Loading...
HomeMy WebLinkAboutSEPA EPIC-ND-33 - BENAROYA COMPANY - PARKWAY PLAZA WEST DEVELOPMENTPARKWAY PLAZA WEST BENAROYA EPIC -ND -33 CITY OF TUKW1LA CERTIFICATION BY APPLICANT: 1 hereby certify that the information furnished in ethis environmental checklist o sheet is true and. accurate to the best my Project Name: Project Address: 17500 Southcenter Parkway, Tukwila BELOW THIS LINE FOR CITY USE ONLY ACTION .BY OTHER' DEPARTMENTS: Signature and Title Parkway Plaza West 1. Date of Review: Building fr Planning Engineering Police by: Fire by •Agency review of environmental checklist determined that: ';.The project is exempt by definition. ro'ect has no significant. environmental impact and application �should l sld 7 be processed without further consideration of environmental affect! The project has significant environmental xzoxctoafurth�r complete aetionefox perm mental impact , statement must be prep p More specific, information is needed to determine impact.' . by: July 1 1976 Date - =Check One' (4.) or ( -) (a-) • or k/ ( +) or ( -) (a-) or ( -). nature and. Title of Responsible Official 3. Applicant was notified of decision on: 'by Date e Staff. Person by Letter, phone • with Washing State Environmental Policy Act and City of Tukwila In accordance ��i g Ordinance No. 759. a Means recommend a full environmental impact statement be•donel () Means recommend a full environmental impact statement•not•be CITY OF TUKWILA ENVIRONMENTAL QUESTIONNAIRE This questionnaire must be completed by all persons applying for a permit from the city of Tukwila, unless it is determined by the Responsible Official that an environmental or forms have been developed 9 proposals. BACKGROUND DATA: • 1. Name of applicant: Jack A. Benaroya Company 2. Address and phone of Applicant:" 5950 Sixth Avenue South; Seattle% WA 98788 -4750 _ 3. . Project name: Parkway Plaza West 4. Project location: 17500 Southcenter Parkway; Tukwila, WA 98188 5. Nature and brief description of proposal: site (approximately 12 acres) Estimated completion date: August 15, 1976 Do you have any plans for future expansion, if yes please explain: Development of retail buildings 8." What other governmental permits are required prior to completion of this project? - (a) Rezone, conditional use, substantial development, etc. - YES NO'X - W (b) King County Hydr�olics Permit . "YES- NO X . (c) Building permit . YES .NO X (d) Puget Sound Air Pollution Control Permit YES NO X (e) Sewer .hook .up permit YES .NO X (f) Sign-permit _ YES NO X (g) Water hook up permit YES-- ES NO X (h) Storm water system permit (connection to-existing) YES x NO • (i) Curb cut permit YES x 'NO (j) Electrical permit (State of Washington) YES NO x (k) Plumbing permit (King County) YES NO .X (1) Other 9. Do you know of any plans by others which may affect the property covered by your proposal? If yes, explain: No 10. Agency requiring checklist: Cit 11. Accepted b agincb on: ,7-/1;-(0 b (to be fiy city on e 7 of y: -.ENVIRONMENTAL IMPACTS (Explanations of all "yes" and "maybe" answers are required.) Yes Maybe No Earth. Will the proposal result in: (a) Unstable earth conditions or in any changes in geologic sub - structures: (b) .Disruptions, displacements or overcovering.of the soils: (c) Change in topography or ground surface relief features? (d) The destruction, covering, or modification of any unique geologic or physical features? (e) Any increase in wind or water erosion of soils, either on or off the site? • (f) Changes in deposition or erosion of beach sands, or in changes in siltation, deposition, or erosion which may modify the channel of a river or stream or the bed of the ocean or any bay, inlet or lake? .Explanation: Air. Will the proposal result in: (a) Air emissions or deterioration of ambient air quality? (b) The creation of objectionable odors? X X (c) Alteration of air movement, moisture or temperature, or in any change in climate, either locally or regionally? Explanation: X Water. Will the proposal result in': (a) Changes in currents, or the course or direction of water movements, in either marine or fresh waters? (b) Changes in absorption rates, drainage patterns, or the amount of surface water run - off? (c) Alterations to the course or flow of flood waters? (d) Change in the amount of surface water in any Watercourse? (e) 66� () • Yes Maybe . v ce i.u� s (f) (g) IVo X Discharge into alteration surface r- da- / 4e 6!17 �y�ay or in any alteration of sur - /, face.'water quality, including 'e X temperature or turbidity? 4164":—///6/ Alteration of the direction or rate of flow of ground waters? . Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an acquifer by cuts or excavations? (h) Deterioration in ground water quality, either through direct. injection, or through the seep- age of leachate, phosphates, detergents, waterborne virus or bacteria, or other substances :into -the ground waters? (i) Reduction in the amount of water otherwise available for public water. supplies ?' Explanation: X •X Flora._ Will the proposal result in: (a) Change in the diversity of species, or numbers of any species of flora (including trees, shrubs, grass, crops, micro -flora and aquatic plants)? (b). Reduction of the numbers of any unique, rare or endangered species of flora? (c) Introduction of new species of flora into an area, or in a bar - rier to the normal replenishment of existing species? Explanation: Fauna. Will the proposal result in: (a) Changes in the diversity of species, or numbers of any species of fauna (birds, land animals including rep- .tiles,, fish and shellfish, benthic organisms, insects, or micro- fauna)? (b) Reduction of the numbers of any unique, rare or endangered species of fauna? (c) Introduction of new species of fauna into an area, or result in a.barrier to the migration or movement of fauna? a� (d) Deterioration to existing wildlife br - ,-� . habitat? )/,(4-1 amj Yes .Maybe • No Explanation: Noise.- Will the proposal increase exist . ing noise levels? • Explanation: Yes Maybe No Licht and Glare: Will the proposal produce X new light or glare? -- Explanation::' Land Use. Will. the proposal result in the alteration of the present or planned land. • use of an area? Explanation:. Natural Resources. Will the proposal re- sult in: 1(a) Increase in the rate of use of any natural resource? • (b) Depletion of any nonrenewable nat- ural resource? Explanation:.. Risk of Upset. Does the proposal -involve a risk of an explosion or the release of hazardous substances (including, but not limited to, oil, pesticides, chemicals or radiation) in the event of an accident or upset conditions? 0 Explanation: Population. Will the proposal alter the • location, distribution, density, or growth rate of the human population of an area? . Explanation: _Housing. Will the proposal affect existing housing availability, or create a demand for additional housing? Explanation: Transportation /Circulation.- Will the pro- posal result in:. 4.441/vel 414 (a) Generation of additional vehi cul a 4.44 -e . move ment? fi�la d )1ry fr 1-24414/1";A:"-""/ 7 L 7 li k (b) Effects on exi sti ng parking facilities ,���� tow-v.. or demand for new parking? km104, Yes Maybe No (c). Impact upon existing transportation systems? -(d) Alterations to present patterns of circulation or movement of people and /or goods? • (e) Alterations to waterborne or air • • . traffic? . Explanation: /0 G 0 Local Services. Will the proposal have an ;effect upon, or result in a need for new services in any of the following areas:. (a)' Fire protection? (b) (c) Schools? (d) Parks? (e) Maintenance of public facilities, including roads? Other' governmental services? Police protection? cm, . tam (f) Explanation: • --5- .X. • • Energy. Will the proposal result in: • (a) Use of substantial amounts of fuel or energy? (b) Demand upon existing sources of energy, or require the development of new sources of energy? Explanation: Utilities. Will"the proposal result in a need for new systems, or alterations to the.follow- ing utilities: (a) Power or natural gas? (b) .Communications systems? (c) Water ?' (d) Sewer or septic tanks? (e) Storm water drainage? (f) Solid waste and disposal? Explanation: • Yes Maybe No • .X ,. X.. ...X X Human Health. Will the proposal result in the creation of any health hazard or potential . health hazard (excluding mental health)? Explanation: Aesthetics. Will the proposal result in the obstruction of any scenic vista or view open to the public, or will the proposal result in the creation of an aesthetically offensive . site open to public view? Explanation: • Recreation. Will the proposal result in an impact upon the quality or quantity of ex- isting recreational opportunities? Explanation: Archeological /Historical. Will the proposal result in an alteration of.a significant archeological or historical site? Explanation: .Revenue. Will the proposal cause a signifi- ca' nt.increase in city reve'nnues? �zv� G✓��La -e . "ko .7 Explanation: Yes Maybe • ;:Employment. Will the proposal create a significant amount of new jobs? . Explanation: /Yeti/