Loading...
HomeMy WebLinkAboutSEPA EPIC-152-80 - CITY OF TUKWILA - 152ND STREET WIDENING AND IMPROVEMENTSSTREET WIDENING S 152 BETWEEN MACADAM AND 52 AV S, AND 57AVE S EPIG152 -80 FORM FOR (PROPOSED/IF)CIIUL) DECLARATION OF PSTRWOOORNODj(NON- SIGNIFICANCE) Description of Proposal Street widening /road improvements /acquisition of right-of-way. Proponent City of Tukwila Location of Proposal Along S. 152nd St. between Macadam Road and 52nd Ave. So, and along approixmately 350 feet of 52nd Ave. So. (See attached. vicinity map.) Lead Agency City of Tukwila This proposal has been determined to (have /not have) a significant adverse impact upon the environment. An EIS (is /is not) required under RCW 43.21C.030(2)(c). This decision was made after review by the lead agency of a completed environmental checklist and other information on file with the lead agency. Responsible Official Mr. Ted Uomoto Position /Title Director, Public Works Date 9 -19 -80 Signature S41 pG"- r (ci • Date: September 19, 1980 ENVIRONMENTAL CHECKLIST FORM I. BACKGROUND 1. Name of Proponent CITY OF TUKWILA 2. Address and Phone Number of Proponent: _ 6200 Southcenter Boulevard Tukpkwila, Washing_tnn 98188 3. Date Check��;_s 43submitted 9 -19 -80 4. Agency Requiring Checklist City of Tukwila 5. Name of Proposal, if applicable: S. 152nd St. & 5Zth Ave. S. Stre_pt Improvements 6. Nature and Brier Description of the Proposal (includ- ing but not limited to its size, general design ele- ments, and other factors that will give an accurate understanding its scope and nature): Widening of S" 152nd from 2 lanes 20' wide to 2 lanes 28' wide (970 LF) Widening of 57th Ave. S. trom 2 lanes 16' wide to 2 lanes-24' wide T340 LF). Installation of 5' sidewalks; rockery construction (see 7. Location or Proposal (describe the physical setting or attached.) 'the proposal, as well as the extent of the land area affected by any environmental impacts, including any other information needed to give an accurate understand- ing of the environmental setting of the proposal): The area is multi - residential. Widening will regIlirP removal of shrubs & trees for rockery•& sidewalks. Large trees that are remqved wjll hP rpplarpd • 8. Estimated Date for Completion of the Proposal: December, )980 9. List of all Permits, Licenses or Government Approvals Required for the Proposal (federal, state and local- - including rezones): N/A 10. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes., explain: N/A 11. Do you know of any plans by others which may affect the property-covered by your proposal? If yes, explain: alone • 12. Attach any other application form that has been corn-. pleted regarding the proposal; if none has been com- pleted, but is expected to be filed at some future date, describe the nature of such application form.: N/A • • ENVIRONMENTAL CHECKLIST FORM ATTACHMENT 9 -19 -80 Point 6. (Continued) along north shoulder of S. 152nd and East shoulder of 57th Avenue So. on sloped hillside; acquisition of right - of -way along S. 152nd St.; 210 1.f. x 25' wide and 760 1.f. x 10' wide. II. ENVIRONMENTAL IMPACTS (Explanations of all "yes" and "maybe" answers are required) Yes Maybe No (1) Earth. Will the proposal result in: (a) Unstable earth conditions or in changes in geologic substructures? (b) Disruptions, displacements, com- paction or overcovering of the soil? X (c) Change in topography or ground surface relief features? (d) The destruction, covering or modification of any unique geologic or physical features? (e) Any increase in wind or water erosion of soils, either on or off the site? (f) Changes in deposition or ero- sion of beach sands, or changes in siltation, deposition or erosion which may modify the channel of a river or stream or the bed of the ocean or any bay, inlet or lake? Explanation: Displacement will occur for rockeries: overcovering for lane widening and sidewalks. (2) Air. Will the proposal result in: (a) Air emissions or deterioration of ambient air quality? X (b) The creation of objectionable odors? X X X X (c) • Alteration of air movement, moisture or temperature, or any change in climate, either locally or regionally? Explanation: Temporary - construction' related emissions. will create minor deterioration of air quality. X Yes Maybe ro (3) Water. Will the proposal result in: (a) Changes in currents,"or the course or direction of water move- ments, in either marine or fresh waters? X X X (b) Changes in absorption rates, drainage patterns, or the rate and amount of surface water runoff? (c) Alterations to the course or flow of flood waters? (d) Change in the amount of sur- face water in any water body? X (e) Discharge into surface waters, or in any alteration of surface water quality, including but not limited to temperature, dissolved oxygen or turbidity? X (f) Alteration of the direction or rate of flow of ground waters? X (g) Change in the quantity of ground waters, either through direct additions or withdrawals, or through interception of an aquifer by cuts or excavations? (h) Deterioration in ground water quality,, either through direct in- jection, or through the seepage of leachate, phosphates, detergents, waterborne virus or bacteria, or other substances into the ground waters? (i) Reduction in the amount of water otherwise available for public water supplies? X X X Explanation: Minimal change in absorption rates will occur due to added impervious surtace. Not a significant impact. (4) Flora. Will the proposal result in: (a) Change in the diversity .of species, or numbers of any species of flora (including trees, shrubs, grass, crops, microflora and X aquatic plants)? (b) Reduction of the.numbers of any unique, rare or endangered species of flora? X • Yes Maybe No (c) Introduction of new species of flora into an area, or in a barrier to the normal replenish- ment of existing species? X (d) Reduction in acreage of any agricultural crop? Explanation: Elimination of existing cultivated flora for rockeries & sidewalks. Some species will be replaced. (5) Fauna. Will the proposal result in: (a) Changes in the diversity of species, or numbers of any species of fauna (birds, land animals including reptiles, fish and shell- fish, benthic organisms, insects or microfauna)? X (b) Reduction of the numbers of any unique, rare or endangered species of fauna? (c) Introduction of new species of fauna into an area, or result in a barrier to the migration or movement of fauna? (d) Deterioration to existing fish or wildlife habitat? X X X EXp lan do Elimination of insects in construction area. No other nfaund ur hdbi Ld t will be disturbed. (6) Noise. Will the proposal increase existing noise levels? Explanation: X (7) Light and Glare. Will the pro- posal produce new light or glare? Explanation: X (8) Land Use. Will the proposal result in the alteration of the present or planned land use of an area? Explanation: X (9) Natural Resources. Will the pro - posal result in: (a) Increase in the rate of use of any natural resources? (b) Depletion of any nonrenewable natural resource? Explanation: Yes Maybe (10) Risk of Upset. Does the proposal involve.a risk of an explosion or the release of hazardous substances (including, but not limited to, oil, pesticides, chemicals or radiation) in the event of an acci- dent or upset conditions? Explanation: (11) Population. Will the proposal alter the location, distribution, density, or growth rate of the human population of an area? Explanation: (12) Housing. Will the proposal affect existing housing. or create a demand for additional housing? Explanation: (13) Transportation /Circulation. Will the proposal result in: (a) Generation of additional vehicular movement? (b) Effects on existing parking facilities, or demand for new parking? (c) Impact upon existing trans- portation systems? (d) Alterations to present patterns of circulation or move- ment of people and /or goods? (e) Alterations to waterborne, rail or air traffic? .•' 111 •es Maybe No (f) Increase in traffic hazards to motor vehicles, bicyclists or pedestrians? X Explariation: Temporary construction related increase. Can be mitigated by using flagmen, barriers and other re- lated traffic controls. (14) Public Services. Will the pro- posal have an effect upon, or result in a need for new or al- tered governmental services in any of the following areas: (a)- Fire protection? X (b) Police protection? X (c) Schools? X (d) Parks or other recreational. facilities? X (e) Maintenance of public'facili- X ties, including roads? (f) Other governmental services? X Explanation: Proposed project will increase the amount 4 Explanation: Yes Maybe No (17) Human Health. Will the proposal result in the creation of any health hazard or potential health hazard (excluding mental health)? X Explanation: (18) Aesthetics. Will the proposal result in the obstruction of any scenic vista or view open to the public, or will the proposal re- sult in the creation of an aesthetically offensive site open to public view? Explanation: X (19) Recreation. Will the proposal result in an impact upon the quality or quantity of existing recreational opportunities? Explanation: (20) Archeological /Historical. Will the proposal result in an alteration of a significant archeological or his- torical site, structure, object or building? Explanation: X III. SIGNATURE I, the undersigned, state.that to the best of my knowledge the above information is true and complete. It is understood that the lead agency may withdraw any declaration of non- signi- ficance that it might issue in reliance upon this checklist should there be any willful misrepresentation or willful lack of full disclosure on my part. Proponent: • / • \ \•,- L. .r,....j ' 1 r- -----• % , : - ; I • ' t.1 • t i k . \ \ t 1 1 1 f I . • : ' a • 1 et i , : , — — —.I • • ti s ..i Lriaik 1TJ • 1 . -oil I . 1 r - • I A! ' • • .1 ' f ; • - . , • , • t .1, 5 I L .'42I i..° i ilr S 1 • 1' r;• ' ..-,' (1` •;- . • 1 I. , . , ... IN.:.\:'...-. ‘. . • 1 t . mI , , 11-- — --.• :7:.:A/ 7.-: s- ..., . ,. 1 . e 1 , 4 N \ •‘----...... 7i r, • 41 t t s : _, A. 141• Mk XI 9. ,...1 044 : ST , . . ...• „ . , -A ,-- - •- . i t... .• •••,, s- . / • • f !: L. 1. D. 30 -- )1:1; 3'4'4 ?44' • _4( T S .140,. ST: PROJECT SITE 4; - ,- .., ' -•• lin : i • . I ■ I 1 a . S S MittM r t. • S 5s'S 1 1 / • / // 1 ST 0 22 • • I \s‘-t• Tgit SOUTH CENTER,:.' -,• loninrwrE' FmtE 44V *A, ss‘ /174L1 N_SLI•/-N • ‘. tfl • 1 Li, a tVO r „ - E••• • *'• • ;,1 : e. •