HomeMy WebLinkAboutSEPA EPIC-ND-27 - CITY OF TUKWILA - CHRISTENSEN GREENBELTCHRISTENSEN GREENBELT
EPIGND -27
ENVIRONMENTAL ASSESSMENT.
CHRISTENSEN GREENBELT PROJECT
#EPIC -ND -27
OFFICIAL TITLE OF PROPOSED ACTION:
TYPE OF PROPOSED ACTION:
PROJECT SPONSOR:
CONTACT PERSON:
NATURE OF THIS REPORT:
A. DESCRIPTION OF THE ACTION.
Christensen Greenbelt. Froject..`
Linear Riverside Park Development
City of Tukwila
Fred N. Satterstrom .
Tukwila Planning Department
6230 Southcenter:$oulevard
Tukwila, WA 98188 (206) 244 -6290
Environmental Assessment
1. The Proposal: The proposed action is commonly known as the Christensen
Greenbelt Project, a narrow linear -type park stretching along the Green River
in Tukwila.
• Essentially_, the proposed project. includes the development of approximately
1.8 miles of existing public right -of -way and other city -owned lands for local..
and regional recreation. The project site is located along the west bank of
the. Green River between Interstate 405 and South 180th Street. Map,l shows
the location of the Christensen Greenbelt project. The site: is located
within walking distance of a majority of the resident, employee, and customer
population of the city..
The objective of the proposed action is to provide river access and linear -
type recreation of local and regional importance. Recreational activities
which will be provided by this project include safe, lawful, and convenient
river access for steelhead fishing,' canoeing and trails and facilities for
walking, cycling, jogging, and picnicking.
The proposed Christensen Greenbelt project is considered a vital link in the
regional trail system along the Green River. Futuristically, the Christensen
Greenbelt will connect with the existing Kent trail system to the south, the.
planned King County system to the north, and the soon- to -be- constructed Renton
system to the east.
2. Major Aspects of the Proposal: The Christensen Greenbelt project will
transform the existing Christensen dirt road into-an elongated recreational
and open space corridor. The greenbelt will extend from South 180th Street
northerly to Interstate 405, a distance of 1.8 miles. The greenbelt.'will be
created in a 3 -phase development program. Park development will consist of a
6 -foot wide pedestrian path, 8 -foot wide bike path, with parking lots..at var-
ious points for access to.the greenbelt. Lawn areas with:b'uilt -in irrigation •
systems will be established where riverbank conditions allow. Tree: plantings:
will grace the pathway along its entirety.
1
To Renton
MQO ❑ To =urien
CHRISTENSEN GREENGE - J� )�c ,
` UN V�1 ll PLan Ht HOM8 &° IRE SEA -TA i 1AIRPORT
TUMWILA PLAMNIM6'DEPAMTME/IT 1775
j
Q
S
0(
8
fAVINi TO BC DONE WITH OF 11fy4I1A AN 1976
WG9T VALLI, M — WAY
NOTFS
1. the FC%_LOWING D•AVONCTS '.JITOvJAPF'�:A1IY.Are r10R:Z:J.- :T7.L.
LG'J.`IONS ONLY
as
aS
U
O ND CAM ALLOWED
▪ I•MAY VEHICULAR TwrK
re / RANZ.
• PCNIC AREAS
A MINT 0'11.41-Meg'
NIDEX r-IAP
.10 FEET
ChM I6TENSEN RLY.2
TO . WON
C_
St.ITHAKEA .
PAK
FOSTER. GOLF
TOKF -NT
���` xstl�, +:Fj IiA'� i;rr�Nl'�1 `41i� �4 , th
�� �i� %1�.� ✓ % /�� . I tl .I_, �l Iw_� �, i r Diu r -/err
UI 1tF III= IIIHIII=
c(U AI =aq�11 =111
ice; 0-20' Mr.T
LAWN
° vJNYJPVS
VICINITY MAP
GN.97 DEr 'T 7 TO 11xwILA Keve5- Pti r_LE
BY PJ`-Er WFS1ERN TOK TC✓W LANE
PV6 -V,. PAKK f+JKPJE! W4LY
SKETCH
CHRISTENSEN GREENBELT
s. a a nRa BY.EARLtiwo2.9. DESIGN PLAN
L.WD F•INL
TJ C= -AI-
VLF_TE'.i AT,
A F-/IN,-T-
DAATL
rJ 9G Cgp1FLETF�IN
1977 WI r,. C. - A T-
W'NG ASSISrw -L
iD BE CPT CD IN 1976
WIT!I CRYOF ;•ACWµ.A FLnDS
TO BE COMPLETe711 Igl7 WIr-4 IAC.
GRA\T-IN-AI.% ASS,STAV..E.
WG9T VALLI, M — WAY
NOTFS
1. the FC%_LOWING D•AVONCTS '.JITOvJAPF'�:A1IY.Are r10R:Z:J.- :T7.L.
LG'J.`IONS ONLY
as
aS
U
O ND CAM ALLOWED
▪ I•MAY VEHICULAR TwrK
re / RANZ.
• PCNIC AREAS
A MINT 0'11.41-Meg'
NIDEX r-IAP
.10 FEET
ChM I6TENSEN RLY.2
TO . WON
C_
St.ITHAKEA .
PAK
FOSTER. GOLF
TOKF -NT
���` xstl�, +:Fj IiA'� i;rr�Nl'�1 `41i� �4 , th
�� �i� %1�.� ✓ % /�� . I tl .I_, �l Iw_� �, i r Diu r -/err
UI 1tF III= IIIHIII=
c(U AI =aq�11 =111
ice; 0-20' Mr.T
LAWN
° vJNYJPVS
VICINITY MAP
GN.97 DEr 'T 7 TO 11xwILA Keve5- Pti r_LE
BY PJ`-Er WFS1ERN TOK TC✓W LANE
PV6 -V,. PAKK f+JKPJE! W4LY
SKETCH
CHRISTENSEN GREENBELT
s. a a nRa BY.EARLtiwo2.9. DESIGN PLAN
L.WD F•INL
3. Land Use Plans, Permits, and Zoning Regulations: In 1962, John Graham $
Co. completed Tukwila's first Comprehensive Plan for Tukwila. In that Plan, all
lands contiguous to the 1.8 mile project site were designated for industrial use.
Since 1962, commercial and industrial developments in Andover Industrial Park
have sprung up along over 90% of Christensen Road. Only one undeveloped parcel
of land currently exists along Christensen Road.
The proposed greenbelt is consistent with the goals and policies of Tukwila's
Shoreline Master Program and conforms to the recently adopted Park Plan, in
which it is the number one priority project.
All lands on both sides of the Green River along the proposed Christensen Green-
belt are presently zoned for industrial purposes. Although zoned for industrial
use, the east side of the Green River has not yet reached the level of develop-
ment as that on the west side.
A shoreline substantial development permit is required before development of the
proposed greenbelt may begin. This permit is now being reviewed . by the Attorney
General's office and the Department of Ecology.
B. DESCRIPTION OF THE EXISTING ENVIRONMENT.
1. Natural Environment: The Christensen Greenbelt lies in a broad, very flat
alluvial floodplain formed over thousands of years by deposition of sediments from
the Green River. The site itself is located on the west bank of the river. River-
bank conditions vary along the 1.8 mile site from levee -like banks on the south
(25 -28 feet elevation) to flat, natural banks on the north (23 -26 feet elevation).
Flowing along the eastern edge of the proposed greenbelt is
average discharge of the Green at the site is approximately
maximum flood flows reach 9,000 to 12,000 cfs. Some minor,
of property has occurred in the past at the northern end of
subsequent to the construction of Howard Hanson Dam.
Vegetation on the site is found exclusively on that portion lying between Chris-
tensen Road and the river. Tree growth along the river is sparse but a few,
elongated stands of tall black cottonwood and broadleaf maples line segments of
the bank. Understory flora consists mostly of sedges, .fireweed, rushes, and
various grass species.
the Green River. The
1500 cfs. Typical
localized flooding
the project site
Wildlife on the site is confined to small mammals such as beaver, weasel, rabbit,
and possibly skunk, and numerous and diverse species of songbirds.
2. Human Environment: Current population of the City of Tukwila is 3370.;
1975 population for the Tukwila Planning Area is over 22,000. Approximately
50,000 persons come to the Tukwila area (particularly Southcenter) each day
to shop, and another 10,000 come to work in the 500+ commercial and industrial
enterprises. The proposed greenbelt lies within walking distance of much of
this resident - shopper - employee population.
An estimated 70,500 cars travel through Tukwila daily on Interstate 5. An
additional 53,000 cars daily pass through on Interstate 405. These two free-
ways intersect about i mile northwest of the subject site.
The subject site is currently publicly owned and is "open to the public ".
However, due in part to the extreme disrepair of the existing Christensen
Road and the lack of recreational and open space improvements, current
recreational use of the site is minimal. Most of this use is for steel -
head fishing and spontaneous activities; there is little, if any, trail or
bike use.
Land use in the vicinity is primarily urban interspersed with small, undeveloped
tracts. Over 90% of the land contiguous to the proposed greenbelt is industrially
developed; across the river from the project site present development is more sparse.
All the lands contiguous to the proposed greenbelt and across the river from
the site are planned for urban uses.
C. ENVIRONMENTAL IMPACT OF THE PROPOSED ACTION.
1. Impacts to the Natural Environment: The primary environmental impact of
the proposed action is the replacement of an existing dirt road with a 14 -foot
wide strip of asphalt. In order to accomplish this action, the dirt road will
need to be graded and disturbance to the soil and subsurface geology will be
inevitable, although negligible. It is expected that the impervious asphalt
surface will cause a slight increase in the rate of storm water runoff for that
area which it covers. This increase will only be slight due to the fact . that
the present dirt road (which consists of a gravel ballast with approximately.
50% clay) is nearly. impervious.
Landscaping of the proposed greenbelt is expected to have some initial, insigni-
ficant environmental impacts. Several areas of existing field grasses will be
disturbed or replaced with lawns, and erosion could occur during this disturbance.
2. Impacts to the Human Environment: The proposed action would limit the
recreational use of the project site by the motorist. Presently, the motorist
may drive the length of Christensen Road. As a result of the proposed greenbelt,
the motorist would be confined to designated parking lots and access points along
the river.
D. MITIGATING MEASURES INCLUDED IN THE PROPOSED ACTION.
As mentioned in Section C., the primary environmental impacts will be a slight
increase in the runoff rate for the asphalted area and soil erosion which may
occur during path construction and landscaping activities.
While a slight increase in the runoff rate is expected for the area covered by
the 14 -foot wide asphalt strip, the overall runoff rate for the project site is .
not expected to exceed that which presently exists. To explain, the present
width of Christensen Road is approximately 30-35 feet and is composed of a
nearly impervious gravel ballast of about 50% clay composition. This existing
surface will be replaced by only 14 feet of asphalt and the remainder of the .
right -of -way will be replaced with pervious soil material, trees, and grass.
Consequently, while the runoff rate for the asphalt portion will be slightly
increased, this increase may be offset by the reduction in the rate for the
remaining portion of the. right -of -way.
5
Erosion and dust can be controlled or reduced somewhat during the construction
process also. Planting sod instead of seed will decrease the amount of erosion
in areas where lawns are to be established. Watering or misting of the site
during construction of the road will reduce dust and particulates in the air.
E. UNAVOIDABLE ADVERSE ENVIRONMENTAL IMPACTS.
No unavoidable, adverse environmental impacts are expected as a result of the
proposed Christensen Greenbelt project.
F. RELATIONSHIP BETWEEN LOCAL SHORT -TERM ENVIRONMENTAL USES AND THE MAINTENANCE
AND ENHANCEMENT OF LONG -TERM PRODUCTIVITY.
In its present state, the subject area provides a small degree of wildlife
habitat and represents an open, undeveloped linear space along the Green River.
Development of the Christensen Greenbelt is not expected to diminish this
condition; rather, at least with respect to the site's open space nature, the
proposed action will actually improve its, aesthetic appeal.
The proposed site offers little, if any, opportunity for agricultural activities
and as such does not constitute a displacement of potential agricultural land
with nonagricultural use. Neither does the site afford any significant oppor-
tunity for commercial or industrial development, due primarily to its narrow,
elongated configuration and severe shoreline development restrictions.
Due to the inherent characteristics of the site — its size, width, location,
etc. -- the choice of suitable uses is limited. The proposed action
represents a suitable use of the site; one which will not degrade the existing
environmental conditions, and one which will continue to serve as an amenity
and recreational opportunity for generations to come.
G. IRREVERSIBLE AND IRRETRIEVABLE RESOURCE COMMITMENTS WITH THE PROPOSED ACTION.
The proposed action will result in the commitment of the subject site to
recreational and open space use, which, in turn, will commit financial recources,
construction materials, and labor to achieving such use. The commitment result-
ing from the proposed action will belong -term, probably 50 years or more. While
the commitment of finances, materials, and labor are irretrievable ones, the
commitment of the land itself is not. The Christensen Greenbelt, as proposed,
represents a flexible recreational development which leaves open future options
for new development :or re- development.
H. ALTERNATIVES TO THE PROPOSED ACTION.
1. No Action: This alternative would entail leaving the site as is, with
Christensen Road remaining a dirt, chuckhole road and the land between the
road and river unaffected.
The advantages to this alternative are ecological and financial. Left as is, .
the wildlife and vegetation currently using the site would be unaffected. Finan-
cially, the City and State would have additional monies to fund . other projects.
6
Difficulty of using the site in its present condition is the primary disadvan-
tage of this alternative. Poor road conditions currently inhibit auto and bike
traffic. Also, the site's untidy condition and its lack of focal points, par-
ticularly around entrances, detracts from its use and obscures its identity as
an open space.
2. Establish Greenbelt at Another Location: Since the proposed action is a
riverside greenbelt, the only other place this alternative could be established
is across the Green River from Christensen Road. Most of these riverside pro -
perties are currently in private ownership with some in public street rights -of-
way.
No anticipated advantages would accrue: as a result of this action.
The disadvantages in this alternative are locational and financial. Because
certain areas along the river are developed, the trail would have to cross
currently used industrial and commercial lands. It would also be extremely
difficult to wedge a trail or greenbelt between the Green River and the West
Valley Highway where the latter parallels the river to the south. Moreover,
this alternative would require gaining easements or title to land along the
river and would likely skyrocket the cost of the project.
I. CONSULTATION AND COORDINATION OF EFFORTS IN DEVELOPING THE PROPOSAL.
1. Internal Coordination: Within the City of Tukwila itself, there has
been much coordination of city departments and boards and commissions. Citizens
and the Park Board initially rated the proposed action a high priority in the
new Park Plan. In adopting the Park Plan, the City Planning Commission favora-
bly recommended the project to the City Council. In turn, the Council authorized
the expenditure of local funds for matching purposes.
2. .External Coordination and Consultation: The proposed project has been
coordinated closely with the King County Department of Hydraulics and U.S.
Army Corps of Engineers for the flood control aspects of the project.
J. REVIEW OF THE ASSESSMENT INFORMATION.
• In the spirit.of coordination and cooperation, this environmental assessment
• has been sent to the following agencies for their review and comments:
U.S. Army Corps of Engineers
U.S. Soil Conservation Service
State Department of Ecology
King County Parks Department
City of Kent
City of Renton
King County Public Works, Hydraulics Division
April 8, 1976
CITY OF TUKWILA
DECLARATION OF NON - SIGNIFICANCE
ON THE
CHRISTENSEN GREENBELT PROJECT
EPIC -ND -27
Pursuant to Chapter 18.98 of the Tukwila Municipal Code dealing with envir-
onmental requirements and the State Environmental Policy Act of 1971.
Proposed recreational project along the Green River in publicly -owned
right -of -way, commonly known as the Christensen Greenbelt.
CITY OF TUKWILA - APPLICANT
INTRODUCTION:
The following is a statement of declaration by the undersigned as the Respon-
sible Official pursuant to Chapter 18.98 of the Tukwila Municipal Code and the
Washington State Environmental Policy Act of 1971.
An Environmental Assessment has been completed on,the proposed project to
develop a linear greenbelt in existing public right -of -way along the Green
River, west side.
DECLARATION:
Based upon the environmental assessment submitted, the City of Tukwila Muni-
cipal Code Chapter 18.98 dealing with environmental policy, and the guidelines
issued by the Washington State Department of Ecology for the implementation of
the State Environmental Policy Act, I find that the proposed action will not
have a significant effect upon the environment and therefore an environmental
impact statement is not required.
-CITY OF TUKWILA
Stoknes, Planning Director
Date of Negative Declaration: April 28, 1976
AGENDA ITEM: IV A
-- PUBLIC HEARING - REZONE (Oldright)
Interurban qve. & Southcenter Blvd. J
CITY OF TUKWILA
ENVIRONMENTAL ASSESSMENT
#75 -13 -R
A. THE PROPOSED ACTION:
This environmental assessment has been prepared to report, the potential
impact of a proposed rezoning of certain property located near the inter-
section of Interurban Avenue and Renton -Three Tree Point Road from C -1
and R -4 to C -2, (SEE, Attachment A). The applicant has submitted a site
plan with the application showing plans for a restaurant - cocktail lounge
with 190 parking spaces, (SEE, Attachment B).
A negative declaration of environmental impact for this rezone request is
included with this assessment as Attachment G.
B. JUSTIFICATION:
The proposed rezone has been applied for in accordance with the require-
ments of the City'of Tukwila zoning ordinance, Title 18.
C. LOCATION:
The subject property is located on the west side of and adjacent to the
intersection of Interurban Avenue (S.R. 181) and Renton -Three Tree Point
Road. The legal description of the subject property is as follows:
"That portion of Tract 28, Interurban Addition to Seattle, according to
plat recorded in Volume 10 of Plats, page 55, in King County, Washington,
lying southwesterly of the River Street (Secondary State Highway No. 5 -M)
and westerly of the Renton-Three .Tree Point Road (Secondary State Highway
No. 1 -L.)
EXCEPT that portion lying between the westerly junction of said roads and
a line drawn parallel to the west line of said Tract 28, through a point
100 feet due west of the most easterly point in the westerly line of said
junction; and
EXCEPT Railroad right -of -way, if any;
AND EXCEPT that portion conveyed to State of Washington Auditor's File No.
5528323.
D. HISTORICAL BACKGROUND:
The best information available indicates that prior to•September 1971 the
subject property was zoned R -1, single family residential. On September 7, 1971,:
the eastern portion of the site was rezoned by Ordinance 1683 to C -1 (Neighbor=
hood Retail Business) and the western portion to R - -4 (Apartments), conditioned
upon a Concomitant Zoning Agreement with the City of Tukwila. According to
Ordinance #683, included herewith as Attachment D; this agreement was executed.
Although the application for rezoning in 1971 was for rezoning the eastern
portion of the site to C -1, and the subsequent official action of the City
through Ordinance #683 was to grant the rezoning of the eastern portion to
C -1, the zoning designation which erroneously found its way onto the city
zoning map was C -2. Thus, the eastern portion of the subject site is shown
to be C -2 on the city zoning map in Attachment C when in fact the actual
zoning is C -1. This mistake has been corrected on the vicinity map in
Attachment A.
E. PUBLIC PARTICIPATION:
Application for the rezoning from C -1 and R -4 to C -2 classification was
made with the Tukwila Planning Department on July 30, 1975._ A public
hearing before the Tukwila Planning Commission was advertised in the Renton
Record - Chronicle and scheduled for September 25, 1975. If the Planning
Commission's response is favorable to the rezone request, the rezone will
go before the Tukwila City Council.
F. RELATIONSHIP TO EXISTING LAWS, POLICIES, AND PLANS:
At the present time the subject property and the general vicinity of the
rezone is identified on the Tukwila Comprehensive Plan Map as multiple
family, (SEE, Attachment E). A multiple family designation logically
includes the R -2, R -3, R -4 and RMH zoning classifications, but the comprehensive
plan makes no reference as to the density of this multiple family development.
Though the subject property falls within 200 feet of the ordinary high water
mark of the Green River, the act of rezoning property does not require a
shoreline development permit. However, at such time that the subject property
,would be developed, a shoreline development permit would likely be required.
G. ACTION REMAINING FOR IMPLEMENTATION:
The rezone application must go before the Tukwila Planning Commission
at an advertised public hearing on September 25, 1975. If approved by
the Planning Commission,, the rezone request will go before the Tukwila
City Council for final disposition. If denied by the Commission, the
applicant may appeal the decision to the City Council.
H. EXISTING CONDITIONS:
1. Zoning and Land Use. The existing zoning on the subject property is R -4
and C -1. The R -4 zoned portion of property is located uphill from the C -1
portion. Allowed uses in the R -4 zone include apartments, offices, conval-
escent homes, clinics, and boarding and lodging homes. Allowed uses in
the C -1 zone include neighborhood retail businesses like banks, restaurants,
drug stores, grocery markets, meat, hardware, and jewelry stores, and other .
similar commercial uses which cater to the local community.
Zoning on the west side of the subject property is for residential and
public.use. Several parcels of multiple family zoning,•namely R -3, R -4
and RMH zoning, are located here and apartment buildings have been con-
structed on each of these multiple family zoned sites. The Tukwila City
Park, which consists of 6.5 acres of public tennis courts, picnic grounds,
and natural stands of tall fir trees, borders the subject property
for over 525 feet on the latter's west side. Also, a piece of R -1 .
property borders the subject property's south boundary. Four occupied
single family homes are located in this R -1 zone.
The eastern side of the subject property is bordered by roads,
namely the Renton -Three Tree Point Road and Interurban Avenue.
Beyond these roads to the east is the Green River. Zoning on
the eastern side of the Green River is entirely M -1, light industry.
2. Natural Conditions.
a. Geology. Geologically, the subject site is composed of
basaltic type rocks and sedimentary rocks (shale and
sandstone). According to the U.S. Geological Survey,
these types of rocks have good seismic, foundation, and
slope stabilities but may become unstable when modified.
b. Soils. According to the 1952 King County Soil Survey, the
soils on this site are classified as Cathcart soils. These
soils have formed over shale and sandstone and include some
glacial debris. Cathcart soils are subject to erosion,
especially when found on steep slopes. Vegetation on .the-
subject site helps to stabilize the soil and mitigate erosion.
c. Topography. Basically, the subject site is the. easternmost
part of a basaltic knoll which juts out into the Green River
Lowland. The gradient of slopes 'on the site ranges generally
between 25 and 40 percent. Several areas on the site reach
over 50 percent slope, and the northeastern facing•bluff is a
100 percent slope (or a 45 degree angle).
d. Drainage. There are no streams on the subject property.
Because of the. impermeable nature of the underlying geology-
basalt, shale, and sandstone — soils become readily saturated
during periods of peak rainfall and surface runoff is high.
Dense vegetation on the site serves to intercept a portion
of this rainfall and mitigate surface runoff.
e. Vegetation. The subject site is densely wooded with a
typical second - growth forest understory. Coniferous tree
species (evergreens) located on the site include grand
fir, Douglas fir, western hemlock, and red cedar. Deciduous
varieties include broadleaf maple, vine maple, red alder,
dogwood, and willow. Understory vegetation includes swordfern,
Oregongrape, salal, and numerous shrubs.
f. Wildlife. Bird and animal species which use or inhabit
the subject property are typical of those generally found
in the Tukwila area. Although no field studies have been
done, it is assumed that such birds as robins, sparrows,
crows, quail and possibly hawks use this area for nesting
or foraging. Small mammals like skunk, weasel, raccoon,
and rabbit are assumed to use this area also.
3. Circulation. Access to the subject property is possible .from two
streets, South 153rd Street and Renton -Three Tree Point Road (also
called Southcenter Boulevard). South 153rd Street, a 40' -wide
residential street, extends to within 100 feet of the subject property's
west boundary; the final 100 feet is in an .unimproved condition due
to the fact that the properties on both sides of the right -of -way
are undeveloped. The other point of access to the site is from
Southcenter Boulevard. Average daily traffic volumes on Southcenter
Boulevard, according to a TOPICS study completed.in 1973, is in
excess of 11,000 vehicles.
4. Utilities. A 12" water line extends along the west side of South -
center Boulevard and is sufficient to serve any proposed development
on the site. According to the Public Works Department, there is
sufficient pressure within this line to force water up the hillside
to future buildings.
Sanitary sewer service is not available adjacent to the subject prop-
erty. The nearest line is 145 feet south of the site, and the size of
this line is only 6 -inch, which would preclude any large -scale devel-
opment from connecting to it. A larger 8 -inch sewer line is located
an additional 30 -feet south of the 6 -inch line or about 175 feet from
the subject property.
I. ENVIRONMENTAL IMPACT OF THE PROPOSED LEGISLATION:
As mentioned, the subject site has two zoning classifications: R -4 and
C -1. The C-1 or commercial zoning occupies the "lower" portion of the
subject site while the R -4 or multiple family residential zoning occupies
the "upper" portion of the site. Allowed.uses in the R -4 or upper portion
of the subject site include apartments, parks, certain types of office
buildings and boarding and lodging houses. These types of uses are
characteristic of and compatible with the existing uses found in the
upland area adjacent to the subject site.
The proposed rezoning would classify the "upper" portion of the.subject
site as C -2, Local Retail Business. A C -2 classification allows such..
uses as auto and trailer sales, restaurants (with cocktail lounges),
drive -in restaurants, taverns, offices, gas stations, tire stores, in
addition to those uses allowed in the C -1 zone (e.g., bakeries, banks,
barber and beauty shops, clothing, drug, and hardware stores, restaurants
with no liquor facilities, and grocery markets). Based upon the existing
land use border.ing.the subject property on the Tukwila hill, it seems that
such 'commercial uses as those mentioned would be incongruous with the
nature or character of the surrounding area. In addition, access to the
"upper" portion of the subject property would he via South 153rd Street
which has a 40 -foot right -of -way. The minimum width of streets serving
commercial areas should be 60 -foot right -of -way, as stated in the municipal
code (17.08.010). If the "upper" portion of the subject site is developed
commercially,.it is expected that vehicular movements to and from the site
will have an adverse effect on South 153rd Street.
The most logical ingress- egress point to the subject property from South
center Boulevard is at the southeast corner of the site where the gradient
of the slope is least. However, the sight distance at this point is
restricted and the Public Works Department has expressed concern over the
practicality of ingress- egress at this point, (SEE, attached letter from
Tukwila Public Works Director, Attachment F).
The present natural condition of the subject site is a heavily wooded
hillside, geologically composed of basalt and sedimentary rocks with thin
overlying soils, which generally ranges between 25 and 40 percent slopes.
Commercial buildings which are allowed under C -2 zoning, along with their
associated parking and service areas, would require dramatic alterations to
the natural condition of.the property. Because of the steepness of the
slope, cuts would have to'be made for building sites, parking lots, and
access roads, effectively eliminating much of the natural vegetation which
presently serves to reduce erosion on the steep hillside.
J. ANY UNAVOIDABLE ADVERSE ENVIRONMENTAL EFFECTS:
Approval of C -2 zoning on the subject property with subsequent develop-
ment of a commercial establishment will result in the'removal of the
greater portion of the natural vegetation and reduce the wildlife habitat
to nil. Soil erosion on the steep hillside will be severe during the
construction phase. As a result of devegetation and construction of
roads, parking lots and buildings, increased storm water runoff will result.
An increase in auto traffic onto South 153rd Street and Southcenter Boulevard
will also occur, with potential traffic hazards due to restricted sight dis-
tance on Southcenter Boulevard and inadequate right -of -way on 153rd.
K. ALTERNATIVES TO THE PROPOSED ACTION:
Since the proposed action is one of rezoning the property to permit other
uses than its present zoning allows, there are only two alternatives: to
either grant or deny the rezone request. Granting the rezone request would
allow the'subject property to be used for commercial uses which would be
either local or regional in nature. Denying the rezone request would
restrict the use of the R -4 property to office or residential use, and. the
C -1 property to local retail business uses.
L. RELATIONSHIP BETWEEN LOCAL SHORT TERM ENVIRONMENTAL. USES AND THE MAINTENANCE
AND ENHANCEMENT OF LONG TERM PRODUCTIVITY:
The steep hillside on which the subject property is located is neither
a suitable nor a desireable environment for agriculture, nor are any
significant deposits of mineral resources known to be located on the site.
The proposed rezoning of the property, coupled with its subsequent
development; would constitute a long -term use of the land. As such, the
subject. property would generate revenue for the City of Tukwila, the South
Central School District No. 406, and other taxing entities. Development .
to C -2 use would allow residents of the City as well as others to obtain
commercial services from the subject site.
Tukwila Planning Department
August 22, 1975
HJI�
3NOZ3J JO 31IS
t
V IN3WHOVJJV
rri
LI
" •
Attachment C
RANGE 4 EAST
RANGE 5 EAST
CITY • OF TUKWILA
ZONING
LEGEND
R A.
R 17.2
111.12.0
R28.4
R.3
R.3.60
R.4
RMH
PF
C.1
C2
CPR
CM
M1
61-2
• "------,7;;;; - - -
C -PR
R-1-9.6
1/
747
RESIDENTIAL. AGRICULTURAL
1 FAMILY RESIDENCE
1 FAMILY RESIDENCE
1 FAMILY RESIDENCE
2 FAMILY RESIDENCE
3 FAMILY RESIDENCE
3 or4 FAMILY RESIDENCE
LOW APARTMENTS
MULL RESIDENCE HIGH DENS.
PUBLIC FACILITY
NEIGHBORHOOD RETAIL
LOCAL RETAIL
PLAN'D BUS. CENTER REGIONAL
INDUSTRIAL PARK
LIGHT INDUSTRY
HEAVY INDUSTRY
SOO 1000 'SOO 2000 1000 F1.
CITY,OF TUKWILA PLANNING DEPARTMENT MAY 1975 TUKWILA WASHINGTON-REVISIONSFR
•
WASHINGTON
ORDINANCE NO 4
llL
ATTACHMENT D
AN ORDINANCE rezoning certain property
within the City:; :•of Tukwila from R -1 to
R -4 and.0 -1.
WHEREAS, Frank and Joan Todd have petitioned to rezone
property within the City of Tukwila from R -1 to C -1, and
WHEREAS, the hearings required by law were held before
the Planning Commission and the City Council, and
WHEREAS, the Planning Commission and the City Council
recommended R -4 and C -1 zoning providing a concomitant zoning
agreement was executed to control the development of said property
for the health, safety and welfare of the residents of the City of
Tukwila and whereas said agreement has been executed.
NOW, THEREFORE, the City Council of the City of Tukwila
do ordain as follows:
•. Sec. 1. ,The property described on Exhibit "A" is
hereby rezoned from land classification R -1 to R -4 and C-1 as
indicated on the exhibit.
Sec. 2. This new zoning classification is expressly ..con-
ditioned on the full and complete performance by Todd of the Con-
comitant Zoning Agreement.
PASSED this 7th day of September, 1971..
ATTEST:
CITY CLERK
'APPROVED AS TO FORM:
• CITY ATTORNE
PUBLISHED RECORD CHRONICLE
'MAYOR
‘4,4 ILA ;y •
- l �I • /
r ..t ; _ i':l i • • �•
csh-5
EXIBIT "A"
FROM R-1 to R-4 the West 125 feet of Block 28, Interurban Addition
to Seattle
AND
FROM R-1 to C -1 Block 28, Interurban Addition to Seattle less the
West 125 feet.
1' .
TUKWILA -TODD CONCOMITANT ZONING AGREEMENT.
THIS .is a Concomitant Zoning Agreement executed this
day of ,.1971, between the City .of Tukwila, a municipal
.corporation of the Third Class within the State of Washington (herein-
after called .TUKWILA) and Frank Todd and Joan Todd; His Wife, (herein-
after referred to as TODD).
RECITALS:.
TODD is the owner in fee simple of.property within the City
of Tukwila, described in Exhibit "A" attached hereto, and by this
reference incorporated herein, and hereinafter referred to as "The
property "; land
WHEREAS, Todd has filed a Petition to Rezone the property
from Rl zoning designation to.R -4 and C -1 pursuant to the provisions
of the Tukwila. Municipal Code, and
The City Planning Commission pursuant to public hearing has
recommended to the City Council that the property be rezoned upon
the execution of a property use and development agreement, .and.
WHEREAS, the Tukwila City Council, after public hearing., has
recommended that.•. the property be zoned pursuant to certain'agre giants
relative to the property use and development of the property, and
The establishment of R -1 and C--i zoning on the property will
effect the flow of traffic in the vicinity; effect the storm drainage,
sanitary drainage, and other utilities :within the area and certain
'conditions are regu'ired to control the development of said property
-1-
for the health, safety and welfare of the residents of the City of
Tukwila,
•
NOW, THEREFORE, in the event the City Council of the City of
Tukwila reclassifies the property from R -1 to R-4 and C -1 as indicate
on the attached map marked Exhibit "B" and incorporated herein by ref
and in consideration of the City•Council changing the classi-
fica.tion'of the property to R -4 and C -1 and for so long as the prop-
erty remains so classified, TODD hereby covenants and agrees to the
following covenants and conditions on behalf of themselves and their
-successors and assigns:
_?. 1.'-That 67th Avenue South shall be improved to minimum City
.'h2Standards and there shall be a suitable public turn around near the
} •
0-corner of 67th Avenue South and .South 153rd. The standards
hall
s
'.be set forth in writing and attached to this agreement. The ques
tion of the suitability of the public turn around shall be in the
discretion-of the City Supervisor in consultation with the Fire ar_d
Police Depart_ment. - a -i'1. r/f t ! t CIV f 'r' c� L_
C
2. That sufficient service be provided for fire protection
with hydrants installed with mains as required by City. Standards
' which shall be located in an easement with loop connecting the prop-
erty from Southcenter Boulevard to South 153rd. This service shall
be in writing and in the discretion of the Fire Chief, 0 4 5.'7= 'C'/e6 74°
3. That adequate storm drains be designed to meet the
specific approval of the City of Tukwila Building and Street Depart-
ments' ;.. i� ��
•
-2-
•
. That a decorative fence be erected at' the South end
of the C -Land R -4 zoning to' prevent access from existing public
'street and that there be a landsaa e strip adjacent'to the park
oundary _ 1 4ti'_(1K6°712C -�� r/ ) % •
•That the. building which 34 erected near the.South
T
•
'boundary shall be located at least'40'feet North of the South
. - boundary .
'6.
materials,
•
All aspects of signing, including construction,
lighting, size and location relative to this devel-
opment shall be'and require the approval in the sole discretion
of the Planning Commission.
7. That the . plans for development including all con-
ditions required herein relat
ive
to construction shall be approved
:bx the Planning Commission prior to issuance of a-Building Per-
mit; the- landscaping and signing details shall also be included .
in the design drawing submitted for review.
All design and construction shall be without cost to
the City.
.. That TODD shall - design, construct -and pay for the
.sanitary sewer facilities which will be required. in accordance
with the applicable
ordinances of the. City of Tukwila.
9. No excavation shall occur without the applicant, TODD,
securing an Excavation Permit pursuant to the Ordinances of the .
City of Tukwil W .i ,.::ii /.<,
10, No construction shall be commenced before the City has
notified TODD in writing that the plans and specifications have .
been approved. by.the•Planning Commission and the City Superintendent.
The City shall have the right to inspect said facilities.
and no facility shall be . covered up prior to inspection. TODD • agrees
to comply with all of the City's reasonable inspection requirement.
11. Upon completion of construction and upon certification
:from the City Engineer, that said facilities meet the•standards. Of
the City of Tukwila, TODD shall assign and convey all public fac
ilities,..together with any necessary easements, to the City for
acceptance by /
the City. Said e,asemen s - shall. •be for general .Utility.
.p4rposes :reSaid easement shall be escrowebi in advance of the
Building Permit being issued.
•126 The King County Cause No. 695378.shall be dismissed
with prejudice.
13.
TODD agrees to indemnify and hold the City harmless
from any and all claims which may be asserted against. the City as .
a result of the construction, or maintenance of said facilities
prior to accep tance 'by the City.
14. TODD agrees in . carrying. but. the terms of this para-
•graph, TODD shall'be acting as an independent contractor and in
no respect shall be deemed an agent of the City.
15. That partial waiver or waiver by acquiescence -by
':the City of any provisions. or 'conditions of this agreement shall
not be a waiver of any other provisions or conditions'of this
Agreem nt.
16.
any facility
When notified to make changes or-corrections in.
•
described herein/by the"City Supervisor, TODD agrees
to make such changes or corrections, providin' they are in accord-
reeme t C•
ance with this A
g n , within St,re, t me sE, .far =ch' ire- sake hc2trce
•
In the event of failure to make' said changes or corrections all
rights of Todd :iznae t -y -s=ag r-eemen-t shall- termin _•and• a Stop
Work Order issued by the City qrr= a -1 h•ases -af --cons ru ma=r -erg- - ctcir-
17. •This.agreement shall be, recorded in the Records -of
the King County Auditor and the covenants, duties and obligations
f TODD. under this Agreement shall .constitute.an- .easement:and
•servitude'and:a. covenant attached hereto and running with-the land
..-upon-the. property and shall be binding upon TODD-and their..suc-
.cessors. and assigns, All Builc}ing, Occupancy and Use Permits here-
after applied for or issued shall be subject to the .terms,`condi-
•
tions and limitations of this agreement.
18. .Amendments to this Agreement maybe made:only .after,
approval by the City Council of the City' of Tukwila.
19. This agreement is specifically enforceable-
. "by the Ei cy -.
'and 4.1 -:C=x pia! institute and prosecute any proceeding at lasr or
in equity to enforce. the provisions of this agreement-. ritCCD2agrees
to pay reasonable .Attorney fees
. forcement proceedings.
1 U1
'20. All provisions of
other Ordinances of the City of
except as modified herein.
expended -by_for aa11 en -'
applicable zoning,
building, or
Tukwila shall control this project
-5-
21. It is further expressly agreed by. TODD that in the
event any covenant or condition or restriction hereiriabove con-
tained or any portion thereof is invalid or void, such invalidity
condition
or voidness shall in no way affect any•other covenant,
or-restriction hereinabove contained.
IN WITNESS WHEREOF, this Agreement is executed this
,:.1971, at Tukwila; Washington.
TODD
BY:
Frank Todd'
Joan • Todd
CITY OF TUKWILA
BY
• Mayor.
BY
J
'.Clerk
-67.
ATTACHMENT E
COMPREHENSIVE LAND USE PLAN
CTY OF THWIILA
LEGEND
INDUSTRIAL
RETAIL SALES
MULTIPLE FAMILY
rs] SINGLE FAMILY
PUBLIC
PASSED BY ORDINANCE 484
15 MAY 1967
1
5
03
d
SUBJECT: Proposed Restaurant, Southcenter Blvd. at Interurban Ave.
Bob Oldright
UBLIC Qom® K8 DE '''AR• -." ENT
823 =• - Southcenter ®ulevard
Tukwila, Washington 3087
telephone E 2 6 a 242-2177
July 31, 1975
MEMORANDUM
TO: Kjell Stoknes, Planning Director
FROM: Steve Hall, Public Works Director
ATTACHMENT F
EC
As per our discussions, I have several grave questions and concerns
EL as to the proposed access as indicated on the preliminary site plan
iC for this project.
The first and major one is the sight distance as dictated. by normal
it highway design. In the case of this proposed project, minimum sight
distance would be considered two hundred and fifty feet (250'). I
E am enclosing a page from the AASHO Manual and the accompanying
• calculations for 35 miles per hour on wet pavement.
•
U1
P)
0
c� Enclosures: AASHO.Design
Site Location, Photographs
Proposed Access
w
Secondarily, with the anticipated future widening of Southcenter
Boulevard, it would be a requirement of this Department that the
access road from Southcenter Boulevard as proposed to this site be
at road elevation at the property line. This would simplify future
widening of the road, and not cause a problem in the future with a
possible discrepancy in grades at that point.
Also, as per Tukwila Municipal Code, maximum grade allowed is 15 %.
Steven M. Hall, P.E.
2
z
1
IMMO
tiihr
\
1 �
.non
,.b
1
._1 •1 I.
�. II
Y • IL —t-..ii:- I✓OVSr)
21 (1 j F-
26125 124 i 21- - - : -_i
2 cos 1 I53RD 1 • 16
- ST a1 N
trIWVI 40 r75-1 ' ' J 1,r1 14 er7`•
.. 14115116'I 11 r----- -1:1'
1 I 1 X18
1= 11.4,21= _°t_..
0
ffff:1 ( /DAHO Sr) v
ITS ; .�. 1. 6
S. 15
' 6a 1 1 i 8 1 9N IO 1 1 1 1 1 2 IT; , - - - � 7.
27
J
[.u. /3
54
7
�H
i
/C:3;197-
4P
136 AASHO- GEOMETRIC HIGHWAY DESIGN
Braking Distance
The approximate braking distance of a vehicle on level roadway may be
determined by the use of the standard formula:
d=
30 f
Where d= braking distance, feet
V= initial speed, mph
f=coefficient of friction between tires and roadway
In this formula for braking distance the f factor is used as an overall
or a single value that is representative for the whole of the speed change.
Measurements show that f is not the same for all speeds. It decreases as
the initial speed increases. It varies considerably due to many physical
elements such as air pressure of tires, type of tires, amount of tire tread,
type and condition of the pavement surface, the presence of moisture,
mud, snow or ice, etc. Further, and of greater significance, in stops from
high speeds the actual braking distance, is dependent upon the vehicle
braking system rather than the skidding of tire on pavement. In stops from
TABLE 11I -1
MINIMUM STOPPING SIGHT DISTANCE
Design
speed
mph
30
40
50
60
65
70
75*
80*
Assumed
speed for
condition
mph
28
36
. 44
52
55
58
61
64
30
40
50
60
65
70
75
80
30
40
50.
60
65
70
75
80
Perception and
brake reaction
Time Distance
sec.
Design
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
feet
Coefficient
of
friction
f
Braking distanc Stopping sight distance
e Rounded
on level Computed for design
feet
feet
Criteria -WET PAVEMENTS
103
132
161
191
202
213
224
235
Comparative Valu
110
147
183
220
238
257
275
293
2.5
2.5
2.5
2.5
2.5
2.5
2.5
2.5
.36
.33
.31
.30
.30
.29
.28
.27
73
131
208
300
336
387
443
506
es-DRY PAVEMEN
.62
.60
.58
.56
.56
.55
.54
.53
48
89
144
214
251
297
347
403.
feet
TS
176
263
369
491
538
600
667
741
158
236
327
434 .
489
554
• 622
696
200
275
350 •
475
550
600
675
750
*Design
tDrollof access or where dsuch ncontrol spplan planned in theofutgh`vays with full con -.
2
3aeo Fr
gz9,4E �2 V �G ) (2.5 sec.
"7 FT'
ge79)e im6 0.5 I/42) 2-
lo.3s)
// 7p-
ATTACHMENT G
CITY OF TUKWILA
PLANNING DEPARTMENT
STATEMENT OF DECLARATION
FILE #MF- 75 -13 -R
APPLICATION FOR A REZONE OF A CERTAIN PROPERTY WEST OF AND
ADJACENT TO THE INTERSECTION OF INTERURBAN AVENUE AND SOUTH -
CENTER BOULEVARD FROM R -4 AND C -1 TO C -2.
Applicant - Bob Oldright
INTRODUCTION:
The following is a Statement of Declaration by the undersigned
as the Responsible Official pursuant to Title 18.98 of the
Tukwila Municipal Code and the Washington State Environmental
Policy Act of 1971.
An Environmental Assessment has been completed on the proposed
legislation and has been taken into consideration in this
Declaration.
DECLARATION:
Based upon the Environmental Assessment as prepared, Section
18.98 of the Tukwila Municipal Code dealing with environmental
policy and the guidelines issued by the Washington State Depart-
ment of Ecology for the implementation of the State Environmental
Policy Act, I find that the proposed rezone application from R-4
and C -1 to C -2 will not have a significant effect upon the envir-
onment and therefore a complete Environmental Impact Statement is
not required.
The City reserves the right to require an additional environmental
review, and full Environmental Impact Statement if deemed necessary,
at such time as a building permit is applied for on the property.
PALNNING DEPARTMENT
KS /cw
September 8, 1975
S oknes, Director (Date)
Mr. Fred N. Satterstrom
Planning Department
City of Tukwila
14475 59th Avenue South
Tukwila, Wa. 98168
Dear Mr. Satterstrom:
King County of Washington
John D. Spellman, Co y Executive
Department of Public Works
Jean L. DeSpain, Director
900 King County Administration Building
Seattle, Washington 98104
June 21, 1976
Environmental Assessment
Christensen Greenbelt
We have completed our review of the above environmental assess-
ment and found it to be satisfactory subject to the comments in
our letter to you dated March 23, 1976 (copy enclosed).
Vory\ truly yours,
WILLIAM B. GILLESPIE
Division Engineer
Division of Hydraulics
WBG
LRG:lmw
Enclosure
NPSEN -PL -ER
• •
DEPARTMENT OF THE ARMY
SEATTLE DISTRICT. CORPS OF ENGINEERS
P.O. BOX C -3755
SEATTLE. WASHINGTON 98124
Mr. Fred N. Satterstrom
Planning Department
City of Tukwila
6230 Southcenter Boulevard
Tukwila, Washington 98188
Dear Mr. Satterstrom:
�ECEIVE
JUN 8197 -6
MY OF TUKWILA
3 JUN 1976
We have reviewed the environmental assessment for the Christensen Greenbelt
Project with respect to the Corps of Engineers' areas of responsibility for
flood control, navigation and hydropower.
As indicated in our letter of 7 April 1976, any landscaping improvements
installed on the existing levee would have to be removed and replaced by
the city if and when the levee is raised and widened with Federal funds.
Thank you for the opportunity to comment on this assessment.
Sincerely yours,
R. P. SELL ' D
Chief, Engineering Division
•
Edgar D. Bauch, Mayor
CITY of TUKWILA
14475 - 59TH AVENUE SOUTH
TUKWI LA, WASHINGTON 98067
April 30, 1976
TO RECIPIENTS OF ENVIRONMENTAL ASSESSMENT:
•
Enclosed you will find a copy of the Environmental Assessment for the
proposed CHRISTENSEN GREENBELT project in Tukwila. This greenbelt is
a long (1.8 mile), linear park and trail development along the Green
River.
Note that the enclosed document is an assessment, not a draft Environmental
Impact Statement. However, should you have any comments or questions regard-
ing the project, please direct them to Fred N. Satterstrom of the Planning
Department staff (242- 2177).
Thank you for your consideration.
Very truly yours,
Kjell Stoknes
Planning Director
KS /FS /cw
• •
CITY OF TUKWILA
DECLARATION OF NON - SIGNIFICANCE
ON THE
CHRISTENSEN GREENBELT PROJECT
EPIC -ND -27
Pursuant to Chapter 18.98 of the Tukwila Municipal Code dealing with envir-
onmental requirements and the State Environmental Policy Act of 1971.
Proposed recreational project along the Green River in publicly -owned
right -of -way, commonly known as the Christensen Greenbelt.
CITY OF TUKWILA - APPLICANT
INTRODUCTION:
The following is a statement of declaration by the undersigned as the Respon-
sible Official pursuant to Chapter 18.98 of the Tukwila Municipal Code and the
Washington State Environmental Policy Act of 1971.
An Environmental Assessment has been completed on the proposed project to
develop a linear greenbelt in existing public right -of -way along the Green
River, west side.
DECLARATION:
Based upon the environmental assessment submitted, the City of Tukwila Muni-
cipal Code Chapter 18.98 dealing with environmental policy, and the guidelines
issued by the Washington State Department of Ecology for the implementation of
the State Environmental Policy Act, I find that the proposed action will not
have a significant effect upon the environment and therefore an environmental
impact statement is not required.
CITY OF TUKWILA
/tjw AW/9
Kjel Stoknes, Planning Director
Date of Negative Declaration: April 28, 1976
• •
ENVIRONMENTAL ASSESSMENT
CHRISTENSEN GREENBELT PROJECT
#EPIC -ND -27
OFFICIAL TITLE OF PROPOSED ACTION:
TYPE OF PROPOSED ACTION:
PROJECT SPONSOR:
CONTACT PERSON:
Christensen Greenbelt Project
Linear Riverside Park Development
City of Tukwila
Fred N. Satterstrom
Tukwila Planning Department
6230 Southcenter Boulevard
Tukwila, WA 98188 (206) 244 -6290
NATURE OF THIS REPORT: Environmental Assessment
A. DESCRIPTION OF THE ACTION.
1. The Proposal: The proposed action is commonly known as the Christensen
Greenbelt Project, a narrow linear -type park stretching along the Green River
in Tukwila.
Essentially, the proposed project includes the development of approximately
1.8 miles of existing public right -of -way and other city -owned lands for local
and regional recreation. The project site is located along the west bank of
the Green River between Interstate 405 and South 180th Street. Map 1 shows
the location of the Christensen Greenbelt. project. The site is located
within walking distance of a majority of the resident, employee, and customer
population of the city.
The objective of the proposed action is to provide river access and linear -
type recreation of local and regional importance. Recreational activities
which will be provided by this project include safe, lawful, and convenient
river access for steelhead fishing, canoeing and trails and facilities for
walking, cycling, jogging, and picnicking.
The proposed Christensen Greenbelt project is considered a vital link in the
regional trail system along the Green River. Futuristically, the Christensen
Greenbelt will connect with the existing Kent trail system to the south, the
planned King County system to the north, and the soon- to -be- constructed Renton
system to the east.
2. Major Aspects of the Proposal: The Christensen Greenbelt project will
transform the existing Christensen dirt road into an elongated recreational
and open space corridor. The greenbelt will extend from South 180th Street
northerly to Interstate 405, a distance of 1.8 miles. The greenbelt will be
created in a 3 -phase development program. Park development will consist of a
6 -foot wide pedestrian path, 8 -foot wide bike path, with parking lots at var-
ious points for access to the greenbelt. Lawn areas with built -in irrigation
systems will be established where riverbank conditions allow. Tree plantings
will grace the pathway along` its entirety.
1
6
ALKE VY PAYTC
0Y S. -xY ::f T.
t/NWb TO 0G PONE WTH OTT OF TALVAL.A RAIDS IN 1976
WaST VALLEY H — WOW
NOTFS
I. THE Fg10WING DRAWINGS Or' OWAPP14:- .vMAT .O4.-
LOC.NTIONS ONLY
NIDE . MAP
N-fAr ALIOWCD
hW.Y VL711C.VLAR 7}MPIC
MANN Y
PICNIC AREN
♦ FONT Cr INTERMIT
HO FEEI-
CHIC IbT•NSEN RCLAD
1b NTON
II= 111 =III= 111 =11Ya
�IU=AI _I11 -11 =111
L'; -j
GtW
GREEN RAVER
VICINITY MAP
a PEST 8 PC.ET
LAID DEFYED TD TL'✓.WIL' PC0E5- F=ICYCl.E
P 1 1`J_+ET WELTERN r'.>R TRV 4 LANE
PJBLIC FAICK YJKYJ °S WAL L
SKETCH
I. Peer 0-20 rear
TE E9 LAWN I.MIDSiAF'I.VG
REOL;821 s7 Cr-
_sw■,+eM F'R;? 7.NNFR
CHRISTENSEN GREENBELT K ° °- Le - IM191.. BY CARL NTIrROn
DESIGN PLAN
LTO CC c..M-
GLETED Ar.
A FJTLP.E
OATS'
YO E3: CgMR.ETEDIN
1977 WITH VC C ANT-
W-AID ASSIST-ANC-E.
TO 6E. CON.PLETCD IN 1976
WITH CT'OF N•Wp1J FUNDS
TO BE CDMRP_TED IN 1977 W1TH IAC
GRAVT-IN -80 ASEcSTANCE,
WaST VALLEY H — WOW
NOTFS
I. THE Fg10WING DRAWINGS Or' OWAPP14:- .vMAT .O4.-
LOC.NTIONS ONLY
NIDE . MAP
N-fAr ALIOWCD
hW.Y VL711C.VLAR 7}MPIC
MANN Y
PICNIC AREN
♦ FONT Cr INTERMIT
HO FEEI-
CHIC IbT•NSEN RCLAD
1b NTON
II= 111 =III= 111 =11Ya
�IU=AI _I11 -11 =111
L'; -j
GtW
GREEN RAVER
VICINITY MAP
a PEST 8 PC.ET
LAID DEFYED TD TL'✓.WIL' PC0E5- F=ICYCl.E
P 1 1`J_+ET WELTERN r'.>R TRV 4 LANE
PJBLIC FAICK YJKYJ °S WAL L
SKETCH
I. Peer 0-20 rear
TE E9 LAWN I.MIDSiAF'I.VG
REOL;821 s7 Cr-
_sw■,+eM F'R;? 7.NNFR
CHRISTENSEN GREENBELT K ° °- Le - IM191.. BY CARL NTIrROn
DESIGN PLAN
• •
3. Land Use Plans, Permits, and Zoning Regulations: In 1962, John Graham $
Co. completed Tukwila's first Comprehensive Plan for Tukwila. In that Plan, all
lands contiguous to the 1.8 mile project site were designated for industrial use.
Since 1962, commercial and industrial developments in Andover Industrial Park
have sprung up along over 90% of Christensen Road. Only one undeveloped parcel
of land currently exists along Christensen Road.
The proposed greenbelt is consistent with the goals and policies of Tukwila's
Shoreline Master Program and conforms to the recently adopted Park Plan, in
which it is the number one priority project.
All lands on both sides of the Green River along the proposed Christensen Green-
belt are presently zoned for industrial purposes. Although zoned for industrial
use, the east side of the Green River has not yet reached the level of develop-
ment as that on the west side.
A shoreline substantial development permit is required before development of the
proposed greenbelt may begin. This permit is now being reviewed by the Attorney
General's office and the Department of Ecology.
B. DESCRIPTION OF THE EXISTING ENVIRONMENT.
1. Natural Environment: The Christensen Greenbelt lies in a broad, very flat
alluvial floodplain formed over thousands of years by deposition of sediments from
the Green River. The site itself is located on the west bank of the river. River-
bank conditions vary along the 1.8 mile site from levee -like banks on the south
(25 -28 feet elevation) to flat, natural banks on the north (23 -26 feet elevation).
Flowing along the eastern edge of the proposed greenbelt is the Green River. The
average discharge of the Green at the site is approximately 1500 cfs. Typical
maximum flood flows reach 9,000 to 12,000 cfs. Some minor, localized flooding
of property has occurred in the past at the northern end of the project site
subsequent to the construction of Howard Hanson Dam.
Vegetation on the site is found exclusively on that portion lying between Chris-
tensen Road and the river. Tree growth along the river is sparse but a few,
elongated stands of tall black cottonwood and broadleaf maples line segments of
the bank. Understory flora consists mostly of sedges, fireweed, rushes, and
various grass species.
Wildlife on the site is confined to small mammals such as beaver, weasel, rabbit,
and possibly skunk, and numerous and diverse species of songbirds.
2. Human Environment: Current population of the City of Tukwila is 3370;
1975 population for the Tukwila Planning Area is over 22,000. Approximately
50,000 persons come to the Tukwila area (particularly Southcenter) each day
to shop, and another 10,000 come to work in the 500+ commercial and industrial
enterprises. The proposed greenbelt lies within walking distance of much of
this resident - shopper - employee population.
An estimated 70,500 cars travel through Tukwila daily on Interstate 5. An
additional 53,000 cars daily pass through on Interstate 405. These two free-
ways intersect about i mile northwest of the subject site.
4
• •
The subject site is currently publicly owned and is "open to the public ".
However, due in part to the extreme disrepair of the existing Christensen
Road and the lack of recreational and open space improvements, current
recreational use of the site is minimal. Most of this use is for steel -
head fishing and spontaneous activities; there is little, if any, trail or
bike use.
Land use in the vicinity is primarily urban interspersed with small, undeveloped
tracts. Over 90% of the land contiguous to the proposed greenbelt is industrially
developed; across the river from the project site present development is more sparse.
All the lands contiguous to the proposed greenbelt and across the river from
the site are planned for urban uses.
C. ENVIRONMENTAL IMPACT OF THE PROPOSED ACTION.
1. Impacts to the Natural Environment: The primary environmental impact of
the proposed action is the replacement of an existing dirt road with a 14 -foot
wide strip of asphalt. In order to accomplish this action, the dirt road will
need to be graded and disturbance to the soil and subsurface geology will be
inevitable, although negligible. It is expected that the impervious asphalt
surface will cause a slight increase in the rate of storm water runoff for that
area which it covers. This increase will only be slight due to the fact that
the present dirt road (which consists of a gravel ballast with approximately
50% clay) is nearly impervious.
Landscaping of the proposed greenbelt is expected to have some initial, insigni-
ficant environmental impacts. Several areas of existing field grasses will be
disturbed or replaced with lawns, and erosion could occur during this disturbance.
2. Impacts to the Human Environment: The proposed action would limit the
recreational use of the project site by the motorist. Presently, the motorist
may drive the length of Christensen Road. As a result of the proposed greenbelt,
the motorist would be confined to designated parking lots and access points along
the river.
D. MITIGATING MEASURES INCLUDED IN THE PROPOSED ACTION.
As mentioned in Section C., the primary environmental impacts will be a slight
increase in the runoff rate for the asphalted area and soil erosion which may
occur during path construction and landscaping activities.
While a slight increase in the runoff rate is expected for the area covered by
the 14 -foot wide asphalt strip, the overall runoff rate for the project site is
not expected to exceed that which presently exists. To explain, the present
width of Christensen Road is approximately 30-35 feet and is composed of a
nearly impervious gravel ballast of about 50% clay composition. This existing
surface will be replaced by only 14 feet of asphalt and the remainder of the
right -of -way will be replaced with pervious soil material, trees, and grass.
Consequently, while the runoff rate for the asphalt portion will be slightly
increased, this increase may be offset by the reduction in the rate for the
remaining portion of the right -of -way.
5
• •
Erosion and dust can be controlled or reduced somewhat during the construction
process also. Planting sod instead of seed will decrease the amount of erosion
in areas where lawns are to be established. Watering or misting of the site
during construction of the road will reduce dust and particulates in the air.
E. UNAVOIDABLE ADVERSE ENVIRONMENTAL IMPACTS.
No unavoidable, adverse environmental impacts are expected as a result of the
proposed Christensen Greenbelt project.
F. RELATIONSHIP BETWEEN LOCAL SHORT -TERM ENVIRONMENTAL USES AND THE MAINTENANCE
AND ENHANCEMENT OF LONG -TERM PRODUCTIVITY.
In its present state, the subject area provides a small degree of wildlife
habitat and represents an open, undeveloped linear space along the Green River.
Development of the Christensen Greenbelt is not expected to diminish this
condition; rather, at least with respect to the site's open space nature, the
proposed action will actually improve its aesthetic appeal.
The proposed site offers little, if any, opportunity for agricultural activities
and as such does not constitute a displacement of potential agricultural land
with nonagricultural use. Neither does the site afford any significant oppor-
tunity for commercial or industrial development, due primarily to its narrow,
elongated configuration and severe shoreline development restrictions.
Due to the inherent characteristics of the site — its size, width, location,
etc. — the choice of suitable uses is limited. The proposed action
represents a suitable use of the site; one which will not degrade the existing
environmental conditions; and one which will continue to serve as an amenity
and recreational opportunity for generations to come.
G. IRREVERSIBLE AND IRRETRIEVABLE RESOURCE COMMITMENTS WITH THE PROPOSED ACTION.
The proposed action will result in the commitment of the subject site to
recreational and open space use, which, in turn, will commit financial recources,
construction materials, and labor to achieving such use. The commitment result-
ing from the proposed action will be long -term, probably 50 years or more. While
the commitment of finances, materials, and labor are irretrievable ones, the
commitment of the land itself is not. The Christensen Greenbelt, as proposed,
represents a flexible recreational development which leaves open future options
for new development or re- development.
H. ALTERNATIVES TO THE PROPOSED ACTION.
1. No Action: This alternative would entail leaving the site as is, with
Christensen Road remaining a dirt, chuckhole road and the land between the
road and river unaffected.
The advantages to this alternative are ecological and financial. Left as is,
the wildlife and vegetation currently using the site would be unaffected. Finan-
cially, the. City and State would have additional monies to fund other projects.
6
• •
Difficulty of using the site in its present condition is the primary disadvan-
tage of this alternative. Poor road conditions currently inhibit auto and bike
traffic. Also, the site's untidy condition and its lack of focal points, par-
ticularly around entrances, detracts from its use and obscures its identity as
an open space.
2. Establish Greenbelt at Another Location: Since the proposed action is a
riverside greenbelt, the only other place this alternative could be established
is across the Green River from Christensen Road. Most of these riverside pro-
perties are currently in private ownership with some in public street rights -of-
way.
No anticipated advantages would accrue as a result of this action.
The disadvantages in this alternative are locational and financial. Because
certain areas along the river are developed, the trail would have to cross
currently used industrial and commercial lands. It would also be extremely
difficult to wedge a trail or greenbelt between the Green River and the West
Valley Highway where the latter parallels the river to the south. Moreover,
this alternative would require gaining easements or title to land along the
river and would likely skyrocket the cost of the project.
I. CONSULTATION AND COORDINATION OF EFFORTS IN DEVELOPING THE PROPOSAL.
1. Internal Coordination: Within the City of Tukwila itself, there has
been much coordination of city departments and boards and commissions. Citizens
and the Park Board initially rated the proposed action a high priority in the
new Park Plan. In adopting the Park Plan, the City Planning Commission favora-
bly recommended the project to the City Council. In turn, the Council authorized
the expenditure of local funds for matching purposes.
2. External Coordination and Consultation: The proposed project has been
coordinated closely with the King County Department of Hydraulics and U.S.
Army Corps of Engineers for the flood control aspects of the project.
J. REVIEW OF THE ASSESSMENT INFORMATION.
In the spirit of coordination and cooperation, this environmental assessment
has been sent to the following agencies for their review and comments:
U.S. Army Corps of Engineers
U.S. Soil Conservation Service
State Department of Ecology
King County Parks Department
City of Kent
City of Renton
King County Public Works, Hydraulics Division
7 April 8, 1976
•
DISTRICT ENGINEER, SEATTLE DISTRICT
U.S. Army Corps of Engineers
1519 Alaskan Way South
Seattle, Washington 98134
•
Mr. Max Fulner
U.S. Soil Conservation Service
35 South Grady Way
Renton, WA 98055
Mr. Dennis Lundblad
Head Environmental Review
Department of Ecology
Olympia, WA 98504
1H
ii•
Mr. James P. Harris, Planning Director
Kent Planning Agency
P.O. Box 310, City Hall
Kent, WA 98031
Mr. James Webster, Assist. Director
Parks Division
W226 King County Courthouse
Seattle, WA 98104
1
Mr. Gordon Ericksen, Planning.D.irector,
Renton Planning Department
200 Mill Ave. So.
Renton, WA 98055
Mr. G. E. Wannamaker
Division of Hydraulics
900 King County Administration Bldg.
Seattle, WA 98104
V adr r-44)1-
4/30p 6
Mr. Carl Stixrood
Park: Planner
City•of Tukwila
14475-59th Avenue South
Tukwila, Wa. 98067
Dear Mr. Stixrood:
King County S of, Washington
John D. Spellman, County Executive
Department of Public Works
Jean L. DeSpain, Director ( �� ^app{ OF HYORP,ULkts
900 King County Administration Buirthng ---�
Seattle, Washington 98104 il'l)TIAI
Gillfispie
•
Firini,i
March 23, 1976
Giboolls
1Akr; Yci(rgs
F ile
Christijnsen Trail Project
Reference is made to your letters to us dated February 20, 1976,
and March 10, 1976, and to your discussions with Larry Gibbons
of my staff concerning the above subject. We have reviewed this
proposed project and have the following comments:
1. The proposed project should be made compatible with
the two alternatives selected by the U.S. Army Corps
of Engineers for providing flood protection to the
Green River Valley between Auburn and Tukwila, es-
pecially since this project could start as early as
1981. Both of these alternatives consist of either
raising the existing river bank or constructing set-
back levees. Plans showing the heights of these..`
levees were provided you earlier by Larry Gibbons.
If you decide to construct your project as now de -•
signed, we believe the 'City of Tukwila should pay for
any required restoration work when the Corps of
Engineers' project is constructed.
2. The proposed project must not restrict our access along
the river bank for our• river patrol during high water
conditions and our maintenance of the existing river
bank.
3. A- State Flood Control lone permit is required .l.or this
project. Detail plans of your proposed improvements
along; the river bank will be required. with your State
Flood Control Zone application. We are especially con-
cerned with your trail under Strander bridge.
Mr. Carl Stixrood
March 23, 1976
Page Two (2)
4. If the river bank is disturbed by the proposed
project, we recommend that the river bank be sta-
bilized with rock riprap. Details.of this method
of bank stabilization can be obtained'from my
office.
5. No building must be constructed within 30 feet of
the top of the existing river bank.
6. The promenade should be widened to 12 feet to pro-
vide a minimum - working area for construction equip-
ment..
7. The 12 foot wide paved bike lane must be constructed
strong-enough to support heavy construction equipment.
8. Breaks in the median barrier must be provided at.least
every 500 feet to enable us to get construction equip-
ment to the river bank.
If you have any questions regarding the above comments, please
contact our project engineer, Larry Gibbons, on 344 -3874.
Very truly yours,
WILLIAM B..GILLESPIE
Division Engineer
Division of Hydraulics
WBG
LRG:lmw