HomeMy WebLinkAboutSEPA EPIC-30-90 - MA SEGALE - 3 FUEL TANKS REMOVALSEGALE, INC.
REMOVAL OF 3
UNDERGROUND FUEL
TANKS
18400 SOUTHCENTER
BLVD.
EPIC -30 -90
CI� OF TUKWILA - IBLIC WORKS
FAX TRANSMITTAL
FAX NUMBER: (2 o6) 431- 3665
TO:
344 �/4;
TITLE:
DATE:
/06/ID
FROM:
/Ae,E /LEI
COMPANY: J��
/. {/S
DEPARTMENFT:
TITLE:
c /!2'
DEPARTMENT:
FAX NO.
326
TOTAL NO. OF PAGES TRANSMITTED,
INCLUDING THIS COVER SHEET;
w:w w w.a)::
SENT BY
(INITIALS):
•WoCr 'vA Wi:w- A:::vr•o :04.4:::4Nw Ai .»104.
SUBJECT:
COMMENTS /MESSAGE:
•
IF THIS COMMUNICATION IS NOT
CLEARLY RECEIVED. PLEASE CALL:
Vwdwtiw�: �1W�YMaw.l�NiiN�MP%Oii0Dw0Tee:4 ' X:OAN VviwiJ6:4%4.WNvw- .•Nh4:i•:v" .. ah. ..w
TZJKWILA CITY HALL - 6200 Southcenter Boulevard, Tukwila WA 98188 - (206) 433 -1800
03/24/
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Mail Stop PV -11 • Olympia, Washington 98504 -8711 • (206) 459 -6000
November 14, 1990
Mr. Rick Beeler
City of Tukwila
6200 Southcenter Boulevard
Tukwila, WA 98188
Dear Mr. Beeler:
We received the determination of nonsignificance to remove
three underground fuel tanks proposed by M. A. Segale Inc.
(EPIC- 30 -90). Although there was no comment period, we have
the following concerns.
1. There are tank closure requirements in the federal rules
for underground storage tanks. These requirements
include (1) a site assessment to determine whether
contamination has occurred, and (2) filing of a notice of
intent to permanently close the tank with the Department
of Ecology at least 30 days prior to closure.
Information on the closure notice may be obtained by
calling 1- 800 - 826 -7716.
2. The Environmental Protection Agency's minimum
requirements are that closure of underground storage
tanks must be accompanied by sampling for contamination
in the excavation area. The presence of contaminated
soils or ground water, or the presence of free product,
requires notification of the Department of Ecology within
24 hours. Please call Mr. Joe Hickey of the Northwest
Regional Office at (206) 867 -7202. He will identify the
type of testing that will be required.
3. The Environmental Protection Agency requires the results
of an excavation zone assessment be maintained at least
three years after completion of permanent closure or
change -in- service. Ecology recommends the records be
kept in the property file indefinitely for any future
property transfers. These records should be maintained
by successive owners to fulfill liab��i +T
under the Washington Model Toxics `IAct in�t4 I'�$�.10D
RCW. 1 �(''1.' " ='',
k NOV 16 1990
3
0
Mr. Rick Beeler
November 14, 1990
Page 2
4. If storage tanks contain dangerous or hazardous wastes as
defined in WAC 173 -303, please contact the Northwest
Regional Office, Solid and Hazardous Waste Section, at
(206) 867 -7000 for closure requirements.
5: The site assessment must be done by a qualified person
registered with the Department of Ecology.
6. Removal of tanks must be done by firms registered with
the Department of Ecology.
If you have any questions, please call Mr. Roger Nye in our
Northwest Regional Office at (206) 867 -7251.
Sincerely,
M. Vernice Santee
Environmental Review Section
MVS:
6263
cc: Janet Thompson -Lee, NWRO
Roger Nye, NWRO
WAC 197 -11 -970
DETERMINATION OF NONSIGNIFICANCE
Description of Proposal Removal of 3 Underground Fuel Tanks
Proponent M.A. Segale, Inc.
Location of Proposal, including street address, if any 18400 Southcenter Blvd.
Sec. 35, Twn. 23, Range 4E
Lead Agency: City of Tukwila File No. EPIC -30 -90
The lead agency for this proposal has determined that it does not have a probable
significant adverse impact on the environment. An environmental impact statement
(EIS) is not required under RCW 43.21C.030(2)(c). This decision was made after
review of a completed environmental checklist and other information on file with the
lead agency. This information is available to the public on request.
xQ There is no comment period for this DNS
[J This DNS is issued under 197 -11- 340(2). Comments must be submitted by
. The lead agency will not act on this
proposal for 15 days from the date below.
Responsible Official Rick Beeler
Position /Title Planning Director
Address 6200 Southcenter Boulevard Tukwi
Date October ?J', 1990 Signature
Phone 433 -1846
88
You may appeal this determination to the City Clerk at City Hall, 6200 Southcenter
Boulevard, Tukwila, WA 98188 no later than 10 days from the above date by written
appeal stating the basis of the appeal for specific factual objections. You may be
required to bear some of the expenses for an appeal.
Copies of the procedures for SEPA appeals are available with the City Clerk and
Planning Department.
FM.DNS
D TE INTT.
•
ACTIVI1O LOG
m1*
g?(i I , vi 316.g. eh-) ///a./9
AT igi &e.e.)
COMMENTS
/17//hrz., ���
CITY OF TUKWILA
DEPARTMENT OF COMMUNITY DEVELOPMENT
ENVIRONMNITAL REVIEW
ROUTING FORM.
PROJECT SEGALE, INC. (UNDERGROUND TANK REMOVAL)
EPIC: 30 -90
ADDRESS 18400 SOUTHCENTER PARKWAY
DATE TRANSMITTED — 2.Y o
STAFF COORDINATOR DARREN WILSON
RESPONSE REQUESTED BY r 0 - ^ 0
DATE RESPONSE RECEIVED
The attached environmental checklist was received regarding this project.: Please review a
comment below to advise the responsible official regarding the threshold determination. ;
envirorlmentalreview file is available in the Planning Department through the'abovo sta
coordinator, Comments regarding the project you wish carried to the Planning Commissio
Board of Adjustment and City Council should be submitted in the comment section .below..
ITEM
COMMENT
1.1 s ga 1_ • 2 G a/
Date: Comments prepared by; ,
091141011
CITY OF TUKWILA
DEPARTMENT OF COMMUNITY DEVELOPMENT
PROJECT
ADDRESS 18400 SOUTHCENTER PARKWAY
"--
ENVIRONMLATAL REVIEW
ROUTINE FORM
SEGALE, INC., (UNDERGROUND TANK REMOVAL)
EPIC: 30-90
DATE TRANSMITTED — 2.Y / 6
STAFF COORDINATOR DARREN WILSON
RESPONSE REQUESTED BY r 0 0
DATE RESPONSE RECEIVED
• regarding threshold .the above t•
: • ; ihatidn.;
environmental sporiSlul'u• planni VI Department , checklist officia n
. . 1,list was received
r.4 rining:Qorn
• ding this lj id determ sta
• • • • t eas e revi? and
.• eceive regarding the through miss 0
ne d ise bict in you wnis
• •'•• ' Anv re the re • the h car comm • • .
In the
c°mnvnirer.irrion. icalmreriients re6caity COuncil sho •
The • attao 1 to advise ava a • j ct yo submitted •
0.0. • view rding t should be s • The
erdinatdr... ent and . •
Coo. • of Adjustment oarCl 9
cbe.ow file s • the pro e ubrni
riedt° thQ r"1"e"ntsectio:
!TEM COMMENT
(-0 Ave 62emoc),91/..74(5h6Pheril 7DL-7-z m,
obm/Aielp ,97-- 7e f)69,a7.- a cee o
Avs, ex) yt=-72 h5W/C r 5' Ch 9f2 .
Z; Skt,6/77 e 2e6),'62.4) "9/2 e- ,Ar
e •zeie")76 u )9- --5-'441-
57 / kc
Date:
Comments prepared by: ,
0W1410
ENVIRONIVILANITAL REVIEW
ROUTI* FOFIREIvED
AMMT SEGALE, INC. (UNDERGROUND TANK REMOVAL)
EPIC: 30-90 SEP 2 8 1990
trot: '•
• • • ,,•••
)DRESS 18400 SOUTHCENTER PARKWAY
TE TRANSMITTED — 2 91 6
RESPONSE REQUESTED BY r 0
AFF COORDINATOR DARREN WILSON
DATE RESPONSE RECEIVED
•
The aso 0 was e oeived rega'rdingthiS•proje4:;::
r-- PJease review
.c4rnilienfbeloWla.adyiSe the..r p sly e received
regarding the threshrotilddeternaot19.0rl.i:..
envirOniental.reyiew fits is available in the Planning Departtlierlt M ugh the bssv ..stsao
•":.coorditiator.::C061ments regarding the project you wish carried10the.rlannIng.C.oloTtnrnioi3...
Board of Adjustment and City.Councll should submitted 1n :the
TEM COMMENT
i . fi,..r ,nee,r (/).0- ,? EPA
A 14ETRo Discharje
_ ) ,parfr7; i ,e-fy A
3 . 44-
/neje,- perrp;, 1 /5
Or , fri 4) 07 .--10 4,/.4 4 C 44. .
S di ,l., /I
p).
re- t 14. i m• A ) A:I 0 r Li 5 4)/2- 11-2JC ,5-e- 4-Je-r b '7/, CI
to: d 5- d Comments prepared by:
091141110
CITY OF TUKWILA
DEPARTMENT OF COMMUNITY DEVELOPMENT
PROJECT
ADDRESS 18400 SOUTHCENTER PARKWAY
••• •
BuIdlng , LJ Planning .
ENVIRONMLATAL REVIEW
ROUTINn FORM
EPIC: 30-90
Potica
SEGALE, INC. (UNDERGROUND TANK REMOVAL)
DATE TRANSMITTED — 6
STAFF COORDINATOR DARREN WILSON
RESPONSE REQUESTED BY r o ci 0
DATE RESPONSE RECEIVED
ITEM
COMMENT
Date: Comments prepared by; u
09114/00
Environmental Checklist (continued) Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICANT
ERR /Al
SEP 27 1990
CIT11.��
PLANNING DEPT.
ENVIRONMENTAL CHECKLIST
Control No.
Epic File No. - 3D--97)
Fee $225.00 Receipt No.02DDaA4
A. BACKGROUND
1. Name of proposed project, if applicable:
Underground Tank Removal (Asphalt Division)
2. Name of applicant: M. A. Segale, Inc.
3. Address and phone number of applicant and contact person:
Address of Applicant: M. A. Segale, Inc.
P. O. Box 88050
Tukwila, WA. 98138
Contact Person: Stephen E. Miller
Telephone Number: (206) 575 -3200
4. Date checklist prepared: September 17, 1990
5. Agency requesting checklist: City of Tukwila
6. Proposed timing or schedule (including phasing, if applicable):
Applicant proposes to complete all work associated with tank removal commencing
as soon as possible following receipt of applicable permits, completion by
December 31, 1990.
7. Do you have any plans for future additions, expansions, or further activity
related to or connected with this proposal? If yes, explain.
NO.
8. List any environmental information you know about that has been prepared, or will
be prepared, directly related to this proposal.
NONE.
9. Do you know whether applications are pending for governmental approvals of other
proposals directly affecting the property covered by your proposal? If yes,
explain.
NONE.
Environmental Checklist (City of Tukwlia)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
- 2 -
Environmental Checklist (continued) Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICANiT
10. List any governmental approvals or permits that will be needed for your proposal,
if known.
City of Tukwila Fire Department Underground Fuel Tank Removal /Installation Permit
11. Give brief, complete description of your proposal, including the proposed uses
and the size of the project and site. There are several questions later in this
checklist that ask you to describe certain aspects of your proposal. You do not
need to repeat those answers on this page. (Lead agencies may modify this form
to include additional specific information on project description.)
Proposal is to remove three (3) underground storage tanks in accordance with all
applicable City of Tukwila, Washington State Department of Ecology (DOE) and
other regulations.
12. Location of the proposal. Give sufficient information for a person to understand
the precise location of your proposed project, including a street address, if
any, and section, township, and range if known. If a proposal would occur over
a range of area, provide the range or boundaries of the site(s). Provide a legal
description, site plan, vicinity map, and topography map, if reasonably
available. While you should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any permit
applications related to this checklist.
Tanks are located at the M. A. Segale, Inc. Asphalt Plant at 18400 Southcenter
Parkway, Tukwila, Washington.
13. Does the proposal lie within an area designated on the City's Comprehensive Land
Use Policy Plan Map as environmentally sensitive?
NO.
Environmental Checklist (City of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
3
1
Environmental Checklist (continued) Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICANT
B. ENVIRONMENTAL ELEMENTS:
1. Barth
A. General description of the site
(circle /underline one): flat, rolling,
hilly, steep slopes, mountainous, other
N/A .
B. What is the steepest slope on the site
(approximate percent slope)?
Less than three percent (3 %)
C. What general types of soils are found on
the site (for example, clay, sand,
gravel, peat, muck)? If you know the
classification of agricultural soils,
specify them and note any prime
farmland.
Silty sand
D. Are there surface indications or history
of unstable soils in the immediate
vicinity? If so, describe.
NO.
E. Describe the purpose, type, and
approximate quantities of any filling or
grading proposed. Indicate source of
fill.
Purpose of filling and grading will be
only as necessary to backfill the area
where the proposed tank removal has
occurred. The type and source of the
fill will be clean sand and gravel.
Approximate quantity is estimated to be
one hundred fifty (150) cubic yards
combined (for all three tanks)
F. Could erosion occur as a result of
clearing, construction, or use? If so,
generally describe.
NO.
G. About what percent of the site will be
covered with impervious surfaces after
project construction (for example,
asphalt or buildings)?
NONE.
Environmental Checklist (City of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
4
•
Environmental Checklist (continued)
TO BE COMPLETED BY APPLICANT
H. Proposed measures to reduce or control
erosion, or other impacts to the earth,
if any:
N /A.
2. Air:
A. What types of emissions to the air would
result from the proposal (i.e., dust,
automobile odors, industrial wood smoke)
during construction and when the project
is completed? If any, generally
describe and give approximate quantities
if known.
Minimal dust from excavation equipment
which will be controlled with limited
use of water.
B. Are there any off -site sources of
emissions or odor that may affect your
proposal? If so, generally describe.
NO.
C. Proposed measures to reduce or control
emissions or other impacts to air, if
any:
N /A.
3. Water:
A. Surface:
1) Is there any surface water body on
or in the immediate vicinity of
the site (including year -round and
seasonal streams, saltwater,
lakes, ponds, wetlands)? If yes,
describe type and provide names.
If appropriate, state what stream
or river it flows into.
NO.
Environmental Checklist, (City of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
- 5 -
Evaluation for
Agency Use Only
•
Environmental Checklist (continued)
TO BE COMPLETED BY APPLICANT
2) Will the project require any work
over, in, or adjacent to (within
200 feet) the described waters?
If yes, please describe and attach
available plans.
NO.
3) Estimate the amount of fill and
dredge material that would be
placed in or removed from surface
water or wetlands and indicate the
area of the site that would be
affected. Indicate the source of
fill material.
NONE.
4) Will the proposal require surface
water withdrawals or diversions?
Give general description, purpose,
and approximate quantities if
known.
NO.
5) Does the proposal lie within a
100 -year floodplain? If so, note
location on the site plan.
NO.
6) Does the proposal involve any
discharges of waste materials to
surface waters? If so, describe
the type of waste and anticipated
volume of discharge.
NO.
Environmental Checklist (City of Tukwlla)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
- 6 -
Evaluation for
Agency Use Only
•
Environmental Checklist (continued)
TO BE COMPLETED BY APPLICANT
B. Ground:
1) Will ground water be withdrawn, or
will water be discharged to ground
water? Give general description,
purpose, and approximate
quantities if known.
NO.
2) Describe waste material that will
be discharged into the ground from
septic tanks or other sources, if
any (for example: Domestic
sewage; industrial, containing the
following chemicals . .'
agricultural; etc.). Describe the
general size of the system, the
number of such systems, the number
of houses to be served (if
applicable), or the number of
animals or humans the system(s)
are expected to serve.
N /A.
C. Water Runoff (including storm water):
Environmental Checklist (City of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
1) Describe the source of runoff
(including storm water) and method
of collection and disposal, if any
(include quantities, if known).
Where will this water flow? Will
this water flow into other waters?
If so, describe.
Source of runoff will be storm
water consistent with current
conditions only and is anticipated
to be negligible.
7
Evaluation for
Agency Use Only
• •
Environmental Checklist (continued) Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICA1lNT
2) Could waste materials enter ground
or surface waters? If so,
generally describe.
NO.
D. Proposed measures to reduce or control
surface, ground, and runoff water
impacts, if any:
N /A.
4. Plants:
A. Check or circle /underline types of
vegetation found on the site:
_ deciduous tree: alder, maple, aspen, other
_ evergreen tree: fir, cedar, pine, other
shrubs
X grass
_ crop or grain
_ wet soil plants: cattail, buttercup, bulrush, skunk cabbage, other
_ water plants: water lily, eel grass, milfoil, other
x other types of vegetation
Various vegetation as landscaping on adjacent site, in place.
B. What kind and amount of vegetation will
be removed or altered?
NONE.
C. List threatened or endangered species
known to be on or near the site.
NONE.
Environmental Checklbt (City of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
- 8 -
Environmental Checklist (continued) Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICANT
D. Proposed landscaping, use of native
plants, or other measures to preserve or
enhance vegetation on the site, if any:
N /A.
5. Animals:
A. Circle /underline any birds and animals
which have been observed on or near the
site or are known to be on'or near the
site:
Birds: Hawk, heron, eagle, songbirds, other:
Mammals: Deer, bear, elk, beaver, other:
Fish: Bass, salmon, trout, herring, shellfish, other:
B. List any threatened or endangered
species known to be on or near the site.
NONE.
C. Is the site part of a migration route?
If so, explain.
NO.
D. Proposed measures to preserve or enhance
wildlife, if any:
NONE.
Environmental Checklist (City of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
9
Environmental Checklist (continued)
TO BE COMPLETED BY APPLICANT
6. Energy and Natural Resources:
A. What kinds of energy (electric, natural
gas, oil, wood stove, solar) will be
used to meet the completed project's
energy needs? Describe whether it will
be used for heating, manufacturing, etc.
N /A.
B. Would your project affect the potential
use of solar energy by adjacent
properties? If so, generally describe.
NO.
C. What kinds of energy conservation
features are included in the plans of
this proposal? List other proposed
measures to reduce or control energy
impacts, if any:
NONE.
7. Environmental Health:
A. Are there any environmental health
hazards, including exposure to toxic
chemicals, risk of fire and explosion,
spill, or hazardous waste, that could
occur as a result of this proposal? If
so, describe.
Environmental CheddIst (City of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
Any hazards associated with removal of
underground storage tanks will be
addressed on an as- needed basis,
consistent with applicable regulations.
1) Describe special emergency
services that might be required.
N /A.
2) Proposed measures to reduce or
control environmental health
hazards, if any:
Compliance with applicable
regulations.
- 10 -
Evaluation for
Agency Use Only
Environmental Checklist (continued) Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICANT
B. Noise:
1) What types of noise exist in the
area which may affect your project
(for example: traffic, equipment,
operation, other ?)
NONE.
2) What types and levels of noise
would be created by or associated
with the project on a short -term
or a long -term basis (for example:
traffic, construction, operation,
other)? Indicate what hours noise
would come from the site.
No additional noise is
anticipated. Noise associated
with the project will be noise
associated with normal, short -
term, construction excavation
operation. Hours will be from
7:00 a.m. - 7:00 p.m., Monday
through Saturday.
3) Proposed measures to reduce or
control noise impacts, if any:
NONE.
8. Land and Shoreline Use:
A. What is the current use of the site and
adjacent properties?
Site and adjacent parcels owned by
applicant are currently being used for
applicant's construction business,
including production and sale of asphalt
concrete.
B. Has the site been used for agriculture?
If so, describe.
NO.
C. Describe any structures on the site.
Asphalt Plant within 100 feet of tanks.
Environmental Checklist (City of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
•
Environmental Checklist (continued) Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICANT
D. Will any structures be demolished? If
so, what?
NO.
E. What is the current zoning
classification of the site?
M -2
F. What is the current comprehensive plan
designation of the site?
M -2
G. If applicable, what is the current
shoreline master program designation of
the site?
N /A.
H. Has any part of the site been classified
as an "environmentally sensitive" area?
If so, specify.
NO.
I. Approximately how many people would
reside or work in the completed project?
NO CHANGE.
J. Approximately how many people would the
completed project displace?
NONE.
K. Proposed measures to avoid or reduce
displacement impacts, if any:
N /A.
L. Proposed measures to ensure the proposal
is compatible with existing and
projected land uses and plans, if any:
Environmental Cheddlal (City of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
Proposal is only for removal of three
(3) underground storage tanks. N /A.
- 12 -
Environmental Checklist (continued) Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICANT
9. Housing:
A. Approximately how many units would be
provided, if any? Indicate whether
high, middle, or low - income housing.
N /A.
B. Approximately how many units, if any,
would be eliminated? Indicate whether
high, middle, or low- income housing.
NONE.
C. Proposed measures to reduce or control
housing impacts, if any:
N /A.
10. Aesthetics:
A. What is the tallest height of any
proposed structure(s), not including
antennas; what is the principal
exterior building material(s) proposed?
N /A. No structures are proposed.
B. What views in the immediate vicinity
would be altered or obstructed?
N /A.
C. Proposed measures to reduce or control
aesthetic impacts, if any:
N /A.
Environmental Checklist (CIty of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
- 13 -
1 •
Environmental Checklist (continued) Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICANT
11. Light and Glare:
A. What type of light or glare will the
proposal produce? What time of day
would it mainly occur?
NONE.
B. Could light or glare from the finished
project be a safety hazard or interfere
with views?
NO.
C. What existing off site sources of light
to glare may affect your proposal?
NONE.
D. Proposed measures to reduce or control
light and glare impacts, if any:
N /A.
12. Recreation:
A. What designated and informal
recreational opportunities are in the
immediate vicinity?
NONE.
B. Would the proposed project displace any
existing recreational uses? If so,
describe.
NO.
C. Proposed measures to reduce or control
impacts on recreation, including
recreation opportunities to be provided
by the project or applicant, if any:
N /A.
Environmental Checklist (City of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
- 14 -
• •
Environmental Checklist (continued) Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICANT
13. Historic and Cultural Preservation:
A. Are there any places or objects listed
on, or proposed for, national, state, or
local preservation registers known to be
on or next to the site? If so,
generally describe.
NO.
B. Generally describe any landmarks or
evidence of historic, archaeological,
scientific, or cultural importance known
to be on or next to the site.
NONE.
C. Proposed measures to reduce or control
impacts, if any:
N /A.
14. Transportation:
A. Identify public streets and highways
serving the site, and describe proposed
access to the existing street system.
Show on site plans, if any.
Southcenter Parkway.
B. It site currently served by public
transit? If not, what is the
approximate distance to the nearest
transit stop?
No. Nearest transit stop is on South
180th Street - approximately 1/2 mile
north of the site.
C. How many parking spaces would the
completed project have? How many would
the project eliminate?
N /A.
Environmental Checklist (City of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
- 15 -
• •
Environmental Checklist (continued) Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICANT
D. Will the proposal require any new roads
or streets, or improvements to existing
roads or streets, not including
driveways? If so, generally describe
(indicate whether public or private).
NO.
E. Will the project use (or occur in the
immediate vicinity of) water, rail, or
air transportation? If so, generally
describe.
NO.
F. How many vehicular trips per day would
be generated by the completed project?
If known, indicate when peak volumes
would occur.
None. No increased traffic is
anticipated.
G. Proposed measures to reduce or control
transportation impacts, if any:
N /A.
15. Public Services:
A. Would the project result in an increased
need for public services (for example:
fire protection, police protection,
health care, schools, other)? If so,
generally describe.
NO.
B. Proposed measures to reduce or control
direct impacts on public services, if
any.
N /A.
Environmental Checklist (Qty of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
- 16 -
r'
• •
Environmental Checklist (continued) Evaluation for
Agency Use Only
TO BE COMPLETED BY APPLICANT
16. Utilities:
A. Circle /underline utilities currently
available at the site: electricity,
natural qas, water, refuse service,
telephone, sanitary sewer, septic
system, other.
B. Describe the utilities that are proposed
for the project, the utility providing
the service and the general construction
activities on the site or in the
immediate vicinity which might be
needed.
NONE.
C. SIGNATURE:
The above answers are true and complete to the best
of my knowledge, I understand that the lead agency
is relying on them to make its decision.
OWNER /AGENT SIGNATURE: 0 0..,e■
M. A. SEGALE, INC.,
M. A. Segale, President
DATE SUBMITTED:
Environmental Checklist (City of Tukwila)
RE: Removal of Underground Storage Tanks
ASPHALT DIVISION
- 17 -
0/71N/£'
/711/CWAy
:SCACE RAMC
�' RI
VICINITY MAP,
NO 5CAC!
DRIVEWAY
:sCA CC RAMO
'0711 I orr,vrvnty
01. R
moo
wu: /"cryo'
o..: 9 -zs90
TUKMW ASPRALf FNNT /Imo sot/mamma
GSC•