HomeMy WebLinkAboutTrans 2016-11-07 Item 1B - Contract Supplement #6 - 42nd Avenue South (160th Street - 131st Place) Phase III with CH2MHillCity of Tukwila Allan Ekberg, Mayor TO: Transportation Committee FROM: Bob Gibenomm,Pub|ic Works0irector^���— BY: Cymdy Knighton, Senior Program Manager CC: Mayor Ekberg DATE: November 4, 2016 SUBJECT: 42 Id Ave South (S 160th — S 131s' PI) Phase III Project No. 9941U303, Contract No 12-810 Supplemental Agreement No. 6 ISSUE Authorize the Mayor to sign Supplemental Agreement NO. OVVith CH2K4HiU for $718'783.O5for the combined 42 nd Ave S street improvements and Gilliam Creek Culvert design contract. BACKGROUND In February 2012, CH2MHiU began design work 00 8 project that combined the 42 nd Ave 8 (Southcente[ Blvd to S 160th St) roadway improvements and the Gilliam Creek culvert F8p|RC8rO8D[ project. /# this time, the project is designed through the 9096 |8ve|' iDC|UdiDQ the UDd8q][OUOdiDg Of 88ri8| utilities. At the 80% staff level review, 8 dHt8[DliD81iOD was made that the project did OUtcomply with the City's Sensitive Areas Ordinance (SAO). The |G[g88t issue with SAO compliance is the proposed storm water detention ponds location within the stream buffer. AG8COOdG[y iGSU8 is 8 requirement to mitigate the [8|OC81iOD Of 14 feet O[less of the 8tr880 to 8||Ovv for the COOD8CLiOD to 8 new and more D8tU[8| St[B8nO bed that will [UD through the 16-foot- wide new culvert. DISCUSSION GUpp|8[DeOLa| Aor8B[DeDt NO. 8 is needed for the redesign and F8|OC8bOD Of the SL000 water detention facilities in order to comply with the City's shoreline buffer requirements, to develop a mitigation plan for landscaping iD the stream buffer, and tO develop 8 mitigation plan for the stream [e|VCatiOD from G 36-inch pipe to 8 more D81Un8| setting. Additional :0VndiD81iOD vvOrh with the affected utilities is also necessary to both accommodate the revised design as well as the revised construction schedule. FINANCIAL IMPACT The proposed 2O17C|P sheet for the 42» Ave S project haGbeenU tO allow funding for this additional design work from the proposed increased construction budget. Council k5 being asked k] approve Supplement No. 81O Contract No. 12-01O with CH2MHiUiOthe 80OUOL Of $218.783.O5 for the 42nd Ave S Phase ||| Project and CODSide[ this item at the NOVH[Db8[ 14' 2010 Committee Of the Whole Meeting and SUbS8qU8Dt November 21, 2010 Regular meeting. Attachments: Page u. Revised 2817 Proposed C|p Supplemental Agreement No. 8 wApw eng\projects\a- rwu=projects\42nd aveo phase m(99410303 94-rsO3)\design\jnfo memo supp #6110416 sb.docx 73 CITY OF TUKWILA CAPITAL PROJECT SUMMARY 2017 to 2022 PROJECT: 42nd Ave South Phase III Project No. 99410303 DESCRIPTION: Design and construct street improvements, drainage, sidewalks, bike facilities, and driveway adjustments JUSTIFICATION: Provide pedestrian and vehicle safety, drainage, and neighborhood revitalization. STATUS: (Phase III (S /C Blvd (154th) - S 160 St), Design began in 2012, construction in 2017. Project No. 99410303 Phase IV (S 139 St - S 131 PI) in beyond. Project No. 99410301 Phase 190 -RW15 (S /C Blvd (154) - 144 St) $3,796 & Phase II 94 -RS02 (144 -139) $1,850, both completed. MAINT. IMPACT: Reduce pavement, shoulder, and drainage work. COMMENT: Only Phase III is shown in active years. Project includes Surface Water's Gilliam Creek 42nd Ave S Culvert project for $1.3m (pg. 100) and is part of the Walk & Roll Plan. Seattle City Light's funding is a 60/40 underground split. FINANCIAL Through Estimated (in $000's) 2015 2016 2017 2018 2019 2020 2021 2022 BEYOND TOTAL EXPENSES Phase IV Design 1,000 174 211 1,385 Land (R/W) 100 100 Const. Mgmt. 750 322 560 1,632 Construction 2,323 1,086 3,800 7,209 Undergrounding 2,467 1,057 3,524 TOTAL EXPENSES 1,000 1 174 5,851 1 2,465 1 0 0 0 0 4,360 1 13,850 FUND SOURCES Seattle City Light 1,077 462 1,539 Surface Water 144 4 148 Other Utilities 1 150 136 287 Bond 4,600 1,800 6,400 City Oper. Revenue 855 170 24 67 0 0 0 0 4,360 5,476 TOTAL SOURCES 1,000 174 5,851 1 2,465 1 0 0 0 0 4,360 13,850 74 2017 - 2022 Capital Improvement Program 2 City of Tukwila Agreement Number: • 6200 Southcenter Boulevard, Tukwila WA 98188 CONTRACT FOR SERVICES Amendment #6 Between the City of Tukwila and CH2M Hill Engineers, Inc That portion of Contract No. 12 -010 between the City of Tukwila and CI-12M Hill Engineers, Inc is amended as follows: Section 2: Scope of Services shall be supplemented with the following: The Consultant agrees to perform the services, identified on Exhibit A -1 attached hereto, including the provision of all labor, materials, equipment and supplies. Section 3: Time for Performance shall be modified as follows: 3. Time for Performance. Work under this contract shall commence upon the giving of written notice by the City to the Consultant to proceed. The Consultant shall perform all services and provide all work product required pursuant to this Agreement by December 31, 2017, unless an extension of such time is granted in writing by the City. Section 4: Payment shall be modified as follows: A. Payment for the work provided by the Consultant shall be made as provided in Exhibit B -1, attached hereto, provided that the total amount of payment to the Consultant for this work shall not exceed $218,783.05 without express written modification of the Agreement signed by the City. The new total contract shall not exceed $1,383,340.62 without express written modification of the Agreement signed by the City. All other provisions of the contract shall remain in full force and effect. Dated this day of CITY OF TUKWILA Allan Ekberg, Mayor ATTEST /AUTHENTICATED Christy O'Flaherty, MMC, City Clerk 20 CONTRACTOR APPROVED AS TO FORM City Attorney Page 1 of 1 75 Exhibit A -1 40th— 42nd Ave S. Phase III City of Tukwila Amendment 6 Scope of Work The scope of work is amended as follows: • The project schedule has incurred additional delays while permitting issues were being resolved within the City. The CONSULTANT assisted in these discussions, developing concepts and analyzing alternatives to the Detention Pond design. The result of these discussions has added some significant changes to the design primarily related to the stormwater detention facilities. The current direction is to eliminate the stormwater detention Pond adjacent to Gilliam Creek and install a detention vault in S. 158th St., just west of 42nd Ave S. Additional coordination with private utility service providers is required to resolve outstanding issues and finalize the design. Feedback from the public outreach will also require design revisions. Amendments 4 and 5 extended the duration from December 31, 2015 to December 31, 2016 without any scope or budget adjustments. This Amendment 6 defines scope and budget adjustments for additional services as well as account for the extended duration through December 31, 2017. TASK 1 1. Project Management Due to the 12 month time extension, additional project management is required for providing overall project administration, team management, schedule management, scope and budget management, and the preparation of progress reports and invoicing. With a credit for 2 months of inactivity, the additional duration for purposes of project management is assumed to be 10 months. Deliverables: Monthly progress reports and invoices (10) Bi- Monthly meeting materials (5), notes and action items Schedule updates r[ll TASK 2 2. Gilliam Creek Culvert 2.5.2 Culvert 60%, 90%, and Final Design Additional work will be required to coordinate with other Utilities (SCL, Century Link and Comcast) related to the temporary support of their facilities during the culvert installation. We need to facilitate a decision on how this work will be contracted and revise the contract documents. Assumptions: • CI-12M will participate in up to 6 meetings with utility providers and City Staff to reach a conclusion/ decision on the preferred approach to the construction of the temporary support system. • CH2M will incorporate necessary plan revisions, special provisions, bid items/bid schedules into the contract documents. • The preferred approach is assumed to not require any additional design, including utility support systems by CI-12M (beyond what was included in the 90 % submittal.) Deliverables: • Meeting notes and action items from design coordination with SCL, Century Link and Comcast. • Incorporate revisions to contract documents. TASK 3 3. Geotechnical Engineering Additional work will be required to determine the soil conditions and groundwater conditions at the proposed detention vault site at the west leg of S 158th Street. Geotechnical exploration to include 2 boring to a depth of 20 feet and a piezometer in one of the boring. Perform standard penetration test sampling at 2.5 feet interval, and sieve size analyses. Assumptions: • No infiltration test will be performed. • The CONSULTANT will collect monthly readings of the water level in the piezometer. • Temporary closure of S 158th Street will be needed. Deliverables: • Technical memorandum to supplement the geotechnical data report and recommendation report with design recommendations for the detention vault design. TASK 4 4. Survey and Mapping No additional work under this task MA TASK 5 30% Design ~~ No additional work under this task TASK d� Environmental �� �,��° Documentation ��° ������wwonn��unK���u�°nn 6. 1 Environmental S upp~ rt The CONSULTANT will provide the following support: Assist Public Works 6nthe completion of the Special Permission Permit Prepare plans and documentation related tothe landscaping plan required for the Special Permission • Prepare to show locations of plantings within the stream buffer and along the roadway corridor • Develop memorandum documenting how the project would mitigate tree removal and the landscaping requirements based upon Tukwila Municipal Code. Address comments from City of Tukwila Planning staff on Special Permissions Application. Comments on the Special Permission Application will be delineated and complete responses provided. Coordinate with Public Works mn the Special Permissions Permit: • One (1) meeting with Public Works hobe attended bnnpto two (2)CONSULTANT team members with Public Works Staff to review proposals to address City of Tukwila Planning comments on Special Permission Permit • One (1) meeting with Public Works and Planning staff to discuss path forward with regards to stormwater and Special Permission Permit. Meeting to be attended by up to three (3) C[)N5TJ[IANI team members. Development of concise working memorandum documenting preliminary determinations of potential environmental issues related to alternatives to locating stormwater pond adjacent to Gilliam Creek. Memorandum will address the environmental issues of up to six (6) other locations 6u the project areatocoDeutanddiocbargeotozznwatmr.Inforzuadon will be presented to City of Tukwila Public Works to assist infinding a location outside of Gilliam Creek buffer. Revise Special Permission Application and supporting information based upon coordination and meeting with Public Works and Planning staff members. This will include a5 year stream buffer monitoring plan that assumes the first year im performed 6v the contractor and the following 4 years by the City ufTukwila. Deliverables • Special Permissions Permit Application. Application includes City o{ Tukwila application form, Special Permissions permit information, and landscape plans • Revised Special Permissions permit application package • Memorandum addressing response to comments on the Special Permission. 78 TASK 7 7. Right of Way 7.1 Acquisitions from private property Slope easements for two parcels. Assumptions: • Two (2) permanent Slope Easements are required (parcels #15854 and #15838) Deliverables: • Parcel/ Easement calculations, legal descriptions and exhibits • Parcel/ Easement exhibits for each parcel (2) • Record easement with King County (2) • Appraisals (2) • Negotiations with property owner (2) to secure the necessary rights TASK 8 8. Agency, Stakeholder, and Community Coordination 8.1. Stakeholder and Agency Coordination (CITY, Property Owners, Utilities, WSDOT) 8.1.4. Utilities The CONSULTANT will assist in additional coordination with utility companies including: Seattle City Light (SCL), Comcast, Century Link and Zayo to facilitate finalize undergrounding plans for power and communication lines along 42nd Ave S. The CONSULTANT will assist in the coordination with Valley View Sewer regarding sewer connections/ stubs for 3 parcels currently on septic system (#15458, #15837, #15838) Assumptions: • Up to 4 additional meetings with utility companies to coordinate the design of their facilities with the other proposed project improvements. Deliverables: • Meeting minutes and action items 4 N*1 TASK 9 Contract 9,3~ Roadway and Sto r0hra^nage 9.3,1, Roadway Sections The CONSULTANT will revise and update the ��w�to City directed changes ' - [ to the bike facilities. Deliverables: * Revisions incorporated into the 100% Typical Roadway Sections 9.3~2. Paving, Grading and Drainage Plans and Profiles The CONSULTANT will revise the plans tu incorporate the following design : • Revise mtorzunmtoz collection and conveyance system bo direct the appropriate flow volume to the new mtozzuwater vault buS.158th Street am described bz Task 9.S.3. • Revise layout for the storm main north of 158th Street to move manhole covers out of the wheel path due toa shift to the roadway centerline stripe. • Revise the layout of the storm drain systems that discharges into the pond. • Revise storm drain profiles ao needed per the revised layout. • Revise Grading ou Parcels #l5854 and #l5838 where vve are changing frozuavvaDtoaalo9ed interface. • Revise limits of paving/overlay t* include the entire 16Uffiintersection. Revisions incorporated into 100% Paving, Grading and Drainage Plans and Profiles and Detail Sheets 9.3.3, Stormwater Management Facilities • Design o[storuzwater vault inlet and outlet structures and associated storm drain collection systems, grading and • Two additional Plan sheets to show the vault details and section. • Revise Demolition and Erosion Control Plans, and Paving Plans to cover changes around the detention vault and the former detention pond site. • Add an additional stormwater treatment device to the storm drain system (that was formerly used to discharge to the pond) north o{ the culvert. • The detention vault tobe pre-cast concrete. • A Contractor designed aborbngnlanvviUbe required. • One field visit Deliverables: * 100% St000weter Management Plans and Details (4) 80 9.5. Utility 9.5.2. Utility Undergrounding Plans — Power and Communication The CONSULTANT will revise the plans to incorporate any changes that come out of the additional coordination with SCL, Century Link, Comcast and ZAYO. Deliverables: • 100% Utility Undergrounding Plans, Profiles and Details (16) 9.6. Structures No additional work under this task 9.7. Channelization, Illumination and Signing The CONSULTANT will revise the plans to incorporate revisions to the striping including a shift to the centerline stripe and striping for the bicycle facilities. The CONSULTANT will coordinate with WSDOT regarding under bridge lighting. Deliverables: • Revisions incorporated into 100% Channelization, Illumination, and Signing Plans (6) TASK 10 10. Specifications Due to the changes to the stormwater detention facilities, and continued discussions related to supporting Power and Communications lines during the construction of the culvert at Gilliam Creek, additional work will be required to the specifications as follows: The CONSULTANT will prepare and incorporate special provisions related to the Stormwater detention vault and related facilities. The CONSULTANT will prepare and incorporate special provisions related to the utility support system at the culvert. Deliverables: • 100% Stormwater Detention Specifications • 100% Stream Buffer Mitigation Specifications 1) 1 year monitoring plan 2) Temporary Irrigation • 100% Special Provision and bid schedule for the Utility Support System at the culvert crossing 81 TASK 11 11. Cost Estimating Due to the changes described above, additional work will be required for the cost estimate. • 11.2 Engineer's Estimate Deliverables: • 100% Cost estimate 82 Exhibit B - Consultant Fee Summary City of Tukwila 40th - 42nd Avenue South Phase III Amendment #6 10/28/2016 Budget Summary By Task Task Description Labor Hours Total Labor Total Reimbursable Overall Totals Roadway Design Task 1 - Project Management 138 $25,267 $150 $25,417 Task 3 - Geotechnical Engineering 35 $4,268 $12,000 $16,268 Task 4 - Survey and Mapping 0 $0 $0 $0 Task 6 - Environmental Documentation 0 $0 $0 $0 Task 8 - Agency, Stakeholder & Community Coordination * 48 $10,447 $0 $10,447 Task 9 - Contract Drawings 358 $52,008 $0 $52,008 Task 10 - Specifications 80 $14,554 $0 $14,554 Task 11 -Cost Estimating 44 $7,233 $0 $7,233 Task 12 - Major Milestone Reviews (30 %, 60 %, 90 %, 100 %) 0 $0 $0 $0 Task 13 - Services Durino Biddin and Construction 0 $0 $0 $0 3 a "A Culvert & Stormdrain Task 1 - Project Management 49 $9,024 $0 $9,024 Task 2 - Gilliam Creek Culvert 58 $11,977 $0 $11,977 Task 3 - Geotechnical Engineering 23 $2,845 $0 $2,845 Task 4 - Survey and Mapping 0 $0 $0 $0 Task 5 - 30% Roadway Design 0 $0 $0 $0 Task 6 - Environmental Documentation 138 $28,926 $0 $28,926 Task 9 - Contract Drawings 140 19,911 $`0 $19,911 . @ e rk"�6P,T ., ?{ < 3, Right of Way Task 1 - Project Management 10 $1,805 $0 $1,805 Task 7 - Ri ht of Way 50 $8,369 $10,000 $18,369 €+f';0• :'' r '' {i" „I k4 ^r €� 0. 4fV hrXl ;frry?i P' AMENDMENT #6 TOTALS ' 1,171 $196,633 $22,150 $218,7$3 83 Exhibit B - Consultant Fee Determination City of Tukwila 40th - 42nd Avenue South Phase!!! - Amendment 56 , ... CH2M HILL. INC - Title . Sr. Protect Manager Sr. Consultant Br. Engineer Engineer Surveyor Jr Engineer Sr. Technician Technician Office TOTAL TOTAL Requested 55 Rate 5242.52 $219.02 $192.77 5160.57 $135.73 $104.35 $138.61 $76.03 $93.83 Task Name; - ` LOS - LOE , - LOS. ,- - LOE. Lf .` LO, , LOB LOE _, L00 - Total .Total LOS Dollars T,�; �'�I��dan?irafft",..• °,��z �� . ��:'�� , e�<�8$ � ,4� i2�� � >���9 �� � 1i%�� ? .. �-�o .�., -� ii�, � � t% �� . i!?zt 6tka� � .��"i��, r � 3t?sS,g $26,746 1,1 Overall Project Management ", 68 - :; 0 24 0 Q., ; . 0 0 0 " 6p 152.. Time extensions and associated Project Management (10 months) 48 24 72 $16,267 Monthly Progress Report, and Invoices (10) 20 60 80 510,480 `• .'1.2 Coordination MeetEtgs wtth`City ;= ; , '.20 . , -,, 0 " 16 10 ,� 0. -` 0 0 ; 0 b " 45 :: 39,346; - Bi- Monthly Project Team Meetings - 5 meetings, 2 Hours, 3 staff - City and Bellevue Office: Meeting Agendas, Summaries, Action Items 20 15 10 45 $9,348 = s 060 MSS c :=P:. tit) irYi t(J¢ yYien tyi ti ti (i ,4i �I�i i� e a e e i e a lv Yft e and a l i II II I �� �i �II��� e s 1 t r ,, rd p�r ink nand Additional Meetings Comcast (6 eetings, Utility revisions ki Me n. (1 . o _ , 5711 n Conditions l e , Complete Site Reconnaissance 4 417 Complete Subsurface Exploration and Laboratory Testing including Coordination of Access Engineer Present 8 16 24 $3,212 Monthly Monitoring (5 months) 10 10 $1,044 Update Technical Memo 4 16 20 $2,441 Meetings - 2 meetings 3 staff Special Permissions Permit Application 6 24 24 54 611,338 Revised Special Permissions Permit Application Package 2 24 24 50 $10,368 Memorandum addressing response to comments on the Special Permission •. 16 $3,294 t c a • e a ROW Acquisition Su••o 24 24 50 •e t: .:.' ) }j"... e.. •, !�i "WFs • �a9e "•i � "j srI I i. { • 1 1 ! ) / 1 v V d yia �I . . ��piil�i'� �t ��I dl 4�(�l e • 0 i i e e 48 e . RoadwayantStormWaterDrairaa 2- e 8 4 • 1 11 1 e, i r 98 1 Roadway Sect- orris *'�* ; '' Revisions 100! Roadway Sections Paving. Grading and Drainage: Plans and Profiles = • i Revisions 100% Roadway Paving, Grading and Drainage Plans and Profiles and Detail Sheets 32 • e 60 60 20 232 $31,901 Evaluate Bike Lanes/sharrow configuration 2 16 83,681 StomWater Management Facilities, . , Prepare 100% Stormwater Management Plans and Details (4) 80 • e 20 140 Uth iity e e e 1 e 17118ty Under®raurding Plans - Polder and Canununica0611 100% Utility Undergrounding Plans, Profiles and Details (16) 32 20 52 $8,941 Cbatinelization; Illumination, and Sign[ng, - e 1 Revisions 100% Channetization, Illumination & Signing Plans & Details (6) p I kV !i M�i 6 eal�NQ f - 1 1 t i • 100% Stormwater Detention Specifications 40 40 $6,423 100% Stream Buffer Mitigation Specifications 16 0 16 i 100°A Special Provision and bid schedule for the Utility Support System at the culvert crossing 24 24 4,626 G '$7,233�� =. 11,2 Engineer' Estimate '; `' 4 0 " 16`�,.w= ,. ;..12' i =, . it . �:'12 -, 0 , 0 0; , ,. 4+F -' 100% Cost Estimate 4 16 12 12 44 $7,233 Exhibit B - Consultant Fee Summary City of Tukwila 40th 42nd Avenue South Phase III Direct Labor Classification Quantity X Rate _ Cost Hours x Rate = Cost Sr. Project Manager Appraisals - Sub 160.0 Total Expenses $242.52 $38,803.20 Sr. Consultant 78.0 $219.02 $17,083.56 Sr. Engineer 321.0 $192.77 $61,879.17 Engineer 202.0 $160.57 $32,435.14 Surveyor 24.0 $135.73 $3,257.52 Jr. Engineer 150.0 $104.35 $15,652.50 Sr. Technician 136.0 $138.61 $18,850.96 Technician 40.0 $76.03 $3,041.20 Office 60.0 $93.83 $5,629.80 1,171.0 $196,633.05 Expenses Category Quantity X Rate _ Cost Drilling - Sub $12,000.00 Travel - Mileage 277.8 $0.540 $150.00 Acquisitions - Sub $5,000.00 Appraisals - Sub $5,000.00 Total Expenses $22,150.00 85 Exhibit B - Consultant Fee Summary City of Tukwila 40th - 42nd Avenue South Phase 111 October 28, 2016 Reimbursables Reimbursable Item Task 1 - Project Management Task 3 - Geotechnical Engineeri ng Task 7 - Right of Way Totals Drilling - Sub $12,000.00 $12,000.00 Travel - Mileage $150.00 $150.00 Acquisitions - Sub $5,000.00 $5,000.00 Appraisals - Sub $5,000.00 $5,000.00 Totals $150.00 $12,000.00 1 $10,000.00 1 $22,150.00 86