Loading...
HomeMy WebLinkAboutSEPA EPIC-210-83 - FARWEST PAINT MANUFACTURING - 133RD STREET VACATIONFARWEST PAINT STREET VACATION - SO. 133 "° & 134`" PL. EPIG210 -83 Affidavit of Publication STATE OF WASHINGTON COUNTY OF KING } ss. Cindy Strupp being first duly sworn on oath, deposes and says that she is the chief clerk of THE DAILY RECORD CHRONICLE, a newspaper published six (6) times a week. That said newspaper is a legal newspaper and it is now and has been for more than six months prior to the date of publication referred to, printed and published in the English language continually as a newspaper published four (4) times a week in Kent, King County, Washington, and it is now and during all of said time was printed in an office maintained at the aforesaid place of publication of said newspaper. That the Daily Record Chronicle has been approved as a legal newspaper by order of the Superior Court of the County in which it is published, to -wit, King County, Washington. That the annexed is a ....NQ.tiC.e...Of...Action as it was published in regular issues (and not in supplement form of said newspaper) once each issue for a period of two consecutive issues, commencing on the 8tldayof December , 19 83 ,and ending the 15thyof December 1983 , both dates inclusive, and that such newspaper was regularly distributed to its sub- scribers during all of said period. That the full amount of the fee charged for the foregoing publication is the sum of $ 42 • 4 5 which has been paid in full at the rate of per folio of one hundred words for the first insertion and per folio of one hundred words for each subsequent insertion. i f �l r r °' '7 1 /DEC 2 0 19R1 Ci11`i= FLA;1- ---- NNG DEFT. 1 + R 14411ACTIO■IBY4«OK.. 1 .CITY OF, TUKWILA Pursuant to the provisions of chapter 43.21C RCW, notice is hereby given that: I The City of Tukwila did on NOTICE }OF -;; Subscribed and.3worn to before me this 3 Chief Clerk 15th / for the State of Washington, residing at KWIC, King County. Federal Wa Notary Public in a day of — Passed by the Legislature, 1955, known as Senate Bill 281, effective June 9th, 1955. — Western Union Telegraph Co. rules for counting words and figures, adopted by the newspapers of the State. VN #87 Revised 5/82 41 let tit November 21, 1983, take the action described below. Any action to set aside,, enjoin, review, or otherwise challenge such action on the grounds of noncompliance with the provisions of Chap- ter 32.21 C. (State Enviro_ n- mental Policy Act) 'shat( be commenced within 30 days or be barred. The action taken by City of Tukwila notice of which is hereby given, was as follows: . Issue a determination of Nonsignificance for vacation of South 133rd easterly of So. 134th Place to West, Marginal Way South 99T. Pertinent documents may Ibe examined during regular i business hours at. the Plan- ning Department located at: City Hall, 6200 Southcenter Boulevard. It This notice is given by P Robert J. Sheehan and Paul 'E. Sheehan,' dba California -^{` Avenue Co., a partnership and filed by Robert J. Sheehan, partner. Published in the Daily Re- cord Chronicle on Decemb- er 8 and 1:5, 1'983. R8833 • ntimmEsnr • • F A R W E S T P A I N T M A N U F A C T U R I N -C L ��,; `- ,;,il ,t � . 4522 South 133rd ........- - P.O. Box 68726 Tukwila, Washington 98168 { , (206) 244 -8844 (._..i - . ;;:.. ,; • , {a December 16, 1983 L. Rick Beeler, Associate Planner City of Tukwila 6200 Southcenter Boulevard Tukwila, Washington 98188 Dear Mr. Beeler: Enclosed is affidavit from The Daily Record Chronicle for the publication of notice you requested in your letter of November 29, 1983. Sincerely, Robert J. Sheehan, Partner dba California Avenue Co. RJS:ag Encl: Affidavit of Publication cc:. Paul Sheehan MATSON PAINT PRODUCTS WONDERGLO® High Quality Paints 1908 Citytf Tukwila 6200 Southcenter Boulevard Tukwila Washington 98188 Gary L. VanDusen, Mayor November 29, 1983 Robin Huber Farwest Paint Co. 4522 So. 133rd. P.O. Box 68726 Tukwila:WA 98168 Re:. Street Vacation Dear Robin: Enclosed is the public notice featured in the State Environmental Policy Act to be published pursuant to the Determination of Nonsignificance issued for your street vacation. Please publish in "Record Chronicle" on the same day for two consecutive weeks, and mail me a copy of the affidavit of publication you will receive from the newspaper. The purpose of this notification is to establish and terminate any rights to appeal the Determination of Nonsignificance. Once the mentioned 30 day period expires, rights to appeal also expire. Otherwise, appeal rights could continue on into the future. Therefore, we advise applicants to opt for publishing the notice, although additional effort and expense. is involved. It is insurance against possible future problems. If you have any questions, give me a call at 433 -1847. Respectf »1 L. Rick Beeler Associate Planner RB /mlk NOTICE OF ACTION BY • ('L -��� f Goner rrn 1t"\ f c tU \ lLP\ Pursuant to the provisions of chapter 43.2]C RCW, notice is hereby given that: ct itct The did on ODVti*lber^ Z.1( (9'x,3 (d.ete) take the action described -below_ Any action to set aside, enjoin, review, or otherwise challenge such action on the grounds of noncompliance with the provisions of chapter 43.2]C RCW (State En v*ironmental Policy Act) shall be commenced within 3 • days or be barred. The action taken by 'tikw414 notice of which is hereby given, was as follows: lajj ISSo t_ a Ofri7e..kmi rt.4 i ort of r nsi yn i ■tu c-Orl o +t Sd . f33 r4 5-r, [ek (y of .S1. (3) Saida • - . .. Pertinent documents may be examined during regular business hours at the officc of- C 1 fy � ( ZOO 5,0+11 e r Sou (e ∎t u vc . . located at: 1f (Location, including room number) -`t I S 4104. Lt LS g v!n b y Far we Mawyccia t»i t3r Lc .� GlRcJ "qiled by 4411Vii b d J. �tre-eh Cliza Or t -t aoctec. WAC 197 -11 -1350 DETERMINATION OF NONSIGNIFICANCE Description of proposal Street Vacation Proponent Farwest Paint Manufacturing Co. Location of proposal So. 133rd St. easterly of So. 134th Place Lead agency` City of Tukwila File No. EPIC - 201 -83 This proposal has been determined not to have a probably significant adverse impact on the environment. An environmental impact statement (EIS). is not required under RCW 43- 21C.020(c). Thisdecision was made after review by the lead agency of acompleted environmental checklist and other information on file with the lead agency. This information is available to the public on request. Responsible official Brad Collins Position /title Planning Director Address and phone 6200 Southcenter Blvd., Tukwila, WA 98188 433 -1845 Date November 21, 1983 Signature tee, 4 -tom ,¢/,,,rurN,�s -� r At.* __ -Mo_ - C1IY Oh TU011LA PERMIT NUMBER - . •TR0L NUMBER 43 -3I3 CENTRAL PERMIT SYSTEM - PLAN CHECK ROUTING FORM TO: BLDG, PLNG, P,W, FIRE PROJECT Fi3y ai5- aZ. 4 if-`ec a( ADDRESS DATE. TRANSMITTED 11A5i 3 C,P,S, STAFF COORDINATOR PicA POLICE I P,& R. RESPONSE REQUESTED BY 8—Mr/g3 RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE • COMMENTS IN THE.SPACE BELOW, INDICATE CRUCIAL CONCERNS BY CHECKING•THE BOX NEXT TOTHE LINE(S) ON WHICH. THAT CONCERN IS NOTED: 1)N5 11 :� J.i T Acc -ASS is (os?'. 13y 2) El 3) 1 Ims mss, c. Nis 'rz 1 t-u_kr) 57-frg C)1 174cAlvM N LAh-('(d' ��(13M1'rrfl -S (R-L ii S i t .r ' ctetslS 1- 5) 6) i-?t\ —u G' . T� .12 LATENT' M 14 t stilviMe 7) (wL4 ? PKi-A/ (3C (ZL k 1 • ishu. TzD 8) 'Ct1v A P. Of- T -6 11444 73110C. �s • 9) crri wi LL t&E • . rpt>. tk, N11A iw _ 10) il) 12) 13) 14) 1X1 1- 1 1 i 15> D, R, C, REVIEW REQUESTED PLAN RESUBMITTAL REQUESTED PLAN CHECK DATE II/ 10/83 COMMENTS PREPARED BY C.P.S. FORM 2 ?OSTE D o rJ SiTF CITY OF TUKWILA NOTICE OF PUBLIC HEARING BY THE TUKWILA CITY COUNCIL NOTICE IS HEREBY GIVEN that the Tukwila City Council will conduct a Public Hearing on the 28th day of November, 1983, at 7:00 p.m. in the Council Chambers of Tukwila City Hall, 6200 Southcenter Boulevard, to' consider the following: VACATION OF THE UNOPENED PORTION OF SOUTH 133RD STREET LYING EASTERLY OF SOUTH 134TH PLACE Any and all interested persons are invited to be present to voice approval disapproval, or opinions'on same., CITY OF TUKWILA Maxine Anderson City Clerk Published Record Chronicle - November 8, 1983 . CITY OF "VILA 41iEFMIT NUMBEP, CiiTROL NUhBER $3-,314a- CENTRAL PERMIT SYSTEM - PLAN CHECK ROUTING FORM TO: BLDG, IVJPLNGI 1 P,W, FIRE POLICE' 1 J P,& R. PROJECT F,lyrv./5- au',?,& oefiJ' 2C i 9-yu ADDRESS60, Ja.3-V L. c P ;,)3L1 °L i21, DATE. TRANSMITTED 1/k5) .3 . RESPONSE REQUESTED BY ///q/13 C,P,S. STAFF COORDINATOR Pi(JP -RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE.SPACE BELOW, •INDICATE CRUCIAL CONCERNS BY CHECKING.THE BOX NEXT TOiTHE LINE(S) ON WHICH.THAT CONCERN IS NOTED: T. 1 1 1) -..4& P ►-�-t. _ , 2) A.►- z 3) 4) . 5) 7) . 8) 9) 10) 11) 12) 13) 14) 15) D. R, C,REVIEW REQUESTED Er PLAN RESUBIIITTAL REQUESTED P11 ALI nnnnn%irr. fl PLAN CHECK DATE ►' -8- 3 COMMENTS PREPARED BY eec-- CIP,S, FORM 2 01-3-3/3 CITY OF TUKWILA Ilb . RECEIVED CITY OF TUKWttA ENVIRONMENTAL CHECKLIST FORM PJY 2 1983 WW1/6 DEPT. This questionnaire must be completed and submitted with the application for. permit. This questionnaire must be completed by all persons applying for a permit from the City of Tukwila, unless it is determined by the Responsible Official that the permit is exempt or unless the applicant and Responsible Official previously agree an Environmental Impact Statement needs to becpmpleted. A fee of $50.00 must accompany the filling of the Environmental Questionnaire to cover costs of the threshold determination. I. BACKGROUND 1. Name of Proponent: FMwE5T PA-zit) T 8F-6- (! 0. /ber* . S heehA 2. Address and Phone Number of Proponent: 4/0-72,2- Sough J3,3 rd 3. Date Checklist Submitted: ///-2/8'.7 4. Agency Requiring Checklist: (1,42/ Of ----/Doe,. 5. Name of.Proposal, if applicable:vp,(p 'Ipl p - cymbeev.sa0 rocriol`1 pF S, (53an ja2LY of 5, 1341TN PL, 6. Nature and Brief Description of the Proposal (including but not limited to its size, general design elements, and other factors that will give an accurate understanding of its scope and nature): 1 7 i ".Q -11 «V ✓� c/a/7f, - QV 49te1-r/es4 7.t 4 f iOLi t /33 t;4 I, 14,o, y L 4(1I 7. Location of Proposal (describe (des robe the physical setting of the proposal, as . well as the extent of the land area affected by any environmental im- pacts, including any other information needed to give an accurate under- standing of the environmental setting of the proposal): �J #� 8. Estimated Date for Completion of the Proposal: 9. List of all Permits, Licenses or Government Approvals Proposal (federal, state and .local): (a) Rezone, conditional use, shoreline permit, etc. (b) .King County Hydraulics Permit (c) Building permit /9s,3 Required for the YES YES YES NO ✓ NO , NO • • (d) Puget Sound Air Pollution Control Permit YES NO ✓ (e) Sewer hook up permit YES NO ✓ (f) Sign permit YES NO ✓ (g) Water hook up permit YES NO ✓ (h) Storm water system permit YES NO ✓ (i) Curb cut permit YES NO ✓ (j) Electrical permit (State of Washington) YES NO L/7 (k) Plumbing permit (King County) YES NO ✓ (1) Other: 10. Do you have any plans for future additions, expansion, or futher activity related to or connected with this proposal? If yes, explain: 11. Do you know of any plans by d'thers.which may affect the property covered by your proposal? If yes, explain: 12. Attach any other application form that has been completed regarding the pro- posal; if none has been completed, but is expected to be filed at some future date, describe the nature of such application form: II. ENVIRONMENTAL IMPACTS (Explanations of all "yes" and "maybe" answers are required) 1. Earth. Will the proposal result in: (a) Unstable earth conditions or in changes in geologic substructures? (b) Disruptions, displacements, compaction or overcover- ing of the soil? (c) Change in topography or ground surface relief fea- tures? (d) The destruction, covering or modification of any unique geologic or physical features? YES MAYBE NO YES MAYBE NO (e) Any increase in wind or water erosion of soils, either on or off the site? t✓ (f) Changes in deposition or erosion of beach sands, or changes in siltation, deposition or erosion which may modify the channel of a river or stream or the bed of the ocean or any bay, inlet or lake? Explanation: 2. Air. Will the proposal result in: (a) Air emissions or deterioration of ambient air quality? (b) The creation of objectionable odors? (c) Alteration of air movement, moisture or temperature, or any change in climate, either locally or regionally? Explanation: 3. Water. Will the proposal result in: (a) Changes in currents, or the course or direction of water movements, in either marine or fresh waters? (b) Changes in absorption rates, drainage patterns, or the rate and amount of surface water runoff? (c) Alterations to the course or flow of flood waters? (d) Change in the amount of surface water in any water body? (e) Discharge into surface waters, or in any,alteration of surface water quality, including but not limited to temperature, dissolved oxygen or turbidity? (f) Alteration of the direction or rate of flow of ground waters? (g) Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations? -3- • • (h) Deterioration in ground water quality, either through direct injection, or through the seepage of leachate, phosphates, detergents, waterborne virus or bacteria, or other substances into the ground waters? (i) Reduction in the amount of water otherwise avail- able for public water supplies? Explanation: 4. Flora. Will the proposal result in: (a) Change in the diversity of species, or numbers of any species of flora (including trees, shrubs, grass, crops, microflora and aquatic plants)? (b) Reduction of the numbers of any unique, rare or endangered species of flora? (c) Introduction of new species of flora into an area, or in a barrier to the normal replenishment of existing species? (d) Reduction in acreage of any agricultural crop? Explanation: 5. Fauna. Will the proposal result in: (a) Changes in the diversity of species, or numbers of any species of fauna (birds, land animals including reptiles, fish and shellfish, benthic organisms, insects or microfauna)? (b) Reduction of the numbers of any unique, rare or endangered species of fauna? (c) Introduction of new species of fauna into an area, or result in a barrier to the migration or movement of fauna? (d) Deterioration . to existing fish or wildlife habitat? Explanation: YES MAYBE NO 6. Noise. Will the proposal increase existing noise levels? Explanation: 7. Light and Glare. Will the proposal produce new light or glare ?. Explanation: 8. Land Use. Will the proposal result in, the altera- tion of the present or planned land use of an area? YES MAYBE. NO J ation• A 2..e.A.4.4.4.,t, (1,436 9. Natural Res urces. Will the proposal result in: (a) Increase in the rate of use of any natural resources? (b) Depletion of any nonrenewable natural resource? Explanation: 10. Risk of•Upset. Does the proposal involve a risk of an explosion or the release of hazardous substances (including, but not limited to, oil, pesticide's, chemicals or radi- ation) in the event of an accident or upset conditions? Explanation: • • 11. Population. Will the proposal alter the location, distribution, density, or growth rate of the human population of an area? Explanation: 12. Housing. Will the proposal affect existing housing, or create a demand for additional housing? Explanation: 13. Transportation /Circulation. Will the proposal result in: (a) Generation of additional vehicular movement? (b) Effects on existing parking facilities, or demand for new parking? (c) Impact upon existing transportation systems? (d) Alterations to present patterns of circulation or movement of people and /or goods? (e) Alterations to waterborne, rail or air traffic? (f) Increase in traffic hazards to motor vehicles, bicyclists or pedestrians? • Explanation: 14. Public Services. Will the proposal have an effect upon, or result in a need for new or altered governmental services in any of the following areas:' YES MAYBE. NO (a) Fire protection? (b) Police protection? (c) Schools? (d) Parks or other recreational facilities? (e) Maintenance of public facilities, including roads? v ,v (f) Other governmental services? Explanation: 15. Energy. Will the proposal result in:. (a) Use of substantial amounts of fuel or energy? (b) Demand upon existing sources of energy, or require the development of new sources of energy? Explanation: 16. Utilities. Will the proposal result in a need for new systems, or alterations to the following utilities: (a) Power or natural gas? (b) Communications systems? (c) Water? (d) Sewer or septic tanks? (e) Storm water drainage? (f) Solid waste and disposal? Explanation: 17. Human Health. Will the proposal result in the crea- tion of any health hazard or potential health hazard (excluding mental health)? Explanation: YES MAYBE NO • • 18. Aesthetics. Will the proposal result in the obstruc- tion of any scenic vista or view open to the public, or will the proposal result in the . creation of an aesthetically of- fensive site open to public view? Explanation: 19. Recreation. Will the proposal result in an impact upon the quality or quantity of exist- ing recreational opportunities? Explanation: 20. Archeological /Histroical. Will the proposal result in an alteration of a signifi- cant archeological or his- torical site, structure, object or building? Explanation: CERTIFICATION BY APPLICANT: YES MAYBE NO I, the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaration of non - significance that it might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of full disclosure on my part. nature and Title Date -8- I U KW 1 LA • *PERMIT NUMBER , INTROL NUMBER X33- I CENTRAL PERMIT SYSTEM - PLAN CHECK ROUTING FORM TO: BLDG, PLNG, 1 P,W, FIRE POLICE PROJECT Faru.2,5 AM.& ,5h'et l/2e ADDRESS6D, J33�,L -1 °L _)Q.L DATE. TRANSMITTED . RESPONSE REQUESTED BY /rid}' /g3 C,P,S. STAFF COORDINATOR PAP. RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE • COMMENTS IN THE. SPACE BELOW, INDICATE CRUCIAL CONCERNS BY CHECKING. THE BOX NEXT TO ,THE LINECS) ON WHICH.THAT CONCERN IS NOTED: r r- 1 1 1) 2) 3) 4) 5) 6) 7) 8) • 9) 10) 11) 12) 13) 14) 15) D, R,- C,REVIEW REQUESTED PLAN RESUBIIITTAL REQUESTED =A1\ CHEt1KC DATE /VV�."3 COMMENTS PREPARED BY%�i C;P,S, FORM 2 MY OF IUKWILA iirERMIT NUMBERFpc. -)W -3 •TROL NUMBER: 3:3-3 Li-3- CENTRAL PERMIT SYSTEM - PLAN CHECK ROUTING FORM TO: BLDG, PLNG, 1 P,W, FIRE POLICE 1 1 P,& R, PROJECT Fart i5 /- )Qa(l-& ADDRESS60, la Y L old 6', ) 3 ' - 4 L , DATE. TRANSMITTED II/)3 . RESPONSE REQUESTED BY ii/P//3 C,P,S, STAFF COORDINATOR Pic RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE. SPACE BELOW, INDICATE CRUCIAL CONCERNS BY CHECKING-THE BOX NEXT TO,THE LINE(S) ON WHICH. THAT CONCERN IS NOTED: 1) 1/ >f-�- r--1 2) 1 II 4) 5). 6) 7) . 8) 9) 10) 11) 12) 13) 14) . D, R, C, 'REVIEW REQUESTED PLAN RESUBMITTAL REQUESTED „i A i.t t rnnr /rr1 571 mac— J PLAN CHECK DP,TE COMMENTS PREPARED BY 17 C;P,S, FORM 2 CITY OF TUKW ILA .PERMIT NUMBER • •TROL NUMBER X3-3 CENTRAL PERMIT SYSTEM -. PLAN CHECK ROUTING FORM TO: BLDG, PLNG, P,W, _I'L FIRE POLICE P,8 P, • PROJECT F uwi5� )Q? ih' t VQ(°_0i ADDRESS60. /53-vd. 01, 13L/ °L ILL, DATE. TRANSMITTED . RESPONSE REQUESTED BY 8)4/1'3 C, P, S, STAFF COORDINATOR Pick?, RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE • COMMENTS IN THE. SPACE BELOW, INDICATE CRUCIAL CONCERNS BY CHECKING.THE BOX NEXT TO THE LINE(S) ON WHICH.THAT CONCERN IS NOTED: r 1 • • 1) SL e..1' e /��+; e r �i rw .. j es de 4� 2) 1 Ste. d fr)5 g. '- ha- .o,1 -.d 3) ,,W; or *0 V sca 71-1 01 G1 por- 0 "1 / - 4) 5) 7) 8) . 9) 10) 11) 12) . . 13) . 14) 15) D, R, C, REVIEW REQUESTED PLAN CHECK DATE /1— PLAN RESUBiMITTAL REQUESTED COMMENTS PREPARED BY 171 r.1 ,,,r nnnnntrrr, C;P,$, FORM 2 CITY OF TUKWILA •RMIT NUMBER - COIOROL NUMBER $3- I3 CENTRAL PERMIT SYSTEM - PLAN CHECK ROUTING FORM . TO: BLDG, 1- PLNG, P,W, FIRE V POLICE P,& R. PROJECT Faru)15/ at-M.b er VC c i-U ADDRESS,133-rd- 6, )30 °L at , DATE. TRANSMITTED I i/.0l S3 . . RESPONSE REQUESTED BY ilia /S 3. C,P,S. STAFF COORDINATOR P/c 1 RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE • COMMENTS IN THE SPACE BELOW, INDICATE CRUCIAL CONCERNS BY CHECKING THE BOX NEXT TO ,THE LINE(S) ON WHICH.THAT CONCERN IS NOTED: F1 1) ri 2) t 3) r i 4) ri 5) 6) in 7) 8) ri 9) 10) -[ 11) 12) 7 13) r--1 14) 1 15) D, R, C,REVIEW REQUESTED PLAN RESUBMITTAL REQUESTED DI I U [GRRf\P1'i PLAN CHECK DATE COMMENTS PREPARED BY C;P1S, FORM 2 PERMIT NUMBER IiiNTROL NUMBER $3-34: CENTRAL PERMIT SYSTEM PLAN CHECK ROUTING FORM TO: BLDG, PLNG, P.W. : FIRE PROJECT Ftw'i5- atirT& ADDRESS DATE. TRANSMITTED / /.3 C. P, S, STAFF COORDINATOR P 'Ck-0 POLICE P, R. RESPONSE REQUESTED BY 21/21.? 3 • RESPONSE RECEIVED PLEASE REVIEW THE ATTACHED PROJECT PLANS AND RESPOND WITH APPROPRIATE COMMENTS IN THE. SPACE. BELOW, INDICATE CRUCIAL CONCERNS BY CHECKING-THE BOX NEXT TO :THE LINE(S) ON WHICH. THAT CONCERN IS NOTED: ri l> Fl 2) ri 3) 4) rt5) 6> ri 7) 8) • 13) Woc,O JtW MtA 33 kb (irn . ���- o)0... 14) &iv?, ALL& C 15) D,R,C, REVIEW REQUESTED PLAN RESUBMITTAL REQUESTED w nn nn�,rr. 1-71 • PLAN CHECK DATE // /57/3 COMMENTS PREPARED BY C;P,S, FORM 2 Go1 3-3J3 • CITY OF TUKWILA ENVIRONMENTAL CHECKLIST FORM RECEIVED CITY OF TUIONII.A NOV 2 1983 WILDING OEM This questionnaire must be completed and submitted with the application for. permit. This questionnaire must be completed by all persons applying for a permit from the City of Tukwila, unless it is determined by the Responsible Official that the permit is exempt or unless the applicant and Responsible Official previously agree an Environmental Impact Statement needs to be 9mpleted. A fee of $50.00 must accompany the filling of the Environmental Questionnaire to cover costs of the threshold determination. I. BACKGROUND 1. Name of Proponent: ) 4 4wE..T p/} =a r ,4t' . e!/). //Robert . Sheehan 2. Address and Phone Number of Proponent: 12/52- Souk/, )3 rd ,S4reef; :. 3. Date Checklist Submitted: /y/.2/8 3 4. Agency Requiring Checklist: C,'i. y pf --7;104/ is In 5. Name of, Proposal , if applicable:VOti(A11O1.1 CF(yti3pet,w0 porzlic*Nop S. Mao 11212• OF S. 134TO R.. 6. Nature and Brief Description of the Proposal (including but not limited to its size, general design elements, and other factors that will give an accurate understanding of its scope and nature): J L 41) .%mss 7. Location of Proposal (describe the physical setting of the proposal, as well as the extent of the land area affected by any environmental im- pacts, including any other information needed to give an accurate under- standing of the environmental setting of the proposal): 8. Estimated Date for Completion of the Proposal: .9) /933 9. List of all Permits, Licenses or Government Approvals Required for the Proposal (federal, state and local): (a) Rezone, conditional use, shoreline permit, etc. (b) King County Hydraulics Permit (c) Building permit YES NO YES NO v// YES NO • • (d) Puget Sound Air Pollution Control Permit YES NO / (e) Sewer hook up permit YES NO ✓ (f) Sign permit YES NO ✓ (g) Water hook up permit YES NO ✓ (h) Storm water system permit YES NO ✓ (i) Curb cut permit YES NO ✓ (j) Electrical permit (State of Washington) YES NO i/ (k) Plumbing permit (King County) YES NO ✓ (1) Other: 10. Do you have any plans for future additions, expansion, or futher activity related to or connected with this proposal? If yes, explain: ,d -Pita.o aZ`"v 11. Do you know of any plans by d"thers which may affect the property covered by your proposal? If yes, explain: 12. Attach any other application form that has been completed regarding the pro- posal; if none has been completed, but is expected to be filed at some future date, describe the nature of such application form: II. ENVIRONMENTAL IMPACTS (Explanations of all "yes" and "maybe" answers are required) 1. Earth. Will the proposal result in: (a) Unstable earth conditions or in changes in geologic substructures? (b) Disruptions, displacements, compaction or overcover- ing of the soil? (c) Change in topography or ground surface relief fea- tures? (d) The destruction, covering or modification of any unique geologic or physical features? -2- YES MAYBE NO • (e) Any increase in wind or water erosion of soils, either on or off the site? (f) Changes in deposition or erosion of beach sands, or changes in siltation, deposition or erosion which may modify the channel of a river or stream or the bed of the ocean or any bay, inlet or lake? Explanation: 2. Air. Will the proposal result in: (a) Air emissions or deterioration of ambient air quality? (b) The creation of objectionable odors? (c) Alteration of air movement, moisture or temperature, or any change in climate, either locally or regionally? Explanation: 3. Water. Will the proposal result in: (a) Changes in currents, or the course or direction of water movements, in either marine or fresh waters? (b) Changes in absorption rates, drainage patterns, or the rate and amount of surface water runoff? (c) Alterations to the course or flow of flood waters? (d) Change in the amount of surface water in any water body? (e) Discharge into surface waters, or in any alteration of surface water quality, including but not limited to temperature, dissolved oxygen or turbidity? (f) Alteration of the direction or rate of flow of ground waters? (g) Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations? -3- YES MAYBE NO (h) Deterioration in ground water quality, either through direct injection, or through the seepage of leachate, phosphates, detergents, waterborne virus or bacteria, or other substances into the ground waters? (i) Reduction in the amount of water otherwise avail- able for public water supplies? Explanation: 4. Flora. Will the proposal result in: (a) Change in the diversity of species, or numbers of any species of flora (including trees, shrubs, grass, crops, microflora and aquatic plants)? (b) Reduction of the numbers of any unique, rare or endangered species of flora? (c) Introduction of new species of flora into an area, or in a barrier to the normal replenishment of existing species? (d) Reduction in acreage of any agricultural crop? Explanation: 5. Fauna. Will the proposal result in: (a) Changes in the diversity of species, or numbers of any species of fauna (birds, land animals including reptiles, fish and shellfish, benthic organisms, insects or microfauna)? (b) Reduction of the numbers of any unique, rare or endangered species of fauna? (c) Introduction of new species of fauna into an area, or result in a barrier to the migration or movement of fauna? (d) Deterioration to existing fish or wildlife habitat? Explanation: YES MAYBE NO YES MAYBE NO 6. Noise. Will the proposal increase existing noise levels? Explanation: 7. Light and Glare. Will the proposal produce new light or glare? Explanation: 8. Land Use. Will the proposal result in the altera- tion of the present or planned land use of an area? Explanation: U 7-•ci • 9. Natural Res urces. Will the proposal result in: (a) Increase in the rate of use of any natural resources? (b) Depletion of any nonrenewable natural resource? Explanation: 10. Risk of Upset. Does the proposal involve a risk of an explosion or the release of hazardous substances (including, but not limited to, oil, pesticides, chemicals or radi- ation) in the event of an accident or upset conditions? Explanation: 11. Population. Explanation: • • Will the proposal alter the location, distribution, density, or growth rate of the human population of an area? 12. Housing. Will the proposal affect existing housing, or create a demand for additional housing? Explanation: 13. Transportation /Circulation. Will the proposal result in: (a) Generation of additional vehicular movement? (b) Effects on existing parking facilities, or demand for new parking? (c) Impact upon existing transportation systems? (d) Alterations to present patterns of circulation or movement of people and /or goods? (e) Alterations to waterborne, rail or air traffic? (f) Increase in traffic hazards to motor vehicles, bicyclists or pedestrians? Explanation: ..(A47 14. Public Services. Will the proposal have an effect upon, or result in a need for new or altered governmental services in any of the following areas: (a) Fire protection? (b) Police protection? (c) Schools? (d) Parks or other recreational facilities? (e) Maintenance of public facilities, including roads? YES MAYBE NO sz tv • • (f) Other governmental, services? Explanation: 15. Energy. Will the proposal result in: (a) Use of substantial amounts of fuel or energy? (b) Demand upon existing sources of energy, or require the development of new sources of energy? Explanation: 16. Utilities. Will the proposal result in a need for new systems, or alterations to the following utilities: (a) Power or natural gas? (b) Communications systems? (c) Water? (d) Sewer or septic tanks? (e) Storm water drainage? (f) Solid waste and disposal? Explanation: 17. Human Health. Will the proposal result in the crea- tion of any health hazard or potential health hazard (excluding mental health)? Explanation: YES MAYBE NO • • YES MAYBE NO 18. Aesthetics. Will the proposal result in the obstruc- tion of any scenic vista or view open to the public, or will the proposal result in the creation of an aesthetically of- fensive site open to public view? Explanation: 19. Recreation. Will the proposal result in an impact upon the quality or quantity of exist- ing recreational opportunities? Explanation: 20. Archeological /Histroical. Will the proposal result in an alteration of a signifi- cant archeological or his- torical site, structure, object or building? Explanation: CERTIFICATION BY APPLICANT: I, the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaration of non - significance that it might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of full disclosure on my part. nature and Title ' Date -8- - (93