HomeMy WebLinkAboutSEPA EPIC-176-81 - GACO WESTERN - BUILDINGGACO WESTERN INC
18700 SOUTHCENTER PY
EPIC - 176 -81
CITY OF TUKWILA
OFFICE OF COMMUNITY DEVELOPMENT
FINAL
DECLARATION OF NON - SIGNIFICANCE
Description of proposal Floor Space Additions to Manufacturing Bldg.
Proponent GACO Western, Inc.
Location of Proposal 18700 Southcenter Parkway
Lead Agency City of Tukwila File No. EPIC - 176 -81
This proposal has been determined to lii /not have) a significant
adverse impact upon the environment. An EIS (ii /is not) required
under RCW 43.21C.030(2)(c). This decision was made after review
by the lead agency of a completed environmental checklist and other
information on file with the lead agency.
Responsible Official .
Position /Title
Brad Collins
Planning Director
Date 7 January 1982 Signature 6A-6-4 Ce.Q -...,,
COMMENTS:
• • •
CITY OF TUKWILA
ENVIRONMENTAL CHECKLIST FORM
This questionnaire must be completed and submitted with the application for
permit. This questionnaire must be completed by all persons applying for a
permit from the City of Tukwila, unless it is determined by the Responsible
Official that the permit is exempt or unless the applicant and Responsible
Official previously agree an Environmental Impact Statement needs to be completed.
A fee of $50.00 must accompany the filling of the Environmental Questionnaire
to cover costs of the threshold determination.
I. BACKGROUND
1. Name of Proponent: Gaco Western, Inc.
2. Address and Phone Number of Proponent: 18700 Southcenter Parkway
Tukwila, WA 98188 (206) 575 -0450
3. Date Checklist Submitted:
September 21, 1981
4. Agency Requiring Checklist: City of Tukwila
Office and Factory Division for
5. Name of Proposal, if applicable: Gaco Western, Inc. Tukwila
6. Nature and Brief Description of the Proposal (including but not limited
to its size, general design elements, and other factors that will give
an accurate understanding of its scope and nature):
Adding to our existing building: A second floor of offices of
approximately 6000 square feet (over existing offices) and
adding approximately 8000 square feet of factory.
7. Location of Proposal (describe the physical setting of the proposal, as
well as the extent of the land area affected by any environmental im-
pacts, including any other information needed to hive an accurate under-
standing of the environmental setting of the proposal):
The project is located on flat land fronting on Southcenter
Parkway with business adjacent to the South end and asphalt
plant to the north. The rear of the project consists mainly of
lawn and vegitation and faces the Greenriver. Approximately
10% of the land will be affected by the expansion of the factory.
8. Estimated Date for Completion of the Proposal: September, 1983
9. List of all Permits, Licenses or Government Approvals Required for the
Proposal (federal, state and local):
(a) Rezone, conditional use, shoreline permit, etc. YES NO x
(b) King County Hydraulics Permit YES x NO
(c) Building permit .YES x NO
• • • •
(d) Puget Sound Air Pollution Control Permit YES NO` X
(e) Sewer hook up permit YES NO X
(f) Sign permit YES NO X
(g) Water hook up permit YES . NO X
(h) Storm water system permit YES NO X
(i) Curb cut permit YES NO X
(j) Electrical permit (State of Washington) YES X NO
(k) Plumbing permit (King County) YES X NO
(1) Other:
10. Do you have any plans for future additions, expansion, or futher activity
related to or connected with this proposal? If yes, explain:
no
11. Do you know of any plans by others which may affect the property covered by
your proposal? If yes, explain:
no
12. Attach any other application form that has been completed regarding the pro-
posal; if none has been completed, but is expected to be filed at some future
date, describe the nature of such application form:
none, to date
II. ENVIRONMENTAL IMPACTS
(Explanations of all "yes" and "maybe" answers are required)
1. Earth. Will the proposal result in:
(a) Unstable earth conditions or in changes in geologic
substructures?
(b) Disruptions, displacements, compaction or overcover-
ing of the soil?
(c) Change in topography or ground surface relief fea-
tures?
(d) The destruction, covering or modification of any
unique geologic or physical features?
YES MAYBE NO
X
X
X
X
• •
YES MAYBE NO
(e) Any increase in wind or water erosion of soils,
either on or off the site? X
(f) Changes in deposition or erosion of beach sands, or
changes in siltation, deposition or erosion which
may modify the channel of a river or stream or the
bed of the ocean or any bay, inlet or lake? X
Explanation:
Item (b) Some disruptions, displacement, compaction
during construction.
2. Air. Will the proposal result in:
(a) Air emissions or deterioration of ambient air
quality? X
(b) The creation of'objectionable odors? X
(c) Alteration of air movement, moisture
or temperature, or any change in climate, either
locally or regionally? X
Explanation:
3. Water. Will the proposal result in:
(a) Changes in currents, or the course or direction
of water movements, in either marine or fresh
waters? X
(b) Changes in absorption rates, drainage patterns,
or the rate and amount of surface water runoff?
(c) Alterations to the course or flow of flood waters? X
(d) Change in the amount of surface water in any water
body? X
(e) Discharge into surface waters, or in any alteration
of surface water quality, including but not limited
to temperature, dissolved oxygen or turbidity? X
(f) Alteration of the direction or rate of flow of
ground waters? X
(g) Change in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations? X
• •
• •
YES MAYBE NO
(h) Deterioration in ground water quality, either
through direct injection, or through the seepage
of leachate, phosphates, detergents, waterborne
virus or bacteria, or other substances into the
ground waters? X
(i) Reduction in the amount of water otherwise avail-
able for public water supplies? X
Explanation:
4. Flora. Will the proposal result in:
(a) Change in the diversity of species, or numbers
of any species of flora (including trees, shrubs, X
grass, crops, microflora and aquatic plants)? _
(b) Reduction of the numbers of any unique, rare or
endangered species of flora? X
(c) Introduction of new species of flora into an area,
or in a barrier to the normal replenishment of
existing species? X —
(d) Reduction in acreage of any agricultural crop? X
Explanation:
Item (c) Ornamental plants will be added near
the office entrance.
5. Fauna. Will the proposal result in:
(a) . Changes in the diversity of species, or numbers
of any species of fauna (birds, land animals
including reptiles, fish and shellfish, benthic
organisms, insects or microfauna)? X
(b) Reduction of the numbers of any unique, rare or
endangered species of fauna? X
(c) Introduction of new species of fauna into an
area, or result in a barrier to the migration
or movement of fauna?
(d) Deterioration to existing fish or wildlife
habitat? X
Explanation:
• •
6. Noise. Will the proposal increase existing noise
levels?
YES MAYBE NO
X
Explanation:
There may be increased noise during and due to construction.
However, this may not even be noticable due to existing
trucking at nearby gravel plant, asphalt plant and warehouses.
7. Light and Glare
Explanation:
Will the proposal produce new
light or glare? X
8. Land Use. Will the proposal result in the altera-
tion of the present or planned land use
of an area?
Explanation:
9. Natural Resources. Will the proposal result in:
(a) Increase in the rate of use of any natural
resources?
(b) Depletion of any nonrenewable natural
resource?
Explanation:
10. Risk of Upset. Does the proposal involve a risk of an
explosion or the release of hazardous
substances (including, but not limited
to, oil, pesticides, chemicals or radi-
ation) in the event of an accident or
upset conditions?
Explanation:
X
11. Population.
Explanation:
• • •
Will the proposal alter the location,
distribution, density, or growth rate
of the human population of an area?
12. Housing. Will the proposal affect existing housing,
or create a demand for additional housing?
Explanation:
13. Transportation /Circulation. Will the proposal result
(a) Generation of additional vehicular movement?
(b)
Effects on existing parking facilities, or
.demand for new parking?
(c) Impact upon existing transportation systems?
(d)
(e)
(f)
Alterations to present patterns of circulation
or movement of people and /or goods?
Alterations to waterborne, rail or air traffic?
Increase in traffic hazards to motor vehicles,
bicyclists or pedestrians?
in:
YES MAYBE NO
X
X
X
Explanation:
Item (a) Minimal. It is anticipated there will be two (2)
. new employees.
14. Public Services.
Will the proposal have an effect upon,
or result in a need for new or altered
governmental services in any of the
following areas:
Fire protection?
Police protection?
Schools?
Parks or other recreational facilities?
Maintenance of public facilities, including
roads?
X
X
X
(f) Other governmental services?
Explanation:
15. Energy. Will the proposal result in:
(a) Use of substantial amounts of fuel or energy?
(b) Demand upon existing sources of energy, or
require the development of new sources of
energy?
Explanation:
•
YES MAYBE NO
X
X
Items (a) and (b). The expansion is relatively small and .
the existing electrical power to the building app ears
adequate for the expansion.
16. Utilities. Will the proposal result in a need for
new systems, or alterations to the
following utilities:
(a) Power or natural gas?
(b) Communications systems?
(c) Water?
(d) Sewer or septic tanks?
(e) Storm water drainage?
(f) Solid waste and disposal?
Explanation:
Item (e). Areas affected by the expansion are presently
covered by the existing building or by asphalt paving.
17. Human Health. Will the proposal result in the crea-
tion of any health hazard or potential
health hazard (excluding mental health)?
Explanation:
X
•
18. Aesthetics. Will the proposal result in the obstruc-
tion of any scenic vista or view open to
the public, or will the proposal result
in the creation of an aesthetically of-
fensive site open to public view?
Explanation:
19. Recreation. Will the proposal result in an impact
upon the quality or quantity of exist-
ing recreational opportunities?
Explanation:
20. Archeological /Histroical. Will the proposal result in
an alteration of a signifi-
cant archeological or his-
torical site, structure,
object or building?
Explanation:
CERTIFICATION BY APPLICANT:
YES MAYBE NO
I, the undersigned, state that to the best of my knowledge the above
information is true and complete. It is understood that the lead agency
may withdraw any declaration of non - significance that it might issue in
reliance upon this checklist should there be any willful misrepresentation
or willful lack of full disclosure on my part.
e and Title
itle
X
X
X
Date
8
i c
i j
!
c, ?h
LL
' ,_Iti;5cIiii,iiiiitilli
Siii6
4 AL%td5,t,r� of CE 141j
it tiJO£,I1191 ph
J�1 <
r.11it ti t{t di m '
: v ii" d� i; ) n
o f 11a} S f : /%-,, !gip 11. O
=
4g,•tA iSt r 11
ill ?
$ a,
_ qd O1
I
� R Z
1 & a;: 2.
i il
1 11 0
iirrqn RI
[:1044 1
11 1
1//i
i II
ill
11 ,
Do
)11
itil
°.
4-,
1 i
i
. t %,
q II if
1111
3
cr
H
11 11 1
o = i
SsrF113 :1
�� tiiiii f C
b
1
C
# f
kr
'
f
f f
•ziw�
'i . :,. i. ..'
4
` J
-
�`l=
S1t
ir
(" tt
Pill--:
li lC7.:r
;1
All
�'R!=�—j
�YWaleL
_s
ad r t fSe.
� �T dry rn
j J
r
Office and Factory
TukwAddi�ton
for Gaco Western Incorporated
_=
f `
4 :=
Kenneth D. Long & Associates
Architecture & Planning
too Mores' Sheet, Seattle, WA 98109. 1206,) 285-9060
„.., i b
11 1 / 'C. '',...it ' ” 4147.14,:: .....
.4 s /
A7.71/ rt ) l> wlsn 0.11.• :(lne, S.W. •rr •.r '17. M st P...., Oweir ix Ct :PAY N.", to / /4/r# // � /F 'RA
••• r
•w u (.11.1 t rrvlta: •t PAW r r v> 4 v wAa>w°. tv v°la v t / / „ y
".aq,e ' //0/./d/2(.2t717 74/237 , / „ / C o v
,OZ•./J'WS
/ `
v. i ; //
OY
' / /
�/ :,.-.5/ o f /
o/ 1• e
* 'L y g / /. p
/- /
rN l
.4..0.,/fro �. his
0”. r0 r s` i1 0" / /
3 ' ,°�
73, / / +�
a \
/
/ j i ':;4,'
r p7 / A
/ / / 1 °t�l t
./ . / acs /.
,aVl'.'WJ SJ
IrAp 1W9
1U7 .7(
•
9 1a7 1A0:'
1l9 lw.V CPR/0
A>NA•w win, lwtt JIA/!r PA•Y v b
l4Iw,4'r,>4 f/wei>wv'fla4samt. e-4sslN ww.anwv.s.M
Cm !wait uar. AI.N.It.°! >fr a frW .11.7' �lll
>iw•frlbs 'r.S am.. -es , xao l.M.MI. nst• Au Avww Await.
•a >.Y >.ttss wsrv..w• A>r>4tr4wtnrf• sus "COYAII f►
!r!/A• •i.®y 4rwf1, M•Y Ar twsrnAav •awrp sNtta•
DATE OF TRANSMITTAL
PLANNING DEPARTMENT
TRANSMITTAL
3o / uoV / 8!
TO: ❑ BUILDING DEPT. [:)POLICE DEPT.
❑ FIRE DEPT. ❑ RECREATION DEPT.
`PUBLIC WORKS DEPT. ❑
PROJECT: CA -wssrez4 ADpI'pDid
LOCATION: Iviae, sae-T't , pK -/'
The above mentioned applicant has submitted the following plans or materials
for the above reference project:
Environmental Checklist ❑Preliminary Plat
❑Environmental Impact State- ❑Final Plat
ment
❑Site /Development Plans ORezone Request.
❑Shoreline Permit Application❑ Variance Request
❑Conditional Use Permit ❑Other:
Application
The attached materials are sent to you for your review and comment. The
Planning Dept. needs your comments to satisfy review procedures and to
complete the project file.
Please use the space provided below for your comments or attach a separate
sheet.
Requested response date: to /
Review Department comments:
e=t i h to Fie=f
4)yi
!.!C1! 3 G
By: Date:
790$
City of Tukwiiii
6200 Southcenter Bo . rd
Tukwila Washington 98188
PLANNING DEPARTMENT •
TRANSMITTAL
DATE OF TRANSMITTAL 3O /110V / 81
TO:
PROJECT:
LOCATION:
❑ BUILDING DEPT.
❑ FIRE DEPT.
❑ PUBLIC WORKS DEPT.
❑ POLICE DEPT.
RECREATION DEPT.
GAe c) - WESjf•6I h• rpm.1
telex, Sc,e- • PKw`C
The above mentioned applicant has submitted the following plans or materials
for the above reference project:
75.XEnvironmental Checklist OPreliminary Plat
❑Environmental Impact State- OFinal Plat
ment
❑.Site /Development Plans DRezone Request.
❑Shoreline Permit Application0 Variance Request
OConditional Use Permit ❑Other:
Application
The attached materials are sent to you for your review and comment. The
Planning Dept. needs your comments to satisfy review procedures and to
complete the project file.
Please use the space provided below for your comments or attach a separate
sheet.
Requested response date: 10 / DEG / 81
Review Department comments:
i.•..- e1.1
By: _!—a,.._- /�1� __ _=z Date: /a --
PLANNING DEPARTMENT
TRANSMITTAL
DATE OF TRANSMITTAL 30 /140V . 81
TO:
PROJECT:
LOCATION:
❑ BUILDING DEPT. ❑ POLICE DEPT.
%FIRE DEPT. ❑ RECREATION DEPT.
❑ PUBLIC WORKS DEPT. ❑
6444 - wEsreui Avvrrem
g 7 ('Kw'C
The above mentioned applicant has submitted the following plans or materials
for the above reference project:
'Environmental Checklist ❑Preliminary Plat
❑Environmental Impact State- ❑Final Plat
ment
❑Site /Development Plans ❑Rezone Request.
❑ Shoreline Permit Application❑ Variance Request
❑Conditional Use Permit ❑Other:
Application
The attached materials are sent to you for your review and comment. The
Planning Dept. needs your comments to satisfy review procedures and to
complete the project file.
Please use the space provided below for your comments or attach a separate
sheet.
Requested response date: 10 / PEG / 8l
Review Department comments:
IF DESIGNED AND BUILT TO CODE, THERE SHOULD BE LITTLE PROBLEM.
WOULD REQUEST THAT THE FIRE HYDRANT IN FRONT OF THE BUILDING BE
UP GRADED TO A FIRE HYDRANT CONTAINING 1 -4;1/2 INCH STEAMER AND
2 -2 1/2 INCH HOSE PORTS. THIS WOULD ALLOW THE DEPARTMENT TO
GET FULL UTILIZATION OUT OF THE FIPF FLOWS AVAILABLE.
By: aar-A,XigtiAJel
Date: ��'
l ez
1909
City of Tukwilqiii
6200 Southcenter Bouleti
Tukwila Washington 98188
PLANNING DEPARTMENT
TRANSMITTAL
DATE OF TRANSMITTAL 30 / U" ./ 8I
•
TO: ❑ BUILDING DEPT. . OLICE DEPT.
❑ FIRE DEPT. ❑ RECREATION DEPT.
❑ PUBLIC WORKS DEPT. ❑
PROJECT: Gdea, -Wes -rSQ41 Appr .L
LOCATION: SLOG'.. FKwY
The above mentioned applicant has submitted the following plans or materials
for the above reference project:
'Environmental Checklist ❑Preliminary Plat
❑Environmental Impact State- ❑Final Plat
ment
OSite/Development Plans ❑Rezone Request_
❑ Shoreline Permit Application❑ Variance Request
❑Conditional Use Permit ❑Other:
Application
The attached materials are sent to you for your review and comment. The
Planning Dept. needs your comments to satisfy review procedures and to
complete the project file.
Please use the space provided below for your comments or attach a separate
sheet.
Requested response date: 10 / OEG / 8I
Review Department comments:
By:.
Date:
TO
t-----, F
1 0
i
{
I M
44 SUBJECT
MESSAGE
Pe,
FrTe5TFoirsA) ® 45 472
SIGNED
SEND PARTS 1 AND 3 WITH CARBON INTACT -
PART 3 WILL BE RETURNED WITH REPLY.
DATE /
POLY PAK (50 SETS) 4P472
-4
N.Nt:a City of Tukwila
6200 South; enter Boule
• 1908,
Tukwila Washington 98188
PLANNING DEPARTMENT
TRANSMITTAL
DATE OF TRANSMITTAL 30 /110V •/ 8I
TO: BUILDING DEPT. ❑POLICE DEPT.
❑ FIRE DEPT. ❑ RECREATION DEPT.
❑ PUBLIC WORKS DEPT. ❑
PROJECT: -WEAN ADGiTt t l
LOCATION: ►e'ldna, so'-r.. PKw`f
The above mentioned applicant has submitted the following plans or materials
for the above reference project: t-1
'`Environmental Checklist ❑Preliminary Plat
DEnvironmental Impact State- ❑Final Plat
ment
❑Site /Development Plans ❑Rezone Request_
❑ Shoreline Permit Application Variance Request
❑Conditional Use Permit ❑Other:
Application
The attached materials are sent . to you for your review and comment. The
Planning Dept. needs your comments to satisfy review procedures and to
complete the project file.
Please use the space provided below for your comments or attach a separate
sheet.
Requested response date: 10 / 0E4../ 8I
Review Department comments:
By:
Date: / , %Sj
ILA
City of Tukwi•
R41♦ �1 6200 Southcenter Boulevard
Tukwila 1Nashington 98188
r9os
PLANNING DEPARTMENT
TRANSMITTAL
DATE OF TRANSMITTAL 30 /110V / 61
TO:
❑ BUILDING DEPT.
❑ FIRE DEPT.
❑ PUBLIC WORKS DEPT.
❑ POLICE DEPT.
❑ RECREATION DEPT.
PROJECT: 661' -WESM..44 ADDrp .t
LOCATION: PerZno, soc.: g. peNLPf
The above mentioned applicant has submitted the following plans or materials
for the above reference project:
'aEnvironmental Checklist ❑Preliminary Plat
❑Environmental Impact State- ❑Final Plat
ment
❑ Site /Development Plans ❑Rezone Request,
['Shoreline Permit Application❑ Variance Request
['Conditional Use Permit ❑Other:
Application
The attached materials are sent to you for your review and comment. The
Planning Dept. needs your comments to satisfy review procedures and to
complete the project file.
Please use the space provided below for your comments or attach a separate
sheet.
Requested response date: to / Dec. / 81
Review Department comments:
By: Date: