HomeMy WebLinkAboutSEPA EPIC-ND-33 - BENAROYA COMPANY - PARKWAY PLAZA WEST DEVELOPMENTPARKWAY PLAZA WEST
BENAROYA
EPIC -ND -33
CITY OF TUKW1LA
CERTIFICATION BY APPLICANT:
1 hereby certify that the information furnished in ethis environmental checklist
o
sheet is true and. accurate to the best my
Project Name:
Project Address: 17500 Southcenter Parkway, Tukwila
BELOW THIS LINE FOR CITY USE ONLY
ACTION .BY OTHER' DEPARTMENTS:
Signature and Title
Parkway Plaza West
1. Date of Review: Building
fr
Planning
Engineering
Police by:
Fire
by
•Agency review of environmental checklist determined that:
';.The project is exempt by definition.
ro'ect has no significant. environmental impact and application
�should l
sld 7 be processed without further consideration of environmental affect!
The project has significant environmental xzoxctoafurth�r complete
aetionefox perm
mental impact , statement must be prep p
More specific, information is needed to determine impact.'
. by:
July 1
1976
Date
- =Check One'
(4.) or ( -)
(a-) • or k/
( +) or ( -)
(a-) or ( -).
nature and. Title
of Responsible Official
3. Applicant was notified of decision on:
'by
Date
e
Staff. Person
by
Letter, phone
•
with Washing
State Environmental Policy Act and City of Tukwila
In accordance ��i g
Ordinance No. 759.
a Means recommend a full environmental impact statement be•donel
() Means recommend a full environmental impact statement•not•be
CITY OF TUKWILA
ENVIRONMENTAL QUESTIONNAIRE
This questionnaire must be completed by all persons applying for a permit
from the city of Tukwila, unless it is determined by the Responsible Official
that an environmental or
forms have been developed 9
proposals.
BACKGROUND DATA: •
1. Name of applicant: Jack A. Benaroya Company
2. Address and phone of Applicant:" 5950 Sixth Avenue South; Seattle% WA 98788 -4750 _
3. . Project name: Parkway Plaza West
4. Project location: 17500 Southcenter Parkway; Tukwila, WA 98188
5. Nature and brief description of proposal:
site (approximately 12 acres)
Estimated completion date: August 15, 1976
Do you have any plans for future expansion, if yes please explain:
Development of retail buildings
8." What other governmental permits are required prior to completion of this
project? -
(a) Rezone, conditional use, substantial development, etc. - YES NO'X -
W
(b) King County Hydr�olics Permit . "YES- NO X
.
(c) Building permit . YES .NO X
(d) Puget Sound Air Pollution Control Permit YES NO X
(e) Sewer .hook .up permit
YES .NO X
(f) Sign-permit _ YES NO X
(g) Water hook up permit YES--
ES NO X
(h) Storm water system permit (connection to-existing)
YES x NO
•
(i) Curb cut permit
YES x 'NO
(j) Electrical permit (State of Washington) YES NO x
(k) Plumbing permit (King County) YES NO .X
(1) Other
9. Do you know of any plans by others which may affect the property covered by
your proposal? If yes, explain: No
10. Agency requiring checklist: Cit
11. Accepted b agincb on: ,7-/1;-(0 b
(to be fiy city on e 7 of y:
-.ENVIRONMENTAL IMPACTS
(Explanations of all "yes" and "maybe" answers are required.)
Yes Maybe No
Earth. Will the proposal result in:
(a) Unstable earth conditions or in
any changes in geologic sub -
structures:
(b) .Disruptions, displacements
or overcovering.of the soils:
(c) Change in topography or ground
surface relief features?
(d) The destruction, covering, or
modification of any unique
geologic or physical features?
(e) Any increase in wind or water
erosion of soils, either on
or off the site? •
(f) Changes in deposition or
erosion of beach sands, or
in changes in siltation,
deposition, or erosion which
may modify the channel of a
river or stream or the bed of
the ocean or any bay, inlet
or lake?
.Explanation:
Air. Will the proposal result in:
(a) Air emissions or deterioration
of ambient air quality?
(b) The creation of objectionable
odors?
X
X
(c) Alteration of air movement,
moisture or temperature, or
in any change in climate,
either locally or regionally?
Explanation:
X
Water. Will the proposal result in':
(a) Changes in currents, or the
course or direction of water
movements, in either marine
or fresh waters?
(b) Changes in absorption rates,
drainage patterns, or the
amount of surface water run -
off?
(c) Alterations to the course or
flow of flood waters?
(d) Change in the amount of surface
water in any Watercourse?
(e) 66�
()
• Yes Maybe .
v ce i.u� s
(f)
(g)
IVo
X
Discharge into alteration surface r- da- / 4e 6!17 �y�ay
or in any alteration of sur - /,
face.'water quality, including 'e X
temperature or turbidity? 4164":—///6/
Alteration of the direction or
rate of flow of ground waters? .
Change in the quantity of
ground waters, either through
direct additions or withdrawals,
or through interception of an
acquifer by cuts or excavations?
(h) Deterioration in ground water
quality, either through direct.
injection, or through the seep-
age of leachate, phosphates,
detergents, waterborne virus
or bacteria, or other substances
:into -the ground waters?
(i) Reduction in the amount of water
otherwise available for public
water. supplies ?'
Explanation:
X
•X
Flora._ Will the proposal result in:
(a) Change in the diversity of species,
or numbers of any species of flora
(including trees, shrubs, grass,
crops, micro -flora and aquatic
plants)?
(b). Reduction of the numbers of any
unique, rare or endangered species
of flora?
(c) Introduction of new species of
flora into an area, or in a bar -
rier to the normal replenishment of
existing species?
Explanation:
Fauna. Will the proposal result in:
(a) Changes in the diversity of species,
or numbers of any species of fauna
(birds, land animals including rep-
.tiles,, fish and shellfish, benthic
organisms, insects, or micro- fauna)?
(b) Reduction of the numbers of any
unique, rare or endangered species
of fauna?
(c) Introduction of new species of fauna
into an area, or result in a.barrier
to the migration or movement of fauna?
a�
(d) Deterioration to existing wildlife br - ,-� .
habitat? )/,(4-1 amj
Yes .Maybe • No
Explanation:
Noise.- Will the proposal increase exist .
ing noise levels? •
Explanation:
Yes Maybe No
Licht and Glare: Will the proposal produce X
new light or glare? --
Explanation::'
Land Use. Will. the proposal result in the
alteration of the present or planned land.
• use of an area?
Explanation:.
Natural Resources. Will the proposal re-
sult in:
1(a) Increase in the rate of use of any
natural resource?
•
(b) Depletion of any nonrenewable nat-
ural resource?
Explanation:..
Risk of Upset. Does the proposal -involve
a risk of an explosion or the release of
hazardous substances (including, but not
limited to, oil, pesticides, chemicals or
radiation) in the event of an accident or
upset conditions? 0
Explanation:
Population. Will the proposal alter the •
location, distribution, density, or growth
rate of the human population of an area? .
Explanation:
_Housing. Will the proposal affect existing
housing availability, or create a demand for
additional housing?
Explanation:
Transportation /Circulation.- Will the pro-
posal result in:. 4.441/vel 414
(a) Generation of additional vehi cul a 4.44 -e .
move
ment? fi�la d )1ry fr 1-24414/1";A:"-""/
7 L 7
li k
(b) Effects on exi sti ng parking facilities ,���� tow-v..
or demand for new parking? km104,
Yes Maybe No
(c). Impact upon existing transportation
systems?
-(d) Alterations to present patterns of
circulation or movement of people
and /or goods?
•
(e) Alterations to waterborne or air •
• . traffic? .
Explanation:
/0 G
0
Local Services. Will the proposal have an
;effect upon, or result in a need for new
services in any of the following areas:.
(a)' Fire protection?
(b)
(c) Schools?
(d) Parks?
(e) Maintenance of public facilities,
including roads?
Other' governmental services?
Police protection? cm, . tam
(f)
Explanation:
•
--5-
.X.
•
•
Energy. Will the proposal result in:
• (a) Use of substantial amounts of fuel or
energy?
(b) Demand upon existing sources of energy,
or require the development of new
sources of energy?
Explanation:
Utilities. Will"the proposal result in a need
for new systems, or alterations to the.follow-
ing utilities:
(a) Power or natural gas?
(b) .Communications systems?
(c) Water ?'
(d) Sewer or septic tanks?
(e) Storm water drainage?
(f) Solid waste and disposal?
Explanation:
•
Yes Maybe No
•
.X
,. X..
...X
X
Human Health. Will the proposal result in the
creation of any health hazard or potential .
health hazard (excluding mental health)?
Explanation:
Aesthetics. Will the proposal result in the
obstruction of any scenic vista or view open
to the public, or will the proposal result
in the creation of an aesthetically offensive .
site open to public view?
Explanation:
•
Recreation. Will the proposal result in an
impact upon the quality or quantity of ex-
isting recreational opportunities?
Explanation:
Archeological /Historical. Will the proposal
result in an alteration of.a significant
archeological or historical site?
Explanation:
.Revenue. Will the proposal cause a signifi-
ca' nt.increase in city reve'nnues?
�zv� G✓��La -e . "ko .7
Explanation:
Yes Maybe •
;:Employment. Will the proposal create a
significant amount of new jobs?
. Explanation:
/Yeti/