Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M12-023 - REGENCY CLEANERS
REGENCY CLEANERS 950 ANDOVER PK E M12 -023 City oikukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206. 431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http://www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 2623049105 Address: 950 ANDOVER PK E TUKW Project Name: REGENCY CLEANERS Permit Number: M12 -023 Issue Date: 09/21/2012 Permit Expires On: 03/20/2013 Owner: Name: NATIONWIDE LIFE INS Address: REAL ESTATE INVESTMENT , ONE NATIONWIDE PLAZA 43215 Contact Person: Name: WILLIAM LIPSCOMB Address: 950 ANDOVER PK E , TUKWILA WA 98188 Email: NOT PROVIDED Phone: 206 - 650 -6933 Contractor: Name: OWNER AFFIDAVIT - WILLIAM LIPSCOMB Phone: Address: Contractor License No: Expiration Date: DESCRIPTION OF WORK: REPLACE OLD BOILER WITH NEW FIRETUBE STEAM BOILER Value of Mechanical: $1,000.00 Type of Fire Protection: UNKNOWN Electrical Service Provided by: Permit Center Authorized Signature: Fees Collected: $197.81 International Mechanical Code Edition: 2009 Date: 9-.)- (-(2_ I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this permit. ' ! �%� ` Z Signature: Date:7 Print Name: %/' �� 7 (4)7S This permit shall become null and void if the wo kqs not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the la pection. doc: IMC -4/10 M12 -023 Printed: 09 -21 -2012 • • PERMIT CONDITIONS Permit No. M12-023 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 6: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 7: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 8: ** *FIRE DEPARTMENT CONDITIONS * ** 9: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 10: The top of the new boiler is so close to the ceiling that it is an obstruction to sprinkler discharge patterns. Install 2 additional sprinkler heads to protect the other side of the room obstructed by the boiler. 11: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2327). 12: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 13: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 14: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: IMC -4/10 M12 -023 Printed: 09 -21 -2012 CITY OF TUKWIL‘p Community Developmen ailment Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, WA 98188 littp://www.Tukw laW A .gov MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** Site Address: g.522 /47-19.ezeeW■er Tenant Name: King Co Assessor's Tax No.: Suite Number: (7. er7C7 , pROOERTir .ci*NEk:', : - : . ' - . -- ' ' ' '' • ' Name: Al // i /// Z2V-1-7 ./7S'ec.-77.-S Address: 7 te.., /- Ce, City: State: Zip: ' CONTACT.PERSON- *son receivinkalli'project,:, ,., : .. .,.. communication .. . . Name: iii A / //27 4_oat,7,2‘ Address: Address: City: ---• / State : / - -, At,----- Zip: Zi. . Phone: Z&., e5-0. #73 ax: Email: Phone: New Tenant: Floor: 0 Yes k No MECHANICAL CONTRACTOR INFORMATJON:::'..: ;•:'.' Company Name: -- Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: - • - 44,4* 4.4,44...4,44,14444 , . 4.4) 44.44.44444.....r.4-4 44.4.-444444. -.4.4444. 4.4 .v4,444,4444 4.4.444-444444,444•404444.44-44.4,-...4-4.4. pyry 44.,4,44-44,44444.44444.4444-4 4,44-444444,44.51....4444,44,4447 Valuation of project (contractor's bid price): $ /e2-6,•-° /9p? cf/ /e7e--,7,c? S'4" A)117/ /7.a-461 Describe the scope of work in detail: 'zr Use: Residential: New Replacement 0 Conuriercial: New 0 Replacement Fuel Type: Electric ID Gas Other: 1-1:\ApplicationsWorms-Applications On Line \2011 Applications \Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being in�Iled and the quantity below: Unit TyPe - Qty. Furnace <100k btu y, Furnace >100k btu Floor furnace Suspended /wall /floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm .Unit Type. Qty_'. Air handling unit y, >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial • Unit Type' Qty_'. Fire damper y, Diffuser Thermostat Wood /gas stove Emergency generator Other mechanical equipment Boiler /Compess ror 0 -3 hp /100,000 btu y, 3 -15 hp /500,000 btu 15 -30 hp /1,000,000 btu 30 -50 hp /1,750,000 btu 50+ hp /1,750,000 btu PERMIT APPLICATION. NOTES Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER H n RIZED AGENT: Signature: Print Name: 7.91////f-- Mailing Address: ��� "47 -/-7". H:WpphcationsWorms- Applications On Line\20I I Applications\Mechanical Permit Application Revised 8- 9- 11.docx Revised: August 2011 bh Day Telephone: City Date: zo6. State cf rof Zip Page 2 of 2 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: http: / /www.TukwilaWA.gov Parcel No.: 2623049105 Address: 950 ANDOVER PK E TUKW Suite No: Applicant: REGENCY CLEANERS RECEIPT Permit Number: M12 -023 Status: PENDING Applied Date: 02/10/2012 Issue Date: Receipt No.: R12 -00592 Initials: User ID: Payee: WER 1655 Payment Amount: $197.81 Payment Date: 02/10/2012 01:51 PM Balance: $0.00 FAMILY TRUST INVESTMENTS TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 184898 ACCOUNT ITEM LIST: Description 197.81 Account Code Current Pmts MECHANICAL - NONRES PLAN CHECK - NONRES 000.322.102.00.00 158.25 000.345.830 39.56 Total: $197.81 doc: Receint -06 Printed: 02 -10 -2012 5 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION ' 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit Inspection Request Line (206) 431 -2451 41/2 -023 (206) 431 -3670 Project: tipp . /,40 1X / �....d./. Type of Inspection: 1 /�GL / /6. Addrel?.55 A • Date Called: Special Instructions: • l i r °a Date Wanted: V 0 . p.m. Requester��)1G( Phone No: IApproved per applicable codes. Corrections required prior to approval. COMMENTS: -31 Inspector:/ J /` (,/ Date: n REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to„schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION N0. PERMIT NO. /14 /Z -v2j CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project:p /19 ,,,, , /7/o,7o4 Type of Inspection: M,/.4 ,Z7), G A- l 1 /. --( >e,- .<n ."--, nb) C Address , / .cs /..7 .4-, 6 /6 /L' t _ c.— >Le Date Called: _ Special nstructions: +' 4"30 Date Wanted: `,71 � � ( /� pm. Requester: • Phone No: /-1 t. h Ga Approved per applicable codes. Corrections required prior to approval. Z COMMENTS: l 1 /. --( >e,- .<n ."--, nb) C / .cs /..7 .4-, 6 /6 /L' t _ c.— >Le . d� f' G 14--1. _ .. / . /1 , .--, f `. /.s_' fX Go, /? l- //mil v ///-to S,'Z IJS-'' ) 14_ / ®.�.f / .47j rl.. :vG4 r „t, 3.) , (e.../ ./..0 — — /,��. ,'h. ,; -7-2-, PO-le- - Ol c "1 /t,./60,■,77,i., ^P .,,i e.e.ze, Inspector: 7/ REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Date: 11- 30-13 3 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project w7 c_t _ Typ• e of Inspection: ,c / Address: J se / GC P.*. E-7 Date Called: / S LS / /! _ i .# / Special Instructions: «3a Z .-, A I �' . /t�E�%��Z��' Date Wanted:. /2--/2---/ .. a.m. Requester:�{ � /'r"!•� Phone 2. _7.V 71- '.57€ ElApproved per applicable codes. Corrections required prior to approval. COMMENTS: / .■ v'A/ /.mob / S LS / /! _ i .# / , ,.. /,),-,, A /3 ti ,'7 j. ' Ye%/ i i^,.`..„#.,1 ell-, / S / r/' 1 )%"e2' -2--- ,c, oil- rg— L...,,,,,e-- .7 G/ s s- c. 4, C rat^ -ei s."'" fir' 40. /'P a 1L- 6 Inspector: Date: '11 n REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 le, (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: /� 6 C-4.4.. Type of Inspection: ) 417 /i ' e_ > "." / " Address: ' Date 'Gilled: ■0. 1/1 ea"—/ Special Instructions: Date Wanted: —� ,,/� (_ / a. > _1 L p_J Requester: /4. Phone No: ElApproved per applicable codes. 4Corrections required prior to approval. r COMMENTS: ) 417 /i ' e_ > "." / .4--/-1--0 • ?Z. / /5/ --7 rte/ i ,•-• 5 ■0. 1/1 ea"—/ ).-yr, , /4. ,/,:s)0 A--.„493 ,.., -,..--, 3) f)? /e -t--r.fi-,, 4 ' ' / */- //7 2 /-.in // 7'-1e A-170. e le- /2 _1l! f r) ....A17 -. 1 " - ,A--27e y....' .' / i� / �f a b.% GI / 4.,( / L / /43,61.,.. Inspector: 44, ,•� /�,� REIuuSF'ECTION FEE REQIJ RED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: f �� INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 A4/2 - °z3 Project( / Type of Inspection: / Address: Date Called. Special Instructions: Date Wanted:. f Requester: Phone No: Approved per applicable codes. Corrections required -prior to approval. 5 COMMENTS: Inspector: ' �i ' f q _ n REIN P'E"CTION FEE REg IRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: 9 `.2 S----12 1 SPECTION NUMBER INSPECTION RECORD Retain a copy with permit PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT ndover Park East, Tukwila, Wa. 98188 206 - 575 -4407 e5e,.1 1 Z l cq vs 61 5 01.14 - I`'I istructions: 4 Type of Inspection: ,Me(,/, F014 Contact Person: Phone No.: Approved per applicable codes. Corrections required prior to approval. NTS: r.iv-c I OK M ed' Fit-,( OK gift Inspection: Sprinklers: n: Hood & Duct: Pre -Fire: Occupancy Type: Dr: Date: /,3. -J) Hrs.: $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from ty of Tukwila Finance Department. Call to schedule a reinspection. g Address Company Name: s: fsh >h of REVISIONS No changes shall' be made to the scope of vfork without prior approval of Tukwila Building Division. NOTE: R visions will require a new plan submittal • and may inc'ude additional plan review fees. City of lbkwila TYPICALDDSTING PARKING\ ANDOVER PARK EAST A� e SITE P).AN SCAAL , . 20' -T LEGAL DESCRIPTION THAT PORTION OF THE SOUTHEAST QUARTER OF THE SOUTHEAST QUARTER OF SECTION .26. TOWI&IP 26 NORTH. RANGE 4 EAST W.Y. IN THE CRY OF KING COUMY EA9QNGTON DESCRIBED AS FOLLOWS: BE044NG AT THE- NOR1fEAST CORNER OF THE SOUTHEAST QUARTER OF SAID Dim s 02'2225 W ALONG THE EAST LIE OF SAID SOUTHEAST QUARTER DISTANCE OF 1319.75 FEET TO THE CM/TUNE OF THE P -17 DRAINAGE ROAM TN CON UES MARGIN 8512'3t E TO TERMINUS AT THE WESTERLY MARGIN OF CH THENCE N 8512.32. N ALONG THE SAD P -17 DRAINAGE CHANNEL CENTERU 92.45 .FEET; TTEIICE 5 01'47'2r M 21.00 FEET TO THE TRUE POINT OF BEGINNING: THENCE CONTINUING 5 cram. M 297.59 FEET: THENCE N 6512'32: M 297.00 FEET TO THE EASTERLY HARM OF ANDOVER PARK EAST AS.REOOROED UNDER AUDITORS FVE NO 6355530. VOLWE 5005. PAGE 135 AND 66. RECORDS OF KING COUNTY. IIASHINGTOK THENCE N or47'2f E ALONG SAID EASTERLY MARGIN 297.59 FEET; THENCE S 8512'32' E 297.00 FEET TO THE TRUE POINT OF BEGINNING SUBJECT 10 MID 6NCWOING AND FASEIENT FOR UTUTIES OVER THE EAST 15.00 FEET AND OVER NNE WEST 15.00 FEET THEREOF; SUBJECT TO AND INCLUDING AN EASEMENT FOR RAILROAD PURPOSES OVER THE EAST 27 FEET THEREOF. 1 EXISTING BUILDING DATA CGNSTRUCTDN TYPE: FULLY SPIINKLERED OCCUPANCY: EXISTING PARKING STAL: V -N 8 -2 68 DESCRIPTION OF WORK al ray I^ ce REVIEWED FOR CODE COMPLIANCE APPROVED SEP 21 2012 • 1) t, �✓ City of Tu a BUILDING DI ION FEL PY Permit No. NOTES Plan ro■ ' w approval is subject to errors and omissions. p{ ;roval r construction documents does not authorize Vis violation of any adopted code or ordinance. Receipt of approved Field Copy and conditions is acknowledged: City Of Tukwila BUILDING DIVISION 11 12-023 RECEIVED FEB 10 2012 PITCENTER IF THIS MICROFILMED DOCUMENT IS LESS CLEAR THAN THIS NOTICE, IT IS DUE TO rue nnu try TIC rut AC, 0IW t IWIAICYT Z AYI BUILD. m Z 0 M CD DC VI GC a� ASSISTING YOU I SHEET NUMBER: A.1 SEPARATE PERMIT REQUIRED FOR: Mechanical IA Electrical 1A(‘ Plumbing Gas Piping City of Tukwila flI , DIVISION 37 MTL. DOOR W /SELF CLOSER GASKETS ibm 42 "X24" VENT OPENING ABOVE 84 "X24" L- SHAPED VENT COLUMN EXISTING WALLS TO REMAIN TYPICAL \ c 1L 62" THERMDSTEAM BOILER MODEL VFT -50 (150 PSI) - SEE ATTACHED MANUFAC- TURER SPECS FOR DETAILS BLOW -DOWN TANK J REVIEWED FOR CODE COMPLIANCE APPROVED SE? 21 2012 City of Tukwila BUILDING DIVISION THERMtEAM BJSSV -B �. RETURN SYS TANK (59GAL) EXISTING 2X6 WALL KWEIM M \\\ RtR\1 nO k \ \\1R�1 \ \11\ OVERFLOW MAKE -UP TANK 1 NEW 2X6 WALL PR. 3'7" MTL DOORS W /SELF CIDERS G SMOKE GASKETS 5 1 /2" maik-\ REGENCY CLEANERS - 95D ANDOVER PARK EAST PLAN OF BOILER ROOM 1/2" =1, -0„ 5 1 /2" CORRECTION MU-023 EDGE OF STORAGE MEZZANINE ABOVE - SEE ORIGINAL DRAWING SUBMIS- SION RECEIVED CITY OF TUKWILA SEP 0 6 2012 PERMIT CENTER PERMIT NO. M12 -023 9 011 -339 16' -4" , 4' -7" 3' -9° 5 1 /2" maik-\ REGENCY CLEANERS - 95D ANDOVER PARK EAST PLAN OF BOILER ROOM 1/2" =1, -0„ 5 1 /2" CORRECTION MU-023 EDGE OF STORAGE MEZZANINE ABOVE - SEE ORIGINAL DRAWING SUBMIS- SION RECEIVED CITY OF TUKWILA SEP 0 6 2012 PERMIT CENTER PERMIT NO. M12 -023 9 011 -339 1 -1/2 "MPG DN WATER HEATER 199 MBH ®3/4"G 1 "GVTR UP 1 "G MEZZANINE 1 "G 1 -1/2 "MPG REVIEWED FOR CODE COMPLIANCE APPROVED SEP 21 2012 City of Tukwila BUILDING DIVISION CLEANERS MAIN FLOOR 1 "MPG MPG 1 -1 /2 "MPG TO GAS METER MPG F-44 GAS FLOOR PLAN - AS -BUILT SCALE: 1/8" = RECEIVED CITY OF TUKWILA SEP 0 6 2012 PERMIT CENTER GAS SIZING SCHEDULE PIPE SEGMENT PIPE LOAD (MBH) BRANCH LENGTH (FT) PIPE SIZE (IN) PIPE CAPACITY (MBH) 4220 O1 2309 150' 1 -1/2 "MPG O2 2110 150' 1 -1/2 "MPG 4220 3* 2110 6' 1-1/2"G 2299 O4 199 125' 1 "MPG 1710 O5 199 20' 1"G 466 06 199 20' 3/4 "G 247 *SEE M2.3. NOTES: 1. SIZING FROM TABLE 402.4(2) AND 402.4(3) AND EQUATION 4 -1 IN THE 2009 IFGC. PERMIT /INSPECTION RESPONSE FAMILY TRUST INVESTMENTS REGENCY CLEANERS 950 ANDOVER PARK EAST TUKWILA, WA 98188 METRIX E N G I N E E R S 1131 SW 7TH ST, SUITE 110 425- 336 -2822 RENTON, WA 98057 www.metrixeng.com DRAWN BY: MH CHECKED BY SM DATE: 9/5/12 M2.2 1 -1/2 "MPG UP 1"GVTR 42x24 HIGH COMBUSTION AIR UP 42x24 LOW COMBUSTION AIR UP 42x24 LOW COMBUSTION AIR FIRE SPRINKLERPJP_ING (FOR REFERENCE ONLY) BLOW DOWN TANK CONDENSATE TANK CHEMICAL POT FEEDER 1 GAS BOILER ROOM PLAN - AS -BUILT M2.3 � SCALE: 1/4" = SHEET NOTES: 1. REFER TO M2.2 FOR GAS SIZING SCHEDULE. REVIEWED FOR CODE COMPLIANCE APPROVED SEP 21 2012 BUILDING NG Tukwila DIVISION RECEIVED CITY OF TUKWILA SEP 0 6 2012 PERMIT CENTER PERMIT /INSPECTION RESPONSE FAMILY TRUST INVESTMENTS REGENCY CLEANERS 950 ANDOVER PARK EAST TUKWILA, WA 98188 METRIX E N G I N E E R S 1131 SW 7TH ST, SUITE 110 RENTON, WA 98057 425 - 336 -2822 www.metrixeng.com DRAWN BY: MH CHECKED BY: SM DATE: 9/5/12 M2.3 [>K:: FIRE SPRINKLERPJP_ING (FOR REFERENCE ONLY) BLOW DOWN TANK CONDENSATE TANK CHEMICAL POT FEEDER 1 GAS BOILER ROOM PLAN - AS -BUILT M2.3 � SCALE: 1/4" = SHEET NOTES: 1. REFER TO M2.2 FOR GAS SIZING SCHEDULE. REVIEWED FOR CODE COMPLIANCE APPROVED SEP 21 2012 BUILDING NG Tukwila DIVISION RECEIVED CITY OF TUKWILA SEP 0 6 2012 PERMIT CENTER PERMIT /INSPECTION RESPONSE FAMILY TRUST INVESTMENTS REGENCY CLEANERS 950 ANDOVER PARK EAST TUKWILA, WA 98188 METRIX E N G I N E E R S 1131 SW 7TH ST, SUITE 110 RENTON, WA 98057 425 - 336 -2822 www.metrixeng.com DRAWN BY: MH CHECKED BY: SM DATE: 9/5/12 M2.3 BOILER ROOM HIGH /LOW COMBUSTION AIR 1 "GVTR 12 "0 BOILER FLUE 10 "0 ABANDONED BOILER FLUE M2.4 ry- RELIEF HOOD 3 "0 PVC VENT 8 "0 ABANDONED VENT 6 "0 ABANDONED 3 "0 WATER WATER HEATER HEATER FLUE COMBUSTION AIR \-2"VTR �1 "GVTR 3 "0 WATER HEATER FLUE nor- RELIEF HOOD \\_2" BLOW OUT AND CONDENSATE TANK RELIEF VENT ROOF TERMINATION PLAN - AS -BUILT SCALE: 1/8" = SHEET NOTES: 1. ALL GAS VENTS AS SHOWN ARE 12 INCHES OR LESS IN SIZE AND LOCATED NOT LESS THAN 8 FEET FROM A VERTICAL WALL OR SIMILAR OBSTRUCTION. THEY ARE AT LEAST 1' -0" ABOVE THE ROOF PER SECTION 503.6.4 IN THE 2009 IFGC. 2. ALL VENT TERMINALS OF A DIRECT -VENT APPLIANCE COMPLY WITH THE DISTANCE REQUIREMENTS PER SECTION 503.8 IN THE 2009 IFGC. 3. ALL PLUMBING VENTS THROUGH THE ROOF ARE AT LEAST 10' -0" FROM ANY AIR OPENINGS PER SECTION 906 IN THE 2009 Iipr. REVIEWED FOR CODE PP COMPLIANCE ROVED SEP 21 2012 BUILDING Tukwila (VISION RECEIVED CITY OF TUKWIL..s SEP 0 6 2012 PERMIT CENTER PERMIT /INSPECTION RESPONSE FAMILY TRUST INVESTMENTS REGENCY CLEANERS 950 ANDOVER PARK EAST TUKWILA, WA 98188 METRIX E N G I N E E R S 1131 SW 7TH ST, SUITE 110 RENTON, WA 98057 425- 336 -2822 www.metrixeng.com DRAWN BY: MH CHECKED BY: SM DATE: 9/5/12 M2.4 INSTALLATION AND OPERATING INSTRUCTIONS VERTICAL FIRE TUBE BOILER NATURAL GAS BURNER MODEL # P._ FOR YOUR SAFETY This product must be installed and serviced by a professional service technician or gas /oil supplier, qualified in steam boiler installation. Improper installation and /or operation could cause serious injury or death. Improper installation and /or operation will void the warranty. Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. WARNING Improper installation, adjustment, alteration, service or maintenance can cause injury or property damage. Read the manual thoroughly. For assistance or additional information consult a qualified installer, service agency or the gas /oil supplier. WHAT TO DO IF YOU SMELL GAS REVIEWED FOR CODE COMPLIANCE APPROVED SEP 21 2012 City of Tukwila BUILDING DIVISION • DO NOT TRY TO LIGHT ANY APPLIANCE. • DO NOT TOUCH ANY ELECTRICAL SWITCH; DO NOT USE ANY PHONE IN YOUR BUILDING • IMMEDIATELY CALL YOUR GAS SUPPLIER FROM A NEIGHBOR'S PHONE. FOLLOW THE GAS SUPPLIER'S INSTRUCTIONS • IF YOU CANNOT REACH YOUR GAS SUPPLIER, CALL THE FIRE DEPARTMENT THERMOSTEAM SYSTEMS INC. 604 N. HILL STREET SOUTH BEND, IN 574- 236 -6222 cITYRFArigiin FEB 17 2012 F'ERMRCE►ii'ER M? IMPORTANT THESE INSTRUCTIONS ARE INTENDED AS A GUIDE FOR THE INSTALLING CONTRACTOR AND AS A REFERENCE FOR THE OPERATOR, OWNER AND SERVICE MAN RETAIN THESE INSTRUCTIONS NEAR THE EQUIPMENT FOR READY REFERENCE This unit must be installed in accordance with those installation regulations in force in the local area where the installation is to be made. Local regulations shall be carefully followed in all cases. Authorities having jurisdiction shall be consulted before installation is made. THERMOSTEAM SYSTEMS, INC. has a commitment to product improvement and provides a continuing quest for the highest standards of product performance. In pursuing this policy of continuous development of products, the Manufacturer reserves the right to vary any details in this manual with- out notice. TABLE OF CONTENTS GENERAL INFORMATION A. INTRODUCTION 3 B. WARRANTY 4 C. ENGINEERING ASSISTANCE 4 INSTALLATION A. UNCRATING 4 B. PLACEMENT 4 C. PIPING CONNECTIONS 4 D. ELECTRICAL CONNECTION 5 E. FUEL CONNECTIONS 5 • GAS 5 F. FLUE 6 G. COMBUSTION AIR 6 START -U P A. PRE START -UP CHECKS 7 • PIPING CONNECTIONS 7 • PUMPS 7 • ELECTRICAL 7 • COMBUSTION AIR 7 • GAS 7 B. FILLING THE SYSTEM 7 C. CONTROL SETTINGS 7 • CONTROLLER 7 • HIGH LIMITS 7 • LOW WATER CUT -OFFS 7 D. BURNER 7 • PREPARATION FOR START -UP 7 • START -UP : GAS BURNER 8 OPERATION AND MAINTENANCE A. OPERATION 9 B. MAINTENANCE 9 2 GENERAL INFORMATION IMPORTANT WARNING: The Model VFT Boiler shall be installed according to the procedures detailed in this manual, or the THERMOSTEAM SYSTEMS, INC. warranty may be voided. The installation must conform to the requirements of the local jurisdiction having authority, and to the latest edition of the National Fuel Gas Code, ANSI Z223.1. Any modifications to the boiler or its gas /oil controls may void the warranty. If the field conditions require modifications, consult the Factory. A. INTRODUCTION This manual supplies information on the application, installation and operation of Model VFT — (Fire Tube) steam boiler. Review all applications and installation procedures completely before proceeding with the installation. Consult the THERMOSTEAM factory, or local factory representative, with any problems or questions regarding this equipment. Experience has shown that improper installation causes most operating problems. The VFT models are offered in the basic configuration shown in FIGURE 1 & TABLE 1. FIGURE 1 ly slum • WWI UIC IDM1q N PILE O OrNG LEFT SIDE IOIOCNiI FRONT y -a ■ M KNOW& GMMMI TOP 11. M •I. OiAUMC (MLYI L WOO L -w MODEL NUMBER 1 MULL NOM BOILER HP .1. RATED INPUT MBTU NOM OUTPUT PPH VESSEL WATER OVERALL CONNECTIONS (NPT) BURNER DIMS (IN.) VOL* DIMENSIONS (IN.) FEED WATER BLOWDOWN STEAM OUTLET FLUE BLOWER DIA HEIGHT (GAL) W L" H 15PSI P5/ 15 PSI 150 PSI SIZE HP (NATURAL GAS) VFT -2406 6 250 210 24 45 52 28 50 81 3/4" 1" 1" 1 -1/2" 1" 6" 1/4" VFT -2409 9.5 400 330 24 54 64 28 50 90 3/4" 1" 1" 1 -1/2" 1" 6" 1/4" VFT -2410 10 420 340 24 57 69 28 50 95 3/4" 1" 1" 1 -1/2" 1" 6' 1/4" VFT -3115 15 630 520 31 48 88 35 57 84 3/4" 1" 1" 2" 1 -1/4" 6" 1/4" VFT -3920 20 840 690 39 45 128 43 65 81 3/4" 1" 1" 2 -1/2" 1 -1/4" 8" 1/3" VFT -3925 25 1050 860 39 . 52 156 43 65 88 3/4" 1" 1" 2 -1/2" 1 -1/4" 8" 1/3" VFT -3930 30 1260 1030 39 60 188 43 65 98 3/4" 1" 1" 3" 1 -1/2" 10" 1/3" VFT -4635 35 1470 1210 46 48 196 50 72 84 1" 1 -1/4" 1" 3" 1 -1/2" 12" 1/3" VFT -4640 40 1674 1370 46 52 218 50 76 90 1" 1 -1/4" 1" 3" 1 -1/2" 12" 1/3" VFT -5850 50 2110 1730 58 52 275 62 88 88 1" 1 -1/4" 1" 4 "F 2" 12" 1/3" VFT -5860 60 2500 2050 58 60 332 62 98 98 1" 1 -1/4" 1" 4 "F 2" 14" 1" VFT -5872 72 3000 2460 58 64 336 62 98 102 1" 1 -1/4" 1" 4 "F 2" 14" 1" VFT - 6284 84 3500 2870 62 64 378 66 106 102 1" 1 -1/2" 1" 4 "F 2 -1/2" 16" 1 -1/2" VFT -62100 100 4200 ' 3440 62 74 452 66 106 118 1" 1 -1/2" 1" 6 "F 3" 16" 1 -1/2" 3 B. WARRANTY THERMOSTEAM SYSTEMS, INC., fired steamed boilers are covered by a limited warranty. A copy of the warranty is included in the back of this manual. Make all warranty claims to an authorized THERMOSTEAM SYSTEMS representative or directly to the factory. Claims must include the unit serial number, model number (per name plate) and installation date. Shipping and labor costs are not included in the warranty coverage. Some accessory items may be shipped in separate packages. Verify receipt of all packages listed on the packing slip. Inspect everything for damage immediately upon delivery, and advise the carrier of any shortages or damage. File any such claims with the carrier. The carrier, not the shipper, is responsible for shortages and damage to the shipment, whether visible or concealed. C. ENGINEERING ASSISTANCE Consult the representative or factory regarding any questions or problems which may come up involving the specifications, installation or operation of THERMOSTEAM SYSTEMS, INC., equipment. An experienced engineering staff is ready to assist in assuring their proper application and performance. INSTALLATION UNCRATING 1. Care must be given not to damage controls or to deform the unit's casing during removal of the crate. 2. When using pry bars or forklifts, be certain to support the unit on the shipping skids or the channel base. 3. Storage — electrical equipment can be damaged if exposed to adverse weather. THE UNIT SHOULD BE STORED INSIDE. The electrical panel and controls must be covered with plastic throughout all construction to avoid accumulation of dust and moisture on the controls and other components. PLACEMENT 1. Provide a firm, level foundation for the unit. Standard fired units are not suitable for placement on combustible flooring. 2. Leave a permanent space of 18 inches on the sides and rear, and 24 inches on the front for burner maintenance. 3. Be sure to keep the burner and controls covered at all times while work is in progress CAUTIOUS: DO NOT USE THE UNIT'S HOUSING TOP FOR SCAFFOLDING PIPING CONNECTIONS NOTE: Refer to applicable dimensional drawing (DD) appendixes to this manual 1. Boiler piping connections and valves MUST comply with state and local codes, in addition to compliance with AWE piping requirements. 2. Install all safety valve(s) on the connections(s) provided. Plumb the safety valve outlet full size to the floor drain for low pressure boilers, or to a safe point of discharge for high pressure boilers. When two or more valves are used, discharge lines may be manifolded provided unions are included for disassembly and the common discharge pipe size must be greater or equal in area to the total area of all safety valve outlets combined. Check local codes for proper safety valve discharge piping. 3. Connect the feedwater supply to the feedwater valve train as shown on the DD. CAUTION: Do not oversize feedwater piping and valves on Steam boilers, as this may result in severe pressure fluctuations during feedwater cycles if the fill rate is too rapid. 4 4. Pipe both the bottom blowdown and surface blowoff (if provided) to a nearby drain (low pressure boilers) or to a blowdown receiver (boilers greater than 15 psi). Check compliance with local codes. Be sure to provide a low point drain to enable complete draining of the boiler. ELECTRICAL CONNECTIONS CAUTION: The boiler must be electrically grounded in accordance with the most recent edition of the National Electrical Code, ANSI /NFPA 70. Do not rely on the gas or water piping to ground the metal parts of the boiler. The use of plastic pipe or dielectric unions may isolate the boiler electrically. Service and maintenance personnel may be standing on wet floors and could be severely shocked by an undergrounded boiler. 1. Check the boiler wiring diagram (WD) for correct voltage, frequency, phase and amperage of the required branch circuit. The branch circuit must be protected by a properly sized circuit breaker or fused safety switch. 2. Electrically ground the unit per NEC and local code requirements, using AWG #10 Cu wire minimum. 3. AU field installed electrical safety devices and controls (draft switches, relays, timers, pressure reset devices, etc.) can be connected as shown in the wiring diagram designated "Field interlock Provision ". FUEL CONNECTIONS NOTE: Also refer to the burner literature supplied as an appendix to this manual relative to the actual burner supplied with your unit. - GAS - NOTE: Contact your local gas service company to assure that adequate gas service is available and to review applicable installation codes for your area, the gas line pressure should be in the range of 5 —14" WC. 1. Size the main gas line in accordance with TABLE 2. The figures shown are for straight lengths of pipe at 0.2 ins., WC pressure drop, which is considered normal for low pressure systems. Note that fittings such as elbows and tees will add to the pipe pressure drop. 2. Refer to FIGURE 2 for details of gas piping. Mount any items of the gas train shipped loose as shown. Install the main gas cock with drip leg upstream of the regulator and automatic valves. The pilot line should be piped into the upstream tapping on the main gas train shut -off cock. TABLE 2 GAS PIPING PRESSURE DROP DATA EQUIVALENT LENGTH OF STRAIGHT PIPE IN FEET 20 1 30 1 40 1 50 1 60 1 80 1 100 1 150 1 200 PIPE SIZE IN INCHES CCFH GAS WITH .2" PRESSURE DROP 1" 300 250 210 190 180 150 135 110 75 1 -1/4" 520 425 360 325 300 260 230 190 165 1 -1/2" 800 690 580 500 480 410 370 300 260 2" 1700 1400 1200 1100 1000 850 750 600 540 2 -1/2" 3000 2500 2100 1900 1800 1550 1375 1100 950 EQUIVALENT LENGTHS OF STANDARD PIPE IN FEET FOR LISTED FITTINGS FITTING TYPE 1" 1 -1/4" 1 -1/2" 2" 2 -1/2" NOMINAL PIPE SIZE IN INCHES STD. TEE 5.5 7.5 9 12 13.5 STD. ELBOW 2.7 3.7 4.5 5.5 6.1 5 FIGURE 2 Main Gas Cock Drip Leg Pilot Shut -off Cock Combination Main Automatic Gas Valve and Gas Pressure Regulator External Venting Optional Leakage Test Gas Cock Solenoid not Valve le Inside Burner Cabinet, 1.71 Ira,: Aux. Gas Valve (Solenoid, Diaphragm or Motorized) Sumer Lask Test Press Tapping May Also 8e In Nipple or Test Cock) NOTE: For ease of servicing we recommend the use of a union immediately upstream of the main gas pressure regulator or combination gas valve /pressure regulator. 3. Install vent lines from main gas regulator (if used) and (if applicable) diaphragm gas valve. Vent line should be run to the outside of the building, terminating clear of windows or fresh air intakes. Outside termination of vent should have a screen to prevent insects from building nests in vent pipe. The vent should terminate in a manner which will preclude the possibility of water, dirt or other matter from entering the line. 4. Test gas lines for leaks using soap solution. Your local gas service company may wish to carry out or witness this test CAUTION: Gas pressure above 14 ins. WC may damage the standard diaphragm gas shut -off valve. Do not exceed this value when pressure testing lines unless you cap off the line upstream of the main gas cock and pilot take -off. FLUE CAUTION: Jurisdictional authorities relating to venting/flue requirements vary widely. In order to make certain of compliance, the controlling authorities should be consulted. 1. Use positive pressure breeching material. Breeching should be short, straight and full size. Horizontal runs over 10' or over (2) elbows should be avoided. Runs should pitch upward at least 1' per foot. 2. A full size barometric damper should be installed in the breeching to regulate the drafts. After startup, check the damper and breeching by holding a match near the edge of the damper. A correct installation will pull the flame with the burner running. COMBUSTION AIR 1. Provide fresh air to support combustion and to supply adequate location ventilation. NOTE: All fuels require approximately 10 cubic feet of standard air (sea level at 60° F) per 1000 BTU's firing rate, for theoretical perfect combustion. In actual practice, a certain amount of excess air is required to ensure complete combustion, but this can vary substantially with specific job conditions. Additional air is lost from the boiler room through barometric dampers, draft diverters and similar venting. devices. It is generally accepted that 1 square inch of free air opening (for each gas or oil burner in the room) per 1000 BTU /hr firing rate will be adequate. 2. After startup, test to assure a positive boiler room pressure with the boiler operating at 100% input. CAUTION: Under no circumstances should a boiler room be under negative pressure. If combustion air is ducted to the burner, make sure the duct size is adequate to assure proper burner operation. 6 START -U P PRE - STARTUP CHECKS 1. Piping Connections • Are they complete and correct? 2. Pumps • Are the feed pumps functional? • Is the motor rotation correct? 3. Electrical • Is the branch circuit power supply as required per the burner name plate? • Is the unit properly grounded? 4. Combustion Air • Is adequate fresh combustion air available? • Is the breeching /stack open and unobstructed? 5. Gas • Is the proper gas supply available? FILLING THE SYSTEM 1. The system and the boiler should be thoroughly flushed before start up. 2. Operate water column and level control drain /blowdown valves to assure that these are thoroughly flushed and operate properly. 3. Before firing the unit, be sure the unit is filled to the proper water level. CONTROL SETTINGS 1. Controller — This is the pressure sensing device which controls the operation of the burner. Set the controller for the desired steam pressure 2. High Limits — Set the high limit auto reset control approximately 10% above the setting of the controller. Manual reset limits should be set approximately 5% above the auto reset limit, but should not be set higher than 95% of the safety valve set pressure. 3. Low Water Cut -off — This limit is always Factory-set. If additional units are field installed, manual reset LWCO's should be positioned below the automatic reset limit. BURNER IMPORTANT: Read the burner O &M manual (appendixes to this manual) thoroughly before attempting to start the burner). CAUTION: Failure to properly follow the detailed start up instructions given in the burner O &M manual may result in an explosion which could cause property damage, injury, or loss of life. 1. Preparation for startup - All fuels • Run an inspection of the tightness of all electrical connections and retighten as necessary. This tightness inspection is vital because vibration during shipment can often loosen electrical connections. • Set the burner control panel switch to the "OFF" position. • Turn the operating control down to its lowest setting • Check fuses and replace as necessary • Depress the flame safeguard programming control reset button 7 OPERATION AND MAINTENANCE A. OPERATION 1. When operating controller calls for pressure, the burner blower motor will start and after a suitable prepurge period (30 -90 seconds approximately) the burner pilot will light. (The unit performs its own safety check and opens the main valve only after the pilot is proven to be lit.) The main flame is then established. 2. The operating controller will control the desired steam pressure. The differential adjustment should be set at the highest value which will still provide acceptable steam pressure variation. Two pressure controllers are supplied on hi -lo fired units, and a proportional controller is supplied on modulating burners. 3. An automatic reset pressure limit is supplied as standard on all modulating units. 4. A manual reset high limit is provided as standard equipment on all units. The burner will automatically shut down whenever an over pressure condition occurs. 5. A manual reset low water cutoff is also provided as standard equipment on all units. The low water cutoff automatically shuts off the burner whenever the water level drops below the factory set level in the upper part of the tank. NOTE: Warranty does NOT cover any damage caused by lack of required maintenance or improper operating practices. B. MAINTENANCE 1. At startup and at least every six months thereafter, the pilot and main burner flame should be observed for proper performance. (Refer to burner literature supplied with this manual for detailed information). 2. Inspect the venting system for obstruction, leakage, and corrosion at least once per year. 3. Keep boiler area clean and free from combustible material, gasoline and other flammable vapors and liquids. 4. Be certain all combustion air and ventilation openings are unobstructed. 5. The gas and electric controls installed on these boilers are engineered for both dependable operation and long life, but the safety of this equipment completely depends on their proper functioning. It is strongly recommended that the basic items be checked yearly by a competent service person and replaced as necessary. The basic controls are: • Operating Control • Pilot Safety System • Automatic Electric Gas /Oil Valve(s) • Limit Controls 6. Low water cutoffs should be inspected every six months, including cleaning probes and flushing floats. 7. Firebox inspections can be made by removing the burner. If repairs are required, the entire firebox can be withdrawn from beneath the pressure vessel by use of the (3) jacking eyes attached to the vessels lower flange. 9 START UP -GAS BURNER • Manually open and close the main gas shut off cock, leak test cock and pilot cock to determine that they operate freely. Open all three cocks. (Reset low gas pressure switch if supplied) • Set the main power switch and burner panel control switch to the "ON" position Wait 30 seconds and turn up the operating control to the desired setting • The burner blower motor will start and after a suitable prepurge period (this will vary with the type of flame safeguard control supplied — but will usually be a minimum of 30 seconds to a maximum of 90 seconds) the burner pilot will light, after which the main flame will be established. NOTE: For more detailed burner start-up information, refer to the burner literature supplied as an appendix to this manual relative to the actual burner supplied with your unit. 8 1DISC 1 NON -FUSED DISCONNECT SW 2N • H 3 4 6 7 10 12 13 15 16 17 19 19 20 21 22 1MB ES1 II§11 N 0780001076 (REV2) 1.1 MAIN TO EMERGENCY STOP L2 MAIN P2 CS_V 1CBL B1 wHT RED Bw I WHY P1 El (YE) E2 (9K) 93 (WM) E4 (RD) 95 BL) 1LSB C ❑ ❑ 0— AUTO X ALARM El R. LW FEEDWATER BY OTHERS 696 orto 40761.1 a 113 0Q13 LOW FIRE START INTERLOCK (IN MOD. MOTOR) Al 1PS COMB. 1-?; -I AR SW. I TERMINAL STRIP ARRANGEMENT: ES2 LW LJ MF PREWIRED GAS TRAIN: ICED CE) w LWF „fR AR - LISTED GROUNDING BAR ANIMA GREEN SCREW MOUNTED IN PANEL AND WIRED TO EARTH GROUND LABELED "EQUIPMENT GROUND' LIGHT 6 SW. CIRCUIT BOARD V.VE r T N 0.1 N.C.I L2 IGNDI ADVANTAGE 9ONRTGL6 SEAMS ZE2 22 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 I GIG 1 1 PV1 [ L2 MF FL1 j 720 j IT 1FU MOTOR FUSE 1M BURNER MOTOR SPAINELECTRBOE GAS IGN. TRANS. IVVL/V IL,' PILOT VALVE 2VLV 1FSG O 1104RM 7)197A A L m MV MAIN GAS VALVE AUX GAS VALVE IMM BELIMO A1O(24 -MFT86 MODULATING MOTOR 1FD O la FLAME ROD B1 0 u I R TAU , KU 2 au• IKU5� &U5 (.9181050 PRESSURE CONTROL DAY (.9191050 PRESSURE CONTROL NIGHT MODULATION RELAY 41 ACO G GREEN GGRRO NDIM ETO VALVES MTh GROUND ME RMT897 6 UM11ED TO APPLICA- TIONS FIRING 20 GPH OR BELOW. CAUIRt TH6BURN IRS DESIGNED FOR USEWIH °PERATNG OR SAF7Y LBLR DEDUCES CAPABLE OF SWITCFING THE FULL LOAD MOTOR DJRRBIT. CONGLLT SPEC. SNIT FOR MOTOR HORSEPOWER. UMUUSTT BE RREEf( JUMPER FD FORLOCKOUT ONAIIRR FLOW MD FLAME FAILURES. OD. FOR HAND INPUT ABOVE 25 MBH I 20 GPIs FOR U.) NEUTRAL WIRING MAY NOT BE CONNECTED AS SHOWN, NEUTRAL TE) S AS Z2A CAUTION: ALL F ELD YARNS MUST BE HIRED AS S ON WIRING Certified As Built Designer: pc 1/8/12 Engineer: WB1A6/12 \SUI.I No. 19683 'USE COPPER CONDUCTORS MY: CAUTION177RQWALI DISC 70 OFF BEFORE MENG. - G - EDDIPLFNFGND. CONDUCTOR - F - FLARE MCAT: RUNN SEPARATE COMM OR SNBiDED CABLE FACTCRIA NO -2� 115V ' ffT - 5 FOR VOLTAM' MAUI SHORN ON DAMAN 6ONLY PROVTED AND MOWED 8Y POWER RAGE F SPECIRCALLY CAWED FOR ON BURFERSPEC. DEFT . ELECTRICAL SPECS CONTROL WIRE COLOR LEGEND SCHEMATIC SYMBOLS NOTES 'Volts/Phase Amps/Phase Motor Oil Pump Controls 115V/10 Min Ampacity Red - 120 VAC BLK - Greater than 120 VAC ORN - Modulating Signals YeI - Dry Circuit GRN - Ground Conductor BLU - DC WHT - Neutral Conductor (Grounded Conductor) I Denotes Control Panel Terminals ODenotes Terminal Designation on Device Field Wiring Furnished by Others Field Wiring Furnished by Others OCustomer's power supply circuit with protection device as required. Suggested wiring: #12 awg cu wire min. OMain power supply connection lugs will accept up to 1410 awg cu wire per terminal. OGround lug for #12 awg cu wire is located adjacent to main power connection lugs. O4 Control circuit wiring: #14 awg mtw 105 °C UL CSA. OFactory setpoints ThermoSteam® Systems, Inc FPS 58 50 PF 2,110,000 P 150 TYPE SIZE HP BURNER BTU FUEL PRESSURE JOB NAME: Regency Cleaners C.O #: 6948 DRAWN BY: DJC I APP'VD BY: DATE: 1/4/12 DRAWING NUMBER FS5850EAA -02 -E REVISION: 0 ITEM DESCRIPTION QTY MATERIAL INV# / DWG 1 1" SCH 80 x 5" TBE 2 SA106 -B 5368 2 1" CONBRACO BRONZE BALL VALVE 250 WSP 1 BRONZE 3422 3 1" BLOWDOWN VALVE 200 WSP 1 BRONZE 3564 elThermoSteam Systems Inc. NAME DATE FINISH: TOLERANCES DRAWN DJC 6/21/11 WEIGHT: FRACTIONAL • 1/16" ANGULAR ± 3' .01 • .005 .001 • .0005 TITLE: BLOWDOWN - 1" APP'VD MAT'L: SEE DWG DWG. NO. FPS -BD -1 I REV: 0 ITEM DESCRIPTION QTY. MATERIAL INV# / DWG 1 3/4" SCH 80 NIPPLE x 3" 5 BMI 4179 2 3/4" SCH 80 CLOSE NIPPLE 1 BMI 4178 3 1" SCH 80 NIPPLE x 2• 1 BMI 4184 4 3/4" CONBRACO BRONZE BALL VALVE 250 WSP 1 BRONZE 3421 5 3/4" SPENCE CAST IRON STRAINER 250 WSP 1 BMI 3612 6 3/4" PARKER METERING VALVE 500 psi 1 N/A 3978 7 3/4" MAGNATROL BRONZE SOLENOID VALVE 200 psi 1 N/A 3871.1 8 3/4" NPT UNION 150# BMI 4352 9 1" to 3/4" REDUCER 150# & 300# 2 BMI 4250 10 1" CONBRACO BRONZE BALL VALVE 250 WSP 1 BRONZE 3422 ThermoSteam Systems Inc. NAME DATE FINISH: DRAWN DJC 6/21/11 WEIGHT: TOLERANCES TITLE: 8ACT WNAL : 1I18• ANGULAR a 0• Al :.005 .001 2.0005 BLOW OFF - 3/4" w/ CONDUCTIVITY APP'VD MATL: SEE DWG DWG. NO. FPS- BO -.75 -C REV: 0 ITEM DESCRIPTION QTY MATERIAL INV# / DWG 1 1" SCH 80 x 5" TBE 1 SA106 -B 5368 2 1" UNITED BRASS GLOBE VALVE 200 WSP 1 Brass 3468 3 1" SCH 80 NIPPLE x 2" 1 A106 4184 4 1" UNITED BRASS SPRING CHECK VALVE 200 WSP 1 BRASS 3523 ThermoSteam Systems Inc. NAME DATE FINISH: TOLERANCES DRAWN DJC 6/20/11 WEIGHT: FRACTIONAL • 1/16" ANGULAR • 3' .01 • .005 .001 • .0005 TITLE: FEEDWATER - 1" APP'VD MAT'L: SEE DWG DWG. NO. FPS -FW -1 I REV: 0 MP) ter 0 T. eq- STEAM OUTLET MAW M RATE INSPECTOR OPENING r PVT CnIP IOW Certified As Built Designer. Dr Van] Engineer Nfl,Ong Sena! NO: ,IRS b sak ISOMETRIC NEW SCALE 1:111 nn OESQNVnOM ar POWER FUME 7143004,5 WO "MISS r0e4nn614TNnmRa FPS 5se0 CASOET ASSE,RY FPS LEVEL CONTROL FEEEIWATER -1- BLOW OFF -Le r C0N0UCTMTY REUEF -2SU PPM MYOR0LEV6550 r ION RESET. 030 PS1 t AMANGME CORTOLS PRESSURE COMM. tma ON MOPES 41.147 M mama* pet NW Mr • PreateLV4444 Me* ewe 21. bmMI�LLSLCED rmn emels Nel Ps at u Mbl 11..rt2.n127r t Ra F�.TN PM .ea.e Ma 5.1 BFe Pavp bdl SePN00NbwM eOrnrRONn. Th•rmoSto•mv Syslsms. Inc FPS wan 2„0 FF TYPE BM LON, (PARER FUEL PRESSURE NOB OMEE:Rm Omen 9� COS 4943 ,L ;z oRAwttouc �wE.,M,w,iA VVO iDM E � pYA. R0 FSSR97.406 'REV 0 ITEM DESCRIPTION QTY MATERIAL INV# / DWG 1 1" SCH 80 NIPPLE x 2 -1/2" 4 BMI 4185 2 r SCH 80 CLOSE NIPPLE 1 BMI 4183 3 1" NPT UNION 150# 2 BMI 4353 4 1" NPT CROSS 150# 2 BMI 4363 5 HYDROLEVEL 250 PUMP CONTROL/LWCO, 250 PSI 1 N/A 1831 6 1" SCH 80 x 4" TBE 1 SA108 -B 5368 1" SCH 80 x 6.4375" TBE 1 SA106.8 5368 8 1" NPT PLUG 150# 1 BMI 4374 9 1" CONBRACO BRONZE BALL VALVE 150 WSP 1 BRONZE 3405 10 1" to 1/2" REDUCER 150# or 300# 2 BMI 4249 11 BRONZE LIQUID LEVEL GUAGE - 1/2" NPT 1 N/A 3950 20" ISOMETRIC VIEW SCALE 1:8 ThermoSteam Systems Inc. NAME DATE FINISH: TOLERANCES DRAWN DJC 6/20/11 WEIGHT:49.15 Ibs FRACTIONAL a 1 /10' ANGULAR _ 3' .01 1.005 .001 1.0005 TITLE: FPS LEVEL CONTROL APP'VD MATL: SEE DWG DWG. NO. FPS LC IREV: 0 ITEM DESCRIPTION QTY. MATERIAL INV# / DWG 1 3/4" SCH 80 NIPPLE x 4" 3 BMI 4180 2 3/4" NPT 90' STREET ELBOW 1 BMI 4318 3 3/4" NPT UNION 150# 1 BMI 4352 3/4" SCH 80 CLOSE NIPPLE 1 BMI 4178 5 1/4" SIPHON 1 BMI 3105 6 3/4" SCH 80 NIPPLE x 5" 3 BMI 4181 7 1/4" NPT F x F GAUGE COCK 150 WSP 1 Brass 3956 8 4-1/2° WINTERS PRESSURE GAUGE (0-300 psi) 1 N/A . 3116 9 3/4" NPT PLUG 150# 2 BMI 4373 10 HONEYWELL L404F -1102 10-150 psi (AR) w/ DIFF 10 psi 1 WA 1625 11 HONEYWELL 4078-1041 MR (10 -150 psi) 1 N/A 1634 12 1/4" SCH 40 NIPPLE x CLOSE 4 BMI 4101 13 HONEYWELL L91B1050 (5-150 psi) 2 N/A 1614 14 3/4" x 3/4" x 1/4 TEE 5 SA105 4757 15 3/4" NPT TEE 3000# 1 SA105 4887.12 ThermoSteam Systems Inc. 0 ISOMETRIC VIEW SCALE 1:5 NAME DATE FINISH: TOLERANCES DRAWN DJC 7/20/11 WEIGHT: FRACTIONAL . 7N8' ANGULAR a 3' .m • .005 .001 :.0005 TITLE: PRESSURE CONTROL - MOD 150 psi D/N APP'VD MATL: SEE DWG DWG. NO. D10002 IREV: 2 ITEM DESCRIPTION QTY MATERIAL INV# / DWG 1 1 -1/2" SCH 80 NIPPLE x 4" 1 BMI 4193 2 1 -1/2" NPT 90° ELBOW 150# 1 BMI 4325 3 1 -1/2" - 1" REDUCER 150# OR 300# 1 BMI 4254 4 KUNKLE 6021FE01-150 (SET © 150) 1 N/A 3357 ThermoSteam Systems Inc. NAME DATE FINISH: TOLERANCES DRAWN DJC 6/21/11 WEIGHT: FRACTIONAL • 1/16" ANGULAR ± 3' .01 _ .005 .001 ± .0005 TITLE: RELIEF -.2583 PPH APP'VD MAT'L: SEE DWG DWG. NO. FPS -R- 2583 -150 REV: 0 ThermoSteam Systems Inc. Page 1 Parent Number FS5850EAA -02 6948 Serial Number 19683 National Board National 19683 PBI Item Number FPS- 58 -50- 150- P2110N FGOO CRN Rev. No. 1/06/12 Rio° NOM Item Number ' Description Seq Req'd u M 1 FS5850EAA -02 -T SUB ASSEMBLY FPS TRIM 2 FPS58- 50- J50A -C FPS 58 -50 CABINET J50A -15 3 9210 INSULATION 1/8" X 1 1/2" FT 100' ROLL - INSULATION TAPE w/ PSA 3 9123.1 TURBULATOR 2" X 52" X 3/4" 3 9206 INSUL 2 "X 24 "CERAMIC FIBER RT8 INSULATION 2 "X 24" CERAMIC FIBER RT8 3 9230 INSULATION MC -12 -1500 - 1 -1/2" WELD PIN 3 FP- FLUE -55 -12 FLUE 55 "OD X 12" ID 4 5306 SHEET METAL 60 "X120 "X16GA - CR MATERIAL = A1011 - SHEET METAL 4 5307 SHEET METAL 48 "X120" X11GA -CR MATERIAL = A1011 - SHEET METAL 4 5306 SHEET METAL 60 "X120 "X16GA - CR MATERIAL = A1011 - SHEET METAL 4 5422 ANGLE S 1" X 1" X 1 /8" MATERIAL = A36 - .80 LBS /FOOT 4 9204 INSULATION 2 "X24 "X48 "ROCKWOOL 6 PIECES PER BUNDLE ROCKWOOL 4 9204 INSULATION 2 "X24 "X48 "ROCKWOOL 6 PIECES PER BUNDLE ROCKWOOL 3 CP- 6 -6 -85 CABINET CORNER POST 6 "X6 "X85" 16 GA. SHEET METAL 4 5306 SHEET METAL 60 "X120 "X16GA - CR MATERIAL = A1011 - SHEET METAL 3 CF -6262 CABINET FRAME 61 -7/8 X 61 -7/8 4 5422 ANGLE S 1" X 1" X 1 /8" MATERIAL = A36 - .80 LBS /FOOT 4 5422 ANGLE S 1" X 1" X 1/8" . MATERIAL = A36 - .80 LBS /FOOT 3 RS -31 -62 CAB ROOF SPLIT 31 -1/8 "X62 -1 /8" 16 GA. SHEET METAL 4 5306 SHEET METAL 60 "X120 "X16GA - CR MATERIAL = A1011 - SHEET METAL FPS 58 -50 TRIM SUB FIBERGLASS TAPE AMERICAN FUEL THERMAFIBER INC. THERMAFIBER INC. 001A 001A 003A 005A 006A 007A 008A 001A 002A 003A 004A 005A 006A 009A 001A 010A 001A 002A 011A 001A 1.000 EA 1.000 EA 26.200 EA 128.000 EA 30.000 SF .055 M 1.000 EA .216 EA .233 EA .016 EA .166 FT .200 BD .063 BD 4.000 EA .170 EA 1.000 EA 10.312 FT 9.979 FT 1.000 EA .310 EA Certified As Built Designer: DJC 1/6/12 Engineer: WB 1/6/12 Serial No: 19683 4111141 ThermoSteam. Systems Inc. Page 2 Parent Number FS5850EAA -02 CO 6948 Serial Number 19683 National Board 19683 PBI Item Number FPS- 58 -50- 150- P2110N FGOO CRN Rev. No. 1/06/12 Men oM No. Item Number Description 4 Qty Req'd Re 'd V o M 3 5306 3 5306 SHEET METAL 60 "X120 "X16GA - CR MATERIAL = A1011 - SHEET METAL 3 6234 WASHER, FLAT 1/2" 3 6127 BOLT HEX HD 1/2 -13 X 2" 3 6224 WASHER, LOCK 1/2" 3 6213 NUT 1/2 -13 HEX 3 PR -11 CABINET PATCH RECTANGLE SHEET METAL 60 "X120 "X16GA - CR MATERIAL = A1011 - SHEET METAL 4 5306 3 P- 49.75 -85 4 5306 3 PS- 49.75 -26 4 5306 3 PS- 49.75 -59 4 5306 3 9206 3 9206 2 90418 2 FPS -BD -1 3 5368 3 3422 ZINC PLATED GRADE 5 - ZINC PLATED ZINC PLATED GRADE 5 - ZINC PLATED 16 ga. SHEET METAL INTEGRA FASTENER CO. INTEGRA FASTENER CO. 012A 013A 014A 015A 016A 017A 018A SHEET METAL 60 "X120 "X16GA - CR MATERIAL = A1011 - SHEET METAL OO1A CABINET PANEL 49 -3/4 "X 85" 16 GA. SHEET METAL PHANTOM 019A SHEET METAL 60 "X120 "X16GA - CR MATERIAL = A1011 - SHEET METAL OO1A CAB SPLIT PAN 49 -3/4 "X 26" 16 GA. SHEET METAL PHANTOM 020A SHEET METAL 60 "X120 "X16GA - CR MATERIAL = A1011 - SHEET METAL OO1A ' CAB SPLIT PAN 49 -3/4 "X 59" 16 GA. SHEET METAL 021A SHEET METAL 60 "X120 "X16GA - CR MATERIAL = A1011 - SHEET METAL OO1A INSUL 2 "X 24 "CERAMIC FIBER RT8 INSULATION 2 "X 24" CERAMIC FIBER RT8 022A INSUL 2 "X 24 "CERAMIC FIBER RT8 INSULATION 2 "X 24" CERAMIC FIBER RT8 023A BURNER JR50A -15 UL /CSD -1 MOD INPUT RATE 2,110 MBH /HR GAS 115/1/60 SEE BURNER REQUEST FOR OPTIONS 002A FPS SLOWDOWN 1" 003A PIPE 1" - SCHEDULE 80 MATERIAL = SA106B - SMLS OO1A BALL VALVE 1" STEAM BRONZE - THREADED - FULL PORT -250 WSP 70- 145 -64 - CONBRACO 002A .013 .004 16.000 8.000 8.000 8.000 1.000 .030 3.000 .600 1.000 .190 1.000 .422 61.000 5.100 1.000 1.000 EA .840 FT 1.000 EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA SF SF EA ThermoSteam Systems. Inc,,, Page 3 Parent Number FS5850EAA -02 CO 6948 Serial Number 19683 National Board 19683 PBI Item Number FPS- 58 -50- 150- P2110N FGOO CRN Rev. No. 1/06/12 Inden tad BOM Item Number Description Qty Req'd u o 3 3564 2 FPS -LC 3 4185 3 4183 3 4353 3 4363 3 1831 3 5368 SLOWDOWN VALVE 1" BRONZE FPS LEVEL CONTROL NIPPLE 1" NPT X 2 -1/2" NIPPLE 1" NPT CLOSE UNION - 1" NPT CROSS 1" NPT LEVEL SWITCH - PROBE 250 PIPE 1" - SCHEDULE 80 3 5368 PIPE 1" - SCHEDULE 80 3 4374 PLUG 1" NPT 3 3405 BALL VALVE 1" BRONZE 3 4249 REDUCER BUSHING 1" TO 1/2" 3 3950 GAUGE LIQUID LEVEL BRONZE 3 3943 GAUGE GLASS 5/8" OD X 48" 2 FPS -FW -1 FPS FEEDWATER 1" 3 5368 PIPE 1" - SCHEDULE 80 3 3468 GLOBE VALVE 1" 3 4184 NIPPLE 1" NPT X 2" 3 3513 CHECK VALVE 1" SWING 2 FPS- BO -.75 -C FPS BLOW OFF 3/4" BRONZE - WYE PATTERN - 200 WSP 226UT -1 - UNITED BRASS 003A 004A A106 - SCHED 80 - BLACK MALLEABLE IRON OO1A A106 - SCHED 80 - BLACK MALLEABLE IRON 002A BLACK MALLEABLE IRON - 150# 003A BLACK MALLEABLE IRON - 150# 004A PUMP CONTROL - LWCO COMBINATION 250 PSI - HYDROLEVEL 005A MATERIAL = SA106B - SMLS 006A MATERIAL = SA1068 - SMLS 007A BLACK MALLEABLE IRON - 150# OO8A THREADED - FULL PORT -150 WSP /600 WOG 64- 105 -01 - CONBRACO 009A NPT - BLACK MALLEABLE IRON FOR 150# AND 300# APPLICATIONS O10A 1/2" NPT- 250WSP@ 400 °FMAX.- MINQTY6 AUTOMATIC - 24- 351 -03 - CONBRACO OEM -100 O11A RED LINE GAUGE GLASS O11B 005A MATERIAL = SA106B - SMLS OO1A RISING STEM - BRONZE THREADED - 200 WSP 81T -1 UNITED BRASS 400 WOG 002A A106 - SCHED 80 - BLACK MALLEABLE IRON 003A BRONZE - 200 WSP @ 406° MAX - 400# WOG TEFLON DISC - 62T -1 - UNITED BRASS 004A CONDUCTIVITY 006A 1.000 1.000 4.000 1.000 2.000 2.000 1.000 .340 .500 1.000 1.000 2.000 1.000 .500 1.000 .420 1.000 1.000 1.000 1.000 EA EA EA EA EA EA EA FT FT EA EA EA EA EA EA FT EA EA EA EA ThermoSteam Systems In.c... Page 4 Parent Number FS5850EAA -02 CO 6948 Serial Number 19683 National Board 19683 PBI Item Number FPS- 58 -50- 150- P2110N FGOO CRN Rev. No. 1/06/12 Inden tad NOM Item Number Description Seq (,l�/ Req'd u M 3 4179 3 4178 3 4184 3 3421 3 3612 3 3978 3 , 3671.1 3 4352 3 4363 3 4250 3 3422 NIPPLE 3/4" NPT X 3" NIPPLE 3/4" NPT CLOSE NIPPLE 1" NPT X 2 "'. BALL VALVE 3/4" STEAM STRAINER 3/4" CAST:IRON METERING VALVE 3/4" NPT A106 - SCHED 80 - BLACK MALLEABLE IRON OO1A A106 - SCHED 80 - BLACK MALLEABLE IRON 002A A106 - SCHED 80 - BLACK MALLEABLE IRON 003A BRONZE - THREADED - FULL PORT -250 WSP 70- 144 -64 - CONBRACO 004A NPT THREADED - WYE PATTERN - 250 WSP SP00202K - SPENCE 005A 500 PSI @ 450° F MAX - 25 GPM MV1200S -V -3/4 - PARKER Cv =3.2 006A SOLENOID VALVE BRONZE NC 3/4" 120V COIL - FULL PORT - 200 PSI MAX 300 PSI MAX STATIC - 29L33 - MAGNATROL 007A UNION - 3/4" NPT BLACK MALLEABLE IRON - 150# 008A CROSS 1" NPT BLACK MALLEABLE IRON - 150# 009A REDUCER BUSHING 1" TO 3/4" NPT - BLACK MALLEABLE IRON FOR 150# AND 300# APPLICATIONS O10A BALL VALVE 1" STEAM BRONZE - THREADED - FULL PORT -250 WSP 70- 145 -64 - CONBRACO O11A 007A 4193 NIPPLE 1 -1/2" NPT X 4" A106 - SCHED 80 - BLACK MALLEABLE IRON OO1A 4325 ELBOW 1 -1/2" NPT 90* BLACK MALLEABLE IRON - 150# 002A 4254 REDUCER BUSHING 1 -1/2" TO 1" NPT - BLACK MALLEABLE IRON FOR 150# AND 300# APPLICATIONS 003A 3357 RELIEF VALVE SAFETY 150 PSI 1" NPT- M x 1 -1/4" - F - SEC I STEAM V 3% - 2583 PPH - 6021FE -150 - KUNKLE 004A 5412 CHANNEL C 3" W X 1.410H TYPE C MATERIAL = A36 - 4.1 LBS per FOOT 008A 1832 LEVEL SWITCH - PROBE 550 LWCO - MAN RESET TEST - 250 PSI MODEL 4400 - HYDROLEVEL 009A 6234 WASHER, FLAT 1/2" ZINC PLATED INTEGRA FASTENER CO. O10A 6224 WASHER, LOCK 1/2" ZINC PLATED INTEGRA FASTENER CO. 011A 2 FPS -R- 2583 -150 FPS RELIEF 2,583 PPH 0 150 PSI 2583 PPH 3 3 3 3 2 2 2 2 5.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 2.000 1.000 1.000 1.000 1.000 1.000 1.000 .800 1.000 4.000 4.000 EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA FT EA EA EA . Ther.moSteam Systems Inca Page 5 Parent Number FS5850EAA -02 CO 6948 Serial Number 19683 National Board 19683 PBI Item Number FPS- 58 -50- 150- P2110N FGOO CRN Rev. No. 1/06/12 men tad No. Item Number Description Se 4 Qty Re 'd 4 V o M 2 6213 2 10079 2 D10002 3 4180 3 4178 3 4181 3 4101 3 4318 3 4352 3 4288 3 4289 3 3105 3 3956 3 3116 3 4373 3 1625 3 1634 3 1614 NUT 1/2 -13 HEX HVJ CONDUCTIVITY CONTROL FPS PRESSURE CONTROL NIPPLE 3/4" NPT X 4" NIPPLE 3/4" NPT CLOSE NIPPLE 3/4" NPT X 5" NIPPLE 1/4" NPT CLOSE EMI ELBOW STREET 3/4" NPT 90* UNION - 3/4" NPT TEE NPT 3/4" X 3/4" X 3/4" TEE NPT 3/4" X 3/4" X 1/4" SIPHON 1/4" MAT'L = BMI SHUTOFF VALVE 1/4 "NPT -FX F GAUGE PRESS 300PSI /2000KPA PLUG 3/4" NPT LIMIT PRESSURE L404F -1102 GRADE 5 - ZINC PLATED ADVANTAGE CONROLS - 2EZ MODULATING - 150 PSI DAY /NIGHT • A106 - SCHED 80 - BLACK MALLEABLE IRON A106 - SCHED 80 - BLACK MALLEABLE IRON A106 - SCHED 80 - BLACK MALLEABLE IRON SCHEDULE 40 - BLACK MALLEABLE IRON BLACK MALLEABLE IRON - 150# BLACK MALLEABLE IRON - 150# NPT - BLACK MALLEABLE IRON - 150# NPT - BLACK MALLEABLE IRON - 150# 500PSI /400F 2EZ- B27L -01 ENGINEERED SPECIALTY PRODUCTS HEX SHOULDER - BRASS - 150 WSP 41- 222 -04 1/4 - CONBRACO GAGE COCK 4 -1/2" - 0 to 300 PSI - 1/4" LNPT BRASS Q326 -300 - WINTERS BLACK MALLEABLE IRON - 150# 10 to 150 PSI - SPST - AR - DIFF 1OPSI HONEYWELL PRESSURE LIMIT LIMIT PRESSURE L4079B -1041 10 to 150 PSI - SPST - (MR) HONEYWELL PRESSURE LIMIT 012A 013A 014A 001A 002A 003A 004A 005A 006A 007A 008A 009A 01OA O11A 012A 013A 014A PRESS CNTR L91B 5 TO 150 PSI 0 to 135 OHM - SURFACE MOUNT - 1/4" FNPT MODULATING OUTPUT - L9181050 - HONEYWELL 015A 1 FPS58 -50 -V FPS 58 -50 VESSEL 002A 4.000 1.000 1.000 3.000 1.000 3.000 4.000 1.000 1.000 1.000 5.000 5.000 5.000 1.000 2.000 1.000 1.000 2.000 EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA 1.000 EA ThermoSteam.:Systems Inc. Page 6 FS5850EAA Parent Number 02 CO 6948 Serial Number 19683 National Board 19683 PBI Item Number FPS- 58 -50- 150- P2110N FGOO CRN Rev. No. 1/06/12 In d N M Item Number Description Seq Qty Req'd u M 2 8220 STEEL PLATE 3/8 "- 96" X 380" MATERIAL = SA516 -70 PLATE w/ MTRS 2 FPS58 -128 -T FPS 58 -128 TOP HEAD 56 -1/2" OD x 1/2" SA516 -70 3 8211 STEEL PLATE 1/2" - 96" X 240" MATERIAL = SA516 -70 PLATE w/ MTRS 2 FPS58 -128 -B FPS 58 -128 BOTTOM HEAD 56 -1/2" OD x 1/2" SA516 -70 3 8211 STEEL PLATE 1/2" - 96" X 240" MATERIAL = SA516 -70 PLATE w/ MTRS 2 5451 FLAT BAR 3/16" X 1" MATERIAL = A36 2 5444 FLANGE RING 2 "X2 "X3/16 "X57 -3/4 FLANGE RING - MATERIAL = A36 2 5322 PIPE .120 WALL X 2" OD BT MATERIAL = - GRADE SA178 BOILER TUBING 2 4879 FULL COUPLING 3/4" NPT MATERIAL = SA105 - 3000# (3M) 2 4880 FULL COUPLING 1" NPT MATERIAL = SA105 - 3000# (3M) 2 4880 FULL COUPLING 1" NPT MATERIAL = SA105 - 3000# (3M) 2 4879 FULL COUPLING 3/4" NPT MATERIAL = SA105 - 3000# (3M) 2 4880 FULL COUPLING 1" NPT MATERIAL = SA105 - 3000# (3M) 2 4875.3 HALF COUPLING 3" NPT MATERIAL = SA105 - 3000# (3M) 2 4609 PLUG BRASS 3" NPT - SOLID 2 4875 HALF COUPLING 1 -1/2" NPT MATERIAL = SA105 - 3000# (3M) 2 4875.1 HALF COUPLING 2" NPT MATERIAL = SA105 - 3000# (3M) 2 SUB8442 LIFT EYE FIRETUBE SA516 -70 3 8211 STEEL PLATE 1/2" - 96" X 240" MATERIAL = SA516 -70 PLATE w/ MTRS MTRS = MAT'L TEST REPORTS 2 4321 ELBOW STREET 1" NPT 90* BLACK MALLEABLE IRON - 150# MTRS = MAT'L TEST REPORTS SUB MTRS = MAT'L TEST REPORTS SUB MTRS = MAT'L TEST REPORTS OO1A .260 EA 002A 1.000 EA OO1A .141 EA 003A 1.000 EA OO1A .141 EA 004A 14.850 FT 005A 1.000 EA 006A 544.000 FT 007A 2.000 EA 008A 2.000 EA 009A 1.000 EA O10A 1.000 EA O11A 1.000 EA 012A 4.000 EA 013A 4.000 EA 014A 1.000 EA 015A 1.000 EA 016A 4.000 EA 001A .002 EA 017A 1.000 EA rFS5850EAA ThermoSteam Systems Inc. Page 7 Parent Number -02 co 6948 Serial Number 19683. National Board 19683 PBI Item Number FPS- 58 -50- 150- P2110N FGOO CRN Rev. No. 1/06/12 Inden tad No. Item Number Description Seq Qty Req'd u M 2 2 2 2 3 3 4670 5527 5424 6389.1 5304 6389 1 FP58 -B 2 5475.6 2 5475.6 2 5475.6 2 5422 2 5422 2 5307 2 5425 COPPER SF 1" ADAPTOR C X M COPPER TUB 1" TYPE L HARD SWEAT FITTING ADAPTOR C X M HARD COPPER TUBING ANGLE 2" X 2" X 1/8" MATERIAL = A36 - 1.65 LBS /FOOT DATA PLATE "S "& "M" W /BRACKET SHEET METAL 48 "X96 "X16GA - CR MATERIAL = A1011 - SHEET METAL DATA PLATE "S "& "M" DATA PLATE - 8" x 4" x .064 SS FIRETUBE BASE FOR 58" UNIT TUBING 2" X 3" X .12 TUBING 2" X 3" X .12 TUBING 2" X 3" X .12 ANGLE S 1" X 1" X 1 /8" ANGLE S 1" X 1" X 1/8" MATERIAL = A -500 MATERIAL = A -500 MATERIAL = A -500 MATERIAL = A36 - .80 LBS /FOOT MATERIAL = A36 - .80 LBS /FOOT SHEET METAL 48 "X120" X11GA -CR MATERIAL = A1011 ANGLE S 2" X 2" X 1/4" MATERIAL = A36 - 1 FP58- 24- CC -J50A CHAMBER 58" OD X 24" HIGH 2 2 2 2 8204 STEEL PLATE 1/4" -96 "X380" 8204 5444 BR -12- 10.875 - SHEET METAL 3.19 LBS /FOOT POWERFLAME J50A -15 MATERIAL = SA516 -70 PLATE w/ MTRS STEEL PLATE 1/4" -96 "X380" MATERIAL = SA516 -70 PLATE w/ MTRS FLANGE RING 2 "X2 "X3/16 "X57 -3/4 FLANGE RING - MATERIAL = A36 BURNER RING - 12" X 10 -7/8" ID ASSEMBLY MTRS = MAT'L TEST REPORTS MTRS = MAT'L TEST REPORTS 018A 019A 020A 021A 001A 002A 003A 001A 002A 003A 004A 005A 006A 007A 004A 001A 002A 003A 004A 1.000 6.830 .250 1.000 .014 1.000 1.000 16.625 18.667 2.750 10.312 9.979 .004 .667 1.000 .100 .120 1.000 1.000 EA FT FT EA EA EA EA FT FT FT FT FT EA FT EA EA EA EA EA rik ThermoStea. m Systems Inc. Page 8 Parent Number FS5850EAA -02 CO 6948 Serial Number 19683 National Board 19683 PBI Item Number FPS- 58 -50- 150- P2110N FGOO CRN Rev. No. 1/06/12 Won B d No. Item Number Description Se q Qty 'd Req'd o M 3 BR- 12- 10.875 -P BURNER RING - 12" X 12" 3 6273 THREADED ROD 1/2 -13 2 4878 -FULL COUPLING 1/2" NPT 2 4372 PLUG 1/2" NPT 10 -7/8" ID ZINC PLATED MATERIAL = SA105 - 3000# (3M) BLACK MALLEABLE IRON - 150# 2 5377.2 PIPE 10" - SCHEDULE 20 MATERIAL = SA53B - ERW 2 PF- J50A -15I POWER FLAME J50A -15 INSULATION 2 9206 INSUL 2 "X 24 "CERAMIC FIBER RT8 INSULATION 2 "X 24" CERAMIC FIBER RT8 2 9205 INSULATION CERAMIC FIBER RT8 INSULATION 1 "x 24 "CERAMIC FIBER RT8 2 9205 INSULATION CERAMIC FIBER RT8 INSULATION 1 "x 24 "CERAMIC FIBER RT8 2 9208 INSULATION MATRILITE 24 LWI -24 REFRACTORY - AC 55 LB BAGS 2 9234 INSULATION MC -12 -3500 3 1/2" WELD PIN PURCHASED 001A 002A 005A 006A 007A 008A 009A 010A 011A 012A 013A 1.000 .600 1.000 1.000 .500 1.000 30.000 19.200 2.800 3.000 BG .018 M EA FT EA EA FT EA. SF SF SF High Efficiency Vertical Multi -Tube Dp� , VIEWED FOR VFT Series I,.:E COMPLIA 6 -100 BHP (250 -4,200 MBH Input) APPROVED FNc ETUBE STEAM BOILERS 12" MIN. STEAM OUTLET City of Tukwila BUILDING DIVISION PRESSL.R6 VESSEL SAFETY VALVE H INSPOPEECTION 1- 13" PRESSURE CONTROLS PROBE -TYPE LOW WATER ' CUTOFF BLOWDOWN COMBUSTION CHAMBER VALVE NOTE: LIFTING LUG LOCATED IN FLUE OPENING LEFT END 31" 1 GAS CONNECTION FLUE FRONT LEVEL CONTROL/ LOW WATER / CUTOFF r 18" TYP MIN CLEARANC —.. (REAR & SIDES; FEEDWATER VALVES INSPECTION OPENING POWER BURNER BURNER REMOVAL CLEARANCE TOP NOTES: CHECK WITH LOCAL CODES FOR COMPLIANCE VNTH MINIMUM CLEARANCES. "L" DIMENSION MAY VARY BASED ON BURNER CONFIGURATION AND BRAND. Model Number NOM. BHP Rated Input MBTU NOM. Output PPH' Vessel Dimesions Water Vol. (Gal.) Overall Dimensions (IN.) Connections (NPT) Flue Size • Hgt. W FRONT LEVEL CONTROL/ LOW WATER / CUTOFF r 18" TYP MIN CLEARANC —.. (REAR & SIDES; FEEDWATER VALVES INSPECTION OPENING POWER BURNER BURNER REMOVAL CLEARANCE TOP NOTES: CHECK WITH LOCAL CODES FOR COMPLIANCE VNTH MINIMUM CLEARANCES. "L" DIMENSION MAY VARY BASED ON BURNER CONFIGURATION AND BRAND. Model Number NOM. BHP Rated Input MBTU NOM. Output PPH' Vessel Dimesions Water Vol. (Gal.) Overall Dimensions (IN.) Connections (NPT) Flue Size Dia. Hgt. W L "" H Feed Water Blowdown Steam Output 15PSI 150 PSI 15 PSI 150 PSI VFT -24 -06 6 250 210 24 46 52 28 50 80 3/4" 1" 1" 1 -1/2° 1° 6° VFT -24 -09 9.5. 400 330 24 54 64 28 50 91 3/4" 1" 1" 1 -1/2" 1" 6" VFT -24 -10 10 420 340 24. 57 69 28 50 94 3/4° 1" 1" 1 -1/2" 1" 6' VFT -31 -15 15 • 630 520 31 48 88 35 57 85 3/4° 1" 1" 2" 1" 8° VFT -31 -20 20 840 690 31 60 117 35 57 97 3/4° 1" 1° 2' 1' 8" VFT -39-20 20 840 860 39 45 128 43 65 80 3/4" 1" 1" 2-1/2" 1 -1/4" 8" VFT-39-25 25 ' 1050 1030 39 52 156 43 65 89 3/4" 1" 1° 2 -1/2" 1 -1/4" 10° VFT-39-30 30 1260 1210 39 60 188 43 65 97 3/4° 1' 1" 3° 1 -1/2" 10° VFT -46-35 35 1470 1370 46 48 196 50 76 83 3/4° 1 -1/4° 1" 3" 1 -1/2" 12° VFT -46-40 40 1674 1730 46 52 218 50�76______.89_.. 3/4" 1-1/4" 1" 3" 1.1/2° 12° VFT -58-50 50 2110 1730 58 52 275 62 88 87 1° 1 -1/4" 1" 4 °F# 2" 12" VFT -58-60 60 2500 2050 58 60 332 96 95 1" 1 -1/4° 1° 4 °F 2° 14" VFT -58 -72 72 3000 2460 58 64 336 62 96 101—i 1" 1 -1/4' 1° 4 °F Y 14° VFT -62 -72 72 3000 2460 62 56 319 66 , 106 91 1" 1 -1/4" 1" 4 "F 2° 14° VFT -62 -84 - 84 3500 2870 62 64 378 66 106 101 1° 1-1/4" 1" 4 "F 2-1/2"F 16" VFT -62 -100 100 4200 3440 62 64 325 66 106 105 1" 1 -1/4° 1" 6'F 3 "F 16° From and at 212 F, " Actual operating: mul ply by 1.3 to obtain approx. flooded volume, "" Dependent on bumer stickout, # Indicates flanged connection (150#RF). 01 3 ,FPcN ply PH 800.548 9643, FAX 574289.5932, www ThermoSteam corn Copyright ® 2008, All rights reserved. Specifications subject to change without notice. REC ED FEB 10 2012 � ITcEidTTR T rmoS eam 0 Systeems, Inc Jennifer Marshall From: Bob Benedicto Sent: Friday, September 21, 2012 10:23 AM To: Dave Larson Cc: Jennifer Marshall; Brenda Holt; Bill Rambo Subject: Regency Cleaners Dave, I spoke to Chalena this AM. I told her that the Mechanical Permit was ready to be issued. She will be picking it up this PM. I also told her that all inspections will have to be scheduled on Monday. Alina will be back Monday and (supposedly) will be scheduling. I will be following up on this. Regarding the inspections, There will not be an automatic extension for these inspections if they are not approved. If there are corrections necessary, I want the inspection report to state the date certain that the corrections will be made. If the completion of any corrections that are found are not made in a reasonable amount of time as stated in the inspection report , or if it seems that they are employing their very successful delay tactic, I will begin issuing Civil Citations to Regency Cleaners and every day that the work is delayed. Bob 1 • CITY OF TUKWILA Department of Community Development BUILDING DIVISION Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -3670 FAX (206) 431 -3665 August 7, 2012 Ms. Alina Garrity 950 Andover Park East Suite #19 Tukwila WA 98188 Subject: Request for permit extension. RE: Permit# D11 -339, M12 -023, PG11 -163, M11 -151 & PG10 -166 Dear Ms. Garrity: I have reviewed your formal request for extension of the above referenced permits. First of all a brief status of each permit will serve as context for my decision. D11 -339: This is a replacement for permit D06 -214 to create the boiler room and install a 40 HP boiler. It has been more than five years since that permit expired by limitation. It has been ten months since the replacement permit (D11 -339) was issued. M12 -023: This is the mechanical permit for boiler replacement related to permit D11- 339. This week it will have been five months since this permit was issued with no apparent action. Fire Department final inspection and Building Division final inspection have not been scheduled. M11 -151: This permit was to replace permits M10 -174 and M08 -123 both of which were to complete the same scope of work. Four years have passed and this work is yet to be completed. There remain two outstanding corrections to be completed. One is to install the `B" vent on the south sheet ironer, and the second involves the exhaust termination and the proximity to the existing HVAC intake. PG11 -163: This is the work to install two water heaters. There remain two corrections to be accomplished. This inspection occurred six months ago and the required work (by our records) has not been completed. • • PG10 -166: This permit was to install one electric water heater. Three correction items were identified on the rough -in inspection. After twenty -one month, there is no record that the corrections have been completed. The work under the referenced permits remain incomplete and without City inspection approval for a period of more than five years. Therefore it is reasonable to conclude that any further extension (of 180 days) for each permit would only serve to further enable indefinite delays and therefore your request for 180 day extensions is denied. However, in further consideration of your request, I will extend the expiration date of all the referenced permits to September 14, 2012. On this date all permits will expire by limitation. If this occurs and final inspection approval has not been issued on all permits, I will seek legal authority to direct the utility to disconnect the natural gas service to the Regency Cleaners tenant space. The revocation of the business license will follow. Sincere Robe Benedicto, Building Official CC:. Don Tomaso, Fire Marshal 2 REGENCY CLEANERS Commercial & Consumer Accounts 950 Andover Park East Suite #19 Tukwila WA 98188 Date: August 6, 2012 RE: Permit No. D11 -339 8, M12 -023 Regency Cleaners Dear Building Official, Please see this letter as a formal request on behalf of Regency Cleaners to extend our outstanding permits another 180 days. We have been working on these permits for quite some time and are at the stage where we are awaiting drawings from the architect regarding the new boiler placement.. We are expecting them back next week. Both permits, as we see it, are correlated and the issuance of M12 -023 is holding up our final inspection for D11-339. Please address all correspondence for permits to Regency Cleaners, c/o Alina Garrity as I am the main contact for all ongoing permit work. Thank you. Sincerely, Alina Garrity Regency Cleaners o N 5 v-p F I >Z ,1CA orc • ppprwNCt gi (,,344.1,..1~0tIPD. RECEIVED CirrY OF TUKWILA ��► �. . AUG 0 6 2012 �2G�, h Doc° Z14b - 3341 1 5 9 -1,-- 1-� auo wr y -,;� t L-Ye't -1z 4 &e-Pni t` rot...f Ne,6 tl:_, 5 acos m ,1.11 ^ Regency Cleaners 1 950 Andover Park East: Sutie 19 1 Tukwila WA 98188 07 -02 -2012 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director WILLIAM LIPSCOMB 950 ANDOVER PK E TUKWILA WA 98188 RE: Permit Application No. M12 -023 REGENCY CLEANERS 950 ANDOVER PK E TUKW Dear Permit Applicant: In reviewing our current application files, it appears that your permit applied for on 02/10/2012, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and/or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Your permit application will expire on 08/08/2012. If you still plan to pursue your project, a written request for extension of your application must be submitted to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit application. If it is determined that an extension is granted, your application will be extended for an addtional 90 days from the expiration date and you will be notified by mail. In the event that we do not receive your written request for extension or request was denied, your permit application will expire, become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, Bill Rambo Permit Technician File: Permit File No. M12 -023 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431-3670 • Fax 206 -431 -3665 C • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director February 27, 2012 William Lipscomb 950 Andover Pk E Tukwila, WA 98188 RE: Correction Letter #1 Mechanical Permit Application Number M12 -023 Regency Cleaners — 950 Andover Pk E Dear Mr. Lipscomb, This letter is to inform you of corrections that must be addressed before your mechanical permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. The Fire Department has no corrections at this time. Building Department: Dave Larson at 206 431 -3678 if you have questions regarding the attached memo. Please address the attached comments in an itemized format with applicable revised plans, specifications, and /or other documentation. The City requires that two (2) sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at (206) 431 -3670. Sincerely, shall ician encl File: M12 -023 W:\Pennit Center \Correction Letters\2012\M12 -023 Correction Letter #1.doc 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665 Tukwila Building Division Dave Larson, Senior Plan Examiner Building Division Review Memo Date: February 22, 2012 Project Name: Regency Cleaners Permit #: M12 -023 Plan Review: Dave Larson, Senior Plans Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an . itemized format with revised plans, specifications and /or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets shall be original signed wet stamped, not copied.) 1. The plans provided are for the old boiler model FG 40. Please provide new plans relative to the new boiler model VFT 58 -50. Boiler size and floor plan should be to scale. 2. Please provide the size and length of low pressure gas piping after the medium pressure regulator to the new boiler. This is needed to verify that it is adequate to serve the new larger boiler. 3. Please provide a rooftop termination plan showing the vent termination and all other equipment, exhausts or air intakes within 10 feet of the new boiler vent. Provided 02/17/12 Should there be questions concerning the above requirements, contact the Building Division at 206 -431- 3670. No further comments at this time. • CITY OF TUKWILA Department of Community Development 6300 Southcenter Boulevard, Tukwila, WA 98188 Telephone: (206) 431 -367o FAX (206) 431 -3665 E -mail: tukplanftci.tukwila.wa.us Permit Center /Building Division 206 431 -3670 Public Works Department 206 433 -0179 Planning Division 206 431 -3670 AFFIDAVIT IN LIEU OF CONTRACTOR REGISTRATION Ov PERMIT NO: M (1, 0 O-3 STATE OF WASHINGTON) ) ss. COUNTY OF KING Ci',ii 1 2 it G / -; stb'tes as follows: L./ [please print name] 1. I have made application for a permit from the City of Tukwila, Washington. 2. I understand that state law requires that all building construction contractors be registered with the State of Washington. The exceptions to this requirement are stated under Section 18.27.090 of the Revised Code of Washington, a copy of which is printed on the reverse side of this Affidavit. I have read or am familiar with RCW 18.27.090. 3. I understand that prior to issuance of a permit for work which is to be done by any contractor, the City of Tukwila must verify either that the contractor is registered by the State of Washington, or that one of the exemptions stated under RCW 18.27.090 applies. 4. In order to provide verification to the City of Tukwila of my compliance with this requirement, I hereby attest that after reading the exemptions from the registration requirement of RCW 18.27.090, I consider the work authorized under this permit to be exempt under number J'and will therefore not be performed by a registered contractor. 5. I understand that the licensing provision of RCW 19.28.161 through 19.28.271 shall not apply to persons making electrical installations on their own property or to regularly employed employees working on the premises of their employer. The proposed electrical work is not for the construction of a new building for rent, sale or lease. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work. Signed and sworn to before me this day of p{ 1i? ,be7. , 20 a Z641 C( AR PUBLIC in and for the State of Washington Residing at / l/'1D') , County Name as commissioned: ail o ieftrAlie My commission expires: 18.27.090 Exemptions. The regiaion provisions of this chapter do not apply to 1. An authorized representative of the United States government, the state of Washington, or any incorporated city, town, county, township, irrigation district, reclamation district, or other municipal or political corporation or subdivision of this state; 2. Officers of a court when they are acting within the scope of their office; 3. Public utilities operating under the regulations of the utilities and transportation commission in construction, maintenance, or development work incidental to their own business; 4. Any construction, repair, or operation incidental to the discovering or producing of petroleum or gas, or the drilling, testing, abandoning, or other operation of any petroleum or gas well or any surface or underground mine or mineral deposit when performed by an owner or lessee; 5. The sale of any finished products, materials, or articles of merchandise that are not fabricated into and do not become a part of a structure under the common law of fixtures; 6. Any construction, alteration, improvement, or repair of personal property performed by the registered or legal owner, or by a mobile /manufactured home retail dealer or manufacturer licensed under chapter 46.70 RCW who shall warranty service and repairs under chapter 46.70 RCW; 7. Any construction, alteration, improvement, or repair carried on within the limits and boundaries of any site or reservation under the legal jurisdiction of the federal government; 8. Any person who only furnished materials, supplies, or equipment without fabricating them into, or consuming them in the performance of, the work of the contractor; 9. Any work or operation on one undertaking or project by one or more contracts, the aggregate contract price of which for labor and materials and all other items is less than five hundred dollars, such work or operations being considered as of a casual, minor, or inconsequential nature. The exemption prescribed in this subsection does not apply in any instance wherein the work or construction is only a part of a larger or major operation, whether undertaken by the same or a different contractor, or in which a division of the operation is made into contracts of amounts less than five hundred dollars for the purpose of evasion of this chapter or otherwise. The exemption prescribed in this subsection does not apply to a person who advertises or puts out any sign or card or other device which might indicate to the public that he or she is a contractor, or that he or she is qualified to engage in the business of contractor; 10. Any construction or operation incidental to the construction and repair of irrigation and drainage ditches of regularly constituted irrigation districts or reclamation districts; or to farming, dairying, agriculture, viticulture, horticulture, or stock or poultry raising; or to clearing or other work upon land in rural districts for fire prevention purposes; except when any of the above work is performed by a registered contractor; 11. An owner* who contracts for a project with a registered contractor, except that this exemption shall not deprive the owner of the protections of this chapter against registered and unregistered contractors. The exemption prescribed in this subsection does not apply to a person who performs the activities of a contractor for the purpose of leasing or selling improved property he or she has owned for less than twelve months; 12.* Any person working on his or her own property, whether occupied by him or her or not, and any person working on his or her personal residence, whether owned by him or her or not but this exemption shall not apply to any person who performs the activities of a contractor on his or her own property for the purpose of selling, demolishing, or leasing the property; 13. An owner* who performs maintenance, repair, and alteration work in or upon his or her own properties, or who uses his or her own employees to do such work; 14. A licensed architect or civil or professional engineer acting solely in his or her professional capacity, an electrician certified under the laws of the state of Washington, or a plumber certified under the laws of the state of Washington or licensed by a political subdivision of the state of Washington while operating within the boundaries of such political subdivision. The exemption provided in this subsection is applicable only when the person certified is operating within the scope of his or her certification; 15. Any person who engages in the activities herein regulated as an employee of a registered contractor with wages as his or her sole compensation or as an employee with wages as his or her sole compensation; 16. Contractors on highway projects who have been prequalified as required by RCW 47.28.070, with the department of transportation to perform highway construction, reconstruction, or maintenance work; 17. A mobile /manufactured home dealer or manufacturer who subcontracts the installation, set -up, or repair work to actively registered contractors. This exemption only applies to the installation, set -up, or repair of the mobile /manufactured homes that were manufactured or sold by the mobile /manufactured home dealer or manufacturer; 18. An entity who holds a validfelectricalcontractor's license under chapter 19.28 :RCW thai "employs a certified journeyman electricianfatcertified residentialspecialty electrician, or an electric al'trainee. meetilg;the requirements of chapter 1:§,$8 RCW t' o'perform':plumbing work that is incident411y,adirectly; and immediately appropriate to the like -in kind eplacementtof alhousehold appliance or other smaliti ousehold'utilization' equipment that requires limited ele tcipowe'> "and,l;inited waste and /or water connections: „An electrical trainee must be supervised by a certified electrician1while'performing plumbing work. • Per Washington State Department of Labor and Industries lessee has been interpreted to be equivalent to owner for purposes of exemptions. UBI No. 602268961 Status Active License No. TOTALMI936JW License Type Construction Contractor Effective Date 4/16/2007 Expiration Date 4/16/2013 Suspend Date ) Specialty 1 General C' 1 T ��;y � V � Specialty 2 I) Unused �y FEA 17 2017_ /17/12 e. Contractors or Tradespeople Detail • • 0 Washington State Department of Labor & Industries Contractors or Tradespeople Detail Return to List > Start a New Search > FRI Printer friendly Verify Workers' Como Premium Status Check for Dept. of Revenue Account About General /Specialty Contractor A business registered as a construction contractor with L&I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name TOTAL MACHINERY INC Phone, No. (206) 226-3370 Address 7110 Zircon Ct Sw Suite /Apt. City Lakewood State WA Zip 98498 County Pierce Business Type Corporation Parent Company PERMIT CENTER Other Associated Licenses License Name Type Specialty Specialty Effective 1 2 Date Expiration Status Date TOTALS *972 LL TOTAL SERVICE Construction Contractor General Unused 6/13/2003 6/13/2005 Expired KACESI *9630M KACES INC Construction Contractor General Unused 9/14/2004 9/14/2006 Inactive 0 Business Owner Information Q Hide All 11-02- Name Role Effective Date Expiration Date PARK, ROBERT HAROLD IPresident 1 04/16/2007 B Bond Information Bond Bond Company Name Bond Effective Expiration Cancel Impaired Bond Received Account Date Date Date Date Amount Date Number I i ttps:// fortress .wa.gov /Ini /bbip /Result.aspx 1/ /17/12 Contractors or Tradespeople Detail 3 RU INS CO LSM00096 04/06/2008 Until Cancelled $12,000.00 03/24/2008 2 AMERICAN CONTRACTORS IND CO 100021884 04/06/2007 Until Cancelled 06/02/2008 $12,000.00 04/13/2007 1 COLONIAL AM CAS& SURETY OF MARYLAND LPM 4040336 07/23/2004 Until Cancelled 07/26/2006 $12,000.00 09/14/2004 Assignment of Savings Information ' No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Expiration Cancel Impaired Amount Received Date Date Date Date Date 7 Cas Ins Co L179000810 L179000810 03/20/2011 03/20/2012 $1,000,000.00 03/18/2011 5 CAPITOL SPECIALTY INS CORP CS00339865 03/20/2009 03/20/2011 $1,000,000.00 03/19/2010 4 CAPITOL SPECIALTY INS CORP CS00339865 03/20/2008 03/20/2009 $1,000,000.00 03/11/2008 3 CAPITOL SPECIALTY INS CORP CS00339865 03/20/2007 03/20/2008 $1,000,000.00 04/13/2007 2 MAXUM INDEMNITY CO 8DG000499202 07/23/2005 07/23/2006 $2,000,000.00 07/22/2005 9 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period L Warrant Information No unsatisfied warrants on file within prior 6 year period ()Washington State Dept. of Labor & Industries. Use of this site is subject to the laws of the state of Washington. ttps: // fortress .wa.gov /Ini /bbip /Result.aspx 2/ 71% CO COPY. PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -023 PROJECT NAME: REGENCY CLEANERS SITE ADDRESS 950 ANDOVER PK E Original Plan Submittal Response to Incomplete Letter # DATE: 09 -06 -12 X Response to Correction Letter # 1 Revision # After Permit Issued EPARTMENTS: 11 ng ivision Public Works ❑ Fire Prevention Structural Planning Division ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 09 -11 -12 Complete Incomplete ❑ Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route 15p Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10 -09 -12 Approved ❑ Approved with Conditions Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 PLANPRIVINVIRK • U ING SLIP ACTIVITY NUMBER: M12 -023 DATE: 02 -10 -12 PROJECT NAME: REGENCY CLEANERS SITE ADDRESS: 950 ANDOVER PK E X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: 6`Girdln i7ivlslon ire Pre)ention Planning Division 9 Public Works n Structural n Permit Coordinator 1 DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: Incomplete n DUE DATE: 02 -14 -12 Not Applicable n Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route Structural Review Required nNo further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved n Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 03-13-12 Not Approved (attach comments) g DATE: Permit Center Use'Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ( Fire ❑ Ping ❑ PW ❑ Staff Initials:�t/1ni Documents /routing slip.doc 2 -28 -02 City of Tukwila REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Web site: http: / /www.TukwilaWA.gov Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 09/05/2012 Plan Check/Permit Number: M12 -023 rResponse to Incomplete Letter # Response to Correction Letter # X f Revision # after Permit is Issued Revision requested by a City Building Inspector or Plans Examiner Project Name: Regency Cleaners • Project Address: 950 Andover Pk E, Tukwila, WA 98188 Contact Person: Melinda Herrin Phone Number: (206) 234 -1310 Summary of Revision: The following is a response to each of the items on Correction Letter #1 dated 2- 27 -12: 1. See submitted Plan of Boiler Room, same as provided by owner on 8/30/12. 2. See submitted M2.2 and M2.3 for gas piping floor plan and boiler plan. 3. See submitted M2.4 for roof termination plan. Sheet Number(s): M2.2, M2.3, M2.4 RECEIVED CRY OF TUKWILA se, 06 20121 PERMIT CENTER "Cloud" or highlight all areas of revision including date of r v';'on Received at the City of Tukwila Permit Center by: E Entered in Permits Plus on R- (D' -17 H:Wppltcations\Forms- Applications On Line\2010 Applications \7 -2010 - Revision Submittal.doc Revised: May 2011