?
3) PROJECT LOCATION: (STREET ADDRESS, GEOGRAPHIC, LOT/BLOCK)/i6 o f/f /,S7S &JI )
RA 7714'') /LA /)i9. 9B /e8
SECTION II: PROJECT INFORMATION
DESCRIBE BRIEFLY THE PROJECT YOU. PROPOSE K 9/6" K /5,'Al' ,. gf}/RD�2) /it%lr 311-7?
I . I_/ i i I /' • • I ff .i P Jr.OP /f
_
5) ANTICIPATED PERIOD OF CONSTRUCTION: FROM Qc /, / q TO )g7-,,,Q.8.,/q84,1
6) WILL PROJECT BE DEVELOPED., IN PHASES? OYES le NO IF YES, DESCRIBE:
PROJECT STATISTICS:.
A) ACREAGE OF PROJECT SITE: NET ?, Sy GROSS'• EASEMENTS
B) FLOORS OF CONSTRUCTION: TOTALII FLOORS INCLUDES: D BASEMENT D MEZZANINE'
TOTAL GROSS INCLUDES: D BASEMENT D MEZZANINE
FLOOR AREA -
SITE UTILIZATION: EXISTING PROPOSED NOTES
ZONING DESIGNATION
COMP. PLAN DESIGNATION
BUILDING FOOTPRINT AREA
LANDSCAPE AREA
PAVING AREA
TOTAL PARKING STALLS:
- STANDARD SIZE.
- COMPACT SIZE
- HANDICAPPED SIZE
TOTAL LOADING SPACES
AVER. SLOPE OF PARKING AREA
AVER. SLOPE OF SITE
O 0
D D
O 0
IS THIS SITE DESIGNATED FOR SPECIAL CONSIDERATION ON THE CITY'S ENVIRONMENTAL BASE
MAP? DYES ONO
SECTION III: APPLICANT'S AFFIDAVIT
, BEING DULY SWORN, DECLARE THAT I AM THE
CONTRACT PURC ' ER OR OWNER OF THE PROPERTY INVOLVED IN THIS APPLICATION AND THAT THE FORE-
GOING STATEMENTS AND ANSWERS HEREIN CONTAINED AND THE INFORMATION HEREWITH SUBMITTED ARE IN
ALL RESPECTS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF.
DATE
SUBSCRIBED AND SWORN BEFORE ME
TH I S ID DAY OF M ,Pas r
, 198'5".
NOTARY PUBLIC IN AND FOR THE STATE OF WASHINGTON
RESIDING AT SFA rT I.F
X l7ll/fy141//2_
(SIGNATURE OF ONT4P.C,T PURCHASER OR OWNER)
•
•
•
Speed Message
From
•
•
WilsonJones
GRAYLINE FORM 44 -900 2 -PART
G1983 • PRINTED IN U.S.A.
Signed
-CITY OF .TUKWILA
CENTRAL PERMIT SYSTEM •
ENVIRONMENTAL�REVIEW ROUTING FORM
BLDG • G P.W.
PROJECT. fly, \(t Q' S L IPLAi
LOCATION ((Q� �C, C s 1 S
TO:
FIRE
CN e4 2 Cl
.•PIC a44 -84
FILE 84•- 2J-'SA/1,1
POLICE
P & R
DATE TRANSMITTED /j(, 2:71 «s 4
STAFF COORDINATOR,C.�
THE ATTACHED .ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND•CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
FILE NO.
RESPONSE REQUESTED BY hock, -31J HO 4
RESPONSE RECEIVED
ITEM COMMENT
DATE COMMENTS PREPARED BY.
C.P.S. Form 11
CITY OF TUKWILA
CENTRAL PERMIT SYSTEM
ENVIRONMENTAL REVIEW ROUTING FORM
TO; .
BLDG 1 1 PLNG
P.W.
PROJECT . n,N.LCP.:&Aft(.2- PLPJ1J
LOCATION 1(,cZ)CJ, C{ j S.) FILE N0.
DATE TRANSMITTED AsMtb, • 2 ( ( 4 RESPONSE REQUESTED BY / )(k. 31, (c(a T
STAFF COORDINATOR EtC RESPONSE RECEIVED
CN .'1C�
*PIC 244-64
FILE 84,- 2z-vvte
FIRE POLICE
P &R
THE ATTACHED ENVIRONMENTAL CHECKhLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT'
ONLY. IMPACT UPON•POLICE ORIENTED PUBLIC SAFETY WOULD BE THE REMOVAL AND.'
REPLACEMENT OF THE EXISTING LIGHT POLE. IT WOULD APPEAR FROM THE SITE
.SKETCHES THAT THE NEW LOCATION WOULD AFFORD H
ON CHRISTENSEN TRAIL
I}.LUMINATION /THAN THAT
•
PROVIDED PRESENTLY...THIS IS A PLUS. `PJL
DATE COMMENTS PREPARED BY
C.P.S. Form 11
CITY OF TUKWILA
CENTRAL PERMIT SYSTEM
ENVIRONMENTAL
TO;
PROJECT
BY_,AU G 2 7 1984
:TUKWILA FIRE PREVENTION BUREAI
REVIEW ROUTING FORM
BLDG
PLNG
P.W.
FIRE
CNe4 -2 c
•
. EPIC Z 44 64
FILE 64- Zs— Sn/t.i°
1
POLICE
P &R
LOCATION ((Qc Zc, CaS1.ZS 1'LI
DATE TRANSMITTED , 2 :((c2 `C
STAFF COORDINATOR
THE ATTACHED .ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
FILE NO.
RESPONSE REQUESTED BY /(_j(4. 3I1 Icta 4+
RESPONSE RECEIVED
ITEM. COMMENT
DATE
COMMENTS PREPARED BY
C.P.S. Form 11
CITY OF TUKWILA PERMIT NUMBERS =LB -gMr CONTROL NUMBER g4-2g0
CENTRAL PERMIT SYSTEM - ROUTI FORM
TO: Q BLDG. 0 PLNG. [ . P.W. .Q FIRE Ei POLICE Q P. & R.
PROJECT la\VIRONINNJ PILPyLtor
ADDRESS 1C:OOC- L. t121Sna)Se ■.S rW
DATE TRANSMITTED (,(, 2:71 L ct 4
RESPONSE REQUESTED BY
C.P.S. STAFF COORDINATORCTj"Z.�'�
RESPONSE RECEIVED
PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE
SPACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINE(S) ON WHICH
THAT CONCERN IS NOTED:
Q 574 r4 , o7
Avid/ .�.LCes
40144a.6/e o r (6 l*...r6.
s ,a /e / /au tees ?
Q S/-6? 7i spec/4../ e r,s9i7
a
Q
a
a
Q
a
Q
Q
a
a
a
a
Q
Q
Q
a
D.R.C. REVIEW REQUESTED [] PLAN CHECK DATE 7/Z g
PLAN SUBMITTAL REQUESTED 0 COMMENTS PREPARED BY
PLAN APPROVED `5 467!
C.P.S. FORM 2
/-Dg1 -e/`9C/
1 • T6Li j
CITY OF TUKWILA
ENVIRONMENTAL CHECKLIST FORM
l
f
•
ciTy
This questionnaire •must be completed and submitted wi th the"app1= -e ta.o'offor�t
permit. This questionnaire must be completed by all persons applying for a -
permit from the City of Tukwila, unless it is determined by the Responsible
Official that the permit is exempt or unless the applicant and Responsible
Official previously agree an Environmental Impact Statement needs to be completed.
A fee of $60.00 must accompany the filling of the Environmental Questionnaire
to cover costs of. the threshold determination.
I. BACKGROUND
1. Name of Proponent: 4,4-04)D /47, 7( ,7,9 /A
2. Address and Phone Number. of Proponent: /4/9 l'//P/ 772F:4A9zE,U R0,-710-5-
7- G1/ //9/i , , Z/JA. Q ,' — y/- -2./ /7)
Date Checklist Submitted:
R-3
4. Agency Requiring Checklist: G' /T% x2/= 7 ', /..0 /z 4
5.. Name of Proposal, if applicable: '/,p0,4E-,//426._ 8/7,_,c-z)
6. Nature and.Brief Description of the Proposal .(including but not limited
to its size, general design elements, and other factors that will give
an accurate understanding of its scope and nature) :,9 9 �'k /5 ����5►TppgGE
OWED FOR G4R.OffiliNG ToOLS ANO MAr4./TEN,4,vc - 0 --emu r 70 13E at//2.7-
"9.6TACENr TD EX /S'T /N6- 78,41.S4' ENCL4S -2/ E, 1/4'a /7/11/..51.4/ 44 47pDF //vG-
/VAT6-R,ALS C5HAL1 //1ATL'/W 7&1sE of Err /ST /ivG at .o s ONE (J) 4 /&//7
R . 'O
i4S LI77L6 AS POSS /i3LE.,
7. Location of Proposal (describe the physical setting of the proposal, as
well as the extent' of the land area affected by any environmental im-
pacts, including any other; information needed to give an accurate under-
standing of the environmental setting of the proposal):
.0
ie mr
A'
AP
8. Estimated Date for Completion of the Proposal:
9. List of all. Permits; Licenses or Government Approvals Required for the
Proposal (federal, state and local):
(a) Rezone, conditional use, shoreline permit, etc. ..YES / NO_
(b) .King County Hydraulics Permit YES NO
(c) Building permit YESI/ NO
•
(d) Puget Sound Air Pollution Control Permit YES NOQ/
(e) Sewer hook up permit YES NO t/
(f) Sign permit 'YES Wt.,/
(g) Water hook up permit YES NO
(h) Storm water system permit YES NO
(i) Curb cut permit YES NO
(j) Electrical permit (State of Washington) YES 1--NO
(k) Plumbing permit (King County) YES NO .-
(1) Other:-
10. Do you have any plans for future additions, expansion, or futher activity
related to or connected with this proposal? If yes, explain:
.11. Do you. know of any plans by others.which may affect the property covered by
..your proposal? If yes, explain:
12. Attach any other application form that has been completed regarding the pro-
posal; if none has been completed, but is expected to be filed at some future
date, describe the nature of . such application form:
II. ENVIRONMENTAL IMPACTS
(Explanations of all "yes" and "maybe" answers are required)
1. Earth. Will the proposal result in.:
(a) Unstable earth conditions or in changes in geologic
substructures?
(b) Disruptions, displacements, compaction or overcover-
ing of the soi 1 ? C An- F R /NG- Foie 67/e.D
(c) Change in topography or ground surface relief fea-
tures?
(d) The destruction, covering or modification of any
unique geologic or physical features?
-2
YES MAYBE NO
x
(e) Any increase in wind or water erosion of soils,
either on or off the site?
(f) Changes in deposition or erosion of beach sands, or
changes in siltation, deposition or erosion which.
may modify the channel of a river or stream or the
bed of the ocean or any bay, inlet or lake?
Explanation:
2. Air. Will the proposal result in:
(a) Air emissions or deterioration of ambient air
quality?
(b) The creation of objectionable odors?
(c) Alteration of air movement, moisture
or temperature, or any change in climate, either
locally or regionally?
Explanation:
3. Water. Will the proposal result in:
(a) Changes in currents, or the course or direction
of water movements, in either marine or fresh
'Waters?.
(b) Changes in absorption rates, drainage patterns,
or the rate and amount of surface water runoff?
(c) Alterations to the course or flow of flood waters?
(d) Change in the amount of surface water in any water
body?
(e) Discharge into surface waters, or in any alteration
of surface water quality, including but not limited
to temperature, dissolved oxygen or turbidity?
(f) Alteration of the direction or rate of flow of
ground waters?
(g). Change in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations?
-3 -_
YES MAYBE NO
x
_x_
K
x
• YES MAYBE NO
(h) Deterioration in ground water quality, either
through direct injection, or through the seepage
of leachate, phosphates, detergents, waterborne
virus or bacteria, or other substances into the
ground waters?
(i) Reduction in the amount of water otherwise avail-
able for public water supplies?
Explanation:
4.. Flora. Will the proposal result in:
(a) Change in the diversity of species, or numbers
of any species of flora (including trees, shrubs,
grass, crops, microflora and aquatic plants)?
• (b) Reduction of the numbers of any unique, rare or
endangered species of flora? •
(c) Introduction of new species of flora into an area,
or in a barrier to the normal replenishment of
existing species?
(d) Reduction in acreage of any agricultural crop?
Explanation:
5. Fauna. Will the proposal result in:
(a) Changes in the diversity.of species, or numbers
of any species of fauna (birds, land animals
including reptiles, fish and shellfish, benthic
organisms, insects or microfauna)?
(b) Reduction of the numbers of any unique, rare or
endangered species of fauna?
(c) Introduction of new species of fauna into an
area, or result in a barrier to the migration
or movement of fauna?
'(d) Deterioration to existing fish or wildlife
habitat?
Explanation:
•
6. Noise. Will the proposal increase existing noise
levels?
Explanation:
7. Light and Glare. Will the proposal produce new
light or glare?
Explanation:
8. Land Use... Will the proposal result in the altera-
tion of the present or planned land use
of an area?
Explanation:
9. Natural Resources. Will the proposal result in:
. (a) Increase in the rate of use of any natural
resources?
(b) Depletion of any nonrenewable, natural
resource?
Explanation:
10. Risk of Upset. Does the proposal involve a risk of an
explosion or the release of hazardous
substances (including, but not limited
to, oil, pesticides, chemicals or radi-
ation) in the event of an accident or
upset conditions?
Explanation:
YES MAYBE NO
x
X
11. Population.
Explanation:
•
Will the proposal alter the location,
distribution, density, or growth rate
of the human population of an area?
12. Housing. Will the proposal affect existing housing,
or create a demand for additional housing?
Explanation:
13. Transportation /Circulation. Will the proposal result 'in:
(a) Generation of additional vehicular movement?
(b) Effects on existing parking facilities, or
demand for new parking?
(c) Impact upon existing transportation systems?
(d) Alterations to present patterns of circulation
or movement of people and /or goods?
(e) Alterations to waterborne, rail or air traffic?
(f) Increase in traffic hazards to motor vehicles,
bicyclists or pedestrians?
• Explanation:
14.. Public Services. Will the proposal have an effect upon,
or result in a need for new or altered
governmental services in any of the
following areas:
(a) Fire protection?
(b) Police protection?
(c) Schools?
(d) Parks or other recreational facilities?
(e) Maintenance of public facilities, including
roads?
YES MAYBE NO
(f) Other governmental services?
Explanation:
15. Energy. Will the proposal result in:
(a) Use of substantial amounts of fuel or energy?
(b) Demand upon existing sources of energy, or
require the development of new sources of
energy?
Explanation:
.16. Utilities. Will the proposal result in a need for
new systems, or alterations to the
following utilities:
(a) Power or natural gas?
(b) Communications systems?
(c) Water?
(d) Sewer or septic tanks?
(e) Storm water drainage?
(f) Solid waste and disposal?
Explanation:,(,) mavE 1 10-#7- P046
17. Human Health. Will the proposal result in the crea-
tion of any health hazard or potential
health hazard (excluding mental health)?
Explanation:
YES MAYBE NO
x
1 •
:: pp.Rv..ri 170 .H
L.. fir4'U>x6, •
i"jcl4 4- {'% !i �;-
ouTi.E :�
_
;try, 6./NTIstr, _
0.1r-4
zax�a. c
poal=2,0)
. "--- N I
..r)
1 +
K. o, zI
A■ le ..1 t;
. h.v.vvv.4.x...I.Nx.‘1.-A
i 1
it
/ •
iarleyEJensen
rti #act A.I.A.
51,teayette circle
dfeyette,A 9454$
45) 284.4398
izivevi5k1 1?1.,Az
ti'[oP.�G'
FFANy
/dry'- !' -o
Mara-
7- 10 -e'.4
mi-.
f2a2r To
filATo -)c '6I•
tt-Ai rac
Ot4f4A-1 ro
MAU GotoR
TrocTUIzE ors
.40,,doe'
eta. 04:912*
(1
•Lce,AT.4.2
-1-4HT
77-17,
i, 1'
11
.
._
i-I,
. ' . ';
,----i: ; • -i -
i
ii,„ -- 41-4
i
--11
r
1
il
Hem.) KfL.
:feetf
41AT-0 G441J4
1■1o12--rH
1.■/A-rioN1
LoOqP-eh -
MAIG4-1
rlrk
1 PO4-.
*To coo
to
11AZ,14 ceto 12.•
-rt4411)ft-ed
or EgWitr4A
• VA-r io
Y41"=11-o"
HarleyEJensen
. .
Architect,A.I.A.
251- Lafayette Circle
LafeYette,CA 94549
(415)284•439
rtAtA
‘-'11012-Aare-
444
11-t COP-i flAf..1%r•
44R.I•tri:Wvgi4
.
PAre
GLaoofit
*TAP e`f
MFfz
pLywo. 4110
4IVCCO
�---
A/69- iX,Co
Par ;,, •
•
112 FL-1410
8 �8:.
u.. n - x at
-couc. Bt.K.
it
•
H/04z1.-y 36144,t4
A!?Gk{irl.T,:-..A„ A.-
2 t ;
4„A S Y6.rfe; G .E
IAFAYe rC: �..GR °145 41
12.1Ve}2V1: VII
11.4 • ir9 t4 ; 641.1 PAP y
Gi•l lzihr try - J ¢: Ac
rt1KvII LA, WA-
h1:E�✓% -1 't
A aok
:F'1-11,N .
• pP.e7T r GE F -I r,*r'►o\1 :
A el 1-60'!.x 1 1 to " -4-a1274.6!. a bD rOf2
e4ulefritsii"
►h rdFe.FiP !3u!Lr AG7�Gr'it�1r
XI5r1 N� . i'P7H
�1/ U. i%INIJH A►JD F M - L
f� H Tie e p 4 way o ,c ;. •
B01LL'>I t.14•*. . H X15r I t.16t L-160417
�a -flu' e* . t.OG rE-Q Ah: pi
QJU E .I rINJ& p 1■1t ee.
p!>f UR-U1✓ 7 . �� � �rYL. A' F,r51 Wit. .
A L.. E
CM ISTENSEN RD •
ANDOVER PA RR. WEST
E.9 T
:1 ...
•
•
Job
•
Of
CITY OFT (u'u
UK�ILA
Central Permit System 1(/
-7t--02-7/v/
MASTER LAND DEVELOPMENT APPLICATION FORM
PLEASE WRITE LEGIBLY OR TYPE ALL REQUESTED INFORMATION—INCOMPLETE
ACCEPTED FOR PROCESSING.
r I •
APPL I CAT 1 DIMS WILL NOT
# z u0 6r0 �4,n,8o
BE
SECTION is GENERAL DATA
TYPE OF APPLICATION: ❑ BSIP ❑ SHORT ❑ SUBDIVISION SHORELINE ❑ PRO ❑ PMUD ❑ BAR
PLAT PERMIT INTERURBAN PLAN
❑ CONDUSEONAL ❑UNUSESS• ❑ VARIANCE ❑ OGF ❑ AMEN•DMFrNT
APPLICANT:
NAME /99MEL A /1/0/1)4 /9A)
TELEPHONE (W6) 2.4 /- 578
ADDRESS /d 3D/i (28/9/87-.1036-/1.) /1C. //y ?/1/L4, /v /9. ZIP q9
2)
PROP. OWNER: NAME Rj fJl//yfjJ/yn ,v7/// TELEPHONE (Z6 ) ZL/1 -- l /C'
ADDRESS ./bD(eLediR /.Q�/t 96A) Z1P gf /
3) PROJECT LOCATION: (STREET ADDRESS, GEOG 2APH 1 C , LOT/ BLOCK) 69jf /R ,cy s 7,)
/41), 7W(&) /Li /)9, 98188
SECTION 11: PROJECT INFORMATION
4) 'DESCR I BE BR I EFLY THE PROJECT YQU. PROPQSE. 4 9 /6 //X /Sl //..A4ADee-j_)//0,-
5)
6)
4
ANTICIPATED PERIOD OF CONSTRUCTION: FROM 0c77';'/ ,/ TO cgs /
WILL PROJECT BE DEVELOPED.,IN PHASES? OYES NO IF YES, DESCRIBE:
7) PROJECT STATISTICS.:
A) ACREAGE OF PROJECT SITE: NET �. 5-? GROSS' EASEMENTS
B) FLOORS OF CONSTRUCTION: TOTAL17FLOORS
TOTAL GROSS
FLOOR AREA
SITE UTILIZATION:
ZONING DESIGNATION
COMP. PLAN DESIGNATION
BUILDING FOOTPRINT AREA
LANDSCAPE AREA
PAVING AREA
TOTAL PARKING STALLS:
- STANDARD SIZE.
- COMPACT SIZE
- HANDICAPPED SIZE
TOTAL LOADING SPACES
AVER. SLOPE OF PARKING AREA
AVER. SLOPE OF SITE
INCLUDES• ❑BASEMENT ❑MEZZANINE'
INCLUDES: ❑BASEMENT ❑MEZZANINE
EXISTING. PROPOSED • NOTES
❑ ❑
❑ ❑
❑ ❑
1S THIS SITE DESIGNATED FOR SPECIAL CONSIDERATION ON THE CITY'S ENVIRONMENTAL BASE
MAP? ❑ YES ❑ NO
SECTION III APPLICANT'S AFFIDAVIT
I , Q/221.e.42.1. .�% �/J�jyf , BEING DULY SWORN, DECLARE THAT I AM THE
CONTRACT PURCHASER OR OWNER OF THE PROPERTY INVOLVED IN THIS APPLICATION AND THAT THE FORE-
GOING STATEMENTS AND ANSWERS HEREIN CONTAINED AND THE INFORMATION HEREWITH SUBMITTED ARE IN
ALL RESPECTS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF.
DATE
SUBSCRIBED AND SWORN BEFORE ME
THIS 6 DAY OF RV C., 5 T , 19 V.
NOTARY PJ LI,C IN AND FOR THE STATE OF WASHINGTON
RESIDING AT9 rrl,F
(S I GNATURE OF ONTR:P CT PURCHASER OR OWNER )
-L'ITY OF TUKWILA
CENTRAL PERMIT SYSTEM
•
REVIEW ROUTING FORM
EPIC a44 - 4
FILE 84-2.S- sn/l.a
TO: BLDG PLNG P.W. 1 FIRE 1 POLICE P & R
PROJECT tN,(,tC(Z\(t (Z6G IPI "Zust
LOCATION 16, ,C c) c2 C 3S
FILE NO.
DATE TRANSMITTED /,v�, 2.(q4 RESPONSE REQUESTED BY 01, 311 Ici414 T
STAFF COORDINATOR F4,Cr..._
RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM- COMMENT
/
ale .i Ze I rr�.
DATE 6% ? / .//�y
COMMENTS PREPARED BY L`�
C.P.S. Form 11
CITY OF TUKWILA PERMIT NUMBERS = Z-6-S.M CONTROL NUMBER 04 -Lq3
CENTRAL PERMIT SYSTEM - ROUTS FORM •
TO: 0 BLDG. Q PLNG. P.W. .Q FIRE Q POLICE Q P. & R.
PROJECT 14\4cPPNICaNi PLAZA-
ADDRESS 1(OCDC- c„ 2-1-Sn )s` S r2-0
DATE TRANSMITTED & C.t , .7, I t 4
C.P.S. STAFF COORDINATOR ,C : k.
RESPONSE REQUESTED BY
RESPONSE RECEIVED
pct. tcla4
PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE
SPACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINE(S) ON WHICH
THAT CONCERN IS NOTED:
Q
a
Q
a
a
a
D.R.C. REVIEW REQUESTED [�
PLAN SUBMITTAL REQUESTED [i
PLAN APPROVED EJ
PLAN CHECK DATE
COMMENTS PREPARED BY
C.P.S. FORM 2
l.i
• CITY OF TUKWILA
ENVIRONMENTAL CHECKLIST FORM/ " r
`• %, -; ILA
This questionnaire must be completed and submitted with the "a'pp•1-The `
permit. This questionnaire must be completed by all persons applying for a
permit from.the City of Tukwila, unless it is determined by the Responsible
Official that the permit is exempt or unless the applicant and Responsible
Official previously agree an Environmental Impact Statement needs to be completed.
A fee of $60.00 must accompany the filling of the Environmental Questionnaire
to cover costs of. the threshold determination.
I BACKGROUND
1. Name of Proponent: /)/ /I /oz) ,4.
2. Address and Phone Number. of Proponent: / 2 69/12,,4f7 -22 0,9 0 �.„0,'V /05
7-G1/ //2 /L, . /1JA. QTY /f'7 - .? y/- 2//7)
Date Checklist Submitted: R -,3 Tga
4. Agency Requiring Checklist: (1/,ry ,9, T/, ','z4
5. Name of Proposal, if applicable: a/.9,pn,c,U //VrT (37 -Aeb
6. Nature and•Brief Description of the Proposal (including but not limited
to its size, general design elements, and other factors that will give
an accurate understanding of its, scope and nature) :,9 9 G /iX /S h.'67:0,'.9GE
ei/ED FafR SAROEAI /NG TaOL,S 94/D /YJA /AJTE i,4WJCE EQ / /P/l9Eiv T 7,0 B4 SG/ALT
,9LDTACE/VT TO EX /S'T /NG TR, S,V f4/CL ,5-2/) , 1 // F //1/ /�S// .9QDF /A/G
/VATER /ALS (.51.J1 AL1 /0A7-47f/ T7DM DF E r /ST /r1lG OFF /a E 22L/Jer.s . DA/&"
/�rJLE Iv /LL dE RELzi'ATEp AND Px Ls-rho G- LAAJDSc'HP /,& rs T/7 DE .D israR.. D
.4S L /77LE AS POSSI131.E.
7 Location of Proposal (describe the physical setting of the proposal, as
well as the extent of the land area affected by any environmental im-
pacts, including any other information needed to give an accurate under-
standing of the environmental setting of the proposal):
4.
L
•
L I
8. Estimated Date for Completion of the Proposal:
9. List of all. Permits, Licenses or Government Approvals Required for the
Proposal. (federal, state and local):
(a) Rezone_, conditional use, shoreline permit, etc. ..YES ✓ NO_
(b) .King County Hydraulics Permit YES NO
(c) Building permit YES//"NO
(d) Puget Sound Air Pollution Control Permit YES N04/
(e) Sewer hook up permit YES NO t,--
(f) Sign permit 'YES NOt/
(g) Water hook up permit YES NO c�
(h) Storm water system permit YES NO
(i) Curb cut permit YES NO
(j) Electrical permit (State of Washington) YES ✓NO
(k) Plumbing permit (King County) YES. NO
(1) Other:
10. Do you have any plans for future additions, expansion, or futher activity
related to or connected with this proposal? If yes, explain:
.11. Do you. know of any plans by others.which may affect the property covered by
..your proposal? If yes, explain:
12. Attach any other application form that has been completed regarding the pro-
. posal; if none has been completed, but is expected to be filed at some future
date, describe the nature of such application form:
II. ENVIRONMENTAL IMPACTS
(Explanations of all "yes" and "maybe" answers are required)
1. Earth. Will the proposal result in.:
(a) Unstable earth conditions or in changes in geologic
substructures?
(b) Disruptions, displacements, compaction or overcover-
ing of the soil ?. CE•eur FI R /NO- ibR SAWED
(c) Change in topography or ground surface relief fea-
tures?
(d) The destruction, covering or modification of any
unique geologic or physical features?
-2-
Or
YES MAYBE NO
X.
x
• •
(e) Any increase in wind or water erosion of soils,
either on or off the site?
(f) Changes in deposition or erosion of beach sands, or
changes in siltation, deposition or erosion which
may modify the channel of a river or stream or the
bed of the ocean or any bay, inlet or lake?
Explanation:
2. Air. Will the proposal result in:
(a) Air emissions or deterioration of ambient air
quality?
(b) The creation_of objectionable odors?
(c) Alteration of air movement, moisture
• or temperature, or any change in climate, either
locally or regionally?
Explanation:
3. Water. Will the proposal result in:
'(a) Changes in currents, or the course or direction
of water movements, in either marine or fresh
waters?
• (b) Changes in absorption rates, drainage patterns,
or the rate and amount of surface water runoff?
(c) Alterations to the course or flow of flood waters?
(d) Change in the amount of surface water in any water
body?
(e) Discharge into surface waters, or in any alteration
of surface water quality, including but not limited
to temperature, dissolved oxygen or turbidity?
(f) Alteration of the direction or rate of flow of
ground waters?
(g). Change in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations?
-3-
YES MAYBE NO
x
•.
(h) Deterioration in ground water quality, either
through direct injection, or through the seepage
of leachate, phosphates,-detergents, waterborne
virus or bacteria, or other substances into the
ground waters?
(i) Reduction in the amount of water otherwise avail-
able for public water supplies?
Explanation:
4.. Flora. Will the proposal result in:
(a) Change in the diversity of species, or numbers
of any species of flora (including trees, shrubs,
grass, crops, microflora and aquatic plants)?
(b) Reduction of the numbers of any unique, rare or
endangered species of flora?
(c) Introduction of new species of flora into an area,
or in a barrier to the normal replenishment of
existing species?
(d) Reduction in acreage of any agricultural crop?
Explanation:
5. Fauna. Will the proposal result in:
(a) Changes in the diversity.of species, or numbers
of any species of fauna (birds, land animals
including reptiles, fish and shellfish, benthic
organisms, insects or microfauna)?
(b) Reduction of the numbers of any unique, rare or
endangered species of fauna?
(c) Introduction of new species of fauna into an
area, or result in a barrier to the migration
or movement of fauna?
(d) Deterioration to existing fish or wildlife
habitat?
Explanation:
YES MAYBE NO
6. Noise. Will the proposal increase existing noise
levels?
Explanation:
7. Light and Glare. Will the proposal produce new
light or glare?
Explanation:
8. Land Use.., Will the proposal result in the altera-
tion of the present or planned land use
of an area?
Explanation:
9. Natural Resources. _Will the proposal result_in:
. (a) Increase in the rate of use of any natural
resources?
(b) Depletion of any nonrenewable, natural
resource?
Explanation:
10. Risk of Upset. Does the proposal involve a risk of an
explosion or the release of hazardous
substances (including, but not limited
to, oil, pesticides, chemicals or radi-
ation) in the event of an accident or
upset conditions?
Explanation:
YES MAYBE NO
• •
11. Population. Will the proposal alter the location,
distribution, density, or growth rate
of the human population of an area?
Explanation:
12. Housing. Will the proposal affect existing housing,
or create a demand for additional housing?
Explanation:
13. Transportation /Circulation. Will the proposal result'in:
(a) Generation of additional vehicular movement?
(b) Effects on existing parking facilities, or
demand for new parking?
(c) Impact upon existing transportation systems?
(d) Alterations to present patterns of circulation
or movement of people and /or goods?
(e) Alterations to waterborne, rail or air traffic?
(f) Increase in traffic hazards to motor vehicles,
bicyclists or pedestrians?
Explanation:
14. Public Services. Will the proposal have an effect upon,
or result in a need for new or altered
governmental services in any of the
following areas:
(a) Fire protection?
(b) Police protection?
(c) Schools?
(d) Parks or other recreational facilities?
(e) Maintenance of public facilities, including
roads?
YES MAYBE NO
-74
(f) Other governmental services?
Explanation:
15. Energy. Will the proposal result in:
(a) Use of substantial amounts of fuel or energy?
(b) Demand upon existing sources of energy, or
require the development of new sources of
energy?
Explanation:
.16. Utilities. Will the proposal result in a need for
new systems, or alterations to the
fol lowing utilities:
(a) Power or natural gas?
(b) Communications systems?
(c) Water?
(d) Sewer or septic tanks?
(e) Storm water drainage?
(f) Solid waste and disposal?
Explanation:-(A) mauE 1 1 CG#T 1°049
17. Human Health. Will the proposal result in the crea-
tion of any health hazard or potential
health hazard (excluding mental health)?
Explanation:
YES MAYBE NO
Rv. v, oo Hat-1
6,41 -rci4 t7 ✓i-pc
oait�t; ,arm 1
� 1 d vrJ ,a►-1
sr-
FG01 -1-,G
tax a,6 A.G.
• ice.
. Maill sMkcs ■&..`RA
it
a I E.Je Ise
.rchitect A.I.A. i
511,a'fayette Circle
ofeyette, -CA 9454$
75) 284.4398
19[4=4
0-44„
.:rc?
c1}�r A'
7 =10 -64
Per F_ To
MMT6I -tKt'6a •
51.061
1
It
I
1 Ij 11 � I
li
e,t-yo i4
It wt.
No Mil.
F to,
QR-e6 -
tikTGH y
->puTh• F-1- .4J• •
► -ou
• ax t44
e.ge.wsLipa
ii
W T g.vAT 101
Eitt3.1i0��
Harley E•Jensen
Architect _ .A.
251'tafeyette Circle
Lafayette, CA 94549
(415) 294•439c.?
414 TEG -100 C,oM pkt.1 sr'
61.990g-
‘Pf Pip
MHz:-
mit . f2A2rii.
To
()
,11.1C0
\(--- • \I* 'r49
PAr fia
v7," R.,6,00.
es.(144t141.
4044..44544.-
4 -
(-------4--reA0PH
aria4ougs.
find
1-1146-12.1-Y.
2*1-- 1.04 .--i/61 C-
re; PLe-
LAroyETre- . cA 14G41
q-ive}2-VieNk) PL-,1A
a0(2.1k4e.‘
• -rpt Terot-i,comeAoy
e,Hfzir 404.0
rtm.y./164.) WA..
7- 10-04-
•
`?,"")E•AJ4-1.
!'■;e' fi,d1,Y.A;
c„.
•*54.1,■-■1
- •
A
4)
• /t.
1"=2a I
PEDESTRIAN
BRIDGE •
11,1-4 )1111-11,i-141(r)
• ..•
.. • •
M.:: •
1.••••••••-
V A•• E r M I G
t f T -1 1 2 -1 p'i a .1 :
Vh . ���P r0 (��'. SUILr .d+C)sz,ce, 1�
r XPublN� . -rP
WA‘1;1. •1 ,J eA 1 A40 F �l1J
VAV H -r& *€ o p J AAF2 -5kr,
P�JILt�IiJG;s. tlf; ��CISTIt�Gi l- I611417
�?'IDcLl.
27 l✓ Loo.ocr -Q Y
aJU 'l4.1 ItJl1 NV�- p�El.t 1.6 To Ps
p1>*ifiR -e110 .�� err ,
��•N![AtTit
Date
Scale
Drawn
Job
Sheet
Of
(,i /P.i y y6/
CITY OF TUK•ILA
Central Permit System
MASTER LAND DEVELOPMENT APPLICATION FORM
PLEASE WRITE LEGIBLY OR TYPE ALL REOUESTED. INFORMATION -- INCOMPLETE APPLICATIONS-WILL—NOT
ACCEPTED FOR PROCESSING.
# Zug X11 #271b
BE
SECTION I: GENERAL DATA
TYPE OF APPLICATION: ❑ BSIP ❑SHORT ❑SUBDIVISION SHORELINE ❑ PRD ❑ PMUD ❑ BAR
PLAT PERMIT INTERURBAN
APPLICANT:
PLAN
❑ CONDUSEONAL ❑UNUSESS• ❑VARIANCE ❑ CZONING DAMEN•DMFrNT
NAME 199/),EL% /%,' QL0.9 )
TELEPHONE (Z ') z/11/ -5787
l, ,31/3 ef// 1, TEA)SE'3 4'o. /�4' %L Ka- J /Lft Lvl7. ZIP q 6155
2) PROP. OWNER: NAME A2.041/%134Wf, Fi�rr/�1�/ TELEPHONE (Z)6 ),Zz// - 2/ /C'
ADDRESS /6Dm rnfi�R /.47-/Li 'EA) / fl TZ/Ki /L G 11.)4 Z I P Gjfi /
PROJECT LOCAT 1 ON : (STREET ADDRESS, GEOGRAPH 1 C , LOT/ BLOCK) /,642-) [�jf jQyg-fE/US' ;1 ]
RD, 7- /E-&) /GF9 /»A2. 618/88
SECTION 11: PROJECT INFORMATION
4) 'DESCR I BE BR I EFLY THE PROJECT YQU. PROPOSE. G% //,)' l$ .Alir D�iU /�� ✓c E/i
;/ is / /' i/j _• i /i ■ !I /1
EIUI'1d.SL(L
5) ANTICIPATED PER 1 OD OF CONSTRUCTION: FROM p0; / /qgeV TO (je T, ,.Q8J2 `�� ?!*
q¢
6) WILL PROJECT BE DEVELOPED,IN PHASES? OYES Na NO IF YES, DESCRIBE:.
PROJECT STATISTICS.:
A) ACREAGE OF PROJECT SITE: NET ,- sy GROSS`- EASEMENTS
B) FLOORS OF CONSTRUCTION: TOTAL1IFLOORS INCLUDES: ❑ BASEMENT ❑MEZZANINE
TOTAL GROSS INCLUDES: ❑ BASEMENT ❑ MEZZANINE
FLOOR AREA -
EXISTING PROPOSED NOTES
SITE UTILIZATION:
ZONING DESIGNATION
COMP. PLAN DESIGNATION
BUILDING FOOTPRINT AREA
LANDSCAPE AREA
PAVING AREA
TOTAL PARKING STALLS:
- STANDARD SIZE
- COMPACT SIZE
- HANDICAPPED SIZE
TOTAL LOADING SPACES
AVER. SLOPE OF PARKING AREA
AVER. SLOPE OF SITE
❑ ❑
❑ ❑
❑ ❑
IS THIS SITE DESIGNATED FOR SPECIAL CONSIDERATION ON THE CITY'S ENVIRONMENTAL BASE
MAP? OYES ❑ NO
SECTION III: APPLICANT'S AFFIDAVIT
TO/172644L % jjJjA92 . , BEING DULY SWORN, DECLARE THAT 1 AM THE
CONTRACT PURCf ER OR OWNER OF THE PROPERTY INVOLVED IN THIS APPLICATION AND THAT THE FORE -
GOING STATEMENTS AND ANSWERS HEREIN CONTAINED AND THE INFORMATION HEREWITH SUBMITTED ARE IN
ALL RESPECTS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF.
DATE
SUBSCRIBED AND SWORN BEFORE ME
TH 1 S DAY OF AV cti S T 1 9
NOTARY PI; L1C IN AND FOR THE STATE OF WASHINGTON
RESIDING ATTTI.E'
(SIGNATURE OF P ONTt &,CT PURCHASER OR OWNER)
CITY OF TUKWILA
CENTRAL PERMIT SYSTEM
REVIEW ROUTING FORM
PLNG
P.W.
PROJECT 1?_IN4N22\IlCNG PLPfq-PS
CN e - -2c10
PIC a4 4 -64
FILE 64- j--viA,
FIRE 1 POLICE
P & R
LOCATION I(00 c1U, crzis%SS �1 te2_10
DATE TRANSMITTED AU(.t) , 2:71 Ns 4
STAFF COORDINATOR ,C_
FILE NO.
RESPONSE REQUESTED BY (11, 3I1 1cp 4
RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL. REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT
/i�/1_Jl'ti D L 7,udP.se;E�/I - `✓`D.��9�Sc
,yD .rzb -P At-
/PA, 2e-.e-‘ 5 ■
DATE - Z 'COMMENTS PREPARED BY
C.P.S. Form 11
CITY OF TUKWILA PERMIT NUMBERS T SN r CONTROL NUMBER gel- -2_q3
CENTRAL PERMIT SYSTEM - ROUT. FORM III
TO: a BLDG. Q PLNG. P.W. a FIRE 0 ;POLICE a P. & R.
PROJECT ?„I,\i \It tJ PLAZA-
ADDRESS 1W300. tjaS'AS S
DATE TRANSMITTED &(t, 2:7/ (q4 RESPONSE REQUESTED BY __ a, 3l L'9 a 4
C.P.S. STAFF COORDINATOR ,CV_gD -- RESPONSE RECEIVED
PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE
SPACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINE(S) ON WHICH
THAT CONCERN IS NOTED:
a
a
0
a
0
a
a
a
0
0
0
a
a
D.R.C. REVIEW REQUESTED [i
PLAN SUBMITTAL REQUESTED [J
PLAN APPROVED [I
PLAN CHECK DATE
COMMENTS PREPARED BY
C.P.S. FORM 2
(1/-6a4 "d`161
CITY OF TUKWILA
ENVIRONMENTAL CHECKLIST FORM
}}
This questionnaire must be completed and submitted with .the "app-1 -ea do for �t
permit. This questionnaire must be completed by all persons applying for
permit from the City of Tukwila, unless it is determined -by the Responsible
Official that the permit is exempt or unless the applicant and Responsible
Official previously agree an Environmental Impact Statement needs to be completed.
A fee of $60.00 must accompany the filling of the Environmental Questionnaire
to cover costs of. the threshold determination.
I. BACKGROUND
1. Name of Proponent: ,p
P /lA)// /V U
2. Address and Phone Number' of Proponent: /, 2,') 6y/p /,q*T- -ti(E,U RD; SOS
77.1/ /} /i AJ /1)r4. QX /fr7 — 2 y/- 2//72
3. Date Checklist Submitted: R- 3--Ra
4. Agency Requiring Checklist: e//y19, 7Z'A /U /z 4
5. Name of Proposal, if applicable: 4, ,c7/, ,U //V�r
6. Nature and,Brief Description of the Proposal (including but not limited ,'.
to its size, general design elements, and other factors that will give
an accurate understanding of its scope and nature) :,9 k /S .' /cSTdrP,9GE
BHEL) fOR GAWDEAJ /NG 7.0.04.5* AND 41A /4/TENAA/C - � 2/hO/r7&7U r 7 2 BE7 1?1 7
AOTACENT TD EX /:927;116- 7W/4S,v EyCLOSURE, L!%QLL F //!/ /�5W AyD /17PDA-jN-
/M976-4 /ALS di/ALL 70/970/1 7.405E: DF EY /ST //VG 22L ev-S Dv C/) 4/6 "/7.
p�LE f)/c� dF PFLO/'A rE/-) AA) n cxi s-rin iAtA) t 1P //u/.. rs -rp ti e Dis ni R. D
AS L., TILE. As POSS /134 E..
'7. Location of Proposal (describe the physical setting of the proposal, as
well as the extent of the land area affected by any environmental im-
pacts, including any other . information needed to give an accurate under-
standing of the environmental setting of the proposal):
42.7.40/ 4DT 07- 1z �� ) R /4)
8. Estimated Date for Completion of the Proposal:
9. List of all. Permits, Licenses or Government Approvals Required for the
Proposal (federal, state and local):
(a) Rezone, conditional use, shoreline permit, etc. YES ✓ NO
(b). King County Hydraulics Permit YES NO
(c) Building permit YES,/ NO
•
(d) Puget Sound Air Pollution Control Permit YES NOQ/
(e) Sewer hook up permit YES NO t/
(f) Sign permit YES NO
(g) Water hook up permit YES, NO c�.s
(h) Storm water system permit YES NOt„,—
(i) Curb cut permit YES NO
(j) Electrical permit (State of Washington) YES ✓N0
(k) Plumbing permit (King County) YES NO
(1) Other:
10. Do you have any plans fors future additions, expansion, or futher activity
related to or connected with this proposal? If yes, explain:
11. Do you. know of any plans by others.which may affect the property covered by
your proposal? If yes, explain:
12. Attach any other application form that has been completed regarding the pro- .
posal; if none has been completed, but is expected to be filed at some future
date, describe the nature of such application form:
II. ENVIRONMENTAL IMPACTS
(Explanations of all "yes" and "maybe" answers are required
1. Earth. Will the proposal result in.:
(a) Unstable earth conditions or in changes in geologic
substructures?
(b) Disruptions, displacements, compaction or overcover-
ing of the soil? Cemeitir FLoaR /No- Fog 6fiZQ
(c) Change in topography or ground surface relief fea-
tures?
) The destruction, covering or modification of any
unique geologic or physical features ?.
. -2
(
YES MAYBE NO
X_
x
•
(e) Any increase in wind or water erosion of soils,
either on or off the site?
(f) Changes in deposition or erosion of beach sands, or
changes in siltation, deposition or erosion which
may modify the channel of a river or stream or the
bed of the ocean or any bay, inlet or lake?
Explanation:
2. Air. Will the proposal rdsult.in:
(a) Air emissions or deterioration of ambient air
quality?
(b) The creation of objectionable odors?
(c) Alteration of air movement, moisture
• or temperature, or any change in climate, either
locally or regionally?
Explanation:
3. Water. Will the proposal result in:
'(a) Changes in currents, or the course or direction
of water movements, in either marine or fresh
'waters?
(b) Changes in absorption rates, drainage patterns,
or the rate and amount of surface water runoff?
(c) Alterations to the course or flow of flood waters?
(d) Change in the amount of surface water in any water
body?
(e) Discharge into surface waters, or in any alteration
of surface water quality, including but not limited
to temperature, dissolved oxygen or turbidity?
(f) Alteration of the direction or rate of flow of
ground waters?
(g) Change in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations?
-3
YES MAYBE NO
x
•
(h). Deterioration in ground water quality, either
through direct injection, or through the seepage
of leachate, phosphates, detergents, waterborne
virus or bacteria, or other substances into the
ground waters?
(i) Reduction in the amount of water otherwise avail-
able for public water supplies?
•
Explanation:
4. Flora. .Will the proposal result in:
(a) Change in the diversity of species, or numbers
of any species of'flora (including trees, shrubs,
grass, crops,,microflora and aquatic plants)?
(b) Reduction of the numbers of any unique, rare or
endangered species of flora?
(c) Introduction-of new species of flora into an area,
or in a barrier to the normal replenishment of
existing species?
(d) Reduction in acreage of any agricultural crop?
Explanation:
5. Fauna. Will the proposal result in:
(a) Changes in the diversity of species, or numbers
of any species of fauna (birds, land animals
including reptiles, fish and shellfish, benthic
organisms, insects or microfauna)?
(b) Reduction of the numbers of any unique, rare or
endangered species of fauna?
(c) Introduction of new species of fauna into an
area, or result in a barrier to the migration
or movement of fauna?
(d) Deterioration to existing fish or wildlife
habitat?
Explanation:
YES MAYBE NO
6. Noise. Will the proposal increase existing noise
levels?
Explanation:
7. Light and Glare. Will the proposal produce new
light or glare?
Explanation:
8. Land Use.. Will the proposal result in the altera-
tion of the present or planned land use
of an area?
Explanation:
9. Natural Resources. Will the proposal result in:
(a) Increase in the rate of use of any natural
resources?
(b) Depletion of any nonrenewable natural
resource?
• Explanation:
10. Risk of Upset. Does the proposal involve a risk of an
explosion or the release of hazardous
substances (including, but not limited
to, oil, pesticides, chemicals or radi-
ation) in the event of an accident or
upset conditions?
Explanation:
YES MAYBE NO
X
• •
11. Population. Will the proposal alter the location,
distribution, density, or growth rate
Of the human population of an area?
Explanation:
12. Housing. Will the proposal affect existing housing,
or create a demand for additional housing?
Explanation:
13. Transportation/Circulation. Will the proposal result in:
(a) Generation of additional vehicular movement?
• (b) Effects on.existing parking facilities, or
demand for new parking?
(c) Impact upon existing transportation systems?
(d) Alterations-to present patterns of circulation
or movement of people and /or goods?
(e) Alterations to waterborne, rail or air traffic.?
(f) Increase in traffic hazards to motor vehicles,
bicyclists or pedestrians?
Explanation:
14. Public Services. Will the proposal have an effect upon,
or result in a need for new or altered
governmental services in any of the
following areas:
(a) Fire protection?
(b) Police protection?
(c) Schools?
(d) Parks or other recreational facilities?
(e) Maintenance of public facilities, including
roads?
YES MAYBE NO
•
(f) Other governmental services?
Explanation:
15. Energy. Will the proposal result in:
(a) Use of substantial amounts of fuel or energy?
(b) Demand upon existing sources of energy, or
require the development of new sources of
energy?
Explanation:
16. Utilities. Will the proposal result in a need for
new systems, or alterations to the
following utilities:
(a) Power or natural gas?
(b) Communications systems?
(c) Water?
(d) Sewer or septic tanks?
• (e) Storm water drainage?
(f) Solid waste and disposal?
Expl anati on :,(Ai) MOUE ) 100-Hr I001-9
17. Human Health. Will the proposal result in the crea-
tion of any health hazard or potential
health hazard (excluding mental health)?
Explanation:
YES MAYBE NO
- N
x
Rv.vio0 t 6►-1
.1 4 flOorU%6, •
aq 4 L410
•
0.h G ..o1.3;)24-.
•
—A
l
2b a+..
000go,
:o
4
•
M.XkliMai■NMAA
,r
°�arley,EJensert
architect A.I.A.
51;t;afeyette circle
6feyette,tA 94549
175) 2844393
jaivevi5k4 ri4szeli%
o
GHQ Rfn
:: ,'°� pithy
7-10-a4
• iv)
iza9r To
MATGf-t 4)e-,r'61 •
EA-o6,
6`4 • *Ti/Ci.,0
Ot4teol .ro
MAV GoLoFL
Trrx-rthaE ofs
.474(to'a.
Pea. 0.012-
(1*,,bd
1! 1
• 1
il
, .
I
I
_.......
11
I
'
. - - i
I
• •--- • - • • • --• • • .
. , - • , •
- •
rfr
.1-10‘.41
:ferF -to •
4krA4• e:4614
Nop-T-H
VA-ri.ot\J
1-00\hze6 -
frtkrGH
-W0111 e.4-64/•
<-0,ro coo
t.111-1
Mkros
er rut
_
kNA I
c0.1
- '
t-!..1 •
Vk T'7
ax .51-1 t.J4
"rg•kl-f:
e.1461.sLifie
VA-1100
y4[l•I7Il
. HarteyEJensen
Architect A.LA.
251 Lafayette Circlet
Lafayette, CA 94549
(4P5)284439
\1 \/ ■.•4 r1-ALA
• ‘oroP-rA4e- .48 k7
eot-1 f34441d
44F-Ven>10eht • pArs.itp
11)}4v.t.6CA., •
saw e-,4
2*1- 1.4 p),;;T/6.-rfe; GT20.6
tAFA-egft /CA'. 14G41
612.(042,46,4e.‘
TeGrtlisi CoMPAPY
gerka .
rt.m.v.ilL,A., WA_
�V t
�o!�E
hME D
Gxlciti�
te",4,t2.rIa.
t"-2o1
W
tt3
F 10N1 = .
A ell- eig.,c I�lo" hip,A4e- off �f7. rOjz
A Jt7 01e11 0'r
V, . f-' -' 153UI Lr c - 4!
iP(iH e.NG up-E.
FI N i�H AIJ o pet,piri61 MAcre.42-1 t -Aa
�ILpll�ili,�: !t�E:: i
CITY OF TUHIPLA
Central Permit System
MASTER LAND
DEVELOPMENT APPLICATION FORM
PLEASE WRITE LEGIBLY OR TYPE ALL
ACCEPTED FOR PROCESSING.
REQUESTED INFORMATION -'- INCOMPLETE APPLICATIONS WILL NOT BE
0-074, U-74(
SECTION is GENERAL DATA
TYPE
OF APPLICATION: D 651P
) APPLICANT:
3)
OSHORT a SUBDIVISION
PLAT
0 CONDITIONAL
USE
DUNCLASS.
USE
NAME AI/J%ELA ./4)6/1
ADDRESS Id (.3./s L217% iSTEn)%5Wit) /f0-'1F//z/ TL/kW /Ld 4, /9. ZIP 981f38
PROP. OWNER: NAME j Ayjgyn[� F /C'HT/lg6/R TELEPHONE (�6 ),Z4// -Q/ I�
ADDRESS ILD/Y7 (:HR!`�,'T�/LiS�/I� /1,1, ' /iJ - TZ1/CLIJ /L �} z -'4, ZIP GIR /
PROJECT LOCAT 1 ON : (STREET ADDRESS, GEOGRAPHIC, LOT/ BLOCK) /at;; [/ff jf /,S7E/.)„.5- ))
SHORELINE
PERMIT
PRD oPMUD INTERURBAN
0 VARIANCE 1 CHG. OF
ZONING
COMP. PLAN
AMENDMENT
TELEPHONE (.Z 76) z4' / -578q
Rl), r�.�r�o' /L� hJ,42, 98/88
SECTION II: PROJECT INFORMATION
Q) DESCR I BE BR I EFLY THE PROJECT YQU. PROPOSE. e:7',6 % A, /$.
I_/ :. / / . • •
•
5) ANTICIPATED PERIOD OF CONSTRUCTION: FROM 0c7.;/ /eq TO r, q �r !''T
6) WILL PROJECT BE DEVELOPED..IN PHASES? OYES R NO IF YES, DESCRIBE:
,7), .PROJECT STATISTICS.:..
A)
B),.
IS
ACREAGE OF. PROJECT SITE:
FLOORS OF CONSTRUCTION:
SITE UTILIZATION:
NET j� Sy
TOTAL Ji FLOORS
TOTAL GROSS
FLOOR AREA
ZONING DESIGNATION
COMP. PLAN DESIGNATION
BUILDING FOOTPRINT AREA
LANDSCAPE AREA
PAVING AREA
TOTAL PARKING STALLS:
- STANDARD SIZE.
- COMPACT SIZE
- HANDICAPPED SIZE
TOTAL LOADING SPACES
AVER. SLOPE OF PARKING AREA
AVER. SLOPE OF SITE
THIS SITE DESIGNATED FOR SPECIAL
MAP? D YES ❑ NO
GROSS'
EASEMENTS
INCLUDES - D BASEMENT D MEZZANINE'
INCLUDES: a BASEMEN-
ASEMENT D MEZZANINE
EXISTING PROPOSED
0
0
❑
O
0
0
NOTES
CONSIDERATION ON THE CITY'S ENVIRONMENTAL BASE
SECTION III: APPLICANT'S AFFIDAVIT
CONTRACT PURC
, BEING DULY SWORN, DECLARE THAT 1 AM THE
ER OR OWNER OF THE PROPERTY INVOLVED 161 THIS APPLICATION AND THAT THE FORE-
GOING STATEMENTS AND ANSWERS HEREIN CONTAINED AND THE INFORMATION HEREWITH SUBMITTED ARE IN
ALL RESPECTS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE AND BELIEF.
DATE
SUBSCRIBED AND SWORN BEFORE ME
TH15
G DAY OF Rv S T
, 1 9 cy
-ex4.'441- �
NOTARY PUBLIC IN AND FOR THE STATE OF WASHINGTON
RESIDING AT S6-4 TTI.F
X - _
(S 1 GNATURE OF /rONTRk!.C,T PURCHASER OR OWNER)
ti
CITY OF TUKWILA
CENTRAL PERMIT SYSTEM
ENVIRONMENTAL REVIEW ROUTING F0RM
F;TiLDG 1-711PLNG P.W \[ FIRE POLICE (/rP & R
l\l,e2\ct
TO;
PROJECT
•CN 84" 29'o
EPIC 7-44 -84
FILE 64 - ?- j--SM,r°
LOCATION (67,■()C, Ckk-tZ.15TS 0 FILE N0.
DATE TRANSMITTED (4 , Z ?((qc 4 RESPONSE REQUESTED BY (4. •3 ( 1 1c1 4
STAFF COORDINATOR �.(,C �. ^W_ RESPONSE RECEIVED
THE ATTACHED ENVIRONMENTAL CHECKLIST WAS RECEIVED REGARDING THIS PROJECT. PLEASE
REVIEW AND COMMENT BELOW' TO ADVISE THE RESPONSIBLE OFFICIAL REGARDING THE THRESHOLD
DETERMINATION. THE ENVIRONMENTAL REVIEW FILE IS AVAILABLE IN THE PLANNING DEPART-
MENT THROUGH THE ABOVE STAFF COORDINATOR. COMMENTS REGARDING THE PROJECT YOU WISH
CARRIED TO THE PLANNING COMMISSION, BOARD OF ADJUSTMENT, AND CITY COUNCIL SHOULD BE
MADE ON THE ATTACHED CENTRAL PERMIT SYSTEM ROUTING FORM.
ITEM COMMENT
DATE COMMENTS PREPARED BY
C.P.S. Form 11
CITY OF TUKWILA PERMIT NUMBER Z�-� CONTROL NUMBER �� -2qo
CENTRAL PERMIT SYSTEM - ROUTING FORM
TO: [[ BLDG. C1 PLNG. Q► P.W. Q FIRE Q POLICE EI P. & R.
PROJECT ?1\1 1)NI6 P(.Pr2A
ADDRESS 16000. c. LIST
DATE TRANSMITTED TiV (t, Z%/ [9,C34 RESPONSE REQUESTED BY
C.P.S. •STAFF COORDINATOR4C .b_Z.' . RESPONSE RECEIVED
i5(t., ?,l , tdi 4
PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE
SPACE BELOW. INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO THE LINE(S) ON WHICH
THAT CONCERN IS NOTED:
D.R.C. REVIEW REQUESTED []
PLAN SUBMITTAL REQUESTED [[
PLAN APPROVED [�
PLAN CHECK DATE
COMMENTS PREPARED BY
C.P.S. FORM 2
Cam - f�f ��10 • c- L-0
CITY OF TUKWILA
ENVIRONMENTAL CHECKLIST FORM
1.1/61M8
AUG 21 1984
_�1l�ANIV 1i��r1�PLA
P
This questionnaire must be completed and submitted with the a°ppl-•rca.ora,_ for
permit. This questionnaire must be completed by all persons applying for a
permit from the City of Tukwila, unless it is determined by the Responsible
Official that the permit is exempt or unless the applicant and Responsible
Official previously agree an Environmental Impact Statement needs to be completed.
A fee of $60.00'must accompany the filling of the Environmental Questionnaire
to cover costs of. the threshold determination.
I. BACKGROUND
1. Name of Proponent: / / /e72//)O �` • �E w0,4.T/ -A4fwe
2. Address and Phone Number' of Proponent: /l/.!K9 �///pj��EysE,U Ro, jpS
7- -amzU // A� h).9. QX/ f'7 — 2///)
3. Date Checklist Submitted: .�
4. Agency Requiring Checklist: L? /77 D/ TL//2L 4
• 5.. Name of-Proposal, if applicable:
.6. 'Nature and,Brief Description of the Proposal (including but not limited
to its size; general design elements, and -other factors that will give
an accurate understanding of its scope and nature): AP 9 /S cSTD/PAGE
BHED FOR GARDE.c/ /NG TDD4S RND A9A /A/ThiVAit/C - EQU�P/l9Eti T 70 BR- SUzGT •
AGO c 4.9T/NG- 7h4C.5,w E/I/CLDSL/RF, .421,04Z R//1/ /dy/ ,161/2) AQDF/A/G-
49ATET?/ALS c9HA/1 /M T W L;7.44)47-. EF . oNE L/) z,/c rr
p�LE u) /LL dE R&7, ii47 /D AND -J ,G- LANDSOHP /A!G 2S Tn Be DIST4
AS L/7"7464.5 POSE / 8' -E'..
7. Location of Proposal (describe-the physical setting of the-proposal, as
well as the extent of the land area affected by any environmental im-
pacts, including any other. information needed to give an accurate under-
standing of the environmental setting of the proposal):
/D ' /eg A Lr /G /9 //!) -s D 7. E/UT 7D G/P��:A) R /U,e
8. Estimated Date for Completion of the Proposal:
9. List of all. Permits, Licenses or Government Approvals Required for the
Proposal (federal, state and local):
(a) Rezone, conditional use, shoreline permit, etc. .YES ✓ NO_
(b). King County Hydraulics Permit YES NO
(c) Building permit YESI/ NO
(d) Puget Sound Air Pollution Control Permit YES NO .-
(e) Sewer hook up permit YES NO t/
(f) Sign permit YES NO y�
(g) Water hook up permit YES NO
(h) Storm water system permit YES NOt.----
(i) Curb cut permit YES NO —`
(j) Electrical permit (State of Washington) YES ✓NO
(k) Plumbing permit (King County) YES NO 4,---
(1) Other:
10. Do you have any plans for future additions, expansion, or futher activity
related to or connected with this proposal? If yes, explain:
11. Do you. know of any plans by others which may affect the property covered by
• your proposal? If yes, explain:
4,D
12. Attach any other application form that has been completed regarding the pro-
posal; if none has been completed, but is expected to be filed at some future
date, describe the nature of such application form:
II. ENVIRONMENTAL IMPACTS
(Explanations of all "yes" and "maybe" answers are required)
YES MAYBE NO
1. Earth. Will the proposal result in.:
(a) Unstable earth conditions or in changes in geologic
substructures?
(b) Disruptions, displacements, compaction or overcover-
i n g of the soil? C e`An- fLawz iNG FOle 67/41)
(c) Change in topography or ground surface relief fea-
tures?
(d) The destruction, covering or modification of any
unique geologic or physical features?
-2
X
• •
(e) Any increase in wind or water erosion of soils,
either on or off the site?
(f) Changes in deposition or erosion of beach sands, or
changes in siltation, deposition or erosion which
may modify the channel of a river or stream or the
bed of the ocean or any bay, inlet or lake?
Explanation:
2. Air. Will the proposal result in:
(a) Air emissions or deterioration of ambient air
quality?
(b) The creation of objectionable odors?
(c) Alteration of air movement, moisture
or temperature, or any change in climate, either
locally or regionally?
Explanation:
3. Water. Will the proposal result in:
(a) Changes in currents, or the course or direction
of water movements, in either marine or fresh
waters ?.
(b) Changes in absorption rates, drainage patterns,
or the rate and amount of surface water runoff?
(c) Alterations to the course or flow of flood waters?
(d) Change in the amount of surface water in any water
body?
(e) Discharge into surface waters, or in any alteration
of surface water quality, including but not limited
to temperature, dissolved oxygen or turbidity?
(f) Alteration of the direction or rate of flow of
ground waters?
(g) Change in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations?
-3-
YES MAYBE NO
X_
X_
x_
• •
(h) Deterioration in ground water quality, either
through direct injection, or through the seepage
of leachate, phosphates, detergents, waterborne
virus or bacteria, or other substances into the
ground waters?
(i) Reduction in the amount of water otherwise avail-
able for public water supplies?
Explanation:
4. Flora. Will the proposal result in:
(a) Change in the diversity of species, or numbers
of any species of flora (including trees, shrubs,
grass, crops, microflora and aquatic plants)?
(b) Reduction of the numbers of any unique, rare or
endangered species of flora?
(c) Introduction of new species of flora into an area,
or in a barrier to the normal replenishment of
existing species?
(d) Reduction in acreage of any agricultural crop?
Explanation:
5. Fauna. Will the proposal result in:
(a) Changes in the diversity of species, or numbers
of any species of fauna (birds, land animals
including reptiles, fish and shellfish, benthic
organisms, insects or microfauna)?
(b) Reduction of the numbers of any unique, rare or
endangered species of fauna?
(c) Introduction of new species of fauna into an
area, or result in a barrier to the migration
or movement of fauna?
(d) Deterioration to existing fish or wildlife
habitat?
Explanation:
YES MAYBE NO
x
6. Noise. Will the proposal increase existing noise
levels?
Explanation:
7. Light and Glare. Will the proposal produce new
light or glare?
Explanation:
8. Land Use, Will the proposal result in the altera-
tion of the present or planned land use
of an area?
Explanation:
9. Natural Resources. Will the proposal result in:
(a) Increase in the rate of use of any natural
resources?
(b) Depletion of any nonrenewable natural
resource?
Explanation:
10. Risk of Upset. Does the proposal involve a risk of an
explosion or the release of hazardous
substances (including, but not limited
to, oil, pesticides, chemicals or radi-
ation) in the event of an accident or
upset conditions?
Explanation:
YES MAYBE NO
11. Population. Will the proposal alter the location,
distribution, density, or growth rate
of the human population of an area?
Explanation:
12. Housing. Will the proposal affect existing housing,
or create a demand for additional housing?
Explanation:
13. Transportation /Circulation. Will the proposal result in:
(a) Generation of additional vehicular movement?
(b) Effects on existing parking facilities, or
demand for new parking?
(c) Impact upon existing transportation systems?
(d) Alterations to present patterns of circulation
or movement of people and /or goods?
(e) Alterations to waterborne, rail or air traffic?
(f) Increase in traffic hazards to motor vehicles,
bicyclists or pedestrians?
Explanation:
14. Public Services. Will the proposal have an effect upon,
or result in a need for new or altered
governmental services in any of the
following areas:
(a) Fire protection?
(b) Police protection?
(c) Schools?
(d) Parks or other recreational facilities?
(e) Maintenance of public facilities, including
roads?
YES MAYBE NO
(f) Other governmental services?
Explanation:
15. Energy. Will the proposal result in:
(a) Use of substantial amounts of fuel or energy?
(b) Demand upon existing sources of energy, or
require the development of new sources of
energy?
Explanation:
16. Utilities. Will the proposal result in a need for
new systems, or alterations to the
following utilities:
(a) Power or natural gas?
(b) Communications systems?
(c) Water?
(d) Sewer or septic tanks?
(e) Storm water drainage?
(f) Solid waste and disposal?
Explanation:V(AI) MauE 1 I iagr 104246
17. Human Health. Will the proposal result in the crea-
tion of any health hazard or potential
health hazard (excluding mental health)?
Explanation:
YES MAYBE NO
• •
18. Aesthetics. Will the proposal result in the obstruc-
tion of any scenic vista or view open to
the public, or will the proposal result
in the creation of an aesthetically of-
fensive site open to public view?
Explanation:
19. Recreation. Will the proposal result in an impact
upon the quality or quantity of exist-
ing recreational opportunities?
Explanation:
20. Archeological /Histroical. Will the proposal result in
an alteration of a signifi-
cant archeological or his-
torical site, structure,
object or building?
Explanation:
CERTIFICATION BY APPLICANT:
YES MAYBE NO
I, the undersigned, state that to the best of my knowledge the above
information is true and complete. It is understood that the lead agency
may withdraw any declaration of non - significance that it might issue in
reliance upon this checklist should there be any willful misrepresentation
or willful lack of full disclosure on my part.
0„,„g
Signature and Title
Date
•
. •
eso 71.1114)
jil
G 2 1 1q8/1
CITY OF It..kik.y,,LA •
PLANNING DEPT.
HE fffv
r r
•
oioo' 1.4
....071.441;5
HarleyEJe/ nsen
Architect A.1. Al
251,1alvette Circle
L4tfoi•ette;CA 94540
(4i5)844398
' . •
r'r. • •
..„..
tN) frIT
12,42r-
HATO r4.
New rixt..0
Orly* .ro.
G9tofi
-(E:ictl)rze ofs
Pg I rat
Or:
C 4130 1■14212-r H
11-9---1----If
t.,
i;
,1
I, 11
,'4 I;
J.
, I:
1
,
4 ,i
!,
, ,
,,
•
" 1.ar.„ATW
4HT rvd,f-tt
411-
.
3r6.-
likrA4 '60714
-
t-,tkrciA &
.w0.14 EL6V.
1
11 G 2, 1 1984
."
PLANNHNGDEPTJ
.
Xte-/r4.
\fi2oke-41
t.e1.40e-dt.* e
8-14N/P N
eg4 Le,51.-/P-6 • ----
Astocoo
cdog-
1,14.-:croce-
ep eg*ritut
,•
y41.10 tio,
.
'Co MAT- H
(E) get.
Fe) \Vi (J 7
Gtoovp..f
MP ..
/\1I fl 2 1 1984
PLANNING DEF
G I.oyV psi
e:'
MFR•
i2tMrnl ()
24•4 P212-I614 .cod..r
hrvvh wk�. (N)
X40"0-0. W�ui
Yt tp 10,4`t,
41=0 "D,G
%4 " /fr
Io, I'-o
LAroyeff
Itvepvl.: vJ ..PL„A2444.:
Tl t 1t%re• cats eXtJY
liii12.I45fe1,15n
rlKvIt L,o., WA_
•p=ea-
7 -ia -84
J LC In ��'. !�
AUG 9' 1:
I C� °� Y F
i
PLAN,'
•
F++<Ih1 fN /� -..
PN1f -2o
•
1
[10 G 2 1 1984 i" 1
• i
c.,P1 OF TWorA
PLANNING DFPT.
a--
nsen
12-1\/.6-42--• Vt\/\/
e-t■'
.• '
L
a)
co
1°F.E21cJr F2.11?.(1,01 :
A ,1-e, 1214.61- -61-f E-0 f=ofz.
1.1.rtt.lAtk,e, pH
1412t:7 ft9-* t=3
• t.h1Gt.cvoup-E .
1-1- • 0 M-1- .0.44 pelopf
• $*461L-L■ td141: a-,44,-E2y PicA;r
F3011.-r)11.141•., I ti6v.
. e
t-JA ley :ee.
11L /40‘
a._
Oats
Scale
rarin
Job
Sheet
•
. ' •
•
■