Loading...
HomeMy WebLinkAboutPermit D12-047 - STONEWAY CONCRETE - PLANT DEMOLITIONSTONEWAY CONCRETE DEMO 17024 WEST VALLEY HY EXPIRED 07 -17 -13 D12 -047 City o '' ukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -43 1 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov DEVELOPMENT PERMIT Parcel No.: 2523049049 Address: 17024 WEST VALLEY HY TUKW Suite No: Project Name: STONEWAY CONCRETE DEMO Permit Number: D12 -047 Issue Date: 07/12/2012 Permit Expires On: 01/08/2013 Owner: Name: ANMARCO Address: 9125 10TH AVE S , SEATTLE WA 98108 Contact Person: Name: RICK HINRICHS Address: 9216 EIGHTH AV S , SEATTLE WA 98108 Contractor: Name: GARY MERLINO CONST CO INC Address: 9125 10TH AVE S , SEATTLE WA 98108 Contractor License No: GARYMCC 150MW Lender: Name: Address: Phone: 206 - 255 -2645 Phone: (206)762 -9125 Expiration Date: 02/14/2013 DESCRIPTION OF WORK: DEMOLITION OF BATCH PLANT, DRIVER SHACK, SILOS AND DRIVE OVER/GRIZZLY. WORK PERFORMED BEFORE PERMIT WAS ISSUED. NO STORM DRAINAGE LINES WILL BE CAPPED. SANITARY SEWER CAPPED @ MH#1 BY GARY MARLING Co. SEDIMENT SOCKS INSTALLED IN ALL EXISTING STORM DRAINAGE STRUCTURES. RE- DEVELOPMENT OF PROPERTY IN NEAR FUTURE, WATER SERVICE LINE SHUT -OFF WITHIN PROPERTY UTILITY EASEMENT. Value of Construction: $30,000.00 Type of Fire Protection: Type of Construction: Electrical Service Provided by: PUGET SOUND ENERGY Fees Collected: $2,101.25 International Building Code Edition: 2009 Occupancy per IBC: * *continued on next page ** doc: IBC-7/10 D12 -047 Printed: 07 -12 -2012 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: Land Altering: Landscape Irrigation: Moving Oversize Load: N N • Number: 0 Size (Inches): 0 Start Time: Volumes: Cut 0 c.y. End Time: Fill 0 c.y. Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature: Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance.ejf work. I am aut ign and obtain this development permit and agree to the conditions attached to this per Signat Print Name: Date: %/�2/! 2� This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 5: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the doc: IBC -7/10 D12 -047 Printed: 07 -12 -2012 Building Official from requiring the correctio rrors in the construction documents and ot) ata. 6: ** *PUBLIC WORKS DEPARTMENT CONDITIONS * ** 7: Contractor shall notify Public Works Project Inspector at (206)433 -0179 of commencement and completion of work at least 24 hours in advance. 8: Work affecting traffic flows shall be closely coordinated with the City Project Inspector. Traffic Control Plans shall be submitted to the Inspector for prior approval. 9: Any material spilled onto any street shall be cleaned up immediately. 10: Temporary erosion control measures shall be implemented as the first order of business to prevent sedimentation off -site or into existing drainage facilities. 11: The site shall have permanent erosion control measures in place as soon as possible after final grading has been completed and prior to the Final Inspection. 12: Sewer and water utilities shall be plugged at the mains if they are to be abandoned. If they will be used again in the near future for a new building, they shall be capped at the property line and at the water meter respectively. doc: IBC -7/10 D12 -047 Printed 07 -12 -2012 CITY OF TUKWILA Community Develop Department Public Works Depart nt Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 http:! /www.TukwilaWA.tov Building Pet :Project Date Application Accepted: Date Application Expires:-,: (For ' office use only).: CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** Site Address: �o2 f,�%Qfb"�' /)44I t1 tuj Tenant Name: t',W 4.( (• ti King Co Assessor's Tax No.: c2 9. a -304 go4Y Suite Number: Floor: New Tenant: ❑ Yes ❑.. No ?PROPERTY,: OW NERD' Name: A n may /t Address: 41 a / i t Ave' 6. City��k i� State: Zip: e.c, CONTACT:PERSON person receiving a I project;. coramUnicatien a Name: l `''� r'l r 1� Address: q ;1 ,{ v-& �. City: Gettig Z Phone: Email: r. IA �. l7 -t--/D h el ly C Gr>i-e, State: WA 'A Zip:,6m GENERAL:C(*TRACTOR LNFORMATION Company Name: (2,61 1 N N 1 l l t l i nil ezw.3'1"l Jf Y C Address: (,N . A., City:_ State: WA Zip: q �i D d r, Phone' ,7 0 ,q I ,.Fax: Contr Reg No.: 6 vAat :w q j^ — O�, ,b Tukwila Business License No.: tC H:Wpplications\Forms- Applications On Line \20I I Applicauons\Permit Application Revised - 8- 9- 11.docx Revised: August 2011 bh l : JTECT OF RECORD. Company Name: Architect Name: Address: City: State: Zip: Phone: Fax: Email: ENGINEER OF,RECORD :. Company Name: Address: Engineer Name: City: State: 9 `dress: City: State: Zip: Phone: Fax: Email: i''''''':..44,','''''''' NDER/BOND1ISSUED fre%iured for projects $5,000 or `3 RC W 4 21:095) Y ." :.: t , Name: Address: City: State: Zip: Page 1 of 4 .• a v • a∎ a a a v l - i+ V V -7✓ 1. -✓ V/ Valuation of Project (contractor's bid pr $ `�' C: r_`C' C "' Existing lding Valuation: $ Describe the scope of work (please provide detailed information): V l t -t �� ac kak .. p 1 - - , r (lac L. Will there be new rack storage? ❑ ....Yes No If yes, a separate permit and plan submittal will be required. vide All Building Ares wire not J type at Occupancy per IBC PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8-1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. 11 \Applications \Forms - Applications On Line \20I 1 Applications\Permit Application Revised - 8 -9 -11 docx Revised. August 2011 bh Page 2 of 4 .PUBLIC .woRFs PER rr Il4'ORMAT1ON - 206 - 433 -0179 . Scopebf Work (please provide detailed i t ( > ati on): 1) p) yto .-4-r try) ioct\ - -aA to 4_‘- 'trek- r ) l cyam l °rzzj l(j • Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water 71,. Tukwila ❑ ...Water District #125 ❑ .. Water Availability Provided Sewer District . Tukwila ❑ ...Valley View ❑ ...Renton .. Sewer Use Certificate ❑...Sewer Availability Provided ❑... Highline ❑ .. Renton ❑ .. Seattle Septic System: ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ❑ .. Civil Plans (Maximum Paper Size — 22" x 34 ") ❑ .. Technical Information Report (Storm Drainage) ❑ .. Bond 0... Insurance 0... Easement(s) Proposed Activities (mark boxes that apply): ❑ .. Right -of -way Use - Nonprofit for less than 72 hours ❑ .. Right -of -way Use - No Disturbance ❑ .. Construction/Excavation /Fill - Right -of -way ❑ Non Right -of -way ❑ ❑ .. Total Cut ❑ .. Total Fill cubic yards cubic yards 0... Geotechnical Report ❑... Maintenance Agreement(s) ❑ ...Traffic Impact Analysis ❑ ...Hold Harmless — (SAO) ❑ ...Hold Harmless — (ROW) O... Right -of -way Use - Profit for less than 72 hours ❑... Right -of -way Use — Potential Disturbance ❑... Work in Flood Zone 0... Storm Drainage ❑ .. Sanitary Side Sewer 0... Abandon Septic Tank 0... Grease Interceptor R❑' Cap or Remove Utilities ...Curb Cut ❑ ... Channelization .. Frontage Improvements 0... Pavement Cut 0... Trench Excavation ❑ .. Traffic Control 0... Looped Fire Line 0... Utility Undergrounding ❑ .. Backflow Prevention - Fire Protection Irrigation Domestic Water " ❑ .. Permanent Water Meter Size... WO # ❑ .. Temporary Water Meter Size .. 91 WO # ❑ .. Water Only Meter Size 7> WO # ❑ ...Deduct Water Meter Size ❑ .. Sewer Main Extension Public ❑ Private ❑ ❑ .. Water Main Extension Public ❑ Private ❑ FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) ❑..Water ❑ .. Sewer ❑ .. Sewage Treatment Monthly Service Billing to: Name: Day Telephone: Mailing Address: City State Zip Water Meter Refund/Billing: Name: Mailing Address: Day Telephone: City State Zip H:Wpplications\Forms- Applications On Line\2011 Applications\Permit Application Revised - 8- 9- 11.docx Revised: August 2011 bh Page 3 of 4 PERMIT APPLICATION NOTES — Value of Construction — In all cases, a valu4onstruction amount should be entered by the app t. This figure will be reviewed and is.,ulject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWN Signature: Print Name: OR AUTHORIn GEN LL 11e ictt Kl utL t- Date: /604 A c 6IJR Day Telephone: arlp. 7L-4 L �✓ X 35105 Mailing Address: l I `Q''1 Avg � X� 041 �o� Q � VVA /C<1 og H %ApplicationsTorms- Application On Line12011 Applications'Permit Application Revised - 8- 9.11.docx Revised. August 2011 bh City State Zip Page 4 of 4 ® • City of Tukwila tiA Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone. 206 -43 1 -3670 Fax: 206- 431 -3665 Web site: hap: Uwww.Tukwila WA.,ov RECEIPT Parcel No.: 2523049049 Permit Number: D12-047 Address: 17024 WEST VALLEY HY TUKW Status: APPROVED Suite No: Applied Date: 02/16/2012 Applicant: STONEWAY CONCRETE DEMO Issue Date: Receipt No.: R12 -02104 Initials: User ID: Payee: WER 1655 Payment Amount: $1,009.15 Payment Date: 07/12/2012 10:21 AM Balance: $0.00 HEIDI KLUDT TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 003801 ACCOUNT ITEM LIST: Description 1,009.15 Account Code Current Pmts BUILDING - NONRES PW BASE APPLICATION FEE PW PERMIT /INSPECTION FEE PW PLAN REVIEW 000.322.100 000.322.100 000.342.400 000.345.830 Total: $1,009.15 659.15 250.00 50.00 50.00 doc: Receiot -06 Printed: 07 -12 -2012 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite 4100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 2523049049 Permit Number: D12-047 Address: 17024 WEST VALLEY HY TUKW Status: PENDING Suite No: Applied Date: 02/16/2012 Applicant: STONEWAY CONCRETE DEMO Issue Date: Receipt No.: R12 -00672 Initials: User ID: Payee: WER 1655 Payment Amount: $1,092.10 Payment Date: 02/16/2012 08:48 AM Balance: $0.00 ANMARCO TRANSACTION LIST: Type Method Descriptio Amount Payment Check 14770 1,092.10 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000.322.100 000.345.830 640.237.114 Total: $1,092.10 659.15 428.45 4.50 doc: Receiot -06 Printed: 02 -16 -2012 NOTE: PSE COMPLETED TERMINATION OF GAS AT LOCATION SHOWN ON PLAN AND ELECTRICAL AT TRANSFORMER. ALL EXISTING STORM DRAINAGE STRUCTURES HAVE SEDIMENT SOCKS INSTALLED. NO STORM DRAINAGE LINES WILL BE CAPPED. RE- DEVELOPMENT OF PROPERTY IN NEAR FUTURE. WATER SERVICE LINE SHUT -OFF WITHIN PROPERTY UTILITY EASEMENT TO BE COMPLETED BY GARY MERLINO CONSTRUCTION COMPANY, INC. 30° DEMO DRIVE OVER 16' X 100' AREA ALL ASPHALT AROUND CONCRETE STRUCTURES WILL REMAIN FOR DRAINAGE AND DUST CONTROL. SANITARY SEWER CAPPED AT MH #1 BY GARY MERLINO CONSTRUCTION CO., INC. These plans have been reviewed by the Public Works Department for conformance with current City standards. Acceptance is subject to errors and omissions which do not authorize violations of adopted standards or ordinances. The responsibility for the adequac. - of the design rests totally with the designer. Additions, deletions or revisions to these drawings after this date will void this acceptance and will require a resubmittal of revised drawings for subsequent approval. Final acceptance is s • ject to field inspection by the Public Works utiliti inspector. Date: dr? By: Pcrrr approval is subject to errors and old eL ' ( 3` :01x4 :ruction documents does not auto?..' -. t adopted code or ordinance. Re.cet0 Copy and conditions is acknowledged: %LA By Date: 7/1z1/�� OW NERCI hINTd(AR"CU"' ita BUILDING0DIVISION SEATTLE, WA 98108 CONTACT: RICK HINRICHS 9216 8T" AVE. SOUTH SEATTLE, WA 98108 206.255 -2645 CELL rickh(cstonewayconcrete.com L AL, Pe_ 42.1171- 4 3 40 45� cpse 102-105! CB #2 REVISIONS rhences sh ?Ii he made to the scop with Jut prior approval of 71.'t'•vila t uilding Division. wii require a new plan . bm'r ,al FP Pic .Li -Ma y include ..dditional plan rev ' ^es. SET PK. MALL' 1\1e31°541-112.°W • lU CB #3 1153. J CB #4 C a� to 4o= zl 45= GAS CAPPED-4. qJWM SeT F2-. R.. ,PI V- LS '+OO GM 5 O3rJo =W i�F,�;lwi �Jlrl�i.J ISO �l14echanical gioEiectrical Celumbing goeas Piping of Tukwila ING DIVISION MH #2 • CB #5 3o o /,>8 seT L. R f3EG 1 NN t t.14 Ar TLIE cENT aF sEf'tor l 2 ; TLl etic MIESr 4,LotsiGI 114C ceNTE=2. U N e Cr secric 4 2F F=cT R7 l NTp-scQ- vvrri4 -r cNTe-g- u OF11 -1= G�.LtG�CaD, t(LwAU {ccej ST. piuUL- MD PAGFIG Vac I?-{CZ LIT of WA`(i TU eNGC 50011.1 e.PLY .64-0r4 6, 5411") 1741 GeNTi°R- u N e 517 .40 reel; Tl imiNlGE 1`1044-14 46/° 271s)" TO 1.145 W fsT� t2LY U N e c* FUCICT 500 NIP e-L1`crWG Ra t Q461'4- r OF WAY AS cGTIGer•11\469 trJ 411\14 CoL(ttY Sulaes2to COL)LLT C4USr✓ No. 32$73, ANP Tl. -Err TR1» POINT GP E C�INNIP1�i ThGNCe cortrl r 1 U t IJ64 NotzTN, 4b 27 ' Pte'" vdesr To -rue easreRLY u N S ATT u1 o.W r\10. 5-t-1 C'.sr VALLei c2oAp); 'f- i.l�\1Ge NOQTLIeaL'' .4,1-01•1 61 D e.ASi -e Rb( 41 FaNWDy M42gl/n1 47 r r, Tu eNC' e4 .4T Tip wesTegLY Lt N C OF 541117 -0.16reT ScOND el-e01 12411-1.4 AS.Y 14ur cr wlv.Y 'T1:Ier\IGe Awr.6 Se417 W esregL ( U Tb Tt-i -nzve fbiNY O f3641N1 NINEt ;'f L1dTT iN Tue ItANAI TLg W I l,,a.) counrrY OI V-1 til Ei , 5TA-pe aF tn/Asl4 lu4TbN . INCOMPLETE 1. TR# s-T t . 1 2 - t G- t I ICO- DEMO 5 SILOS 16' X 100' AREA DEMO BATCH PLANT 50 X 90' AREA 1 I 0MH #1 11/g REVIEWED FO CODE COMPLIANCE - APPROVED JUN 2 0 2412 City of Tukwila ILDING DIVISIO NW N E 4 5E� 2.6-T2.31\1-12.4e.. 1n/ . M. KING COUNTY ASSESSOR'S TAX NO: 2523049049 0.--01•1 DEMOLITION PLAN FOR STONEWAY CONCRETE BATCH PLANT 17024 WEST VALLEY HWY TUKWILA, WA 98188 Sco.L� 2/15/12 Scr t•R. LA ot4 L( PP 1 DEMO DRIVER'S SHACK 20 X 20' AREA 0 RECEIVEC MAR 13 2012 TUKWII,A PUBLIC WORKS 't 0. 13 ser I.R LEGEND MH SANITARY SEWER MAN HOLE O PP POWER POLE Q GM GAS METER ❑ CB CATCH BASIN T TRANSFORMER WM I" =6o' 2" WAR► lVED MAR 08 2012 REVISION 3 /6 /12PERMITCENTER 1. ADD ASSESSOR'S TAX NO. 2. UPDATE CONTACT INFORMATION 3. ADD NOTES 4. ADD UTILITY LOCATIONS 5. ADD LEGEND SHEET 1 OF 1 06 -03 -2013 RICK HINRICHS 9216 EIGHTH AV S SEATTLE WA 98108 • City of Tukwila • Jim Haggerton, Mayor Department of Community Development Jack Pace, Director RE: Permit No. D12 -047 STONEWAY CONCRETE DEMO 17024 WEST VALLEY HY TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 07/17/2013. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and /or receive an extension prior to 07/17/2013, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, 7:),Up Bill Rambo Permit Technician File: Permit File No. D12 -047 6300 Southcenter Boulevard, Suite # 100 • Tukwila, Washington 98188 • Phone 206 -431 -3670 • Fax 206-431 -3665 January 16, 2013 Heidi Kludt AnMarCo 9125 Tenth Ave S Seattle, WA 98108 • City of Tukwila • Jim Haggerton, Mayor Department of Community Development Jack Pace, Director RE: Request for Extension Development Permit D12 -047 Stoneway Concrete Demo —17024 West Valley Hy Dear Ms. Kludt, This letter is in response to your written request for an extension to Permit Number D12 -047. The Building Official has reviewed your letter and considered your request to extend the above referenced permit. The City of Tukwila Building Division will be extending your permit an additional 180 days from the date of expiration, July 17, 2013. If you should have any questions, please contact our office at (206) 431 -3670. Sincerely, er Marshall Technician File: Permit No. D12 -047 W: (Permit CenterlExtension LetterslPermits120121D12 -047 Permit Extension.docx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax 206 - 431 -3665 nMarCo• 9125 Tenth Avenue South • Seattle, Washington 98108 • (206) 762 -9125 Office • (206) 766 -9000 Fax RECEIVED DEC' 21 20121 COMMUNITY DEVELOPMENT December 19, 2012 City of Tukwila Jennifer Marshall Permit Technician Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, WA 98188 RE: Permit No. D12 -047 Stoneway Concrete Demo 1704 West Valley Hy Tukw Request for Permit Extension Dear Ms. Marshall, We recently received notification from you that the above noted permit will expire on 01/08/2013. Therefore, I am requesting a permit extension for this project. have not been able to complete the necessary drawings to date due to time restrictions from other projects, but I am working towards that submittal. It is my understanding that you will notify me by mail if this request is granted. Sincerely, (414"tc &I,(6tY- Heidi Kludt Project Manager aArito fte/e9e dal( o! //5f2D/3 Bella Bottega LaDenze MJB Properties Pier 1 Casetta Lago Liberty Ridge M &M Lease Co. Quarry Industrial Park Cava Materials Mcrlino Holdings II Park Drive I Sea-Sal Partners Cedar Shores Land Merlino Land Development Park Drive II SR 900 Strada da Valle Sumner Terra 2235 Fifth Avenue 501 Monster Road 12 -03 -2012 RICK HINRICHS 9216 EIGHTH AV S SEATTLE WA 98108 • City of Tukwila • Jim IHaggerton, Mayor Department of Community Development Jack Pace, Director RE: Permit No. D12 -047 STONEWAY CONCRETE DEMO 17024 WEST VALLEY HY TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 01/08/2013. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 -431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 01/08/2013, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, \WA( enni=er Marshall my Technician File: Permit File No. D12 -047 6300 S'outhcenter Boulevard, Suite #100 • 'Tukwila, Washington 98188 • Phone 206 -431 -3670 • Fcrx 206 -431 -3665 07 -02 -2012 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director RICK HINRICHS 9216 EIGHTH AV S SEATTLE WA 98108 RE: Permit Application No. D12 -047 STONEWAY CONCRETE DEMO 17024 WEST VALLEY HY TUKW Dear Permit Applicant: In reviewing our current application files, it appears that your permit applied for on 02/16/2012, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Your permit application will expire on 08/14/2012. If you still plan to pursue your project, a written request for extension of your application must be submitted to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit application. If it is determined that an extension is granted, your application will be extended for an addtional 90 days from the expiration date and you will be notified by mail. In the event that we do not receive your written request for extension or request was denied, your permit application will expire, become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D12 -047 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431 -3670 • Fax 206 -431 -3665 Joanna Spencer • • From: Greg Villanueva Sent: Tuesday, May 01, 2012 11:08 AM To: 'rickh @stonewayconcrete.com' Cc: Joanna Spencer Subject: 17024 West Valley Highway Hi Rick, As the NPDES Coordinator for Tukwila, I received a call from the Department of Ecology Hazardous Waste Office asking about the black barrels and totes that remain at the non - permitted Stoneway demolition site. I was able to read most of the labels on the containers and appreciate that they were labeled as non - regulated. Please let me know what your intention is with the barrels and totes. I need to get back to Ecology and give them an update. Respectfully, Greg Villanueva NPDES Coordinator Department of Public Works City of Tukwila greg.villanueva@tukwilawa.gov 206- 431 -2442 Office 206 - 571 -6321 Cell D12 -041 ¶ April 13, 2012 • City of Tukwila Department of Public Works Mr. Gary Merlino Gary Merlino Construction Co., Inc. 9125 - 10th Ave. So. Seattle, WA 98108 • Jim Haagerton, Mayor Bob Giberson, P.L., Director SUBJECT: Demolition of Batch Plant at 17024 W. Valley Hwy., Tukwila, WA Permit No. D12 -047 Dear Mr. Merlino, The City of Tukwila is requesting that you remove the existing water service to your concrete batch plant as part of the scope of work in your demolition project. The water service shall be removed up to the water main in the street, the corporation stop shall be removed and a repair band installed on the existing water main. If a corporation stop was not used, the tee can remain in place and a blind flange can be installed with a concrete thrust block. This requirement is from the Third 2009 Edition of the City of Tukwila Public Works Department Infrastructure Design & Construction standards under paragraph 7.1, Metered Service 7.1.1.4 "When determined by the Director, Permittee shall remove the corporation stop at the main and pipes, meters, etc." This authority is under Ordinance 1783, filed with the City Clerk, and authorizes the Public Works Department to create and to amend these standards. If you have any questions, please contact me at (206)431 -2441. Sincerely, '917-(le Michael P. Cusick, P.E. Sr. Utilities Engineer Attachments cc: Bryan Still Joanna Spencer MC /sb W: \PW Eng\OTHER \Mike Cusick \Merlino Letter - Batch Plant Demo.Doc PERMANENT FILE COPY INFRASTISTURE DESIGN AND CONSTRUCTIONNTANDARDS 7.0.6 FIRE AND LOOPED SYSTEM If possible for purposes of meeting fire protection and water quality standards, water systems are to be looped in accordance with the City's Comprehensive Water Supply Plan and the Uniform Fire Code. Non - looped systems require the Director's approval. 7.0.7 RECLAIMED WATER Where available, reclaimed water can be utilized for non - potable uses such as irrigation, cooling, and energy needs. Technical specifications (i.e. blocking, valves, etc.) as provided in these Standards for potable water systems are also applicable to reclaimed water systems. In addition, non - potable, reclaimed water systems must be clearly identified with signs and purple coloring in accordance with the Water Reclamation and Reuse Standards of the Washington DOE manual, Criteria for Sewage Works Design. 7.0.8 SYSTEM MODIFICATIONS Modification to the water supply or plumbing on private property requires upgrade of the meter(s) and the cross connection control to current standards. 7.0.9 MAINTENANCE The property owner owns and maintains the water service from the meter onto the property. 7.1 METERED SERVICE 7.1.1 GENERAL A. All permanent meters for one project shall be located at the property line and within the right -of -way. No pack joints will be allowed 1. Residential - Connections shall be a minimum of 3/4 inch and shall use one section of copper tubing type K continuous from the main to the meter, without any joints. Materials between the meter and the house must meet the current King County Department of Health standards. 2. Non - residential - Connections shall be a minimum of 1 inch and shall use one section of copper tubing type K continuous from the main to the meter, without any joints. Pipe and fittings shall be rated for pressure of twice the maximum working pressure of the 360- pressure zone. 3. Deduct Meter - The meter shall read in cubic feet and shall have an TRPL register that is compatible to the Sensus automatic reading system. Install deduct meter for landscape irrigation next to the permanent water meter or within six feet of the permanent meter when located in a landscaped area. In order to connect the deduct meter to the permanent meter ing system, connect the two boxes using PVC conduit. 4. Permanent Service Disconnection When determined by the Director, Permittee shall remove the corporation stop at the main and pipes, meters, etc. 58 Revision date: 04/172009 • • INFRASTRUCTURE DESIGN AND CONSTRUCTION STANDARDS CHAPTER 1 INTRODUCTION 1.0 PURPOSE These standards are intended to ensure consistent design and construction requirements and adherence to the City's comprehensive plans. It is this City's policy to maintain a high level of quality in the construction of public facilities. The standards detailed herein have been prepared to foster consistent requirements of quality and value for both public and private construction, and are to be applied to both. The standards in this document set forth the minimum criteria and specifications for both public and private construction projects. In addition, these standards provide the minimum design and construction requirements for utility and street improvements to be accepted by the City of Tukwila. The Director may substitute more stringent design standards and specifications where special conditions warrant. The Director may relax these standards upon approval of a variance. These standards shall not substitute for engineering design, nor are these standards intended to limit innovative design where equal performance in value, safety, and maintenance economy can be demonstrated. 1.1 DEPARTMENTS Public Works Engineering Public Works Operations and Maintenance Engineering and Development 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 206 - 433 -0179 Operations and Maintenance 600 Minkler Boulevard Tukwila, WA 98188 206 - 433 -1860 Fire Department Community Development Station #51 444 Andover Park East Tukwila, WA 98188 206 - 433 -1859 Planning /Building /Permit Center 6300 Southcenter Boulevard Suite 100 Tukwila, WA 98188 206- 431 -3670 1.2 AUTHORITY Ordinance 1783, filed with the City Clerk, authorizes the Public Works Department to create and to amend these Standards. 1 Revision dale: 04117/2009 INFRASTRUCTURE DESIGN AND CONSTRUCTIOIrtSTANDARDS 1.3 REVISIONS Th e City periodically reviews and revises the Standards. Additionally, anyone may submit to the Director a written request for a revision to these standards. The request shall include a brief description of the revision, justification for the revision, and a copy of the proposed text or drawing. If the revision is accepted, the Director revises these standards at the periodic review. The revision request form is in Appendix E. 1.4 REFERENCES, STANDARDS, AND CODES The following lists of references, standards, and codes provide the basis for design and construction requirements for residential, commercial, or industrial development, or construction of public infrastructure within the City. Where conflicts in design and construction requirements arise, these Development Guidelines and Design and Construction Standards (Standards) prevail. 1.4.1 ALL PROJECTS The City of Tukwila recognizes and uses the most current edition of the following references, standards, and codes. 1. City of Tukwila Standards, 2. City of Tukwila Municipal Code, 3. City of Tukwila Comprehensive Plans, including Sewer, Water, Surface Water, Land Use, 4. Standard Specifications for Road, Bridge, and Municipal Construction, prepared by the Washington State Chapter of the American Public Works Association and the Washington State Department of Transportation. (Standard Specifications). 5. Standard Plans for Road, Bridge and Municipal Construction, prepared by the Washington State Department of Transportation, 6. Manual on Uniform Traffic Control Devices (MUTCD), U.S. Department of Transportation as amended and approved by Washington State Department of Transportation, 7. King County Surface Water Design Manual (1998), 8. The City's NPDES permit, 9. Sensitive Areas Overlay (TMC 21), 10. State and National Environmental Policy Acts, 11. Shoreline Management Act, State of Washington, 12. Tukwila and King County Shoreline Master Plans, 13. WISHA - Washington Industrial Safety & Health Administration, 14. OSHA - Occupational Safety & Health Administration, 15. All other federal, state and local special requirements. In cases where the above references, standards, and codes do not cover elements of the project design and construction, the City recognizes and uses the most current edition of the following: 2 Revision date: 04/17/2009 • plant, equipment, structures, or property within the City used or to be used for the purpose of offerin telecommunication service. provided, however, this doe not include lessees that solely lease bandwidth (and d not own telecommunication facilities within the City o Tukwila). 88. "Telecommunication Facilities" — se "Facilities." 89. "Telecommunication Service" means th providing or offering for rent, sale or lease, or in exchang for other value received, the transmittal of voice, data image, graphic or video programming information o service(s) between or among points by wire, cable, fibe optics, laser, microwave, radio, satellite or simil facilities, with or without benefit of any close transmission medium. 90. "TMC" means the Tukwila Municipal Cod adopted by the City Council. 91. "Topping" means the severe cutting of th top of a street tree resulting in stubs beyond the branc collar in the crown or severe cutting which removes substantial portion of the normal canopy, disfigures th street tree, and reduces the height. 92. "Underground Facilities" means telecom munication and /or cable facilities located under th surface of the ground, alone or in combination, direc buried or in utility tunnels or conduits, excluding th underground foundations or supports for overhea facilities. 93. "Unpaved Street Surface" means street sur face that is neither standard nor nonconforming pave street surface. 94. "Unsafe Condition" means any conditio that the Director reasonably determines is a hazard t health, endangers the safe use of the right -of -way by th public, or does or may impair or impede the operation o functioning of any portion of the right -of -way, or ma cause damage thereto. 95. "Utility Excavator" shall mean any owne whose facility or facilities in the public right -of -way ar used to provide electricity, gas, information services sewer service, steam, storm drains, telecommunications traffic controls, transit service, .video, water, or othe services to customers regardless of whether such owner i deemed a public utility. 96. "Utility System Improvements" means wate and /or sewer facilities as specified in RCW 35.91.020 it now reads, or as hereafter amended. 97. "Vegetation" means all trees, plants, shrubs groundcover, grass, and other vegetation. 98. "Washington Utilities and Transportatio Commission "or "WUTC" means the State administrativ agency, or lawful successor, authorized under Title 80 o the Revised Code of Washington to regulate and overse telecommunications carriers, services an telecommunications providers in the State of Washington to the extent prescribed by law. (Ord. 1995 §1(part), 20021 • TITLE 11 — RIGHT OF WAY USE 11.04.050 Powers of Director The Director shall have the following powers: 1. Prepare and adopt procedures as needed to implement this title and to carry out the responsibilities of the Department. Such procedures do not require approval of the City Council to be implemented; how- ever, the Council may, by motion or resolution, direct that procedures and fees be amended or modified to the satisfaction of the Council. 2. Approve the issuance of any permit applied for under the provisions of this title. 3. Deny the issuance or renewal of any permit applied for, or to revoke, suspend, or otherwise restrict any permit issued under this title. • 4. Order the correction or discontinuance of any condition, activity, or use of any right -of -way that violates or is contrary to any provision of this chapter or procedures adopted under this chapter or other applicable codes or standards; or that is being conducted without a right -of -way use permit. 5. Have . all powers and remedies available under State law, this title, and procedures adopted under this title for securing the correction or discontinuance of any condition contrary to this title. 6. Prioritize conflicting uses of the rights -of -way, or deny any or all such uses or proposed uses. 7. Administer and coordinate the enforcement of this title and all procedures adopted under this title. 8. Advise the City Council, • Mayor, City Administrator, and other City departments on matters relating to applications for use of rights -of -way. 9. Carry out such other responsibilities as required by this title or other codes, ordinances, reso- lutions or procedures of the City. 10. Request the assistance of other City departments to administer and enforce this title, as necessary. (Ord. 1995 §1(part), 2002) 11.04.060 Appeals A decision of the Director made in accordance with this title shall be considered determinative and final. Any appeal must be filed in Superior Court within 30 days of the date of issuance of the final determination. (Ord. 1995 §1(part), 2002) 11.04.070 Way It is unlawful for the owner and /or person occupying or having charge or control of any premises abutting upon any public right -of -way or alley in the City to construct, place, cause, create, maintain or permit to remain upon any part of such right -of -way located between the curbline or, if there is no curbline, then between the adjacent edge of the traveled portion of such right -of -way by the members of the general public, including but not limited to the following conditions: Hazardous Conditions on Public Right -of- Printed May 2008 Page 11 -5 April 3, 2012 • City of Tukwila Department of Community Development Rick Hinrichs 9216 8th Ave S Seattle, WA 98108 RE: Correction Letter #1 Development Permit Application Number D12 -047 Stoneway Concrete —17024 West Valley Hy Jim Haggerton, Mayor Jack Pace, Director Dear Mr. Hinrichs, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Public Works Department. At this time the Building, Fire., and Planning Departments have no comments. Public Works Department: Joanna Spencer at 206 431 -2440 if you have questions regarding the attached comments. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that four (4) sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 431 -3670. Sincerely, er Ma all t Technician Fi s. D12 -047 W:\Permit Center \Correction Letters\2012\D12 -047 Correction Letter #1.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 PUBLIC WORKS DEPARTMENT COMMENTS PROJECT: Stoneway Concrete Demolition 17024 West Valley Hwy PERMIT NO: D12 -047 PLAN REVIEWER: Contact Joanna Spencer (206) 431 -2440 if you have any questions regarding the following comments. 1) After evaluating the existing water service pipe condition Public Works has determined that the water service shall be capped with blind flange at the 8" TEE on the west side of West Valley Hwy. Existing 8" gate valve shall be removed, since it is old and in substandard condition. After the gate valve water service is reduced to 1.5" or 2" cast iron pipe which is also in substandard condition and will not be allowed to be utilized to serve future site redevelopment. Please show location of the existing 2" water meter box and capping location at the water main together with a traffic control plan. Please contact Mr. Mike Cusick, P.E., PW Senior Water and Sewer Engineer at (206)431- 2441 directly to discuss this requirement. 2) For work inside the City Right of Way please submit: a) Executed attached Hold Harmless Agreement for work inside the City Right -of- Way. Notarized signature is required. PW has a notary on staff. b) Insurance Certificate naming Tukwila as additional insured is required. c) Corporate surety bond or cash deposit for 150% of value of Right -of Way work to be done, in order to guarantee faithful performance of permitted work (erosion control, capping, traffic control, roadway pavement restoration) is required. d) Upon completion of work submit a two (2) year maintenance bond — minimum 10% of Right -of Way construction cost. e) Since Public Works Construction Type C permit has a progressive fee based on construction cost associated with demo work, please submit construction cost estimate for temporary and permanent erosion/sediment control, utility service lines cappings, traffic control and road pavement restoration. Enter subject construction cost amount on page 1 of Bulletin A -2. (W:PW Eng/Other /Joanna/Comments/D12 -047) • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director February 22, 2012 Rick Hinrichs 9216 Eighth Av S Seattle, WA 98108 RE: Incomplete Letter #1 Development Permit Application D12 -047 Stonewat Concrete Demo —17024 West Valley Hy Dear Mr. Hinrichs, This letter is to inform you that your permit application received at the City of Tukwila Permit Center on February 16, 2012 is determined to be incomplete. Before your application can continue the plan review process the attached /following items from the following department(s) need(s) to be addressed: Public Works Department: Joanna Spencer at 206 431 -2440 if you have questions concerning the attached comments. Please address the comment above in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that four (4) sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 431 -3670. Sincerely, Bill Rambo Permit Technician Enclosures File: D12 -047 W: \Permit Center \Incomplete Letters\2012\D12 -047 Incomplete Ltr #1.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • • PUBLIC WORKS DEPARTMENT COMMENTS DATE: February 21, 2012 PROJECT: Stoneway Concrete Demolition 17024 West Valley Hwy PERMIT NO: D12-047 PLAN REVIEWER: Contact Joanna Spencer (206) 431 -2440 if you have any questions regarding the following comments. 1) Show existing storm drainage structures where erosion control measures have been installed /implemented already. 2) Your demolition application submittal shall include utility line cappings. Sanitary side sewer shall be capped at the existing sewer MH in front of the building. Please show the existing sewer MH on plan. 3) Are there any storm drainage lines that need to be capped as a result of the demolition? If yes, please show them on plan. Are there any utility lines serving the drive over area? 4) Unless the property is going to be redeveloped in the near future, water service line shall be capped at the water main which is located on the east side of West Valley Hwy. Please show location of the existing 2" water meter and capping location together with a traffic control plan. 5) For work inside the City Right of Way: a) Hold Harmless Agreement shall be executed for any work inside the City Right of Way. Notarized signature is required. PW has a notary on staff. b) Insurance Certificate naming Tukwila as additional insured is required. c) Corporate surety bond or cash deposit for 150% of value of Right -of Way work to be done, in order to guarantee faithful performance of permitted work (erosion control, capping, traffic control, roadway pavement restoration) is required. d) Upon completion of work submit a two (2) year maintenance bond — minimum 10% of Right -of Way construction cost. e) Since Public Works Construction Type C permit has a progressive fee based on construction cost associated with demo work, please submit construction cost estimate for temporary and permanent erosion/sediment control, utility service lines cappings, traffic control and road pavement restoration. Enter subject construction cost amount on page 1 of Bulletin A -2. (W:PW Eng/ Other /Joanna/Comments /D12- 047inc) Approved Transaction Page 1 of 1 pscleanair.org Puget Sound Clean Afr Agency Notification Case #: 201200368 This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for inspection at all times at the asbestos project or demolition site (Reg III, 4.03(a)(6)). Fee Amount Paid $105.00 Credit Card Transaction # VTHF8D2F8734 Transaction Date 02/16/12 Owners Name Stoneway Concrete Project Street Address 17024 W Valley Hwy City Tukwila Contact Person Rids Hinrichs Mailing Address 9125 10th Ave. S. Seattle, WA98108 Phone (206)762 -9125 Zip 98188 Phone (206)255 -2645 This project includes a demolition. Demolition Start Date 02/16/12 Completion Date 03/16/12 Demolition will be completed by a demolition contractor Demo Contractor Gary Merlino Construction Company Inc. Contact Rick Hinrichs Mailing Address 9125 10th Ave. S. Seattle, WA98108 Contractor Job # Phone (206) 255 -2645 This Is an emergency project. The emergency reason: There was a sudden, unexpected event that resulted In a public health or safety hazard. (1) I certify that the Information I have provided is to the best of my knowledge true and accurate. (2) I understand that I must file an Amendment to this Notification If: • The type of project has changed. The project types are asbestos and demolition. • The quantity of friable asbestos to be removed meets a larger project category. • The project's start or completion date has changed. (3) I understand one Notification must be filed for each structure. The only exception is for a single - family residence that includes multiple ancillary structures, such as a detached garage or other outbuildings having the same street address. If there is no street address, I have used a building number. (4) I understand the fees for this Notification are nonrefundable. Create Another Notification View History 121 1.41/1 If you have questions, contact us at asbestos @pscleanair.org or 206.689A058. 14 o RECEIVED FEB 16 2012 PERU CENTER https: / /secure.pscleanair.org /Asbestos /Approved.aspx 2/16/2012 &MOW COPY lb PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: 012 -047 DATE: 06 -06 -12 PROJECT NAME: STONEWAY CONCRETE DEMO SITE ADDRESS: 17024 WEST VALLEY HY Original Plan Submittal X Response to Correction Letter # 1 Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: Building Division ublic orks Fire Prevention Structural Planning Division ❑ Permit Coordinator .n DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete DUE DATE: 06-07 -12 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: nNo further Review Required DATE: APPROVALS OR CORRECTIONS: Approved Approved with Conditions Notation: REVIEWER'S INITIALS: iRy DUE DATE: 07-05-12 Not Approved (attach comments) DATE: Permit` Genter,'UserP ly • CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 • PERVITCO COF1 • PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D12 -047 DATE: 03 -08 -12 PROJECT NAME: STONE WAY CONCRETE DEMO SITE ADDRESS: 17024. WEST VALLEY HY Original Plan Submittal X Response to Incomplete Letter # 1 Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: Building Division ❑ �jS k\ eGI 3- ) Public Works W Fire Prevention Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete DUE DATE: 03 -13 -12 Not Applicable P,.erm ECe rifer se: „ "••!! INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route Structural Review Required n No further Review Required n REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 04-10-12 Approved ❑ Approved with Conditions INI Not Approved (attach comments) Notation: REVIEWER'S INITIALS: DATE: Permit Center.'rUse Only . • CORRECTION LETTER MAILED: ...U�` 1'1""-- Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW Staff Initials: Documents /routing slip.doc 2 -28 -02 • PLAN REVIEW/ROUTING SLIP ACTIVITY NUMBER: D12-047 DATE: 02-16-12 PROJECT NAME: STONEWAY CONCRETE DEMO SITE ADDRESS: 17024 WEST VALLEY HY X: Plan Submittal Response to Incomplete Letter # Response to:CorreciidhiLetter # Revision # . After ,Permit Issued DEPARTMENTS: 1$L- —1,1\ uilding ivisi n ,Z Public orks 1Vv‘ Pik ire Prevention is Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete Fl DUE DATE: 02-21-12 Not Applicable ri „ . PerinitCenter Use, INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS AILED: Departments determined incomplete: Bldg fl Fire fl Ping LJ PWI5rStaff Initials: TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: Approved Approved with Conditions ri Notation: REVIEWER'S INITIALS: DUE DATE: 03-20-12 Not Approved (attach comments) n DATE: CORRECTION LETTER MAILED: Departments issued corrections: Bldg LI Fire E Ping D PW E Staff Initials: Documents/routing slip.doc 2-28-02 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Web site: http: / /www.TukwilaWA.gov RECEIVED env OF TUKWILA JUN 06 20121 PeRuri ct1'EA Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 06/05/2012 Plan Check/Permit Number: D12 -047 Response to Incomplete Letter # ?( Response to Correction Letter # 1 _ Revision # after Permit is Issued Revision requested by a City Building Inspector or Plans Examiner Project Name: Stoneway Concrete Demo Project Address: 17024 West Valley Hy Contact Person: Heidi Kludt Summary of Revision: Phone Number: (206) 255 -9627 In response to letter dated April 13, 2012 from Michael P. Cusik, P.E. Letter requests removal of the existing water service to the concrete batch plant site. Owner will be completing and filing a Construction Permit Application for a 10 x 20 sales trailer for a heavy equipment sales yard. Existing water meter service to be connected to sales trailer per approved permit. Sheet Number(s): "Cloud" or highlight all areas of revision including date revision C Received at the City of Tukwila Permit Center by: �-- Entered in Permits Plus on (o -'b" ( 1 H: \Applications \Forms- Applications On Line\2010 Applications \7 -2010 - Revision Submittal.doc Revised: May 2011 City of Tukwila REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Web site: http: / /www.TukwilaWA.gov Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 03/07/2012 Plan Check/Permit Number: D12 -047 Response to Incomplete Letter # 1 Response to Correction Letter # Revision # after Permit is Issued Revision requested by a City Building Inspector or Plans Examiner Project Name: Stoneway Concrete Demo Project Address: 17024 West Valley Hy Contact Person: Rick Hinrichs Phone Number: (206) 255 -2645 Summary of Revision: Revisions per City of Tukwila letter dated 2/22/12 to Rick Hinrichs as follows: 1. Existing storm drainage structures shown on plan and erosion control measures addressed in Notes. 2. Plan submittal shows utility line capping and existing MH in front of building (driver's shack). 3. No storm drainage lines will be capped. All utility lines which served the drive over area have been removed. 4. Property is to be re- developed in the near future. Water service line to be capped within property utility easement. 5. Revisions on Plan highlighted. Sheet Number(s): 1 of 1 "Cloud" or highlight all areas of revision including date of revision RECEIVED CITY OF TUKWILA MAR 08 20121 PERMIT (wirykrA Received at the City of Tukwila Permit Center by: Entered in Permits Plus on c2 3 /0&/0- 11:\ApplicationsWorms- Applications On Line \2010 Applications \7.2010 - Revision Submtttal.doc Revised: May 2011 Contractors or Tradespeople Prter Friendly Page Page 1 of 2 General /Specialty Contractor A business registered as a construction contractor with L8I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name GARY MERLINO CONST CO INC UBI No. 600584952 Phone 2067629125 Status Active Address 9125 10Th Ave 5 License No. GARYMCC150MW Suite /Apt. City Seattle State WA Zip 98108 County King Business Type Corporation Parent Company License Type Construction Contractor Effective Date 7/16/1985 Expiration Date 2/14/2013 Suspend Date Specialty 1 General Specialty 2 Unused Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status JCMULUJ912DB JCM U -LINK JOINT VENTURE Construction Contractor General Unused 3/2/2009 3/2/2013 Active TAISEC*951P8 TAISEI CORPORATION Construction Contractor General Unused 10/28/2005 10/28/2013 Active JAYDECI075Q2 JAY DEE CONTRACTORS INC Construction Contractor General Unused 11/22/1993 10/6/2012 Active ANMAR * *157N2 ANMARCO Construction Contractor General Unused 8/22/1985 1/24/2014 Active FRANKCC340L7 FRANK COLUCCIO CONST CO Construction Contractor General Unused 6/27/1966 7/9/2014 Active TYDICI *077DR TYDICO INC Construction Contractor General Unused 3/19/1993 3/15/2005 Archived MERLIGM330KA MERLINO, GARY M. Construction Contractor General Unused 5/1/1967 8/22/1985 Archived RAINIVC974L3 RAINIER VALLEY CONSTRUCTRS LLC Construction Contractor General Unused 7/21 /2003 7/21 /2005 Expired Business Owner Information Name Role Effective Date Expiration Date MERLINO, GARY MARIO President 01/01/1980 JUSTUS, ARIANE MARIE Secretary 01/25/2011 RAYMOND, DANIEL L Treasurer 01/25/2011 OLIVER, CHARLES HARLAN Vice President 01/25/2011 WESTEREN, ANITA Member 01/01/1980 01/25/2011 https: // fortress .wa.gov /lni /bbip /Print.aspx 07/12/2012