Loading...
HomeMy WebLinkAboutPermit D12-252 - WESTFIELD SOUTHCENTER MALL - REROOFWESTFIELD MALL REROOF 2800 SOUTHCENTER MALL D12-252 City okukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov DEVELOPMENT PERMIT Parcel No.: 9202470010 Address: 2800 SOUTHCENTER MALL TUKW Suite No: Project Name: WESTFIELD MALL - REROOF Permit Number: D12-252 Issue Date: 08/20/2012 Permit Expires On: 02/16/2013 Owner: Name: WESTFIELD PROPERTY TAX DEPT Address: PO BOX 130940 , CARLSBAD CA 92013 Contact Person: Name: DON AUSTIN Address: 3601 121 ST SW , LYNNWOOD WA 98087 Contractor: Name: COMMERCIAL INDSTRL ROOFING INC Address: 3601 121ST STREET SW , LYNNWOOD, WA 98037 Contractor License No: COMMEI *205JJ Lender: Name: SELF FUNDED - WESTFIELD MALL Address: Phone: 425 - 423 -0900 Phone: 425 - 423 -0900 Expiration Date: 05/16/2013 DESCRIPTION OF WORK: REROOF SECTION "B" OF EXISTING MALL Value of Construction: $375,000.00 Fees Collected: $6,176.57 Type of Fire Protection: SPRINKLERS /AFA International Building Code Edition: 2009 Type of Construction: II-B Occupancy per IBC: 0019 Electrical Service Provided by: PUGET SOUND ENERGY * *continued on next page ** doc: IBC -7/10 D12 -252 Printed: 08 -20 -2012 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: Land Altering: Landscape Irrigation: Moving Oversize Load: Sanitary Side Sewer: Sewer Main Extension: Storm Drainage: Street Use: N N Water Main Extension: Water Meter: N Permit Center Authorized Signatur Number: 0 Start Time: Volumes: Cut 0 c.y. Start Time: Private: Profit: N Private: I hereby certify that I have read and exa ed t governing this w • ' will be - omplied with, whet The granting of t construction or the to this permit. Date: Size (Inches): 0 End Time: Fill 0 c.y. End Time: Public: Non - Profit: N Public: ermit and know the same to be true and correct. All provisions of law and ordinances r specified herein or not. of presume to give authority to violate or cancel the provisions of any other state or local laws regulating work. I am authorized to sign and obtain this development permit and agree to the conditions attached Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *FIRE DEPARTMENT CONDITIONS * ** 2: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 3: Application of roof coverings with the use of an open -flame devices requires a separate permit from the Tukwila Fire Department located at 444 Andover Park East, Tukwila, Washington, 98188; telephone - (206)575 -4407. There shall be not less than one multi- purpose portable fire extinguisher with a minimum 2 -A 20 -B:C rating on the roof being covered or repaired. (IFC 105.6.24, 1417.3) 4: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 5: Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 6: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: IBC -7/10 D12 -252 Printed: 08 -20 -2012 • CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov • Building Permit No. b p-- Project No. r Date Application Accepted: Date Application Expires: t -&0---15 (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION Site Address: " Southcenter Tenant Name: Westfield Southcenter Mall PROPERTY OWNER Name: Don Austin Name: Westfield LLC City: Lynnwood State: WA Zip: 98087 Address: 2800 Southcenter Mall Email: don @cir- roofmg.com City: Tukwila State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: Don Austin Address: 3601 121st Street SW Lynnwood WA 98087 City: Lynnwood State: WA Zip: 98087 Phone: (425) 423 -0900 Fax: (425) 423 -0992 Email: don @cir- roofmg.com GENERAL CONTRACTOR INFORMATION Company Name: Commercial Industrial Roofing Address: 3601 121st Street SW Lynnwood WA 98087 City: Lynnwood State: WA Zip: 98087 Phone: (425) 423 -0900 Fax: (425) 423 -0992 Contr Reg No.: COMMEI *205JJ Exp Date: 05/13/2013 Tukwila Business License No.: H:\ApplicationsWorms- Applications On Line \2011 Applications \Permit Application Revised - 8 -9 -1 I.docx Revised: August 2011 bit King Co Assessor's Tax No.: Suite Number: Floor: New Tenant: ❑ Yes ®..No ARCHITECT OF RECORD Name: S_ / 2 t / Company Name: Address• Architect Name: Address: tate: City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Name: S_ / 2 t / Company Name: Address• Engineer Name: Address: tate: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: S_ / 2 t / � Address• City: tate: Zip: Page 1 of 4 BUILDING PERMIT INFORMATION! 206 -431 -3670 Valuation of Project (contractor's bid price): $ 375,000 Describe the scope of work (please provide detailed information): Will there be new rack storage? ❑ Yes Existing Building Valuation: $ .. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq 11): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: 0 Sprinklers ® Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11 " paper including quantities and Material Safely Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\ Applications\Forns- Applications On Line \2011 Applications \Permit Application Revised - 8 -9 -1 I.docx Revised: August 2011 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC l' Floor 2nd Floor 3`d Floor Floors thru • Basement Accessory Structure* Attached Garage Detached Garage Attached Carport Detached Carport Covered Deck Uncovered Deck PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq 11): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: 0 Sprinklers ® Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes ❑ No If `yes', attach list of materials and storage locations on a separate 8 -1 /2 "x 11 " paper including quantities and Material Safely Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\ Applications\Forns- Applications On Line \2011 Applications \Permit Application Revised - 8 -9 -1 I.docx Revised: August 2011 bh Page 2 of 4 . • PERMIT APPLICATION NOTES — Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY B E STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER Signature: Print Name: Don Austin Day Telephone: (425) 754 -4046 Date: Mailing Address: 3601 121st Street SW Lynnwood WA 98087 H:\Applications \Forms - Applications On Line \2011 Applications \Permit Application Revised - 8- 9- 11.docx Revised- August 2011 bh City State Zip Page 4 of 4 • City of Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov RECEIPT ParcelNo.: 9202470010 Permit Number: D12 -252 Address: 2800 SOUTHCENTER MALL TUKW Status: APPROVED Suite No: Applied Date: 07/30/2012 Applicant: WESTFIELD MALL - REROOF Issue Date: Receipt No.: R12 -02398 Initials: TLS User ID: 1670 Payment Amount: $3,745.1S Payment Date: 08/20/2012 02:18 PM Balance: $0.00 Payee: COMMERCIAL INDUSTRIAL ROOFING TRANSACTION LIST: Type Method Descriptio Amount Payment Check 142445 3,745.15 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts BUILDING - NONRES STATE BUILDING SURCHARGE 000.322.100 640.237.114 Total: $3,745.15 3,740.65 4.50 doc: Receiot -06 Printed: 08 -20 -2012 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -43 1 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.e,ov RECEIPT Parcel No.: 9202470010 Permit Number: D12 -252 Address: 2800 SOUTHCENTER MALL TUKW Status: PENDING Suite No: Applied Date: 07/30/2012 Applicant: WESTFIELD MALL - REROOF Issue Date: Receipt No.: R12 -02237 Payment Amount: $2,431.42 Initials: WER Payment Date: 07/30/2012 02:30 PM User ID: 1655 Balance: $3,745.15 Payee: COMMERCIAL INDUSTRIAL ROOFING INC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 142396 2,431.42 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts PLAN CHECK - NONRES 000.345.830 2,431.42 Total: $2,431.42 doc: Receiot -06 Printed: 07 -30 -2012 INSPECTION RECORD Retain a copy with permit INSPECTION N0. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION C/VI( 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: tN es e kA ^ / Typeeof�nspection: ., l0 e t`, A.) A L. 5u. t� Address: 2ZKo v � A- A Date Called: ,_— Special Instructions: j� (Le, tg " o P NkA Date Wanted r 14 i 3 -aam,r p.m. Requester: Phone o:, Approved per applicable codes. El Corrections required prior to approval. COMMENTS: L o 2f 4;1— Lio it4 Dtc Inspr;or: Date: 14 ri LI REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. L INSPECTION RECORD Retain a copy with permit f 2 —25L- INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Pro, jegt ` P'16 M4.?( TYPInspectign: Address ®Q4 MA/4-4 ) Al( ak Date Called: 1t Special Instructions: O r Co Q r ?04 is_ 154 - Z1 6q.5 Date Wanted �` I ! ,-.51.111- Req ster: /! t PAtj /\/A, PhooNo is-. .440 ElApproved per applicable codes. :orrections required prior to approval. VT COMMENTS: t Nike / MA/4-4 ) Al( ak d-,nf -P Id Ai IJ • II &A6 1t (z) fps -5 c ,le L \ Ai f lA :_S I .' \ ! " /) Inspect Dater -/ 3 ri REINSPECTION FEE RaUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permi CITY OF TUKWILA BUILDING 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 431 -2451 2)cz_?52 PERMIT NO. DIVISION (206) 431 -367.0 Project: r e vJi? sr- ,. to ( Type 9f Inspe -t'on: (ke - j omp Address: Q O S ,t ` , ` I� Date Called: Special Instructions: ;N. 5� , Ai 7.---- • Date Wanted: - ��, a,r a. i 2 't'- _ p.m. Requester: Phoij 2 5 _'1 0 l; °G4 Approved per applicable codes. Ij Corrections required prior to approval. COMMENTS: An' (_!:'; Ai I Spector: . F-7 IDat a 1 ❑ REINSPECTION FEE REQUIREDtPrior to next inspection. fee trust be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 INSPECTION RECORD Retain a copy with permit DI Z PERMIT NO. Project: TYPe IFe e o /'� /2 Address: .2806 '. / /0.r If Date Called: Special Instructions: • Date Wa ted:. Requester Phone 125 -2;_,/:„. 'egg p.proved per applicable codes. Corrections required prior to approval. COMMENTS: nspector: 1/1401.41 he" Da _, 2- t R (NS ECTION FEE REQUIRE 9t Prior t next inspection. fee must be p id t 6300 Southcenter Blvd., Suite 1. 0. Call to schedule reinspection. (tc gee.hi fsitfiast z52, ROOF MEMBRANEISYSTEM GUARANTEE Guarantee No.: 45019 Guarantee Date: January 18, 2013 SIPLAST, INC. has sold materials whidh have been used in applying a Roof Membrane/System (comprised solely of the Siplast, Inc. Roof Membrane. Rigid Roof Insulation designated as Paralherm Polyisocyanumte and/or Siplast Wood Fiberboard and/or DensDedc. DensDedc Prime or DensDeck DuraGuard, and : r. t Fasteners and/or ParaStik insulation Adhesive) to a building owned and described as follows: OWNER: ADDRESS OF 0 OF SYSTEM: Parobase PlusJParadiene 20/Paradiene 30 FR TG F DECK: Metal JO8 NAME 8, AREA: ADDRESS OF B 2800 Southcenter Mao Tukawila. WA 98188 Southoanter Mall - Roof Area B 2800 Southcenter Mau Tukewila, WA 98188 USE OF BUILDING: F INSULATION: F AREA: PING CONTRACTOR: COMPLETION DATE: SiPIAST HEREBY 0 =•VE OWNER, subject to the to :, Mauna stated herein, That the Roof M (comprised solely of the SIPLAST Roof Membrane, Parathenn and/or Wood Fiberboard and /or DensOeck, DensDedc Prune or DensDeek DureGuard. Parafast Fasteners and/or Para -Star Insulation Adhesive) at the above building will remain in o watertight condition for a period of 20 years. commencing web the date hereof: or SIPLAST. will repair the Roof MembranelSystem at its own expense. A. TERMS AND CONDITIONS This Guarantee shall be subject to the following additional temps and conditions. 1. SIPLAST shall be gable under thb Guarantee only if a. The Roof Membrane is installed according to SIPLAST speditratlons: b. The Rigid Roof Insulation is installed according to SIPLAST specifications: c. The hhstaltation of tho Roof Membrane and Roof Insulation is by roofing =tractor approved in advance by SIPLAST: d. Tho use of SIPLAST materials has been approved in advance by SIPLAST. B. NOTICE OF CLAIM Any claim hereunder shall be deemed waived unless the Owner shall have given SIPLAST written notice thereof within thirty (30) days after a teak is discovered or should by reasonable diligence have been discovered. C. EXCLUSIONS FROM COVERAGE This Guarantee does not cover leaks or failure of the Roof Membrane/System to perform as guaranteed herein resulting from occurrences beyond the control of SIPLAST indgd ng but net tinted t0: 1. Damage to the Roof Membrane/System caused by gghfning, windstorm, hail. earthquake, tornado. hurricane, flood, malicious mischief, vandalism, chemical or organic deposits or other unusual occurrences. 2. Damage to the Roof Membrane/System caused by (i) abuse or abnormal use of the roof or Roof MembranefSystem or a any deliberate or negligent eel in maintaining the roof. 3. Damage to the Roof MembranelSystem caused by unauthorized repairs, alterations or modifications, er subsequent wont on or through the roof done without prior written approval by SIPLAST of the methods one materials to be used. TO THE condafons and Parathe rm Polyisocyanurate, DensDedc 220 Squares Cornnxrdal Industrial Roofing, Inc. January 18.2013 4. Damage to the Roof Membrane/System caused by structural defects or failures (including. but not limited to, setting or shifting of the building. and crocking or movement of girders. beams, partitions or foundations) or defects or failure of any substrate component, Including defects in application of any substrate component to which the Membrane/System is installed. 5. Damage to the Roof Membrane/System caused by falling objects. 6. Damage to the Roof MembranelSystem caused by movement of metal work used in conjunction with the Roof Membrane/System. 7. Damage to the Roof Membrane/System caused by installation of a sprWcler system, water or air conditioning equipment, radio or television antenna, framework for signs, water tower or other installation on the roof after the Installation of the Roof Membrane without a prior written approval by SIPLAST of the methods and materials to be used. 8. Damage to the Roof Membrane/System resulting from other than occasional traffic across its surface or from its use as a storage area or recreational surface or for any other similar purpos0. 9. Damage to the Roof Membrane/System caused by a change In use of the building without prior written approval of SIPLAST. 10. Damage to the Roof Membrane caused by pending of water or other conditions resufthng from Improper drainage. D. UMiTATiON OF LIABILITY SIPLAST shall be liable only for the cost of repair of such existing Roof Membrane/System by a SIPLAST approved contractor and will not bo tiabio for damages to other components of the roof assembly or the building or the contents or for consequential damages. The expense of removing and rrpinring traffic surfaces built over tho roof shall bo borne by the Owner, D shag be a Condition to the Ilabilty of SIPLAST, hereunder that SIPLAST have access to the roof during business hours throughout the term of tho Guarantee. This Guarantee will bo subject to all costs of installation being paid. including those of the roofing contractor. THIS GUARANTEE, AND THE STATEMENTS. O5UOAUONS AND REPRESENTATIONS HEREIN CONTAINED. SHALL GE IN LIEU OF ANY AND AU. OTHER GUARANTEES. EXPRESS OR IMPLIED, INCLUDING, WITHOUT IMITATION, ANY IMPLIED GUARANTEE OF MERCHANTABILITY OR FITNESS FOR ANY PARTICULAR PURPOSE. SIPLAST SHALL NOT DE LIABLE FOR ANY CAMAGETO THE$UILDING OR CONTENTS THEREOF, OR FOR ANY CONSEQUENTIAL. INCIDENTAL. SPECIAL OR PENAL DAMAGES. SIPLAST AGENTS HAVE NO AUTHORITY TO GIVE GUARANTEES BEYOND THOSE PROVIDED IN THIS GUARANTEE Slplast SIPLAST, INC. By James iI: Molrenhoff:'Ptestdentt 1000 E. Rochelle Blvd. living, Texas 750623940 469.9952200 www.alplasLemm AECEIVt :.AIL CITY OF -rule APR 03..: tt PAY (.Td ctir.a3: RECEI M CITY OF T An Icaca1 Group CanD IW MAR 1 !f PERMIT e 3 ILA ER SEPARATE PE REQUIRED FC Eft eohanIcal electrical Emlumbing 1:70ffas Piptng City of Tukwil ELtr ?.,O;NG DIVIS nal plan N o. 4 W -12.0 Permit No. Filp.ri review approval �srai of const c� uppr (E) Scupper Mechanical (W- 26.0) -- .Penthouse (N) Slope to Drain. Contractor to submit proposed material, cricket shapes and slopes to successfully ® eliminate ponding wa ?� W -13.0 or W -29.0 for ALT. BID ITEM NO 2 •--( W -5.0 (W -13.0 or W -20.0 for ALT. BID ITEM NO. 2 Mechanical Penthouse (W- 12.0)--. W -13.0 or W -27.0 for BID ITEM NO. 2 ROOF AREA B ALT. BID `W -13.0)- or W -29.0 for ALT. 81D ITEM NO. 2 (W- 28:0) --1 KEY DESCRIPTION . Area of Base Bid Low -Slope Roof Retrofit -- See System Description 1 / W -3.0 Area of Potential Alt. Bid Low -Slope Roof Retrofit -- See System Description 1 / -W 3.0 . = ;r`.:Zi Base Bid Elevated Concrete Equipment Platform - See Detail 1 / W 13.0 or 1 / -W 29.0 for ALT. BID ITEM Alt Bid Elevated Concrete Equipment Platform -- See Detail 1 / W 13.0 or 1 / -W 29.0 for ALT. BID ITEM Adjacent Bldg. and /or C Roof Area - Not part of Project Work # # Roof Top Appurtenances: Quantities, locations, dims. and . types must be field verified by Contractor, See Sim. Details 1 / W-14.0; 15.0, 16.0, 17.0, 18.0. ❑ Curb Mounted Ventilators: Quantities, locations, dimensions and types must be field verified by Contractor, See Sim. Detail 1 / W -14.0. o Roof Drains: Quantities, locations, dimensions and types must be field verified by Contractor, See Detail 1 / W -19.0. • Penetrations: Quantities, locations; dims. and types must be field verified by Contractor, See Detail 1 / W -20.0. W -13 0 Detail Tag: References location of Detail Drawing which occurs later in the set. Drawing sheets W -21.0, W -22.0, W -23.0, and W -24.0 contain additional information which was is not keyed on this General Roof Plan Drawing. (N) Scupper ?? W -11.0 f_Roof Drain (TYP•) ROOF AREA A BASE BID (N) Overflow roof drains (OD) required at this Roof Area. W -26.0 Mech'. P.H. • OD. . Roof Grain-(RD) W -19.0 W -25.0 t;3 i21,1 r.. W -10.0 Mechanical Penthouse. W -13.0 or W -29.0 for ALT. BID ITEM NO. 2 • W -19.0 subject to e docume Code any a ved F' . td Co 1 ,, 1111 1 x W -13.0 or W -29.0 for ALT. BID ITEM NO. 2 W -12.0) W -13.0 Side- -Side upPfREV PEWED6FOR or W-29 Ofor ALT. BID ITEM NO. 2 CODE COMPLIANCE APPROVED RAFFIC PROTECTION PANEL: Placq at entry_door to lead out to rs and t primary unit line. des not auth,' e rdinance. Receipt ns is a Wedged: Mechanical Penthouse 1---(W -25.0 (B) W -2.1 143.1 � W6.0 dm AUG 032012 j-T IIU12 City Tukwila BUILDING DIVISION BY W8.0�� (E) Cement Asbestos Boar Clad Walls 0 aim BUI ILDING ENVELOPE TECHNOLOGY & RESEARC pi dF wi� arSION e not to scale. All dimensions and conditions must be field verified by the Contractor. 2. Structural components are depicted in some buildin envelope details for illustrative purposes only. 3.. Layers and components may be depicted cut back, layered, separated, or expanded for clarity. ABBREVIATION KEY: (N) Indicates a new component to be provided and installed by the Contractor. Indicates an existing component to be left as is, repaired, and/ or rehabilitated by the Contractor per Project Documents. FV Indicates a specific dimension or measurement, which shall be field verified by The Contractor. PV Indicates Plumbing vent penetration. VH Indicates passive ventilator hood. NOTE DESCRIPTION n J Cement Asbestos Board Clad Walls: All asbestos clad walls shall be encapsulated per Project Requirements. In general, prepare, seal joints, prime and coat. All penetration (i.e., doors, louvers, pipes, conduits etc.) shall be properly' backed and sealed watertight with Project- Approved sealant joints. All fasteners discovered to be backing out shall be carefully set flush prior to priming and coating work. See Detail 1 / W -6.0 for additional information. Concrete and CMU walls at Base Bid Area shall be clad per Detail 1 / W -3.1 Note: Contractor shall provide-sufficient slope and cricket system (1/8:12) to successfully drain all roof areas per Code & Project Specifications. No areas of ponding water. Low -slope roof areas shall be tied watertight into the existing steep -slope roof system per Detail 1 / W -12.0. All steep slope areas shall be fully protected and carefully accessed during Project Work. Otherwise, steep roofs not part of Project Work. -152 NOTE: All existing sheet metal panel Gadding shall remain or be reused. BUILDING. ENVELOPE RECEIVE JUL 3 0 2012 PERMIT GFNTE WESTFIELD SOUTHCENTER -- 2011 REROOFING PROJECT GENERAL ROOF PLAN TECHNOLOGY &RESEARCH 4000 Defrkige Way SW, Firs[.Floor. Seattle, WA 08106 • Phone: 206-4053155. Far. 2013-405-3458 DRWG /CHGD DJ DATE : 07/11/11 IB APPROVED : BID & PERMIT SET W -2.0 FILE COPY prarrnIt ken_ COMMERCIAL INDUSTRIAL ROOFING INC. 3601 121St STREET SW, LYNNWOOD, WA 98087 425 -423 -0900 fax 425 -423 -0992 July 3o, 2012 Southcenter Re -Roof of Section B The existing roof membrane consists of a multiply BUR system (3 -ply) over 2.5" of insulation over a metal deck. This system will be removed in its entirety. The new system will consist of the following elements • 5/8" board over metal roof deck • Vapor barrier • 3.5" of polyisocyanurate • 1 %" board • Three ply membrane system b22SZ Washington State Contractor's Number CO- MM- EI *205JJ REVIEWED FOR CODE COMPLIANCE APPROVED AUG 0 3 2012 City of Tukwila BUILDING DIVISION RECEIVE JUL 302012 PERMIT CENTER INSULATION PARADIENE 30 FR TG 1 PARADIENE 20 TG INSULATION SLOPE 0" - 2' /s' per ft* MATERIALS per 100 sq ft INSULATION PARADIENE 20 TG 76 Ib PARADIENE 30 FR TG 112 Ib * Contact Siplast for higher slope requirements. n.t.s. Specification: 2030 IT Requirements and recommendations detailed in the Siplast catalog and Siplast long form specifications shall apply in addition to the following recommendations and specifications. Application 1. Install insulation panels according to manufacturer's recommendations and FM Global requirements, if applicable. The edges of insulation panels should be in moderate contact without forcing and cut to fit neatly against adjoining surfaces. The insulation layer should present a smooth surface to accept the roof membrane. 2. Beginning at the low point of the roof, fully torch one ply of the Paradiene 20 TG to the insulation surface, lapping sides and ends a minimum of 3 inches. Offset end laps a minimum of 3 feet. 3. Beginning again at the low point of the roof, fully torch one ply of Paradiene 30 FR TG to the Paradiene 20 TG surface, lapping sides and ends a minimum of 3 inches. Offset end laps a minimum of 3 feet. Stagger laps between plies. Note: Torch prime all granule surfaces to be lapped by adjoining sheets. Caution: Siplast recommends that all practices pertaining to NRCA CERTA guidelines be followed when torching methods are employed. This includes performing a fire watch following any torch applications. Always have approved fire- extinguishing equipment nearby. Ref. #: P20 -tg P30 -tg Rigid Date: 11.2.09 SiplaSt. 1000 East Rochelle Boulevard Irving, Texas 75062 (800) 922 -8800 FAX (469) 995 -2206 ra An (copal Group Company /n v L 1 AO IF ROO" MAN 0VOILA t"nN 41060LEEAR,/ O n i —1 f1 r—Th �l Site Plan STRANGER BOULEVARD WJE EN0TN00RS ARCHITECTS MATERIALS SCIENTISTS Was, Janney, Bs., Associates, Inc. NO 9. Harney Steal $aatW. HWaHH Ton 98108 2011622,1441 WIy -208 08831.0]01 fax � ore l Icy I—i,,. —an+I— n*oft * .c. Southcenter Mall Traffic Coating Repairs 2800 Southcenter Mali Tukwila, WA 98188 Westfield Construction 1107 Galleria Boulevard Roseville, CA 95678 Croavi laula 2012.1838 W2W12 MEC MRM As Noted Site Plan ONO Ms A100 • 2800 Southcenter Mall, Tukwila, WA 98188 Directions, Location and Map 1 MapQuest Page 1 of 1 mapquest Map of: 2800 Southcenter Mall Tukwila, WA 98188 -2876 Notes ©2011 MapQuest, Inc. Use of directions and maps is subject to the MapQuest Terms of Use. We make no guarantee of the accuracy of their content, road conditions or route usability. You assume all risk of use. View Terms of Use http:// www. mapquest .com/print ?a= app.core.dbb2bb 1 b0fedf88131 a47452 7/30/2012 TGFU.R10630 - Roofing Systems FILE COPY Ilko runt Nn_ ONLINE CERTIFICATIONS DIRECTORY TGFU.R10630 Roofing Systems Page Bottom Page 1 of 9 Roofing Systems See General Information for Roofing Systems SIPLAST INC 1111 HWY 67 S ARKADELPHIA, AR 71923 USA R10630 "Siplast Wood Fiberboard G" or "Siplast Wood Fiber C" may be used wherever wood fiberboard is specified. "Para -Stik may be used in any Classification to adhere insulation layers to the roof deck." References to polyisocynaurate insulation may include "Paratherm H ", "Tapered Paratherm H ", "Paratherm H -P ", "Tapered Paratherm H -P ", "Paratherm H -WF ", "Paratherm H -CG ", "Tapered H -CG ", "Paratherm H -DWD ", "Paratherm H -NB ", or "Paratherm H -DD ". "Paradiene 20 PR," "Paradiene 20 PR TG," "Paradiene 20 PR EG," "Paradiene 20 PR EG TG," "Paradiene 20 PR HV," "Paradiene 20 PR HV TG" and "Irex PR" are all suitable substitutions for Teranap." "Paradiene 20 SA" (self- adhered) is an acceptable alternate to "Paradiene 20." °Paradiene 20 EG SA" (self- adhered) is an acceptable alternate to "Paradiene 20 EG." "Paradiene 20 HT SA" (self- adhered) is an acceptable alternate to "Paradiene 20 HT." "Paradiene 20 TS SA" (self- adhered) is an acceptable alternate to "Paradiene 20 TS." "Paradiene 20 MW SA P" (self- adhered) is an acceptable alternate to "Paradiene 20 SA P ". "Teranap 1M G /S" is an acceptable alternative to "Parafor 50 LT". ASPHALT FELT SYSTEMS WITH HOT ROOFING ASPHALT Class A, B or C Hot roofing asphalt: For use in asphalt organic or glass fiber felt roofing systems. Asphalt glass fiber felts: Type G1 (Paraglas ), Type G2 (Parabase or Parablase Plus) for use in asphalt glass fiber felt roofing systems. COLD APPLICATION SYSTEMS Class A T. Dbck: NC thdiine: I - -1/2 Insulation (Optional): — Polyisocyanurate, glass fiber, wood fiber or perlite, any thickness. Base /Ply Sheet: — One or more layers Type G1, G2, 15 or 30, hot mopped. Primer (Optional): — "Pro Primer" (not UL Classified). Membrane: — "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," 1 -1/2 gal /sq into which a 110 g fleece is embedded. Surfacing: — "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," 1 gal /sq. REVIEWED FOR CODE COMPLIANCE APPROVED AUG 0 3 2012 City of Tukwila BUILDING DIVISION RECEIVE JUL 3 0 2012 PERMIT CENTER 2. Deck: C -15/32 Incline: 1 -1/2 bI 252 http: // database. ul. com /cgi- bin/XYV /template/LISEXT /1 FRAME/showpage.html ?name =... 12/28/2011 TGFU.R10630 - Roofing Systems Page 2 of 9 Barrier Board: - G -P Gypsum DensDeck ®, mechanically fastened. Insulation: - Polyisocyanurate, glass fiber, wood fiber or perlite, any thickness. Base /Ply Sheet (Optional): - One or more layers Type G1, G2, 15 or 30, hot mopped. Primer (Optional): - "Pro Primer" (not UL Classified). Membrane: - "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," 1 -1/2 gal /sq into which a 110 g fleece is embedded. Surfacing: - "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," 1 gal /sq. 3. Deck: C -15/32 Incline: 4 Insulation (Optional): - Any UL Classified, any thickness Barrier Board: - G -P Gypsum DensDeck ®, mechanically fastened. Primer (Optional): - "Pro Primer" (not UL Classified). Membrane: - "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," 1 -1/2 gal /sq into which a 110 g fleece is embedded. Surfacing: - "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," 1 gal /sq. 4. Deck: NC Incline: 2 -1/4 Primer: - "Pro Primer W" applied at 0.08 lbs /ft2 (0.4 kg /m2). Base Coat: - 'Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," applied at 0.41 lbs/ft2 (2.0 kg /m2) reinforced with 110 g Pro Fleece (not Classified). Immediately followed by a second application of "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," at 0.20 lbs/ft2 (1.0 kg /m). Intermediate Coat: - "Terapro Base Resin 1013" or "Terapro Wearing.Layer 1001," applied at a rate of 0.20 Ibs /ft2 (1.0 kg /m2) with natural or color quartz embedded in wet resin at a rate of 1.0 lbs/ft2 (5.0 kg /m2). Surfacing: - "Pro Color Finish" or °Pro Clear Finish" applied at 0.13 Ibs /ft2 (0.65 kg /m2). 5. Deck: NC Incline: 2 -1/4 Primer: - °Pro Primer W" applied at 0.08 Ibs /ft2 (0.4 kg /m2). Base Coat: - 'Terapro Base Resin 1013° or "Terapro Wearing Layer 1001," applied at 0.31 Ibs /ft2 (1.5 kg /m2). Intermediate Coat: - "Terapro Base Resin 1013° or "Terapro Wearing Layer 1001," applied at a rate of 0.20 Ibs /ft2 (1.0 kg /m2) with natural or color quartz embedded In wet resin at a rate of 1.0 Ibs /ft2 (5.0 kg /m2). Surfacing: - "Pro Color Finish" or "Pro Clear Finish" applied at 0.13 Ibs /ft2 (0.65 kg /m2). 6. Deck: NC Incline: 1 Primer: - "Pro Primer W° applied at 0.08 lbs/ft2 (0.4 kg /m2). Base Coat: - "Terapro VTS Resin" trowel applied at 0.82 lbs/ft2 (4.0 kg.m2) with natural quartz embedded into wet material at a rate of 1.0 Ib /ft2 (5.0 kg /m2). Surfacing: - "Pro Color Finish" applied at 0.13 Ibs /ft2 (0.65 kg /m2). 7. Deck: C -15/32 Incline: 2 -1/4 Insulation (Optional): - Any UL Classified, any thickness Barrier Board: - G -P Gypsum Corp. 1/4 in. DensDeck® Roofboard" with all joints staggered a minimum of 6 in. from the plywood joints. Primer: - "Pro Primer W" applied at 0.08 Ibs /ft2 (0.4 kg /m2). Base Coat: - "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," applied at 0.41 Ibs /ft2 (2.0 kg /m2) reinforced with 110 g Pro Fleece (not Classified). Immediately followed by a second application of "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," at 0.20 lbs/ft2 (1.0 kg /m). Intermediate Coat: - "Terapro Base Resin 1013" or \'Terapro Wearing Layer 1001," applied at a rate of 0.20 lbs/ft2 (1.0 kg /m2) with natural or color quartz embedded in wet resin at a rate of 1.0 Ibs /ft2 (5.0 kg /m2). Surfacing: - "Pro Color Finish" or "Pro Clear Finish" applied at 0.13 lbs/ft2 (0.65 kg /m2). 8. Deck: C -15/32 Incline: 2 -1/4 Insulation (Optional): - Any UL Classified, any thickness Barrier Board: - G -P Gypsum Corp. 1/4 in. DensDeck® Roofboard" with all joints staggered a minimum of 6 in. from the plywood joints. Primer: - "Pro Primer W" applied at 0.08 Ibs /ft2 (0.4 kg /m2). Base Coat: - "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," applied at 0.31 Ibs /ft2 (1.5 kg /m2). Intermediate Coat: - "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," applied at a rate of 0.20 lbs/ft2 (1.0 kg /m2) with natural or color quartz embedded in wet resin at a rate of 1.0 lbs/ft2 (5.0 kg /m2). Surfacing: - "Pro Color Finish" or "Pro Clear Finish" applied at 0.13 Ibs /ft2 (0.65 kg /m2). 9. Deck: C -15/32 Incline: 1 -1/2 Insulation (Optional): - Any UL Classified, any thickness. Barrier Board: - G -P Gypsum DensDeck ®, 1/4 in. thick min., with all joints staggered a minimum of 6 in. from the pI%4 ood joints. http: / /database.ul. com/cgi- bin/XYV /template/LISEXT/ 1 FRAME/showpage.html ?name =... 12/28/2011 TGFU.R10630 - Roofing Systems Page 3 of 9 Base /Ply Sheet (Optional): - Type G2, mechanically fastened. Ply Sheet: - "Paradiene 20," "Paradiene 20 SA," "Paradiene 20 TS," "Paradiene 20 P," "Paradiene 20 SA P," "Paradiene 20 TS P," "Paradiene 20 TS SA P," "Paradiene 20 TG P" or "Paradiene 20 TG. Primer: - "Pro Primer" (not UL Classified) applied at 0.18 lb/ft2. Membrane: - "Parapro Roof Membrane° - base coat of "Parapro Roof Membrane Resin Color 7035" (Summer or Winter) or "Parapro Roof Membrane Resin Color 9010" applied at 0.42 lb/ft2, 140 g/ft2 polyester fleece, top coat of "Parapro Roof Membrane Resin Color 7035" (Summer or Winter) or "Parapro Roof Membrane Resin Color 9010" applied at 0.26 lb /ft2. 10. Deck: NC Incline: 1 -1/2 Insulation (Optional): - Any UL Classified, any thickness. Barrier Board (Optional): - G -P Gypsum DensDeck ®, 1/4 in. thick min, USG Securock, V. in. thick min., High Density Wood Fiber, Perlite, or Fiberglass Insulation. Base/Ply Sheet (Optional): - Type G2, mechanically fastened. Ply Sheet: - "Paradiene 20," "Paradiene 20 SA," "Paradiene 20 TS," "Paradiene 20 P," "Paradiene 20 SA P," "Paradiene 20 TS P," "Paradiene 20 TS SA P," "Paradiene 20 TG P" or "Paradiene 20 TG ". Primer: - "Pro Primer" (not UL Classified) applied at 0.18 lb/ft2. Membrane: - "Parapro Roof Membrane" - base coat of "Parapro Roof Membrane Resin Color 7035" (Summer or Winter) or "Parapro Roof Membrane Resin Color 9010" applied at 0.42 lb/ft2, 140 g /ft2 polyester fleece, top coat of "Parapro Roof Membrane Resin Color 7035" (Summer or Winter) or "Parapro Roof Membrane Resin Color 9010" applied at 0.26 lb/ft2. 11. Deck: NC Incline: 1 -1/2 Barrier Board (Optional): - G -P Gypsum DensDeck ®, 1/4 in. thick min. Primer: - Pro Primer W applied at 0.4 kg /m2 Base Coat: - "Terapro Base Resin" applied at 2.0 kg /m2 reinforced with 110 g polyester fleece, Pro Fleece (not Classified). Immediately followed by a second application of Terapro Base Resin applied at 1.0 kg /m2 Intermediate Coat: - "Terapro VTS Resin" applied at a rate of 4.5 kg /m2 Intermediate Coat - "Pro Color Finish° applied at a rateof 0.5 kg /m2 Surfacing: - "Pro Color Chips" applied at a rate of 1.0 kg /m2 Surfacing: - "Pro Clear Finish" applied at 0.4 kg /m2 12. Deck: C -15/32 Incline: 1 -1/2 Insulation (Optional): - Any UL Classified, any thickness Barrier Board: - G -P Gypsum DensDeck ®, 1/4 in. thick min., with all joints staggered a minimum of 6 in. from the plywood joints. Primer: - Pro Primer W applied at 0.4 kg /m2 Base Coat: - "Terapro Base Resin" applied at 2.0 kg /m2 reinforced with 110 g polyester fleece, Pro Fleece (not Classified). Immediately followed by a second application of Terapro Base Resin applied at 1.0 kg /m2 Intermediate Coat: - "Terapro VTS Resin" applied at a rate of 4.5 kg /m2 Intermediate Coat: - "Pro Color Finish" applied at a rate of 0.5 kg /m2 Surfacing: - "Pro Color Chips" applied at a rate of 1.0 kg /m2 Surfacing: - "Pro Clear Finish" applied at 0.4 kg /m2 Class B 1. Deck: C -15/32 Incline: 2 Insulation (Optional): - Any UL Classified, any thickness. Barrier Board: - G -P Gypsum DensDeck ®, 1/4 in. thick min., with all joints staggered a minimum of 6 in. from the plywood joints. Base /Ply Sheet (Optional): - Type G2, mechanically fastened. Ply Sheet: - "Paradiene 20," °Paradiene 20 SA," "Paradiene 20 TS," "Paradiene 20 P," "Paradiene 20 SA P," "Paradiene 20 TS P," "Paradiene 20 TS SA P," "Paradiene 20 TG P" or "Paradiene 20 TG". Primer: - "Pro Primer" (not UL Classified) applied at 0.18 lb/ft2. Membrane: - "Parapro Roof Membrane" - base coat of "Parapro Roof Membrane Resin Color 7035" (Summer or Winter) or "Parapro Roof Membrane Resin Color 9010" applied at 0.42 lb/ft2, 140 g /ft2 polyester fleece, top coat of "Parapro Roof Membrane Resin Color 7035° (Summer or Winter) or "Parapro Roof Membrane Resin Color 9010° applied at 0.26 lb/ft2". 2. Deck: NC Incline: 2 Insulation (Optional): - Any UL Classified, any thickness. Barrier Board (Optional): - G -P Gypsum DensDeck ®, 1/4 in. thick min, USG Securock, 1/4 in. thick min., High Density Wood Fiber, Perlite, or Fiberglass Insulation. Base /Ply Sheet (Optional): - Type G2, mechanically fastened. Ply Sheet: - "Paradiene 20," "Paradiene 20 SA," "Paradiene 20 TS," "Paradiene 20 P," "Paradiene 20 SA P," "Paradiene 20 TS P," "Paradiene 20 TS SA P," "Paradiene 20 TG P" or "Paradiene 20 TG ". Primer: - "Pro Primer" (not UL Classified) applied at 0.18 lb/ft2. Membrane: - "Parapro Roof Membrane" - base coat of "Parapro Roof Membrane Resin Color 7035" (Summer or Winter) or "Parapro Roof Membrane Resin Color 9010" applied at 0.42 lb/ft2, 140 g /ft2 polyester fleece, top coat of "Parapro Roof Membrane Resin Color http: / /database. ul.com/cgi- bin/XYV /template/LIS EXT/ 1 FRAME/showpage.html ?name =... 12/28/2011 TGFU.R10630 - Roofing Systems Page 4 of 9 7035" (Summer or Winter) or "Parapro Roof Membrane Resin Color 9010" applied at 0.26 lb /R2 ". SINGLE PLY MEMBRANE SYSTEMS Unless otherwise indicated the Type G2 or G3 base sheet may be mechanically fastened or applied with hot roofing asphalt; the membranes (modified bitumen) are applied with hot roofing asphalt. Membrane and base /ply sheets suffixed "TG ", heat fused in place, are acceptable alternates to the same membranes and base /ply sheets, adhered with hot roofing asphalt, in applicable applications. Siplast "PA -311," "PA- 311M," and "PA- 311LS" (1.5 to 2.5 gal /sq) cold application cements are suitable alternates for hot roofing asphalt in Classifications not exceeding 1 in, incline. Only UL Classified roof insulations (excluding polystyrenes) are to be utilized in the insulated systems described below in any thickness or combination or as noted in individual Classifications, mechanically fastened or either adhered with hot roofing asphalt or UL Classified insulation adhesive. "Siplast Fiberglass Roof Insulation" may be used wherever glass fiber insulation is specified. 1/2 in. thick gypsum wallboard or 1/4 in. thick G -P Gypsum DensDeck® may be used in any roofing system currently Classified for use over noncombustible roof deck; this allows the system to be used over combustible roof deck (15/32 in. thick min) provided that: • The joints in the insulation are offset 6 in. with the joints in the roof deck, and • Polystyrene insulation, if used, is placed beneath the gypsum wall board /DensDeck ®. The use of rosin paper in a roofing assembly, either on combustible or non - combustible roof deck, is acceptable and will not change the existing Classification for the assembly. Rosin paper may be viewed as optional in all roofing systems. Unless otherwise indicated, on all noncombustible deck systems vapor retarders or ply sheets are optional beneath roof insulation on all systems. In any system, "Paravent FS" may be included in addition to, but not in lieu of, any base sheet or base /ply sheet. "Parabase FS" may be used in lieu of "Parabase" in any system where "Parabase" is mechanically fastened. Unless specified in the individual Classifications, the following membrane and base /ply sheet alternatives are applicable. "Paradiene 20 EG ", "Paradiene 20 HT" and "Paradiene 20 HV" are suitable alternates for "Paradiene 20" in any applicable Classifications. "Paradiene 20 TS" is a suitable alternate to "Paradiene 20" in any applicable Classifications. "Paradiene 30 FR HT" is a suitable alternate to "Paradiene 30 FR" in any applicable Classification. "Paradiene 30 HT FR CR" is a suitable alternate to "Paradiene 30 CR FR" in any applicable Classification. "Paradiene 30 HT" and "Paradiene 40 FR" are suitable alternates to "Paradiene 30" in any applicable Classification. "Paradiene 30 FR ECO- ACTIVE" is a suitable alternate to "Paradiene 30 FR" in any applicable Classification. "Paradiene 20 MW" is an acceptable substitute for "Paradiene 20 ". "Paradiene 30 MW" is an acceptable substitute for "Paradiene 30 ". "Paradiene 30 MW FR" is an acceptable substitute for "Paradiene 30 FR ". "Paradiene 30 MW TG" is an acceptable substitute for "Paradiene 30 (TG) ". "Paradiene 30 MW FR TG" is an acceptable substitute for "Paradiene 30 FR (TG) ". "Paradiene 30 FR (TG) ECO- ACTIVE" is a suitable alternate to "Paradiene 30 FR (TG)" in any applicable Classification. " Parafor 30 ECO- ACTIVE" is a suitable alternate to "Parafor 30" in any applicable Classification. "Irex 40 ", "Irex HT" and "Irex PR" are suitable alternates for "Irex 30" in any applicable Classification. "Irex 40" and "Irex HT" may be heat fused in place. "Veral Copper ", " Veral Stainless Steel" and "Veral Spectra" are suitable alternates for "Veral Aluminum" in any applicable Classification. Additional layers of Type G2, "Parabase" and "Parabase Plus" may be added to any Classification. The "PC -227" (max 3 gal /sq) coating is suitable for use over any of the following systems up to a max incline of 3/4 in. Wood fiberboard, 1/2 in. thick min, may be used over polyisocyanurate insulation in any classification specifying the latter. Class A - Ballasted 1. Deck: NC Incline: 3 Insulation (Optional): — Any UL Classified, any thickness, covered with 3/4 in. min perlite. Base /Ply Sheet: — "Terabase ", "Terabase TG °, "Paradiene 20 ", "Paradiene 20 TG" or "Paradiene 20 PR ". http: / /database. ul. com /cgi- bin/XYV /template/LISEXT/ 1 FRAME/showpage.html ?name =... 12/28/2011 TGFU.R 10630 - Roofing Systems Page 5 of 9 Membrane: — "Paradiene 20 PR" or "Teranap" (modified bitumen). Surfacing: — 400 Ib /sq embedded in a flood coat of hot roofing asphalt or PA -311, or concrete pavers, min. 10 lb/sq. ft.. 2. Deck: NC Incline: 2 Base Sheet: — "Terabase ", "Terabase TG ", "Paradiene 20" or "Paradiene 20 TG ", adhered with hot roofing asphalt. Membrane: — "Paradiene 20" or "Teranap ", adhered with hot roofing asphalt. Vapor Barrier (Optional): — Polyethylene film (not UL Classified). Insulation: — Expanded polystyrene (EPS) or extruded polystyrene (XEPS), any thickness. Slip Sheet (Optional - not UL Classified): — Phillips Fibers "Rufon ", International Paper "D689" or "Fabrene °, 2 oz /sq yd. Surfacing: — Crushed stone (1/2 to 1 -1/2 in. diam) or river bottom stone (3/4 to 1 -1/2 in. diam), 600 Ibs /sq min, loose laid, or concrete pavers, min. 10 lb/sq. ft. Class A - Fully Adhered 1. Deck: NC Incline: 1/2 Insulation (Optional): — Polyisocyanurate, urethane, perlite /isocyanurate or composite, glass fiber, perlite or wood fiber, no limitation. Base /Ply Sheet: — "Paradiene 20 ". Membrane: — "Paradiene 30FR" or "Paradiene30 CR FR ". 2. Deck: C -15/32 Incline: 1/2 Insulation: — Polyisocyanurate, urethane, perlite, perlite /urethane composite or glass fiber, 3/4 min. Base /Ply Sheet: — "Paradiene 20 ". Membrane: — "Paradiene 30FR ". 3. Deck: C -15/32 Incline: No limitation. Insulation: — Polyisocyanurate, urethane, perlite /isocyanurate composite, glass fiber, perlite or wood fiber, any thickness. Insulation (Optional): — Wood fiberboard, 1/2 in. thickness min. Base /Ply Sheet: — One layer Type G2, "Paradiene 20" or "Irex 30 ". Membrane: — "Veral Aluminum ", heat fused in place. 4. Deck: C -15/32 Incline: No limitation. Base Sheet: — Type G2, "Parabase" or "Parabase Plus ", mechanically fastened or adhered with hot roofing asphalt. PIy Sheet: — Type G2, "Paradiene 20" or "Irex 30 ", adhered with hot roofing asphalt. Membrane: — "Veral Aluminum ", heat fused in place. 5. Deck: NC Incline: 1 Insulation (Optional): — Polyisocyanurate, glass fiber, perlite, wood fiber, mechanically attached or adhered with hot roofing asphalt, any thickness. Base /Ply Sheet: — Type G2 "Parabase" or "Parabase Plus ", mechanically fastened or adhered with hot roofing asphalt. PIy Sheet (Optional): — "Paradiene 20 ", "Paradiene 20EG ", "Paradiene 20 HT" or "Paradiene 20 NV", adhered with hot roofing asphalt. Membrane: — "Paradiene 30 HT FR TG ", "Paratech FR" or "Paradiene 40FR ", adhered with hot roofing asphalt. 6. Deck: C -15/32 Incline: 1 Insulation: — Polyisocyanurate, 1 -1/4 in. min or glass fiber, perlite, wood fiber, 1/2 in. min, with joints offset 6 in. from joints in deck. Base /Ply Sheet: — Type G2 (22 lb min) "Parabase" or "Parabase Plus ", mechanically fastened. Membrane: — "Paratech FR" or "Paradiene 40FR ", adhered with hot roofing asphalt. 7. Deck: NC Incline: 1/2 Insulation: — Expanded polystyrene (EPS), extruded polystyrene (XEPS), any thickness. Barrier Board: — Wood fiber, perlite, glass fiber, 0.45 in. min. Base /Ply Sheet: — "Paradiene 20 ". Membrane: — "Paradiene 30FR ". 8. Deck: NC Incline: No limitation Insulation: — Expanded polystyrene (EPS), extruded polystyrene (XEPS), any thickness. Barrier Board: — Wood fiber, perlite, glass fiber, 0.45 in. min. Base /Ply Sheet: — Type G2, "Paradiene 20" or "Irex 30 ". Membrane: — "Veral Aluminum ", heat fused. http: // database. ul. com /cgi- bin/XYV /template/LISEXT/ 1 FRAME /showpage.html ?name =... 12/28/2011 TGFU.R1063O - Roofing Systems Page 6 of 9 9. Deck: NC Incline: 1 Insulation: — Expanded polystyrene (EPS), extruded polystyrene (XEPS), any thickness. Barrier Board: — Wood fiber, perlite, glass fiber, 0.45 in. min. Base /Ply Sheet: — Type G2, "Parabase ", "Parabase Plus ", mechanically fastened or adhered with hot roofing asphalt. Membrane: — "Paradiene 40FR" or "Paratech FR ". 10. Deck: C -15/32 Incline: No limitation Insulation: — Expanded polystyrene (EPS), extruded polystyrene (XEPS), any thickness. Barrier Board: — Perlite, glass fiber, 3/4 in. min. Base /Ply Sheet: — Type G2, "Irex 30" or "Paradiene 20 ". Membrane: — "Veral Aluminum ", heat fused. 11. Deck: NC Incline: 1/2 Base Sheet: — Type G2, "Parabase" or "Parabase Plus ", mechanically fastened or adhered with hot roofing asphalt. Ply Sheet: — "Paradiene 20 ". Membrane: — "Paradiene 30FR ". 12. Deck: NC Incline: No limitation Base /Ply Sheet: — Type G2, G3, "Paradiene 20" or "Irex 30 ". Membrane: — "Veral Aluminum ", heat fused. 13. Deck: NC Incline: 1 Insulation (Optional): — Glass fiber, perlite, wood fiber, one or more layers, any combination, 2 in. max thickness, mechanically fastened or adhered with hot roofing asphalt. Base /Ply Sheet: — "Paradiene 20 ", adhered with hot roofing asphalt. Membrane: — "Paradiene 30 FR ", adhered with hot roofing asphalt. 14. Deck: C -15/32 Incline: 1 Cap Sheet: — Inverted Type G3, mechanically fastened. Base Sheet: — "Paradiene 20 ", heat fused. Cap Sheet: — "Paradiene 30 FR ", heat fused or hot mopped. 15. Deck: C -15/32 Incline: 1 Insulation (Optional): — Any UL Classified, any thickness. Barrier Board: — G -P Gypsum DensDeck ®, 1/4 in. thick min. Base /Ply sheet: — "Paradiene 20 ", adhered with hot roofing asphalt. Membrane: — "Paradiene 30 FR ", adhered with hot roofing asphalt. 16. Deck: NC Incline: 1/2 Insulation: — Wood fiber, 1/2 in. thick, mechanically fastened. Base /Ply Sheet: — "Paradiene 20 ", adhered with hot roofing asphalt. Membrane: — "Paradiene 30 CR FR ", adhered with hot roofing asphalt. 17. Deck: NC Incline: 1/2 Base Sheet: — Type G2, "Parabase" or "Parabase Pius ", mechanically fastened or adhered with hot roofing asphalt. Ply Sheet: — "Paradiene 20 ", adhered with hot roofing asphalt. Membrane: — "Paradiene 30 CR FR ", adhered with hot roofing asphalt. 18. Deck: NC Incline: 1/2 Insulation (Optional): — Gass fiber, perlite, wood fiber, one or more layers, any combination, any thickness, mechanically fastened or adhered with hot roofing asphalt. Base /Ply Sheet: — "Paradiene 20 ", adhered with hot roofing asphalt. Membrane: — "Paradiene 30 CR FR ", adhered with hot roofing asphalt. 19. Deck: C -15/32 Incline: 1/2 http: // database. ul. com /cgi- bin/XYV /template/LISEXT/ 1 FRAME/showpage.html ?name =... 12/28/2011 TGFU.R10630 - Roofing Systems Page 7 of 9 Cap Sheet: — Inverted Type G3, mechanically fastened. Base Sheet: — "Paradiene 20 ", heat fused. Cap Sheet: — "Paradiene 30 CR FR ", heat fused or hot mopped. 20. Deck: C-15/32 Incline: 1/2 Insulation (Optional): — Any UL Classified, any thickness. Barrier Board: — G -P Gypsum DensDeck ®, 1/4 in. thick min. Base Sheet: — "Paradiene 20 ", adhered with hot roofing asphalt. Cap Sheet: — "Paradiene 30 CR FR ", adhered with hot roofing asphalt. 21. Deck: NC Incline: 1 Insulation (Optional): — Any UL Classified, any thickness. Barrier Board: — G -P Gypsum DensDeck ®, 1/4 in. thick min. Base Sheet: — "Paradiene 20 TG ", heat fused. Ply Sheet: — "Teranap ", hot mopped. Cap Sheet: — "Paradiene 30 FR TG ", heat fused. 22. Deck: NC Incline: 1 Insulation (Optional): — Wood fiberboard, 1 in. min., over any UL Classified polyisocyanurate insulation, any thickness, any combination. Base Sheet: — "Paradiene 20 ", adhered with "SFT Adhesive" at a rate of 2 gal /sq. Membrane: — "Paradiene 30 FR ", adhered with "SFT Adhesive" at a rate of 2 gal /sq. 23. Deck: C -15/32 Incline: 1 Insulation (Optional): — Any UL Classified, any thickness, any combination, covered with optional wood fiberboard. Barrier Board: — 1/2 in. thick gypsum wallboard or 1/4 in. thick G-P Gypsum Corp. DensDeck ®, with all joints staggered 6 in. min. from plywood joints. Base Sheet: — "Paradiene 20 ", adhered with "SFT Adhesive" at a rate of 2 gal /sq. Membrane: — "Paradiene 30 FR ", adhered with "SFT Adhesive" at a rate of 2 gal /sq. 24. Deck: C -15/32 Incline: 1/2 Base Sheet: — Type G2 or "Irex 40," mechanically fastened Insulation: — Polyisocyanurate, minimum 2 " thick Barrier Board: — 3/4 in. thick perlite or Johns Manville "Duraboard," adhered with hot roofing asphalt Base Sheet: — "Paradiene 20" or "Paradiene 20 EG," adhered with hot roofing asphalt. Membrane: — "Paradiene 30 CR FR," adhered with hot roofing asphalt. Class B - Fully Adhered 1. Deck: C -15/32 Incline: No limitation. Base /Ply Sheet: — Type G2, "Irex 30 ", Type G3 or "Paradiene 20 ". Membrane: — "Veral Aluminum ", may be heat fused in place. 2. Deck: NC Incline: 1 Base Sheet: — Type G2, "Parabase" or "Parabase Plus" . Ply Sheet: — "Paradiene 20 ". Membrane: — "Paradiene 30FR ". 3. Deck: C -15/32 Incline: 1/2 Base Sheet: — Type G2 or "Parabase" or "Parabase Pius ", mechanically fastened. Ply Sheet: — "Pardiene 20 ". Membrane: — "Paradiene 30FR ". 4. Deck: C -15/32 Incline: 1/2 Base /Ply Sheet: — Type G2, "Parabase" or "Parabase Plus ". Membrane: — "Paradiene 40FR" or "Paratech FR ". 5. Deck: C -15/32 Incline: 1/2 http: / /database. ul. com /cgi- bin/XYV /template/LISEXT/ 1 FRAME /showpage.html ?name =... 12/28/2011 TGFU.R10630 - Roofing Systems Page 8 of 9 Insulation: — Wood fiber, perlite, glass fiber, 1/2 in. min. Base Sheet: — "Paradiene 20 ". Membrane: — "Paradiene 30FR ". 6. Deck: NC Incline: 2 -1/2 Insulation (Optional): — Polyisocyanurate, glass fiber, perlite, wood fiber, mechanically fastened or adhered with hot roofing asphalt, any thickness. Base /Ply Sheet: — "Paradiene 20 ", mechanically fastened or adhered with hot roofing asphalt. Membrane: — "Paradiene 30FR ", adhered with hot roofing asphalt. 7. Deck: C -15/32 Incline: 2 -1/2 Insulation: — Glass fiber, perlite, wood fiber, mechanically fastened, 1/2 in. min. Base /Ply Sheet: — "Paradiene 20 ", mechanically fastened or adhered with hot roofing asphalt. Membrane: — "Paradiene 30FR ", adhered with hot roofing asphalt. 8. Deck: C -15/32 Incline: 2 1/2 Insulation: — Polyisocyanurate, mechanically fastened, 1 -1/4 in. min. Base /Ply Sheet: — "Paradiene 20 ". Membrane: — "Paradiene 30FR ", adhered with hot roofing asphalt. 9. Deck: C-15/32 Incline: 2 1/2 Base Sheet: — "Parabase" or "Parabase Plus ", mechanically fastened or adhered with hot roofing asphalt. Ply Sheet: — "Paradiene 20 ", adhered with hot roofing asphalt. Membrane: — "Paradiene 30FR ", adhered with hot roofing asphalt. 10. Deck: NC Incline: 1 Insulation (Optional): — Glass fiber, perlite, wood fiber, one or more layers, any combination, any thickness, mechanically fastened or adhered with hot roofing asphalt. Base /Ply Sheet: — "Paradiene 20 ", adhered with hot roofing asphalt. Membrane: — "Paradiene 30 CR FR ", adhered with hot roofing asphalt. 11. Deck: C -15/32 Incline: 1 Insulation : — Wood fiberboard, 1/2 in. min., over any UL Classified polyisocyanurate insulation, 1.5 in. min. Base Sheet: — "Paradiene 20 ", adhered with "SFT Adhesive" at a rate of 2 gal /sq. Membrane: — "Paradiene 30 FR ", adhered with "SFT Adhesive" at a rate of 2 gal /sq. 1. Deleted. 2. Deck: C -15/32 Class C - Fully Adhered Incline: 2 -1/2 Base Sheet: — Type G2, "Parabase" or "Parabase Plus ", mechanically fastened or adhered with hot roofing asphalt. Ply Sheet: — "Paradiene 20 ", adhered with hot roofing asphalt. Membrane: — "Paradiene 30 ", adhered with hot roofing asphalt. 3. Deck: C -15/32 Incline: No Limitation Insulation (Optional): — Polyisocyanurate, glass fiber, perlite, wood fiber, any combination, any thickness, mechanically fastened or adhered with hot roofing asphalt. Base /Ply Sheet: — (Optional when no insulation is used, otherwise required) Type G2, "Parabase ", "Parabase Plus ", "Paradiene 20 ", mechanically fastened or adhered with hot roofing asphalt. Membrane: — "Parafor SOLT ", "Parafor SOWS ", adhered with hot roofing asphalt, mechanically fastened or heat fused in place. 4. Deck: C -15/32 Incline: 2 -1/2 Insulation (Optional): — Polyisocyanurate, glass fiber, perlite, wood fiber, any thickness, mechanically fastened or adhered with hot roofing asphalt. Base /Ply Sheet: — "Paradiene 20 ", mechanically fastened or adhered with hot roofing asphalt. Membrane: — "Paradiene 30 ", adhered with hot roofing asphalt. 5. Deck: C -15/32 Incline: No Limitation http: // database. ul. com /cgi- bin/XYV /template/LISEXT /1 FRAME /showpage.html ?name =... 12/28/2011 TGFU.R10630 - Roofing Systems Page 9 of 9 Insulation (Optional): — Polyisocyanurate, glass fiber, perlite, wood fiber, G -P Gypsum DensDeck ®, any combination, any thickness, mechanically fastened or adhered with hot roofing asphalt. Base /Ply Sheet (Optional): — Type G2, G3 inverted, "Parabase" or "Parabase Plus ", mechanically fastened or adhered with hot roofing asphalt. Ply Sheet: — °Paradiene 20° or °Paradiene 20 FS ", hot mopped. Membrane: — " Parafor 50" or "Parafor 30 ", heat fused in place. MAINTENANCE AND REPAIR SYSTEMS 1. Deck: C -15/32 Incline: 1/2 Existing Roof System: — Class A or B (gravel surfaces maintained) covered with: Insulation: — Polyisocyanurate, glass fiber, wood fiber or perlite, any thickness, hot mopped or mechanically fastened. Base /Ply Sheet (Optional): — Any Type G1, G2, 15 or 30, hot mopped or mechanically fastened. Primer (Optional): — "Pro Primer" (not UL Classified). Membrane: — "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," 1 -1/2 gal /sq into which a polyester (110 g) is embedded. Surfacing: — "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," 1 gal /sq. 2. Deck: NC Incline: 1/2 Existing Roof System: — Class A or B (gravel surfaces may be removed) covered with: Insulation: — Polyisocyanurate, glass fiber, wood fiber or perlite, any thickness, hot mopped or mechanically fastened. Base /Ply Sheet (Optional): — Any Type G1 or G2, hot mopped or mechanically fastened. Primer (Optional): — "Pro Primer" (not UL Classified). Membrane: — "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," at 0.42 Ibs /ft2 (2.0 kg /m2) into which a polyster fleece (110 g) is embedded. Surfacing: — "Terapro Base Resin 1013" or "Terapro Wearing Layer 1001," at 0.26 Ibs /ft2 (1.3 kg /m2). Class C 1. Deck: C -15/32 Incline: 1 Existing Roof System: — Class C roofing system covered with: Base Sheet: — One or more layers "Carlisle Modified Base Sheet" mechanically fastened or hot mopped. Membrane: — Carlisle "Sure -Weld AFX or AFX PLUS Membrane" mechanically fastened or hot mopped. Last Updated on 2011 -10 -04 Questions? Print this page Notice of Disclaimer Page Top Copyright © 2011 Underwriters Laboratories Inc.® The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured under UL's Follow -Up Service. Only those products bearing the UL Mark should be considered to be Listed and covered under UL's Follow -Up Service. Always look for the Mark on the product. UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1. The Guide Information, Designs and /or Listings (files) must be presented in their entirety and in a non - misleading manner, without any manipulation of the data (or drawings). 2. The statement "Reprinted from the Online Certifications Directory with permission from Underwriters Laboratories Inc." must appear adjacent to the extracted material. In addition, the reprinted material must include a copyright notice in the following format: "Copyright © 2011 Underwriters Laboratories Inc. ®" An independent organization working for a safer world with integrity, precision and knowledge. http: // database. ul. com /cgi- bin/XYV /template/LISEXT/ 1 FRAME/showpage.html ?name =... 12/28/2011 crity toffldwFta 02 -01 -2013 epartmenti Gonimuni y D�evelo neni DON AUSTIN 3601 121 ST SW LYNNWOOD WA 98087 RE: Permit No. D12 -252 WESTFIELD MALL - REROOF 2800 SOUTHCENTER MALL TUKW Dear Permit Holder: Jrrn Hagger %nk Mb r Jack»Peite, Director In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 03/12/2013. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 03/12/2013, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D12 -252 6300 Squilicenter Boul'eva'rd 'Suite #1.(70 Gila; Wasliing'ton 98188 • Phone x431 -3670 • Fax 20Fr4.1 -3665 PE Q �j soh'. r �,. '�':M. PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D12 -252 DATE: 07 -30 -12 PROJECT NAME: WESTFIELD MALL - REROOF SITE ADDRESS: 2800 SOUTHCENTER MALL X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: o' 1� — UdingiVsion Public Works n n A)c9 Fire Prevention Structural Planning Division ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete n DUE DATE: 07 -31 -12 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES /THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: n APPROVALS OR CORRECTIONS: Approved Notation: Approved with Conditions DUE DATE: 08 -28 -12 Not Approved (attach comments) n REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 Contractors or Tradespeople Pr Friendly Page • General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name COMMERCIAL INDSTRL ROOFING INC UBI No. 600346392 Phone 4254230900 Status Active Address 3601 121St Street Sw License No. COMMEI "205JJ Suite /Apt. License Type Construction Contractor City Lynnwood Effective Date 4/11/1980 State WA Expiration Date 5/16/2013 Zip 98087 Suspend Date County Snohomish Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Business Owner Information Name Role Effective Date Expiration Date DUGAN JR, WILLIAM L Vice President 04 /11/1980 Amount DUGAN, CHRISTINA D President 04/11/1980 04/28/2011 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 7 GREAT AMERICAN 0404872 04/11/2002 Until Cancelled $12,000.00 05/02/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 25 Cincinnati Specialty Underwrit CSU0030715 08/24/2011 08/24/2012 $1,000,000.00 08/23/2011 24 GEMINI INS CO VCGP018746 09/24/2010 08/24/2012 $1,000,000.0008 /18/2011 23 SCOTTSDALEINSCO BCS0022006 05/01 /2010 05/01 /2011 $1,000,000.0004 /30/2010 22 co LLEY FORGE INS 107848714 04/01/2007 05/01 /2010 $1,000,000.00 04 /28/2009 21 TRANSCONTINENTAL INS CO 1078489714 05/01/2006 05/01/2007 $1,000,000.0004 /26/2006 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period https: // fortress .wa.gov /lni/bbip/Print.aspx 08/20/2012