Loading...
HomeMy WebLinkAboutPermit D12-207 - KENT ENGINEERING - REROOFKENT ENGINEERING 4208 S 116 ST D12-207 City okukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206 -431 -2451 Web site: http: / /www.TukwilaWA.gov Parcel No.: 3347400005 Address: 4208 S 116 ST TUKW Suite No: Project Name: KENT ENGINEERING DEVELOPMENT PERMIT Permit Number: D12-207 Issue Date: 06/18/2012 Permit Expires On: 12/15/2012 Owner: Name: KENT DESIGN AND DEVELOPMENT Address: 4811 S 150TH ST , TUKWILA WA 98188 Contact Person: Name: LEE STENSON Address: 155 SW 152 ST , BURIEN WA 98166 Contractor: Name: F LEE STENSON INC. Address: 1801 S 93 ST C -27 , SEATTLE, WA 98108 Contractor License No: FLEESI* 122CA Lender: Name: Address: Phone: 206 - 423 -8425 Phone: 206 241 -7738 Expiration Date: 03/07/2013 DESCRIPTION OF WORK: REMOVE AND REPLACE EXISTING ROOF MATERIAL Value of Construction: $12,000.00 Fees Collected: $527.55 Type of Fire Protection: International Building Code Edition: 2009 Type of Construction: Occupancy per IBC: 0008 Electrical Service Provided by: SEATTLE CITY LIGHT * *continued on next page ** doc: IBC -7/10 D12 -207 Printed: 06 -18 -2012 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: N Number: 0 Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: Size (Inches): 0 Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature: L3ij1Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the pexf rmance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. /'4 Signature ✓ Date: Print Name: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IBC -7/10 D12 -207 Printed: 06 -18 -2012 CITY OF TUK44 Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http: / /www.TukwilaWA.gov Building Pere No. 1 J I _2_0 7 Project No. Date Application Accepted: (0-(2----(,)-, Date Application Expires: `�- (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION d/at D s O ti T;IL j, TH S.772, Site Address: King Co Assessor's Tax No.: 3311 7y d -450s--0,3 .2.0 $' S 0 t/`T /J- 1/6 TA S 77Z k-77" Suite Number: Floor: New Tenant: ❑ Yes Tenant Name: fi-N7 /_N! - /A/ 00/z /A,-4 PROPERTY OWNER Name F/' STXAISDA/- 'rive-- Name: kr, .Q 45/6N 4 Le .. . Address:ya88 S //G m'- sr Email i. 6 L S7 0-AISLW e._ G/hvL/L • ee" CitYtOk w R. A. State: u/4- Zip: CONTACT PERSON — person receiving all project communication Name F/' STXAISDA/- 'rive-- Address:,, S Gc/ /S-2 sr- City: L3 UR , f.f," State: 1.4,/.1. Zip: 9v `6 Phoneaa6 -h+23 7'/2ea Email i. 6 L S7 0-AISLW e._ G/hvL/L • ee" GENERAL CONTRACTOR INFORMATION Company Name 4Ae, S io S(>M z.lve_ Address: /6.-6 _ Sct- /d "2 STS City: 8 U A / -ii, State: u.,/1 Zip: 9P/64 Phonio6 42 3 - �02tSE` Contr Reg No. :n.... sr yr / �2Exp/Date: Tukwila Business License N oq 13 / 92._ H:\Applications\Forms- Applications On Line\2012 Applications'Permit Application Revised - 2- 7- 12.docx Revised: February 2012 bh 0 ARCHITECT OF RECORD Name: Company Name: A/ iii- Company Name: A- Ai Architect Name: • Engineer Name: Address: Address: State: City: State: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Name: IVA- Company Name: A- Ai Address: Engineer Name: Address: State: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: IVA- Address: City: State: Zip: Page 1 of 4 BUILDING PERMIT INFORMATIO- 206 - 431 -3670 • Valuation of Project (contractor's bid price): $ 12, 000 Existing Building Valuation: $ ' 2'22 .60 0 Describe the scope of work (please provide detailed information): /Z./Y) U (/ $12-0/34 4O Will there be new rack storage? ❑ ....Yes No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8 -1/2 "x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System - For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H: Applications\Forms- Applications On Line\2012 Applications'permit Application Revised - 2- 7- I2.docx Revised: February 2012 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC la` Floor c21 0 0 2nd Floor /y n O 3rd Floor MA O Floors thru D Basement `'. N/A- 0 Accessory Structure* J biz a Attached Garage P A- D Detached Garage /u A- 0 Attached Carport /Lf /- O Detached Carport /t / /1- 0 Covered Deck 0 Uncovered Deck M lT PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8 -1/2 "x 11" paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System - For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H: Applications\Forms- Applications On Line\2012 Applications'permit Application Revised - 2- 7- I2.docx Revised: February 2012 bh Page 2 of 4 PERMIT APPLICATION NOTES — • Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OW R OR LITHO RIZED AGENT: Signature: r Date: 6/4.2/20/ Z— Print Name: /— . A i, �' ,i�SO M Day Telephone: Mailing Address: / SS Sw /,S' 2 S ✓'— 402/M4, can City State H:\Applications\Forms- Applications On Line \20I2 Applications\Permit Application Revised - 2- 7- 12.docx Revised: February 2012 bh gi/66 Zip Page 4 of 4 PUBLIC WORKS PERMIT INFCIIVATION — 206 - 433 -0179 Scope of Work (please provide detailed information): fimU /EPV,A ri v c / 2 o o/-- i h r 7 /u F w 5 77t a, ,O )" / /UJOQP Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate sheet. Water District ❑ .. Tukwila ❑ ...Water District # 125 ❑ .. Water Availability Provided Sewer District ❑ .. Tukwila ❑ .. Sewer Use Certificate 0... Highline ❑...Valley View ❑ ... Renton ❑ ...Sewer Availability Provided 0... Renton 0... Seattle Septic System: ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. Submitted with Application (mark boxes which apply): ❑ .. Civil Plans (Maximum Paper Size — 22" x 34 ") ❑ .. Technical Information Report (Storm Drainage) ❑ .. Bond 0... Insurance ❑... Easement(s) Proposed Activities (mark boxes that apply): ❑ .. Right -of -way Use - Nonprofit for less than 72 hours ❑ .. Right -of -way Use - No Disturbance ❑ .. Construction/Excavation /Fill - Right -of -way ❑ Non Right -of -way ❑ ❑ .. Total Cut ❑ .. Total Fill cubic yards cubic yards ❑ .. Sanitary Side Sewer ❑ .. Cap or Remove Utilities ❑ .. Frontage Improvements ❑ .. Traffic Control ❑ .. Backflow Prevention - Fire Protection Irrigation Domestic Water 0... Geotechnical Report 0... Maintenance Agreement(s) ❑ .. Traffic Impact Analysis ❑ .. Hold Harmless — (SAO) ❑ .. Hold Harmless — (ROW) 0... Right-of-Way Use - Profit for less than 72 hours 0... Right-of-way Use — Potential Disturbance 0... Work in Flood Zone 0... Storm Drainage 0... Abandon Septic Tank ❑... Curb Cut 0... Pavement Cut 0... Looped Fire Line ❑ .. Permanent Water Meter Size (1) ❑ .. Temporary Water Meter Size (1) ❑ .. Water Only Meter Size >> >> ❑ .. Sewer Main Extension Public ❑ ❑ .. Water Main Extension Public ❑ ❑...Grease Interceptor 0... Channelization 0... Trench Excavation ❑ ... Utility Undergrounding WO # (2) >> WO # (3) >> WO # WO # (2) >> WO # (3) >> WO # WO # ❑ .. Deduct Water Meter Size " Private ❑ Private ❑ FINANCE INFORMATION Fire Line Size at Property Line Number of Public Fire Hydrant(s) ❑ .. Water ❑ .. Sewer ❑ .. Sewage Treatment Monthly Service Billing to: Name: Day Telephone: Mailing Address: Water Meter Refund/Billing: Name: Mailing Address: City State Zip Day Telephone: City State Zip H:\Applications\Forms- Applications On Line\2012 Applications\Permit Application Revised - 2- 7- 12.door Revised: February 2012 bh Page 3 of 4 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -43 1 -3670 Fax: 206 -431 -3665 Web site: http: / /www.Tukwila WA.aov Parcel No.: 3347400005 Address: 4208 S 116 ST TUKW Suite No: Applicant: KENT ENGINEERING RECEIPT Permit Number: D12-207 Status: APPROVED Applied Date: 06/12/2012 Issue Date: Receipt No.: R12 -01896 Initials: User ID: WER 1655 Payment Amount: $321.50 Payment Date: 06/18/2012 11:30 AM Balance: $0.00 Payee: FREDERICK LEE STENSON TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 02592C ACCOUNT ITEM LIST: Description 321.50 Account Code Current Pmts BUILDING - NONRES STATE BUILDING SURCHARGE 000.322.100 640.237.114 Total: $321.50 317.00 4.50 doc: Receipt -06 Printed: 06 -18 -2012 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 3347400005 Permit Number: D12-207 Address: 4208 S 116 ST TUKW Status: PENDING Suite No: Applied Date: 06/12/2012 Applicant: KENT ENGINEERING Issue Date: Receipt No.: R12 -01850 Initials: User ID: WER 1655 Payment Amount: $206.05 Payment Date: 06/12/2012 02:10 PM Balance: $321.50 Payee: FREDERICK LEE STENSON TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 00594C ACCOUNT ITEM LIST: Description 206.05 Account Code Current Pmts PLAN CHECK - NONRES 000.345.830 206.05 Total: $206.05 doc: Receiot -06 Printed: 06 -12 -2012 INSPECTION NO. INSPECTION RECORD Retain a copy with permit PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: /FA/Tc4"-A!G Corrections required prior to approval. Type of Inspection: F -/•9 4, COMMENTS: Address: 124 8 s //6 sue- Date Called: Special Instructions: Date Wanted:. 7 -2y— 12 a.m, P.m. Requester: Phone No: v3Approved per applicable codes. Corrections required prior to approval. COMMENTS: rateL. 7` Z L� 1 py1; -I' t_' 6 le. / t---1A1 1 Insp. Etor: Y I +.A./,, rateL. 7` Z L� 1 REIN PECTION FEE REQUIREDPrior to nixt inspection, fee mst be pa' at 6300 Southcenter Blvd., uite 100. Call to schedule reinspection. INSPECTION NO. INSE ECTION RECORD Retain a copy with permit _L»2 -Z'7 PERMIT NO. CITY.OE- TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 tiz, (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project:. Type of Inspection: Z%?- 2 2 o c ,Aee .r 'T"± 'ill Address: - 442e)e S // 6 5-7-- Date Called: Special Instructions: _; Date Wanted:. a -2,i- / Z..- Vim: , P.m- Requester: Phone No art 4,--4/z3 Approved per applicable codes. Corrections required prior to approval. COMMENTS: //✓-- 7 { 517:1 �Ii)v 4,P.•v,/.r f IiEINSPECTION FEE RECt !RED. Pno to next inspection, fee must be aid at 6300 Southcenter Blvd.. Suit 100. Call to schedule reinspection. REVISIONS No changes s II be made to the scope of work wi out prior approval of Tukwi Building Division. NOTE: Revisions require a new plan submittal and may include additional plan review fees. Noa r N og S j/ 57— I-10 — 0005 =03 ;;;) ,7c e_ LcTS 1 .Z3yd- /3hoc.K / • C_7 H/LLit/4A" 's 5 itittOPY Ave /r/o., Permit No. 2- and omissions. not authorize Receipt is acknowledged: 1. 1;1 ,:1 •VL to ON EPARATE PERMIT EQUIRED FOR: Mechanical Electrical Plumbing Gas Piping REVIEWED FOR ODE COMPLIANCE APPROVED JUN 15 2012 City o T kwila BUILDIN IVISION City of Tukwila 8 °`r ax;$ IVISION 37 au .5' //C., Tit $ T 11) tar. )1•804111117 RECEIVEY JUN 12 2012 PERMIT CENTER QUALITY METAL ROOFING MANUFACTURED BY REVIEWED • CO A pOMFLI ROVE: JUN 15 201; sUIL011VG D�trvila IVISI Uf Washington, Inc.' INSTALLATION AND HANDLING MANUAL R NCE RECEIVE9 PER1V ' BUNTER N Of Washington, Inc. Galvanized Bugle Head Screw Fastening Leg Snap -Loc Application: For ease of application, the Snap -Loc panel has a fastening leg designed into the panel. To apply the panels, all that is necessary is to align the panels with the eave edge and fasten, using galvanized bugle - head screws, spacing the screws about 18" to 24" along the fastening leg. To apply the remaining panels, simply snap the next panel in place and fasten as before. Note: Caution must be taken to insure that the panels are kept in "square as they are applied. 30 Ib. felt should be applied prior to laying the panels. NOTE: Cutting. Steel roofing and trim should be cut with nibblers, tin snips or a profile shear. Although Champion Metal of WA. does not advocate the use of a saw, the reality is many people use a power saw in some manner. There are two concerns when using a saw. First, be sure that no burrs are left on the ends of the panel. The rough edges are not protected and will rust. Second, the filings coming off the blade are hot and will adhere to the surface of the panels and these will rust. Be sure all filings are removed from the surface as they will rust and pit the surface of the sheet. 3 Ridge Cap * Of Washington, Inc. TSLRC - .......„ 1----- i.,/,. !,,7.. ,........ 4 Matching Non - Vented Snap -Loc Closure x 48" 1. Nail a 2 x 2 on both sides of the roof peak. 2. Install the roof panels by lining them up with the eaves. The ridge cap will cover any slight differences in length at the peak. 3. If pitch is low or you are facing a strong wind, you may want to bend the flat pan of the panel up under the ridge, creating a dam. This ensures that water will not be blown under the ridge. Although bending your panels up is recommended, you may also want to use a matching closure, specifically made for the Snap - Loc panel, under the ridge cap to stop the weather. 4. After the gable trim is applied, place the ridge cap on top and notch out the 1 -1/2" return so that the ridge cap sits down flush with the pan of the panel. A notching tool should be available through your distributor. 5. Fasten the ridge cap to the 2 x 2's with the painted neoprene - washered screws. Vented Ridge Cap .* TSLRV, 5J J----- _n. Use the same application as the standard Snap -Loc ridge cap with these exceptions: 1. 2 x 2's are cut into blocks and spaced so that the airflow is unobstructed. 2. The return on the vented ridge cap is only'' /," so it will not sit down flat in the pan. A 'A" air space will exist for the airflow. 3. Bird screen may be placed across the 2 x 2's, if desired. 4. With a vented ridge cap, some installers choose to omit the 2 x 2's altogether and fasten the ridge into the top of the panel ribs using an exposed painted trim fastener. 5. Note: Bending up your panels under the ridge will prevent water from penetrating the system under most circumstances. If the structure is located in a severe environment where wind - driven rain or snow is a concern, vented closures and other options are available. Snap -Loc Vented Closure x 24" 6 Co Washington, Inc. Shed Metal * TSLSM Gable Trim TSLGT This is simply a ridge cap for a single - sloped roof. Install the roof panels. You may want to bend them up underneath to block water. You may also want to use matching closure strips to help seal under the cap. After the gable trim is applied, place the shed metal on top and notch out the 1' / :" return so that the ridge sits down flush with the pan of the panel. A notching tool should be available from your distributor. Fasten the cap down from behind, into the wall, using an exposed painted trim fastener. You may also wish to fasten the cap into the top of the panel ribs with the same exposed painted trim fastener. The gable trim is applied on top of the panel over the rib before the ridge cap is applied. It is fastened to the fascia board with exposed painted trim fasteners. As shown in the diagram, if a rib does not fall flush with the gable edge, you must make an artificial rib by cutting the panel vertically 1" wider than the building and bending it up to form a rib. 8 Eave Trim * TSLET of Washington, Inc. www. cha mpionrneta l . com N67%,„7s1.7%.7S6% Fasten the eave trim down using bugle head screws. Install the eave trim first, then run a bead of Pro -Seal 34® on top making sure that your sealant is below the line of screws. Next apply the roof panels on top of the eave trim. When a house has gutters, some installers choose not to use the eave trim. This is because the standard eave trim may not fit with your gutter spikes. These installers simply extend the panel over the roof's edge enough to get the water into the gutter. The exact distance to extend the panels depends on the pitch of the roof and how low the gutters are hung. The Snap -Loc panels will often be bowed at the bottom. This is not a bad thing. It helps to prevent "oil- canning." Usually you do not see the bottom of the panels because of the gutters. It is an accepted installation procedure to seal under the panels with Pro - Seal 34e and place an exposed fastener in the flat area of the panel. This will seal the eave line and prevent water from trying to siphon up under the panels. Guttered Eave Trim * TSLETG 1/2" hem 1" Guttered Eave Trim Snap -Loc panel The guttered eave trim is designed to be used when there are gutters on the building. The 1" drop on the face of the trim helps the water drain into the gutter without interfering with the gutter spikes. The use of a hem on the bottom instead of a drip will protect a homeowner's hands when they clean their gutters. The trim is installed the same way as the standard eave trim. 10 Sidewall Flashing TSLCF Compensating Sidewall Flashing TSLCS -- O Ca trift Washington, Inc. www. ch a mp t onme to l . com 41' 2" 1 Butt the side edge of the panel against the wall. Install the flashing to cover the rib. The flashing usually slides underneath the siding on the wall. If a rib does not match up with the wall, cut the panel 1" wider than the area, bend the panel up using a hand brake, tack it to the wall and install the flashing. Note: Compensating Sidewall can be ordered. It helps to compensate for a roof that is out of square. Endwall Flashing * TSLEF, Wall Endwall Flashing nap -Loc panel Install roofing panels. If your pitch is shallow, you may want to bend up the pan, creating a dam. You may also install matching Snap -Loc closure. Notch out the return and install the endwall flashing over the roof panels. Use bugle head screws through the upper leg of the flashing into the wall. Cover the screws with wall siding. As an option, you may also use an exposed fastener through the endwall into the top of the panel ribs. Note: We can fabricate a custom piece of this trim in a ventilated format for an additional charge. 11 ISTORAGE OF METAL ROOFING MATERIALS Of Washington, Inc. WWW.. s;hampinnni°ta I.eorir CARE AND MAINTENANCE Of your Champion Metal Snap -Loc Roof. Steel roofing requires very little maintenance to preserve its life expectancy and appearance. However, it does require some. Here is a list of activities that will help ensure that you receive the optimal life expectancy out of your roof. • Periodically remove all debris from the roof. • Your metal roof should be washed periodically. Wash with a mixture of one cup detergent, which contains Tess than .5% phosphate, dissolved into five (5) gallons of warm water. • Another solution would be using a mixture of one (1) cup of household ammonia 1 WARRANTY INFORMATION 1 Please keep all paperwork related to your metal roofing. In order for a warranty issue to be investigated, we must have proof of purchase. The proof required is our work order number and the date of purchase. If you did not receive a copy of our work order, please contact the dealer from whom the product was purchased. It is not a good idea to store metal roofing flat for an extended period of time. When the product is stored flat, water and condensation can siphon in between the panels. Over time the combina- tion of expansion and contraction, the weight of the panels, temperature change and dampness will soften the coatings. Once the coatings are compromised, the life expectancy of the steel is sacrificed. If you are planning on storing your Snap -Loc roofing, try to elevate one end and possibly cover the bundles to ensure water does not get trapped. It is our intent to provide you with the information to ensure you the longest lasting life expectancy for your metal roof. If you have any questions regarding this issue, please contact your local dis- tributor or one of our sales representatives. 32 *PERM GOUMU (;OPi• PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D12 -207 PROJECT NAME: KENT ENGINEERING SITE ADDRESS: 4208 S 116 ST X Original Plan Submittal Response to Correction Letter # DATE: 06 -12 -12 Response to Incomplete Letter # Revision # After Permit Issued D PARTMENTS: Buil ing ivision Public Works ❑ �� f`Qr tIL- Fir" a Preven ion Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete DUE DATE: 06 -14 -12 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route kj Structural Review Required n No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 07-12 -12 Approved n Approved with Conditions K Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 Contractors or Tradespeople Peer Friendly Page • General /Specialty Contractor A business registered as a construction contractor with LEI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company F LEE STENSON INC 2062417738 155 Sw 152 Nd Street UNIT A Seattle WA 98166 King Corporation UBI No. 601036362 Status Active License No. FLEESI *122CA License Type Construction Contractor Effective Date 2/1/1988 Expiration Date 3/7/2013 Suspend Date Specialty 1 General Specialty 2 Unused Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status SHEPPCR088MG SHEPPARD CONST Et RMDLNG INC Construction Contractor Carpentry/Framing Siding 7/7/1992 7/1/1996 Archived SWIIN" 081CJ 5 W I INC Construction Contractor General Unused 2/11/1992 2/10/1995 Archived STENSWI122DA STENSON WHITESPAR INC Construction Contractor General Unused 3/1/1988 2/10/1992 Archived STENSFL162CB STENSON, F LEE Construction Contractor General Unused 2/2/1984 1/25/1988 Archived Business Owner Information Name Role Effective Date Expiration Date STENSON, FREDERICK LEE President 02/01/1988 Amount STENSON, CHARLENE 17 01/01/1980 01/01/1980 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 5 CBIC 638940 01/25/2002 Until Cancelled $12,000.00 01/22/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 17 CBIC C11638940 05/15/2007 05/15/2013 $1,000,000.00 04/15/2011 16 PRAETORIAN INS CO HFP200125400 05/15/2007 05/15/2008 $1,000,000.00 04/23/2007 15 INSURANCE CORP OF HANNOVER H86FP1689903 05/15/2006 05/15/2007 $1,000,000.00 03/20/2006 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period https: // fortress .wa.gov /lni /bbip/Print.aspx 06/18/2012