Loading...
HomeMy WebLinkAboutSEPA EPIC-25-89 - SCHOFIELD ROBERT - MIKAMI / SHIMATSU REZONEMIKAMI REZONE REZONE SINGLE FAMILY RESIDENCE (R -1) TO REGIONAL RETAIL (C -2) 16813 SOUTHCENTER PARKWAY EPIC -25 -89 NOTICE OF ASSIGNMENT AND TRANSFER Date �,�A !Q (`l '70 To Pac is First Federal Savings Bank Address 400 SW 152nd, Seattle, WA 98166 Please take notice that the.account in your institution evidenced by account or passbook number and /or certificate number(s)0C-/p4/6-3 a in an amount of at least but not less than $38,50 0 has been assigned and transferred to the undersigned as collateral for the Obligations and that such money is payable directly to the undersigned. Please complete your acknowledgement of assignment and transfer and return same to the undersigned. City of Tukwi a a.r, 0( Authorized Signature) ACKNOWLEDGEMENT We acknowledge receipt of your notice of assignment and transfer of the account of Robert H. Schofeild or Leslie M. Schofeild in this institution evidenced by and /or certificate number(s) 047- 14o2115tpgether with all moneys and claims for moneys now and hereafter due or payable thereon. We further acknowledge that such moneys are payable directly to the City and that no account holder or assignee (except for the City) shall have any right to make any withdrawal from said account or to obtain any new certificate evid hdCing saidaccoun,. (a4 i 70 Date n6 -14 -9n Pacific First Feder Savings Bank By PBRII (Title) Agreement To Be Subject To A Sensitive Areas Ordinance The undersigned owner and developer of real property located at 16813 Southcenter Parkway, Tukwila, WA and more specifically described in Exhibit A attached hereto, hereby agrees, pursuant to the requirements of Tukwila Ordinance No.'s 1544 and 1550, that if the City of Tukwila will process the following applications: EPIC -25 -89 SEPA for Mikami Rezone. 89 -4 -R Mikami Rezone the development of the property described in Exhibit A will be subject to all of the Sensitive Areas Ordinance provisions as finally passed by the City Council even though those provisions may be more restrictive than any conditions or limitations imposed by or resulting from the processes described above. The Undersigned agree(s) that these processes will be continued solely at their risk and expense and that the result of the final Sensitive Area Ordinance may be to require extensive project modification and re- evaluation or recision of the above approvals. It is also understood and agreed that continuation of these processes does not mean that applications not pending on November 20, 1989, for this project, will be accepted or processed unless the City Council approves a petition therefor. , The undersigned acknowledges that the covenants herein run with the land described in Exhibit A and that this document will be recorded with the King County Department of Records and Elections and that these covenants cannot be released without the written consent of the City of Tukwila. Landowner pplicant STATE OF WASHINGTON ) ss. COUNTY OF RING On this day personally appeared before me Matt M Mikami and Robert H Schofield , to me known to be the individual described in and who executed this instrument, and acknowledged that s /he signed the same as a free and voluntary act for the uses and purposes herein mentioned. Dated January 10 f ,.1990. Notary [public 6ali and for the State of Washington, residing at Federal Way My appointment expires 9-29 -93 •EXHIBIT A, Page 1 of 2 DESCRIPTION: PARCEL A: • THAT PORTION OF THE NORTHEAST 1/4 OF THE SOUTHWEST 1/4 (HEREINAFTER REFERRED TO AS THE SUBDIVISION) IN SECTION 26, TOWNSHIP 23 NORTH, RANGE 4 EAST W.M. LYING WEST OF COUNTY ROAD NO. 972, MESS BROTHERS ROAD, CONVEYED TO KING COUNTY BY DEED RECORDED UNDER RECORDING NO. 921233 ( SOUTHCENTER PARKWAY FORMERLY 57TH AVENUE SOUTH), DESCRIBED AS FOLLOWS: BEGINNING AT A POINT ON THE WEST LINE OF SAID SUBDIVISION, 1,020 FEET NORTH OF THE SOUTHWEST CORNER THEREOF; THENCE NORTH, ALONG SAID WEST LINE, 294.62 FEET, MORE OR LESS, TO THE NORTHWEST CORNER OF SAID SUBDIVISION; THENCE EAST, ALONG THE NORTH LINE OF SAID SUBDIVISION, TO THE INTERSECTION WITH THE WEST LINE OF SAID COUNTY ROAD; THENCE SOUTH, ALONG SAID WEST LINE, A DISTANCE OF 294.62 FEET, MORE OR LESS, TO THE INTERSECTION WITH A LINE RUNNING EAST FROM THE POINT OF BEGINNING PARALLEL TO THE SOUTH LINE OF SAID SUBDIVISION; THENCE WEST ON SAID PARALLEL LINE TO THE POINT OF BEGINNING; EXCEPT THAT PORTION THEREOF CONVEYED TO THE STATE OF WASHINGTON FOR PRIMARY STATE HIGHWAY NO. 1 (SR 5) BY DEED RECORDED UNDER RECORDING NO. 5524599 AND 5992105; AND EXCEPT THAT PORTION LYING EASTERLY OF THE WESTERLY MARGIN OF SOUTHCENTER PARKWAY AS CONVEYED BY DEED RECORDED UNDER RECORDING NO. 6343852; SITUATE IN THE CITY OF TUKWILA, COUNTY OF KING, STATE OF WASHINGTON. PARCEL B: THAT PORTION OF THE FOLLOWING DESCRIBED PARCEL LYING NORTHERLY OF A LINE WHICH IS 1,020 FEET NORTHERLY OP AND PARALLEL WITH THE SOUTH LINE OF THE HEREINAFTER REFERRED TO NORTHEAST 1/4 OF THE SOUTHWEST 1/4: THAT PORTION OF THE NORTHEAST 1/4 OF THE SOUTHWEST 1/4 OF SECTION 26, TOWNSHIP 23 NORTH, RANGE 4 EAST W.M., DESCRIBED AS BEGINNING AT A POINT WHICH IS OPPOSITE HIGHWAY ENGINEER'S STATION (HEREINAFTER REFERRED TO AS HES) LW 2504 +89.33 ON THE LW LINE SURVEY OF SR 5, SOUTH 178TH STREET TO SOUTH 126TH STREET, AND 553.73 FEET SOUTHEASTERLY THEREFROM; THENCE EASTERLY TO A POINT OPPOSITE HES LW 2505 +00 ON SAID LW LINE SURVEY AND 590 FEET SOUTHEASTERLY THEREFROM; THENCE NORTHERLY TO A POINT OPPOSITE HES LW 2505 +75 ON SAID LW LINE SURVEY AND 570 FEET SOUTHEASTERLY THEREFROM; THENCE NORTHERLY TO A POINT OPPOSITE HES LW 2507 +15 ON SAID LW LINE SURVEY AND 515 FEET SOUTHEASTERLY THEREFROM; THENCE NORTHERLY TO A POINT OPPOSITE HES LW 2509 +50 ON SAID LW LINE SURVEY AND 500 FEET SOUTHEASTERLY THEREFROM; THENCE NORTHWESTERLY TO A POINT OPPOSITE SAID HES AND 428.97 FEET SOUTHEASTERLY THEREFROM; THENCE SOUTHERLY IN A STRAIGHT LINE TO THE POINT OF BEGINNING; SITUATE IN THE CITY OF TUKWILA, COUNTY OF KING, STATE OF WASHINGTON. Form No. W.AArt555 (Previous Form No. 80R) '99 1s 72 No N8etti•.p' w- • — •e s.•.. io►1 410 • • •f• • •0 *BIT A, Page 2 of 2 N 5 • y" fla ti 6 �• Lc./ 14 4 7 /4as orpo / / / / / ORDER NO. 3 .'. % ESCROW NO. LOAN NO. MORTGAGOR PLAT MAP Vol PG 1 ce -1 • • • w M 1 3x7.991 I164I 16 / M t / a ti / • 0 • / • I yrs/4•7 .J .. v_ iv 4 I k I ` >- 3 cc Q 1 This map does not purport to show all highways, roads or easements affecting said property: no liability is assumed for variations in dimensions and location 4 WAC 197 -11 -970 MITIGATED DETERMINATION OF NONSIGNIFICANCE Description of Proposal Rezone 1.74 acres from R -1 -7.2 (Single Family Residence) to C -2 (Regional Retail). Fill and other construction activities are covered by other SEPA checklists. Mitigating actions are listed in Attachment A. Proponent Robert H. Schofield. Location of Proposal, including street address, if any 16813 Southcenter Parkway in the SW 1/4 of Sec. 26, Twn. 23, Bge. 4; Tukwila, WA. Lead Agency: City of Tukwila File No. EPIC -.25 - 89 The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. [� There is no comment period for this DNS This DNS is issued under 197 -11- 340(2). Comments must be submitted by JAN Uttk -( 2.2 ) 987 . The lead agency will not act on this proposal for 15 day from the date below.. Responsible Official Rick Beeler Position /Title Planning Director Address 6200 Southcenter Boulevard, Date 70 • Signature Phone 433 -1846 j0,0141/ You may appeal th s determination to the City Clerk at City Hall, 6200 Southcenter Boulevard, Tukwila, WA 98188 no later than 10 days from the above date by written appeal stating the basis of the appeal for specific factual objections. You may be required to bear some of the expenses for an appeal. Copies of the procedures for SEPA appeals are available with the City Clerk and Planning Department. FM.DNS City of Tukwila PUBLIC WORKS DEPARTMENT 6300 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -0179 Ross A. Earnst, P.E. Director M E M O R A N D U M To: Jack Pace From: Ron Cameron Date: November 27, 1989 Re: Makamie rezone traffic analysis First, we cannot agree with the volumes predicted; this has been discussed with Chris Brown. The projections are based on the existing center which is impacted by parking and access - therefore, in serious question as to what traffic can be generated by the proposed development in the future. Never - the -less, the magnitude of the volumes are still relatively small. The Chris Brown work shows 690 vehicles per day for 26.4 /KSF while a rate of 50 /KSF is more realistic. The peak hour differences are too small to evaluate LOS differences between the 26.4 rate and a rate of 50. For example, Chris Brown shows about a 50/50 split to north and south. The affect between 20 and 40 noon peak trips at the, Southcenter Parkway /Strander intersection which has about 3,000 provides an indication of scale. The traffic will affect LOS. Second, we do not agree on the level -of- service analysis that shows Southcenter PkWy /Strander operating at C and D for the existing noon and pm peak. Work by CH2M and observation shows LOS F. The Brown report recommends widening Strander with a 3rd lane for the combined Tukwila Pond and Makamie additional traffic too maintain LOS D. A construction cost estimate to widen Strander and add sidewalks prepared shows $530,900; design and construction administration costs will inrease the costs to $715,000. The Chris Brown report identifies the Makamie development as being 0.6 or 0.8 per cent of the total peak hour traffic. The higher generation rate would make these 1.2 or 1.6. This would result in somewhere between $5,720 and $11,440 of the future project costs. The average of low and high is $8,580 and that is the "fairest" assessment of contribution for the future improvement. A signal warrant analysis was requested but not provided; the high Southcenter PkWy volumes will limit access to the site until a signal is constructed. The S 168 St signal is planned to be constructed in conjunction with S 168 Street. This signal will provide access control for the Makamie development - vehicles and .• • • pedestrians. Approval of the development should be conditioned on its particapation in the future signal. Design costs, construction costs, and construction administration costs will be about $120,000. The Makamie development should provide one fourth (one leg of the intersection) of these costs to provide for increased safety of vehicle and pedestrian traffic on Southcenter PkWy, crossing Southcenter PkWy, and access to the site. The traffic mitigation funds are the $8,580 Southcenter /Strander improvement share and $30,000 signal improvement share. They need to be provided prior to issuing certificate of occupancy. • To: Rick From Ron Subject: Scofield Southcenter Pk Wy rezone Date: October 24, 1989 The traffic analysis elements to be evaluated is based on: most of the Schofield development traffic will travel to/from the north on Southcenter Pk Wy & the Strander - Klickitat intersections; the CH2M deficiencies work identifies this as one of the top City of Tukwila LOS corrections needed, this area is operating at LOS F - any additional traffic will further impede traffic safety and movement; the proposed rezone will change the trip generation rate from about 25/acre for residential to 250/acre or more; from 10/day for the existing home to 2,000/day (+/-) for 24,000 sq ft of retail the traffic analysis requested is intended to identify fair share costs for traffic mitigations (reaching LOS D), it's intended to be a consistent approach used with other developments in the area. They have previously been discussed with Mr. Scofield, at DRC, following DRC with Mr. Scofield and Chris Brown, and in the October 11 letter to Mr. Scofield. The requested rezone could be recommended for approval with a signed condition that the developer will participate in the costs of traffic mitigation improvements; the development would pay its fair share. The fair share costs will be determined with the traffic study described in the October 11 letter. The costs are 2not known now. The fact that the proposal is to rezone to the comprehensive plan zoning is one reason for the approval. Another is that the particular development is rather small traffic generation wise. It is still recommended that the traffic impacts resulting from a rezone be known prior to rezone approval. This is the same message given last Monday, October 16th and verbally to Mr. Scofield last week. It is not recommended to approve a rezone without traffic analysic7. XC: John McFarland CITY OF TUKWILA 6200 SOUTHCE.VTER BOULEVARD, TUKIVILA, WASHINGTON 98188 October 16, 1989 Robert H. Schofield 4212 Hunts Point Road Bellevue, WA 98004 PHONE 8 (2061 433.1800 Garb' L. VanDusen. Mayor RE: Environmental Determination for Mikami Rezone (EPIC- 25 -89). Dear Mr. Schofield, This letter is to confirm your discussion with Vernon Umetsu of my staff on October 13, 1989. New information has been received from the City Public Works Department regarding potentially significant traffic impacts due to your project. I am therefore withdrawing my previous Determination of Non - significance until I am able to review a traffic study on the proposed rezone action. This traffic study should reflect Public Works Department parameters in their letter of October 11, 1989 (attached). A SEPA traffic study for a rezone action normally requires assuming the most intensive development possible under the proposed zone. However, I am reasonably convinced that you are committed to the smaller 24,000 s.f. retail project described in your checklist. I will accept this as the scale of the proposed action if you will amend the SEPA project description to reflect this size. Re- evaluation of environmental impacts will delay Planning Commission review of your rezone application. This delay is unavoidable since SEPA must be completed before other City actions can be taken. Please contact Ron Cameron, City Engineer (433 -0179) if you have any questions regarding the traffic study; or Vernon Umetsu of my department (433 -1858) if we can be of further assistance. Sincerel "AZI P* L. ick Beeler SEPA Responsible Official �' C Cont l rti( C4 DAJ City of Tukwila PUBLIC WORKS DEPARTMENT 6300 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -0179 Ross A. Earnst, P.E. Director October 11, 1989 Mr. Robert Schofield 3806 - 130th Northeast Bellevue, Washington 98005 Dear Mr. Schofield: RE: Southcenter Parkway Property Rezone The proposed Southcenter Parkway rezone for development will need a transportation safety and capacity analysis. It will need to evaluate the impace needs including several items. The purpose of this letter is to identify them for evaluating the proposed rezone and development. Jack Pace of Tukwila Planning Department has suggested that the analysis be coordinated with Southcenter Plaza Phase II; the evaluation identified in this letter combines them so the cumulative effect will be quantified. Trip generation for ADT, Noon Peak, PM, and Peak Christmas shopping peaks (noon & PM) is requested to be calculated. Please show the traffic volume distribution onto Southcenter Parkway from north of Klickitat through the South 180th Street intersection and on Strander through Andover Park West. The Christmas high volume period occurs from mid November through Christmas. The volumes need to show existing (1), the additional traffic of Phase I (2), the Phase II traffic (3), and the total (4). It would be preferred if the trip distribution (Strander, Southcenter Parkway, Klickitat, etc.) could be shown "graphically" on a map in the manner displayed in Figure 3 -16, page 62, 1988 ITE TRANSPORTATION AND LAND DEVELOPMENT. It would be preferred if turning movements could be shown as displayed in Figure 17.2, page 522, 1982 ITE MANUAL OF TRAFFIC ENGINEERING STUDIES. Please show a tabulation of parking demand using the ITE Land Development reference and 1987 ITE PARKING GENERATION book - comparing ITE parking demand, proposed developmen supp y, an ukwila Municipal Code requirements. A trip distribution table and map for the rezone traffic is requested. It should show the traffic assignment through the nearby street network including: Southcenter Parkway & I -5 northbound off (signal), Klickitat, I -5 northbound off unsignalized, Strander and South 180th Street; Strander and Doubletree /Security Bank access, 58th, 61st, and Andover Park West showing the existing Phase I, additional Phase II, and total traffic. Mr. Robert Schofield October 11, 1989 Page 2 The Level Of Service (LOS) for the peak hours is requested to include analysis of existing volumes plus Phase I (1) and (1) plus Phase II traffic volumes - for the existing street network and for propoed street mitigations. Suggested capacity mitigations include the 58th and 168th connection that was identified in the Phase I evaluation, widening Strander approaching Southcenter Parkway, widening Southcenter Parkway from the northern intersection through Strander, and similar lane additions. Other suggestions will be openly considered and welcomed. Safety mitigations for pedestrian movements and local circulation need to be addressed in accord with evaluation findings. Pedestrians crossing between the rezone and existing complex (to the south) across Southcenter Parkway should be addressed in the evaluation. Evaluation of accident patterns for existing records and projections is requested. Safety evaluation work needs to tabulate hourly and peak hour signal warrants for the 58th /Strander intersection and 168th /Southcenter Parkway intersection, pedestrians, driveway circulation, and truck access including radius, loading movements, and parking. A book of tabulated traffic counts and accidents prepared to assist you has been provided to Chris Brown. We look forward to completing this work with you. Sincerely, Ron Cameron, P.E. City Engineer RC /kjr CC: Chris Brown, Chris Brown Associates Jack Pace, Planning A iiiIDAVIT O F D I S T•I B U T I O N JOANNE JOHNSON hereby declare that: Q Notice of Public Hearing O Notice of Public Meeting [] Board of Adjustment Agenda Packet Q Board of Appeals Agenda Packet (] Planning Commission Agenda Packet Q Short Subdivision Agenda Packet EJ Determination of Nonsignificance 0 Mitigated Determination of Non - significance [I Determination of Significance and Scoping Notice O Notice of Action O Official Notice Notice of Application for ❑ Other Shoreline Management Permit O Shoreline Management Permit [[ Other was mailed to each of the following addresses on TUESDAY, OCTOBER 2, 1989 , 19 Name of Project (SEE ATTACHED) MIKAMI REZONE File Number EPIC -25 -89 (BOB SCHOFIELD Signature tt/1 • ATTACHMENT A Mitigating Actions Required for the Determination of Non - Significance File No. EPIC- 25 -89: Mikami Rezone 1. Deposit with the City the following funds prior to a building permit to reflect the currently estimated fair - share contribution to mitigate traffic impacts: Widen Strander Blvd. and add sidewalks. Construct a traffic signal at the So. 168th St./ Southcenter Parkway intersection. $ 8,580 $ 30,000 Total Required Contribution $ 38,580 2. The obligation to contribute the above funds to the City of Tukwila shall be recorded with the King County Assessor as part of the title to the land, using an instrument approved by the Tukwila City Attorney. Recording shall be done on or before the effective date of the City Council's rezone action. No alteration of this recording shall be allowed without the written consent of the City of Tukwila. WAC 197 -11 -970 DETERMINATION OF NONSIGNIFICANCE � NP o /1 a ci Description of Proposal TO REZONE 1.74 ACRES FROM R -1 -7.2 (SINGLE FAMILY FAMILY) TO C -2 (REGIONAL RETAIL). FILL AND OTHER CONSTRUCTION ACTIVITIES WILL BE COVERED BY OTHER SEPA CHECKLISTS. Proponent ROBERT H. SCHOFIELD Location of Proposal, including street address, if any 16813 SOUTHCENTER PARKWAY IN THE SW 1/4 OF SEC. 26, TWN. 23, RGE 4., TUKWILA, WA. Lead Agency: City of Tukwila File No. EPIC -25 -89 The lead agency for this proposal has determined that it does not have a probable significant adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after review of a completed environmental checklist and other information on file with the lead agency. This information is available to the public on request. There is no comment period for this DNS xg This DNS is issued under 197 -11- 340(2). Comments must be submitted by . The lead agency will not act on this proposal for 15 days from the date below.. Responsible Official Rick Beeler Position /Title Address Date Planning Director 6200 Southcenter Boulevard, Signature Phone 433 -1846 8188 4t-40 You may appeal this determination to the City Clerk at City Hall, 6200 Southcenter Boulevard, Tukwila, WA 98188 no later than 10 days from the above date by written appeal stating the basis of the appeal for specific factual objections. You may be required to bear some of the expenses for an appeal. Copies of the procedures for SEPA appeals are available with the City Clerk and Planning Department. FM.DNS • • MAILING LIST OF PROPERTY OWNERS AND RESIDENTS WITHIN 300 FEET OF PROPERTY OF MATT M. MIKAMI State of Washington Dept. Of Transportation kf -01 Land Mngmt Office Transportation Bldg Olympia, WA 98504 Bon Marche c/o L.V. Miller 3rd & Pine Seattle, WA 98111 Phoenix Mutual Life Ins. Co. Real Estate Investment One American Row Hartford, Conn. 06115 Attn: Mr. Spielman Puget Sound Power & Light Co Mr. Lertkantitham - Realestate Dept P.O. Box 97034 OBC - lln Bellevue, WA 98009 -9734 Peter Skarbo 16705 Southcenter Parkway Tukwilla, WA 98188 Real Property West, Inc. 101 California St. Suite 2525 San Francisco, California Akiko Shimatsu & Yaeko Mikami 427 SW 154th st Apt 5 Seattle, WA 98166 BOB H. SCHOFIELD 4212 HUNTS POINT ROAD BELLEUVE, WA 98004 CITY OF TUKWILA • 6200 SOUTHCENTER BLVD. TUKWILA, WA 98188 (206) 433 -1800 • TO: WSDOT JIM LUTZ, UTILITY ENGINEER 15325 S.E. 30TH PLACE BELLEVUE, WA 98007 56242 6:1 l CITY OF TUKWILA 6200 SOUTHCENTER BLVD. TUKWILA, WA 98188 (206) 433 -1800 1C, re r '�'. 4y 'stir .� rjs y t"`d 1 } •1�,Y;y'.: bin #' i '���r, r .> > , �.t. , h ;,�, ENVIRONMENTAL REVIEW SECTION CENTRAL OPERATIONS PROGRAM DEPARTMENT OF ECOLOGY CAMPUS MAIL STOP PV -11 OLYMPIA, WA 98504 -8711 September 22, 1989 Robert H. Schofield 4212 Hunts Point Road Bellevue, WA 98004 L. Rick Beeler • SEPA Responsible Official 6200 Southcenter Blvd. Tukwila, WA 98188 RE: SEPA Checklist for Mikami Rezone. Dear Mr. Beeler, I herewith clarify my submitted SEPA checklist on the proposed Mikami Rezone. The proposed action is to rezone the subject property from R -1- 7.2 to C -2. This is the sole action being proposed. All other discussion in the submitted checklist related to specific construction activities are future projected actions which will be the subject of separate SEPA checklists. Sincerely, Robert H. Schofield • City of Tukwila PLANNING DEPARTMENT 6200 Southcenter Boulevard Tukwila, Washington 98188 (206) 433 -1849 LETTER OF TRANSMITTAL TO 6Ar i c,. ) (;c)SD o Y DATE 7-2-40 ADDRESS S 3012f pc. ' REGARDING L{ Ec.c.G (,uC, cJA X Boo 7 ATTENTION WE ARE SENDING YOU THE FOLLOWING XAtt (I Under separate cover COPIES DESCRIPTION 1 Se-ph C(fKLsT THESE ARE TRANSMITTED [1 For approval For review and comment Q For your use and information Q As requested Q Other COMMENTS /F((5 (5 Any 12-01 A(O � c r S67,11 rvi- YOU 1? LW i , Dctiet -oPC - PG, is RA c Cee, cc./eC, -7 Fr -To S�Rc L�Ve-L A A( A F C r Yov2 -14A(N 4 GC" SYSz-CM 166 -64S- - CA C,c., M c : T 4 - /8S . (F 0 ff64 L'e 4 ( Y Q2ve57co, (S. An/nC(PAi e- r4- DaS 7-0 /7e" /SSOC SIGNED (/G7_f✓ f ' (kf e— 5c'_ (23 /P4.LTRANS) f, S7)o7 CA-CC Ora Aro cot-111/4,10.17Y ,47— (S T/MO, I{acA.JeVere_) 19A K rS -715 tee v r el,kJ . PRA rnt AGE" SY5 r c Fog_ jrcc. d- Co"t Tr& vC Tco^r. CITY OF TUKWILA ENVIRON WNTAL REVIEW ROU MG FORM DEPARTMENT OF COMMUNITY DEVELOPMENT PROJECT M K A m k6-0"6- EPIC: .2 S- 8? ADDRESS i 6 c 3 5a TF,t Cam(rex DATE TRANSMITTED % 72 /8? RESPONSE REQUESTED BY STAFF COORDINATOR eniv--ovi s-ferrU DATE RESPONSE RECEIVED Fly 7/89 The attached environmental checklist was received regarding this project. Please review and comment below to advise the responsible official regarding the threshold determination. The environmental review file is available in the Planning Department through the above staff coordinator. Comments regarding the project you wish carried to the Planning Commission, Board of Adjustment and City Council should be submitted in the comment section below. ITEM COMMENT TW(S iS s c- 7 c7 PR.O —A-PP sew ?/2( zG� Date: Comments prepared by: 09/14/89 CITY OF TUKWILA ENVIRON WNTAL REVIEW ROU M G FORM DEPARTMENT OF COMMUNITY DEVELOPMENT EPIC: 2 S - 89 PROJECT 1,41 i_ A M I o f ADDRESS 6 8 3 se, �Tff Ce,Q(rm_ DATE TRANSMITTED /�O /6'? STAFF COORDINATOR xitivogi err p1 <wY RESPONSE REQUESTED BY DATE RESPONSE RECEIVED ?l,2 7/89 The attached environmental checklist was received regarding this project. Please review and comment below to advise the responsible official regarding the threshold determination. The environmental review file is available in the Planning Department through the above staff coordinator. Comments regarding the project you wish' carried to the Planning Commission, Board of Adjustment and City Council should be submitted in the comment section below. ITEM T7r(s /5 P13- 11 COMMENT S ()RTC c7 of Pker-/-PP oAt ?7.2_1 5) C) c n C y PRA Ll FILL Ri1-0 Jfta-- TPA -FF lc INI IT I CrA-711)J Nnl� si s oNI sTCI it 1? K wy cco I C tan S i i1 "�C-S X INaLUO tG S osm, 'D , i OL14i1t 1-LA( 611\k ANLit f)(0 -41S j c 017+ I „J 1 0-6 y2 Ft o o P it 12tF To Nip M S 4e 2 1 1 D U t N C , S I l l CC.-711(1M 1 1 1 ( K ) j FT ArSov 100 Ni R.. F•L,c)049LiA-IN) • 'P.w? — c,t L S Ddr L � v.XJ t"� .N (Vv) SITS. S P3 - sITS PU1Ns 9 P9- a., - iiisLo v I (0 - c - - -T kFF i L A-NA LN s Is /-rat P 67v t K[t STCU 4 ±4_ To l,,) N 1 r] rZA. , IZCGI+ A IQ tv t-L. RAT1 Ur) / S I N ' c t U1 s ,1( ,54= - cuV Ov-i CID \N fl rn o rvs ' PUTli S', l 6 5 STi L T 1 )Ay >7(1avM NS'P6 MNS"r i t,., lecUL.4. Date: 67/ Z //go) Comments prepared by: 09114/89 ENVIRONIK.NTAL REVIEW ROU MG FORM CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT EPIC: 2S-- 8? PROJECT M 1 K- A M I ADDRESS t RI 3 Sn _04 cow 7e-y2 DATE TRANSMITTED ?4,/... O /8? STAFF COORDINATOR V6,x,voa- RESPONSE REQUESTED BY 7 7/0 DATE RESPONSE RECEIVED The attached environmental checklist was received regarding this project. Please review and comment below to advise the responsible official regarding the threshold determination: The environmental review file is available in the Planning Department through the above staff Comments regarding the project you wish carried to the Planning Commission, Board of Adjustment and City Council should be submitted in the comment section below. ITEM COMMENT 7776- /5 s vATCCr M PRA A-PA o,&r Mil , z� 0-7111,64vd":5 Otri f111`.5 Date: Q -a / - (, ! Comments prepared by: , 09/14/89 '' p�. i OF TUKWILA ENVIRON ZNTAL REVIEW ROUTING FORM [DEPARTMENT OF COMMUNITY DEVELOPMENT EPIC: 2 S - 9, TO: XBuilding Planning ub Wks Fire Police. ParksfRec PROJECT M K_ M t t k_ E O I/ E ADDRESS cg j 3 Sn uTff cc re-R_ pi, LJ DATE TRANSMITTED l //O /? RESPONSE REQUESTED BY 7/� 7/RP errU DATE RESPONSE RECEIVED STAFF COORDINATOR The attached environmental checklist was received regarding this project. Please review and comment below to advise the responsible official regarding the threshold determination. The environmental review file is available in the Planning Department through the above staff.: coordinator. Comments regarding the project you wish carried to the Planning Commission, Board of Adjustment and City Council should be submitted in the comment section below..: ;TEM COMMENT 771's /5 S ciPTe'c.-T OF PR.e -A4P13 OA( ?721 , L� 4 41„g 41fD Date: * Comments prepared by: , 09/14/89 CITY OF TUKWILA DEPARTMENT OF COMMUNITY DEVELOPMENT ENVIRONM ROUTI TAL REVIEW ITG FORM EPIC: 2s--- 87 KBuilding 'Planning Pub Wks Police Parks /Rec PROJECT M' l -M i I P_ E-3 ont E ADDRESS 16s/3 7� c_exy - DATE TRANSMITTED 9‘7,20 /8 STAFF COORDINATOR Veito:,ropi UM e n u RESPONSE REQUESTED BY F/2 7/g? DATE RESPONSE RECEIVED The attached environmental checklist was received regarding this project. Please review and comment below to advise'' the responsible official regarding the threshold determination. The environmental review file is available in the Planning Department through the above staff coordinator. Comments regarding the project you wish carried to the Planning Commission, Board of Adjustment and City Council should be submitted in the comment section below. ITEM COMMENT r ((5. /S s vAre c-r OF Pkg -A P/c oAi ?721 4, ZG,. Date: Comments prepared by: , 09/14/89 • ENVIRONMENTAL CHECKLIST ContriikNo. Epic E le No. AS-87 Fee $100.00 Receipt No. 2,OSSs4 A. BACKGROUND 1. Name of proposed project, if applicable: j .1 - 2. Name of applicant: 1, '-r- iy. ,14.4d, •,; 3. Address and phone number of applicant and contact person: /tpi3 Jam Aicexurtx 72.0e. gIi8J 5w-c ri 9; 65,vrAcr poL WA1 A t R4uS0-72i suse.taicZV Uii s N4Arr.f Pew" RP. eea-. AM- • Woi 4. Date checklist prepared: y -,S gg 5. Agency requesting Checklist: City of Tukwila 6. Proposed timing or schedule (including phasing, if applicable): F /�•L 6.4"DE ,r cruic. Eivy • f44• 89 / Als.2 4C7 d J y .. 9G Iv 9 -90 . 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. AJo PRae6n -YY To Ea" Fl C,c.eb S Ttee T' GRA1 e * 2 D. cos S Co iv r i e oc reb. c - 7 1 9 1 ,4 7 e s e'A S 7-0 J e F I c, e't 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. /.COn(IC CcePT f%S kaLA-TdD 710 Pe7eM, 71 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. e GSxGePT /68 r" con^z4 -c- o2. 10. List any government approvals or permits that will be needed for your proposal. 741e cal 4.4 Gl 7- se Co.t ,ci L .2t a-u ve AppEar'v.4C-. 7�C —fir- DGJL� 7 b i�€)2- C.GTTCS%2_ P12z0-1 A- PRA C4y DoT" A-PP2ovAC OF U2/k SNAG SYS-rc t, 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this page. Section E requires a complete description of the objectives and alternatives of your proposal and should not be summarized here. lei F [ t.. 43 A.1$,S APAavw. Pr____ 4- .3.Yoo-e f S,Te" J4.19d SF Rego p2..r► p - / -7 . l �o G . 2. /tt ■ 710 p�Aaox.rrA -re .y /�ovo Cu . yoS • ? €vTt}2e A c-r ot.ts NOT cou612.0j lnl TltIS Se PA P[rt2- A-PP (CAKT Lg7TG). 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applica- tions related to this checklist. 8/3 Sounrc rL 7A s-+.a, / Ararsr .s Ave- o.= .s7- r.4d 3' J-J4I2 ?rouser Fuc.v ts.acc1 oM7Z.6a7 13. Does the proposal lie within an area designated on the City's Comprehensive Land Use Policy Plan Map as environmentally sensitive? /'?.NOR- WN'Srcg __poia -r,o,) �� — SeXIS.Tt.,g t7L1 TO .$c.!.00.1 -3- TO BE COMPLETED BY APPLICV B. ENVIRONMENTAL ELEMENTS 1. Earth a. General description of the site (circle one): rolling, hilly, steep slopes, mountainous, • Evaluation for Agency Use Only other b. What is the steepest slope on the site (approximate percent slope)? I.JkiEA..) • fl_ Ep — �oNc- c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any prime farmland. AFAT s,`4— d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. ND e. Describe the purpose, type, and approximate quanti- ties of any filling or grading proposed. Indicate source of fill. F, 4_ 76 6. !".oe- o.er SD 4.4 rI+ eA?CX- i�fbarG..n..r d- 1Ac.6aT ,00�+ -� TD A V e 'Sa u 7- , A#oaox . is 600 444 • yt'S . 7V A /YAr7102,At- .0-406.0,f31.-`/ 7=P0Q -f .5.4".0 P•Ts • f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. SCE G/2.6.4067" t i ct I ate• � . r APPt, c. ri A.1 g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? ilApt.OW . Fa y, • •Evaluation for Agency Use Only h. Proposed measures to reduce or control erosion, or othe r impacts to the earth, if any: W/Nrizo c. SC_O 400- Tr.�l.04 2. Air a. What types of emissions to the air would result from the proposal (i.e., dust, automobile odors, industrial wood smoke) during construction and when the project is completed? If any, generally describe and give approximate quantities if known. "41.4r. aTritsseelvS b. Are there any off -site sources of emissions or odor that may affect your proposal? If so, generally describe. ,JQ c. Proposed measures to reduce or control emissions or other impacts to air, if any: 3. Water a. Surface: 1) Is there any surface water body on or in the immediate vicinity of the site (including year - round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. ^Jc, • .Evaluation for Agency Use Only 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. No 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. ,,,A 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quan- tities, if known. ,vo 5) Does the proposal lie within a 100 -year floodplain? If so, note location on the site plan. n)o 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. ,v o • b. Ground: 40 Evaluation for Agency Use Only 1) Will ground water be withdrawn, or will water be discharged to ground water? Give general description, purpose, and approximate quan- tities, if known. ,uo 2) Describe waste materials that will be discharged into the ground from septic tanks or other sour- ces, if any (for example: Domestic sewage; industrial, containing the following chemicals...; agricultural; etc.) Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. ,v4 c. Water Runoff (including storm water): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. ALC. Ta (OLLeZT ON sorer ZD 4u Teo srpR'y 34, -*Tdr1 • •Evaluation for Agency Use Only 2) Could waste materials enter ground or surface waters? If so, generally describe. A>,5 d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if any: D#J SITE MANS P62 c. 7 ( OFJZtKui6A 4. Plants a. Check or circle types of vegetation found on the site: deciduous tree: alder, maple, aspen, other _ evergreen tree: fir, cedar, pine, other shrubs _ grass v- pasture crop or grain - 44m1,4c, w144. ex)," 4-81 wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other water plants: water lily, eelgrass, milfoil, other other types of vegetation b. What kind and amount of vegetation will be removed or altered? weEos r .4&43A04 i. r ia.•■•nrY t.'-' c. List threatened or endangered species known to be on or near the site. "3 P.A • d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: (RAss rga _ �� aes sia„..usf 5. Animals a. Circle any birds and animals which have been observed on or near the site or are known to be on or near the site: birds: hawk, heron, eagle, songbirds, other: mammals: deer, bear, elk, beaver, other: fish: bass, salmon, trout, herring, shellfish, other: b. List any threatened or endangered species known to be on or near the site. /UoArE c. Is the site part of a migration route? If so, e xp 1 a i n . Poo-- or Ge Fwec..ky d. Proposed measures to preserve or enhance wildlife, if any: iv #AJ Evaluation for Agency Use Only • 6. Energy and Natural Resources 0 Evaluation for Agency Use Only a. What kinds of energy (electric, natural gas, oil, wood stove, color) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. evt c , Euzr1.ic b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. ivy c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: /> covers 7. Environmental Health a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this proposal? If so, describe. ,uo 1) Describe special emergency services that might be required. ,v0,,,E- 2) Proposed measures to reduce or control environ- mental health hazards, if any: ANON F • b. Noise •Evaluation for Agency Use Only 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other) ?__ A/0" -G- 2) What types and levels of noise would be created by or associated with the project on a short - term or a long -term basis (for example: traf- fic, construction, operation, other)? Indicate what hours noise would come from the site. X2il cKS J D7Ne W_ c eAJ T. N a is - W o.ar6 YA . 3) Proposed measures to reduce or control noise impacts, if any: /00-,,,g- 8. Land and Shoreline Use a. What is the current use of the site and adjacent properties? ,Qs oev e A.D .nr,- b. Has the site been used for agriculture? If so, describe. GAa -De-NJ c. Describe any structures on the site. Ai-vase- ,► SHED .s Ma • d. Will any structures be demolished? If so, what? Yo'S , 4g erli e. What is the current zoning classification of the site? /2_ I 77. Z f. What is the current comprehensive plan designation of the site? cot- ,M�72c.A g. If applicable, what is the current shoreline master program designation of the site? NA. h. Has any part of the site been classified as an "environmentally sensitive" area? If so, specify. b i. Approximately how many people would reside or work in the completed project? to — 3S • Approximately how many people would the completed project displace? Z — ,2ez,Qemer 80444A.r A,.4 ormt71- tea,. e' .9 <rv,,.ab k. Proposed measures to avoid or reduce displacement impacts, if any: No 6,6- 1. Proposed measures to ensure the proposal is com- patible with existing and projected land uses and plans, if any: APe;dmwE ,fie- 41.4eSr ,- i6 n,S.S7 )-0 i- .77 - Lo ,yO.t,C•ht j-)1.04n1. f01.L0*u L,TY Evaluation for Agency Use Only • 9. Housing a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low- income housing? 30 b. Approximately how many units, if any, would be eli- minated? Indicate whether high, middle, or low- income housing. c. Proposed measures to reduce or control housing impacts, if any: ,VA,_ 10. Aesthetics a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? 20' 5714 CC-0 b. What views in the immediate vicinity would be altered or obstructed? /0.10.441- 502116-0410"Wh. c. Proposed measures to reduce or control aesthetic impacts, if any: 4,4/4.s,N, JELv -mJ Evaluation for Agency Use Only • 11. Light and Glare •Evaluation for Agency Use Only a. What type of light or glare will the proposal produce? What time of day would it mainly occur? Nuw�' b. Could light or glare from the finished project be a safety hazard or interfere with views? NU c. What existing off -site sources of light or glare may affect your proposal? �oN r d. Proposed measures to reduce or control light and glare impacts, if any: 12. Recreation a. What designed and informal recreational oppor- tunities are in the immediate vicinity? /1r7,4,c_ ( S 4.94 snAJc N Se- ) b. Would the proposed project displace any existing recreational uses? If so, describe. No c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: • 13. Historic and Cultural Preservation •Evaluation for Agency Use Only a. Are there any places or objects listed on, or pro- posed for, national, state, or local preservation registers known to be on or next to the site? If so, generally describe. x,c) b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or cultural importance known to be on or next to the site. AlONb c. Proposed measures to reduce or control impacts, if any: 6/0„a- 14. Transportation a. Identify public streets and highways serving the site, and describe proposed accss to the existing street system. Show on site plans, if any. .S E , W E D es ye _so... mg 4 cru x_ - 2 ► vE • b. Is the site currently served by public transit? If not, what is the approximate distance to the nearest transit stop? ` /E3 , 7,2A.a,,r s7-40.5 AT- PQovenri . c. How many parking spaces would the completed project have? Now many would the project eliminate? 1 Od1a..►x. /pb . • •Evaluation for Agency Use Only d. Will the proposal require any new roads or streets, or improvements to existing roads or streets, not including driveways? If so, generally describe (indicate whether public or private). ,vo CoaisTR.vc,Tio,i Nok -( (LC>Q 's • S <NA I4rion17. ChANKUZ-4Zirrcot4 THIS co (cc. re el/A( -(2AM r�r e. Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. ,)o f. Now many vehicular trips per day would be generated by the completed project? If known, indicate when peak volumes would occur. g. Proposed measures to reduce or control transpor- tation impacts, if any: 54E /7 -4.514 '`sQ" 15. Public Services a. Would the project result in an increased need for public services (for example: fire protection, police protection, health care, schools, other)? If so, generally describe. No b. Proposed measures to reduce or control direct impacts on public services, if any. ,vq. • 16. Utilities •Evaluation for Agency Use Only a. Circle utilities currently available at the site: natural •as, *, efuse serv.ictip septic system, other. b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. - A L21E .u'1 rn4eijie . C. Signature The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Signature: Date Submitted: ? - 6 -6F� PLEASE CONTINUE TO THE NEXT PAGE. TO BE COMPLETED BY APPLICA' D. SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS •Evaluation for Agency Use Only (do not use this sheet for project actions) Because these questions are very general, it may be helpful to read them in conjunction with the list of the elements of the environment. When answering these questions, be aware of the extent the proposal, or the types of activities likely to result from the proposal, would affect the item at a greater intensity or at a faster rate than if the proposal were not imple- mented. Respond briefly and in general terms. 1. How would the proposal be likely to increase discharge to water; emissions to air; production, storage, or release of toxic or hazardous substances; or production of noise? Thcote-,45 67- wATIM. 12,44 Aj c1FF.p AD2 rtlae Proposed measures to avoid or reduce such increases are: l�sE C.4.7-4// &45s , S Fo,c. SI4.r !a«rz1, o,v oN s, rte' /2e7E'xTtoN 5-y3i g)'a . 2. How would the proposal be likely to affect plants, ani- mals, fish, or marine life? Loss of A0/40-44.7-74-7- F d i t Sorg . a / A.OS of (4.L B /r,¢,a... -f, .v TS . Proposed measures to protect or conserve plants, ani- mals, fish, or marine life are: ,y4.,„v4 Ai en.) N 1 • / i%2c--ET ,Sy-A.0 ■t-. w X2-1 • •Evaluation for Agency Use Only 3. How would the proposal be likely to deplete energy or natural resources? NON G Proposed measures to protect or conserve energy and natural resourses are: ,5�. comet Pevz. .c), SAv,/vKis • 4. How would the proposal be likely to use or affect environmentally sensitive areas or areas designated (or eligible or under study) for governmental protection; such as parks, wilderness, wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites, wetlands, floodplains, or prime farmlands? S /76 Nas /tv • to 4•412-04"A✓ • 64 - Lail • Proposed measures to protect such resources or to avoid or reduce impacts are: ,0e„,E- - A 4a4-o- w, I"- /30"' ('T •4 Peg- /firr►., daers,neuad' • 5. How would the proposal be likely to affect land and shoreline use, inclduing whether it would allow or encourage land or ,shoreline uses incompatible with existing plans? ,-'o / M,I,a.,TS • 0 Evaluation for Agency Use Only Proposed measures to avoid or reduce shoreline and land use impacts area: How does the proposal conform to the Tukwila Shoreline Master Plan? cve-t 6. How would the proposal be likely to increase demands on transportation or public services and utilities? AS IN 7L SMn.cL 20-'r-A sc- Pdeose-cr .P_t"tZuILr! Proposed measures to reduce or respond to such demand(s) are: /`/ i T► !An. rd C-c elsporn y 7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or requirements for the protection of the environment. No /,- ,o,}cri • 8. Does the proposal conflict with policies of the Tukwila Comprehensive land Use Policy Plan? If so, what poli- cies of the Plan? ,v o Proposed measures to avoid or reduce the conflict(s) are: Evaluation for Agency Use Only TO BE COMPLETED BY APPLICAiii •Evaluation for Agency Use Only E. SUPPLEMENTAL SHEET FOR ALL PROJECT AND NON PROJECT PROPOSALS The objectives and the alternative means of reaching the objectives for a proposal will be helpful in reviewing the aforegoing items of the Environmental Checklist. This information provides a general overall perspective of the proposed action in the context of the environmental infor- mation provided and the submitted plans, documents, suppor- tive information, studies, etc. 1. What are the objective(s) of the proposal? A- 1HA,"c : .E✓EL • PoTeXIT /AL .41 CONS /iftc,JT W.TN TNKwi -A c a.v DR�/+c7v1i ij� 2. What are the alternative means of accomplishing these objectives? QEaoNt I0 ,ti- / , c - v, ti -i.. 3. Please compare the alternative means and indicate the preferred course of action: /.,L` to- en- 2 o../er-s Aar- to /2 -e • Evaluation for Agency Use Only 4. Does the proposal conflict with policies of the Tukwila Comprehensive Land Use Policy Plan? If so, what poli- cies of the Plan? ,va Proposed measures to avoid or reduce the conflict(s) are: A'A- -23- LAND USE MAP COMPREHENSIVE LAND USE PLAN MAP ZONING MAP .3772fi?gwv1 T A VAI>2F4' ct 71.31-Pa,111,713-` Nr7 ez#114) • ,TbZ , ft, Iffn I 1 9",^9 20 17 } ) AVM .io 4nia0v.31v3 Al /7 /.to ,$7 ; • I t- i I . snVpi (reowscre 1 c7a4,r0,04 'fin I • #musswaY) LS891.5 _WM7 7/A? ,PZ OSA'," 74/136Y /Cr, 1.1C2N 3,29t1 04 CO 0.1. 211:1 ,017/ / 44x3ti4V I rrtr,5 cti of.615t = Attg 69- -6 Al =funs- El 117/ SOYOJS* ity..V I Y vAC. ORD. 1232 I k f w A' 1:4J''' :23 - •C p 1 e� t±- r- ;Q5.42, W O '9 Se •435.99 A 4A-013. 0280 28 435.35' A3 • / 434. 7Z Altar' 13goy0 030o 30 • 20 � 10 • j 60 10\ `\ \'' CT\ I27. 99 " 3G ,36 31g. S.. 0 I,3 434.08 31 e h� • R /37• J o3.t/. /30.42 599° ei j/ 960` 031-=• .E Vo• 4 • I ` o 4 3 se /s�S \.. 0� s .-• i .^ Iw SR 432.8/ 9 ao • vas' 4 ': p. . ®,40/ 33 432./9 J 1 1 1 t11 N 4-7•S3/ 40 3 3l 40-5 � 75 Q . f Sao ago ,4as31407 7 A. • IL I el" 10t -1 • '/4 GG d' G° • gCG,:pr' �� Ow�•OHt. +,C^-^^'G6 "`y'MALG1'r -•GP • 1 'A�e t- 1•-'�_ +11. 11 YES�GGL OG Sou-r -�G6—. -r 6.. /AK- <NA�1I�GICM E�IJIA r�'A �J... nn. "GO_G',1A... ♦IP.L,c..',y 1•. "GI -1 GI4!GT .. ;2y BVA�`G +�:'N iF_�iS i_ - ✓ECr :OS "GTCni • LIGaG G1'G U•••• b2 ^n7'wui-r L7VAfi a —,- • •y' -Gu PG AP r+ OI! 0512E 19 1 Jr AfV �!l: opt eel-000.F, m-70 • oQ. /erY 1-- raw eoo..'. 27. B� NDARY" 8:.:ITOPOGR:AP:HIC o t1 VVOff1 SHIMATSU PROPERTY sEP271989J CITY Of JGM'LA . PLAIVo.14 Pq'T. ;KING `'Ca.oUNTY;WN 2 • Chri8topher Brown a Amociate8 879 Rainier Avenue N., 6uite A -201 Renton, WA 98055 -1380 (206) 772 -1188 SCHOFIELD II - SOUTHCENTER PROJECT A Proposed Shopping Center in Tukwila Traffic Study November 9, 1989 Traffic Engineer8 Transportation Planner8 [tov 9 1989 CITY OF �i u�:vviLA PLANNING DEPT. SCHOFIELD II — SOUTHCENTER PROJECT Traffic Study TABLE OF CONTENTS Introduction 1. Location 1. Purpose 1. Project Description 3. Access 3. Scope of Study 4. Traffic Data 5. Data References and Sources 11. Trip Generation 11. Traffic Assignment 13. Traffic Assignment, Site Traffic 14. Traffic Assignment, Adjacent Traffic 14. Horizon Year Traffic 14. Levels of Service 23. LOS Discussion 31. Parking 31. Mitigating Measures 32. Conclusions 32. LIST OF TABLES I. Expansion Factors II. Trip Generation III. Net Trip Generation IV. Levels of Service, Definitions V. Levels of Service APPENDIX Capacity Calculations 8. 12. 13. 28. 29. SCHOFIELD II - SOUTHCENTER PROJECT A Proposed Addition to a Shopping Center in Tukwila Traffic Study Introduction Creating a new phase to an existing, small shopping center on presently vacant property in a major suburban community will increase vehicular traffic demands on the adjacent collector and arterial road system. If the projected traffic volumes are large and /or if projected increases in traffic demands due to the change in land use associated with the proposed project are large, then the traffic carrying ability of the adjacent street and arterial systems may be impacted. Accordingly, it is appropriate to review both current and future traffic conditions to determine what the possible traffic impacts might be from such a new commercial development and, in concert with the existing and proposed commercial development, define the appropriate mitigating measures, if any, to ensure the continuation of adequate traffic operations. Location The Schofield II - Southcenter project is to be located on a site lying on the west side of Southcenter Parkway almost opposite S. 168th Street, south of Strander Boulevard in the the City of Tukwila, King County. The site location is sketched on Figure 1, Vicinity Map. Purpose The purpose of this study was to gather a data base of current traffic operations on the adjacent collector and arterial routes serving a proposed addition to an existing shopping center which for the purposes of this traffic study is called • the "Schofield II - Southcenter Project ", to include traffic from two proposed but adjacent developments called "Speiker - -1- Christopher brown C� A oeiates \ 879 Rainier Avenue N. , eSuite A -201 \\ / Renton, WA 98055 -1380 (206) 772 -1188 5 151ST ST T I■ S 167TH ST 168TH 1.. IN 1 170114 (ST S 'n MAO PL' /OATH ST S 160TH --1S 1 S 168T aS1731DST z ti �I_...... ST 175TH ST CORP PATE OR S 172ND PL ?i ST f eOwTWKE' PK y9L '179TH M!DLINQQ SAXON. OR TRIL1NQ DR S 186TH ST FIGURE 1 Vicinity Map Schofield Retail Building II _ -2_ Christopher Brown a Associates 879 Rainier Avenue N.. (Suite A -201 Renton, WA 98055 -1380 (206) 772 -1188 Southcenter Project" that incorporates a Target store, and a new . proposal that to date is held in abeyance called, for file purposes only, "Tukwila Pond Center Phase II ", to identify an expansion factor to derive the arterial traffic flow during the Pre - Christmas shopping season (sometimes called the Christmas shopping season), to derive both noon peak and p.m. peak hour demands on the arterial system, to define the probable trip generation for the site under the proposed development scenario for these two peak hours, to estimate the driveway and arterial street traffic demands for the horizon year, in this case for Christmas and non - Christmas traffic at both noon and p.m. peak hours, and to quantify the existing and horizon year levels of service (LOS) at the key intersections and access driveway serving the site under these various nonseasonal and seasonal loadings. Further, given that the development may immediately proceed, a secondary function of the study is to also identify any possible changes in access and traffic control systems to ensure the maintenance of adequate traffic operations on the impacted system in the future when the project is completed and occupied. Project Description The site as proposed is a small retail facility lying north of and adjacent an existing retail center. The new facility, comprising some 26 k.s.f. of retail space will also have in common the expanded parking lot serving the existing 29.5 k.s.f. building. Both will compliment each other in terms of design and parking and access driveways. The existing site has a single driveway on Southcenter Parkway for customers; the new site to the north will also have a driveway to the rear of the new building, about opposite the proposed S. 168th Street. New on site parking will be provided for 116 vehicles, adding to the existing supply of 53 stalls. Parking design is with right angle stalls to serve the longer duration customers. Access Access to the site is to be only from Southcenter Parkway. At the site, along its frontage, this access is enhanced with a two -way, left -turn lane. Further, the northern driveway, being -3- Chri8topher Brown Associate8 879 Rainier Avenue N., c uite A -201 Renton, WA 98055 -1380 (206) 772 -1188 J opposite S. 168th Street, will have the advantage of a new traffic signal that is to to be built by the city. In this study, it has been assumed that a traffic signal will be installed at the northern driveway in the near future. Geometric parameters for the key intersections serving this site as well as the driveway are shown as a part of the data input to the capacity analysis appended to, this study. Scope of Study The scope of the .study was defined by the City of Tukwila traffic engineer and was to include: • 1. Trip generation for the new facility. 2. Noon peak hour traffic volumes on the existing network. 3. P.M. peak hour traffic volumes on the existing network. 4. Estimates of Christmas shopping season noon peak hour traffic volumes on the existing network. 5. Estimates of Christmas shopping season p.m. peak hour traffic volumes on the existing network. 6. The inclusion of traffic demands from two major projects close by: Tukwila Pond Center incorporating a new Target store, and Assumptions on a second phase of the Tukwila Pond Center lying on the west side of the pond. 7. Maps showing the trip distribution of site generated traffic on the serving arterial network. The traffic network under study consists of Southcenter Parkway from S. 180th Street to the northernmost freeway off ramp/ signalized intersection on the Southcenter Shopping Center driveway close to Nordstrom and Frederick & Nelson's. -4- Christopher Brown Associates 879 Rainier Avenue N., Suite A -201 Renton, WA 98055 -1380 (206) 772 -1188 Also requested for review in the arterial network is the intersection of Andover Park West at Strander Boulevard. Last, in addition to traffic generation, a request for a tabulation of parking demand was included in the scope of work. Traffic Data Traffic data used in this analysis is from recent (October, 1989) manual turning movement traffic counts taken at both noon and in the p.m. peak hour. The current average weekday noon hour and the p.m. peak hour traffic data are shown on Figures 2 and 3 on the immediate, following pages. Figure 2, Average Weekday Noon Peak Hour and Figure 3, Average Weekday P.M. Peak Hour, are schematic diagrams only and reflect the hourly traffic volumes, by direction (at each arrow head), in accordance with the standards of the Bureau of Highway Traffic, Yale University. Intersection total approach volume as well as turning movement volume is also shown in the appendix as a part of the computer input data (intersection diagrams). For estimating the traffic demands that would be occasioned by the Christmas season peak shopping period, the city engineering staff provided copies of machine count data taken at several locations on the arterial network in 1988. The expected growth in traffic volume in this season, above normal or average conditions, was derived by comparing similar peak hour data at the identical locations. A tabular comparison of non - Christmas Season and Christmas season traffic, by direction and location, is shown in Table I on page 8. From the data, it may be seen that the mean increase in the noon peak hour is expected to be about fourteen percent while the p.m. peak hour will increase by about twelve percent. The expected Christmas shopping season noon and p.m. peak hour traffic volumes on the arterial network are shown on Figure 4, page 9, Christmas Season, Noon Peak and Figure 5, page 10, Christmas Season, PM Peak Hour, respectively. These volumes are for the current system as it is presently configured with the current level of Tukwila's commercial development. No diversion due to congestion is assumed, either. The Christmas data of these figures is "unrestrained ". -5- ( �\ Christopher Brown 0 Associates\ 879 Rainier Avenue N., c,uite A -201 Renton, WA 98055 -1380 11161111 (206) 772 -1188 lJ /■ Southcenter AccessRoad (S9 p, 3\ EXISTING SITE page 6 Southcenter Parkway Klickitat Drive NOTE: Noon Peak Hour, Thursday 11:45 to 12:45 November 2, 1989 Strander Boulevard S. 180th Street m a 0 0 FIGURE 2 Average Weekday Noon Peak Hour 111 EXISTING SITE >1 x 124 4) a) 0 4 4) 0 Southcenter AccessRoad Klickitat Drive NOTE: P. M. peak hour, Thursday November 2, 1989 4:15 -5:15 p.m. Strander Boulevard `�S page 7 S. 180th Street FIGURE 3 U) a) 0 Average Weekday PM Peak Hour TABLE I Expansion Factors for Pre - Christmas Shopping Season Location Dir. Nov. Dec. % Change Noon Peak Hour Southcenter /S. of Strander NB 1492 1542 + 3.4 Southcenter /S. of Strander SB 1534 1550 + 1.0 Strander /W. of Andover Strander /W. of Andover Southcenter /N. of 180th Southcenter /S. of 180th Andover /N. of Strander Andover /N. of Strander EB 634 726 + 14.5 WB 747 849 + 13.6 NB 1079 1124 + 4.2 SB 677 1036 + 53.0 NB 653 793 + 21.4 SB 779 711 - 8.7 180th /E. of Southcenter WB 1105 1125 + 1.8 180th /E. of Southcenter EB 726 994 + 36.9 180th /W. of Southcenter 180th /W. of Southcenter WB 518 585 + 12.9 EB 439 506 + 15.3 Mean Increase of Noon Traffic in Christmas Season + 14.1 % P.M. Peak Hour Southcenter /S. of Strander NB 1855 1381 -25.6 Southcenter /S. of Strander SB 1674 1333 -20.4 Strander /W. of Andover Strander /W. of Andover EB 525 600 +14.3 WB 784 915 +16.7 Southcenter /N. of 180th NB 712 953 +33.8 Southcenter /S. of 180th SB 760 910 +19.7 Andover /N. of Strander Andover /N. of Strander 180th /E. of Southcenter 180th /E. of Southcenter 180th /W. of Southcenter 180th /W. of Southcenter NB 622 858 +37.9 SB 625 708 +13.3 WB 1116 1105 -1.0 EB 560 749 +33.8 WB 941 903 -4.0 EB 422 511 +21.6 Mean Increase of P.M. Peak Traffic in Xmas Season + 11.7 % Christopher Brown Associates 879 12ainier Avenue N., 6uite A -201 12enton, WA 98055 -1380 (206) 772 -1188 4 N h � Nam ti 0 zM L;4-1 1 kW H EXISTING SITE a\ (VA‘ k Q Southcenter AccessRoad Klickitat Drive Southcenter Parkway page 9 NOTE: Data is for the noon peak hour in the Pre - Christmas shopping season. Based on expansion rate of 14.11 % Strander Boulevard f‘\2- S. 168th Street S. 180th Street FIGURE 4 Andover Park West. Christmas Season, Noon Peak /� EXISTING SITE page 10 Southcenter AccessRoad Klickitat Drive rd NOTE: Data is for the p.m. peak w hour in the Pre - Christmas shopping season. 0 Based on expansion rate 0 of 11.7 percent. 0 4J 0 0 f1713# Strander Boulevard t//' ,De S. 168th Street i// S. 180th Street FIGURE 5 Andover Park West. k1� eee 0-4 Christmas Season, PM Peak Hour Next, expected traffic demands that would be carried on the network, generated by the two adjacent projects previously discussed on page four, were obtained from the prior traffic studies for those respective projects. It should be noted that one of those projects (the larger one with the Target store) is now under construction while the second one has, at this time, been deferred indefinitely. (The latter project has been called Tukwila Pond in the following study while the former shopping center, to differentiate it from others, is referred to as the "Speiker" project, named after the sponsoring developer.) The trip assignment for these projects is discussed later. Data References and Sources Data resources used in this study include the aforementioned seasonal machine count traffic data prepared by the city of Tukwila, limited trip generation statistics published by the Institute of Transportation Engineers (I.T.E.) in the document, Trip Generation; an Informational Report, 4th edition, (used for comparison purposes only) Parking Generation, 2nd edition, also published by I.T.E., and the 1985 Highway Capacity Manual, Special Report 209, published by the Transportation Research Board, Washington, D.C. For the latter item, reference is also made to, the computer program CAPCALC 85, Version 2.2, published by.Roger Creighton and Associates, New York, used under license for this study. Trip Generation The trip generation data for the site is based on observed noon and p.m. peak hour traffic demands. The noon peak extends from 12 o'clock to 1 o'clock and is primarily driven, by observation of parking lot demands, by the high quality sit down restaurant located on the site. The balance of the site is merchandising with clothing and furniture sales dominating. The p.m. peak hour data was from 4 o'clock to 6 o'clock; the peak was from four to five. With the scale of the existing site at 29.5 k.s.f., the following trip generation rates, shown in Table II, were derived and on the basis of those rates, the trip production for the new facility were computed. Christopher Brown Associates 879 Rainier Avenue N., e'uite A -201 Renton, WA 98055 -1380 (206) 772 -1188 TABLE II Trip Generation, Schofield II - Southcenter Project (Gross Traffic Demand, No Delimitation for Pass -By) Time Interval A.W.D.T.* Noon Inbound Noon Outbound P.M. Inbound P.M. Outbound Rate per KSF 26.4 1.83 1.29 1.39 1.42 Volume 690 vehicles per day 48 vehicles per hour 34 vehicles per hour 36 vehicles per hour 37 vehicles per hour * Average Weekday Daily Traffic Note that in terms of the "peak hour of the site" the noon hour is the descriptor. For the peak of the street, it can be taken at either noon or the p.m. peak which extends from 4 o'clock to 5 o'clock. (At some locations it ran from 4:15 to 5:15.) The peak hour of the street system, in Tukwila, is the p.m. peak. The a.m. peak is of little consequence in this area. The closest approximation to the Institute of Transportation Engineers' (I.T.E.) land use code for this type of shopping center where the retail sales tend to be low vehicular traffic volume generators would be Land Use Code 820 and in particular for trip generation with the same parameters as a shopping center in the 1,000,000 to 1,250,000 g.s.f. range. This is due to the fact that the actual trip production per thousand square feet of space is quite low. According to the published traffic report, "A Methodology for Consideration of Pass -by Trips in Traffic Impact Analyses for Shopping Centers" by Steven A. Smith and published in the August, 1986, ITE Journal, a shopping center of the size of this proposal could be expected to have approximately 44 percent of its total generated trips served from the "pass -by" traffic stream. Stated another way, about 44 percent of its traffic will come from the existing traffic stream. New traffic that will be produced by the site is in the order of 56 percent of that shown in Table II. Accordingly, net traffic added to the external system will be as shown below in Table III on the following page. -12- Christopher Brown a Associates 879 Rainier Avenue N., c,uite A -201 Renton, WA 98055 -1380 (206) 772 -1188 TABLE III Net Trip Generation, Schofield II - Southcenter Project Time Interval A.W.D.T. Noon Inbound Noon Outbound P.M. Inbound P.M. Outbound Traffic Assignment Volume 390 vehicles per day 27 vehicles per hour 19 vehicles per hour 20 vehicles per hour 21 vehicles per hour The distribution of site generated traffic for this project is based on current intersection movements including the driveway demand while traffic for the adjacent projects is assigned to the network on the basis of the 1990 population distribution in the South King County region as supplied by PSCOG. The traffic distribution, as a percent of all new site traffic, is described below in Figure A. Klickitat Drive -13- 12 12 w • Southcenter driveway F &N a N S1 'U N 0 0 0 Strander Blvd, Site /0 %C S. 180th Street FIGURE A Distribution of Traffic as a % of Site Traffic RJ Chri8topher Brown Amociate8 879 rainier Avenue N., c uite A -201 Renton, WA 98055 -1380 (206) 772 -1188 Traffic Assignment, Site Traffic The assignment of the actual peak hour traffic volumes involves two distinct times of day. These are the noon hour and the p.m. peak hour of the arterial street. In addition, the Christmas season is also of interest so the noon and p.m. peak hour assignments for this season were also defined. Considering only site generated traffic, the assignments to the arterial system for the noon hour, p.m. peak hour of the average weekday and for noon and p.m. peak hour of the Christmas season are shown in the following figures. Figure 6 Figure 7 Figure 8 Figure 9 Average Weekday Noon Peak Hour Assignment Average Weekday P.M. Peak Hour Assignment Christmas Season Noon Peak Hour Assignment Christmas Season P.M. Peak Hour Assignment Traffic Assignment, Adjacent Traffic The assignment of traffic from the two adjacent projects of record are next described in the following figures. These allow opportunity for assessing their potential impacts. Note, however, that one of them is in doubt since its actual type and scale of development is undefined, as discussed earlier. Again, considering only site generated traffic, the assignments of the "near projects" as they are called, onto the arterial system for the noon hour, p.m. peak hour of the average weekday and for noon and p.m. peak hour of the Christmas season are depicted in the following figures. Figure 10 Figure 11 Figure 12 Figure 13 Average Weekday Noon Peak Hour Assignment Average Weekday P.M. Peak Hour Assignment Christmas Season Noon Peak Hour Assignment Christmas Season P.M. Peak Hour Assignment Horizon Year Traffic With the project built, including traffic from the adjacent -14- Christopher Brown Associates 879 Rainier Avenue N., e,uite A -201 Renton, WA 98055 -1380 (206) 772 -1188 r■ M • E zM In w H SITE Southcenter Access Road Klickitat Drive Southcenter Parkway page 15 NOTE: Data on this figure is based on trip generation rates from the existing commercial site to the south. Trip assignment is based on current arterial flow. Strander Boulevard S. 168th Street S. 180th Street r Andover Park West. FIGURE 6 Average Weekday Noon Peak Site Traffic Assignment J �J Southcenter Access Road SITE 21 ■ Klickitat Drive b NOTE: X W a Data. on this figure is the estimated Christmas season trip P generation with assignment based on current flow on the arterial network. U O c Strander Boulevard page/Y6 11 S. 168th Street S. 180th Street h Andover Park West. S' T F7' FIGURE 7 Average Weekday PM Peak Site Traffic Assignment 111 ety ti O .J1 Southcenter Access Road a • H O Klickitat Drive NOTE: aData on this figure is based on an expansion rate of 9.1 percent for the Pre - v +► Christmas season. 0 Trip assignment is based on expected arterial flow rates. I Strander Boulevard page 17 S. 168th Street S. 180th Street Andover Park West. 2 -■,,MM FIGURE 8 Christmas Season, Noon Peak Traffic Assignment /♦ ma 2� a Ln w H page 18 SITE Southcenter Access Road Klickitat Drive NOTE: ro Data on this figure is based on an expansion rate of 9.1 rid percent for the Pre-Christmas a shopping season. • Traffic assignment is based on expected arterial flow o rates. 0 0 Strander Boulevard Andover Park West. 2� J S. 168th Street N S. 180th Street FIGURE 9 Christmas Season PM Peak Hour Traffic Assignment 1.1 i\ ma z if; 4-1 H Q SITE Southcenter Access Road Klickitat Drive >1 NOTE: N, td _w Data on this figure is the '� b net trip assignment for the a Tukwila Pond Center Phase II w and Speiker - Southcenter : 4) Project. ai 0 Data applies to the noon peak b 4 of the street system. 0 0 m `� \ Strander Boulevard ..1-/)1 .7.9B -page 19 aft' S. 168th Street S. 180th Street ■ FIGURE 10 Average Weekday Noon Peak Assignment, Near Projects ♦` fa h w ti O Southcenter Access Road /7:\I Pi a zM III 4-1 H Q SITE J Klickitat Drive Southcenter Parkway <3\ NOTE: Data on this figure is the net trip assignment for the Tukwila Pond Center Phase II and Speiker - Southcenter project. Data applies to the p.m. peak hour of the arterial street system. Strander Boulevard page 20 S. 168th Street S. 180th Street Andover Park West. FIGURE 11 Average Weekday PM Peak Assignment, Near Projects i\ Southcenter AccessRoad ti Q SITE page 21 ' � l Klickitat Drive NOTE: Southcenter Parkway Data on this figure is the net assignment during the Pre- Christmas season in the noon peak hour for Tukwila Pond Center Phase II and the Speiker Southcenter project. Strander Boulevard S. 168th Street S. 180th Street P Andover Park West. FIGURE 12 Christmas Season, Noon Peal Assignment, Near Projects r• v) Southcenter Access Road Klickitat Drive NOTE: (� a) Data on this figure is the net ro assignment during the Pre - ''' Christmas season in the p.m. w peak of the street system for 4.) Tukwial Pond Center Phase II and 0 the Speiker - Southcenter .o 0 project. 'n 4J 0 `�3 0 page 22 / Strander Boulevard S. 168th Street S. 180th Street FIGURE 13 Christmas Season, PM Peak Assignment, Near Projects projects, the horizon year average weekday and Christmas shopping season will have the design hour traffic demands shown on the following figures. Figure 14 Figure 15 Figure 16 Figure 17 Noon Peak Hour Design Traffic Volumes Average Weekday P.M. Peak Hour Design Volumes Christmas Season Noon Peak Hour Design Volumes Christmas Season P.M. Peak Hour Design Volumes Levels of Service The Level of Service (LOS) describes the quality of traffic flow. This ranges from the best or highest level, 'A', usually denoted by an ability to select ones' own speed or the ability to change lanes or overtake at will, down to the lowest of worst level 'F'. This LOS is the lowest possible level and is one where traffic is severely constrained. It is usually denoted by "jam" conditions and attendant long traffic delays. As a measure of intersection delay, it is described in terms the stopped delay each vehicle is expected to encounter at signalized intersections and in terms of both reserve capacity as well as expected delay at non - signalized intersections. These are shown below in Table. IV. -23- TABLE IV Level of Service Definitions Signalized intersections Level of Service Delay Per Vehicle (Seconds) A Under 5 seconds B 5.1 - 15.0 seconds C 15.1 - 25.0 seconds D 25.1 - 40.0 seconds E 40.1 - 60.0 seconds F Greater than 60 sec. 1 ,/ Christopher Brown & Associates 4 879 Rainier Avenue N., eSuite A -201 / Renton, WA 98055 -1380 / (206) 772 -1188 Southcenter AccessRoad M • M a I4-1 H SITE Klickitat Drive Southcenter Parkway NOTE: Data of this figure includes all traffic from the Tukwila Pond and Speiker projects and proposed site expansion. J15 c►1 Z1b 151 r Sio Strander Boulevard S. 168th Street S. 180th Street page 24 11 N ra, FIGURE 14 k‘141 t /-Az Noon Peak Hour Design Traffic Volumes RS • 2 I4-1 H O SITE page 25 N 0 N. 49 o ti 27 ' \k Southcenter AccessRoad rat% Klickitat Drive Southcenter Parkway NOTE: Data on this figure includes all traffic from Tukwila Pond and Speiker projects and from proposed site expansion. �6 Strander Boulevard S. 168th Street S. 180th Street FIGURE 15 Andover Park West. 61 Average Weekday PM Peak Hour Design Traffic Volumes is ,\ Southcenter AccessRoad Klickitat Drive Southcenter Parkway Data on this figure includes all traffic from Tukwila Pond and Speiker projects and site expansion, with traffic expanded for the expected Christmas shopping season. Strander Boulevard SITE 168th Street S. 180th Street Andover Park West. FIGURE 16 Christmas Season, Noon Peak Hour Design Volumes l.� a4 09 C4 H I SITE Southcenter Access Road Klickitat Drive NOTE: ro Data on this figure includes a4 all traffic from Tukwila Pond and Speiker projects and site expansion, with traffic expanded for the expected Christmas shopping season. 0 0 L1 07- 1ge6 page :247 kt Strander Boulevard S. 168th Street S. 180th Street FIGURE 17 Andover Park West. Christmas Season, PM Peak Hour Design Volumes TABLE IV - Continuation Level of Service Definitions Unsignalized intersections Level of Service Reserve Capacity A B D E F 400 or more 300 to 399 200 to 299 100 to 199 0 to 99 none Expected Delay Little or none Short delays Average delays Long delays Very long delays failure, extreme congestion Capacity computations were performed in accordance with Special Report 209, the Highway Capacity Manual, using the computer program CAPCALC 85, Version 2.2 published by Roger Creighton and Associates and licensed to this firm. The "Operations and Design" method, more rigorous than the "Planning" method, is used for signalized intersections. The only STOP sign controlled intersection is the northbound freeway off ramp. It used parameters for arterial roads with speeds under 35 m.p.h. A note of caution; the computer program will not accept roads with more than two approach lanes for STOP sign analysis. Southcenter Parkway has a four lane northbound approach with prohibited left turns (the ramp is an off ramp) so the analysis may be partially inhibited. Regardless, it does give an idea of likely operations. As noted earlier, all input data is listed in the appendix, along with computer output. When reviewing the appended computer data, it may be noted that each set of data has its' own file reference number. This is located at the top right of each data sheet. The title and other descriptive material is on the upper left corner. Levels of service for all conditions, are appended. These include analyses of: Average Weekday Noon Peak Hour Average Weekday P.M. Peak Hour Christmas Season Noon Peak Hour Christmas Season P.M. Peak Hour for current traffic as well as future traffic with the subject project and adjacent projects. -28- Chri8topher Brown A88ociate� 879 Rainier Avenue N., 6uite A -201 Renton, WA 98055 -1380 (206) 772 -1188 Levels of service (LOS) for current and Christmas (Xmas) shopping season noon and p.m. peak hour traffic conditions without the project are noted below. Note that no revisions to the street geometry are assumed (e.g., no widening on Strander Boulevard nor on Southcenter Parkway). All signals are set with 120 second cycle lengths. To the extent possible, maximum green time is kept on Southcenter Parkway so that progression can be maintained. At times, this lowers side street LOS values but overall LOS is kept at an optimum. Intersection TABLE V Levels of Service Average Christmas Weekday Season Noon PM Peak Noon PM Peak Southcenter Parkway/ Southcenter Mall (F &N) Southcenter Parkway/ Klickitat Drive Southcenter Parkway/ N.B. I -5 Off Ramp Southcenter Parkway/ Strander Boulevard Southcenter Parkway/ S. 180th Street Strander Boulevard/ Andover Park West * See discussion below. B B C C C C C C E D F D C D C F* F* F* F* F* D D D D In the above table, traffic conditions at S. 180th Street are congested at all hours according to the calculations that are appended. In this case, NO free right turns were assumed, so the LOS calculations are not quite correct. This intersection is not adjusted in this study. Primary focus is at the Strander Boulevard intersection on Southcenter Parkway. At the Strander Boulevard intersection on Southcenter Parkway, the low LOS during the Christmas P.M. Peak Hour is due to the existing geometry. Corrective action is discussed later. -29- Christopher Brown 0 Associate� 879 Rainier Avenue N., c uite A -201 Renton, WA 98055 -1380 (206) 772 -1188 With the project complete, and assuming the adjacent projects also finished, the arterial levels of service (LOS) for the noon peak hour and the P.M. Peak Hour in both average weekday and in the Christmas shopping season are noted in Table VI. TABLE VI Design Hour Levels of Service Intersection Southcenter Parkway/ Southcenter Mall (F &N) Southcenter Parkway/ Klickitat Drive Southcenter Parkway/ N.B. I -5 Off Ramp Southcenter Parkway/ Strander Boulevard Southcenter Parkway/ S. 180th Street Strander Boulevard/ Andover Park West Southcenter Parkway/ S. 168th Street Average Christmas Weekday Season Noon PM Peak Noon PM Peak B B C C C C D C F E F E C D* D E F F F F D D E D B A B A * This includes a three lane approach lane on the east leg. As with prior cases, the low LOS at S. 180th Street continues. In the p.m. peak hour, a test was made with Strander Boulevard widened on the east leg to three lanes so left, left and right, and right turns could be made. This is a suitable mode for the average case but it did not assist in the Christmas season. -30- Christopher Brown g Associates 879 Rainier Avenue N., 6uite A -201 \l Renton, WA 98055 -1380 (206) 772 -1188 LOS Discussion The Schofield project of and by itself does not cause a shift in the LOS but, in concert with the adjacent projects, there is: o A one step shift at Southcenter Parkway and Klickitat Drive in the noon hour peak of the Christmas season. o A lowering of the LOS at the freeway off ramp except at noon in the Christmas season when it is at LOS 'F' and can not get worse. o A constant degree of congestion at S. 180th Street at Southcenter Parkway regardless of any project. o An improvement in the p.m. peak on Strander Boulevard at Southcenter Parkway on the average weekday if the east leg is widened to three lanes. This is not significant in the Christmas season, however. The site driveway on Southcenter Parkway will function at very good levels of service if a signal is introduced. Indeed, the LOS will be very high even in the Christmas season. The intersection of Strander Boulevard at Andover Park West will also continue to function well. Of course, the eastbound leg will have a new right turn only lane. Parking On completion of this project, it will, in concert with the existing site have a total parking supply of 169 stalls. This is made up by the provision of 116 stalls adding to the existing supply of 53 stalls. By the I.T.E. Parking Generation (2nd edition) publication, for shopping centers of this type (Land Use Code 820), the demand for parking will be: Average Weekday 120 stalls Saturday 111 stalls. The parking supply for the completed center appears to be adequate. -31- ii Christopher Brown 0 Associates \ 879 Rainier Avenue N., Suite A -201 Renton, WA 98055 -1380 (206) 772 -1188 Mitigating Measures The sole mitigation measure for addressing the project's traffic impacts is the installation of an actuated traffic signal at the intersection of the site's entrance on Southcenter Parkway. This is a project presently contemplated by city staff and is a benefit to other commercial properties close by, especially in consideration of pedestrian crossing movements. With the net "new" traffic produced by this project amounting to some 390 vehicle trips per day with 46 of these in the noon hour and 42 vehicles in the p.m. peak hour, the percentage contribution to the arterial network is relatively insignificant. The north south split is about 50/50 so that north of the site the Southcenter Parkway gains at most 23 and 21 vehicles per hour during the noon and p.m. peak hour, respectively. The percentage increase is in the order of 0.8 percent in the noon peak and 0.6 percent in the p.m. peak. From a percentage view, these are minimal. Conclusions The construction and operation of the new 26 k.s.f. Schofield II Southcenter project will increase traffic demands on the adjacent collector and arterial road system by about 390 new vehicular trips per day and the noon hour traffic volumes, in this case the heaviest peak traffic hour of the day, by about 46 (new) vehicle trips per hour. The p.m. peak hour will increase by about 42 vehicles per hour. The road system serving the project site, including the key signalized intersections along Southcenter Parkway are capable of accommodating site generated traffic within acceptable LOS standards except at s. 180th Street where congestion will be met. There will be a shift in the LOS at Strander Boulevard/ Southcenter Parkway and this will be improved with the addition of a new lane on the east leg, in a left only /left- and - right/ and right only configuration. At Christmas, there will be congestion to the south of the site, but north of Klickitat Drive, operations will be adequate. Parking on site will be adequate with this new addition to the existing commercial site. -32- Chri8topher Brown C4 A88ociate8 879 Rainier Avenue N., Suite A -201 Renton, WA 98055 -1380 1 (206) 772 -1188 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCOO1N <1 0 SB TOTAL 777 > 39 v 738 N W - +- E SOUTHCENTER PRKWY. N/S STREET 2 1 V *> A \ / 1 - - *> 1 - - -* v A OFF RAMP FROM I -5 E/W STREET 105 ^ EB TOTAL 264 137 SOUTHCENTER PRKWY. N/S STREET 22 v ^ 58 WB TOTAL 0 344 286 v SOUTHCENTER DRIVEWA E/W STREET 648 A 0 250 <. .> NB TOTAL 898 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCOO1N INTERSECTION : OFF RAMP FROM I -5 @ SOUTHCENTER DRIVEWA @ SOUTHCENTER PRKWY. WEEKDAY NOON 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE ME OEM ONO, EB 0 1 N 0 0 0.88 0 N 0.0 3 WB 2 0 N 0 0 0.88 0 N 0.0 3 NB -2 2 N 0 0 0.98 0 Y 13.0 5 SB 2 2 N 0 0 0.98 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 105 137 22 LT 1 14.0 R 1 14.0 WB 286 0 58 L 1 12.0 LR 1 12.0 NB 0 648 250 T 1 12.0 TR 1 12.0 SB 39 738 0 L 1 12.0 T 2 24.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 LT R LR 30 90 WB 1 L LR LR 30 90 WB 2 L LR L R 20 100 NB 3 T TR R 55 65 SB 3 L T L 55 65 SB 4 L T L 15 105 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCOO1N INTERSECTION : OFF RAMP FROM I -5 @ SOUTHCENTER DRIVEWA @ SOUTHCENTER PRKWY. WEEKDAY NOON 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN` GROUP FACTOR RATE LT RT EB LT 242 275 1.00 275 0.43 0.00 R 22 25 1.00 25 0.00 1.00 WB NB SB L 232 264 1.00 264 1.00 0.00 LR 112 127 1.00 127 0.48 0.52 T 449 458 1.00 458 0.00 0.00 TR 449 458 1.00 458 0.00 1.00 L 39 40 1.00 40 1.00 0.00 T 738 753 1.00 753 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB LT 1800 1 R 1800 1 WB L LR NB T TR SB L T 1.07 1.00 1.00 1.00 1.00 1.00 1.00 0.77 1.07 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.95 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.92 0.86 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 0.85 1.00 1483 1637 1693 1410 1800 1530 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.95 1676 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCOO1N INTERSECTION : OFF RAMP FROM I -5 @ SOUTHCENTER DRIVEWA @ SOUTHCENTER PRKWY. WEEKDAY NOON 1989 CBD ? N ACTUATED SIGNAL C A P A C I T Y ANA L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB LT 275 0 1483 0.185 Y 0.250 371 0.741 R 25 0 1637 0.015 N 0.250 409 0.061 WB L 81 183 1693 0.048 N 0.167 282 0.287 LR 127 0 1410 0.090 N 0.417 587 0.216 NB T 458 0 1800 0.254 N 0.458 825 0.555 TR 458 0 1530 0.299 Y 0.458 701 0.653 SB L 30 10 1676 0.018 Y 0.125 209 0.144 T 753 .0 3528 0.213 N 0.583 2058 0.366 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.502 LOSS TIME PER CYCLE : 12 INTERSECTION V/C : 0.558 O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS L E V E L NO. 0011, MOP EB LT 0.741 0.250 120 31.5 371 5.3 0.85 31.3 D R 0.061 0.250 120 26.0 409 0.0 0.85 22.1 C 30.4 D WB L 0.287 0.167 120 33.3 282 0.2 1.00 33.5 D LR 0.216 0.417 120 17.1 587 0.0 0.85 14.5 B 27.3 D NB T 0.555 0.458 120 17.9 825 0.6 0.40 7.4 B TR 0.653 0.458 120 19.1 701 1.5 0.50 10.3 B 8.8 B SB L 0.144 0.125 120 35.6 209 0.0 1.00 35.6 D T 0.366 0.583, 120 10.1 2058 0.1 0.85 8.7 B 10.0 B INTERSECTION DELAY : 14.9 secs /veh LEVEL OF SERVICE : B 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCO02N N W - +- E S SB TOTAL 1046 <I v 349 697 SOUTHCENTER PARKWAY N/S STREET 1 2 I I <* v 235 ^ EB TOTAL /\ 696 461 A \/ 1 - - -* v 1 - - -* v KLICKITAT DRIVE E/W STREET 659 663 <. A NB TOTAL 1322 < * A 2 SOUTHCENTER PARKWAY N/S STREET CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCO02N INTERSECTION KLICKITAT DRIVE @ SOUTHCENTER PARKWAY AVERAGE NOON 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB -1 1 N 0 0 0.87 0 N 0.0 3 NB 0 0 N 0 0 0.95 0 N 0.0 5 SB 0 0 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 235 0 461 L 1 12.0 R 1 12.0 NB 659 663 0 L 2 24.0 T 2 24.0 SB 0 697 349 T 2 24.0 R 1 12.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L EB 3 R NB 2 T NB 3 L SB 1 R SB 2 R R T L R 50 R 40 30 L 40 R 40 R 30 70 80 90 80 80 90 PAGE 1 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO2N INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY AVERAGE NOON 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB NB SB L 235 270 1.00 270 1.00 0.00 R 461 530 1.00 530 0.00 1.00 L 659 694 1.00 694 1.00 0.00 T 663 698 1.00 698 0.00 0.00 T 697 734 1.00 734 0.00 0.00 R 349 367 1.00 367 0.00 1.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW - - -- - - -- - - -- EB L 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1530 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 NB L 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 SB T R 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 PAGE 2 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO2N INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY AVERAGE NOON 1989 CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB L 270 0 1530 0.176 N 0.417 637 0.424 R 530 0 1530 0.346 Y 0.750 1147 0.462 NB L 694 0 3312 0.210 Y 0.333 1104 0.629 T 698 0 3600 0.194 N 0.250 900 0.776 SB T 734 0 3600 0.204 N 0.250 900 0.816 R 367 0 1530 0.240 Y 0.667 1020 0.360 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.796 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 0.861 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB L 0.424 0.417 120 18.8 637 0.3 1.00 19.1 C R 0.462 0.750 120 4.4 1147 0.2 0.85 3.9 A 9.0 B NB L 0.629 0.333 120 25.6 1104 0.8 1.00 26.4 D T 0.776 0.250 120 31.8 900 3.0 0.50 17.4 C 21.9 C SB T 0.816 0.250 120 32.2 900 4.1 0.61 22.1 C R 0.360 0.667 120 6.7 1020 0.1 0.40 2.7 A 15.6 C INTERSECTION DELAY : 16.6 secs /veh LEVEL OF SERVICE : C CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCO03N INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY AVERAGE NOON 1989 UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH CBD ?N T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP (%) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 2 1 N 0 0 0.87 0 N 0.0 3 NB 0 1 N 0 0 0.95 0 N 0.0 5 SB 0 1 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 0 0 345 R 1 14.0 NB 0 1322 0 T 4 48.0 SB 0 1158 0 T 2 24.0 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SC003N INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY AVERAGE NOON 1989 UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH CBD ?N U N S I G N A L I Z E D C R I T I CAL GAPS APP EB NB SB , CRITICAL GAPS (SEC) LEFT TURN THROUGH RIGHT TURN 0.00 0.00 6.00 V O L U M E A L L O C A T I O N T O LAN E S LANE 1 LANE 2 APP L T R L T OIMM MIN LANE 3 L T R EB 0 0 345 0 0 0 0 0 0 NB 0 0 0 0 0 0 0 0 0 SB 0 579 0 0 579 0 0 0 0 APP EB NB SB U N S I G N A L I Z E D LANE 1 RESERVE CAPACITY 68 LEVEL OF SERVICE E RESERVE CAPACITY LEVEL OF SERVICE RESERVE CAPACITY LEVEL OF SERVICE MAJOR STREET - NB /SB woo .11•10 LANE 2 LANE 3 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCO04N SOUTHCENTER PRKWY. N/S STREET 2 2 v *> A *> 2 1 SOUTHCENTER PRKWY. N/S STREET N W - +- E SB TOTAL 1503 v .> 1020 483 STRANDER BLVD. E/W STREET 934 558 A .> NB TOTAL 1492 A 388 v WB TOTAL 514 902 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO4N INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY NOON 1989 CBD ?N ACTUATED SIGNAL APP WB NB SB T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE S I G N A L WM a= MIS OM 2 3 N 0 0 0.98 10 Y 18.0 4 2 3 N 0 0 0.98 10 Y 18.0 3 -2 3 N 0 0 0.98 0 N 18.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD WB 514 0 388 L 1 12.0 R 1 12.0 NB 0 934 558 T 2 24.0 R 1 12.0 SB 483 1020 0 L 2 24.0 T 2 24.0 APP PHASE =NB NM MO WB 3 WB 1 NB 2 NB 3 SB 2 SB 1 PHASING 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R L R LR 55 65 R R 25 95 T R R 40 80 R R 55 65 T 40 80 T L L 25 95 PAGE 1 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO4N INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY NOON 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT WB NB SB Mi• Ma MO L 514 524 1.00 524 1.00 0.00 R 388 396 1.00 396 0.00 1.00 T 934 953 1.00 953 0.00 0.00 R 558 569 1.00 569 0.00 1.00 L 483 493 1.00 493 1.00 0.00 T 1020 1041 1.00 1041 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW - - -- - - -- - - -- - - -- WB L 1800 1 1.00 0.99, 0.99 1.00 1.00 1.00 1.00 0.85 1500 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 NB T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 SB L 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 3600 PAGE 2 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO4N INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY NOON 1989 CBD ? N ACTUATED SIGNAL C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO WB L 524 0 1500 0.349 Y 0.458 687 0.763 R 396 0 1500 0.264 Y 0.667 1000 0.396 NB T 953 0 3528 0.270 N 0.333 1176 0.810 R 569 0 1500 0.379 Y 0.792 1187 0.479 SB L 493 0 3312 0.149 Y 0.208 690 0.714 T 1041 0 3600 0.289 N 0.542 1950 0.534 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 1.141 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 1.234 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS WB L 0.763 0.458 120 20.6 687 3.5 1.00 24.1 C R 0.396 0.667 120 6.9 1000 0.1 0.62 4.3 A 15.6 C NB T 0.810 0.333 120 27.8 1176 3.1 0.85 26.3 D R 0.479 0.792 120 3.2 1187 0.2 0.85 2.9 A 17.5 C SB L 0.714 0.208 120 33.6 690 2.4 1.00 36.0 D T 0.534 0.542 120 13.5 1950 0.2 0.40 5.5 B 15.3 C INTERSECTION DELAY : 16.2 secs /veh LEVEL OF SERVICE : C 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCO05N SB TOTAL 677 <' 141 425 W - +- E SOUTHCENTER PRKWY. N/S STREET 1 2 ^ 687 WB TOTAL 360 1105 58 v S. 180TH STREET E/W STREET A /\ v 1 1 - - -> 1 - - -* v E/W STREET 199 ^ EB TOTAL 439 235 5 v SOUTHCENTER PRKWY. N/S STREET 193 A 17 66 <. > i NB TOTAL 276 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCO05N INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. WEEKDAY NOON 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE • EB -6 1 N 0 0 0.88 0 N 0.0 3 WB 2 0 N 0 0 0.92 0 N 0.0 3 NB -2 1 N 0 0 0.85 3 Y 18.0 3 SB 2 2 N 0 0 0.92 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 199 235 5 L 1 11.0 T 1 11.0 R 1 10.0 WB 58 360 687 L 1 12.0 TR 1 12.0 R 1 12.0 NB 17 193 66 L 1 11.0 TR 1 12.0 SB 425 111 141 L 2 24.0 TR 1 12.0 S I G N A L PHA S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L L 15 105 EB 2 L T R LR 30 90 WB 1 L L 15 105 WB 2 L TR R LR 30 90 WB 3 L TR R R L 20 100 WB 6 R R 10 110 NB 4 L L 10 110 NB 5 TR R 15 105 SB 4 L L L 10 110 SB 6 L L TR LR 20 100 PAGE 1 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO5N INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. WEEKDAY NOON 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 199 226 1.00 226 1.00 0.00 T 235 267 1.00 267 0.00 0.00 R 5 6 1.00 6 0.00 1.00 WB L 58 63 1.00 63 1.00 0.00 TR 669 727 1.00 727 0.00 0.46 R 378 411 1.00 411 0.00 1.00 NB L 17 20 1.00 20 1.00 0.00 TR 259 305 1.00 305 0.00 0.25 SB L 425 462 1.00 462 1.00 0.00 TR 252 274 1.00 274 0.00 0.56 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 0.95 1708 T 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1798 R 1800 1 0.94 1.00 1.03 1.00 1.00 1.0.0 0.85 1.00 1481 WB L 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.95 1693 TR 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.93 1.00 1657 R 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.85 1.00 1515 NB L 1800 1 0.97 1.00 1.01 1.00 1.00 1.00 1.00 0.95 1675 TR 1800 1 1.00 1.00 1.01 1.00 1.00 1.00 0.96 1.00 1745 SB L 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.92 3246 TR 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.92 1.00 1623 PAGE 2 CHRISTOPHER BROWN 7/1/2064 INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. WEEKDAY NOON ACTUATED SIGNAL SCHOFIELD, NOON DATA 1989 CBD ? N SCO05N C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW APP MVM RATE LT FLOW FLW RT RATIO EB L T R WB L TR R NB L TR SB L TR GREEN LN GR V/C CRIT ? RATIO CAPACITY RATIO 161 65 1708 0.094 Y 267 0 1798 0.148 N 6 0 1481 0.004 N 53 10 1693 0.031 N 727 0 1657 0.439 Y 411 0 1515 0.271 N 20 0 1675 0.012 N 305 0 1745 0.175 Y 279 183 3246 0.086 Y 274 0 1623 0.169 N CYCLE LENGTH : 120.0 LOSS TIME PER CYCLE : 0.125 0.250 0.250 0.125 0.417 0.500 0.083 0.125 0.167 0.083 213 449 370 212 690 757 140 218 0.756 0.595 0.016 0.250 1.054 0.543 0.143 1.399 541 0.516 135 2.030 SUM OF CRITICAL LANES' FLOW RATIOS : 0.794 18 INTERSECTION V/C : 0.934 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd APP MVM RATIO RATIO LEN DELAY CAP DELAY EB WB NB SB L 0.756 0.125 120 38.6 T 0.595 0.250 120 30.1 R 0.016 0.250 120 25.8 L 0.250 0.125 120 36.0 TR 1.054 0.417 120 27.7 R 0.543 0.500 120 15.6 L 0.143 0.083 120 .38.8 TR 1.399 0.125 120 42.3 L 0.516 0.167 120 TR 2.030 0.083 120 LN GR LN GR APP APP PF DELAY LOS DELAY LOS 213 9.6 1.00 449 1.6 0.85 370 0.0 0.85 212 0.1 1.00 690 42.2 0.85 757 0.6 0.85 140 0.0 1.00 218 308.4 0.85 48.2 26.9 21.9 36.1 59.4 13.8 38.8 298.1 E D C D E B D F 34.6 541 0.7 1.00 35.3 D 46.1 135 1547.6 0.85 1354.6 F 36.5 D 42.6 E 281.3 F 525.7 F INTERSECTION DELAY :198.5 secs /veh LEVEL OF SERVICE : F CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCO06N INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST WEEKDAY NOON 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 0 1 N 0 0 0.88 0 Y 18.0 3 WB 0 2 N 0 0 0.80 5 Y 18.0 3 NB 0 4 N 0 0 0.87 0 Y 15.5 3 SB 0 2 N 0 0 0.87 7 Y 15.5 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 113 402 119 L 1 12.0 TR 2 21.0 WB 90 452 209 L 1 11.0 TR 2 20.0 NB 172 331 56 LTR 2 25.0 SB 285 371 123 LTR 2 27.0 APP PHASE EB 1 EB 2 WB 1 WB 2 NB 3 SB 4 S I G N A L PHA S I N G 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R L L 12 88 TR R 28 72 L L 12 88 TR R 28 72 LTR LR 27 73 LTR LR 33 67 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCO06N SB TOTAL 779 <1 .> 123 i 285 v 371 W +- E ANDOVER PARK WEST N/S STREET 2 < *> v A \ / A < *> STRANDER BLVD. E/W STREET 2 113 ^ EB TOTAL 634 402 ANDOVER PARK WEST N/S STREET 119 ^ 209 WB TOTAL 452 751 90 v STRANDER BLVD. E/W STREET 331 A 172 j 56 <. .> NB TOTAL 559 PAGE 1 CHRISTOPHER BROWN 7/1/2064 INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST WEEKDAY NOON ACTUATED SIGNAL SCHOFIELD, NOON DATA 1989 CBD ? N SCOO6N APPROACH LANE GROUP MVM VOLUME EB WB NB SB L 113 TR 521 L 90 TR 661 LTR 559 LTR 779 V O L U M E A D J U S T M E N T FLOW RATE IN GROUP 128 592 112 826 643 895 LANE UTIL ADJ FLOW FACTOR RATE 1.00 1.00 1.00 1.00 1.00 1.00 128 592 112 826 643 895 PROP OF TURNS LT RT 1.00 0.00 0.00 0.23 1.00 0.00 0.00 0.32 0.31 0.10 0.37 0.16 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS APP MVM SAT FLOW ADJ. LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L TR WB L TR NB LTR SB LTR 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1800 2 0.95 1.00 1.00 1.00 1.00 1.00 0.97 1.00 1800 1 0.97 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1800 2 0.94 0.99 1.00 1.00 1.00 1.00 0.95 1.00 1800 2 1.02 0.98 1.00 1.00 1.00 1.00 0.99 0.98 1800 2 1.05 0.99 1.00 1.00 1.00 1.00 0.98 0.98 1710 3317 1642 3183 3474 3579 PAGE 2 CHRISTOPHER BROWN 7/1/2064 INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST WEEKDAY NOON ACTUATED SIGNAL SCHOFIELD, NOON DATA 1989 CBD ? N SCOO6N C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW APP MVM RATE LT FLOW FLW RT RATIO EB L TR WB L TR NB LTR SB LTR 128 0 1710 0.075 592 0 3317 0.178 112 0 1642 0.068 826 0 3183 0.260 643 0 3474 0.185 895 0 3579 0.250 CYCLE LENGTH : 100.0 LOSS TIME PER CYCLE : 12 GREEN LN GR V/C CRIT ? RATIO CAPACITY RATIO Y 0.120 205 0.624 N 0.280 929 0.637 N 0.120 197 0.569 Y 0.280 891 0.927 Y 0.270 938 0.686 Y 0.330 1181 0.758 SUM OF CRITICAL LANES' FLOW RATIOS : 0.770 INTERSECTION V/C : 0.875 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd APP MVM RATIO RATIO LEN DELAY CAP DELAY EB L 0.624 0.120 100 TR 0.637 0.280 100 WB L 0.569 0.120 100 TR 0.927 0.280 100 NB LTR 0.686 0.270 100 SB LTR 0.758 0.330 100 31.8 24.0 31.6 26.6 LN GR LN GR APP APP PF DELAY LOS DELAY LOS 205 4.0 1.00 929 1.0 0.85 197 2.8 1.00 891 11.2 0.85 35.8 D 21.2 C 23.8 C 34.4 D 32.1 D 32.3 D 24.9 938 1.5 0.85 22.4 C 22.3 C 22.7 1181 2.0 0.85 21.0 C 21.0 C INTERSECTION DELAY : 25.2 secs /veh LEVEL OF SERVICE : D CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCOO1PM INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & ROADWAY C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE WIN MO EB 0 1 N 0 0 0.88 0 N 0.0 3 WB 2 0 N 0 0 0.88 0 N 0.0 3 NB -2 2 N 0 0 0.98 0 Y 13.0 5 SB 2 2 N 0 0 0.98 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 109 102 33 LT 1 14.0 R 1 14.0 WB 311 0 65 L 1 12.0 LR 1 12.0 NB 0 558 197 T 1 12.0 TR 1 12.0 SB 14 755 0 L 1 12.0 T 2 24.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 LT R LR 30 90 WB 1 L LR LR 30 90 WB 2 L LR L R 20 100 NB 3 T TR R 55 65 SB 3 L T L 55 65 SB 4 L T L 15 105 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCOO1PM <1 0 SB TOTAL 769 > 14 v 755 N W - +- E SOUTHCENTER PRKWY. N/S STREET 2 • 1 v *> /\ A \ / 1 - - *> 1 - - -* v E/W STREET 109 ^ EB TOTAL 244 102 33 v SOUTHCENTER PRKWY. N/S STREET A 65 WB TOTAL 0 376 311 v SOUTHCENTER DRIVE E/W STREET 558 A 0 i 197 <. NB TOTAL 755 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCOO1PM INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB WB NB SB LT 211 240 1.00 240 0.52 0.00 R 33 37 1.00 37 0.00 1.00 L 253 287 1.00 287 1.00 0.00 LR 123 140 1.00 140 0.47 0.53 T 378 386 1.00 386 0.00 0.00 TR 377 385 1.00 385 0.00 1.00 L 14 14 1.00 14 1.00 0.00 T 755 770 1.00 770 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB LT 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 1.00 0.71 1367 R 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1637 WB L 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.95 1693 LR 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.92 0.87 1426 NB T 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 1800 TR 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 0.85 1.00 1530 SB L 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.95 1676 T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCOO1PM INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK 1989 CBD ? N ACTUATED SIGNAL C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB LT 240 0 1367 0.176 Y 0.250 342 0.702 R 37 0 1637 0.023 N 0.250 409 0.090 WB L 100 187 1693 0.059 N 0.167 282 0.355 LR 140 0 1426 0.098 N 0.417 594 0.236 NB T 386 0 1800 0.214 N 0.458 825 0.468 TR 385 0 1530 0.252 Y 0.458 701 0.549 SB L 9 5 1676 0.005 Y 0.125 209 0.043 T 770 0 3528 0.218 N 0.583 2058 0.374 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.433 LOSS TIME PER CYCLE : 12 INTERSECTION V/C : 0.481 O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS L E V E L wiim EB LT 0.702 0.250 120 31.1 342 4.3 0.85 30.1 D R 0.090 0.250 120 26.2 409 0.0 0.85 22.3 C 29.0 D WB L 0.355 0.167 120 33.7 282 0.3 1.00 34.0 D LR 0.236 0.417 120 17.2 594 0.0 0.85 14.6 B 27.6 D NB T 0.468 0.458 120 17.0 825 0.3 0.40 6.9 B TR 0.549 0.458 120 17.9 701 0.7 0.40 7.4 B 7.1 B SB L 0.043 0.125 120 35.1 209 0.0 1.00 35.1 D T 0.374 0.583 120 10.1 2058 0.1 0.85 8.7 B 9.2 B INTERSECTION DELAY : 14.4 secs /veh LEVEL OF SERVICE : B 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCOO2PM W - +- E SB TOTAL 1099 { 1 <' v 525 574 SOUTHCENTER PARKWAY N/S STREET 1 2 <* v 171 ^ EB TOTAL /\ 687 516 A \/ 1 - - -* v 1 - - -* v KLICKITAT DRIVE E/W STREET 1155 584 <. A NB TOTAL 1739 SOUTHCENTER PARKWAY N/S STREET CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCOO2PM INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY AVERAGE P.M. PEAK 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & ROADWAY C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP (%) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB -1 1 N 0 0 0.87 0 N 0.0 3 NB 0 0 N 0 0 0.95 0 N 0.0 5 SB 0 0 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 171 0 516 L 1 12.0 R 1 12.0 NB 1155 584 0 L 2 24.0 T 2 24.0 SB 0 574 525 T 2 24.0 R 1 12.0 SIGNAL P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L R L R 40 80 EB 3 R R 50 70 NB 2 T 30 90 NB 3 L L 50 70 SB 1 R R 40 80 SB 2 R T R 30 90 PAGE 1 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCOO2PM INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY AVERAGE P.M. PEAK 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 171 197 1.00 197 1.00 0.00 R 516 593 1.00 593 0.00 1.00 NB L 1155 1216 1.00 1216 1.00 0.00 T 584 615 1.00 615 0.00 0.00 SB T 574 604 1.00 604 0.00 0.00 R 525 553 1.00 553 0.00 1.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA EB L 1800 1 R 1800 1 NB L T SB T R ADJ. RT LT FLOW - - -- - - -- - - -- -- -- 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1530 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.92 3312 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 PAGE 2 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCOO2PM INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY AVERAGE P.M. PEAK 1989 CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB L 197 0 1530 0.129 N 0.333 510 0.386 R 593 0 1530 0.388 Y 0.750 1147 0.517 NB L 1216 0 3312 0.367 Y 0.417 1380 0.881 T 615 0E 3600 0.171 N 0.250 900 0.683 SB T 604 0 3600 0.168 N 0.250 900 0.671 R 553 0 1530 0.361 Y 0.583 892 0.620 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 1.116 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 1.206 L E V E L O F S E R V I C E LN 'GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB L 0.386 0.333 120 23.3 510 0.3 1.00 23.6 C R 0.517 0.750 120 4.7 1147 0.3 0.85 4.2 A 9.0 B NB L 0.881 0.417 120 24.5 1380 5.0 1.00 29.5 D T 0.683 0.250 120 30.9 900 1.5 0.50 16.2 C 25.0 C SB T 0.671 0.250 120 30.8 900 1.4 0.50 16.1 C R 0.620 0.583 120 12.4 892 1.0 0.50 6.7 B 11.6 B INTERSECTION DELAY : 17.5 secs /veh LEVEL OF SERVICE : C CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCO03PM INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY AVERAGE P.M. PEAK 1989 UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH CBD ?N APP EB NB SB T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR (%) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE 2 1 N 0 0 0.87 0 N 0.0 3 0 1 N 0 0 0.95 0 N 0.0 5 0 1 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 0 0 248 R 1 14.0 NB 0 1739 0 T 4 48.0 SB 0 1150 0 T 2 24.0 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SC003PM INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY AVERAGE P.M. PEAK 1989 UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH CBD ?N U N S I G N A L I Z E D C R I T I CAL GAPS APP EB NB SB CRITICAL GAPS (SEC) LEFT TURN THROUGH RIGHT TURN 0.00 0.00 6.00 V O L U M E ALLOCATION T O LANES LANE 1 LANE 2 LANE 3 APP L T R L T R L T R EB 0 0 248 0 0 0 0 0 0 NB 0 0 0 0 0 0 0 0 0 SB 0 575 0 0 575 0 0 0 0 APP EB NB SB U N S I G N A L I Z ED LANE 1 LANE 2 LANE 3 RESERVE CAPACITY 188 LEVEL OF SERVICE D RESERVE CAPACITY LEVEL OF SERVICE RESERVE CAPACITY LEVEL OF SERVICE MAJOR STREET - NB /SB CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCOO4PM INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE - -- - -- - - -- - - -- - - -- WB 2 3 N 0 0 0.98 10 Y 18.0 4 NB 2 3 N 0 0 0.98 10 Y 18.0 3 SB -2 3 N 0 0 0.98 0 N 18.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD WB 725 0 559 L 1 12.0 R 1 12.0 NB 0 1180 675 T 2 24.0 R 1 12.0 SB 449 949 0 L 2 24.0 T 2 24.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R WB 3 L WB 1 R NB 2 T NB 3 R SB 2 T SB 1 T R R L LR 60 60 R 20 100 R 40 80 R 60 60 40 80 L 20 100 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCO04PM SOUTHCENTER PRKWY. N/S STREET 2 2 v *> N W - +- E SB TOTAL 1398 v .> 949 449 STRANDER BLVD. E/W STREET A 559 /\ WB TOTAL \/ 725 1284 A *> 2 1 1180 A SOUTHCENTER PRKWY. N/S STREET NB TOTAL 1855 675 .> v PAGE 1 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCOO4PM INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT WB L 725 740 1.00 740 1.00 0.00 R 559 570 1.00 570 0.00 1.00 NB SB T 1180 1204 1.00 1204 0.00 0.00 R 675 689 1.00 689 0.00 1.00 L 449 458 1.00 458 1.00 0.00 T 949 968 1.00 968 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW - - -- - - -- - - -- - - -- WB L 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.85 1500 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 NB T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 SB L 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 3600 PAGE 2 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCOO4PM INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK 1989 CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO WB L 740 0 1500 0.493 Y 0.500 750 0.987 R 570 0 1500 0.380 Y 0.667 1000 0.570 NB T 1204 0 3528 0.341- N 0.333 1176 1.024 R 689 0 1500 0.459 Y 0.833 1250 0.551 SB L 458 0 3312 0.138 Y 0.167 552 0.830 T 968 0 3600 0.269 N 0.500 1800 0.538 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 1.470 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 1.589 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS =NM 1IM WB L 0.987 0.500 120 22.5 750 22.4 1.00 44.9 E R 0.570 0.667 120 8.2 1000 0.6 0.62 5.5 B 27.7 D NB T 1.024 0.333 120 30.8 1176 26.2 0.85 48.4 E R 0.551 0.833 120 2.3 1250 0.4 0.85 2.3 A 31.6 D SB L 0.830 0.167 120 36.8 552 7.2 1.00 44.0 E T 0.538 0.500 120 15.6 1800 0.3 0.40 6.4 B 18.5 C INTERSECTION DELAY : 26.4 secs /veh LEVEL OF SERVICE : D CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCO05PM INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB -6 1 N 0 0 0.88 0 N 0.0 3 WB 2 0 N 0 0 0.92 0 N 0.0 3 NB -2 1 N 0 0 0.85 3 Y 18.0 3 SB 2 2 N 0 0 0.92 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 199 235 5 L 1 11.0 T 1 11.0 R 1 10.0 WB 135 547 434 L 1 12.0 TR 1 12.0 R 1 12.0 NB 29 133 41 L 1 11.0 TR 1 12.0 SB 245 150 365 L 2 24.0 TR 1 12.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L T R LR 20 80 WB 2 R R 15 85 WB 3 R TR L LR 20 80 NB 4 L TR LR 20 80 SB 5 L L TR LR 25 75 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCO05PM SB TOTAL 760 <' .> 365 i 245 v 150 W - +- E SOUTHCENTER PRKWY. N/S STREET A 434 WB TOTAL 547 1116 135 v S. 180TH STREET E/W STREET A v 1 - - -* \/ 1 - - -> 1 ---* v E/W STREET 199 ^ EB TOTAL 439 235 5 v SOUTHCENTER PRKWY. N/S STREET 133 A i 29 1 41 NB TOTAL 203 PAGE 1 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCOO5PM INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 199 226 1.00 226 1.00 0.00 T 235 267 1.00 267 0.00 0.00 R 5 6 1.00 6 0.00 1.00 WB L 135 147 1.00 147 1.00 0.00 TR 579 629 1.00 629 0.00 0.06 R 402 437 1.00 437 0.00 1.00 NB L 29 34 1.00 34 1.00 0.00 TR 174 205 1.00 205 0.00 0.24 SB L 245 266 1.00 266 1.00 0.00 TR 515 560 1.00 560 0.00 0.71 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA EB L 1800 1 T 1800 1 R 1800 1 WB L 1800 1 TR 1800 1 R 1800 1 NB L 1800 1 TR 1800 1 SB L TR ADJ. RT LT FLOW - - -- - - -- - - -- - - -- - - -- 0.97 1.00 1.03 1.00 1.00 1.00 1.00 0.20 360 0.97 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1798 0.94 1.00 1.03 1.00 1.00 1.00 0.85 1.00 1481 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.62 1105 1.00 1.00 0.99 1.00 1.00 1.00 0.99 1.00 1764 1.00 1.00 0.99 1.00 1.00 1.00 0.85 1.00 1515 0.97 1.00 1.01 1.00 1.00 1.00 1.00 0.20 353 1.00 1.00 1.01 1.00 1.00 1.00 0.96 1.00 1745 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.92 3246 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.89 1.00 1570 PAGE 2 CHRISTOPHER BROWN 7/1/2064 INTERSECTION : S. 180TH STREET @ SOUTHCENTER.PRKWY. WEEKDAY P.M. PEAK ACTUATED SIGNAL SCHOFIELD, PM DATA 1989 CBD ? N SCOO5PM C A P A C I T Y ANA L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW APP MVM RATE LT FLOW FLW RT RATIO EB L T R WB L TR R NB L TR SB L TR 226 0 360 0.628 267 0 1798 0.148 6 0 1481 0.004 147 0 1105 0.133 629 0 1764 0.357 437 0 1515 0.288 34 0 353 0.096 205 0 1745 0.117 266 0 3246 0.082 560 0 1570 0.357 CYCLE LENGTH : 100.0 LOSS TIME PER CYCLE : 15 CRIT ? Y N N N Y N Y Y GREEN LN GR V/C RATIO CAPACITY RATIO 0.200 0.200 0.200 0.200 0.200 0.350 0.200 0.200 72 360 296 221 353 530 71 349 3.139 0.742 0.020 0.665 1.782 0.825 0.479 0.587 N 0.500 1623 0.164 Y 0.250 392 1.429 SUM OF CRITICAL LANES' FLOW RATIOS : 1.555 INTERSECTION V/C : 1.829 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd APP MVM RATIO RATIO LEN DELAY CAP DELAY EB L 3.139 0.200 100 T 0.742 0.200 100 R 0.020 0.200 100 WB L 0.665 0.200 100 TR 1.782 0.200 100 R 0.825 0.350 100 NB L 0.479 0.200 100 TR 0.587 0.200 100 SB L 0.164 0.500 100 TR 1.429 0.250 100 65.3 28.6 24.4 28.1 37.8 22.6 26.9 27.6 LN GR LN GR APP APP PF DELAY LOS DELAY LOS 72 7560.5 0.85 360 5.5 0.85 296 0.0 0.85 221 5.0 0.85 353 886.7 0.85 530 7.1 0.85 71 3.8 0.85 349 1.9 0.85 10.3 1623 0.0 0.85 33.3 392 325.5 0.85 6481.9 29.0 20.7 28.1 785.8 25.2 26.1 25.1 F D C 2951.5 F D F D 420.0 F D D 25.1 D 8.8 B 305.0 F 209.4 F INTERSECTION DELAY :777.8 secs /veh LEVEL OF SERVICE : F CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCO06PM INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST WEEKDAY P.M PEAK HOUR 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 0 1 N 0 0 0.88 0 Y 18.0 3 WB 0 2 N 0 0 0.80 5 Y 18.0 3 NB 0 4 N 0 0 0.87 0 Y 15.5 3 SB 0 2 N 0 0 0.87 7 Y 15.5 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 88 380 57 L 1 12.0 TR 2 21.0 WB 40 544 152 L 1 11.0 TR 2 20.0 NB 140 382 48 LTR 2 25.0 SB 243 282 100 LTR 2 27.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L L 12 88 EB 2 TR R 28 72 WB 1 L L 12 88 WB 2 TR R 28 72 NB 3 LTR LR 27 73 SB 4 LTR LR 33 67 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCO06PM <1 100 SB TOTAL 625 > 243 v 282 N W - +- E ANDOVER PARK WEST N/S STREET 2 v A \/ STRANDER BLVD. E/W STREET 88 ^ EB TOTAL 525 380 57 v A < *> 2 ANDOVER PARK WEST N/S STREET ^ 152 WB TOTAL 544 736 40 STRANDER BLVD. E/W STREET 382 A i 140 j 48 <. .> NB TOTAL 570 PAGE 1 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCOO6PM INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST WEEKDAY P.M PEAK HOUR 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 88 100 1.00 100 1.00 0.00 TR 437 497 1.00 497 0.00 0.13 WB L 40 50 1.00 50 1.00 0.00 TR 696 870 1.00 870 0.00 0.22 NB LTR 570 655 1.00 655 0.25 0.08 SB LTR 625 718 1.00 718 0.39 0.16 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW - - -- - - -- - - -- - - -- EB L 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1710 TR 1800 2 0.95 1.00 1.00 1.00 1.00 1.00 0.98 1.00 3352 WB L 1800 1 0.97 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1642 TR 1800 2 0.94 0.99 1.00 1.00 1.00 1.00 0.97 1.00 3250 NB LTR 1800 2 1.02 0.98 1.00 1.00 1.00 1.00 0.99 0.99 3520 SB LTR 1800 2 1.05 0.99 1.00 1.00 1.00 1.00 0.98 0.98 3579 PAGE 2 CHRISTOPHER BROWN 7/1/2064 INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST WEEKDAY P.M PEAK HOUR ACTUATED SIGNAL SCHOFIELD, PM DATA 1989 CBD ? N SCOO6PM C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW APP MVM RATE LT FLOW FLW RT RATIO EB L TR WB L TR NB LTR SB LTR 100 0 1710 0.058 497 0 3352 0.148 50 0 1642 0.030 870 0 3250 0.268 655 0 3520 0.186 718 0 3579 0.201 CYCLE LENGTH : 100.0 LOSS TIME PER CYCLE : 12 GREEN LN GR V/C CRIT ? RATIO CAPACITY RATIO Y 0.120 205 0.488 N 0.280 939 0.529 N 0.120 197 0.254 Y 0.280 910 0.956 Y 0.270 950 0.689 Y 0.330 1181 0.608 SUM OF CRITICAL LANES' FLOW RATIOS : 0.713 INTERSECTION V/C : 0.810 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd APP MVM RATIO RATIO LEN DELAY CAP DELAY EB L 0.488 0.120 100 TR 0.529 0.280 100 WB L 0.254 0.120 100 TR 0.956 0.280 100 NB LTR 0.689 0.270 100 SB LTR 0.608 0.330 100 31.3 23.1 30.4 26.9 LN GR LN GR APP APP PF DELAY LOS DELAY LOS 205 1.5 1.00 939 0.5 0.85 197 0.2 1.00 910 14.7 0.85 32.8 D 20.1 C 22.2 C 30.6 D 35.4 D 35.1 D 24.9 950 1.5 0.85 22.4 C 22.3 C 21.3 1181 0.7 0.85 18.7 C 18.6 C INTERSECTION DELAY : 25.4 secs /veh LEVEL OF SERVICE : D 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCOO1NC SB TOTAL 887 <1 `> 0 ` 45 v 842 N W - +- E SOUTHCENTER PRKWY. N/S STREET 2 1 A \ / 1 - - *> 1 - - -* v E/W STREET 120 ^ EB TOTAL 301 156 25 SOUTHCENTER PRKWY. N/S STREET ^ 66 WB TOTAL 0 392 326 v SOUTHCENTER DRIVE E/W STREET 739 A i 0 1 285 <. .> 1 NB TOTAL 1024 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCOO1NC INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. XMAS NOON 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 0 1 N 0 0 0.88 0 N 0.0 3 WB 2 0 N 0 0 0.88 0 N 0.0 3 NB -2 2 N 0 0 0.98 0 Y 13.0 5 SB 2 2 N 0 0 0.98 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 120 156 25 LT 1 14.0 R 1 14.0 WB 326 0 66 L 1 12.0 LR 1 12.0 NB 0 739 285 T 1 12.0 TR 1 12.0 SB 45 842 0 L 1 12.0 T 2 24.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 LT R LR 30 90 WB 1 L LR LR 30 90 WB 2 L LR L R 20 100 NB 3 T TR R 55 65 SB 3 L T L 55 65 SB 4 L T L 15 105 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCOO1NC INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. XMAS NOON 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB WB NB SB LT 276 314 1.00 314 0.43 0.00 R 25 28 1.00 28 0.00 1.00 L 265 301 1.00 301 1.00 0.00 LR 127 144 1.00 144 0.48 0.52 T 512 522 1.00 522 0.00 0.00 TR 512 522 1.00 522 0.00 1.00 L 45 46 1.00 46 1.00 0.00 T 842 859 1.00 859 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW - - -- - - -- - - -- - - -- EB LT 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 1.00 0.72 1387 R 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1637 WB L 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.95 1693 LR 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.92 0.85 1394 NB T 1800 1 1.00 0.99. 1.01 1.00 1.00 1.00 1.00 1.00 1800 TR 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 0.85 1.00 1530 SB L 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.95 1676 T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCOO1NC INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. XMAS NOON 1989 CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB LT 314 0 1387 0.226 Y 0.250 347 0.905 R 28 0 1637 0.017 N 0.250 409 0.068 WB L 125 176 1693 0.074 N 0.167 282 0.443 LR 144 0 1394 0.103 N 0.417 581 0.248 NB T 522 0 1800 0.290 N 0.458 825 0.633 TR 522 0 1530 0.341 Y 0.458 701 0.745 SB L 2 44 1676 0.001 Y 0.125 209 0.010 T 859 0 3528 0.243 N 0.583 2058 0.417 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.568 LOSS TIME PER CYCLE : 12 INTERSECTION V/C : 0.631 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB LT 0.905 0.250 120 33.2 347 18.5 0.85 43.9 E R 0.068 0.250 120 26.1 409 0.0 0.85 22.2 C 42.0 E WB L 0.443 0.167 120 34.2 282 0.8 1.00 35.0 D LR 0.248 0.417 120 17.3 581 0.0 0.85 14.7 B 28.4 D NB T 0.633 0.458 120 18.8 825 1.1 0.50 9.9 B TR 0.745 0.458 120 20.3 701 3.0 0.50 11.6 B 10.7 B SB L 0.010 0.125 120 35.0 209 0.0 1.00 35.0 D T 0.417 0.583 120 10.5 2058 0.1 0.85 9.0 B 10.3 B INTERSECTION DELAY : 17.4 secs /veh LEVEL OF SERVICE : C CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO2NC INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY XMAS NOON 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB -1 1 N 0 0 0.87 0 N 0.0 3 NB 0 0 N 0 0 0.95 0 N 0.0 5 SB 0 0 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 268 0 467 L 1 12.0 R 1 12:0 NB 752 759 0 L 2 24.0 T 2 24.0 SB 0 797 398 T 2 24.0 R 1 12.0 S I G N A L PHASING APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L EB 3 R NB 2 T NB 3 L SB 1 R SB 2 R R T 11M• allis NNW, =la L R 50 70 R 40 80 30 90 L 40 80 R 40 80 R 30 90 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCOO2NC W - +- E SB TOTAL 1195 <' v 398 797 SOUTHCENTER PARKWAY N/S STREET 1 2 <* v 268 ^ EB TOTAL /\ 735 467 A \/ 1 - - -* v 1 - - -* v KLICKITAT DRIVE E/W STREET 752 759 <. A NB TOTAL 1511 <* A 2 2 SOUTHCENTER PARKWAY N/S STREET PAGE 1 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO2NC INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY XMAS NOON 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 268 308. 1.00 308 1.00 0.00 R 467 537 1.00 537 0.00 1.00 NB L 752 792 1.00 792 1.00 0.00 T 759 799 1.00 799 0.00 0.00 SB T 797 839 1.00 839 0.00 0.00 R 398 419 1.00 419 0.00 1.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1530 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 NB L 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 SB T 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 PAGE 2 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCO02NC INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY XMAS NOON 1989 CBD ? N ACTUATED SIGNAL C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO 'CAPACITY RATIO EB L 308 0 1530 0.201 N 0.417 637 0.484 R 537 0 1530 0.351 Y 0.750 1147 0.468 NB L 792 0 3312 0.239 Y 0.333 1104 0.717 T 799 0 3600 0.222 N 0.250 900 0.888 SB T 839 0 3600 0.233 N 0.250 900 0.932 R 419 0 1530 0.274 Y 0.667 1020 0.411 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.864 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 0.934 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LQS EB L 0.484 0.417 120 19.4 637 0.5 1.00 19.9 C R 0.468 0.750 120 4.4 1147 0.2 0.85 3.9 A 9.7 B NB L 0.717 0.333 120 26.6 1104 1.6 1.00 28.2 D T 0.888 0.250 120 33.0 900 7.7 0.61 24.8 C 26.5 D SB T 0.932 0.250 120 33.4 900 11.7 0.61 27.5 D R 0.411 0.667 120 7.0 1020 0.2 0.40 2.9 A 19.3 C INTERSECTION DELAY : 20.2 secs /veh LEVEL OF SERVICE : C CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCO03N.0 INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY XMAS NOON 1989 UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH CBD ?N T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 2 1 N 0 0 0.87 0 N 0.0 3 NB 0 1 N 0 0 0.95 0 N 0.0 5 SB 0 1 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 0 0 394 R 1 14.0 NB 0 1509 0 T 4 48.0 SB 0 1321 0 T 2 24.0 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCO03NC INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY XMAS NOON 1989 CBD ?N UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH U N S I G N A L I Z E D C R I T I C A L G A P S CRITICAL GAPS (SEC) APP LEFT TURN THROUGH RIGHT TURN EB 0.00 6.00 NB 0.00 - -- SB- -- - -- V O L U M E A L L O C A T I O N T O LAN E S LANE 1 LANE 2 LANE 3 APP L T R L T R L T R EB 0 0 394 0 0 0 0 0 0 NB 0 0 0 0 0 0 0 0 0 SB 0 660 0 0 661 0 0 0 0 U N S I G N A L I Z ED APP LANE 1 LANE 2 LANE 3 EB RESERVE CAPACITY -43 LEVEL OF SERVICE FAILURE NB RESERVE CAPACITY - -- - -- LEVEL OF SERVICE SB RESERVE CAPACITY LEVEL OF SERVICE MAJOR STREET - NB /SB CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO4NC INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. XMAS NOON 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE WB 2 3 N 0 0 0.98 10 Y 18.0 4 NB 2 3 N 0 0 0.98 10 Y 18.0 3 SB -2 3 N 0 0 0.98 0 N 18.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD WB 587 0 443 L 1 12.0 R 1 12.0 NB 0 1070 637 T 2 24.0 R 1 12.0 SB 551 1164 0 L 2 24.0 T 2 24.0 APP PHASE WB 3 WB 1 NB 2 NB 3 SB 2 SB 1 S I G N A L PHA S I N G 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R L R LR 55 65 R R 25 95 T R R 40 80 R R 55 65 T 40 80 T L L 25 95 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCO04NC SOUTHCENTER PRKWY. N/S STREET 2 2 v *> A *> 2 1 SOUTHCENTER PRKWY. N/S STREET W - +- E SB TOTAL 1715 v .> 1164 551 STRANDER BLVD. E/W STREET 1070 A 637 .> NB TOTAL 1707 A 443 v WB TOTAL 587 1030 PAGE 1 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO4NC INTERSECTION : STRANDER BLVD,. @ SOUTHCENTER PRKWY. XMAS NOON 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT WB L 587 599 1.00 599 1.00 0.00 R 443 452 1.00 452 0.00 1.00 NB SB T 1070 1092 1.00 1092 0.00 0.00 R 637 650 1.00 650 0.00 1.00 L 551 562 1.00 562 1.00 0.00 T 1164 1188 1.00 1188 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW WB L 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.85 1500 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 NB T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 SB L 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 3600 PAGE 2 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO4NC INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. XMAS NOON 1989 CBD ? N ACTUATED SIGNAL C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO WB L 599 0 1500 0.399 Y 0.458 687 0.872 R 452 0 1500 0.301 Y 0.667 1000 0.452 NB T 1092 0 3528 0.310 N 0.333 1176 0.929 R 650 0 1500 0.433 Y 0.792 1187 0.548 SB L 562 0 3312 0.170 Y 0.208 690 0.814 T 1188 0 3600 0.330 N 0.542 1950 0.609 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 1.303 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 1.409 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS WB L 0.872 0.458 120 22.3 687 8.4 1.00 30.7 D R 0.452 0.667 120 7.3 1000 0.2 0.62 4.6 A 19.5 C NB T 0.929 0.333 120 29.4 1176 9.3 0.85 32.9 D R 0.548 0.792 120 3.5 1187 0.4 0.85 3.3 A 21.8 C SB L 0.814 0.208 120 34.4 690 5.2 1.00 39.6 D T 0.609 0.542 120 14.3 1950 0.4 0.50 7.3 B 17.7 C INTERSECTION DELAY : 19.7 secs /veh LEVEL OF SERVICE : C CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO5NC INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. XMAS NOON 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB -6 1 N 0 0 0.88 0 N 0.0 3 WB 2 0 N 0 0 0.92 0 N 0.0 3 NB -2 1 N 0 0 0.85 3 Y 18.0 3 SB 2 2 N 0 0 0.92 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 227 268 6 L 1 11.0 T 1 11.0 R 1 10.0 WB 66 411 784 L 1 12.0 TR 1 12.0 R 1 12.0 NB 19 220 75 L 1 11.0 TR 1 12.0 SB 485 127 161 L 2 24.0 TR 1 12.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L L 15 105 EB 2 L T R LR 30 90 WB 1 L L 15 ,105 WB 2 L TR R LR 30 90 WB 3 L TR R R L 20 100 WB 6 R R 10 110 NB 4 L L 10 110 NB 5 TR R 15 105 SB 4 L L L 10 110 SB 6 L L TR LR 20 100 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCO05NC SB TOTAL SOUTHCENTER PRKWY. 784 773 N/S STREET 1 1 <� > 161 i 485 v 127 1 2 v 1 *> WB TOTAL 411 1261 66 v S. 180TH STREET E/W STREET A * - -- 1 A < * -- 1 * - -- 1 A /\ v 1 1 - - -> 1 - - -* v E/W STREET 227 ^ EB TOTAL 501 268 6 v <* A *> SOUTHCENTER PRKWY. N/S STREET 220 A i 19 1 75 NB TOTAL 314 PAGE 1 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO5NC INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. XMAS NOON 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 227 258 1.00 258 1.00 0.00 T 268 305 1.00 305 0.00 0.00 R 6 7 1.00 7 0.00 1.00 WB L 66 72 1.00 72 1.00 0.00 TR 764 830 1.00 830 0.00 0.46 R 431 468 1.00 468 0.00 1.00 NB L 19 22 1.00 22 1.00 0.00 TR 295 347 1.00 347 0.00 0.25 SB L 485 527 1.00 527 1.00 0.00 TR 288 313 1.00 313 0.00 0.56 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 0.95 1708 T 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1798 R 1800 1 0.94 1.00 1.03 1.00 1.00 1.00 0.85 1.00 1481 WB L 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.95 1693 TR 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.93 1.00 1657 R 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.85 1.00 1515 NB L 1800 1 0.97 1.00 1.01 1.00 1.00 1.00 1.00 0.95 1675 TR 1800 1 1.00 1.00 1.01 1.00 1.00 1.00 0.96 1.00 1745 SB L 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.92 3246 TR 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.92 1.00 1623 PAGE 2 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCOO5NC INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. XMAS NOON 1989 CBD ? N ACTUATED SIGNAL CAPACITY ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB L 233 25 1708 0.136 Y 0.125 213 1.094 T 305 0 1798 0.170 N 0.250 449 0.679 R 7 0 1481 0.005 N 0.250 370 0.019 WB L 62 10 1693 0.037 N 0.125 212 0.292 TR 830 0 1657 0.501 Y 0.417 690 1.203 R 468 0 1515 0.309 N 0.500 757 0.618 NB L 22 0 1675 0.013 N 0.083 140 0.157 TR 347 0 1745 0.199 Y 0.125 218 1.592 SB L 352 175 3246 0.108 Y 0.167 541 0.651 TR 313 0 1623 0.193 N 0.083 135 2.319 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.944 LOSS TIME PER CYCLE : 18 INTERSECTION V/C : 1.111 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB L 1.094 0.125 120 40.4 213 81.9 1.00 122.3 F T 0.679 0.250 120 30.9 449 2.8 0.85 28.6 D R 0.019 0.250 120 25.8 370 0.0 0.85 21.9 C 70.9 F WB L 0.292 0.125 120 36.2 212 0.2 1.00 36.4 D TR 1.203 0.417 120 31.1 690 116.6 0.85 125.5 F R 0.618 0.500 120 16.5 757 1.1 0.85 15.0 B 83.1 F NB L 0.157 0.083 120 38.8 140 0.0 1.00 38.8 D TR 1.592 0.125 120 43.6 218 559.3 0.85 512.5 F 482.9 F SB L 0.651 0.167 120 35.5 541 1.9 1.00 37.4 D TR 2.319 0.083 120 47.5 135 2547.6 0.85 2205.8 F 844.4 F INTERSECTION DELAY :331.0 secs /veh LEVEL OF SERVICE : F CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCO06NC INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST XMAS NOON 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 0 1 N 0 0 0.88 0 Y 18.0 3 WB 0 2 N 0 0 0.80 5 Y 18.0 3 NB 0 4 N 0 0 0.87 0 Y 15.5 3 SB 0 2 N 0 0 0.87 7 Y 15.5 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 129 459 136 L 1 12.0 TR 2 21.0 WB 103 516 238 L 1 11.0 TR 2 20.0 NB 196 378 64 LTR 2 25.0 SB 325 423 140 LTR 2 27.0 S I G N A L PHA S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L L 12 88 EB 2 TR R 28 72 WB 1 L L 12 88 WB 2 TR R 28 72 NB 3 LTR LR 27 73 SB 4 LTR LR 33 67 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCO06NC <1 140 SB TOTAL 888 .> 325 v 423 W - +- E ANDOVER PARK WEST N/S STREET 2 < *> v A \/ A < *> STRANDER BLVD. E/W STREET 2 129 ^ EB TOTAL 724 459 ANDOVER PARK WEST N/S STREET 136 v A 238 WB TOTAL 516 857 103 v STRANDER BLVD. E/W STREET 378 A 196 I 64 <. .> NB TOTAL 638 PAGE 1 CHRISTOPHER BROWN SCHOFIELD, NOON DATA INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST XMAS NOON 1989 CBD ? N ACTUATED SIGNAL 7/1/2064 SCOO6NC V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 129 147 1.00 147 1.00 0.00 TR 595 676 1.00 676 0.00 0.23 WB L 103 129 1.00 129 1.00 0.00 TR 754 942 1.00 942 0.00 0.32 NB LTR 638 733 1.00 733 0.31 0.10 SB LTR 888 1021 1.00 1021 0.37 0.16 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1710 TR 1800 2 0.95 1.00 1.00 1.00 1.00 1.00 0.97 1.00 3317 WB L 1800 1 0.97 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1642 TR 1800 2 0.94 0.99 1.00 1.00 1.00 1.00 0.95 1.00 3183 NB LTR 1800 2 1.02 0.98 1.00 1.00 1.00 1.00 0.99 0.98 3474 SB LTR 1800 2 1.05 0.99 1.00 1.00 1.00 1.00 0.98 0.98 3579 PAGE 2 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, NOON DATA SCO06NC INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST XMAS NOON 1989 CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB L 147 0 1710 0.086 Y 0.120 205 0.717 TR 676 0 3317 0.204 N 0.280 929 0.728 WB L 129 0 1642 0.079 N 0.120 197 0.655 TR 942 0 3183 0.296 Y 0.280 891 1.057 NB LTR 733 0 3474 0.211 Y 0.270 938 0.781 SB LTR 1021 0 3579 0.285 Y 0.330 1181 0.865 CYCLE LENGTH : 100.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.878 LOSS TIME PER CYCLE : 12 INTERSECTION V/C : 0.998 L E V E.L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB L 0.717 0.120 100 32.2 205 7.6 1.00 39.8 D TR 0.728 0.280 100 24.7 929 2.0 0.85 22.7 C 25.7 D WB L 0.655 0.120 100 31.9 197 5.2 1.00 37.1 D TR 1.057 0.280 100 28.0 891 39.8 0.85 57.6 E 55.1 E NB LTR 0.781 0.270 100 25.7 938 3.0 0.85 24.4 C 24.3 C SB LTR 0.865 0.330 100 23.9 1181 4.9 0.85 24.5 C 24.5 C INTERSECTION DELAY : 33.7 secs /veh LEVEL OF SERVICE : D CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCOO1PC INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. XMAS P.M. PEAK 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & ROADWAY C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 0 1 N 0 0 0.88 0 N 0.0 3 WB 2 0 N 0 0 0.88 0 N 0.0 3 NB -2 2 N 0 0 0.98 0 Y 13.0 5 SB 2 2 N 0 0 0.98 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 122 114 37 LT 1 14.0 R 1 14.0 WB 347 0 73 L 1 12.0 LR 1 12.0 NB 0 623 220 T 1 12.0 TR 1 12.0 SB 16 843 0 L 1 12.0 T 2 24.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 LT R LR 30 90 WB 1 L LR LR 30 90 WB 2 L LR L R 20 100 NB 3 T TR R 55 65 SB 3 L T L 55 65 SB 4 L T L 15 105 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCOO1PC SB TOTAL 859 <1 .> 0 i 16 v 843 W - +- E SOUTHCENTER PRKWY. N/S STREET A \ / 1 - - *> 1 - - -* v E/W STREET 122 ^ 1 EB TOTAL 273 114 37 v SOUTHCENTER PRKWY. N/S STREET A 73 WB TOTAL 0 420 347 v SOUTHCENTER DRIVE E/W STREET 623 A 0 220 <. .> NB TOTAL 843 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCOO1PC INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. XMAS P.M. PEAK 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB LT 236 268 1.00 268 0.52 0.00 R 37 42 1.00 42 0.00 1.00 WB L 283 322 1.00 322 1.00 0.00 LR 137 156 1.00 156 0.47 0.53 NB T 422 431 1.00 431 0.00 0.00 TR 421 430 1.00 430 0.00 1.00 SB L 16 16 1.00 16 1.00 0.00 T 843 860 1.00 860 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB LT 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 1.00 0.66 1271 R 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1637 WB L 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.95 1693 LR 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.92 0.86 1410 NB T 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 1800 TR 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 0.85 1.00 1530 SB L 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.95 1676 T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCOO1PC INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. XMAS P.M. PEAK 1989 CBD ? N ACTUATED SIGNAL C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB LT 268 0 1271 0.211 Y 0.250 318 0.843 R 42 0 1637 0.026 N 0.250 409 0.103 WB L 140 182 1693 0.083 N 0.167 282 0.496 LR 156 0 1410 0.111 N 0.417 587 0.266 NB T 431 0 1800 0.239 N 0.458 825 0.522 TR 430 0 1530 0.281 Y 0.458 701 0.613 SB L 11 5 1676 0.007 Y 0.125 209 0.053 T 860 0 3528 0.244 N 0.583 2058 0.418 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.499 LOSS TIME PER CYCLE : 12 INTERSECTION V/C : 0.554 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB LT 0.843 0.250 120 32.5 318 12.5 0.85 38.2 D R 0.103 0.250 120 26.3 409 0.0 0.85 22.4 C 35.9 D WB L 0.496 0.167 120 34.5 282 1.2 1.00 35.7 D LR 0.266 0.417 120 17.5 587 0.1 0.85 15.0 B 28.9 D NB T 0.522 0.458 120 17.6 825 0.5 0.40 7.2 B TR 0.613 0.458 120 18.6 701 1.1 0.50 9.8 B 8.5 B SB L 0.053 0.125 120 35.1 209 0.0 1.00 35.1 D T 0.418 0.583 120 10.5 2058 0.1 0.85 9.0 B 9.5 B INTERSECTION DELAY : 16.1 secs /veh LEVEL OF SERVICE : C CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCO02PC INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY XMAS P.M. PEAK 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE - -- - -- - - -- - - -- - - -- EB -1 1 N 0 0 0.87 0 N 0.0 3 NB 0 0 N 0 0 0.95 0 N 0.0 5 SB 0 0 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 191 0 576 L 1 12.0 R 1 12.0 NB 1290 652 0 L 2 24.0 T 2 24.0 SB 0 641 586 T 2 24.0 R 1 12.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L EB 3 R NB 2 T NB 3 L SB 1 R SB 2 R R T L R 40 R 50 30 L 50 R 40 R 30 80 70 90 70 80 90 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCOO2PC N W - +- E SB TOTAL 1227 <' v 586 641 SOUTHCENTER PARKWAY N/S STREET 1 2 <* 191 ^ EB TOTAL 767 576 A \/ 1 - - -* v 1 - - -* v KLICKITAT DRIVE E/W STREET 1290 652 <, A I 1 NB TOTAL 1942 < * A I I 2 2 SOUTHCENTER PARKWAY N/S STREET PAGE 1 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCOO2PC INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY XMAS P.M. PEAK 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB NB SB L 191 220 1.00 220 1.00 0.00 R 576 662 1.00 662 0.00 1.00 L 1290 1358 1.00 1358 1.00 0.00 T 652 686 1.00 686 0.00 0.00 T 641 675 1.00 675 0.00 0.00 R 586 617 1.00 617 0.00 1.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA EB L 1800 1 R 1800 1 NB L T SB T R ADJ. RT LT FLOW ■- -- - - -- - - -- - - -- 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1530 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.92 3312 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 PAGE 2 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCO02PC INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY XMAS P.M. PEAK 1989 CBD ? N ACTUATED SIGNAL C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB L 220 0 1530 0.144 N 0.333 510 0.431 R 662 0 1530 0.433 Y 0.750 1147 0.577 NB L 1358 T 686 3312 0.410 Y 0.417 1380 0.984 3600 0.191 N 0.250 900 0.762 SB T 675 0 3600 0.187 N 0.250 900 0.750 R 617 0 1530 0.403 Y 0.583 892 0.692 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 1.246 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 1.347 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB L 0.431 0.333 120 23.7 510 0.4 1.00 24.1 C R 0.577 0.750 120 5.0 1147 0.5 0.85 4.7 A 9.5 B NB L 0.984 0.417 120 26.3 1380 15.4 1.00 41.7 E T 0.762 0.250 120 31.7 900 2.7 0.50 17.2 C 33.5 D SB T 0.750 0.250 120 31.6 900 2.5 0.50 17.0 C R 0.692 0.583 120 13.3 892 1.6 0.50 7.4 B 12.4 B INTERSECTION DELAY : 22.0 secs /veh LEVEL OF SERVICE : C CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCO03PC INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY XMAS P.M. PEAK 1989 CBD ?N UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH T R A F F I C & ROADWAY C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 2 1 N 0 0 0.87 0 N 0.0 3 NB 0 1 N 0 0 0.95 0 N 0.0 5 SB 0 1 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / VOLUMES LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 0 0 277 R 1 14.0 NB 0 1942 0 T 4 48.0 SB 0 1285 0 T 2 24.0 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCO03PC INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY XMAS P.M. PEAK 1989 CBD ?N UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH U N S I G N A L I Z E D C R I T I C A L GAPS APP EB NB SB CRITICAL GAPS (SEC) LEFT TURN THROUGH RIGHT TURN 0.00 - -- 6.00 0.00 V O L U M E A L L O C A T I O N T O LAN E S LANE 1 LANE 2 LANE 3 APP L T R L T R L T EB 0 0 277 0 0 0 0 0 0 NB 0 0 0 0 0 0 0 0 0 SB 0 642 0 0 643 0 0 0 0 U N S I G N A L I Z E D APP LANE 1 LANE 2 LANE 3 EB RESERVE CAPACITY 110 LEVEL OF SERVICE D NB RESERVE CAPACITY - -- LEVEL OF SERVICE SB RESERVE CAPACITY LEVEL OF SERVICE MAJOR STREET - NB /SB CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO04PC INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ?N ACTUATED SIGNAL APP WB NB SB T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE 2 3 N 0 0 0.98 10 Y 18.0 4 2 3 N 0 0 0.98 10 Y 18.0 3 -2 3 N 0 0 0.98 0 N 18.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD WB 916 0 767 L 1 12.0 R 1 12.0 NB 0 1336 834 T 2 24.0 R 1 12.0 SB 681 1052 0 L 2 24.0 T 2 24.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R WB 3 L R LR 60 60 WB 1 R R 20 100 NB 2 T R R 40 80 NB 3 R R 60 60 SB 2 T 40 80 SB 1 T L L 20 100 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO04PC SOUTHCENTER PRKWY. N/S STREET 2 2 v *> \/ A *> 2 1 SOUTHCENTER PRKWY. N/S STREET SB TOTAL 1733 v .> 1052 681 STRANDER BLVD. E/W STREET 1336 834 A .> NB TOTAL 2170 A 767 v WB TOTAL 916 1683 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCOO4PC INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT WB L 916 935 1.00 935 1.00 0.00 R 767 783 1.00 783 0.00 1.00 NB SB T 1336 1363 1.00 1363 0.00 0.00 R 834 851 1.00 851 0.00 1.00 L 681 695 1.00 695 1.00 0.00 T 1052 1073 1.00 1073 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW WB L 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.85 1500 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 NB T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 SB L 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 3600 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCOO4PC INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL CAPACITY ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO IMO 01110 WB L 935 0 1500 0.623 Y 0.500 750 1.247 783 0 1500 0.522 Y 0.667 1000 0.783 NB T 1363 0 3528 0.386 N 0.333 1176 1.159 R 851 0 1500 0.567 Y - 0.833 1250 0.681 SB L 695 0 3312 0.210 Y 0.167 552 1.259 T 1073 0 3600 0.298 N 0.500 1800 0.596 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 1.922 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 2.078 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS WB L 1.247 0.500 120 30.3 750 146.1 1.00 176.4 F R 0.783 0.667 120 10.6 1000 2.9 0.71 9.6 B 100.3 F NB T 1.159 0.333 120 33.0 1176 84.0 0.85 99.4 F R 0.681 0.833 120 2.9 1250 1.1 0.85 3.4 A 62.5 F SB L 1.259 0.167 120 40.1 552 159.3 1.00 199.4 F T 0.596 0.500 120 16.2 1800 0.4 0.40 6.6 B 82.3 F INTERSECTION DELAY : 80.0 secs /veh LEVEL OF SERVICE : F CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCO05PC INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. XMAS P.M. PEAK 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE =Os Mae MED WHO EB -6 1 N 0 0 0.88 0 N 0.0 3 WB 2 0 N 0 0 0.92 0 N 0.0 3 NB -2 1 N 0 0 0.85 3 Y 18.0 3 SB 2 2 N 0 0 0.92 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 162 306 4 L 1 11.0 T 1 11.0 R 1 10.0 WB 151 611 485 L 1 12.0 TR 1 12.0 R 1 12.0 NB 32 149 46 L 1 11.0 TR 1 12.0 SB 274 168 408 L 2 24.0 TR 1 12.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R - -- - - -- - - -- -- - -- EB 1 L T R LR 20 80 WB 2 R R 15 85 WB 3 R TR L LR 20 80 NB 4 L TR LR 20 80 SB 5 L L TR LR 25 75 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCO05PC SB TOTAL 850 I I I I <1 > 408 i 274 v 168 E/W STREET 162 ^ EB TOTAL 472 306 4 v N W - +- E SOUTHCENTER PRKWY. N/S STREET 1 2 <* v <* A *> SOUTHCENTER PRKWY. N/S STREET ^ 485 WB TOTAL 611 1247 151 v S. 180TH STREET E/W STREET 149 A I 32 1 46 <. .> NB TOTAL 227 PAGE 1 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCOO5PC INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. XMAS P.M. PEAK 1989 CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 162 184 1.00 184 1.00 0.00 T 306 348 1.00 348 0.00 0.00 R 4 5 1.00 5 0.00 1.00 WB L 151 164 1.00 164 1.00 0.00 TR 647 703 1.00 703 0.00 0.06 R 449 488 1.00 488 0.00 1.00 NB L 32 38 1.00 38 1.00 0.00 TR 195 229 1.00 229 0.00 0.24 SB L 274 298 1.00 298 1.00 0.00 TR 576 626 1.00 626 0.00 0.71 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 0.20 360 T 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1798 R 1800 1 0.94 1.00 1.03 1.00 1.00 1.00 0.85 1.00 1481 WB L 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.53 944 TR 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.99 1.00 1764 R 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.85 1.00 1515 NB L 1800 1 0.97 1.00 1.01 1.00 1.00 1.00 1.00 0.20 353 TR 1800 1 1.00 1.00 1.01 1.00 1.00 1.00 0.96 1.00 1745 SB L 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.92 3246 TR 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.89 1.00 1570 PAGE 2 CHRISTOPHER BROWN 7/1/2064 INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. XMAS P.M. PEAK ACTUATED SIGNAL SCHOFIELD, PM DATA 1989 CBD ? N SCOO5PC C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW APP MVM RATE LT FLOW FLW RT RATIO EB L T R WB L TR R NB L TR SB L TR 184 0 360 0.511 348 0 1798 0.194 5 0 1481 0.003 164 0 944 0.174 703 0 1764 0.399 488 0 1515 0.322 38 0 353 0.108 229 0 1745 0.131 298 0 3246 0.092 626 0 1570 0.399 CYCLE LENGTH : 100.0 LOSS TIME PER CYCLE : CRIT ? Y N N N Y N Y Y GREEN LN GR V/C RATIO CAPACITY RATIO 0.200 0.200 0.200 0.200 0.200 0.350 0.200 0.200 72 360 296 189 353 530 71 349 2.556 0.967 0.017 0.868 1.992 0.921 0.535 0.656 N 0.500 1623 0.184 Y 0.250 392 1.597 SUM OF CRITICAL LANES' FLOW RATIOS : 1.548 15 INTERSECTION V/C : 1.821 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd APP MVM RATIO RATIO LEN DELAY CAP DELAY EB L 2.556 0.200 100 T 0.967 0.200 100 R 0.017 0.200 100 WB L 0.868 0.200 100 TR 1.992 0.200 100 R 0.921 0.350 100 NB L 0.535 0.200 100 TR 0.656 0.200 100 SB L 0.184 0.500 100 TR 1.597 0.250 100 49.8 30.2 24.4 29.4 40.4 23.7 27.2 28.0 LN GR LN GR APP APP PF DELAY LOS DELAY LOS 72 3712.7 0.85 360 28.6 0.85 296 0.0 0.85 189 22.1 0.85 353 1392.5 0.85 530 15.5 0.85 71 5.7 0.85 349 3.1 0.85 10.5 1623 0.0 0.85 35.6 392 549.9 0.85 3198.1 50.0 20.7 43.8 1218.0 33.3 28.0 26.4 F E C 1128.4 F E F D 649.2 F D D 26.5 D 8.9 B 497.7 F 339.7 F INTERSECTION DELAY :585.7 secs /veh LEVEL OF SERVICE : F CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCO06PC INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST XMAS P.M PEAK HOUR 1989 CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 0 1 N 0 0 0.88 0 Y 18.0 3 WB 0 2 N 0 0 0.80 5 Y 18.0 3 NB 0 4 N 0 0 0.87 0 Y 15.5 3 SB 0 2 N 0 0 0.87 7 Y 15.5 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 98 424 64 L 1 12.0 TR 2 21.0 WB 45 608 170 L 1 11.0 TR 2 20.0 NB 156 427 54 LTR 2 25.0 SB 271 315 112 LTR 2 27.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R - -- - - -- - - -- -- - -- EB 1 L L 12 88 EB 2 TR R 28 72 WB 1 L L 12 88 WB 2 TR R 28 72 NB 3 LTR LR 27 73 SB 4 LTR LR 33 67 7/1/2064 CHRISTOPHER BROWN INTERSECTION SCO06PC <1 SB TOTAL 698 112 i 271 v 315 STRANDER BLVD. E/W STREET 98 ^ EB TOTAL 586 424 64 v W - +- E ANDOVER PARK WEST N/S STREET 2 < *> v A < *> 2 ANDOVER PARK WEST N/S STREET ^ 170 WB TOTAL 608 823 45 v STRANDER BLVD. E/W STREET 427 A 156 54 <. .> NB TOTAL 637 PAGE 1 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCOO6PC INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST XMAS P.M PEAK HOUR 1989 CBD ? N ACTUATED SIGNAL ' V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 98 111 1.00 111 1.00 0.00 TR 488 555 1.00 555 0.00 0.13 WB L 45 56 1.00 56 1.00 0.00 TR 778 972 1.00 972 0.00 0.22 NB LTR 637 732 1.00 732 0.24 0.08 SB LTR 698 802 1.00 802 0.39 0.16 S A T U R A T I O N F L O W IDEAL # OFD ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1710 TR 1800 2 0.95 1.00 1.00 1.00 1.00 1.00 0.98 1.00 3352 WB L 1800 1 0.97 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1642 TR 1800 2 0.94 0.99 1.00 1.00 1.00 1.00 0.97 1.00 3250 NB LTR 1800 2 1.02 0.98 1.00 1.00 1.00 1.00 0.99 0.99 3520 SB LTR 1800 2 1.05 0.99 1.00 1.00 1.00 1.00 0.98 0.98 3579 PAGE 2 CHRISTOPHER BROWN 7/1/2064 SCHOFIELD, PM DATA SCO06PC INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST XMAS P.M PEAK HOUR 1989 CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB L 111 0 1710 0.065 Y 0.120 205 0.541 TR 555 0 3352 0.166 N 0.280 939 0.591 WB L 56 0 1642 0.034 N 0.120 197 0.284 TR 972 0 3250 0.299 Y 0.280 910 1.068 NB LTR 732 0 3520 0.208 Y 0.270 950 0.771 SB LTR 802 0 3579 0.224 Y 0.330 1181 0.679 CYCLE LENGTH : 100.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.796 LOSS TIME PER CYCLE : 12 INTERSECTION V/C : 0.905 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB L 0.541 0.120 100 31.5 205 2.2 1.00 33.7 D TR 0.591 0.280 100 23.6 939 0.7 0.85 20.7 C 22.8 C WB L 0.284 0.120 100 30.5 197 0.2 1.00 30.7 D TR 1.068 0.280 100 28.1 910 43.6 0.85 60.9 F 59.2 E NB LTR 0.771 0.270 100 25.6 950 2.8 0.85 24.1 C 24.0 C SB LTR 0.679 0.330 100 22.0 1181 1.1 0.85 19.6 C 19.6 C INTERSECTION DELAY : 33.9 secs /veh LEVEL OF SERVICE : D CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO11N INTERSECTION : OFFRAMP FROM I -5 @ SOUTHCENTER DRIVEWA @ SOUTHCENTER PRKWY. WEEKDAY NOON DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 0 0 N 0 0 0.95 0 N 12.0 3 WB 2 0 N 0 0 0.95 0 N 0.0 3 NB -2 2 N 0 0 0.98 0 Y 13.0 5 SB 2 2 N 0 0 0.98 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 105 137 22 LT 1 14.0 R 1 14.0 WB 288 0 58 L 1 12.0 LR 1 12.0 NB 0 748 251 T 1 12.0 TR 1 12.0 SB 39 868 0 L 1 12.0 T 2 24.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV EB 1 LT R LR WB 1 L LR LR WB 2 L LR L R NB 3 T TR R SB 3 L T L SB 4 L T L G Y +R 30 90 30 90 20 100 55 65 55 65 15 105 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO11N SB TOTAL 907 <1 `> 0 i 39 v 868 SOUTHCENTER PRKWY. N/S STREET A \/ 1 - - *> 1 - - -* v OFFRAMP FROM I -5 E/W STREET 105 ^ 1 EB TOTAL 264 137 > 22 v A A 1 1 SOUTHCENTER PRKWY. N/S STREET ^ 58 WB TOTAL 0 346 288 v SOUTHCENTER DRIVEWA E/W STREET 748 A 0 251 <. > i NB TOTAL 999 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO11N INTERSECTION : OFFRAMP FROM I -5 @ SOUTHCENTER DRIVEWA @ SOUTHCENTER PRKWY. WEEKDAY NOON DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB WB NB SB Nilo ONO MIS 0•111 LT 242 255 1.00 255 0.43 0.00 R 22 23 1.00 23 0.00 1.00 L 234 246 1.00 246 1.00 0.00 LR 112 118 1.00 118 0.48 0.52 T 500 510 1.00 510 0.00 0.00 TR 499 509 1.00 509 0.00 1.00 L 39 40 1.00 40 1.00 0.00 T 868 886 1.00 886 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB LT 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 1.00 0.79 1522 R 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1637 MOP WB L LR NB T TR SB L T 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.95 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.92 0.87 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 0.85 1.00 1693 1426 1800 1530 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.95 1676 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO11N INTERSECTION : OFFRAMP FROM I -5 @ SOUTHCENTER DRIVEWA @ SOUTHCENTER PRKWY. WEEKDAY NOON DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB LT 255 0 1522 0.168 Y 0.250 380 0.671 R 23 0 1637 0.014 N 0.250 409 0.056 WB L 59 187 1693 0.035 N 0.167 282 0.209 LR 118 0 1426 0.083 N 0.417 594 0.199 NB T 510 0 1800 0.283 N 0.458 825 0.618 TR 509 0 1530 0.333 Y 0.458 701 0.726 SB L 30 10 1676 0.018 Y 0.125 209 0.144 T 886 0 3528 0.251 N 0.583 2058 0.431 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.519 LOSS TIME PER CYCLE : 12 INTERSECTION V/C : 0.577 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB LT 0.671 0.250 120 30.8 380 3.2 0.85 28.9 D R 0.056 0.250 120 26.0 409 0.0 0.85 22.1 C 28.2 D WB L 0.209 0.167 120 32.8 282 0.1 1.00 32.9 D LR 0.199 0.417 120 16.9 594 0.0 0.85 14.4 B 26.8 D NB T 0.618 0.458 120 18.7 825 1.0 0.50 9.8 B TR 0.726 0.458 120 20.1 701 2.6 0.50 11.3 B 10.5 B SB L 0.144 0.125 120 35.6 209 0.0 1.00 35.6 D T 0.431 0.583 120 10.6 2058 0.1 0.85 9.1 B 10.2 B INTERSECTION DELAY : 14.6 secs /veh LEVEL OF SERVICE : B 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO22N W - +- E SB TOTAL 1178 <1 v 349 829 SOUTHCENTER PARKWAY N/S STREET 1 2 <* v 235 ^ EB TOTAL /\ 702 467 A \/ 1 - - -* v 1 - - -* v KLICKITAT DRIVE E/W STREET 663 764 <. NB TOTAL 1427 A <* A 2 SOUTHCENTER PARKWAY N/S STREET CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO22N INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY AVERAGE NOON DESIGN CBD ?N ACTUATED SIGNAL APP EB NB SB T R A F F I C & ROADWAY C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE -1 1 N 0 0 0.95 0 N 0.0 3 O 0 N 0 0 1.00 0 N 0.0 5 O 0 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 235 0 467 L 1 12.0 R 1 12.0 NB 663 764 0 L 2 24.0 T 2 24.0 SB 0 829 349 T 2 24.0 R 1 12.0 APP PHASE S I G N A L P H A S I N G 1ST MV 2ND MV 3RD MV PROT PMSV EB 1 L EB 3 R NB 2 T NB 3 L SB 1 R SB 2 R R T G Y +R L R 50 70 R 40 80 30 90 L 40 80 R 40 80 R 30 90 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO22N INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY AVERAGE NOON DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 235 247 1.00 247 1.00 0.00 R 467 492 1.00 492 0.00 1.00 NB L 663 663 1.00 663 1.00 0.00 T 764 764 1.00 764 0.00 0.00 SB T 829 873 1.00 873 0.00 0.00 R 349 367 1.00 367 0.00 1.00 S A T U R A T I O N F L O W IDEAL /1 OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1530 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 NB L 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 SB T 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO22N INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY AVERAGE NOON DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB L 247 0 1530 0.161 N 0.417 637 0.388 R 492 0 1530 0.322 Y 0.750 1147 0.429 NB L 663 0 3312 0.200 Y 0.333 1104 0.601 T 764 0 3600 0.212 N 0.250 900 0.849 SB T 873 0 3600 0.242 Y 0.250 900 0.970 R 367 0 1530 0.240 N 0.667 1020 0.360 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.764 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 0.826 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR • 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB L 0.388 0.417 120 18.5 637 0.2 1.00 18.7 C R 0.429 0.750 120 4.2 1147 0.2 0.85 3.7 A 8.7 B NB L 0.601 0.333 120 25.3 1104 0.7 1.00 26.0 D T 0.849 0.250 120 32.6 900 5.4 0.61 23.2 C 24.5 C SB T 0.970 0.250 120 33.9 900 17.0 0.61 31.0 D R 0.360 0.667 120 6.7 1020 0.1 0.40 2.7 A 22.6 C INTERSECTION DELAY : 20.4 secs /veh LEVEL OF SERVICE : C CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SC033N INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY AVERAGE NOON DESIGN CBD ?N UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH APP EB NB SB T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE 2 1 N 0 0 0.87 0 N 0.0 3 0 1 N 0 0 0.95 0 N 0.0 5 0 1 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 0 0 400 R 1 14.0 NB 0 1423 0 T 4 48.0 SB 0 1296 0 T 2 24.0 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO33N INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY AVERAGE NOON DESIGN CBD ?N UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH U N S I G N A L I Z E D C R I T I C A L G A P S APP EB NB SB CRITICAL GAPS (SEC) LEFT TURN THROUGH RIGHT TURN 0.00 0.00 6.00 V O L U M E A L L O C A T I O N T O LANES LANE 1 LANE 2 LANE 3 APP L T R L T R L T R EB 0 0 400 0 0 0 0 0 0 NB 0 0 0 0 0 0 0 0 0 SB 0 648 0 0 648 0 0 0 0 U N S I G N A L I Z E D APP LANE 1 LANE 2 LANE 3 EB RESERVE CAPACITY -42 LEVEL OF SERVICE FAILURE NB RESERVE CAPACITY LEVEL OF SERVICE SB RESERVE CAPACITY LEVEL OF SERVICE MAJOR STREET - NB /SB CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SC044N INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY NOON DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE WB 2 3 N 0 0 0.98 10 Y 18.0 4 NB 2 3 N 0 0 0.98 10 Y 18.0 3 SB -2 3 N 0 0 0.98 0 N 18.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD WB 599 0 502 L 1 12.0 R 1 12.0 NB 0 942 618 T 2 24.0 R 1 12.0 SB 648 1039 0 L 2 24.0 T 2 24.0 S I G N A L P HAS I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV WB 3 L R LR WB 1 R R NB 2 T R NB 3 R SB 2 T SB 1 T L L R R G Y +R 55 65 25 95 40 80 55 65 40 80 25 95 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO44N SOUTHCENTER PRKWY. N/S STREET A *> 2 1 SOUTHCENTER PRKWY. N/S STREET N W -4-- E SB TOTAL 1687 v .> 1039 648 STRANDER BLVD. E/W STREET 942 618 A .> NB TOTAL 1560 A 502 v WB TOTAL 599 1101 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SC044N INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY NOON DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT WB L 599 611 1.00 611 1.00 0.00 R 502 512 1.00 512 0.00 1.00 NB T 942 961 1.00 961 0.00 0.00 R 618 631 1.00 631 0.00 1.00 SB L 648 661 1.00 661 1.00 0.00 T 1039 1060 1.00 1060 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW WB L 1800 1 R 1800 1 NB T R SB L T 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.85 1500 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 180,0 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 0.92 3312 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 3600 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO44N INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY NOON DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO WB L 611 0 1500 0.407 Y 0.458 687 0.889 R 512 0 1500 0.341 Y 0.667 1000 0.512 NB T 961 0 3528 0.272 N 0.333 1176 0.817 R 631 0 1500 0.421 Y 0.792 1187 0.532 SB L 661 0 3312 0.200 Y 0.208 690 0.958 T 1060 0 3600 0.294 N 0.542 1950 0.544 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 1.369 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 1.480 O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS L E V E L alla MHO MD WB L 0.889 0.458 120 22.6 687 9.7 1.00 32.3 D R 0.512 0.667 120 7.7 1000 0.4 0.62 5.0 A 19.8 C NB T 0.817 0.333 120 27.9 1176 3.3 0.85 26.5 D R 0.532 0.792 120 3.4 1187 0.4 0.85 3.2 A 17.3 C SB L 0.958 0.208 120 35.7 690 17.9 1.00 53.6 E T 0.544 0.542 120 13.6 1950 0.2 0.40 5.5 B 24.0 C INTERSECTION DELAY : 20.5 secs /veh LEVEL OF SERVICE : C CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO55N INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. WEEKDAY NOON DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB -6 1 N 0 0 0.88 0 N 0.0 3 WB 2 0 N 0 0 0.92 0 N 0.0 3 NB -2 1 N 0 0 0.85 3 Y 18.0 3 SB 2 2 N 0 0 0.92 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 216 235 5 L 1 11.0 T 1 11.0 R 1 10.0 WB 58 360 206 L 1 12.0 TR 1 12.0 R 1 12.0 NB 17 213 66 L 1 11.0 TR 1 12.0 SB 443 128 157 L 2 24.0 TR 1 12.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV EB 1 L L EB 2 L T R LR WB 1 L L WB 2 L TR R LR WB 3 L TR R R L WB 6 R R NB 4 L L NB 5 TR R SB 4 L L L SB 6 L L TR LR G Y +R 15 105 30 90 15 105 30 90 20 100 10 110 10 110 15 105 10 110 20 100 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO55N SB TOTAL 728 <I > 157 i 443 v 128 N W - +- E SOUTHCENTER PRKWY. N/S STREET 1 2 <* v *> ^ 206 WB TOTAL 360 624 58 v S. 180TH STREET E/W STREET A * - -- 1 A < * -- 1 * - -- 1 A 1 - - -* \/ 1 - - -> 1 - - -* v E/W STREET 216 ^ EB TOTAL 456 235 5 SOUTHCENTER PRKWY. N/S STREET 213 A i 17 1 66 <. .> NB TOTAL 296 1 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SC055N INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. WEEKDAY NOON DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 216 245 1.00 245 1.00 0.00 T 235 267 1.00 267 0.00 0.00 R 5 6 1.00 6 0.00 1.00 WB L 58 63 1.00 63 1.00 0.00 TR 363 395 1.00 395 0.00 0.01 R 203 221 1.00 221 0.00 1.00 NB L 17 20 1.00 20 1.00 0.00 TR 279 328 1.00 328 0.00 0.24 SB L 443 482 1.00 482 1.00 0.00 TR 285 310 1.00 310 0.00 0.55 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 0.95 1708 T 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1798 R 1800 1 0.94 1.00 1.03 1.00 1.00 1.00 0.85 1.00 1481 WB L 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.95 1693 TR 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1782 R 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.85 1.00 1515 NB L 1800 1 0.97 1.00 1.01 1.00 1.00 1.00 1.00 0.95 1675 TR 1800 1 1.00 1.00 1.01 1.00 1.00 1.00 0.96 1.00 1745 SB L 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.92 3246 TR 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.92 1.00 1623 PAGE 2 CHRISTOPHER BROWN 11/24/2009 INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. WEEKDAY NOON ACTUATED SIGNAL SCHOFIELD, NOON DATA DESIGN CBD ? N SCO55N C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW APP MVM RATE LT FLOW FLW RT RATIO EB L T R WB L TR R NB L TR SB L TR 49 267 6 58 395 221 20 328 196 0 0 5 0 0 0 0 1708 0.029 1798 0.148 1481 0.004 1693 0.034 1782 0.222 1515 0.146 1675 0.012 1745 0.188 GREEN LN GR V/C CRIT ? RATIO CAPACITY RATIO Y N N N Y N N Y 303 179 3246 0.093 Y 310 0 1623 0.191 N CYCLE LENGTH : 120.0 LOSS TIME PER CYCLE : 18 0.125 0.250 0.250 0.125 0.417 0.500 0.083 0.125 213 449 370 212 742 757 140 218 0.230 0.595 0.016 0.274 0.532 0.292 0.143 1.505 0.167 541 0.560 0.083 135 2.296 SUM OF CRITICAL LANES' FLOW RATIOS : 0.532 INTERSECTION V/C : 0.626 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd APP MVM RATIO RATIO LEN DELAY CAP DELAY PF EB L 0.230 0.125 120 T 0.595 0.250 120 R 0.016 0.250 120 WB L 0.274 0.125 120 TR 0.532 0.417 120 R 0.292 0.500 120 NB L 0.143 0.083 120 TR 1.505 0.125 120 SB L 0.560 0.167 120 TR 2.296 0.083 120 35.9 213 0.1 1.00 30.1 449 1.6 0.85 25.8 370 0.0 0.85 36.2 212 0.2 1.00 19.9 742 0.6 0.85 13.3 757 0.1 0.85 38.8 140 0.0 1.00 43.0 218 434.8 0.85 LN GR LN GR APP APP DELAY LOS DELAY LOS 36.0 26.9 21.9 36.4 17.4 11.4 38.8 406.1 D D C D C B D F 34.9 541 1.0 1.00 35.9 D 47.4 135 2456.0 0.85 2127.9 F 31.1 D 17.2 C 383.9 F 853.7 F INTERSECTION DELAY :358.6 secs /veh LEVEL OF SERVICE : F CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO66N INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST WEEKDAY NOON DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE - -- - -- - - -- - - -- - - -- EB 0 1 N 0 0 0.88 0 Y 18.0 3 WB 0 2 N 0 0 0.80 5 Y 18.0 3 NB 0 4 N 0 0 0.87 0 Y 15.5 3 SB 0 2 N 0 0 0.87 7 Y 15.5 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 114 442 116 L 1 12.0 T 2 24.0 R 1 11.0 WB 99 503 209 L 1 11.0 TR 2 20.0 NB 167 340 76 LTR 2 25.0 SB 274 391 124 LTR 2 27.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT EB 1 L EB 2 T WB 1 L WB 2 TR NB 3 LTR SB 4 LTR R L L LR LR PMSV R R G Y +R 12 28 12 28 27 33 88 72 88 72 73 67 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO66N <1 124 SB TOTAL 789 .> 274 v 391 ANDOVER PARK WEST N/S STREET 2 < *> v A /\ 1 - - -* \/ 2 - - -> 1 - - -* v A < *> STRANDER BLVD. E/W STREET 2 114 ^ EB TOTAL 672 442 ANDOVER PARK WEST N/S STREET 116 v ^ 209 WB TOTAL 503 811 99 STRANDER BLVD. E/W STREET 340 A 167 I 76 <. .> I' I NB TOTAL 583 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO66N INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST WEEKDAY NOON DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB WB NB SB L 114 130 1.00 130 1.00 0.00 T 442 502 1.00 502 0.00 0.00 R 116 132 1.00 132 0.00 1.00 L 99 124 1.00 124 1.00 0.00 TR 712 890 1.00 890 0.00 0.29 LTR 583 670 1.00 670 0.29 0.13 LTR 789 907 1.00 907 0.35 0.16 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1710 T 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 R 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1484 WB L 1800 1 0.97 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1642 TR 1800 2 0.94 0.99 1.00 1.00 1.00 1.00 0.96 1.00 3216 NB LTR 1800 2 1.02 0.98 1.00 1.00 1.00 1.00 0.98 0.99 3493 SB LTR 1800 2 1.05 0.99 1.00 1.00 1.00 1.00 0.98 0.98 3579 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SC066N INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST WEEKDAY NOON DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB L 130 0 1710 0.076 Y 0.120 205 0.634 T 502. 0 3600 0.139 N 0.280 1008 0.498 R 132 0 1484 0.089 N 0.280 416 0.317 WB L 124 0 1642 0.076 N 0.120 197 0.629 TR 890 0 3216 0.277 Y 0.280 900 0.989 NB LTR 670 0 3493 0.192 Y 0.270 943 0.710 SB LTR 907 0 3579 0.253 Y 0.330 1181 0.768 CYCLE LENGTH : 100.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.798 LOSS TIME PER CYCLE : 12 INTERSECTION V/C : 0.907 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB L 0.634 0.120 100 31.9 205 4.3 1.00 36.2 D T 0.498 0.280 100 22.9 1008 0.3 0.85 19.7 C R 0.317 0.280 100 21.6 416 0.2 0.85 18.5 C 22.3 C WB L 0.629 0.120 100 31.8 197 4.3 1.00 36.1 D TR 0.989 0.280 100 27.2 900 20.7 0.85 40.7 E 40.1 E NB LTR 0.710 0.270 100 25.1 943 1.8 0.85 22.9 C 22.8 C SB LTR 0.768 0.330 100 22.8 1181 2.2 0.85 21.2 C 21.2 C INTERSECTION DELAY : 27.5 secs /veh LEVEL OF SERVICE : D CHRISTOPHER BROWN 11/24/2009 SCHOFIELD W /SIGNAL AT DRIVE SCO77N INTERSECTION : S. 168TH STREET @ DRIVEWAY @ SOUTHCENTER PRKWY. WEEKDAY NOON DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 0 0 N 0 0 0.80 5 Y 17.7 3 WB 0 0 N 0 0 0.80 5 Y 17.7 3 NB 0 2 N 0 0 0.98 2 Y 13.0 3 SB 0 2 N 0 0 0.98 2 Y 13.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 27 1 47 LT 1 11.0 R 1 11.0 WB 4 1 64 LT 1 11.0 R 1 12.0 NB 43 1071 6 L 1 12.0 TR 2 24.0 SB 57 1163 43 L 1 12.0 TR 2 24.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 LT R LR 10 110 WB 1 LT R LR 10 110 NB 2 L L 5 115 NB 3 L TR LR 105 15 SB 2 L L 5 115 SB 3 L TR LR 105 15 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO77N SB TOTAL 1263 <� .> 43 i 57 v 1163 W - +- E SOUTHCENTER PRKWY. N/S STREET 2 1 A \ / 1 - - *> 1 - - -* v S. 168TH STREET E/W STREET 27 ^ EB TOTAL 75 1 47 < * A *> 1 2 SOUTHCENTER PRKWY. N/S STREET ^ 64 WB TOTAL 1 69 4 v DRIVEWAY E/W STREET 1071 A 43 6 <. .> NB TOTAL 1120 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD W /SIGNAL AT DRIVE SC077N INTERSECTION : S. 168TH STREET @ DRIVEWAY @ SOUTHCENTER PRKWY. WEEKDAY NOON DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB LT 28 35 1.00 35 0.96 0.00 R 47 59 1.00 59 0.00 1.00 WB LT 5 6 1.00 6 0.83 0.00 R 64 80 1.00 80 0.00 1.00 NB L 43 44 1.00 44 1.00 0.00 TR 1077 1099 1.00 1099 0.00 0.01 SB L 57 58 1.00 58 1.00 0.00 TR 1206 1231 1.00 1231 0.00 0.04 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB LT 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.93 1624 R 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1484 WB LT R NB L TR SB L TR 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.91 1589 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 1800 1 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1693 1800 2 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 3564 1800 1 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1693 1800 2 1.00 0.99 1.00 1.00 1.00 1.00 0.99 1.00 3528 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD W /SIGNAL AT DRIVE SCO77N INTERSECTION : S. 168TH STREET @ DRIVEWAY @ SOUTHCENTER PRKWY. WEEKDAY NOON DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB LT 35 0 1624 0.022 N 0.083 135 0.259 R 59 0 1484 0.040 N 0.083 124 0.476 WB LT 6 0 1589 0.004 N 0.083 132 0.045 R 80 0 1530 0.052 Y 0.083 127 0.630 NB L 42 2 1693 0.025 N 0.042 71 0.592 TR 1099 0 3564 0.308 N 0.875 3118 0.352 SB L 56 2 1693 0.033 Y 0.042 71 0.789 TR 1231 0 3528 0.349 Y 0.875 3087 0.399 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.434 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 0.469 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB LT 0.259 0.083 120 39.2 135 0.2 0.85 33.5 D R 0.476 0.083 120 39.9 124 2.2 0.85 35.8 D 34.6 D WB LT 0.045 0.083 120 38.5 132 0.0 0.85 32.7 D R 0.630 0.083 120 40.4 127 6.5 0.85 39.9 D 38.9 D NB L 0.592 0.042 120 42.9 71 8.5 1.00 51.4 E TR 0.352 0.875 120 1.0 3118 0.0 0.85 0.8 A 2.7 A SB L 0.789 0.042 120 43i3 71 28.1 1.00 71.4 F TR 0.399 0.875 120 1.1 3087 0.0 0.40 0.4 A 3.6 A INTERSECTION DELAY : 5.5 secs /veh LEVEL OF SERVICE : B CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO11PM INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 0 1 N 0 0 0.88 0 N 0.0 3 WB 2 0 N 0 0 0.88 0 N 0.0 3 NB -2 2 N 0 0 0.98 0 Y 13.0 5 SB 2 2 N 0 0 0.98 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 109 102 33 LT 1 14.0 R 1 14.0 WB 312 0 65 L 1 12.0 LR 1 12.0 NB 0 656 198 T 1 12.0 TR 1 12.0 SB 14 861 0 L 1 12.0 T 2 24.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R .11=P IMP all• OMB EB 1 LT R LR 30 90 WB 1 L LR LR 30 90 WB 2 L LR L R 20 100 NB 3 T TR R 55 65 SB 3 L T L 55 65 SB 4 L T L 15 105 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO11PM SB TOTAL 875 <I .> 0 i 14 v 861 N W - +- E SOUTHCENTER PRKWY. N/S STREET 2 1 v *> /\ A \ / 1 - - *> 1 - - -* v E/W STREET 109 ^ EB TOTAL 244 102 33 A A 1 1 SOUTHCENTER PRKWY. N/S STREET ^ 65 WB TOTAL 0 377 312 v SOUTHCENTER DRIVE E/W STREET 656 A 0 198 NB TOTAL 854 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO11PM INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB LT 211 240 1.00 240 0.52 0.00 R 33 37 1.00 37 0.00 1.00 WB L 254 289 1.00 289 1.00 0.00 LR 123 140 1.00 140 0.47 0.53 NB T 427 436 1.00 436 0.00 0.00 TR 427 436 1.00 436 0.00 1.00 SB L 14 14 1.00 14 1.00 0.00 T 861 879 1.00 879 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB LT 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 1.00 0.71 1367 R 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1637 WB L 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.95 1693 LR 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.92 0.87 1426 NB T 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 1800 TR 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 0.85 1.00 1530 SB L 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.95 1676 T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO11PM INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB LT 240 0 1367 0.176 Y 0.250 342 0.702 R 37 0 1637 0.023 N 0.250 409 0.090 WB L 102 187 1693 0.060 N 0.167 282 0.362 LR 140 0 1426 0.098 N 0.417 594 0.236 NB T 436 0 1800 0.242 N 0.458 825 0.528 TR 436 0 1530 0.285 Y 0.458 701 0.622 SB L 9 5 1676 0.005 Y 0.125 209 0.043 T 879 0 3528 0.249 N 0.583 2058 0.427 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.466 LOSS TIME PER CYCLE : 12 INTERSECTION V/C : 0.518 O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS L E V E L COM •1•11 SSW EB LT 0.702 0.250 120 31.1 342 4.3 0.85 30.1 D R 0.090 0.250 120 26.2 409 0.0 0.85 22.3 C 29.0 D WB L 0.362 0.167 120 33.7 282 0.4 1.00 34.1 D LR 0.236 0.417 120 17.2 594 0.0 0.85 14.6 B 27.7 D NB T 0.528 0.458 120 17.7 825 0.5 0.40 7.3 B TR 0.622 0.458 120 18.7 701 1.2 0.50 9.9 B 8.6 B SB L 0.043 0.125 120 35.1 209 0.0 1.00 35.1 D T 0.427 0.583 120 10.5 2058 0.1 0.85 9.0 B 9.4 B INTERSECTION DELAY : 14.5 secs /veh LEVEL OF SERVICE : B CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO22PM INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY AVERAGE P.M. PEAK DESIGN CBD ?N ACTUATED SIGNAL APP EB NB SB T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR ( %) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE -1 1 N 0 0 0.95 0 N 0.0 3 O 0 N 0 0 1.00 0 N 0.0 5 O 0 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 171 0 530 L 1 12.0 R 1 12.0 NB 1207 683 0 L 2 24.0 T 2 24.0 SB 0 681 525 T 2 24.0 R 1 12.0 APP PHASE S I G N A L P H A S I N G 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L EB 3 R NB 2 T NB 3 L SB 1 R SB 2 R R T L R 40 R 50 30 L 50 R 40 R 30 80 70 90 70 80 90 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO22PM SB TOTAL 1206 <1 v 525 681 SOUTHCENTER PARKWAY N/S STREET 171 ^ EB TOTAL /\ 701 530 \/ 1 - - -* v 1 - - -* v KLICKITAT DRIVE E/W STREET 1207 683 <. ^ NB TOTAL 1890 <* 1 1 2 2 SOUTHCENTER PARKWAY N/S STREET PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO22PM INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY AVERAGE P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB NB SB L 171 R 530 L 1207 T 683 T 681 R 525 180 1.00 180 558 1.00 558 1207 1.00 1207 683 1.00 683 717 1.00 717 553 1.00 553 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1530 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 NB L 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 SB T 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO22PM INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY AVERAGE P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB L 180 0 1530 0.118 N 0.333 510 0.353 R 558 0 1530 0.365 Y 0.750 1147 0.486 NB L 1207 0 3312 0.364 Y 0.417 1380 0.875 T 683 0 3600 0.190 N 0.250 900 0.759 SB T 717 0 3600 0.199 N 0.250 900 0.797 R 553 0 1530 0.361 Y 0.583 892 0.620 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 1.090 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 1.178 O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS L E V E L i■ MID EB L 0.353 0.333 120 23.0 510 0.2 1.00 23.2 C R 0.486 0.750 120 4.5 1147 0.3 0.85 4.1 A 8.7 B NB L 0.875 0.417 120 24.4 1380 4.7 1.00 29.1 D T 0.759 0.250 120 31.7 900 2.6 0.50 17.1 C 24.8 C SB T 0.797 0.250 120 32.0 900 3.6 0.50 17.8 C R 0.6200.583 120 12.4 892 1.0 0.50 6.7 B 13.0 B INTERSECTION DELAY : 17.9 secs /veh LEVEL OF SERVICE : C CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO33PM INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY AVERAGE P.M. PEAK DESIGN CBD ?N UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 2 1 N 0 0 0.87 0 N 0.0 3 NB 0 1 N 0 0 0.95 0 N 0.0 5 SB 0 1 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 0 0 293 R 1 14.0 NB 0 1890 0 T 4 48.0 SB 0 1271 0 T 2 24.0 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC033PM INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY AVERAGE P.M. PEAK DESIGN CBD ?N UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH U N S I G N A L I Z E D C R I T I C A L G A P S APP EB NB SB CRITICAL GAPS (SEC) LEFT TURN THROUGH RIGHT TURN 0.00 0.00 6.00 V O L U M E A L L O C A T I O N T O LANES LANE 1 LANE 2 LANE 3 APP L T R L T R L T R EB 0 0 293 0 0 0 0 0 0 NB 0 0 0 0 0 0 0 0 0 SB 0 635 0 0 636 0 0 0 0 U N S I G N A L I Z E D APP LANE 1 LANE 2 LANE 3 EB RESERVE CAPACITY 95 LEVEL OF SERVICE E NB RESERVE CAPACITY - -- LEVEL OF SERVICE SB RESERVE CAPACITY - -- LEVEL OF SERVICE MAJOR STREET - NB /SB IMO ■11, ONO CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO44PM INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE - -- - -- - - -- - - -- - - -- WB 2 3 N 0 0 0.98 10 Y 18.0 4 NB 2 3 N 0 0 0.98 10 Y 18.0 3 SB -2 3 N 0 0 0.98 0 N 18.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD WB 822 0 690 L 1 12.0 R 1 12.0 NB 0 1202 748 T 2 24.0 R 1 12.0 SB 616 946 0 L 2 24.0 T 2 24.0 APP PHASE WB 3 WB 1 NB 2 NB 3 SB 2 SB 1 S I G N A L P H A S I N G 1ST MV 2ND MV 3RD MV PROT PMSV L R LR R R T R R T T L L R R G Y +R 60 60 20 100 40 80 60 60 40 80 20 100 11/24/2009 CHRISTOPHER BROWN INTERSECTION SC044PM SOUTHCENTER PRKWY. N/S STREET 2 2 v *> N W - +- E SB TOTAL 1562 v .> 946 616 STRANDER BLVD. E/W STREET A * - -- 1 * - -- 1 A 690 v ` /\ WB TOTAL \/ 822 1512 A *> 2 1 SOUTHCENTER PRKWY. N/S STREET 1202 748 A .> NB TOTAL 1950 v PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC044PM INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT WB NB SB L 822 839 1.00 839 1.00 0.00 690 704 1.00 704 0.00 1.00 T 1202 1227 1.00 1227 0.00 0.00 R 748 763 1.00 763 0.00 1.00 L 616 629 1.00 629 1.00 0.00 T 946 965 1.00 965 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW - - =- - - -- - - -- WB L 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.85 1500 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 NB T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 SB L 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 3600 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC044PM INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y ANA L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO WB L 839 0 1500 0.559 Y 0.500 750 1.119 R 704 0 1500 0.469 Y 0.667 1000 0.704 NB T 1227 0 3528 0.348 N 0.333 1176 1.043 R 763 0 1500 0.509 Y 0.833 1250 0.610 SB L 629 0 3312 0.190 Y 0.167 552 1.139 T 965 0 3600 0.268 N 0.500 1800 0.536 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 1.727 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 1.867 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS WB L 1.119 0.500 120 25.9 750 68.0 1.00 93.9 F R 0.704 0.667 120 9.5 1000 1.6 0.71 7.9 B 54.6 E NB T 1.043 0.333 120 31.1 1176 31.9 0.85 53.5 E R 0.610 0.833 120 2.6 1250 0.6 0.85 2.7 A 34.0 D SB L 1.139 0.167 120 39.1 552 82.5 1.00 121.6 F T 0.536 0.500 120 15.6 1800 0.3 0.40 6.4 B 51.8 E INTERSECTION DELAY : 45.7 secs /veh LEVEL OF SERVICE : E CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC044PM INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE WB 2 3 N 0 0 0.98 10 Y 18.0 4 NB 2 3 N 0 0 0.98 10 Y 18.0 3 SB -2 3 N 0 0 0.98 0 N 18.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD WB 822 0 690 L 1 12.0 LR 1 12.0 R 1 12.0 NB 0 1202 748 T 2 24.0 R 1 12.0 SB 616 946 0 L 2 24.0 T 2 24.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT WB 4 L LR WB 1 R WB 3 L LR NB 2 T R NB 3 R NB 4 R R SB 2 T SB 1 T L R L R R L PMSV R LR R R R G Y +R MM 40 80 20 100 20 100 40 80 20 100 40 80 40 80 20 100 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO44PM SOUTHCENTER PRKWY. N/S STREET 2 2 v *> W - +- E SB TOTAL 1562 v .> 946 616 STRANDER BLVD. E/W STREET A *> 2 1 SOUTHCENTER PRKWY. N/S STREET 1202 748 A .> NB TOTAL 1950 A 690 WB TOTAL 822 1512 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC044PM INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT WB NB SB L 662 676 1.00 676 1.00 0.00 LR 219 223 1.00 223 0.73 0.27 R 631 644 1.00 644 0.00 1.00 T 1202 1227 1.00 1227 0.00 0.00 R 748 763 1.00 763 0.00 1.00 L 616 629 1.00 629 1.00 0.00 946 965 1.00 965 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW WB L 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.85 1500 LR 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.96 0.89 1507 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 NB T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 SB L 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 3600 PAGE 2 CHRISTOPHER BROWN 11/24/2009 INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK ACTUATED SIGNAL SCHOFIELD, PM DATA DESIGN CBD ? N SC044PM C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW APP MVM RATE LT FLOW FLW RT RATIO WB L 443 233 1500 0.295 LR 223 0 1507 0.148 R 644 0 1500 0.429 NB T 1227 0 3528 0.348 R 763 0 1500 0.509 SB L 629 0 3312 0.190 T 965 0 3600 0.268 12 CYCLE LENGTH : 120.0 LOSS TIME PER CYCLE : GREEN LN GR V/C CRIT ? RATIO CAPACITY RATIO N 0.333 N 0.500 Y 0.667 N 0.333 Y 1.167 Y 0.167 N 0.500 500 753 1000 1176 1750 0.886 0.296 0.644 1.043 0.436 552 1.139 1800 0.536 SUM OF CRITICAL LANES' FLOW RATIOS : 1.128 INTERSECTION V/C : 1.253 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd APP MVM RATIO RATIO LEN DELAY CAP DELAY WB L LR R NB T R 0.886 0.333 120 0.296 0.500 120 0.644 0.667 120 1.043 0.333 120 0.436 1.167 120 SB L 1.139 0.167 120 T 0.536 0.500 120 28.8 500 13.4 753 8.9 1000 31.1 1176 2.6 1750 39.1 552 15.6 1800 LN GR LN GR APP APP PF DELAY LOS DELAY LOS 12.1 1.00 40.9 0.1 0.62 8.4 1.0 0.71 7.0 31.9 0.85 53.5 0.1 0.85 2.3 82.5 1.00 0.3 0.40 E B B 22.1 C E A 33.9 D 121.6 F 6.4 B 51.8 E INTERSECTION DELAY : 35.9 secs /veh LEVEL OF SERVICE : D CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC055PM INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK DESIGN CBD ?N ACTUATED SIGNAL APP EB WB NB SB T R A F F I C & ROADWAY C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR (%) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE - 6 1 N 0 0 0.88 0 N 0.0 3 2 0 N 0 0 0.95 0 N 0.0 3 - 2 1 N 0 0 0.85 3 Y 18.0 3 2 2 N 0 0 0.95 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 159 274 3 L 1 11.0 T 1 11.0 R 1 10.0 WB 135 547 248 L 1 12.0 TR 1 12.0. R 1 12.0 NB 29 151 41 L 1 11.0 TR 1 12.0 SB 259 168 382 L 2 24.0 TR 1 12.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT EB 1 L T WB 2 R WB 3 R TR NB 4 L TR 'SB 5 L L R L TR R PMSV LR LR LR LR G Y +R 20 15 20 20 25 MN, ORM MIND 80 85 80 80 75 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO55PM SB TOTAL 809 <' > 382 i 259 v 168 SOUTHCENTER PRKWY. N/S STREET ^ 248 WB TOTAL 547 930 135 v S. 180TH STREET E/W STREET A * - -- 1 A < * -- 1 * - -- 1 A /\ v 1 1 - - -> 1 - - -* v E/W STREET 159 ^ EB TOTAL 436 274 3 v SOUTHCENTER PRKWY. N/S STREET 151 A 1 29 1 41 <7 I NB TOTAL 221 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC055PM INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 159 181 1.00 181 1.00 0.00 T 274 311 1.00 311 0.00 0.00 R 3 3 1.00 3 0.00 1.00 WB L 135 142 1.00 142 1.00 0.00 TR 547 576 1.00 576 0.00 0.00 R 248 261 1.00 261 0.00 1.00 NB L 29 34 1.00 34 1.00 0.00 TR 192 226 1.00 226 0.00 0.21 SB L 259 273 1.00 273 1.00 0.00 TR 550 579 1.00 579 0.00 0.69 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 0.20 360 T 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1798 R 1800 1 0.94 1.00 1.03 1.00 1.00 1.00 0.85 1.00 1481 WB L 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.0.0 0.57 1016 TR 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1782 R 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.85 1.00 1515 NB L 1800 1 0.97 1.00 1.01 1.00 1.00 1.00 1.00 0.20 353 TR 1800 1 1.00 1.00 1.01 1.00 1.00 1.00 0.97 1.00 1763 SB L 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.92 3246 TR 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.90 1.00 1588 PAGE 2 CHRISTOPHER BROWN 11/24/2009 INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. WEEKDAY P.M. PEAK ACTUATED SIGNAL SCHOFIELD, PM DATA DESIGN CBD ? N SC055PM C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW APP MVM RATE LT FLOW FLW RT RATIO EB L T R WB L TR R NB L TR SB L TR 181 311 3 142 576 261 34 226 O 360 0.503 O 1798 0.173 O 1481 0.002 O 1016 0.140 O 1782 0.323 O 1515 0.172 O 353 0.096 0 1763 0.128 273 0 3246 0.084 579 0 1588 0.365 CYCLE LENGTH : 100.0 LOSS TIME PER CYCLE : CRIT ? Y N N N Y N Y Y N Y GREEN LN GR V/C RATIO CAPACITY RATIO 0.200 0.200 0.200 0.200 0.200 0.350 0.200 0.200 0.500 0.250 72 360 296 203 356 530 71 353 2.514 0.864 0.010 0.700 1.618 0.492 0.479 0.640 1623 0.168 397 1.458 SUM OF CRITICAL LANES' FLOW RATIOS : 1.415 15 INTERSECTION V/C : 1.665 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd APP MVM RATIO RATIO LEN DELAY CAP DELAY EB L 2.514 0.200 100 T 0.864 0.200 100 R 0.010 0.200 100 WB L 0.700 0.200 100 TR 1.618 0.200 100 R 0.492 0.350 100 NB L 0.479 0.200 100 TR 0.640 0.200 100 SB L 0.168 0.500 100 TR 1.458 0.250 100 LN GR LN GR APP APP PF DELAY LOS DELAY LOS 48.9 72 3501.5 0.85 3017.8 29.4 360 13.2 0.85 36.2 24.4 296 0.0 0.85 20.7 28.3 203 6.9 0.85 29.9 36.0 356 585.3 0.85 528.1 19.4 530 0.6 0.85 17.0 26.9 71 3.8 0.85 26.1 27.9 353 2.7 0.85 26.0 10.4 1623 0.0 0.85 33.6 397 359.0 0.85 F D C 1126.3 F D F C 319.6 F D D 25.9 D 8.8 B 333.7 F 229.3 F INTERSECTION DELAY :414.5 secs /veh LEVEL OF SERVICE : F CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC066PM INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST WEEKDAY P.M PEAK HOUR DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 0 1 N 0 0 0.88 0 Y 18.0 3 WB 0 2 N 0 0 0.80 5 Y 18.0 3 NB 0 4 N 0 0 0.87 0 Y 15.5 3 SB 0 2 N 0 0 0.87 7 Y 15.5 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 88 420 54 L 1 12.0 TR 2 21.0 WB 49 589 152 L 1 11.0 TR 2 20.0 NB 134 391 67 LTR 2 25.0 SB 233 301 100 LTR 2 27.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT EB 1 L L EB 2 TR WB 1 L L WB 2 TR NB 3 LTR LR SB 4 LTR LR PMSV R R G Y +R 12 88 28 72 12 88 28 72 27 73 33 67 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO66PM SB TOTAL 634 1 <1 > 100 i 233 v 301 N W - +- E ANDOVER PARK WEST N/S STREET 2 < *> v n \ / STRANDER BLVD. E/W STREET 88 ^ EB TOTAL 562 420 A < *> 2 ANDOVER PARK WEST ^ 152 WB TOTAL 589 790 49 v STRANDER BLVD. E/W STREET 391 A 134 1 67 <, .> N/S STREET NB TOTAL 54 592 v PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC066PM INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST WEEKDAY P.M PEAK HOUR DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 88 100 1.00 100 1.00 0.00 TR 474 539 1.00 539 0.00 0.11 WB NB SB L 49 61 1.00 61 1.00 0.00 TR 741 926 1.00 926 0.00 0.21 LTR 592 680 1.00 680 0.23 0.11 LTR 634 729 1.00 729 0.37 0.16 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1710 TR 1800 2 0.95 1.00 1.00 1.00 1.00 1.00 0.98 1.00 3352 WB L 1800 1 0.97 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1642 TR 1800 2 0.94 0.99 1.00 1.00 1.00 1.00 0.97 1.00 3250 NB LTR 1800 2 1.02 0.98 1.00 1.00 1.00 1.00 0.98 0.99 3504 SB LTR 1800 2 1.05 0.99 1.00 1.00 1.00 1.00 0.98 0.98 3579 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC066PM INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST WEEKDAY P.M PEAK HOUR DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB L 100. 0 1710 0.058 Y 0.120 205 0.488 TR 539 0 3352 0.161 N 0.280 939 0.574 WB L 61 0 1642 0.037 N 0.120 197 0.310 TR 926 0 3250 0.285 Y 0.280 910 1.018 NB LTR 680 0 3504 0.194 Y 0.270 946 0.719 SB LTR 729 0 3579 0.204 Y 0.330 1181 0.617 CYCLE LENGTH : 100.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.741 LOSS TIME PER CYCLE : 12 INTERSECTION V/C : 0.842 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB L 0.488 0.120 100 31.3. 205 1.5 1.00 32.8 D TR 0.574 0.280 100 23.5 939 0.6 0.85 20.5 C 22.4 C WB L 0.310 0.120 100 30.6 197 0.3 1.00 30.9 D TR 1.018 0.280 100 27.6 910 27.4 0.85 46.7 E 45.7 E NB LTR 0.719 0.270 100 25.1 946 1.9 0.85 22.9 C 22.8 C. SB LTR 0.617 0.330 100 21.4 1181 0.7 0.85 18.8 C 18.7 C INTERSECTION DELAY : 29.2 secs /veh LEVEL OF SERVICE : D CHRISTOPHER BROWN 11/24/2009 SCHOFIELD W /SIGNAL AT DRIVE SCO77PM INTERSECTION : S. 168TH STREET @ DRIVEWAY @ SOUTHCENTER PRKWY. WEEKDAY P.M PEAK DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & ROADWAY C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 0 0 N 0 0 0.80 5 Y 17.7 3 WB 0 0 N 0 0 0.80 5 Y 17.7 3 NB 0 2 N 0 0 0.98 2 Y 13.0 3 SB 0 2 N 0 0 0.98 2 Y 13.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 40 1 39 LT 1 11.0 R 1 11.0 WB 3 1 49 LT 1 11.0 R 1 12.0 NB 32 1654 4 L 1 12.0 TR 2 24.0 SB 43 1702 45 L 1 12.0 TR 2 24.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT EB 1 LT R WB 1 LT R NB 2 L NB 3 L TR SB 2 L SB 3 L TR L L PMSV LR LR LR LR G Y +R 10 110 10 110 5 115 105 15 5 115 105 15 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO77PM SB TOTAL 1790 1 I i 1 1 <1 `> 45 i 43 1 v 1702 SOUTHCENTER PRKWY. N/S STREET 2 1 1 1 <* v 1 /\ A \ / 1 - - *> 1 - - -* v S. 168TH STREET E/W STREET 40 ^ 1 EB TOTAL 80 1 > 39 < * A 1 2 SOUTHCENTER PRKWY. N/S STREET A 49 WB TOTAL 1 53 3 v DRIVEWAY E/W STREET 1654 A 1 32 1 4 1 1 1 NB TOTAL 1690 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD W /SIGNAL AT DRIVE SC077PM INTERSECTION : S. 168TH STREET @ DRIVEWAY @ SOUTHCENTER PRKWY. WEEKDAY P.M PEAK DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB WB NB SB LT 41 51 1.00 51 0.98 0.00 R 39 49 1.00 49 0.00 1.00 LT 4 5 1.00 5 0.75 0.00 R 49 61 1.00 61 0.00 1.00 L 32 33 1.00 33 1.00 0.00 TR 1658 1692 1.00 1692 0.00 0.00 L 43 44 1.00 44 1.00 0.00 TR 1747 1783 1.00 1783 0.00 0.03 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB LT 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1729 R 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1484 WB LT 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.90 1571 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 NB L 1800 1 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1693 TR 1800 2 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 3564 SB L 1800 1 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1693 TR 1800 2 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 3564 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD W /SIGNAL AT DRIVE SC077PM INTERSECTION : S. 168TH STREET @ DRIVEWAY @ SOUTHCENTER PRKWY. WEEKDAY P.M PEAK DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB LT 51 0 1729 0.029 N 0.083 144 0.354 R 49 0 1484 0.033 N 0.083 124 0.395 WB LT 5 0 1571 0.003 N 0.083 131 0.038 R 61 0 1530 0.040 Y 0.083 127 0.480 NB L 30 3 1693 0.018 N 0.042 71 0.423 TR 1692 0 3564 0.475 N 0.875 3118 0.543 SB L 41 3 1693 0.024 Y 0.042 71 0.577 TR 1783 0 3564 0.500 Y 0.875 3118 0.572 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.564 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 0.610 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB LT 0.354 0.083 120 39.5 144 0.6 0.85 34.1 D R 0.395 0.083 120 39.6 124 1.1 0.85 34.6 D 34.0 D WB LT 0.038 0.083 120 38.4 131 0.0 0.85 32.6 D R 0.480 0.083 120 39.9 127 2.2 0.85 35.8 D 35.0 D NB L 0.423 0.042 120 42.6 71 2.4 1.00 45.0 E TR 0.543 0.875 120 1.4 3118 0.2 0.85 1.4 A 2.2 A SB L 0.577 0.042 120 42.9 71 7.7 1.00 50.6 E TR 0.572 0.875 120 1.4 3118 0.2 0.40 0.6 A 1.8 A INTERSECTION DELAY : 3.5 secs /veh LEVEL OF SERVICE : A CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO11NC INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. XMAS NOON DESIGN CBD ?N ACTUATED SIGNAL APP EB WB NB SB T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR (%) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE 0 1 N 0 0 0.88 0 N 0.0 3 2 0 N 0 0 0.88 0 N 0.0 3 -2 2 N 0 0 0.98 0 Y 13.0 5 2 2 N 0 0 0.98 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 120 156 22 LT 1 14.0 R 1 14.0 WB 328 0 66 L 1 12.0 LR 1 12.0 NB 0 845 286 T 1 12.0 TR 1 12.0 SB 45 979 0 L 1 12.0 T 2 24.0 S I G N A L PHA S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 LT R LR 30 90 WB 1 L LR LR 30 90 WB 2 L LR L R 20 100 NB 3 T TR R 55 65 SB 3 L T L 55 65 SB 4 L T L 15 105 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCOIINC SB TOTAL 1024 <' `> 0 i 45 t v 979 N I t W - +- E t t S SOUTHCENTER PRKWY. N/S STREET /\ A \ / 1 - - *> 1 - - -* v E/W STREET 120 ^ 1 EB TOTAL 298 156 > 22 SOUTHCENTER PRKWY. N/S STREET A 66 WB TOTAL 0 394 328 v SOUTHCENTER DRIVE E/W STREET 845 A t 0 1 286 <. .> NB TOTAL 1131 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO11NC INTERSECTION -: SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. XMAS NOON DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB WB NB SB LT 276 314 1.00 314 0.43 0.00 R 22 25 1.00 25 0.00 1.00 L 266 302 1.00 302 1.00 0.00 LR 128 145 1.00 145 0.49 0.52 T 566 578 1.00 578 0.00 0.00 TR 565 577 1.00 577 0.00 1.00 L 45 46 1.00 46 1.00 0.00 T 979 999 1.00 999 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB LT 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 1.00 0.72 1387 R 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1637 WB L 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.95 1693 LR 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.92 0.85 1394 NB T 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 1800 TR 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 0.85 1.00 1530 SB L 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.95 1676 T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO11NC INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. XMAS NOON DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB LT 314 0 1387 0.226 Y 0.250 347 0.905 R 25 0 1637 0.015 N 0.250 409 0.061 WB L 125 177 1693 0.074 N 0.167 282 0.443 LR 145 0 1394 0.104 N 0.417 581 0.250 NB T 578 0 1800 0.321 N 0.458 825 0.701 TR 577 0 1530 0.377 Y 0.458 701 0.823 SB L 15 31 1676 0.009 Y 0.125 209 0.072 T 999 0 3528 0.283 N 0.583 2058 0.485 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.612 LOSS TIME PER CYCLE : 12 INTERSECTION V/C : 0.680 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB LT 0.905 0.250 120 33.2 347 18.5 0.85 43.9 E R 0.0610.250 120 26.0 409 0.0 0.85 22.1 C 42.2 E WB L 0.443 0.167 120 34.2 282 0.8 1.00 35.0 D LR 0.250 0.417 120 17.3 581 0.0 0.85 14.7 B 28.4 D NB T 0.701 0.458 120 19.7 825 1.9 0.50 10.8 B TR 0.823 0.458 120 21.5 701 5.5 0.61 16.5 C 13.6 B SB L 0.072 0.125 120 35.2 209 0.0 1.00 35.2 D T 0.485 0.583 120 11.0 2058 0.1 0.85 9.4 B 10.5 B INTERSECTION DELAY : 18.0 secs /veh LEVEL OF SERVICE : C CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO22NC INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY XMAS NOON DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB -1 1 N 0 0 0.95 0 N 0.0 3 NB 0 0 N 0 0 1.00 0 N 0.0 5 SB 0 0 N 0 0 1.00 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 268 0 544 L 1 12.0 R 1 12.0 NB 806 864 0 L 2 24.0 T 2 24.0 SB 0 936 398 T 2 24.0 R 1 12.0 APP PHASE EB 1 EB 3 NB 2 NB 3 SB 1 SB 2 S I G N A L PHA S I N G 1ST MV 2ND MV 3RD MV PROT PMSV L R T L R R R T G Y +R L R 50 R 40 30 L 40 R 40 R 30 70 80 90 80 80 90 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO22NC SB TOTAL 1334 <1 v 398 936 SOUTHCENTER PARKWAY N/S STREET 1 2 1 <* v 268 ^ EB TOTAL ' 812 544 A \/ 1 ---* v 1 - - -* v KLICKITAT DRIVE E/W STREET 806 <. A NB TOTAL 1670 864 <* 2 2 A SOUTHCENTER PARKWAY N/S STREET PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO22NC INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY XMAS NOON DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB NB SB L 268 R 544 L 806 T 864 T 936 R 398 282 1.00 282 573 1.00 573 806 1.00 806 864 1.00 864 936 1.00 936 398 1.00 398 1.00 0.00 0.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1530 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 NB L 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 SB T 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 R 1800 1 1.00 1.00 1.0.0 1.00 1.00 1.00 0.85 1.00 1530 PAGE 2 CHRISTOPHER BROWN 11/24/2009 INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY XMAS NOON ACTUATED SIGNAL SCHOFIELD, NOON DATA DESIGN CBD ? N SCO22NC C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW APP MVM RATE LT FLOW FLW RT RATIO EB L 282 R 573 NB L T 806 864 SB T 936 R 398 GREEN LN GR V/C CRIT ? RATIO CAPACITY RATIO O 1530 0.184 N 0.417 0 1530 0.375 Y 0.750 O 3312 0.243 Y O 3600 0.240 N O 3600 0.260 Y 0 1530 0.260 N CYCLE LENGTH : 120.0 LOSS TIME PER CYCLE : 9 637 0.443 1147 0.500 0.333 1104 0.730 0.250 900 0.960 0.250 900 1.040 0.667 1020 0.390 SUM OF CRITICAL LANES' FLOW RATIOS : 0.878 INTERSECTION V/C : 0.949 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB L 0.443 0.417 120 19.0 637 0.3 1.00 19.3 C R 0.500 0.750 120 4.6 1147 0.3 0.85 4.2 A 9.2 B NB L 0.730 0.333 120 26.8 1104 T 0.960 0.250 120 33.7 900 SB T 1.040 0.250 120 34.7 900 R 0.390 0.667 120 6.8 1020 1.7 1.00 15.4 0.61 34.0 0.61 0.1 0.40 28.5 D 30.0 D 29.3 D 41.9 E 2.8 A 30.2 D INTERSECTION DELAY : 25.1 secs /veh LEVEL OF SERVICE : D CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SC033NC INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY XMAS NOON DESIGN CBD ?N UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 2 1 N 0 0 0.87 0 N 0.0 3 NB 0 1 N 0 0 0.95 0 N 0.0 5 SB 0 1 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 0 0 451 R 1 14.0 NB 0 1670 0 T 4 48.0 SB 0 1478 0 T 2 24.0 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO33NC INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY XMAS NOON DESIGN CBD ?N UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH U N S I G N A L I Z E D CRITICAL GAP S CRITICAL GAPS (SEC) APP LEFT TURN THROUGH RIGHT TURN EB 0.00 - -- 6.00 NB 0.00 SB V O L U M E A L L O C A T I O N T O LAN E S LANE 1 LANE 2 LANE 3 APP L T R L T R L T R EB 0 0 451 0 0 0 0 0 0 NB 0 0 0 0 0 0 0 0 0 SB 0 739 0 0 739 0 0 0 0 U N S I G N A L I Z E D APP LANE 1 LANE 2 LANE 3 EB RESERVE CAPACITY -156 LEVEL OF SERVICE FAILURE NB RESERVE CAPACITY LEVEL OF SERVICE SB RESERVE CAPACITY LEVEL OF SERVICE MAJOR STREET - NB /SB CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO44NC INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. XMAS NOON DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & ROADWAY C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE 4■1 WIN NM WB 2 3 N 0 0 0.98 10 Y 18.0 4 NB 2 3 N 0 0 0.98 10 Y 18.0 3 SB -2 3 N 0 0 0.98 0 N 18.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD WB 692 0 573 L 1 12.0 R 1 12.0 NB 0 1093 724 T 2 24.0 R 1 12.0 SB 764 1153 0 L 2 24.0 T 2 24.0 S I G N A L PHA S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R WB 3 L R LR 55 65 WB 1 R R 25 95 NB 2 T R R 40 80 NB 3 R R 55 65 SB 2 T 40 80 SB 1 T L L 25 95 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO44NC SOUTHCENTER PRKWY. N/S STREET 2 2 1 1 v *> \/ SOUTHCENTER PRKWY. N/S STREET N W - +- E SB TOTAL 1917 .> 1153 764 STRANDER BLVD. E/W STREET 1093 A 724 .> NB TOTAL 1817 A 573 v WB TOTAL 692 1265 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SC044NC INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. XMAS NOON DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT WB NB SB L 692 706 1.00 706 1.00 0.00 R 573 585 1.00 585 0.00 1.00 T 1093 1115 1.00 1115 0.00 0.00 R 724 739 1.00 739 0.00 1.00 L 764 780 1.00 780 1.00 0.00 T 1153 1177 1.00 1177 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW WB L 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.85 1500 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 NB T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 SB L 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 3600 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SC044NC INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. XMAS NOON DESIGN CBD ? N ACTUATED SIGNAL CAPACITY A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO WB L 706 0 1500 0.471 Y 0.458 687 1.028 R 585 0 1500 0.390 Y 0.667 1000 0.585 NB T 1115 0 3528 0.316 N 0.333 1176 0.948 R 739 0 1500 0.493 Y 0.792 1187 0.623 SB L 780 0 3312 0.236 Y 0.208 690 1.130 T 1177 0 3600 0.327 N 0.542 1950 0.604 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 1.590 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 1.719 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF . DELAY LOS DELAY LOS WB L 1.028 0.458 120 25.3 687 33.9 1.00 59.2 E R 0.585 0.667 120 8.3 1000 0.7 0.62 5.6 B 34.9 D NB T 0.948 0.333 120 29.6 1176 11.3 0.85 34.8 D R 0.623 0.792 120 3.9 1187 0.7 0.85 3.9 A 22.5 C SB L 1.130 0.208 120 37.4 690 74.6 1.00 112.0 F T 0.604 0.542 120 14.2 1950 0.4 0.50 7.3 B 49.0 E INTERSECTION DELAY : 35.8 secs /veh LEVEL OF SERVICE : D CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO55NC INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. XMAS NOON DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB -6 1 N 0 0 0.88 0 N 0.0 3 WB 2 0 N 0 0 0.92 0 N 0.0 3 NB -2 1 N 0 0 0.85 3 Y 18.0 3 SB 2 2 N 0 0 0.92 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 247 299 6 L 1 11.0 T 1 11.0 R 1 10.0 WB 66 393 304 L 1 12.0 TR 1 12.0 R 1 12.0 NB 19 234 75 L 1 11.0 TR 1 12.0 SB 504 146 179 L 2 24.0 TR 1 12.0 S I G N A L PHA S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L L 15 105 EB 2 L T R LR 30 90 WB 1 L L 15 105 WB 2 L TR R LR 30 90 WB 3 L TR R R L 20 100 WB 6 R R 10 110 NB 4 L L 10 110 NB 5 TR R 15 105 SB 4 L L L 10 110 SB 6 L L TR LR 20 100 11/24/2009 CHRISTOPHER BROWN INTERSECTION SC055NC <1 SB TOTAL 829 .> 179 504 v 146 SOUTHCENTER PRKWY. N/S STREET 1 2 A 304 WB TOTAL 393 763 66 v S. 180TH STREET E/W STREET A /\ v 1 - - -* \/ 1 - - -> 1 - - -* v E/W STREET 247 ^ EB TOTAL 552 299 6 v SOUTHCENTER PRKWY. N/S STREET 234 A 19 1 75 <. I i 1 NB TOTAL 328 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO55NC INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. XMAS NOON DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 247 281 1.00 281 1.00 0.00 T 299 340 1.00 340 0.00 0.00 R 6 7 1.00 7 0.00 1.00 WB L 66 72 1.00 72 1.00 0.00 TR 419 455 1.00 455 0.00 0.06 R 278 302 1.00 302 0.00 1.00 NB L 19 22 1.00 22 1.00 0.00 TR 309 364 1.00 364 0.00 0.24 SB L 504 548 1.00 548 1.00 0.00 TR 325 353 1.00 353 0.00 0.55 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 0.95 1708 T 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1798 R 1800 1 0.94 1.00 1.03 1.00 1.00 1.00 0.85 1.00 1481 WB L 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.95 1693 TR 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.99 1.00 1764 R 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.85 1.00 1515 NB L 1800 1 0.97 1.00 1.01 1.00 1.00 1.00 1.00 0.95 1675 TR 1800 1 1.00 1.00 1.01 1.00 1.00 1.00 0.96 1.00 1745 SB L 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.92 3246 TR 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.92 1.00 1623 PAGE 2 CHRISTOPHER BROWN 11/24/2009 INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. XMAS NOON ACTUATED SIGNAL SCHOFIELD, NOON DATA DESIGN CBD ? N SC055NC C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW APP MVM RATE LT FLOW FLW RT RATIO EB L T R WB L TR R NB L TR SB L TR 120 340 7 67 455 302 22 364 161 0 0 5 0 0 0 0 1708 0.070 1798 0.189 1481 0.005 1693 0.040 1764 0.258 1515 0.199 1675 0.013 1745 0.209 GREEN LN GR V/C CRIT ? RATIO CAPACITY RATIO Y N N N Y N N Y 375 173 3246 0.116 Y 353 0 1623 0.217 N CYCLE LENGTH : 120.0 LOSS TIME PER CYCLE : 0.125 0.250 0.250 0.125 0.417 0.500 0.083 0.125 213 449 370 212 735 757 140 218 0.563 0.757 0.019 0.316 0.619 0.399 0.157 1.670 0.167 541 0.693 0.083 135 2.615 SUM OF CRITICAL LANES' FLOW RATIOS : 0.653 18 INTERSECTION V/C : 0.768 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd APP MVM RATIO RATIO LEN DELAY CAP DELAY EB L 0.563 0.125 120 37.6 T 0.757 0.250 120 31.6 R 0.019 0.250 120 25.8 WB L 0.316 0.125 120 36.3 TR 0.619 0.417 120 20.9 R 0.399 0.500 120 14.2 NB L 0.157 0.083 120 38.8 TR 1.670 0.125 120 44.1 SB L 0.693 0.167 120 TR 2.615 0.083 120 LN GR LN GR APP APP PF DELAY LOS DELAY LOS 213 2.5 1.00 449 5.0 0.85 370 0.0 0.85 212 0.3 1.00 735 1.1 0.85 757 0.2 0.85 140 0.0 1.00 218 688.0 0.85 40.1 31.1 21.9 36.6 18.7 12.2 38.8 622.3 E D C 35.0 D D C B 17.9 C D F 587.5 F 35.8 541 2.6 1.00 38.4 D 49.0 135 3931.5 0.85 3383.4 F 1347.4 F INTERSECTION DELAY :538.8 secs /veh LEVEL OF SERVICE : F CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SCO66NC INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST XMAS NOON DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 0 1 N 0 0 0.88 0 Y 18.0 3 WB 0 2 N 0 0 0.80 5 Y 18.0 3 NB 0 4 N 0 0 0.87 0 Y 15.5 3 SB 0 2 N 0 0 0.87 7 Y 15.5 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 130 500 132 L 1 12.0 T 2 24.0 R 1 11.0 WB 114 .566 238 L 1 11.0 TR 2 20.0 NB 189 387 83 LTR 2 25.0 SB 313 446 141 LTR 2 27.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L L 20 100 EB 2 T R R 40 80 WB 1 L L 20 100 WB 2 TR R 40 80 NB 3 LTR LR 30 90 SB 4 LTR LR 30 90 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO66NC SB TOTAL 900 <1 141 .> 313 v 446 W - +- E ANDOVER PARK WEST N/S STREET 2 < *> v A /\ 1 2 - - -> 1 - - -* v STRANDER BLVD. E/W STREET 130 ^ EB TOTAL 762 500 132 A < *> 2 ANDOVER PARK WEST N/S STREET ^ 238 WB TOTAL 566 918 114 v• STRANDER BLVD. E/W STREET 387 A 189 83 <. .> NB TOTAL 659 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SC066NC INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST XMAS NOON DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB WB NB SB L 130 148 1.00 148 1.00 0.00 T 500 568 1.00 568 0.00 0.00 R 132 150 1.00 150 0.00 1.00 L 114 142 1.00 142 1.00 0.00 TR 804 1005 1.00 1005 0.00 0.30 LTR 659 757 1.00 757 0.29 0.13 LTR 900 1034 1.00 1034 0.35 0.16 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1710 T 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 R 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1484 WB L 1800 1 0.97 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1642 TR 1800 2 0.94 0.99 1.00 1.00 1.00 1.00 0.95 1.00 3183 NB LTR 1800 2 1.02 0.98 1.00 1.00 1.00 1.00 0.98 0.99 3493 SB LTR 1800 2 1.05 0.99 1.00 1.00 1.00 1.00 0.98 0.98 3579 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, NOON DATA SC066NC INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST XMAS NOON DESIGN CBD ? N ACTUATED SIGNAL CAPACITY ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB L 148 0 1710 0.087 Y 0.167 285 0.519 T 568 0 3600 0.158 N 0.333 1200 0.473 R 150 0 1484 0.101 N 0.333 495 0.303 WB L 142 0 1642 0.086 N 0.167 274 0.518 TR 1005 0 3183 0.316 Y 0.333 1061 0.947 NB LTR 757 0 3493 0.217 Y 0.250 873 0.867 SB LTR 1034 0 3579 0.289 Y 0.250 895 1.155 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.909 LOSS TIME PER CYCLE : 12 INTERSECTION V/C : 1.010 LEVEL O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB L 0.519 0.167 120 .34.7 285 1.4 1.00 36.1 D T 0.473 0.333 120 24.1 1200 0.2 0.85 20.7 C R 0.303 0.333 120 22.5 495 0.1 0.85 19.2 C 23.1 C WB L 0.518 0.167 120 34.7 274 1.4 1.00 36.1 D TR 0.947 0.333 120 29.6 1061 12.1 0.85 35.4 D 35.5 D NB LTR 0.867 0.250 120 32.7 873 6.5 0.85 33.3 D 33.2 D SB LTR 1.155 0.250 120 36.1 895 84.6 0.85 102.6 F 102.4 F INTERSECTION DELAY : 50.4 secs /veh LEVEL OF SERVICE : E CHRISTOPHER BROWN 11/24/2009 SCHOFIELD W /SIGNAL AT DRIVE SC077NC INTERSECTION : S. 168TH STREET @ DRIVEWAY @ SOUTHCENTER PRKWY. XMAS NOON DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE MEW WM EB 0 0 N 0 0 0.80 5 Y 17.7 3 WB 0 0 N 0 0 0.80 5 Y 17.7 3 NB 0 2 N 0 0 0.98 2 Y 13.0 3 SB 0 2 N 0 0 0.98 2 Y 13.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 27 1 51 LT 1 11.0 R 1 11.0 WB 4 1 64 LT 1 11.0 R 1 12.0 NB 47 1220 6 L 1 12.0 TR 2 24.0 SB 57 1327 65 L 1 12.0 TR 2 24.0 APP PHASE S I G N A L P H A S I N G 1ST MV 2ND MV 3RD MV PROT EB 1 LT R WB 1 LT R NB 2 L NB 3 L TR SB 2 L SB 3 L TR L L PMSV LR LR LR LR G Y +R 10 110 10 110 5 115 105 15 5 115 105 15 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO77NC SB TOTAL 1449 <' `> 65 i 57 v 1327 W - +- E SOUTHCENTER PRKWY. N/S STREET A \ / 1 - - *> 1 - - -* v S. 168TH STREET E/W STREET 27 ^ EB TOTAL 79 1 51 v < * A *> 1 2 SOUTHCENTER PRKWY. N/S STREET ^ 64 WB TOTAL 1 69 4 v DRIVEWAY E/W STREET 1220 A 47 I 6 <. .> NB TOTAL 1273 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD W /SIGNAL AT DRIVE SC077NC INTERSECTION : S. 168TH STREET @ DRIVEWAY @ SOUTHCENTER PRKWY. XMAS NOON DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB WB NB SB LT 28 35 1.00 35 0.96 0.00 R 51 64 1.00 64 0.00 1.00 LT 5 6 1.00 6 0.83 0.00 R 64 80 1.00 80 0.00 1.00 L 47 48 1.00 48 1.00 0.00 TR 1226 1251 1.00 1251 0.00 0.00 L 57 58 1:00 58 1.00 0.00 TR 1392 1420 1.00 1420 0.00 0.05 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB LT 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.93 1624 R 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1484 WB LT 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.90 1571 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 NB L 1800 1 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1693 TR 1800 2 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 3564 SB L 1800 1 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1693 TR 1800 2 1.00 0.99 1.00 1.00 1.00 1.00 0.99 1.00 3528 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD W /SIGNAL AT DRIVE SCO77NC INTERSECTION : S. 168TH STREET @ DRIVEWAY @ SOUTHCENTER PRKWY. XMAS NOON DESIGN CBD ? N ACTUATED SIGNAL ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO C A P A C I T Y MD EB LT 35 0 1624 0.022 N 0.083 135 0.259 R 64 0 1484 0.043 N 0.083 124 0.516 WB LT 6 0 1571 0.004 N 0.083 131 0.046 R 80 0 1530 0.052 Y 0.083 127 0.630 NB L 45 3 1693 0.027 N 0.042 71 0.634 TR 1251 0 3564 0.351 N 0.875 3118 0.401 SB L 55 3 1693 0.032 Y 0.042 71 0.775 TR 1420 0 3528 0.402 Y 0.875 3087 0.460 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.486 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 0.525 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB LT 0.259 0.083 120 39.2 135 0.2 0.85 33.5 D R 0.516 0.083 120 40.0 124 3.0 0.85 36.5 D WB LT 0.046 0.083 120 38.5 131 0.0 0.85 32.7 D R 0.630 0.083 120 40.4 127 6.5 0.85 39.9 D NB L 0.634 0.042 120 43.0 71 11.1 1.00 54.1 E TR 0.401 0.875 120 1.1 3118 0.0 0.85 0.9 A SB L 0.775 0.042 120 43.3 71 25.9 1.00 69.2 F TR 0.460 0.875 120 1.2 3087 0.1 0.40 0.5 A 35.1 D 38.9 D 2.9 A 3.2 A INTERSECTION DELAY : 5.2 secs /veh LEVEL OF SERVICE : B CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO11PC INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE S I G N A L IMO OM al= EB 0 1 N 0 0 0.88 0 N 0.0 3 WB 2 0 N 0 0 0.88 0 N 0.0 3 NB -2 2 N 0 0 0.98 0 Y 13.0 5 SB 2 2 N 0 0 0.98 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 122 114 37 LT 1 14.0 R 1 14.0 WB 349 0 73 L 1 12.0 LR 1 12.0 NB 0 724 221 T 1 12.0 TR 1 12.0 SB 16 954 0 L 1 12.0 T 2 24.0 P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 LT R LR 30 90 WB 1 L LR LR 30 90 WB 2 L LR L R 20 100 NB 3 T TR R 55 65 SB 3 L T L 55 65 SB 4 L T L 15 105 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCOIIPC SB TOTAL 970 1 <1 > 0 i 16 v 954 N W - +- E SOUTHCENTER PRKWY. N/S STREET /\ A \/ 1 - - *> E/W STREET 122 ^ EB TOTAL 273 114 37 v SOUTHCENTER PRKWY. N/S STREET A 73 WB TOTAL 0 422 349 v SOUTHCENTER DRIVE E/W STREET 724 A 0 i 221 <. .> NB TOTAL 945 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCOIIPC INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB LT 236 268 1.00 268 0.52 0.00 R 37 42 1.00 42 0.00 1.00 WB L 284 323 1.00 323 1.00 0.00 LR 138 157 1.00 157 0.47 0.53 NB T 473 483 1.00 483 0.00 0.00 TR 472 482 1.00 482 0.00 1.00 SB L 16 16 1.00 16 1.00 0.00 T 954 973 1.00 973 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB LT 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 1.00 0.66 1271 R 1800 1 1.07 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1637 WB L 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.95 1693 LR 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.92 0.86 1410 NB T 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 1800 TR 1800 1 1.00 0.99 1.01 1.00 1.00 1.00 0.85 1.00 1530 SB L 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.95 1676 T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO11PC INTERSECTION : SOUTHCENTER DRIVE @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB LT 268 0 1271 0.211 Y 0.250 318 0.843 R 42 0 1637 0.026 N 0.250 409 0.103 WB L 141 182 1693 0.083 N 0.167 282 0.500 LR 157 0 1410 0.111 N 0.417 587 0.267 NB T 483 0 1800 0.268 N 0.458 825 0.585 TR 482 0 1530 0.315 Y 0.458 701 0.688 SB L 11 5 1676 0.007 Y 0.125 209 0.053 T 973 0 3528 0.276 N 0.583 2058 0.473 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.533 LOSS TIME PER CYCLE : 12 INTERSECTION V/C : 0.592 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB LT 0.843 0.250 120 32.5 318 12.5 0.85 38.2 D R 0.103 0.250 120 26.3 409 0.0 0.85 22.4 C 35.9 D WB L 0.500 0.167 120 34.5 282 1.2 1.00 35.7 D LR 0.267 0.417 120 17.5 587 0.1 0.85 15.0 B 28.9 D NB T 0.585 0.458 120 18.3 825 0.8 0.40 7.6 B TR 0.688 0.458 120 19.5 701 2.0 0.50 10.7 B 9.1 B SB L 0.053 0.125 120 35.1 209 0.0 1.00 35.1 D T 0.473 0.583 120 10.9 2058 0.1 0.85 9.,3 B 9.7 B INTERSECTION DELAY : 15.8 secs /veh LEVEL OF SERVICE : C CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO22PC INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY XMAS P.M. PEAK DESIGN CBD ?N ACTUATED SIGNAL APP EB NB SB T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR (%) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE -1 1 N 0 0 0.95 0 N 0.0 3 0 0 N 0 0 1.00 0 N 0.0 5 0 0 N 0 0 1.00 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD . MVM LNS WD EB 191 0 657 L 1 12.0 R 1 12.0 NB 1347 754 0 L 2 24.0 T 2 24.0 SB 0 752 586 T 2 24.0 R 1 12.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L R L R 40 80 EB 3 R R 50 70 NB 2 T 30 90 NB 3 L L 50 70 SB 1 R R 40 80 SB 2 R T R 30 90 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO22PC W - +- E SB TOTAL 1338 <' v 586 752 SOUTHCENTER PARKWAY N/S STREET 1 2 <* v 191 ^ EB TOTAL 848 657 A \/ 1 - - -* v 1 - - -* v KLICKITAT DRIVE E/W STREET 1347 754 <. A NB TOTAL 2101 < * A 2 2 SOUTHCENTER PARKWAY N/S STREET PAGE 1 CHRISTOPHER- BROWN 11/24/2009 SCHOFIELD, PM DATA SCO22PC INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY XMAS P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB NB SB L 191 201 1.00 201 1.00 0.00 R 657 692 1.00 692 0.00 1.00 L 1347 1347 1.00 1347 1.00 0.00 T 754 754 1.00 754 0.00 0.00 T 752 752 1.00 752 0.00 0.00 R 586 586 1.00 586 0.00 1.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1530 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 NB L 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 SB T 1800 2 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3600 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO22PC INTERSECTION : KLICKITAT DRIVE @ SOUTHCENTER PARKWAY XMAS P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB L 201 0 1530 0.131 N 0.333 510 0.394 R 692 0 1530 0.452 Y 0.750 1147 0.603 NB L 1347 0 3312 0.407 Y 0.417 1380 0.976 T 754 0 3600 0.209 N 0.250 900 0.838 SB T 752 0 3600 0.209 N 0.250 900 0.836 R 586 0 1530 0.383 Y 0.583 892 0.657 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 1.242 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 1.343 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB L 0.394 0.333 120 23.3 510 0.3 1.00 23.6 C R 0.603 0.750 120 5.2 1147 0.7 0.85 5.0 A 9.2 B NB L 0.976 0.417 120 26.2 1380 14.0 1.00 40.2 E T 0.838 0.250 120 32.4 900 5.0 0.61 22.8 C 33.9 D SB T 0.836 0.250 120 32.4 900 4.9 0.61 22.8 C R 0.657 0.583 120 12.8 892 1.3 0.50 7.0 B 15.9 C INTERSECTION DELAY : 23.2 secs /veh LEVEL OF SERVICE : C CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO33PC INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY XMAS P.M. PEAK DESIGN CBD ?N UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH APP EB NB SB T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE 2 1 N 0 0 0.87 0 N 0.0 3 0 1 N 0 0 0.95 0 N 0.0 5 0 1 N 0 0 0.95 0 N 0.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 0 0 322 R 1 14.0 NB 0 2103 0 T 4 48.0 SB 0 1411 0 T 2 24.0 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC033PC INTERSECTION : N.B. 1 -5 OFF RAMP @ SOUTHCENTER PARKWAY XMAS P.M. PEAK DESIGN CBD ?N UNSIGNALIZED - MAJOR STREET RUNS NORTH / SOUTH U N S I G N A L I Z E D C R I T I CAL GAPS CRITICAL GAPS (SEC) APP LEFT TURN THROUGH RIGHT TURN EB 0.00 6.00 NB 0.00 - -- SB - -- V O L U M E A L L O C A T I O N T O LANES LANE 1 LANE 2 LANE 3 APP L T R L T R L T R MIN O. MEP EB 0 0 322 0 0 0 0 0 0 NB 0 0 0 0 0 0 0 0 0 SB 0 705 0 0 706 0 0 0 0 U N S I G N A L I Z E D APP LANE 1 LANE 2 LANE 3 EB RESERVE CAPACITY 18 LEVEL OF SERVICE E NB RESERVE CAPACITY LEVEL OF SERVICE SB RESERVE CAPACITY LEVEL OF SERVICE MAJOR STREET - NB /SB CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC044PC INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & ROADWAY C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE WB 2 3 N 0 0 0.98 10 Y 18.0 4 NB 2 3 N 0 0 0.98 10 Y 18.0 3 SB -2 3 N 0 0 0.98 0 N 18.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD WB 822 0 690 L 1 12.0 R 1 12.0 NB 0 1202 748 T 2 24.0 R 1 12.0 SB 616 946 0 L 2 24.0 T 2 24.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R WB 3 L R LR 60 60 WB 1 R R 20 100 NB 2 T R R 40 80 NB 3 R R 60 60 SB 2 T 40 80 SB 1 T L L 20 100 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO44PC SOUTHCENTER PRKWY. N/S STREET \/ SOUTHCENTER PRKWY. N/S STREET SB TOTAL 1562 I I 1 Y .> 946 616 STRANDER BLVD. E/W STREET 1202 748 A .> NB TOTAL 1950 v 690 WB TOTAL 822 1512 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SCO44PC INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT WB L 822 839 1.00 839 1.00 0.00 R 690 704 1.00 704 0.00 1.00 NB SB T 1202 1227 1.00 1227 0.00 0.00 R 748 763 1.00 763 0.00 1.00 L 616 629 1.00 629 1.00 0.00 T 946 965 1.00 965 0.00 0.00 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW WB L 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.85 1500 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 NB T 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 1.00 3528 R 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.85 1.00 1500 SB L 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 0.92 3312 T 1800 2 1.00 0.99 1.01 1.00 1.00 1.00 1.00 1.00 3600 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC044PC INTERSECTION : STRANDER BLVD. @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL C A PAC I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO WB L 839 0 1500 0.559 Y 0.500 750 1.119 R 704 0 1500 0.469 Y 0.667 1000 0.704 NB T 1227 0 3528 0.348 N 0.333 1176 1.043 R 763 0 1500 0.509 Y 0.833 1250 0.610 SB L 629 0 3312 0.190 Y 0.167 552 1.139 T 965 0 3600 0.268 N 0.500 1800 0.536 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 1.727 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 1.867 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS WB L 1.119 0.500 120 25.9 750 68.0 1.00 93.9 F R 0.704 0.667 120 9.5 1000 1.6 0.71 7.9 B 54.6 E NB T 1.043 0.333 120 31.1 1176 31.9 0.85 53.5 E R 0.610 0.833 120 2.6 1250 0.6 0.85 2.7 A 34.0 D SB L 1.139 0.167 120 39.1 552 82.5 1.00 121.6 F T 0.536 0.500 120 15.6 1800 0.3 0.40 6.4 B 51.8 E INTERSECTION DELAY : 45.7 secs /veh LEVEL OF SERVICE : E CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC055PC INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB -6 1 N 0 0 0.88 0 N 0.0 3 WB 2 0 N 0 0 0.92 0 N 0.0 3 NB -2 1 N 0 0 0.85 3 Y 18.0 3 SB 2 2 N 0 0 0.92 0 N 0.0 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 179 306 4 L 1 11.0 T 1 11.0 R 1 10.0 WB 151 611 197 L 1 12.0 TR 1 12.0 R 1 12.0 NB 32 166 46 L 1 11.0 TR 1 12.0 SB 283 188 432 L 2 24.0 TR 1 12.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L T R LR 20 80 WB 2 R R 15 85 WB 3 R TR L LR 20 80 NB 4 L TR LR 20 80 SB 5 L L TR LR 25 75 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO55PC <1 432 SB TOTAL 903 > 283 v 188 N W - +- E SOUTHCENTER PRKWY. N/S STREET ^ 197 WB TOTAL 611 959 151 v S. 180TH STREET E/W STREET A /\ v 1 1 - - -> 1 - - -* v E/W STREET 179 ^ EB TOTAL 489 306 4. SOUTHCENTER PRKWY. N/S STREET 166 A 32 I 46 <. > i NB TOTAL 244 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC055PC INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 179 203 1.00 203 1.00 0.00 T 306 348 1.00 348 0.00 0.00 R 4 5 1.00 5 0.00 1.00 WB L 151 164 1.00 164 1.00 0.00 TR 611 664 1.00 664 0.00 0.00 R 197 214 1.00 214 0.00 1.00 NB L 32 38 1.00 38 1.00 0.00 TR 212 249 1.00 249 0.00 0.22 SB L 283 308 1.00 308 1.00 0.00 TR 620 674 1.00 674 0.00 0.70 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 0.20 360 T 1800 1 0.97 1.00 1.03 1.00 1.00 1.00 1.00 1.00 1798 R 1800 1 0.94 1.00 1.03 1.00 1.00 1.00 0.85 1.00 1481 WB L 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 0.53 944 TR 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1782 R 1800 1 1.00 1.00 0.99 1.00 1.00 1.00 0.85 1.00 1515 NB L 1800 1 0.97 1.00 1.01 1.00 1.00 1.00 1.00 0.20 353 TR 1800 1 1.00 1.00 1.01 1.00 1.00 1.00 0.97 1.00 1763 SB L 1800 2 1.00 0.99 0.99 1.00 1.00 1.00 1.00 0.92 3246 TR 1800 1 1.00 0.99 0.99 1.00 1.00 1.00 0.89 1.00 1570 PAGE 2 CHRISTOPHER BROWN 11/24/2009 INTERSECTION : S. 180TH STREET @ SOUTHCENTER PRKWY. XMAS P.M. PEAK ACTUATED SIGNAL SCHOFIELD, PM DATA DESIGN CBD ? N SC055PC C A P A C I T Y A N A L Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW APP MVM RATE LT FLOW FLW RT RATIO EB L T R WB L TR R NB L TR SB L TR Ram wM MIND WO* 203 0 360 0.564 348 0 1798 0.194 5 0 1481 0.003 164 0 944 0.174 664 0 1782 0.373 214 0 1515 0.141 38 0 353 0.108 249 0 1763 0.141 308 0 3246 0.095 674 0 1570 0.429 CYCLE LENGTH : 100.0 LOSS TIME PER CYCLE : CRIT ? Y N N N Y N Y Y GREEN LN GR V/C RATIO CAPACITY RATIO 0.200 0.200 0.200 0.200 0.200 0.350 0.200 0.200 72 360 296 189 356 530 71 353 2.819 0.967 0.017 0.868 1.865 0.40.4 0.535 0.705 N 0.500 1623 0.190 Y 0.250 392 1.719 SUM OF CRITICAL LANES' FLOW RATIOS : 1.615 15 INTERSECTION V/C : 1.900 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd APP MVM RATIO RATIO LEN DELAY CAP DELAY EB L 2.819 0.200 100 T 0.967 0.200 100 R 0.017 0.200 100 WB L 0.868 0.200 100 TR 1.865 0.200 100 R 0.404 0.350 100 NB L 0.535 0.200 100 TR 0.705 0.200 100 SB L 0.190 0.500 100 TR 1.719 0.250 100 55.8 30.2 24.4 29.4 38.8 18.7 27.2 28.3 LN GR LN GR APP APP PF DELAY LOS DELAY LOS 72 5228.0 0.85 360 28.6 0.85 296 0.0 0.85 189 22.1 0.85 356 1069.4 0.85 530 0.3 0.85 71 5.7 0.85 353 4.3 0.85 10.5 1623 0.0 0.85 37.5 392 759.3 0.85 4491.2 50.0 20.7 43.8 942.0 16.1 28.0 27.7 F E C E F C D D 8.9 B 677.3 F 1671.3 F 610.5 F 27.6 D 467.2 F INTERSECTION DELAY :708.5 secs /veh LEVEL OF SERVICE : F CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC066PC INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST XMAS P.M PEAK HOUR DESIGN CBD ?N ACTUATED SIGNAL APP EB WB NB SB T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR ( %) ( %) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE O 1 N 0 0 0.95 0 Y 18.0 3 O 2 N 0 0 0.95 5 Y 18.0 3 O 4 N 0 0 0.95 0 Y 15.5 3 O 2 N 0 0 0.95 7 Y 15.5 3 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM 'LNS WD EB 99 467 60 L 1 12.0 T 2 21.0 R 1 12.0 WB 55 657 170 L 1 11.0 TR 2 20.0 NB 148 437 75 LTR 2 25.0 SB 261 335 114 LTR 2 27.0 S I G N A L P H A S I N G APP PHASE 1ST MV 2ND MV 3RD MV PROT PMSV G Y +R EB 1 L L 15 105 EB 2 L T R LR 25 95 WB 1 L L 15 105 WB 2 TR R 25 95 WB 5 L TR LR 20 100 NB 3 LTR LR 30 90 SB 4 LTR LR 30 90 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO55PC SB TOTAL 903 • <r .> 432 i 283 v 188 SOUTHCENTER PRKWY. N/S STREET ^ 197 WB TOTAL 611 959 151 v S. 180TH STREET E/W STREET A /\ v 1 1 - - -> 1 - - -* v E/W STREET 179 ^ EB TOTAL 489 306 4 SOUTHCENTER PRKWY. N/S STREET 166 A i 32 1 46 NB TOTAL 244 1 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC066PC INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST XMAS P.M PEAK HOUR DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB L 99 104 1.00 104 1.00 0.00 T 467 492 1.00 492 0.00 0.00 R 60 63, 1.00 63 0.00 1.00 WB L 55 58 1.00 58 1.00 0.00 TR 827 871 1.00 871 0.00 0.21 NB LTR 660 695 1.00 695 0.22 0.11 SB LTR 710 747 1.00 747 0.37 0.16 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB L 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1710 T 1800 2 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 3420 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 WB L 1800 1 0.97 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1642 TR 1800 2 0.94 0.99 1.00 1.00 1.00 1.00 0.97 1.00 3250 NB LTR 1800 2 1.02 0.98 1.00 1.00 1.00 1.00 0.98 0.99 3504 SB LTR 1800 2 1.05 0.99 1.00 1.00 1.00 1.00 0.98 0.98 3579 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD, PM DATA SC066PC INTERSECTION : STRANDER BLVD. @ ANDOVER PARK WEST XMAS P.M PEAK HOUR DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB L 99 5 1710 0.058 Y 0.125 214 0.463 T 492 0 3420 0.144 N 0.208 712 0.691 R 63 0 1530 0.041 N 0.208 319 0.197 WB L 53 5 1642 0.032 N 0.125 205 0.259 TR 871 0 3250 0.268 Y 0.375 1219 0.715 NB LTR 695 0 3504 0.198 Y 0.250 876 0.793 SB LTR 747 0 3579 0.209 Y 0.250 895 0.835 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.733 LOSS TIME PER CYCLE : 15 INTERSECTION V/C : 0.838 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS EB L 0.463 0.125 120 37.1 214 1.2 1.00 38.3 D T 0.691 0.208 120 33.4 712 2.0 0.85 30.1 D R 0.197 0.208 120 29.8 319 0.0 0.85 25.3 D 30.9 D WB L 0.259 0.125 120 36.1 205 0.2 1.00 36.3 D TR 0.715 0.375 120 24.3 1219 1.4 0.85 21.8 C 22.7 C NB LTR 0.793 0.250 120 32.0 876 3.5 0.85 30.2 D 30.1 D SB LTR 0.835 0.250 120 32.4 895 4.9 0.85 31.7 D 31.6 D INTERSECTION DELAY : 28.4 secs /veh LEVEL OF SERVICE : D CHRISTOPHER BROWN 11/24/2009 SCHOFIELD W /SIGNAL AT DRIVE SC077PC INTERSECTION : S. 168TH STREET @ DRIVEWAY @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ?N ACTUATED SIGNAL T R A F F I C & R O A D W A Y C O N D I T I O N S GRADE HV ADJ. PKG LN. BUSES CONF. PEDS PED BUTTON ARR APP (%) (%) Y/N Nm (Nb) PHF (peds /hr) Y/N SEC TYPE EB 0 0 N 0 0 0.80 5 Y 17.7 3 WB 0 0 N 0 0 0.80 5 Y 17.7 3 NB 0 2 N 0 0 0.98 2 Y 13.0 3 SB 0 2 N 0 0 0.98 2 Y 13.0 5 G E O M E T R I C S / V O L U M E S LANE GROUPS VOLUME 1 2 3 APP LT TH RT MVM LNS WD MVM LNS WD MVM LNS WD EB 43 1 43 LT 1 11.0 R 1 11.0 WB 3 1 49 LT 1 11.0 R 1 12.0 NB 32 1846 4 L 1 12.0 TR 2 24.0 SB 43 1900 49 L 1 12.0 TR 2 24.0 APP PHASE aim WO S I G N A L PHA S I N G 1ST MV 2ND MV 3RD MV PROT EB 1 LT R WB 1 LT R NB 2 L NB 3 L TR SB 2 L SB 3 L TR L PMSV LR LR LR LR G Y +R 10 110 10 110 5 115 105 15 5 115 105 15 11/24/2009 CHRISTOPHER BROWN INTERSECTION SCO66PC SB TOTAL 710 I <' 114 .> 261 v 335 STRANDER BLVD. E/W STREET 99 ^ EB TOTAL 626 467 60 N W - +- E ANDOVER PARK WEST N/S STREET 2 < *> v A < *> 2 ANDOVER PARK WEST N/S STREET ^ 170 WB TOTAL 657 882 55 v STRANDER BLVD. E/W STREET 437 A 148 I 75 <. > I NB TOTAL 660 PAGE 1 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD W /SIGNAL AT DRIVE SC077PC INTERSECTION : S. 168TH STREET @ DRIVEWAY @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL V O L U M E A D J U S T M E N T APPROACH LANE GROUP FLOW RATE LANE UTIL ADJ FLOW PROP OF TURNS MVM VOLUME IN GROUP FACTOR RATE LT RT EB LT 44 55 1.00 55 0.98 0.00 R 43 54 1.00 54 0.00 1.00 WB NB SB LT 4 5 1.00 5 0.75 0.00 R 49 61 1.00 61 0.00 1.00 L 32 33 1.00 33 1.00 0.00 TR 1850 1888 1.00 1888 0.00 0.00 L 43 44 1.00 44 1.00 0.00 TR 1949 1989 1.00 1989 0.00 0.03 S A T U R A T I O N F L O W IDEAL # OF ADJUSTMENT FACTORS ADJ. APP MVM SAT FLOW LANES WIDTH H.V. GRADE PARK BUS AREA RT LT FLOW EB LT 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.99 1729 R 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1484 WB LT 1800 1 0.97 1.00 1.00 1.00 1.00 1.00 1.00 0.87 1519 R 1800 1 1.00 1.00 1.00 1.00 1.00 1.00 0.85 1.00 1530 NB L 1800 1 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1693 TR 1800 2 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 3564 SB L 1800 1 1.00 0.99 1.00 1.00 1.00 1.00 1.00 0.95 1693 TR 1800 2 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 3564 PAGE 2 CHRISTOPHER BROWN 11/24/2009 SCHOFIELD W /SIGNAL AT DRIVE SC077PC INTERSECTION : S. 168TH STREET @ DRIVEWAY @ SOUTHCENTER PRKWY. XMAS P.M. PEAK DESIGN CBD ? N ACTUATED SIGNAL C A P A C I T Y ANAL Y S I S LN GR ADJ FLOW PMSV ADJ SAT FLOW GREEN LN GR V/C APP MVM RATE LT FLOW FLW RT RATIO CRIT ? RATIO CAPACITY RATIO EB LT 55 0 1729 0.032 N 0.083 144 0.382 R 54 0 1484 0.036 N 0.083 124 0.435 WB LT 5 0 1519 0.003 N 0.083 127 0.039 R 61 0 1530 0.040 Y 0.083 127 0.480 NB L 31 2 1693 0.018 N 0.042 71 0.437 TR 1888 0 3564 0.530 N 0.875 3118 0.606 SB L 42 2 1693 0.025 Y 0.042 71 0.592 TR 1989 0 3564 0.558 Y 0.875 3118 0.638 CYCLE LENGTH : 120.0 SUM OF CRITICAL LANES' FLOW RATIOS : 0.623 LOSS TIME PER CYCLE : 9 INTERSECTION V/C : 0.674 L E V E L O F S E R V I C E LN GR V/C GREEN CYC 1st LN GR 2nd LN GR LN GR APP APP APP MVM RATIO RATIO LEN DELAY CAP DELAY PF DELAY LOS DELAY LOS IMP .00 MID EB LT 0.382 0.083 120 39.6 144 0.8 0.85 34.3 D R 0.435 0.083 120 39.8 124 1.6 0.85 35.2 D 34.4 D WB LT 0.039 0.083 120 38.4 127 0.0 0.85 32.6 D R 0.480 0.083 120 39.9 127 2.2 0.85 35.8 D 35.0 D NB L 0.437 0.042 120 42.7 71 2.7 1.00 45.4 E TR 0.606 0.875 120 1.5 3118 0.2 0.85 1.4 A 2.2 A SB L 0.592 0.042 120 42.9 71 8.5 1.00 51.4 E TR 0.638 0.875 120 1.6 3118 0.3 0.50 0.9 A 2.0 A INTERSECTION DELAY : 3.5 secs /veh LEVEL OF SERVICE : A