Loading...
HomeMy WebLinkAboutSEPA EPIC-273-85 - SOUTH 188TH CONNECTORSOUTH 188TH CONNECTOR NEW 4 OR 5 LANE ARTERIAL EPIC 273 -85 N 4%LA w'4s City of Tukwila 4 Z 6200 Southcenter Boulevard " = Tukwila Washington 98188 • 1908 • Gary L. VanDusen, Mayor TO: Brad Collins, Planning Director FROM: Byron G. Sneva, Public Works Director March 21, 1985 SOUTH 188th CONNECTOR - Environmental Process Project M- 9999(51) City Project #84- RW05 -3 (Environmental) MEMORANDUM DATE: SUBJECT: The South 188th Connector Feasibility Study and Regional Impacts report for the construction of South 188th Connector from I -5 at South 188th with Southcenter Parkway in the vicinity of South 180th with a new 4 or 5 lane arterial is now complete. This is a project consisting of a four or five lane roadway in anew location. It requires right -of -way and demolition (Potential) of some structures. Due to the project's scope, a full EIS is normally anticipated with a project of this nature. Public interest to date indicates that enough public controversy is associated with the project to consider it . appropriate to carry out a full EIS. Therefore, this project is classified as a Class I project and shall receive a full EIS procedure as part of its development. /cs cc: Mayor Chamber of Commerce, Transportation Committee PSCOG City of Renton City of Kent King County, Roads Division John Klasell, WSDOT City Engineer Senior Engineer Associate Planner Tukwila Transportation Committee