Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M12-081 - BEST BUY - MOBILE
BEST BUY MOBILE 17250 SOUTHCENTER PY SUITE 116 M12 -081 City oilkukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-43 1 -3670 Inspection Request Line: 206 -431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 7888920020 Address: 17250 SOUTHCENTER PY TUKW Project Name: BEST BUY MOBILE Permit Number: M12 -081 Issue Date: 08/01/2012 Permit Expires On: 01/28/2013 Owner: Name: WIG PROPERTIES LLC -SS Address: 4811 134TH PL SE , BELLEVUE WA 98006 Contact Person: Name: RICHARD BURG Address: 117 HURT DR SE , SMYRNA GA 30082 Email: RICHBURG @USPERMIT.NET Contractor: Name: EVERGREEN REFRIGERATION LLC Address: 727 S KENYON ST , SEATTLE WA 98108 Contractor License No: EVERGRL954R2 Phone: 800 517 -6484 Phone: 206 763 -1744 Expiration Date: 01/06/2014 DESCRIPTION OF WORK: ADD AND RELOCATE SEVERAL SUPPLY DIFFUSER AND RETURN GRILLES AND ASSOCIATED DUCT MODIFICATIONS. Value of Mechanical: $6,250.00 Fees Collected: $269.31 Type of Fire Protection: SPRINKLERS /AFA International Mechanical Code Edition: 2009 Electrical Service Provided by: Permit Center Authorized Signature: I hereby certify that I have read and governing this work will be complie xa with V'V�7 J Date: 001 h2-- ed this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. The granting of this permit does not pre e to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this permit. Signature: Date: '113 /1r(2 Print Name: hell- ?>11 \ This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IMC -4/10 M12-081 Printed: 08 -01 -2012 PERMIT CONDITIONS Permit No. M12-081 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IMC -4/10 M12-081 Printed: 08 -01 -2012 • CITY OF TUKWILA Community Develop rent Depart Permit Center 6300 Southcenter Rlvd., Suite 100 Tukwila, WA 98188 • Mechanical Permit No.. ! v `12-011 Project No. Date Application Accepted: OCD � 2 Y0 12i Date Application Expires: Ut 1,0 1(1— {For ng4ce use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax **please print" Site Address: 17250 Southcenter Parkway Tenant Name: Best Buy Mobile King Co Assessor's Tax No.: 7.88892.0020 Suite Number: TBD Floor: .' 1 New Tenant: 0 Yes ❑,.No PROPERTY OWNER Name: Richard Burg Name: Wig Properties, LLC City: Smyrna State: GA ZiP: 30082 Address: 4811 134th Place SE Email: richburg @uspermit.net City: Bellevue State: WA Zip: 98006 CONTACT PERSON — person receiving all project communication Name: Richard Burg Address: 117 Hurt Drive SE City: Smyrna State: GA ZiP: 30082 Phone: (800) 517 -6484 Fax: (800) 517 -3758 Email: richburg @uspermit.net MECHANICAL CONTRACTOR INFORMATION Company Name: Out to Bid Address:.. City: State: Zip :, Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ Describe the scope of in detail: Adding and relocating several supply diffuser and return grilles, and associated duct modifications. 6,250 Um:, Residential: New ❑ Replacement Commercial: New ❑ Replacement Fuel Tyne; Electric ❑ Gas D 0 Other: - H:1Applicalio9eFmmr•Applicmms On Iine12011 Aff a m?.MerMicd Patel: Apptiostion Asaue4 B9-11 duo Revved Aognei gal t : Page'l of lndicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >IOOk btu 6 Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit <10,000 cfm , Unit Type Q y Air.handling unit >10,000 cfm 6 Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct . Incinerator - domestic Incinerator - - comm/industrial Unit Type Qty Fire damper Diffuser 6 Thermostat Wood/gas stove Emergency generator Other mechanical equipment Bofder/Contpressor Qty 0 -3 hp/100,000 btu` 3-15 hp/500,000 btu 15 -30 hp/1,000,000 btu 30-50 hp/1,750,000 btu 50+ hp/1,750,000 btu' PERMIT APPLICATION NOTES - Value of construction - in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review - applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each The extension shall be requested in writing: and justifiable cause demonstrated. Section 1053.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERIUR / Y THE LAWS sF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 0 Signature: Print Name: D AGENT: Mailing Address: // ! /4-tel. /4-tel:r A ..1 x et, 64. . Day Telephone: 11:1ApplicantnnWm ns;491ka iom On line12011 Apphmnam\Madbonl Permit Application Reined 119-11.docc Revise& AdaanSOOO sn City 3ooez- Zip Paget Of .2 Cali of Tukwila, Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206-431-3665 Web site: hip : //wtivw. ci. tukwila. wa. us SET RECEIPT Copy Reprinted on 08 -01 -2012 at 12:17:14 08/01/2012 RECEIPT NO: R12 -02257 Initials: JEM Payment Date: 08/01/2012 User ID: 1165 Total Payment: 414.95 Payee: EVERGREEN REFRIGERATION, LLC SET ID: 0801 SET NAME: Temporary Set SET TRANSACTIONS: Set Member EL12 -0718 EL12 -0719 M12 -081 TOTAL: Amount 136.50 63.00 215.45 215.45 TRANSACTION LIST: Type Method Description Amount Payment Check 005497 414.95 TOTAL: 414.95 ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PERMIT - NONR 000.322.101.00.0 MECHANICAL - NONRES 000.322.102.00.0 199.50 215.45 TOTAL: 414.95 Cif! of Tukwila. Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 -431 -3665 Web site: http: //www.ci.tukwila.wa.us SET RECEIPT RECEIPT NO: R12 -01728 Initials: JEM Payment Date: 05/30/2012 User ID: 1165 Total Payment: 1,115.75 Payee: C.M. ARCHITECTURES, P.A. SET ID: S000001751 SET NAME: Tmp set/Initialized Activities SET TRANSACTIONS: Set Member D12 -182 EL12 -0498 M12 -081 TOTAL: Amount 957.06 104.83 53.86 957.06 TRANSACTION LIST: Type Method Description Amount Payment Check 120598 1,115.75 TOTAL: 1,115.75 ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PLAN - NONRES 000.345.832.00.0 PLAN CHECK - NONRES 000.345.830 TOTAL: 104.83 1,010.92 1,115.75 INSPECTION NO. INSPECTION RECORD, Retain a copy with permit Jo PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 0. (206) 431 -367 Permit Inspection Request Line (206) 431 -2451 Project: .. i'Jis; (3(ztj 0o Gil E Type of Inspection: `1ti0L. Address: 1-7 2-0 SO C' O -PLk Date Called: Special Instructions: Date Wanted:. - 30 - t 2 - a.m. p.m. Requester: Phone No: (o _ G7S _3 i v ?fij cj Approved per applicable codes. Corrections required prior to approval. COMMEENNTS: Peviv , if rA�.f P Iti- `riti)4! t 1,\ r Date n R INSPECT ON FEE REQUIRED. Prior to next inspection, fee must be p id at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit frk IZ -.O8 INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 ICS (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project:. 6 E T r3z) (. i 0-1/49a3-_-1-e. Type of Inspection: - R 6k (0 R-..117_ n.J Address: V `7 2�3O 5000• -i i'`1 Date Called: Special Instructions: tA Me,; ,,,,. Date Wanted:. a.6. Requester: CO-7C 3 ) 32_ Phon, No: Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspect t: c--.\ jG�,r Day z3 �EINSPECTION FEE RE�UIRED. Prior o next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 1//00. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. - CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 ,{2_ : (206) 431 3670 Permit Inspection Request Line (206) 431 -2451 Projec Typ of Inspection: , Address: Date Called: Special Instructions: f / Date Wanted: �- MAIM Requester: Phone No: // __� -�} `A0(p - l3 t5 --'.? ElApproved per applicable codes. D Corrections required. prior to.approval. COMMENTS: Inspector: E'REINSPECTION FEE REQUIRED. Prior to next inspection fee must:be' paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule.reinspection: Date: • EAGLE TEST & BA LACING COMP. NY 4ABC CERTIFIED 815 E. Main Cushing, OK 74023 Phone: (918) 225 -1668 fax: (918) 2225 -1fi87 13047 S. E. 47th Pt. Bellevue, WA 98006 Phone: (425) 747-9256 Fax: (425) 641 -5662 TEST AND BALANCE REPORT PTotect• T guy , of (l_t Location: 17250 Sou-rf- IcEIJTEL 'kWV,.SP4cic 1I6 ,TvKWtLA,1 A Architect: Uv C/■Rl...5Onl Engineer. Contractor: s ele.G E 1oF(ZIGF.RATIOw Project `cumber. ,CITY OF TUKWILA Aut ' 2012 PERMIT CENTER This is to certify that Eagle Test & Balance has balanced the systems described herein to their optimum perfonnaance capabilities. The testing and balancing bas been performed in accordance with the standard requirements and procedures of the Associated Air Balance Council and the results of these test are herein recorded. Associated Air Balance Counct7 Certiffcation Number. 93 -02 -01 Date:' Test & Balance Engineer: Stephen D. Barnes Project -6ES T " ,8/CY MOg l L System RI" - / Alkek Nigir Date Page AIR DISTRIBUTION TEST SHEET Terminal Number Room Number Terminal Design Test —FPM or CFM Final Type : Size Factor FPM' - CFM Test 1 Test 2 Test 3 FPM CFM ) . C /0'( 1,0 1 7 :5 / 70 --./ .0 /f 85 - , C /0" , -•v0 , / 7J'_ /7� '. /.5 / 87 3 , -. C 'o„ lap )5V /90 /70 /60 >s0 4 /0" y,0 /60 /60 )30 S A /o' 1,V /sa ' 5 »/ 15'6 . /S0 A - l '' / , 0 / 5 J ) /25- 6 la" 1 '0 /.SO 160 /70 • /sue $ i3 /0' ` F0 /50 / '90 26 /Ss' .4 &' 1.0 7s 95-' • /DO 75- /0 A. 6'' /rV 7-5 13c5 ?,. ! 5 11 IF iz" 1.0 300 1)0 idS . 2P /9- 1 . /, 0 300 /90 230 2_ • • Remarks Form #89040 Project Name 'r F u y/ m O g f L-E Date Page of AIR MOVING EQUIPMENT TEST SHEET . SYSTEM Specified. R (LI - Specified Equipment Location Total CFM - Fan FZ Od ;,,o /3✓ Area Served • WO LE SPA CE-' iZ O 0 O Equipment Manufacturer Vo R►< A/A CFM Model 1 7225 7.-FO(1 JIO/aAAAIA' Serial Number 2- g 0 _NI I P 19 aZ75 Motor Sheave & No. Grooves Specified. Actual Specified Actual Total CFM - Fan 2000 ;,,o /3✓ Total CFM - Outlet iZ O 0 O O/5 . A/A CFM 1720 1 7225 OVA CFM 2- g 0 2.5:'4 Total Static Pressure (Total/EExtemali '7.G a 3-5- Inlet Pressure 1050 - r 0 ' 3 -- -- Discharge Pressure �---- 4. 0 A-...2-- / Fan RPM ---- 44 I G Motor Sheave & No. Grooves Specified Actual Specified Actual Motor Manufacturer G 6-Ni TS- sa c'sr.J re a Motor HP/BHP I . Phase 1 1 Voltage fps 2...o 9 Amperage '7.G 3,8 Motor RPM 1050 5 S PEED Motor Service Factor �---- Starter Heater Elements Motor Sheave & No. Grooves PD Fan Sheave & No. Grooves D Belts .. 'pD Remarks 1.$D = D IP E c 1 1)RIVC Form #89030 • Project Narne EXHAUST FAN DATA SHEET Date Page : of SYSTal r- Actual Equipment Location G E l f∎I fJ G . Area Served 12557` Roon'► l:quipmeni Manufacturer • gD A n) 100 Model • 1 ID p.`A • j Serial Number , Phase Motor Sheave & No. Grooves Fan Sheave & No. Grooves 1)V Belts ",') Not always required or applicable. Remarks 1J dJ = D t Z T - DR \E Form.N89031 Specified . Actual Specified Actual - Total CFM - Fan 1 1 0. 41 5 Tots-1 CFM - Outlet 100 Gj • Total Static Pressure' (Total/External} . ... Phase - I. ' --- --- .1. Inlet Pressure - — 0 p c f . j 2,0 Discharge Pressure ®— Ampaiage 1 i c7 ©, 4) Fan RPM -7)1) —.:= �% Motor Sheave & No. Grooves Fan Sheave & No. Grooves 1)V Belts ",') Not always required or applicable. Remarks 1J dJ = D t Z T - DR \E Form.N89031 Specified Actual • Specdted Actual Motor Manufacturer go k) Motor HPIBHP �-- Phase - I. ' --- --- .1. Voltage .1` 1 S j 2,0 - Ampaiage 1 i c7 ©, 4) Motor RPM —.:= �% Motor Service Factor r •--=_ Starter Heater Elements =—. Motor Sheave & No. Grooves Fan Sheave & No. Grooves 1)V Belts ",') Not always required or applicable. Remarks 1J dJ = D t Z T - DR \E Form.N89031 2009 Washington State Energy Code Compliance Form for Norresident al and Multifamily Residential . roject Summary`' PRJ -SUM 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised November 2010 Project Info - Project Address Best Buy Mobile Date 5/23/2012 South Center Square For Building Department Use I Tukwila, WA Applicant Name: Shawn Whalen Applicant Address: 50 South 6th Street Ste 1100, Minneapolis, MN 55402 Applicant Phone: 612 - 465 -7550 FILE COPY Permit No. REVIEWED FOR CODE COMPLIANCE APPROVED JUN 1 3 2012 City of Tukwila BUILDING DIVISION REC TUlk"" C1TY OF MAN 302012 PERMIT CENTER 2009 Washington State Energy Code Compliance'Form for Nonresidential and Multifamily Residential interior Lighting Summaiy LTG -INT 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised November 2010 Project Info Project Address Best Buy Mobile Date 5/23/2012 South Center Square For Building Department Use Tukwila, WA Applicant Name: Shawn Whalen Applicant Address: 50 South 6th Street Ste 1100, Minneapolis, MN 55402 Applicant Phone: 612 - 465 -755o Project Description ❑ Plans Induded requirements. ❑ New Building ❑ Addition -' Alteration Refer to WSEC Section 1513 for controls and commissioning Compliance Option Q Prescriptive QQ Lighting Power Allowance 0 Systems Analysis (See Qualification Checklist (over). Indicate Prescriptive & LPA spaces clearly on plans.) Alteration Exceptions (check appropriate box - sec. 1132.3) ❑ No changes are being made to the lighting and space use not changed ❑ Less than 60% of the fixtures new, installed wattage not increased, & space use not changed. Maximum Allowed Lighting Wattage Location (floor plan/room #) Occupancy Description Allowed Watts per ft2" Gross Interior Area in ft2 Allowed x Area SALES RETAIL 1.33 1170 1556 TOILET ROOM RESTROOM 0.80 45 36 sTOCK /OFFICE OFFICE 0.91 208 189 SALES DISPLAY ALLOWANCE PER TABLE 15 -1, NOTE 10 0.60 608 365 ALLOWANCE PER NOTE 10 1.00 1000 1000 SALES D /D1 - 2' SHOW WINDOW LED TRACK LIGHTING 1 100 100 " From Table 15-1 (over) - document all exceptions on form LTG -LPA Total Allowed Watts 3146 Proposed Lighting Wattage Location (floor plan/room #) Fixture Description Number of Fixtures Watts/ Fixture Watts Proposed SALES B /BE - 2'X2' RECESSED 2 -LAMP FLUORESCENT 6 61 366 SALES P - PENDANT 6 16 96 SALES D /D1 - LED TRACK LIGHTING W /5A CURRENT LIMITER 1 600 600 SALES Ex.- EXISTING 2'x4' 3 -LAMP FLUORESCENT 14 85 1190 OFFICE Ex.- EXISTING /RELOCATED 2'x4' 3 -LAMP FLUORESCENT 3 85 255 SALES D /D1 - 2' SHOW WINDOW LED TRACK LIGHTING 1 100 100 RESTROOM EXISTING (2)LAMP 4' FLUORESCENT 1 61 61 Total Proposed Watts may not exceed Total Allowed Watts for Interior Total Proposed Watts 2668 Notes: 1. For proposed Fixture Description, indicate fixture type, lamp type (e.g. T -8), number of lamps in the fixture, and ballast type (if included). For track lighting, list the length of the track (in feet) in addition to the fixture, lamp, and ballast information. 2. For proposed Watts/Fixture, use manufacturer's listed maximum input wattage of the fixture (not simply the lamp wattage) and other criteria as specified in Section 1530. For line voltage track lighting, list the greater of actual luminaire wattage or length of track multiplied by 50, or as applicable, the wattage of current limiting devices or of the transformer. For low voltage track lighting list the transformer rated wattage. 3. List all fixtures. For exempt lighting, note section and exception number, and leave Watts/Fixture blank. 2009 Washington State Energy Code Compliance•Form for Nonresidential and Multifamily Residential h teribr Lighting Summary (back) ' 4.' LTG -INT 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised November 2010 Prescriptive Spaces Occupancy: 0 Warehouse or Parking Garage 0 Other Qualification Checklist Note: If occupancy type is "Other' and fixture answer is checked, the number of fixtures in the space is not limited by Code. Clearly indicate these spaces on plans. If not qualified, do LPA Calculations. Lighting Fixtures: (Section 1521) Check if 95% or more of fixtures comply with 1,2 or 3 and rest are ballasted. 1. Fluorescent fixtures with a) 1 or 2 two (amps, b) reflector or louvers, c) 5-60 watt T -1, T -2, T-4, T -5, T -8, or CFL lamps, and d) hard -wired electronic dimming ballasts. Screw -in CFL fixtures and tracking lighting do not qualify. 2. Metal Halide with a) reflector b) ceramic MH lamps < =150w c) electronic ballasts 3. LED lights. TABLE 15 -1 Unit Liahtina Power Allowance (LPA Use' LPA (W /ft`)U se' LPA` (W /ft`) Automotive facility 0.85 Office buildings, office /administrative areas in facilities of other use types (including but not limited to schools, hospitals, institutions, museums, banks, churches)5 0.91 Convention center 1.10 Parking garages 0.20 Courthouse 1.10 Penitentiary and other Group 1 -3 Occupancies 0.90 Cafeterias, fast food establishments°, restaurants/bars5 1.20 Police and fire stations 0.90 Dormitory 0.85 Post office 1.00 Dweling Units 1.00 Retail7s, retail banking, mall concourses, wholesale stores (pallet rack shelving) 1.33 Exercise center 0.95 School buildings (Group E Occupancy only), school classrooms, day care centers 1.00 Gymnasia, assembly spaces 0.95 Theater, motion picture 0.97 Health care clinic 1.00 Theater, performing arts 1.25 Hospital, nursing homes, and other Group 1 -1 and 1 -2 Occupancies 1.20 Transportation 0.80 Hotel/motel 1.00 Warehouses 0.50 Laboratory spaces (all spaces not classified "laboratory" shall meet office and other appropriate categories) 1.62 Workshops 1.20 Laundries 1.20 Libraries' 1.20 Plans Submitted for Common Areas Only' Manufacturing facility 1.20 Main floor building lobbies' (except mall concourses) 1.10 Museum 1.00 Common areas, corridors, toilet facilities and washrooms, elevator lobbies 0.80 Footnotes for Table 15 -1 1) In cases in which a general use and a specific use are listed, the specific use shall apply. In cases in which a use is not mentioned specifically, the Unit Power Allowance shall be determined by the building official. This determination shall be based upon the most comparable use specified in the table. See Section 1512 for exempt areas. 2) The watts per square foot may be increased, by 2% per foot of ceiling height above 20 feet, unless specifically directed otherwise by subsequent footnotes. 3) Watts per square foot of room may be increased by 2% per foot of ceiling height above 12 feet. 4) For all other spaces, such as seating and common areas, use the Unit Light Power Allowance for assembly. 5) Watts per square foot of room may be increased by 2% per foot of ceiling height above 9 feet. 6) Reserved. 7) For conference rooms and offices less than 150ft2 with full height partitions, a Unit Lighting Power Allowance of 1.1 w/ft2 may be used. 8) Reserved. 9) For indoor sport toumament courts with adjacent spectator seating over 5,000, the Unit Lighting Power Allowance for the court area is 2.60 W /ft2. 10) Display window illumination installed within 2 feet of the window, provided that the display window is separated from the retail space by walls or at least three - quarter- height partitions (transparent or opaque) and lighting for free- standing display where the lighting moves with the display are exempt. An additional lighting power allowance is allowed for merchandise display luminaires installed in retail sales areas that are specifically designed and directed to highlight merchandise. The following additional wattages apply: i. 0.6 watts per square foot of sales floor area not listed in items ii and iii below; ii. 1.4 watts per square foot of fumiture, clothing, cosmetics or artwork floor area; or iii. 2.5 watts per square foot of jewelry, crystal or china floor area. The specified floor area for items i, ii, or iii above, and the adjoining circulation paths shall be identified and specified on building plans. Calculate the additional power allowance by multiplying the above LPDs by the sales floor area for each department excluding major circulation paths. The total additional lighting power allowance is the sum of allowances for sales categories 1, ii, or iii plus an additional 1,000 watts for each separate tenant larger than 250 square feet in area. The additional wattage is allowed only if the merchandise display luminaires comply with all of the following: (a) Located on ceiling- mounted track or directly on or recessed into the ceiling itself (not on the wall). (b) Adjustable in both the horizontal and vertical axes (vertical axis only is acceptable for fluorescent and other fixtures with two points of track attachment). This additional lighting power is allowed only if the lighting is actually installed and automatically controlled, separately from the general lighting, to be turned off during nonbusiness hours. This additional power shall be used only for the specified luminaires and shall not be used for any other purpose. ERMIT COORD COON> PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -081 PROJECT NAME: BEST BUY MOBILE SITE ADDRESS: 17250 SOUTHCENTER PY DATE: 05/30/12 X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # after Permit Issued DEPARTMENTS: AT L tr-).12 AINS N /14- �y11 --1 Budding Division ® Fire Prevention IM Public Works ❑ Structural Planning Division Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete DUE DATE: 05/31/12 Incomplete ❑ Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TOES /THURS ROUTING: Please Route 111 Structural Review Required n No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 06/28/12 Approved n Approved with Conditions Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 02/29/12 Contractors or Tradespeople De it c. LaborState Department of Labor & Industries Contractors or Tradespeople Detail Return to List > Start a New Search > Printer friendly • Verify Workers' Comp Premium Status Check for Dept. of Revenue Account Page 1 of 2 About General /Specialty Contractor A business registered as a construction contractor with L&I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name EVERGREEN REFRIGERATION LLC Phone No. (206) 763 -1744 Address 727 S Kenyon St Suite /Apt. City Seattle State • WA Zip 98108 County King Business Type Limited Liability Company Parent Company UBI No. J 602512953 Status Active License No. EVERGRL954R2 License Type JD Construction Contractor Effective Date 1/6/2006 Expiration Date 1/6/2014 Suspend Date Specialty 1 J General Specialty 2 1, Unused Other Associated Licenses License Name Type Specialty Specialty Effective Expiration Status 1 2 Date Date EVERGREEN HOME • Construction EVERGHH910)0 HEATING & ENGY Contractor EVERGREEN Construction EVERGI" 201 D7 REFRIGERATION INC Contractor 3 Business Owner Information i Hide All General Unused 4/20/2009 4/20/2013 Active General Unused 3/27/1980 7/31/2006 Re- Licensed Name Role Effective Date Expiration Date EVERGREEN REFRIGERATION LLC ' Partner /Member 12/22/2005 PATTON, DAVID Partner /Member 01/06/2006 PATTON, RODGER Partner /Member 01/06/2006 https: // fortress .wa.gov /lni /bbip /Result.aspx 08/01/2012 ABBREVIATIONS HVAC SYMBOL LEGEND AFF AMP AP BTU CBV CFH CFM CHW CHWR CHWS CLG CO CR CW DB DEMO DIA DIFF DWG DX EAT ELEC ELEV EMS EWB EWT EX H EXIST F FSD FCO FD FD FFE FLR FP M FT GA GAL GC GPH HP HT HVAC HW HZ ABOVE FINISHED FLOOR AMPERE (AMP, AMPS) ACCESS PANEL BRITISH THERMAL UNIT CIRCUIT BALANCING VALVE CUBIC FEET PER HOUR CUBIC FEET PER MINUTE CIRCULATING HOT WATER CHILLED WATER RETURN CHILLED WATER SUPPLY CEILING CLEANOUT CONDENSATE RETURN COLD WATER DECIBEL DEMOLITION DIAMETER DIFFUSER DRAWING DIRECT EXPANSION ENTERING AIR TEMPERATURE ELECTRICAL ELEVATION ENERGY MANAGEMENT SYSTEM EXTERNAL STATIC PRESSURE ENTERING WET BULB ENTERING WATER TEMPERATURE EXHAUST EXISTING FAHRENHEIT COMBINATION FIRE /SMOKE DAMPER FLOOR CLEANOUT FIRE DAMPER FLOOR DRAIN FINISHED FLOOR ELEVATION FLOOR FEET PER MINUTE FOOT OR FEET GAGE OR GAUGE GALLONS GENERAL CONTRACTOR GALLONS PER HOUR HORSEPOWER HEIGHT HEATING, VENTILATING, AIR CONDITIONING HOT WATER HERTZ ID INV KW LAT LBS LWB LWT MA MAX MBH MIN MISC NA NC NIC NTS OA OBD PH PVC RA REC REL RH RM RPM SA SAN SD SF SP SPEC STD TD TSP V TYP VFD VSD VOL VTR W W/0 WC WCO WT INSIDE DIAMETER INVERT KILOWATT LEAVING AIR TEMPERATURE POUNDS LEAVING WET BULB LEAVING WATER TEMPERATURE MIXED AIR MAXIMUM THOUSAND BTU'S /HR MINIMUM MISCELLANEOUS NOT APPLICABLE NOISE CRITERIA NOT IN CONTRACT NOT TO SCALE OUTSIDE AIR OPPOSED BLADE DAMPER PHASE (ELECTRICAL) POLYVINYL CHLORIDE RETURN AIR RECESSED RELIEF RELATIVE HUMIDITY ROOM REVOLUTIONS PER MINUTE SUPPLY AIR SANITARY SMOKE DAMPER SQUARE FEET STATIC PRESSURE SPECIFICATION STANDARD TEMPERATURE DIFFERENCE TOTAL STATIC PRESSURE TYPICAL VOLTS VARIABLE FREQUENCY DRIVE VARIABLE SPEED DRIVE VOLUME VENT THROUGH ROOF WATTS WITH WITHOUT WATER CLOSET WALL CLEANOUT WEIGHT EQUIPMENT TAGS ACC U AHU CP DHC EF EU H EWC EWH AIR COOLED CONDENSING UNIT AIR HANDLING UNIT CIRCULATING PUMP DUCT HEATING COIL EXHAUST FAN ELECTRIC UNIT HEATER ELECTRIC WATER COOLER ELECTRIC WATER HEATER ECU IH MAU RF RH RTU VAV FAN COIL UNIT INTAKE HOOD MAKE —UP AIR UNIT RETURN FAN RELIEF HOOD ROOFTOP UNIT VARIABLE AIR VOLUME BOX MISC. SYMBOL LEGEND XXX 1 EQUIPMENT TAG 0 CONNECTION TO EXISTING AREVISION TRIANGLE OX KEY NOTE SHEET INDEX M -1 HVAC PLAN M -2 PLUMBING PLAN M -3 MECHANICAL SPECIFICATIONS MAIN DUCT BRANCH MANUAL VOLUME DAMPER SPIN —ON FITTING RIGID ROUND DUCT DUCTWORK SUPPLY DUCT UP SUPPLY DUCT DOWN SUPPLY DUCT UP THROUGH ROOF RETURN /EXHAUST /RELIEF DUCT UP RETURN /EXHAUST /RELIEF DUCT DOWN RETURN /EXHAUST /RELIEF DUCT UP THROUGH ROOF MANUAL VOLUME DAMPER MOTORIZED DAMPER FIRE DAMPER W /ACCESS PANEL FIRE /SMOKE DAMPER W /ACCESS. PANEL SMOKE DAMPER W /ACCESS PANEL DUCT RISE (OR DROP) EXISTING DUCTWORK TO REMAIN EXISTING DUCTWORK TO REMAIN EXISTING DUCTWORK TO BE REMOVED EXISTING DUCTWORK TO BE REMOVED SUPPLY AIR TERMINAL RETURN /TRANSFER AIR TERMINAL EXHAUST AIR TERMINAL VAV BOX ACCESS PANEL THERMOSTAT TEMPERATURE SENSOR SMOKE DETECTOR LONG RADIUS ELBOW SHORT RADIUS ELBOW WITH VANES f 1 2/12 12/12 x 12/12 ; x” 12/12 1 2/1 2 12/12 ;" ✓ IL 12/12 r12/12 IL 12/12 IL 12/12 f FSD 12/12 FD IL I SD f- 12/12 T 12/12 1 2/1 2 TYPE — NECK SIZE AIRFLOW (CFM) TYPE — NECK SIZE AIRFLOW (CFM) TYPE — NECK SIZE AIRFLOW (CFM) X r\\ A -10 300 B -22/22 300 C -10/10 150 BRANCH DUCT W/ EXTERNAL INSULATION INSULATED FLEXIBLE DUCT MAX. 5' -0" LONG ONE DRAW BAND FOR INNER LINER AND ONE DRAW BAND FOR OUTSIDE VAPOR BARRIER — TYPICAL © EACH FLEX —DUCT CONNECTION 4" RIGID DUCT EXTENSION ATTACHED` TO DIFFUSER NECK .' ti CEILING DIFFUSER CDTYP. DIFFUSER/DUCT CONNECTIONS , NO SCALE LAY -IN DIFFUSER GENERAL NOTES A. THE GENERAL CONTRACTOR SHALL COORDINATE TEST & BALANCE WITH NEBB OR AABC CERTIFIED BALANCE CONTRACTOR. TEST & BALANCE OF ENTIRE TENANT HVAC SYSTEM SHALL BE PERFORMED, INCLUDING BUT NOT LIMITED TO: SUPPLY AIR, RETURN AIR, OUTSIDE AIR, CHILLED WATER, AND HOT WATER. VERIFY WITH BEST BUY MOBILE CONSTRUCTION MANAGER AND /OR LANDLORD REPRESENTATIVE. B. SUBMIT COPIES OF TEST & BALANCE REPORT TO LANDLORD, OWNER & ENGINEER. C. CONTRACTOR SHALL COMPLETELY REMOVE FROM THE PREMISES ALL EQUIPMENT, PIPING, DUCTWORK, CONTROLS, CONTROL WIRING, ETC. AND ALL ASSOCIATED SUPPORTS, BRACING, PADS, ETC. NOT BEING REUSED OR SHOWN TO REMAIN WHETHER IN THE DEMISED SPACE, ON THE ROOF OR OTHERWISE LOCATED OUTSIDE OF THE DEMISED SPACE. DO NOT ABANDON IN PLACE. D. REFER TO ARCHITECTURAL SHEETS FOR CEILING HEIGHTS. E. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING EQUIPMENT CONDITIONS PRIOR TO BID. F. EXISTING DUCT LAYOUT FOR REFERENCE ONLY. CONTRACTOR TO VERIFY EXACT SIZES AND LAYOUT. G. MECHANICAL INSTALLATION (Sc SERVICE WORK SHALL BE COMPLETE BY SUBSTANTIAL COMPLETION. CONDUCT TEST & BALANCE DURING TIME OF FIXTURING. G.C. SHALL COORDINATE COMPLETION OF WORK THAT HAS IMPACT ON TEST & BALANCE RESULTS (I.E. WALLS; DROP CEILING; DOORS; ETC.) H. ALL NEW DUCTWORK TO BE SHEET METAL — SEE SPECIFICATION FOR ADDITIONAL INFORMATION. I. SLEEVE AND SEAL ALL FLOOR PENETRATIONS LIQUID TIGHT AND INSTALL WATERPROOF FLOOR MEMBRANE —ALL PLUMBING AREAS. EXHAUST FAN SCHEDULE Alm mr EF A B UNIT TAG EF -1 E AREA SERVED TOILET ROOM SUPPLY MANUFACTURER EXISTING I IL MODEL NUMBER EXISTING LAY —IN DRIVE (BELT, DIRECT) EXISTING LAY —IN FAN DATA TITUS CFM 100 TITUS ESP EXISTING E '13 RPM . 50F MOTOR RPM — 24" X 24" ELECTRICAL 1 00 7 EXISTING V —PH —CY EXISTING - STARTER v EXISTING RETURN AIR GRILLE TO BE CLEANED AND REUSED. o. EXISTING HP --- EXISTING REMARKS VERIFY INTERLOCK W/ TOILET ROOM LIGHTS. REFER TO KEYNOTE #4 FOR RE— FURBISHING 0 TYPE EXISTING CLASS (I, II, III, IV) EXISTING - FILTERS TYPE THROWAWAY DEPTH 2" AF5 EFFICIENCY % 30% MEAN APD .14 O 44 CFM 2000 FPM EXISTING 13 63.2/80.0 INPUT MBH 125 APD EXISTING CONTROL STEPS 1 DX COOLING COIL CFM 2000 400 EAT DB /WB — _ LAT DB /WB 60.2/59.0 ® SENSIBLE /TOTAL MBH 36.4/36.9 0 © REFRIGERANT TYPE R -410A SPLIT — Fig NUMBER OF CIRCUITS 1 REFR SUCTION TEMP — /_ I, COMPRESSOR TYPE SCROLL QUANTITY 1 ■ UNLOADING % 0 -100% E1 ECONOMIZER �� g® MCA © V —PH —CY EXISTING * i_ EXISTING DISCONNECT EXISTING OPERATING WEIGHT (LBS) EXISTING REMARKS EXISTING ROOFTOP UNIT TO REMAIN — SEE KEYNOTE #1 FOR REFURBISHING REQUIREMENTS. � 150 A0 150 — w Aiii, _W1 ® 12/10 11 —_ 10 3 � 0 - �_ 12/ 10 � li -` g �: 175 „ —_ — A O9 D V u O PIIIIIIIIIIM p ' O • 110 *At O O EX. R.A. I■ sn ', QI EX. S.A. �. O -12/10 �� I •' 600 — ., EX. S.A. 10 Er --■ —I _ - A p A ® IIiv lidL I I /LfThJ8p(V ._ \ A UL%VA ! C RTU I al !� r B I� �I, �® � - (---- ■ II pp �1 10 . --(. . � IMIrk ... u •• .• (--,, HVAC PLAN 4 IA n ■ . n ._'-1 A. THE GENERAL CONTRACTOR SHALL COORDINATE TEST & BALANCE WITH NEBB OR AABC CERTIFIED BALANCE CONTRACTOR. TEST & BALANCE OF ENTIRE TENANT HVAC SYSTEM SHALL BE PERFORMED, INCLUDING BUT NOT LIMITED TO: SUPPLY AIR, RETURN AIR, OUTSIDE AIR, CHILLED WATER, AND HOT WATER. VERIFY WITH BEST BUY MOBILE CONSTRUCTION MANAGER AND /OR LANDLORD REPRESENTATIVE. B. SUBMIT COPIES OF TEST & BALANCE REPORT TO LANDLORD, OWNER & ENGINEER. C. CONTRACTOR SHALL COMPLETELY REMOVE FROM THE PREMISES ALL EQUIPMENT, PIPING, DUCTWORK, CONTROLS, CONTROL WIRING, ETC. AND ALL ASSOCIATED SUPPORTS, BRACING, PADS, ETC. NOT BEING REUSED OR SHOWN TO REMAIN WHETHER IN THE DEMISED SPACE, ON THE ROOF OR OTHERWISE LOCATED OUTSIDE OF THE DEMISED SPACE. DO NOT ABANDON IN PLACE. D. REFER TO ARCHITECTURAL SHEETS FOR CEILING HEIGHTS. E. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING EQUIPMENT CONDITIONS PRIOR TO BID. F. EXISTING DUCT LAYOUT FOR REFERENCE ONLY. CONTRACTOR TO VERIFY EXACT SIZES AND LAYOUT. G. MECHANICAL INSTALLATION (Sc SERVICE WORK SHALL BE COMPLETE BY SUBSTANTIAL COMPLETION. CONDUCT TEST & BALANCE DURING TIME OF FIXTURING. G.C. SHALL COORDINATE COMPLETION OF WORK THAT HAS IMPACT ON TEST & BALANCE RESULTS (I.E. WALLS; DROP CEILING; DOORS; ETC.) H. ALL NEW DUCTWORK TO BE SHEET METAL — SEE SPECIFICATION FOR ADDITIONAL INFORMATION. I. SLEEVE AND SEAL ALL FLOOR PENETRATIONS LIQUID TIGHT AND INSTALL WATERPROOF FLOOR MEMBRANE —ALL PLUMBING AREAS. EXHAUST FAN SCHEDULE Alm mr EF A B UNIT TAG EF -1 E AREA SERVED TOILET ROOM SUPPLY MANUFACTURER EXISTING RETURN MODEL NUMBER EXISTING LAY —IN DRIVE (BELT, DIRECT) EXISTING LAY —IN FAN DATA TITUS CFM 100 TITUS ESP EXISTING TMSA RPM EXISTING 50F MOTOR RPM — 24" X 24" ELECTRICAL HP — EXISTING V —PH —CY EXISTING EXISTING SUPPLY AIR DIFFUSER TO BE CLEANED AND REUSED. STARTER EXISTING EXISTING RETURN AIR GRILLE TO BE CLEANED AND REUSED. DISCONNECT EXISTING HP WEIGHT (LBS) EXISTING REMARKS VERIFY INTERLOCK W/ TOILET ROOM LIGHTS. REFER TO KEYNOTE #4 FOR RE— FURBISHING GRILLE, REGISTER AND DIFFUSER Alm mr TYPE A B C D E ITEM SUPPLY SUPPLY SUPPLY RETURN RETURN DESCRIPTION LAY —IN LAY —IN LAY —IN LAY —IN LAY —IN MANUFACTURER TITUS EXISTING EXISTING TITUS EXISTING MODEL NUMBER TMSA EXISTING EXISTING 50F EXISTING SIZE 24" X 24" EXISTING EXISTING 24" X 24" EXISTING REMARKS - ADJUSTABLE STD. WHITE FINISH EXISTING SUPPLY AIR DIFFUSER TO BE CLEANED AND REUSED. EXISTING SUPPLY AIR DIFFUSER TO BE CLEANED AND RELOCATED AS SHOWN. STD. WHITE FINISH EXISTING RETURN AIR GRILLE TO BE CLEANED AND REUSED. 1 -ID KEY NOTES 01 EXISTING ROOF TOP UNIT (RTU) TO REMAIN. INCLUDING MAIN DUCTWORK, INSULATION, HANGER ASSEMBLIES, ETC. MECHANICAL CONTRACTOR SHALL CHECK, TEST, AND SERVICE UNIT AS REQUIRED, INCLUDING BUT NOT LIMITED TO: FANS, BELTS, BEARING, COILS, DAMPERS, DAMPER OPERATORS, AND MOTORS TO ASSURE UNIT IS OPERATING AT OR NEAR ORIGINAL DESIGN CONDITIONS. PROVIDE DOCUMENTATION OF SERVICES PERFORMED TO BBM CPM. REVISIONS No changes shall be made to the scope of work without prior approval of =ukwila Building Division. visions will require a new plan submittal ra / I. is ude additional plan review fees. O2 RELOCATE EXISTING THERMOSTAT FOR RTU CONTROL TO LOCATION SHOWN MOUNTED AT 4' —O" A.F.F. CONFIRM OPERATION OF EXISTING THERMOSTAT PRIOR TO REUSE. O3 CONFIRM OPERATION OF EXISTING DUCT — MOUNTED SMOKE DETECTOR. IF NOT EXISTING, INSTALL DUCT SMOKE DETECTOR FURNISHED BY ELECTRICAL CONTRACTOR IN RETURN MAIN DUCT. DETECTOR SHALL SHUT DOWN HVAC UNIT UPON DETECTION OF SMOKE. O4 SERVICE AND CLEAN EXISTING EXHAUST FAN AND ASSOCIATED DUCTWORK TO REMAIN. REPLACE AND REPAIR UNIT COMPONENTS AS REQUIRED TO MAKE UNIT FULLY FUNCTIONAL, INCLUDING BUT NOT LIMITED TO: FANS, BELTS, BEARINGS, DAMPERS, MOTORS, OPERATING AND SAFETY CONTROLS. O FLEX DUCT 5' -0" MAX LENGTH. (TYPICAL FOR ALL) O6 INSTALL NEW SPIN —IN TAKE OFF IN EXISTING SUPPLY AIR DUCTWORK. PROVIDE MANUAL VOLUME DAMPER. O7 EXTEND NEW SUPPLY AIR RUN —OUT AS REQUIRED FOR NEW DIFFUSER LOCATION. VERIFY SIZE OF EXISTING RUN —OUT IN FIELD. CONTRACTOR TO VERIFY, PRIOR TO BID, IF EXISTING RUN —OUT HAS MANUAL VOLUME DAMPER — PROVIDE NEW IF NOT EXISTING. TYPICAL OF ALL SUPPLY AIR TAKE —OFFS TO BE RE -USED. Og RETURN AIR GRILLE CONNECTION SHALL BE GALV. SHEET DUCT. FLEX DUCT: IS NOT ACCEPTABLE (TYPICAL). O. CLEAN EXISTING SUPPLY DUCT TO REMAIN. SEE SPECIFICATION FOR CLEANING HVAC SYSTEM. 11 CLEAN EXISTING RETURN DUCT TO REMAIN. SEE SPECIFICATION FOR CLEANING HVAC SYSTEM. O. CLEAN AND REUSE (RELOCATE IF SHOWN) THE EXISTING SUPPLY AIR DIFFUSER. CONTRACTOR SHALL VERIFY DIFFUSER IS IN GOOD WORKING CONDITION AND REBALANCE EXISTING DIFFUSER TO THE CFM INDICATED. CONTRACTOR SHALL REPLACE ANY DAMAGED DIFFUSERS TO ENSURE PROPER AIR FLOWS — NEW DIFFUSER SHALL MATCH EXISTING DIFFUSERS. 0 CLEAN AND REUSE EXISTING RETURN AIR GRILLES. CONTRACTOR SHALL VERIFY GRILLES ARE IN GOOD WORKING CONDITION AND REPLACE ANY DAMAGED RETURN AIR GRILLES AS NECESSARY. CONTRACTOR SHALL MATCH EXISTING RETURN AIR GRILLES IF EXISTING GRILLES NEED TO BE REPLACED. 14 RELOCATE FIRE SPRINKLER HEADS AS REQUIRED FOR NEW LIGHTS, DIFFUSERS, WALLS AND CEILINGS. PLAN SHALL BE SUBMITTED BY A LANDLORD APPROVED FIRE SPRINKLER CONTRACTOR (IF NECESSARY). SPACE LOAD CALCULATIONS DESIGN TEMPS SUMMER 85 65 75 OADB 0.A.W.B 1 .A. D. B. GAINS SOLAR LOAD DEG F DEG F DEG F ROOF LOAD GLASS LOAD WALL LOAD LIGHTS PEOPLE PEOPLE (SENS) PEOPLE (LAT) INFILTRATION (SENS) INFILTRATION (LAT) MISCELLANEOUS VENTILATION (SENS) VENTILATION (LAT) SUPPLY FAN LOAD SENS. LOAD TOTAL LOAD TOTAL CFM 2247 6882 392 276 7642 17 3527 3400 211 — 203 8199 2477 — 2708 2224 34076 34565 2000 BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H WINTER OADB 23 DEG F IADB 70 DEG F LOSS 4842 3007 1988 BTU H BTU H BTU H 1049 BTU H 13905 BTUH TOTAL 24791 BTUH VENT. 280 CFM E PER UT r� SRED FOR: 0 Mechanical electrical Rlumbing grdbas Piping (j of Tukwila °o`'Y 3 DIVISION FILE Cat PY Permit Na 1 ' O8 1 Ma Plan review approval is subject to errors and omissions. A p coral of construction documents does not autilf !?s t 4 v otatJon of any adopted code or ordinance. Rece= .t 01 approved Field Copy and conditions is acknowlec gc& By Date:. S / / 12 City Of Tukwila BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED JUN 1 3 2012 City of Tukwila BUILDING DIVISION RE( tVt r. CITY OF TUIMIILA MAY 3 0 2012 PERMIT CENTER M OUTSIDE AIR CALCULATION OUTSIDE AIR CALCULATION BASED ON THE 2009 INTERNATIONAL MECHANICAL CODE: AREA #1 — SALES 0.12 CFM /SQFT. X 938 SQ. FT. = 7.5 CFM / PERSON X 15 PEOPLE _ NET SQ. FOOTAGE: 938 113 '113 VENTILATION: 226 CFM AREA #2 — STORAGE NET SQ. FOOTAGE: 397 VENTILATION: 48 CFM 0.12 CFM /SQFT. X 397 SQ. FT. = MINIMUM VENTILATION REQUIRED: MINIMUM VENTILATION SUPPLIED: 274 CFM 280 CFM 0412755 -139 L'il DUNHAM Dunham Associates, Inc. 50 South Sixth Street /Suite 1100 Minneapolis, Minnesota 55402 -1540 PHONE 612.465.7550 FAX 612.465.7551 WEB dunhameng.com mechanical + electrical consulting engineering DRAWN BY:_1111 CHECKED BY: GMS SQ. FT. CALCS RETAIL: 1,170 SF TOTAL: 1,682 SF c�vnc�r: 1.0 LARGE CONCEPT DATE: 04 -28 -1 1 STORE NUMB 0 0 W < wago cn 1- w Do Ual W m 1— Q W1W) U 2WO- DQNY PERMIT SET ISSUE DATE: 05 -23 -12 REV. DATE EXISTING RTU SCHEDULE RTU • UNIT TAG RTU -1 A AREA SERVED — A MANUFACTURER YORK MODEL NUMBER ZFO60 TYPE PACKAGE MIN OUTSIDE AIR CFM 280 SUPPLY FAN CFM 2000 ESP .50 TSP .75 RPM EXISTING HP EXISTING BHP EXISTING TYPE EXISTING CLASS (I, II, III, IV) EXISTING FILTERS TYPE THROWAWAY DEPTH 2" EFFICIENCY % 30% MEAN APD .14 GAS HEAT EXCHANGER CFM 2000 FPM EXISTING EAT /LAT 63.2/80.0 INPUT MBH 125 APD EXISTING CONTROL STEPS 1 DX COOLING COIL CFM 2000 EAT DB /WB 77.3/65.0 LAT DB /WB 60.2/59.0 SENSIBLE /TOTAL MBH 36.4/36.9 REFRIGERANT TYPE R -410A SPLIT — NUMBER OF CIRCUITS 1 REFR SUCTION TEMP — COMPRESSOR TYPE SCROLL QUANTITY 1 UNLOADING % 0 -100% ECONOMIZER EXISTING ELECTRICAL MCA EXISTING V —PH —CY EXISTING STARTER EXISTING DISCONNECT EXISTING OPERATING WEIGHT (LBS) EXISTING REMARKS EXISTING ROOFTOP UNIT TO REMAIN — SEE KEYNOTE #1 FOR REFURBISHING REQUIREMENTS. KEY NOTES 01 EXISTING ROOF TOP UNIT (RTU) TO REMAIN. INCLUDING MAIN DUCTWORK, INSULATION, HANGER ASSEMBLIES, ETC. MECHANICAL CONTRACTOR SHALL CHECK, TEST, AND SERVICE UNIT AS REQUIRED, INCLUDING BUT NOT LIMITED TO: FANS, BELTS, BEARING, COILS, DAMPERS, DAMPER OPERATORS, AND MOTORS TO ASSURE UNIT IS OPERATING AT OR NEAR ORIGINAL DESIGN CONDITIONS. PROVIDE DOCUMENTATION OF SERVICES PERFORMED TO BBM CPM. REVISIONS No changes shall be made to the scope of work without prior approval of =ukwila Building Division. visions will require a new plan submittal ra / I. is ude additional plan review fees. O2 RELOCATE EXISTING THERMOSTAT FOR RTU CONTROL TO LOCATION SHOWN MOUNTED AT 4' —O" A.F.F. CONFIRM OPERATION OF EXISTING THERMOSTAT PRIOR TO REUSE. O3 CONFIRM OPERATION OF EXISTING DUCT — MOUNTED SMOKE DETECTOR. IF NOT EXISTING, INSTALL DUCT SMOKE DETECTOR FURNISHED BY ELECTRICAL CONTRACTOR IN RETURN MAIN DUCT. DETECTOR SHALL SHUT DOWN HVAC UNIT UPON DETECTION OF SMOKE. O4 SERVICE AND CLEAN EXISTING EXHAUST FAN AND ASSOCIATED DUCTWORK TO REMAIN. REPLACE AND REPAIR UNIT COMPONENTS AS REQUIRED TO MAKE UNIT FULLY FUNCTIONAL, INCLUDING BUT NOT LIMITED TO: FANS, BELTS, BEARINGS, DAMPERS, MOTORS, OPERATING AND SAFETY CONTROLS. O FLEX DUCT 5' -0" MAX LENGTH. (TYPICAL FOR ALL) O6 INSTALL NEW SPIN —IN TAKE OFF IN EXISTING SUPPLY AIR DUCTWORK. PROVIDE MANUAL VOLUME DAMPER. O7 EXTEND NEW SUPPLY AIR RUN —OUT AS REQUIRED FOR NEW DIFFUSER LOCATION. VERIFY SIZE OF EXISTING RUN —OUT IN FIELD. CONTRACTOR TO VERIFY, PRIOR TO BID, IF EXISTING RUN —OUT HAS MANUAL VOLUME DAMPER — PROVIDE NEW IF NOT EXISTING. TYPICAL OF ALL SUPPLY AIR TAKE —OFFS TO BE RE -USED. Og RETURN AIR GRILLE CONNECTION SHALL BE GALV. SHEET DUCT. FLEX DUCT: IS NOT ACCEPTABLE (TYPICAL). O. CLEAN EXISTING SUPPLY DUCT TO REMAIN. SEE SPECIFICATION FOR CLEANING HVAC SYSTEM. 11 CLEAN EXISTING RETURN DUCT TO REMAIN. SEE SPECIFICATION FOR CLEANING HVAC SYSTEM. O. CLEAN AND REUSE (RELOCATE IF SHOWN) THE EXISTING SUPPLY AIR DIFFUSER. CONTRACTOR SHALL VERIFY DIFFUSER IS IN GOOD WORKING CONDITION AND REBALANCE EXISTING DIFFUSER TO THE CFM INDICATED. CONTRACTOR SHALL REPLACE ANY DAMAGED DIFFUSERS TO ENSURE PROPER AIR FLOWS — NEW DIFFUSER SHALL MATCH EXISTING DIFFUSERS. 0 CLEAN AND REUSE EXISTING RETURN AIR GRILLES. CONTRACTOR SHALL VERIFY GRILLES ARE IN GOOD WORKING CONDITION AND REPLACE ANY DAMAGED RETURN AIR GRILLES AS NECESSARY. CONTRACTOR SHALL MATCH EXISTING RETURN AIR GRILLES IF EXISTING GRILLES NEED TO BE REPLACED. 14 RELOCATE FIRE SPRINKLER HEADS AS REQUIRED FOR NEW LIGHTS, DIFFUSERS, WALLS AND CEILINGS. PLAN SHALL BE SUBMITTED BY A LANDLORD APPROVED FIRE SPRINKLER CONTRACTOR (IF NECESSARY). SPACE LOAD CALCULATIONS DESIGN TEMPS SUMMER 85 65 75 OADB 0.A.W.B 1 .A. D. B. GAINS SOLAR LOAD DEG F DEG F DEG F ROOF LOAD GLASS LOAD WALL LOAD LIGHTS PEOPLE PEOPLE (SENS) PEOPLE (LAT) INFILTRATION (SENS) INFILTRATION (LAT) MISCELLANEOUS VENTILATION (SENS) VENTILATION (LAT) SUPPLY FAN LOAD SENS. LOAD TOTAL LOAD TOTAL CFM 2247 6882 392 276 7642 17 3527 3400 211 — 203 8199 2477 — 2708 2224 34076 34565 2000 BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H BTU H WINTER OADB 23 DEG F IADB 70 DEG F LOSS 4842 3007 1988 BTU H BTU H BTU H 1049 BTU H 13905 BTUH TOTAL 24791 BTUH VENT. 280 CFM E PER UT r� SRED FOR: 0 Mechanical electrical Rlumbing grdbas Piping (j of Tukwila °o`'Y 3 DIVISION FILE Cat PY Permit Na 1 ' O8 1 Ma Plan review approval is subject to errors and omissions. A p coral of construction documents does not autilf !?s t 4 v otatJon of any adopted code or ordinance. Rece= .t 01 approved Field Copy and conditions is acknowlec gc& By Date:. S / / 12 City Of Tukwila BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED JUN 1 3 2012 City of Tukwila BUILDING DIVISION RE( tVt r. CITY OF TUIMIILA MAY 3 0 2012 PERMIT CENTER M OUTSIDE AIR CALCULATION OUTSIDE AIR CALCULATION BASED ON THE 2009 INTERNATIONAL MECHANICAL CODE: AREA #1 — SALES 0.12 CFM /SQFT. X 938 SQ. FT. = 7.5 CFM / PERSON X 15 PEOPLE _ NET SQ. FOOTAGE: 938 113 '113 VENTILATION: 226 CFM AREA #2 — STORAGE NET SQ. FOOTAGE: 397 VENTILATION: 48 CFM 0.12 CFM /SQFT. X 397 SQ. FT. = MINIMUM VENTILATION REQUIRED: MINIMUM VENTILATION SUPPLIED: 274 CFM 280 CFM 0412755 -139 L'il DUNHAM Dunham Associates, Inc. 50 South Sixth Street /Suite 1100 Minneapolis, Minnesota 55402 -1540 PHONE 612.465.7550 FAX 612.465.7551 WEB dunhameng.com mechanical + electrical consulting engineering DRAWN BY:_1111 CHECKED BY: GMS SQ. FT. CALCS RETAIL: 1,170 SF TOTAL: 1,682 SF c�vnc�r: 1.0 LARGE CONCEPT DATE: 04 -28 -1 1 STORE NUMB 0 0 W < wago cn 1- w Do Ual W m 1— Q W1W) U 2WO- DQNY PERMIT SET ISSUE DATE: 05 -23 -12 REV. DATE A • A A A A SCALE: AS NOTED HVAC PLAN M -1 ABBREVIATIONS AFF ABOVE FINISHED FLOOR ID INSIDE DIAMETER AMP AMPERE (AMP, AMPS) INV INVERT AP ACCESS PANEL KW KILOWATT BTU BRITISH THERMAL UNIT LAT LEAVING AIR TEMPERATURE CBV CIRCUIT, BALANCING VALVE LBS POUNDS CFH CUBIC FEET PER HOUR LWB LEAVING WET BULB CFM CUBIC FEET PER MINUTE LWT LEAVING WATER TEMPERATURE CHW CIRCULATING HOT WATER MA MIXED AIR CHWR CHILLED WATER RETURN MAX MAXIMUM CHWS CHILLED WATER SUPPLY MBH THOUSAND BTU'S /HR CLG CEILING MIN MINIMUM CO CLEANOUT MISC MISCELLANEOUS CR CONDENSATE RETURN NA NOT APPLICABLE CW COLD WATER NC NOISE CRITERIA DB DECIBEL NIC NOT IN CONTRACT DEMO DEMOLITION NTS NOT TO SCALE DIA DIAMETER OA OUTSIDE AIR DIFF DIFFUSER OBD OPPOSED BLADE DAMPER DWG DRAWING PH PHASE (ELECTRICAL) DX DIRECT ,EXPANSION PVC POLYVINYL CHLORIDE EAT ENTERING AIR TEMPERATURE RA RETURN AIR ELEC ELECTRICAL REC RECESSED ELEV ELEVATION REL RELIEF EMS ENERGY' MANAGEMENT SYSTEM RH RELATIVE HUMIDITY ESP EXTERNAL STATIC PRESSURE RM ROOM EWB ENTERING WET BULB RPM REVOLUTIONS PER MINUTE EWT ENTERING WATER TEMPERATURE SA SUPPLY AIR EXH EXHAUST SAN SANITARY EXIST EXISTING SD SMOKE DAMPER FAHRENHEIT SF SQUARE FEET FSD COMBINATION FIRE /SMOKE DAMPER SP STATIC PRESSURE FCO FLOOR CLEANOUT SPEC SPECIFICATION FD FIRE DAMPER STD STANDARD FD FLOOR DRAIN TD TEMPERATURE DIFFERENCE FFE FINISHED FLOOR ELEVATION TSP TOTAL STATIC PRESSURE FLR FLOOR TYP TYPICAL FPM FEET PER MINUTE V VOLTS FT FOOT OR FEET VFD VARIABLE FREQUENCY DRIVE GA GAGE OR GAUGE VSD VARIABLE SPEED DRIVE GAL GALLONS VOL VOLUME GC GENERAL CONTRACTOR VTR VENT THROUGH ROOF GPH GALLONS PER HOUR W WATTS HP HORSEPOWER W/ WITH HT HEIGHT W/O WITHOUT HVAC HEATING!, VENTILATING, AIR CONDITIONING WC WATER CLOSET HW HOT WATER WCO WALL CLEANOUT HZ HERTZ WT WEIGHT EQUIPMENT TAGS ACCU AIR COOLED CONDENSING UNIT FCU FAN COIL UNIT AHU AIR HANDLING UNIT IH INTAKE HOOD CP CIRCULATING PUMP MAU MAKE —UP AIR UNIT DHC DUCT HEATING COIL RF RETURN FAN EF EXHAUST FAN RH RELIEF HOOD EUH ELECTRIC UNIT HEATER RTU ROOFTOP UNIT EWC ELECTRIC WATER COOLER VAV VARIABLE AIR VOLUME BOX EWH ELECTRIC WATER HEATER PLUMBING LINETYPE LEGEND WATER DOMESTIC COLD — DOMESTIC COLD WATER (BELOW FLOOR /GRADE) — — — — — DOMESTIC COLD WATER (EXISTING) — — DOMESTIC HOT WATER HOT WATER — — — DOMESTIC (EXISTING) G GAS ROOF) G GAS (ON G GAS (EXISTING) — — G — GAS (EXISTING ON ROOF) SANITARY SEWER (ABOVE FLOOR /GRADE) SANITARY SEWER (BELOW FLOOR /GRADE) SANITARY SEWER (EXISTING) VENT — VENT (UNDERFLOOR /GRADE) VENT (EXISTING) PLUMBING SYMBOL LEGEND FLOOR DRAIN X ANCHOR a REDUCER El BALL VALVE 11 PIPE FLANGE ► FLOW ARROW D4 GATE VALVE 4 AIR CHAMBER o EXPANSION JOINT T----.1 CHECK VALVE * WATER HAMMER p FLEXIBLE ARRESTER LI CONNECTOR r>aai DRAIN VALVE Ei EXPANSION TANK T TEST PLUG 2 —WAY VALVE © WATER METER M VACUUM I RELIEF VALVE c SOLENOID VALVE ti, THERMOMETER 4 AQUASTAT A PRESSURE A MOTORIZED VALVE PRESSURE GAGE REGULATOR L13 —WAY VALVE [-1 STRAINER o PIPE DOWN THERMOSTATIC/ l PRESSURE BALANCE © PUMP o PIPE UP MIXING VALVE Faucet TP TRAP PRIMING P# PLUMBING () TEE DOWN VALVE FIXTURE TAG PRESSURE FLOOR 111 UNION RELIEF VALVE ® RECEPTOR TAG 11 BUTTERFLY VALVE ►1 BFP BACKFLOW n PIPE CAP PREVENTER .1 GLOBE VALVE b CIRCUIT S PIPE BREAK BALANCING VALVE ;MISC. SYMBOL LEGEND 1 — XXX EQUIPMENT TAG S CONNECTION TO EXISTING 1 AREVISION (TRIANGLE KEY NOTE DOMESTIC WATER RISER NO SCALE SANITARY WASTE & VENT RISER NO SCALE X D 0 CO PLUMBING PLAN 114 " =l' -0" KEY NOTES O EXTEND AND CONNECT NEW 2" SANITARY SEWER TO EXISTING 3" (MIN) SANITARY SEWER PIPING SERVING EXISTING TOILET ROOM. FIELD VERIFY EXACT LOCATION, SIZE, FLOW DIRECTION, AND INVERT ELEVATION OF CONNECTION POINT PRIOR TO ROUGH —IN OF NEW SANITARY SEWER. PROVIDE FCO AT POINT OF CONNECTION TO EXISTING. EXTEND AND CONNECT NEW CW PIPING OF SIZE SHOWN TO EXISTING 3/4" (MIN) CW PIPING SERVING EXISTING TOILET ROOM. FIELD VERIFY EXACT LOCATION OF CW PIPING PRIOR TO ROUGH —IN. PROVIDE SHUTOFF VALVE AT POINT OF CONNECTION TO EXISTING. O EXTEND NEW 1 -1/2" VENT AND CONNECT TO EXITING MIN. 2" VENT PIPING SERVING EXISTING TOILET ROOM. FIELD VERIFY EXACT LOCATION OF EXISTING VENT PIPING PRIOR TO ROUGH —IN. SERVICE AND CLEAN EXISTING WATER CLOSET TO REMAIN. O5 SERVICE AND CLEAN EXISTING LAVATORY TO REMAIN. O6 SERVICE AND CLEAN EXISTING WATER HEATER TO REMAIN. VERIFY OPERATION PRIOR TO REUSE — PROVIDE NEW IF REQUIRED. BATHROOM COMPONENT SCHEDULE Item Model # Exist. To Remain New (Add /Replace) Notes: Toilet — 1 — -- Toilet Seat — 'y 1 — -- Sink — 1 — -- Faucet — 1 — -- Pipe Wrap — 1 — -- Water Heater — 1 — EXISTING Water Cooler ELKAY MODEL LZSTLBC — 1 SEE SCHEDULE REVIEWED FOR CODE COMPLIANCE APPROVED JUN i32012 City of Tukwila BUILDING DIVISION EXISTING FIXTURE NOTES: Toilet: Ensure that the fixture is fully functioning. Clean completely. Notify the Construction Project Manager if there are any cracks or leaks. Ensure that seat is existing, complete, level, clean, and is properly attached. Sink: Ensure that the fixture is fully functioning. Fixture must be securely attached to the wall. Clean all components. Faucet: Ensure that faucet is fully functioning. Clean all components. Faucet to be securely attached to fixture. Ensure there are no leaks from faucet. Pipewrap: Ensure that there is complete pipewrap covering exposed piping. IN111 I-. OS I 0412755 -139 El DUNHAM Dunham Associates, Inc. 50 South Sixth Street f'Suite 1100 Minneapolis, Minnesota 55402 -1540 PHONE 612.465,7550 FAX 612.465.7551 WEB dunhameng.com mechanical + electrical consulting engineering DRAWN BY: MJI CHECKED BY: GMS SQ. FT. CALCS RETAIL_ 1,170 SF PLUMBING FIXTURE SCHDULE EXISTING INSTANTANEOUS WATER HEATER SCHEDULE I MAY 302012 #" FIXTURE TYPE MANUFACTURER UNIT NO. MANUFACTURER MODEL KW OUTPUT (GPM) TEMP. RISE °F VOLTAGE REMARKS IWH -1 EXISTING DHC -3 -1 3.0 EXIST. EXIST. EXISTING EXISTING TO REMAIN 0412755 -139 El DUNHAM Dunham Associates, Inc. 50 South Sixth Street f'Suite 1100 Minneapolis, Minnesota 55402 -1540 PHONE 612.465,7550 FAX 612.465.7551 WEB dunhameng.com mechanical + electrical consulting engineering DRAWN BY: MJI CHECKED BY: GMS SQ. FT. CALCS RETAIL_ 1,170 SF PLUMBING FIXTURE SCHDULE TOTAL: 1,682 SF REc .vEw. O P# CITY OFTUKWILA MAY 302012 FIXTURE NO. FIXTURE TYPE MANUFACTURER TYPE & MODEL NO. TRIM NO. SUPPORT PIPE SIZES REMARKS PERMIT CENTER TRAP WASTE VENT CW HW P1 WATER CLOSET EXISTING EXISTING EXISTING FLOOR MOUNT 4" 2" 1/2" — EXISTING TO REMAIN P2 LAVATORY EXISTING EXISTING EXISTING WALL HUNG 1 -1 /2" 2" 1 -1 /2" 1 /2" 1 /2" EXISTING TO REMAIN P3 HI —LO WATER COOLER ELKAY BARRIER —FREE LZSTL8C — — WALL MOUNT 1 -1 /2" 2" 1 -1 /2" 1 /2" — UNIT TO BE INSTALLED WITH ACCESSORY APRON LKAPREZL FOR ADA COMPLIANCE IF MTD. ON EXPOSED WALL 0412755 -139 El DUNHAM Dunham Associates, Inc. 50 South Sixth Street f'Suite 1100 Minneapolis, Minnesota 55402 -1540 PHONE 612.465,7550 FAX 612.465.7551 WEB dunhameng.com mechanical + electrical consulting engineering DRAWN BY: MJI CHECKED BY: GMS SQ. FT. CALCS RETAIL_ 1,170 SF TOTAL: 1,682 SF CONCEPT: 1.0 LARGE CONCEPT DATE: 04 -28 -1 1 STORE NUMBER: # ## W 0— IX ce Q LJo W 00 N U WmI- -Q LO�{ U�f►'V/ 2 W O - D Q N Y 0o-1■: PERMIT SET ISSUE DATE: 05 -23 -12 REV. DATE A A • A A A SCALE: AS NOTED PLUMBING PLAN M==2 15010 GENERAL PROVISIONS A. FURNISHING LABOR, MATERIALS, EQUIPMENT AND SERVICES REQUIRED AS SHOWN ON THE DRAWINGS AND SPECIFIED IN DIVISION 15. B. ALL WORK SHALL BE COMPLETE AND SHALL BE LEFT IN OPERATING CONDITION. C. INCLUDE ALL PARTS AND LABOR WHICH ARE INCIDENTAL AND NECESSARY FOR A COMPLETE AND OPERABLE INSTALLATION EVEN THOUGH NOT SPECIFICALLY MENTIONED IN THE CONTRACT DOCUMENTS. D. ARRANGE WITH APPROPRIATE UTILITY COMPANIES TO PROVIDE TEMPORARY AND PERMANENT UTILITY SERVICES AS REQUIRED AND COORDINATE THEIR INSTALLATION WITH CONSTRUCTION PROGRESS OF THIS PROJECT. PAY ALL FEES AND COSTS CHARGED BY UTILITY COMPANIES FOR UTILITY SERVICES. E. OBTAIN ALL TEMPORARY AND PERMANENT PERMITS AND LICENSES REQUIRED IN CONNECTIONS WITH THIS DIVISION'S WORK. PAY ALL FEES AND EXPENSES REQUIRED FOR SUCH PERMITS AND LICENSES. F. REQUEST INSPECTIONS AS REQUIRED BY REGULATING AGENCIES OF INSTALLATIONS OF PLANS SPECIFICATIONS. G. PROVIDE THE OWNER WITH A CERTIFICATE OF FINAL INSPECTION AND APPROVAL BY ENFORCEMENT AUTHORITIES. H. MEET OR EXCEED ALL CURRENT APPLICABLE CODES, ORDINANCES AND REGULATIONS FOR ALL INSTALLATIONS. PROMPTLY NOTIFY THE ENGINEER IN WRITING, IF THE CONTRACT DOCUMENTS APPEAR TO CONFLICT WITH GOVERNING CODES AND REGULATIONS. CONTRACTOR ASSUMES ALL RESPONSIBILITY AND COSTS FOR CORRECTING NON - COMPLYING WORK INSTALLED WITHOUT NOTIFYING THE ENGINEER. I. HIGHER QUALITY OF WORKMANSHIP AND MATERIALS INDICATED IN THE CONTRACT DOCUMENTS TAKES PRECEDENCE OVER THAT ALLOWED IN REFERENCED CODES AND STANDARDS. FURNISH: TO OBTAIN, COORDINATE, SUBMIT THE NECESSARY DRAWINGS, DELIVER TO THE JOB SITE IN NEW CONDITION READY FOR INSTALLATION, UNLOAD AND UNPACK, AND GUARANTEE. J. INSTALL: TO RECEIVE AT THE JOB SITE, STORE, ASSEMBLE, ERECT, SET IN PLACE, ANCHOR, APPLY, FINISH, PROTECT, CLEAN, TEST, START -UP, AND MAKE READY FOR OWNER'S USE. K. PROVIDE: TO FURNISH AND INSTALL. L. CONTRACTOR IS RESPONSIBLE FOR DIMENSIONAL DIFFERENCES, WEIGHTS, ELECTRICAL REQUIREMENTS AND ANY OTHER RESULTING CHANGES, WHEN USING,EQUIPMENT OTHER THAN THAT SCHEDULED ON THE DRAWINGS. CONTRACTOR IS RESPONSIBLE FOR ANY ADDITIONALCOSTS INCURRED AS A RESULT OF SUBSTITUTIONS. BEFORE SUBMITTING A PROPOSAL ON THE WORK CONTEMPLATED, EXAMINE THE SITE OF THE PROPOSED WORK AND BECOME THOROUGHLY FAMILIAR WITH EXISTING CONDITIONS AND LIMITATIONS. NO EXTRA COMPENSATION WILL BE ALLOWED BECAUSE OF MISUNDERSTANDING AS TO THE AMOUNT OF WORK INVOLVED NOR BIDDERS LACK OF KNOWLEDGE OF EXISTING CONDITIONS WHICH COULD HAVE BEEN DISCOVERED OR REASONABLY ANTICIPATED PRIOR TO BIDDING. N. MECHANICAL EQUIPMENT AND SYSTEMS SHOWN ON THE DRAWINGS AS EXISTING, HAVE BEEN BASED ON EXISTING PLANS, AND MAY NOT BE INSTALLED AS ORIGINALLY SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO VISIT THE SITE AND MAKE EXACT DETERMINATION OF THE EXISTENCE, LOCATION AND CONDITION OF SUCH FACILITIES PRIOR TO SUBMITTING A BID. 0. CONSULT THE DRAWINGS AND SPECIFICATIONS OF DIVISION 16 AND OTHER TRADES FOR CORRELATING INFORMATION AND LAYOUT WORK SO THAT IT WILL COORDINATE WITH OTHER TRADES. VERIFY DIMENSIONS AND CONDITIONS (1E., FINISHED CEILING HEIGHTS, FOOTINGS AND FOUNDATION ELEVATIONS, BEAM DEPTHS, ETC.) WITH THE ARCHITECTURAL AND STRUCTURAL DRAWINGS. P. DRAWINGS MAY NOT SHOW EVERY RISE AND OFFSET REQUIRED FOR THE WORK. INSTALL PIPING AND DUCTWORK TO ACCOMMODATE THE BUILDING STRUCTURE AND THE WORK OF OTHER TRADES, WITH ALL REQUIRED OFFSETS AND WITHOUT EXTRA COST TO THE OWNER. Q. OBTAIN EXACT LOCATION OF CONNECTION TO EQUIPMENT, FURNISHED BY OTHERS FROM THE PERSON FURNISHING THE EQUIPMENT. R. GUARANTEE AND MAINTAIN THE STABILITY OF WORK AND MATERIALS AND KEEP SAME IN PERFECT REPAIR AND CONDITION FOR THE PERIOD OF ONE (1) YEAR AFTER THE FINAL COMPLETION OF THE WORK AS EVIDENCED BY ISSUANCE OF THE FINAL CERTIFICATE BY THE ARCHITECT. S. DEFECTS OF ANY KIND DUE TO FAULTY WORK OR MATERIALS APPEARING DURING THE ABOVE MENTIONED PERIOD MUST BE IMMEDIATELY MADE GOOD BY THE CONTRACTOR AT HIS OWN EXPENSE TO THE ENTIRE SATISFACTION OF THE OWNER AND ARCHITECT AND ENGINEER. INCLUDE DAMAGE TO THE FINISH OR THE BUILDING RESULTING FROM THE ORIGINAL DEFECT OR REPAIRS. T. MAGNETIC STARTERS, DISCONNECTS, AND POWER WIRING PROVIDED BY THE ELECTRICAL CONTRACTOR, UNLESS OTHERWISE SPECIFIED. U. CONTROL AND INTERLOCK WIRING PROVIDED BY THE MECHANICAL CONTRACTOR, UNLESS OTHERWISE SPECIFIED. V. PROVIDE ONLY PRODUCTS FROM MANUFACTURERS WITH LOCAL REPRESENTATION THAT CAN PROVIDE COMPLETE COVERAGE, PARTS AND LABOR, FOR REPLACEMENT AND SERVICE OF THEIR PRODUCTS. PROVIDE ONLY EQUIPMENT THAT WILL FIT IN THE SPACE AVAILABLE AND BE COMPLETELY SERVICEABLE. BRING AND CONFLICTS TO THE ENGINEER'S ATTENTION PRIOR TO ORDERING THE EQUIPMENT. W. COORDINATE/SCHEDULE ALL WORK WITH THE OWNER TO MINIMIZE ANY DISRUPTIONS. CONFINE ALL INTERRUPTIONS TO THE SMALLEST POSSIBLE AREA. PROVIDE TEMPORARY CONNECTIONS IF REQUIRED TO PROVIDE CONTINUITY OF SERVICE. X. INSPECT ALL AREAS AFFECTED BY THE INTERRUPTIONS AND RETURN ALL AUTOMATICALLY CONTROLLED EQUIPMENT, ELECTRICALLY OPERATED EQUIPMENT TO THE SAME OPERATING CONDITION PRIOR TO THE INTERRUPTION. Y. NO FIRE SPRINKLER OR FIRE ALARM SYSTEMS ARE TO REMAIN INACTIVE AT THE END OF THE WORK DAY. ASSURE THAT THE FIRE SPRINKLER OR FIRE ALARM SYSTEM IS OPERATIONAL AT THE END OF EACH WORK DAY. COORDINATE WITH THE OWNER. Z. PROVIDE NEW MATERIAL AND EQUIPMENT, UNLESS NOTED OTHERWISE. PROTECT EQUIPMENT AND MATERIAL FROM DAMAGE, DIRT AND THE WEATHER. M. PROVIDE THE HIGHEST QUALITY WORKMANSHIP AND PERFORM ALL WORK ONLY BY SKILLED MECHANICS. INSTALL MATERIAL AND EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, INSTRUCTIONS AND CURRENT STANDARDS. BB. THE ENGINEER RESERVES THE RIGHT TO REJECT MATERIAL OR WORKMANSHIP NOT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, BEFORE OR AFTER INSTALLATION. CC. ALL PIPING AND DUCTWORK SHALL BE RUN IN THE MOST DIRECT AND STRAIGHT MANNER POSSIBLE MAINTAINING PROPER GRADING. DD. IT IS THE INTENT OF THESE PLANS AND SPECIFICATIONS THAT MOST PIPING AND DUCTWORK BE CONCEALED WHERE EXPOSED, RUN AS CLOSE TO CEILING AND /OR WALL AS POSSIBLE PARALLEL WITH ADJACENT STRUCTURAL OR ARCHITECTURAL ELEMENTS. EE. DO NOT INSTALL PIPING OR DUCTWORK IN ANY SWITCHGEAR, TRANSFORMER, ELEVATOR EQUIPMENT, TELEPHONE, OR ELECTRICAL EQUIPMENT ROOM, UNLESS IT IS A BRANCH SERVING THAT ROOM. FF. DO NOT INSTALL PIPING OR DUCTWORK ABOVE SWITCHBOARDS, PANELBOARDS, CONTROL PANELS, MOTOR CONTROL CENTERS, ETC. GG. ARRANGE WORK TO FACILITATE MAINTENANCE, REPAIR OR REPLACEMENT OF EQUIPMENT. PROVIDE ACCESS FOR DEVICES THAT REQUIRE MAINTENANCE. FOR CONCEALED DEVICES, VERIFY THAT ACCESS PANELS ARE PROPERLY LOCATED AND LABELED. HH. INSTALL MATERIAL AND EQUIPMENT IN ACCORDANCE WITH T HE MANUFACTURER'S WRITTEN INSTRUCTION. II. PERFORM ALL CUTTING AND PATCHING NECESSARY TO WORK, UNLESS SPECIFICALLY DELEGATED TO THE GENERAL CONTRACTOR. OBTAIN SPECIAL PERMISSION FROM THE STRUCTURAL ENGINEER BEFORE CUTTING STRUCTURAL MEMBERS OR FINISHED MATERIAL. PERFORM ALL PATCHING IN SUCH A MANNER AS TO LEAVE NO VISIBLE TRACE AND RETURN THE AREA AFFECTED TO THE CONDITION OF UNDISTURBED WORK. PERFORM ALL PATCHING BY WORKERS EXPERIENCE, SKILLED, AND LICENSED FOR THE PARTICULAR TYPE OF WORK INVOLVED. INFERIOR WORK WILL NOT BE ACCEPTED. JJ. PATCH ALL HOLES LEFT AS A RESULT OF DEMOLITION OF MECHANICAL EQUIPMENT AND DEVICES. KK. DRILL ALL HOLES IN MASONRY WITH ROTARY DRILL. IMPACT TOOLS ARE NOT ALLOWED. GORE DRILL ALL HOLES IN MASONRY AND CONCRETE FOR MECHANICAL PENETRATIONS. PROVIDE AND DISPOSE OF ALL WATER REQUIRED FOR CORE DRILLING. COORDINATE WITH OTHER TRADES TO PREVENT DAMAGE FROM WATER. LL. PREVENT THE SPREAD OF DUST, DEBRIS, AND OTHER MATERIAL INTO ADJACENT AREAS. MM. REPLACE ALL CEILING TILES DAMAGED DURING INSTALLATION OF WORK, WITH NEW TILE. NN. REFINISH ALL MECHANICAL EQUIPMENT DAMAGED DURING SHIPPING AND /OR INSTALLATION TO ITS ORIGINAL CONDITION. REMOVE ALL RUST; PRIME, AND PAINT PER MANUFACTURE'S RECOMMENDATIONS FOR FINISH EQUAL TO ORIGINAL. 00. DO NOT USE HEATING, VENTILATING AND AIR CONDITIONING SYSTEMS PROVIDED IN THIS SCOPE OF WORK FOR TEMPORARY HEATING, VENTILATING AND AIR CONDITIONING DURING CONSTRUCTION. PP. PROTECT OPENINGS AND EQUIPMENT FROM OBSTRUCTION, BREAKAGE, MISUSE, DAMAGE OR BLEMISHES. PROTECT MATERIALS AND EQUIPMENT IMMEDIATELY UPON RECEIPT AT THE JOB SITE OR IMMEDIATELY AFTER THEY HAVE BEEN REMOVED FROM THEIR SHIPPING CONTAINERS. UNLESS NOTED OTHERWISE, KEEP THEM CLEAN AND UNDAMAGED UNTIL FINAL ACCEPTANCE OF THE ENTIRE PROJECT BY THE OWNER. WHEN A PORTION OF THE BUILDING IS OCCUPIED BY THE OWNER BEFORE SUBSTANTIAL COMPLETION OF THE ENTIRE PROJECT, MAKE ARRANGEMENTS TO TRANSFER RESPONSIBILITY FOR PROTECTION AND HOUSEKEEPING FOR THE OCCUPIED PORTION. QQ. PROTECT PIPE, DUCT AND EQUIPMENT OPENINGS WITH TEMPORARY PLUGS OR CAPS. KEEP OPENINGS COVERED UNTIL PERMANENT OPENINGS WITH TEMPORARY PLUGS OR CAPS. KEEP OPENINGS COVERED UNTIL PERMANENT CONNECTIONS ARE COMPLETE. RR. CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO MECHANICAL EQUIPMENT, MATERIALS OR WORK UNTIL FINAL ACCEPTANCE OF THE ENTIRE PROJECT BY THE OWNER. KEEP THE PREMISES FREE FROM ACCUMULATION OF WASTE MATERIAL OR RUBBISH, CAUSED BY HIS EMPLOYEES OR WORK, AT ALL TIMES. REMOVE RUBBISH, TOOLS, SCAFFOLDING, AND SURPLUS MATERIALS FROM AND ABOUT THE BUILDING, AND LEAVE WORK AREAS "BROOM CLEAN" OR ITS EQUIVALENT UPON COMPLETION OF THE WORK. CLEAN MECHANICAL EQUIPMENT AND REMOVE TEMPORARY IDENTIFICATION. SS. IN CASE OF DISPUTE, THE OWNER WILL REMOVE THE RUBBISH AND CHARGE THE COST TO THE CONTRACTOR. TT. BEFORE START -UP, LUBRICATE, CHARGE, AND FILL SYSTEMS AS SPECIFIED AND ACCORDING TO MANUFACTURER'S INSTRUCTIONS. UU. CLEAN, DISINFECT, AND TEST ALL PLUMBING AND PIPING SYSTEMS. VV. PERFORM TESTING, ADJUSTING AND BALANCING IN ACCORDANCE WITH THAT SECTION. WW. OPERATE EQUIPMENT AND SYSTEMS; IN ALL THEIR OPERATING MODES, TO VERIFY PROPER OPERATION, PRIOR TO FINAL FIELD OBSERVATION AND OWNER INSTRUCTIONS. XX. ATTEND PRE - TESTING CONFERENCE AS SCHEDULED BY TESTING, ADJUSTING AND BALANCING CONTRACTOR. YY. PROVIDE ASSISTANCE TO TEST, ADJUSTING AND BALANCING CONTRACTOR BY MAKING ADJUSTMENTS TO SYSTEM AND SYSTEM COMPONENTS REQUIRED FOR ACHIEVING DESIGN PERFORMANCE. ZZ. IF ACCEPTABLE PERFORMANCE OF ANY TEST IS NOT ACHIEVED, MAKE THE NECESSARY CORRECTIONS AND THE TEST SHALL BE REPEATED UNTIL ACCEPTABLE PERFORMANCE IS ACHIEVED. AAA. FULLY INSTRUCT THE OWNER'S DESIGNATED PERSONNEL IN THE OPERATION OF EACH MECHANICAL SYSTEM AT THE TIME IT IS PUT INTO SERVICE. PROVIDE INSTRUCTION USING COMPETENT INSTRUCTORS AND FACTORY TRAINED PERSONNEL. BBB. INCLUDE DOCUMENTATION OF INSTRUCTIONS IN THE OPERATION OF MAINTENANCE MANUALS. CCC. OBTAIN A WRITTEN STATEMENT FROM THE OWNER THAT HIS DESIGNATED PERSONNEL HAVE BEEN INSTRUCTED. DDD. SUBMIT COMPLETED BOUND OPERATION AND MAINTENANCE MANUALS TO OWNER INCLUDING SHOP DRAWINGS, WARRANTIES, TEST REPORTS, CERTIFICATIONS, TEST AND BALANCE REPORTS, SYSTEM VALIDATION REPORTS AND RECORD DRAWINGS. 15025 DEMOLITION A. FURNISH LABOR, EQUIPMENT, AND MATERIALS REQUIRED FOR CUTTING, DEMOLITION, REMOVAL, PATCHING, AND RESTORATION WORK NECESSARY TO ACCOMPLISH AND COMPLETE ALL DEMOLITION, INCLUDING ANY RELOCATION OF REUSE OF EXISTING MATERIALS, EQUIPMENT, SYSTEMS, AS WELL AS THE DISPOSITION OF SALVAGED MATERIALS OR DEBRIS. B. ACCOMPLISH ALL WORK OF CUTTING, REMOVAL, DEMOLITION, RELOCATION, PATCHING, AND RESTORATION BY USING ONLY MECHANICALS SKILLED IN THE TRADE REQUIRED. PROVIDE FOR THE SAFETY OF THE EXISTING BUILDING AND PERSONNEL, AS WELL AS FOR NEW CONSTRUCTION AS A RESULT OF WORK, PROCEDURES, OPERATIONS OR ACTIVITIES UNDER THIS CONTRACT. C. WHERE THE WORK OF REMOVALS, DEMOLITION, CUTTING AND SIMILAR WORK INVOLVES STRUCTURAL CONSIDER RATIONS, CONSULT WITH STRUCTURAL ENGINEER. EXERCISE EXTREME CARE TO AVOID DAMAGE AND PRESERVE THE SAFETY OF THE STRUCTURE AND OF ALL PERSONNEL. PARTICULAR CARE MUST BE TAKEN WHERE THE DEMOLITION OR REMOVALS OCCUR ADJACENT TO OCCUPIED AREAS. D. UTILIZE COMPETENT AND QUALIFIED TECHNICAL ASSISTANCE TO DEVELOP SAFE METHODS AND TECHNIQUES TO ACCOMPLISH THE WORK, INCLUDING TEMPORARY SHORING AND SUPPORTS, METHODS OF REMOVAL AND OTHER CONSIDERATIONS. DESIGN AND PLACE ALL PERMANENT OR TEMPORARY SUPPORTS TO CARRY ALL LOADS DOWN TO SOUND BEARING. 15081 DUCTWORK INSULATION A. MATERIALS: CONFORM TO MAXIMUMIFLAME SPREAD /SMOKE DEVELOPED RATING OF 26/60 IN ACCORDANCE WITH ASTM E84, NFPA 255 AND UL 723. B. CONFORM TO ASTM STANDARDS FOR "K" VALUE, MOISTURE VAPOR TRANSMISSION, MAXIMUM MOISTURE ABSORPTION, JACKET, INSULATING CEMENT, AND ADHESIVE. C. MANUFACTURER: SCHULLER - MANVILLE 800 SERIES SPIN -GLAS a. GLASS FIBER (FLEXIBLE/RIGID):) SCHULLER - MANVILLE 800 SERIES SPIN/GLAS. EQUIVALENT PRODUCTS: CERTAINTEED, KNAUF, OWENS- CORNING. b. GLASS FIBER DUCT LINER, FLEXIBLE: SCHULLER - MANVILLE PERMACOTE LINACOUSTIC STANDARD. EQUIVALENT PRODUCTS: CERTAINTEED, KNAUF, OWENS- CORNING. c. INSTALL IN ACCORDANCE WITH ;NAIMA NATIONAL INSULATION STANDARDS. D. DRIP PAN BELOW ROOF FANS: FLEXIBLE GLASS FIBER BLANKET - EXTERNAL: 1 -1/2 INCHES THICK. E. EXHAUST AND RELIEF AIR DUCTS WITHIN 10 FT. OF EXTERIOR OPENINGS: FLEXIBLE GLASS FIBER BLANKET - EXTERNAL: 1 -1/2 INCHES THICK. F. OUTSIDE AIR INTAKE DUCTS: a. FLEXIBLE GLASS FIBER BLANKET - EXTERNAL: 3 INCHES THICK. b. RIGID GLASS FIBER - EXTERNAL: 1 -1/2 INCHES THICK. G. SUPPLY DUCTS - CONCEALED: FLEXIBLE GLASS FIBER BLANKET - EXTERNAL 1 -1/2 INCHES THICK. H. SUPPLY DUCTS - EXPOSED RIGID GLASS FIBER - EXTERNAL: 1 INCH THICK. I. TRANSFER DUCTS: FLEXIBLE GLASS FIBER DUCT LINER: Y INCH THICK. 15083 PIPING INSULATION A. CONFORM TO MAXIMUM FLAME SPREAD /SMOKE DEVELOPED RATING OF 25/60 IN ACCORDANCE WITH ASTM E84, NFPA 255 AND UL 723. B. CONFORM TO ASTM STANDARDS FOR "K" VALUE, MOISTURE VAPOR TRANSMISSION, MAXIMUM MOISTURE ABSORPTION, JACKET, INSULATING CEMENT, AND ADHESIVE. C. MANUFACTURER: GLASS FIBER: SCHULLER - MANVILLE, CERTAINTEED, KNAUF, OWENS - CORNING. a. CELLULAR FOAM: ARMSTRONG, HALSTEAD, IMCOA/NOMACO, RUBATEX, ARMAFLEX 2000. D. INSTALL IN ACCORDANCE WITH NAIMA NATIONAL INSULATION STANDARDS. VERIFY THAT PIPING HAS BEEN TESTED BEFORE. APPLYING INSULATION MATERIALS. VERIFY THAT SURFACES ARE CLEAN AND DRY, WITH FOREIGN MATERIAL REMOVED. E. CONTINUE INSULATION THROUGH WALLS, SLEEVES, PIPE HANGERS, AND OTHER PIPE PENETRATIONS. FINISH AT SUPPORTS, PROTRUSIONS, AND INTERRUPTIONS. F. BURIED PIPING: PROVIDE FACTORY FABRICATED ASSEMBLY WITH INNER ALL- PURPOSE SERVICE JACKET WITH SELF -SEALING LAP, AND ASPHALT IMPREGNATED OPEN MESH GLASS FABRIC, WITH ONE MIL THICK ALUMINUM FOIL SANDWICHED BETWEEN THREE LAYERS OF BITUMINOUS COMPOUND; OUTER SURFACE FACED WITH A POLYESTER FILM. G. SCHEDULE: INSULATION THICKNESS PER LOCAL CODE OR ASHRAE STANDARD 90.1 -1999, WHICHEVER IS MORE STRINGENT. 15100 PLUMBING PIPING A. SANITARY PIPING: a. CAST IRON PIPE: ASTM A74 SERVICE WEIGHT, FITTINGS: CAST IRON, JOINTS: HUB- AND-SPIGOT, COMPRESSION TYPE WITH NEOPRENE GASKETS OR LEAD AND OAKUM. b. CAST IRON PIPE: CISPI 301, HUBLESS, FITTINGS: CAST IRON, JOINTS: NEOPRENE GASKET AND STAINLESS STEEL CLAMP AND SHIELD ASSEMBLIES. c. ABS PIPE (BELOW GRADE): ASTM D2661, FITTINGS: ABS JOINTS: SOLVENT WELD. d. PVC PIPE (BELOW GRADE): ASTM D2665, FITTINGS: PVC, JOINTS: SOLVENT WELD WITH SOLVENT CEMENT. e. COPPER TUBE (ABOVE GRADE): ASTM B88 TYPE "L ", HARD TEMPER ONLY. EXCEPT THESE MATERIALS SHALL NOT BE USED TO RECEIVE THE WASTES FROM URINALS NOR WASTES FROM WATER CLOSETS IN BATTERY, FITTINGS: CAST BRONZE, OR WROUGHT COPPER, JOINTS: SOLDER, GRADE 50B. B. WATER PIPING: a. COPPER TUBING (BELOW GRADE): ASTM B88, TYPE "K" SOFT COPPER, FITTINGS: CAST COPPER ALLOY OR WROUGHT COPPER AND BRONZE, JOINTS: B CUP SILVER BRAZE. b. COPPER TUBING (ABOVE GRADE): ASTM B88, TYPE "L" HARD DRAWN, FITTINGS: CAST COPPERS ALLOY OR WROUGHT COPPER AND BRONZE, JOINTS: B CUP SILVER BRAZE. C. NATURAL GAS PIPING: a. STEEL PIPE (BELOW GRADE): ASTM A53 SCHEDULE 40 BLACK, FITTINGS: FORGED STEEL WELDING TYPE, JOINTS: WELDED, JACKET POLYETHYLENE JACKET OR DOUBLE LAYER, HALF - LAPPED 10 MIL POLYETHYLENE TAPE. b. STEEL PIPE (ABOVE GRADE): ASTM A53 SCHEDULE 40 BLACK 2 INCH AND SMALLER EXPOSED, FITTINGS: MALLEABLE IRON, JOINTS: THREADED. c. STEEL PIPE (ABOVE GRADE): ASTM A53 SCHEDULE 40 BLACK, 2 INCH AND SMALLER CONCEALED, AND 2 Y INCH AND LARGER, FITTINGS: FORGED STEEL WELDING TYPE, JOINTS: WELDED. D. VERIFY THAT EXCAVATIONS ARE TO REQUIRED GRADE, DRY AND NOT OVER- EXCAVATED. E. PREPARE PIPING CONNECTIONS TO EQUIPMENT WITH FLANGES OR UNIONS. F. PROVIDE NON - CONDUCTING DIELECTRIC CONNECTIONS WHEREVER JOINTING DISSIMILAR METALS. G. INSTALL VENT PIPING PENETRATING ROOFED AREAS TO MAINTAIN INTEGRITY OF ROOF ASSEMBLY. H. WHERE PIPE SUPPORT MEMBERS ARE WELDED TO STRUCTURAL BUILDING FRAMING, SCRAPE, BRUSH CLEAN, AND APPLY ONE COAT OF ZINC RICH PRIMER TO WELDING. I. PROVIDE SUPPORT FOR UTILITY METERS IN ACCORDANCE WITH REQUIREMENTS OF UTILITY COMPANIES. J. PREPARE EXPOSED, UNFINISHED PIPE, FITTINGS, SUPPORTS, AND ACCESSORIES READY FOR FINISH PAINTING. K. PIPE VENTS FROM GAS PRESSURE REDUCING VALVES TO OUTDOORS AND TERMINATE IN WEATHER PROOF HOOD. L. SLEEVE PIPES PASSING THROUGH PARTITIONS, WALLS AND FLOORS. M. USE GROOVED MECHANICAL COUPLINGS AND FASTENERS ONLY IN ACCESSIBLE LOCATIONS. N. PROVIDE UNIONS DOWNSTREAM OF VALVES AND AT EQUIPMENT OR APPARATUS CONNECTIONS. 0. PROVIDE BRASS MALE ADAPTERS EACH SIDE OF VALVES IN COPPER PIPED SYSTEM. SOLDER ADAPTERS TO PIPE. P. ESTABLISH INVERT ELEVATIONS, SLOPES FOR DRAINAGE TO % INCH PER FOOT (SMALLER THAN 3 INCH PIPE), AND 1/8 INCH PER FOOT (3 INCHES AND LARGER) MINIMUM. MAINTAIN GRADIENTS. Q. SLOPE WATER PIPING MINIMUM 0.25 PERCENT AND ARRANGE TO DRAIN AT LOW POINTS. R. PROVIDE NEW SANITARY SEWER SERVICES. BEFORE COMMENCING WORK CHECK INVERT ELEVATIONS REQUIRED FOR SEWER CONNECTIONS, CONFIRM INVERTS AND ENSURE THAT THESE CAN BE PROPERLY CONNECTED WITH SLOPE FOR DRAINAGE AND COVER TO AVOID FREEZING. S. PROVIDE SUPPORT AND EQUIPMENT REQUIRED TO CONTROL EXPANSION AND CONTRACTION OF PIPING. PROVIDE LOOPS, PIPE OFFSETS, AND SWING JOINTS, OR EXPANSION JOINTS WHERE REQUIRED. T. PROVIDE HANGERS (MINIMUM OF 12 GAUGE) IN QUANTITY AND SPACING REQUIRED TO SUFFICIENTLY SUPPORT PIPING. 15110 VALVES & PLUMBING SPECIALTIES A. MANUFACTURERS: a. GATE VALVES (UP TO AND INCLUDING 2 "): STOCKHAM MODEL B -105, OR EQUIVALENT BY: i. HAMMOND, KITZ, MILWAUKEE, NIBCO, CRANE. b. BALL VALVES (UP TO AND INCLUDING 2 "): APOLLO 77- 100!17 -200 SERIES, OR EQUIVALENT BY: i. HAMMOND, KITZ, MILWAUKEE, NIBCO, WATTS, CRANE. c. SWING CHECK VALVES (UP TO AND INCLUDING 2- 1/2 "): STOCKHAM MODEL B -3091B -319, OR EQUIVALENT BY: 1 HAMMOND, KITZ, MILWAUKEE, NIBCO, CRANE. d. BALL VALVES (FOR NATURAL GAS): APOLLO 80 -100 SERIES, OR EQUIVALENT BY: i. HAMMOND, KITZ, MILWAUKEE, NIBCO, WATTS. e. TEMP. AND PRESS. RELIEF VALVE (UP TO 80,000 BTU INPUT): WATTS 10L MODEL M7. f. WATER HAMMER ARRESTOR: WATTS SERIES 16. g. BACKFLOW PREVENTER: WATTS 9BD. h. VACUUM BREAKER: WATTS N36 -3/4 ". i. PRESSURE REDUCING VALVE: WATTS SERIES U6. j. ATMOSPHERIC VACUUM BREAKER: WATTS SERIES 288A. k. HOSE AND VACUUM BREAKER: WATTS SERIES 8. I. DIELECTRIC UNION: WATTS SERIES 3000. m. TRAP SEAL PRIMER VALVE: JOSAM 88260, OR EQUIVALENT BY: i. J.R. SMITH, WADE, ZURN B. INSTALL APPROVED POTABLE WATER PROTECTION DEVICES ON PLUMBING LINES WHERE CONTAMINATION OF DOMESTIC WATER MAY OCCUR; JANITOR ROOMS, FIRE SPRINKLER SYSTEMS, PREMISE ISOLATION. C. INSTALL WATER HAMMER ARRESTORS COMPLETE WITH ACCESSIBLE ISOLATION VALVE ON HOT AND COLD WATER SUPPLY PIPING WHERE REQUIRED BY CODE AND PER MANUFACTURER'S RECOMMENDATIONS /REQUIREMENTS. D. INSTALL AIR CHAMBERS ON HOT AND COLD WATER SUPPLY PIPING TO EACH FIXTURE OR GROUP OF FIXTURES (EACH WASHROOM). FABRICATE SAME SIZE AS SUPPLY PIPE OR % INCH MINIMUM, AND MINIMUM 18 INCHES LONG. 15325 SPRINKLER SYSTEMS A. CONTRACTOR SHALL DESIGN AND HYDRAULICALLY CALCULATE THE NEW AND RENOVATION OF EXISTING PIPING SYSTEMS, INCLUDING LOCATION OF ALL VALVES, DEVICES AND SPRINKLER HEADS. DESIGN SPRINKLER SYSTEM PIPING BASED ON HAZARD RATING AS OF THE MOST STRINGENT OF THE REGULATING AGENCIES RESPONSIBLE FOR THIS FACILITY, INCLUDING THE OWNER INSURANCE COMPANY REQUIREMENTS AND THE GOVERNING AUTHORITIES, FM OR AS DETERMINED BY LOCAL REQUIREMENTS. PERFORM WORK IN ACCORDANCE WITH NFPA 13. B. SUBMIT SHOP DRAWINGS, PRODUCT DATA, AND HYDRAULIC CALCULATIONS TO AUTHORITY HAVING JURISDICTION, AND OWNER'S INSURANCE UNDERWRITER FOR APPROVAL. SUBMIT PROOF OF APPROVAL TO ARCHITECT /ENGINEER. C. PROVIDE EXTRA SPRINKLERS UNDER PROVISIONS OF NFPA 13. D. PROVIDE SUITABLE WRENCHES FOR EACH SPRINKLER TYPE. E. PROVIDE METAL STORAGE CABINET FOR EXTRA SPRINKLERS LOCATED ADJACENT TO THE VALVE ASSEMBLY. F. SPRINKLER MANUFACTURERS: AUTOMATIC SPRINKLER OF AMERICA, RELIABLE AUTOMATIC SPRINKLER COMPANY, STAR SPRINKLER COMPANY, VIKING CORPORATION. G. WATER FLOW SWITCH: VANE TYPE SWITCH FOR MOUNTING HORIZONTAL OR VERTICAL, WITH TWO CONTACTS, RATED 10 AMP AT 125 VOLT AC AND 2.5 AMP AT 24 VOLT DC. H. INSTALL SYSTEM IN ACCORDANCE WITH NFPA 13. I. INSPECTOR'S TEST CONNECTION: FOR EACH SPRINKLER SYSTEM AND FOR EACH WaTERFLOW ALARM DEVICE, WHERE MULTIPLE DEVICES OCCUR, PROVIDE AN INSPECTOR'S TEST ASSEMBLY. J. PROVIDE A FLOW SWITCH FOR EACH SYSTEM. SET RETARD ON FLOW SWITCHES TO 30 SECONDS OR AS REQUIRE BY LOCAL AUTHORITIES HAVING JURISDICTION. K. WATER CURTAINS AT NON -RATED OPENINGS: a. INSTALL SPRINKLER HEADS ON 6 FOOT CENTERS TO PROVIDE A WATER CURTAIN AT NON -FIRE RATED DOORS AND WINDOWS. LOCATE SPRINKLER HEADS WITHIN 1 FOOT OF THE DOOR OR WINDOW ON BOTH SIDES OF THE DOOR AND WINDOW. b. SPRINKLER HEADS ARE TO BE SUPPLIED FROM THE WET OVERHEAD SPRINKLER SYSTEM. c. WATER CURTAIN SPRINKLER HEADS ARE TO BE HYDRAULICALLY CALCULATED AS A PART OF THE OVERHEAD WET SPRINKLER SYSTEM WITH A MINIMUM DESIGN DISCHARGE OF 3 GPM PER LINEAL FOOT WITH NO SPRINKLER DISCHARGING LESS THAN 15 GPM. MINIMUM PRESSURE AT A SPRINKLER HEAD IS TO BE 7 PSI. L. EXISTING FIRE PROTECTION SYSTEMS: a. IN BUILDINGS WITH EXISTING FIRE PROTECTION SYSTEMS, THE CONTRACTOR SHALL CLOSELY COORDINATE HIS WORK WITH THE OWNER TO MINIMIZE DISRUPTION OF THAT SYSTEM. b. NO FIRE PROTECTION SYSTEM IS TO REMAIN DEACTIVATED AT THE END OF THE WORK DAY UNLESS AGREED TO WITH THE PROPERTY OWNER, AND A SUITABLE FIRE PROTECTION SCHEME SUCH ASIA MANNED FIRE WATCH, HAS BEEN IMPLEMENTED AND APPROVED BY THE OWNER. IT IS THE CONTRACTOR'S RESPONSIBILITY TO SEE THAT ALL FIRE PROTECTION SYSTEMS ARE FILLED, AND THE SYSTEM FUNCTIONAL BEFORE COMPLETING HIS WORK DAY. M. CENTER SPRINKLERS IN ONE DIRECTION ONLY IN CEILING TILE WITH LOCATION IN OTHER DIRECTION VARIABLE, DEPENDENT UPON SPACING AND COORDINATION WITH CEILING ELEMENTS. N. ENSURE REQUIRED DEVICES ARE INSTALLED AND CONNECTED AS REQUIRED TO FIRE ALARM SYSTEM. 0. COORDINATE PIPING WITH STRUCTURAL, MECHANICAL PIPING AND DUCTWORK, AND ELECTRICAL WITHIN THE BUILDING. PIPING CONFLICTS BETWEEN SYSTEM SHALL BE REMOVED AND REPLACED AT NO COST TO THE OWNER. P. CONDUCT ALL APPLICABLE TESTS AS REFERENCED IN NFPA STANDARD 13. ALL NECESSARY TESTS SHALL BE CONDUCTED IN CONFORMANCE WITH REQUIREMENTS OF NFPA. Q. WIRING FOR FLOW SWITCHES, VALVE SUPERVISORY SWITCHES, SUPERVISORY PRESSURE SWITCHES, AND POWER TO AIR COMPRESSORS WILL BE PROVIDED UNDER DIVISION 16. COORDINATE LOCATION OF THESE DEVICES WITH THE ELECTRICAL CONTRACTOR. 15410 PLUMBING FIXTURES AND EQUIPMENT A. MANUFACTURERS: a. WATERCLOSETS; AMERICAN STANDARD, CRANE, EWER, KOHLER b. URINALS; AMERICAN STANDARD, CRANE, ELDER, KOHLER c. LAVATORIES; AMERICAN STANDARD, CRANE, ELJER, KOHLER d. ELECTRIC WATER COOLERS; ELKAY, HALSEY TAYLOR, HAWS, OASIS e. MOP SINKS; FIAT, EL MUSTEE, STERN - WILLIAMS, SWAN f. SERVICE SINKS; FIAT, EL MUSTEE, STERN- WILLIAMS, SWAN g. FAUCETS (LAVATORIES): AMERICAN STANDARD, CRANE, ELJER, KOHLER, DELTA, MOEN, CHICAGO FAUCET, ZURN h. SEATS: BEMIS, BENEKE, CHURCH, OLSONITE, SPERZEL i. CARRIERS: JOSAM, JONESPEC, J.R. SMITH, WADE, ZURN j. INSULATION KITS: TRUBRO, BROCAR, PLUMBEREX SPECIALTY PRODUCTS k. RECEPTORS (FLOOR DRAINS, ETC.): JOSAM, J.R. SMITH, WADE, ZURN I. FLOOR/WALL CLEANOUTS: JOSAM, J.R. SMITH, WADE, ZURN m. WATERHEATERS (TANK TYPE): A.O. SMITH, RHEEM/RUUD, STATE n. WATERHEATERS (INSTANTANEOUS): CHRONOMITE LABS, HATCO B. PROVIDE BRACKETS, BRACES OR REINFORCING ANGLES AS REQUIRED IN ALL PARTITIONS NOT SUFFICIENT IN THEMSELVES TO SUPPORT PLUMBING FIXTURES OR OTHER WALL -HUNG EQUIPMENT. C. INSTALL EACH FIXTURE WITH CHROME PLATED, 17 GAUGE TUBING TRAP WITH CLEANOUT, EASILY REMOVABLE FOR SERVICING AND CLEANING. D. INSTALL COMPONENTS LEVEL, PLUMB AND SECURE. E. INSTALL AND SECURE FIXTURES IN PLACE WITH WALL CARRIERS AND BOLTS. F. SEAL FIXTURES TO WALL AND FLOOR SURFACES WITH SEALANT, COLOR TO MATCH FIXTURE. G. MOUNT LEVER CONTROL FOR HANDICAPPED WATER CLOSETS ON WIDE SIDE OF TOILET STALL. H. INSULATE WASTE AND SUPPLIES FOR ALL HANDICAPPED FIXTURES. I. ROUGH -IN FIXTURE PIPING CONNECTIONS IN ACCORDANCE WITH MINIMUM SIZES INDICATED IN PLUMBING FIXTURE SCHEDULE ON DRAWINGS. J. REVIEW MILLWORK SHOP DRAWINGS. CONFIRM LOCATION AND SIZE OF FIXTURES AND OPENINGS BEFORE ROUGH -IN AND INSTALLATION. K. EXPOSED WATER PIPING CHROME PLATED BRASS. L. PROVIDE SHUT OFF VALVE AND SOLENOID VALVE IN GAS PIPING TO EACH PIECE OF GAS EQUIPMENT. 15732 ROOF TOP AIR CONDITIONING UNIT A. EXISTING ROOF TOP UNIT TO REMAIN. REFER TO SHEET M -1 FOR REFURBISHING REQUIREMENTS AND AIR BALANCE! 15810 DUCTWORK A. PERFORM WORK IN ACCORDANCE WITH SMACNA- HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE, UNLESS MORE STRINGENT REQUIREMENTS ARE NOTED IN LOCAL CODES. B. GALVANIZED STEEL DUCTS: ALL NEW DUCTWORK TO BE ASTM A525 AND ASTM A527 GALVANIZED STEEL SHEET, LOCK-FORMING QUALITY, HAVING G60 ZINC COATING OF IN CONFORMANCE WITH ASTM A90. C. INSULATED DUCT BOARD: INSULATED DUCT BOARD MAY ONLY BE RE -USED WITH PRIOR APPROVAL FROM ENGINEER - CONTRACTOR TO CONTACT ENGINEER FOR APPROVAL PRIOR TO REUSE. D. INSULATED FLEXIBLE DUCTS: a. MANUFACTURERS: FLEX -AIRE, FLEXMASTER, NORFLEX, THERMAFLEX, WIREMOLD. b. TWO PLY VINYL FILM SUPPORTED BY HELICALLY WOUND SPRING STEEL WIRE, FIBERGLASS INSULATION; POLYETHYLENE VAPOR BARRIER FILM. PRESSURE RATING: 10 INCHES WG POSITIVE AND 1.0 INCHES WG NEGATIVE. MAXIMUM VELOCITY: 4000 FPM. TEMPERATURE RANGE: -10 DEGREES F TO 160D DEGREES F. D. FABRICATE AND SUPPORT IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE, UNLESS MORE STRINGENT REQUIREMENTS ARE NOTED IN LOCAL CODES. E. INSTALLATION - GENERAL: a. INSTALL AND SEAL DUCTS IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE, UNLESS MORE STRINGENT REQUIREMENTS ARE NOTED IN LOCAL CODES. b. SUPPORT DUCTWORK IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE, CHAPTER 4, HANGERS AND SUPPORTS (MINIMUM OF 12 GAUGE). c. PROVIDE FIRESTOP SYSTEMS FOR PIPE AND DUCT THROUGH - PENETRATIONS OF THE FOLLOWING FIRE - RESISTANCE RATED ASSEMBLIES, INCLUDING BOTH EMPTY OPENINGS AND OPENINGS CONTAINING PENETRATING ITEMS: FLOORS AND CEILINGS, WALLS AND PARTITIONS, SMOKE BARRIERS, AND CONSTRUCTION ENCLOSED COMPARTMENTALIZED AREAS. d. DUCT HANGERS SHALL NOT ATTACH TO BOTTOM CHORD OF STEEL JOIST OR METAL ROOF DECKING. ATTACH TO TOP CHORD OF STEEL JOIST. e. CONNECT DIFFUSERS OR LIGHT TROFFER BOOTS TO LOW PRESSURE DUCTS DIRECTLY OR WITH 3 FEET MAXIMUM LENGTH OF FLEXIBLE DUCT HELD IN PLACE WITH STRAP OR CLAMP. F. PROTECTION: DURING CONSTRUCTION, PROVIDE TEMPORARY CLOSURES OF METAL OR TAPED POLYETHYLENE ON OPEN DUCTWORK TO PREVENT CONSTRUCTION DUST FROM ENTERING DUCTWORK SYSTEM. G. CLEANING: a. CLEAN DUCT SYSTEM AND FORCE AIR AT HIGH VELOCITY THROUGH DUCT TO REMOVE ACCUMULATED DUST. TO OBTAIN SUFFICIENT AIR, CLEAN HALF THE SYSTEM AT A TIME. PROTECT EQUIPMENT WHICH MAY BE HARMED BY EXCESSIVE DIRT WITH TEMPORARY FILTERS, OR BYPASS DURING CLEANING. b. CLEAN DUCT SYSTEMS WITH HIGH POWER VACUUM MACHINES. PROTECT EQUIPMENT WHICH MAY BE HARMED BY EXCESSIVE DIRT WITH FILTERS, OR BYPASS DURING CLEANING. 15820 DUCTWORK ACCESSORIES A. COMBINATION FIRE AND SMOKE DAMPERS: a. MANUFACTURERS: CESCO, GREENHECK, NAILOR, POTTRFF, PREFCO, RUSKIN, SAFE -AIR. b. FABRICATE IN ACCORDANCE WITH NFPA 90A, UL 555, UL 555S, LEAKAGE CLASS II, AND AS INDICATED. c. ACTUATORS: UL LISTED AND LABELED SPRING RETURN ELECTRIC TYPE SUITABLE FOR 120 VOLTS, SINGLE PHASE, 60 HZ. [ELECTRIC TYPE SUITABLE FOR 24 VOLTS, DC.] LOCATE DAMPER OPERATOR ON EXTERIOR OF DUCT AND LINK TO DAMPER OPERATING SHAFT. PROVIDE FOR TESTING OR RESETTING AT DAMPER. FIRE DAMPERS: a. MANUFACTURERS: AIR BALANCE, CESCO, GREENHECK, NAILOR, POTT RFF, PREFCO, RUSKIN, SAFE -AIR. b. FABRICATE IN ACCORDANCE WITH NFPA 90A AND UL555, AND AS INDICATED. C. SMOKE DAMPERS: a. MANUFACTURES: AIR BALANCE, CESCO, GREENHECK, NAILOR, POTTO RFF, PREFCO, RUSKIN, SAFE -AIR. b. FABRICATE IN ACCORDANCE WITH NFPA 90A, UL 555, UL 555S, [LEAKAGE CLASS I] [LEAKAGE CLASS II], AND AS INDICATED. c. ACTUATORS: UL LISTED AND LABELED SPRING RETURN ELECTRIC TYPE SUITABLE FOR 120 VOLTS, SINGLE PHASE 60 HZ. [ELECTRIC TYPE SUITABLE FOR 24 VOLTS, DC]. LOCATE DAMPER OPERATOR ON EXTERIOR OF DUCT AND LINK TO DAMPER OPERATING SHAFT. PROVIDE FOR TESTING OR RESETTING AT DAMPER. D. INSTALL ACCESSORIES IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS, NFPA 90A, AND FOLLOW SMACNA HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE. E. INSTALL CONTROL DAMPERS FURNISHED IN SECTION 16906. F. PROVIDE BACKDRAFT DAMPERS ON EXHAUST FANS OR EXHAUST DUCTS NEAREST TO OUTSIDE AND WHERE INDICATED. 15830 FANS A. MANUFACTURERS: GREENHECK, COOK, JENN -AIR, TWIN CITY FAN. B. INSTALL ACCORDING TO MANUFACTURER'S INSTRUCTIONS. 15850 AIR OUTLETS AND INLETS A. GRILLES, REGISTERS AND DIFFUSERS: a. MANUFACTURERS: TITUS, ANEMO STAT, KRUEGER, METALAIRE, NAILOR, PRICE, TUTTLE & BAILEY. B. LOUVERS: a. LOUVER BY OTHERS AMERICAN WARMING AND VENTILATING. b. MANUFACTURERS: AMERICAN WARMING AND VENTILATING, ARROW UNITED, CESCO, GREENHECK, LOUVERS AND DAMPERS, RUSK IN. C GRAVITY ROOF VENTILATORS: a. MANUFACTURERS: COOK, GREENHECK, PENN. D. GOOSENECKS: a. FABRICATE IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE, OF MINIMUM 18 GAGE GALVANIZED STEEL. b. MOUNT ON MINIMUM 12 INCH HIGH CURB BAS WHERE SIZE EXCEEDS 9 X 9 INCH. 15895 HVAC CLEANING SYSTEM A. SECTION INCLUDES: a. MECHANICAL CLEANING OF HVAC SYSTEMS TO INCLUDE THE REMOVAL OF DIRT, BACTERIA, FUNGI, DUST AND DEBRIS THAT HAS ACCUMULATED INSIDE THE DUCTS AND HVAC EQUIPMENT. b. CLEANING OF ALL SUPPLY, RETURN, AND EXHAUST AIR DUCTWORK, DIFFUSERS, GRILLES AND REGISTERS. c. CHEMICAL PRESSURE WASHING AND DECONTAMINATION OF ALL HEATING AND COOLING COILS. d. DECONTAMINATION OF DAMPERS, SUPPLY AIR FANS, RETURN AIR FANS AND OTHER COMPONENTS. QUALITY ASSURANCE: a. SERVICES PROVIDED BY VENTILATION CLEANING CONTRACTOR CERTIFIED BY NATIONAL AIR DUCT CLEANERS ASSOCIATION ( NADCA). b. PERFORM HVAC SYSTEM CLEANING IN ACCORDANCE WITH NADCA STANDARD 1992 -01. CLEANING CHEMICALS: a. DEGREASER AS MANUFACTURED BY; ZEP OR APPROVED SUBSTITUTION. b. COIL CLEANER AS MANUFACTURED BY: RENEUZ OR APPROVED SUBSTITUTION. VACUUM COLLECTION SYSTEM: a. HEPA FILTERED VACUUM RATED AT 4000 CFM AND ABLE TO MAINTAIN 1.5 INCHES OF STATIC PRESSURE INSIDE THE ISOLATED AREA OF DUCTWORK. b. AIR COMPRESSOR CAPABLE OF PROVIDING A MINIMUM OF 160 PSI AT 26 CFM. c. RBS -1500 ROTARY BRUSH SYSTEM FOR MECHANICALLY CLEANING ALL TYPES OF DUCTWORK AND VENTILATION SHAFTS. E. EXAMINATION: a. VERIFY CONDITIONS AT SITE BEFORE COMMENCING WORK. 'F. PREPARATION: a. PROTECT ALL FURNISHINGS, EQUIPMENT, ETC. IN WORK AREA WITH POLYETHYLENE OR EQUIVALENT. b. SEAL OFF ENDS AND OPENINGS OF ANY DUCTWORK, NOT BEING IMMEDIATELY WORKED ON. c. PROTECT ALL INTERNAL DUCT DEVICES SUCH AS TURNING VANES, COILS, FIRE DAMPERS, SENSORS, ETC., FROM COATING OVERSPRAY. d. SUPPORT AND BRACE DUCTWORK WHICH WILL BE ENTERED BY PERSONNEL FOR DECONTAMINATION. e. ISOLATE EQUIPMENT WHICH GENERATES NOISE FROM OCCUPIED AREAS. f. MARK ALL AIR VOLUME CONTROL DAMPER POSITIONS PRIOR TO CLEANING AND RESTORE TO MARKED POSITION AT COMPLETION OF WORK. G. ACCESS DOORS: a. PROVIDE DUCT ACCESS DOORS FOR INSPECTION AND CLEANING BEFORE AND AFTER FILTERS, COILS, FANS, HUMIDIFIERS, DUCT MOUNTED SMOKE DETECTORS, AUTOMATIC DAMPERS, AT FIRE DAMPERS, COMBINATION FIRE AND SMOKE DAMPERS, AND ELSEWHERE AS INDICATED. PROVIDE MINIMUM 8 X 8 INCH SIZE FOR HAND ACCESS. 18 X 18 INCH SIZE FOR SHOULDER ACCESS, AND AS INDICATED. REVIEW LOCATIONS PRIOR TO FABRICATION. H. DUCTWORK a. DETERMINE ACCESS POINTS TO FACILITATE CLEANING SECTION BY SECTION. b. PROVIDE WITHIN THE DUCTWORK DISTRIBUTION SYSTEM, PROTECTIVE SEALS OF ANY AREAS DOWNSTREAM FROM RECEIVING PARTICULATES DURING THE INSTALLATION OF ACCESS POINTS. c. CUT EXISTING EXTERIOR DUCT INSULATION AND DUCT TO PROVIDE AN ACCESS DOOR TO FACILITATE CLEANING. MAXIMUM SIZE OF ACCESS TO BE 22" X 22 ". C. 15906 AUTOMATIC CONTROLS (RTU) A. SEQUENCE OF OPERATION: ROOFTOP UNIT, DX COOLING WITH GAS HEAT a. EXISTING CONTROL SEQUENCE TO REMAIN UNCHANGED. tl-wo REVIEWED FOR CODE COMPLIANCE APPROVED 'JUN i32012 City of Tukwila BUILDING DIVISION RECEIvti4 CV OFTUKWILA MAY 302012 PERMIT CENTER 0412755 -139 DUNHAM Dunham Associates, Inc. 50 South Sixth Street / Suite 1100 Minneapolis, Minnesota 55402-1540 PHONE 612.465.7550 Fax 612.465.7551 WEB dunhameng.com mechanical + electrical consulting engineering DRAWN BY: _1411. CHECKED BY GMS z W wZ _Zz NCO V 4C Lai 0 mE WHW xV v ce Cet SQ. FT. CALCS RETAIL: 1,170 SF TOTAL" 1,682 SF CONCEPT: 1.0 LARGE CONCEPT DATE: 04 -28 -11 STORE NUMBER: # ## 0 PERMIT SET ISSUE DATE: 05 -23 -12 REV. DATE A A n A n SCALE: AS NOTED MECHANICAL SPECIFICATIONS M -3