HomeMy WebLinkAboutSEPA EPIC-187-82 - CITY OF TUKWILA - 6-YEAR TRANSPORTATION IMPROVEMENT PROGRAMTUKWILA 6 YEAR
TRANSPORTATION PLAN
AMENDMENTS
EPIC- 187 -82
THRESHOLD DETERMINATION
TUKWILA 6 YEAR T.I.P. AMENDMENTS - (EPIC- 187 -82)
After circulating the checklist prepared by the Public Works Department,
and reviewing the comments received, I must agree with Byron Sneva's
cover transmittal that the information contained therein is of little
useful value. However, this result is not the fault of the SEPA process;
rather, it is the outcome of failure to follow the Planning Staff's
guidance is given to D.P.W. prior to beginning work on the checklist.
It is our opinion that the checklist as submitted is inadequate. The urgency
of preparing an adequate environmental assessment of the policy implications
of the six year street plan is apparent in that it is the City's closest
approximation of a comprehensive capital improvements program. That other
jurisdictions do not review their T.I.P.'S is irrelevent; as a legislative
proposal for Council action, SEPA assessment is clearly an obligation per
RCW 43.21C.030(2c).
To bring the checklist up to the standards of full disclosure expected by
SEPA, we suggest attention to the following topics:
A) Section 1, Item 6: Description of Proposal
The narrative describes this proposal as an "update," yet it does
not describe the changes in project priority which have taken place
or the criteria for those changes. The discussion should be
expanded accordingly.
Section 1, Item 11: Plans by Others
Section 2, Item 13: Transportation/Circulation
The Comprehensive Plan contains a number of policies regarding
the encouragement of a variety of transportation modes in the City and
directing that they interface efficiently. The 6 -year street plan,
as a legislative proposal, should include an analysis of its
transportation system improvement priorities relative to the City's
long -term transportation policies.
In conclusion, we suggest that the final threshold determination be delayed
until the additional information suggested herein is provided.
<3914eP F
M
4 SUBJECT
MESSAGE / jef -ii, z,,,,,, g, jt, tS za..s Z- X'?=r-1//074-
Scoc St?i/&?, . '-
,S
REPLY
67-t/Z'a___-
/ ;1/0/` oel 105
FiEDiFOFT ® 45 472
SIGNED
SEND PARTS 1 AND 3 WITH CARBON INTACT -
PART 3 WILL BE RETURNED WITH REPLY.
DATE
POLY PAK (50 SETS) 4P472
•
CITY OF TUKWILA
ENVIRONMENTAL CHECKLIST FORM
This questionnaire must be completed and submitted with the application for
permit. This questionnaire must be completed by all persons applying for a
permit from the City of Tukwila, unless it is determined by the Responsible
Official that the permit is exempt or unless the applicant and Responsible
official previously agree an Environmental Impact Statement needs to be completed.
A fee of $50.00 must accompany the filling of the Environmental Questionnaire
to cover costs of the threshold determination.
I. BACKGROUND
1. Name of Proponent: Tukwila.Public Works Department
2. .Address and Phone Number of Proponent: 6200 Southcenter Boulevard
3.. Date Checklist Submitted:
7/2/82
4.. Agency Requiring Checklist: Tukwila Planning Department
5. Name of Proposal, if applicable: Tukwila.6 -Year Transportation Program
6. Nature and .Brief Description of the Proposal (including but not limited
to its size, general design elements, and other factors that will give
an accurate understanding of its scope and nature):
Annual update of road improvement needs for the City of Tukwila scheduled
for a 6 -year construction period of 1983 -1988.
7. Location of Proposal (describe the physical setting of the proposal, as
well as the extent of the land area affected by any environmental im-
pacts, including any other information needed to give an accurate under -
standing of the environmental setting of the proposal):
The 6 -Year Transportation Program prioritizes road improvements for the
residential, commerical and industrial areas within the corporate limits
oc Tukwila
8. Estimated Date for Completion of the Proposal: 1988 (See Item #6)
9. List of all Permits, Licenses or Government Approvals Required for the
Proposal (federal, state and local): Not applicable
•
(a) Rezone, conditional use, shoreline permit, etc. YES NO
(b) King County Hydraulics Permit YES NO__
(c) Building permit YES N0__
• •
(d) Puget Sound Air Pollution Control Permit YES NO
(e) Sewer hook up permit YES NO
(f) Sign permit YES NO
(g) Water hook up permit YES NO
(h) Storm water system permit YES NO
(i) Curb cut permit YES NO
(j) Electrical permit (State of Washington) YES NO
(k) Plumbing permit (King County) YES NO
(1) Other:
10. Do you have any plans for future additions, expansion, or futher activity
related to or connected with this proposal? If yes, explain:
Yes, this is.a six -year program which is revised and updated annually
11. Do you know of any plans by others which may affect the property covered by
your proposal? If yes, explain:
1) Proposed LID for the ccommerciallindustrial district South of T -405
2) 1977 Comprehensive Land -Use Policy Plan, Chapter 5. Transportation and Utilities
3) The 1979 Entranco Transportation Improvement Plan
12. Attach any other application form that has been completed regarding the pro-
posal; ..
if none has been completed, but is expected to be filed at some future
date, describe the nature of such application form:
See attached
II. ENVIRONMENTAL IMPACTS -
(Explanations of all "yes" and "maybe" answers are required)
YES MAYBE NO
1. Earth. Will the proposal result in:
(a) Unstable earth conditions or in changes in geologic
substructures?
(b) Disruptions, displacements, compaction or overcover-
ing of the soil? X
(c) Change in topography or ground surface relief fea-
tures? X
(d) The destruction, covering or modification of any
unique geologic or physical features?
(e) Any increase in wind or water erosion of soils,
either on or off the site?
(f) Changes in deposition or erosion of beach sands, or
changes in siltation, deposition or erosion which
may modify the channel of a river or stream or the
bed of the ocean or any bay, inlet or lake?
Explanation: Proposed road improvements will encourage
future development of vacant lands. The indirect effect
of allowing this development will impact the areas geology
and topography.
YES MAYBE NO
2. Air. Will the proposal result in:
(a) Air emissions or deterioration of ambient air
quality? —
(b)' The creation of. objectionable odors? _
(c) Alteration of air movement, moisture
or temperature, or any change in climate, either
locally or regionally?
Explanation: Proposed road.improvements will generate
additional traffic, which in turn will impact the ambient
air quality. However, improved pollution controls available
in today's market will reduce the effect of auto exhaust
on the environmental.
3. Water. Will the proposal result in:
(a) Changes in currents, or the course or direction
of water movements, in either marine or fresh
waters?
(b) Changes in absorption rates, drainage patterns,
Dr the rate and amount of surface water runoff?
(c) Alterations to the course or flow of flood waters?
(d) Change in the amount of surface water' in any water
body?
(e) Discharge into surface waters, or in any alteration
of surface water quality, including but not limited
to temperature, dissolved oxygen or turbidity?
(f) Alteration of the direction or rate of flow of
ground waters?
(g) Change in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations?
X
X
X
X
X
X
x
X
• •
YES MAYBE NO
(h) Deterioration in ground water quality, either
through direct injection, or through the seepage
of leachate, phosphates, detergents, waterborne
virus or bacteria, or other substances into the
ground waters? X
(i) Reduction in the amount of water otherwise avail-
able for public water supplies? X
Explanation: The resulting effect of the proposed
road improvements will be a continued trend toward more impervious
surfaces {associated with continued development) the consequence
which may be: 1) increased surface run-off and discharge into
existing water courses and 2) decreased ground water recharge
4. Flora. Will the proposal result in:
(a) Change in the diversity of species, or numbers
of any species of flora (including trees, shrubs,
grass, crops, microflora and aquatic plants)? _
(b) Reduction of the numbers of any unique, rare or
endangered species of flora?
(c) Introduction of new species of flora into an area,
or in a barrier to the normal replenishment of
existing species? X
(d) Reduction in acreage of any agricultural crop? _
Explanation: Continued development may displace some plant
habitat thus resulting in fewer numbers of certain species.
5. Fauna. Will the proposal result in:
(a) Changes in the diversity of species, or numbers
of any species of fauna (birds, land animals
including reptiles, fish and shellfish, benthic
organisms, insects or microfauna)?
(b) Reduction of the numbers of any unique, rare or
endangered species of fauna?
(c) Introduction of new species of fauna into an
area, or result in a barrier to the migration
or movement of fauna?
X
(d) Deterioration to existing fish or wildlife
habitat? X
Explanation: Continued development may displace some
wildlife habitat hence resulting in fewer numbers of
certain species.
YES MAYBE NO
6. Noise. Will the proposal increase existing noise
levels? -�—
Explanation: Proposed road improvements will generate
more vehicular traffic causing an increase in the ambient
noise level.
7. Light and Glare. Will the proposal produce new
light or glare? X
Explanation: Indirectly, new improvements occurring under
proposl:will generate additional light.
8. Land Use. Will the proposal result in the altera-
tion of the present or planned land use
of an area?
Explanation: The'road improvements will provide better access
to many areas of the City which will allow for
more intensive land use per current zoning.
9. Natural Resources. Will the proposal result in:
(a). Increase in the rate of use of any natural
resources?
(b) Depletion of any nonrenewable natural
resource?
Explanation:
10. Risk of Upset. Does the proposal involve a risk of an
explosion or the release of hazardous
substances (including, but not limited
to, oil, pesticides, chemicals or radi-
ation) in the event of an accident or
- upset conditions?
Explanation:
X
• •
11. Population. Will the proposal alter the location,
distribution, density, or growth rate
of the human population of an area?
YES MAYBE NO
Explanation:The proposed road improvements will provide
better access to and within the City which will
indirectly alter the location, distribution,
density and growth rate of the human population.
12. Housing. Will the proposal affect existing housing,
or create a demand for additional housing?
Explanation:
13. Transportation /Circulation. Will the proposal result
(a) Generation
(b) Effects on
demand for
in:
of additional vehicular movement? X
existing parking facilities, or
new parking?
(c) Impact upon existing transportation systems? X
(d) Alterations to present patterns of circulation
or movement of people and /or goods? X
Alterations to waterborne, rail or air traffic? _
Increase in traffic hazards to motor vehicles,
bicyclists or pedestrians? _
Explanation: Proposed road improvements will generate
additional vehicular traffic, which in turn, will create
a demand for additional parking and will alter present
patterns of circulation. Improved transit stops and
sidewalks will encourage increased pedestrian traffic.
14. Public Services. Will the proposal have an effect upon,
or result in a need for 'new or altered
governmental services in any of the
following areas:
Fire protection?
Police protection?
Schools?
(d) Parks or other recreational facilities?
(e) Maintenance of public facilities, including
roads?
X
X
X
• •
YES MAYBE NO
(f) Other governmental services? X
Explanation: The proposed improvements will impact
the demand for additional governmental service, fire
and police protection.
15. Energy. Will the proposal result in:
(a) Use of substantial amounts of fuel or energy?
(b) Demand upon existing sources of energy, or
require the development of new sources of
energy?
Explanation:
16. Utilities. Will the proposal result in a need for
new systems, or alterations to the
following utilities:
(a) Power or natural gas?
(b) Communications systems?
(c) Water?
(d) Sewer or septic tanks?
(e) Storm water drainage?
(f) Solid waste and disposal?
Explanation: Portions of the 6 -year T.I.P. represent
additional roadways which will require added utilities.
17. Human Health. Will the proposal result in the crea-
tion of any health hazard or potential
health hazard (excluding mental health)?
Explanation:
X
X
YES MAYBE NO
•
18. Aesthetics. Will the proposal result in the obstruc-
tion of any scenic vista or view open to
the public, or will the proposal result
in the creation of an aesthetically of-
fensive site open to public view?
Explanation:
19. Recreation. Will the proposal result in an impact
upon the quality or quantity of exist-
ing recreational opportunities?
Explanation:
20. Archeological /Histr_oical. Will the proposal result in
an alteration of a signifi-
cant archeological or his-
torical site, structure,
object or building?
Explanation:
X
X
CERTIFICATION BY APPLICANT:
I, the undersigned, state that to the best of my knowledge the above
information is true and complete. It is understood that the lead agency
may withdraw any declaration of non - significance that it might issue in
reliance upon this checklist should there be any willful misrepresentation
or willful lack of full disclosure on my part.
Signature and Title Date
CITY;iOF TUKWILA fip
ERMIT NUMBER COROL NUMBER
CENTRAL PERMIT SYSTEM - PLAN CHECK ROUTING FORM
TO: r BLDG,
PROJECT,
ADDRESS
DATE TRANSMITTED 12 July 1982
C,P,S, STAFF COORDINATOR Mark
PLNG, 1 P,W, FIRE POLICE P,& R,
6 Year Transportation Improvement Plan Amendment.
City -wide
RESPONSE REQUESTED BY 19 July. 1982
RESPONSE RECEIVED
PLEASE REVIEW THE ATTACHED AND RESPOND WITH APPROPRIATE
COMMENTS IN THE SPACE BELOW, INDICATE CRUCIAL CONCERNS BY CHECKING THE
BOX NEXT TO THE LINE(S) ON WHICH THAT CONCERN IS NOTED:
C1) . /.. _ e...v:
1-1 2) 6) -z' .e D;sf,`.�f .k-,_d/4 .,._.d...
4)
11
El
G H-. Gt- c r� �l r{�j to �°.-. �� /T9 l2 c✓ o ✓ �JC /�i) L� i /f�
5) r!.4"-
6)
d✓ -. a l v i /� 4a c m O ✓e6∎L' :: 4/
7) .moor ,ea-% 4�,G�
8) A-07t. r42 se- 4e -4=- 4_ /rC.`s-s
V
9),.
10) (a) 7L2., t / 3 V
ri 11) ,r 7 // s-
12) ; ��.�7 ��e
13) o ,...,- ../,�A- JL .m et r74- .� , p
14) ms.- 7o� /��.
15) fca/,fe r r/3'et k.;,- mac,
D,R,C, REVIEW REQUESTED LJ P DATE 2—
PLAN. RESUBMITTAL REQUESTED T COMMENTS PREPARED BY
C,P,S, FORM 2
CITY OF TUKWILA
HERMIT NUMBER CliiROL NUMBER
CENTRAL PERMIT SYSTEM — PLAN CHECK ROUTING. -FORM
TO: 1 BLDG,
PROJECT
ADDRESS
PLNG,
•
P,W,
FIFE POLICE
6 Year Transportation Improvement Plan Amendment
1
P. R.
City-wide
DATE-TRANSMITTED 12 July 1982
C, P, S, STAFF COORDINATOR Mark
RESPONSE REQUESTED BY
RESPONSE RECEIVED
19 July 1982
PLEASE REVIEW THE ATTACHED Av,NM i AND RESPOND WITH APPROPRIATE
COMMENTS IN THE SPACE BELOW, INDICATE CRUCIAL CONCERNS BY CHECKING THE
BOX NEXT TO THE LINE(S) ON WHICH THAT CONCERN IS NOTED:
C .
El 2) d _. t a %i , i Q•
i
3)
4V8,4414teip *IX
11
4)
5)
6)
7)
8)
9)
10)
11)
12)
13)
14)
15)
D,R,C, REVIEW REQUESTED III PLAN CHECK DATE
PLAN RESUBMITTAL REQUESTED fl COMMENTS PREPARED BY
C,P,S, FORM 2
CITY OF TUKWPLA
� PERMIT NUMBER , 40ONTROL NUMBER
CENTRAL PERMIT SYSTEM - PLAN CHECK ROUTING FORM
TO: r - BLDG.
PROJECT,
ADDRESS
PLNG, T P.W. FIRE
POLICE
6 Year Transportation Improvement Plan Amendment
P.& R,
City-wide
DATE TRANSMITTED 12 July 1982
RESPONSE REQUESTED BY 19 July 1982
C.P, S. STAFF COORDINATOR ' Mark RESPONSE RECEIVED
PLEASE REVIEW THE ATTACHED Wat kEKAND RESPOND WITH APPROPRIATE •
COMMENTS IN THE SPACE BELOW, INDICATE CRUCIAL CONCERNS BY CHECKING THE
BOX NEXT TO THE LINE(S) ON WHICH THAT CONCERN IS NOTED:
1) 111/4iii /YI /I, moo, o rL. oo-e. (i) /44.e 'ccess �F
2) -e-i".9 e't c y i kilt: /e €.447 4 yd ii7 4,7_3
3) 4141 .2/7 j.e
"e7'01 54/7 no7'1744/ o74 LIs7% 4 i 47/.
5) -� fc iat a j m f- ..e�- a he Kr $ u a-es
6)
7)
8)
9)
[] 10)
r--1 11)
[ _ 1 12)
13)
E 14)
F.] 15)
�Q -u�no�
D,R,C, REVIEW REQUESTED E PLAN CHECK DATE
PLAN
RESUBMITTAL REQUESTED fl COMMENTS PREPARED BY o
C,P,S, FORM 2
7—/3-12-
CITY OF TUKWILA
•ERMIT NUMBER , CA/ROL NUMBER
CENTRAL PERMIT SYSTEM - PLAN CHECK ROUTING FORM
PLNG, 1 P,W,
•■•■1
FIRE
POLICE
PROJECT, 6 Year Transportation Improvement Plan Amendment
ADDRESS City-wide
n
P.& R.
DATE- TRANSMITTED 12 July 1982
RESPONSE REQUESTED BY
19 July -1982
C.P.S. STAFF COORDINATOR Mark RESPONSE RECEIVED
PLEASE REVIEW THE ATTACHED Ai440Ph404AND RESPOND WITH APPROPRIATE •
COMMENTS IN THE SPACE BELOW, INDICATE CRUCIAL CONCERNS BY CHECKING THE
BOX NEXT TO THE LINE(S) ON WHICH THAT CONCERN IS NOTED:
C 1) /'o .c 0MM sArrs
-2)
ri 3)
El L4)
❑ 5>
El 6)
El 7)
ri. 8)
9)
10)
ri 11)
n
12)
ri 13)
C i4>
ri 15)
D,R,C, REVIEW REQUESTED
PLAN RESUBMITTAL REQUESTED
PLAN CHECK DATE /4
COMMENTS PREPARED BY 6U,a9D
C,P;S, FORM 2
A 1-2
V► /\ 11.../"11\ 11Nr-ll`1V1 VI \ 1 ► \v`. {��� -l)v�
OBLIGATION PROGRAM -"—
1.v
)-(caring Date
Adoption Date
../
No.
t No
_
•-• "` -r -• • •.7
_o be on all colyds
7 -8 1hie -Form. • '
punched from
- r cou u 1 lug! I`.u11, IJC,
n
_G
d
.�
+-
•C
ice•
•
4
a
\
.
: "8
a
Ib
�o
Ia
{L
0
_
:PR OJ.CTCO5T5'.1 N THOU5AN03" OF • OOLLA RS
pROu ..cT IDENTIFICATION
Work
Code
Total
den th
9
(Mile9� •
os>rfGAT1ON :_ :5'CHEDUtr�
FUNDING SOURCE
TOTAL
FUNDS
TO le, Route, Road Log No., Section No.,
Y E A; .R
FEDERAL
U.A.B.
LOCAL,
Loco .tion/Termini,Deecripiion of Work) • ".
Beginning Milepost Bridge No.
•
.16t..
"(Annual •
Element)
'.z rid •
. "
3rd
'
4. 5
4. Gth
, .
AMOUNT
PROGRAM
) . A5
!a� .
:..4 .....:
87, •40
3
41 44
0,7
4-
40
8
47
'. 9 :..'..
40 '• .. ∎ 61
l0
52 . .. JS
- .:.1I: .
So . 55
12 '..
co 43
.13
41 "". ' c•1
-:'• 14..
ce : -11
15
'►2 75
16
1G 79
no
17
H5
► 1 1 1 1 1 1 1 1 1 1 1 1 1 , 1, 1 1" 1 1 1 1 1
1
B,D1G1L
0_1013,0
M
U
X
-414j0.15_414
,015.
'i ,• 1 ..•1
1 1 ,71014
18_
1B1R1M_'1
1 "I .
181415.)
(801)
(11.0)
(25)
1100_17
13,81111.1
j
Grady'Way Bridge Replacement
Joint Project /Renton 10%, Fed 80 %, Tukwila 10%
A,F,H;J
K,M
•
•
Renton
WSDOT
BNRR
1 1 1
1
•
111_11 1518
1 1 1 , 1 1 1 ,_1 , . . , 11 1 1 1 1 1 1 1 1 1 1,, 1 2-0.13,
DI I;L
401
M
U
X
141210
5171.3 ,8
•, 1 I
1 1 I
5111111
FiAlU,S
S/C Boulev"ar.d :• 62nid to :- Grady -Way:? widen 4 •lanes
1r i dges "=over'r river and I 405. rainps ..
A, ,G,H
J/1,M •
/
1 1 1 1 1 1 1 11 1 . 1 1 1 1 1 1 1 1 1 J 1 1 1 1 1 1 1&
.B,D
F,11,
, 9,0
'7
M
U
U
X
1 1610
Location
feasib-
i l i ty
'1' 1415
1'4,510
"P& & E
1 1 1
1,01910
R.O.W.
'
1, 1
4131110
Constr.
1 1 1
4171218
, 1415
FIAIULS
FIAIUIS
1 1 1
1 1 1
111IR12
1 1_ I
1
1
151911 La
1 1 1423
188th Connector
•;_den to 5 lanes,
F; ,•, S t. IF- .1 Ic;: `■. <xK0•.r
= 4 lane connected to 57th, 57th :- -°
..
-install ."signal- :-;at.- 57th•-Av•. outh-=
-.., ' 1.,o `1 (n q_At. j `r•^,---) rAlz 5. n�
, 1.1 1 1 1 , 1 1 1 1 1 1 1 1 1 1 1 L
6M
I•
,_t
i
S
S /C- Pkwy. I -5 Ramp ::"to ":Strarider Blvd .� __:v ;:
In terconnect.: 3 signals at::I "- :5, -.- ramp=,. Klicki.:tatwantl'--
3 trander Blvd. . '`S e-l.,44{L ,
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 6H1,
,
• 1 1 1 .
S
U
X
1 1 8 " 1 0
1 1 1
1 1 i
11 ,
1 1715
F IA IU I S
1 1 ,
I I I
1
1 1 ,8 10
•
180th" Street and Andover Park East ,.0gn'al :i;Zat:ton. -..r.
letir Signal and channelizat'on-
1 trk
-
-
11 1 1 i 1„ , 1 1 1 1 1 1, , ► 1 .1 I , .
2 /�
Di F1 -��1,Z01012,0
A,B ,K
-C
•
U
1 1214
, 15,0
.7
131412
.
1.1 1
1, 1
i 1 1
131712
,•
1 1412_
1
1 14 ,1 1CL
•Iacadam Rd. from S/C Blvd. to 144th Street
)verlay, curb, sidewalks, channelization
r '
1 1 1, 1 'L 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1• l• 1}
A,B;D1G
0,0,1 38
C
U
1 1' 1
121510
181314
•I 1 '1
1 1 1
1 1 1
1 1 1
1 10 18 14
1
11 10 1aL'L
;o. 168th Street, .S /C Pkwy to Andover Park West •
Jew 3 -lane, street, 2 new signals at A.P.W. & S/C Pkwy.
F,H,I,J
K
L.I.D.
J___, 1 1 1 1 1 1 1, , 1 1 1 , 1 , 1 , 1 1 I 1 1
'•1"i nk 1 er Blvd.. Andover- Pk" :_..:E: "::.to - S R-`1 -..•_---" ---
iail . • T
5 lane bridge cross._ n�gp:,.Gre1�en•-Rive ;: = ne 's- n
�j I" J 1 L
0, Q11L2
S
U
;2,7;4
, I,
1 1 1
1_610 ,9
1 16 ,5 18
FL/1'11,S
, 1 ►.-"
14 11,5
112 10 17 1;
A, F,G
H
R.O.W.
•
O151RIeUTIoN
-Co u1
OBLIGATION PROGRAM
Hearing Date
Adoption Date
„
'10.
t No.
- .....�,.- ... ..„,— VVIY a.,,1,.1,..a., 111
1 3 -6 be on all card&
...,,,:/. v 1.1,..1
punched from
•
-
Neoolui Ion Nurnber
7 -8 • Thi9 -Form, ' •
n
•
•
A
\'o
..8
a`
v
-P RZO-J:EOT_'CO5T5'.1 N THOU5AN D5 OF •DOLLAR S •
PROJECT IDENTIFICATION
1 aM.ior C.oas
_of Work
Work
Code
To.taI
'.Cength
00tie9).,
•
°
d
.9-
c
yT
OBLIGATION :�S'CH'E'DULLE
.FUN DING SOURCE '
TOTAL
FUND 3
-Iii lc, Route, Road Log No:, Section No.,
• �
t`j
Y E A,
FEDERAL.
U.A.B.
LOCAL
Location %Terminl,Deacrlpiion of Work)..
Beginning Milepost' 4 bridge No. •
9
• •
. '19t
(Artnllal.•
Element
.z nd••
'
3rd
I 4., 5
.6th
AMOUNT
PROGRAM
_2 .
$5
SQ
4 .....
07. 4Q
r-
5
41 44
tit
0.7
Ora
S
Q4L48
U
6
• .:.5:
• '• ::. 61
.•t1.j4::8�.i..
10
52 . .. D6
1
_.:.11.
SO • • . S8
..1 1 1
Oo
-I
12 ' - .
G3
1 i
13
04 -- : ” G"t
-111418_
_.:•• 14.
ce 11
1 1 1
15
1E 15
_'1'1 1
16
76 13
1 1 1.
1 11 13
Local
A°
1
�.
17
R!:
1 i1,41t;,
•
1 1 11 LJ
_L_1 t,, r t t l t t t l l t 1.1.1 1 1 1 1 1 1 1 1
6 /H,I,
Tukwila.Pkwy. S -line to Andover Pk. W. signalization
coordination and right turn at east approach 1-405
or, Ranrp
6 M-
A, D, H 1
• ')
r
00l0
1 1
U
1 , 113
1 1 1
1 11 1.3
1
I - 1_
•
1 1 1
Spec
Signal
1 1 1
1 1 1
.._i _t 1 1 1_1
_1
Strander
for
1 1 , 1 1 1 , 1 1 1 1 1 1 1 3 1 1 1 1
S.R. 181 at
right .turn
Blvd.
north approach
._, 1 1 1 1 , 1 , 1 i 1 1 1 1 ► 1 1 1 , J 1 1 1 1 1 1
1J
A,B,D1G
0,0,38
S
U
1 1,
►41010
1,115 17.
1
1'-1
1
1 1
1 1 1
1141011
11 15 16
1
11 151517
•linkler Blvd. Andover Pk. W. to S/C Parkway •
Vevi street, 4 lanes, 2 signals A.P.W. & S/C Pkwy.
K rj%
•
.
1 1 1 1 1,
1 1, 1 1 1 1 1 1 1 1 1 1 1 1 1 1,
180th. Street,T , -÷ c.,.i
a t i o n s, :: than -n e- 147Z.E ii o n---
P :5' — co-A n; .
6�%
1�L11 -z
OBLIGATION PROGRAM
Flcaring pate
Adoption Date
J.
tJ No.
1 9 -6 be on all card&
punched•from
__.
7 -8 this -form.
G
g
4-,
.tlo
\;o
:
;
a
40
k
A
fill
i�(A►,nua1
0
;p R.O-J t.CT.'COSTS" 1 N THOU3AN D3
OF" DOLLA R5
PROD .,CT IDENTIFICATION
1
Major Clo65
. of Wcirk
Work
Code
To.taJ
length
Mile9 .,"
O-BLIGATION'.. :s'CH'E.DULE
FUNDING SOURCE
TOTAL
FUND 5
r
Ti1Ic,
Loce.tion/Termini,Deecripiion
Beginning
Rote, Road Log No., Section No.,
Y E A. FY •
FEDERAL
U.A.B.
LOCAL,
of Work, • • .
Milepo5-t 4- bridge No,
•
•19t -'
•
Element)
2 nc1
66
3 rd
4.1 5
¢•6th
AMOUNT
PROGRAM
_2
.
I+3
' • ...4. :.....
$i •40
3
41 44
0.7
745"
8
47
'•
48
3,.:..
" .'.' 6I
52
.10
. . :,
_.:.1I: ..
so • • ' 60
12 •,.
Co . • "63
.
44
13
-•". '
61
.... 14.
Ca .
11
15
'If-
15
16
74 19
do
1'I
net
1 1 1 1 1_ 1 1 1 1 1 1 1 1"•I 1_ , 1 1 1 1 1 • 1 1
6Y/I,H1i1P1
J• 1 1
S
I
11
I
.'1 1
1
l t9 t5
L. I . U.
1► 1 19.1��_
•
_,_L
ndover 'Pk. W. , Tukwila Parkway to Strander Blvd.
ons trust trfansi t stops
, , , I I I I I I I I I I I I 1 J , .I I
6
H 1 I 1 1
i• it
5
U
1
, I
I 1• ,
J 17 10
, 1 1
I I I
.1 J
1
l i
t
1 17 It)
MOO
_1 __LJ__L_I 1
O. 180th St., 57th Ave. to Andover Park West.•
eft and right turn modifications. •
-
L.I.D.
L 1 1 1 1 1 1 1 I 1 . 1 1 1 1 I I 1 I 1 1 1 1 1 1 1 1
M
P 1 , ,
1
1 1
I " 1 i
12 14 14
I I ' I
i l l
t i
t
I I
I
-,2 ,4 /I
1 1 12 i1 14
-
ndover Pk. 1J.', • Strander Blvd. to So. 180th
ores trust transit stops
•
.y1
•
"
•
L.I.D.
1 1 1 1 1 I , 1 , , 1,1 1 I 1 1_1 1 1 I , ► • J I . 1 " 1
.
6 j
H 1 ' I j 3
1 1 1
S-1.1
r
i i
ill
1 ,5 14
1 1 1
1 1 I
1 1
1
1 1
l
...1 -1554
L.I.D.
1 , 1 151`1
trander Blvd. at Andover Pk. W.
eft turn channelizati-on and signal modifications
I 1 I l I 1 I I I 1 I 1 I l l I i I I I 1 I i I 1 I
6 _
H I I , ,
• , 1 , •
S
U
1
1 1
1 1 1
1 14 19
I I
I I 1
1 1
,
L I
I
, 14 t0)
I I I 019
). 180th Street at Andover Pk. W.
iden at intersection only, signal modification
;,,,4•.-
•
_I
.
L.I.D.
•
, 1 1
1 1 1 1 I I , I J 1 1 , , 1 1 1
southbound off -ramp to Minkler
6 to 7 lanes
2 X
. F , G , J
A,E,H,K
•
0,012,8
S
U
1
1
i •,
1 1 ,
_
,2 10 ,0
•
1 12 18 14
.,
, 1
.
1,
i.
L 1
,.
1
l 14 18 A
L.I.D.
1 ,1 ,4 ,8 111
'C Pkwy., I -5
iden from 5 &
, 1 ,_1
1 t I . 1
I 1 , 1 1 1 1 1 , 1 1 1 1 Lim'
4 RA ,13_11),F
•
•
0;0 {2 10
A
U
,_(
I ' 1
I , 1
-
121112
111
1 1 1
I i
i
I I
I
i2,1 LZ
L•.I.D.
1 1 12 ,1 12._
,3rd - Interurban
rainage and
Ave. So. to the River
• street improvements
L_ 1 1 1 1 1 1 1 1 L l- I 1 1 1_ ' , 1 1 , 1 1 1 1 1 1
-y1 U 1D i F (�
Q 1 Oa 2 1 0.
L
yU
1
1 j
1 1 1
13 15 16
1 1 1
1 1 1
1 1
1
13 12
Ia.
I 13,6
L, 1115 11..
I. 154th from 53rd to City Limits
treet improvements
A,H,J,K
.
.
•
DISTRIBUTION
1 COPY D15TRICT STATE AID •EN3INEER
__ I.. I ti.1 .,.. •••••
OBLIGATION PROGRAM ---
I-fcaring pate
AdopFion Date
4.v.-
/44;---:'
r�,
,,,' >y No
__
.9-.43 be on all cards
punched from
—__
.
7-8 th15 -form, • .
•
\o
.
a
px
7
40
U
-P I O- J:E.cTs'C05T5'..1 N T1-IOU5AN D3
OF 'DOLLAR S
PROJ•ECT IDE.NTIFICATION
.q •
s!.9_1-
,.
U
o o
1.
Work
•
Code
TO't01I
.Cength
(Miles)-
6
k
-
�-
�,.�
G.
45"
M
OBL(GAT10N: S'CH'EDUIvfr.
FUNDING SOURCE
-TOTAL
FUND 9
-tit lc,
Location
Beginning
Route, Road Log No., Section No.,
lb
1
! `
8
A7
Y E X. R
FEDERAL
U.A.B.
LOCAL
-
/Termini Deecri iion of Work .
p >
Milepost 4 Bridge No. •
. . • , .
.191'.'
(Ahnua'.1
Element)
"z nil
3 rd
4, 5
d. 6 th
AMOUNT
'...13
PROGRAM
- ..2
D5
..
74 .
- :.4 -..:.
37. :A4
5
41 44
0;01<412
. S, • •
40 " : 1S►
• I •j 4•x•1•.,
. •
10
52.. .. D5
L .
_...11:
SO • •
'1 1' 1
- _.�',.
110
.
12. '..
Co 63
1817 15
-
.4 •'•"
1 l
161
1
_:.. 1h..
ce . .
_ III I
11
15
1¢ 15
_Li Lill
16
16 /9
181715
L . I .0 .
17
Ao on
I. 1�',?L`-',
i_
VDIF1GII
S.R. 181, • I -405 to Strander Blvd.
l.iden from 5. to 7 lanes, signal.modification at 2 .
intersections
A,B I,J
K
1 1 „ 1 1 „ 1 1 1 1 1 1 1 1 1 1 1 1 ) , 1 1 1
V
D 1 F I G . I
A,B,H,J
K
0 1 0 1 3 1 8
S
U
1 1 1
1 1 ,
1
i 1
1 2 1 8 18
1
1
1
•14
1, 1
12,8,8
L.I.D.
1, 12, ut�
_,
Strander Blvd., Andover Pk. W. to Bridge •
Widen from 4 to 5 lanes, signal revision •
1
-
Strander to 168th
1 new signal at Strander Blvd.
A,R,n1r,
F,H,I;J
K
n 1 h216
.
C_l
I
1 1 1
1, it
I
t t
AIR (l
,
I
i
1 l t
lit
1818,0,
1 1 181810
1 1-1_1 1
58th Avenue South,
New 3 lane street,
L.I.D.
, , , 1 , ( 1 , , 1 , t , 1 1 , 1 r 1
r /
13.1111 F a 1 . 1
A,H,J,K
0 , 0 18 ► 5
•
_.. _ i ___t—
i 1 1
►
1 1
12 i3 , 6
,
1
1
I .1 ,
1 1 t.-_
1 2 , 316
,_1--_1, 2 t . 3 1 (
_. _.
So. 168th Street,Andover Pk. W. to Andover Pk. E.
Ivey/ 3 lane street
1 1 1 t 1 1 1 1 1 1 1 1
•
I
• , L 1 .
h1
U
t t ,
111
•
1
t I
12 18 .6
1
1
1,
I t►
12 5 17
J1219
1 1 12 1 8 ,
• •
Interurban Ave. So., S.R. 599 Off -Ramp, Install 3 new
signals and interconnect. Joint project with WSDOT
, 1 1 , , ,
1 1 , 1 , 1 1 1 1 1 , 1 1 1 1 _ 1 1 , _ _ t _
Connector to City Limits
5 lanes
/
: I ,.G_
A,H,J,K
n 1 0 1 5 1 n
.•• •
S
-
11_
_1 1 ,
•
1 , 1
.
1
1 1
1121 7 1 0
1
1
1
I 1 1
1 L 1
,,
1 1 2 , 7 0
L.I.D.
1, 1. 2, 7 1(
�,
57th Avenue, 188th
Widen from 2 to
, , 1 , 1 1
Park W. to Christianson
4
)
C , F i G 1
-
0104310
_I1
r 1 1
1 1 1
1
1 '1
1 1 5 ' 1 3
1
1
L
1 1 1
1 1 1
11513
L.1.0.
„ 1 .151:
Baker Blvd. Andover
1 1 1 1 1 1 1 1 1 1 1 1 , 1 1 , 1
2 rAB1D,F1G
0,042,0
A
U
, 1 1
1 1 1
1
1 1
•
1114 12
1
1
1
1 1 1
-
, 1 t•'-
X11412
L.I.O.
_I_1 1.1.11.1:;.
,___,, _,__
Lon,Iacres Way S.R. 181 to East, widen from.2 to 4 lane.
provide sidewalks for pedestrian access
A,H,J,K
0151 R1 eU-f I OIV
.��.� nlarn,r•r ATA'rE AID ENGINEER
j.1 -I 1 1,
OBLIGATION PROGRAM --
Ffearing Date
Adoption Dane
.,.!)
No.
-
•- 7r ..
3-.6 be on all cards
punched .from
-
RcouIu 1 WI/ Ivu1.I Vt.;
-r -a fhio -form.
11
•
.2
a
\
;
«
U
1 b
io
i?`
U
_
•13 R O-J:ECT_•COST5 •.l N THOU3AN D3 OF •DOLLARS
pROJGCT IDENTIFICATION
Major Claos
_of Work
.
Work
Code
To:f aI
..Length
.(Mileo
_
_
'
tr
6.78
isItiibtil
S
OB Lid ATION::::SCH'E.DULe
.F.UNDING SOURCE
j
TOTAL I
FUND 3 I
- --
T�1I,, Route Road Lo •No, Section No.
9 >
Y E A R
FEDERAL
U.A.B.
LOCAL
(j Local ion/Termini,Deocripiion of Work, .
Dep�nning Milepost bridge No.
g
'1St
Element)
•.2 rid
3rd
4., 5
th
.. .
AMOUNT
PROGRAM
___.�
1 b$
5
3a
" r!/<
.4:....
37. X10
H I I 1. j
5
41 44
J, 1
•.9::
413 •' ::, 151
'• I• l :' 1..
10
n. .. 66
1 •. 1 1
....1I:
SO • • EO
• 1 , I
12 •.
Co G3
. j. 3_ 7,
•13
04 ••• • G'1
, 1 1 1
- .. -14.
C6 'II
• 1 1 1
15
Iif '15
`• 1 1 1,
16
1G 'N)
0.1317
L.I.O.
AO
1,l
n!•
1 1 1 t 1 1
I I I I 1 1 I I. 1 I. 1 I I I 1 1 1'1 j
S -Line Bridge to S/C Shopping Mall
modification /walkways
L.Lht 1/,
New Access at
New access /slignal
1 1 t t t 1 1 1 1„ t 1 1 1 I 1 ► ,,
4
L
10,4
A
U
,1,415
1 ,.
1 1 1.
1,01615
I I I
'I I, I I 1
I l t
I 11,7_, tU
_,
56th Avenue Bridge Replacement
Joint with King County
•.
1 1 1
I I 1 I t I j i 1 1 1 I 1
to. .170th
with sidewalk
0,012,1
,220
1 I I
1 1 1
1 1• 1
1 1 i
1 1 1 1 1 t
121? 10
1 1 012 1a
_1
53rd, 166th
Street improvement
_1_L -JL 1 1 t , I 1 l I t 1 1 ► t t ► r 1 l 1 1 ,
Kt.
I ,
0101016
1• 1 9 1 0
1 1 1
1 1 1
1 1 1
1 t 1
1 1 1 I I 1
1 19 t0
1 1 1 1910
_J
166th, 53rd to 54th, street improvement with sidewalk
1 _1_1- 1_L_I_I
140th, 55th to
I 1 1 1 1 I 1 1 1 1 1 t 1 I 1 1 1 1 1
R
1 1 t
1
I I I
1 1 1 2 ! 0
1 I 1
t 1 t
I 1 1
I I 1 I 1 I
, 1 12 11)
I t 11 12 , 0
53rd, street improvement with sidewalk
-
:,1 _
•
_, 1 , t t t t t 1 1 I 1 1 1 1 1 1 t , 1 1 1 1 1 1.1
1
1 1 1
01 01 2, 7
1 1 j
121815
1 1 1
1 1 1
1 1 1
1 •• 1 1 L 1 i
12 18 15
1 1 t? 01 lr1
55th, 140th to 144th,•.street improvement with sidewalk
Ir
1 1 1 1 1_1
to
1
1 1 1_ 1 1 1 1 1 1 1 1 1 1 1 1 1 1• I
i i I
0,015
r 1 1
.1 11810
t 1 • 1
1 1 • I
1 I_ 1
1 t i. I t .1
11 1f; tO
I 1 LL�111_
_1
160th, 51st
t
53rd, street improvement with sidewalk
t I 1 , , 1 1 1 1 1 1 1 1 • ; 1 1 1 1 1
___I 1 t
0,011.0_
1 1 i
1 1 1
1212 L5
1 1 t
1 ,_ 1
1 t 1 t I I , -
•
1 2 12 t5
1--1 2..12_1!)
1 I t
_jTL
54th, Slade Way to 166th, street improvement with
sidewalk
..E
l
.
1 L
_
015TRIbUTION
I COPY 015TRICT STATE A10 ENa11--10ER
\--11 / ♦ 1 /.../ II . . , • .
OBLIGATION PROGRAM ---
Nearing Date
Adoption Date
•
7
da.
�- ter_•._ .. -- ., ..- .,_...
3 -.6 be on all card&
.. ... ...
punched from
KCOO1UI10r) Ivufr.iUCI
•
7-o • ih13 form.
•
�v
.n
�
\
as
7
4Q
k
.b
��
t`l
- PRO- 3:ECT.'C05T5.'.l N THOUeAND3 OF •DOLLARS
.
ROJECT IDE'4TIFICATION
.o
-,111"t
t.3
- a
Work
Code
Total
length •.9-
(Mile9).
c'
ii
c
tom'
0.
OBL(GAT1ON :.S'CH'EDULE
FUNDING SOURCE
TOTAL
FUND J
TN 1c, Route, Road Log No., Section No.,
..
Y E A . F�
FEDERAL,
U.A.B.
trOCAI,
Local ion /Ternnini
Beginning
Deocri iion of Work
(Annucil
Element).
n`�
3rd
4 5
6 th
Milepog-i- 4. bridge No.
•
AMOUNT°
PROGRAM
1 - 2 -
7
85
•. •
9G
!'ll
' .. 4 :.:...
37. 'A4
1 1 1
5
41 44_45-
0; 0L 11 81_
t3
41
•..9:...
48 •.• ..'..61
'' i •1'. •
52 .
. 1
.10 .
_ ...-'55
.. 11
.... I I:
SO'. ' 50
4. 121010
.
12
CO • ' ' C3
1 l t
44
1
-'- '..
I
L1
I
Ca
L i
11
i
-1¢
- 1
I
15
I,
1G '10
i2 )O 18,
L.I.D.
dY
1
,
DS
IL 10 1 ?i
1 I_ 1 1 1 1 1 1 1 1 1 - 1 1 1 " 1 1 1 1 1 1 1 1 1 1
_.
53rd,'.160th to Klickitat
(By developer extension or L.I.D.)
1 1 1 1 1
L 1 1 1 1 1 1 1 1 ii 1 1 1 1.1 I i 1 1 I
54th to 160th
_fflt.
J i
01,01 1, 9
•
.
, , 1
1
L 1
12_1215
. 1 1
I I
I
:1 I
i
1
1
1
1 ?_1? .5
L
1
? i
Slade Way,
(By L.I.D.).
l 1 1 1 I . 1 J' 1 1 1 1 1 1 , , I J f 1 1 1 I I
M
i l t
01 01 3 , 8
1 1 1
1
L I
'41010
I 1 : 1
1
t
I
1 1
1
1
I
,
14 10_10_
1
1
14_1-0 11
__1_1
51th, 141st to'147th street improvement with sidewalk
-
-
. . 1 1 1 1 1 1 1 i 1 I 1 1 1 1 1 1 I 1 1 1 1 1 1 1
1/4
• t 4
0101 Oil
-.
--_f 1. ►
I
I 1
1 I I
111015
1
1
1
1 1
1
1
,
„1 ,0 ,5
1
1
l l I°,',
141st, 56th to 57th, street improvement with sidewalk
_l , 1 1 1 1 1 1 1 1 i 1 i 1 1 1 1 1 1 1 1 1 1 1 1 1
M
1 1 J
0, 0 1 1 1 3
I I I
I
l i
_ t i t
1 L1 7 15
I
1
1
1 1
1
I l
i
1 1 17 1 5_
1
'
1
•
1 1 1 7 ,';
56th Ave. , 139th to 141st, street improvement with sidewalk
;,,,r!,_,
_ L , 1 . 1 1 , 1 1 1 1 1 1 1 1 1 1 1 , I 1 1 1 1 1 1
• %
1 _ , I
0, 01 1 L3
-
J I '1
••
t
1 1
1 1 1
0.'715
1
1
1
1' 1
1
1
1
1
.11 17 15
,
,
11 , 7 .1'..
_
56th Pl., 139th to 141st, street improvement with
sidewalk
C ! %
•
- — i - -; -- 1
-
0,_040 5
•
- - -
-
i 1 1
1
1 1
1 1 'I
1 1 7' 15
1
1
1
I l
i
1
1
I
1 0 6
1
1
1 0 0".
1 l l_ 1 1 1
I 1 l I 1 1 1 1 1 1 1 1 1 I 1 1 1 1 i . 1'
to 56th .Place
•
139th, 56th
•.
1 , 1 1 1 1 1 1 1 1 1 1 , L • 1 1 1 , . 1 1 1 . 1
1 ' 1 4
_ _ _ j 1.._1
01 04 11 5
,_.._1
, i
I
1 I
1 ' 1 1
111810
• 1
,
i
1 1
I
1
1
1'..
mil_ 11
_1_►
Ili ti_ .it)
_1
56th, 137th to 139th, street improvement with side-
1 -r a 1 k
•
O15TRI BUTTON
STATE AID ENGINEER
151Alva
1 /\
1 r-1 . 1 1 \ r-‘t S.-el 'VI N. to I.. ■. g•
OBLIGATION PROGRAM
-
I-rcaring Date
Adoption Date
.-..,
NO.
■---
-
- --vr--
1 3-G be on all card&
•
punched from
•
. tw.0,...,,u I Ilit I INLJI%, LJt-.1
7-8 ihi5 .:FOrra,
61
CI"
8
4._._
•C
* '
0.7
45-
•
ti
-2
\•
g•"'
'3
PC
AO
•-■
.
PRO:3:E.CT.:C05T5-.1 NI THOUSAN D5. OF • OOLLA R5
.
12ROJF.,CT IDENTIFICATION _ •
.
.
i
.2 .4
-a- O
0
--)t..-
2 '
..3
sa
•
Work
Code
. •
1-6"-Ial
length
Nile 0. ••(.)
OBLiGATION..7.5CREDULE .
.F.L.J.NDING SOURCE
.
'TOTAL
FUN D 3
—
Ti 1 )c, Route., Road Log No., Section No.,
ki
:
k
bLiL14:4—a71n.U:
6
47
Y E A R .
FEDERAL
U.A.13.
LOCAL,
f Loco tiontfermini, Deocripiion of Work,•
7. Beginning Milepost 4 bridge No.
_
. . .. ' i. • .
.
:15.t..
-
.
Eiement)
. •:.3: .. :
48 • " ; .iii
. e tici
3 rd
..
4.5
45. th
.
AMOUNT
PROGRAM
• : 4 ... .•_.
a7 :4Q
5
41 44
.10
52., .. D5
.... it
SO ' "59
12, 1.
GO 63
01
15
— '.'
61
..- 14
Ca .
11
15
D2 '15
'16
16
15
40
17
AS
1 1
°IC1°17.
..;-"---.
-
i I 1 j‘.
1— 181°1
.1 1 1
.
1 1 1
1 1 1 a
1 181°a'
1 1 1 til I" '
Plith, 59th to E. Terminus , street improvement with
sidewa 1 ks 1
,
.
.
-
.•
•
I 1 1 1
1 ,_ 1
to E. Terminus to 500 South new street
.
1/
1 1 1
0 0 2 4
ill
j 1 i
1 1 1
i 1 i
1 1
j i 1
i 1 1
1310 10
1 I: I
1 i 1
I 1 1
Alt
1 I 1
It!
1 1 ,
1310 ,0
III
i 1 13 tO__111
1 1 1 I__I
__1
58th, 59th
construction
•
1
• . •
.
____.1 i 1 1 1 1 1 1 i 1 j 1 1 1 1 1 1 1 1 1 1 _1 1.11
1 1 1
_L..1 1 1
I 1._ 1_
I 1 1
1 1
i 1 1
ti I
L__1
1 1_ 1
11 i..._1._.._1
__.t
•
VA
•
-
lit
ili
ill
1_11
III
Ill
Ili
111
11111,
.
•
II,
i ,1, 11,111 1 1 1111111111111i
A
1,11
• .
111
11,1
•
: .;
111
•
111
1 1 1
1 1 1
1 1 1
1 1 .1_
`.•
1
'
1 1 1 1 i_..._
.
•
•
•
%
4
VA
r.0111
.
I 1 .I
1 1 •
I 1 I
I -1 1
1-1- —1
-.
1 1 1
1 i
111111
•
.
• . •
' —
.
---.- •
'
'
-
•
l_jt_t 1111111_1111111 t 11_ 11 it 1
• • .
• •
11 •
111
111
•
111
1. 1 1
•
1 1 i
1 1 1
1 _11 i__.
i__L_L_i_ . 1
•
---- -
DifiiRiBU'riON •
GY-A-7.-= A In v-klf4(VJ f-FF?