Loading...
HomeMy WebLinkAboutPermit D12-359 - CATHEDRAL EVENT CENTER - TENANT IMPROVEMENTCATHEDRAL EVENT CENTER 16401 WEST VALLEY HY EXPIRED 07-13-13 D12-359 City ATukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206- 431 -2451 Web site: http: / /www.TukwilaWA.gov Parcel No.: 2523049007 Address: 16401 WEST VALLEY HY TUKW Suite No: Project Name: CATHEDRAL EVENT CENTER DEVELOPMENT PERMIT Permit Number: D12 -359 Issue Date: 01/11/2013 Permit Expires On: 07/10/2013 Owner: Name: DESIMONE TRUST WVH Address: C/O BNY MELLON NA , 1201 3RD AVE STE 5010 98101 Contact Person: Name: SEAN ROACH Address: 701 WESTLAKE AV N , SEATTLE WA 98109 Contractor: Name: NORTHWEST GREEN BUILDERS LLC Address: 4509 INTERLAKE AV N, SUITE 224 , SEATTLE WA 98103 Contractor License No: NORTHGB882CP Phone: 206 - 550 -6062 Phone: 206 -550 -6062 Expiration Date: 02/17/2014 Lender: Name: AMERICAN CONTRACTORS INDEMNITY COMPANY Address: 601 S FIGUEROA ST, SUITE 1600 , LOS ANGELES CA 98007 ' DESCRIPTION OF WORK: NEW TENANT: CHANGE OCCUPANCY FROM A -2 RESTAURANT TO A -2 BANQUET HALL/NIGHT CLUB. ADD ACCESSIBLE FAMILY RESTROOM, REMOVE NON - BEARING PARTITION. UPDATE RESTROOM FINISHES. ADD NEW EXIT DOOR. PUBLIC WORKS ACTIVITIES INCLUDE CLEANING PARKING LOT STORM DRAINAGE SYSTEM AND FIELD VERIFICATION GREASE INTERCEPTOR PRESENCE. Value of Construction: $40,000.00 Fees Collected: $2,146.10 Type of Fire Protection: SPRINIU,ERS /AFA International Building Code Edition: 2009 Type of Construction: V -B Occupancy per IBC: 0003 Electrical Service Provided by: PUGET SOUND ENERGY * *continued on next page ** doc: IBC -7/10 D12 -359 Printed: 01 -11 -2013 Public Works Activities: Channelization / Striping: N Curb Cut / Access / Sidewalk / CSS: N Fire Loop Hydrant: N Number: 0 Size (Inches): 0 Flood Control Zone: Hauling: N Start Time: End Time: Land Altering: Volumes: Cut 0 c.y. Fill 0 c.y. Landscape Irrigation: Moving Oversize Load: Start Time: End Time: Sanitary Side Sewer: Sewer Main Extension: Private: Public: Storm Drainage: Street Use: Profit: N Non - Profit: N Water Main Extension: Private: Public: Water Meter: N Permit Center Authorized Signature: Date: 011lll13 I hereby certify that I have read and e d this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied hether specified herein or not. The granting of this permit does not pres construction or the • erformance of work. to this permit. Signature: e to give authority to violate or cancel the provisions of any other state or local laws regulating I am authorized to sign and obtain this development permit and agree to the conditions attached Print Name: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. PERMIT CONDITIONS: 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: All food preparation establishments must have Seattle/King County Department of Public Health sign -off prior to opening or doing any food processing. Arrangements for final Health Department inspection shall be made by calling Seattle/King County Department of Public Health, (206/296- 4928), at least three working days prior to desired inspection date. On doc: IBC -7/10 012-359 Printed: 01 -11 -2013 work requiring Health Department approv is the contractor's responsibility to have a siplans approved by the agency on the job site. 7: There shall be no occupancy of a building until final inspection has been completed and approved by Tukwila building inspector. No exception. 8: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 9: Ventilation is required for all new rooms and spaces of new or existing buildings and shall be in conformance with the International Building Code and the Washington State Ventilation and Indoor Air Quality Code. 10: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 11: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 12: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 13: ** *FIRE DEPARTMENT CONDITIONS * ** 14: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 15: It has been reported that the Fire Department Connection (FDC) is missing from the fireline. Ensure that the FDC is replaced and meets the following requirements. 16: The fire department connection (FDC) shall have a downward angle bend between 22.5 and 45 degrees, with a 5 -inch Storz fitting(s) and Knox FDC locking Storz cap. (NFPA 13- 6.8.3) (City Ordinance #2327) 17: The height of fire department connections (FDC's) shall be 36 to 48 inches above grade. 18: Fire department connections (FDC's) shall be oriented in the direction of fire apparatus access, have a 4 foot clear space in front and to the sides of the connection, be appropriately signed, have the building address served by the FDC stenciled vertically in 3 -inch high white numbers on a "safety red" background directly beneath the hose connection facing the direction of vehicular access, and protected from potential vehicular damage. 19: Fire department connections (FDC's) shall be located within 50 feet of a fire hydrant. 20: The total number of fire extinguishers required for a light hazard occupancy with Class A fire hazards is calculated at one extinguisher for each 3,000 sq. ft. of area. The extinguisher(s) should be of the "all purpose" (2A, 10 B:C) dry chemical type. The travel distance to any extinguisher must be 75' or less. (IFC 906.3) (NFPA 10, 3 -2.1) 21: Portable fire extinguishers, not housed in cabinets, shall be installed on the hangers or brackets supplied. Hangers or brackets shall be securely anchored to the mounting surface in accordance with the manufacturer's installation instructions. Portable fire extinguishers having a gross weight not exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 5 feet (1524 mm) above the floor. Hand -held portable fire extinguishers having a gross weight exceeding 40 pounds (18 kg) shall be installed so that its top is not more than 3.5 feet (1067 mm) above the floor. The clearance between the floor and the bottom of the installed hand -held extinguishers shall not be less than 4 inches (102 mm). (IFC 906.7 and IFC 906.9) 22: Fire extinguishers shall not be obstructed or obscured from view. In rooms or areas in which visual obstruction cannot be completely avoided, means shall be provided to indicate the locations of the extinguishers. (IFC 906.6) 23: Extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (IFC 906.5) 24: Fire extinguishers require monthly and yearly inspections. They must have a tag or label securely attached that indicates the month and year that the inspection was performed and shall identify the company or person performing the service. Every six years stored pressure extinguishers shall be emptied and subjected to the applicable recharge procedures. If the required monthly and yearly inspections of the fire extinguisher(s) are not accomplished or the inspection tag is not completed, a reputable fire extinguisher service company will be required to conduct these doc: IBC -7/10 D12-359 Printed: 01 -11 -2013 required surveys. (NFPA 10, 4 -3, 4 -4) 25: Portable fire extinguishers shall be provided within a 30 -foot (9144 mm) travel distance of commercial -type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher. (IFC 904.11.5) 26: Every room or space that is an assembly occupancy shall have the occupancy load of the room or space posted in a conspicuous place, near the main exit or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. (IFC 1004.3) 27: Egress doors shall be readily openable from the egress side without the use of a key or special knowledge or effort. (IFC 1008.1.8.3 subsection 2.2) 28: Each door in a means of egress from an occupancy of Group A or E having an occupant load of 50 or more and any Group H occupancy shall not be provided with latch or lock unless it is panic hardware or fire exit panic hardware on rated fire doors. (IFC 1008.1.9) 29: Door handles, pulls, latches, locks and other operating devices on doors required to be accessible by Chapter 11 of the International Building Code shall not require tight grasping, tight pinching or twisting of the wrist to operate. (IFC 1008.1.8.1) 30: Exit hardware and marking shall meet the requirements of the International Fire Code. (IFC Chapter 10) 31: Exits and exit access doors shall be marked by an approved exit sign readily visible from any direction of egress travel. Access to exits shall be marked by readily visible exit signs in cases where the exit or the path of egress travel is not immediately visible to the occupants. Exit sign placement shall be such that no point in an exit access corridor is more than 100 feet (30,480 mm) or the listed viewing distance for the sign, whichever is less, from the nearest visible exit sign. (IFC 1011.1) 32: Every exit sign and directional exit sign shall have plainly legible letters not less than 6 inches (152 mm) high with the principal strokes of the letters not less than 0.75 inch (19.1 mm) wide. The word "EXIT" shall have letters having a width not less than 2 inches (51 mm) wide except the letter "I ", and the minimum spacing between letters shall not be less than 0.375 inch (9.5 mm). Signs larger than the minimum established in section 1011.5.1 of the International Fire Code shall have letter widths, strokes and spacing in proportion to their height. The word "EXIT" shall be in high contrast with the background and shall be clearly discernible when the exit sign illumination means is or is not energized. If an arrow is provided as part of the exit sign, the construction shall be such that the arrow direction cannot be readily changed. (IFC 1011.5.1) 33: Exit signs shall be illuminated at all times. To ensure continued illumination for a duration of not less than 90 minutes in case of primary power loss, the sign illumination means shall be connected to an emergency power system provided from storage batteries, unit equipment or on -site generator. (IFC 1006.1, 1006.2, 1006.3) 34: Emergency lighting facilities shall be arranged to provide initial illumination that is at least an average of 1 foot -candle (11 lux) and a minimum at any point of 0.1 foot -candle (1 lux) measured along the path of egress at floor level. Illumination levels shall be permitted to decline to 0.6 foot -candle (6 lux) average and a minimum at any point of 0.06 foot -candle (0.6 lux) at the end of the emergency lighting time duration. A maximum -to- minimum illumination uniformity ratio of 40 to 1 shall not be exceeded. (IFC 1006.4) 35: Aisles leading to required exits shall be provided from all portions of the building and the required width of the aisles shall be unobstructed. (IFC 1013.4) 36: Maintain sprinkler coverage per N.F.P.A. 13. Addition/relocation of walls, closets or partitions may require relocating and/or adding sprinkler heads. (IFC 901.4) 37: Sprinklers shall be installed under fixed obstructions over 4 feet (1.2 m) wide such as ducts, decks, open grate flooring, cutting tables, shelves and overhead doors. (NFPA 13- 8.6.5.3.3) 38: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinlder work shall commence without approved drawings. (City Ordinance No. 2327). 39: A fire alarm system is required for this project. The fire alarm system shall meet the requirements of N.F.P.A. 72 and City Ordinance #2328. 40: Maintain square foot coverage of detectors per manufacturer's specifications in all areas including: closets, elevator shafts, top of stairwells, etc. (NFPA 72- 5.5.2.1) 41: Maintain automatic fire detector coverage per N.F.P.A. 72. Addition/relocation of walls, closets or partitions may doc: IBC -7/10 D12 -359 Printed: 01 -11 -2013 require relocating and/or adding automati. detectors. • 42: An approved fire alarm system is required for this project. The fire alarm system shall meet the requirements of N.F.P.A. 72 and the City of Tukwila Ordinance #2328. 43: Maintain fire alarm system audible /visual notification. Addition/relocation of walls or partitions may require relocation and/or addition of audible /visual notification devices. (City Ordinance #2328) 44: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2328) (IFC 104.2) 45: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 46: All electrical work and equipment shall conform strictly to the standards of the National Electrical Code. (NFPA 70) 47: The maximum flame spread class of finish materials used on interior walls and ceilings shall not exceed that set forth in Table No. 803.5 of the International Building Code. 48: In occupancies of Groups A, E, I and R -1 and dormitories in Group R -2, curtains, draperies, hangings and other decorative materials suspended from walls or ceilings shall be flame resistant in accordance with NFPA 701 or be noncombustible. Where required to be flame resistant, decorative materials shall be tested by an approved agency and pass Test 1, as described in NFPA 701, or such materials shall be noncombustible. Reports of test results shall be prepared m accordance with NFPA 701 and furnished to the fire code official upon request. (IFC 805.1, 805.2) 49: New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. Address numbers shall be Arabic numbers or alphabet letters. Numbers shall be a minimum of 4 inches (102mm) high with a minimum stroke width of 0.5 inch (12.7mm). (IFC 505.1) 50: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 51: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 52: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. 53: ** *PUBLIC WORKS DEPARTMENT CONDITIONS * ** Minimum 48 hours in advance contractor shall call 206 433 -0179 to schedule a mandatory pre - construction meeting with Public Works. Since building was vacant forseveral years, applicant shall vacuum storm drainage catchbasins to assure proper parking drainage. Any storm drainage deficiencies shall be corrected.Provide cleaning documentation to Mr. Dave Stuckle, Public Works Project Inspector (206) 433 -0179. 54: Applicant shall obtain a separate Public Works Type C Construction Permit correction of backflow deficiencies on domestic water, fire prevention and landscape irrigation lines, see notes 1, 2 and 3 on sheet T1. 55: Per Sean Roach, permit contact there will be no food preparation, however presence of an existing outside grease interceptor shall be verified with City staff. Contractor shall contact Mr. Mike Cusick. P.E., PW Senior Sewer Engineer at (206) 431 -2441 to witness field verification. 56: Public Works shall not do final sign -off until of this TI permit until Public Works permit for backflow(s) installation is finaled. doc: IBC -7/10 D12 -359 Printed: 01 -11 -2013 CITY OF TUKWILA Community Development Department Public Works Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Building Permit No. Project No. Date Application Accepted: Date Application Expires: (For office use only) ' CONSTRUCTION PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION Site Address: King Co Assessor's Tax No.: 252304 -9007 16401 West Valley Highway, Tukwila 98188 Suite Number: Floor: Tenant Name: Cathedral Event Center PROPERTY OWNER Name: Desimone Trust WVH c/o Eliz. Parrott Stultz Address: 1201 Third Ave, Suite 5010 City: Seattle State: WA Zip: 98101 CONTACT PERSON= person receiving all project m comunica iori :• �. ' ° -, .. -, , Name: Sean Roach Address: 701 Westlake Ave. N City: Seattle State: WA iii Zip: Phone: (206) 550 -6062 Fax: (888) 790 -0067 Email: sean @madronapoint.com GENERAL CONTRACTOR INFORMATION Company Name: Northwest Green Builders, LLC Address: 4509 Interlake Ave N #224 City: Seattle State: WA Zip: 98 103 Phone: (206) 550 -6062 Fax: (888) 790 -0067 Contr Reg No.: NORTHGB882CP Exp Date: 02/ 7/2014 Tukwila Business License No.: BUS- 0993237 , \ \ ■ H:Wpplications \Forms - Applications On Line \2011 Applications \Permit Application Revised - R -9 -I I.docx Revised: August 2011 bh New Tenant: ® Yes ❑ .. No ARCHITECT OF RECORD Company Name: BjarkoSerra Architects Architect Name: Greg Bjarko Address: 2 Nickerson St., Suite 100 City: Seattle State: WA Zip: 98109 Phone: (206) 545 -1443 Fax: (206) 548 -0443 Email: greg @bjarkoserra.com ENGINEER OF RECORD Name: American Contractors Indem. Co Address: 601 South Figueroa Street Suite 1600 Company Name: Engineers NW Engineer Name: Dale Kaemingk Address: 9725 3rd Ave. NE, Suite 207 City: Seattle, State: WA Zip: 98 115 Phone: (206) 525 -7560 Fax: (206) 522 -6698 Email: dalek @engineersnw.com LENDER/BOND ISSUED (required fo6prole js;$5,000 (ir, greater per,RCW1n9,42795) Name: American Contractors Indem. Co Address: 601 South Figueroa Street Suite 1600 City: Los Angeles State: CA Zip: 98007 Page 1 of 4 BID DING PERMIT INFORMATIOT ■206 -431 -3670 • Valuation 'oftProlect'(contractoi s bid price): $ 40,000 Existing Building Valuation: $ 591,000 Describe the scope of work (please provide detailed information): Change occupancy from A2 Restaruant to A2 Banquet Hall/Night Club. Add Accessible Family Restroom, remove non - bearing partitions. Update restroom finishes. Add new exit door. Will there be new rack storage? ❑ Yes Z.. No If yes, a separate permit and plan submittal will be required. Provide All Building Areas in Square Footage Below PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: ® Sprinklers I Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If "yes', attach list of materials and storage locations on a separate 8-1/2" x I I " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications \Forms - Applications On Line\201 I Applications\Permit Application Revised - 8 -9 -11 .docx Revised: August 2011 bh Page 2 of 4 Existing Interior Remodel Addition to Existing Structure New Type of Construction per IBC Type of Occupancy per IBC 1st Floor 7,098 5,699 0 0 VB A2 :2'x' Floor _• ... 3Td Floor .Floors tliru `' Basement Accessory; Structure *• Attached Garage ;. , .. Detached Garage •' Attached Carport .Detached Carport CoveredDeck: Uncovered Deck .. PLANNING DIVISION: Single family building footprint (area of the foundation of all structures, plus any decks over 18 inches and overhangs greater than 18 inches) *For an Accessory dwelling, provide the following: Lot Area (sq ft): Floor area of principal dwelling: Floor area of accessory dwelling: *Provide documentation that shows that the principal owner lives in one of the dwellings as his or her primary residence. Number of Parking Stalls Provided: Standard: Compact: Handicap: Will there be a change in use? ❑ Yes No If "yes ", explain: FIRE PROTECTION /HAZARDOUS MATERIALS: ® Sprinklers I Automatic Fire Alarm ❑ None ❑ Other (specify) Will there be storage or use of flammable, combustible or hazardous materials in the building? ❑ Yes No If "yes', attach list of materials and storage locations on a separate 8-1/2" x I I " paper including quantities and Material Safety Data Sheets. SEPTIC SYSTEM ❑ On -site Septic System — For on -site septic system, provide 2 copies of a current septic design approved by King County Health Department. H:\Applications \Forms - Applications On Line\201 I Applications\Permit Application Revised - 8 -9 -11 .docx Revised: August 2011 bh Page 2 of 4 PERMIT APPLICATION NOTES — Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one or more extensions of time for additional periods not exceeding 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTHO D A 1. NT: Signature: Print Name: pal Mailing Address: 701 t i ( 4( 4"r A.) H:Wpplications \Forms - Applications On Line\2011 Applications \Permit Application Revised - 8.9 -1 I.docx Revised: August 2011 bh Day Telephone: City Date: �� l 3/1"-- Z ( (S B9C3-g7‘. 1 State Zip Page 4 of 4 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov Parcel No.: 2523049007 Address: 16401 WEST VALLEY HY TUKW Suite No: Applicant: CATHEDRAL EVENT CENTER RECEIPT Permit Number: D12 -359 Status: APPROVED Applied Date: 11/13/2012 Issue Date: Receipt No.: R13 -00253 Payment Amount: $1,615.10 Initials: JEM Payment Date: 01/11/2013 03:03 PM User ID: 1165 Balance: $0.00 Payee: TRAGO LAKE UNION LLC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 1068 1,615.10 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts BUILDING - NONRES STATE BUILDING SURCHARGE 000.322.100 640.237.114 Total: $1,615.10 1,610.60 4.50 Hart. Raraint -nR Printari• nt- 11 -7n1l • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov Parcel No.: 2523049007 Address: 16401 WEST VALLEY HY TUKW Suite No: Applicant: CATHEDRAL EVENT CENTER RECEIPT Permit Number: D12 -359 Status: PENDING Applied Date: 11/13/2012 Issue Date: Receipt No.: R12 -03102 Payment Amount: $5.70 Initials: WER Payment Date: 11/13/2012 04:18 PM User ID: 1655 Balance: $1,615.10 Payee: NORTHWEST GREEN BUILDERS LLC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 1053 5.70 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts BUILDING - NONRES 000.322.100 5.70 Total: $5.70 rinr.• RPraint -AR PrintPri. 11-11-7m 7 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov Parcel No.: 2523049007 Address: 16401 WEST VALLEY HY TUKW Suite No: Applicant: CATHEDRAL EVENT CENTER RECEIPT Permit Number: D12-359 Status: PENDING Applied Date: 11/13/2012 Issue Date: Receipt No.: R12 -03101 Initials: WER User ID: 1655 Payment Amount: $525.30 Payment Date: 11/13/2012 04:17 PM Balance: $1,620.80 Payee: NORTHWEST GREEN BUILDERS LLC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 1053 525.30 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts PLAN CHECK - NONRES 000.345.830 525.30 Total: $525.30 rinr.• Raraint_f1R Printarl• 11- 13_9019 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 ,(206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: CAritF r 4L_ ec t!F Type of Inspection: 1ie►r`aJe C.— ,nPc..,7tat l- Address: jr I Cl q 61 �Pa44 t1 E Date Called: Special Instructions: 1..1aSYrCb0Le.N Date Wanted:. I -- 11— 12, Requester: Phone No: Approved per applicable codes. C6rrections required prior to approval. 11-' • COMMENTS: Inspect ❑ REIN paid a Date: CTION FEE REC4RED. Pri r to next inspection. fe ust be- 300 Southcenter B vd.. Suit 100. Call to schedule reinspection. - --• - -- • 06 -03 -2013 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director SEAN ROACH 701 WESTLAKE AV N SEATTLE WA 98109 RE: Permit No. D12 -359 CATHEDRAL EVENT CENTER 16401 WEST VALLEY HY TUKW Dear Permit Holder: In reviewing our current records, the above noted permit has not received a final inspection by the City of Tukwila Building Division. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or the National Electric Code, every permit issued by the Building Division under the provisions of these codes shall expire by limitation and become null and void if the building or work authorized by such permit has not begun within 180 days from the issuance date of such permit, or if the building or work authorized by such permit is suspended or abandoned at any time after the work has begun for a period of 180 days. Your permit will expire on 07/13/2013. Based on the above, you are hereby advised to: 1) Call the City of Tukwila Inspection Request Line at 206 - 431 -2451 to schedule for the next or final inspection. Each inspection creates a new 180 day period, provided the inspection shows progress. -or- 2) Submit a written request for permit extension to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit. The Building Code does allow the Building Official to approve one extension of up to 180 days. If it is determined that your extension request is granted, you will be notified by mail. In the event you do not call for an inspection and/or receive an extension prior to 07/13/2013, your permit will become null and void and any further work on the project will require a new permit and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. D12 -359 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax 206 -431 -3665 Joanna Spencer From: Sean Roach <sean @madronapoint.com> Sent: Wednesday, January 09, 2013 11:44 AM To: Joanna Spencer Subject: Follow Up Joanna. Following up with our discussion regarding out permit. As you requested, I am clarifying that we will not be using the kitchen to prepare food. Hope this helps. Let me know if you need anything further. Thanks. Sean Sent from my iPhone pERMA NENT FILE COPY D12 -3S9 • Joanna Spencer From: Sean Roach <sean @madronapoint.com> Sent: Tuesday, January 08, 2013 5:45 PM To: Joanna Spencer Cc: Greg Bjarko; Troy Selland Subject: [FWD: Cathedral items] Attachments: D00001.pdf Joanna, This is Sean Roach, one of the partners of Cathedral Event Center, located at 16401 West Valley Hwy, Tukwila, WA. 98188. Here are the answers to questions #1 and #2. I understand that with these answers, we will be able to get our building permit, which will be great as we are excited to move forward. #1 The planned business operations are to be an event center and concert venue. We will rent the space for live music, corporate events, weddings, receptions, etc. Because we need to go out and market the space to individuals and businesses, it is hard to give you a frequency, but we are hoping to be as busy as possible. Hopefully we will have several events during the weekdays and concerts during the weekend nights. We are looking to have mostly temporary employees for events with 1 or 2 managers. There will be no open business hours per se, since we are open by appointment, and the employees will work during those times. I am not sure what the capacity will be after the new permitting, I believe it says that on the plans. #2 The plans that we received from the landlord show a grease interceptor on them in the southwestern corner of the building, so my assumption is that since it was a restaurant previously, it must be there. The original building plans for the location must have them as well, which I'm hoping the City has record of. We do not have any maintenance or pumping records as we have no relation to the former tenant, but I will email the landlord and see if they (the Desimone Trust) has anything. Please let me know if that satisfies your questions. If not, I will do my best to provide whatever else you need. Thanks, Sean Roach The Madrona Point Group Insurance 1 Real Estate 1 Construction Seattle Office 701 Westlake Avenue North Seattle, WA 98109 Orcas Island Office 365 North Beach Road, Suite 102 Post Office Box 67 1 PERMANENT FILE COPY DI269 of za Caty ®f Tu ila • Jim Haggerton, Mayor Department of Community Development Jack Pace, Director November 21, 2012 Sean Roach 701 Westlake Av N Seattle, WA 98109 RE: Correction Letter #1 Development Permit Application Number D12 -359 Cathedral Event Center — 16401 West Valley Hy Dear Mr. Roach, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Public Works Department. At this time the Building, Fire, and Planning Departments have no comments. Public Works Department: Joanna Spencer at 206 431 -2440 if you have questions regarding the attached comments. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that four (4) sets of revised plans, specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206) 431 -3670. Sincerely, Bill Rambo Permit Technician encl File No. D12 -359 W:\Permit Center \Correction Letters \2012\D12 -359 Correction Letter #I.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 • • PUBLIC WORKS DEPARTMENT COMMENTS DATE: November 20, 2012 PROJECT: Cathedral Event Center 16401 West Valley Hwy PERMIT NO: D12 -359 PLAN REVIEWER: Contact Joanna Spencer at (206) 431 -2440 if you have any questions regarding the following comments. 1) Please provide a brief narrative describing the nature of business operations and schedule /frequency of proposed business events and activities so Public Works can determine traffic impacts and assess a traffic impact fee, if applicable. Please include number of employees, business hours, work hours of employees, banquet hall capacity, etc. 2) The City requires grease interceptors on all buildings where food preparation occurs and at locations determined by the Public Works Director as necessary for the proper handling of liquid wastes. If one exists please submit maintenance and pumping records. If none exists a new one shall be installed. Proposed grease interceptors shall have a three compartment, double baffle tank sized per Uniform Plumbing Code, Appendix H. Refer to attached City of Tukwila Detail SS -14. 3) Since the building was vacant for several years, existing catch basins in the parking lot shall be vacuumed and re- grouted to assure proper function of existing storm drainage system and prevent parking lot flooding. 4) The City has determined that the building has deficiencies on the domestic water, fire prevention and irrigation lines. a) Domestic Water A Reduced Pressure Principle Assembly (RPPA), previously called a Reduced Pressure Backflow Assembly (RPBA), shall be installed immediately downstream of the existing 2" permanent water meter. Installation at another location requires the Public Works Director's approval. The RPPA shall be installed in a Hot Box/Hot Rock or equal freeze protection enclosure anchored to a minimum 4" thick concrete pad. Public Works strongly recommends a power supply be provided for the freeze protection enclosure. On your site plan, please show the property line(s), street name, North arrow, building location, and size of existing permanent water meter and proposed RPPA. Show manufacturer name and backflow model number. Submit RPPA cut sheet and circle backflow to be installed. • • Comments D12 -359 Page 2 November 20, 2012 b) Fire Prevention There is an existing 6" Detector Double Check Valve Assembly (DCVA) on the fire line; however, Public Works has not received required annual backflow test reports since 2000. Fire Department Connection (FDC) has been removed recently. Not sure if it was stolen for scrap metal or if it was removed for replacement. FDC shall have a Storz Knox Lock Box installed. Contact the Tukwila Fire Department at (206) 575 -4404 for ordering information. Tamper switches need to be installed on the fire line isolation valves. c) Landscape Irrigation There is a Double Check Valve Assembly on the irrigation system connection; however, Public Works has never received required annual backflow test reports. There is an existing sewer deduct meter that is not compatible with the AMR meter reading system. A SENSUS meter and radio needs to be installed if the owner wants to continue to get sewer deduction for irrigation water usage. If you need assistance locating backflow deficiencies in the field, please contact Mr. Todd Reedy, Water Department Operations Foreman at (206) 571 -6309. A separate letter addressing backflow deficiencies was mailed to Desimone Trust WVH, c/o Eliz. Parrott Stults, representing the property owner on November 20, 2012. 5) Four (4) sets of site plans prepared by a WA State licensed professional engineer shall be submitted together with grease interceptor sizing calculations. Plan shall show location of grease interceptor, existing domestic water meter, sewer deduct meter to be replaced with SENSUS meter, existing irrigation Double Check Valve Assembly (DCVA) to be tested, proposed RPPA, existing fire DDCVA, FDC with Knox Lock Box to be added, and existing storm drainage catch basins. 6) Please submit a construction cost estimate for utilities site work. See attached Public Works Bulletin Aland A2. Please fill out item 2 on page 1 of Bulletin A2. W:PW Eng/Other /Joanna /Comments 1 D12- 359.doc • City of Tukwila Department of Public Works November 19, 2012 Desimone Trust WVH c/o Eliz. Parrott Stoltz 1201 Third Ave, Ste #5010 Seattle, WA 98101 RE: Cathedral Event Center Tenant Improvement 16401 West Valley Hwy, Tukwila, WA 98188 Permit No. D12 -359 To Whom It May Concern: Jim Haggerton, Mayor Bob Giberson, P.E., Director In accordance with Washington State Department of Health guidelines for Group A Public Water Systems, Public Works has implemented a cross - connection control program to protect the public water system from contamination via cross - connection. Since this project includes alterations to the existing plumbing system, the entire plumbing system must be brought up to the current standards as set forth in the Uniform Plumbing Code, including installation of approved backflow prevention on domestic water, fire prevention and irrigation line. The City has determined that the subject building has deficiencies on the domestic water, fire prevention, and landscape irrigation lines. a) Domestic Water A Reduced Pressure Principle Assembly (RPPA), previously called a Reduced Pressure Backflow Assembly (RPBA), shall be installed immediately downstream of the existing 2" permanent water meter. installation at another location requires the Public Works Director's approval. The RPPA shall be installed in a Hot Box/Hot Rock or equal freeze protection enclosure anchored to a minimum 4" thick concrete pad. Public Works strongly recommends a power supply be provided for the freeze protection enclosure. On your site plan, please show the property line(s), street name, North arrow, building location, and size of existing permanent water meter and proposed RPPA. Show manufacturer name and backflow model number. Submit RPPA cut sheet and circle backflow to be installed. b) Fire Prevention There is an existing 6" Detector Double Check Valve Assembly (DCVA) on the fire line; however, Public Works has not received required annual backflow test reports since 2000. Fire Department Connection (FDC) has been removed recently. Not sure if it was stolen for scrap metal or if it was removed for replacement. FDC shall have a Storz Knox Lock Box installed. Contact the Tukwila Fire Department at (206) 575 -4404 for ordering information. Tamper switches need to be installed on the fire line isolation valves. PERMANENT FILE 0013V 6300 Southcenler Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 433 -0179 • Fax: 206 - 431 -3665 ...Desiinone Trust WVH . )age.2 • November 19, 2012 4110 ti , ,'. • ,'ti, c) Landscape Irrigation There is a Double Check Valve Assembly on the irrigation system connection; however, Public Works has never received required annual backflow test reports. There is an existing sewer deduct meter that is not compatible with the AMR meter reading system. A SENSUS meter and radio needs to be installed if the owner wants to continue to get sewer deduction for irrigation water usage. If you need assistance locating these deficiencies in the field, please contact Mr. Todd Reedy, Water Department Operations Foreman at (206) 571 -6309. If you opt to install now, you will need to submit a revision to this Tenant Improvement permit or apply for a separate Public Works Type C Construction Permit. Installation plans consisting of a schematic'that clearly shows the location of the proposed RPPA, FDC and sewer deduct meter in relationship to the property line(s), building perimeter and existing domestic water meter, shall besubniitted together with a construction cost estimate for items a, b and c. For a Type C permit, Public Works collects a base application and plan review fee ($250.00 plus 2.5% of construction cost for RPPA, FDC, sewer deduct meter installations and backflow testing). An additional 2.5% of the subject construction cost will be assessed at the time of permit issuance. I have enclosed Development Bulletins A9 and C5, which spells out design and installation requirements for cross connection control and Bulletins A 1 and A2 summarizing Public Works Type C construction permit fees. Please call Mike Cusick, Public Works Senior Water and Sewer Engineer at (206) 431 -2441 if you have any questions. Sincerely, oanna Spencer Development Engineer enclosures: Public Works Bulletins #A1, A2, A9 and C5 Permit Application cc: Sean Roach D12-359 (W:PW Eng/Other /Joanna Spencer /Letter Desimone Trust 11192012) • • November 15, 2012 Cathedral Event Center / D12 -359 Regarding the old Barnaby's Restaurant at 16401 W. Valley Hwy: - No RPPA installed on 2" domestic service for premise isolation. -There is a 6" DCVA on fireline, however we have not received a test report for it since 2000. They have been notified every year about the need to test it. - The FDC has been removed recently. Not sure if it was stolen for scrap metal or if it was removed for replacement. I informed the fire department. Needs to have a Storz adapter installed. - No tamper switches on the fireline isolation valves. - There is a DCVA on irrigation system connection, however we have never received a test report for it. - There is a sewer deduct meter on irrigation, however it is not compatible with our AMR meter reading system. They need to install a Sensus meter and radio if they want to contnue to get a sewer deduction for irrigation water. Todd PERMANENT FILE COPY • • ENWSTRUCTURAL ENGINEERS Engineers Northwest Inc., P.S. November 12, 2012 BJARKO SERRA ARCHITECTS 2 Nickerson Street, Suite 100 Seattle WA. 98109 ATTN: Greg Bjarko RE: Cathedral Event Center 16401 West Valley Highway Tukwila, WA Beam Removal ENW Project No. 12000097 Greg: On September 20, 2012 I reviewed the two 6 x 12 beams in question. They are located near the entry of the building well below the roof. It is my opinion that these beams are not a part of the structural system of the building and can be removed without consequence. Please feel free to call if you have any questions. Sincerely, ENGINEERS N 'T EST, INC., P.S. Dale Kaemingk, P.E., S.E. Vice President DK:jk We get buildings built. • • RECEIVED CITY OF TUKWILA NOV 1 3 2012 PERMIT CENTER • 9725 Third Ave NE, Suite 207 • Seattle, WA 98115 • 206.525.7560 • fax 206.522.6698 www.engineersnw.com *EMIT CORD COPS PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D12 -359 DATE: 01/07/12 PROJECT NAME: CATHEDRAL EVENTS CENTER SITE ADDRESS: 16401 WEST VALLEY HY Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # 1 Revision # after Permit Issued DEPARTMENTS: Building Division ❑ 3� � L • () Public Works Fire Prevention Structural Planning Division ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ DUE DATE: 01/08/13 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: I* Please Route REVIEWER'S INITIALS: DATE: Structural Review Required ❑ No further Review Required ❑ APPROVALS OR CORRECTIONS: DUE DATE: 02/05/13 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only. CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: • PE X PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: D12 -359 DATE: 11 -13 -12 PROJECT NAME: CATHEDRAL EVENT CENTER SITE ADDRESS: 16401 WEST VALLEY HY X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # After Permit Issued DEPARTMENTS: Public U--I0 &It tL Fire Prevention Structural CL AP Planning Division ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11 -15 -12 Complete Incomplete Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required — No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 12 -13 -12 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) N- Notation: REVIEWER'S INITIALS: DATE: Permit Center Use.Only CORRECTION LETTER MAILED: t I—) -I"I).—._ Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW - Staff Initials: 1/14( Documents/routing slip.doc 2 -28 -02 Cityk Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Web site: http: / /www.TukwilaWA.gov 111 REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: //7-// Plan Check/Permit Number: t7/ — 351 ❑ Response to Incomplete Letter # [Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner n0� '''°R I_a JAN 0 7 2013 / 'ERMIT CENTER Project Name: GAf f Zit'2 / -el /G-77 74-_i (' 7 t Project Address: /�p y/ a/es f l/cGl / Contact Person: aI /54) -y Phone Number: liD6- -(Y / Summary of Revision: ,Ole / 74 Sheet Number(s): 7 "Cloud" or highlight all areas f revision including date of revision Received at the City of Tukwila Permit Center by: Entered in Permits Plus on ffL -_ H:\Applications\Forms- Applications On Line \2010 Applications \7 -2010 - Revision Submittal.doc Revised: May 2011 Contractors or Tradespeopleonter Friendly Page • General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name NORTHWEST GREEN BUILDERS LLC UBI No. 603167520 Phone 2065506062 Status Active Address 4509 Interlake Ave N License No. NORTHGB882CP Suite /Apt. # 224 License Type Construction Contractor City Seattle Effective Date 2/17/2012 State WA Expiration Date 2/17/2014 Zip 98103 Suspend Date County King Specialty 1 General Business Type Limited Liability Company Specialty 2 Unused Parent Company Business Owner Information Name Rote Effective Date Expiration Date ROACH, SEAN ANDREW Partner /Member 12/27/2011 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 1 American Contractors Indem CO 100187983 02/16/2012 Until Cancelled $12,000.00 02/17/2012 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 2 Contractors Bonding & Insuranc C11SJ8062 12/05/2012 12/05/2013 $1,000,000.00 12/05/2012 1 Nevada Capital Ins Co 77NPP4023386 12/28/2011 12/28/2012 $1,000,000.00 02/17/2012 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period Infractions /Citations Information No records found for the previous 6 year period https: // fortress .wa.gov /lni/bbip/Print.aspx 01/11/2013 ABBREVIATIONS (E) (N) AFF ALUM ARCH BRD CLR COL CONC COOR DIA DWG ELEC EQ FF FOIC FR/ FT GC GWB GYP HORZ HVAC iN LBS MANU MAX MDF M DO MECH MiN MTL NIC NOM OAE OC OPP P -LAM PLYWD PT RBR REM REQD RO SF SI SiM STL STRUCT. T &G T.O. THK TYP UON VERT VIF W/ WD WIN WP LEGEND ROOM NAME 1 W1 EXISTING NEW AT ABOVE FINISH FLOOR ALUMINUM ARCHITECT OR ARCHITECTURAL BOARD CLEAR COLUMN CONCRETE COORDINATE DIAMETER DRAWING ELECTRIC OR ELECTRICAL EQUAL FINISH FLOOR FURNISHED BY OWNER, INSTALLED BY CONTRACTOR FROM FEET GENERAL CONTRACTOR GYPSUM WALL BOARD GYPSUM HORIZONTAL HEATING VENTILATION AIR CONDITIONING INCHES POUNDS MANUFACTURER MAXIMUM MEDIUM DENSITY FIBERBOARD MEDIUM DENSITY OVERLAY MECHANICAL MINIMUM METAL NOT IN CONTRACT NOMINAL OR APPROVED EQUAL ON CENTER OPPOSITE PLASTIC LAMINATE PLYWOOD PRESSURE TREATED RUBBER REMAINING REQUIRED ROUGH OPENING SQUARE FEET SQUARE INCHES SIMILAR STEEL STRUCTURE OR STRUCTURAL TONGUE AND GROOVE TOP OF THICK TYPICAL UNLESS OTHERWISE NOTED VERTICAL VERIFY IN FIELD WITH WOOD WINDOW WORK POINT FLOOR +/- 0' - 0" ( +/- 000.00') EG ROOM NAME KEYNOTE FINISHED FLOOR REFERENCE ELEVATION RELATIVE EL. (ABSOLUTE EL.) DOOR NUMBER WINDOW NUMBER WALUROOF/FLOOR ASSEMBLY SECTION LARGE SCALE DETAIL - DRAWING NUMBER/SHEET NUMBER EGRESS LIGHT PLANNING APPROVED - No changes can be made to these plans without approval from the Planning Division of DCD REVISIONS No changes shall bo made to the Rome of work without prior approve! ft T ukwila Building Division. NOTE: Revisions will require a new plan submitt I and may include additional plan review fees. GENERAL REQUIREMENTS GENERAL: All phases of this work shall conform to the minimum standards of all applicable codes, however, where the drawings and /or specifications are more stringent, they shall govem. For drawings that are indicated to contain limited information as required to obtain a building permit, see Drawing Notes for additional requirements for Owner /Contractor design responsibilities. Provide anchorage of all fixtures and equipment as required by applicable codes. The following General Requirements are portions of selected Code Requirements and do not represent all applicable requirements for the project. See Structural Notes on Structural Drawings for Structural General Requirements. Refer to applicable Codes for more detailed information and additional requirements. HAZARDOUS MATERIALS Contractor shall comply with all Laws and Regulations regarding the discovery, handling, removal, and dean -up of any hazardous material affected by the work. FIRE RESISTIVE MATERIALS AND CONSTRUCTION: All fire resistant construction shall comply with Chapter 7, IBC.. Fire Walls per section 706 IBC Fire Barriers per section 707 IBC Enclose all Shafts per Section 708 IBC Fire Partitions shall be constructed per Section 709 IBC Smoke Barriers shall comply with Section 710. Smoke partitions per section 711. Construct horizontal fire rated assembles in accordance with Section 712 IBC All penetrations in fire assembles shall comply with Section 713 IBC All joints in fire resistive assemblies shall comply with Section 714 IBC Structural members shall be protected per Section 704 IBC when required. Fire rated glazing, doors, and window assemblies shall comply with Section 715 IBC Provide Fire - blocking and Draft -stops in combustible concealed locations in walls, floors, ceilings, etc per Section 717 IBC INTERIOR FINISHES: All interior finishes shall empty with the minimum requirements of Chapter 8, IBC Maximum Flame spread class: per table 803.9 IBC Exit End. & Passageways - class B (26 -75) Corridors & Exit passageways - class B (26 -75) Rooms or Areas - class C (76 -200) FIRE PROTECTION SYSTEM: Fire protection system shall comply with Chapter 9 IBC. And Tukwila Fire Department requirements. An automatic sprinkler system shall be provided per WAC 903.2.1.6 DRAWING NOTES 1. Prior to commen the work, the contractor shall carefully study and compare the contract documents and shalt at once report to the architect any error, inconsistency or omission he may discover. Further, the contractor shall examine the premises and conditions affecting the work and shall compare them to the conditions as represented in the contract documents. Verify all dimensions. Should conflicts or inconsistencies between the actual conditions and the contract documents be noted, the contractor shall immediately notify the architect. Do not proceed with any work involving a discrepancy before receiving clarification from the architect. 2. The contractor represents that he has examined the contract documents in detail and has determined that they are sufficient, adequate and satisfactory for the completion of the work in accordance with the contract requirements. 3. The drawings and specifications are to be considered as complementary and all work necessary for the execution of the work as shown on the drawings and not described in the specifications, and all work described in the specifications and not shown on the drawings, or any work which is obviously necessary to complete the work within the limits established by the drawings and the specifications, shall be considered as part of the contract and shall be executed by the contractor without extra compensation in the same manner and with the same character of material as other portions of the contract. 4. Dimensions on drawings are shown to face of masonry, concrete, or to face of studs unless otherwise noted (U.N.O.) 5. Do not scale drawings, use written dimensions. Where none are given, obtain clarification from architect prior to proceeding with the work. 6. Specific details and notes on the drawings shall take precedence over typical details and general notes. 7. Drawings indicate general and typical details of construction, where conditions are not specifically indicated but are similar in character to details shown, similar details of construction shall be used, subject to approval of the architect. Where specific dimensions, details or design intent cannot be determined, obtain clarification from the architect before proceeding with the work. 8. Prior to commencing any work, verify and coordinate dimensions and the clearances required for all products, materials, and equipment whether provided by the contractor or furnished by owner and installed by contractor. 9. These drawings contain a limited amount of information as required to obtain a building permit. As a result, many portions of the project are design/build in nature. Therefore, the owner/contractor is responsible for the appropriate selection of the products and materials and design of details where none are specified. Design build work includes but is not limited to most products and material selections and detailing, electrical systems, plumbing systems, heating and ventilation systems, fixtures and equipment. The owner /contractor is also responsible for obtaining the additional information required to execute the work properly including but not limited to: recommendations and specifications from product manufacturers, industry quality standards, and applicable code standards. 10. The owner/contractor are solely responsible for interpreting the contract documents and observing the work of the contractor to discover, correct or mitigate errors, inconsistencies, or omissions. The architect shall not be responsible for any deviations from the contract documents. EXITING AND EXIT COMPONENTS: All exits and components shall comply with chapter 10 IBC Means of egress shall have a ceiling height of not less than 7' -6" per 1003.2 Objects may protrude per 1003.3 Stair headroom per 1009.2 Door height per 1008.1.1 The walking surface of means of egress shall have a slip resistant surface and be securely attached. Elevation change in the means of egress require sloped surfaces per section 1003.5 Conform to the minimum required egress width per section 1005.1 Means of egress shall be illuminated per Section 1006. The minimum light level shall be 1 foot- candle at the walking surface. Exit stairways shall comply with section 1007.3 IBC All Doors, Gates and Turnstiles shall comply with Section 1008. All doors shall provide a dear width of not less than 32" per 1008.1.1. Doors shall swing in the direction of travel when serving an occupant load of 50 or more persons. All doors shall be readily openable from the egress side without the use of a key or any special knowledge or effort. Door handles, pulls, latches, locks, and other operating devices shall be mounted 34" min. and 48" max. above he finished floor. Door hardware required to be accessible shall not require tight grasping, tight pinching, or twisting of the wrist to operate. Doors shalt be openable with no more than one releasing operation. Manually operated flush bolts or surface bolts are not permitted on required means of egress doors. Interior stairway doors shall be openable from both sides without the use of a key or special knowledge or effort. per section 1008.1.9.10 Landings at doors to comply with sections 1008.1.5 and 1008.1.6 Thresholds shall comply with 1008.1.7. Panic Hardware shall comply with 1008.1.10. Gates shall conform to 1008.2. Stairways and handrails shall comply with sections 1009 & 1012 IBC Min. width is 36" for stairs serving an occupant load of less than 50. Min. headroom of 6'-8" clear Riser shall be 7" max. and 4" min. Tread depth shall be 11" min. Tread and riser shall be dimensionally uniform except for a 3/8" tolerance between the smallest and Largest treads and risers respectively. Profile shall conform to 1009.4.5 Landings or floors shall be at the top and bottom of each stairway. Stairway construction per 1009.6 Handrails shall comply with sections 1009.10.1, 1009.12 and 1012 ACCESSIBILITY REQUIREMENTS: Provide accessible path of travel and facilities per the minimum requirements of Chapter 11 IBC and ICC A117.1 -2009 All floor surfaces shall be firm and stable, all areas subject to wet conditions shall have slip resistant floors. VENTILATION: IBC Section 1203 Provide source specific ventilation for all contaminants per 1203.4 GLAZING: IBC Chapter 24 Safety glazing shall comply with Section 2406. Each pane of glass located in a hazardous location shall be provided with a manufacturer's label that complies with 2406.3 Provide safety glazing at the following hazardous locations per 2406.4: 1. Glazing in swinging doors except jalousies. 2. Glazing in fixed and sliding panels of sliding door assemblies, and in panels of sliding and bi- folding closet door assemblies. 3. Glazing in storm doors. 4. Glazing in all unframed swinging doors. 5. Glazing in doors and enclosures for hot tubs, whirlpools, saunas, steam rooms, bathtubs, and showers. Glazing in any part of a building wall enclosing these compartments where the bottom edge of the glazing is less than 60" vertically from any standing or walking surface. 6. Glazing in an individual fixed or operable panel adjacent to a door where the nearest vertical edge is within a 24" arc of either vertical edge of the door in a closed position and where the bottom exposed edge of the glazing is less than 60" above the walking surface. 7. Glazing in an individual fixed or operable panel, other than those locations described in Items 5 and 6 above, that meets all of the following conditions: Exposed area of a panel is greater than 9 square feet. Exposed bottom edge less than 18" above the floor. Exposed top edge greater than 36" above the floor. One or more walking surfaces within 36" horizontally of the glazing. 8. Glazing in guards or railings, including structural baluster panels and nonstructural in -fill panels regardless of an area or height above walking surface. 9. Glazing in walls and fences enclosing indoor and outdoor swimming pools, hot tubs and spas where the bottom edge of the glazing is less than 60" above the walking surface and within 60" horizontally of the water's edge. This shall apply to single glazing and all panels in multiple glazing. 10. Glazing adjacent to stairways, landings, and ramps within 36" horizontally of the walking surface when the exposed surface of the glass is less than 60" above the plane of the adjacent walking surface, 11. Glazing adjacent to stairways within 60" horizontally of the bottom tread of the stairway in any direction when the exposed surface of the glass is less than 60" above the nose of the tread. Exceptions are listed in 2406.4 to the above. Glass in Handrails and Guards shall comply with Section 2407. t \ ex. valve vault existing parking (no change) edge of pavement IBC 1004.3 POSTING OF OCCUPANT LOAD. Every room or space that is an assembly occupancy shall have the occupant load of the room or ace posted in a conspicuous place, near the main�t� or exit access doorway from the room or space. Posted signs shall be of an approved legible permanent design and shall be maintained by the owner or authorized agent. 1. Reduced Pressure Principle Assembly (RPPA) be installed in a Hot Box/Hot Rock and anchored to a cement pad. 2. install Storz Knox Lock Box. Tamper switches need to be installed on the fire line isolation valves 3. Installation of a Sensus meter and radio transmitter to deduct the sewer usage for domestic water from irrigation water that does not enter the sewer. Vicinty Map 0�, �Q4�&c��' get k/4) pe)115 k5 k 9-6°4s c-)c4 -7 SEPARATE PERMiT REQUIRED FOR: Mechanical Electrical .0 Plumbing el Gas Piping City of Tukwila BUILDING DIVISION PROJECT & CODE NOTES PROPERTY OWNER: Desimone Trust WVH c/o Elizabeth Parrot Stultz - vice president Regional Manager - Western Region Trust Real Estate 1201 Third Ave Suite 5010 Seattle, WA 98101 206.664.8840 TENANT: PROJECT ADDRESS: TAX ID NUMBER LEGAL DESCRIPTION: GOVERNING CODES Zoning Code: Building Code: Energy Code: ZONING DATA Zone: Use: BUILDING CODE DATA Occupancy Group: Construction Type: No. of Stories: FLOOR AREAS OCCUPIED LOAD PARKING PLUMBING FIXTURES PROJECT TEAM ARCHITECT SHEET INDEX T1 ARCHITECTURAL Al A2 A3 SCALE: 1 " = 30' Cathedral Event Center 16401 West Valley Highway Tukwila, WA98188 252304 -9007 POR GL 2 IN NW 1/4 LY WLY OF SR 181 & SLY OF STRANDER BLVD & NLY OF LN RNG S 81 -07-31 W FR PT ON C/L SD SR 241 FT SELY FR HES 165 +56.97 The City of Tukwila Zoning Code IBC 2009 Edition w/ WAC 2009 WSEC -2009 Edition TUC - Tukwila Urban Center Existing: Restaurant, Lounge (A -2) New: Nightclub, Banquet Hall (A-2)* Existing Occupancy: A -2 New Occupancy: A -2* *same occupancy new use Type VB, sprinklered construction 1 + mezzanine Existing floor area (sf) Proposed new area(sf) Total Area 7098 s.f. 0 s.f. 7098 s.f. REVIEW D FOR CODE COMPLIANCE` APPROVED JAN 10 20t3 City of tu ila BUILDING DIVISION A -2 Nightclub, Banquet Hall assembly (standing) main floor 3788 sf / 5 net = 757 occ. A -2 Accessory storage, mech. and equip. main floor 283 sf / 300 gross =1 occ. mezzanine 696 sf /300 gross = 3 occ. A -2 Kitchen 1782 sf 1200 gross = 9 occ. Total Occupant Load = 770 occ. Existing parking to remain - no modifications See Sheet Al Ex p bjarkolserra ARCHITECTS 1050 N 34th St. Seattle, WA 98103 Tel: 206- 545 -1443 Fax: 206 - 548 -0443 Greg Bjarko JUL 13 201 3 PROJECT INFO, GENERAL NOTES, SITE PLAN MAIN FLOOR PLAN MEZZANINE LEVEL DEMO PLANS AND ADA BATHROOM PLANS OFIRECTION bjarko ARCHITECTS serra 2 Nickerson Street Suite 100 Seattle WA 98109 T 206 545 14,43 F 206 548 0443 Project: Cathedral Event Center 16401 West Valley Highway Tukwila, WA, 98188 Issuance: -11 s- anuary 7, 2013 -Site Comments FILE COPY 1 Permit No., p j2j :n ' F r :`clwILMan review approval is subject to errors and missions. JAN 0 7 20131►ro i a OF of construction docwnents does not autteze L t: :olatlorl of any adopted ed code or ordnance. Receipt roved F a an i , is ads ow od: - Tukw Ia Amtrak �. Tukwila S,aoon Tukwila Stauon fltNormboun,) .Sm.tfboura, Vicinity Map NOT TO SCALE By P12.7-61 City Of Tbicwila BUILDING DIVLSION Sheet Title: General Notes, Project Info & Site Plan T 1 13 NEW CLOSET 9 NEW ADA BATH BAR 164 sf 1occ CV N a) 2( -5 3' -0" clr. HALL BAR 219sf 1 occ per IFC 907.2 12 - 907:2.12.3;, provide sound system cut-off, prow d interface between alarm system.and sound system to elimina te-the npise source upon a alarm activation, also provide smoke detection wilt' voice j evacuation 788 s MAIN FLR OCC. LOADtassembly EZZANINE OCC ,LOAD(storagei 3 occ. TOTAL OCC:10 t FOR ASSEMBLY SPACE ress :xviatn sprinkler riser WOMEN EXIT 5" tall curb 10 11, typ MEN PLUMBING FIXTURES Min. Number of fixtures Per WSBC 2902.1 Water Closets 6000 s.f. Assembly A -2/ 30 = 200 Therefore, 100 male & 100 female (3) Water closets required for each male and female (2) water closets may be reduced with urinals Provided Men's room -2 water closets, and 3 urinals, Okay Women's room- 4 water closets, Okay Lavatories (1) per (2) water closets, therefore (2) Lavatories for each male and female restrooms Provided Men's room-2 lavatories, Okay Women's room - 3 lavatories, Okay Note that an additional Accessible Family Restroom is provided as well. 4 L__ 1 per IFC 907.2.12 - 907:2.12.3, provide sound system cut-off provide interface between alarm system and sound system to eliminate the noise source upon a alarm activation, also provide smoke detection with voice evacuation 4 6' -0 3/8" existing Main Floor Plan 1 SCALE 1/4" = 1' -0" } 2009 IBC MEANS OF EGRESS ILLUMINATION 1006.1 illumination required. The means of egress, including the exit discharge, shall be illuminated at all times the building space served by the means of egress is occupied. 1006.2 Illumination level. The means of egress illumination level shall not be Tess than 1 foot- candle at the walking surface. 1006.3 Illumination emergency power. The power supply for means of egress illumination shall normally be provided by the premises' electrical supply. In the event of power supply failure, an emergency electrical system shall automatically 'Ruminate the following areas: 1. Aisles and unenciosed stairways of rooms that require two or more means of egress. 2. Corridors, exit enclosures and exit passageways... 3. Exterior egress components... 4. Interior exit discharge elements... 5. Exterior landings... for exit discharge doorways... 2009 IBC MEANS OF EGRESS ILLUMINATION 1006.4 Performance of system. Emergency lighting facilities shall be arranged to provide initial illumination that is at least an average of 1 foot - candle and a minimum at any point of 0.1 foot - candle measured along the path of egress at floor level. Illumination levels shall be permitted to decline to 0.6 foot - candle at the end of the emergency lighting time duration. A maximum -to- minimum illumination uniformity ration of 40 to 1 shall not be exceeded. REVIEWED FOR CODE COMPLIANCE APPROVED JAN 10 2013 City of Tukwila BUILDING DIVISION EX RED JUL .13 2013 FLOOR PLAN NOTES 1. (e) construction to remain 2. (n) door w/ lever hardware (@ sim. latch & no closer) 3. (e) mezzanine above 4. (e) exit door w/ new panic hardware 5. (n) new exit door w /panic hardware 6. (n) emergency egress lighting 7. (n) replace existing bar 8. (n) new bar 9. (n) 2x framed interior walls w/ gwb each side 10. (n) screening 11. (e) replace existing plumbing fixtures 12. (n) water closet partions 13. (n) install grab bars per ICC A117.1 -2009 14. (e) existing stair to remain 15. (e) existing railing 16. (n) new handrail, 1.5" diam. w/ 1.5" clear btw finished wall and handrail, 34 " =38" above nosing 17. (n) new guardrail, 42" tall min. openings in guard shall not allow 4" diam sphere to pass through per 1013.3 IBC. New railing syetem to meet the requirements of IBC 1607.1. System shall be designed to resist 50Ib. If applied in any direction at the top to transfere the load through the support structure. System shall be designed to resist a single concentrated load of200 lbs applied at any direction to the top and transfer the load through the supports to the structure. Intermediate rails shall be designed to withstand 50 Ibs applied over 1 sf of area. 18. (n) egress path - provide min. lfc of illumination at walking surface per IBC 1006.2 19. (n) new vanity and lays. 20. (n) pavers to sidewalk WALL KEY existing framed wall to remain new wd framed wall 1 demo wall - non bearing RECEIVEL.. CITY OF TUKVJli NOV 1 3 2012 PERMIT CEi'? EGRESS DOOR SCHEDULE DOOR WIDTH DOORS PER FRAMES max. HARDWARE KEY NUMBER EA. DOOR OPENING HEIGHT THICKNESS MATERIAL FINISH JAMB MATERIAL FINISH U -Value SET REMARKS 100 6' -0 3/8" 2 7'-O" 1 3/4" WD/GL stained WD stained N/A new panic hardware - existing door - provide new egress hardware existing door - no locks existing door - provide new egress hardware double door existing door/hardware 101 6' -0 3/8" 2 7' -O" 1 3/4" WD/GL stained - WD stained ' N/A 102 3` -0" 1 7' -0" 1 3/4" WD stained - WD stained N/A new panic hardware 103 6' -0" 2 7' -O" 1 3/4" MTL PAINT - MTL PAINTED 0.60 panic hardware existing hardware 104 3' -6" 1 71-0" 1 3/4" WD stained - WD stained N/A bjarko ARCHITECTS serra 2 Nickerson Street Suite 100 Seattle WA 98109 T 206545 1443 F 206 548 0443 5412 REGISTERED E?E'0 ARCHITECT Project: VINCENT G. BJARKO STATE OF WASHINGTON Cathedral Event Center 16401 West Valley Highway Tukwila, WA, 98188 Issuance: November 13, 2012 Permit Submittal Sheet Title: Main Floor Plan Al outline of building Mezzanine Level HVAC APPROX. ROOF HVAC APPROX. fan 9" curb at thresholds STORAGE/ FAN ROOM 153 sf 9" curb at thresholds per IFC 907.2.12 — 907.2.12.3, provide sound system cut -off, provide interface between alarm system and sound system to eliminate the noise source upon a alarm activation, also provide smoke detection with voice evacuation MEZZANINE 193 sf MEZZANINE OCC. LOAD = 3 occ. 15 HVAC APPROX. TELEPHONE/ / STORAGE f 56 sf one tread min ;f, ,, Lv 17 16- dn r 15 STORAGE 294 sf J attic access ASSUMED WALL THICKNESS (TYP.). REVIEWED FOR CODE COMPLIANCE APPROVED JAN 10 2013 City of Tukwila BUILDING DIVISION outline of building SCALE:.1 /4" = 1' -0" EX D JUL 13 201-3 FLOOR PLAN NOTES 1. (e) construction to remain 2. (n) door w/ lever hardware (@ sim. latch & no closer) 3. (e) mezzanine above 4. (e) exit door w/ new panic hardware 5. (n) new exit door w /panic hardware 6. (n) emergency egress lighting 7. (n) replace existing bar 8. (n) new bar 9. (n) 2x framed interior walls w/ gwb each side 10. (n) screening 11. (e) replace existing plumbing fixtures 12. (n) water closet partions 13. (n) install grab bars per ICCA117.1 -2009 14. (e) existing stair to remain 15. (e) existing railing 16. (n) new handrail, 1.5" diam. w/ 1.5" clear btw finished wall and handrail, 34 " -38" above nosing 17. (n) new guardrail, 42" tall min. openings in guard shall not allow 4" diam sphere to pass through per 1013.3 IBC. New railing syetem to meet the requirements of IBC 1607.1. System shall be designed to resist 501b. If applied in any direction at the top to transfere the Toad through the support structure. System shall be designed to resist a single concentrated load of 200 lbs applied at any direction to the top and transfer the load through the supports to the structure. Intermediate rails shall be designed to withstand 50 lbs applied over 1 sf of area. 18. (n) egress path — provide min. 1 fc of illumination at walking surface per IBC 1006.2 19. (n) new vanity and lays. 20. (n) pavers to sidewalk thx WALL KEY 1 existing framed wall to remain new wd framed wall ! demo wall - non bearing RECEIVED CITY CF TUKWIL A, NOV 1 3 2012 �ERi1lil "r UENTEI.- bjarko ARCHITECTS serra 2 Nickerson Street Suite 100 Seattle WA 98109 T 206 545 1443 F 206 548 0443 5412 REGISTERED ARCHITECT Project: VINCENT G. BJARKO STATE OF WASHINGTON Cathedral Event Center 16401 West Valley Highway Tukwila, WA, 98188 Issuance: November 13, 2012 Permit Submittal Sheet Tide: Mezzanine Level Plan A2 11 11 office i11 11 - 16 1i i - dV u dn 1 1 i storage ii ir 11 di �1 11 11 11 11 11 11 nI Mezzanine Level Demo Plan SCALE: 1/8" = 1' -0" di d3 13 0 5' -O" clr. 1' -6" MEZZANINE LEVEL DEMO NOTES d1. remove (e) non - structural 6 x 12 wood beams - refer to structural sketch d2. remove (e) walls and doors as indicated (dashed lines) d3. remove (e) mezzanine storage access stair 1-= 1 i t / -e---; tfr 1 . _1 I_! - -- q 91` i r 1 L. • _ - r1 -1 -• I:• -11 = 1 1 d4 11 11 1. 1 1:"$i 1 ° I 1 11 ' d2 d3 Le- 11 J J Main Floor Demo Plan SCALE: 1/8" = 1' -0" di di : '1 r C - -Z - -i C - -L ❑❑ REVIEWED FOR CODE COMPLIANCE APPROVED d2 d3 ti 11 11 d2� WALL KEY 1 existing framed wall to remain new wd framed wall 1 ! demo wall - non bearing MAIN FLOOR DEMO NOTES d1. remove (e) movable partitions d2. remove (e) walls and doors as indicated (dashed lines) d3. remove (e) existing casework and fixtures as indicated d4. remove (e) vanity JAN 10 2013 bottom of mirror E M City of Tukwila BUILDING DIVISION INN 3'-4" -1 C protruding dispenser, tbd / 1' -0" max. 2' -0" min. ADA Bathroom Elevations 11-6" 3' -O" 2' -O" t 1 a SCALE: 1/2" = 1' - 0" 0 1' 2' 4' EXPIIED JUL 13 2013 FLOOR PLAN NOTES 1. (e) construction to remain 2. (n) door w/ lever hardware (@ sim. latch & no closer) 3. (e) mezzanine above 4. (e) exit door w/ new panic hardware 5. (n) new exit door w /panic hardware 6. (n) emergency egress lighting 7. (n) replace existing bar 8. (n) new bar 9. (n) 2x framed interior walls w/ gwb each side 10. (n) screening 11. (e) replace existing plumbing fixtures 12. (n) water closet partions 13. (n) install grab bars per ICC A117.1 -2009 14. (e) existing stair to remain 15. (e) existing railing 16. (n) new handrail, 1.5" diam. w/ 1.5" clear btw finished wall and handrail, 34 " -38" above nosing 17. (n) new guardrail, 42" tall min. openings in guard shall not allow 4" diam sphere to pass through per 1013.3 IBC. New railing syetem to meet the requirements of IBC 1607.1. System shall be designed to resist 50Ib. If applied in any direction at the top to transfere the load through the support structure. System shall be designed to resist a single concentrated load of 200 lbs applied at any direction to the top and transfer the load through the supports to the structure. Intermediate rails shall be designed to withstand 50 lbs applied over 1sf of area. 18. (n) egress path - provide min. lfc of illumination at walking surface per IBC 1006.2 19. (n) new vanity and lays. 20. (n) pavers to sidewalk RECEIVED CITY OFTUKWii. NOV 1 3 2012 ERIt/lI' GEINTEF; ADA Bathroom Plan & Elevations 3s ci SCALE: 1 /2" = 1' -0" Marko ARCHITECTS serra 2 Nickerson Street Suite 100 Seattle WA 98109 T 206 545 1443 F 206 548 0443 Project: 5412 Y1�CENT� SNtNG ON SiATECF Cathedral Event Center 16401 West Valley Highway Tukwila, WA, 98188 Issuance: November 13, 2012 Permit Submittal Sheet Title: Demo Plans & ADA Bathroom A3