Loading...
HomeMy WebLinkAboutSEPA EPIC-FD-25 - SKARBO PETER - SKARBO REZONESKARBO REZONE R -1 TO C -2 SOUTHCENTER PY EPIGFD -25 CITY OF TUKWILA OFFICE OF COMMUNITY DEVELOPMENT flttft-Pt/F F I N A L DECLARATIOil OF 6 f1-OAf eE /NON- SIGNIFICA SCE Description of proposal Skarbo Rezone R -1 to C -2 Proponent Peter Skarbo Location of Proposal. Southcenter Parkway adjacent to Puget Power Substation Lead Agency City of Tukwila File No. EPIC -FD -25 This proposal has been determined to (- o►e /not have) a significant adverse im- pact upon the environment. An EIS ( /is not) required under RCW 43.21C.030(2) (c). This decision was made after review by the lead agency of a completed environmental checklist and other information on file with the lead agency. Responsible Official Kjell Stoknes Position /Title OCD Director Date 9 August 1977 Signature COMMENTS: Subject to approval of a landscape plan and garbage recepticle location'by the Responsible Official. CITY OF TUKWILA ENVIRONMENTAL CHECKLIST FORM This questionnaire must be completed and submitted with the application for permit. This questionnaire mist he completed by all persons applying fora permit from the City of Tukwila, unless it is determined by the Responsible . Official that the permit is exempt or unless the applicant and Responsible Official previously agree an Environmental Impact Statement needs to be completed. A fee of $50.00 must accompany the filling of the Environmental Questionnaire to cover costs of the threshold determination. I. BACKGROUND 1. Name of Proponent: ___Mr: __Peter Skarbo 2. Address and Phone Number of Proponent: 1420- Second Avenue Seattle, Washington 98101 Phone: MA 2 -0673 3. Date Checklist Submitted: 1 .1ui 1427 4. Agency Requiring Checklist: City Qf Tukwila Skarbo Scandinavian Furniture 5. Name of Proposal, if applicable :ImaQLt Building 6. Nature and Brief Description of the Proposal (including but not limited to its size, general design elements, and other factors that will give an accurate understanding of its scope and nature): Construct furniture. sales and warehouse building, with associated. off -, street parking and loading_ facilities. N130 re 0o G -Z S- 57:0I 7. Location of Proposal (describe the physical setting of the proposal, as well as the extent of the land area affected by any environmental im- pacts, including any other information needed to give an accurate under- standing of the environmental setting of the proposal): Adjacent_to and north of Puget Power substation on west side of Southcenter Parkway. 8. Estimated Date for Completion of the Proposal : January, 1978 9. Li st of all Permits, Licenses or Government Approvals Proposal (federal, state and local): (a) Rezone, onditional use, shoreline permit, etc. (b) King County Hydraulics Permit (c) Building permit Required forb the YES X NO x YES NO X YES_ x NO (d) Puget Sound Air Pollution Control Permit (e) Sewer hook up permit (f) Sign permit (g) Water hook up permit (h) Storm water system permit (i) Curb cut permit (j) Electrical permit (State of Washington) (k) Plumbing permit (King County) (1) Other: None to our knowledge YES NO x YES X NO YES x NO YES x NO YES x NO YES x NO YES x NO YES x NO 10. Do you have any plans for future additions, expansion, or futher activity related to or connected with this proposal? If yes, explain: No 11. Do you know of any plans by others which may affect the property covered by your proposal? If yes, explain: No 12. Attach any other application form that has been completed regarding the pro- posal; if none has been completed, but is expected to be filed at some future date, describe the nature of such application form: Not Applicable II. ENVIRONMENTAL IMPACTS (Explanations of all "yes" and "maybe" answers are required) YES MAYBE NO 1. Earth. Will the proposal result in: (a) Unstable earth conditions or in changes in geologic substructures? x (b) Disruptions, displacements, compaction or'overcover- ing of the soil? x x (c) Change in topography or ground surface relief fea- tures? x (d) The destruction, covering or modification of any unique geologic or physical features? -2- x. ■ • • YES MAYBE NO (e) Any increase in wind or water erosion of soils, either on or off the site? x (f) Changes in deposition or erosion of beach sands, or changes in siltation, deposition or erosion which may modify the channel of a river or stream or the bed of the ocean or any bay, inlet or lake? x Explanation: 1(b) :Building will displace soils for excavation. Some soils may be removed from site. Some soils may be compacted under slabs, parking pavements. 1(c) :There will be minor alterations of existing topography; but, in general existing contours will remain at or near present positions. 2. Air. Will the proposal result in: (a) Air emissions or deterioration of ambient air quality? (b) The creation of objectionable odors? (c) Alteration of air movement, moisture or temperature, or any change in climate, either locally or regionally? Explanation: 3. Water. Will the proposal result in: (a) Changes in currents, or the course or direction of water movements, in either marine or fresh waters? (b) Changes in absorption rates, drainage patterns, or the rate and amount of surface water runoff? x (c) Alterations to the course or flow of flood waters? x (d) Change in the amount of surface water in any water body? x (e) Discharge into surface waters, or in any alteration of surface water quality, including but not limited to temperature, dissolved oxygen or turbidity? x (f) Alteration of the direction or rate of flow of ground waters? (g) Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations? -3- x YES MAYBE NO (h) Deterioration in ground water quality, either through direct injection, or through the seepage of leachate, phosphates, detergents, waterborne virus or bacteria, or other substances into the ground waters? x (i) Reduction in the amount of water otherwise avail- able for public water supplies? x Explanation: 3(b): Site will be in large part covered by roof and impervious paving. Water falling thereon will be collected and carried in closed pipe to municipal storm sewer system. 4. Flora. Will,the proposal result in: (a) Change in the diversity of species, or numbers of any species of flora (including trees, shrubs, grass, crops, microflora and aquatic plants)? (b) Reduction of the numbers of any unique, rare or endangered species of flora? (c) Introduction of new species of flora into an area, or in a barrier to the normal replenishment of existing species? J (d) Reduction in acreage of any agricultural crop? x Explanation: 4(a): Existing flora over majority of site will be removed. They consist in assorted common grasses, weeds. Most existing trees at west edge of site (adjoining 1-5 Right -of -way) will remain. 5 Fauna. Will the proposal result in: (a) Changes in the diversity of species, or numbers of any species of fauna (birds, land animals including reptiles, fish and shellfish, benthic organisms, insects or microfauna)? x (b) Reduction of the numbers of any unique, rare or endangered species of fauna? x (c) Introduction of new species of fauna into an area, or result in a barrier to the migration or movement of fauna? x (d) Deterioration to existing fish or wildlife habitat? x Explanation: • • YES MAYBE NO 6. Noise. Will the proposal increase existing noise levels? x Explanation: 7. Light and Glare. Will the proposal produce new light or glare? x Explanation: Project will operate in evenings. Thus, building and parking areas will be illuminated. Further, project sign(s) will be illuminated after dark. 8. Land Use. Will the proposal result in the altera- tion of the present or planned land use of an area? x Explanation: Land is currently vacant. Proposal is for a use consistent with planned land use to our knowledge. 9. Natural Resources. Will the proposal result in: (a) Increase in the rate of use of any natural resources? (b) Depletion of any nonrenewable natural resource? Explanation: 10. Risk of Upset. Does the proposal involve a risk of an explosion or the release of hazardous substances (including, but not limited to, oil, pesticides, chemicals or radi- ation) in the event of an accident or upset conditions? Explanation: 1 x 11. Population. Explanation: • • Will the proposal alter the location, distribution, density, or growth rate of the human population of, an area? 12. Housing. Will the proposal affect existing housing, or create a demand for additional housing? Explanation: 13. Transportation /Circulation. Will the proposal result in: (a) Generation of additional vehicular movement? (b) Effects on existing parking facilities, or demand for new parking? (c) Impact upon existing transportation systems? (d) Alterations to present patterns of circulation or movement of people and /or goods? (e) Alterations to waterborne, rail or air traffic? (f) Increase in traffic hazards to motor vehicles, bicyclists or pedestrians? YES, MAYBE NO x Explanation: 13(a): Project will have off - street parking capacity of about 38 cars. The Owner feels this is an ample capacity for their needs. 14. Public Services. Will the proposal have an effect upon, or result in a need for new or altered governmental services in any of the following areas: (a) Fire protection? (b) Police protection? (c) Schools? (d) Parks or other recreational facilities? (e) Maintenance of public facilities, including roads? x x • • (f) Other governmental services? Explanation: 15. Energy. Will the proposal result in: (a) Use of substantial amounts of fuel or energy? (b) Demand upon existing sources of energy, or require the development of new sources of energy? Explanation: YES MAYBE NO x x x 16. Utilities. Will the proposal result in a need for new systems, or alterations to the following utilities: (a) Power or natural gas? x (b) Communications systems? (c) Water? x (d) Sewer or septic tanks? x (e) Storm water drainage? x (f) Solid waste and disposal? x Explanation: 17. Human Health. Will the proposal result in the crea- tion of any health hazard or potential health hazard (excluding mental health)? Explanation: x • • 18. Aesthetics. Will the proposal result in the obstruc- tion of any scenic vista or view open to the public, or will the proposal result in the creation of an aesthetically of- fensive site open to public view? Explanation: 19. Recreation. Will the proposal result in an impact upon the quality or quantity of exist- ing recreational opportunities? Explanation: 20. Archeological /Histroical. Will the proposal result in an alteration of a signifi- cant archeological or his- torical site, structure, object or building? Explanation: CERTIFICATION BY APPLICANT: YES MAYBE NO I, the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaration of non- significance that it might issue in reliance upon this checklist should there be any willful misrepresentation o _:illf 1 lack of full disclosure on my part. John Mahlum AIA, Architect 1 July 1977 Signature and Title Date x x x RECEP Date y 19 (;73 Received From ateAt„, ÷ `111411,,,, v� Address rs $ For ACCOUNT HOW PAID AMT.' OF ACCOUNT, 8KB08 R6tvi m AMT.,.PAID BALANCE: CASH, CHECK'. MONEY ORDER • • By • CITY OiFillraVill BUILDING DEM-14E11T 6230 Southcenter Blvd. Tukwila, Washington 98067 Phone: (206) 242 -2177 OCATION OF WORK / NUMBER & STREET Adjacent to and north of Puget Power substation on west side of Southcenter Parkway .OT S E BLOCK E A T T SUBDIVISION ACHED L E G A L D E S C R I P T I O N >WNER Mr. Peter Skarbo 1DDRESS1420 - Second Avenue, Seattle, Washington 98199 PHONE MA 2 -0673 TAME OF BUILDER Not yet selected. STATE LICENSE NO. NA SALES TAX NO. NA ■DDRESS NA PHONE NA- • I` �C'EIVE® Q17/ 00 TUKWILA ¶ 1i 7 ► BUILDING DEPT. _. ESTIMATED VALUE OF COMPLETED WORK $ APPLICATION PERMIT FEE $ FOR PLAN CHECK FEE $ BUILDING PERMIT LATE PERMIT FEE $ TOTAL FEE $ TYPE OF CONST. OCCUPANCY GROUP DATE TODAY FIRE ZONE USE ZONE FIRE SPRINKLERS REQUIRED MAX. OCC. LOAD DYes III No )ESCRIPTION OF WORK: Grade and fill per attached plan. NAMF OF TENANT! Skarbo Scandinavian Furniture Imports NATURE OF BUSINESS : Retail furniture sales THIS PERMIT DOES NOT AUTHORIZE ANY WORK IN PUBLIC RIGHT -OF -WAY OR ON UTILITY EASEMENTS. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING, VENTILATING OR AIR CONDITIONING. HEREBY CERTIFY THAT NO WORK IS TO BE DONE EXCEPT AS DESCRIBED ABOVE AND IN APPROVED PLANS AND SPECIFICATIONS AND THAT ALL WORK IS TO CONFORM TO TUKWILA CODES AND ORDINANCES. APPLIC • ,ili Mr. Peter Skarbo BY John Mahlum AIA, Architect Malilum & Mahlum Architects r--,L; Fri f r-,= • JUL 5 1977 • ' Mahlum, Mahlum & Nordfors hitects 2114 Thorndyke West SEATTLE, WASHINGTON 98199 TO (206) 283 -4151 7l1Kt&IA GENTLEMEN: LETT. OF U QIRIS 1 DT1QEL DATE ,JL /Y fc77l /v/ JOB NO. ATTENTION 5- RE: R/7�s/�ij✓ &m/;e 8/,,c�i /' Gil /par/r ViAt i QJ� Cd S gJavirirroa (Iwo M77 /+3a7 ,B' /W /4& 2 ' uif PPMMs /1€k'7Io/VS 2c �'7701./S Z WE ARE SENDING YOU X Attached ❑ Under separate cover via the following items: ❑ Shop drawings X Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION 2 7.S•77 /+3a7 ,B' /W /4& 2 ' uif PPMMs /1€k'7Io/VS 2c �'7701./S Z WaVor /(14P' 51-10601( flea/ T LL2-770/1/ c .1% c /fo/7oiv 2 � g1,00 / "-47 O" ceAce / APPriC47og , B04.0lw6 / Affr (6w6 oar) THESE ARE TRANSMITTED as checked below: XFor approval ❑ Approved as submitted ❑ For your use ❑ Approved as noted ❑ As requested ❑ Returned for corrections REMARKS ❑ For review and comment ❑ ❑ FOR BIDS DUE ❑ Resubmit ❑ Submit ❑ Return copies for approval copies for distribution corrected prints 19 ❑ PRINTS RETURNED AFTER LOAN TO US r 469 i ui' - C 2W-ie /s/- f COPY TO E2e, ' off A D 4 0 Eire FORM 240 -2 - Available from [ )Townsend, Mass. 01469 SIGNED: If enclosures are not as noted, kindly notify us at once. a.o.or )IN CAJt•T o. Moot we'ry C--721 n ' ------ raelomacco ONINW zaw,a, c4 ;;;"----1 . I ,/ • kl Oki,,,,, so - I ''...tbitat 14 • C our,' C/1.0.• I 00 n ' , L . •-44---------, • ,, . If i!"'.--. .1' r ll, i OOP. a■ 3 laa-pinnarr:• • Una.. a a •0 S17.1. I \ NON ACC ■11...01, CO • f" I —Pe OW , •413.. I 113.5.+13.3 7 I 53,00.30,. • S.t31 • TUKWI LA INDUSTRIAL COUNC I L VICINITY MAP TUKWI L A, WASHINGTON 575 0109 SC4ce LEGAL ..ESCR/PT/DN ''hit portion of the northwest quarter .of Section 26, Township 23 North, • kange 4 East, 4. described as follows: ieginning at the southwest corner of said subdivision; thence South 89'21'31" East along south line thereof 1961.64 feet to the west margin of 57th Avenue South (iess Brothers Road) thence North 0009'22" 'Jest along said v:ent margin 250.00 feet; thence North 8921'31" :qest 6.00 feet to the west margin of 57th Avenue South,. as widened hy deed from Southcenter corporation to City of Tukwila and the true point of beginning; thence continuing North q9°21.31- Jest 217.50 feet to the easterly margin of Primary Stare :ighway No. 1 as condemned in United States District court Cause No. 6010; thence North 45°04'23" East 77.10 feat along said easterly margin to an angle point therein; thence North 12-4641" ;ast, along said easterly marnin 106.52 feetto an angle point therein;,45.- thence North 23"31'3C" AMC along said easterly margin 129.77 feet to an angle point therein; thence northerly along said easterly margin along a curve to the left, the center of which bears North 7B43'19" ;Jest aktilifinitaMiii, having a radius of 6029.59 feet an arc distance of.631.42 feet; thence South 84'43'19— East, along said easterly margin 30.00 feet to an angle Point therein.: thence North 04°19'17• East, Along said easterly margin 265.00 feet to an angle Point therein; thence North 45°4247" 'ast, along 5aid easterly margin 83.51 feet to the westerly margin of 57th Avenue South, as conveyed to the City of hy deed recorded under Auditor's File No. 573981, records of • King County, Washington; thence South 00'23'45" East, along said westerly marnin 234.43 feet; thence South 0034'46" Nast, along said westerly margin as widened 840.79 feet; Vi thence South 00"09,22"imw , along said westerly margin 150.00 feet to the true point of beginning. Situate in the City of Tukwila, County of King, State of olashington. T0PD6RAPMC RAP 4P1/1A/ ,4. /1/49PSON SOW-I/CENTER 1944PA14/4Y PAW-AV)/ AT STA9.44(01; FILE 76304 DAT LAY1Y27, /976 SCALE .1- 449' DWN A! C. 9rfL2 qgcLZ 97 / .1 C9 'LI 9 17 • - 90 •95.? 7 ----- 1.„ (20 -,95/ 44.,03' , 60 .00/1/ - - 7/1, 1'7 19- . - s6\1-: 9(7:1-71,,Z. L2T.•/‘?-41"2-1°..3-12/1 (1(-Ict, • -„L ?, ; - - OVA* e ...c-i • _ _ _—.—/-- -57 -i- Aro; ,, ,- • -00 '00/ --r. :-.5-- , , _ _ _ 00 • G_S--- sr's? ..g *Se - • - - iv •Fr''' 0 \ • 6 CO • 07 / fr 9 17 • 50-7 \ 8 07 • 1'6? . L 67 e n 5 0* ' ,S1. N-- , • 9,, , 5-2- 4 ,..., 21- — — • •6 6 'or z ° % • 4c‘CS q. (Cc ' I L 97 o, N-0 • ■., C - 0 LZ :. ‘,,.. N r • OF en s ,••• • / ' \Z:zt \"L ssz i."442/4/ 7.2Z 0 Z C:0 ' k- • 947 1'97 e1 1•\ 43- -i,---of-- ..,, Q4Z QgZ '6? 57£ ovr Z • £ Z 00,940_7 •40 0°. 204• 11'0" '�1VH ELEVATION