Loading...
HomeMy WebLinkAboutPermit M12-071 - TOTAL WINETOTAL WINE 300 ANDOVER PK W SUITE 500 M12 -071 City PTukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 2623049001 Address: 300 ANDOVER PK W TUKW Project Name: TOTAL WINE Permit Number: M12 -071 Issue Date: 05/14/2012 Permit Expires On: 02/25/2013 Owner: Name: Address: Contact Person: Name: Address: Email: SEGALE PROPERTIES LLC PO BOX 88028 , TUKVVILA WA 98138 STEVE NELSON Phone: 206 575 -2000 PO BOX 88028 , TUKWILA WA 98138 Contractor: Name: SEGALE PROPERTIES LLC Address: PO BOX 88028 , TUKWILA WA 98138 Contractor License No: SEGALPL902CQ Phone: 206 -575 -2000 Expiration Date: 04/01/2014 DESCRIPTION OF WORK: REVISE EXISTING DUCTWORK, INSTALL NEW DUCTWORK, AND INSTALL NEW DIFFUSERS FROM (8) EXISTING RTU'S. INSTALL NEW T -STATS AND REMOTE SENSORS. REWORK EXISTING BATHROOM EXHAUST. INSTALL NEW CONDENSERS, FAN UNITS AND REFRIGERANT LINES FOR (2) COOLERS AND (1) HUMIDOR. Value of Mechanical: $72,714.00 Type of Fire Protection: SPRINKLERS Electrical Service Provided by: Permit Center Authorized Signature: t11 U \ V I hereby certify that I have read and governing this work will be complie wit whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this permit. Fees Collected: $1,032.81 International Mechanical Code Edition: 2009 Date: OtiW ed this permit and know the same to be true and correct. All provisions of law and ordinances Signature: Print Name: Date: d 9 4 // 2- This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IMC -4/10 M12 -071 Printed: 09 -11 -2012 • • PERMIT CONDITIONS Permit No. M12-071 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: Readily accessible access to roof mounted equipment is required. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Ventilation is required for all new rooms and spaces of new or existing buildings and shall be in conformance with the International Building Code and the Washington State Ventilation and Indoor Air Quality Code. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: ** *FIRE DEPARTMENT CONDITIONS * ** 11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 12: Maintain sprinlder coverage per N.F.P.A. 13. Addition/relocation of walls, closets or partitions may require relocating and/or adding sprinkler heads. (IFC 901.4)(Extend sprinkler protection to the beer /wine cooler.) 13: Sprinklers shall be installed under fixed obstructions over 4 feet (1.2 m) wide such as ducts, decks, open grate flooring, cutting tables, shelves and overhead doors. (NFPA 13- 8.6.5.3.3) 14: All new sprinlder systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinlder systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2327). 15: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2328) 16: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 17: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2328) 18: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2328) 19: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2328) doc: IMC -4/10 M12 -071 Printed: 09 -11 -2012 20: Maintain fire alarm system au /visual notification. Addition/relocation of ilkor partitions may require relocation and/or addition of audiisual notification devices. (City Ordinance 8) (Extend fire alarm notification to the walk -in beer /wine cooler.) 21: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2328) (IFC 104.2) 22: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 23: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 24: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 25: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: IMC -4/10 M12 -071 Printed: 09 -11 -2012 City okukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -43 1 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: Address: 2623049001 300 ANDOVER PK W TUKW Project Name: TOTAL WINE Permit Number: M12 -071 Issue Date: 05/14/2012 Permit Expires On: 11/10/2012 Owner: Name: Address: Contact Person: Name: Address: Email: Contractor: Name: Address: SEGALE PROPERTIES LLC PO BOX 88028 , TUKWILA WA 98138 STEVE NELSON Phone: 206 575 -2000 PO BOX 88028 , TUKWILA WA 98138 SEGALE PROPERTIES LLC Phone: 206 - 575 -2000 PO BOX 88028 , TUKWILA WA 98138 Contractor License No: SEGALPL902CQ Expiration Date: 04/01/2014 DESCRIPTION OF WORK: REVISE EXISTING DUCTWORK, INSTALL NEW DUCTWORK, AND INSTALL NEW DIFFUSERS FROM (8) EXISTING RTU'S. INSTALL NEW T -STATS AND REMOTE SENSORS. REWORK EXISTING BATHROOM EXHAUST. INSTALL NEW CONDENSERS, FAN UNITS ADN REFRIGERANT LINES FOR (2) COOLERS AND (1) HUMIDOR. Value of Mechanical: $52,714.00 Type of Fire Protection: SPRINKLERS Electrical Service Provided by: Permit Center Authorized Signature: LA. Fees Collected: $827.81 International Mechanical Code Edition: 2009 Date: S1/4ILI- () I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this permit. Signature Date: .5-/Y/Z-e-f -7-- Print Name: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IMC -4/10 M12 -071 Printed: 05 -14 -2012 • • PERMIT CONDITIONS Permit No. M12-071 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: Readily accessible access to roof mounted equipment is required. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Ventilation is required for all new rooms and spaces of new or existing buildings and shall be in conformance with the International Building Code and the Washington State Ventilation and Indoor Air Quality Code. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 10: ** *FIRE DEPARTMENT CONDITIONS * ** 11: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 12: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2051) 13: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air - moving equipment upon detection of smoke in the main return -air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 14: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2051) 15: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2051) 16: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2051) 17: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2051) (IFC 104.2) 18: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 19: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2050 and #2051) 20: Any overlooked hazardous condition and /or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. doc: IMC -4/10 M12 -071 Printed: 05 -14 -2012 21: These plans were reviewed by fliector 511. If you have any questions, pleaselTukwila Fire Prevention Bureau at (206)575 -4407. doc: IMC -4/10 M12 -071 Printed: 05 -14 -2012 CITY OF TUKWI1A Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http: //www.Tuk wilaW A. gov • Mechanical Permit No. Project No Date Application Accepted:. Date Application Expires: (F'or office use onlv) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** SITE LOCATION Site Address: 300 Andover Park West King Co Assessor's Tax No.: 262304-9001 Suite Number: 500 Floor: 1 Tenant Name: Total Wine PROPERTY OWNER Name: Steve Nelson Name: Segale Properties LLC Address: PO Box 88028 Address: PO Box 88028 City: Tukwila State: WA City: Tukwila State: WA Zip: 98138 CONTACT PERSON — person receiving.all project communication Name: Steve Nelson Address: PO Box 88028 Address: PO Box 88028 Phone: (206) 575-2000 Fax: (206) 575-1662 City: Tukwila State: WA Zip: 98138 Phone: (206) 575-2000 Fax: (206) 575-1662 Email: snelson@segaleproperties.com New Tenant: WI Yes 0 .. No MECHANICAL CONTRACTOR INFORMATION Company Name: Sega le Properties LLC Address: PO Box 88028 City: Tukwila State: WA Zip: 98138 Phone: (206) 575-2000 Fax: (206) 575-1662 Contr Reg No.: SEGALPL902CQ Exp Date: 04/01/2014 Tukwila Business License No.: BUS-101320 Valuation of project (contractor's bid price): $ 52,714 Describe the scope of work in detail: Revise existing duct work, install new duct work and install new diffusers from 8 existing RTU's. Install new T-stats and remote sensors. Rework existing bathroom exhaust. Install new condensers, fan units and refrigerant lines for 2 coolers and 1 humidor. Use: Residential: New 0 Commercial: New Replacement Replacement Fuel Type: Electric 0 Gas 0 Other: HAApplicationsWonns-Applications On Line \ 2011 Applications \Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 • Indicate type of mechanical work being installed and the quantity below. Unit Type Qty Furnace <100k btu Furnace >100k btu 48 Floor furnace 9 Suspended /wall /floor mounted heater 1 Appliance vent 8 Repair or addition to heat/refrig/cooling system 4 Air handling unit <10,000 cfm 1 Unit Type Qty Air handling unit >10,000 cfm 48 Evaporator cooler 9 Ventilation fan connected to single duct 1 Ventilation system 8 Hood and duct Incinerator — domestic Incinerator — comm /industrial Unit Type Qty Fire damper Diffuser 48 Thermostat 9 Wood/gas stove Emergency generator Other mechanical equipment Boiler /Compressor 0 -3 hp /100,000 btu 3 -15 hp /500,000 btu 15 -30 hp /1,000,000 btu 30 -50 hp /1,750,000 btu 50 +hp /1,750,000 btu PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING WNER OR 70 ED AGENT: Signature: C1), Date: 04/24/2012 Print Name: Steven R. Nelson Day Telephone: (206) 396 -2011 Mailing Address: PO Box 88028 Tukwila WA 98138 City State Zip 1-I:\Applications\Potms- Applications On Line \2011 Applications'Mechanical Permit Application Revised 8- 9- 11.docx Revised: August 2011 bh Page 2 of 2 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov Parcel No.: 2623049001 Address: 300 ANDOVER PK W TUKW Suite No: Applicant: TOTAL WINE RECEIPT Permit Number: M12 -071 Status: ISSUED Applied Date: 04/24/2012 Issue Date: 05/14/2012 Receipt No.: R12 -02479 Payment Amount: $205.00 Initials: JEM Payment Date: 08/28/2012 03:13 PM User ID: 1165 Balance: $0.00 Payee: SEGALE PROPERTIES LLC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 2122 205.00 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES PLAN CHECK - NONRES 000.322.102.00.00 164.00 000.345.830 41.00 Total: $205.00 doc: Receiot -06 Printed: 08 -28 -2012 Cif! of Tukwila, Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http: //www. ci. tukwila.wa. us SET RECEIPT RECEIPT NO: R12 -01406 Initials: Payment Date: 04/24/2012 User ID: 1670 Total Payment: 5,220.75 Payee: SEGALE PROPERTIES LLC SET ID: 0424 SET NAME: TOTAL WINE SET TRANSACTIONS: Set Member Amount EL12 -0381 M12 -071 PG12 -061 TOTAL: 3,948.00 827.81 444.94 3,948.00 TRANSACTION LIST: Type Method Description Amount Payment Check 2111 5,220.75 TOTAL: 5,220.75 ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PERMIT - NONR ELECTRICAL PLAN - NONRES MECHANICAL - NONRES PLAN CHECK - NONRES PLUMBING - NONRES 000.322.101.00.0 000.345.832.00.0 000.322.102.00.0 000.345.830 000.322.103.00.0 TOTAL: 3,158.40 789.60 662.25 254.55 355.95 5,220.75 1.1 • INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVIS.IO.N 6300 Southcenter Blvd., #100, Tukwila. WA 98188 -(206) 431 -3670 Permit Inspection Request Line (206) 431 - 2451'` Project: 1.-0I A L U� s. r j >` Type of Inspection 1` r tJ cfi Address. 30(.1 APB ' OO Date Called:,: - ' . Special Instructions: DatGanted '' r p.m. Requester: Phone. No: 206-s 2:00 0 Approved per applicable codes. ElCorrections required prior to. approval. COMMENTS: 1��!w�►4- c - oxE ' nspecto Da n RE1 PECTION FEE REQUIRED. Prior to next inspection fee must: be pa� at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection.' INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. 11/112-07 CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: • `IL�I1� L_i�cr�� Typ ocInspection: i -1��1 Address: Date Called: Special Instructions: Date Wanted:. a.my Requester: Phone No: 1.4)L- c,G-11'7 I. Approved Per applicable codes. E Corrections required prior to approval. COMMENTS: orDA( Date. ZG — �7 RE SPECTION FEE REhUIRED. Priq to next inspet tion. fee must be aid at 6300 Southcenter Blvd.. Suite /100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 1,14, (206) 431-3670 Permit Inspection Request Line (206) 431-2451 Project: UkiAP ( Type of Inspectipn: J 6 if- -1,-1 Address: 0 0 /'JO t Special Instructions: Date Called: Date Wanted: 415 ( Requester: Phone No: 1 Approved per applicable codes. El Corrections required prior to approval. / COMMENTS: jitiur,-c . ____ k.Lir. . 0 1 / ki 11 L) A 371\-(/ f , Inspectkrj Date:_ r7 REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION NO. INSPECTION RECORD Retain a copy with permit M(z --o7 PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Pro:Kee- "- ! (or �� Typ f Insp etion: °"`, ��P = �rAr( , oil Address: -3,o,o /WOOL/if-1A/ Date Called: Special Instructions: r ov S 'L.—Requester Date Wanted: Z a.m. — Z �p-nT C , t t o5, . (it-JM!� %-cam c.o — 1 t%3-- 11-7( Approved per applicable codes. Corrections required prior to approval. COMMENTS: ,45r.s-co Inspe cor: n REINSPECTION FEE R QUIRED. �'rior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Date INSPECTION RECORD Retain a copy with permit _INSPECTION NO. PERMIT NO.w( CITY OF' TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 It. (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project:,., -:-.. (3 ` UPI l nl Type f nspecti n: �t /� J� 1� �„ 4"` Ad ss: JO J Date Called: Special Instructions: Date Wanted: `� (�, (�rDr ( p.m. Requester: Phone No: EApproved per applicable codes. Corrections required prior to approval. COMMENTS: D tt 9.0 / PP i4J V --3 Inspe t� or: Date: ( ^ 1REINSPECTION.FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. PERMIT COORD COP! PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -071 DATE: 08/28/12 PROJECT NAME: TOTAL WINE SITE ADDRESS: 300 ANDOVER PK W, STE 500 Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # X Revision # 1 after Permit Issued EP'ART ENTS: uiidEing vision Public Works ire Prevention Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Er Incomplete I I DUE DATE: 08/30/12 Not Applicable ❑ Comments: Permit Center Use Only 1, 114601■APLife LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS ROUTING: I�I Please Route Structural Review Required n No further Review Required I I REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved I I 1 Approved with Conditions �4 Not Approved (attach comments) n Notation: DUE DATE: 09/27/12 REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: 1ERMIT COORD COO. PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -071 PROJECT NAME: TOTAL WINE SITE ADDRESS: 300 ANDOVER PK W, STE 500 DATE: 04/24/12 X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: A, likr .11u71ding"Division ' Pire Prevention Public Works ❑ Structural Planning Division ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete DUE DATE: 04/26/12 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route Structural Review Required No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 05/24/12 Approved Approved with Conditions Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 02/29/12 PROJECT NAME: SITE ADDRESS: �s PERMIT NO: 1 " l t 0'7 ao ORIGINAL ISSUE DATE: 5.11 -1 —t REVISION LOG REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS 1 g- « BEM (t Olk\II -f— Summary of Revision: 1,,,a,. M zw r c 00(4i^ Received by: 5 )r2uf: eva,'j , ,_ REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) REVISION NO. DATE RECEIVED STAFF INITIALS ISSUED DATE STAFF INITIALS Summary of Revision: Received by: (please print) • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Web site: REVISION SUBMITTAL Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: 08/28/2012 Plan Check/Permit Number: M12 -071 Response to Incomplete Letter # Response to Correction Letter # 1 Revision # 1 after Permit is Issued Revision requested by a City Building Inspector or Plans Examiner Project Name: Total Wine Project Address: 300 Andover Park West Suite 500 Contact Person: Steve Nelson Summary of Revision: Phone Number: (206) 575 -2000 Install a new 7' -9" x 16' -0" enclosed beer cooler in warehouse. Installation to included an evaporator, condenser and condensate drain to existing floor sink. ✓a' C-a4 71 sL c/r 6--, 4( z, 600- co wtbeZ 2 3`11 4i - CA l 1,k40 rectd, Sheet Number(s): M1.1 "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: ❑ Entered in Permits Plus on H:\ApplicationsWorms- Applications On Line\2010 Applications \7 -2010 - Revision Submittal.doc Revised: May 2011 Contractors or Tradespeople Peer Friendly Page • General /Specialty Contractor A business registered as a construction contractor with LEtI to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name SEGALE PROPERITIES LLC UBI No. 602023533 Phone 2065752000 Status Active Address Po Box 88028 License No. SEGALPL902CQ Suite /Apt. License Type Construction Contractor City Tukwila Effective Date 2/18/2010 State WA Expiration Date 4/1/2014 Zip 981382028 Suspend Date County King Specialty 1 General Business Type Limited Liability Company Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status LAPIALP055MZ LA PIANTA LIMITED PARTNERSHIP Construction Contractor General Unused 7/9/1995 4/1/2001 Archived SEGALBP151M5 SEGALE BUSINESS PARK Construction Contractor General Unused 7/25/1985 7/9/1995 Archived LAPIAL'008J8 LA PIANTA LLC Construction Contractor General Unused 4/28/2000 4/1/2010 Inactive Business Owner Information Name Role Effective Date Expiration Date SEGALE, MARIO A Agent 02/18/2010 Amount SEGALE, MARIO A Partner /Member 02/18/2010 12DLS31006 Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date SAFECO INS CO OF AM 6115146 02/18/2010 Until Cancelled $12,000.00 03/28/2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 4 Alaska National Insurance Co 12DLS31006 04/01/2012 04/01/2013 $1,000,000.00 03 /30/2012 3 Alaska National Ins Co 11DLS31006 04/01/2011 04/01/2012 $1,000,000.0003 /29/2011 2 ALASKA NATIONAL INSURANCE COMP 10DLS31006 04/01/2010 04/01/2011 $1,000,000.00 03/31/2010 1 ALASKA NATIONAL INSURANCE COMP 09DLS31006 02/18/2010 04/01/2010 $1,000,000.00 03/31/2009 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 05/14/2012 SEISMIC NOTES: 1. RECTANGULAR DUCTWORK WITH A CROSS - SECTIONAL AREA OF 6 SQ. FT. AND LARGER, AND SUSPENDED MORE THAN 12" FROM POINT OF CONNECTION TO STRUCTURE TO TOP OF DUCT SHALL BE BRACED IN TWO DIRECTIONS (90' OPPOSING) USING ROD OR STRAP OF SAME LOAD CHARACTERISTICS AS PRIMARY SUSPENSION ROD OR STRAP. 2. DUCTWORK 28" IN DIAMETER AND LARGER, AND SUSPENDED MORE THAN 12" FROM POINT OF CONNECTION TO STRUCTURE TO TOP OF DUCT SHALL BE BRACED IN TWO DIRECTIONS (90' OPPOSING) USING ROD OR STRAP OF SAME LOAD CHARACTERISTICS AS PRIMARY SUSPENSION ROD OR STRAP. DUCTWORK SHALL HAVE TRANSVERSE BRACING AT MAXIMUM 30' -O" ON CENTER AND WITHIN 48" OF CHANGE IN DIRECTION AND LONGITUDINAL BRACING AT MAXIMUM 60' -0" ON CENTER. 4. CEILING DIFFUSERS AND GRILLES SHALL BE SECURED TO A STRUCTURAL ELEMENT USING A 12 GAUGE CEILING SUSPENSION WIRE. GAS, HIGH - HAZARD AND FIRE PROTECTION PIPING SHALL BE SIESMIC SUPPORTED PER THE SPECIFICATIONS. OTHER PIPING IN BOILER AND MECHANICAL EQUIPMENT ROOMS THAT IS GREATER THAN 1" AND PIPING 2-1/2" AND LARGER THAT IS SUSPENDED MORE THAN 12" FROM POINT OF CONNECTION TO STRUCTURE SHALL BE BRACED IN TWO DIRECTIONS (90' OPPOSING) USING ROD OF SAME LOAD CHARACTERISTICS AS PRIMARY SUSPENSION ROD. PIPING IN EQUIPMENT ROOMS THAT IS LESS THAN 2-1/2" DIAMETER SHALL BE TRANSVERSELY BRACED AT MAXIMUM 3O' -0" ON CENTER. PIPING 16" OR LESS IN DIAMETER SHALL BE TRANSVERSELY BRACED AT MAXIMUM 40' -0" ON CENTER AND LONGITUDINALLY AT 8O' -0" ON CENTER. PIPING LARGER THAN 16" DIAMETER SHALL BE TRANSVERSELY BRACED AT MAXIMUM 30' -0" ON CENTER AND LONGITUDINALLY AT 60'- 0" ON CENTER. A TRANSVERSE BRACE SHALL ALSO BE PROVIDED WITHIN 10' -0" OR 15 PIPE DIAMETERS OF EACH CHANGE OF DIRECTION. GENERAL DEMOLITION NOTES: 1. PRIOR TO SUBMITTING BID, VISIT THE JOB SITE AND BECOME FULLY ACQUAINTED WITH THE EXISTING CONDITIONS OF THE PROJECT. REVIEW GENERAL NOTES, SPECIFICATIONS AND OTHER DRAWINGS FOR ADDITIONAL REQUIREMENTS THAT MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY ARCHITECT, ENGINEER OR OWNER, AS DEFINED IN BID DOCUMENTS, OF CONFLICTS OR DISCREPANCIES PRIOR TO SUBMISSION OF BID. 2. EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND SITE VISITS AND MAY NOT REFLECT EXACT "AS- BUILT" CONDITIONS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. COORDINATE NEW WORK AND DEMOLITION WITH OTHER DISCIPLINES AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION. 3. OWNER RETAINS RIGHTS OF SALVAGE FOR EQUIPMENT AND FIXTURES TO BE REMOVED. COORDINATE WITH OWNER THE EQUIPMENT AND FIXTURES TO BE SALVAGED AND THE LOCATION FOR STORAGE. AVOID DAMAGE TO SALVAGED EQUIPMENT, FIXTURES AND DEVICES DURING DEMOLITION WORK AND DURING TRANSPORT TO OWNER'S DESIGNATED STORAGE LOCATION. 4. 5. REMOVE ITEMS SHOWN HEAVY -LINED DASHED, CROSSHATCHED, AND /OR NOTED TO BE REMOVED. AVOID DAMAGING EXISTING SURFACES AND EQUIPMENT TO REMAIN FOR NEW INSTALLATION. REFA R DAMAGE CAUSED DURING WORK AT NO 'EXTRA COST TO THE OWNER. 6. SEAL PENETRATIONS THROUGH FLOORS, WALLS, CEILINGS AND ROOFS WHERE MECHANICAL COMPONENTS ARE REMOVED AND WHERE THE EXISTING PENETRATION IS NOT USED FOR THE NEW INSTALLATION. REPAIR DAMAGED SURFACES TO MATCH ADJACENT AREAS OR AS INDICATED ON THE ARCHITECTURAL DRAWINGS. 7. REMOVE HANGERS AND SUPPORTS WHERE DUCTWORK, PIPING AND /OR EQUIPMENT ARE REMOVED AND THE EXISTING HANGERS AND SUPPORTS ARE NOT USED FOR THE NEW INSTALLATION. 8. INSTALL PERMANENT CAPS WHERE DUCTWORK AND PIPING IS REMOVED AND THE EXISTING TAPS ARE NOT USED FOR THE NEW INSTALLATION. WHERE DUCTWORK AND PIPING ARE REMOVED AND THE EXISTING TAPS WILL BE USED FOR THE NEW INSTALLATION, INSTALL TEMPORARY CAPS TO PROTECT THE INTERIOR SURFACES UNTIL NEW DUCTWORK AND PIPING ARE INSTALLED. 9. INSPECT EXISTING EQUIPMENT TO REMAIN TO VERIFY THAT EQUIPMENT IS OPERATING PROPERLY. NOTIFY OWNER OF DAMAGED AND /OR MALFUNCTIONING COMPONENTS. MECHANICAL SYMBOLS HVAC EQUIPMENT &. DUCTWORK NOTE: ALL DUCT DIMENSIONS SHOWN ON DRAWINGS ARE INSIDE DIMENSIONS. SEE SECTION 15250 Of- THE SPECIFICATION FOR DUCTWORK TO RECEIVE INSULATION OR LINER. NOTE: THIS IS A MASTER LEGEND AND NOT ALL SYMBOLS, ABBREVIATIONS, ETC. ARE NECESSARILY USED ON THE DRAWINGS. EnHg RD 0 FD EXISTING DUCTWORK OR EQUIPMENT TO REMAIN EXISTING DUCTWORK OR EQUIPMENT TO BE REMOVED LINEAR SLOT DIFFUSER INSULATED FLEXIBLE DUCT (MAX. 5' -0 "' LONG) BRANCH DUCT WITH 45' RECTANGLE -ROUND BRANCH FITTING AND MANUAL VOLUME DAMPER ELBOW WITH TURNING VANES BRANCH DUCT WITH BELL -MOUTH FITTING & MANUAL VOLUME CONTROL DAMPER RETURN, EXHAUST, OR OUTSIDE AIR DUCT UP RETURN, EXHAUST, OR OUTSIDE AIR DUCT DOWN SUPPLY AIR DUCT UP SUPPLY AIR DUCT DOWN EQUIPMENT WITH FLEXIBLE DUCT CONNECTION 10" CSD -1 300 CFM NECK SIZE, TYPE, CFM OF SUPPLY DIFFUSER OR REGISTER 24x24 CEG -1 800 CFM SIZE, TYPE, CFM OF EXHAUST GRILLE MANUAL VOLUME DAMPER SQUARE TO ROUND TRANSITION DUCT MOUNTED SMOKE DETECTOR (SD= SUPPLY /RD= RETURN) RISER DESIGNATION FIRE DAMPER FIRE SMOKE DAMPER SD SMOKE DAMPER VD VOLUME DAMPER MD MOTORIZED DAMPER BACKDRAFT DAMPER HUMIDISTAT ICS THERMOSTAT CO CO2 FS CARBON MONOXIDE SENSOR CARBON DIOXIDE SENSOR FLOW SWITCH HS HUMIDITY SENSOR 117)-q PULL STATION SPI TS STATIC PRESSURE SENSOR TEMPERATURE SENSOR RL REFRIGERANT LIQUID (RL) REFRIGERANT DISCHARGE (HOT GAS) (RD) RS REFRIGERANT SUCTION (RS) DB REFRIGERANT DISCHARGE BYPASS (RDB) RV REFRIGERANT VENT (RV) ANNOTATION MECHANICAL OR FIRE PROTECTION PLAN CALLOUT PLUMBING PLAN NOTE CALLOUT ELECTRICAL PLAN NOTE CALLOUT TECHNOLOGY PLAN CALLOUT PLUMBING EQUIPMENT DESIGNATION. (CONTRACTOR FURNISHED AND INSTALLED). REFER TO PLUMBING FIXTURE OR EQUIPMENT SCHEDULES EQUIPMENT DESIGNATION CONTRACTOR INSTALLED) 1 S FURNISHED, / /I MECHANICAL EQUIPMENT DESIGNATION (CONTRACTOR FURNISHED AND INSTALLED UNLESS NOTED OTHERWISE) CONNECTION POINT OF NEW WORK TO EXISTING DETAIL REFERENCE UPPER NUMBER INDICATES DETAIL NUMBER LOWER NUMBER INDICATES SHEET NUMBER SECTION CUT DESIGNATION FIRE SPRINKLERS C UPRIGHT SPRINKLER U PENDENT SPRINKLER CONCEALED SPRINKLER Q DRY PENDENT SPRINKLER V DRY SIDEWALL SPRINKLER -- - - - - -- -- SIDEWALL SPRINKLER REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. tti T=: f.3 :signs will require a new plan submittal and may include additional plan review fees. FIL.2 COPY Permit No.. MtO7I P ^^ review approval is subject to =wand ordeals. ls. & r oc tai of construction documents does not authorize t , ` '. v ation of any adopted code or ordnance. Receipt o{ approved RI& Copy and conditions is acia'iow1edg d: •iei4 % By Date: 3"2--/c7:- 62- AR ATE PERMIT � EQUWRED FOR: ❑ Mechanical iiienumbing Iiii0eas Piping C of Tukwila '1.;`!...c:i3NG DIVISION City Of Tukwila BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE f APPROVED MAY 11 2012 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA APR 2 it 2012 PERMIT CENTER NAI 2 w� 2 xL 0< 0 0 U, z O LAS VEGAS :: IRVINE :: PHOENIX :: SALT LAKE o E t/)OWp�O 6W.- gr. fal—ces osa.owcr ON IgVilMeOW CI '3E96 ERzw owzzEl im % 0 0 06 m ifft (1) STORE NUMBER: XXXX ON ANOTHER PROJEC' IS NOT AUTHORIZED AND MAY BE C co m a THIS DRAWING FOR REUSE REQUIRES THE SERVICES OF PROPERLY LICENSED ARCHITECTS AND ENGINEERS. REPRODUCTION OF ISSUE BLOCK 04/05/12 PERMIT SET OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJ CHECKED BY: TA/RO /SJ DRAWN BY: RRR FILE: M01.DWG SHEET NAME: MECHANICAL SYMBOLS SHEET NUMBER: M0.1 U, ® ATTENTION Alk ALL UNITS ARE DESIGNED FOR INDOOR APPLICATIONS UNLESS NOTED OTHERWISE DESCRIPTION COOLER AS DRAWN- NO FLOORS NSF AND UL LABELED FOR FLAME SPREAD AND SMOKE DEVELOPED THERMA - STRUCTURE (WOOD FRAME) SEISMIC TIE DOWNS: IF REQUIRED AND NOT SHOWN AS SUPPLIED BY KPS - THEY ARE TO BE SUPPLIED BY OTHERS INSULATION 4" POURED IN PLACE URETHANE FOAM GENERAL NOTES SCREED: 1 -1/2" X 2 -1/2" X 18 GA. CONT. ANGLE NAMEPLATE: KYSOR PANEL SYSTEMS COVED BASE: WHERE REQUIRED AND NOT SHOWN IS BY OTHERS. ROOF: N/A INSTALL: BY OTHERS FINISH INTERIOR WALL: NATURAL EMBOSSED GALVANIZED INTERIOR TOP: NATURAL EMBOSSED GALVANIZED INTERIOR FLOOR: N/A EXTERIOR WALL: NATURAL EMBOSSED GALVANIZED EXTERIOR TOP: NATURAL EMBOSSED GALVANIZED EXTERIOR FLOOR: N/A DOORS /OPENING (1) C3066C (36" X 78 ") INSET COOLER DOOR DOOR)OPENIN ' HARDWAI E (1) K -1094 CLOSER, (2) K -1248 HINGE, (1) K -78 LATCH JAMB GUARDS 18 GA GALVANIZED JAMB GUARDS (FACTORY INSTALLED) ELECTRICAL ?1) SWITCH, (1) 2" DIAL THERMOMETER AO SECTION NO SCALE Saved on 8/8/2012 8:47:25 AM by SJENKINS. C -3 22 -11/16 x 4 -3/8 W -2 23 W -1 47 W -1 47 W -1 47 N N c -1 18 -1/16 x 4-3/8 5 1/2" 01 - COOLER NO FLOOR 10' - 0" O.A. L.O.F = 115 - 13/16" 36 X 78 F.O. NSF LABEL 13180 BTU /HR WALL AND INFILTRATION LOSS. LOAD BASED ON STORAGE ONLY. DW -1 47 C3066CR -1 5 1/2" W -1 47 6' -6" 16'x" W -1 47 C -2 25 -1/8 x 4 -3/8 ALL LAAVOUT C o te sre.a.. Lo 3 A 3 0 c_t_ai rieeetNeY4* \-C a. .r� Tat 25 -1/8 GIT PG GIT T -2 47 GIT T- 2 �- T- 3 FJ 47 GIT 25 -1/8 16' -0" TP TOP k.AYOUT N 3N C -1 18 -1/16 x 4 -3/8 .1 ATTENTION A PENETRATIONS ARE THE RESPONSIBILITY OF OTHERS. Minimum Design Load Uniformly Distributed Tops (PSF): 10 Walls (PSF): 5 *Floors (PSF): N/A *Not For Pallet Jack or Forklift �ECtt�.E`" �. GITY OF TUK AUG 2 8 2012 PERMIT CENTER P- et C z COLOR CODE BLACK LEGEND ELECTRICAL SYMBOLS 0-s SWITCH 0,-- 4-WAY SWITCH 0= JUNCTION BOX 0= SWITCH TO= THERMOMETER ® = TS -2 THERMOMETER p= HEATED VENT (X38?! WO = HEATER WIRE JUNCTION © = LIDHT NO= NON - HEATED VENT ®= ALARM QD = DIGITAL THERMOMETER O= FAN CUTOFF SWITCH ®= HEATED VENT (+1845) OV = HEATED VENT (P1825) CT = 2N3x2 -3/4" ELECT. BOY W/3/4" CONDUIT NOTE REFERENCE LAYOUT(S) FOR LOCATIONS AND FOR SPECIFICATIONS REFER TO GENERAL NOTES. KYSOR PANEL 3831 SOUTH BULLARD AVE GOODYEAR, AZ 85338 P.O. # $0612- 1402 -DEB DRAWING SD -3 of 4 FX03713 KPS -300 SCALE 3/4" = 1' -0" PLANT LOC. AZ DRAWN BY DATE: SIENKS 8/8/2012 SIENKS 8/8/2012 CHECK BY: DATE: S3 8/8/2012 PLAN VIEW SHEET .,UNIT # 1 , 6) w l O_sg A. imix.,....0,,,k, 1.il��a A....,...ari=11=1,1_00azipm - I�� ..��' . ors Al .tie -� , •1,■ . e n ills ll� ._ =_M! .� MME �E rSII 1111111lr 1EllENI DNI ..--l-- -r- -- ---i.. N t1111111111.11111111111111 111111111111111111111111 i�l'11111111i1111111R11 I II 16' Wr.1 ;1ri1 r�1�1i1ri7i1�1G1 I AMY i ail �. ' J CAE Za M. Min ' k 1�1.1111r�!...r..mi II 111:1 i %Y mar ®ww... AWMp, !M -• 1wir ifi1i■ I 8x8 1r�r�i;, -Al �S>lr w its • -- �r,iilt__Ar�____ ._i j∎1 ���%VW ii, �� a /Lim 1 II INIIIIIIIIIIIIIIIMmarniim i 11111u, nnnr 11l!n r r-r�in �Ctrr. 1.1 r3C.:�+�C� �C += +�Cti +�C. � Cvr�C:r' 31 r�L�� v� . Alf . 111 II I• p III r �rnrrill�rair 1141nr.� - , . _. .... � .. rig III �..1,- - it /1 = E y - .. .. ,.. :.. '. �... ' /. n, n� III ilingarniMMIIIME uE51-10 1 t•Tiiws.�_- -VI � Ali IN 5ta - 1111111111 11111111 1111111111 1111111 10111110 1111111111 111111111 1111111111 111111011 1111111111 1111111111 i 111111111 111111111 1111111111 1111111111 0HIIlI04 N < 1011 11111 111111/191//1141 /1/1/1/1 / 1919111 ►.191119111 ►.1:1111 MIMEO IIIIIIIC:!!11111111 1111 II11', 11111111111111111111111111111111 , 11 magi! 1111111111 NFL ON ROOF (:U (TYP) 1111111111111111111111111 11_ 111 111111111111111111111111111 off / SD=1 120 MECHANICAL FLOOR PLAN SCALE: 1 /8" =1' -O" MECHANICAL KEY NOTES: O1 22 "x22" SA DOWN TO DROP BOX. REFER TO RTU SCHEDULES FOR MORE INFORMATION. 0 RETURN DUCT SIZE AS INDICATED WITH END TURNED UP AND INLET COVERED WITH BIRD SCREEN. 03 DEMO EXISTING RTU TEMPERATURE SENSOR AND REPLACE WITH NEW AT THIS LOCATION_ PROVIDE INSULATED BACKING FOR SENSORS ON EXTERIOR WALLS. 0 EXISTING RETURN DUCT WITH INLET TO REMAIN. O PROVIDE THERMOSTAT FOR ALL ROOFTOP UNITS INSIDE COUNT ROOM ON WALL ABOVE COUNTER TO THE RIGHT OF ENTRANCE DOOR AND WIRE EACH THERMOSTAT TO TEMPERATURE SENSOR THAT SERVES SAME ROOFTOP UNIT. LABEL EACH THERMOSTAT IN COUNT ROOM :P R OWNER'S DIRECTION. STACK THERMOSTATS ON WALL IN ROWS OF THREE. PROVIDE REFRIGERANT PIPING SIZED AND INSULATED PER MANUFACTURER'S RECOMMENDATIONS. �7 EXISTING ROOFTOP UNIT TO REMAIN. ® EXISTING RETURN DUCT WITH INLET TO BE REBUILT AND CONNECT TO NEW DUCT AS SHOW O EXISTING SUPPLY AND RETURN DUCTS WITH DIFFUSERS TO REMAIN. 10 REPLACE EXISTING CEILING EXHAUST FANS PER SCHEDULE. FIELD VERIFY EXISTING LOCATION. MAINTAIN 10' -0' CLEARANCE FROM ALL ROOFTOP UNIT OUTSIDE AIR INTAKES. 11 PROVIDE WIRING FROM EXISTING DUCT DETECTOR(S) TO NEW REMOTE TEST AND RESET STATION. RESET STATION MUST BE ACCESSIBLE FROM ROOF. 12 EXISTING SUPPLY DUCT TO BE SHORTENED AND MOVE DIFFUSER IN TO THIS ROOM. 13 EXTEND EXISTING RETURN DUCT AND MOVE RETURN GRILLE TO WALL. 14 22 °x46" PLENUM FOR RETURN DIFFUSERS. 15 VERIFY EXISTING ROOFTOP UNIT HAS POWER AND IS FULLY OPERATIONAL. IF UNIT CANNOT SALVAGED, CONTRACTOR TO INCLUDE AN ALTERNATE PRICE IN HIS BID FOR A REPLACEMEN RTU OF SAME TONNAGE AND HEAT CAPACITY AND CURB ADAPTOR. NEW RTU SHALL USE 410A REFRIGERANT AND SHALL HAVE SEER OR EER THAT MEETS ENERGY CODE. GENERAL NEW NOTES: 1. PRIOR TO SUBMITTING BID, VISIT THE JOB SITE AND BECOME FULLY ACQUAINTED WITH THE EXISTING CONDITIONS OF THE PROJECT. REVIEW THE GENERAL NOTES, SPECIFICATIONS AND OTHER DRAWINGS FOR ADDITIONAL REQUIREMENTS WHICH MAY NOT BE SPECIFICALLY CALLED OUT IN THIS PORTION OF THE CONSTRUCTION DOCUMENTS. NOTIFY ARCHITECT, ENGINEER AND /OR OWNER OF CONFLICTS OR DISCREPANCIES PRIOR TO SUBMISSION OF BID. 2. EXISTING CONDITIONS WERE TAKEN FROM ORIGINAL DRAWINGS AND SITE VISITS AND MAY NOT REFLECT EXACT "AS- BUILT" CONDITIONS. FIELD VERIFY EXISTING CONDITIONS PRIOR TO SUBMITTING FINAL BIDS. COORDINATE NEW WORK AND DEMOLITION WITH OTHER DISCIPLINES AND EXISTING CONDITIONS PRIOR TO CONSTRUCTION. 3. COORDINATE THE INSTALLATION OF THE MECHANICAL SYSTEMS WITH OTHER TRADES TO ENSURE A NEAT AND ORDERLY INSTALLATION. INSTALL DUCTWORK AND PIPING AS TIGHT TO STRUCTURE AS POSSIBLE. COORDINATE WITH OTHER TRADES TO AVOID CONFLICTS... COORDINATE INSTALLATION OF DUCTWORK AND. PIPING TO AVOID CONFLICTS WITH ELECTRICAL PANELS, LIGHTING FIXTURES, ETC. ANY MODIFICATIONS REQUIRED DUE TO LACK OF COORDINATION WILL BE THE RESPONSIBILITY OF THE CONTRACTOR AT NO EXTRA COST-TO THE OWNER. DURING INSTALLATION OF NEW WORK, AVOID DAMAGING EXISTING SURFACES AND EQUIPMENT TO REMAIN. REPAIR DAMAGE CAUSED DURING CONSTRUCTION AT NO EXTRA COST TO THE OWNER. 5. ALL NEW MECHANICAL EQUIPMENT SHOWN ON THE MECHANICAL PLANS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR UNLESS OTHERWISE NOTED. 6. NEW MECHANICAL EQUIPMENT, DUCTWORK AND PIPING ARE SHOWN AT APPROXIMATE LOCATIONS. FIELD MEASURE FINAL DUCTWORK AND PIPING LOCATIONS PRIOR TO FABRICATION AND MAKE ADJUSTMENTS AS REQUIRED TO FIT THE DUCTWORK AND PIPING WITHIN THE AVAILABLE SPACE. VERIFY THAT FINAL EQUIPMENT LOCATIONS MEET MANUFACTURER'S RECOMMENDATIONS REGARDING SERVICE CLEARANCE AND PROPER AIRFLOW CLEARANCE AROUND EQUIPMENT. REFER TO ARCHITECTURAL DRAWINGS FOR RELATED CONSTRUCTION DETAILS AS APPLICABLE TO THE HVAC SYSTEM. VERIFY CHASES AND PENETRATIONS SHOWN ON ARCHITECTURAL DRAWINGS THAT ARE INTENDED FOR DUCTWORK AND PIPING MEET REQUIREMENTS. 8. COORDINATE LOCATION OF ROOF MOUNTED HVAC EQUIPMENT AND ROOF PENETRATIONS WITH THE ARCHITECTURAL AND STRUCTURAL DRAWINGS. 9. INDOOR AIR QUALITY MEASURES: PROTECT INSIDE OF (INSTALLED AND DELIVERED) DUCTWORK AND HVAC UNITS FROM EXPOSURE TO DUST, DIRT, PAINT AND MOISTURE. REPLACE INSULATION THAT HAS GOTTEN WET AT ANY TIME DURING CONSTRUCTION, DRYING THE INSULATION IS NOT ACCEPTABLE. SEAL ANY TEARS OR JOINTS OF INTERNAL FIBERGLASS INSULATION. REMOVE DEBRIS FROM CEILING /RETURN AIR PLENUM INCLUDING DUST. AN INDEPENDENT, PROFESSIONAL DUCT CLEANING COMPANY SHALL VACUUM CLEAN ANY DUCTWORK CONNECTED TO HVAC UNITS THAT WERE OPERATED DURING THE CONSTRUCTION PERIOD AFTER NEW FILTERS ARE INSTALLED AND PRIOR TO TURNING SYSTEM OVER TO THE OWNER. 10. INSTALL DUCTWORK AND PIPING PARALLEL TO BUILDING COLUMN LINES UNLESS OTHERWISE SHOWN OR NOTED. 11. OVERHEAD HANGERS AND SUPPORTS FOR EQUIPMENT, DUCTWORK AND PIPING SHALL BE FASTENED TO BUILDING JOISTS OR BEAMS. DO NOT ATTACH HANGERS AND SUPPORTS TO THE ABOVE FLOOR SLAB OR ROOF. 12. COORDINATE LOCATION OF EQUIPMENT SUPPORTS WITH LOCATION OF EQUIPMENT ACCESS PANELS /DOORS TO ENABLE SERVICE OF EQUIPMENT AND /OR FILTER REPLACEMENT. 13. SEAL PENETRATIONS THROUGH THE BUILDING COMPONENTS IN ACCORDANCE WITH THE CONTRACT SPECIFICATIONS. FIREPROOF PENETRATIONS THROUGH FIRE RATED COMPONENTS IN ACCORDANCE WITH U.L. REQUIREMENTS. 14. COORDINATE THE EXACT MOUNTING SIZE AND FRAME TYPE OF DIFFUSERS, REGISTERS AND GRILLES WITH THE SUPPLIER TO MEET THE CEILING, WALL AND DUCT INSTALLATION REQUIREMENTS. 15. ADJUST LOCATION OF CEILING DIFFUSERS, REGISTERS AND GRILLES AS REQUIRED TO ACCOMMODATE FINAL CEILING GRID AND LIGHTING LOCATIONS. 16. LOCATE AND INSTALL TEMPERATURE SENSORS AT LOCATIONS SHOWN ON PLANS. VERIFY EXACT LOCATIONS WITH ARCHITECT PRIOR TO INSTALLATION. INSTALL DEVICES AT 10' AFF UNLESS NOTED OTHERWISE ON PLANS. PROVIDE INSULATED BACKING FOR TEMPERATURE SENSORS MOUNTED ON EXTERIOR BUILDING WALLS. INSTALL WIRING IN CONDUIT PROVIDED BY DIVISION 16. AT A MINIMUM, PROVIDE CONDUIT IN THE WALL FROM THE JUNCTION BOX TO 6" ABOVE THE CEILING. 17. COORDINATE THE LOCATION AND ELEVATION OF WALL - MOUNTED DEVICES WITH PRESENTATION BOARDS, DISPLAY CABINETS, SHELVES OR OTHER COMPONENTS SHOWN ON THE ARCHITECTURAL DRAWINGS THAT ARE TO BE INSTALLED UNDER OTHER DIVISIONS. CONTRACTOR WILL NOT BE REIMBURSED FOR _ RELOCATION OF WALL - MOUNTED DEVICES CAUSED BY A LACK OF COORDINATION. 18. PROVIDE A MANUAL BALANCING DAMPER IN ' EACH 'BRANCH DUCT TAKEOFF FROM MAIN SUPPLY, RETURN, OUTDOOR AND EXHAUST AIR DUCTS UNLESS NOTED OTHERWISE ON PLANS. 19. PROVIDE A PREFABRICATED 45 DEGREE, HIGH EFFICIENCY, RECTANGULAR /ROUND BRANCH DUCT TAKEOFF FITTING WITH MANUAL BALANCING DAMPER AND LOCKING QUADRANT FOR BRANCH DUCT CONNECTIONS AND TAKE -OFFS TO INDIVIDUAL DIFFUSERS, REGISTERS AND GRILLES. 20. BRANCH DUCTWORK TO AIR OUTLETS SHALL BE SAME SIZE AS OUTLET NECK SIZE UNLESS OTHERWISE NOTED. 21. RIGID DUCTWORK INSULATION: PROVIDE 3/4 LB DENSITY, 2" (R -5) THICK, INSULATION WRAP ON RIGID ROUND AND RECTANGULAR, CONCEALED, SUPPLY AND RETURN AIR DUCTS AND ON OUTSIDE AIR DUCTS. PROVIDE 1-1/2 LB DENSITY, 1-1/2" (R -6) INTERN DUCT LINER ON RECTANGULAR SUPPLY AND RETURN AIR DUCTS. DUCT SIZES ON MECHANICAL PLANS INDICATE CLEAR INSIDE AIRFLOW DIMENSIONS, INCREASE SHEET METAL SIZES ACCORDINGLY. 22. PROVIDE THER_MAFLEX TYPE M -KE, FLEXMASTER TYPE 8, OR APPROVED EQUAL FLEXIBLE DUCTWORK. FLEXIBLE DUCTWORK SHALL BE LISTED UNDER UL 181 AS CLASS 1 AIR DUC AND BE PROVIDED WITH INTEGRAL R -5, 3/4 LB 'DENSITY FIBERGLASS INSULATION. FLEXIBLE DUCTWORK SHALL NOT EXCEED 5' -O" IN LENGTH AND SHALL BE INSTALLED AND SUPPORTED TO AVOID SHARP BENDS AND SAGGING. 23. PROVIDE A NEW SET OF AIR FILTERS IN UNITS PRIOR TO TESTING, ADJUSTING AND BALANCING. AND BEFORE TURNING SYSTEM(S) OVER TO OWNER. 24. CONTRACTOR SHALL FIELD VERIFY THAT THE EXISTING EQUIPMENT INCLUDING ACCESSORIES BEING REUSED FOR THIS PROJECT IS NOT DAMAGED AND IS IN GOOD WORKING ORDER. REPORT ANY DEFICIENCIES TO THE OWNER OR ARCHITECT. CONTRACTOR SHALL SUBMIT TO THE OWNER AND ARCHITECT A WRITTEN REPORT DESCRIBING TESTS PERFORMED TO VERIFY OPERATION AND RESULTS OF THE TESTS. 25. CLEAN EXISTING EQUIPMENT AND EQUIPMENT COMPONENTS BEING REUSED FOR THIS PROJECT. PROVIDE NEW FILTERS FOR EXISTING PACKAGED ROOFTOP UNITS PRIOR TO STARTUP OF EQUIPMENT. NEW FILTERS SHALL BE COMPATIBLE WITH THE EXISTING EQUIPMENT AND EQUAL IN PERFORMANCE TO THE EXISTING FILTERS AT NEW CONDITION UNLESS OTHERWISE NOTED. 26. LUBRICATE EXISTING .EQUIPMENT BEING REUSED FOR THIS PROJECT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. OBTAIN INSTRUCTIONS FROM MANUFACTURER IF THEY ARE NOT AVAILABLE AT THE SITE. 27. FULLY CHARGE EXISTING REFRIGERANT SYSTEMS BONG REUSED FOR THIS PROJECT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. CHARGE SYSTEMS WITH NEW • REFRIGERANT MATCHING EXISTING. 28. EXPOSED RECTANGULAR AND ROUND SPIRAL DUCTWORK SHALL BE PRE - INSULATED WITH 1-1/2" INTERNAL INSULATION AND MOUNTED AT JOIST HEIGHT. 29. ONTRACTOR TO CROSS REFERENCE FIRE PROTECTION DRAWINGS FOR ALL SYSTEM FIRE jell �- ° 41.1 NEa. cm( OF APR 2 4 2012 PERMIT CENTER B L AND ENGINEE ISSUE BLOCK 04/05/12 PERMIT SET CHECKED BY: TA/RO /SJ DRAWN BY: RRR FILE: - i , ! C 41 `�j w 41 +�45 fi- jr*!". w kg w� 4'i SHEET NAIVE: MECHANICAL FLOOR PLAN SHEET NUMBER: Mtl w Lu 0 0 Lu cn 0 2 cn 0 N 0 0 La cn 0 0 W 0 cc 0 a 0 0 (EXISTING) FAN SCHEDULE MARK SERV CE (EA, RA, SA) MANUFACTURER 411111*. .41111■r AIM. /NW JENNFAN MOUNTING `i,,� AIM. ROOFTOP MODEL � +.411111.., BCRD 120A CFM ESP (IN) DRIVE (BELT /DIRECT) MIN. HP FAN RPM VFD (Y /N) ELECTRICAL NOTES V /PH EF -1 EA 790 0.5 DIRECT 1/4 1725 N 120/1 A -D NOTES: A. PROVIDE WITH MINIMUM 12" HIGH B. DIVISION 16 CONTRACTOR TO FURNISH C. STARTERS FOR ALL MOTORS SHALL D. FAN TO BE CONTROLLED BY ROOM A- D,G,H,I BACKDRAFT DAMPER AND SPEED CONTROLLER. SWITCH. WITH UNIT. ROOF CURB, B1RDSCREEN, DISCONNECT BE FURNISHED INTEGRAL LIGHT SWITCH. GRILLE, REGISTER AND DIFFUSER SCHEDULE MARK MANUFACTURER MODEL FACE TYPE MOUNTING LOCATION FACE SIZE (IN) MAX. NC MAX. PRESS. DROP (IN. W.C.) NOTES SD -1 PRICE SMD LOUVERED GYP. BRD. CLG. 24x24 25 0.10 A- D,G,H,I SD -2 PRICE SMD LOUVERED A.C.T. 24x24 25 0.10 A- D,G,H,I SG -1 PRICE 520 DBL.DEFL. DUCT NECK +1 -3/4 25 0.10 A,D,F,G,K,L SG -2 NOT USED A -E RTU -4 - _ SINGLE ZONE FC 5,000 RG -1 PRICE PDDR PERFORATED A.C.T. 24x24 30 0.08 A,C,D,J RG -2 NOT USED A -C, E RTU -6 - EXISTING 12.5 TON 30 0.08 - A,C:n, l RG -3 NOT USED A--C, E RTU -7 - (STING 7.5 TO SI GL ZONE F 3 001 EG -1 PRICE PDDR PERFORATED GYP. BRD. CLG. 12x12 30 0.08 A,C,D,J TG -1 NOT USED A -C, E NOTES: A. PROVIDE B. PROVIDE OF COOLING C. DISCONNECT D. PROVIDE E. EXISTING MITSUBISHI PLEATED THROWAWAY AIR .FILTERS. THERMOSTAT WITH STAGED COOLING CAPABILITY AS REQUIRED FOR OPERATION CONTROLS. INSTALL THERMOSTAT IN COUNT ROOM PER PLANS. TO REMAIN. SYSTEM BY AES INDUSTRIES, MODEL ADB -6 -20 OR APPROVED EQUAL. BALANCE PRIMARY CFM AND 0/A CFM TO QUANTITIES AS INDICATED. NEW 2 ", 30% EFFICIENT WITH 7 -DAY PROGRAMMABLE AND ECONOMIZER SWITCH EXISTING WITH DROP BOX DIFFUSER ROOFTOP UNIT TO REMAIN. N/A 410a NOTES: A. NECK SIZE SHOWN ON DRAWINGS. B. 4 -WAY THROW PATTERN UNLESS OTHERWISE SHOWN ON DRAWINGS. C. BRANCH DUCT SIZE SHALL BE SAME AS NECK SIZE UNLESS OTHERWISE SHOWN ON DRAWINGS. D. BAKED ENAMEL FINISH, WHITE OR TO MATCH MOUNTING FINISH COLOR AS DETERMINED BY ARCHITECT. E. FRONT BLADES PARALLEL TO LONG DIMENSION. F. FRONT BLADES PARALLEL TO SHORT DIMENSION. G. DOUBLE DEFLECTION BARS SHALL BE ADJUSTABLE. H. PROVIDE NECK FOR DUCT CONNECTION. I. FRAME TYPE TO MATCH CEILING /WALL CONSTRUCTION, COORDINATE WITH ARCHITECTURAL REFLECTED CEILING PLAN. J. PROVIDE OPPOSED BLADE DAMPER ADJUSTABLE FROM FACE OF DEVICE. K. MAXIMUM PRESSURE DROP BASED ON 45 DEGREE HORIZONTAL DEFLECTION L. PROVIDE WITH CLOSED CELL FOAM GASKETING MATERIAL AND AIR SCOOP DUCT MOUNTED SUPPLY AIR GRILLE AS SCHEDULED FOR DIRECT MOUNTING TO ROUND DUCTWORK. PROVIDE WITH DOUBLE DEFLECTION CORE WITH INDIVIDUALLY ADJUSTABLE BLADES, FRONT BLADES PARALLEL TO SHORT DIMENSION; ALL WELDED CONSTRUCTION WITH REINFORCED PRECISION CORNERS; CLOSED CELL FOAM GASKET AROUND ENTIRE DUCT OPENING PERIMETER; AND AIR SCOOP ADJUSTABLE FROM FRONT OF GRILL. REGISTER MOUNTING TO ROUND DUCT DETAIL NO SCALE ROOFTOP UNIT MODEL SCHEDULE UNIT TYPE ` HVAC UNIT MIN. 0/A CFM CAPACITY (MBH) 39.0 MARK MANUFACTURER =1 I RE: ROOF CURB DETAIL THIS SHEET I' \ CANVAS CONNECTION (TYPICAL) RETURN AIR DUCT --- --- SUPPLY AIR DUCT } VERIFY HEIGHT NOTES: I A.F.F. WITH ARCHITECT 1. PROVIDE OPENING THROUGH ROOF AND ROOF DECK INSULATION NO LARGER THAN REQUIRED TO ALLOW DUCTS TO PASS THROUGH. REFER TO PLANS FOR DUCT SIZES. TRANSITION AS. REQUIRED IN ROOF CURB TO RTU SUPPLY AND RETURN OPENINGS. 2. PROVIDE SLOPED ROOF CURB TO INSTALL ROOFTOP UNIT LEVEL TO ENSURE PROPER DRAINAGE. COORDINATE ROOF SLOPE WITH ARCHITECTURAL. FLASH AND COUNTER FLASH ROOF PENETRATIONS, ETC. TO ENSURE WEATHER TIGHT INSTALLATION. --- DROP BOX BY AES INDUSTRIES MODEL ADS -6 -20 OR APPROVED EQUAL 8 ROOFTOP UNIT WITH DROP BOX NO SCALE METAL BAND OVER INSULATION (TYPICAL) HIGH EFFICIENCY TAKEOFF EXTERNALLY INSULATED, WITH VOLUME DAMPER AND DAMPER LOCK WITH EXTENSION FOIL TAPE AT INSULATION JOINT SEE NOTE 1. PRE - INSULATED FLEXIBLE DUCT AS REQUIRED, INSTALL PERMANENTLY SEALED AND SUPPORTED TO PREVENT KINKING AND SHARP TURNS METAL BAND (TYPICAL) CEILING DIFFUSER WITH VOLUME DAMPER, FIRE DAMPER OR COMBINATION VOLUME /FIRE DAMPER AS SCHEDULED CEILING INSULATED DUCT -i - PROVIDE 1" THICK, R -6 FIBERGLASS INSULATION TO COMPLETELY COVER DIFFUSER CONE WHERE SCHEDULED OF SPECIFIED. NOTES: 1. EXTEND RIGID METAL DUCT SO THAT MAXIMUM FLEXIBLE DUCT LENGTH DOES NOT EXCEED 5' -0 ". PROVIDE RIGID 90' ELBOW WHERE REQUIRED TO KEEP FLEXIBLE DUCT WITHIN 5' -O" LENGTH LIMITATION. LAY -IN CEILING ® DIFFUSSCALE ER DETAIL NO NOT USED SEISMIC ROOF CURB DETAIL NO SCALE EXISTING ROOFTOP UNIT MODEL SCHEDULE UNIT TYPE ` MODEL MIN. 0/A CFM CAPACITY (MBH) 39.0 MARK MANUFACTURER NOTES FAN TYPE CFM REFR. TYPE RTU -1 - EXISTING 12.5 TON SINGLE ZONE FC 5,000 R -22 1000 A -E RTU -2 - EXISTING 12.5 TON SINGLE ZONE FC 5,000 R -22 1000 A -E RTU -3 - EXISTING 12.5 TON SINGLE ZONE FC 5,000 R -22 1000 A -E RTU -4 - EXISTING 12.5 TON SINGLE ZONE FC 5,000 R -22 1000 A -C, E RTU -5 - EXISTING 12.5 TON SINGLE ZONE FC 5,000 R-22 1000 A -C, E RTU -6 - EXISTING 12.5 TON SINGLE ZONE FC 5,000 R -22 1000 A--C, E RTU -7 - (STING 7.5 TO SI GL ZONE F 3 001 R- 2 •60 A- RTU -8 55 EXISTING 7.5 TON SINGLE ZONE FC 3,000 R -22 960 A -C, E NOTES: A. PROVIDE B. PROVIDE OF COOLING C. DISCONNECT D. PROVIDE E. EXISTING MITSUBISHI PLEATED THROWAWAY AIR .FILTERS. THERMOSTAT WITH STAGED COOLING CAPABILITY AS REQUIRED FOR OPERATION CONTROLS. INSTALL THERMOSTAT IN COUNT ROOM PER PLANS. TO REMAIN. SYSTEM BY AES INDUSTRIES, MODEL ADB -6 -20 OR APPROVED EQUAL. BALANCE PRIMARY CFM AND 0/A CFM TO QUANTITIES AS INDICATED. NEW 2 ", 30% EFFICIENT WITH 7 -DAY PROGRAMMABLE AND ECONOMIZER SWITCH EXISTING WITH DROP BOX DIFFUSER ROOFTOP UNIT TO REMAIN. CONDENSING UNIT SCHEDULE MARK SERVICE MANUFACTURER MODEL REFR. TYPE CAPACITY (MBH) 39.0 MIN. NO. OF STAGES 1 MIN. SEER - MCA 31 MOCP 40 V /PH 208/3 DISC TYPE FUSED STARTER TYPE N/A NOTES A -D CU-1A WALK -IN COOLER RUSSELL R- 0600M44 404A CU-1B WALK -IN COOLER RUSSELL R- 06000M44 404A 39.0 1 - 31 40 208/3 FUSED N/A A -D CU -2 FINE WINE COOLER RUSSELL R-H251M44 404A 10.6 1 - 15 20 208/3 FUSED N/A A -D CU -3 HUMIDOR MITSUBISHI MU -A09WA 410a 6.5 1 13.0 14 15 120/1 FUSED N/A A -D CU -4 SERVER ROOM MITSUBISHI MUY -A17NA 410a 11.1 1 16.0 14 15 208/1 FUSED N/A B -E NOTES: A. VENDOR FURNISHED, CONTRACTOR INSTALLED. B. CAPACITY BASED ON 105' F. ROOF AMBIENT TEMPERATURE AND 35' F. SATURATED SUCTION TEMPERATURE C. DISCONNECT SWITCH FURNISHED BY DIVISION 16 CONTRACTOR. D. STARTER FURNISHED BY MANUFACTURER. E. CONTRACTOR FURNISHED, CONTRACTOR INSTALLED. PARALLEL TO STRUCTURE FAN COIL UNIT SCHEDULE • • ` • MIN. 0/A CFM) NOTES MARK MANUFACTURER MODEL SUPPLY FAN CFM ESP IN REFR. TYPE CAP. MBH EAT DB LAT DB V/ PH MCA MOCP DISC. TYPE STARTER TYPE -1 FCtJ- I A RUbS -:: r�l���E�L 8 -. AA68 -3908 - 4,440 N/A 404A .. ` -39.0. :. 35 25 � ' N/A :,. ...,. � 20/ s ,. 1 �+.3 - w ,:, CIR: BKR. - N A % A -G FCU -1 B RUSSELL M68 -390B 4,440 N/A 404A 39.0 35 25 N/A 120/1 14.3 20 CIR. BKR. N/A A -G FCU -2 RUSSELL AA28 -106B 1,540 N/A 404A 10.6 35 25 N/A 120/1 4.8 15 - - CIR. BR. N/A A -G FCU -3 MITSUBISHI MS -A09WA 300 N/A 410a 6.5 75 55 N/A 120/1 1.2 15 CIR. BKR N/A A -F,H FCU -4 MITSUBISHI MSY -A17NA 340 N/A 410a 11.1 75 55 N/A 208/1 1 15 CIR. BKR N/A B -F,H,J NOTES: A. VENDOR FURNISHED, CONTRACTOR INSTALLED. B. EQUIPMENT SIZED FOR 105' F ROOF AMBIENT TEMPERATURE AND 35° F SATURATED SUCTION TEMPERATURE C. DISCONNECT SWITCH FURNISHED BY DIVISION 16 CONTRACTOR. D. STARTER FURNISHED BY MANUFACTURER. E. PROVIDE WITH SPRING VIBRATION ISOLATION AND ALL - THREAD HANGING RODS. F. COORDINATE CONTROL REQUIREMENTS AND INSTALLATION WITH OWNER'S REPRESENTATIVE. G. WALK -IN COOLER AND FINE WINE COOLER TEMPERATURES SHALL BE INCLUDED AS A CONTROL POINT ON THE CENTRALIZED CONTROL SYSTEM PANEL. ANNUCIATE AN ALARM WHEN COOLER TEMPERATURES RISE ABOVE AN ADJUSTABLE SETPOINT H. INDOOR UNITS RECEIVE POWER FROM OUTDOOR UNITS THROUGH FIELD SUPPLIED INTERCONNECTED WIRING. J. CONTRACTOR FURNISHED, CONTRACTOR INSTALLED. ROOF JOIST- OPTIONAL ROUTING IN CONCEALED AREAS ROUND SUPPLY AIR DUCT PERPENDICULAR TO STRUCTURE BOTTOM OF STRUCTURE TWIST STRAP 16 GA. GALV. STEEL BAND (2" WIDE) • ROOF ANGLE OR UNISTRUT ROUND DUCT LOAD RATED FASTENERS (MAX. 36 "0) LOADS MUST BE HUNG WITHIN 6" OF PANEL POINTS LOAD RATED FASTENERS (MAX. 24"0) NOTE: 1. FOR DUCTS LARGER THAN 36"O, USE TWO HANGER RODS, WIRES OR STRAPS TO SUPPORT DUCT FROM EACH SIDE. ®ROUNDUCT SUPPORT DETAIL D NO SCALE SIZE AND QUANTITY OF HANGER RODS SHALL BE AS RECOMMENDED BY STRUT MANUFACTURER USE 20 GAUGE GALVANIZED 12" LONG 360' METAL INSULATION SHIELD USE TWO -PIECE PIPE CLAMP FOR REFRIGERANT PIPE SUPPORT NUT (TYPICAL) PIPE INSULATION (TYPICAL) �- REFRIGERANT PIPE (TYPICAL) PROVIDE 1- 5/8 "x1 -5/8" 14 GA. CHANNEL SUPPORT (TYPICAL) PIPING ARRANGEMENT SHOWN IS SCHEMATIC. ADJUST TO SUIT FIELD CONDITONS. REFER TO SPECIFICATIONS FOR MORE INFORMATION. PIPE AND CONDUIT OF ALL TRADES MAY BE COMBINED ON THE SAME SUPPORT CHANNEL. COORDINATE SUPPORT CHANNEL LENGTH WITH PIPING AND CONDUIT TO BE SUPPORTED. SUPPORT CHANNEL SPACING SHALL BE DETERMINED BY SMALLEST PIPE TO BE SUPPORTED. PIPE SUPPORTS, BRACKETS, SHIELDS AND PIPE TO BE PRIMED FOR PAINTING (COLOR BY ARCHITECT) IN OPEN OFFICE AREAS. TRAPEZE PIPE HANGER NOT TO SCALE PARALLEL TO STRUCTURE PERPENDICULAR TO STRUCTURE ROOF 6" 7- ANGLE OR UNISTRUT HANGER STRAP SEE NOTE 1. JOIST 6" 1" MIN ROOF F., 60" (MAX) I SHEET METAL SCREWS SEE NOTE 2. (TYP) BOTTOM OF STRUCTURE LOADS MUST BE HUNG WITHIN 6" OF PANEL POINTS RECTANGULAR DUCT - . - THREADED ROD (TYP) ANGLE OR UNISTRUT NOTE: 1. USE THREADED ROD FOR ALL DUCTS LARGER THAN 60 "0 WIDE. 2. SHEET METAL SCREWS MAY BE OMITTED IF HANGER STRAP IS CONTINUOUS AND LOOPS UNDER ENTIRE DUCT. RECTANGULAR DUCT SUPPORT DETAIL NO SCALE PROVIDE ARMAFLEX OR EQUAL INSULATION ON REFRIGERANT SUCTION LINE ■ SEAL OPENING WEATHERTIGHT PROVIDE FLASHING BETWEEN CURB AND ROOF IN A MANNER TO MAINTAIN ROOF WARRANTY 4 plllll�'&4_ 4h, 74cf. ■ ROOF DECK 26 GA. GALVANIZED COVER, SLOPE TO DRAIN CAULK ALL AROUND 1" RIGID INSULATION PREFABRICATED INSULATED CURB WITH TREATED WOOD NAILER ROOFING INSULATION 4 ; I�III�I���11 ROOF OPENING REFRIGERANT PIPING .NO 1. FOR MULTIPLE PIPES, PROVIDE ONE ENCLOSURE, WHERE FEASIBLE. PIPE ROOF PENETRATION DETAIL NO SCALE REVIEWED FOR telE COMPLIANCE APPROVED MAY 11 2012 City City of Tukwila BUILDING, DIVISION )O7I RECEIVED CITY OF TUKWILA APR 242012 PERMIT CENTER 0 0 U, tJ z LU _o 0 j_ „CD rn y 0. LO C211 QN u to it 4 VX a 'a w i Ce U U v LLI °� u Eo o • VHS U 11. N u I♦ CONSULTANT LAS VEGAS :: IRVINE :: PHOENIX :: SAL mwD ogwoloow- Z®owp to oN 10:41101: � �O� ohjui &WZpZp LL1 m• 1•■ ISSUE BLOCK 04/05/12 PERMIT r 0 U N 0 z N a 0 x 6 x o w x CO ce M o Z 41 A O 0 0 U La° L. V) W Z W z I- U H 2 0 z w U J Ui w 0 0 a- U. 0 W U Ui W 5 W U 0 a a- L." a * O N CO o %y U w lEuj 2 LU Z 0 V U Z W. o r CL 0 w R- SET CHECKED BY: TA/RO /SJ DRAWN BY: RRR FILE: 0 oz 0 0 0 w N 0 Z U, 0 LU SHEET NAME: MECHANICAL SCHEDULES AND DETAILS SHEET NUMBER: M2.1 z 0 r 15A: Heating, Ventilating, and Air Conditioning: 15A 1 GENERAL INSTRUCTIONS 15A 1 -1 GENERAL REQUIREMENTS REQUIREMENTS UNDER DIVISION ONE AND THE GENERAL AND SUPPLEMENTARY CONDITIONS OF THESE SPECIFICATIONS SHALL BE A PART OF THIS SECTION. CONTRACTOR SHALL BECOME THOROUGHLY ACQUAINTED WITH ITS CONTENTS AS TO REQUIREMENTS THAT AFFECT THIS DIVISION OR SECTION. THE WORK REQUIRED UNDER THIS SECTION INCLUDES MATERIAL, EQUIPMENT, APPLIANCES, TRANSPORTATION, SERVICES, AND LABOR REQUIRED TO COMPLETE THE ENTIRE SYSTEM AS REQUIRED BY THE DRAWINGS AND SPECIFICATIONS. THE SPECIFICATIONS AND DRAWINGS FOR THE PROJECT ARE COMPLEMENTARY, AND PORTIONS OF THE WORK DESCRIBED IN ONE SHALL BE PROVIDED AS IF DESCRIBED IN BOTH. IN THE EVENT OF DISCREPANCIES, NOTIFY THE ENGINEER AND REQUEST CLARIFICATION PRIOR TO PROCEEDING WITH THE WORK INVOLVED. 15A 1 -2 DEFINITIONS FURNISH: THE TERM "FURNISH" IS USED TO MEAN "SUPPLY AND DELIVER TO THE PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION AND SIMILAR OPERATIONS." INSTALL: THE TERM "INSTALL" IS USED TO DESCRIBE OPERATIONS AT THE PROJECT SITE INCLUDING THE ACTUAL "UNLOADING, UNPACKING, ASSEMBLY, ERECTION, PLACING, ANCHORING, APPLYING, WORKING TO DIMENSION, FINISHING, CURING, PROTECTING, CLEANING, AND SIMILAR OPERATIONS." PROVIDE: THE TERM "PROVIDE" MEANS "TO FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE." FURNISHED BY OWNER OR FURNISHED BY OTHERS: THE ITEM WILL BE FURNISHED BY THE OWNER OR OTHERS. IT IS TO BE INSTALLED AND CONNECTED UNDER THE REQUIREMENTS OF THIS DIVISION, COMPLETE AND READY FOR OPERATION, INCLUDING ITEMS INCIDENTAL TO THE WORK, INCLUDING SERVICES NECESSARY FOR PROPER INSTALLATION AND OPERATION. THE INSTALLATION SHALL BE INCLUDED UNDER THE GUARANTEE REQUIRED BY THIS DIVISION. ENGINEER: WHERE REFERENCED IN THIS DIVISION, "ENGINEER" IS THE ENGINEER OF RECORD AND THE DESIGN PROFESSIONAL FOR THE WORK UNDER THIS DIVISION, AND IS A CONSULTANT TO, AND AN AUTHORIZED REPRESENTATIVE OF, THE ARCHITECT, AS DEFINED IN THE GENERAL AND /OR SUPPLEMENTARY CONDITIONS. WHEN USED IN THIS DIVISION, IT MEANS INCREASED INVOLVEMENT BY, AND OBLIGATIONS TO, THE ENGINEER, IN ADDITION TO INVOLVEMENT BY, AND OBLIGATIONS TO, THE "ARCHITECT AHJ: THE LOCAL CODE AND/OR INSPECTION AGENCY (AUTHORITY) HAVING JURISDICTION OVER THE WORK. THE TERMS "APPROVED EQUAL ", "EQUIVALENT ", OR "EQUAL" ARE USED SYNONYMOUSLY AND SHALL MEAN "ACCEPTED BY OR ACCEPTABLE TO THE ENGINEER AS EQUIVALENT TO THE ITEM OR MANUFACTURER SPECIFIED ". THE TERM "APPROVED" SHALL MEAN LABELED, LISTED, OR BOTH, BY A NATIONALLY RECOGNIZED TESTING LABORATORY (E.G. UL, ETL, CSA), AND ACCEPTABLE TO THE AHJ OVER THIS PROJECT. 15A 1 -3 PREBID SITE VISIT PRIOR TO SUBMITTING BID, VISIT THE SITE OF THE PROPOSED WORK AND BECOME FULLY INFORMED AS TO THE CONDITIONS UNDER WHICH THE WORK IS TO BE DONE. FAILURE TO DO SO WILL NOT BE CONSIDERED SUFFICIENT JUSTIFICATION TO REQUEST OR OBTAIN EXTRA COMPENSATION OVER AND ABOVE THE CONTRACT PRICE. 15A 1 -4 MATERIAL AND WORKMANSHIP PROVIDE NEW MATERIAL, EQUIPMENT, AND APPARATUS UNDER THIS CONTRACT UNLESS OTHERWISE STATED HEREIN, OF BEST QUALITY NORMALLY USED FOR THE PURPOSE IN GOOD COMMERCIAL PRACTICE, AND FREE FROM DEFECTS. MODEL NUMBERS LISTED IN THE SPECIFICATIONS OR SHOWN ON THE DRAWINGS ARE NOT NECESSARILY INTENDED TO DESIGNATE THE REQUIRED TRIM, WRITTEN DESORIF TIONS F THE TRIM GOVERN MODEL NUMBERS. PIPE, PIPE FITTINGS, PIPE SPECIALTIES AND VALVES SHALL BE MANUFACTURED IN PLANTS LOCATED IN THE UNITED STATES. WORK PERFORMED UNDER THIS CONTRACT SHALL PROVIDE A NEAT AND "WORKMANLIKE" APPEARANCE WHEN COMPLETED, TO THE SATISFACTION OF THE ARCHITECT AND ENGINEER. WORKMANSHIP SHALL BE THE FINEST POSSIBLE BY EXPERIENCED MECHANICS. INSTALLATIONS SHALL COMPLY WITH APPLICABLE CODES AND LAWS. THE COMPLETE INSTALLATION SHALL FUNCTION AS DESIGNED AND INTENDED WITH RESPECT TO EFFICIENCY, CAPACITY, NOISE LEVEL, ETC. ABNORMAL NOISE CAUSED BY RATTLING EQUIPMENT, PIPING, DUCTS, AIR DEVICES, AND SQUEAKS IN ROTATING COMPONENTS WILL NOT BE ACCEPTABLE. IN GENERAL, MATERIALS AND EQUIPMENT SHALL BE OF COMMERCIAL SPECIFICATION GRADE IN QUALITY. LIGHT DUTY AND RESIDENTIAL TYPE EQUIPMENT WILL NOT BE ACCEPTED. REMOVE FROM THE PREMISES WASTE MATERIAL PRESENT AS A RESULT OF WORK, INCLUDING CARTONS, CRATING, PAPER, STICKERS, AND /OR EXCAVATION MATERIAL NOT USED IN BACKFILLING, ETC. CLEAN EQUIPMENT INSTALLED UNDER THIS CONTRACT TO PRESENT A NEAT AND CLEAN INSTALLATION AT THE TERMINATION OF THE WORK. REPAIR OR REPLACE PUBLIC AND PRIVATE PROPERTY DAMAGED AS A RESULT OF WORK PERFORMED UNDER THIS CONTRACT TO THE SATISFACTION OF AUTHORITIES AND REGULATIONS HAVING JURISDICTION. 15A 1 -5 COORDINATION COORDINATE WORK WITH THAT OF OTHER TRADES SO THAT THE VARIOUS COMPONENTS OF THE SYSTEMS WILL BE INSTALLED AT THE PROPER TIME, WILL FIT THE AVAILABLE SPACE, AND WILL ALLOW PROPER SERVICE ACCESS TO THOSE ITEMS REQUIRING MAINTENANCE. COMPONENTS WHICH ARE INSTALLED WITHOUT REGARD TO THE ABOVE SHALL BE RELOCATED AT NO ADDITIONAL COST TO THE OWNER. UNLESS OTHERWISE INDICATED, THE GENERAL CONTRACTOR WILL PROVIDE CHASES AND OPENINGS IN BUILDING CONSTRUCTION REQUIRED FOR INSTALLATION OF THE SYSTEMS SPECIFIED HEREIN. CONTRACTOR SHALL FURNISH THE GENERAL CONTRACTOR WITH INFORMATION WHERE CHASES AND OPENINGS ARE REQUIRED. KEEP INFORMED AS TO THE WORK OF OTHER TRADES ENGAGED IN THE CONSTRUCTION OF THE PROJECT, AND EXECUTE WORK IN A MANNER AS TO NOT INTERFERE WITH OR DELAY THE WORK OF OTHER TRADES. FIGURED DIMENSIONS SHALL BE TAKEN IN PREFERENCE TO SCALE DIMENSIONS. CONTRACTOR SHALL TAKE HIS OWN MEASUREMENTS AT THE BUILDING, AS VARIATIONS MAY OCCUR. CONTRACTOR WILL BE HELD RESPONSIBLE FOR ERRORS THAT COULD HAVE BEEN AVOIDED BY PROPER CHECKING AND INSPECTION. PROVIDE MATERIALS WITH TRIM THAT WILL PROPERLY FIT THE TYPES OF CEILING, WALL, OR FLOOR FINISHES ACTUALLY INSTALLED. MODEL NUMBERS LISTED IN THE SPECIFICATIONS OR SHOWN ON THE DRAWINGS ARE NOT INTENDED TO DESIGNATE THE REQUIRED TRIM. 15A 1 -6 ORDINANCES AND CODES WORK PERFORMED UNDER THIS CONTRACT SHALL, AT A MINIMUM, BE IN CONFORMANCE WITH APPLICABLE NATIONAL, STATE AND LOCAL CODES HAVING JURISDICTION. EQUIPMENT FURNISHED AND ASSOCIATED INSTALLATION WORK PERFORMED UNDER THIS CONTRACT SHALL BE IN STRICT COMPLIANCE WITH CURRENT APPLICABLE CODES ADOPTED BY THE LOCAL AHJ INCLUDING ANY AMENDMENTS AND STANDARDS AS SET FORTH BY THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), UNDERWRITERS LABORATORIES (UL), OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA), AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME), AMERICAN SOCIETY OF HEATING, REFRIGERATION, AND AIR CONDITIONING ENGINEERS (ASHRAE), AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), AMERICAN SOCIETY OF TESTING MATERIALS (ASTM) AND OTHER NATIONAL STANDARDS AND CODES WHERE APPLICABLE. WHERE THE CONTRACT DOCUMENTS EXCEED THE REQUIREMENTS OF THE REFERENCED CODES, STANDARDS, ETC., THE CONTRACT DOCUMENTS SHALL TAKE PRECEDENCE. PROCURE AND PAY FOR PERMITS AND LICENSES REQUIRED FOR THE ACCOMPLISHMENT OF THE WORK HEREIN DESCRIBED. WHERE REQUIRED, OBTAIN, PAY FOR AND FURNISH CERTIFICATES OF INSPECTION TO OWNER. CONTRACTOR WILL BE HELD RESPONSIBLE FOR VIOLATIONS OF THE LAW. 15A 1 -7 PROTECTION OF EQUIPMENT AND MATERIALS STORE AND PROTECT FROM DAMAGE EQUIPMENT AND MATERIALS DELIVERED TO JOB SITE. COVER WITH WATERPROOF, TEAR— RESISTANT, HEAVY TARP OR POLYETHYLENE PLASTIC AS REQUIRED TO PROTECT FROM PLASTER, DIRT, PAINT, WATER, OR PHYSICAL DAMAGE. EQUIPMENT AND MATERIAL THAT HAS BEEN DAMAGED BY CONSTRUCTION ACTIVITIES WILL BE REJECTED, AND CONTRACTOR IS OBLIGATED TO FURNISH NEW EQUIPMENT AND MATERIAL OF A LIKE KIND. KEEP PREMISES BROOM CLEAN FROM FOREIGN MATERIAL CREATED DURING WORK PERFORMED UNDER THIS CONTRACT. PIPING, EQUIPMENT, ETC. SHALL HAVE A NEAT AND CLEAN APPEARANCE AT THE TERMINATION OF THE WORK. PLUG OR CAP OPEN ENDS OF DUCTWORK AND PIPING SYSTEMS WHILE STORED AND INSTALLED DURING CONSTRUCTION WHEN NOT IN USE TO PREVENT THE ENTRANCE OF DEBRIS INTO THE SYSTEMS. 15A 1 -8 SUBSTITUTIONS THE BASE BID SHALL INCLUDE ONLY THE PRODUCTS FROM MANUFACTURERS SPECIFICALLY NAMED IN THE DRAWINGS AND SPECIFICATIONS. NO SUBSTITUTION WILL BE CONSIDERED PRIOR TO RECEIPT OF BIDS UNLESS WRITTEN REQUEST FOR APPROVAL TO BID HAS BEEN RECEIVED BY THE ENGINEER AT LEAST TEN CALENDAR DAYS PRIOR TO THE DATE FOR RECEIPT OF BIDS. EACH SUCH REQUEST SHALL INCLUDE THE NAME OF THE MATERIAL OR EQUIPMENT FOR WHICH IT IS TO BE SUBSTITUTED AND A COMPLETE DESCRIPTION OF THE PROPOSED SUBSTITUTE INCLUDING DRAWINGS, CUTS, PERFORMANCE AND TEST DATA AND OTHER INFORMATION NECESSARY FOR AN EVALUATION. A STATEMENT SETTING FORTH CHANGES IN OTHER MATERIALS, EQUIPMENT OR OTHER WORK THAT INCORPORATION OF THE SUBSTITUTE WOULD REQUIRE SHALL BE INCLUDED. THE BURDEN OF PROOF OF THE MERIT OF THE PROPOSED SUBSTITUTE IS UPON THE PROPOSER. THE ENGINEER'S DECISION OF APPROVAL OR DISAPPROVAL TO BID OF A PROPOSED SUBSTITUTION SHALL BE FINAL. THE TERMS "APPROVED", "APPROVED EQUAL", AND EQUAL REFER TO APPROVAL BY THE ENGINEER AS AN ACCEPTABLE ALTERNATE BID. NO SUBSTITUTIONS WILL BE CONSIDERED THAT ARE NOT BID AS AN ALTERNATE. NO MATERIAL SUBSTITUTIONS SHALL BE CONSIDERED FOR APPROVAL PRIOR TO AWARD OF CONTRACT. COORDINATE AND VERIFY WITH OTHER TRADES WHETHER OR NOT THE SUBSTITUTED EQUIPMENT CAN BE INSTALLED AS SHOWN ON THE CONSTRUCTION DRAWINGS WITHOUT MODIFICATION TO ASSOCIATED SYSTEMS OR ARCHITECTURAL OR ENGINEERING DESIGN. INCLUDE ADDITIONAL COSTS FOR ARCHITECTURAL AND ENGINEERING DESIGN FEES IN BID IF DRAWING MODIFICATIONS ARE REQUIRED BECAUSE OF SUBSTITUTED EQUIPMENT. 15A 1 -9 SHOP DRAWINGS UPON BEING AWARDED A CONTRACT, SUBMIT TO THE ARCHITECT FOR APPROVAL, SIX (6) COPIES OF MANUFACTURER'S SHOP DRAWINGS FOR EQUIPMENT TO BE FURNISHED UNDER THIS CONTRACT, ITEMS REQUIRING COORDINATION BETWEEN CONTRACTORS AND SHEET METAL DUCTWORK FABRICATION DRAWINGS. BEFORE SUBMITTING SHOP DRAWINGS AND MATERIAL LISTS, VERIFY THAT EQUIPMENT SUBMITTED IS MUTUALLY COMPATIBLE AND SUITABLE FOR THE INTENDED USE, AND WILL FIT THE AVAILABLE SPACE AND ALLOW AMPLE ROOM FOR MAINTENANCE. HIGHLIGHT, MARK, LIST OR INDICATE THE MATERIALS, PERFORMANCE CRITERIA AND ACCESSORIES THAT ARE BEING PROPOSED. SUBMITTALS AND SHOP DRAWINGS SHALL NOT CONTAIN THE ENGINEER'S FIRM NAME OR LOGO, NOR SHALL IT CONTAIN THE ENGINEERS' SEAL AND SIGNATURE. THEY SHALL NOT BE COPIES OF THE ENGINEERS'S WORK PRODUCT. IF THE CONTRACTOR DESIRES TO USE ELEMENTS OF SUCH PRODUCT, REFER TO PARAGRAPH "ELECTRONIC DRAWING FILES" FOR PROCEDURES TO BE USED. THE ENGINEER'S CHECKING AND SUBSEQUENT APPROVAL OF SUCH SHOP DRAWINGS WILL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR ERRORS IN DIMENSIONS, DETAILS, SIZE OF MEMBERS, QUANTITIES, OMISSIONS OF COMPONENTS OR FITTINGS; COORDINATION OF ELECTRICAL REQUIREMENTS; OR FOR COORDINATING ITEMS WITH ACTUAL BUILDING CONDITIONS. PROCEED WITH THE PROCUREMENT AND INSTALLATION OF EQUIPMENT ONLY AFTER RECEIVING APPROVED SHOP DRAWINGS RELATIVE TO EACH ITEM. CATALOG DATA SHALL BE PROPERLY BOUND, IDENTIFIED, INDEXED AND TABBED IN A 3— RING BINDER. LABEL THE CATALOG DATA WITH THE EQUIPMENT IDENTIFICATION ACRONYM OR NUMBER AS USED ON THE DRAWINGS AND INCLUDE PERFORMANCE CURVES, CAPACITIES, SIZES, MATERIALS, FINISHES, WIRING DIAGRAMS AND DEVIATIONS FROM SPECIFIED EQUIPMENT OR MATERIALS. MARK OUT INAPPLICABLE ITEMS. SHOP DRAWINGS WILL BE RETURNED WITHOUT REVIEW IF THE ABOVE MENTIONED REQUIREMENTS ARE NOT MET. REFER TO DIVISION 1 FOR ACCEPTANCE OF ELECTRONIC SUBMITTALS FOR THIS PROJECT. FOR ELECTRONIC SUBMITTALS, CONTRACTOR SHALL SUBMIT THE DOCUMENTS IN ACCORDANCE WITH THE PROCEDURES SPECIFIED IN DIVISION 1. CONTRACTOR SHALL NOTIFY THE ARCHITECT AND ENGINEER THAT THE SHOP DRAWINGS HAVE BEEN POSTED. IF ELECTRONIC SUBMITTAL PROCEDURES ARE NOT DEFINED IN DIVISION 1, CONTRACTOR SHALL INCLUDE THE WEBSITE, USER NAME AND PASSWORD INFORMATION NEEDED TO ACCESS THE SUBMITTALS. FOR SUBMITTALS SENT BY E —MAIL, CONTRACTOR SHALL COPY THE ARCHITECT AND ENGINEER'S DESIGNATED REPRESENTATIVES. CONTRACTOR SHALL ALLOW THE ENGINEER REVIEW TIME AS SPECIFIED ABOVE IN THE CONSTRUCTION SCHEDULE. CONTRACTOR SHALL SUBMIT ONLY THE DOCUMENTS REQUIRED TO PURCHASE THE MATERIALS AND /OR EQUIPMENT IN THE ELECTRONIC SUBMITTAL AND SHALL CLEARLY INDICATE THE MATERIALS, PERFORMANCE CRITERIA AND ACCESSORIES BEING PROPOSED. GENERAL PRODUCT CATALOG DATA NOT SPECIFICALLY NOTED TO BE PART OF THE SPECIFIED PRODUCT WILL BE REJECTED AND RETURNED WITHOUT REVIEW. 15A 1 -10 ELECTRONIC DRAWING FILES IN PREPARATION OF SHOP DRAWINGS OR RECORD DRAWINGS, CONTRACTOR MAY, AT HIS OPTION, OBTAIN ELECTRONIC DRAWING FILES IN AUTOCAD OR DXF FORMAT ON 3.5 INCH FLOPPY DISK, 100 MB ZIP DISK OR CD —ROM DISK, AS DESIRED, FROM THE ENGINEER FOR A SHIPPING AND HANDLING FEE OF $200 FOR A DRAWING SET UP TO 12 SHEETS AND $15 PER SHEET FOR EACH ADDITIONAL SHEET. CONTRACTOR SHALL CONTACT THE ARCHITECT FOR WRITTEN AUTHORIZATION AND ENGINEER FOR THE NECESSARY RELEASE AGREEMENT FORM AND TO SPECIFY SHIPPING METHOD AND DRAWING FORMAT. IN ADDITION TO PAYMENT, ARCHITECT'S WRITTEN AUTHORIZATION AND ENGINEER'S RELEASE AGREEMENT FORM MUST BE RECEIVED BEFORE ELECTRONIC DRAWING FILES WILL BE SENT. 15A 1-11 OPERATION AND MAINTENANCE INSTRUCTIONS DURING THE COURSE OF CONSTRUCTION, COLLECT AND COMPILE A COMPLETE BROCHURE OF EQUIPMENT FURNISHED AND INSTALLED ON THIS PROJECT. INCLUDE OPERATIONAL AND MAINTENANCE INSTRUCTIONS, MANUFACTURER'S CATALOG SHEETS, WIRING DIAGRAMS, PARTS LISTS, APPROVED SHOP DRAWINGS, AND DESCRIPTIVE LITERATURE AS FURNISHED BY THE EQUIPMENT MANUFACTURER. INCLUDE AN INSIDE COVER SHEET THAT LISTS THE PROJECT NAME, DATE, OWNER, ARCHITECT, CONSULTING ENGINEER, GENERAL CONTRACTOR, SUB — CONTRACTOR, AND AN INDEX OF CONTENTS. SUBMIT THREE COPIES OF LITERATURE BOUND IN APPROVED BINDERS WITH INDEX AND TABS SEPARATING EQUIPMENT TYPES TO THE ARCHITECT AT THE TERMINATION OF THE WORK. PAPER CLIPS, STAPLES, RUBBER BANDS, AND MAILING ENVELOPES ARE NOT CONSIDERED APPROVED BINDERS. FINAL APPROVAL OF MECHANICAL SYSTEMS INSTALLED UNDER THIS CONTRACT WILL BE WITHHELD UNTIL THIS EQUIPMENT BROCHURE IS RECEIVED AND DEEMED COMPLETE BY THE ARCHITECT AND ENGINEER. INSTRUCT WORKMEN TO SAVE REQUIRED LITERATURE SHIPPED WITH THE EQUIPMENT ITSELF, FOR INCLUSION IN THIS BROCHURE. PROVIDE "AS— BUILT' DRAWINGS (SEE DIVISION 1 AND GENERAL CONDITIONS). 15A 1 -12 TRAINING AT A TIME MUTUALLY AGREED UPON BETWEEN THE OWNER AND CONTRACTOR, PROVIDE THE SERVICES OF A FACTORY TRAINED AND AUTHORIZED REPRESENTATIVE TO TRAIN OWNER'S DESIGNATED PERSONNEL ON THE OPERATION AND MAINTENANCE OF THE EQUIPMENT PROVIDED FOR THIS PROJECT. PROVIDE TRAINING TO INCLUDE BUT NOT BE LIMITED TO AN OVERVIEW OF THE SYSTEM AND /OR EQUIPMENT AS IT RELATES TO THE FACILITY AS A WHOLE; OPERATION AND MAINTENANCE PROCEDURES AND SCHEDULES RELATED TO STARTUP AND SHUTDOWN, TROUBLESHOOTING, SERVICING, PREVENTIVE MAINTENANCE AND APPROPRIATE OPERATOR INTERVENTION; AND REVIEW OF DATA INCLUDED IN THE OPERATION AND MAINTENANCE MANUALS. SUBMIT A CERTIFICATION LETTER TO THE ARCHITECT STATING THAT THE OWNER'S DESIGNATED REPRESENTATIVE HAS BEEN TRAINED AS SPECIFIED HEREIN. LETTER SHALL INCLUDE DATE, TIME, ATTENDEES AND SUBJECT OF TRAINING. THE CONTRACTOR AND THE OWNER'S REPRESENTATIVE SHALL SIGN THE CERTIFICATION LETTER INDICATING AGREEMENT THAT THE TRAINING HAS BEEN PROVIDED. SCHEDULE OWNER TRAINING WITH AT LEAST 7 DAYS' ADVANCE NOTICE. 15A 1 -13 SPARE PARTS FURNISH TO OWNER, WITH RECEIPT, THE FOLLOWING SPARE PARTS FOR THE EQUIPMENT FURNISHED FOR THIS PROJECT: A. ONE SET OF SPARE FILTERS OF EACH TYPE REQUIRED FOR EACH UNIT. IN ADDITION TO THE SPARE SET OF FILTERS, INSTALL NEW FILTERS PRIOR TO TESTING, ADJUSTING, AND BALANCING WORK AND BEFORE TURNING SYSTEM OVER TO OWNER. B. FURNISH ONE COMPLETE SET OF BELTS FOR EACH FAN. C. FURNISH THREE OPERATING KEYS FOR EACH TYPE OF AIR OUTLET AND INLET THAT REQUIRE THEM. 15A 1 -14 WARRANTIES WARRANT EACH SYSTEM AND EACH ELEMENT THEREOF AGAINST ALL DEFECTS DUE TO FAULTY WORKMANSHIP, DESIGN OR MATERIAL FOR A PERIOD OF 12 MONTHS FROM DATE OF SUBSTANTIAL COMPLETION, UNLESS SPECIFIC ITEMS ARE NOTED TO CARRY A LONGER WARRANTY IN THE CONSTRUCTION DOCUMENTS OR MANUFACTURER'S STANDARD WARRANTY EXCEEDS 12 MONTHS. REMEDY ALL DEFECTS, OCCURRING WITHIN THE WARRANTY PERIOD(S), AS STATED IN THE GENERAL CONDITIONS AND DIVISION 1. WARRANTIES SHALL INCLUDE LABOR AND MATERIAL MAKE REPAIRS OR REPLACEMENTS WITHOUT ANY ADDITIONAL COSTS TO THE OWNER. PERFORM THE REMEDIAL WORK PROMPTLY, UPON WRITTEN NOTICE FROM THE ENGINEER OR OWNER. AT THE TIME OF SUBSTANTIAL COMPLETION, DELIVER TO THE OWNER ALL WARRANTIES, IN WRITING AND PROPERLY EXECUTED, INCLUDING TERM LIMITS FOR WARRANTIES EXTENDING BEYOND THE ONE YEAR PERIOD, EACH WARRANTY INSTRUMENT BEING ADDRESSED TO THE OWNER AND STATING THE COMMENCEMENT DATE AND TERM. 15A 1 -15 CUTTING AND PATCHING PERFORM CUTTING OF WALLS, FLOORS, CEILINGS, ETC. AS REQUIRED TO INSTALL WORK UNDER THIS SECTION. OBTAIN PERMISSION FROM THE ARCHITECT PRIOR TO CUTTING. DO NOT. CUT OR DISTURB STRUCTURAL MEMBERS WITHOUT PRIOR APPROVAL FROM THE ARCHITECT. CUT HOLES AS SMALL AS POSSIBLE. GENERAL CONTRACTOR SHALL PATCH WALLS, FLOORS, ETC. AS REQUIRED BY WORK UNDER THIS SECTION. PATCHING SHALL MATCH THE ORIGINAL MATERIAL AND CONSTRUCTION. REPAIR AND REFINISH AREAS DISTURBED BY WORK TO THE CONDITION OF ADJOINING SURFACES IN A MANNER SATISFACTORY TO THE ARCHITECT. 15A 1 -16 ROUGH —IN COORDINATE WITHOUT DELAY ROUGHING —IN WITH GENERAL CONSTRUCTION. CONCEAL PIPING AND CONDUIT ROUGH —IN EXCEPT IN UNFINISHED AREAS AND WHERE OTHERWISE SHOWN. 15A 1 -17 STRUCTURAL STEEL STRUCTURAL STEEL USED FOR SUPPORT OF EQUIPMENT, DUCTWORK AND PIPING SHALL BE NEW, CLEAN, AND CONFORM TO ASTM DESIGNATION A -36. SUPPORT MECHANICAL COMPONENTS FROM THE BUILDING STRUCTURE. DO NOT SUPPORT MECHANICAL COMPONENTS FROM CEILINGS, OTHER MECHANICAL OR ELECTRICAL COMPONENTS, AND OTHER NON— STRUCTURAL ELEMENTS. 15A 1 -18 ACCESS DOORS PROVIDE ACCESS DOORS IN CEILINGS, WALLS, ETC. WHERE INDICATED OR REQUIRED FOR ACCESS OR MAINTENANCE TO CONCEALED VALVES AND EQUIPMENT INSTALLED UNDER THIS SECTION. PROVIDE CONCEALED HINGES, SCREWDRIVER —TYPE LOCK, ANCHOR STRAPS; MANUFACTURED BY MILCOR, ZURN, TITUS, OR EQUAL. OBTAIN ARCHITECT'S APPROVAL OF TYPE, SIZE, LOCATION AND COLOR BEFORE ORDERING. 15A 1 -19 PENETRATIONS PROVIDE SLEEVES FOR PIPES PASSING THROUGH ABOVE GRADE CONCRETE OR MASONRY WALLS, CONCRETE FLOOR OR ROOF SLABS. SLEEVES ARE NOT REQUIRED FOR CORE DRILLED HOLES IN EXISTING MASONRY WALLS, CONCRETE FLOORS OR ROOFS. PROVIDE 10 GAUGE GALVANIZED STEEL SLEEVES FOR SLEEVES 6" AND SMALLER. PROVIDE GALVANIZED SHEET METAL SLEEVES FOR LARGER THAN 6 ". SCHEDULE 40 PVC SLEEVES ARE ACCEPTABLE FOR INSTALLATION IN AREAS WITHOUT RETURN AIR PLENUMS. SEAL ELEVATED FLOOR, EXTERIOR WALL AND ROOF PENETRATIONS WATERTIGHT AND WEATHERTIGHT WITH NON— SHRINK, NON — HARDENING COMMERCIAL SEALANT. PACK WITH MINERAL WOOL AND SEAL BOTH ENDS WITH MINIMUM OF 1/2" OF SEALANT. SEAL AROUND PENETRATIONS OF FIRE RATED ASSEMBLIES. COORDINATE FIRE RATINGS AND LOCATIONS WITH THE ARCHITECTURAL DRAWINGS. REFER TO ARCHITECTURAL SPECIFICATIONS FOR FIRE STOPPINGS. PROVIDE A PRODUCT SCHEDULE FOR UL LISTING, LOCATION, WALL OR FLOOR RATING AND INSTALLATION DRAWING FOR EACH PENETRATION FIRE STOP SYSTEM. EXTEND PIPE INSULATION FOR INSULATED PIPE THROUGH FLOOR, WALL AND ROOF PENETRATIONS, INCLUDING FIRE RATED WALLS AND FLOORS. THE VAPOR BARRIER SHALL BE MAINTAINED. SIZE SLEEVE FOR A MINIMUM OF 1" ANNULAR CLEAR SPACE BETWEEN INSIDE OF SLEEVE AND OUTSIDE OF INSULATION. PROVIDE PREFABRICATED ROOF CURBS MANUFACTURED BY CUSTOM CURB, INC., PATE COMPANY, THYCURB OR APPROVED EQUAL. PROVIDE ROOF CURB WITH FACTORY INSTALLED WOOD NAILER; WELDED, 18 GAUGE GALVANIZED STEEL SHELL, BASE PLATE AND FLASHING; 1-1/2" THICK, 3 POUND RIGID INSULATION; FULLY MITERED 3 —INCH RAISED CANT; COVER OF WEATHER — RESISTANT, WEATHER —PROOF MATERIAL AND PIPE COLLAR OF WEATHER — RESISTANT MATERIAL WITH STAINLESS STEEL PIPE CLAMPS. PROVIDE BOX FRAMES FOR RECTANGULAR OPENINGS WELDED 12 GAUGE GALVANIZED STEEL ATTACHED TO FORMS AND OF A MAXIMUM DIMENSION ESTABLISHED BY THE ARCHITECT. NOTIFY THE GENERAL CONTRACTOR OR ARCHITECT BEFORE INSTALLING ANY BOX OPENINGS NOT SHOWN ON THE ARCHITECTURAL OR STRUCTURAL DRAWINGS. 15A 1 -20 AIR FILTERS PROVIDE FARR 30/30 PLEATED, THROWAWAY TYPE FILTERS, UNLESS OTHERWISE INDICATED. AIR UNITS SHALL HAVE NEW FILTERS INSTALLED WHEN THEY ARE OPERATED BEFORE FINAL ACCEPTANCE. FILTERS SHALL BE MANUFACTURED BY AMERICAN AIR FILTER, FARR, FLANDERS, OR APPROVED EQUAL. IF HVAC EQUIPMENT IS USED DURING THE CONSTRUCTION PERIOD, CONTRACTOR SHALL PROVIDE ONE SET OF FILTERS WHEN THE UNIT IS STARTED AND REPLACE FILTERS WHEN NEEDED, BUT NOT LESS THAN EVERY MONTH_ ON THE DAY OF SUBSTANTIAL COMPLETION, THE CONTRACTOR SHALL CLEAN THE UNIT AND PROVIDE A NEW SET OF FILTERS IN THE UNIT. 15A 1 -21 ELECTRICAL WIRING LINE VOLTAGE WIRING SHALL BE PROVIDED BY DIVISION 16. LINE VOLTAGE CONTROL AND INTERLOCK WIRING FOR MECHANICAL SYSTEMS SHALL ALSO BE PROVIDED BY DIVISION 16 CONTRACTOR. LOW VOLTAGE CONTROL WIRING SHALL BE PROVIDED BY THE DIVISION 15 CONTRACTOR_ FURNISH WIRING DIAGRAMS TO THE DIVISION 16 CONTRACTOR AS REQUIRED FOR PROPER EQUIPMENT HOOKUP. COORDINATE WITH THE DIVISION 16 CONTRACTOR THE ACTUAL WIRE SIZING AMPS FOR MECHANICAL EQUIPMENT (FROM THE EQUIPMENT NAMEPLATE) TO ENSURE PROPER INSTALLATION. 15A 1 -22 REFRIGERANT AND OIL PROVIDE FULL REFRIGERANT AND OIL CHARGE IN NEW AIR CONDITIONING REFRIGERATION SYSTEMS, AND MAINTAIN IT FOR FULL TERM OF THE GUARANTEE. 15A 1 -23 FINAL TESTING AND ADJUSTMENTS FINAL SYSTEM TESTING, BALANCING AND ADJUSTMENTS SHALL BE PERFORMED BY A CONTRACTOR CERTIFIED BY THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB), ASSOCIATED AIR BALANCE COUNCIL (AABC) OR OTHER APPROVED AGENCY. PERFORM TEST READINGS ON FANS, UNITS, COILS, ETC. AND ADJUST EQUIPMENT TO DELIVER SPECIFIED AMOUNTS OF AIR. PREPARE TESTING AND BALANCING REPORT LOG SHOWING AIR SUPPLY QUANTITIES, AIR ENTERING AND LEAVING TEMPERATURES AND PRESSURES, FAN AND UNIT TEST READINGS, MOTOR VOLTAGE AND AMP DRAWS, ETC., AND SUBMIT SIX COPIES OF THE FINAL COMPILATION OF DATA TO THE ARCHITECT FOR EVALUATION AND APPROVAL BEFORE FINAL INSPECTION OF THE PROJECT. BALANCE AIR SYSTEMS TO WITHIN PLUS OR MINUS 10 PERCENT FOR TERMINAL DEVICES AND BRANCH LINES AND PLUS OR MINUS 5 PERCENT FOR MAIN DUCTS AND AIR HANDLING EQUIPMENT OF THE AMOUNT OF AIR SHOWN ON THE DRAWINGS. FURTHER ADJUSTMENTS SHALL BE MADE TO OBTAIN UNIFORM TEMPERATURE IN SPACES. ADJUST EQUIPMENT TO OPERATE AS INTENDED BY THE SPECIFICATION. ALIGN BEARINGS AND REPLACE BEARINGS THAT HAVE DIRT OR FOREIGN MATERIAL IN THEM WITH NEW BEARINGS WITHOUT ADDITIONAL COST TO THE OWNER. BALANCE CONTRACTOR SHALL INCLUDE IN THE REPORT ANY IMPROPERLY INSTALLED OR MISSING BALANCING DEVICES THAT WOULD NEGATIVELY IMPACT THE SYSTEM OPERATION. ADJUST THERMOSTATS AND CONTROL DEVICES TO OPERATE AS INTENDED. ADJUST BURNERS, PUMPS, FANS, ETC. FOR PROPER AND EFFICIENT OPERATION. CERTIFY TO ARCHITECT THAT ADJUSTMENTS HAVE BEEN MADE AND THAT SYSTEM IS OPERATING SATISFACTORILY. FURTHER ADJUSTMENTS SHALL BE MADE TO OBTAIN UNIFORM TEMPERATURE IN SPACES. CALIBRATE, SET, AND ADJUST AUTOMATIC TEMPERATURE CONTROLS. CHECK PROPER SEQUENCING OF INTERLOCK SYSTEMS, AND OPERATION OF SAFETY CONTROLS. 15A 1 -24 MISCELLANEOUS REMODELING WORK REMOVE ALL UNUSED EQUIPMENT, DUCTWORK, PIPING AND ASSOCIATED SUPPORTS. CAP DUCTWORK AND PIPING AT MAINS AND SEAL AIR AND WATER TIGHT. PROVIDE ITEMS Or IIVAC SYSTEMS MODIFICATION REQUIRED BECAUSE OF BUILDING REMODELING, AS NOTED ON THE DRAWINGS OR NECESSARY FOR PROPER OPERATION. MATCH EXISTING MATERIALS AND CONSTRUCTION TECHNIQUES WHEN MODIFYING EXISTING SYSTEMS UNLESS SPECIFIED OTHERWISE. COORDINATE ADDITIONAL REQUIREMENTS WITH GENERAL CONTRACTOR AND ARCHITECT. SEAL AIRTIGHT EXISTING DUCTWORK REQUIRED TO BE ABANDONED IN PLACE OR NOT IN USE AT THE TERMINATION OF THE WORK. CAP AND SEAL WEATHERTIGHT EXISTING ROOF CURBS AND ROOF OPENINGS TO BE ABANDONED IN PLACE AS A RESULT OF EQUIPMENT REMOVAL. CLEAN AND REBALANCE EXISTING DUCTWORK, DIFFUSERS, REGISTERS, AND GRILLES INTENDED FOR REUSE AS REQUIRED OR AS INDICATED ON DRAWINGS. CLEAN AND REFURBISH EXISTING HVAC EQUIPMENT INTENDED FOR REUSE AS REQUIRED FOR PROPER OPERATION INCLUDING REPLACEMENT OF FILTERS, BELTS, MOTORS, REMOTE CONTROLS, AND SAFETY INTERLOCKS. 15A 1 -25 SEISMIC REQUIREMENTS SEISMIC PROTECTION FOR SEISMIC CONCERNS OF ALL MECHANICAL AND ELECTRIC SYSTEMS EXCEPT FIRE PROTECTION SYSTEMS MUST MEET MINIMUM REQUIREMENTS OF FOR BUILDINGS CLASSIFIED AS SEISMIC USE GROUP [I][II][III] AND SEISMIC DESIGN CATEGORY [A][B][C][D][E][F]. SEISMIC PROTECTION OF WATER PIPES FOR FIRE PROTECTION SYSTEMS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH THE PROVISIONS OF NFPA 13. SEISMIC RESTRAINTS, ISOLATORS, AND ISOLATION MATERIALS SHALL BE OF THE SAME MANUFACTURER, SHALL BE CERTIFIED BY THE MANUFACTURER AND SHALL BE BY AMBER /BOOTH COMPANY, INC., KINETICS NOISE CONTROL, INC., LOOS & COMPANY, INC., MASON INDUSTRIES, INC. OR UNI— STRUT. RESTRAINING DEVICES SHALL HAVE A PRE — APPROVAL NUMBER FROM CALIFORNIA OSHPD OR OTHER RECOGNIZED GOVERNMENT AGENCY SHOWING MAXIMUM RESTRAINT RATINGS. THE REQUIREMENTS FOR SEISMIC PROTECTION MEASURES TO BE APPLIED TO MECHANICAL /ELECTRICAL EQUIPMENT AND SYSTEMS SHALL BE INSTALLED IN STRICT ACCORDANCE WITH ALL APPLICABLE LOCAL, STATE, AND /OR FEDERAL CODES AND WITH MANUFACTURER'S REQUIREMENTS, THE MOST STRINGENT SHALL APPLY. ALL ANCHOR CONNECTIONS TO STRUCTURE FOR SUPPORT OF MECHANICAL AND ELECTRICAL EQUIPMENT, REGARDLESS OF THE NEED FOR SEISMIC RESTRAINTS, SHALL BE SHOWN ON SHOP DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE TYPE AND LOCATION OF SEISMIC RESTRAINTS REQUIRED FOR THE MECHANICAL AND ELECTRICAL ELEMENTS SHOWN ON THE CONTRACT DRAWINGS BASED ON THE SEISMIC CODE CRITERIA STATED ABOVE, THE SIZE AND WEIGHT OF THE SUPPORTED ELEMENT AND THE DISTANCE FROM STRUCTURE THAT THE ELEMENT WILL BE INSTALLED. THE CONTRACTOR SHALL SUBMIT DESCRIPTIVE CATALOG DATA OF SEISMIC RESTRAINTS, SHOP DRAWINGS SHOWING THE TYPES, LOCATIONS AND INSTALLATION DETAILS OF SEISMIC RESTRAINTS AND CALCULATIONS SHOWING THAT THE SEISMIC RESTRAINTS MEET THE SEISMIC REQUIREMENTS TO THE ENGINEER OF RECORD AND TO THE LOCAL AUTHORITY HAVING JURISDICTION FOR REVIEW AND APPROVAL. CALCULATIONS SHALL BE SIGNED AND SEALED BY A REGISTERED PROFESSIONAL ENGINEER, LICENSED IN THE STATE OF THE PROJECT LOCATION AND EMPLOYED BY THE MANUFACTURER OF THE SEISMIC RESTRAINT PRODUCTS. CALCULATIONS SHALL INCLUDE DEAD LOADS, STATIC SEISMIC LOADS AND CAPACITY OF MATERIALS UTILIZED FOR CONNECTIONS TO EQUIPMENT AND STRUCTURE. 15A 2 DUCT INSULATION. DUCTWORK. ACCESSORIES. FLUES AND FANS 15A 2 -1 DUCT INSULATION PROVIDE DUCT LINER IN SUPPLY AND RETURN AIR DUCTWORK. LINER SHALL BE 1 -1/2" THICK, 1-1/2 POUND DENSITY FIBERGLASS, MINIMUM R -5.0 CERTAINTEED CORP. "TOUGHGARD" OR EQUIVALENT OWENS— CORNING OR KNAUF LONG TEXTILE FIBER DUCT LINER. LINER SURFACE SHALL SERVE AS A BARRIER AGAINST INFILTRATION OF DUST AND DIRT, SHALL MEET ASTM C 1338 FOR FUNGI RESISTANCE AND SHALL BE CLEANABLE USING DUCT CLEANING METHODS AND EQUIPMENT OUTLINED BY NORTH AMERICAN INSULATION MANUFACTURERS ASSOCIATION (NAIMA) DUCT CLEANING GUIDE. INSTALL WITH LINER ADHESIVE AND MECHANICAL FASTENERS IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND RECOMMENDATIONS. DUCTWORK SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. INCREASE SHEET METAL BY LINER THICKNESS IN BOTH DIRECTIONS WHERE LINER IS INSTALLED. COVER CONCEALED RIGID ROUND AND RECTANGULAR OUTSIDE AIR DUCTWORK, AND ROUND AND RECTANGULAR EXHAUST AND RELIEF AIR DUCTWORK WITHIN 10 FEET OF EXTERIOR DISCHARGE OUTLETS WITH 2" THICK, 3/4 POUND DENSITY, MINIMUM R -5.0 DUCT WRAP, CERTAINTEED OR EQUIVALENT OWENS— CORNING OR KNAUF WITH HEAVY —DUTY FOIL— SCRIM —KRAFT FACING, AND WITH JOINTS TAPED WITH 3" WIDE FOIL TAPE. INSULATING MATERIALS, ADHESIVES, COATINGS, ETC., SHALL NOT EXCEED FLAME SPREAD RATING OF 25 AND SMOKE DEVELOPED RATING OF 50 PER ASTM E 84. CONTAINERS FOR MASTICS AND ADHESIVES SHALL HAVE U.L. LABEL. 15A 2 -2 DUCTWORK PROVIDE GALVANIZED STEEL DUCTWORK AND HOUSINGS AS SHOWN ON DRAWINGS. CONSTRUCT DUCTWORK INCLUDING FITTINGS AND TRANSITIONS IN CONFORMANCE WITH CURRENT SMACNA STANDARDS RELATIVE TO GAUGE, BRACING, JOINTS, ETC. MINIMUM THICKNESS OF DUCT SHALL BE 26 —GAUGE SHEET METAL. REINFORCE HOUSINGS AND DUCTWORK OVER 30" WITH 1 -1/4" ANGLES NOT LESS THAN 5' -6" ON CENTERS, AND CLOSER IF REQUIRED FOR SUFFICIENT RIGIDITY TO PREVENT VIBRATION. SUPPORT HORIZONTAL RUNS OF DUCT FROM STRAP IRON HANGERS ON CENTERS NOT TO EXCEED 8' -0 ". DO NOT SUPPORT CEILING GRID, CONDUITS, PIPES, EQUIPMENT, ETC. FROM DUCTWORK. COORDINATE ROUTING OF DUCTWORK WITH OTHER CONTRACTORS SUCH THAT PIPING, ELECTRICAL CONDUIT, AND ASSOCIATED SUPPORTS ARE NOT ROUTED THROUGH THE DUCTWORK. CONSTRUCT SUPPLY DUCTS TO MEET SMACNA POSITIVE PRESSURE OF 2" W.G. CONSTRUCT RETURN AND EXHAUST DUCTWORK UPSTREAM OF FANS TO MEET SMACNA NEGATIVE PRESSURE OF 1" W.G. PROVIDE MILL PHOSPHATIZED OR GALVANEALED FINISH FOR EXPOSED DUCTWORK TO BE FIELD PAINTED. SHOP TREATED SHEET METAL SHALL HAVE GALVANIZED METAL PRIMER APPLIED IN THE SHOP AFTER FABRICATION AND PRIOR TO SHIPPING. Q SEAL DUCTWORK WITH HEAVY LIQUID SEALANT, HARDCAST IRONGRIP 601 DESIGN POLYMER DP 1010 , UNITED MCGILL DUCT SEALER OR APPROVED EQUAL, APPLIED ACCORDING TO SEALANT MANUFACTURER'S INSTRUCTIONS. FOR DUCTS WITH PRESSURE CLASSIFICATION OF 2" W.G. AND GREATER SEAL LONGITUDINAL AND TRANSVERSE DUCTWORK JOINTS AIRTIGHT TO MEET SMACNA CLASS B. FOR DUCTS WITH PRESSURE CLASSIFICATION LESS THAN 2" W.G. SEAL TRANSVERSE JOINTS AIRTIGHT TO MEET SMACNA CLASS C. TAPES AND MASTICS SHALL BE LISTED AND LABELED IN ACCORDANCE WITH UL 181A. PROVIDE RADIUS ELBOWS, TURNS, AND OFFSETS WITH A MINIMUM CENTERLINE RADIUS OF 1-1/2 TIMES THE DUCT WIDTH. WHERE SPACE DOES NOT PERMIT FULL RADIUS ELBOWS, PROVIDE SHORT RADIUS ELBOWS WITH A MINIMUM OF TWO CONTINUOUS SPLITTER VANES. VANES SHALL BE THE ENTIRE LENGTH OF THE BEND. PROVIDE MITERED ELBOWS WHERE SPACE DOES NOT PERMIT RADIUS ELBOWS, WHERE SHOWN ON THE DRAWINGS, OR AT THE OPTION OF THE CONTRACTOR WITH THE ENGINEER'S APPROVAL. MITERED ELBOWS LESS THAN 45 DEGREES SHALL NOT REQUIRE TURNING VANES. MITERED ELBOWS 45— DEGREES AND GREATER SHALL HAVE SINGLE THICKNESS TURNING VANES OF SAME GAUGE AS DUCTWORK, RIGIDLY FASTENED WITH GUIDE STRIPS IN DUCTWORK. VANES FOR MITERED ELBOWS SHALL BE PROVIDED IN ALL SUPPLY AND EXHAUST DUCTWORK AND IN RETURN AND OUTSIDE AIR DUCTWORK THAT HAS AN AIR VELOCITY EXCEEDING 1000 FPM. DO NOT INSTALL VANES IN GREASE DUCTWORK. DUCTS SHALL BE CONNECTED TO FANS, FAN CASINGS AND FAN PLENUMS BY MEANS OF FLEXIBLE CONNECTORS. FLEXIBLE CONNECTORS SHALL BE NEOPRENE COATED GLASS CLOTH CANVAS CONNECTIONS, DURO —DYNE, ELGEN, VENTFABRIC OR EQUAL. FLEXIBLE CONNECTORS SHALL HAVE A FLAME SPREAD OF 25 OR LESS AND SMOKE DEVELOPED RATING NOT HIGHER THAN 50. MAKE AIRTIGHT JOINTS AND INSTALL WITH MINIMUM 1 -1/2" SLACK. PROVIDE BALANCING DAMPERS, MANUFACTURED BY RUSKIN, GREENHECK, NAILOR INDUSTRIES, CESCO, LOUVERS & DAMPERS, POTTORFF OR APPROVED EQUAL, WHERE SHOWN ON DRAWINGS AND WHEREVER NECESSARY FOR COMPLETE CONTROL OF AIR FLOW. SPLITTER DAMPERS SHALL BE CONTROLLED BY LOCKING QUADRANTS; PROVIDE YOUNG REGULATOR OR VENTLOK END BEARINGS FOR THE DAMPER ROD. RECTANGULAR VOLUME DAMPERS SHALL BE OPPOSED BLADE INTERLOCKING. TYPE. ROUND VOLUME DAMPERS SHALL BE BUTTERFLY TYPE CONSISTING OF CIRCULAR BLADE MOUNTED TO A SHAFT. DAMPER LEAKAGE FOR OUTSIDE AIR DAMPERS SHALL NOT EXCEED 4.0 CFM /SQUARE FOOT IN FULL CLOSED POSITION AT 1" WG PRESSURE DIFFERENTIAL ACROSS DAMPER. REFERENCE MANUFACTURER AND MODEL NUMBER FOR OUTSIDE AIR DAMPERS IS RUSKIN MODEL CD -50. PROVIDE "SPIN —IN" FITTING WITH STANDOFF CONNECTION AND VOLUME DAMPER FOR ROUND DUCTWORK BRANCH TAKEOFFS TO INDIVIDUAL AIR DEVICES. OMIT DAMPER AT TAKEOFF FITTING WHEN DAMPER iS LOCATED DOWNSTREAM OF TAKEOFF. WHERE ACCESS TO DAMPERS THROUGH A HARD CEILING IS REQUIRED, PROVIDE A METROPOLITAN AIR TECHNOLOGY MODEL RT -250 OR EQUAL BY YOUNG'S REGULATOR CONCEALED, CABLE OPERATED VOLUME DAMPER WITH REMOTE OPERATOR. DAMPER SHALL BE ADJUSTABLE THROUGH THE DIFFUSER FACE OR FRAME WITH STANDARD 1/4" NUTDRIVER OR FLAT SCREWDRIVER. CABLE ASSEMBLY SHALL ATTACH TO DAMPER AS ONE PIECE WITH NO LINKAGE ADJUSTMENT. POSITIVE, DIRECT, TWO —WAY DAMPER CONTROL SHALL BE PROVIDED WITH NO SLEEVES, SPRINGS OR SCREW ADJUSTMENTS TO COME LOOSE AFTER INSTALLATION. SUPPORT CABLE ASSEMBLY TO AVOID BENDS AND KINKS IN CABLE. ROUND OR OVAL DUCTWORK SHALL BE SEMCO, UNITED, WESCO OR EQUAL, SHEETMETAL, WITH SMOOTH INTERIOR SURFACE, WITH LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) ROUND DUCTWORK GAUGES PER THE FOLLOWING TABLE (REFERENCE SMACNA HVAC DUCT CONSTRUCTION STANDARDS FOR GAUGES WHEN PRESSURES EXCEED 2" W.G.): SIZE 14" & UNDER 15" THRU 26" 28" THRU 36" 38" THRU 50" 52" THRU 60" DUCT GAUGE 26 24 22 20 18 FITTING GAUGE 24 22 20 20 18 LINDAB SPIROSAFE, LEWIS & LAMBERT OR APPROVED EQUAL FACTORY — MANUFACTURED ROUND DUCTWORK AND FITTINGS MAY BE SUBSTITUTED FOR SPECIFIED ROUND BRANCH DUCTWORK, AT CONTRACTORS OPTION. HEAVY LIQUID JOINT SEALANT MAY BE OMITTED ON FACTORY— MANUFACTURED ROUND DUCTWORK. LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) FITTINGS 24" IN DIAMETER AND LESS SHALL BE PREFABRICATED, SPOTWELDED AND 'INTERNALLY SEALED. CONTINUOUSLY WELD FITTINGS LARGER THAN 24" IN DIAMETER. FITTING GAUGE SHALL BE 22 GAUGE FOR 36" FITTINGS AND UNDER, 20 GAUGE FOR LARGER SIZES. 90 DEGREE TEE'S SHALL BE CONICAL TYPE. SEAL LONGITUDINAL AND TRANSVERSE DUCTWORK JOINTS AIRTIGHT WITH HEAVY LIQUID SEALANT APPLIED ACCORDING TO MANUFACTURER'S INSTRUCTIONS. PROVIDE GAUGE THICKNESS IN MEDIUM PRESSURE (DUCT PRESSURE CLASS 3" TO 6" W.G.) DUCTWORK AS RECOMMENDED BY SMACNA. 15A 2 -3 FLEXIBLE DUCT LOW PRESSURE (DUCT PRESSURE CLASS UP TO AND INCLUDING 2" W.G.) AND MEDIUM PRESSURE (DUCT PRESSURE CLASS 2.1" TO 6" W.G.) FLEXIBLE DUCT SHALL BE FLEXMASTER TYPE 8B, THERMAFLEX TYPE G— KM, M —KE, OR EQUAL (FIRE RETARDANT POLYETHYLENE) PROTECTIVE VAPOR BARRIER, U.L.181 CLASS 1, ACOUSTICAL INSULATED DUCT, R -5.0 FIBERGLASS INSULATION. PROVIDE CPE LINER WITH STEEL WIRE HELIX MECHANICALLY LOCKED OR PERMANENTLY BONDED TO THE LINER. FLEXIBLE DUCT RUNS SHALL NOT EXCEED 5 FEET IN LENGTH, AND SHALL BE INSTALLED FULLY EXTENDED AND STRAIGHT AS POSSIBLE AVOIDING TIGHT TURNS. INSTALL FLEXIBLE DUCT IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. SUPPORT FLEXIBLE DUCT AT MAXIMUM 5 FEET ON CENTER AND WITHIN 6 INCHES OF BENDS. BENDS SHALL NOT EXCEED A CENTERLINE RADIUS OF ONE DUCT DIAMETER. DUCT SAG SHALL NOT EXCEED 1/2 INCH. SUPPORTING MATERIAL IN DIRECT CONTACT WITH THE DUCT SHALL NOT BE LESS THAN 1 -1/2 INCHES IN WIDTH. CONNECT FLEXIBLE DUCT TO RIGID METAL DUCT OR AIR DEVICES AS RECOMMENDED BY THE MANUFACTURER. AT A MINIMUM, INSTALL TWO WRAPS OF DUCT TAPE AROUND THE INNER CORE CONNECTION AND A METALLIC OR NON— METALLIC CLAMP OVER THE TAPE AND TWO WRAPS OF DUCT TAPE OR A CLAMP OVER THE OUTER JACKET. DUCT CLAMPS SHALL BE LABELED IN ACCORDANCE WITH UL-181B AND MARKED 181B—C. DUCT TAPE SHALL BE LABELED IN ACCORDANCE WITH UL 181B AND MARKED 181B —FX. 15A 2 -4 AIR DEVICES PROVIDE AIR DEVICES AS SCHEDULED ON DRAWINGS, MANUFACTURED BY CARNES, E.H. PRICE, KRUEGER, NAILOR INDUSTRIES, TITUS, OR TUTTLE & BAILEY. SELECT AIR DEVICES TO LIMIT ROOM NOISE LEVEL TO NO HIGHER THAN NC -30 UNLESS OTHERWISE SHOWN. PROVIDE DEVICES WITH A SOFT PLASTIC GASKET TO MAKE AN AIRTIGHT SEAL AGAINST THE MOUNTING SURFACE. COORDINATE FINAL LOCATION, FRAME, AND MOUNTING TYPE OF AIR DEVICES WITH ARCHITECTURAL REFLECTED CEILING PLANS. SUBMIT COMPLETE SHOP DRAWINGS INCLUDING INFORMATION ON NOISE LEVEL, PRESSURE DROP, THROW, CFM FOR EACH AIR DEVICE, STYLES, BORDERS, ETC. CLEARLY MARKED WITH SPECIFIED EQUIPMENT NUMBER. SUBMIT SAMPLES OF EACH AIR DEVICE AS REQUESTED BY THE ENGINEER. PROVIDE WALL SUPPLY AIR REGISTERS WITH DOUBLE DEFLECTION BLADES AND OPPOSED BLADE DAMPERS. PROVIDE WALL RETURN AIR GRILLES AND EXHAUST AIR REGISTERS WITH HORIZONTAL 35 OR 45 DEGREE ANGLE VISION —PROOF BARS. PROVIDE CONCEALED FASTENERS FOR WALL MOUNTED REGISTERS AND GRILLES. PROVIDE CEILING SUPPLY AIR REGISTERS OF ALUMINUM CURVED BLADE TYPE WITH BLADES PARALLEL TO LONG DIMENSION AND WITH THROW PATTERN AS INDICATED ON DRAWINGS. PROVIDE OPPOSED BLADE DAMPERS FOR SUPPLY AIR REGISTERS AND EXHAUST AIR REGISTERS UNLESS INDICATED OTHERWISE. PROVIDE CEILING SUPPLY AIR DIFFUSERS AND RETURN AIR GRILLES OF LAY —IN OR SURFACE MOUNTED TYPE AS REQUIRED TO BE COMPATIBLE WITH CEILING CONSTRUCTION. PROVIDE CEILING DIFFUSERS AND GRILLES WITH WHITE ENAMEL FINISH UNLESS NOTED OTHERWISE. PROVIDE DROP BOX DIFFUSERS WITH MINIMUM 22 GAUGE GALVANIZED STEEL CONSTRUCTION, FACTORY ASSEMBLED AND WELDED, AND PROVIDED WITH STANDARD DUCT CONNECTIONS AND MOUNTING BRACKETS FOR FIELD INSTALLATION. DIFFUSERS SHALL HAVE DOUBLE DEFLECTION GRILLES OR DRUM LOUVERS THAT ARE INDIVIDUALLY ADJUSTABLE TO CUSTOMIZE HORIZONTAL AND VERTICAL THROWS AND FACTORY INSTALLED AIR DIVERTERS OR TURNING VANES. INSULATE DIFFUSERS WITH 1" THICK, 1.5 LB DUCT LINER INSULATION. PROVIDE FACTORY PRIMED AND PAINTED DIFFUSERS, COLOR AS SELECTED BY THE ARCHITECT. PROVIDE DROP BOX DIFFUSERS AS MANUFACTURED BY AES INDUSTRIES, CAN FAB, CUSTOM CURB, INC. OR PLENUMS INC. 15A 2 -5 SCREENS PROVIDE SCREENS ON DUCTS, FANS, AND OPENINGS TO THE OUTDOORS AS SCHEDULED AND /OR NOTED ON THE DRAWINGS. INSECT SCREENS SHALL BE 0.012 —INCH THICKNESS, 1/4" MESH, ALUMINUM WIRE. BIRD SCREENS SHALL BE 0.063 —INCH, 1/2 —INCH MESH ALUMINUM WIRE. 15A 2 -6 ROOF RELIEF AIR HOODS EXISTING TO REMAIN. 15A 2 -7 EXHAUST AIR SYSTEMS PROVIDE ROOF MOUNTED EXHAUST FANS AS SCHEDULED ON THE DRAWINGS, OR EQUAL COOK, GREENHECK, CARNES, TWIN CITY FANS, ACME OR PENNBARRY COMPLETE WITH ALUMINUM HOUSING, ALUMINUM CENTRIFUGAL WHEEL, MOTOR WITH INTEGRAL THERMAL OVERLOAD PROTECTION, DISCONNECT SWITCH MOUNTED INSIDE THE HOUSING, BIRDSCREEN, BACKDRAFT DAMPER, AND PATE PREFABRICATED ROOF CURB. THREE PHASE FANS SHALL BE FURNISHED WITH MAGNETIC STARTERS WITH PUSH BUTTON STATION. 15A 3 HVAC EQUIPMENT 15A 3 -1 EXISTING ROOFTOP UNITS (GAS FIRED HEAT) CONTRACTOR SHALL CLEAN, COMB OUTDOOR COIL FINS, RECHARGE REFRIGERANTS AND ADJUST FANS FOR SCHEDULED CFM. 15A 3 -2 CONDENSING UNITS INSTALL SPLIT SYSTEM, AIR COOLED CONDENSING UNITS AS SCHEDULED ON THE DRAWINGS. UNIT SHALL CARRY A FIVE YEAR GUARANTEE ON THE COMPRESSOR AND REFRIGERANT CIRCUIT, AND A ONE YEAR GUARANTEE ON THE REMAINING COMPONENTS. PROVIDE REFRIGERANT PIPING SIZED AS RECOMMENDED BY EQUIPMENT MANUFACTURER WITH FOAMED PLASTIC INSULATION ON THE SUCTION LINE AS SPECIFIED IN THIS SECTION. PROVIDE 4 "X4" ACQ ROT —PROOF WOOD BLOCKS FOR MOUNTING CONDENSING UNITS ON ROOF. SECURELY ATTACH UNITS TO BLOCKS. 15A 3 -3 FAN COIL UNITS [DIRECT EXPANSION. 1.5 -5 TONS] INSTALL SPLIT SYSTEM, FAN COIL UNITS AS SCHEDULED ON THE DRAWINGS. PROVIDE HONEYWELL OR EQUAL ELECTRONIC PROGRAMMABLE TYPE THERMOSTAT, SEVEN —DAY MODEL, MANUAL CHANGEOVER, SWITCHING SUBBASE, MULTI —STAGE AS REQUIRED TO MATCH UNIT COOLING /HEATING STAGING. PROVIDE SPRING VIBRATION ISOLATORS AND ALL — THREAD HANGING RODS FOR HORIZONTAL INSTALLATIONS. 15A 3 -5 REFRIGERANT PIPING AND INSULATION PROVIDE ASTM B 88, TYPE L OR ASTM B 280, TYPE ACR HARD DRAWN COPPER REFRIGERANT PIPING, CLEANED AND SEALED AT THE FACTORY, AND SPECIFICALLY DESIGNED FOR REFRIGERANT. FITTINGS SHALL BE HARD DRAWN AND HAVE LONG RADIUS TURNS. SOLDER JOINTS WITH "SiLFOS" (1 5 PERCENT SILVER, 5 PERCENT PHOSPHORUS, 80 PERCENT COPPER, 1300 DEGREES FAHRENHEIT FLOW TEMPERATURE). SOLDER JOINTS WITH A SLOW STREAM OF DRY NITROGEN PASSING THROUGH THE PIPING. INSULATE SUCTION LINES WITH 1" FOAMED PLASTIC INSULATION, ARMAFLEX OR EQUAL PIPING INSULATION SHALL HAVE A FLAME SPREAD OF 25 OR LESS, AND A SMOKE DEVELOPED RATING OF 50 OR LESS WHEN TESTED IN ACCORDANCE WITH ASTM E84. COAT INSULATION THAT IS EXPOSED TO THE ELEMENTS WITH A PROTECTIVE SEALER. INSTALL AND SUPPORT PIPING TO KEEP NOISE AND VIBRATION TO A MINIMUM. SUPPORT AND SECURE PIPING TO UNISTRUT TYPE SUPPORTS SO THAT NO VIBRATION PASSES TO THE BUILDING STRUCTURE. PIPE ATTACHMENTS SHALL BE COPPER — PLATED OR HAVE NONMETALLIC COATING FOR ELECTROLYTIC PROTECTION WHERE ATTACHMENTS ARE IN DIRECT CONTACT WITH COPPER TUBING. INSTALL A SUPPORT WITHIN ONE FOOT OF EACH CHANGE OF DIRECTION. MOUNT PIPE HANGERS AROUND THE OUTSIDE OF THE INSULATION WITH SADDLES TO PREVENT HANGERS FROM RUPTURING THE INSULATION. REPLACE INSULATION THAT IS CUT OR BROKEN BY THE HANGERS. RUN REFRIGERANT LINES PARALLEL AND PERPENDICULAR TO WALL AND FLOOR LINES AND TO APPEAR STRAIGHT AND IN GOOD ORDER. PITCH SUCTION LINES DOWN SLIGHTLY (1" IN 20') TOWARDS THE COMPRESSOR. PROVIDE OIL TRAPS AT THE BASE OF VERTICAL SUCTION RISERS OVER 6 FEET HIGH. INSTALL LIQUID LINE SIGHT GLASSES IN LIQUID LINES NEAREST THE EXPANSION VALVE. FACTORY MOUNT EXPANSION VALVES WITH THE SENSING BULBS SHIPPED LOOSE. FIELD MOUNT EXPANSION VALVE BULB AFTER REFRIGERANT PIPING IS COMPLETE (DAMAGE MAY OCCUR IF BULBS COME IN CONTACT WITH HEAT). FOR SYSTEMS OF 5 TON CAPACITY AND SMALLER, THE CONTRACTOR SHALL HAVE THE OPTION TO PROVIDE COPPER REFRIGERANT TUBING LINE SET SIZED AS RECOMMENDED BY EQUIPMENT MANUFACTURER AND OF LENGTH AS REQUIRED FOR THE INSTALLATION. PROVIDE 1" THICK FOAMED PLASTIC INSULATION, ARMAFLEX OR EQUAL, ON THE SUCTION LINE. PROVIDE QUICK— CONNECT FLARE TUBING COMPRESSION FITTINGS OR SOLDER CONNECTIONS AS REQUIRED TO MATCH THE CONNECTIONS OF THE CONDENSING UNIT AND EVAPORATOR COIL. 15A 3 -6 SYSTEM EVACUATION AND CHARGING BLOW OUT REFRIGERATION LINES WITH DRY NITROGEN AT A SUITABLE PRESSURE BEFORE MAKING FINAL CONNECTION AT THE CONDENSING UNIT OR COIL TO ENSURE AGAINST DIRT, SCALE, OR OTHER FOREIGN MATERIAL BEING IN THE LINES. DRAW A VACUUM TO 29" OF MERCURY. BREAK THIS VACUUM BY CHARGING DRY REFRIGERANT GAS INTO THE SYSTEM, RAISING THE PRESSURE TO 0 PSIG. REPEAT THE LATTER TWO STEPS FOR A TRIPLE EVACUATION BEFORE THE FINAL EVACUATION IS STARTED. MAKE FINAL EVACUATION BY REDUCING THE SYSTEM ABSOLUTE PRESSURE TO A MAXIMUM OF 0.5 MILLIMETERS (500 MICRONS) AND ALLOWING THE PUMP TO RUN AT THIS PRESSURE FOR A MINIMUM OF TWO HOURS. REPEAT THE PROPER AMOUNT OF REFRIGERANT CHARGE PER THE MANUFACTURER'S RECOMMENDATIONS. RECORD THE AMOUNT OF REFRIGERANT BY WEIGHT CHARGED INTO THE SYSTEM FOR EACH CIRCUIT RECORDED TO THE NEAREST 1/4 POUND ON TAGS AND ATTACH TAGS TO THE LIQUID LINE NEAR THE CONDENSING UNIT. REFRIGERANT SHALL BE SUPPLIED BY THE HVAC CONTRACTOR. 15A 4 TEMPERATURE CONTROLS 15A 4 -1 GENERAL REQUIREMENTS PROVIDE A SYSTEM OF TEMPERATURE CONTROLS INCLUDING THERMOSTATS, CONTROL PANELS, TIME SWITCHES, OVERRIDE TIMERS, DAMPER MOTORS, AND RELAYS REQUIRED TO PROVIDE THE DESIRED SEQUENCE OF OPERATION. PROVIDE INTEGRATED WIRING DIAGRAMS SHOWING INTERCONNECTIONS BETWEEN FIELD INSTALLED EQUIPMENT AND PACKAGE WIRING G FJRNISHED WITH THE HV A C EQUIPMENT. PROVIDE SUPERVISION AND ON —JOB CHECKOUT SERVICE AS REQUIRED TO ENSURE THAT INSTALLATION MEETS REQUIREMENTS OF THE SPECIFICATION. THE SYS1 EM SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FOLLOWING THE ACCEPTANCE OF THE SYSTEM BY THE ARCHITECT /ENGINEER. CORRECT DEFECTS OCCURRING DURING THIS PERIOD AT NO ADDITIONAL COST TO THE OWNER. 15A 4 -2 EQUIPMENT MANUFACTURERS AND MODEL NUMBERS ARE LISTED FOR REFERENCE AS TO QUALITY AND FEATURES REQUIRED FOR THE CONTROL DEVICES. PROVIDE CONTROL DEVICES BY BARBER — COLMAN, HONEYWELL, JOHNSON CONTROLS, TRANE OR WHITE RODGERS WITH QUALITY AND FEATURES AS INDICATED. SEVEN DAY PROGRAMMABLE, OCCUPIED /UNOCCUPIED THERMOSTATS FOR CONTROL OF MULTIPLE STAGES OF HEATING AND COOLING SYSTEMS AND FOR CONTROL OF ECONOMIZER SYSTEM SHALL BE HONEYWELL SERIES T7351 THERMOSTAT WITH INTEGRAL SUBBASE AND W7459A ECONOMIZER MODULE. PROVIDE TR21 REMOTE SENSOR. INSTALL THERMOSTATS AT 48" AFF TO MEET ADA REQUIREMENTS UNLESS OTHERWISE NOTED ON THE PLANS. SMOKE DETECTORS FURNISHED AND INSTALLED AS INDICATED IN SECTION 15A PART 3 OR AS SCHEDULED ON THE PLANS (OR HEAT DETECTORS, IF PERMITTED BY CODE) SHALL SHUT DOWN EACH ASSOCIATED UNIT SUPPLY FAN UPON ACTIVATION WHERE REQUIRED BY CODE. PROVIDE REMOTE VISUAL AND AUDIBLE ALARM DEVICE IN AN APPROVED LOCATION IF SMOKE DETECTORS ARE NOT CONNECTED TO A FIRE ALARM PANEL AND LABEL DEVICE AS "AIR DUCT DETECTOR TROUBLE ". 15A 5 SEQUENCE OF OPERATION 15A 5 -1 EXISTING ROOFTOP UNIT CONTROL DURING OCCUPIED HOURS, OPERATE ROOFTOP UNIT SUPPLY FAN CONTINUOUSLY AND OPEN OUTDOOR AIR DAMPER TO MINIMUM POSITION TO MAINTAIN MINIMUM VENTILATION. CYCLE STAGE(S) OF COOLING AND HEATING TO MAINTAIN ROOM THERMOSTAT SET POINT A(75 DEGREES FAHRENHEIT COOLING, 72 DEGREES FAHRENHEIT HEATING). SMOKE DETECTORS SHALL SHUTDOWN UNIT UPON ALARM. DURING UNOCCUPIED HOURS, CYCLE THE ROOFTOP UNIT SUPPLY FAN AND COOLING OR HEATING SYSTEM TO MAINTAIN UNOCCUPIED SETBACK TEMPERATURE SET POINTS. OUTDOOR AIR DAMPER SHALL BE CLOSED DURING UNOCCUPIED HOURS. 15A 5 -2 PUBLIC RESTROOM, EXHAUST FAN CONTROL EXHAUST FAN SHALL BE CONTROLLED BY ROOM LIGHT SWITCH. tit REVIEWED FOR CODE COMPLIANCE APPROVED MAY 112012 Si 4y City of Tukwila BUILDING DIVISION RECEIVE4 CITY OF TUKWILA APR 242012 PERMIT CENTER ISSUE BLACK 04/05/12 PERMIT SET CHECKED BY: TA/RO /SJ DRAWN BY: RRR FlLE: y y�'i.,r A :.� • WA f U 49091 4 1°h,.`E�STBO�n�� SHEET NAME MECHANICAL SPECIFICATIONS SHEET NUMBER M3.1 t J Sn 0 0 0 0 0 Iv U L W a cn 0 tai 0 0 a W 0. 0. 2006 Washin • on State Nonresidential Eners Code Com fiance Form 2006 Washington Siete Nonresidential Energy Code Compliano Forms Revised July 20,07 Project Imo Project Address TOTAL HINE a mow Date 4/16/2012 Date 4/3/2012 300 ANDOVER PARK WEST 300 ANDOVER PARK VEST SEER IIIM or EER Location For Building Department Use Applicant Name: TUKWILA, EA Applicant Address: Applicant Name: TOTAL WINE & MORB. ��- Applicant Address: IIIII all 111111 Applicant Phone: 1111111111111111111111.11111111111.1 NM 2006 Washin! ton State Nonresidential Ener Code Com Hance Form 2006 Washington State Nonresidential Energy Code Compliance Farms Revised July 2007 Project Info Project Address TOTAL WINE & raves Date 4/16/2012 Capacity' Btuh, 300 ANDOVER PARK WEST For Building Dept. Use SEER IIIM or EER Location TUKWILA, WA Applicant Name: TOTAL WINE & MORE Applicant Address: 340 Applicant Phone: 16.00 Project Description Briefly describe mechanical system type and features. DIncludes Plans ADDING (1) COOLING ONLY DUCTLESS SPLIT SYSTEM. EXISTING HVAC TO REMAIN Include documentation requiring compliance with commissioning requirements, Section 1416. Compliance Option Simple System 0 Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cool in; E • ui • ment Schedule Equip. ID Brand Nam& Model No.' Capacity' Btuh, Total CFM OSA CFM or Econo? SEER IIIM or EER Location FcU,cU^ 4 MITSUBISHI MUY -AI7NA 11100 340 16.00 1.1111111 SEAVER alit MN I IIIII all 111111 1111111111111111111111.11111111111.1 NM CHECKED BY: TA/RO /SJ Heating Equipment Schedule Equip. ID Brand Name' Model No.' Capacity Btu/h OSA cfm Total CFM or Econo? Input Btuh Output Btuh Effieien c' 4 Fan Eaul?rnent Schedule Equip. ID Brand Name' Model No.' CFM sp1 HP/BHP Float ControP Location of Service CHECKED BY: TA/RO /SJ DRAWN BY: RRR AIM , A. 49091 SHEET NAME: ENERGY COMPLIANCE DOCUMENTS SHEET NUMBER: M411 1If available. 2 As tested accord'ng to Table 14-1A through 14-1G. 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 5 Row control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). 2006 Washin. on State Nonresidential Ener Code Com•liance Form Mechanical Summary (back) MECH -SUM System Description See Section 1421 for full description of Simple System qualifications. If Heating/Cooling or Coding Only: * Constant vol? r. Air cooled? ■ Packaged sys? <20,000 Btuh? ;- Split system? 3 Economizer included? If Heating Only: f <5000 cfm? •; <70% outside air? Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Heating Only Heating/Cooling or Cooling Only Reference Section 1421 5fm7 000 Yes No </<70% OS )>-Y \ f Air Cooled Constant Vol? Yes lit Syste Package —No t►f <=84,000 \� Btuh7 Yes ,/ 60I C'a `\in ded?"' o "'N �20,Qb 7 Stub? !` \./ `f es Yes j Reference ~) Section 1423 Simple System Allowed (section 1420) Y otal Cap 4w0 economrzer‘\---N <240,000 Ruh/' 01.1090 A41 Outddeks, / or Adjacent to Outdoor No of Cdp, <54,000 ;>—N ‘'Nj3tuh? Use Complex Systems (section 1430) !Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. tit 0 REVIEWED FOR COMPLIANCE APPROVED MAY 11 2012 City of Tukwila BUILDING DIVISION REChiv CITY OF TUKVN1A APR 2`+2012 MOT CENTER ISSUE BLOCK 04/05/12 PERMIT SET CHECKED BY: TA/RO /SJ DRAWN BY: RRR AIM , A. 49091 SHEET NAME: ENERGY COMPLIANCE DOCUMENTS SHEET NUMBER: M411 1- 3 J N 0 z a 0 U N 0 V N 0 N cc 0 0 Q w o_ a 0 z oc 0 U3 1- EC.TR CAL :DATA >< R -404A MRD'tt COIl,. MOTEL MIPS a 209.123911/50 1� !! ,t 3•.?.• 'c1. >_41� AMPS 4t46Oi3A0 COMPRESSOR COND TOTAL MCA I<` i...X..!: :1 COND r %r:! :.4YI� :)f TOTAL iii' __ ©® NUMBER RST45C1 E 0.50 5.1 -- F1A UTdT i" RLA FLA H�.Q RST55C1 E NA FL4 UNIT R`Ho55to4 4 F. H080MM4 RST45C1E RST55CtE - 33.7 33.7 0 -5 ®;�,® -- 0.5 �ffaii -- - �� �� A 2 8-14 27.314 17.114: 160 le Do 43D os 95 15 in II'/ 11-11004444 1156 70 1E 6.3 342 0S 7.8 15 • 05 5.7 15.0 0.4 125 8.6 R9t125t441 RSS7CIE 9.3 51.0 1.0 35.0 1.0 8.3 15 -• - �� 1.50 8.6 : R1i157 M,4 tS14K6E 86 5$.0 1.0 510 1.0 8.7 15 �� 25 0 .. -0.8 ' _, ; _ et- r' X I. q x154: -Tire f;.. K ` ': Ai IIIMMI Ir. Irtli FINIIIIMIIIIMI Nr. WU MUM 111010111101111111111.111 R1-12511444 C9 KSE tillithiga - 28, 601-132314144 C.S24K6E 20-1/4 411% . 1 -4 400... R114o01M4 CS2'/KiE 21.5 121 0 3.1 25.6 12.1 105.0 Si 182 20 T.0 52 0 1.3 92 15 R'H600M44 GS3;iKOE 27.8 125.0 3.1 31.7 16 -$ 102.0 3.1 20.9 26 2.8 48O - 1.1 10.4 i5 ® 11'10551444 '11 90 RST45C15 2 &1068 • 0.5 15 -- -- - - -- - -_ 0 5... 15. l,. 111 -110c 444 RS'ri1C1E 6.9 342 0.5 8 -4 15 4.7 - 3t0 0.5 82 R•H1511144 CS10K6E : 11.1 56.0 - - 1 0 131 18 7.2 51 0 t 0 9.2 - R•H251M44 R•H3_45H44 LS14K6E i'S.`40K6E 124 17.9 61.0 98.0 1.0 144 18 8.5 55.0 10 10.5 15 -- -- ®� ®, 3.1 22 27 13 -3 75.0 31 17.4 21 -- -- FCH4W1f44 CK27K6E 2:3.7 121.0 ® 27.fl 34 14 -1 705 -0 3.7 182 22 - ®.1. ®�. R1- i50o144 CS33K6E 30.1 125.0 =e� 342 42 18-5 102.0 3.1 20.6 25 -- - R1H0751-44 R-S70CIE 7.0 1 -178 '+� ®ini 21.0 11311111111311111111111121011111011.1111MMIIIII01 R'H100L44 1159701E 11.0 510 0.5 125 7.0 350 OS 8.5 -- - - - :, R-H165L44 CFO K6E 11.4 592 1.0 13.4 7.0 52.0 1.0 9.0 ® ---- -- -- --. R11215L44 R*H075L44 16 -7 870 10 18.7 24 102 720 1-0 122 16 - -- -- - -- 1111.316L44 68 206 105.0 1.0 225 28 12-3 85.0 1 -0 74A 16 6.6 420 04 7.5 15 56 A 23-1/4 27 -314 17-114 180 68 R111135 L44 iiiiarMiiii R•51008844 KAR -010E 6.4 40.0 05 7.0 15 28 270 0.5 5.3 15 1.8 15 0 OA 23 15 R•S20Qid44 KPX -024>E - 9.1 55.0 1.0 1 111 1. 15 5.5 50.4 1.0 7.8 1. -- 15 -- - -- -- --- W52510144 ERC -021E - - - - -- -- 7.9 46.0 7.0 29. 16 a1. 239 0.8 4.4 16 H S300rm4 ERE-0,31E 15.3 869 10 17.3 22 112 820 1.0 132 16 5.2 41.0 - 08 Si 15 R5o6a1.44 KAN -006E 3.6 24.0 0.5 6.1 15 22 132 0 -5 3.7 15 -- -- KAM -007E -- 5.1 R'S0751_44 KAM-007E 5.6 35.0 05 71 15 3.2 19.9 05 47 15 - -- -- 5/8 -- --- R51001.44 KAJ -010E 6.9 40.0 0.5 8.4 16 4.5 270 0.5 6.0 15 -_- ...- -_ -- 70 R15150.44 KAL -016E 9.9 55.0 1.0 119 18 8.9 50.0 1.0 8.6 15 - -- -- -- -- -- R52001.44 EAV-021E 147 102.0 10 16.7 22 7.4 500 1.0 9.4 15 - -- - -- -- -- --- ft-53001.4e' Lai-1-032E 18.7 s 105.0 rwasw 1.0 19.7 24 122 112.0 1-0 14.8 19 6.0 562 OA 62 15 R120414444 ZS15K4E 13.6 55.A 1.0 15.6 120.0 D 93 560 10 112 16.0 43 270 0.4 - 52 159 R'02601,444 Z512*(41 164 73 0 1.0 184 25.0 9.7 63 0 1.0 11,7 15,0 S.0 31.0 0.4 52 15.0 R °0315M44 ZS211(4E 164 88.0 32 - 20.6 25.0 11 1 77 0 32 152 17.0 5.7 38.0 2.1 8.3 .150 W03508444 Z-i20(4E 2a.7 109.0 32 24.9 30.6 13.0 88.0 3.8 17.8 20.0 7.1 44 0 2,1 9,7 150 R'04001444 ZS30(4E 26.8 129.0 32 31 -0 38.O 15.0 09.0 32 192 23.0 82 49.5 2.1 10.8 152 R°0000I444 Z1339K4E 31.5 1609 32 300 44.0 21A 123.0 32 25.0 31.0 9.6 62:0 21 122 15.0 W065010144 ZS46K4E -- --- - -- - -- - 23 -9 156.0 32 281 34.0 9.3 70.0 2.1 11.9 15 -0 _ R•0200L44 ZFOSK4E 13.6 55.0 1:0 15 -6 20.0 9.3 55.0 19 112 16.0 4.8 27.0 04 52 15.0 11•0250144 ZF06K4E 16.4 73,0 10 16.4 25,0 9,7 630 1.0 117 16.0 50 310 0,4 5,9 f 16.0 R•0300L44 2609444E 164 88.0 1.0 18.4 25.0 11.1 77.0 19 13.1 17.0 6.7 39.0 0.4 6.6 15.0 Fr03011.44 L1=11K4E 20.7 109.0 1 0 22.7 300 13.5 68.0 1.0 15,6 20.0 7.1 44.0 0.4 80 16.0 WC:1400144 Z613K4E 268 129.0 32 370 38.0 15.0 99.0 32 19.2 23.0 PP 57.0 2.1 10.8 190 IrOso0L44 ZF15K'4E 31 5 150 0 32 35. 6.7 440 21 4 1211.0 32 2S.13 31 0 9.6 Re 0 2.1 12.2 2a0 IR1_16064_44 ZF18K4E -- - -- -- 23.9 156.0 32 281 34 0 9-3 70.0 2.1 11-9 23.0 R'IJb00t.M4 2DD•R93KE _.. .... _.. .. , . spa , 29 120.0 32 26 -5 10 60.0 - 17 121 16 : RU600W 4 201_ R7BKE ' � 316 1690 32 358 44 '': .. "13.5 050 1 1 154 20 .. R1)3001.44 2DFF16KE -- - -- , --- -- 16.8 : 102.0 3.1 209 26 8 -1 620 7 R'4401L44 21-1L -F2OKE ' -- -- - - -- 26 3 161 -0 3.1 30.4 38 102 60.0 1 -1 11.6 11'!15001.44 22A•F23KE - - -- - - - ,.. 2138 161.0 31 32.9 41 10.2 60.0 1.1 .1 1.9 " 1 /4s c011,4 *sS01 Is rated fur 230/1/00 appi cation only. Uxr Buick Boost aansio mer for 208i1 V t liAat Ural Am 3 irrtudes ap{.roxinsa1e sP wance For c-0n1rr31 rkrr-r4 rs lams' 1A - 208r230V; o.56 - 45014. $ MCA 14irirrvm Circui1 Arnpaeity dcw 051 iruk.91e ,evaporate -(-} EathIGal recptir rents. (Evaporator In (odor au4,.o defrost heater amps) 12 NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. 3FINEWINE COOLER DETAIL NO SCALE Walk -In and Fine Wine Refrigeration Wiring To Any Additional: Units Walk -in Controls Evaporator, Thermostat, Solenoid, Double Throw Switch (by IC), and Defrost Clock, to be wired per diagram above Walk -In Condensing Unit Walk -in condensing units to be located on roof of building above walk -in location. Permits, as required, by CC. Provide 23 0v 3 ph with fused disconnect and 120v service receptacle. Compressors) equipped with PCS motor(s) N Normal Operation - *Thermostat cycles solenoid *Fans operate continously *Clock kills t -stet and solenoid *Fans operate continously Tans Switched Off: *Switch kills t -stat and so enoid whenever it turns off to avoid liquid slug at compressor varsi NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SiTE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. FINE WINE COOLER DETAIL NO SCALE SPE-CiF /CATIONS ' R -404A MODEL NUMBER COMPRESSOR RECR NOM 0 90% R -4044. (i-BS) CONN. (013S, IN-) FIG FIG Damns] (n-) APPROX. SHIP WT. (-) Sound Dn DAM MAT 1111311111031 __ ©® R11055M44 RST45C1 E 0.50 5.1 -- 573 A 28114 27-3/4 17.1/4 R'H080A944 RST55C1 E 0.76 S.1 1! &8 A 2844 27 -314. 17 -i!4: - R14080M44 RST84C1 E 0.75 5.1 5f8 A 2 8-14 27.314 17.114: 160 27+,5 R'1-1100N144 RS7OC1E 1.00 S.1 58 A 2 &ftb 27 -3rf 17 -i!4 16T R'H125•44 R SS7C1E 125 8.6 - 2 &f /4 17 -114 195 271/2 R'H151M44 CS10K6E 1.50 8.6 : 1/2 r® 281!4 17 -1!4 205 �. '9..“ . 3 !♦ . - 7* 11B7r 11111111111111111 i7" s Immo w �Sl7Mf![''1S!!7infirmi mormus X I. q x154: -Tire f;.. K ` ': Ai -. 7i .. 1/2 5/8 tillithiga - CS20118E 3 -00 - 20-1/4 411% 48 28-976 - 1P? 42-1M 32-114 - R1H500M44 0838K6E 5.00 24.3 ® ,ISjtl!♦ Q 33 42 -1/4 32 -114 405 ! R'11055H44 2 &1068 0.50 5.1 818 5/8 A 28-1/4 27.3/4 17 -114 165 ' 68 R'H0901144 0.75 5.1 3/8 Sr8 A 28-114 27 -314 17 -1/4 173 66 451/7 58 1 00 -- EXT 1/2 R'H15001H44 CS10K61E 1.50 . : 28-I/4 _ 17 -114 221 - R *11251144 CS14K6E 2.50 8.6 318 Al 7 B 3&1/4 17 -1/4 253 72 114 132 514 4 C320I E 3.00 13.7 112 1 -178 D ® 42 -114 32 -114 297 75 R11400844 C327K6E 4.00 24.3 1/2 1 -1/8 D 33 42.1/4 321/4 416 73 8115001144 cS33K6E 5.00 24.3 1/2 1 -1/a D 33 42 -114 32.115 433 72 R*H075L44 RS70C1 E 0.75 5 -1 3/8 518 A 28-1/4 27 -3/4 11 -1 /4 157 68 14111100L44 RS97C1E 1.00 5.1 348 56 A 23-1/4 27 -314 17-114 180 68 R111135 L44 iiiiarMiiii Mal MM. MEIN - w mum mum R112/ 5L44 CF09K6E 2.00 8.6 3/8 718 B 2&164 27 -3/4 17 -1/4 243 75 R'14315L44 CF12K6E 3.00 13.7 1/2 1 -1/B C 28-1/4 3&114 20-114 ' 255 77 RS1001444 KAR -01 OE 1.00 5.1 3113 5$ A 28-1/4 27 -314 17 -1/4 205 65 R1S2001444 KAK -020E 2.00 8.6 318 ' 718 B 2 8414 3 &1/4 17 -1/4 270 70 R'S2501444 E C-02 1E R 2.50 8.6 1/2 1 -1/8 B 2 &114 38-1/4 17- 114 360 70 R 'S 3fUM44 ER F -031E 3.00 24.3 1/2 M 1.1,8 0 32 42 -1/4 32.114 415 70 8/3050144 KAN -005E 0.50 5.1 318 518 A 28-1/4 27 -314 17 -114 189 67 R'S075L44 KAM -007E 0.75 5.1 18 58 A 28.1/4 27 -3/4 17 -114 205 67 R4S100L44 KM-010E 1.00 5.1 318 5/8 A 28-1/4 27-3/4 17 -114 220 67 R*8150L44 KAL -016E 1.50 8.6 3/8 7/8 B 28-1/4 38.114 17.1!4 248 70 R*5200144 EAV-021E 2.00 8.6 319 7/8 B 28-114 38-1/4 17 -1/4 290 70 A 8300144 LAN-032E 3.00 13.7 1/2 1 -1/8 _ C 28-1/4 38. 114 20 -1 /4 383 70 R*0200M44 ZS15K4E 2.00 13.7 112 7/8 C 28-1/4 38-1/4 20 -114 215 71 W02509444 ZS19K4E 230 13.7 1/2 1.146 C 28-1/4 38114 204/4 230 72 _ 13'0315M44 ZS21K4E 3.00 13.7 1/2 1 -1/8 D 33 42- 114 32 -114 315 74 R10350444 ZS26K4E 2.50 13.7 1t2 1 -118 D 33 42 -1/4 32 -1/4 335 74 R40400M44 ZS3OK4E 4.00 243 1/2 1 -1 /8 D 33 42 -114 • 32 -114 352 74 R10600M44 2828K4E 6.00 24.3 1/2 1 -178 D 33 42 -14 32 -1/4 383 74 R*0650M44 ZS45K4E 8.50 24.3 5/2 1 -118 D 22 42 -1/4 32 -1/4 405 76 R•0200L44 ZFO6K4E 2.00 13.7 112 7/8 0 28-1/4 38-1/4 20-1/4 230 71 1310250L44 ZFOBK4E 2.50 13.7 112 718 C 28114 38-14 20 -1/4 240 73 R'03001.44 ZFO9K4E 3.00 13.7 1/2 1 -116 C 28-114 38.114 20.1/4 245 73 11•0301 L44 2.F11 K4E 3.00 13.7 1/2 1-1/8 C 28-1/4 38-114 20 -114 255 72 R'0400L44 ZF13K4E 4.00 24.3 112 1 -118 D 33 42 -114 32 -1/4 352 74 R•0500L44 ZF15K4E 5.00 24.3 12 1 -118 0 33 42 -114 32 -114 367 74 R•0600L44 ZFIBK4E 6.00 24.3 112 1 -118 D 33 42 -1/4 32 -1/4 382 76 R*05001v144 20D -R63KE 5.00 24.3 1/2 1 -143 D 33 42 -114 32 -1/4 630 78 R"060011444 20L -R78KE 6.00 24.3 518 1 -118 D 33 42 -1/4 32 -1/4 630 78 R'D300L44 2DF -F161(E 3.00 24.3 112 1 -V8 D 33 42 -114 32 -1 /4 575 78 R'D400L44 2D1-F20KE 4.00 24.3 112 1 -1./8 D 33 42 -1 /4 32 -1/4 600 78 R'D500L44 2DA -F23KE 5.00 24.3 112 1 -1 /8 D 33 42 -1/4 32- 114 620 78 fi Estimated dbA values at 10 feet from the unit. Correction factors: Deduct 6 dbA. for 20 to 40 feet. 12 dbA 0 40 to 60 feet Ratings at rite outlet of me discharge air. The acSJal measurements may vary depending upon installation variables. Environmental factors may have a significant influence on this data. See page 15 tar dimensional drawings. 13 NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. FINE WINE COOLER DETAIL NO SCALE Physicai Dimensions Al! Models 39 Mc * Figure f3 -17 -114" height (Uses 2 grill pieces as shown). Figure C - 20 -1;4" height (Single grill piece, not shown). Fitt. D 33 i Suction,, 29 o1C- 32-4 421 43 cFc 434 D -N. /r Electrical Access f Right Side Electrical Connections 15 NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. FINE WINE COOLER DETAIL NO SCALE Russell Physical Data ABndels y TYPE RefigerantConnections No, of Din)errSions maws) Ship 14t. 1 All Liquidt AA Suction AE/AH/AG Suction AA AEJAIVAG 8 G 18418 441 112 O 58 ODS - - 19 27+,5 33 18-536 1/2 5/8 - 2 19 - - 271/2 34 18.666 - 1/2 5/8 - - 2 19 - - 27:2 36 28-766 1/2 5/8 - - 2 33 - - 411% 48 28-976 - 1P? 718 - - 2 33 - - 411,E 51 2 &1068 - EXT 1/2 7M - - 2 37 - - 451/7 58 28.1M.S -- EXT 1/2 7)8 - - 2 33 - - 411/2 60 28-134B - EXT - 1/2 716 _ 2 37 - - is 45+. 38-1608 - EXT 1M t-SB - - 2 55 - - 631/2 79 38 -125B - EXT 1/2 1 -118 - - 2 55 - - 6311 84 48.2128 - EXT 1/2 1.148 - - 3 361/2 3811 - 811/2 254 48.2846 • -- EXT 1/2 1.1/8 - - 3 36%. 381 - 8111 262 58 -2756 EXT 1/2 1.118 - 3 541/2 381 - 991/2 312 88-3188 - EXT 1/2 1 -1/8 - - 4 381/2 38 38% 117% 354 68.390B - EXT 1/2 1-18 - - 4 -_;y 38 ^ +h y 370 16' 39 16-36. 1 • I • • • ; • • : • s1 2 19 - -" 27112 41 16.488 16418 EXT 1/2 518 518 58 2 19 - - 271 44 16 -588 16-486 EXT 1/2 5/8 5/8 5/6 2 19 - - 27111 47 26 -70B 26-608 EXT 112 518 718 SIB 2 33 - - 411/2 54 26-876 26.758 EXT 112 718 7/8 5/B 2 33 - - 41% 55 26.1158 26-926 EXT 1/2 7/8 7/6 51B 2 37 - - 45 +1 62 36.1456 36 -1206 EXT 1/2 MI 718 55)8 2 55 - 631 78 36.1708 38 -1408 EXT 1/2 1-1/8 1.1/8 5/8 2 55 - - 631/2 85 45.1926 46.1648 EXT 112 1.18 1.1/8 5/8 3 38% 36% - 811/2 255 46 -2308 46 -1858 EXT 1/2 1 -1/8 1-1/8 58 3 38% 381/2 - 3111 285 56-2450 56 -2108 EXT 112 1 -118 1-118 5/8 3 54% 361 - 9911 306. 66.295B 66 -245B EXT 1/2 1.18 1-1/8 5/8 4 361/2 36 36% 11Th 353 68.3456 66.2808 EXT 1/2 1 -18 1-118 58 4 38% 36 36% 1171/2 368 14.42: 14-37= •• 1 L I s 5t8 •� � : •A'- 2 19 - - 2 §$ 42 24 -848 24728 EXT 112 718 78 58 2 37 - - 451; 43 24-1058 24-85B EXT 112 78 718 518 2 37 - - 45172 55 34-1309 34 -1058 EXT 112 7/8 7/8 518 2 55 - - 831.E 79 44-1700 44 -1409 EXT 1/2 7/8 1.118 5/8 3 361/2 3634 - 8112 251 54-2158 54-180B En 1/2 1.18 1.1/8 5/3 3 5414 36144 - 9912 299 64 -2558 84 -2158 EXT 1/2 1 -1)8 1-1/8 516 4 3614 351'/ 3611 117V 340 Installation Notes: (1) install 12" away from back wall, (2) Drain connection on AA and AE units are centered on drain pan; and on the left end (facing air discharge) on AH and AG units. (3) For long air throw requirements, specify high throw fan guard. (4) Unit height at drain end of hot gts models is as follows: 1,2, and 3 fan models = 15 -7/8', 4,5, and Stan models = 16.1/4". A WINO ,BONt *MOWN - ....-� 0•••••• prim --1 rw h/ tt rep I0111CALOa TOP LITS MOP AI ,AOIAA11S Lams 6 sucramoma NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. FINE WINE COOLER DETAIL No . SCALE REVIEWED FOR. ODE COMPLIANCE APPROVED MAY 11 2012 ;, ■ City of Tukwila BUILDING DIVISION IRECEIVEik . CITY OF TUKWILA APR 2 it 2012 PERMIT CENT-ER to 0 Li cc) Q • C Ty = O w CL Ur)• O cL O LL ai to U� UQ)N w al � O r U- 4, O Om'D W l0 Z W C zQ- Q W 0 0 Imo z to L L07-120- CO r0 CO COQ. Z CO re m O O1• -000 Q U Va O ILI • Z rt c9 rnz o� N CnS --- 0 0 rn Z n N U) z 14 a Qa ieNrosg ow° O =alp le 0X °W OM ova ®OO ®118- CONTRARY TO THE 06 m c4 *ma gl k• law' en z VI HORIZED AND MAY z N U W O - a.. z 0 W U, ce tr N O ce W ec to a-' a co U 51 En W rn U Lu re O J 0_ 8 0 0 FOR REFERENCE ISSUE BLOCK 04/05/12 PERMIT SET CHECKED BY: TA/RO /SJ DRAWN BY: RRR FILE: '�`a,i //�i '-d `�0 49091 .� " 'SSI ()NALRV" AP 2012 SHEET NAME: MEP VENDOR COORDINATION PLAN SHEET NUMBER: MPEOEI pPrecautlons when using the control valve) ILUMIDOR WALK -IN Walk -ins are assembled from components by various manufacturers all equipment is supplied by Total Wine vendor dor Modern Store Equipment All wiring, refrigeration., and condensate drain piping, both labor and material (including refrigeration gas) are by General Contractor. WALLS & CEILINGS are manufactured by Kysor Panel Systems prefabricated panels with 4" urethane insulation and finished in Non- painted 26 gauge galvanized steel. Modem Store Equipment erects panels at site. Exposed panel exteriors are to be finished in painted sheetrock by General Contractor. ENTRANCE DOOR: Eliason FCG -1 provided and installed by Modern Store Equipment WINDOWS are manufactured by Schott Gemtron and will be erected at site by Modern Store Equipment. There are no electrical connections required on Humidor Doors & Windows. AC /Hum:my SYSTEMS are manufactured by Mitsubishi and supplied by Modem Store Equipment, Wiring is to be as per standard Mitsubishi wiring diagram • eat by o Store Equipment. All Electrical, Plumbing and (attached). Equipment ltxrat by Modern g Refrigeration Connections completed by appropriate contractor. Condensing unit is to be located on top of Humidor Box above Evaporator Blower inside Humidor. Mitsubishi Model: 141U-A09 W A Dimensions: 11 t /4 "d x 31 1/2 "w Electric: 115/1/60 Electric Load: MCA 14.0 Evaporator Blower located on inside center of back wall in walk -in box at ceiling. Modern Store Equipment will install unit at site. Drain connection to Mitsubishi Specs & local Code Mitsubishi Model: MS- A09WA Dimensions: W 14 x D 15 x H 10 x L 32 Electric: 115/1 Electric Load: M CA1.2 Amps Humidifier: manufactured by Nortec and supplied by Modern Store Equipment, Wiring is to be as per standard Nortec wiring diagram (attached). Modem Store Equipment will mount equipment and Wire Humidistat Control Circuit (Low Voltage). All Electrical and Plumbing connections Completed By Appropriate Contractor. Nortec Model: RH Space #2548758 Electric: 1 15/ 1 -. 1lAeCi1Ic Loa::. 12.7 Amps NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. HUMIDOR COOLER DETAIL NO SCALE 2-4. PIPE FORMING AND DRAIN PIPING 2-4-1. PIPE FORMING • Piece the drain hose below the refrigerant piping. • Make sure that the drain hose is not heaved remelted. • Do not put the hose when applying the lope. • When the drain hose passes the roan, be sure to wrap insulation material (obtainable at a store) around it. Netot Screws may damage the cover of refrigerant pipe during left piping. Make sure not to damage the ewer of refrigerant pipe. Left or left•rear piping Nolan Be sure to reattach the drab hose and the drain cap in case of left or left-roar piping. Othemrise, it could taus@ drops of water to drip down from the drain hose. 1) Put the refrigerant piping and the drain hose together, than firmly apply felt tape (7) tom the end. Felt tape (7) overlap width should be 113 the tape width. Use a bandage stopper at the end of fan tape (7). 2) Pull outthe drain cap at the rear right of the indoor unit (Fig. 1) • Hold the convex section at the end and pull the drain cap. 3) Pun outthe drain hose at the roar left of the indoor unit (Fig. 2) • Hold the claw marked by the arrows and pull out the tan hose forward. 4) Put the drain cap into the section to which the drain hose is to be attached at the rear of the indoor unit. (Fig. 3) • krsert nd sharp •edged took such as screwdrivers nto the hole at the end of the cap and insert the cap fairy into the drain pan. 6) Insert the drain hose fully into the drain pan at the rear right oftho indoor unit. (Fig. 4) • Check if the hose is hooked securely to the projection of its inserting part at the drain pan. 6) Insert the drain hose into wall hate sleeve (C), and hook the upper part of indoor unit on installation plate (1). Then, move the indoor unit completely to the left in order to make placing the piping In the back space of the unit easier. 7) Cut out a piece or cardboard from the shipping box, roll it up, hook it onto the back rib, and use k as a spacer to lilt the indoor unit. (Fig. 5) 8) Conned the refrigerant piping with the extension pipe (Be 9) Thrust the lower part attire Indoor ant into the Installation date (1), Rear or downward piping 1) Put the refrigerant piping and the drain hose together. their firmly apply piping tape (G) from the end. 2) Insert the piping and the lain hose into the wall hole sleeve (C), and hook the upper part of the Indoor unit on the installation plate (1). 3) Check lithe Indoor unit is hooked securely on the installation plate (1) by move.g the uni to left and right 4) Thrust the lower pan of the Indoor unit into the Installation date (1). RIg it piping Note: Bakes performing the following, make sure that wiring is completed, and the conduit cover is installed. (Refer to 2.3.) 1) Put the refrigerant piping and the drain hose together, paskion them to let side, and than firmly apply piping tape (G) from the and 2) Insert the piping and the drain hose into the wall hale sleeve (C), and hook the upper part of the indoor unit on the installation plate (1). 3) Check lithe indoor unit is hooked securely on the installation plate (1) by moving the uni to let and right 4) Thrust the lower part of the indoor unit into the installation date (1). 2-4.2. DRAiN PIPING • lithe extension drain hose has to pass through a roan, be sure to wrap 5 with corn - nwrcialy sold insulation. • The drain hose should point downward for easy drab flow. (Fig. 1) • If the drain hose provided with the indoor unit is too short, conned it with drain hose (4 that should be provided at your site. (Fig. 2) • When connecting the drain hose to the hard vinyl chloride pipe, be sure to insert 5 securely Into the pipe. (Fig. 3) j4xu plpn as pipe Indoorfouldoor unit nranbrn wire 03 -Felt twos (7) F1gn,J laps IS ++t F ?a-o ( Cut offm case IF ta{x17) .`Mom) , ca 3,Ie iI rNrbn.[- Gain. rte: 0.0 EVaR1 CaJ ' Fig. 1 MAX- A15117NA MY. Al5117NA _ . Qran ruse Fig .2 •_. J-.,._ • Crai, hose ' _- Fig .4 wen t'ap Fig -3 sue. ` "f Fig 5 1 1 0 3 at car in case of cICMn- wardl aping. Cut oat in case e! right plasm; RI- To the left cram an have sL 10,32. in mm) Pg. 2 27.315 in 170 OM) ,rniere Dram has,.. Red vtnt,r1 ctxarede pipe 1 L' 1.3115 In. 1.0 mm) Fig. 3 Do not make dean doing as shown below. n,uiS'ed rain orator An" Water Blow At least Tip car dram i -31!32 in- hose amud ,5Omml n water ' l4 =set St, NOTE: INFORMATION SHOWN iS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. HUMIDOR COOLER DETAIL NO SCALE 1 -2. SELECTING THE INSTALLATION L • Where airflow Is not Worked. Where cool eir spreads error the entire room. Red wail wthoutvenation. Where 5 is not maenad to dined sunshine. Where easily dashed. At a distance 3 R (1 m) or more away from your TV and radio. Operation of the air conditioner may inter- fere with radio or TV reception- An amplifier may be required for the affected device. In a place as far away as posedthe from !Wormed and incandescent 5 so the infrared rernde corded can operate the air non ttioner normally). - VYhere the air titer can be renewed and replaced easily. Note: Install indoor unit at a high position cn therwot where ale can distribute over he entire roam. • Where t is easy to operate and misty visible. • Where children cannot toucan 5. Select a position about 4 5. (1.2 m) above the floor and check that signals from the remote controller are surely received by the indoor unit from that position (beep' or 'beep beep' receiving tone sounds). Ater that. attach remote controller holder to a pillar or wall and install wireless remote controls . 1-3. SPECIFICATIONS OCATION Note: In rooms we're inverter type fluorescent temps ere used, the signal nom the wireless remote art seder may not be received. 011V)O(R UNIT • Vetere it is not exposed to sitong -rind. • Where airflow is good and dustless.. Where neighbours ere not annoyed by operation sound or hot air. • Where rigid wall or support is available to prevent the increase of operation some or vibration. • Vetere there is no risk of makeitIS le gas leakage. • When krsienlng the unit at a high levet be nuxe to se- cure the unit legs. • Mere it is at least 10 Fre (3 m) away from the antenna of TV set or radw. Operation of the air candle on& may interfere with redo or TV reception in areas where re ception is weak. An ampleier may be required far the affected device. • Install the unit horizontally. • Please instal it in an area not affected by snowfall or blowing stow. In areas with heavy snow, please instal a canopy, a pedestal ardor same bade boards. 14 -1. POWER SUPPLY AND INDOOR/OUTDOOR WIRE CONNECTION • Power should be taken from an exclusive bnnehed circuit. • Wiring work should be based on applicable technical standards. • Wring connections should be made following the diagram. • Screws should be tightened so they wit not loosen. Connecting ires and conned) ound wire n9 rig !P • Use sold aondudar AWGI4 or stranded conductorAWG1B, AWG18, or AVVIG14. ▪ Use double Insulated capper wire with 300V insulation • Use copper conductors wee. ' Fellow local electrical code, Paws supply cable and ground wire • Use sold or stranded canrLdorAWG14. • Use copper conductors only. ' Fellow beet electrical code. Note: Men the index unit is powered from the outdoor nnik a disconnect meat may need to be installed to power seedy circuit (between indoor and outdoor unit) depending as local rode. 13 -2, REFRIGERANT PIPES • Ensure that the 2 refrigerant pipes tee insulated to prevent xondensetion, • Retigerem pipe bending radius must be 4 in. (100 mm) or more. CAUTION Be sure to use the insulation of specified thickness. Excessive thickness may cause incorrect instalation of the indoor unit and lack of thickness may cause dew. drippaga. • This unit has flared connections on both Indoor and outdoor sides. • Remove the outdoor units valve cover, then connect the pipe. • Refrigerant pipes are used to conned the Indoor and outdoor units. • Be careful not to crush or bend the pipe in ripe trending. • Refrigerant adtustment... If pipe length exceeds 25 R. (7m). addltionai refrigerant (12410A) charge isreaiired (The outdoor unit is charged with refrigerant for ewe length up to 25 ft. 17 n(! Elecbicsl specification note: • It is advisable to make a pgrhtg loop near outdoor unit me as to reduce vibration tranamnted from there. • For increased efficiency, install the outdoor unit in a location where =Minima deed sunlight or excessive water can be avoided as much as possible. Nate When operating the ale condition in low outside temperature, be sure to Fellow the Instructions desct sec below. • Haver Instal the outdoor unit In In a a where its air inlet%oudet side mey be exposed directly to wind. • To prevent exposure to wind, install the outdoor unit . witty its air inlet side facing the wall. • To prevent exposure to wind, it is recommended to in stall a bake board on the air outlet side or the outdoo unit Avoid the following places for installation where air conditioner trouble is liable to occur. • Where flammable gas could leak. • Where there is much machine oil. • Salty places such es the seaside. • Where sulfide as is generated such as a hot spring. • Where there is high - frequency or wireless equipment. MODEL M82- AO9I12NA MAX- A15117NA MY. Al5117NA M9• AOPWtA M6• A121WA 3 s Id -�, h P For hired sr .>i s+mPhr ( HzJ P ewer V PHASE 23S/230 60 1 1 0 3 Min. Circa Arrrpadty 1.0 1.0 1.2 1.2 Fan motor F.LA ) ( 076 0.95 lAfl1T 0.0315 (0.9) ' Pknver soppy (V, PHASE, H4 2081230, 1, 60 115 1, 50 Max. Fuse size (time delete (A) 15 16 55 20 Mkt. Circuit Armeey 12 14 14 16 Fan motor (F.L.A.) 0.62 0.52 0,53 0.928 Compressor (R.L A) 7.9 10.1 9,30 10.82 (L.R.A) g.2 12 47 56 Cored voltage Indoor uni - Remote controller: (WFireless) Indoor unit - Outdoor unit: DC -12-24V ,Polar) Indoor unit- Remote controller: (Wireless) Indoor unit - Outdoor unit: AC115V Pipe side diameter Minimum wall chits- miss Insulation them. insulation male- rial inch (mm) Height difference For hired 114(8.35) (o.$) 5/16 (8) Heat resisting foam plastic 0.045 Spectre gra" Forges kf9Z A09112NA MS -A08WA 3/13(9.5Z ants {0.8) 5118 (8) MSZ- A15117NA MSY -A15/ t7NA MS -Ai2WA 112112.7) 0.0315 (0.9) X 6 (8) Limits htBZ- A09(12f15i17NA MSY.A151171 A M8•A89r12WA Pipe length 651t. (20 m) max. 655, (20 m) max. Height difference 40 fe (12 m) max. 35 f. (10 m) max. No. of Bence 10 max. 10 max. ngth 1 Pipe leUp i Ze ft. (7m) No additional cnerge is required, Excen,eng 25 R (7rn) Additional charge is required- {Refer to the table below.) Refrigerant to be added MSZ- A09/12115117NA MSY- A15M7NA 1.132 oz each 5 R. (Maim) MS- A09r121PiA 1.08 oz. each 5 ft. (20ghn) NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. HUMIDOR COOLER DETAIL / NO SCALE DOOR UNIT .INSTALLATION 3 -1. CONNECTING WIRES FOR OUTDOOR UNIT 1) Remove the service panel. 2) Remove the conduit carer. 3) Fix the conduit connector to conduit plate (A models)/conduit cover (B models) with lock nut then secure R against unit with screws. 4) Loosen terminal screw, and connect Indoor/outdoor unit connecting wire (A) from the indoor unit correctly on the terminal block. Be careful not to make rte- wining. Fiat the wire to the ter- minal block securely so that no par Bits core ts appeared, card no external brea is conveyed to the connecting section of de terminal block. 5) Firmly tighten the terminal screws to prevent them from loosening. After tightening, pull the wires Ilghty to contain that they do not move. 6) Connect power supply cad (K). 7) Conned ground wires of indoor %outdoor unit connecting wire (A) and poorer supply cord (te to the TB support. 8) Install the conduit cover. 9) install the service panel securely. MUY- A15r17NA PA U Z -A09 '12115; 17FIA A MU -005 WA PAU Y -A 15;1751A PA U Z -A09.1 2+15, 1 7N A alb Diu MIN • Make earth wire a title longer than others. (Mora than 1.12132 in. 35 mm) • For future servicing, give extra length to the connecting wires. hdoorlcutdaor unit canneding wire (A) Frnvw supply curd f K) Conduit cover B MU -Al2WA Termini 51 • Make earth wire a Glle longer than others. {More than 1 -12/32 in- 35 mm) • For future servicing, give extra length to the connecting wires. Power Ripply cord 11() In,sar:riatdvor unit ra r motIng r4Ye (A .J 3 -2., FLARING WORK 1) Cut the capper pipe correctly with pipe cutter. (Fig. 1, 2) 2) Completely remove al burrs tom the cut cross section of pipe. (Fig. 3) • Putthe end of the copper pipe to downward direction as you remove burs in order to avoid to let burs drop in the piping. 3) Remove flare nuts attached to indoor and outdoor units, then put them on pipe having com- pleted burr removal. (Not possiah to put them on ater faring work.) 4) Flaring work (Fig. 4, 5). Firmly hold copper pipe in the dimension shown in the table. Select A mm tom the table no: aiding to the tool you use. 5) Check • Compare the fterad work with Fig. 6. • If flare is noted to be defective, cut offthe Oared section and do flaring wok again. Pipe diameter Inch (mm) Not inch (mm) _ midi type tool for R41 0A A inch (mm) clutch type tad for R22 Wing nut type tool for R22 Tightening .,- .....,.,...- ..___.®... N•m torgrk• -._. . -_ ft•h (k( n) a 114 (6.35) { 17} Oki 0.02 (Oto0.5) 0.04 to sae (ID to 1.5) 0 (1.5 )k ',.... 13.7 m 17.7 {14010 1180) x 310 (9.S M (22) 34°310 41.2 251042 (3501o420j x12 (12.x 112 6) Otto .08t 0.10 (2.0 to 2.5) '49flto58.4 381042 (5001o675) 01 5l9 (15.88) 68 (29} 735 to 78.4 54to 58 (750 lo 800) rY� riper Fig. 1 Gana yo'-� i"'j '--t -° No go rid p�_1L'.1,6 II'T„'BI LI•a `;� L;+r Tilted Uneven Burred Fig. 2 ,Bun Copper pipe • Spare reunion Pica nutter � I Fig, 3 ,.., Frenngl tong rau[on typo VWirsg nut type Fig ,4 + Dien it . Flom nuk m Copper pipe Fig.6 Inside is s'him Simd @ii at Ing uvrtI'ut any around \ f strolonas. ‘1,4, Evan length as acoursd Fig. 8 2 (E) I NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. HUMIDOR COOLER DETAIL NO SCALE 1-4. INSTALLATION DIAGRAM ACCESSORIES Check the following ports before installation. < Indoa unit> (1) Installation plate 1 (2) :madden plate ruing screw 4 -25 mm I 5 (3) Remote controller holder 1 1 4 Winne crew tar i3) 3.5 � 16 mm' @tack 2 (E) I 2 to 5 (5) 8dtemy (AAA) for (6) I 2 (6) Verelese remote controller 1 1 i7) Fettape(Forlellor kfl -rear piping) 1 1 (8) Alr•laantng fawn 1 PARTS TO BE PROVIDED AT YOUR SITE (A) )nownbrtdoar unit coin act re wire` 1 (H) Extension pipe 1 (C) Wailho)esIoBve 1 )) Wei Mounter 1 • (E) Pipet e:1g bard 2 to 5 (F) Fixing screw for (E) 4 = 20 mm 2 to 5 (G) Ming tape 1 (H) Play 1 ar Fixing scrim (2) Ft5(n tea Alert. In W1e Wain a mark ° V I Dratghose • 0) (or son PVC hose, 19132 in. (15 mm] erns( tie, or had PVC pipe VP16) 2 to 5 (J) R.M9Matlan oil 1 (K5 Pee* nip *ly cord 1 • Notes Piave indoorkutdoer unit connecting wire (A) and power supply acrd (K) at least 3 ft. (1 m) away from the TV antenna wire. Links should be entailed by licensed contractor according to local code requirements. Be sons 10 ua wag hole sleeve (C) to prevent Indoor ;ant indoorIouutdoor connecting wire (A) From contacting wet nc e metal pegs in the wail and sleeve (C to prevent damage by roderm in case the weft is hallow. MU -AOSWA MY- A15,17NA .' mte - Ae9;12 15'17ree fxasl.ali r upon 4. r.. !1nOmm1 or ,ttr.t any t•t JC(ok1 In front and en tooth sides of the ant Open Iwo sides of Inrt. node, or r_er w de. Unit: inch 2 -10 mm x 21 mm slot 4V811 bele erPer (L +f 'Seal tlw wall hole -- '' ,gap nth putty (H ' 1 i Fix tho pipo to vial with pipe faing ffoandlE) al off the -•*a length Pipe g fixin bard (El Fl err (F1 Ater the leak test, apply insulating mate- rial tightly so that there is no gap. When the piping is to be attached to a wall containing metals (tin dated) or metal netting, use a chemically treated wooden piece 25/32 in. (20 mm) or thicker between theme' and the piping or wrap 7 to Slums of insulaian vinyl tape around the piping. To use existing piping, perform COOL operation for 30 minutes and pump down before removing the old air conditioner. Renate Pere according to the dimension for raw refrigerant. )u -Al2 W A span tA•c s'.des of NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. HUMIDOR COOLER DETAIL NO SCALE 3.3. PIPE CONNECTION • Fasten flare nut with a torque wrench as specified in the table. • When fastened too tight flare nut may brake attar a long period and cause refrigerant leakage_ indoor unit connection Connect both liquid and gas pipings to Indoor unit. • Apply a the. cold of refdgecatian dl (.1) on the seat surface of pipe. • For connection, fist aign the cater, then tighten the first 3 to 4 bins of flare nut- • Use tightening torque table below as a guideline far indoor unit side union jdnt section, and tighten using two wrenches. Excessive tightening damages the flare section. outdoor unit connection Connect pipes to stop valve pipe joint of the outdoor unit in the same manner applied for indoor unit. • For tightening, use a torque wrench or spanner and use the same tightening torque ap- plied for indoor unit. 3-4. INSULATION AND TAPING 1) Corer piping joints with pipe cover, 2) For outdoor unit side, surely insulate every piping including valves. 3) Using piping tape (G), apply taping starting from the entry of outdoor unit. • Stop the end of piping tape (3) with tape (with adhesive agent attached). • When piping have to be arranged through above ceiling, doses a where the temper- ature and humidly are high, wind addibonal commercially sold insulation to present condensation. T =, TEST 4-1. PURGING PROCEDURES AND LEAK TEST 1) Remove sweat pat cap of stop valve on the side of the outdoor unit gas pipe. (The atop valve will network in ks initial state fresh out of the factory, totally dosed with cap on) 2) Conned gauge menlfold were and vacuum pump to service port of atop valve on the gas pipe side dew outdoor unit. -5 101 MPe Stop valve cap (-30 n Hg (Torque 13 6 to [ -76O elHolt 234rd -e, 230 Stop vaHa to 300 49c•nn) for L101110 Compeond pmnsura rouge ( for R4ICA) Pressure p`3i x char R410A) Gauge rnanr¢dd cease (for P4134) . Handle Hqh charge hose (for Ra t 0A) '-mile' part cap !Torque 13.7 to 17 7 Nam, 140 10 130155r-oral Adapter for pro- IL venting the but now A Control vane Span Close `r Body Vacuity pump Or the vraryum Pump vdri the hoarier to prevwnt tea beak (bas) When attaching the control valve to the service port, valve core may deform or loosen if excess pressure 15 appied. This may cause gill teak., When attaching the control valve to Service port the service port oaks sure that the vakre are is in dosed posn, and then tighten part A. Do not tighten part A on tum the Rudy when valve cote is in open position. Ch:urue hose 3) Run the vacuum pump - (Vamumize for more than 15 minutes.) 4) Check the vacuum with gauge manifold valve, than dose gauge manifold valve, and stop the vacuum pump. 5) Lowe as it is kr one or two minutes. Make sure politer gauge nwi4f ld valve remains in the same position. Carden, that pressure gauge shows -0.101 Mpe [Gauge) (-30 n.Hg [ -780 m nHgj). 8) Remove gauge manifold valve quickly from service port of stop valve. 7) ARer refrigerant pipes are connacled and evacuated, fully open el stop valves or both sides of gas pipe and liquid pipe. Operating without fully opening lowers the perform- ance and this causes trouble. 8) Refer to 1 -3., and charge the prescribed amount of refrigerant H needed. Be sure to charge slowly with liquid reMgerant. Otherwise, composition or the refrigerant in the system may be changed and affect performance of the eh condtloner. 9) Tighten cap of aervice pat to obtain the initial status. 10) Leak test 4-2. TEST RUN 1) Insert power supply plug into the power outlet and/or tum on the breaker. Check that all LED lamps are not lit. If they are blinking, check that the horizontal vane is installed correctly. Refer to operating instructions for details. 2) Press the E.O. SW. Test run wet be performed for 30 minutes- If the let side lamp of the operation Indicator . blinks every 0.6 seconds, inspect the indoor/outdoor uni connecting wire (A) for ride- wiring. Aber the test run, emergency COOL mode (75eF [24"C] COOL) ell start. 3) To stop operation, press the E.O. SW several times whist LED lamps turn of Refer to operating instructions for deans. - Checking the remote (infrared) signal reception Press the ON/OFF button on the remote controller and check that an electronic sound is heard from the indoor unit Press the ON/OFF button again to arm the air conditioner off. • Once the cameressor stops, the restart preventive device operates so the can pressor will not operate for 3 minutes to protect the air conditioner. 4-3. AUTO RESTART FUNCTION This product Is equipped with an auto restart tinction. When the power supply Is stopped during operation, such as during blackouts, tea function automatically starts operation In the previous setting once the power supply is resumed. (Rehr to the operating Instructions for details.) Caulletn • Ater test run or remote signal reception check, hum off the uni with the E-0- SW or the remote controller before finning off the power supply- Not doing so wit cause the unit to start operation automatically when power supdy is resumed. To the user • Aker installing the unit, make sure to explain the user about auto restart function. • If auto restate function is unnecessary, it can be deactivated. Consult the service rep- resentative to deactivate the function. Refer to the service manual for details. 4-4. EXPLANATION TO THE USER • Using the OPERATING INSTRUCTIONS, explain be the user how to use the ale condi- tuner (how to use the remote contrdler, how to remove the air filters, how to remora or put the renota controller in the remote controller holder, how to clean, precautions for operation, etc.) • Recommend the user to read the OPERATNG NSTRUCTIONS carefully. NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. C-7) HO SCUMALIDE OR COOLER DETAIL N " tr } ')1 2 -1. FIXING OF INSTALLATION PLATE - Find a structural material (such as a stud) in the wetland fix instalatlon plate (1) horizon- tally with fixing srraws (2). • To prevent €nstalolen plate (1) from vibrating, be sure to install the firing screws in the holes Indicated In the iliustretlon. For aided support, ibdng screws may also be installed In ether holes. • Wine n bolts recessed In t he catcate wall are to be uixad, s ecu secure installation date (1) using 7/16 In. x 13x16 let , 7 116 In. x 1 In. (11 nxn • 20 mm -11 mm * 26 mm) oval hate (17.5'411. [450 mm] retch). • lithe recessed bolt fs too long, change it br a shorter one avalable in the marked, 2 -2. WALL HOLE DRILLING 1) Determine the wall hole position. - 2) Deli a die. 2 -9116 in. (65 Film) hole. The addoor side should tae 6/32 to 9/52 In. (5 to 7 rim) lower than the Indoor side. 3) Insert well hole sleeve (C). - 2 -3. CONNECTING VIES FOR INDOOR UNIT Note: When the indoor uni is powered from tire outdoor unit, a disconnect switch may need to be Installed to power supply circuit (between indoor and outdoor unit) dependes on local code. 1) Remove the front panel. ('Refer to 5-1.) 2) Hook the upper part of the indoor unit on the installation plate. 3) Remove corner box and conduit cover. 4) Fix conduit pipe for rear piping) elbow I oint ( for tight la R or downward piping) to san- cta cover with Cork nut The thread part of lsbaterd conduit ppe I elbow joint epp:aring Inside should be less than 318 in. ( 50 ram). (Fig. 1 ) Elbow ) dm should appear less *an 1-3/16 in. (30 nen outside. (Fig. 2 3r ( J (9 2) 5) Process the end of ground wire (Fig, 3). Connect l to the ground terminal of ehadrica' parts box. 6) Process the end of Indkorloutdoor uni Iwnneding wire (A) (Fig. 3). Fix it to taminai block. Be careful not to make m€s-wiing. Fix the wire to the terminal black securely so that no part of its core is eppesred, and no external force is conveyed to the connecting section of the terminal blade. 7) Firmly tighten the temilnal screws to prevent then from loosening. Senor lightening, pull the wires lightly to confrm that they do not move. 8) Secure indoonfoutdecr tnh ccenacting wire (A) and the ground wire ilwelt condut cover. Never fail to heck the claw of the conduit cover to the electrical box. Attach lire condui cover securely. (Fig. 4) 8) According to the piping direction, cut off the shaded pan of the left site of box (Fig. 5) or torner box {Fig.e). Reinstall comer box and front panel. MS- A09IA12WA • ankcnnat seem may be requtea Clackers b@d eke. •• Use amglongue Ward In orderte boned • gns dienbaminaL mace air 61"Ina4 'erred block }- .7brNnr- I 1lei we ells OUTDOOR WU SAC 34,71 I Wm. lee j I ,,,,r• t SOW slit AG arm �n�ramerer• MST-MS/Al 7NA MS2 -A09fA 12/A 151117 NA nemekt •. Ae5ceenc smeatm e be requtmt Cluck the Modica •• Use envenom ermine !n adir%ca era • gaud dretotereind Persraupy 81e21evAC• wear hikes, emu SWDOORIllri a� 1 4 r � 2 mm) or mcra 19.., r. ' 06 m lyre /! ff,% , /.. 7,,/4 ff!/ .'" / ., tre/i / /,. /f / Ld,ng / 4 Titan b - k 11 i5 rnm l or mom seer) 1 ,,• r -rd lafl beck piping (us no spec.') and the are to ttne center hate. I tee dailaliw, Plata fa) revel iii %i J � :vac / r 3 in 175 remt amore Pi run all• • I g I • e I• o , _ _ I :�s--. 1: • _, O i II cap ° d t. 8 In. - ,75 mm: - I 0, R anf � •r z : ,�r1,G rim. °' • f lus, f tree rt 'else tit Ravi sees wash Center of dia. I aeelfi the tot ' 12 -9x15 In ar Fixing scrim (2) Ft5(n tea Alert. In W1e Wain a mark ° V I f95 m .' note Plumb Plumb ml e " Seam for left hot la 2-iL'1R in i 4,65 mint vuall i J• r;3 Ge?2- 9.. +32n 1,7 mm) Cs oar vide 0 y14 ..•.r y� rIt 4_.- r i 4 - r �, r r . "` -.` fbl ♦ • yi r I~ "ratio ._ Vans -we S r Isoffaminw 1 ��e �r 4.ndl9i lemon- tfm,inal Fixing cover bad; worm e IP Condia: ,]f cIC,Crclj1oint Mori-ear CPg..1 ib?rngH, :en. a. cntvn,:•ea Mina] • Connect wires to the matchingnu ethers oftemunels • For Uwe siuvising, give extra length to the connedtng wires. Condukcavar fl 1 i r,f.wee., : - - Less then 1.3e6 in. a -r o (30 mm) j Lessthan310 in. 1.=.11.....= ` (10 n rn) ■, Lode nut Elbow join (kir right, let, or downward piping) Fig 2 Conduit pipe or elbow joint Fi7. 1 ` L. "mac 1 - G ell • - - Hook Conduit coves ..,9. - 1 in [25 mm) Lead wire • Make ground Cam! (Mme then wee 1-9/16 1■%'32 nn- - -__115 MITI) a little longer than in. [40 erne Fop . Cut left .- y.. 1 al ._---< Box off in case of Cut a$ in case PION ofleitdamnrard p4 ig Fro G Cole' nos Cut downward case piping 1 in. 4f'PS•r (25 moo %7777 Cut off +n case of of right piping F;.; (5 NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. HUMIDOR COOLER DETAIL NO SCALE ViLls--(17 REVIEWED FOR CODE COMPLIANCE APPROVED MAY 11 2012 City of Tukwila BUILDINQ DIVISION RECE►Vt. CITY OF TUKWIL A APR 2012 PERMIT CENTER ISSUE BLOCK 04/05/12 PERMIT SET OF THIS DRAWING FOR REFERENCE OR EXAMPLE ON ANOTHER PROJECT REQUIRES THE SERVICES OF PROPERLY LICENSED ARIHITECTS AND ENGINEERS. REPRODUCTION OF THIS DRAWING FOR REUSE UN ANUIIIEK I'K:1 .JtGI IS NUI AUIIIUKILtU AIVU MAT Ot I.0 NIKAKi RI Inc LAO. CHECKED BY: TA/RO /SJ DRAWN BY: RRR FiLE: SHEET NAME: MEP VENDOR COORDINATION PLAN SHEET NUMBER: MPE0.2 PROJECT SITE OR AT A LATER TIME. U ATE AND IT IS NOT SUITA w 1n rn IFIC SITE CONTEMPORANEOUSLY WITH PARED FOR USE ON THIS S THIS DRAWING WAS Space Model (blower pack) Figure 2: RH Models Table 1: RH Specifications Model Pat tNo. Volts Capacity lb (hg) KW Anips Phase Max Ext Standard Fuse Gy iirder Net/ hull, welgtlt lb (kg) 110 -12n 4 (1.0) RH Space- 2548758! 208 69 (1.1) 220-240 3 (3.6) 110420 5 (2 ') PH Duct - 2,43750 208 87 (40) 220 -240 10 (4.6) 1.5 2.6 S; 0 1'2.7 202 1a 3_. 3. $8 20 202 16/22 1 (7.5/ 10 -0) 15/ �1 (7.0/ 9.5) Options and Accessories Nortec provides a complete line of options and accessories for every humidification application. The following options and accessories are available and may have been delivered with your RH humidifier. Refer to the installation instructions that came with the accessories for their proper installation and operation. Table 2: Options and Accessories Option / Accessory Used For ea Dis rites cr_ Aidiidin� taam into air ducts.. Remote Blower Pack Adding steam into a space remote from the humidifier. l ?' or HIT dl;t9t Conrro!lin the cutout of the humidifier based on sensed RH 'Digital or Modulating High Limit Preventing over humidification Ina duct by shutting down or Hurnidistats throttling down the humidifier when duct RH gets high Air Proving Switch eS insuring humidification only occurs when air is moving in a duct. 3 I introclucticn NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. HUMIDOR HUMIDIFIER DETAIL NO SCALE Typical RH Installation Mounting Pg 8 Steam Distribution-° - Pg10 Controls Pg 15 Plumbing- - Pg9 2 in. (5 cm) min. 1' 1 ft (30 crn) min. 1/8 NPT to 1/4 comp - ression Air gap 7/8 in. min. Cold potable water, 3t 80 psig, 112 in, min Dedicated circuit breaker or disconnect C a 9 n NN RH ' ExrERNAt7' Note: 120 V connection shown Electrical Pg 14 Figure 3: Typical Humidifier installation Installatian I6 NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. HUMIDOR HUMIDIFIER DETAIL NO SCALE Any questions Please Call Thank You Eric Miller 1 -609- 298 -2100 Humidity and controls in Humidor Box 1st; Humidity the Nortec RH Space (Steam Humidifier) Adjustment of the "Capacity Adjustment" Control setting. This a Potentiometer that is located on the Main PC Board (Near ON / /OFF switch). The potentiometer can be adjusted between 25% and 100% Capacity. Ideal setting is 50% to 60%. (just low of Center on the Adjustment Potentiometer) 2nd; Humidistat Controls of Nortec RH Space (Steam Humidifier) The Humidistat Johnson Controls ( #W42AA Type SPDT Humidistat for Low or Line Voltage) This mechanical Humidistat is Wired up to the "1" & "2" Terminals on the Nortec.. The control wire on the Johnson Humidistat are wired to the "C "Hot & "L "Neutral. This controller is to be set at 60% RH. 2nd: Mitsubishi Electric Mr. Slim Set up of operation of the Mr. Slim Split -Type Air Conditioner. Using the Remote . Control Settings should be. MODE: Cool TEMP: Set to 76 F Deg FAN: Medium VAIL: Swing Max. Fuse size 15 Amp._ Min. Circuit Ampacity 12_ Amp._ 110-120 1 10 -- -120 Vac Hookup Nortec RH Space Steam Humidifier 'Tower Pock 1 I Space I `nitizec -unnidifier \ortec R I Check that Jumper J -10 is installed Humidistat W42AA SPOT Johnson_ Controls Low Voltage Control Circuit Split - Syste=m (Coocing j- 110 -120 Vac Hookup Outdoor Unit_ �errnincl Block 111 Vox. Fuse size 15 Amp._ Min. Circuit Ampacity T2 Amp._ Terminal Block #2 _I L1 t9 N G Indoor 'unit.e. Terminal Block_ Mitsubishi Electric VS— A09 /Al2WA 9 L1 • N t9 2 1 I Star'. up Settings Thermostat © 70 Deg. stet C 70 CI ERNSTORE E q'. I..I i r. P -!; ENT Scale: NTS Humidor Wiring Total Wine & More Humidor Equipment 03 March 10 Rev NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. HUMIDOR HUMIDIFIER DETAIL NO SCALE Electrical Note: 1 Install jumper between P and terminal that corresponds to supply voltage. 2 Dedicated external fused disconnect must be installed. Fusing must not exceed max circuit protection as indicated on the specification label. 3 Ensure that adequate power is available to carry full humidifier amp draw as indicated on the specification label. 4 Do not use neutral wire as a ground, connect to ground lug. 5 All Wiring to be in accordance with national and local electrical codes. Note: Power wires can also be routed through opening in back of cabinet 120 VAC (1 phase) Ground Neutral F. Hot ;. Note: Connect 12 'Not'. to L1 Ground :fl P 120 208 240 L1 /N 208 VAC (1 phase) Ground Hot Hot .m. 240 VAC (1 phase) Ground • IF- Hot Hot $.f Figure 14: Primary Power Connection E X rr T T Ground p 120 209 240 L1 /N Ground p 120 208 7 240 LIMN Installation 114 NOTE' INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. ® HNO UMIDOR SCALE HUMIDIFIER DETAIL Water Filtration Systems & Replacement Cartridges Twin 99 A 9wirn Triple etion MPORTANT: Must have minimum 2Y cearance area Water Filter Systems 2 kn.(5 cm) 36 in. screws " al yr� �NOTE: Additional clea arlcces r qured for bwweepeck For ° SMARM 1 (92 cm) min 24 in.(6 cm) i min. Height SSM1A -SSM3-4 Modulation 1.24 VAC Controls ''" - 2- OrdOf Loop Controls t 3 Ground y ; 4- Control Signed '3� & Fan Security ' * 8 Fan Security roes 19- Fan Stan `• . 20- Fan Stan x. it i Note: Digital On'Off stet shown 1/8 NPT to 1/4 comp - ression Air gap 7/8 in. min. Cold potable water, 3t 80 psig, 112 in, min Dedicated circuit breaker or disconnect C a 9 n NN RH ' ExrERNAt7' Note: 120 V connection shown Electrical Pg 14 Figure 3: Typical Humidifier installation Installatian I6 NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. HUMIDOR HUMIDIFIER DETAIL NO SCALE Any questions Please Call Thank You Eric Miller 1 -609- 298 -2100 Humidity and controls in Humidor Box 1st; Humidity the Nortec RH Space (Steam Humidifier) Adjustment of the "Capacity Adjustment" Control setting. This a Potentiometer that is located on the Main PC Board (Near ON / /OFF switch). The potentiometer can be adjusted between 25% and 100% Capacity. Ideal setting is 50% to 60%. (just low of Center on the Adjustment Potentiometer) 2nd; Humidistat Controls of Nortec RH Space (Steam Humidifier) The Humidistat Johnson Controls ( #W42AA Type SPDT Humidistat for Low or Line Voltage) This mechanical Humidistat is Wired up to the "1" & "2" Terminals on the Nortec.. The control wire on the Johnson Humidistat are wired to the "C "Hot & "L "Neutral. This controller is to be set at 60% RH. 2nd: Mitsubishi Electric Mr. Slim Set up of operation of the Mr. Slim Split -Type Air Conditioner. Using the Remote . Control Settings should be. MODE: Cool TEMP: Set to 76 F Deg FAN: Medium VAIL: Swing Max. Fuse size 15 Amp._ Min. Circuit Ampacity 12_ Amp._ 110-120 1 10 -- -120 Vac Hookup Nortec RH Space Steam Humidifier 'Tower Pock 1 I Space I `nitizec -unnidifier \ortec R I Check that Jumper J -10 is installed Humidistat W42AA SPOT Johnson_ Controls Low Voltage Control Circuit Split - Syste=m (Coocing j- 110 -120 Vac Hookup Outdoor Unit_ �errnincl Block 111 Vox. Fuse size 15 Amp._ Min. Circuit Ampacity T2 Amp._ Terminal Block #2 _I L1 t9 N G Indoor 'unit.e. Terminal Block_ Mitsubishi Electric VS— A09 /Al2WA 9 L1 • N t9 2 1 I Star'. up Settings Thermostat © 70 Deg. stet C 70 CI ERNSTORE E q'. I..I i r. P -!; ENT Scale: NTS Humidor Wiring Total Wine & More Humidor Equipment 03 March 10 Rev NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. HUMIDOR HUMIDIFIER DETAIL NO SCALE Electrical Note: 1 Install jumper between P and terminal that corresponds to supply voltage. 2 Dedicated external fused disconnect must be installed. Fusing must not exceed max circuit protection as indicated on the specification label. 3 Ensure that adequate power is available to carry full humidifier amp draw as indicated on the specification label. 4 Do not use neutral wire as a ground, connect to ground lug. 5 All Wiring to be in accordance with national and local electrical codes. Note: Power wires can also be routed through opening in back of cabinet 120 VAC (1 phase) Ground Neutral F. Hot ;. Note: Connect 12 'Not'. to L1 Ground :fl P 120 208 240 L1 /N 208 VAC (1 phase) Ground Hot Hot .m. 240 VAC (1 phase) Ground • IF- Hot Hot $.f Figure 14: Primary Power Connection E X rr T T Ground p 120 209 240 L1 /N Ground p 120 208 7 240 LIMN Installation 114 NOTE' INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. ® HNO UMIDOR SCALE HUMIDIFIER DETAIL Water Filtration Systems & Replacement Cartridges Twin 99 A 9wirn Triple etion MPORTANT: Must have minimum 2Y cearance area Water Filter Systems Coarse Pre - Filters SC10A 't 14- 5/2 10 03ane petite' to remove parades 5.00 SCAM 7'x 7'x24'4" n/s 20" tbase prefilter to wnme particles 10.00 Lludes 2 112• clearance belaa. REPLACEMENT CARTRIDGES ib W r)TOru hei• :..... SNI For ° SMARM 1 I 3/1 SSM1A -SSM3-4 SSM1A 69x Sa x 29%r° 'I dubaserto65oKw, 1200 lb. rxggets.andrsrgget dispensers up to 1x0016 1.67 SC1CRC40 40 g 17/8 SC104 513-4 15'A "3 51/2'x25Yr" ,16/1 - Cubws vex 13Wbs. 501 Coarse Pre - Filters SC10A 't 14- 5/2 10 03ane petite' to remove parades 5.00 SCAM 7'x 7'x24'4" n/s 20" tbase prefilter to wnme particles 10.00 Lludes 2 112• clearance belaa. REPLACEMENT CARTRIDGES ib W 04/05/12 SNI credos SMARM 1 I 3/1 SSM1A -SSM3-4 SSMtC6 6 'I 1/3 55152- A -SSM3A SC1CRC40 40 g 17/8 SC104 Sr20Rr20 20 tly OB SC2O Snrtsmaars ice =dines are not domed for cut.. installations. Scotsman reside condensers are &wed lm audu rineallotions Math re requires voltage icicatedon rOrg name plate Feilurs caused try inprt>: avdta3eere rei carsidaed factory defects. Extended periods or opea§waattempertuteseme inglimitAmrs corditutesnsmeunderlhe tams el Scatatmen learaAadurers boated rlfarrrty, mailing in a Ions of %warty coverage Spediabmx and &skin siOyee [tow Mani/ mete. Consult Tour Laid SCOTSM NRpresrdativeAt• I MPORTANT OPERATING REQUIREMENTS: erii loo kaaximam AirTemperarues SOT (10'C) 100F(37.TC) WaterTemperabrres 40F (4.4'S) 107F (37.TC) Water Pressures 20PSIG 80PSIG Capacity Certified for chlorino reduction for up to WOO gallons Flow Rate 1.67gpm (6.3 rpm) per cane dge YOU'LL VALUE THE DIFFERENCE: 775 Corporate Woods Parkway • Vernon Hills. IL 60061 • 1- 800- SCOTSMAN • Fax: (847) 913 -9844 Visit our website at: www.scotsman- ice.com • E -mail; customatservicewscotsman- ice.com r7 `°Scman° SS -SS.e 16693-0 "s NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. HUMIDOR WATER FILTER DETAIL NO SCALE REVIEWED FOR CODE COMPLIANCE APPROVED MAY 11 2012 City of Tukwila BUILDING DIVISION CITY OF TU t APR 2. 4 2012 PERMIT CENTER as • • a' • 0 U, v00 za X t, cs: E0 D Oc Lu o_ U) rn U M 0 Q w X LL ce ds3 al in 0 172 0,, cc 0 i w Ot dY °' u_ E0 Om� G =o I l • Q� 0 0 ry CONSULTANT m Ce LL -; m 0 o_ co 0 z : w Z o royha Z 1"- 2 F-LI 07 —0a Nr-3 ud..' et Z wa LAS VEGAS :: IRVINE :: PHOENIX :: SALT LAKE 4) It' 06 ww: gl IT) v rim STORE NUMBER: XXXX MAY BE CONTRARY TO THE LAW. 0 a 0 N 0 0 5 a 0 z I ca a O ce n. w 0 z 0 w rn 0 0 cn 0 a. re d' ui W to (n ce d' 0 O a 0 w cc ISSUE BLOCK 04/05/12 PERMIT SET CHECKED BY: TA/RO /SJ DRAWN BY: RRR FILE: p I , c. 49091 qg' .1°40,. EG I S_Ti'uR� .rti� SHEET NAME: MEP VENDOR COORDINATION PLAN SHEET NUMBER: MPEOI3 Performance Data Physical Data Hermetic Models MODEL NUMBER HOp Models COMP. MODEL NUMBER AMPS 6 230/1/80 CAPACITY (STUN) AT 95'F AMBIENT • REC°R RG. CONN. ODS°IN. APPROX. SHIP WT. be. Sound. Data dbA 1„t '.I9:la�i ■l:1 CORD FLA SUCTION TEMPERATURE °F 0 90% Lig. SUC_ +47 +30° +28° +20° +10° 0° 10° ' -20° -25° -3fr -4G 1.0 1.0 R'H0501644 0.50 R•H075M44 0.75 15.0 15.0 6000 8800 5400 8100 4800 7400 3800 6200 - _ _.._ _. �. _� -- Si 5.1 1 1 2.0 2.0 518 518 152 167 68 68 R°111010141 100 R'H1501644 1.50 •---- -- 2200 15700 11300 14300 10500 13000 8500 10400 - - -- CS18K6E 16,0 - -- - - -- -- -- -- -- 8.6 8.6 2 2 343 318 5/8 718 195 228 72 72 '3 101120111144 2.00 4 11111300M44 3.00 -- - -• 23900" 28000 21100 25300 19300 22700 15700 18100 - -_- - - -- 2.0 _ - -•- __ -_ _-_ ___ -- 8.6 13.7 2 2 19.0 718 1 -1/8 253 273 72 75 A R11408M44 4.00 1/111500M44 5.00 - -•-- 34700 42300 31600 37500 28500 343&0 22700 27500 - - - - -- - - -•• -- • -•- -- -_ --- -__ --- -_- 24.3 24.3 3 3 --- ___ 1 -t /8 1.118 390 405 73 73 R'21050L44 0.50 R1H075L44 0.75 - -- - -- - -- __- -- -_- 2650 4400 2010 3350 1520 2250 1200 1600 -- - -- -- -- 5.1 5.1 1 1 : 518 5,13 152 157 68 68 R•H100L44 1.00 8111651-44 1.50 - - --- -- -- -- -- --- •-- 5700 10190 4300 7940 2950 5670 7250 4690 -- 3770 --- --- -- 5.1 8.6 1 2 318 3/8 508 7/8 180 195 88 74 R112151.44 100 R°H315L44 3.00 - - - -- - -- -- - -- - -- -- 18420 20870 12930 15940 8870 11320 7360 9508 5940 7610 -- --- -- 8.8 13.7 2 2 318 1/2 718 1 -1/8 243 255 75 77 R11051 H22 R H075H22 R111001422 0.50 0.75 1.00 7550 895) 13000 6280 7300 10600 5810 6551 9550 5120 5800 8500 3990 4450 6550 2930 3200 4750 ----- - -- -- r - - - -• - -- - -- 6.0 6.0 6.0 1 1 1 318 3/8 378 518 518 518 170 175 180 68 68 68 2, R11151H22 Z R-12.01H22 1.50 2.00 18300 22850 14640 19780 12950 16390 11560 14520 8920 11100 5675 7990 - -••- - -- - - -•• - • -•_ -- - 10.0 10.0 2 2 313 3/8 7/8 718 210 223 72 72 R°H251H22 R11301H22 R14401H22 R H500H22 2.50 3.00 4.00 5.00 29840 24530 37070 30800 52890 43010 56900 47100 22300 27830 38720 42550 20250 24560 34650 38200 14960 18580 24600 30000 10870 13200 181-X 22300 ---- - -- -_ - --- - -- - .. -_ -. -- - • -• - -- -- - -_- -- _ -_ 1E0 16.0 28.2 28.2 2 2 3 3 1/2 1/2 1/2 1■2 718 718 703 7/8 245 260 348 380 72 72 73 75 Scroll MD de MODEL s , HP +35° +30` +25° +20° +10° 0° -10° -20° -25" -30° -40° RECR tionaci SUC. SHIP WT. dbAt. 1320200M44 R- 025011144 2.00 2.50 21930 20350 18820 27080 25050 23160 17360 21320 14630 17900 12160 14840 -- - -- -•- - - - - - -- 137 137 2 718 2 1111121 1 -118 215 71 230 72 12'0300544 R•0301b144 3.00 3.00 31110 29050 26940 071 34 90 32330 90 7 24860 29 540 20850 25 190 17090 2077 20770 RS70C1 -• 34.2 - 13.7 13.7 2 2 112 1 -1 8 1/2 1.118 305 72 325 72 06 R 0l►M44 --v.,. -�if y1-_..r•- P.'�.. 600 ^A r.. 50400 47800 44200 . .irs zr.. v r,,.i 41100 1100 . a..r: _ -- -- ----- ----- R1H151H22 CR18KQ 9.0 41.0 2.0 383 74 .s.. "'R�X� ..; v"Bll 34500 w 28800 . 1. .. t . ,.0 ..,���. w... �, , .:.... 4390 5800 24.3 137 13.7 �gi,r.k- iY� 2 2 1.118 ,- 1/2 7(6 112 71B - 230 71 240 73 A. 8'0200144 12•0250L44 •0250L44 2:00 2.50 11211- I - =II -- -- -•--- - -- 11330 13800 9400 12100 7670 10060 6870 6110 8980 7720 8-0300104 8 14 .03014 3.00. . 3.00 -- _•. - -- - -- -- -.- -- - --- - -- 15960 18760 13380 15530 11360 12580 9680 8870 11250 10160 6520 8110 13.7 13.7 ®m 1.1,8 1 -118 245 73 255 73 R'0400L44 R •0500144 R'O600L44 4.00 5.00 6.00 - -° -- ---- - - -- -- ---- - -- -- -- -- --- - -- --- 24090 28490 33400 19800 23650 27400 15940 19250 22100 14080 12430 17270 3200 1 19800 17600 8600 11990 13600 24.3 24.3 24.3 3 3 3 1 -188 1-118 ® 1 -118 352 73 367 74 383 76 8.02001022 R*02501122 2.00 : 2.50 21020 19890 15270 25340 23400 21310 16900 19940 13960 16370 ---- - - --- ---- - - -- • -- - -- 111® -•- -- 16.0 16.0 2 2 12 7,8 112 1 -1/8 215 71 230 72 8.0300•22 R00301M22 3.00 3,00 30440 28170 25840 38160 34720 31890 23470 28310 19330 22730 - - --- - - -- - - -_ - - -- _ - -- - -- -. - - -- ___ __ -_ 16.0 16.0 2 2 1/2 1 -118 1/2 1 -118 305 72 325 72 W.04001622 R'05000.122 8206509122 4 00 600 6 -5A 43320 39910 37460 52200 43370 43930 - 63120 57830 51850 33680 41010 48280 27750 34010 41130 _. - - -_ ---- --- - -- - -- - - -- - -_ -- - -- ---- -_ --- -- 28.2 28.2 28.2 3 3 3 1/2 1-118 112 1 -1/8 5/8 1 -118 352 74 383 74 405 76 t4OTE; For •10'r ambient mrl -ply capacity by 1.0={. Aeduce capacity by 3% for each 5° increase in ambient temperature_ perature_ Consult factory 1x capacities above 110 °F Amb. $ Estimated cibA values at 10 feet from the unit Correction factors: Deduct 6 dbA. for 20 to 40 feet,12 dbA @ 4010 60 feet. Ratings at the cutlet of the discharge air - The actual measure nests may vary depending upon installation variables. Er viranrriental /actors may have a siandir nt. sntluence on this data. NOTE INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. BEER COOLER DETAIL NO SCALE Afr Deftest f socsoonage WALK NI COMB EV ATOP NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. ®BEER NO SCALE COOLER DETAIL Electrical Data Hermetic MODEL NUMBER Models COMP. MODEL NUMBER AMPS 6 230/1/80 AMPS 4it 206/2303/80 AMPS 44460/3/80 COMPRESSOR GOND FLA TOTAL UNIT - 1„t '.I9:la�i ■l:1 CORD FLA TOTAL UN 4.3 5.0 Lai,: �.lj'`_•7:i RLA 1:0 1.0 CORD TOTAL FLA UNfT ill RLA LRA RLA LRA LRA R'H050M44 R- H075M44 RS43C1E RS70C1E 5.4 7.0 24.1 34.2 1.0 1.0 7.4 9.0 15.0 15.0 - - - -- 4.7 _ - 31.0 ____- 1.0 -•___ 6.7 _ -__ 15.0 °° -- �� - -- - -- R'1-1101 M44 6*H150M44 RS97C1 E CS12K6E 11.0 10.9 51.0 56.0 2.0 2.0 14.0 13.9 17.0 17.0 7.0 7.6 35.0 51.0 2.0 20 10.0 10.5 15.0 15.0 - - -- R11201 M44 CS18K6E 16,0 820 2.0 19.0 23.0 10.4 65.0 2.0 13.4 16,0 -- -• - - - -- - - -- R'H300M44 CS20K6E 16.0 96.0 2.0 21.0 260 11-4 75.0 20 14A 19.0 -- - - -- - - -- R'H400M44 CS27K6E 23.9 95.4 3.2 281 35.0 15.3 82.0 3.2 19.5 240 __ - --- ___ 12*H500M44 C 33K6E 30.7 125.0 3.2 349 43.0 20.7 90.0 32 24.9 31.0 8.6 45.0 11.2 15.0 R1H050L44 RS43C1E 5.4 24.1 1.0 7.4 15.0 - - - -- ---- - --- 18.4 73.0 19:4 _ -..__- Fi H075L44 R570C1E 7.0 342 1.0 9:0 15.0 4.7 31.0 1.0 810300.44 15.0 16.4 880 ____ R'H100L44 RS97C1E 11.0 51.0 1.0 13.0 16.0 7.0 35.0 1.0 9.0 15.0 2F11 K4E - - -- - -- IN R'H165L44 CF06K6E 11.4 59.2 2.0 14.4 16.0 7.0 52.0 20 10.0 15.0 - -- 11`0400L44 ZF13K4E R•-1215L44 CF09K6E 16.7 87.0 2.0 19.7 24.0 10.2 72.0 20 13.2 16.0 - - -- __._. ___ R°H315L44 CF12K6E 20.5 105.0 2.0 23.5 28.0 123 85.0 2.0 15.3 18.0 6.6 42.0 1.0 : 15.0 R1-1051H22 ART82C1 5.9 30.0 1.0 7.9 15.0 - - -_ -_ ____ _-- _.,__ ___ -___ 21 ----- R1H075H22 RSE -0075 7.1 35,5 1.0 9,1 15.0 20.0 --- --- -- -- ----- - 4.3 27,0 - -- - - -- R'H100H22 RS70C1 7.0 34.2 1.0 9.0 15.0 4.7 31.0 1,0 6.7 15.0 ------- _ -- -- ----- ----- R1H151H22 CR18KQ 9.0 41.0 2.0 120 15.0 6.0 44,2 2.0 9.0 15.0 -- --- ---- --- - -___ R *H201H22 CR24KQ 13.5 70.5 2.0 16.5 20.0 7.5 40.0 20 10.5 15.0 --- -___ __ -- _ -__ --- R *H251 H22 CR33KQ 18.0 75.0 2.0 19.0 23.0 10.8 69.0 20 13.6 17.0 4.7 31.8 1.0 6.2 15.0 R'H301 H22 CR41 KQ 19.4 110-0 2.0 224 28.0 131 80.0 20 16.1 20.0 5.9 42.0 1.0 7.4 15.0 R1-1401 H22 CR53K0 29.0 140.0 3.2 33.2 41.0 18.0 107.0 3.2 222 27.0 91 55.0 2.1 11.7 15.0 R11500H22 CRN -0500 34.3 142.0 3.2 38.5 48.0 21.4 130.0 3.2 25.6 31.0 9.6 65.0 21 12.2 15.0 Scroif Models W02001144 R20250M44 :' ZS15K4E ZS19K4E 13:6 16.4 55.0 73.0 2.0 20 17.6 20.3 20.0 25.0 9.3 9.7 55.0 63.0 2.0 20 12.3 12.7 15.0 15.0 4.3 5.0 27.0 31.0 1:0 1.0 5.8 6.5 15.0 ` 15.0 R`0300M44 ZS21K4E 16.4 88.0 20 20.6 25.0 11.1 77.0 2.0 14.1 17.0 18 -538 39.0 1.0 7.2 15.0 R'0301 M44 2S26K4E 20.7 109.0 20 24.9 30.0 13 6 88.0 20 16.6 20.0 ® 44.0 1.0 8 6 15.0 ►!Ili rl /�1ir c. i ,. 27-1/2 �y -.. ...0 �:: - ;. :- nrwma_ , . -- i�Rli.• 2 ! . . ' !"M!. 41-1/2 8°0600544 .w.:X ZS-3024E 112 �<. x169.0 32 , 36.0 - ,.. 123.0 33 - - - 62.0 1 - 112 7/8 - 2.0 _314r 2 37 -- 45 -1/2 28 -1228 .2,1,4a:. 7/8 - 2,0 - - R10200144 ZFO6K4E 13.6 55.0 20 16.6 20.0 9.3 55.0 20 12.3 16.0 4.3 27.0 1.0 5.8 15.0 W02501_44 2F08K4E 18.4 73.0 20 19:4 25.0 9.7 63.0 2 0 12.7 16.0 5.0 31.0 1.0 6.5 15.0 810300.44 ZFO9K4E 16.4 880 20 19.4 25.0 11.1 77.0 2.0 14.1 17.0 5.7 N.0 1.0 7.2 15.0 R•0301 144 2F11 K4E 20.7 109.0 20 23.7 30.0 13.6 88.0 2 0 16.6 20.0 7.1 44.0 1.0 8.6 15.0 11`0400L44 ZF13K4E 26,8 129.0 3.2 31.0 38.0 15.0 99.0 3.2 19.2 23.0 8.2 57.0 2.1 10.8 19.0 11`0500L44 ZF15K4E 31.5 169.0 3.2 35.7 44.0 21.4 123.0 3.2 25.8 31.0 9.6 62.0 2,1 12.2 23.0 R •0600L44 ZF18K4E - ---- ----- - ---- --- - - -- 23.9 156.0 32 28.1 34.0 9.3 70.0 21 11.9 23.0 R•0200M22 ZS15K4E 13,6 55,0 2.0 17,5 20.0 9.3 55.0 2.0 12.3 15.0 4.3 27,0 1.0 :15.0 16 -588 R °0250M22 ZS19K4L. 16 4 73.0 20 20.3 25.0 9.7 63.0 2.0 12.7 15.0 5.0 31.0 1.0 518 15.0 R'0300M22 ZS21K4E 16.4 88,0 20 20.6 25.0 11.1 77.0 2.0 14.1 • 170 ® 39.0 1.0 7.2 15.0 R•0301M22 2526K4E 20.7 109.0 20 24.9 30.0 13.6 88.0 2.0 16.6 20.0 2 44.0 1.0 8.6 15.0 R•0400M22 ZS30K4E 26.8 129.0 3.2 31.0 38.0 15.0 990 32 19.2 23.0 82 49.5 2,1 10.8 15.0 R °0600M22 253814E 31.8 169.0 3.2 36.0 44.0 21-4 123.0 3 -2 25.6 31.0 9.6 62.0 2.1 12.2 15.0 122065OM22 ZS45K4E - - -- - -- - - - -- - - -- 23.9 156.0 3.2 28.1 3 4 . 0 9.3 70.0 2.1 11.9 15.0 5 Physical Dimensions - All Models Figure 2 e1ec,r l -- Access :1rc' FY om ens ens are in nth 4s M mounting hoes are are cfc •17 hiih trip madets J4m5i"oi•ce U41 as show. Xs?" high fa•21� an 'ip and a4 Sc €n4 mcffiis. Uses 1 ua3ce gilt ;Ira! :na•c-n5 PIN 172300 -018 REV.15 03AV R3000 NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. (r'\BEER NO SCALE COOLER DETAIL Walk-In and -_. -ine Wine Refrigeration Wiring Defrost Clock To Any Additional Units Walk -In Controls Evaporator, Thermostat, Solenoid, Double Throw Switch (by EC), and Defrost Clock, to be wired per diagram above Walk -In Condensing Unit Walk -in condensing units to be located on roof of building above walk -in location. Permits, as required, by CC. Provide 230v 3 ph with used disconnect and 120v service receptacle. Compressor(s) equipped with PCS motor(s) N Normal Operation - *Thermostat cycles solenoid *Fans operate continously Defrost: *Clock kills t -stat and solenoid *Fans operate continously Fans Switched Off: *Switch kills t -stat and solenoid whenever it turns off to avoid liquid slug at compressor NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. BEER COOLER DETAIL NO SCALE BEER COOLER DETAIL NO SCALE ALL -TEMP - Low Profile unit coolers MODEL Connections Motor Amps 230/1 Heater Amps 230V Heater Amps 4$W1 Number of Hangers Unit Dimensions Inches Alt Liquid AA Suction AE Suction AA AE A B C W 18418 - 1/20D5 5/8ODS - 1.0 - - 2 19 - - 27 -1/2 18 -538 - 112 5/8 - 1.0 - 2 19 ie eE Vnms - 27-1/2 18-668 - 1/2 5/8 1 SHEET NUMBER: 1.0 - - 2 19 - - 27-1/2 28-768 1/2 5/8 I - 2.0 - - 2 33 - --• 41-1/2 28 -97B - 112 7/8 - 2,0 - -- 2 33 - - 41-1/2 28 -1068 - 112 7/8 - 2.0 - 2 37 -- 45 -1/2 28 -1228 - 112 7/8 - 2,0 - - 2 33 - - 41 -1/2 28 -1348 - 112 7/8 - 2.0 -- - 2 37 - -- 45-1/2 38 -1606 - 1/2 1 -1/8 3.0 - - 2 55 - - 63 -1/2 38 -195B - - 1/2 1 -118 i - 3.0 - 2 55 - - 63 -1/2 48-212B - 1/2 1 -1/8 I - 4,0 - - 3 36 -112 36 -1/2 - 81 -1/2 48 -2648 - 1/2 1 -1/8 l - 4.0 - - 3 36 -1/2 36 -1/2 - 81-1/2 58-27513 1/2 1-1/8 11 5,0 - 3 54 -1/2 36-1/2 99-1/2 . aF ,.h.l.. a�a.l. �3 6839013 - 112 -tl2 ellitilgati ;T. ... _e._ -� - ■!+ r+�?r�.!5? r lei. ! '4,1.q� "T 16-488 16-418 I 16 -588 16-4613 112 1.0 26 -70B 26 -60B 1/2 518 7/8 2,0 7,0 3.5 2 33 - - 41 -1/2 26 -878 26 -758 112 718 7/8 2.0 7.0 3.5 2 33 - 41 -1/2 26 -1158 26-92B 1/2 7/8 i 7/8 2,0 2,7 4.4 2 37 -•- - 45-1/2 36 -1458 36 -1208 1/2 718 I 7/8 3,0 13.0 6.4 2 55 - - 63 -1 /2 36 -170B 36 -1408 1/2 1 -118 1 -1/8 3.0 13.0 6.4 2 55 -- - 63-112 46 -192B 46 -1648 1/2 1 -1/8 1 -1 /8 4,0 174 8.7 3 36 -1/2 36-1/2 - 81 -1/2 46 -2308 46 -1858 112 1 -1/8 1 -1/8 4,0 174 8.7 3 36 -1/2 36.1/2 - 81 -1/2 56 -2458 56 -21081 112 1 -1/8 1 -1/8 5.0 18.81 10.9 3 54 -1/2 36 -1/2 - 99 -1/2 66 -295B 66 -245Bt 1/2 1 -1/8 1 -1/8 6.0 22.6' 13.0 4 36 -1/2 36 36 -1/2 117 -112 66 -3458 66-28OBT 1/2 1 -1 /8 1 -1 /8 6.0 t 13.0 4 36 -1/2 36 36 -112 117.112 1442B 14 -37B 1 /2ODS 15/8 GDS 1,0 19 - - 27 -1/2 24 -848 24 -72B 1/2 718 7/8 2.0 8,7 4.4 2 37 - 45 -1/2 24 -1058 24 -85B 1/2 7/8 7/8 2,0 8.7 4.4 2 37 - 45 -112 34-130B 34-1058 'i12 "' 718 7/8 3.0 13.0 6.4 2 55 - 63 -1/2 441706 - 4 441 OB 1/2 2 718 1 -118 4,0 17. 4 8.7 6 -11 3 3 2 - 81 -1/2 54 -215B 54- 180Bt''112 1 -118 1 -1/8 5.0 10.9 NI 541./2 II 36 -1/2 - 99 -1/2 64 -2558 64 -21581 1/2 1 -118 1 -1/8 6.0 13.0 36- 112 36 36 -1/2 117-1/2 t 23013160 heaters are standard an these models. Heaters are wired single phase for all other models, 460/1/60 motor amps = 1/2 the 230/1/60 value. All models require externally equalized expansion valves. Installation Notes: (1) Install 12 away tram bade Walt. (2) Drain connection on AA and AE faits are located In the center, rear at the drain pan. (3) For long air throw requirements, specify high throw fan guard. ov° rt] TOP-7 , IN BACKAip BA TOP 28 NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. BEER COOLER DETAIL NO SCALE .. REVIEWED � FOR CODE COMPLIANCE APPROVED MAY 112012 City of Tukwila BUILDING DIVISION CITY OF TUKVVILA APR 24 2012 PERMIT CENTER z W ISSUE BLOCK 04/05/12 PERMIT SET w 4 1 ht L $ p . $t:;r- cmci KNOCKO {+r9 CHECKED BY: TA/RO /SJ 111.1 ie eE Vnms N.,\:<" S07117.31 CONIC -.1 1-- 3118 IN BACKAip BA TOP 28 NOTE: INFORMATION SHOWN IS FOR REFERENCE ONLY AND IS TO BE REPLACED WITH SITE SPECIFIC SPECIFICATIONS. VENDOR TO PROVIDE STANDARD DETAIL SUFFICIENT FOR GC INSTALLATION. BEER COOLER DETAIL NO SCALE .. REVIEWED � FOR CODE COMPLIANCE APPROVED MAY 112012 City of Tukwila BUILDING DIVISION CITY OF TUKVVILA APR 24 2012 PERMIT CENTER z W ISSUE BLOCK 04/05/12 PERMIT SET CHECKED BY: TA/RO /SJ DRAWN BY: RRR FILE: N.,\:<" ot-T,;,, 8 4SLp SHEET NAME: MEP VENDOR COORDINATION PLAN SHEET NUMBER: MPEO14