HomeMy WebLinkAboutSEPA EPIC-FD-2 - LAUREL DEVELOPMENT - RB FURNITURERB TURNTITURE
SOUTHCENTER PY
EPIC -FD -02
June 24, 114/5
CITY OF TUKWILA
CERTIFICATION BY APPLICANT: _
I hereby certify that the information furnished in this environmental checklist
o
sheet is true and accurate to the best my
Ron Go - - Construction Division Mgr.
9/10/76
By: - .. Date
' Project Name:
Project Address:
Signature and Title
B
u
J-
Southcenter Pa.
a.rkwa
BELOW THIS LINE FOR CITY USE ONLY
-
ACTION BY OTHER'DEPARTMENTS =Check one
or (-)
1. Date of Review: Building by:
2!•7% b: y / .. .! / - --
Planning 9'
Engineering by:
Police by. (+) or ( -)
by:
Fire
2. Agency review of environmental checklist determined that:
':.The project is exempt by definition.
The project has no significant environmental
consideration of l impcand ap t application
"4
should be processed without further consi
The project has significant ebeix�emlpxioxctoafurther�nactioneforrpexmi
mental impact statement mus t prepared
More specific information is needed to determine impact.'
atur and: Ti le .o Responsible Official
3. Applicant was notified of decision on:
'by
Date
In accordance with Washington State Environmental Policy. Act and City of Tukwila
Ordinance No. 759.
-. Means recommend a full environmental impact statement be'done.
() (-). Means recommend a full environmental impact statement not'be done:
• Staff Person
by .
Letter, phone
CITY OF TUKWILA
ENVIRONMENTAL QUESTIONNAIRE
This questionnaire must be completed by all persons applying for a permit
from the city of Tukwila., unless it is determined by the Responsible Official
that an environmental assessment or full impact statement is required. Other
forms have been developed for single- family home applications and legislation
proposals.
BACKGROUND DATA:
1. Name of applicant: Laurel Development Co.
(714).
2. Address and phone of Applicant:2323 Ss E. Main St.,Srvine, Ca_92705979_4000
3. Project name: R. B. Furniture Southcenter
4. Project, location: Tukwila, Washington •
5. Nature and brief description of proposal: construct .a 19,024 sq: ft.
Decor4tor Showroom, 1 story structure.
. Estimated completion date: ' May -1st. 1,77
7. Do you have any plans for future expansion, if yes please explain:
Construct 5,670 sq. ft. One Story Retail Store.
What other governmental permits are required prior to completion of this
project?
(a) Rezone, conditional use, substantial development, etc. - YES NO x
(b) King County Hydr�olics Permit YES• NO x
(c) Building permit YES x .NO
(d) Puget Sound Air Pollution Control. Permit YES NO x.
(e) Sewer .hook .up permit YES X NO
(f) Sign permit YES x NO
(g) Water hook up permit YES x NO
(h) Storm water system permit . YES NO x
(i) Curb cut permit
YES x NO
(j). Electrical permit (State of Washington) YES x NO
(k) Plumbing permit (King County) YES x NO
(1) Other ,
9. Do you know of any plans by others which may affect the property covered by
your proposal? If yes, explain: No
10. Agency requiring checklist: City of Tukwila, Department - Tanning
11. Accepted by agency on: LI ___ by: ( • Ca c t1 -1/4
(to be filled in by city upon eceipt of checklist)
ENVIRONMENTAL IMPACTS
(Explanations of all "yes" and "maybe" answers are required.)
Earth. Will/the proposal result in:
(a) Unstable earth conditions or in
any changes in geologic sub -
structures:
(b) Disruptions, displacements
or overcovering of the soils:
(c) Change in topography or ground
surface relief features?
(d) The destruction, covering, or,
modification of any unique
geologic or physical features?
(e) Any increase in Wind or water
erosion of soils, either on
or off the site?
Changes in deposition or •
erosion of beach sands, or
in changes in siltation;
deposition, or erosion which
may modify the channel of a
river or stream or the bed of
.the ocean 'or any bay, inlet
or lake?
,Explanation:
(b) Construction of Building.
(c) Add landscaping Areas.
(f)
Air. Will the proposal result in:.
(a) Air emissions or deterioration x
of ambient air quality? x
(b) The creation of objectionable
odors? -
(c) Alteration of air movement,
moisture or temperature, or
in any change in climate,
either locally or regionally? x
• Explanation:
Water. Will the p oposal result in:
(a) Changes in currents, or the
course or direction of water
movements, in either marine
or fresh waters?
(b) Changes in absorption rates,
drainage patterns, or the
amount of surface water 'run-
off?
(c) Alterations to the course or
flow of flood waters?
(d) Change in the amount of surface
water in any watercourse?
(e) Discharge into surface waters,
or in any. alteration of sur-
face.water quality, including
temperature or turbidity?
) Alteration of the direction or
rate of flow of ground . waters?
Change in the quantity of
ground waters, either through
d.i rect additions or withdrawals,
or through interception of an
acquifer by cuts or excavations?
(h) Deterioration in ground water
quality, either through direct
injection, or through the seep -
age of leachate, phosphates,
detergents, waterborne virus
or bacteria, or other substances
into the ground waters?
CO Reduction in the amount of water
otherwise available for public
water. supplies?
(g)
Explanation:
Yes Maybe No
x
x
x
x
x
•
Flora. Will the proposal result in:
(a) Change in the diversity of species,
or numbers of any species of flora
(including trees, shrubs, grass,
crops, micro -flora and aquatic
plants)?
(b) Reduction of the numbers of any
unique, rare or endangered species
of flora?
(c) Introduction of new species of
flora into an area, or in a bar-
rier to the normal replenishment of
existing species?
. Explanation:
(c) Improve area by the addition of
trees, shrubs, etc.
Fauna.. the proposal result in:.
(a) Changes in the diversity of species,
or numbers of any species of fauna
(birds, land animals including rep
tiles, fish and shellfish, benthic
organisms, insects, or micro - fauna)?
(b) Reduction of the numbers of any
unique, rare or endangered species
of fauna?
(c) Introduction of new species of fauna
into an area, or result in a barrier
to the migration or movement of fauna?
(d) Deterioration to existing wildlife
habitat?
Explanation:
Noise.- Will the proposal increase exist
ing noise levels?
Explanation:
• Yes Maybe No
x
x
x
Light and Glare. Will the proposal produce
new light or glare?
Explanation::
Addition of parking lot lighting and
store front, sign, lighting, etc.
Land Use. Will. the proposal result in the
alteration of the present or planned land.
use of an area?
Explanation:
Natural Resources. Will the proposal re-
sult in:
Yes Maybe
x
(a) Increase in the rate of use of any
natural resource? x
(b) Depletion of any nonrenewable nat-
ural resource?
Explanation:..
(a) Water for normal toilet facilities.
Risk of Upset.: Does the proposal involve
a risk of an explosion or the release of
hazardous substances (including, but not
limited to, oil, pesticides, chemicals or
radiation) in the event of an accident or
upset conditions?
Explanation:
Population. Will the proposal alter the
location, distribution, density, or growth
rate of the human population of an area? .
Explanation:
•
Housin . Will the proposal affect existing
housing availability, or create a demand for
additional housing?
Explanation:
Transportation /Circulation. Will the pro-
posal result in:
(a) Generation of additional vehicular
movement?
(b) Effects on existing parking facilities,
or demand for new parking?
•
(c) Impact upon existing transportation
systems?
(d) Alterations to present patterns of
circulation or movement of people
and /or goods?
(e) Alterations to waterborne or air
traffic?
Explanation:
(a) Furniture Stores very IQw traffic
volume.
. (b) New parking lot..
Local Services. Will the proposal have an
effect upon, or result in a need for new
services in any of the following areas:
(a) Fire protection?
(b) Police protection?
(c) Schools?
(d) Parks?
(e) Maintenance of public facilities,
including roads?
(f)
Other' governmental services?
Explanation:
Yes Maybe
x
x
x
x
x
'x
.. ;
•
Energy. Will the proposal result in:
(a) Use of substantial amounts of fuel or
energy?
(b) Demand upon existing sources of energy,
or require the development of new
sources of energy?
Explanation:
Utilities. Will the proposal result in a need
for new systems, or alterations to the follow-
ing utilities:
(a) Power or natural gas?
(b) Communications systems?
(c) Water?
(d) Sewer or septic tanks?
(e) Storm water drainage?
(f) • Solid waste and disposal?
Explanation;
Human Health. Will the proposal result in the
creation of any health hazard or potential .
health hazard (excluding mental health)?
Explanation:
Aesthetics. Will the proposal result in the
obstruction of any scenic vista or view open
to the public, or will the proposal result
in the creation of an aesthetically offensive
site open to public view?
Explanation:,
• Yes Maybe No
x
x
x.
x
Recreation. Will the proposal result in an
impact upon the quality or quantity of ex-
isting recreational opportunities?
Explanation:
Archeological /Historical. Will the proposal
result in an alteration of a significant
archeological or historical site?
Explanation:
Revenue. Will the proposal cause a signifi-
cant.increase in city revenues?
Explanation:
Employment. Will the proposal create a
significant amount of new jobs?
Explanation:
Employ local people in store and delivery
of merchandise to and from area.
Yes Maybe' No
x
x
x