Loading...
HomeMy WebLinkAboutPermit D12-351 - BOEING #9-59 - IMPROVEMENTBOEING #9 -59 9725 EAST MARGINAL WY S D12 -351 Parcel No.: Address: Suite No: City oftukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: htto://www.TukwilaWA.gov DEVELOPMENT PERMIT 0003400018 9725 EAST MARGINAL WY S TUKW Project Name: BOEING #9 -59 Permit Number: Issue Date: Permit Expires On: D12 -351 12/13/2012 06/02/2013 Owner: Name: BOEING COMPANY THE Address: PROPERTY TAX DEPT , PO BOX 3707 M/C 20 -00 98124 Contact Person: Name: JOHN MURDOCH Address: PO BOX 3707 M/C 89 -14 , SEATTLE WA 98124 Contractor: Name: Address: BOEING COMPANY, THE 100 N RIVERSIDE, M/C 5003 -4027 , CHICAGO IL 60606 -1596 Contractor License No: BOEINC *294ML Expiration Date: 01/18/2013 Phone: 253 - 657 -0868 Phone: 312 544 -2535 Lender: Name: SELF FUNDED - BOEING Address: DESCRIPTION OF WORK: BLANKET PERMIT - REARRANGE EXISTING MEDICAL CLINIC TO OFFICE SPACE, INCLUDING REMOVAL AND MODIFICATION TO EXISTING NON - BEARING PARTITIONS, RELOCATION OF LIGHTING .AND HVAC GRILLES AND DIFFUSERS. IN-FILL OF EXISTING EXTERIOR GLAZING WITH INSULATED METAL PANELS FOR SECURITY PURPOSES. Value of Construction: $120,000.00 Type of Fire Protection: AFA Type of Construction: II -B Electrical Service Provided by: SEATTLE CITY LIGHT Fees Collected: International Building Code Edition: Occupancy per IBC: $2,705.39 2009 0008 * *continued on next page ** doc: IBC -7/10 D12 -351 Printed: 12 -13 -2012 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: N Number: 0 Size (Inches): 0 Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature: Date: 1 )--.1 J` K I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The gran f this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construc • r the - rformance of work. I am authorized to sign and obtain this development permit and agree to the conditions attached to this pe /� Signatur s''" 1 ru Print Name: it)w#f 6: Ajoave/ / C '/ �Z Date: 13 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). doc: IBC -7/10 D12 -351 Printed: 12 -13 -2012 7: All electrical work shall be inspected annproved under a separate permit issued by tlibity of Thkwila Building Department (206- 431 - 3670). 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ** *FIRE DEPARTMENT CONDITIONS * ** 10: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 11: The total number of fire extinguishers required for a light hazard occupancy with Class A fire hazards is calculated al- one extinguisher for each 3,000 sq. ft. of area. The extinguisher(s) should be of the "all purpose" (2A, 10 B:C) dry chemical type. The travel distance to any extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 3 -2.1) 12: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand -held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand -held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 13: Fire extinguishers shall not be obstructed or obscured from view. In rooms or areas in which visual obstruction cannot be completely avoided, means shall be provided to indicate the locations of the extinguishers. (IFC 906.6) 14: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 15: Fire extinguishers require monthly and yearly inspections. They must have a tag or label securely attached that indicates the month and year that the inspection was performed and shall identify the company or person performing the service. Every six years stored pressure extinguishers shall be emptied and subjected to the applicable recharge procedures. If the required monthly and yearly inspections of the fire extinguisher(s) are not accomplished or the inspection tag is not completed, a reputable fire extinguisher service company will be required to conduct these required surveys. (NFPA 10, 4 -3, 4 -4) 16: Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (IFC 1008.1.8.3 subsection 2.2) 17: Dead bolts are not allowed on auxiliary exit doors unless the dead bolt is automatically retracted when the door handle is engaged from inside the tenant space. (IFC Chapter 10) 18: Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. (IFC 1008.1.8.1) 19: Exit hardware and marking shall meet the requirements of the International Fire Code. (IFC Chapter 10) 20: Aisles leading to required exits shall be provided from all portions of the building and the required width of the aisles shall be unobstructed. (IFC 1013.4) 21: A fire alarm system is required for this project. The fire alarm system shall meet the requirements of N.F.P.A. 72 and City Ordinance #2328. 22: Maintain square foot coverage of detectors per manufacturer's specifications in all areas including: closets, elevator shafts, top of stairwells, etc. (NFPA 72- 5.5.2.1) 23: Maintain automatic fire detector coverage per N.F.P.A. 72. Addition/relocation of walls, closets or partitions may require relocating and/or adding automatic fire detectors. 24: An approved manual fire alarm system including audible /visual devices and manual pull stations is required for this project. The fire alarm system shall meet the requirements of Americans With Disabilities' Act (I.B.C.), N.F.P.A. 72 and the City of Tukwila Ordinance #2328. 25: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2328) (EEC doc: IBC -7/10 D12 -351 Printed: 12 -13 -2012 104.2) 26: An electrical permit from the City of Tukw i a Building Department Permit Center (206 - 431' 3670) is required for this project. 27: The maximum flame spread class of finish materials used on interior walls and ceilings shall not exceed that set forth in Table No. 803.5 of the International Building Code. 28: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 29: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 30: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: IBC -7/10 D12 -351 Printed: 12 -13 -2012 • CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http: / /www.TukwtlaWi- ..ov Building Permit No. Blanket Permit No. IDI2 -3.- Date Application Accepted: Date Application Expires: (For office use only) BLANKET PERMIT TENANT IMPROVEMENT APPLICATION * *Please Print ** FEES: For office use only Existing (square feet) Amount Receipt No. Date Building Permit Fee $ 163‘. 6o 1298 950 Plan Review Fee $ 1 O 4-"s-if Office 2 °d Floor State Building Surcharge $ 4.50 Total $ 2_10 S - N11 9-' 0)-�� r% 10- 30-12 SITE INFORMATION: Valuation of Construction: $ 120,000 9725 East Marginal Way So. The Boeing Company Site Address: Tenant Name: King Co Assessor's Tax No.: Suite Number: 9 -59 Floor: 1 Description of work: Rearrange Existing Medical Clinic to Office Space, including Removal and Modifications to existing non- bearing Partitions, relocation of Lighting and HVAC Grilles and Diffusers. In fill of existing Exterior Glazing with Insulated Metal Panels for Security purposes. Per the International Building Code — 2009 Edition 1. Will there be any structural work? ❑ Yes i No If yes, please describe: 2. Will there be new rack storage? 3. Will there be a change in use? If yes, please explain: ❑ Yes No If yes. a separate permit and plan submittal will be required. ❑ Yes ® No 4. Existing fire protection: ❑ Sprinklers 0 ....Automatic Fire Alarm ❑ .... None 5. Will there be storage or use of flammable, combustible or hazardous materials in the building? If yes. please explain: H2Apphcations■Fornu- Applications On Line\201 1 Applicat o \Blanket Perm i TI Application - 10 -201 I.docs Revised October 2011 hh ❑ Yes 0 No Page 1 of 3 Existing (square feet) Construction Area (square feet) Type of Construction per IBC Type of Occupancy per IBC Building Use 1u Floor 1298 950 II -B B Office 2 °d Floor 3`d Floor Floors thru 1. Will there be any structural work? ❑ Yes i No If yes, please describe: 2. Will there be new rack storage? 3. Will there be a change in use? If yes, please explain: ❑ Yes No If yes. a separate permit and plan submittal will be required. ❑ Yes ® No 4. Existing fire protection: ❑ Sprinklers 0 ....Automatic Fire Alarm ❑ .... None 5. Will there be storage or use of flammable, combustible or hazardous materials in the building? If yes. please explain: H2Apphcations■Fornu- Applications On Line\201 1 Applicat o \Blanket Perm i TI Application - 10 -201 I.docs Revised October 2011 hh ❑ Yes 0 No Page 1 of 3 PROPERTY OWNER Name: The Boeing Company - John S. Murdoch Address: P.O. Box 3707 M/C 89 -14 City: Seattle State: WA Zip: 98124 CONTACT PERSON — person receiving all project communication Name: John S. Murdoch Company Name: The Boeing Company Address: P.O. Box 3707 M/C 89 -14 City: Seattle State: WA Zip: 98124 Phone: (253) 657 -0868 Fax: (253) 657 -0858 Email: ARCHITECT OF RECORD Company Name: The Boeing Company Name: Eric Cranston Company Name: Rolluda Architects Zip' 98124 Address: 105 So Main St. Suite 323 City: Seattle State: WA Zip: 98104 Phone: (206) 624 -4$22 Fax: (206) 624 -4226 Email: eric @rolludaarchitects.com GENERAL CONTRACTOR INFORMATION Company Name: The Boeing Company Address: P.O. Box 3707 M/C 89 -14 City: Seattle State: WA Zip' 98124 Phone: (253) 657 -0868 Fax: (253) 657 -0858 Contr Reg No.: BOEINC *294ML Exp Date: 01/18/2013 Tukwila Business License No.: LENDERBOND ISSUED (required for projects $5,000 or greater per RCW 19.27.095) Name: The Boeing Company Address: P.O. Box 3707 M/C 89 -14 City: Seattle State: WA Zip: 98 124 I hereby certify that I have read and examined this application and know the same to be true and correct, and I am authorized under Blanket Perm A• eemet rhlo. 12- 001 -BPA to apply for and obtain this permit. Signature: Print Name: Organization: Mailing Address: John S. Murdoch Boeing Site Services Gi" 6 i Date: 10/30/2012 P.O. Box 3707 M/C 89 -14 Day Telephone: (253) 657 -0868 Seattle WA 98124 H: %Applical Ions.Fornn -Appl ical ions On Lmrll.111 Applicat tonstBtanket Permit TI Application - 10- 2011.docs Revi cd: October 2011 bh City state Zip Page 2 of 3 General Information This tenant improvement application may be submitted for non - structural interior construction, which is authorized under an existing approved blanket permit agreement. It is the responsibility of the applicant to be aware and comply with all the terms and conditions as set forth in the agreement. The work is limited to that shown on the plans submitted with this application, and such work is limited to non - structural interior construction only. The following work is not covered under the blanket permit process and separate approvals, permits and inspections are obtained through the applicable agencies. Mechanical Electrical Plumbing / Gas Piping Rack Storage Fire Alarm Fire Sprinklers City of Tukwila Building Department 206 -431 -3670 I City of Tukwila Fire Department 206 -575 -4404 Building Permit Application Application Submittal — Application and plans must be complete in order to be accepted for plan review. Make sure to fill out the application completely and follow the plan submittal checklist below. Handouts are available at the Permit Center which provide more in -depth detail on preparing the submittal. Authorized Agent — The applicant must be an authorized agent as identified in the Blanket Permit. Fees — The permit fees are based on valuation of construction as declared by the applicant on the application, and shall include all the work to be covered under the permit. The valuation will be reviewed and is subject to revision by the Building Official to ensure compliance with current fee schedules. To obtain a permit fee estimate, contact the Permit Center at 206 -431 -3670. Submittal Checklist 0 Completed Blanket Permit Tenant Improvement Permit Application Completed Architects Statement Three (3) sets of construction drawings; which include: 0 0 0 0 Site plan showing: Building location on property; Adjoining public rights -of -way; Parking layout; Location of tenant space or area of work within building; Overall dimensions of building; Overall dimensions of tenant space, or area of work; and - Nanie of each common wall tenant(s) and type of business or occupancy. Floor plan of entire floor or tenant space that the work is taking place, showing: Tenant space layout with use of each room labeled; All exit doors, corridors and egress patterns; All new walls, existing walls and proposed walls (provide construction key); and - All other proposed construction. Constniction details Construction key; Cross sections showing wall construction and method of attachment, floor and ceiling; and Reflected ceiling plan (if applicable). Miscellaneous 6" x 8" blank space provided on lower right hand corner of each page of plans (for use by the plan checker); Title block on each sheet, identifying; Project name Company job number (if applicable) Site address Blanket permit agreement number Architect, address and phone number Each sheet of plans stamped by a Washington State licensed architect; Minimum sheet size 18" x 24"; and Plans must be drawn to scale and clearly dimensioned drawings shall be prints which are clearly readable (original pencil or highlighted drawings are not acceptable). ❑ Permit Fees (plan review fee, building permit fee and state building surcharge) HAApplicatinns \Forms- Applications On 1 ine';2111 I Applications \Blanket Permn TI Application - 10-2011 docu Revised: October 2011 bh Page 3 of 3 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: hyp: //www.ci.tukwila.wa.us BLANKET PERMIT AGREEMENT — Architects Statement Plan Review No.: Blanket Permit Agreement No.: /2 —ON— BM Project Name: p7 ~ S0 Ei,4rpY75Q. ��eur, Site Address: 1726 E 425 ynat a)d y / knoigl T KtNl /a WA- 71Ic$ Is any part of the work proposed under this application include ❑ Yes tA No structural work or affect structural components of the building? If yes, has the structural work been authorized by the Tukwila ❑ Yes ❑ No Building Official to be included in this application? Does the proposed work comply with the requirements of 1g, Yes ❑ No the International Building Code (2009 Edition) Chapter 10, Means of Egress? If no, please explain: Will any special inspections be required per Chapter 17 ❑ Yes in the International Building Code (2009 Edition)? No If yes, list specific inspections: As a result of this proposal, does the parking meet the la Yes ❑ No requirements of the Tukwila Zoning Code? If no, please explain deficiency: Signatu _ �r! Print Name: CYY e Organization: Mailing Address: /OS S. / `K A' Q 101 j Sub l 323 5 ARCHITECT/ENGINEER STAMP AND SIGNATURE 6604 STER ARC ..ITEC ERIC CRANSTON STATE OF WASHINGTON 0.11.1,Oi Z. H: Applkation Wormy- Applketinna On Line \2010 Applkation28 -20l() 812nIte Permit Architect Stntensnt.dnc Created: 12 -2008 Revised: 8 -2010 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 0003400018 Permit Number: D12-351 Address: 9725 EAST MARGINAL WY S TUKW Status: PENDING Suite No: Applied Date: 10/30/2012 Applicant: BOEING #9 -59 Issue Date: Receipt No.: R12 -02997 Payment Amount: $2,705.39 Initials: WER Payment Date: 10/30/2012 09:17 AM User ID: 1655 Balance: $0.00 Payee: JOHN S MURDOCH TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd MC Authorization No. 087098 ACCOUNT ITEM LIST: Description 2,705.39 Account Code Current Pmts BUILDING - NONRES PLAN CHECK - NONRES STATE BUILDING SURCHARGE 000.322.100 000.345.830 640.237.114 Total: $2,705.39 1,636.90 1,063.99 4.50 ring. RACaint -f1R Printari• 1f1- 3f1 -9M9 • • INSPECTION RECORD Retain a copy with permit (pit `I{ INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 We_ (206) 431 -367 Permit Inspection Request Line (206) 431 -2451 Proje ^" ^-0 lr -s Ad eint L +rVG: a- Special Instructions: Typ9,,of Inspectipn: JI Date-Called: Date Wanted: . ` Requester: Phone No: Approved per applicable codes. 0 Corrections required prior to approval. COMMENTS: ()f' ( t Ci>JrL D'e — 1 Inspttor: „/ Date: ri REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 K. (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 INSPECTION RECORD Retain a copy with permit J7i a.-3 C I PERMIT NO. j ,IA Pro1ec -e..f q _ 59 Nirg TYPolnsiec�tigr 4. Address: gr72 -5 f. IAJc -* v Date Called: j ,.�`.,�. tJ( • . . - Special Instructions: 3.2_4 Date Wanted:. +".a,m„ n. Requester: Pho a No: n if DApproved per applicable codes. El Corrections required prior to approval. ,/ • �'—" f 17_ inikif COMMENTS: - 1) -- 1 60 1-() r or-- us \-t \ mss, ID K— < A -rte if -- a t \ Inspector: Date: REINSPECTION FEE REQUIRED. Prior to •next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. L INSPECTION RECORD Retain a copy with permit 1N2- 3S INSPECTIO N0. PERMIT NO.� CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (2t) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: Type_ of Inspection: Address: . -12 E i \Ac- �_ v,irl_L Date Called: Special Instructions: Date Wanted:. i1 t %117 P.m. Requester Phone No: 0253-3/0 - S2 7 Approved per applicable codes. EJCorrections required prior to approval. I COMMENTS: Inspec Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. 2009 Washington State Energ Code Compliance Form for Nonresidential and Multifamil Residential Interior Lighting Summary LTG -INT 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised December 2010 Project Info Project Address Boeing Building 9 -059 - Security Relocation Date 10/17/2012 9725 Bast marginal Stay South For Building Department Use r r. P^, rim) t� i Tukwila, 501 98108 Applicant Name: Kazan Group: ApptcantAddress: 600 Stewart Street, #1400, Seattle, WA 98101 ApptcantPhone: 206- 267 -1700 Project Description 1sT FLOOR • New Building • Addition Alteration • Plans Included Refer to WSEC Section 1513 for controls and commissioning requirements. Compliance Option 0 Prescriptive 1 Lighting Power Allowance 0 Systems Analysis (See Qualification Checklist (over). Indicate Prescriptive & LPA spaces dearly on plans.) Alteration Exceptions (check appropriate box- sec. 1132.3) 1.2 0 not charged • No changes are being made to the lighting and space use less than 60% of the fixtures new, installed wattage not increased, & space use not changed. Maximum Allowed Lighting Wattage Location (floor plan/room #) Occupancy Description Allowed Watts per ft2 " gross 'manor Area in ft Allowed x Area 1sT FLOOR CONFERENCE ROOM 0.95 303 288 1sT FLOOR OPEN OFFICE 0.91 648 5 9 0 1ST FLOOR KITCHEN 1.2 0 48 58 " From Table 15 -1 (over) - document aA exceptions on form LTG -LPA Proposed Lighting Wattage Total Allowed Watts 935 Location (floor plan/room #) Fixture Description Number of Fixtures Watts/ Fixture Watts Proposed 1ST FLOOR A: (2) F3218 6 64 384 1ST FLOOR Al: (2) F32111 3 64 192 1ST FLOOR A2: (2) P3218 4 64 256 1ST FLOOR J: LED EXIT SIGN 1 4 4 Total Proposed Watts may not exceed Total Allowed Watts for Interior Total Proposed Watts 836 Notes: 1. For proposed Fixture Description, indicate fixture type, lamp type (e.g. T-8), number of lamps in the fixture, and ballast type (if included). For track lighting, list the length of the track (in feet) in addition to the fixture, lamp, and ballast information. 2. For proposed Watts/Fixture, use manufacturer's listed maximum input wattage of the fixture (not simply the lamp wattage) and ... rfied in Section 1530. For line voltage track lighting, list the greater of actual luminaire wattage or length of REVIE..: .� by 5J, or as applicable, the wattage of current limiting devices or of the transformer. For low voltage track CODE�� bmrer rated wattage. CODE C s^ = ! car exempt lighting, note section and exception number, and leave Watts/Fixture blank. APPROVED DEC 05 2012 • City of Tukwila BUILDING DIVISION CITY OFrTUKWIL A DEC .0.3 2012 PERMIT CENTER CORRECTION LTR# . Di2 � 2009 Washington State Energ Code Compliance Form for Nonresidential and Multifamily Residential Interior Lighting Summary (back) LTG -INT 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised December 2010 Prescriptive Spaces Occupancy 0 Warehouse or Parking Garage • Other Qualification Checklist Note: If occupancy type is "Other and fixture answer is checked, the number of fixtures in the space is not limited by Code. Clearly indicate these spaces on plans. If not qualified, do LPA Calculations. Lighting Fixtures: (Section 1521) 0.85 • Check if 95% or more of fixtures comply with 1,2 or 3 and rest are ballasted. 1. Fluorescent fixtures with a) 1 or 2 two lamps, b) reflector or louvers, c) 5-60 watt T -1, T -2, T -4, T -5, T-8, or CFL lamps, and d) hard -wired electronic dimming ballasts. Screw -in CFL fixtures and tracking lighting do not qualify. 2. Metal Halide with a) reflector b) ceramic MH lamps < =150w c) electronic ballasts 3. LED fights. TABLE 15 -1 Unit Liahtina Power Allowance (LPA Use' LPA` (W/ft`) Use' LPA` (W /H`) Automotive facility 0.85 Office buildings, office/administrative areas in facilities of other use types (including but not limited to schools, hospitals, institutions, museums, banks, churches)5 0.91 Convention center 1.10 Parking garages 0.20 Courthouse 1.10 Penitentiary and other Group 1 -3 Occupancies 0.90 Cafeterias, fast food establishments5, restaurants/bars5 1.20 Police and fire stations 0.90 Dormitory 0.85 Post office 1.00 Dweling Units 1.00 Retail70, retail banking, mall concourses, wholesale stores (pallet rack shelving) 1.33 Exercise center 0.95 School buildings (Group E Occupancy only), school classrooms, day care centers 1.00 Gymnasia, assembly spaces 0.95 Theater, motion picture 0.97 Health care clinic 1.00 Theater, performing arts 1.25 Hospital, nursing homes, and other Group 1 -1 and 1 -2 Occupancies 1.20 Transportation 0.80 Hotel /motel 1.00 Warehouses 0.50 Laboratory spaces (all spaces not classified 'laboratory' shall meet office and other appropriate categories) 1.62 Workshops 1.20 Laundries 1.20 Libraries° 1.20 Plans Submitted for Common Areas Only' Manufacturing facility 1.20 Main floor building lobbies' (except mall concourses) 1.10 Museum 1.00 Common areas, corridors, toilet facilities and washrooms, elevator lobbies 0.80 Footnotes for Table 15 -1 1) In cases in which a general use and a specific use are listed, the specific use shall apply. In cases in which a use is not mentioned specifically, the Unit Power Allowance shall be determined by the building official. This determination shall be based upon the most comparable use specified in the table. See Section 1512 for exempt areas. 2) The watts per square foot may be increased, by 2% per foot of ceiling height above 20 feet unless specifically directed otherwise by subsequent footnotes. 3) Watts per square foot of room may be increased by 2% per foot of ceiling height above 12 feet. 4) For all other spaces, such as seating and common areas, use the Unit Light Power Allowance for assembly. 5) Watts per square foot of room may be increased by 2% per foot of ceiling height above 9 feet. 6) Reserved. 7) For conference rooms and offices less than 150ft2 with full height partitions, a Unit Lighting Power Allowance of 1.1 w/ft2 may be used. 8) Reserved. 9) For indoor sport tournament courts with adjacent spectator seating over 5,000, the Unit Lighting Power Allowance for the court area is 2.60 W/ft2. 10) Display window illumination installed within 2 feet of the window, provided that the display window is separated from the retail space by walls or at least three - quarter - height partitions (transparent or opaque) and lighting for free- standing display where the lighting moves with the display are exempt An additional lighting power allowance is allowed for merchandise display luminaires installed in retail sales areas that are specifically designed and directed to highlight merchandise. The following additional wattages apply: i. 0.6 watts per square foot of sales floor area not listed in items ii and iii below; ii. 1.4 watts per square foot of furniture, dothing, cosmetics or artwork floor area; or iii. 2.5 watts per square foot of jewelry, crystal or china floor area The specified floor area for items i, ii, or iii above, and the adjoining circulation paths shall be identified and spedfied on building plans Calculate the additional power allowance by multiplying the above LPOs by the sales floor area for each department excluding major circulation paths. The total additional lighting power allowance is the sum of allowances for sales categories I, ii, or iii plus an additional 1,000 watts for each separate tenant larger than 250 square feet in area The additional wattage is allowed only if the merchandise display luminaires comply with all of the following: (a) Located on ceiling - mounted track or directly on or recessed into the ceiling itself (not on the wall). (b) Adjustable in both the horizontal and vertical axes (vertical axis only is acceptable for fluorescent and other fixtures with two points of track attachment). This additional lighting power is allowed only if the lighting is actually installed and automatically controlled, separately from the general lighting, to be tumed off during nonbusiness hours. This additional power shall be used only for the specified luminaires and shall not be used for any other purpose. rolluda architects architecture planning interior design 105 South Main Street, Suite 323 • Seattle, Washington 98104 • 206.62 4222 (p) • 206.624.4226 (f) info @rolludaarchitecrs.com (e) • www.rolludaarchitects.com (w) John, To summarize my phone call with you earlier, when at the permit intake this morning, I incorrectly stated that we were upgrading the lighting for the Enterprise Security Remodel, when in fact, we are only relocating existing fixtures, and in some cases removing the middle lamp from 3 -lamp fixtures. In addition, we are placing insulated metal sandwich panels over existing plate glass exterior windows for the purpose of upgraded security and privacy. These panels will provide an additional R -14 at these existing windows. Apologies for the confusion. Please do not hesitate to contact me if you need anything else or have any questions. Thanks, Eric Cranston, Principal Rolluda Architects 206.427.1942 cell bt/-3s--) RECEIVED CITY OF TUKWILA OCT 3 0 2012 PERMIT CENTER • City •f Tip Jim Haggerton, Mayor Department of Community Development Jack Pace, Director November 6, 2012 John S Murdoch The Boeing Company PO Box 3707 M/C 89 -14 Seattle, WA 98124 RE: Correction Letter #1 Development Permit Application Number D12 -351 Boeing #9 -59 — 9725 East Marginal Wy S Dear Mr. Murdoch, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building, Fire, and Public Works Departments. At this time the Planning Department has no comments. Building Department: Dave Larson at 206 431 -3678 if you have questions regarding the attached comments. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that four (4) sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206) 431 -3670. Sincerely, )A>T4 Bill Rambo Permit Technician encl File No. D12 -351 W:\Pennit Center \Correction Letters \2012\D12 -35I Correction Letter 111.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Tukwila Building Division Dave Larson, Senior Plan Examiner Building Division Review Memo Date: November 5, 2012 Project Name: Boeing #9 -59 Permit # D12 -351 Plan Review: Dave Larson, Senior Plans Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and /or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculation sheets shall be stamped and signed. 1. A letter was provided that states that existing lighting will be relocated. Notes on the plans say "Relocate /replace existing light fixtures per electrical sheets this set." These electrical sheets were not included with this permit application and the sheets relative to lighting changes should be added. The index of drawings on the cover sheet should include only the pages provided with this application. Please revise notes on plans to match the letter provided and complete a Washington State Energy Code Interior lighting Budget form. If less than 60% of the fixtures are new and the installed wattage is not increased and the use of the space has not changed, you may check the box under Alteration Exceptions. Should there be questions concerning the above information please contact the Building Division at 206- 431 -3670. I'EMiT COORD COPY. PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D12 -351 DATE: 12/03/12 PROJECT NAME: BOEING #9 -59 SITE ADDRESS: 9725 EAST MARGINAL WY S Original Plan Submittal X Response to Correction Letter # 1 Response to Incomplete Letter # Revision # after Permit Issued DEPARTMENTS: Building Division Public Works Fire Prevention Structural Planning Division El ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete ist- Incomplete ❑ DUE DATE: 12/04/12 Not Applicable ❑ Comments: Permit Center Use�Only , "' " id`s r" INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route 112 Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ DUE DATE: 01/01/13 Approved with Conditions Er Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: • Permit`'GeriteUse�Only; :i' A' " '' • CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: • • PE'' CO `!` COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D12 -351 DATE: 10 -30 -12 PROJECT NAME: BOEING #9 -59 SITE ADDRESS: 9725 EAST MARGINAL WY S X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENT Ar E12' ding Division Public Works 1 4'llt\ Vf i — —1'L ire Prevention Structural ❑ Planning Division Permit Coordinator n DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11 -01 -12 Complete Incomplete ❑ Not Applicable ❑ Comments: Permit Center:Use Only ;;; ': INCOMPLETE LETTER MAILED' AILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route 1* Structural Review Required n No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: DATE: n DUE DATE: 11 -29 -12 Not Approved (attach comments) yr Permit Center Use 9n.Y ; CORRECTION LETTER MAILED: Departments issued corrections: Bldg, Fire ❑ Ping ❑ PW ❑ Staff Initials: (A( Documents/routing slip.doc 2 -28 -02 City of Tukwila Department of Community .Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206- 431 -3670 Fax: 206-431-3665 Web site: http.://mcw.ci.tuk-wi/a.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: Plan Check/Permit Number: D1.2-351 ❑ Response to Incomplete Letter # Response to Correction Letter # 1 ❑ Revision # after Permit is Issued (1 Revision requested by a City Building Inspector or Plans Examiner Project Name: Boeing #9 -59 Project Address: 9725 East Marginal Wy S Contact Person: (30,6 VI rdO(t] Phone Number: 2S3. 1D l . __ Summary of Revision: Fevlsed Y)crle, t2 on silee 's Ih29oR and IA28b ;corn Lig_e_loccaelircptace, exts-_b.v l -R./Axes per eteciv.rmLeilegt5 " eloc to -R,bures Per eleckica.l sheets ded_ _ . I £(ate ee. 0470 eiveDrukvinu 1DEC 0310121 Sheet Numberts): 1A ?. , E OR 1E10 "Cloud" or highlight all areas of revision including date of revision Rrccived at the: ( -it% Tukwila Permit ('ent r hy: Entered in Permits Plus on 12 7 applt.:ttton: _t rni rl ,eft, a -, .t rrai_d Contractors or Tradespeople Prj�ter Friendly Page • General /Specialty Contractor A business registered as a construction contractor with LEI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company BOEING COMPANY, THE 3125442535 100 N Riverside M/C 5003 -4027 Chicago IL 606061596 Out Of State Corporation UBI No. 178005030 Status Active License No. B0EINC'294ML License Type Construction Contractor Effective Date 7/13/1971 Expiration Date 1/18/2013 Suspend Date Specialty 1 General Specialty 2 Unused Business Owner Information Name Role Effective Date Expiration Date SHRONTZ, F A Cancel Date 01/01/1980 Amount CONDIT, P M 25 01/01/1980 HDOG27012905 GIVAN, B E 10/01/2013 01/01/1980 WOODARD, R B 10/02/2012 01/01/1980 Ace American Insurance Company CRUZE, D D 10/01/2011 01/01/1980 KING, C G $10,000,000.00 01/01/1980 23 BEIGHLE, D P HDOG25520051 01/01/1980 10/01/2011 COLLINS, T J 01/01/1980 09/30/2010 BUDINICH, T M ACE AMERICAN INS CO 01/01/1980 10/01/2009 READ, PAUL Secretary 01/01/2001 $10,000,000.00 Bond Information Page 1 of 2 Bond 5 Bond Company Name FEDERAL INS CO Bond Account Number 81312466 Effective Date 01/01/2002 Expiration Date Until Cancelled Cancel Date Impaired Date Bond Amount Received Date $12,000.00 01/14/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 25 Ace American Insurance Company HDOG27012905 10/01/2012 10/01/2013 $10,000,000.00 10/02/2012 24 Ace American Insurance Company HDOG255200500 10/01/2011 10/01 /2012 $10,000,000.00 09/20/2011 23 ACE AMERICAN INS CO HDOG25520051 10/01/2010 10/01/2011 $10,000,000.00 09/30/2010 22 ACE AMERICAN INS CO HDOG24934780 10/01/2009 10/01/2010 $10,000,000.00 09/22/2009 21 ACE AMERICAN INS CO HDOG23732841 A 10/01/2007 10/01/2009 $5,000,000.00 09/26/2008 20 ACE AMERICAN INS CO HDOG21734378 10/01/2006 10/01/2007 $5,000,000.00 09/25/2006 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 12/13/2012 THE /117E7111/&" COMPANY SUPPORT SERVICES GROUP 9 -59 BUILDING - ENTERPRISE SECURITY REMODEL 9 -59 BUILDING PROJECT SITE FROM DOWNTOWN SEATTLE n 14 -01 BOEING DEVELOPMENTAL CENTER 9725 EAST MARGINAL WAY SOUTH TUKWILA, WASHINGTON 98108 CODE SUMMARY 900 TYPE OF APPLICATION: NEW ❑ ALTERATION ❑ ADDITION[] TENANT IMPROVEMENT PROJECT DESCRIPTION: RECONFIGURATION OF EXISTING MEDICAL LAB TO OFFICE SPACE FOR ENTERPRISE SECURITY. WORK INCLUDES REMOVAL AND CONSTRUCTION OF NON- BEARING INTERIOR PARTITIONS, RELOCATION OF LIGHTING AND HVAC DIFFUSERS AND GRILLES, INFILL OF EXISTING EXTERIOR GLAZING WITH INSULATED PANELS. CODES: 2009 INTERNATIONAL BUILDING CODE & WAC 51 -50 2009 INTERNATIONAL MECHANICAL CODE & WAC 51 -52 2009 INTERNATIONAL FIRE CODE & WAC 51 -54 CURRENT WASHINGTON STATE ENERGY CODE WAC 51 -11 CURRENT CITY OF TUKWILA ZONING ORDINANCES CONTRACTOR & STATE NUMBER. THE BOEING CO. BOEINC *294ML(OV2009) BOEING PROJECT ENGINEER: THOMAS HANSON AIA CO 206 - 947 -4880 BOEING CONTACT: JOHN MURDOCH FAX NUMBER: 253- 773 -0119 E -MAIL: ZONING: 99 EXIT 158 EXIT 157 99 EAST MARGINAL WAY CORPORATE PARK FROM SEATTLE— TACOMA AIRPORT 599 TUKWILA DEVELOPMENTAL CE \TER SYM REVISION BY FROM KENT & AUBURN APPROVED 900 NO SCALE DATE SYM REVISION PHONE: 253- 773 -0444 john.s.murdoch@boeinq.com OCCUPANCY GROUP: GROUP BI BUSINESS CONSTRUCTION TYPE: TYPE II -B ALLOWABLE AREA INCREASE. 60' SET —BACK (NO CHANGES) OCCUPANT LOAD: (ALLOWABLE) NO CHANGE FLOOR AREA: (ACTUAL) NO CHANGE (TABLE 10 —A) OFFICES 735 OCC. 9 BLDG GROSS 1,298 SF STORAGE OCC TUNNEL LABORATORY OCC FIRST FLOOR 1.298 SF CANOPY OCC. 1ST FLR MEZZ OTHER 268 OCC. 18 2ND FLOOR 2ND FLOOR ME77 PROJECT AREA 1,003 SF BUILDING HEIGHT: (ACTUAL) 13' -6" FT STORIES: 1 SQ FT SQ FT SQ FT SQ FT SQ FT SQ FT SQ FT MEZZANINE ? ❑ (YES) II (NO) SQ FT FIRE PROTECTION: SPRINKLERED THROUGHOUT PER NFPA 13 ? ❑ (YES) ® (NO) SEPARATION EXTERIOR WALL (NON— BEARING) HOUR RATING EXTTERIOR WALL (BEARING) HOUR RATING INTERIOR WALL (NON— BEARING) HOUR RATING INTERIOR WALL (BEARING) HOUR RATING DEMOUNTABLE PARTITIONS HOUR RATING STRUCTURAL FRAME HOUR RATING FLOOR /CEILINGS HOUR RATING ROOF CONSTRUCTION HOUR RATING SEISMIC DESIGN: ZONE D DESIGN LOADS: (CHAPTER 16) ROOF: LIVE (SNOW) (PSF) FLOOR: OFFICE (PSF) MECH /STOR (PSF) STAIRS (PSF) CONCENTRATED: WIND: EXPOSURE 80 MPH. EXPOSURE C APPROVED DATE li_AsrOES.vc• REVISIONS No changes shall h made to the scope cf without prior approval of Building Division. Mil require a new plan submittal additional plan review fees. (SEPARATE PERMIT E2CIU QED FOR: 115echanicat IrElectrical Cri;lumbing Q�as Piping City of Tukwila BUILDING DIVISION DRAWING INDEX ARCHITECTURAL - CIVIL DRAWING NUMBER REV DRAWING TITLE 09 -059 -0 1 TITLE SHEET 09 -059 -1 A1OR REMOVAL FLOOR PLAN 09 -059 -1 A280R B REFLECTED CEILING REMOVAL PLAN 09-059-1A1 0 D FLOOR PLAN 09 -059 -1 A280 REFLECTED CEILING PLAN 09- 059 —A500 MISCELLANEOUS DETAILS STRUCTURAL DRAWING NUMBER REV DRAWING TITLE 6604 EGIS RED HI ECT S STATE OF WASHINGTON ACCEPTAB LITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN S.REYNOLDS CHECKED DATE 12.20.90 SUBTITLE CODES AND PERMITS PROJECT TITLE: 9 -053 INSTALL TWO ROOMS SUSPENDED CLGS JOB NUMBER: #12125341 QUANTITY SUBMITTED: ❑ 5 SETS: GENERAL PERMIT (SHELL & CORE) OR STRUCTURAL TENANT IMPROVEMENT ® 4 SETS: TENANT IMPROVEMENT (NON- STRUCTURAL) ❑ 3 SETS: FIRE PROTECTION /SPRINKLERS ❑ 2 SETS: TENANT IMPROVEMENT (REVISION) SUBMITTED FOR PERMIT & REVIEW: ▪ BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ STRUCTURAL ❑ GRADING ❑ LANDSCAPE ❑ DEMOLITION ❑ - * TO BE REVIEWED UNDER SEPARATE PERMIT WASHINGTON STATE NON- RESIDENTIAL ENERGY CODE- APPROACHES COMPLIANCE OPTION ❑ PRESCRIPTIVE ❑ LPA ❑ ANALYSIS ® N/A SPECIAL INSPECTIONS REQUIRED: ❑ WELD ❑ REBAR ❑ STRUCTURAL BOLTING ❑ OTHER CALCULATIONS TYPE. N/A ❑ ELECTRICAL ❑ FIRE PROTECTION* ❑ CANTILEVER RACKS ❑ - ❑ CONCRETE ❑ ANCHOR BOLTS ❑ STRUCTURAL OBSERVATION ATTACHED (YES) (NO) DRAWING INDEX MECHANICAL DRAWING NUMBER REV DRAWING TITLE Ph!? r ^uja'w approval-is sU o errors om ss,ons. 01 construction documents does not aut f r 3 o i rprov 0, En a Op - • 'se or 0 • Rance. " f gag aT . Silk •i .Il . r� i It I • i ELECTRICAL DRAWING NUMBER REV DRAWING TITLE 09 -059 -1 E1 OR LIGHTING PLAN — REMOVAL 09 -059-1E1 0 LIGHTING PLAN REVIEWED FOR CODE COMPLIANCE APPROVED DEC 05 2012 City of Tukwila BUILDING DIVISION RECttvti CITY OF TUKV ILA - DEC;0 S 2012 PERMIT CENTER CORRECT LTR# CITY OF TUKWILA BLA►• ' 1 NO. 12- 001 -BPA �12-�51 PROJECT TITLE: 9 -59 ENTERPRISE SECURITY REMODEL COVER SHEET CURRENT REVISION #1 6919-20 SYMBOL DATE 11.06.12 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED TITLE ENTERPRISE SECURITY REMODEL ARCHITECTURAL MASTER BUILDING 9 -59 COL. D.C. SHEET G1 JOB NO. 16919 -20 COMP NO. DWG NO. 09- 059 —G1 no /no /11 2 FLOOR PLA\ SCALE: 1/4" = 1' -0" 5 I REMOVAL LEGE \D NEW FLOOR TO CEILING WALL. NEW FLOOR TO CEILING WALL W /ROCK WOOL SOUND INSULATION. EXISTING FLOOR TO CEILING WALL TO REMAIN. GE \ERAL \OTES REMOVAL NOTES REMOVE EXISTING WALL FROM FLOOR TO CEILING COMPLETE. PATCH AND REPAIR EXISTING FINISHES AT AREAS TO REMAIN AS REQUIRED BY REMODEL. REMOVE EXISTING WOOD DOOR, HM FRAME AND HARDWARE. RETAIN (1) 3' -0" X 7' -0" DOOR /FRAME /HARDWARE SET FOR RE -USE IN THIS PROJECT. CONTACT PROJECT MANAGER FOR DISPOSITION OF REMAINING DOORS. REMOVE EXISTING CARPET AND BASE IN AREA HATCHED. APPROX. 805 S.F. REMOVE EXISTING CASEWORK AND PLUMBING FIXTURES. CONTACT PROJECT MANAGER FOR DISPOSITION OF CASEWORK. CAP UTILITIES AS REQUIRED. SEE MECHANICAL. REMOVE EXISTING VINYL FLOORING AND BASE IN AREA HATCHED. APPROX. 215 S.F. SEAL DOOR IN CLOSED POSITION. REMOVE HARDWARE AND REPLACE WITH BLANKS AT BOTH SIDES. REVIEWED FOR CODE COMPLIANCE APPROVED DEC 0 5 2012 City of Tukwila BUILDING DIVISION RECt►vEci CITY OF TUKIAlt,A. DEC 0 S 2012 PERMIT CENTER 2' 4 SCALE: 1 /4 "= SYM A B C D REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RELOCATE MEDICAL TO 9 -59 BLDG RAISE CANOPY REBUILD BACK ENTRY ENTERPRISE SECURITY REMODEL 110773 -00 110773 -08 110773 -06 16919 -20 TWH TWH T. HANSON C /ROLLUDA 01.23.02 02.26.02 05.10.02 11.06.12 g)t.45,415rAEZAKM' 6604 REGISTERED 'tHITECT ,N STATE OF WASHINGTON ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN MAGGIE DITTMAR DATE 4 -15 -96 CHECKED TWH ENGINEER TWH 01.23.02 SUBTITLE REMOVAL FLOOR PLAN It TUKWILA BLANKET PERMIT NO. 12- 001 -BPA CURRENT REVISION 16919 -20 SYMBOL D DATE 11.06.12 01.16.02 CHECKED APPROVED APPROVED TITLE ENTERPRISE SECURITY REMODEL ARCHITECTURAL MASTER BUILDING 9 -59.1 COL. ALL DEV. CENTER, WA SHEET IAIOR JOB NO. 16919 -20 COMP NO. DWG NO. 09- 059 -1A1 OR HANSONTW: 05/13/02 0 EXIST.CEILING HEIGHTS 0 : -10" (VERIFY) REFLECTED CEILING PLA\ SCALE: 1/4" = 1' -0" IP 1 351 REMOVAL LEGE \D O 2 LAMP, 2x4 FLOURESCENT FIXTURE 2 LAMP, 1x4, FLUOR. FIXTURE, SURFACE MOUNT i 23 WATT FLUORESCENT TUBE LIGHT 0 FLUORESCENT PENDANT LIGHT 0 EXIT LIGHT 4 RELOCATED SURGERY LIGHT, MOUNT TO STRUCTURE ABOVE, MODIFY RELOCATED SUPPORT OVER LAV WALL FLUOR LIGHT 2X2 DIFFUSER RETURN AIR 2x4 RETURN AIR CEILING MOUNTED CURTAIN TRACK GENERAL 1\ OYES NOTE: EXISTING CEILING GRID TO REMAIN AS IS, NO WORK. INSTALL NEW ACCOUSTICAL CEILING TILES IN EXISTING CEILING GRID THROUGHOUT (TYP). INSTALL SOUND INSUL. BATTS OVER CEILING TILES. DO NOT COVER LIGHT FIXTURES AS OVERHEATING MAY OCCUR. EXTEND SOUND INSULATION BEYOND ROOM WALLS 4 FEET. ROOMS TO RECEIVE CEILING SOUND INSULATION ARE: EXAM ROOMS 1 & 2 AND OFFICES 1, 2 & 3. REFERENCE DRAWI \GS 59 -A3 AUSTIN DRAWING DATED 12/62 REMOVAL \OTES REMOVE EXISTING OVERHEAD LIGHT MOUNT. PATCH AND REPLACE CEILING TILE AS REQUIRED TO MATCH EXISTING ADJACENT. RELOCATE EXISTING LIGHT FIXTURES PER ELECTRICAL SHEETS THIS SET. RELOCATE /REPLACE EXISTING DIFFUSERS PER MECHANICAL SHEETS THIS SET. CLEAN GRID AND TILES. REMOVE DAMAGED TILES AS REQUIRED BY REMOVAL WORK. REVIEWED FOR CODE COMPLIANCE APPROVED DEC 05 2012 City of Tukwila BUILDING DIVISION REGtivcv CITY OF RPM/RA DEC 0 S 2012 PERMIT CENTER 4' 8' SCALE: 1/4"=1 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE A RELOCATED MEDICAL TO D.C. 110773 -00 TWH 01.23.02 B ENTERPRISE SECURITY REMODEL 16919 -20 EC /ROLLUDA 11.06.12 g)LAil'ArEZAW® d� ED CT STATE OF WASHINGTON ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED APPROVED BY DEPT. DATE DRAWN M. DITTMAR CHECKED TWH ENGINEER THOMAS HANSON CHECKED DATE SUBTITLE 12 -06 -01 01.23.02 REFLECTED CEILING REMOVAL PLAN 12.18.01 APPROVED APPROVED TITLE ENTERPRISE SECURITY REMODEL BUILDING 9 -59.1 COL. ALL ARCHITECTURAL MASTER ,) TUKWILA BLANKET PERMIT NO. 12-001-BPA CURRENT REVISION 16919 -20 SHEET SYMBOL B DATE B 11.06.12.12 1A280R JOB NO. 16919 -20 COMP NO. DEV. CENTER, WA DWG NO. 09- 059 - 1A280R 15' -0" 15' -0" CONFERENCE ROOM OCCUPANT LOAD: 18 268 S.F. 1.21_8" x 21' -6" T fr 3 3 w •w��������������������������� 1 -11 3/4" OPEN OFFICE OCCUPANT LOAD: 7: 605 S.F. 6> v;4 N N COFFEE RESTROOM #2 0 0 QCCUP 13 _6:.. FICE NT LOAD: 2 S.F.. x 11' -3 MECH ELECT JANITORIAL ROOM 11' -3" FLOOR PLAN SCALE: 1/4" = 1' -O" CD OCCUPANCY - B OCCP. LOAD = 27 3S1 LEGE \D Wire A NEW FLOOR TO CEILING WALL. NEW FLOOR TO CEILING WALL W /ROCK WOOL SOUND INSULATION. EXISTING FLOOR TO CEILING WALL TO REMAIN. GENERAL NOTES 1. ALL DIMENSIONS ARE FROM FACE OF FINISH TO FACE OF FINISH UNLESS OTHERWISE NOTED. 2. ALL NEW WALLS ARE 18 GA METAL STUDS CO 16" 0.C. W/5/8" GWB TAPED, SANDED AND PAINTED BDC1 COLOR. 3. PROVIDE WALL BACKING FOR ALL WALL HUNG CABINETS AND FIXTURES. SEE SHEET A370. 4. PRIOR TO FRAMING START, VERIFY WALL LAY -OUT W /ARCHITECT. 16> 8 INSTALL NEW BASE THROUGHOUT WITH THE FOLLOWING EXCEPTIONS: RESTROOM # 2 & THE EXISTING MECHANICAL ROOM. PAINT ALL WALLS VANILLA PUMICE COLOR WITH THE FOLLOWING EXCEPTIONS: THE EXISTING MECHANICAL ROOM. INSTALL NEW CARPET TILES THROUGHOUT WITH THE FOLLOWING EXCEPTIONS: EXAM ROOM #1, EXAM ROOM #2 & EMERGENCY ROOM. PAINT DOOR FRAMES TO MATCH WALLS. INSTALL SHEET VINYL FLOORING IN THE FOLLOWING ROOMS: EXAM #1, EXAM #2, RESTROOM #1, EMERGENCY AND CLOSET. FOR INTERIOR ELEV'S & EQUIP PLACEMENT, SEE SHEET A370 PREP & FILL HOLES OF SUBFLOOR PRIOR TO CARPET PLACEMENT SSG ROOF MAINT. TO PROVIDE 1'10 CONDUIT THRU ROOF PENETRATION. GCU TO COORDINATE CONSTRUCTION OTES CONSTRUCT NEW WALL FROM FLOOR TO CEILING: 3 5/8" 18 GA. STEEL STUDS AT 16" O.C. W/ 5/8" GWB EACH SIDE AND ROCKWOOL ACOUSTIC INSULATION. PREP, SAND AND PAINT. ALL WALLS, BOTH NEW AND EXISTING ARE TO BE PREPPED, AND PAINTED. SEE FINISH SCHEDULE FOR FINISH. CONSTRUCT NEW WALL FROM FLOOR TO CEILING: 3 5/8" 18 GA. STEEL STUDS AT 16" O.C. W/ 5/8" GWB EACH SIDE. PREP, SAND AND PAINT. ALL WALLS, BOTH NEW AND EXISTING ARE TO BE PREPPED, AND PAINTED. SEE FINISH SCHEDULE FOR FINISH. PROVIDE NEW HM DOOR FRAME. INSTALL EXISTING 3' -0" X 7' -0" WOOD DOOR AND HARDWARE. REFINISH DOOR AS REQUIRED. PAINT HM FRAME PER FINISH SCHEDULE. PROVIDE NEW 24" X 24" CARPET TILE AT AREA HATCHED. 1 /4 TURN EVERY OTHER TILE. APPROX. 1,005 S.F. PROVIDE AND INSTALL NEW 4" RUBBER BASE AT ALL AREAS RECEIVING NEW CARPET. SEE FINISH SCHEDULE FOR CARPET AND BASE. PROVIDE WINDOW FILM AT INTERIOR SIDE OF GLAZING. PRODUCT: 3M FASARA GLASS FINISHES - 'MILKY MILKY' PROVIDE AND INSTALL CYPHER LOCK AT EXISTING DOOR. PROVIDE INFILL AT EXISTING WINDOW /DOOR LOCATION: CENTRIA FORMAWALL 2" INSULATED METAL PANEL SEE DETAIL H /A500. CLEAN AND PAINT EXISTING CEILING GRID AND ACOUSTIC TILE PANELS. REPLACE ANY DAMAGED CEILING TILES AS REQUIRED BY EXISTING CONDITIONS OR NEW WORK. REVIEWED FOR CODE COMPLIANCE APPROVED DEC 0 5 2012 City of Tukuvila BUILDING DIVISION REL i' c.0 CITY OF TUK1!11 6. DEC 0 S2012 £ERMIT CEP TER SCALE: 1/4"=1'- SYM A B C D REVISION BY APPROVED DATE SYM REVISION APPROVED DATE RELOCATE MEDICAL TO 9 -59 BLDG RAISE CANOPY REBUILD BACK ENTRY ENTERPRISE SECURITY REMODEL 110773 -00 110773 -08 110773 -06 16919 -20 TWH TWH T. HANSON C /ROLLUDP 01.23.02 02.26.02 05.10.02 11.06.12 Q�BOE /NG' o�- ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN MAGGIE DITTMAR DATE 4 -15 -96 APPROVED BY DEPT. DATE CHECKED TWH ENGINEER TWH 01.23.02 01.16.02 SUBTITLE FLOOR PLAN " TUKWILA BLANKET PERMIT NO. 12- 001 -BPA CURRENT REVISION 16919 -20 SYMBOL DATE 11.06.12 CHECKED APPROVED APPROVED TITLE ENTERPRISE SECURITY REMODEL ARCHITECTURAL MASTER BUILDING 9 -59.1 COL. ALL SHEET 1A10 JOB NO. 16919 -20 COMP NO. DEV. CENTER, WA DWG No. 09- 059 -1A10 a EXIST.CEILiNG HEIGHTS ®' -10" (VERIFY) REFLECTED CEILING PLAN SCALE: 1/4" = 1' -0" REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE RELOCATED MEDICAL TO D.C. 110773 -00 TWH 01.23.02 ENTERPRISE SECURITY REMODEL 16919 -20 = C /ROLLUDA 11.06.12 Q�BOE /NG° �r- R ISTE ED HIT: T ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED E' IC CRANSTO STATE OF WASHINGTON APPROVED BY DEPT. DATE DRAWN M. DITTMAR CHECKED TWH ENGINEER THOMAS HANSON CHECKED DATE 12 -06 -01 LECE\D 0 1=== 0 01 2 LAMP, 2x4 FLOURESCENT FIXTURE 2 LAMP, 1x4, FLUOR. FIXTURE, SURFACE MOUNT 23 WATT FLUORESCENT TUBE LIGHT FLUORESCENT PENDANT LIGHT EXIT LIGHT RELOCATED SURGERY LIGHT, MOUNT TO STRUCTURE ABOVE, MODIFY RELOCATED SUPPORT OVER LAV WALL FLUOR LIGHT 2X2 DIFFUSER RETURN AIR 2x4 RETURN AIR CEILING MOUNTED CURTAIN TRACK GENERAL NOTES NOTE: EXISTING CEILING GRID TO REMAIN AS IS, NO WORK. INSTALL NEW ACCOUSTICAL CEILING TILES IN EXISTING CEILING GRID THROUGHOUT (TYP). INSTALL SOUND INSUL. BATTS OVER CEILING TILES. DO NOT COVER LIGHT FIXTURES AS OVERHEATING MAY OCCUR. EXTEND SOUND INSULATION BEYOND ROOM WALLS 4 FEET. ROOMS TO RECEIVE CEILING SOUND INSULATION ARE: EXAM ROOMS 1 & 2 AND OFFICES 1, 2 & 3. REFERE \CE DRAWINGS 59 -A3 AUSTIN DRAWING DATED 12/62 CONSTRUCTION NOTES PAINT EXISTING GWB CEILING PER FINISH SCHEDULE. RELOCATE EXISTING LIGHT FIXTURES PER ELECTRICAL SHEETS THIS SET. RELOCATE /REPLACE EXISTING DIFFUSERS PER MECHANICAL SHEETS THIS SET. CLEAN GRID AND TILES. REMOVE DAMAGED TILES AS REQUIRED BY REMOVAL WORK. PATCH AND REPAIR GWB CEILING AS REQUIRED FOR INSTALLATION OF NEW FIXTURE. MATCH EXISTING ADJACENT FINISHES. REVIEWED FOR CODE COMPLIANCE APPROVED DEC 0 5 2012 City of Tukwila BUILDING DIVISION 01.23.02 SUBTITLE REFLECTED CEILING PLAN CITY OF TUK111' A DEC 032012 PERMIT CENTER 4' 8' SCALE: 1/4"=1 - " TUKWILA BLANKET PERMIT NO. 12- 001 -BPA CURRENT REVISION 16919 -20 SYMBOL DATE 11.06.12 12.18.01 APPROVED APPROVED TITLE ENTERPRISE SECURITY REMODEL ARCHITECTURAL MASTER BUILDING 9 -59.1 COL. ALL DEV. CENTER, WA SHEET 1A280 JOB NO. 16919 -20 COMP NO. DWG NO. 09- 059 -1A280 DITTMARM1: 1J22/2002 9.27:02 AM W/ PHOTO ELECTR. CELL -h 41 CEILING FAN & LIGHT PARTIAL PLAN VIEW SCALE: 1 /4" = 1' -0" PANEL XP -5 PANEL N5 45 KVA 480- 120/208V T NSF. RESTROOM {2� i;5 LEGEND: F-00 X,Y MOM $3 X,Y 2 LAMP, 2x4 FLOURESCENT FIXTURE 3 LAMP, 2x4 FLUORESCENT FIXTURE 'N' DENOTES CIRCUIT NUMBER 'X' DENOTES CENTER LAMP 'Y' DENOTES OUTSIDE LAMPS 3 LAMP, 2x4 FLUORESCENT FIXTURE W/ 1 LAMP, 1x4, FLUORESCENT FIXTURE. THREE WAY SWITCH 'X' DENOTES CENTER LAMP 'Y' DENOTES OUTSIDE LAMPS 0 JUNCTION BOX ® RELAY PANEL HIGH INTENSITY LIGHT LIGHT, INCANDESCENT ® EXIT LIGHT EXIT LIGHT, WALL MOUNT ® JUNCTION BOX 277/480 POWER PANEL PHOTO CELL I-® GENERAL \OTES: BATTERY BACK UP. CONDUIT: I /2" MINIMUM, 3/4" MINIMUM FOR ALL HOMERUNS, 2. CONDUCTORS SHOWN: #I2 AWG, STRANDED COPPER, INSULATION TYPE THHN /THWN, UNLESS OTHERWISE NOTED. 3. COLOR CODE CONDUCTORS: IDENTIFY CONDUCTORS WHICH DO NOT HAVE APPROPRIATELY COLORED INSULATION WITH COLOR TAPE WHEREVER CONDUCTORS ARE ACCESSIBLE, IDENTIFY INSULATED GROUND CONDUCTORS PER NEC 250 -57(b) EXCEPTION #I,b OR c (USING TAPE). COLOR CODE AS FOLLOWS: 208Y/120V 480Y/277V A (LEFT BUS IN PNL) B (CENTER BUS IN PNL) C (RIGHT BUS IN PNL) NEUTRAL EQUIPMENT GROUND ISOLATED GROUND BLACK BROWN RED BLUE WHITE GREEN ORANGE YELLOW GRAY GREEN GRN /YEL* GRN /YEL* *GREEN WITH YELLOW TRACER 4. DYMO LABEL EACH RECEPTACLE, JUNCTION /OUTLET BOX AND SWITCH WITH CIRCUIT IDENTIFICATION. 5. INSTALL NEW OR REVISED PANEL SCHEDULES UPON COMPLETION OF JOB. CO \STRUCTION NOTES: REMOVE EXISTING LIGHTING FIXTURE TYPE A, Al, A2, A3, & D. DO NOT DAMAGE. STORE ON SITE FOR REUSE IN NEW RENOVATION. REMOVE EXISTING LIGHTING CONTROL(S) AND ASSOCIATED CONDUIT & CONDUCTORS AS SHOWN. REMOVE EXISTING CONDUIT & CONDUCTORS AS SHOWN. MAINTAIN CIRCUIT CONTINUITY TO DOWNSTREAM LIGHTING FIXTURES TO REMAIN. REMOVE EXISTING LIGHTING FIXTURE AND ASSOCIATED CONDUIT & CONDUCTORS. REMOVE EXISTING EXIT SIGN ANB --tI F�gR lAT & CONDUCTORS. CODE COMPLIANCE APPROVED REMOVAL titt;tty Lt.) CITY OFTUKi Ak DEC O 32012 ITG�N 6O% SUBMITTAL City of Tukwila BUILDING DIVISION 4' 2' SCALE: 1 /4 " =1 SYM REVISION APPROVED DATE SYM REVISION APPROVED DATE A B RELOCATE MEDICAL TO DC ENTERPRISE SECURITY RELOCATION 110773 -00 16919 -20 E.EUROPA PT /SAZAN 1 -03 -02 10.17.12 ,�BOHG° E / o� ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN M. DITTMAR CHECKEb DATE 6 -25 -99 SUBTITLE LIGHTING PLAN FIRST FLOOR CURRENT REVISION 16919 -20 SYMBOL B DATE 10.17.12 APPROVED BY DEPT. DATE ENGINEER CHECKED APPROVED APPROVED TITLE ENTERPRISE SECURITY RELOCATION BUILDING 9 -59.1 ELECTRICAL MASTER COL. D.C. SHEET IEIOR JOB NO. 16919 -20 COMP NO. DWG NO. 09 -059 -1 E1OR W/ PHOTO ELECTR. CELL —,‘ 1 HL C) TYP. OF 4 P NEAL" N. -1 l_Ef JIAIJtI(.. . 29 N5/2! PARTIAL PLAN VIEW SCALE: 1/4" = 1' -0" PANEL XP -5 PANEL N5 45 KVA 480- 120/208V TRANSF. CEILING FAN & LIGHT N5- 1/13,15 CONSTRUCTION COTES: j> PROVIDE CEILING MOUNTED LOW VOLTAGE MULTI - TECHNOLOGY OCCUPANCY SENSOR. PROVIDE WALL MOUNTED LOW VOLTAGE MULTI - TECHNOLOGY OCCUPANCY SENSOR. PROVIDE LOW VOLTAGE POWER SUPPLY /RELAY AS REQUIRED ABOVE CEILING IN ACCESSIBLE LOCATION. REMOVE CENTER LAMP & LAMP SOCKETS FROM EXISTING 3 -LAMP LIGHTING FIXTURE AND REINSTALL LIGHTING FIXTURE WITH TWO OUTBOARD LAMPS AS SHOWN. PROVIDE NEW RACEWAY & CONDUCTORS AS REQUIRED. REINSTALL EXISTING 2 -LAMP FLUORESCENT LIGHTING FIXTURE AS SHOWN. PROVIDE NEW RACEWAY & CONDUCTORS AS REQUIRED. REINSTALL EXISTING 2 -LAMP FLUORESCENT LIGHTING FIXTURE WITH SELF CONTAINED BATTERY BACKUP AS SHOWN. PROVIDE UNSWITCHED CONDUCTORS FOR NIGHT LIGHT OPERATION. PROVIDE NEW RACEWAY & CONDUCTORS AS REQUIRED. INTERCEPT EXISTING LIGHTING CIRCUIT & EXTEND TO RELOCATED LIGHTING FIXTURES AS SHOWN. PROVIDE NEW 277V, 1 -POLE LIGHT SWITCH & ELECTRICAL CONNECTION FOR EXISTING CEILING FAN & LIGHT. PROVIDE NEW RACEWAY & CONDUCTORS AS REQUIRED. 17\/12_ #51 REVISION APPROVED DATE SYM REVISION APPROVED DATE RELOCATE MEDICAL TO DC ENTERPRISE SECURITY RELOCATION 110773 -00 16919 -20 E.EUROPA 01 -03 -03 PT /SAZAN 10.17.12 AIWEAtIAW° ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN M. DITTMAR CHECKED DATE 01 -03 -02 LEGE \D: x$ X$3 CD EEI 0 m 4., 1 LAMP, 1x4, FLUORESCENT FIXTURE. 2 LAMP, 2x4 FLOURESCENT FIXTURE 3 LAMP, 2x4 FLUORESCENT FIXTURE EMERGENCY LIGHTING FIXTURE W/ SELF CONTAINED BATTERY BACK UP. TYPE AS NOTED. SINGLE POLE TOGGLE SWITCH "X" INDICATES QUANTITY 3 -WAY SWITCH "X" INDICATES QUANTITY. JUNCTION BOX RELAY PANEL HIGH INTENSITY LIGHT LIGHT, INCANDESCENT EXIT LIGHT EXIT LIGHT, WALL MOUNT JUNCTION BOX 277/480 POWER PANEL • W WALL MOUNTED OCCUPANCY SENSOR LEVITON #0SW12 -M OR APPROVED EQUAL. ® CEILING MOUNTED OCCUPANCY SENSOR - LEVITON #OSC20 -MOW OR APPROVED EQUAL. ® LOW VOLTAGE POWER PACK /RELAY - LEVITON #OSP20 -oDo OR APPROVED EQUAL. - - — LOW VOLTAGE PLENUM RATED CABLE PER LIGHTING CONTROL SUPPLIER RECOMMENDATION. GE \ERAL \OTES: 1. CONDUIT: 1/2" MINIMUM, 3/4" MINIMUM FOR ALL HOMERUNS. 2. CONDUCTORS SHOWN: #12 AWG, STRANDED COPPER, INSULATION TYPE THHN /THWN, UNLESS OTHERWISE NOTED. 3. COLOR CODE CONDUCTORS: IDENTIFY CONDUCTORS WHICH DO NOT HAVE APPROPRIATELY COLORED INSULATION WITH COLOR TAPE WHEREVER CONDUCTORS ARE ACCESSIBLE. IDENTIFY INSULATED GROUND CONDUCTORS PER NEC 250 -57(b) EXCEPTION #1,b OR c (USING TAPE). COLOR CODE AS FOLLOWS: A 0 (LEFT BUS IN PNL) B 0 (CENTER BUS IN PNL) C 0 (RIGHT BUS IN PNL) NEUTRAL 208Y/120V BLACK RED BLUE WHITE 480Y/277V BROWN ORANGE YELLOW GRAY EQUIPMENT GROUND GREEN GREEN ISOLATED GROUND GRN /YEL* GRN /YEL* *GREEN WITH YELLOW TRACER 4. DYMO LABEL EACH RECEPTACLE, JUNCTION /OUTLET BOX AND SWITCH WITH CIRCUIT IDENTIFICATION. 5. INSTALL NEW OR REVISED PANEL SCHEDULES UPON CO 'La 0 0 0 6. PROVIDE UNSWTICHED CONDUCTORS TO EXIT SIGNS AND EMERGENCY LIGHTING FIXTURES FOR CIRCUIT MONITORING. REVIEWED FOR CODE COMPLIANCE APPROVED DEC 0 5 2012 City of Tukwila BUILDING DIVISION SUBTITLE LIGHTING PLAN- FIRST FLOOR R %UttI' Ei) CITY OF TUKVOI UEC0S2012 PERMIT CENTER 50% SUBMITTAL 8' SCALE: 1 /4 "= CURRENT REVISION 16919 -20 -0" SYMBOL B DATE 10.17.12 APPROVED BY DEPT. DATE ENGINEER E. EUROPA CHECKED APPROVED APPROVED TITLE ENTERPRISE SECURITY RELOCATION BUILDING 9 -59.1 ELECTRICAL MASTER COL. SHEET 1E10 JOB NO. 16919 -20 COMP N0. D.C. DWG N0. 09 -059 -1 E10