Loading...
HomeMy WebLinkAboutPermit D12-311 - KENT ENGINEERING - REROOFKENT ENGINEERING 4208 S 116 ST D12 -311 City &Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206 - 431 -2451 Web site: http://www.TukwilaWA.gov Parcel No.: 3347400005 Address: 4208 S 116 ST TUKW Suite No: Project Name: KENT ENGINEERING DEVELOPMENT PERMIT Permit Number: D12-311 Issue Date: 10/09/2012 Permit Expires On: 04/07/2013 Owner: Name: KENT DESIGN AND DEVELOPMENT Address: 4811 S 150TH ST , TUKWILA WA 98188 Contact Person: Name: LEE STENSON Address: 155 SW 152 ST, UNIT A , BURIEN WA 98166 Contractor: Name: F LEE STENSON INC. Address: 1801 S 93 ST C -27 , SEATTLE, WA 98108 Contractor License No: FLEESI* 122CA Lender: Name: Address: Phone: 206 - 423 -8425 Phone: 206 241 -7738 Expiration Date: 03/07/2013 DESCRIPTION OF WORK: REMOVE & REPLACE EXISTING METAL ROOF TO INCLUDE NEW SUB SHEETING Value of Construction: $13,000.00 Fees Collected: $559.07 Type of Fire Protection: International Building Code Edition: 2009 Type of Construction: Occupancy per IBC: 0008 Electrical Service Provided by: SEATTLE CITY LIGHT * *continued on next page ** doc: IBC -7/10 D12 -311 Printed: 10 -09 -2012 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: N Start Time: End Time: Land Filtering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: N Number: 0 Size (Inches): 0 Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature: /i/l/l/iitil (N( Date: /)(G�( r1.�- I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this permit. Signature: Print Print Name: F /.� S' -4 X./,S 0/t - Date: 76/9./ rWe____ This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or art approval of, any violation of any of the provisions of the building code or of arty other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IBC -7/10 D12 -311 Printed: 10-09 -2012 CITY OF TUKN-4 Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http: / /www.TukwilaWA.gov Building Pe• No. D--3 1 1 Project No. Date Application Accepted: -‘01'S -1 2 Date Application:Expires: (For office use only) CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION 12 U 9 S DU171 1/6' T11 6 T,L_1 King Co Assessor's Tax No.: 33 `" 7 `'' 0 - C zd.5= Site Address: 7Z Gg SOtirM / /co S Suite Number: Floor: New Tenant: ❑ Yes No Tenant Name: k, ,4-iT iC Al /A' /5-k-/1. /.t,!' PROPERTY OWNER Name:4 C‘ S. A./ .04 Name: L AMT ves/6 Awl 4 L e- Address: LZOg SUV7 %J / /t'o -s'- City: %7/h W I State: Gin Zip: 9g ./6 g CONTACT PERSON - person receiving all project communication Name:4 C‘ S. A./ .04 Address: AS_s` 5, f, /s_,2 S 7`" (J.ts 17 /L City: 06 U/L1 k, /,v State: 14 Zip:9r /6 6 Phone:oz0 . 412 3_ 54/p ix: Email:f-l. ,k. STZ.v1'0A/ e Ci /uL , Cvy„.., GENERAL CONTRACTOR INFORMATION Company Name,,f 6j .AAi , 0A, �/v Address: 4.5-3- S Gtr /S-2 CV— /0 City: vA /g�/ State: a%L Zips! f,/6i Phone G, _412 3 - yt12 Contr Reg No. : Exp Date: ��Fit'Z /Zze.�t av 2ai3 Tukwila Business License No. 4 099 3 /9 2. H:Wpplications\Fonns- Applications On Line \2012 Applications\Permit Application Revised - 2- 7- 12.docx Revised: February 2012 bh ARCHITECT OF RECORD Name: Company Name: /11/11- Architect Name: �1� Address: / City: State: Zip: Phone: Fax: Email: ENGINEER OF RECORD Name: Company Name: /11/11- Engineer Name: Address: City: City: State: Zip: Phone: Fax: Email: LENDER/BOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: A /VA Address: City: State: Zip: Page 1 of 4 BUILDING PERMIT INFORMATION— 206 - 431 -3670 Valuation of Project (contractor's bid price): $ / 3 &ad Existing Building Valuation: $ 'tap 000 Describe the scope of work (please provide detailed information): /45/y1 d u. _ a< /2, O(4e. /sr/.ur /7,E rnL Roof rU /?d e .G- /-' 14, t'i Will there be new rack storage? ❑ ....Yes No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes Ri No If "yes', attach list of materials and storage locations on a separate 8 -1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System - For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:1ApplicationslForms- Applications On Line12012 Applications\Permit Application Revised - 2- 7- 12.docx Revised. February 2012 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1' Floor o2 tf, 2nd Floor 7' 3rd Floor itin Floors thru Ai //- Basement /VA Accessory Structure* N A Attached Garage NrgD Detached Garage Al A Attached Carport tin Detached Carport %-/ /A Covered Deck Uncovered Deck /1-e4- Q PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes ❑ No If "yes ", explain: FIRE PROTECTION/HAZARDOUS MATERIALS: ❑ Sprinklers ❑ Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes Ri No If "yes', attach list of materials and storage locations on a separate 8 -1/2" x 11 " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System - For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:1ApplicationslForms- Applications On Line12012 Applications\Permit Application Revised - 2- 7- 12.docx Revised. February 2012 bh Page 2 of 4 PERMIT APPLICATION NOTES - • Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWN R OR AUTHORIZED AGENT: Signature:f� P C�, Date: 2 /ZS /// 20/Z Print Name: C A .5.-E ST7A./S at. .x-A.,( Day Telephone: -BUG - 4'2 3 - 8 �/ Mailing Address: /STS- Sum /S-2 57- H:\Applications\Forms- Applications On Line \2012 Applications\Permit Application Revised - 2- 7- 12.docx Revised: February 2012 bh , .)/L 9r/6-/ City State Zip Page 4 of 4 Scope of Work (please provide detailed information): la ir- M 1 C vF F ,3ti /JP F X i S pAY ir r-A C /ZOO l< 7z iA 64_4,,,,s_ S' On S /1F,Ti( Call before you Dig: 811 Please refer to Public Works Bulletin #1 for fees and estimate shee Wat r District Tukwila Water Availability Provided ver District .. Tukwila ❑ ...Val View ❑ ... Renton .. Sewer Use Certificate ❑ ...Sewer : vailability Provided .Water District #125 ❑... Highline Se Septic System: ❑ On -site Septic System — For on -site septic sys , provide 2 copies of a current -'.tic design approved by King County Health Department. ID .. nton 0... Seattle Su t miffed with A i ' Iica ion mark boxes . hich a Civil Plans (Maximum Paper Size — 22" x 34 ") ❑ .. Technical Information Report (Storm Drainage) ❑ .. Bond ❑... Insurance ❑... Easemen Proposed Activities (mark boxes that apply): ❑ .. Right -of -way Use - Nonprofit for less than 72 hours ... Right -of -way Use - Profit for less than 72 hours ❑ .. Right -of -way Use - No Disturbance \! ... Right -of -way Use — Potential Disturbance ❑ .. Construction/Excavation /Fill - Right -of -way ❑ Non Right -of -way ❑ ❑ .. Total Cut 0 cubic yards 0... Wo', in Flood Zone ❑ .. Total Fill Q cubic yards 0... Sto "' drainage ❑ .. Sanitary Side Sewer 0. Abandon Septic Tank 0... Grease Interceptor ❑ .. Cap or Remove Utilities /'... Curb Cut ❑ ... Channelization ❑ .. Frontage Improvements / ... Pavement Cut \ 0... Trench Excavation ❑ .. Traffic Control 0... Looped Fire Line '� 0... Utility Undergrounding ❑ .. Backflow Prevention - Fire Protectio Irrigation Domestic ; ater ❑ ... Gh technical Report ❑ .. Traffic Impact Analysis ❑.. aintenance Agreement(s) ❑ .. Hold Harmless — (SAO) ❑ .. Hold Harmless — (ROW) ❑ .. Permanent Water Meter Size WO # (2) " WO # (3) " WO # ❑ .. Temporary Water Meter Siz 1) " WO # (2) " WO # (3) " WO # ❑ .. Water Only Meter Size " WO # ❑ .. Deduct Water : ; r Size " ❑ .. Sewer Main Extension... Public ❑ Private ❑ ❑ .. Water Main Extension Public ❑ Private ❑ FINANCE INFORMAT Fire Line Size at Prop r Line Number of Public Fire Hydrant(s) ❑ .. Water ❑ .. Sewer ❑ .. Sewage Treatment Monthl Service lin: to: Name: f C A2/5- 570/ L Day Telephone: , �r Mailing Ad' ss: 4/20e S U U //6 <ST 7r 0 A 4lI s U/A- -- 9e/ cam City State Zip Water Meter Refund/Billing: Name: Mailing Address: Day Telephone: City State Zip H: 1ApplicationsTorms- Applications On Line \2012 Applications\Permit Application Revised - 2- 7- 12.docx Revised: February 2012 bh Page 3 of 4 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: / /www.TukwilaWA.gov Parcel No.: 3347400005 Address: 4208 S 116 ST TUKW Suite No: Applicant: KENT ENGINEERING RECEIPT Permit Number: D12-311 Status: PENDING Applied Date: 09/25/2012 Issue Date: Receipt No.: R12 -02697 Payment Amount: $559.07 lnitials: WER Payment Date: 09/25/2012 02:35 PM User ID: 1655 Balance: $0.00 Payee: FREDERICK LEE STENSON TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 03546C ACCOUNT ITEM LIST: Description 559.07 Account Code Current Pmts BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000.322.100 000.345.830 640.237.114 Total: $559.07 336.10 218.47 4.50 doc: Receipt -06 Printed: 09 -25 -2012 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 .(206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 b/ 2// Project: ke&rr EA/C. Type of Inspection: �Zn/#9 �. . Address: d20B S /i6 il Date Called: . Special Instructions: Date Wanted:. /g2 -3-/2` a. m. Requester: Phone No: 02 06- y2 3- -544z4 . Approved per applicable codes. Corrections required prior to approval. 1 • COMMENTS: ej k 1 �,�k4 �$PiP • Inspef i'or: Date: REINSPECTION FEE REQUIRED. Prior to next inspection.•fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call toschedule reinspection. . INSPECTION RECORD Retain a copy with permit, ?12,-.3t( INSPECTIO NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION (J 6300 Southcenter Blvd., #100, Tukwila. WA 98188 t t (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 'Y- Project A/I r4,' K ti f- TYPee Ins pection: `ev A Address: r t Date Cal1`ed: Special Instructions: ...... 61 `} - d Date Wanted:1. ! / /' ,, aim. — 0. 1 ,,,... P.m. Requester: Phone No- Approved per applicable codes. El'Corrections required prior to approval. COMMENTS: Inspec or: Date: l, °," REINSPECTION FEE REQUIRE e . Prior to next inspection. fee must be • paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. No a r „_ao' CO � - _ 1, y.og S I iCo 711 c: it 33H710 7s LOTS I.23 d— eh oc, ks REVISIONS No changes shall be made to the Kojate, t of work without prior approval or Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. r»,4M's ADo /r''(' REVIEWED FOR CODE COMPLIANCE APPROVED Pla review approval is subject to errors and omissions. vat of construction documents does not authorize t. ;L cation of any adopted code or ordinance. Receipt of app t'ved Feld Copy and conditions is ac nowledged: B /o/7/240/7 City Of 1Ukwila BUILDING DIVISION r -0 REPARATE PERMIT REQUIRED FOR: Mechanical Electrical Plumbing 41 co "At,/ of Tukwila ;? !G DIVISION, /37 °!" NF_w 200P T /LIS ■sa,A- e E - 7 7/20/Z �YFry OCT 0 City o BUILDIN 3 2012 I' kwila 'VISION 0 /ZooG Arz S //G i- A4 s r 31 I RECEIVED CITY OF TUKWILA SEP 2 5 2012 PERMIT CENTER NA= w U, 2F& A /1y 678eo PLy14,Od' y 5 / / EA- 7 W 71) 4 r" F -x isr-/d 4 a iL S /i /4 i" T- F' /t.l /; ` oe r /rA„ ft„,14 PS u ao /v2 /11 Ac- /Z eta /= Ai .0 F /- b ft x �t a Iti/4LLS �O f REVIEWED FOR CODE COMPLIANCE APPROVED OCT 03 2012 City of Tukwila BUILDING DIVISION r/2 / ' 6 bU '?L1 RECEIVED CITY OF TUKWILA SEP 2 5 2012 PERMIT CENTER SNAP -LO QUALITY METAL ROOFING REVIEWED FOR. CODE COMPLIANC APPROVED MANUFACTURED BY OCT 0 3 2012 City of Tukwila BUILDING D Of Washington, Inc.' INSTALLATION AND HANDLING MANUAL 11/8/2010 Of Washington, Inc. Snap -Loc Application: For ease of application, the Snap -Loc panel has a fastening leg designed into the panel. To apply the panels, all that is necessary is to align the panels with the eave edge and fasten, using galvanized bugle - head screws, spacing the screws about 18" to 24" along the fastening leg. To apply the remaining panels, simply snap the next panel in place and fasten as before. Note: Caution must be taken to insure that the panels are kept in square as they are applied. 30 Ib. felt should be applied prior to laying the panels. NOTE: Cutting. Steel roofing and trim should be cut with nibblers, tin snips or a profile shear. Although Champion Metal of WA. does not advocate the use of a saw, the reality is many people use a power saw in some manner. There are two concerns when using a saw. First, be sure that no burrs are left on the ends of the panel. The rough edges are not protected and will rust. Second, the filings coming off the blade are hot and will adhere to the surface of the panels and these will rust. Be sure all filings are removed from the surface as they will rust and pit the surface of the sheet. 3 Of Washington, Inc. UNDERLAYMENT Snap -Loc roofing can span up to 2 foot on center, and still fall within most loading requirements. We at Champion Metal of Washington recommend that Snap -Loc be installed on a solid underlayment. The building owner will be happier with the application for three main reasons: 1. AESTHETICS: A standing seam roof system tends to telegraph whatever the underlayment is. Although "oil canning" with steel cannot be 100% eliminated, a flat underlayment will greatly reduce the possibility. 2. SOUND: It makes sense that if steel roofing is applied onto a solid surface, there will be no dead air space for the sound of rain to reverberate. You should not have a "noisy metal roof ", if it is applied on a solid surface. 3. MAINTENANCE: A solid underlayment makes it much easier to walk on your roof without worrying about denting the product where you step. With Snap -Loc, you have no exposed fasteners to know where your supports would be if using purlins. Note: Heavy snow Toads and freezing conditions require specific unique applications. See the next page regarding this as well as consulting your distributor. 4 Co Washington, Inc. Shed Metal * TSLSM Gable Trim 1" TSLGT r This is simply a ridge cap for a single - sloped roof. Install the roof panels. You may want to bend them up underneath to block water. You may also want to use matching closure strips to help seal under the cap. After the gable trim is applied, place the shed metal on top and notch out the 1W return so that the ridge sits down flush with the pan of the panel. A notching tool should be available from your distributor. Fasten the cap down from behind, into the wall, using an exposed painted trim fastener. You may also wish to fasten the cap into the top of the panel ribs with the same exposed painted trim fastener. The gable trim is applied on top of the panel over the rib before the ridge cap is applied. It is fastened to the fascia board with exposed painted trim fasteners. As shown in the diagram, if a rib does not fall flush with the gable edge, you must make an artificial rib by cutting the panel vertically 1" wider than the building and bending it up to form a rib. 8 of Washington, Inc. wWw. championtneta 1. com Compensating Gable Trim TSLCG -- n Use the same application procedures as the standard Snap -Loc gable trim on the previous page. This is generally used to compensate for a building that is not in square or is slightly wider than the panels. Note: We recommend using this type of gable trim if you are a first - time installer. G -Gable TSLGG -- -m. n 1n" 2-1/4" 1ft hem 1 -1 /4" 1n" in " hem � Sidelap tape When installing this gable trim, it is recommended that you apply sidelap tape under the fastening flange as shown. This is to prevent water from seeping under the gable trim. Flared Gable Trim TSLFG -- 1 -::2 A �� / A This gable trim is designed for use on a prow -type roof where the ridge is wider than the eave. It is applied the same way as W- Valley. It is basically half of a valley. When installing the panels, run a bead of Pro -Seal 346 down under the panels below the screws as illustrated. Be sure to back the ribs of the panels off about 4 to 6 inches from the upturned edge to allow water and debris to drain off the roof and not accumulate. Note: When a very steep pitch is involved, the large distance between ribs can present complications. Some installers cut the panels, eliminating the ribs, and leaving an inch of the flat pan extra. They then fold the inch of flat pan under, giving rigidity to the edge of the panel. By creating a "back hem ", you will find that the panel will lay flatter and you will now have a straight line up the flared gable that will be visible. 9 4 Of Washington, Inc. %tiww.ohnmpinr;ntetal c;nm STORAGE All bundles of Snap -Loc and accessories should be stored in such a manner as to prevent moisture from damaging the surface finish of the metal. This is easily accomplished by raising one end of the bundle allowing any moisture inside of the bundle to escape from the ends. The bundle should then be covered with a waterproof tarp as a final precautionary measure. It is important to wipe the water from the panels if they become wet and allow them to air dry. The air should be allowed to circulate through the loosely restacked bundles to dry them completely. Storing Snap -Loc panels in a wet condition can cause the deterioration of the panels. Raise one end to drain any moisture. l'-. " 00 Cover with tarp allowing air to circulate through the bundle. 23 • PEW CO y PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D12 -311 DATE: 09 -25 -12 PROJECT NAME: KENT ENGINEERING SITE ADDRESS: 4208 S 116 ST X Original Plan Submittal Response t� Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: � al V ktl' " / ,f�� a_ � l4 Building Division Fire Prevention ggi Planning Division Public Works ❑ Structural ❑ Permit Coordinator 1 DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 09-27 -12 Complete 11 Incomplete ❑ Comments: Not Applicable Permit CenterUse Only " INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route REVIEWER'S IN IN DATE: Structural Review Required ❑ No further Review Required APPROVALS OR CORRECTIONS: DUE DATE: 10 -25 -12 Approved ❑ Approved with Conditions ki Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28-02 Contractors or Tradespeople Peter Friendly Page • General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company F LEE STENSON INC 2062417738 155 Sw 152 Nd Street UNIT A Seattle WA 98166 King Corporation UBI No. 601036362 Status Active License No. FLEESI•122CA License Type Construction Contractor Effective Date 2/1/1988 Expiration Date 3/7/2013 Suspend Date Specialty 1 General Specialty 2 Unused ther Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status SHEPPCR088MG SHEPPARD CONST & RMDLNG INC Construction Contractor Carpentry/Framing Siding 7/7/1992 7/1/1996 Archived SWIIN "081CJ S W I INC Construction Contractor General Unused 2/11/1992 2/10/1995 Archived STENSWI122DA STENSON WHITESPAR INC Construction Contractor General Unused 3/1/1988 2/10/1992 Archived STENSFL162CB STENSON, F LEE Construction Contractor General Unused 2/2/1984 1/25/1988 Archived Business Owner Information Name Role Effective Date Expiration Date STENSON, FREDERICK LEE President 02/01/1988 Amount STENSON, CHARLENE 17 01/01/1980 01/01/1980 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 5 CBIC 638940 01/25/2002 Until Cancelled $12,000.00 01/22/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 17 CBIC C11638940 05/15/2007 05/15/2013 $1,000,000.00 04 /15/2011 16 PRAETORIAN INS CO HFP200125400 05/15/2007 05/15/2008 $1,000,000.00 04 /23/2007 15 INSURANCE CORP OF HANNOVER H86FP1689903 05/15/2006 05/15/2007 $1,000,000.00 03/20/2006 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period Infractions /Citations Information No records found for the previous 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 10/09/2012