Loading...
HomeMy WebLinkAboutSEPA EPIC-165-81 - NC MACHINERY / JENSEN CARLYLE - METAL STORAGE SHED\C MACHINERY 16711 WEST VALLEY HWY EPIG165 -81 CITY OF TUKWILA OFFICE OF COMMUNITY DEVELOPMENT FINAL DECLARATION OF NON- SIGNIFICANCE Description of proposal Proponent Metal` Storage shed. Carlyle Jensen. Agent for N.C. Machinery Co. Location of Proposal 16711 West Valley Highway Lead Agency City of Tukwila File No. EPIC - 165 -81 This proposal has been determined to (fig /not have) a significant adverse impact upon the environment. An EIS (. c/is not) required under RCW 43.21C.030(2)(c). This decision was made after review by the lead agency of a completed environmental checklist and other information on file with the lead agency. Responsible Official Position /Title. Date .Brad Collins Planning Director h-Z� -31 COMMENTS: NONE Signature ,1908 City of Tukwili 6200 Southcenter Boulevard Tukwila Washington 98188 PLANNING DEPARTMENT 'TRANSMITTAL DATE OF TRANSMITTAL 14 ,/ TO: PROJECT: LOCATION: ❑ BUILDING DEPT. FIRE DEPT. ❑ PUBLIC WORKS DEPT. ❑ POLICE DEPT. ❑ RECREATION DEPT. N. c. A4A4.4.1Nei - ,ou)ciUe.K`( 151.7 G' . VaL1/ NIGNwe( The above mentioned applicant has submitted the following plans or materials for the above reference project: Environmental Checklist ❑ Preliminary Plat ❑ Environmental Impact State- ❑Final Plat ment ❑Site /Development Plans ❑Rezone Request ❑ Shoreline Permit Application❑ Variance Request ❑Conditional Use Permit - ❑Other: Application The attached materials are sent to you for your review and comment. The Planning Dept. needs your comments to satisfy review procedures and to complete the project file. Please use the space provided below for your comments or attach a separate sheet. Requested response date: 22 / MAY/ 8i Review Department comments: /7r o v, t // p� Q i e O' e 'L-ec S 7 S 1( P°bD j7 67/.71'4 4 cl_ 7,OL /e, —(17' Q iR9 71 o I 42.-X;571N;193 5 .7 ( �. By: Date: 5' / �" 6/ PLANNING DEPARTMENT TRANSMITTAL DATE OF TRANSMITTAL 14 / M* ', 8I TO: ❑ BUILDING DEPT. ❑ POLICE DEPT. ❑ FIRE DEPT. RECREATION DEPT. ❑ PUBLIC WORKS DEPT. ❑ PROJECT: W. C. MAGNI NEB(- AUXI LL MCI 13L-PG, LOCATION: W. VAI. f 1-1I64W44 The above mentioned applicant has submitted the following plans or materials for the above refere ce project: Environmental Checklist ❑Preliminary Plat ❑Environmental Impact State- ❑Final Plat ment ❑Site /Development Plans DRezone Request ❑Shoreline Permit Application❑ Variance Request ❑Conditional Use Permit ElOther: Application The attached materials are sent to you for your review and comment. The Planning Dept. needs your comments to satisfy review procedures and to complete the project file. Please use the space provided below for your comments or attach a separate sheet. Requested response date: 4Z / AVM C 8j Review Department comments: .=' - /. >44a._ X,X- ,.�� �- /.::� 3-4o ww .� �0 7�� ya Ole_ r %' c7 c> ), QQ .fu ✓ Bv: i6%'/� Date: W City of Tukwi6 6200 Southcenter BouleW PLANNING DEPARTMENT Tukwila Washington 98188 • TRANSMITTAL DATE OF TRANSMITTAL 14 / M44/ 8l TO: ❑ BUILDING DEPT. ❑ POLICE DEPT. ❑ FIRE DEPT. ❑ RECREATION DEPT... PUBLIC WORKS DEPT. ❑ PROJECT: f.t. G. mo t-L -14t2f IgtdP6. LOCATION: N teprota j The above mentioned applicant has submitted the following plans or materials for the above reference project: E 7Environmental Checklist ❑Preliminary Plat ❑Environmental Impact State- ['Final Plat ment ❑Site /Development Plans ❑Rezone Request ❑ Shoreline Permit Application❑ Variance Request ❑Conditional Use Permit ❑Other: Application The attached materials are sent to you for your review and comment. The Planning Dept. needs your comments to satisfy review procedures and to complete the project file. Please use the space provided below for your comments or attach a separate sheet. Requested response date: 7Z.' / MAT t 81 Review Department comments: PEC!O riuBUC ti's {stag. CITY OF TUIRu N� e-oQn rn k -TS At '4' 198 By: Date: -Sifi3 %o i City of Tukwirlip 6200 Southcenter Boulevard Tukwila Washington 98188 PLANNING DEPARTMENT TRANSMITTAL DATE OF TRANSMITTAL 14 / MA4 / $) TO: ❑ BUILDING DEPT. . ❑ POLICE DEPT. )FIRE DEPT. j.RECREATION DEPT. PUBLIC WORKS DEPT. ❑ PROJECT: hl. G. h14cii 11.1 [ - A.uxl &R`( BLDG LOCATION: W. VAI,LS"( I41614Wa1 The above mentioned applicant has submitted the following plans or materials for the above reference project: ,vironmental Checklist ❑Preliminary Plat ❑ Environmental Impact State- ❑Final Plat ment ❑Site /Development Plans ❑Rezone Request ['Shoreline Permit Application❑ Variance Request ['Conditional Use Permit ❑Other: Application The attached materials are sent to you for your review and comment. The Planning Dept. needs your comments to satisfy review procedures and to complete the project file. Please use the space provided below for your comments or attach a separate sheet. Requested response date: ZZ / AN"( Review Department comments: By: Date:. CITY OF TUKWILA ENVIRONMENTAL CHECKLIST FORM This questionnaire must be completed and submitted with the application for permit. This questionnaire must be completed by all persons applying for a permit from the City of Tukwila, unless it is determined by the Responsible Official that the permit is exempt or unless the applicant and Responsible Official previously agree an Environmental Impact Statement needs to be completed. A fee of $50.00 must accompany the filling of the Environmental Questionnaire to cover costs of the threshold determination. I. BACKGROUND 1. Name of Proponent: N.C. Machine/1y, c/o Can,eyle 8 Jensen 2. Address and Phone Number of Proponent: 1266 Me't.ce.k St. Seattee, WA 98109 • 3. Date Checklist Submitted: Apn,ii 3, 1981 4. Agency Requiring Checklist: el ty ,'` ?,pt Storage b.2dg f an . C. Mach i.neh y rnucl2 V�,v.Ls.i.on 5. Name of Proposal, if applicable: Webb VcLt y H.c9itukty 6. Nature and Brief Description of the Proposal ( including but not limited to its size, general design elements, and other factors that will give an accurate understanding of its scope and nature):. The bu1dang ,i4 a metal bwiJding with two open sides. Supported by cotumnb g to be used 4on pah,#ts . 4.tonact_e_. 7. Location of Proposal (describe the physical setting of the proposal, as well as the extent of the land area affected by any environmental im- pacts, including any other information needed to give an accurate under- standing of the environmental setting of the proposal): neat aide yard. The area of land aiiected .a appnox. 4000 6q. it.. The pnopen.ty .c,6 itat and pneaentCy used a6 a 6.tonage yard. 8. Estimated Date for Completion of the Proposal: 90 Vcyb 4 wm .issue of b.2dg. 9. List of all Permits, Licenses or Government Apprgals Required for the Proposal (federal, state and local): (a) Rezone, conditional use, shoreline permit, etc. YES NO_x_ (b) King County Hydraulics Permit YES NO (c) Building permit YES x NO (d) Puget Sound(Air Pollution Control Permit YES N0_x_ (e) Sewer hook up permit YES NO X (f) Sign permit YES _ NO X (g) Water hook up permit VES ,_. NO X (h) Storm water system permit YES NO X (i) Curb cut permit YE_ N0 (j) Electrical permit (State of Washington) YES NO (k) Plumbing permit (King County) YES N (1) Other:, 10. Do you have any plans for future additions, expansion, or futher activity related to or connected with this proposal? If yes, explain: NO 11. Do you know of any plans by others which may affect the property covered by your proposal? If yes, explain: NO 12. Attach any other application form that has been completed regarding the pro- posal; if none has been completed, but is expected to be filed at some future date, describe the nature of such application form: NONE II. ENVIRONMENTAL IMPACTS • (Explanations of all "yes" and "maybe" answers are required), 1. Earth. Will the proposal result in: (a) Unstable earth conditions or in changes in geologic Substructures? (b) Disruptions, displacements,. compaction or overcover- ing of the soil? (c) Change in topography or ground surface relief fea- tures? (d) The destruction, covering or modification of any unique gefAosic or ph ys.k41 YES MAYBE NO X X X X (e) eiAny off the site ?ter erosion of soils, (f) Changes in deposition or erosion of beach sands, or . changes in siltation, deposition or erosion which may modify the channel of a river or stream or the bed of the ocean or any bay, inlet or lake? Explanation: 2. Air. Will the proposal result in: (a) Air emissions or deterioration of ambient air quality? (b) The creation of objectionable odors? (c) Alteration of air movement, moisture or temperature, or any change in climate, either locally or regionally? Explanation: 3. Water. Will the proposal result in: (a) Changes in currents, or the course or direction of water movements, in either marine or fresh waters? (b) Changes in absorption rates, drainage patterns, or the rate and amount of surface water runoff? (c) Alterations to the course or flow of flood waters? (d) Change in the amount of surface water in any water body? (e) Discharge into surface waters, or in any alteration of surface water quality, including but not limited to temperature, dissolved oxygen or turbidity? (f) Alteration of the direction or rate of flow of ground waters? (g) Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations? YES MAYBE NO X X X X X X X (h) Deterioration in ground water quality, either through direct injection, or through the seepage of leachate, phosphates, detergents, waterborne virus or . bacteria, or other substances into the ground waters? (i) Reduction in the amount of water otherwise avail - able for public water supplies? e Explanation: Swcbace chanacte. ti.ca the a-cte cu Z not change. 4. Flora. Will the proposal result in: (a) Change in the diversity of species, or numbers of any species of flora (including trees, shrubs, grass, crops, microflora and aquatic plants)? (b) Reduction of the numbers of any unique, rare or endangered species of flora? (c) Introduction of new species of flora into an area, or in a barrier to the normal replenishment of existing species? x (d) Reduction in acreage of any agricultural crop? x Explanation: 5. Fauna. Will the proposal result. in: (a) Changes in the diversity of species, or numbers of any species of fauna (birds, land animals including reptiles, fish and shellfish, benthic organisms, insects or microfauna)? (b) Reduction of the numbers of any unique, rare or endangered species of fauna? (c) Introduction of new species of fauna into an area, or result in a barrier to the migration or movement of fauna? (d) Deterioration to existing fish or wildlife habitat? Explanation: -4- 6. Noise. Will the proposal increase existing noise e Explanation: 7, light and Glare. Will the light or glare? produce new Explanation: 8. Lan d Use. Will the proposal result in the altera- tion of the present or planned land use of an area? Explanation: 9. Natural Resources. Will the proposal result in: (a) Increase in the rate of use of any natural resources? (b) Depletion of any nonrenewable natural resource? Explanation: 10. Risk of Upset. Does the proposal involve or the risk n Explanation: explosion release of hazardous substances (including, but not limited to, oil, pesticides, chemicals or radi- ation) in the event of an accident or upset conditions? YES MAYBE NO X x _x 11. Population. Explanation: Will 1 proposal alter the location/ distri.,ition, density, or growth rate of the human population of an area? 12. Housing. Will the proposal affect existing housing, or create a demand for additional housing? Explanation: 13. Transportation /Circulation. Will the proposal result in: (a) Generation of additional vehicular movement? (b) Effects on existing parking facilities, or demand for new parking? (c) Impact upon existing transportation systems? (d) Alterations to present patterns of circulation or movement of people and /or goods? .(e) Alterations to waterborne, rail or air traffic? (f) Increase in traffic hazards to motor vehicles, bicyclists or pedestrians? Explanation: pnea ent bu lding opeution waa a .t up to handle the baa.i c. o peat i.on. Thia bu lding id only a auba1 d& y to the 6aa is openati.on. 14. Public Services. Will the proposal have an effect upon, or result in a need for new or altered governmental services in any of the following areas: (a) Fire protection? (b) Police protection? (c) Schools? (d) Parks or other recreational facilities? (e) Maintenance of public facilities, including roads? X T X (f) Other governmental services? Explanation: 15. Energy. Will the proposal result in: (a) Use of substantial amounts of fuel or energy? (b) Demand upon existing sources of energy, or require the development of new sources of energy? Explanation: 16. Utilities. Will the proposal result in a need for new systems, or alterations to the following utilities: (a) Power or natural gas? (b) Communications systems? ' (c) Water? (d) Sewer or septic tanks? (e) Storm water drainage? (f) Solid waste and disposal? Explanation: 17. Human Health. Will the proposal result in the crea- tion of any health hazard or potential health hazard (excluding mental health)? Explanation: YES MAYBE NO 18. Aesthetics. Will the proposal result in the obstruc- tion of any scenic vista or view open to the public, or will the proposal result in the creation of an aesthetically of- fensive site open to public view? Explanation: 19. Recreation. Will the proposal result in an impact upon the quality or quantity of exist- ing recreational opportunities? Explanation: 20. Archeological /Histroical. Will the proposal result in an alteration of a signifi- cant archeological or his- torical site, structure, object or building? Explanation: YES MAYBE CERTIFICATION BY APPLICANT: I, the undersigned, state that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaration of non - significance that it might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of full disclosure on my part. gnatur itle Date x 1 _LEGAL DESCRJPmON THAT PORTION OF SECTIoff 25, TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M. 1N THE C1TY OP TUKWILA, Couirr( OF KIIJq I STid,TE OF WASNINg-rom. DESCRIBED AS FDLLOINS: _ OEgINNIN(q AT TIM. WM QU4RTE*. CORNS OF SAID SecTIOU 25; THIIINCC 5 57° 54' 12" E. ALoNEl "TILE EAST -WEST CEw rg.. NE OF 5410 SECTION 25 A DISTAWGE oR 1311.51 PEST TO THE WEST RI EINT of way LINE of 6.R.161 Akio-THE ICU! Po11JT of be0IN14 11.Iq; THENcE 3.01 °40'12 "w. 6I.ONaq SAID It14NT OF wet LINE A DISTANCE OF 156.48 FIT To '1$4e CENTERLINE? OF /WE BASEMENT QRbNTED TO THE CNICAGIO,MILWAUKEE, ST.PLUL AND PPCIRIC AND UNICIJ PACIFIC RAIL*04oSa5 RECORDEa UNDER KING, CO4t-4T1' AUDITOR'S Ili WO. 5204281 ; 110E U. 45 °06 481W. 4LO 4 Salo CEIJTE.RLINE 4 DISTANCE. OP 575.56 FEET MORE OR LEES To THE Tor oP THE Rlgw1 5 'JK OP 411Calie4 RJVER ;TNEuCE ALoN41 5410 ToP OFTI -IE RIGHT DANK oP TNC gI.EEN [EVER THE poLLowING cou45E.s AND DISTANCES.; ._14.35°II'21 "E. 141.15 BEET ; 14.330151'47' E. I19.9SFEET • 14.31.54124'E. 172.04 FEET ; 14.42 °28'41`E. 95.!4 PEET ; IJ.406i7'I4 "E. 12048 FEET • 'J. 42•02.115" 5 (..79 PEET u.00•35'52' E. 43.14 PEET • N.o3°1b'51' e. 116.44 FEET Mots oR Less To 'THE: WORTH UNE OF THE 50U1W q90 FEET OP 414E SOUTWES.51 QUARTE1t OP THE NoRINWCST QUARTER. OF 5410 SECTIo1v 25 ; _THENCE LE4V114G %410 Ter OP 114E RIVER ALWK OF THE (p.m Rivet ALO1.C4 SAID WORN LINE 5.97'54' IZ "E. d DIS7hWCe of 70.00 FEET 144o1LF o0. LESS TO WE 4.ms," caw/ OF WAY UNE OP SA ID 5.R.IbI :THENCE ALoNai Salo R1gHT OP way LINE o14 A .CUILVE To 'THE RIGHT I THE CELIT8P.. OF WHICH 155425 5.155'38' I8' /. , N4v1/.IC4 4 'RADIUS OP 670.0o PECT, AN ARC DISTANCE OF 34.04 FEET ; T14e14cE 5.0'40112"W. ALowy 5410 RIGHT OF WAY A 01 $TawcE OP 34447 FEET THENCE N. 8b° I9146"W. A DI51a1JCE of Io.coPEST 1 _THENCE 5.01 °40112 "W A OI STINGS OP 50.00 FEST .1-THENCE N. &1,'19'46 "W.4 015'11NCE OP 5.00 FEET; TNeucE 5.01°40'11"W A DISTANCE. of 59.43 FEET i0 ZHs - MUB PbIWT OF bt6I1.1W1N4. Q0,1=fi, 474." •cle X X N : PKOF-1;_r_ e 15A1.A P CIQ4 EA55.N 9012 C.10 Veit/ r.S. or :.[CT:ow 05. T041959 •• 2.3 worriA.P.,AAGe Ahl5,1.470•■• OBSCA:BED AO Pau...APO: WeCT 0.1AtTER C04.110. 00 54.0 SerTou OP .5•V 5001014 :5 A olITAPAS o. 1311.51 •417 10T4S WAS -E-C1 S. 410,a OA. OP WAY ,114! • 17' 9••••,-I, ST.P&A. 010 p•Osk, A ,0 5504151; 0 41, 45' 0.45w • 0.01•Nc5 TAO t.V0*.,TAfiuCli 9.0•14, ▪ SAID Tor OPnte LACPT 1.4 55'l4211. 14215 71c 55.54.4r 1.119.'51,07; 19 PEA":' ; 44. 4501:25* 544.11 PEET 4405714 1445 01.1445 50UTA PaIT OP 5.5 50t1T+EA.571 -E AviUO 5A" ▪ ANEC EWA. 00 GRA 10.0C Pe07 1.4025 06_ 1.5244 To T.B. 4.1‘44 1 op WAY Aa,0 2.02m1 cli• WAY u.e au • cucve -r • PAr.,..,r 0* 471, 00 Fee- 4.4 4IC 015TuICZ oPX.o• t4e44r5 5.0,40 I5W. A10 4.4■4 5410 5164-11 O. wAN • 01514*. o.`40tt.w. 0,,7•AL e O. 50.00 *1*' ; 0,51A.,11. of 51A5 Free': ro1.1..11C.IS P02.41. OP Otelmol um.••••.- r.-■.14W74 • _ •.■,■••• 2 %v. 4.* 1._•12,1,!ey ILVI 'rm., ":".• „ -4:'1'41::7:3-1-.."-t • 1 (1f5i-TE PLAN . • .._ ... • r7—= .A4,4 Otos- 1 OPEN SIDEWALL ELEVATION CLOSED SIDEWALL ELEVATION