HomeMy WebLinkAboutSEPA EPIC-FD-81 - TRAMMELL CROW COMPANY - INDUSTRIAL PARK WAREHOUSE (4 BUILDINGS)TRAMMELL CROW
WAREHOUSE PARK
EPIC -FD -81
CITY OF TUKWILA
OFFICE OF COMMUNITY DEVELOPMENT
11111111111110/FINAL
DECLARATIOiJ OF /iNON— SIGidIFICAidCE
/1,
Description of proposal Warehouse Industrial Park /4 buildings
Proponent
Trammell Crow, Company
ole7'6.Tk214L
Location of Proposal
Lead Agency
42nd Avenue South /Duwamish River
Citjr .of Tukwila
File No EPIC -FD -81
This proposal has been determined to (I /not have) a significant adverse im-
pact upon the environment. An EIS (II/is not) required under RCW 43.21C.030(2)
(c). This decision was made after review by the lead agency of a completed
environmental checklist and other information on file with the lead agency.
Responsible Official Kjell Stoknes
Position /Title Director, Office of Community Development
Date
14 March 1979.
COMMENTS:
Signature
This Declaration of Non - Significance is conditioned on the applicant reaching
an approved gauranteed access agreement with the Public Works Department.
JOB NO.
DATE
TO
78345
March 21, 1979
•
City of Tukwila
Office of Community Development
Attn: Roger Blaylock
6230 South Center Blvd
Tukwila, WA 98188
SUBJECT Trammell Crow Whse Park
MACKENZIE ENGINEERING INCORPORATED
2850 N.W. 31ST AVENUE
PORTLAND, OREGON 97210
PHONE 503/224 -9560
TRANSMITTED HEREWITH:
PRINTS
SHOP DWGS
SEPIAS
OTHER
BY
(3) sets (Site plan., Elevation, Riverbank
Profiles only)
(1) set sheets ..1 & 2 (red- marked)
PER YOUR REQUEST
xx FOR YOUR USE
FOR YOUR APPROVAL
FOR YOUR REVIEW AND COMMENT
uu
0.C.D.
CITY OF TUIULA
NAR 2 3 1979
Reg McDonald /as
Mail
JOB N0.' 78345
DATE
TO
January 4, 1978
Roger Blaylock
City of Tukwila
6230 Southcenter Blvd.
Tukwila, WA 98188
SUBJECT Trammell Crow Warehouse - Tukwila
TRANSMITTED HEREWITH:
PRINTS
SHOP DWGS
SEPIAS
OTHER Check for $50.00
BY
MAIINZIE ENGINEERING INCORPORATED
2850 N.W. 31ST AVENUE
PORTLAND, OREGON 97210
PHONE 503/224 -9560
xxx
PER YOUR REQUEST
FOR YOUR USE
FOR YOUR APPROVAL
FOR YOUR REVIEW AND COMMENT
O.C.D.
CITY OF TUKWILA
'JAN 8 1979
Lynn TakeUrhi /as
Mail
•
SHORELINE MANAGEMENT SUBSTANTIAL DEVELOPMENT PERMIT
Real Property owners within 300 feet.
1. Iwao Hirano
4603 S. 125th Street
Seattle, Wa 98178
2. Stephen Pearce, MMD
605 S.W. Ambaum Blvd.
Seattle, Wa 98166
3. A. Codiga
12529 S. 50th St.
Seattle, Wa 98168
4. Pargas of Seattle, Inc.
12642 Interurban Ave. S.
° Seattle, Wa 98168
5. Seattle City Light
1015 - 3rd Avenue
Seattle, Wa 98101
6. King County
7. City of Tukwila
8. State of Washington
CITY OF TUKWILA
:ENVIRONMENTAL CHECKLIST FORM
•
This questionnaire must be completed and submitted with the application for
permit. This questionnaire must be completed by all persons applying for a
permit from the City of Tukwila, unless it is determined by the Responsible
Official that the permit is exempt or unless the applicant and Responsible
Official previously agree an Environmental Impact Statement needs to be completed.
A fee of $50.00 must accompany the filling of the Environmental Questionnaire
to cover costs of the threshold determination.
BACKGROUND
1. Name of Proponent:
Mackenzie Engineering /Lynn Takeuchi, Project Architect
2. Address and Phone Number of Proponent: 2850 N.W. 31st
Portland, Oregon 97210 (503) 224 -9560
3. Date Checklist Submitted:.
12/22/78
City /Tukwila Planning Department
4. Agency Requiring Checklist:
5. Name of Proposal, if applicable: Trammell Crow, Tukwila
6. Nature and Brief Description of the Proposal (including but not limited
to its size, general design elements, and other factors that will give
an accurate understanding of its scope and nature):
(4) one story buildings ranging from 27,500 ;sq. ft. to 72,000.
sq. ft. to be used for storage and office space on a 10 acre site.
•
7. Location of- Proposal (describe the physical setting of the proposal, as
well as the extent of the land a. .. :a affected by any environmental:im -
pacts, including any other infor; :ion needed to give an accurate under -
standing of the environmental se ing of the proposal):
A relatively flat site bounded by the Duwamish River to the
north and 42nd Ave. and Interurban Ave. to the west.
8. Estimated Date for Completion of the Proposal: Fall 1979
9. List of all Permits, Licenses or Government Approvals Required for the
Proposal (federal, state and local):
(a) Rezone, conditional use, shoreline permit, etc. YESX NO
(b) King County Hydraulics Permit YESX NO
(c) Building permit YESX NO
• •
(d) Puget Sound Air Pollution Control Permit YES NOX _
(e) Sewer hook up permit YES X NO
(f) Sign permit YES X NO
(g) Water hook up permit YES x NO
(h) Storm water system permit YES X NO
(i) Curb cut permit YES X NO
(j) Electrical permit (State of Washington) YES X NO
(k) Plumbing permit (King County) YESx NO
(1) Other: Shoreline Management Substantial Development
permit
10. Do you have any plans for future additions, expansion, or futher activity
related to or connected with this proposal? If yes, explain:
No
11: Do you know of any plans by others which may affect the property covered by
your proposal? If yes, explain:
No
12. Attach any other application fc:ri that has been completed regarding the pro-
posal; if none has been completed, but is expected to be filed at some future
date, describe the nature of such application form:
N.A.
II. ENVIRONMENTAL IMPACTS.
(Explanations of all "yes" and "maybe" answers are required)
1. Earth. Will the proposal result in:
(a) Unstable earth conditions or in changes in geologic
substructures?
(b) Disruptions, displacements, compaction or overcover-
ing of the soil? Minimal, for construction
of buildings.
(c) Change in topography or ground surface relief fea-
tures? Minimal, for surface drainage
of storm water around building.
(d) The destruction, covering or modification of any
unique geologic or physical features?
YES MAYBE NO
X
X
X
• • • •
(e) Any increase in wind or water erosion of soils,
either on or off the site?
(f)
Changes in deposition or erosion of beach sands, or
changes in siltation, deposition or erosion which
may modify the channel of a river or stream or the
bed of the ocean or any bay, inlet or lake?
Explanation:
2. Air. Will the proposal result in:
(a) Air emissions or deterioration of ambient air
quality?
(b) The creation of objectionable odors?
(c) Alteration of air movement, moisture
or temperature, or any change in climate, either
locally or regionally?
Explanation:
3. Water: Will the proposal result in:.
(a) Changes in currents, or the course or direction
of water movements, in either marine or fresh
waters?
(b) Changes in absorption rates, drainage patterns,
or the rate and amount of surface water runoff? X T.
N; bl.dg!'s- &paving will increase surface water runoff
(c) Alterations to the course or flow of flood waters? —
(d) Change in the amount of surface water in any water
body? Due to new bldg's &c parking areas surface X
runoff will increase
(e) Discharge into surface waters, or in any alteration
of surface water quality, including but not limited
to temperature, dissolved oxygen or turbidity?
(f) Alteration of the direction or rate of flow of-
ground waters? Due. to storm sewer
(g) Change in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations? _
YES MAYBE NO
-3-
x
X
x
X
X
x
X
• • • •
YES MAYBE MO
(h) Deterioration in ground water quality, either
through direct injection, or through the seepage
of leachate, phosphates, detergents, waterborne
virus or bacteria, or other substances into the
ground waters? X
(i) Reduction in the amount of water otherwise avail -
able for public water supplies? X
Explanation:
4. Flora. Will the proposal result in:
(a) Change in the diversity of species, or numbers
of any species of flora (including trees, shrubs,
grass, crops, microflora and aquatic plants)? X
Present truck farm top soil & vegetation to be removed at bldg &paved areas.
(b) Reduction of the numbers of any unique, rare or
endangered species of flora? X
(c) Introduction of new species of flora into an area,
or in a barrier to the normal replenishment of
existing species?
(d) Reduction in acreage of any agricultural crop?
Explanation:
5. Fauna. Will the proposal result in:
(a) Changes in the diversity of species, or numbers
of any species of fauna (birds, land animals
including reptiles, fish and shellfish, benthic
organisms, insects or microfauna)?
(b) Reduction of the numbers of any unique, rare or
endangered species of fauna?
(c) Introduction of new species of fauna into an
area, or result in a barrier to the migration .
or movement of fauna?
(d) Deterioration to existing fish or wildlife
habitat?
Explanation:
X
X
X
X
• • •
6. Noise. Will the proposal increase existing noise
levels?
YES MIME NO
Explanation: New development provides space for offices
and storage, noise levels would be at a minimum.
7. Light and Glare. Will the proposal produce new
light or glare? X
Explanation: Day use buildings. Exterior security
lights will be installed.
8. Land Use. Will the proposal result in the altera-
tion of the present or planned land use
of an area?
Explanation:
9. Natural Resources. Will the proposal result in:
(a). Increase in the rate of use of any natural
resources?
(b) Depletion of any nonrenewable natural
resource?
Explanation:
10. Risk of Upset. Does the proposal involve a risk of an
explosion or the release of hazardous
substances (including, but not limited
to, oil, pesticides, chemicals or radi-
ation) in the event of an accident or
upset conditions?
Explanation: B -2 Occupancy
x
• . •
11. Population.
Explanation:
Will the proposal alter the location,
distribution, density, or growth rate
of the human population of an area?
•
12. Housing. Will the proposal affect existing housing,
or create a demand for additional housing?
Explanation:
13. Transportation /Circulation. Will the proposal result
(a) Generation of additional vehicular movement?
(b) Effects on existing parking facilities, or
demand for new parking?
(c) Impact upon existing transportation systems?
(d) Alterations to present patterns of circulation
or movement of people and /or goods?
(e) Alterations to waterborne, rail or air traffic?
(f) Increase in traffic hazards to motor vehicles,
bicyclists or pedestrians?
Explanation: Construction of turn lanes on
Interurban Avenue to provide access to site.
in:
14. Public Services. Will the proposal have an effect upon,
or result in a need for new or altered
governmental services in any of the
following areas:
Fire protection?
Police protection?
Schools?
Pa'rks or other recreational facilities?
Maintenance of public facilities, including
roads?
YES MAYBE NO
X
x
X
x
• • • •
YES MAYBE NO
(f) Other governmental services? X
Explanation:
15. Energy. Will the proposal result in:
(a) Use of substantial amounts of fuel or energy? x
(b) Demand upon existing sources of energy, or
require the development of new sources of
energy? x
Explanation: Heating and lighting of office space
and lighting of storage spaces.
16.. Utilities. Will the proposal result in a need for
new systems, or alterations to the
following utilities:
(a) Power or natural gas?
(b) Communications systems?
(c) Water? .
(d) Sewer or septic tanks?
(e) Storm water drainage
(f) Solid waste and disposal?
Explanation:.
17. Human Health. Will the proposal result in the crea-
tion of any health hazard or potential
health hazard (excluding mental health)?
Explanation:
X
X
X
x
X
X
• •
18. Aesthetics. Will the proposal result in the obstruc-
tion of any scenic vista or view open to
the public, or will the proposal result
in the creation of an aesthetically of-
fensive site open to public view?
Explanation:
19. Recreation. Will the proposal result in an impact
upon the quality or quantity of exist-
ing recreational opportunities?
Explanation:
20. Archeological /Histroical.. Will the proposal result in
an alteration of a signifi-
cant archeological or his -
torical site, structure,
object or building?
Explanation:
CERTIFICATION BY APPLICANT:
YES MBE i`O
I, the undersigned, state that to the best of my knowledge the above
information is true and complete. It is understood that the lead agency
may withdraw any declaration of non - significance that it might issue in
reliance upon this checklist should there be any willful misrepresentation
or willful lack of full disclosure on my part.
/2.22.7&
Signature and Title Date
x
x