HomeMy WebLinkAboutPermit D12-207 - KENT ENGINEERING - REROOFKENT ENGINEERING
4208 S 116 ST
D12-207
City okukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206 -431 -2451
Web site: http: / /www.TukwilaWA.gov
Parcel No.: 3347400005
Address: 4208 S 116 ST TUKW
Suite No:
Project Name: KENT ENGINEERING
DEVELOPMENT PERMIT
Permit Number: D12-207
Issue Date: 06/18/2012
Permit Expires On: 12/15/2012
Owner:
Name: KENT DESIGN AND DEVELOPMENT
Address: 4811 S 150TH ST , TUKWILA WA 98188
Contact Person:
Name: LEE STENSON
Address: 155 SW 152 ST , BURIEN WA 98166
Contractor:
Name: F LEE STENSON INC.
Address: 1801 S 93 ST C -27 , SEATTLE, WA 98108
Contractor License No: FLEESI* 122CA
Lender:
Name:
Address:
Phone: 206 - 423 -8425
Phone: 206 241 -7738
Expiration Date: 03/07/2013
DESCRIPTION OF WORK:
REMOVE AND REPLACE EXISTING ROOF MATERIAL
Value of Construction: $12,000.00 Fees Collected: $527.55
Type of Fire Protection: International Building Code Edition: 2009
Type of Construction: Occupancy per IBC: 0008
Electrical Service Provided by: SEATTLE CITY LIGHT
* *continued on next page **
doc: IBC -7/10
D12 -207 Printed: 06 -18 -2012
Public Works Activities:
Channelization / Striping: N
Curb Cut / Access / Sidewalk / CSS: N
Fire Loop Hydrant: N Number: 0
Flood Control Zone:
Hauling: N Start Time: End Time:
Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y.
Landscape Irrigation:
Moving Oversize Load: Start Time: End Time:
Size (Inches): 0
Sanitary Side Sewer:
Sewer Main Extension: Private: Public:
Storm Drainage:
Street Use: Profit: N Non - Profit: N
Water Main Extension: Private: Public:
Water Meter: N
Permit Center Authorized Signature:
L3ij1Date:
I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances
governing this work will be complied with, whether specified herein or not.
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or the pexf rmance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached
to this permit.
/'4
Signature ✓ Date:
Print Name:
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
PERMIT CONDITIONS:
1: ** *BUILDING DEPARTMENT CONDITIONS * **
2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the
Building Official.
3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to
start of any construction. These documents shall be maintained and made available until final inspection approval is
granted.
4: All construction shall be done in conformance with the approved plans and the requirements of the International
Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code.
5: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of,
any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits
presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila
shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the
Building Official from requiring the correction of errors in the construction documents and other data.
doc: IBC -7/10
D12 -207 Printed: 06 -18 -2012
CITY OF TUK44
Community Development Department
Public Works Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http: / /www.TukwilaWA.gov
Building Pere No. 1 J I _2_0 7
Project No.
Date Application Accepted: (0-(2----(,)-,
Date Application Expires: `�-
(For office use only)
CONSTRUCTION PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
SITE LOCATION d/at D s O ti T;IL j, TH S.772,
Site Address:
King Co Assessor's Tax No.: 3311 7y d -450s--0,3
.2.0 $' S 0 t/`T /J- 1/6 TA S 77Z k-77" Suite Number: Floor:
New Tenant: ❑ Yes
Tenant Name: fi-N7 /_N! - /A/ 00/z /A,-4
PROPERTY OWNER
Name F/' STXAISDA/- 'rive--
Name: kr, .Q 45/6N 4 Le
.. .
Address:ya88 S //G m'- sr
Email i. 6 L S7 0-AISLW e._ G/hvL/L • ee"
CitYtOk w R. A. State: u/4-
Zip:
CONTACT PERSON — person receiving all project
communication
Name F/' STXAISDA/- 'rive--
Address:,, S Gc/ /S-2 sr-
City: L3 UR , f.f," State: 1.4,/.1. Zip: 9v `6
Phoneaa6 -h+23 7'/2ea
Email i. 6 L S7 0-AISLW e._ G/hvL/L • ee"
GENERAL CONTRACTOR INFORMATION
Company Name 4Ae, S io S(>M z.lve_
Address:
/6.-6 _ Sct- /d "2 STS
City: 8 U A / -ii, State: u.,/1 Zip: 9P/64
Phonio6 42 3 - �02tSE`
Contr Reg No. :n.... sr yr / �2Exp/Date:
Tukwila Business License N oq 13 / 92._
H:\Applications\Forms- Applications On Line\2012 Applications'Permit Application Revised - 2- 7- 12.docx
Revised: February 2012
bh
0
ARCHITECT OF RECORD
Name:
Company Name:
A/ iii-
Company Name: A-
Ai
Architect Name:
•
Engineer Name:
Address:
Address:
State:
City:
State:
State:
Zip:
Phone:
Fax:
Email:
ENGINEER OF RECORD
Name:
IVA-
Company Name: A-
Ai
Address:
Engineer Name:
Address:
State:
City:
State:
Zip:
Phone:
Fax:
Email:
LENDER/BOND ISSUED (required for projects $5,000 or
greater per RCW 19.27.095)
Name:
IVA-
Address:
City:
State:
Zip:
Page 1 of 4
BUILDING PERMIT INFORMATIO- 206 - 431 -3670
•
Valuation of Project (contractor's bid price): $ 12, 000 Existing Building Valuation: $ ' 2'22 .60 0
Describe the scope of work (please provide detailed information): /Z./Y) U (/ $12-0/34 4O
Will there be new rack storage? ❑ ....Yes
No If yes, a separate permit and plan submittal will be required.
Provide All Building Areas in Square Footage Below
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard:
Compact: Handicap:
Will there be a change in use? ❑ Yes ❑ No If "yes ", explain:
FIRE PROTECTION/HAZARDOUS MATERIALS:
❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No
If `yes', attach list of materials and storage locations on a separate 8 -1/2 "x 11" paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
❑ On -site Septic System - For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H: Applications\Forms- Applications On Line\2012 Applications'permit Application Revised - 2- 7- I2.docx
Revised: February 2012
bh
Page 2 of 4
Existing
Interior Remodel
Addition to
Existing
Structure
New
Type of
Construction per
IBC
Type of
Occupancy per
IBC
la` Floor
c21 0
0
2nd Floor
/y n
O
3rd Floor
MA
O
Floors thru
D
Basement
`'.
N/A-
0
Accessory Structure*
J biz
a
Attached Garage
P A-
D
Detached Garage
/u A-
0
Attached Carport
/Lf /-
O
Detached Carport
/t / /1-
0
Covered Deck
0
Uncovered Deck
M
lT
PLANNING DIVISION:
Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches)
*For an Accessory dwelling, provide the following:
Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling:
*Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence.
Number of Parking Stalls Provided: Standard:
Compact: Handicap:
Will there be a change in use? ❑ Yes ❑ No If "yes ", explain:
FIRE PROTECTION/HAZARDOUS MATERIALS:
❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify)
Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No
If `yes', attach list of materials and storage locations on a separate 8 -1/2 "x 11" paper including quantities and Material Safety Data Sheets.
SEPTIC SYSTEM
❑ On -site Septic System - For on -site septic system, provide 2 copies of a current septic design approved by King County Health
Department.
H: Applications\Forms- Applications On Line\2012 Applications'permit Application Revised - 2- 7- I2.docx
Revised: February 2012
bh
Page 2 of 4
PERMIT APPLICATION NOTES —
•
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be
requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING OW R OR LITHO RIZED AGENT:
Signature: r Date: 6/4.2/20/ Z—
Print Name: /— . A i, �' ,i�SO M Day Telephone:
Mailing Address: / SS Sw /,S' 2 S ✓'—
402/M4, can
City State
H:\Applications\Forms- Applications On Line \20I2 Applications\Permit Application Revised - 2- 7- 12.docx
Revised: February 2012
bh
gi/66
Zip
Page 4 of 4
PUBLIC WORKS PERMIT INFCIIVATION — 206 - 433 -0179
Scope of Work (please provide detailed information): fimU /EPV,A
ri v c / 2 o o/-- i h r 7 /u F w 5 77t a,
,O )" / /UJOQP
Call before you Dig: 811
Please refer to Public Works Bulletin #1 for fees and estimate sheet.
Water District
❑ .. Tukwila ❑ ...Water District # 125
❑ .. Water Availability Provided
Sewer District
❑ .. Tukwila
❑ .. Sewer Use Certificate
0... Highline
❑...Valley View ❑ ... Renton
❑ ...Sewer Availability Provided
0... Renton
0... Seattle
Septic System:
❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department.
Submitted with Application (mark boxes which apply):
❑ .. Civil Plans (Maximum Paper Size — 22" x 34 ")
❑ .. Technical Information Report (Storm Drainage)
❑ .. Bond 0... Insurance ❑... Easement(s)
Proposed Activities (mark boxes that apply):
❑ .. Right -of -way Use - Nonprofit for less than 72 hours
❑ .. Right -of -way Use - No Disturbance
❑ .. Construction/Excavation /Fill - Right -of -way ❑
Non Right -of -way ❑
❑ .. Total Cut
❑ .. Total Fill
cubic yards
cubic yards
❑ .. Sanitary Side Sewer
❑ .. Cap or Remove Utilities
❑ .. Frontage Improvements
❑ .. Traffic Control
❑ .. Backflow Prevention - Fire Protection
Irrigation
Domestic Water
0... Geotechnical Report
0... Maintenance Agreement(s)
❑ .. Traffic Impact Analysis
❑ .. Hold Harmless — (SAO)
❑ .. Hold Harmless — (ROW)
0... Right-of-Way Use - Profit for less than 72 hours
0... Right-of-way Use — Potential Disturbance
0... Work in Flood Zone
0... Storm Drainage
0... Abandon Septic Tank
❑... Curb Cut
0... Pavement Cut
0... Looped Fire Line
❑ .. Permanent Water Meter Size (1)
❑ .. Temporary Water Meter Size (1)
❑ .. Water Only Meter Size
>>
>>
❑ .. Sewer Main Extension Public ❑
❑ .. Water Main Extension Public ❑
❑...Grease Interceptor
0... Channelization
0... Trench Excavation
❑ ... Utility Undergrounding
WO # (2) >> WO # (3) >> WO #
WO # (2) >> WO # (3) >> WO #
WO # ❑ .. Deduct Water Meter Size "
Private ❑
Private ❑
FINANCE INFORMATION
Fire Line Size at Property Line Number of Public Fire Hydrant(s)
❑ .. Water ❑ .. Sewer ❑ .. Sewage Treatment
Monthly Service Billing to:
Name: Day Telephone:
Mailing Address:
Water Meter Refund/Billing:
Name:
Mailing Address:
City
State
Zip
Day Telephone:
City
State
Zip
H:\Applications\Forms- Applications On Line\2012 Applications\Permit Application Revised - 2- 7- 12.door
Revised: February 2012
bh
Page 3 of 4
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 -43 1 -3670
Fax: 206 -431 -3665
Web site: http: / /www.Tukwila WA.aov
Parcel No.: 3347400005
Address: 4208 S 116 ST TUKW
Suite No:
Applicant: KENT ENGINEERING
RECEIPT
Permit Number: D12-207
Status: APPROVED
Applied Date: 06/12/2012
Issue Date:
Receipt No.: R12 -01896
Initials:
User ID:
WER
1655
Payment Amount: $321.50
Payment Date: 06/18/2012 11:30 AM
Balance: $0.00
Payee: FREDERICK LEE STENSON
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Credit Crd VISA
Authorization No. 02592C
ACCOUNT ITEM LIST:
Description
321.50
Account Code Current Pmts
BUILDING - NONRES
STATE BUILDING SURCHARGE
000.322.100
640.237.114
Total: $321.50
317.00
4.50
doc: Receipt -06 Printed: 06 -18 -2012
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206-431-3665
Web site: http: / /www.TukwilaWA.gov
RECEIPT
Parcel No.: 3347400005 Permit Number: D12-207
Address: 4208 S 116 ST TUKW Status: PENDING
Suite No: Applied Date: 06/12/2012
Applicant: KENT ENGINEERING Issue Date:
Receipt No.: R12 -01850
Initials:
User ID:
WER
1655
Payment Amount: $206.05
Payment Date: 06/12/2012 02:10 PM
Balance: $321.50
Payee: FREDERICK LEE STENSON
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Credit Crd VISA
Authorization No. 00594C
ACCOUNT ITEM LIST:
Description
206.05
Account Code Current Pmts
PLAN CHECK - NONRES
000.345.830 206.05
Total: $206.05
doc: Receiot -06 Printed: 06 -12 -2012
INSPECTION NO.
INSPECTION RECORD
Retain a copy with permit
PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
Project:
/FA/Tc4"-A!G
Corrections required prior to approval.
Type of Inspection:
F -/•9 4,
COMMENTS:
Address:
124 8 s //6
sue-
Date Called:
Special Instructions:
Date Wanted:.
7 -2y—
12
a.m,
P.m.
Requester:
Phone No:
v3Approved per applicable codes.
Corrections required prior to approval.
COMMENTS:
rateL. 7` Z L� 1
py1; -I' t_'
6 le. / t---1A1
1
Insp. Etor:
Y
I +.A./,,
rateL. 7` Z L� 1
REIN PECTION FEE REQUIREDPrior to nixt inspection, fee mst be
pa' at 6300 Southcenter Blvd., uite 100. Call to schedule reinspection.
INSPECTION NO.
INSE ECTION RECORD
Retain a copy with permit
_L»2 -Z'7
PERMIT NO.
CITY.OE- TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 tiz, (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
Project:.
Type of Inspection:
Z%?- 2 2 o c
,Aee .r 'T"± 'ill
Address:
- 442e)e S // 6
5-7--
Date Called:
Special Instructions: _;
Date Wanted:.
a -2,i-
/ Z..-
Vim:
, P.m-
Requester:
Phone No
art 4,--4/z3
Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
//✓-- 7
{ 517:1 �Ii)v 4,P.•v,/.r f
IiEINSPECTION FEE RECt !RED. Pno to next inspection, fee must be
aid at 6300 Southcenter Blvd.. Suit 100. Call to schedule reinspection.
REVISIONS
No changes s II be made to the scope
of work wi out prior approval of
Tukwi Building Division.
NOTE: Revisions require a new plan submittal
and may include additional plan review fees.
Noa r N
og S j/ 57—
I-10 — 0005 =03
;;;) ,7c
e_
LcTS 1 .Z3yd-
/3hoc.K / •
C_7 H/LLit/4A" 's
5 itittOPY
Ave /r/o.,
Permit No.
2-
and omissions.
not authorize
Receipt
is acknowledged:
1. 1;1 ,:1 •VL
to
ON
EPARATE PERMIT
EQUIRED FOR:
Mechanical
Electrical
Plumbing
Gas Piping
REVIEWED FOR
ODE COMPLIANCE
APPROVED
JUN 15 2012
City o T kwila
BUILDIN IVISION
City of Tukwila
8 °`r ax;$ IVISION
37 au
.5' //C., Tit $ T
11) tar. )1•804111117
RECEIVEY
JUN 12 2012
PERMIT CENTER
QUALITY METAL ROOFING
MANUFACTURED BY
REVIEWED •
CO A pOMFLI
ROVE:
JUN 15 201;
sUIL011VG D�trvila
IVISI
Uf Washington, Inc.'
INSTALLATION AND HANDLING
MANUAL
R
NCE
RECEIVE9
PER1V ' BUNTER
N
Of Washington, Inc.
Galvanized Bugle Head Screw
Fastening Leg
Snap -Loc Application:
For ease of application, the Snap -Loc panel has a fastening leg designed into the panel. To apply the
panels, all that is necessary is to align the panels with the eave edge and fasten, using galvanized bugle -
head screws, spacing the screws about 18" to 24" along the fastening leg.
To apply the remaining panels, simply snap the next panel in place and fasten as before.
Note: Caution must be taken to insure that the panels are kept in "square as they are applied. 30 Ib. felt
should be applied prior to laying the panels.
NOTE: Cutting. Steel roofing and trim should be cut with nibblers, tin snips or a profile shear. Although
Champion Metal of WA. does not advocate the use of a saw, the reality is many people use a power saw in
some manner. There are two concerns when using a saw. First, be sure that no burrs are left on the ends
of the panel. The rough edges are not protected and will rust. Second, the filings coming off the blade are
hot and will adhere to the surface of the panels and these will rust. Be sure all filings are removed from the
surface as they will rust and pit the surface of the sheet.
3
Ridge Cap *
Of Washington, Inc.
TSLRC
-
.......„
1-----
i.,/,. !,,7..
,........ 4
Matching Non - Vented Snap -Loc Closure x 48"
1. Nail a 2 x 2 on both sides of the roof peak.
2. Install the roof panels by lining them up with the
eaves. The ridge cap will cover any slight
differences in length at the peak.
3. If pitch is low or you are facing a strong wind, you
may want to bend the flat pan of the panel up
under the ridge, creating a dam. This ensures
that water will not be blown under the ridge.
Although bending your panels up is
recommended, you may also want to use a
matching closure, specifically made for the Snap -
Loc panel, under the ridge cap to stop the
weather.
4. After the gable trim is applied, place the ridge cap
on top and notch out the 1 -1/2" return so that
the ridge cap sits down flush with the pan of the
panel. A notching tool should be available
through your distributor.
5. Fasten the ridge cap to the 2 x 2's with the
painted neoprene - washered screws.
Vented Ridge Cap .* TSLRV,
5J J-----
_n.
Use the same application as the standard Snap -Loc
ridge cap with these exceptions:
1. 2 x 2's are cut into blocks and spaced so that the
airflow is unobstructed.
2. The return on the vented ridge cap is only'' /," so
it will not sit down flat in the pan. A 'A" air
space will exist for the airflow.
3. Bird screen may be placed across the 2 x 2's, if
desired.
4. With a vented ridge cap, some installers choose
to omit the 2 x 2's altogether and fasten the
ridge into the top of the panel ribs using an
exposed painted trim fastener.
5. Note: Bending up your panels under the ridge
will prevent water from penetrating the system
under most circumstances. If the structure is
located in a severe environment where wind -
driven rain or snow is a concern, vented closures
and other options are available.
Snap -Loc Vented Closure x 24"
6
Co Washington, Inc.
Shed Metal * TSLSM
Gable Trim TSLGT
This is simply a ridge cap for a single -
sloped roof.
Install the roof panels. You may want to
bend them up underneath to block
water. You may also want to use
matching closure strips to help seal
under the cap.
After the gable trim is applied, place the
shed metal on top and notch out the 1' / :"
return so that the ridge sits down flush
with the pan of the panel. A notching
tool should be available from your
distributor.
Fasten the cap down from behind, into
the wall, using an exposed painted trim
fastener. You may also wish to fasten
the cap into the top of the panel ribs
with the same exposed painted trim
fastener.
The gable trim is applied on top of the
panel over the rib before the ridge cap is
applied. It is fastened to the fascia
board with exposed painted trim
fasteners.
As shown in the diagram, if a rib does
not fall flush with the gable edge, you
must make an artificial rib by cutting the
panel vertically 1" wider than the
building and bending it up to form a rib.
8
Eave Trim * TSLET
of Washington, Inc.
www. cha mpionrneta l . com
N67%,„7s1.7%.7S6%
Fasten the eave trim down using bugle head
screws.
Install the eave trim first, then run a bead of
Pro -Seal 34® on top making sure that your
sealant is below the line of screws. Next
apply the roof panels on top of the eave trim.
When a house has gutters, some installers
choose not to use the eave trim. This is
because the standard eave trim may not fit
with your gutter spikes. These installers
simply extend the panel over the roof's edge
enough to get the water into the gutter. The
exact distance to extend the panels depends
on the pitch of the roof and how low the
gutters are hung.
The Snap -Loc panels will often be bowed at
the bottom. This is not a bad thing. It helps
to prevent "oil- canning." Usually you do not
see the bottom of the panels because of the
gutters. It is an accepted installation
procedure to seal under the panels with Pro -
Seal 34e and place an exposed fastener in
the flat area of the panel. This will seal the
eave line and prevent water from trying to
siphon up under the panels.
Guttered Eave Trim * TSLETG
1/2" hem
1"
Guttered Eave Trim
Snap -Loc panel
The guttered eave trim is designed to
be used when there are gutters on
the building. The 1" drop on the face
of the trim helps the water drain into
the gutter without interfering with
the gutter spikes.
The use of a hem on the bottom
instead of a drip will protect a
homeowner's hands when they clean
their gutters.
The trim is installed the same way as
the standard eave trim.
10
Sidewall Flashing TSLCF
Compensating
Sidewall Flashing
TSLCS --
O
Ca trift
Washington, Inc.
www. ch a mp t onme to l . com
41'
2"
1
Butt the side edge of the panel against the
wall.
Install the flashing to cover the rib. The
flashing usually slides underneath the
siding on the wall.
If a rib does not match up with the wall,
cut the panel 1" wider than the area, bend
the panel up using a hand brake, tack it to
the wall and install the flashing.
Note: Compensating Sidewall can be
ordered. It helps to compensate for a roof
that is out of square.
Endwall Flashing * TSLEF,
Wall
Endwall Flashing
nap -Loc panel
Install roofing panels. If your pitch is
shallow, you may want to bend up the
pan, creating a dam. You may also
install matching Snap -Loc closure.
Notch out the return and install the
endwall flashing over the roof panels.
Use bugle head screws through the
upper leg of the flashing into the wall.
Cover the screws with wall siding.
As an option, you may also use an
exposed fastener through the endwall
into the top of the panel ribs.
Note: We can fabricate a custom
piece of this trim in a ventilated
format for an additional charge.
11
ISTORAGE OF METAL ROOFING MATERIALS
Of Washington, Inc.
WWW.. s;hampinnni°ta I.eorir
CARE AND MAINTENANCE
Of your Champion Metal Snap -Loc Roof.
Steel roofing requires very little maintenance to preserve its life expectancy and appearance.
However, it does require some. Here is a list of activities that will help ensure that you receive the
optimal life expectancy out of your roof.
• Periodically remove all debris from the roof.
• Your metal roof should be washed periodically. Wash with a mixture of one cup
detergent, which contains Tess than .5% phosphate, dissolved into five (5) gallons of
warm water.
• Another solution would be using a mixture of one (1) cup of household ammonia
1 WARRANTY INFORMATION 1
Please keep all paperwork related to your metal roofing. In order for a warranty issue to be
investigated, we must have proof of purchase.
The proof required is our work order number and the date of purchase. If you did not receive a
copy of our work order, please contact the dealer from whom the product was purchased.
It is not a good idea to store metal roofing flat for an extended period of time. When the product
is stored flat, water and condensation can siphon in between the panels. Over time the combina-
tion of expansion and contraction, the weight of the panels, temperature change and dampness
will soften the coatings. Once the coatings are compromised, the life expectancy of the steel is
sacrificed.
If you are planning on storing your Snap -Loc roofing, try to elevate one end and possibly cover the
bundles to ensure water does not get trapped.
It is our intent to provide you with the information to ensure you the longest lasting life expectancy
for your metal roof. If you have any questions regarding this issue, please contact your local dis-
tributor or one of our sales representatives.
32
*PERM GOUMU (;OPi•
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: D12 -207
PROJECT NAME: KENT ENGINEERING
SITE ADDRESS: 4208 S 116 ST
X Original Plan Submittal
Response to Correction Letter #
DATE: 06 -12 -12
Response to Incomplete Letter #
Revision # After Permit Issued
D PARTMENTS:
Buil ing ivision
Public Works ❑
�� f`Qr tIL-
Fir" a Preven ion
Structural
Planning Division
Permit Coordinator
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
Comments:
Incomplete
DUE DATE: 06 -14 -12
Not Applicable
Permit Center Use Only
INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
TUES /THURS ROUTING:
Please Route kj Structural Review Required n No further Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
DUE DATE: 07-12 -12
Approved n Approved with Conditions K Not Approved (attach comments) ❑
Notation:
REVIEWER'S INITIALS: DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
Documents /routing slip.doc
2 -28 -02
Contractors or Tradespeople Peer Friendly Page
•
General /Specialty Contractor
A business registered as a construction contractor with LEI to perform construction work within the scope of
its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of
account and carry general liability insurance.
Business and Licensing Information
Name
Phone
Address
Suite /Apt.
City
State
Zip
County
Business Type
Parent Company
F LEE STENSON INC
2062417738
155 Sw 152 Nd Street
UNIT A
Seattle
WA
98166
King
Corporation
UBI No. 601036362
Status Active
License No. FLEESI *122CA
License Type Construction Contractor
Effective Date 2/1/1988
Expiration Date 3/7/2013
Suspend Date
Specialty 1 General
Specialty 2 Unused
Other Associated Licenses
License
Name
Type
Specialty 1
Specialty
2
Effective
Date
Expiration
Date
Status
SHEPPCR088MG
SHEPPARD
CONST Et
RMDLNG INC
Construction
Contractor
Carpentry/Framing
Siding
7/7/1992
7/1/1996
Archived
SWIIN" 081CJ
5 W I INC
Construction
Contractor
General
Unused
2/11/1992
2/10/1995
Archived
STENSWI122DA
STENSON
WHITESPAR INC
Construction
Contractor
General
Unused
3/1/1988
2/10/1992
Archived
STENSFL162CB
STENSON, F LEE
Construction
Contractor
General
Unused
2/2/1984
1/25/1988
Archived
Business Owner Information
Name
Role
Effective Date
Expiration Date
STENSON, FREDERICK LEE
President
02/01/1988
Amount
STENSON, CHARLENE
17
01/01/1980
01/01/1980
Bond Information
Page 1 of 1
Bond
Bond Company Name
Bond Account Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Bond Amount
Received Date
5
CBIC
638940
01/25/2002
Until Cancelled
$12,000.00
01/22/2002
Assignment of Savings Information No records found for the previous 6 year period
Insurance Information
Insurance
Company Name
Policy Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Amount
Received Date
17
CBIC
C11638940
05/15/2007
05/15/2013
$1,000,000.00
04/15/2011
16
PRAETORIAN
INS CO
HFP200125400
05/15/2007
05/15/2008
$1,000,000.00
04/23/2007
15
INSURANCE
CORP OF
HANNOVER
H86FP1689903
05/15/2006
05/15/2007
$1,000,000.00
03/20/2006
Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period
Warrant Information No unsatisfied warrants on file within prior 6 year period
https: // fortress .wa.gov /lni /bbip/Print.aspx
06/18/2012