Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M12-088 - FORT DENT II - SILA
FORT DENT II - SILA 6840 FORT DENT WY M12 -088 City Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 2954900425 Address: 6840 FORT DENT WY TUKW Project Name: FORT DENT II - SILA Permit Number: M12 -088 Issue Date: 06/25/2012 Permit Expires On: 12/22/2012 Owner: Name: PEPPERWOOD HOLDINGS LLC Address: 2835 82ND AVE SE #300 , MERCER ISLAND WA 98040 Contact Person: Name: DARLA DOLL Address: 7717 DETROIT AVE SW , SEATTLE WA 98106 Email: DARLA.DOLL @MACMILLER.COM Contractor: Name: MACDONALD /MILLER FAC SOL INC Address: PO BOX 47983 , SEATTLE, WA 98106 Contractor License No: MACDOFS980RU Phone: 206 768 -4278 Phone: 206 - 768 -4180 Expiration Date: 12/31/2012 DESCRIPTION OF WORK: SUITE 375: RELOCATE (52) DIFFUSERS, RELOCATE (2) RETURN AIR BOOTS, INSTALL (2) VAV BOXES, INSTALL (1) DUCTLESS SPLIT SYSTEM, INSTALL (12) SOUNDLINES RETURN AIR BOOTS, AND MISC DUCTWORK PER PLANS. Value of Mechanical: $25,000.00 Type of Fire Protection: UNKNOWN Electrical Service Provided by: Permit Center Authorized Signature: Fees Collected: $489.81 International Mechanical Code Edition: 2009 Date: 0(..' 47S I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this permit. Signatur, Print Name: 12') / Date: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IMC -4/10 M12 -088 Printed: 06 -25 -2012 PERMIT CONDITIONS Permit No. M12-088 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: Ventilation is required for all new rooms and spaces of new or existing buildings and shall be in conformance with the International Building Code and the Washington State Ventilation and Indoor Air Quality Code. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 9: ** *FIRE DEPARTMENT CONDITIONS * ** 10: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 11: Maintain sprinkler coverage per N.F.P.A. 13. Addition/relocation of walls, ceilings closets or partitions may require relocating and/or adding sprinkler heads. (IFC 901.4) 12: Sprinklers shall be installed under fixed obstructions over 4 feet (1.2 m) wide such as ducts, decks, open grate flooring, cutting tables, shelves and overhead doors. (NFPA 13- 8.6.5.3.3) 13: All new sprinkler systems and all modifications to existing sprinkler systems shall have fire department review and approval of drawings prior to installation or modification. New sprinkler systems and all modifications to sprinkler systems involving more than 50 heads shall have the written approval of Factory Mutual or any fire protection engineer licensed by the State of Washington and approved by the Fire Marshal prior to submittal to the Tukwila Fire Prevention Bureau. No sprinkler work shall commence without approved drawings. (City Ordinance No. 2327). 14: Maintain fire alarm system audible /visual notification. Addition/relocation of walls, ceilings or partitions may require relocation and /or addition of audible /visual notification devices. (City Ordinance #2328) 15: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2328) (IFC 104.2) 16: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 17: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 18: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: IMC -4/10 M12 -088 Printed: 06 -25 -2012 • CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htto://www.cL tkwila. wa. us Mechanical Permit No. Project No. MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *please print ** SITE LOCATION King Co Assessor's Tax No.: 2954900440 Suite Number: 31C-- Floor: Site Address: 6840 FORT DENT WAY TUKWILA, WA 98188 Tenant Name: FORT DENT II - SILA Property Owners Name: JC RADOVICH Mailing Address: 2000 124TH AVE NE #B103 New Tenant: ❑ Yes MERCER ISLAND WA City State 3 & RF m..No 98040 Zip CONTACT. PERSON - who do we contact when your permit is ready to be issued Name: DARLA DOLL Mailing Address: 7717 DETROIT AVE SW Day Telephone: (206) 768 -4278 SEATTLE WA 98106 E -Mail Address: DARLA.DOLL @MACMILLER.COM City State Fax Number: (206) 768 -4279 Zip MECHANICAL CONTRACTOR INFORMATION Company Name: MACDONALD MILLER Mailing Address: 7717 DETROIT AVE SW SEATTLE WA 98106 Contact Person: PERRY CHRISTIAN E -Mail Address: PERRY.CHRISTIAN @MACMILLER.COM Contractor Registration Number: MACDOFS980RU City State Day Telephone: (206) 768 -4284 Fax Number: (206) 768 -4285 Expiration Date: 12/31/2012 Zip ARCHITECT OF RECORD - All plans must be stamped by architect of record Company Name: N/A Mailing Address: Contact Person: E -Mail Address: City Day Telephone: Fax Number: State Zip ENGINEER OF RECORD — All plans must be stamped by engineer of record Company Name: MACDONALD MILLER Mailing Address: 7717 DETROIT AVE SW SEATTLE WA 98106 Contact Person: PERRY CHRISTIAN E -Mail Address: PERRY.CHRISTIAN @MACMILLER.COM H:\Applications\Forms- Applications On Line \2010 Applications \7 -2010 - Mechanical Permit Application.doc Revised: 7 -2010 bh City State Day Telephone: (206) 768 -4284 Fax Number: (206) 768 -4285 Zip Page 1 of 2 • • Valuation of project (contractor's bid price): $ 25,000.00 Scope of work (please provide detailed information): RELOCATE (52) DIFFUSERS, RELOCATE (2) RETURN AIR BOOTS, INSTALL (2) VAV BOXES, INSTALL (1) DUCTLESS SPLIT SYSTEM, (12) SOUNDLINED RETURN AIR BOOTS AND MISC DUCTWORK PER PLANS Use: Residential: New ❑ Replacement ❑ Commercial: New m Replacement ❑ Fuel Type: Electric m Gas Other: 2 Indicate type of mechanical work being installed and the quant'ty below: Unit Type: Qty Unit Type: Qty Unit Type: Qty Bioler /Compressor Qty furnace <100k btu air handling unit >10,000 cfm fire damper 0 -3 hp /100,000 btu furnace >100k btu evaporator cooler diffuser 52 3 -15 hp /500,000 btu floor furnace ventilation fan connected to single duct thermostat 15 -30 hp /1,000,000 btu suspended/wall/floor mounted heater ventilation system wood/gas stove 30 -50 hp /1,750,000 btu appliance vent hood and duct emergency generator 50+ hp/ 1,750,000 btu repair or addition to heat/refrig/cooling system Incinerator — domestic other mechanical equipment 2 air handling unit <10,000 cfm 1 incinerator — comm/ind PERMIT APPLICATION NOTES - Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 international building code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING S_WNER OR AUTHORIZED AGENT: Signature: Date: 06/07/2012 Print Name: DARLA DOLL Day Telephone: (206) 768 -4278 Mailing Address: 7717 DETROIT AVE SW SEATTLE WA 98106 IDate Application Accepted: ©ce, /��/ City State Zip Date Application Expires: 0/0 /0 7//� Staff Initials: AiG J H:\Apphcanons\Form s- Applications On Ltne\2010 Applications V-2010 - Mechanical Permit Application.doc Revised: 7 -2010 bh Page 2 of 2 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.QOv Parcel No.: 2954900425 Address: 6840 FORT DENT WY TUKW Suite No: Applicant: FOR DENT II - SILA RECEIPT Permit Number: M12 -088 Status: PENDING Applied Date: 06/07/2012 Issue Date: Receipt No.: R12 -01814 Initials: User ID: LAW 1632 Payment Amount: $489.81 Payment Date: 06/07/2012 02:05 PM Balance: $0.00 Payee: MACDONALD- MILLER FACILITY SOLUTIONS INC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 3332 489.81 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES PLAN CHECK - NONRES 000.322.102.00.00 391.85 000.345.830 97.96 Total: $489.81 doc: Receipt-06 Printed: 06 -07 -2012 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 1�' Project: ro R,-;--- 1 l -S I LA Type of Inspection: Fl yV A ii Address: COQ 44 0 l ca,/ k beg/!` to Date Called: Special Instructions: Date Wanted:. .-F'3 - +2 ate. m Requester: Phone No: proved; per applicable codes. D Corrections required prior to approval. COMMENTS: i-)/07/7 ayi //%/v- l Inspector: 4 a 2 RINSPECTION FEE REQUIRED. Prior to next inspection. fee must be id at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 jZ (206)431 -3670' Permit Inspection Request Line (206) 431 -2451 Project: Type of Inspection: Address: c) I-i a K� R -1 tom. tii` t.3 1 Date Called: Special Instructions: Date Wanted:. 2.,1- -1L- -- Cull_ pm. Requester: Phone No: ❑ Approved per applicable codes. ®.Corrections required prior to approval. COMMENTS: l'/ y t (�� fit-- hl°9 1 - ' ‘J60 Inspector': SPECTION FEE REQUIRED. Prior to next inspection, fee must be part at 6300 Southcenter Blvd., Suite 100. Call to schedule 'reinspection:..;. INSPECTION NO. 'INSPECTION RECORD Retain a copy with permit rn12 -' o ? PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 r., (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: roRT i7Fi`2T - S.2LA7 Type of Inspection:nrq '' / , ,`/ Address: P 00 r 0 Rr FtJT , Date Called: Special Instructions: Date Wanted:. /5.n}! Requester: Phone No: cab --.mos -67N� Approved per applicable codes. Corrections required prior to approval. COMMENTS: )Date, l REINI$ECTION FEE REQUIRED! Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to'schedule reinspection. fi INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION. 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431. -3670 Permit Inspection Request Line (206) 431 -2451 /' /.2 -c �9r3 Project: _ �f_ Type of Inspection:: ': �_. Address: 6 ,10 /.77e1?-r- »v eact Date Called: Special Instructions: Date Wanted:. 7- .2 V% - .r� " ' . a.m.. :p.m: Requester: Phone No: o7 c c - '/&3 —9 c1 3 _ .., .. . Approved per applicable codes. Corrections required prior.to"approval. COMMENTS: Inspec or: _ I Dater REINSPECTION FEE �REQUIRE . Prior to next inspection. : fee must be paid at 6300 Southcehter Blvd., Suite 100. Call ao .schedule reinspection • • INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. • CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431-3670 Permit Inspection Request Line (206) 431-2451 in/.2- 055 Project: re3111--,L),"/41--- Type of Inspection: Address: 68 4/0 , A ..-':-- - 0 / 4// Date Called: Special Instructions: i Date Wanted:. 4- 29 —12_ CitZ Requester: Phone No: c,2C6--SW—Z-3.31 Approved per applicable codes. Corrections required prior to approval. COMMENTS: te ?tiA:Se_ -4- 14- 1-7 R SPECTION FEE RE UIRED. Prior to next inspection fee must be p at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NUMBER INSPECTION RECORD Retain a copy with permit z in 2. • o it- -- PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206 - 575 -4407 Project: S ,' /,9 Sprinklers: Type of Inspection: Address: 6 f t--/G f04.-9•-oe.. 4 Suite #: - 4.4.t. Contact Person: Special Instructions: .4 iv./ Phone No.: Approved per applicable codes. Corrections required prior to approval. COMMENTS: Sprinklers: Date: CI) H v4-G /, . .sovi� r ,,, iJ� S 5,K . 1 tZt-r Monitor: .4 iv./ ., c .1.-0,7 ,-.-1 A1/4 Needs Shift Inspection: Sprinklers: Date: Fire Alarm: Hood & Duct: / Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: /= r9,,3.3 Date: -ja zliz. Hrs.: / X$100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: City: State: Zip: Word /Inspection Record f pr p Doc 6/11/10 T.F.D. Form F.P. 113 t. FORT DENT 11 SILA Location Building owner Program user Company Comments By Dataset name Calculation time TRACE® 700 version Location Latitude Longitude Time Zone Elevation Barometric pressure Air density Air specific heat Density- specific heat product Latent heat factor Enthalpy factor Summer design dry bulb Summer design wet bulb Winter design dry bulb Summer clearness number Winter clearness number Summer ground reflectance Winter ground reflectance Carbon Dioxide Level Design simulation period Cooling load methodology Heating load methodology TUKWILA WA JC RADOVICH PERRY CHRISTIAN MacDonald Miller MacDonald - Miller C:\ Users \christianp \Documents\Trane Trace files \Fort Dent 2-FL 3 \7225107- LOAD2.TRC 04:12 PM on 05/16/2012 6.2.7 Seattle, Washington 47.0 deg 122.0 deg 8 386 ft 29.5 in. Hg 0.0749 lb/cu ft 0.2444 Btu/lb-°F 1.0988 Btu /h•cfm• °F 4,836.9 Btu•min /h•cu ft 4.4953 Ib•min/hr•cu ft 82 66 24 0.95 0.95 0.20 0.20 ,400 °F °F °F ppm January - December CLTD -CLF (ASHRAE TFMI UATD REVIEWED FOR CODE COMPLIANCE APPROVED JUN 2 2 2012 BUILDING Tukwila VISION JUN 0 7 2012 PERMIT CENTER TRACEmo vollwan hem Tram 102 System Checksums By MacDonald - Miller VAV -305 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Mo /Hr: 7 / 9 OADB/WB /HR: 69 / 59 / 62 - Space Plenum Sens: + Lat. Sens. + Lat Btu /h Btu /h Net Percent Total Of Total Btu /h ( %) O 0 0 0 O - 0 0 0 O -126 -126 -1 9,844 0 9,844 79 -763 0 -763 -6 403 650 1,053 8 O 0 0 O 0 0 O 0 0 0 O 0 0 9,484 524 10,008 81 560 140 700 6 809 0 809 7 980 0 980 8 2,349 140 2,489 20 86 -86 0 0 O 0 -42 0 O 0 0 O 0 O 0 0 -44 -44 0 O 0 O 0 0 O 0 0 O 0 O 0 0 11,919 534 12,411 100.00 CLG SPACE PEAK Mo /Hr: 6 / 9 OADB: 64 Space Sensible Btu /h 0 0 0 10,673 -1,206 379 Percent Of Total ( %) 0 0 0 90 -10 3 0 0 O 0 O .0 O 0 9,847 83 560 409 980 1,949 73 0 0 0 5 3 8 16 0 0 0 Envelope Loads Skylite Solar Skylite Gond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 11,868 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu/h ( %) O 0 0.00 O 0 000 O -557 4.77 O 0 0.00 -5,112 -5,112 43.77 -572 -1,481 12 68 O 0 0 00 O 0 000 O 0 0 -1,005 -1,005 8 61 -6,688 -8,154 69 82 O 0 0 00 O 0 000 -675 -675 5 78 -675 -675 5 78 -179 0 0 00 O -2,022 17 31 O 0 0 O 0 000 138 -1 18 O 0 00 -965 8 26 O 0 00 O 0 00 O 000 -7,542 - 11,678 100 00 Main CIg Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR ton MBh MBh cfm °F °F gr /Ib 1.0 12.4 11.8 524 75.5 60.0 54.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 1.0 12.4 Leave DB/WB/HR °F °F gr/lb 55.0 51.5 52.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft' ( %) Floor 270 Part 0 Int Door 0 ExFIr 0 Roof 270 0 0 Wall 450 213 47 Ext Door 0 0 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating 55.0 82.7 76 0 67.9 76 0 67.9 75 5 51.7 0 0 0.0 0 0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 540 540 540 540 40 40 0 108 540 40 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 540 540 108 540 40 40 20 108 128 60 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton ft' /ton Btu /hr-ft' No. People Cooling 7.4 2.00 522.19 261.07 45.97 2 Heating 7.4 2.00 -43.25 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -10.3 540 65.3 82 7 0.0 0 0.0 0 0 -1.4 40 24.0 55 0 0.0 0.0 -11.7 O 0.0 0 0 O 0.0 0 0 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 1 of 15 System Checksums By MacDonald - Miller VAV -307 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Gond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo /Hr: 7 / 14 Mo /Hr: 9 / 14 OADB/WB /HR: 81 / 66 / 74 OADB: 77 Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h Net Percent Space Percent Total Of Total Sensible Of Total Btu/h ( %) Btu /h ( %) O o 0 0 0 0 O 0 0 0 0 0 O 64 64 0 0 0 9,679 0 9,679 22 12,386 40 393 0 393 1 -30 0 799 894 1,693 4 923 3 0 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 O 0 0 0 0 10,870 958 11,829 26 13,280 43 7,311 1,828 9,139 20 7,311 24 13,568 0 13,568 30 8,143 27 1,135 0 1,135 3 1,135 4 22,015 1,828 23,842 53 16,590 54 965 -965 0 0 827 3 O 0 10,183 23 0 0 O 0 0 0 0 0 0 O 0 0 0 0 -986 -986 -2 O 0 O 0 0 O 0 0 O 0 O 0 0 33,850 836 44,869 100.00 30,697 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 -4,824 -950 0 0 0 -8,843 - 14,617 0 0 -5,940 -5,940 -1,794 0 0 0 - 22,350 Coil Peak Tot Sens Btu/h 0 0 -4,866 0 -4,824 -1,993 0 0 0 -8,843 - 20,525 0 0 -5,940 -5,940 Percent Of Total ( %) 0.00 0.00 9.06 0.00 8.98 3.71 0 00 0.00 0 1646 3820 0 00 0 00 1106 1106 O 0 00 - 14,120 26.28 O 0 O 0.00 1,189 -2.21 - 14,328 26.67 O 0.00 O 0.00 O 0.00 O 0.00 - 53,725 100.00 Main CIg Aux CIg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F grill) 3.7 44.9 34.2 1,293 79.1 64.5 68.9 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 3.7 44.9 Leave DB/WB /HR °F °F gr /Ib 55.0 52.8 57.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass fP ( %) Floor 2,376 Part 0 Int Door 0 ExFIr 0 Roof 2,376 Wall 519 Ext Door 0 O 0 201 39 O 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating 55.0 84.6 76.3 67.6 76.3 67.6 79.1 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fri MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,397 1,397 1,397 1,397 700 700 0 279 1,397 700 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Intl MinStop/Rh Retum Exhaust Rm Exh Auxiliary Leakage Own Leakage Ups Heating 1,397 1,397 279 1,397 279 279 175 279 454 454 0 0 0 0 ENGINEERING CKS Cooling Heating 50.1 20.0 0.59 0.59 373.57 635.45 18.88 -22.61 35 % OA cfm/ft' cfm/ton ft'/ton Btu /hr-ft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -29.9 0.0 -23.8 Lvg °F 1,397 65.1 84.6 0 0.0 0.0 700 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -53.7 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 2 of 15 System Checksums By MacDonald - Miller VAV -308 COOLING COIL PEAK Peaked at Time: Outside Air: CLG SPACE PEAK Mo /Hr: 7 / 14 Mo /Hr: 9 / 11 OADB/WB /HR: 81 / 66 / 74 OADB: 71 Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h Envelope Loads Skylite Solar 0 Skylite Cond 0 Roof Cond 0 Glass Solar 7,434 Glass /Door Cond 293 Wall Cond 304 Partition/Door 0 Floor 0 Adjacent Floor 0 Infiltration 0 Sub Total = => 8,031 Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Net Percent Space Percent Total Of Total Sensible Of Total Btu/h ( %) Btu /h (%) O 0 0 0 0 O 0 0 0 0 75 75 0 0 0 O 7,434 18 11,517 42 O 293 1 -437 -2 490 794 2 486 2 O 0 0 0 O 0 0 0 O 0 0 0 0 O 0 0 0 565 8,596 21 11,566 42 7,294 1,823 9,117 22 6,447 23 13,593 0 13,593 33 7,871 29 1,139 0 1,139 3 1,094 4 22,026 1,823 23,849 58 15,412 56 881 -881 0 0 501 2 O 0 9,761 24 0 0 O 0 0 0 0 O 0 O 0 0 0 0 -909 -909 -2 O 0 O 0 0 O 0 0 O 0 O 0 0 30,938 599 41,297 100.00 27,480 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) O 0 0.00 O 0 0.00 O -4,819 9.46 O 0 0.00 -3,600 -3,600 7.06 -403 -1,039 2.04 O 0 0.00 O 0 0.00 O 0 0 -8,754 -8,754 17.18 - 12,756 - 18,211 35.74 O 0 0.00 O 0 0 00 -5,880 . -5,880 1154 -5,880 -5,880 1154 -1,760 0 0 00 O - 12,641 24 81 O 0 0 O 0 0 00 1,099 -216 - 15,326 30 07 0 000 0 000 O 000 O 000 - 20,396 - 50,959 100 00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 3.4 41.3 0.0 0.0 0.0 0.0 3.4 41.3 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib Leave DB/WB /HR °F °F gr /Ib 31.0 1,161 79.3 64.8 69.9 55.0 52.9 57.2 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass h' (%) Floor 2,352 Part 0 Int Door 0 ExFlr 0 Roof 2,352 Wall 317 Ext Door 0 0 0 150 47 0 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating 55 0 84.8 76.2 67.6 76 2 67.6 79 3 24.0 0 0 0.0 0 0 0.0 0 0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,250 1,250 1,250 1,250 700 700 0 250 1,250 700 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent !Wit MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 1,250 1,250 250 1,250 250 250 173 250 423 423 0 0 0 0 ENGINEERING CKS OA cfm /ft' cfm/ton ft' /ton Btu/hr-ft' No. People Cooling 56.0 0.53 363.34 683.43 17.56 35 Heating 20.0 0.53 -21.67 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -27 1 0.0 -23 8 Lvg °F 1,250 65.1 84.8 0 0.0 0.0 700 24.0 55.0 0 0 0 0.0 0.0 0 0 0 0.0 0.0 -51 0 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 3 of 15 System Checksums By MacDonald - Miller VAV -311 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total => Mo /Hr: 7 / 14 OADB/WB /HR: 81 / 66 / 74 Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/h ( %) O 0 0 O 0 0 11 11 0 0 0 0 O 0 0 O 0 0 0 0 O 0 O 0 0 O 0 11 11 0 2,739 685 3,424 37 2,706 0 2,706 29 1,507 0 1,507 16 6,952 685 7,637 83 221 -221 0 0 O 0 1,752 19 O 0 0 O 0 0 0 0 -217 -217 -2 O 0 O 0 0 O 0 0 O 0 O 0 0 7,174 257 9,183 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 80 Space Sensible Btu /h 0 0 0 0 0 0 0 0 0 0 0 2,843 1,520 1,507 5,871 258 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 46 25 25 96 4 0 0 0 6,129 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -544 0 0 0 -544 Coil Peak Tot Sens Btu /h Percent Of Total (%) O 0.00 O 0.00 -1,745 26.31 O 0.00 O 0 00 O 000 0 000 O 000 O 0 O 000 -1,745 26 31 O 0 00 O 0 00 O 0.00 O 0.00 O 000 -2,819 42.51 O 0 O 0.00 240 -3.62 -2,308 34 80 O 0.00 O 0.00 O 0.00 O 0.00 -6,632 100.00 Main Clg Aux CIg Opt Vent COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR ton MBh MBh cfm °F °F gr /Ib 0.8 9.2 7.1 270 78.8 64.3 68.3 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Total 0.8 9.2 Leave DBIWB /HR °F °F gr/lb 55.0 52.8 57.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft' (%) Floor 883 Part 0 Int Door 0 ExFIr 0 Roof 883 Wall 0 Ext Door 0 0 0 O 0 O 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating 55.0 71.8 76.6 66.1 76.6 66.1 78.8 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return ReUOA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 279 279 279 279 124 124 0 56 279 124 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 279 279 56 279 56 56 0 56 56 56 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft'/ton Btu /hr-ft' No. People Cooling 44.3 0.32 364.45 1,154.21 10.40 6 Heating 20.0 0.32 -7.51 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -2.4 279 63.9 71.8 0.0 0 0.0 0.0 -4.2 124 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -6.6 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 4 of 15 System Checksums By MacDonald - Miller VAV -351 COOLING COIL PEAK Peaked at Time: Mo /Hr: 8 / 12 Outside Air: OADB/WB /HR: 76 / 64 / 73 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Net Percent Sens. + Lat. Sens. + Lat Total Of Total Btu /h Btu /h Btu/h (°/0) 0 0 0 0 O 0 0 0 0 -126 -126 0 21,856 0 .21,856 64 -106 0 -106 0 930 1,516 2,446 7 O 0 0 O 0 0 O 0 0 0 O 0 0 22,680 1,390 24,070 70 1,761 440 2,201 6 4,148 0 4,148 12 1,163 0 1,163 3 7,072 440 7,512 22 225 -225 0 0 0 0 3,124 9 O 0 0 O 0 O 0 0 -321 -321 -1 O 0 0 0 0 0 0 0 O 0 0 0 0 29,977 1,284 34,384 100.00 CLG SPACE PEAK Mo /Hr: 9 / 12 OADB: 74 Space Percent Sensible Of Total Btu /h ( %) O 0 O 0 O 0 23,600 80 -537 -2 958 3 O 0 O 0 O 0 O 0 24,021 81 1,761 6 2,443 8 1,163 4 5,367 18 211 1 O 0 O 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 29,600 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Space Sens Tot Sens Btu /h Btu /h O 0 0 0 O -1,304 0 0 -7,175 -7,175 -802 -2,095 O 0 O 0 O 0 -2,322 -2,322 - 10,300 - 12,896 O 0 O 0 -1,560 -1,560 -1,560 -1,560 -297 0 0 0 - 12,157 Percent Of Total ( %) 0.00 0.00 4.80 0 00 26 43 772 000 000 0 8 55 4750 0 00 0 00 575 5.75 O 000 -7,458 27.47 O 0 O 000 319 -1 18 -3,749 13 81 -1,808 6 66 O 000 O 0 00 O 000 - 27,151 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib ton MBh Main CIg 2.9 34.4 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 2.9 34.4 30.0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 1,286 76.2 61.7 60.4 55.0 52.4 55.4 O 0.0 0.0 0.0 0.0 0.0 0.0 O 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft' (%) Floor Part Int Door ExFIr Roof Wall Ext Door 624 0 0 0 624 0 0 631 299 47 0 0 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating 55 0 78.2 76 1 68.5 76 1 68.5 76 2 44.1 0.0 0.0 0 0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,347 1.347 1,347 1,347 258 258 0 269 1,347 258 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 1,347 1,347 269 1,347 148 148 46 269 315 193 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm /ton ft' /ton Btu /hr-ft' No. People Cooling 19 1 2.16 470.06 217.77 55.10 13 Heating 11.0 2.16 -43.51 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -18.4 0.0 1,347 65.8 0 0.0 Lvg °F 78.2 0.0 -8.8 258 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -27.2 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 5 of 15 System Checksums By MacDonald - Miller VAV -352 Series Fan - Powered VAV COOLING COIL PEAK Peaked at Time: Mo /Hr: 9 / 12 Outside Air: OADB/WB /HR: 74 / 62 / 67 CLG SPACE PEAK Mo /Hr: 9 / 12 OADB: 74 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 TEMPERATURES Cooling Heating SADB 55.0 78 9 Ra Plenum 76.1 68 4 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.1 68 4 Sens. + Lat Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 75.8 39 4 Btu /h Btu /h Btu/h ( %) Btu /h ( %) Btu /h Btu/h ( %) Fn MtrTD 0.0 0 0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0 0 Skylite Solar 0 0 0 0 0 0 Skyhte Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skyhte Cond 0 0 0.00 Roof Cond 0 -116 -116 -1 0 0 Roof Cond 0 -708 6.09 Glass Solar 11,011 0 11,011 73 11,011 82 Glass Solar 0 0 0.00 AIRFLOWS Glass /Door Cond Wall Cond -251 447 0 730 -251 1,177 -2 8 -251 447 -2 3 Glass /Door Cond Wall Cond -3,348 -374 -3,348 28.79 -976 8.39 Cooling Heating Partition /Door 0 0 0 0 0 Partition /Door 0 0 0.00 Diffuser 612 612 Floor 0 0 0 0 0 Floor 0 0 0.00 Terminal 612 612 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0 Main Fan 612 122 Infiltration 0 0 0 0 0 Infiltration -1,265 -1,265 10.88 Sec Fan 612 612 Sub Total = => 11,208 615 11,822 78 11,208 83 Sub Total =_> -4,988 -6,298 54.16 Nom Vent 80 80 AHU Vent 80 80 Internal Loads Internal Loads Infil 0 25 Lights 967 242 1,209 8 967 7 Lights 0 0 0.00 MinStop /Rh 122 122 People 1,414 0 1,414 . 9 774 6 People 0 0 0.00 Return 612 148 Misc 389 0 389 3 389 3 Misc -850 -850 7.31 Exhaust 80 105 Sub Total =_> 2,770 242 3,012 20 2,130 16 Sub Total =_> -850 -850 7.31 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 118 -118 0 0 118 1 Ceiling Load -175 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 448 3 0 0 Ventilation Load 0 -4,044 34.77 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov /Undr Sizing 0 0 0.00 Ov /Undr Sizing 0 0 0 0 0 Exhaust Heat 187 -1.61 ENGINEERING CKS Exhaust Heat -96 -96 -1 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. -624 5.37 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 13.1 13.1 Duct Heat Pkup 0 0 0 cfm/ft' 1.80 1.80 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm/ton 483.84 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft'Iton 268.67 Btu /heft' 44.66 -34.20 Grand Total = => 14,096 642 15,186 100.00 13,456 100.00 Grand Total =_> -6,012 - 11,628 100.00 No. People 4 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR Leave DB/WB /HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr /Ib W ( %) MBh cfm °F °F Main Clg 1.3 15.2 14.0 612 75.8 61.0 57.5 55.0 52.2 54.6 Floor 340 Main Htg -8.9 612 65.7 78.9 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -2.7 80 24.0 55.0 ExFlr 0 Total 1.3 15.2 Roof 340 0 0 Humidif 0.0 0 0.0 0.0 Wall 294 140 47 Opt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -11.6 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC TRACE@ 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Altemative - 1 System Checksums Report Page 6 of 15 System Checksums By MacDonald - Miller VAV -353 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo /Hr: 9 / 14 Mo /Hr: 9 / 13 OADB/WB /HR: 77 / 63 / 66 OADB: 76 Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h Net Percent Space Percent Total Of Total Sensible Of Total Btu/h ( %) Btu /h ( %) O o 0 0 0 0 O 0 0 0 0 0 O -60 -60 0 0 0 15,704 0 15,704 69 16,224 83 -37 0 -37 0 -217 -1 651 1,056 1,707 7 681 3 O 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 O 0 0 0 0 16,318 996 17,314 76 16,688 85 1,172 293 1,466 6 1,136 6 2,611 0 2,611 11 1,163 6 475 0 475 2 389 2 4,259 293 4,552 20 2,688 14 145 -145 0 0 146 1 O 0 1,056 5 0 0 O 0 0 0 0 O 0 O 0 0 0 -0 -155 -155 -1 O 0 O 0 0 O 0 0 O 0 O 0 0 20,721 990 22,767 100.00 19,522 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h (%) O 0 0.00 O 0 0 00 O -811 4 57 O 0 000 -6,106 -6,106 34 39 -683 -1,779 10 02 O 0 0 00 O 0 000 O 0 0 -1,452 -1,452 8.17 -8,241 - 10,148 5715 O 0 000 O 0 000 -975 -975 5 49 -975 -975 5 49 -208 0 0 0 -9,424 O 000 34 16 O 0 O 0.00 276 -1.55 O 000 -844 4 75 O 000 -6,065 O 0 00 O 000 - 17,757 100 00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib. 1.9 22.8 20.8 888 76.3 61.2 57.7 0.0 , 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 1.9 22.8 Leave DBIWB /HR °F °F gr /Ib 55.0 52.1 54.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft' (%) Floor 390 Part 0 Int Door 0 ExFIr 0 Roof 390 0 0 Wall 537 254 47 Ext Door 0 0 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating 55.0 79 7 76.2 68 3 76.2 68 3 76.3 38 4 0.0 0 0 0.0 0.0 0.0 •0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 888 888 888 888 120 120 0 178 888 120 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Retum Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 888 888 178 888 120 120 29 178 206 149 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft' /ton Btu /heft' No. People Cooling 13.5 2.28 468.21 205.56 58.38 6 Heating 13.5 2.28 -45.53 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -13.7 0.0 Lvg °F 888 65.7 79.7 0 0.0 0.0 -4.1 120 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -17.8 TRACED 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 7 of 15 System Checksums By MacDonald - Miller VAV -361 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 14 Outside Air: OADB/WB /HR: 81 / 66 / 74 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/h ( %) O 0 0 O 0 0 11 11 0 O 0 0 O 0 0 O 0 0 0 0 O 0 0 0 0 O 0 11 11 0 2,202 550 2,752 37 1,753 0 1,753 24 1,741 0 1,741 24 5,695 550 6,245 85 171 -171 0 0 O 0 1,244 17 O 0 0 O 0 O 0 0 -135 -135 -2 O 0 0 0 0 O 0 0 O 0 O 0 0 5,866 254 7,365 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 80 Space Sensible Btu /h 0 0 0 0 0 0 0 0 0 0 0 2,286 984 1,741 5,011 200 0 0 0 Percent Of Total ( %) 0 0 0 0 0 0 0 0 0 0 0 44 19 33 96 4 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 5,211 100.00 Grand Total -> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -422 0 0 0 -422 Coil Peak Tot Sens Btu /h Percent Of Total ( %) O 0 00 O 0.00 -1,407 29 83 O 0.00 O 0 00 O 0 00 0 0.00 O 0 00 O 0 O 0 00 -1,407 29 83 O 000 O 0.00 O 000 O 0.00 O 000 -2,397 50 82 O 0 O 0.00 197 -4.18 -1,110 23 53 O 0.00 O 0.00 O 0.00 O 0.00 -4,717 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.6 7.4 0.0 0.0 0.0 0.0 0.6 7.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib 5.9 231 78.2 63.6 65.8 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 55.0 52.7 0.0 0.0 0.0 0.0 56.6 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft' ( %) Floor 710 Part 0 Int Door 0 ExFIr 0 Roof 710 Wall 0 Ext Door 0 O 0 O 0 0 0 Series Fan - Powered VAV TEMPERATURES Cooling SADB 55.0 Ra Plenum 76.5 Return 76 5 Ret/OA 78 2 Fn MtrTD 0 0 Fn BIdTD 0 0 Fn Frict 0 0 Heating 71.6 66.2 66.2 24.0 0.0 0.0 0.0 AIRFLOWS Cooling 237 237 237 237 80 80 0 47 237 80 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Intl! MinStop /Rh Retum Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 237 237 47 237 47 47 0 47 47 47 0 0 0 0 ENGINEERING CKS % OA cfm/ft' cfm/ton fVlton Btu /hrft' No. People Cooling 33, 7 0.33 386.36 1,156.88 10.37 4 Heating 20.0 0.33 -6.64 HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -2.0 237 64.0 71.6 0.0 0 0.0 0.0 -2.7 80 24.0 55.0 0.0 0.0 -4.7 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 8 of 15 System Checksums By MacDonald - Miller VAV -362 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 14 Outside Air: OADB/WB /HR: 81 / 66 / 74 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/h ( %) 0 0 0 O 0 0 4 4 0 O o 0 O 0 0 O 0 0 O 0 O 0 O 0 0 0 0 4 4 0 2,748 687 3,434 43 2,629 0 2,629 33 580 0 580 •7 5,957 687 6,643 83 247 -247 0 0 O 0 1,608 20 O 0 0 O 0 O 0 0 -234 -234 -3 O 0 O 0 0 O 0 0 O 0 O 0 0 6,203 210 8,022 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 80 Space Sensible Btu /h 0 0 0 0 0 0 0 0 0 0 0 2,852 1,477 580 4,909 287 0 0 0 Percent Of Total ( %) 0 0 0 0 0 0 0 0 0 0 0 55 28 11 94 6 0 0 0 5,196 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) O 0 0.00 O 0 0.00 0 -1,733 2718 O 0 0.00 0 0 000 0 0 0 00 O 0 0.00 O 0 0.00 O 0 0 O 0 0.00 O -1,733 2718 0 0 0 0 -604 0 0 0 -604 O 0 00 O 0 00 O 0.00 O 000 O 0.00 -2,178 34.18 O 0 O 000 206 -323 -2,620 4110 -49 0.77 O 0.00 O 0 00 O 0.00 -6,374 100 00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.7 8.0 0.0 0.0 0.0 0.0 0.7 8.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWB /HR MBh cfm °F °F gr /Ib 6.1 228 79.2 64.7 69.5 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 55.0 52.9 57.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 886 Part 0 Int Door 0 ExFIr 0 Roof 886 Wall 0 Ext Door 0 ft' ( %) 0 0 0 0 0 0 Series Fan - Powered VAV TEMPERATURES Cooling SADB 55 0 Ra Plenum 76 8 Return 76 8 Ret/OA 79 2 Fn MtrTD 0 0 Fn BIdTD 0.0 Fn Frict 0 0 Heating 72.3 65.7 65 7 27 7 00 00 00 AIRFLOWS Cooling 236 236 236 236 120 120 0 47 236 120 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 236 236 47 236 43 43 0 47 47 43 0 0 0 0 ENGINEERING CKS % OA cfm /ft' cfm /ton ft'/ton Btu /hr-ft' No. People Cooling 50 8 0.27 353.71 1,325.43 9.05 6 Heating 18.2 0.27 -7.19 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -2.3 236 63.5 72.3 0 0 0 0.0 0.0 -41 120 24.0 55.0 00 00 -6.4 O 0.0 0.0 O 0.0 0.0 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 9 of 15 System Checksums By MacDonald- Miller VAV -366 COOLING COIL PEAK Peaked at Time: Mo /Hr: 8 / 12 Outside Air: OADB/WB /HR: 76 / 64 / 73 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> CLG SPACE PEAK Mo /Hr: 9 / 11 OADB: 71 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu/h Btu/h Btu/h ( %) Btu /h ( %) O 0 0 0 0 0 O 0 0 0 0 0 0 -35 -35 0 0 0 6,579 0 6,579 51 6,910 67 -32 0 -32 0 -262 -3 280 458 738 6 292 3 0 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 O 0 0 0 0 6,827 422 7,249 56 6,940 67 507 127 633 5 476 5 2,820 0 2,820 22 1,808 17 929 0 929 7 1,101 11 4,256 127 4,383 34 3,386 33 57 -57 0 0 51 0 O 0 1,433 11 0 0 O 0 0 0 0 O 0 O 0 0 0 0 -175 -175 -1 O 0 O 0 0 O 0 0 0 0 O 0 0 11,140 317 12,890 100.00 10,377 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/h Btu/h (%) O 0 0.00 O 0 0.00 0 -378 3.39 0 0 0 00 -2,160 -2,160 19 38 -242 -633 5 68 0 0 0.00 O 0 0.00 O 0 0 -670 -670 6.01 -3,071 -3,840 34.46 0 0 0.00 O 0 0 00 - 450 -450 4 04 - 450 -450 4.04 -74 0 0 00 O -4,773 42.84 O 0 0 O 0 0.00 154 -1.38 -2,233 20.04 O 0.00 O 0.00 O 0.00 O 0.00 -3.596 - 11,143 100,00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.1 12.9 0.0 0.0 0.0 0.0 1.1 12.9 COOLING COIL SELECTION Sens Cap. Coil Airflow MBh cfm Enter DB/WB/HR Leave DB/WB /HR °F °F gr /Ib °F °F gr /Ib 10.4 449 76.1 62.9 65.7 55.0 53.0 57.8 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 180 Part 0 Int Door 0 ExFIr 0 Roof 180 0 0 Wall 190 90 47 Ext Door 0 0 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating 55.0 76.9 76.0 68.7 76.0 68.7 76.1 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 472 472 472 472 160 160 0 94 472 160 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 472 472 94 472 94 94 13 94 108 108 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton ft' /ton Btu /heft' No. People Cooling 33.9 2 62 439 59 167 57 71 61 8 Heating 20.0 2.62 -61.90 HEATING COIL SELECTION Capacity Coil Airflow MBh cfm Main Htg Aux Htg Preheat Humidif Opt Vent Total Ent Lvg °F °F -5.7 472 66.0 76.9 0.0 0 0.0 0.0 -5.5 160 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Altemative - 1 System Checksums Report Page 10 of 15 System Checksums By MacDonald - Miller VAV -367 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 14 Outside Air: OADB/WB /HR: 81 / 66 / 74 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu /h ( %) O 0 0 O 0 0 28 28 0 O 0 0 O 0 0 O 0 0 O 0 O 0 O 0 0 O 0 28 28 0 1,958 489 2,447 16 6,263 0 6,263 40 3,853 0 3,853 25 12,074 489 12,564 80 91 -91 0 0 O 0 3,352 21 O 0 0 O 0 O 0 0 -288 -288 -2 O 0 O 0 0 O 0 0 O 0 O 0 0 12,165 139 15,656 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 80 Space Sensible Btu /h 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total (%) 0 0 0 0 0 0 0 0 0 0 0 2,032 21 3,518 37 3,853 41 9,404 99 106 1 0 0 O 0 O 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 9,510 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu/h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -211 0 0 0 -211 Coil Peak Tot Sens Btu /h Percent Of Total (i) O 0.00 O 0.00 -1,300 10.52 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 O 0 O 0.00 -1,300 10.52 O 0.00 O 0.00 O 0.00 O 0.00 O 0.00 -4,206 34.03 O 0 O 0 00 195 -1 57 -6,905 55.87 -142 1.15 O 0.00 O 0.00 O 0.00 - 12,358 100,00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib 1.3 15.7 11.5 423 79.6 65.2 71.7 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 1.3 15.7 Leave DB/WB /HR °F °F gr /Ib 55.0 52.9 57.5 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft' (%) Floor . 631 Part 0 Int Door 0 ExFlr 0 Roof 631 Wall 0 O 0 O 0 Ext Door 0 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating 55 0 70.4 75 9 67.9 75 9 67.9 79 6 28.7 0 0 0.0 0 0 0.0 0.0 0.0 SADB Ra Plenum Return ReVOA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 466 466 433 466 286 286 0 93 433 286 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 466 466 93 466 83 83 0 93 93 83 0 0 0 0 ENGINEERING CKS OA cfm /ft' cfm /ton ft' /ton Btu /heft' No. People Cooling 66.1 0.69 331.68 483.84 24.80 14 Heating 17.9 0.74 -19.58 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -2.6 466 65.3 70.4 0.0 0 0.0 0.0 -9.7 286 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -12.4 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 11 of 15 System Checksums By MacDonald - Miller VAV -368 COOLING COIL PEAK Peaked at Time: Mo /Hr: 9 / 12 Outside Air: OADB/WB /HR: 74 / 62 / 67 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total ==> Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h CLG SPACE PEAK Mo /Hr: 9 / 12 OADB: 74 Net Percent Space Total Of Total Sensible Btu/h (%) Btu /h O 0 0 0 0 O 0 0 0 0 O -104 -104 -1 0 10,419 0 10,419 74 10,419 -237 0 -237 -2 -237 423 691 1,114 8 423 O 0 0 0 O 0 0 0 O 0 0 0 0 O 0 0 0 10,605 587 11,193 80 10,605 864 216 1,080 8 864 706 0 706 5 386 776 0 776 6 776 2,346 216 2,562 18 2,026 106 -106 0 0 106 O 0 282 2 0 O 0 0 0 O 0 O 0 0 0 -48 -48 0 O 0 O 0 0 O 0 0 O 0 O 0 0 13,057 649 13,989 100.00 Percent Of Total (%) Envelope Loads O Skylite Solar O Skylite Cond O Roof Cond 82 Glass Solar -2 Glass/Door Cond 3 Wall Cond 0 Partition /Door O Floor O Adjacent Floor O Infiltration 83 . Sub Total =_> Internal Loads 7 Lights 3 People 6 Misc 16 Sub Total =_> 0 0 0 Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 12,737 100.00 Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 -3,168 -354 0 0 0 -1,135 -4,657 0 0 -763 -763 -154 0 0 0 -5,573 Coil Peak Tot Sens Btu/h Percent Of Total (%) O 0 00 O 000 -636 6 59 O 0 00 -3,168 32 80 -924 9 57 0 000 O 000 O 0 -1,135 11.76 -5,863 60 71 O 000 O 000 -763 7 90 -763 7.90 O 0 00 -2,022 20 94 O 0 O 0.00 109 -1.13 O 0.00 -1,119 11.58 O 0.00 O 0.00 O 0.00 -9,657 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.2 14.0 0.0 0.0 0.0 0.0 1.2 14.0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib 13.3 580 75.9 60.4 54.9 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DBIWB /HR °F °F gr /Ib 55.0 51.8 53.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft' (%) Floor 305 Part 0 Int Door 0 ExFIr 0 Roof 305 Wall 279 Ext Door 0 0 0 132 47 0 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating 55.0 78.8 76.1 68.4 76.1 68.4 75.9 53.1 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 580 580 580 580 40 40 0 116 580 40 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 580 580 116 580 40 40 22 116 138 62 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm /ton ft' /ton Btu /heft' No. People Cooling 6.9 1.90 497.19 261.64 45.86 2 Heating 6.9 1.90 -31.66 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -8.3 0.0 -1.4 0.0 0.0 -9.7 Lvg °F 580 65.7 78 8 0 0.0 0 0 40 24.0 55 0 O 0.0 0 0 O 0.0 0 0 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Altemative - 1 System Checksums Report Page 12 of 15 System Checksums By MacDonald - Miller VAV -369 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => CLG SPACE PEAK Mo /Hr: 8 / 14 Mo /Hr: 9 / 14 OADB/WB /HR: 79 / 66 / 74 OADB: 77 Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h Net Percent Space Percent Total Of Total Sensible Of Total Btu/h ( %) Btu /h ( %) o o 0 0 0 0 o o 0 0 0 0 o -4 -4 0 0 0 7,499 0 7,499 40 8,515 62 167 0 167 1 -20 0 334 542 876 5 352 3 0 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 O 0 0 0 0 7,999 538 8,537 45 8,847 64 924 231 1,155 6 924 7 5,231 0 5,231 28 2,831 20 1,142 0 1,142 6 1,142 8 7,298 231 7,529 40 4,898 35 100 -100 0 0 93 1 O 0 3,001 16 0 0 O 0 0 0 0 O 0 O 0 0 0 0 -272 -272 -1 O 0 O 0 0 O 0 0 O 0 0 0 0 15,396 398 18,795 100.00 13,838 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Space Sens Tot Sens Btu/h Btu /h O 0 O 0 O -637 O 0 -3,312 -3,312 -370 -967 O 0 O 0 O 0 -1,135 -1,135 -4,817 -6,051 Percent Of Total (i) 0.00 0 00 3.79 000 19 69 5.75 000 0 00 0 675 35.98 O 0 000 O 0 000 -763 -763 4 53 -763 -763 4.53 -147 0 0 0 -5,726 0 -6,365 0 0 247 -3,886 0 0 0.00 3785 0 000 -1.47 23.10 0.00 0 00 0 0.00 0 0.00 - 16,817 100.00 Main CIg Aux Clg Opt Vent Total Total Capacity ton MBh 1.6 18.8 0.0 0.0 0.0 0.0 1.6 18.8 COOLING COIL SELECTION Sens Cap: Coil Airflow Enter DBIWB /HR MBh cfm °F °F gr /Ib 14.6 591 77.4 63.6 67.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr /lb 55.0 52.8 56.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 305 Part 0 Int Door 0 ExFIr 0 Roof 305 Wall 291 Ext Door 0 tt' (i) O 0 138 47 O 0 Series Fan - Powered VAV TEMPERATURES Cooling Heating 55.0 78.3 76.0 68.5 76.0 68.5 77.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 630 630 630 630 240 240 0 126 630 240 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 630 630 126 630 126 126 22 126 148 148 0 0 0 0 ENGINEERING CKS OA cfm /ft' cfm/ton ft'/ton Btu /heft' No. People Cooling 38.1 2.06 402.02 194.73 61.62 12 Heating 20.0 2.06 -55.14 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -8.6 630 65.8 78.3 0.0 0 0.0 0.0 -8.2 240 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -16.8 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Altemative - 1 System Checksums Report Page 13 of 15 System Checksums By MacDonald - Miller VAV -3x1 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => CLG SPACE PEAK Mo /Hr: 8 / 12 Mo /Hr: 9 / 11 OADB/WB /HR: 76 / 64 / 73 OADB: 71 Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h Net Percent Space Percent Total Of Total Sensible Of Total Btu/h ( %) Btu /h ( %) O o 0 0 0 0 O 0 0 0 0 0 O -47 -47 0 0 0 6,579 0 6,579 56 6,910 70 -32 0 -32 0 -262 -3 280 457 737 6 292 3 0 0 0 0 0 O 0 0 0 0 O 0 0 0 0 0 O 0 0 0 0 6,827 410 7,238 62 6,940 70 668 167 835 7 629 6 1,768 0 1,768 15 1,136 11 933 0 933 8 1,106 11 3,369 167 3,537 30 2,870 29 78 -78 0 0 70 1 O 0 1,070 9 0 0 O 0 0 0 0 O 0 O 0 0 0 0 -116 -116 -1 O 0 O 0 0 O 0 0 O 0 O 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat Underflr Sup Ht Pkup Supply Air Leakage 10,275 383 11,728 100.00 9,880 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h (% ) O 0 0.00 O 0 0.00 O -491 5.19 O 0 0.00 -2,160 -2,160 22.84 -242 -631 6.67 0 0 0.00 O 0 0.00 O 0 0 -875 -875 9.25 -3,276 -4,156 43.96 O 0 0 00 O 0 0.00 -588 -588 621 -588 -588 6.21 -112 0 0 00 O -4,545 48 06 O 0 0 O 0 000 177 -1.87 -344 3 63 O 0 00 O 0.00 0 000 0 0.00 -3,975 -9,456 100 00 Main Gig Aux Clg Opt Vent Total Total Capacity ton MBh 1.0 11.7 0.0 0.0 0.0 0.0 1.0 11.7 COOLING COIL SELECTION Sens Cap. Coil Airflow MBh cfm Enter DB/WB/HR Leave DB/WB /HR °F °F gr/lb °F °F gr /Ib 10.0 431 76.1 62.2 62.5 55.0 52.7 56.7 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft' (%) Floor 235 Part 0 Int Door 0 ExFIr 0 Roof 235 Wall 190 Ext Door 0 O 0 90 47 O 0 Series Fan - Powered VAV TEMPERATURES Cooling SADB 55.0 Ra Plenum 76.1 Return 76.1 ReUOA 76.1 Fn MtrTD 0.0 Fn BidTD 0.0 Fn Frict 0.0 Heating 78.1 68 5 68.5 24.0 00 00 00 AIRFLOWS Cooling 450 450 450 450 100 100 0 90 450 100 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 450 450 90 450 90 90 17 90 107 107 0 0 0 0 ENGINEERING CKS OA cfm /ft' cfm /ton ft' /ton Btu /heft' No. People Cooling 22.2 1.91 459.97 240.45 49.91 5 Heating 20.0 1.91 -40.24 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -6.1 0.0 -3.4 Lvg °F 450 65.8 78.1 0 0.0 0.0 100 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -9.5 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Altemative - 1 System Checksums Report Page 14 of 15 System Checksums By MacDonald - Miller VAV -3x2 Series Fan - Powered VAV COOLING COIL PEAK Peaked at Time: Mo /Hr. 7 / 11 CLG SPACE PEAK Mo /Hr. 7 / 11 HEATING COIL PEAK Mo /Hr: Heating Design TEMPERATURES Cooling Heating Outside Air: OADB/WB /HR: 75 / 63 / 67 OADB: 75 OADB: 24 SADB 55.0 81.7 Ra Plenum 76.3 67.9 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.3 67.9 Sens. + Lat Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 76.2 56.1 Btu /h Btu/h Btu/h ( %) Btu /h ( %) Btu /h Btu/h ( %) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 -44 -44 0 0 0 Roof Cond 0 -299 4.04 Glass Solar 6,683 0 6,683 74 6,683 82 Glass Solar 0 0 0.00 AIRFLOWS Glass/Door Cond -158 0 -158 -2 -158 -2 Glass /Door Cond -3,168 -3,168 42.83 Cooling Heating Wall Cond 481 534 1,015 11 481 6 Wall Cond -628 -1,319 17.83 Partition /Door 0 0 0 0 0 Partition /Door 0 0 0 00 Diffuser 372 372 Floor 0 0 0 0 0 Floor 0 0 0 00 Terminal 372 372 Adjacent Floor . 0 0 0 0 0 0 Adjacent Floor 0 0 0 Main Fan 372 74 Infiltration 0 0 0 0 0 Infiltration -540 -540 7 30 Sec Fan 372 372 Sub Total = => 7,006 490 7,496 83 7,006 86 Sub Total =_> -4,335 -5,325 71 99 Nom Vent 20 20 AHU Vent 20 20 Internal Loads Internal Loads Intl 0 11 Lights 366 91 457 5 366 4 Lights 0 0 0 00 MinStop /Rh 74 74 People 422 0 422 5 222 3 People 0 0 0 00 Return 372 85 Misc 524 0 524 6 524 6 Misc -363 -363 4 90 Exhaust 20 31 Sub Total =_> 1,312 91 1,403 16 1,112 14 Sub Total =_> -363 -363 4.90 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 59 -59 0 0 59 1 Ceiling Load -97 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 180 2 0 0 Ventilation Load 0 -1,011 13.67 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov /Undr Sizing 0 0 0.00 Ov /Undr Sizing 0 0 0 0 0 Exhaust Heat 72 -0.97 ENGINEERING CKS Exhaust Heat -28 -28 0 OA Preheat Diff. 0 0.00 Sup. Fan Heat 0 0 RA Preheat Diff. -770 10.41 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 5.4 5.4 Duct Heat Pkup 0 0 0 cfm /ft' 2.57 2.57 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm /ton 493.26 Supply Air Leakage 0 0 0 Supply Air Leakage ' 0 0.00 ft' /ton 192.24 Btu /hr-ft' 62.42 -51.01 Grand Total =_> 8,376 495 9,051 100.00 8,176 100.00 Grand Total =_> -4,795 -7,397 100.00 No. People 1 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR Leave DB/WB /HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr /lb °F °F gr /Ib ft' ( %) MBh cfm °F °F Main Clg 0.8 9.1 8.7 372 76.2 60.5 54.6 55.0 51.8 53.0 Floor 145 Main Htg -6.7 372 65.3 81.7 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -0.7 20 24.0 55.0 ExFIr 0 Total 0.8 9.1 Roof 145 0 0 Humidif 0.0 0 0.0 0.0 Wall 342 132 39 Opt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -7.4 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 15 of 15 Room Checksums By MacDonald - Miller Break 328 COOLING COIL PEAK Peaked at Time: ' Mo /Hr: 7 / 14 Outside Air: OADB/WB /HR: 81 / 66 / 74 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 80 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 TEMPERATURES Cooling Heating SADB 55.0 70.3 Ra Plenum 75.9 67 9 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 75.9 67 9 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 76.7 36 2 Btu /h Btu /h Btu /h ( %) Btu /h (%) Btu /h Btu /h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0 0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0 00 Fn Frict 0.0 0 0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0 00 Roof Cond 0 8 8 0 0 0 Roof Cond 0 -382 20.38 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0.00 AIRFLOWS Glass /Door Cond 0 0 0 0 0 0 Glass /Door Cond 0 0 0 00 Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0 00 Cooling Heating Partition /Door 0 0 0 0 0 Partition /Door 0 0 0.00 Diffuser 180 180 Floor 0 0 0 0 0 Floor 0 0 0.00 Terminal 180 180 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0 00 Main Fan 180 36 Infiltration 0 0 0 0 0 Infiltration 0 0 0 00 Sec Fan 180 180 Sub Total = => 0 8 8 0 0 0 Sub Total =_> 0 -382 20 38 Nom Vent 26 26 AHU Vent 26 26 Internal Loads Internal Loads Infil 0 0 Lights 574 144 718 16 596 15 Lights 0 0 0 00 MinStop /Rh 36 36 People 568 0 568 12 319 8 People 0 0 0.00 Return 180 36 Misc 3,000 0 3,000 66 3,000 76 Misc 0 0 0 00 Exhaust 26 26 Sub Total = => 4,142 144 4,286 94 3,915 99 Sub Total = => 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 27 -27 0 0 31 1 Ceiling Load -62 0 0.00 Leakage Dwn 0 0 Ventilation Load 0 0 304 7 0 0 Ventilation Load 0 -1,310 69 95 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov /Undr Sizing 0 0 0 00 Ov /Undr Sizing 0 0 0 0 0 Exhaust Heat 61 -3 23 ENGINEERING CKS Exhaust Heat -26 -26 -1 OA Preheat Diff. 0 0 00 Sup. Fan Heat 0 0 RA Preheat Diff. -142 7.56 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0 00 % OA 14.4 14 4 Duct Heat Pkup 0 0 0 System Plenum Heat -100 5 34 cfm /ft' 0.97 0.97 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup . 0 0 00 cfm /ton 471.36 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0 00 ft' /ton 486.26 Btu /heft' 24.68 -10.11 Grand Total =_> 4,169 99 4,572 100.00 3,946 100.00 Grand Total =_> -62 -1,872 100 00 No. People . 1 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR Leave DB/WB /HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr /Ib ft' (%) MBh cfm °F °F Main Clg 0.4 4.6 4.2 178 76.7 63.5 68.1 55.0 55.0 65.4 Floor 185 Main Htg -1.0 180 65.3 70.3 Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -0.9 26 24.0 55.0 ExFIr 0 Total 0.4 4.6 Roof 185 0 0 Humidif 0.0 0 0.0 0.0 Wall 0 0 0 Opt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -1.9 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC TRACER) 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 1 of 28 Room Checksums By MacDonald - Miller Conference 1 315 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 14 Outside Air: OADB /WB /HR: 81 / 66 / 74 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h 0 0 0 9,679 393 799 0 0 0 0 10,870 7,311 13,568 1,135 22,015 Net Percent Total Of Total Btu /h (%) 0 0 0 0 64 64 0 9,679 0 393 894 1,693 0 0 0 0 0 958 11,829 0 0 0 22 1 4 0 0 0 0 26 CLG SPACE PEAK Mo /Hr: 9 / 14 OADB: 77 Space Sensible Btu /h 0 0 0 12,386 -30 923 0 0 0 0 13,280 1,828 9,139 20 7,311 0 13,568 30 8,143 0 1,135 3 1,135 1,828 23,842 53 16,590 965 -965 0 0 O 0 10,183 23 O 0 0 0 0 0 0 0 -986 -986 -2 0 0 0 0 0 0 0 0 0 0 0 0 0 33,850 836 44,869 100.00 827 0 0 0 30,697 Percent Of Total ( %) 0 0 0 40 0 3 0 0 0 0 43 24 27 4 54 3 0 0 0 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat OvlUndr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 -4,824 -950 0 0 0 -8,843 - 14,617 0 0 -5,940 -5,940 -1,794 0 0 0 - 22,350 Coil Peak Tot Sens Btu /h Percent Of Total ( %) 0 0.00 0 0.00 -4,866 9.06 0 0.00 -4,824 8.98 -1,993 3.71 0 0.00 O 0.00 O 0.00 -8,843 16.46 - 20,525 38.20 0 0.00 O 0.00 -5,940 11.06 -5,940 11.06 0 0.00 - 14,120 26.28 0 0 O 0.00 1,189 -2.21 - 14,328 26.67 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 - 53,725 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 3.7 44.9 0.0 0.0 0.0 0.0 3.7 44.9 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWB /HR MBh cfm °F °F gr/lb 34,2 1,293 79.1 64.5 68.9 0.0 0 0.0 0.0 0.0 0,0 0 0.0 0.0 0.0 Leave DBIWBIHR °F °F gr/lb 55.0 52.8 57.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 2,376 Part 0 Int Door 0 ExFIr 0 Roof 2,376 Wall 519 Ext Door 0 ft' ( %) 0 0 201 39 0 0 TEMPERATURES Cooling Heating 55.0 84.6 76.3 67.6 76.3 67.6 79.1 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,397 1,397 1,397 1,397 700 700 0 279 1,397 700 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Intl! MinStop!Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 1,397 1,397 279 1,397 279 279 175 279 454 454 0 0 0 0 ENGINEERING CKS OA cfm /ft' cfm/ton ft'/ton Btulhr•fe No. People Cooling 50.1 0.59 373.57 635.45 18.88 35 Heating 20.0 0.59 -22.61 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -29.9 1,397 65.1 84.6 0.0 0 0.0 0.0 -23.8 700 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -53.7 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 2 of 28 Room Checksums By MacDonald - Miller Conference 2 316 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov!Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Sens. + Lat. Btu /h Mo /Hr OADB /WB /HR Plenum Sens. + Lat Btu /h CLG SPACE PEAK 7 / 14 Mo /Hr: 9 / 11 81 / 66 / 74 OADB: 71 Net Percent Space Percent Total Of Total Sensible Of Total Btu /h ( %) Btu /h ( %) o o 0 0 0 0 0 0 0 0 0 0 0 . 75 • 75 0 0 0 7,434 0 7,434 18 11,517 42 293 0 293 1 -437 -2 304 490 794 2 486 2 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 8,031 565 8,596 21 11,566 42 7,294 1,823 9,117 22 6,447 23 13,593 0 13,593 33 7,871 29 1,139 0 1,139 3 1,094 4 22,026 1,823 23,849 58 15,412 56 881 -881 0 0 501 2 O 0 9,761 24 0 0 O 0 0 0 0 O 0 0 0 0 0 0 -909 -909 -2 O 0 0 0 0 0 0 0 0 0 0 0 0 30,938 599 41,297 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 27,480 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OA D B: 24 Space Peak Space Sens Btu /h 0 0 0 0 -3,600 -403 0 0 0 -8,754 - 12,756 0 0 -5,880 -5,880 -1,760 0 0 0 - 20,396 Coil Peak Percent Tot Sens Of Total Btu /h (%) O 0.00 0 0.00 -4,819 9.46 0 0.00 -3,600 7 06 -1,039 2 04 0 0 00 0 0 00 0 0.00 -8,754 17 18 - 18,211 35 74 O 0.00 0 0.00 -5,880 11.54 -5,880 11 54 O 0 00 - 12,641 24.81 O 0 O 000 1,099 -2.16 - 15,326 30.07 0 0 00 0 0 00 0 0.00 0 0.00 0 0.00 - 50,959 100 00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WBIHR MBh cfm °F °F gr /Ib 3.4 41.3 31.0 1,161 79.3 64.8 69.9 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 3.4 41.3 Leave DBIWB /HR °F °F gr /Ib 55.0 52.9 57.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 2,352 Part 0 Int Door 0 ExFIr 0 Roof 2,352 Wall 317 150 47 Ext Door 0 n' (%) O 0 O 0 TEMPERATURES Cooling Heating 55.0 84.8 76.2 67.6 76.2 67.6 79.3 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 1,250 1,250 1,250 1,250 700 700 0 250 1,250 700 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 1,250 1,250 250 1,250 250 250 173 250 423 423 0 0 0 0 ENGINEERING CKS OA cfm /ft' cfm /ton ft'/ton Btu /heft - No. People Cooling 56.0 0.53 363.34 683.43 17.56 35 Heating 20.0 0.53 -21.67 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -27.1 0.0 -23.8 Lvg °F 1,250 65.1 84 8 0 0.0 0 0 700 24.0 55 0 0.0 0 0.0 0 0 0.0 0 0.0 0 0 -51.0 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 3 of 28 Room Checksums By MacDonald - Miller Conference 312 COOLING COIL PEAK Peaked at Time: Mo /Hr: 8 / 12 Outside Air: OADB/WB /HR: 76 / 64 / 73 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h CLG SPACE PEAK Mo /Hr: 9 / 11 OADB: 71 Net Percent Space Percent Total Of Total Sensible Of Total Btu /h ( %) Btu /h ( %) o o 0 0 0 0 0 0 0 0 0 0 0 -47 -47 0 0 0 6,579 0 6,579 56 6,910 70 -32 0 -32 0 -262 -3 280 457 737 6 292 3 O 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 O 0 0 0 0 6,827 410 7,238 62 6,940 70 668 167 835 7 629 6 1,768 0 1,768 15 1,136 11 933 0 933 8 1,106 11 3,369 167 3,537 30 2,870 29 78 -78 0 0 70 1 O 0 1,070 9 0 0 0 0 0 0 0 0 0 O 0 0 0 0 -116 -116 -1 0 0 O 0 0 O 0 0 0 0 O 0 0 10,275 383 11,728 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 9,880 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 -491 5.19 0 0 0.00 -2,160 -2,160 22.84 -242 -631 6.67 0 0 0.00 0 0 0.00 0 0 0.00 -875 -875 9 25 -3,276 -4,156 43 96 0 0 0.00 0 0 0.00 -588 -588 6.21 -588 -588 6.21 -112 0 0.00 0 -4,545 48 06 0 0 0 0 0 0 00 177 -1.87 -344 3.63 O 0 00 O 0.00 0 0.00 O 0.00 0 000 -3,975 -9,456 100 00 Main Clg Aux CIg Opt Vent Total Total Capacity ton MBh 1.0 11.7 0.0 0.0 0.0 0.0 1.0 11.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr/Ib 10.0 431 76.1 62.2 62.5 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WBIHR °F °F grub 55.0 52.7 56.7 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 235 Part 0 Int Door 0 ExFIr 0 Roof 235 Wall 190 90 47 Ext Door 0 fP' ( %) O 0 O 0 TEMPERATURES Cooling Heating 55.0 78.1 76.1 68.5 76.1 68.5 76.1 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 450 450 450 450 100 100 0 90 450 100 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 450 450 90 450 90 90 17 90 107 107 0 0 0 0 ENGINEERING CKS % OA cfm/ft cfm/ton Wlton Btulhrft' No. People Cooling 22.2 1.91 459.97 240.45 49.91 5 Heating 20.0 1.91 -40.24 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -6.1 0.0 -3.4 Lvg °F 450 65.8 78.1 0 0.0 0.0 100 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -9.5 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 4 of 28 Room Checksums By MacDonald - Miller Conference 313 COOLING COIL PEAK Peaked at Time: Mo /Hr: 8 / 12 CLG SPACE PEAK Mo /Hr: 9 / 11 HEATING COIL PEAK Mo /Hr: Heating Design TEMPERATURES Cooling Heating Outside Air: OADB/WB /HR: 76 / 64 / 73 OADB: 71 OADB: 24 SADB 55.0 76.9 Ra Plenum 76.0 68.7 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.0 68.7 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 76.1 24.0 Btu /h Btu /h Btu /h ( %) Btu /h ( %) Btu /h Btu /h (%) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 -35 -35 0 0 0 Roof Cond 0 -378 3.39 Glass Solar 6,579 0 6,579 51 6,910 67 Glass Solar 0 0 0.00 AIRFLOWS Glass /Door Cond Wall Cond -32 280 0 458 -32 738 0 6 -262 292 -3 3 Glass /Door Cond Wall Cond -2,160 -242 -2,160 -633 19.38 5.68 Cooling Heating Partition /Door 0 0 0 0 0 Partition /Door 0 0 0.00 Diffuser 472 472 Floor 0 0 0 0 0 Floor 0 0 0.00 Terminal 472 472 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0 00 Main Fan 472 94 Infiltration 0 0 0 0 0 Infiltration -670 -670 6.01 Sec Fan 472 472 Sub Total = => 6,827 422 7,249 56 6,940 67 Sub Total =_> -3,071 -3,840 34.46 Nom Vent 160 94 AHU Vent 160 94 Internal Loads Internal Loads Infil 0 13 Lights 507 127 633 5 476 5 Lights 0 0 0 00 MinStop /Rh 94 94 People 2,820 0 2,820 22 1,808 17 People 0 0 0.00 Return 472 108 Misc 929 0 929 7 1,101 11 Misc - 450 -450 4 04 Exhaust 160 108 Sub Total = => 4,256 127 4,383 34 3,386 33 Sub Total = => - 450 -450 4.04 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 57 -57 0 0 51 0 Ceiling Load -74 0 0 00 Leakage Dwn 0 0 Ventilation Load 0 0 1,433 11 0 0 Ventilation Load 0 -4,773 42.84 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov!Undr Sizing 0 0 0.00 Ov/Undr Sizing 0 0 0 0 0 Exhaust Heat 154 -1 38 ENGINEERING CKS Exhaust Heat -175 -175 -1 OA Preheat Diff. -2,233 20 04 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 33.9 20.0 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0 00 cfmlft 2.62 2.62 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0 00 cfm/ton 439.59 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft' /ton 167.57 Btu /hrft' 71.61 -61.90 Grand Total =_> 11,140 317 12,890 100.00 10,377 100.00 Grand Total = => -3,596 - 11,143 100.00 No. People 8 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB /HR Leave DB/WB/HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr /Ib °F °F gr /Ib ft' ( %) MBh cfm °F °F Main CIg 1.1 12.9 10.4 449 76.1 62.9 65.7 55.0 53.0 57.8 Floor 180 Main Htg -5.7 472 66.0 76.9 Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -5.5 160 24.0 55.0 ExFIr 0 Total 1.1 12.9 Roof 180 0 0 Humidif 0.0 0 0.0 0.0 Wall 190 90 47 Opt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -11.1 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 5 of 28 Room Checksums By MacDonald - Miller Conference 314 COOLING COIL PEAK Peaked at Time: Mo /Hr: 8 / 14 Outside Air: OADB/WB /HR: 79 / 66 / 74 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h CLG SPACE PEAK Mo /Hr: 9 / 14 OADB: 77 Net Percent Space Total Of Total Sensible Btu /h ( %) Btu /h Percent Of Total ( %) o o 0 0 0 0 o o 0 0 0 0 o -4 -4 0 0 0 7,499 0 7,499 40 8,515 62 167 0 167 1 -20 0 334 542 876 5 352 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,999 538 8,537 45 8,847 64 924 231 1,155 6 924 7 5,231 0 5,231 28 2,831 20 1,142 0 1,142 6 1,142 8 7,298 231 7,529 40 4,898 35 100 -100 0 0 93 1 O 0 3,001 16 0 0 0 0 0 0 0 O 0 0 0 0 0 0 -272 -272 -1 O 0 0 0 0 0 0 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 15,396 398 18,795 100.00 13,838 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h (%) O 0 0 00 0 0 0.00 0 -637 3.79 0 0 0 00 -3,312 -3,312 19 69 -370 -967 5 75 0 0 0 00 O 0 0 00 0 0 0.00 -1,135 -1,135 6 75 - 4,817 -6,051 35 98 0 0 0.00 0 0 0.00 -763 -763 4.53 -763 -763 4.53 -147 0 0 00 O -6,365 37.85 0 0 0 O 0 000 247 -1.47 -3,886 23.10 0 000 0 000 0 000 0 000 0 000 -5,726 - 16,817 100 00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.6 18.8 0.0 0.0 0.0 0.0 1.6 18.8 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WBIHR MBh cfm °F °F gr /Ib 14.6 591 77.4 63.6 67.2 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DBIWB /HR °F °F gr /Ib 55.0 52.8 56.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft (%) Floor 305 Part 0 Int Door 0 ExFIr 0 Roof 305 Wall 291 Ext Door 0 0 0 138 47 0 0 TEMPERATURES Cooling Heating 55.0 78.3 76.0 68.5 76.0 68.5 77.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 630 630 630 630 240 240 0 126 630 240 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 630 630 126 630 126 126 22 126 148 148 0 0 0 0 ENGINEERING CKS OA cfm /ft° cfm /ton ft /ton Btulhr•ff No. People Cooling 38.1 2.06 402.02 194.73 61.62 12 Heating 20.0 2.06 -55.14 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -8.6 0.0 Lvg °F 630 65.8 78.3 0 0.0 0.0 -8.2 240 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -16.8 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 6 of 28 Room Checksums By MacDonald - Miller Hallway 326 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 14 CLG SPACE PEAK Mo /Hr: 7 / 17 HEATING COIL PEAK Mo /Hr: Heating Design TEMPERATURES Cooling Heating Outside Air: OADB/WB /HR: 81 / 66 / 74 OADB: 80 OADB: 24 SADB 55.0 71.8 Ra Plenum 76.6 66 1 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.6 66.1 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 78.8 24.0 Btu /h Btu /h . Btu /h ( %) Btu /h ( %) Btu /h Btu /h ( %) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0 0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0 0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 4 4 0 0 0 Roof Cond 0 -699 26.31 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0 00 AIRFLOWS Glass /Door Cond 0 0 0 0 0 0 Glass /Door Cond 0 0 0 00 Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0.00 Cooling Heating Partition /Door 0 0 0 0 0 Partition /Door 0 0 0.00 Diffuser 112 112 Floor 0 0 0 0 0 Floor 0 0 0 00 Terminal 112 112 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0 00 Main Fan 112 22 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 112 112 Sub Total = => 0 4 4 0 0 0 Sub Total =_> 0 -699 26 31 Nom Vent 50 22 AHU Vent 50 22 Internal Loads Internal Loads Infil 0 0 Lights 1,098 274 1,372 37 1,140 46 Lights 0 0 0 00 MinStop /Rh 22 22 People 1,085 0 1,085 29 609 25 People 0 0 0 00 Return 112 22 Misc 604 0 604 16 604 25 Misc 0 0 0 00 Exhaust 50 22 Sub Total = => 2,787 274 3,061 83 2,353 96 Sub Total = => 0 0 0 00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 89 -89 0 0 104 4 Ceiling Load -218 0 0 00 Leakage Dwn 0 0 Ventilation Load 0 0 702 19 0 0 Ventilation Load 0 -1,130 42 51 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 OvlUndr Sizing 0 0 0 00 Ov /Undr Sizing 0 0 0 0 0 Exhaust Heat 96 -3.62 ENGINEERING CKS Exhaust Heat -87 -87 -2 OA Preheat Diff. -925 34.80 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0 00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 44.3 20 0 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0 00 cfm /ft' 0.32 0.32 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfmlton 364.45 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 ft' /ton 1,154.20 Btu /hr•fe 10.40 -7.51 Grand Total =_> 2,875 103 3,680 100.00 2,456 100.00 Grand Total =_> -218 • -2,658 100 00 No. People 2 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WBIHR Leave DB/WB /HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/Ib °F °F gr /Ib ft' ( %) MBh cfm °F °F Main Clg 0.3 3.7 2.8 108 78.8 64.3 68.3 55.0 52.8 57.0 Floor 354 Main Htg -1.0 112 63.9 71.8 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -1.7 50 24.0 55.0 ExFIr 0 Total 0.3 3.7 Roof 354 0 0 Humidif 0.0 0 0.0 0.0 Wall 0 0 0 Opt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -2.7 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC . TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 7 of 28 Room Checksums By MacDonald - Miller Office 301 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Mo /Hr: 7 / 14 OADB/WB /HR: 81 / 66 / 74 Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu /h (%) O 0 0 0 0 0 2 2 0 0 0 0 O 0 0 0 0 0 O 0 0 0 0 0 0 0 0 2 2 0 450 112 562 30 438 0 438 24 580 0 580 31 1,468 112 1,580 85 35 -35 0 0 0 0 311 17 0 0 0 0 0 0 0 0 -34 -34 -2 O 0 0 0 0 o o 0 0 0 O 0 0 1,503 46 1,860 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 80 Space Sensible Btu /h 0 0 0 0 0 0 0 0 0 0 0 467 246 580 1,293 41 0 0 0 1,334 Percent Of Total ( %) 0 0 0 0 0 0 0 0 0 0 0 35 18 43 97 3 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr Heating Design OADB 24 Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -86 0 0 0 Coil Peak Percent Tot Sens Of Total Btu /h ( %) 0 0.00 0 0.00 -287 24 58 0 0.00 0 0 00 0 0.00 0 000 0 0 00 0 0.00 0 0 00 -287 24 58 0 0 00 0 0 00 O 0 00 O 000 0 000 -614 52.48 O 0 O 000 50 -4.32 -268 22.89 0 0 00 O 0 00 -51 4 36 O 0 00 0 0 00 -86 -1,169 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 1.9 0.0 0.0 0.0 0.0 0.2 1.9 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr/Ib 1.5 59 78.2 63.5 65.7 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr /Ib 55.0 52.9 57.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 145 Part 0 Int Door 0 ExFIr 0 Roof 145 Wall 0 Ext Door 0 ft' (4) O 0 0 0 O 0 TEMPERATURES Cooling Heating 55.0 71.3 76.5 66.2 76.5 66.2 78.2 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 61 61 61 61 20 20 0 12 61 20 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 61 61 12 61 12 12 0 12 12 12 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfmlton triton Btu /hr•fr No. People Cooling 32.9 0.42 391.68 935.61 12.83 1 Heating 20.0 0.42 -8.06 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -0.5 61 64.0 71.3 0.0 0 0.0 0.0 -0.7 20 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -1.2 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 8 of 28 Room Checksums By MacDonald - Miller Office 302 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 14 Outside Air: OADB/WB /HR: 81 / 66 / 74 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu /h ( %) 0 0 0 O 0 0 2 2 0 o o 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 0 450 112 562 30 438 0 438 24 580 0 580 31 1,468 112 1,580 85 35 -35 0 0 0 0 311 17 O 0 0 0 0 o o 0 -34 -34 -2 0 0 O 0 0 O 0 0 0 0 O 0 0 1,503 46 1,860 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 80 Space Percent Sensible Of Total Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 O 0 0 0 O 0 O 0 0 0 0 0 467 35 246 18 580 43 1,293 97 41 3 O 0 O 0 O 0 1,334 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -86 0 0 0 Coil Peak Percent Tot Sens Of Total Btu /h ( %) O 0 00 0 0 00 -287 24 58 O 000 O 0.00 0 0 00 0 000 O 0 00 O 0.00 O 0 00 -287 24 58 0 000 O 0.00 0 000 0 0.00 0 000 -614 52 48 O 0 0 000 50 -4.32 -268 22.89 0 000 O 000 -51 4.36 O 000 0 000 -86 -1,169 100.00 Main CIg Aux Clg Opt Vent Total Total Capacity ton MBh 0 2 1.9 0 0 0.0 0 0 0.0 0 2 1.9 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib 1.5 59 78.2 63.5 65.7 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0,0 0.0 Leave DB/WBIHR °F °F gr /lb 55.0 52.9 57.2 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass ft (%) 145 0 0 0 145 0 O 0 O 0 0 0 0 TEMPERATURES Cooling Heating 55.0 71.3 76.5 66 2 76.5 66.2 78.2 24.0 0.0 0.0 0.0 0 0 0.0 0 0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 61 61 61 61 20 20 0 12 61 20 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 61 61 12 61 12 12 0 12 12 12 0 0 0 0 ENGINEERING CKS % OA cfm /fe cfm /ton futon Btu /hr•fe No. People Cooling 32.9 0.42 391.68 935.61 12.83 1 Heating 20 0 0.42 -8.06 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -0.5 0.0 Lvg °F 61 64.0 71.3 0 0.0 0.0 -0.7 20 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -1.2 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 9 of 28 Room Checksums By MacDonald - Miller Office 309 COOLING COIL PEAK Peaked at Time: Mo /Hr: 8 / 12 Outside Air: OADB /WB /HR: 76 / 64 / 73 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h CLG SPACE PEAK Mo /Hr: 9 / 12 OADB: 74 Net Percent Space Percent Total Of Total Sensible Of Total Btu /h ( %) Btu /h ( %) o o 0 0 0 0 o o 0 0 0 0 o -36 -36 0 0 0 6,285 0 6,285 74 6,787 84 -30 0 -30 0 -154 -2 267 436 703 8 276 3 O 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 6,522 400 6,922 81 6,908 86 507 127 633 7 507 6 353 0 353 4 193 2 387 0 387 5 387 5 1,246 127 1,373 16 1,086 13 65 -65 0 0 61 1 O 0 243 3 0 0 O 0 0 0 0 O 0 0 0 0 0 0 -25 -25 0 O 0. O 0 0 O 0 0 o o o 0 0 7,833 436 8,512 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 8,055 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h (%) 0 0 0.00 0 0 0.00 O -376 6.40 0 0 0.00 -2,063 -2,063 35.13 -231 -603 10.26 0 0 0.00 O 0 0.00 O 0 0.00 -670 -670 11.41 -2,964 -3,712 63.20 0 0 0.00 O 0 0.00 -450 -450 7.66 - 450 -450 7.66 -86 0 0.00 0 -1,011 17.21 O 0 0 O 0 0.00 55 -0.93 O 0.00 -791 13.46 O 0.00 35 -0.60 0 0.00 0 0.00 -3,500 -5,873 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.7 8.5 0.0 0.0 0.0 0.0 0.7 8.5 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr/lb 8.1 349 76.2 61.2 58.2 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr/lb 55.0 52.7 56.5 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 180 Part 0 Int Door 0 ExFIr 0 Roof 180 Wall 182 86 47 ft (i1 0 0 Ext Door 0 0 0 TEMPERATURES Cooling Heating 55.0 78.7 76.1 68.5 76.1 68.5 76.2 56.4 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 367 367 367 367 20 20 0 73 367 20 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop!Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 367 367 73 367 20 20 13 73 87 33 0 0 0 0 ENGINEERING CKS OA cfmlfe cfm/ton futon Btulhr•ft' No. People Cooling 5.5 2.04 516.72 253.75 47.29 1 Heating 5.5 2.04 -32.63 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -5.2 0.0 Lvg °F 367 65.8 78.7 0 0.0 0.0 -0.7 20 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -5.9 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 10 of 28 Room Checksums By MacDonald - Miller Office 310 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Mo /Hr: 8 / 12 OADB /WB /HR: 76 / 64 / 73 Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h CLG SPACE PEAK Mo /Hr: 9 / 12 OADB: 74 Net Percent Space Total Of Total Sensible Btu /h (%) Btu /h 0 0 0 0 0 0 0 0 0 0 0 -31 -31 0 0 4,496 0 4,496 70 4,854 -22 0 -22 0 -110 191 312 503 8 197 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,665 281 4,947 77 4,941 429 107 537 8 429 354 0 354 5 194 389 0 389 6 389 1,172 107 1,279 20 1,012 54 -54 0 0 51 0 0 243 4 0 0 0 0 0 0 0 0 0 0 0 -25 -25 0 0 0 0 0 0 0 0 0 0 0 0 0 0 5,892 309 6,443 100.00 Percent Of Total (%1 0 0 0 81 -2 3 0 0 0 0 82 7 3 6 17 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 6,004 100.00 Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h (%) 0 0 0.00 O 0 0.00 O -315 687 0 0 0 00 -1,476 -1,476 32.12 -165 -431 9.38 0 0 000 0 0 0 00 0 0 0.00 -562 -562 12.23 -2,203 -2,784 60.59 0 0 0.00 O 0 0.00 -378 -378 8 22 -378 -378 8.22 -72 0 0.00 O -1,011 22 00 0 0 0 0 0 0 00 51 -1.12 0 0 00 -514 11.18 0 0.00 40 -0.87 0 0.00 0 0.00 -2,652 -4,595 100 00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.5 6.4 0.0 0.0 0.0 0.0 0.5 6.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm . °F °F gr /Ib 6.1 261 76.2 61.3 58.5 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr /Ib 55.0 52.6 56.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 151 Part 0 Int Door 0 ExFIr 0 Roof 151 Wall 130 Ext Door 0 fl' (14) 0 0 62 47 0 0 TEMPERATURES Cooling Heating 55.0 78 8 76.1 68 5 76.1 68 5 76.2 52 2 0.0 0 0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 273 273 273 273 20 20 0 55 273 20 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 273 273 55 273 20 20 11 55 66 31 0 0 0 0 ENGINEERING CKS OA cfm /ft' cfm /ton ft'/ton Btulhr•ft' No. People Cooling 7.3 1.81 508.83 281.22 42.67 1 Heating 73 1.81 -30.43 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -3.9 273 65.8 78.8 0.0 0 0.0 0.0 -0.7 20 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -4.6 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 11 of 28 Room Checksums By MacDonald - Miller Office 311 COOLING COIL PEAK Peaked at Time: Mo /Hr: 8 / 12 Outside Air: OADB/WB /HR: 76 / 64 / 73 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h CLG SPACE PEAK Mo /Hr: 9 / 12 OADB: 74 Net Percent Space Total Of Total Sensible Btu /h ( %) Btu /h o 0 0 0 0 0 0 0 0 0 0 -26 -26 0 0 4,496 0 4,496 71 4,854 -22 0 -22 0 -110 191 312 503 8 197 0 0 0 0 0 0 0 0 O 0 0 0 0 O 0 0 0 4,665 286 4,951 78 4,941 83 Percent Of Total (%) Envelope Loads 0 Skylite Solar O Skylite Cond 0 Roof Cond 82 Glass Solar -2 Glass /Door Cond 3 Wall Cond 0 Partition /Door 0 Floor 0 Adjacent Floor O Infiltration Sub Total =_> 360 90 450 7 360 353 0 353 6 193 387 0 387 6 387 1,100 90 1,190 19 940 Internal Loads 6 Lights 3 People 7 Misc 16 Sub Total =_> 46 -46 0 0 43 1 0 0 243 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -25 -25 0 0 0 O 0 0 O 0 0 - 0 0 O 0 0 5,811 305 6,359 100.00 5,925 100.00 Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h (%) O 0 0.00 O 0 0.00 O -267 6.04 O 0 0.00 -1,476 -1,476 33.36 -165 -431 9.74 0 0 0.00 O 0 0.00 0 0 0.00 - 476 -476 10.77 -2,117 -2,651 59.91 O 0 0.00 0 0 0.00 -320 -320 7.23 -320 -320 7.23 -61 0 0.00 O -1,011 22.85 0 0 0 O 0 0.00 49 -1.10 0 0.00 -503 11.37 O 0.00 12 -0.27 0 0.00 O 0.00 -2,498 -4,424 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.5 6.4 0.0 0.0 0.0 0.0 0.5 6.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr /Ib 6.0 257 76.2 61.3 58.5 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr/lb 55.0 52.6 0.0 0.0 0.0 0.0 56.3 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 128 Part 0 Int Door 0 ExFIr 0 Roof 128 Wall 130 Ext Door 0 fe ( %) 0 0 62 47 0 0 TEMPERATURES Cooling Heating , 55.0 78.4 76.1 68.5 76.1 68.5 76.2 52.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 270 270 270 270 20 20 0 54 270 20 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infll MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 270 270 54 270 20 20 9 54 63 29 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfmlton ff /ton Btulhr•ft' No. People Cooling 7.4 2.11 508.75 241.55 49.68 1 Heating 7.4 2.11 -34.56 HEATING COIL SELECTION Capacity Coil Airflow MBh cfm Main Htg Aux Htg Preheat Humidif Opt Vent Total -3.7 0.0 -0.7 Ent Lvg °F °F 270 65.8 78.4 0 0.0 0.0 20 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -4.4 TRACE 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 12 of 28 Room Checksums By MacDonald - Miller Office 317 COOLING COIL PEAK Peaked at Time: Mo /Hr: 9 / 12 CLG SPACE PEAK Mo /Hr: 9 / 12 HEATING COIL PEAK Mo /Hr: Heating Design TEMPERATURES Cooling Heating Outside Air: OADB/WB /HR: 74 / 62 / 67 OADB: 74 OADB: 24 SADB 55.0 79.0 Ra Plenum 76.1 68.4 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.1 68.4 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total ReUOA 75.9 54.4 Btu /h Btu /h Btu /h ( %) Btu /h ( %) Btu /h Btu /h ( %) Fn MtrTD 0.0 0 0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0 0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0.00 Fn Frict 0.0 0 0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0.00 Roof Cond 0 -61 -61 -1 0 0 Roof Cond 0 -375 7 09 Glass Solar 5,683 0 5,683 75 5,683 82 Glass Solar 0 0 0 00 AIRFLOWS Glass /Door Cond Wall Cond -129 231 0 377 -129 608 -2 8 -129 231 -2 Glass /Door Cond 3 Wall Cond -1,728 -193 -1,728 -504 32.63 9.52 Cooling Heating Partition /Door 0 0 0 0 0 Partition /Door 0 0 0 00 Diffuser 316 316 Floor 0 0 0 0 0 Floor 0 0 0 00 Terminal 316 316 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0.00 Main Fan 316 63 Infiltration 0 0 0 0 0 Infiltration -670 -670 12 65 Sec Fan 316 316 Sub Total = => 5,785 316 6,100 80 5,785 83 Sub Total =_> -2,591 -3,277 61 88 Nom Vent 20 20 AHU Vent 20 20 Internal Loads • Internal Loads Infil 0 13 Lights 512 128 640 8 512 7 Lights 0 0 0 00 MinStop /Rh 63 63 People 354 0 354 5 194 3 People 0 0 0 00 Return 316 76 Misc. 389 0 389 5 389 6 Misc - 450 -450 8 50 Exhaust 20 33 Sub Total = => 1,254 128 1,382 18 1,094 16 Sub Total = => - 450 -450 8.50 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 62 -62 0 0 62 1 Ceiling Load -91 0 0 00 Leakage Dwn 0 0 Ventilation Load 0 0 141 2 0 0 Ventilation Load 0 -1,011 19.09 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 OvlUndr Sizing 0 0 0 00 Ov /Undr Sizing 0 0 0 0 0 Exhaust Heat 58 -1.10 ENGINEERING CKS Exhaust Heat -24 -24 0 OA Preheat Diff. 0 0 00 Sup. Fan Heat 0 0 RA Preheat Diff. -636 12.01 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 6.3 6 3 Duct Heat Pkup 0 0 0 System Plenum Heat 20 -0 38 cfm /ft' 1.75 1.75 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0.00 cfm /ton 498.75 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0 00 ft' /ton 284.22 Btu /heft' 42.22 -29.42 Grand Total =_> 7,102 357 7,600 100.00 6,942 100.00 Grand Total =_> -3,132 -5,296 100.00 No. People 1 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WBIHR Leave DBIWB /HR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr /Ib °F °F gr/lb ft2 ( %) MBh cfm °F °F Main Clg 0.6 7.6 7.3 316 75.9 60.4 54.9 55.0 51.8 53.2 Floor 180 Main Htg -4.6 316 65.7 79.0 Aux CIg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -0.7 20 24.0 55.0 ExFIr 0 Total 0.6 7.6 Roof 180 0 0 Humidif 0.0 0 0.0 0.0 Wall 152 . 72 47 Opt Vent 0.0 0 0.0 0.0 Ext Door 0 0 0 Total -5.3 Project Name:' Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC TRACE 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 13 of 28 Room Checksums By MacDonald - Miller Office 318 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Mo /Hr: 9 / 12 OADB /WB /HR: 74 / 62 / 67 Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h CLG SPACE PEAK Mo /Hr: 9 / 12 OADB: 74 Net Percent Space Total Of Total Sensible Btu /h ( %) Btu /h 0 0 0 0 0 0 0 0 0 0 0 -43 -43 -1 0 4,736 0 4,736 74 4,736 -108 0 -108 -2 -108 192 314 506 8 192 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,821 272 5,092 80 4,821 352 88 440 7 352 353 0 353 6 193 387 0 387 6 387 1,092 88 1,180 18 932 43 -43 0 0 43 0 0 141 2 0 O 0 0 0 0 0 O 0 0 0 -24 -24 0 0 0 O 0 0 0 0 0 0 0 O 0 0 5,956 292 6,389 100.00 Percent Of Total I %) 0 0 0 82 -2 3 0 0 0 0 83 6 3 7 16 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 5,796 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h (%) O 0 0.00 0 0 0.00 O -261 5.98 0 0 0.00 -1,440 -1,440 33.02 -161 -420 9.63 O 0 0.00 O 0 0.00 O 0 0.00 - 465 -465 10.67 -2,066 -2,586 59.29 O 0 0.00 0 0 0.00 -313 -313 7.17 -313 -313 7.17 -63 0 0.00 O -1,011 23.18 0 0 0 O 0 0.00 51 -1.17 0 0.00 -482 11.06 O 0.00 -20 0.47 0 0.00 O 0.00 -2,442 -4,361 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.5 6.4 0.0 0.0 0.0 0.0 0.5 6.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib 6.1 264 75.9 60.4 55.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr /Ib 55.0 51.8 53.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft (%) Floor 125 Part 0 Int Door 0 ExFIr 0 Roof 125 0 0 Wall 127 60 47 Ext Door 0 0 0 TEMPERATURES Cooling Heating 55.0 78.4 76.1 68.4 76.1 68.4 75.9 51.6 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 264 264 264 264 20 20 0 53 264 20 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 264 264 53 264 20 20 9 53 62 29 0 0 0 0 ENGINEERING CKS OA cfm /ft cfm /ton fYlton Btu /hr•ft' No. People Cooling 7.6 2.11 495.34 234.79 51.11 1 Heating 7.6 2.11 -34.89 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -3.7 264 65.7 78.4 0.0 0 0.0 0.0 -0.7 20 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -4.4 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 14 of 28 Room Checksums By MacDonald - Miller Office 319 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 11 Outside Air: OADB /WB /HR: 75 / 63 / 67 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h CLG SPACE PEAK Mo /Hr: 7 / 11 OADB: 75 Net Percent Space Total Of Total Sensible Btu /h ( %) Btu /h o 0 0 0 0 O 0 0 0 0 0 -44 -44 0 0 6,683 0 6,683 74 6,683 -158 0 -158 -2 -158 481 534 1,015 11 481 O 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 7,006 490 7,496 83 7,006 366 91 457 5 366 422 0 422 5 222 524 0 524 6 524 1,312 91 1,403 16 1,112 59 -59 0 0 59 O 0 180 2 0 0 0 0 0 O 0 0 0 0 0 -28 -28 0 0 0 0 0 0 0 0 0 O 0 0 0 0 8,376 495 9,051 100.00 Percent Of Total ( %) 0 0 0 82 -2 6 0 0 0 0 86 4 3 6 14 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 8,176 100.00 Grand Total = => .HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h (%) O 0 0.00 0 0 0.00 0 -299 4.04 O 0 0.00 -3,168 -3,168 42.83 -628 -1,319 17.83 0 0 0.00 0 0 0.00 0 0 0.00 -540 -540 7.30 -4,335 -5,325 71.99 0 0 0.00 O 0 0.00 -363 -363 4.90 -363 -363 4.90 -97 0 0.00 O -1,011 13.67 0 0 0 O 0 0.00 72 -0.97 0 0.00 -770 10.41 0 .0.00 0 0.00 0 0.00 0 0.00 -4,795 -7,397 100.00 Main Clg Aux Clg Opt Vent COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow ton MBh MBh cfm 0.8 9.1 8.7 372 0.0 0.0 0.0 0 0.0 0.0 0.0 0 Total 0.8 9.1 Enter OBIWB /HR °F °F gr/lb 76.2 60.5 54.6 0.0 0.0 0.0 0.0 0.0 0.0 Leave DBIWBIHR °F °F gr /Ib 55.0 51.8 53.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft (%) Floor 145 Part 0 Int Door 0 ExFlr 0 Roof 145 Wall 342 Ext Door 0 0 0 132 39 0 0 TEMPERATURES Cooling Heating 55.0 81.7 76.3 67.9 76.3 67.9 76.2 56.1 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return RetIOA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 372 372 372 372 20 20 0 74 372 20 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 372 372 74 372 20 20 11 74 85 31 0 0 0 0 ENGINEERING CKS OA cfm /ft cfm /ton ft'/ton Btulhr•ft No. People Cooling 5.4 2.57 493.26 192.24 62.42 1 Heating 5.4 2.57 -51.01 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -6.7 372 65.3 81.7 0.0 0 0.0 0.0 -0.7 20 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -7.4 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 15 of 28 Room Checksums By MacDonald - Miller Office 320 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 9 Outside Air: OADB/WB /HR: 69 / 59 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => CLG SPACE PEAK Mo /Hr: 6 / 9 OADB: 64 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu /h Btu /h Btu /h ( %) Btu /h (%) o o 0 0 0 0 0 0 0 0 0 0 0 -56 -56 -1 0 0 4,985 0 4,985 80 5,406 91 -387 0 -387 -6 -611 -10 204 330 534 9 192 3 O 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 4,803 274 5,076 81 4,987 84 248 62 310 5 248 4 404 0 404 6 204 3 489 0 489 8 489 8 1,142 62 1,204 19 942 16 38 -38 0 0 32 1 0 0 -21 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 -22 -22 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 5,983 275 6,237 100.00 5,961 100.00 Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 O 0 0.00 0 -247 4.28 O 0 0.00 -2,592 -2,592 44.83 -290 -751 12.98 0 0 0.00 O 0 0.00 O 0 0.00 - 447 -447 7.72 -3,328 -4,037 69.81 0 0 0.00 O 0 0.00 -300 -300 5.19 -300 -300 5.19 -80 0 0.00 O -1,011 17.48 O 0 0 O 0 0.00 66 -1.15 0 0.00 -486 8.40 0 0.00 -15 0.26 0 0.00 0 0.00 -3,708 -5,782 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.5 6.2 0.0 0.0 0.0 0.0 0.5 6.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWB /HR MBh cfm °F °F gr /Ib 5.9 263 75.5 60.0 54.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WBIHR °F °F gr /Ib 55.0 51.5 52.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 120 Part 0 Int Door 0 ExFIr 0 Roof 120 Wall 228 Ext Door 0 fe (A) 0 0 108 47 0 0 TEMPERATURES Cooling Heating 55.0 82.4 76.0 67.9 76.0 67.9 75.5 51.7 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 271 271 271 271 20 20 0 54 271 20 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop!Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 271 271 54 271 20 20 9 54 63 29 0 0 0 0 ENGINEERING CKS Cooling Heating 7.4 7.4 2.26 2.26 521.87 230.88 51.98 -48.18 1 OA cfm /fe cfm/ton fV/ton Btu /heft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -5.1 271 65.3 82.4 0.0 0 0.0 0.0 -0.7 20 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -5.8 TRACE 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 16 of 28 Room Checksums By MacDonald - Miller Office 321 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 9 Outside Air: OADB/WB /HR: 69 / 59 / 62 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat' Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h CLG SPACE PEAK Mo /Hr: 6 / 9 OADB: 64 Net Percent Space Total Of Total Sensible Btu /h (%) Btu /h 0 0 0 0 0 0 0 0 0 0 0 -70 -70 -1 0 4,859 0 4,859 79 5,268 -376 0 -376 -6 -595 199 321 519 8 187 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,681 251 4,932 80 4,860 312 78 390 6 312 405 0 405 7 205 490 0 490 8 490 1,207 78 1,285 21 1,007 48 -48 0 0 41 0 0 -21 0 0 0 0 0 0 O 0 0 0 0 0 -22 -22 0 O 0 0 0 0 0 0 0 0 0 0 0 0 5,936 259 6,173 100.00 Percent Of Total CYO 0 0 0 89 -10 3 0 0 0 0 82 5 3 8 17 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 5,907 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h I%) O 0 0.00 0 0 0.00 0 -309 5.24 O 0 0.00 -2,520 -2,520 42.74 -282 -730 12.38 0 0 0.00 0 0 0.00 0 0 0.00 -558 -558 9.47 -3,360 -4,117 69.83 0 0 0.00 O 0 0.00 -375 -375 6.36 -375 -375 6.36 -99 0 0.00 O -1,011 17.15 0 0 0 O 0 0.00 71 -1.21 O 0.00 -479 8.12 0 0.00 15 -0.25 O 0.00 O 0.00 -3,834 -5,896 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.5 6 2 0.0 0 0 0.0 0 0 0.5 6 2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib 5.9 261 75.4 60.0 54.0 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 55.0 51.6 52.1 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft' ( %) Floor 150 Part 0 Int Door 0 ExFlr 0 Roof 150 Wall 222 105 47 Ext Door 0 0 0 0 0 TEMPERATURES Cooling Heating 55 0 83 0 76.0 67 9 76.0 67 9 75 4 51.6 00 00 00 00 00 00 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 269 269 269 269 20 20 0 54 269 20 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 269 269 54 269 20 20 11 54 65 31 0 0 0 0 ENGINEERING CKS OA cfm/ft cfm /ton fe /ton Btu /hrft' No. People Cooling 7.4 1.79 522.50 291.57 41.16 1 Heating ' 7.4 1.79 -39.31 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -5.2 0.0 Lvg °F 269 65.3 83.0 0 0.0 0.0 -0.7 20 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -5.9 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 17 of 28 Room Checksums By MacDonald - Miller Open Work 324 COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Mo /Hr: 7 / 14 OADB /WB /HR: 81 / 66 / 74 Space Plenum Net Sens. + Lat. Sens. + Lat Total Btu /h Btu /h Btu /h O 0 0 O 0 0 0 2 2 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 2 Percent Of Total ( %) 0 0 0 0 0 0 0 0 0 0 0. CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 80 Space Sensible Btu /h 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total ( %) Envelope Loads 0 Skylite Solar 0 Skylite Cond 0 Roof Cond 0 Glass Solar 0 Glass /Door Cond O Wall Cond 0 Partition /Door 0 Floor 0 Adjacent Floor O Infiltration 0 Sub Total = => Internal Loads 562 141 703 37 583 46 Lights 555 0 555 29 312 25 People 309 0 309 16 309 25 Misc 1,427 45 0 0 0 141 -45 0 -44 0 0 0 1,567 0 359 0 0 0 -44 0 0 0 0 0 83 0 19 0 0 0 -2 0 0 0 0 0 1,472 53 1,884 100.00 1,205 53 0 0 0 96 Sub Total =_> 4 0 0 0 1,258 100.00 Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -112 0 0 0 -112 Coil Peak Tot Sens Btu /h 0 0 -358 0 0 0 0 0 0 0 -358 0 0 0 Percent Of Total ( %) 0.00 0.00 26.31 0.00 0.00 0.00 0.00 0.00 0.00 0.00 26.31 0.00 0.00 0.00 0 0.00 0 -579 0 0 49 -474 0 0 0 0 0 0 00 42.51 0 0 00 -3.62 34 80 0 00 0 00 0 00 0 00 0.00 -1,361 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 1.9 0.0 0.0 0.0 0.0 0.2 1.9 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWBIHR MBh cfm °F °F gr/Ib 1.5 55 78.8 64.3 68.3 0.0 0 0.0 0.0 0.0 Leave DBIWB /HR °F °F gr/Ib 55.0 52.8 57.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 181 Part 0 Int Door 0 ExFIr 0 Roof 181 Wall 0 Ext Door 0 ft' ( %) O 0 0 0 O 0 TEMPERATURES Cooling Heating 55.0 71.8 76 6 66.1 76.6 66.1 78 8 24.0 0 0 0.0 0 0 0.0 0 0 0.0 SADB Ra Plenum Return RetIOA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 57 57 57 57 25 25 0 11 57 25 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 57 57 11 57 11 11 0 11 11 11 0 0 0 0 ENGINEERING CKS % OA cfm /k' cfm /ton triton Btu /hrft' No. People Cooling 44 3 0.32 364.45 1,154.20 10.40 1 Heating 20.0 0.32 -7.51 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg •F -0.5 57 63.9 71.8 0.0 0 0.0 0.0 -0.9 25 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -1.4 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 18 of 28 Room Checksums By MacDonald - Miller Open Work Area 303 COOLING COIL PEAK Peaked at Time: • Mo /Hr: 7 / 15 Outside Air: OADB/WB /HR: 82 / 66 / 71 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Load Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu /h (%) O 0 0 O 0 0 36 36 1 O o 0 O 0 0 O 0 0 O 0 0 0 O 0 0 O 0 36 36 1 1,325 331 1,657. 45 884 0 884 24 580 0 580 16 2,789 331 3,121 85 111 -111 0 0 0 0 569 16 0 0 0 O 0 0 0 0 -74 -74 -2 0 0 O 0 0 O 0 0 0 0 O 0 0 2,900 182 3,652 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 80 Space Sensible Btu /h 0 0 0 0 0 0 0 0 0 0 0 1,352 492 580 2,424 119 0 0 0 2,543 Percent Of Total ( %) 0 0 0 0 0 0 0 0 0 0 0 53 19 23 95 5 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -249 0 0 0 -249 Coil Peak Tot Sens Btu /h Percent Of Total ( %) O 0 00 O 000 -832 35.00 0 0.00 0 000 O 0.00 0 000 O 000 O 000 O 0.00 -832 35.00 O 0.00 0 000 O 0.00 O 000 0 000 -1,170 49.19 O 0 O 0.00 96 -4 05 -574 24 14 O 0.00 0 0 00 102 -4.29 0 0.00 0 000 -2,378 100 00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.3 3.7 0.0 0.0 0.0 0.0 0.3 3.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr/lb 3.0 114 78.6 63.5 0.0 0 0.0 0.0 64.9 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr/lb 55.0 52.5 55.9 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total . Glass Floor 420 Part 0 Int Door 0 ExFIr 0 Roof 420 Wall 0 Ext Door 0 fl' (%) 0 0 0 0 0 0 TEMPERATURES Cooling Heating 55.0 72.0 76 7 66.2 76 7 66.2 78 6 24.0 0 0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 116 116 116 116 40 40 0 23 116 40 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return • Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 116 116 23 116 23 23 0 23 23 23 0 0 0 0 ENGINEERING CKS OA cfm /ft' cfm /ton ft'/ton Btulhr•ft' No. People Cooling 34 6 0.28 380.27 1,380.24 8.69 2 Heating 20.0 0.28 -5.66 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -1 0 00 -1 4 Lvg °F 116 64.0 72.0 0 0.0 0.0 40 24.0 .55.0 0.0 0 0.0 0.0 0 0 0 0.0 0.0 -2 4 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 19 of 28 Room Checksums By MacDonald - Miller Open Work Area 304 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 14 Outside Air: OADB/WB /HR: 81 / 66 / 74 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total. = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu /h (%) 0 0 0 0 0 0 3 3 0 0 0 0 0 0 0 0 0 0 O 0 o o 0 0 0 O 0 3 3 0 2,344 586 2,930 39 2,629 0 2,629 35 580 0 580 8 5,553 586 6,140 82 211 -211 0 0 0 0 1,608 21 0 0 0 0 0 0 0 0 -234 -234 -3 O 0 O 0 0 0 0 0 0 0 O 0 0 5,764 145 7,517 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 80 Space Sensible Btu /h 0 0 0 0 0 0 0 0 0 0 0 2,434 1,477 580 4,490 245 0 0 0 Percent Of Total ( %) Envelope Loads 0 Skylite Solar O Skylite Cond O Roof Cond O Glass Solar O Glass /Door Cond 0 Wall Cond 0 Partition /Door 0 Floor 0 Adjacent Floor 0 Infiltration 0 Sub Total = => 51 31 12 95 5 0 0 0 4,736 100.00 Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -516 0 0 0 -516 Coil Peak Tot Sens Btu /h Percent Of Total (%) O 0 00 O 0 00 -1,479 24.09 0 0.00 0 000 0 0 00 0 0 00 0 0 00 0 000 O 0.00 -1,479 24.09 0 000 0 000 0 0.00 0 000 0 0.00 -2,178 35.50 O 0 O 0 00 206 -3.35 -2,620 42.69 0 0.00 0 0.00 -66 1.07 0 000 0 0 00 -6,136 100.00 Main Clg Aux CIg Opt Vent Total Total Capacity ton MBh 0.6 7.5 0.0 0.0 0.0 0.0 0.6 7.5 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr/Ib Leave DB/WB /HR °F °F gr/Ib 5.6 208 79.5 64.8 70.0 55.0 52.7 56.6 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 756 Part 0 Int Door 0 ExFIr 0 Roof 756 Wall 0 Ext Door 0 n' ( %) 0 0 0 0 0 0 TEMPERATURES Cooling Heating 55.0 72.2 76.8 65.7 76.8 65.7 79.5 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return ReUOA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 215 215 215 215 120 120 0 43 215 120 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 215 215 43 215 43 43 0 43 43 43 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm/ton f /ton Btu /hrft' No. People Cooling 55.7 0.29 343.99 1,206.85 9.94 6 Heating 20.0 0.29 '8.12 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -2.1 215 63.5 72.2 0.0 0 0.0 0.0 -4.1 120 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -6.1 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 20 of 28 Room Checksums By MacDonald - Miller Open Work Area 306 COOLING COIL PEAK Peaked at Time: Mo /Hr: 9 / 14 Outside Air: OADB/WB /HR: 77 / 63 / 66 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => CLG SPACE PEAK Mo /Hr: 9 / 13 OADB: 76 Space Plenum Net Percent Space Sens. + Lat. Sens. + Lat Total Of Total Sensible Btu /h Btu /h Btu /h ( %) Btu /h O 0 0 0 0 0 0 0 0 0 0 -60 -60 0 0 15,704 0 15,704 69 16,224 -37 0 -37 0 -217 651 1,056 1,707 7 681 O 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 16,318 996 17,314 76 16,688 1,172 293 1,466 6 1,136 2,611 0 2,611 11 1,163 475 0 475 2 389 4,259 293 4,552 20 2,688 145 -145 0 0 146 O 0 1,056 5 0 O 0 0 0 0 0 O 0 0 0 -155 -155 -1 0 0 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total () 0 0 0 83 -1 3 0 0 0 0 85 6 6 2 14 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 20,721 990 22,767 100.00 19,522 100.00 Grand Total ==> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h (% ) 0 0 0 00 0 0 0.00 0 -811 4 57 0 0 0.00 -6,106 -6,106 34 39 -683 -1,779 10.02 O 0 0 00 O 0 000 O 0 000 -1,452 -1,452 817 -8,241 - 10,148 5715 0 0 0.00 O 0 0.00 -975 -975 5 49 -975 -975 5 49 -208 0 0.00 0 -6,065 3416 O 0 0 O 0 0 00 276 -155 O 0.00 -844 4 75 0 0 00 O 0 00 O 0 00 0 0 00 -9,424 - 17,757 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.9 22.8 0.0 0.0 0.0 0.0 1.9 22.8 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr /Ib 20.8 888 76.3 61.2 57.7 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 55.0 52.1 54.3 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 390 Part 0 Int Door 0 ExFIr 0 Roof 390 Wall 537 Ext Door 0 ft (%) 0 0 254 47 0 0 TEMPERATURES Cooling Heating 55.0 79.7 76.2 68.3 76.2 68.3 76.3 38.4 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 888 888 888 888 120 120 0 178 888 120 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 888 888 178 888 120 120 29 178 206 149 0 0 0 0 ENGINEERING CKS OA cfm /ft' cfm/ton Who n Btu /hr•ft' No. People Cooling 13.5 2.28 468.21 205.56 58.38 6 Heating 13.5 2.28 -45.53 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -13.7 0.0 Lvg °F 888 65.7 79.7 0 0.0 0.0 -4.1 120 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -17.8 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 21 of 28 Room Checksums By MacDonald - Miller Open Work Area 307 COOLING COIL PEAK Peaked at Time: Mo /Hr: 9 / 12 Outside Air: OADB /WB /HR: 74 / 62 / 67 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h CLG SPACE PEAK Mo /Hr: 9 / 12 OADB: 74 Net Percent Space Percent Total Of Total Sensible Of Total Btu /h (%) Btu /h I%) o o 0 0 0 0 0 0 0 0 0 0 0 -116 -116 -1 0 0 11,011 0 11,011 73 11,011 82 -251 0 -251 -2 -251 -2 447 730 1,177 8 447 3 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 11,208 615 11,822 78 11,208 83 967 242 1,209 8 967 7 1,414 0 1,414 9 774 6 389 0 389 3 389 3 2,770 242 3,012 20 2,130 16 118 -118 0 0 118 O 0 448 3 0 0 0 0 0 0 0 O 0 0 0 -96 -96 -1 0 0 0 0 0 0 0 0 0 0 0 0 0 14,096 642 15,186 100.00 13,456 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => 1 Ceiling Load 0 Ventilation Load 0 Adj Air Trans Heat Ov /Undr Sizing 0 Exhaust Heat OA Preheat Diff. . RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h (%) 0 0 0.00 O 0 0.00 O -708 6.09 0 0 0.00 -3,348 -3,348 28.79 -374 -976 8.39 0 0 0.00 0 0 0 00 0 0 0 00 -1,265 -1,265 10.88 -4,988 -6,298 54.16 0 0 0 00 O 0 0 00 -850 -850 7.31 -850 -850 7.31 -175 0 0 00 0 -4,044 34.77 0 0 0 0 0 0.00 187 -1.61 0 0.00 -624 5.37 O 0.00 O 0.00 0 0.00 O 0.00 -6,012 - 11,628 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.3 15.2 0.0 0.0 0.0 0.0 1.3 15.2 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib 14.0 612 75.8 61.0 57.5 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 55.0 52.2 0.0 0.0 0.0 0.0 54.6 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 340 Part 0 Int Door 0 ExFIr 0 Roof 340 Wall 294 140 47 Ext Door 0 Na) 0 0 0 0 TEMPERATURES Cooling Heating 55.0 78.9 76.1 68.4 76.1 68.4 75.8 39.4 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 612 612 612 612 80 80 0 122 612 80 0 0 0. 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 612 612 122 612 80 80 25 122 148 105 0 0 0 0 ENGINEERING CKS OA cfm/ft' cfm /ton ft°Iton Btu /hr-ft' No. People Cooling 13.1 1.80 483.84 268.67 44.66 4 Heating 13.1 1.80 -34.20 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -8.9 0.0 Lvg °F 612 65.7 78.9 0 0.0 0.0 -2.7 80 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -11.6 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 22 of 28 Room Checksums By MacDonald - Miller Reception Ext 300 COOLING COIL PEAK Peaked at Time: Mo /Hr: 8 / 12 Outside Air: OADB/WB /HR: 76 / 64 / 73 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h CLG SPACE PEAK Mo /Hr: 9 / 11 OADB: 71 Net Percent Space Percent Total Of Total Sensible Of Total Btu /h ( %) Btu /h (%) o o 0 0 0 0 0 0 0 0 0 0 0 -33 -33 0 0 0 6,579 0 6,579 50 6,910 72 -32 0 -32 0 -262 -3 280 456 736 6 292 3 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 6,827 423 7,250 55 6,940 72 464 116 581 4 436 5 3,090 0 3,090 24 2,189 23 0 0 0 0 0 0 3,554 116 3,670 28 2,625 27 59 -59 0 0 54 1 0 0 2,396 18 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -247 -247 -2 O 0 0 0 0 0 0 0 O 0 o 0 0 10,440 233 13,070 100.00 9,619 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 -345 2.81 0 0 0.00 -2,160 -2,160 17 62 -242 -631 515 0 0 0.00 O 0 000 0 0 000 -614 -614 5.01 -3,015 -3,749 30.59 0 0 0.00 O 0 0.00 - 413 -413 3 36 - 413 -413 3 36 -79 0 0 00 0 -4,425 36.10 O 0 0 O 0 0.00 165 -1 34 -3,749 30 58 O 0.00 0 0.00 -87 0.71 O 0.00 0 0.00 -3,507 - 12,259 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 1.1 13.1 0.0 0.0 0.0 0.0 1.1 13.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr/lb 9.8 0.0 0.0 419 76.3 62.6 64.6 O 0.0 0.0 0.0 O 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 55.0 51.9 0.0 0.0 0.0 0.0 53.3 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass Floor 165 Part 0 Int Door 0 ExFIr 0 Roof 165 Wall 190 Ext Door 0 ft' ( %) 0 0 90 47 0 0 TEMPERATURES Cooling Heating 55.0 77.3 76.1 68.5 76.1 68.5 76.3 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return ReUOA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 438 438 438 438 198 198 0 88 438 198 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 438 438 88 438 88 88 12 88 100 100 0 0 0 0 ENGINEERING CKS % OA cfmlfe cfm /ton tenon Btu /heft' No. People Cooling 45.1 2.65 401.88 151.49 79.21 10 Heating 20.0 2.65 -74.29 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -5.5 438 65.8 77.3 0.0 0 0.0 0.0 -6.7 198 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -12.3 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 23 of 28 Room Checksums By MacDonald - Miller Reception Int 300 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 14 Outside Air: OADB/WB /HR: 81 / 66 / 74 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu /h ( %) 0 0 0 0 0 0 13 13 0 0 0 0 O 0 0 0 0 0 0 0 0 0 O 0 0 0 0 13 13 0 887 222 1,109 22 2,191 0 2,191 44 580 0 580 12 3,658 222 3,880 78 41 -41 0 O 0 1,173 O 0 0 O 0 -101 -101 0 O 0 0 0 0 0 0 0 24, 0. 0 0' -2 0 0 0 D 0 3,699 93 4,964 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 80 Space Sensible Btu /h 0 0 0 0 0 0 0 0 0 0 0 921 1,231 580 2,731 48 0 0 0 Percent Of Total ( %) 0 0 0 0 0 0 0 0 0 0 0 33 44 21 98 2 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 2,780 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -96 0 0 0 Coil Peak Tot Sens Btu /h Percent Of Total ( %) 0 0 00 0 0.00 -589 14 18 0 0.00 0 0.00 O 0.00 O 0.00 O 0 00 0 0.00 0 0 00 -589 14.18 0 0.00 0 0.00 0 000 0 0.00 O 000 -1,279 30.77 O 0 O 0.00 59 -142 -2,545 61.24 O 0 00 0 0 00 198 -4 76 O 0.00 0 0 00 -96 -4,155 100.00 Main CIg Aux CIg Opt Vent Total Total Capacity ton MBh 0.4 5 0 0.0 0 0 0.0 0 0 0.4 5 0 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWB /HR MBh cfm °F °F gr/lb 3.5 0.0 0.0 123 80.4 65.7 72.6 0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 55.0 52.2 54.7 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft (i) Floor Part Int Door ExFIr Roof Wall Ext Door 286 0 0 0 286 0 0 0 0 0 0 0 0 TEMPERATURES Cooling Heating 55.0 70.7 75.9 67.9 75.9 67.9 80.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 126 126 126 126 100 100 0 25 126 100 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStoplRh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 126 126 25 126 25 25 0 25 25 25 0 0 0 0 ENGINEERING CKS OA cfm /ft° cfm /ton fN /ton Btu /hr•ff No. People Cooling 79.1 0.44 305.75 691.38 17.36 5 Heating 20.0 0.44 -14.53 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -0 8 126 65.3 70.7 0 0 0 0.0 0.0 -3 4 100 24.0 55.0 0 0 0 0.0 0.0 0.0 0 0.0 0.0 -4.2 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 24 of 28 Room Checksums By MacDonald - Miller Seating 327 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 14 Outside Air: OADB/WB /H R: 81 / 66 / 74 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing OvlUndr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 80 Space Plenum Net Percent Space Percent Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Btu /h Btu /h Btu /h ( %) Btu /h (% ) O 0 0 0 0 0 0 0 0 0 0 0 0 7 7 0 0 0 O 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 O 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 O 7 7 0 0 0 496 124 620 11 515 15 3,505 0 3,505 62 1,969 56 273 0 273 5 273 8 4,274 124 4,398 78 2,757 78 23 -23 0 0 27 1 O 0 1,439 25 0 0 0 0 0 0 0 0 0 0 0 0 732 21 -199 -199 -4 0 -.0 0 0 0 0 0 0 0 0 0 0 0 4,297 -91 5,646 100.00 3,516 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat OvlUndr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.5 5.7 0.0 0.0 0.0 0.0 0.5 5.7 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DBIWB /HR MBh cfm °F °F gr /lb 3.5 123 81.4 66.3 73.9 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 55.0 50.9 49.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Space Sens Tot Sens Btu /h Btu /h O 0 0 0 0 -330 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -330 Percent Of Total ( %) 0.00 0.00 5.21 0.00 0.00 0.00 0.00 0.00 0.00 0.00 521 0 0 000 0 0 0 00 O 0 0.00 0 0 0.00 -53 0 0 0 0 -1,617 0 0 75 -4,360 0 0 -98 0 0 0 00 25 55 .0 0 00 -1.18 68.88 0.00 0.00 1.55 0.00 0.00 -53 -6,330 100.00 AREAS Gross Total Glass ft' (%) Floor 160 Part 0 Int Door 0 ExFIr 0 Roof 160 Wall 0 Ext Door 0 0 0 0 0 0 0 TEMPERATURES Cooling Heating 55.0 70.3 75.9 67.9 75.9 67.9 81.4 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 160 160 160 160 160 160 0 32 160 160 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 160 160 32 160 32 32 0 32 32 32 0 0 0 0 ENGINEERING CKS OA cfm /ft' cfm /ton fW /ton Btu /hr•ft' No. People Cooling 100.0 1.00 340.07 340.07 35.29 8 Heating 20.0 1.00 -39.56 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -0.9 0.0 -5.5 Lvg °F 160 65.3 70.3 0 0.0 0.0 160 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -6.3 TRACES 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 25 of 28 Room Checksums By MacDonald - Miller Storage 305 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 15 Outside Air: OADB /WB /HR: 82 / 66 / 71 Space Plenum Net Percent Sens. + Lat. Sens. + Lat Total Of Total Btu /h Btu /h Btu /h ( %) Envelope Loads Skylite Solar 0 0 0 0 Skylite Cond 0 0 0 0 Roof Cond 0 10 10 2 Glass Solar 0 0 0 0 Glass /Door Cond 0 0 0 0 Wall Cond 0 0 0 0 Partition /Door 0 0 0 Floor 0 0 0 Adjacent Floor 0 0 0 0 Infiltration 0 0 0 Sub Total = => 0 10 10 2 Internal Loads Lights 410 103 513 98 People 0 0 0 0 Misc 0 0 0 0 Sub Total = => 410 103 513 98 Ceiling Load 40 -40 0 0 Ventilation Load 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov /Undr Sizing 0 0 0 Exhaust Heat 0 0 0 Sup. Fan Heat 0 0 Ret. Fan Heat 0 0 0 Duct Heat Pkup 0 0 0 Underflr Sup Ht Pkup 0 0 Supply Air Leakage 0 0 0 Grand Total =_> 450 73 522 100.00 CLG SPACE PEAK HEATING COIL PEAK Mo /Hr: 7 / 17 OADB:80 • Space Percent Sensible Of Total Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0. 0 0 0 418 91 0 0 0 0 418 91 42 9 0 0 O 0 O 0 Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h I%) Envelope Loads Skylite Solar 0 0 0.00 Skylite Cond 0 0 0.00 Roof Cond 0 -254 106.93 Glass Solar 0 0 0.00 Glass /Door Cond 0 0 0.00 Wall Cond 0 0 0.00 Partition /Door 0 0 0.00 Floor 0 0 0.00 Adjacent Floor 0 0 0.00 Infiltration 0 0 0.00 Sub Total = => 0 -254 106.93 Internal Loads Lights 0 0 0.00 People 0 0 0.00 Misc 0 0 0.00 Sub Total = => 0 0 0.00 Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 461 100.00 Grand Total =_> -89 0 0.00 O 0 0.00 O 0 0 0 0 0.00 O 0.00 0 0.00 -49 20.64 O 0 00 66 -27 57 0 0 00 0 0 00 -89 -238 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB /HR Leave DB/WB /HR ton MBh MBh cfm °F °F gr/Ib °F °F gr/lb Main Clg 0.0 0.5 0.5 20 76.9 62.9 64.7 55.0 54.3 62.6 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 0.0 0.5 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC AREAS Gross Total Glass ft' ( %) Floor 130 Part 0 Int Door 0 ExFIr 0 Roof 130 0 0 Wall 0 0 0 Ext Door 0 0 0 TEMPERATURES Cooling Heating 55.0 73.9 76.9 65.7 76.9 65.7 76.9 65.7 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling Heating 21 21 21 21 21 4 21 21 0 0 0 0 0 0 4 4 21 4 0 0 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop!Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups ENGINEERING CKS Cooling Heating 0.0 0.0 0.16 0.16 481.43 2,985.98 4.02 -1.83 0 OA cfm/ft cfm/ton ft' /ton Btu /heft' No. People HEATING COIL SELECTION Capacity Coil Airflow Ent Lvg MBh cfm °F °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -0.2 21 63.5 73.9 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -0.2 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 26 of 28 Room Checksums By MacDonald - Miller Work Room 323 COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 14 Outside Air: OADB/WB /HR: 81 / 66 / 74 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Plenum Sens. + Lat. Sens. + Lat Btu /h Btu /h 0 0 0 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu /h ( %) 0 0 0 0 0 0 3 3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 3 0 726 181 907 37 717 0 717 29 399 0 399 16 1,842 181 2,023 83 59 -59 0 0 O 0 464 19 O 0 0 0 0 0 0 0 -57 -57 -2 0 0 0 0 0 0 0 0 0 0 0 0 0 1,901 68 2,433 100.00 CLG SPACE PEAK Mo /Hr: 7 / 17 OADB: 80 Space Sensible Btu /h 0 0 0 0 0 0 0 0 0 0 0 753 403 399 1,555 68 0 0 0 Percent Of Total ( %) 0 0 0 0 0 0 0 0 0 0 0 46 25 25 96 4 0 0 0 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition /Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage 1,624 100.00 Grand Total =_> HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -144 0 0 0 -144 Coil Peak Percent Tot Sens Of Total Btu /h I %) O 0.00 0 0.00 -462 26 31 O 0 00 O 0.00 O 0.00 0 0 00 O 0.00 0 0.00 0 0.00 -462 26.31 0 0.00 O 0.00 0 000 0 000 O 000 -747 42.51 0 0 0 0.00 64 -3 62 -611 34 80 0 0.00 0 0.00 0 0.00 O 0 00 0 0.00 -1,757 100.00 Main Clg Aux Clg Opt Vent Total Total Capacity ton MBh 0.2 2.4 0.0 0.0 0.0 0.0 0.2 2.4 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB /HR MBh cfm °F °F gr /Ib 1.9 72 78.8 64.3 68.3 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 55.0 52.8 57.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC Floor Part Int Door ExFIr Roof Wall Ext Door AREAS Gross Total Glass fl' (i) 234 0 0 0 234 0 0 0 0 0 0 0 TEMPERATURES Cooling Heating 55.0 71.8 76.6 66.1 76.6 66.1 78.8 24.0 0.0 0.0 0.0 0.0 0.0 0.0 SADB Ra Plenum Return Ret/OA Fn MtrTD Fn BIdTD Fn Frict AIRFLOWS Cooling 74 74 74 74 33 33 0 15 74 33 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 74 74 15 74 15 -15 0 15 15 15 0 0 0 0 ENGINEERING CKS OA cfm /ft' cfm /ton ft'/ton Btu /hr•ff' No. People Cooling 44.3 0.32 364.45 1,154.20 10.40 2 Heating 20.0 0.32 -7.51 HEATING COIL SELECTION Capacity Coil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -0.6 0.0 Lvg °F 74 63.9 71.8 0 0.0 0.0 33 24.0 55.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 -1.8 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 27 of 28 Room Checksums By MacDonald - Miller Work/Storage 325 COOLING COIL PEAK CLG SPACE PEAK HEATING COIL PEAK TEMPERATURES Peaked at Time: Mo /Hr: 7 / 14 Mo /Hr: 7 / 17 Mo /Hr: Heating Design Cooling Heating Outside Air: OADB/WB /HR: 81 / 66 / 74 OADB: 80 OADB: 24 SADB 55.0 71.8 Ra Plenum 76.6 66.1 Space Plenum Net Percent Space Percent Space Peak Coil Peak Percent Return 76.6 66.1 Sens. + Lat. Sens. + Lat Total Of Total Sensible Of Total Space Sens Tot Sens Of Total Ret/OA 78.8 24.0 Btu /h Btu /h Btu /h ( %) Btu /h ( %) Btu /h Btu /h ( %) Fn MtrTD 0.0 0.0 Envelope Loads Envelope Loads Fn BIdTD 0.0 0.0 Skylite Solar 0 0 0 0 0 0 Skylite Solar 0 0 0 00 Fn Frict 0.0 0.0 Skylite Cond 0 0 0 0 0 0 Skylite Cond 0 0 0 00 Roof Cond 0 1 1 0 0 0 Roof Cond 0 -225 26 31 Glass Solar 0 0 0 0 0 0 Glass Solar 0 0 0 00 AIRFLOWS Glass /Door Cond 0 0 0 0 0 0 Glass /Door Cond 0 0 0.00 Wall Cond 0 0 0 0 0 0 Wall Cond 0 0 0 00 Cooling Heating Partition /Door 0 0 0 0 0 Partition /Door 0 0 0.00 Diffuser 36 36 Floor 0 0 0 0 0 Floor 0 0 0 00 Terminal 36 36 Adjacent Floor 0 0 0 0 0 0 Adjacent Floor 0 0 0 00 Main Fan 36 7 Infiltration 0 0 0 0 0 Infiltration 0 0 0.00 Sec Fan 36 36 Sub Total = => 0 1 1 0 0 0 Sub Total =_> 0 -225 26.31 Nom Vent 16 7 AHU Vent 16 7 Internal Loads Internal Loads Infil 0 0 Lights 354 88 442 37 367 46 Lights 0 0 0.00 MinStoplRh 7 7 People 349 0 349 29 196 25 People 0 0 0.00 Return 36 7 Misc 195 0 195 16 195 25 Misc 0 0 0 00 Exhaust 16 7 Sub Total = => . 897 88 986 83 758 96 Sub Total = => 0 0 0.00 Rm Exh 0 0 Auxiliary 0 0 Ceiling Load 29 -29 0 0 33 4 Ceiling Load -70 0 0 00 Leakage Dwn 0 0 Ventilation Load 0 0 226 19 0 0 Ventilation Load 0 -364 42 51 Leakage Ups 0 0 Adj Air Trans Heat 0 0 0 0 0 Adj Air Trans Heat 0 0 0 Dehumid. Ov Sizing 0 0 Ov /Undr Sizing 0 0 0 00 Ov!Undr Sizing 0 0 0 0 0 Exhaust Heat 31 -3 62 ENGINEERING CKS Exhaust Heat -28 -28 -2 OA Preheat Diff. -298 34 80 Sup. Fan Heat 0 0 RA Preheat Diff. 0 0.00 Cooling Heating Ret. Fan Heat 0 0 0 Additional Reheat 0 0.00 % OA 44.3 20.0 Duct Heat Pkup 0 0 0 System Plenum Heat 0 0.00 cfmIff 0.32 0.32 Underflr Sup Ht Pkup 0 0 Underflr Sup Ht Pkup 0 0 00 cfm /ton 364.45 Supply Air Leakage 0 0 0 Supply Air Leakage 0 0.00 W /ton 1,154.20 Btu /heft' 10.40 -7.51 Grand Total =_> 926 33 1,185 100.00 791 100.00 Grand Total =_> -70 -856 100 00 No. People 1 COOLING COIL SELECTION AREAS HEATING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DBIWB /HR Leave DBIWBIHR Gross Total Glass Capacity Coil Airflow Ent Lvg ton MBh MBh cfm °F °F gr/lb °F °F gr/lb IV ( %) MBh cfm °F °F Main CIg 0.1 1.2 0.9 35 78.8 64.3 68.3 55.0 52.8 57.0 Floor 114 Main Htg -0.3 36 63.9 71.8 Aux Clg 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Part 0 Aux Htg 0.0 0 0.0 0.0 Opt Vent 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Int Door 0 Preheat -0.5 16 24.0 55.0 ExFIr 0 Total 0.1 1.2 Roof 114 0 0 Humidif 0.0 0 0.0 0.0 Wall 0 0 0 Opt Vent 0.0 0 0.0 0.01 Ext Door 0 0 0 Total -0.9 Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Alternative - 1 System Checksums Report Page 28 of 28 System Zone Room " Load / Airflow Summary By MacDonald - Miller Floor Area ft' People Coil Cooling Sensible Btu /h Coil Cooling Total Btu /h Space Design Max SA cfm Air Changes ach /hr VAV Minimum SA cfm VAV Minimum Main Coil Heating Sensible Btu /h Heating Fan Percent Max SA OA cfm Clg Htg Altema Office 320 Office 321 Rm Peak Rm Peak VAV -305 Sys Peak VAV -305 Sys Block Rm Peak VAV307 Sys Peak VAV -307 Sys Block Rm Peak VAV -308 Sys Peak VAV -308 Sys Block Hallway 326 Rm Peak Open Work 324 Rm Peak Work Room 323 Rm Peak Work/Storage 325 Rm Peak VAV -311 Sys Peak VAV -311 Sys Block Office 309 Rm Peak Office 310 Rm Peak Office 311 Rm Peak Reception Ext 300 Rm Peak VAV -351 Sys Peak VAV -351 Sys Block Open Work Area 307 Rm Peak VAV -352 Sys Peak VAV -352 Sys Block Open Work Area 306 Rm Peak VAV -353 Sys Peak VAV -353 Sys Block Office 301 Rm Peak Office 302 Rm Peak Open Work Area 303 Rm Peak VAV -361 Sys Peak VAV -361 Sys Block Open Work Area 304 Rm Peak Storage 305 Rm Peak Conference 1 315 Conference 2 316 * This report does not display heating only systems. Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC 120 150 270 270 2,376 2,376 2,376 2,352 2,352 2,352 354 181 234 114 883 883 180 151 128 165 624 624 340 340 340 390 390 390 145 145 420 710 710 756 130 1.0 5,920 6,237 271 15.35 54 20 -5,101 217 7.4 7.4 1.0 5,856 6,173 269 12.17 54 20 -5,215 215 7.4 7.4 2.0 11,776 12,411 540 - 10,315 432 7.4 7.4 2.0 11,776 12,411 540 - 10,315 432 7.4 7.4 35.0 34,183 44,869 1,397 3.99 279 20 - 29,880 1,117 50.1 20.0 35.0 34,183 44,869 1,397 - 29,880 1,117 50.1 20.0 35.0 34,183 44,869 1,397 - 29,880 1,117 50.1 20.0 35.0 31,034 41,297 1,250 3.61 250 20 - 27,114 1,000 56.0 20.0 35.0 31,034 41,297 1,250 - 27,114 1,000 56.0 20.0 35.0 31,034 41,297 1,250 - 27,114 1,000 56.0 20.0 2.5 2,832 3,680 112 2.14 22 20 -972 89 44.3 20.0 1.3 1,450 1,884 57 2.14 11 20 -497 46 44.3 20.0 1.6 1,872 2,433 74 2.14 15 20 -642 59 44.3 20.0 0.8 912 1,185 36 2.14 7 20 -313 29 44.3 20.0 6.2 7,065 9,183 279 -2,424 223 44.3 20.0 6.2 7,065 9,183 279 -2,424 223 44.3 20.0 1.0 8,140 8,512 367 13.83 73 20 -5,192 293 5.5 5.5 1,0 6,071 6,443 273 12.29 55 20 -3,914 219 7.3 7.3 1.0 5,987 6,359 270 14.30 54 20 -3,743 216 7.4 7.4 9.9 9,750 13,070 438 18.01 88 20 -5,527 350 45.1 20.0 12.9 29,949 34,384 1,347 - 18,376 1,078 19.1 11.0 12.9 29,949 34,384 1,347 - 18,376 1,078 19.1 11.0 4.0 13,973 15,186 612 12.23 122 20 -8,903 490 13.1 13.1 4.0 13,973 15,186 612 -8,903 490 13.1 13.1 4.0 13,973 15,186 612 -8,903 490 13.1 13.1 6.0 20,759 22,767 888 15.47 178 20 - 13,669 711 13.5 13.5 6.0 20,759 22,767 888 - 13,669 711 13.5 13.5 6.0 20,759 22,767 888 - 13,669 711 13.5 13.5 1.0 1,489 1,860 61 2.84 12 20 -488 49 32.9 20.0 1.0 1,489 1,860 61 2.84 12 20 -488 49 32.9 20.0 2.0 2,990 3,652 116 1.87 23 20 -1,016 93 34.6 20.0 4.0 6,022 7,424 237 -1,992 190 33.7 20.0 4.0 5,883 7,365 237 -1,992 190 33.7 20.0 6.0 5,553 7,517 215 1.94 43 20 -2,049 172 55.7 20.0 0.0 522 522 21 1.09 4 20 -238 17 0.0 0.0 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Load /Airflow Summary Report Page 1 of 2 System Zone Room " Coil Coil Space VAV Main Coil Heating Floor Cooling Cooling Design Air Minimum VAV Heating Fan Percent Area People Sensible Total Max SA Changes SA Minimum Sensible Max SA OA f' # Btu /h Btu /h cfm ach /hr cfm % Btu /h cfm Clg Htg VAV -362 : Sys Peak. VAV -362 Sys Block Conference 313 `. Rm Peak." VAV -366 Sys Peak VAV -366 Sys Block' Break 328 Rm Peak Reception Int 300 • Rim Peak Seating 327 Rm Peak VAV -367 Sys VAV -367 Sys Block Rm Peak, Rm Peak VAV 7368 ' Sys Peak VAV -368 Sys Block Rm.Peak :- Sys Peak Sys Block{ Rm Peak Sys Peak Sys Block Rm Peak VAV -3x2 Sys Peak VAV -3x2 Sys Block ,_. Office 317''„ Office 318 Conference 314 VAV -369 VAV -369 Conference 312 VAV -3x1 VAV -3x1 Office 319',., This report does not display heating only systems. Project Name: Dataset Name: FORT DENT 11 SILA 7225107- LOAD2.TRC 886 6.0 6;075 8,040 236 _ -2,287 189 50.8 18.2 886 6.0 6,057 8,022 236 -2,287 189 50.8 18.2 180 `8.0 10,421 12,890 472 17.81 94 20 -5,692 378 33.9 20.0 180 8.0 10,421 12,890 472 -5,692 378 33.9 20.0 180 '8.0. 10,421 12,890 472 5,692 378' '. 33.9 20.0 185 1.3 4,191 4,572 180 6.58 36 20 -990 144 14.4 14.4 286 5.0 3,495' 4,964 126 3:00 25 20 -749: 101 :79.1 20.0 160 8.0 3,470 5,646 160 6.79 32 20 -880 128 100.0 20.0 631 -.14.3... 11,592 15,618 466 -2,619 373 66.1 17.9 631 14.3 11,455 15,656 466 -2,619 373 66.1 17.9 180 - 1.0. 7,268 '.7,600 316 11.92 63 :, 20 - 4,615 253 6.3 6.3 125 1.0 6,056 6,389 264 14.33 53 20 -3,680 211 7.6 7.6 305 2.0:' :13,32.4 13,989 580 -8,294 464 6.9 6.9 305 2.0 13,324 13,989 580 -8,294 464 6.9 6.9 305 12.0 14,578 18,795 630 14.02 .126 . 20 -8,642 504 38.1 20.0 305 12.0 14,578 18,795 630 -8,642 504 38.1 20.0 305 12.0 14;578: 18,795 630 -8,642 504 38.1. 20:0 235 5.0 10,011 11,728 450 12.99 90 20 -6,049 360 22.2 20.0 235 5.0 10,011. 11,728 450 6,049. 360 22.2 20.0 235 5.0 10,011 11,728 450 -6,049 360 22.2 20.0 145 ' 1.0 8,664• 9,051 372 17.42 74 20 -6,716 298 5.4 5.4 145 1.0 8,664 9,051 372 -6,716 298 5.4 5.4 145 1.0 . 8,664 9,051 372 -6,716 298 5.4 5.4 TRACE® 700 v6.2.7 calculated at 04:12 PM on 05/16/2012 Load /Airflow Summary Report Page 2 of 2 PLAN •PERMJr E W % SLIP ACTIVITY NUMBER: M12 -088 DATE: 06/07/12 PROJECT NAME: FORT DENT II - SILA SITE ADDRESS: 6840 FORT DENT WY X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: " �� nrv� © hl'I� 1►�r� Avs4/ Gil"? *11-- Building Division Fire Prevention Planning Division ❑ Public Works Structural ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 06/12/12 Complete Incomplete ❑ Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route NI Structural Review Required No further Review Required n REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved Notation: REVIEWER'S INITIALS: Approved with Conditions DUE DATE: 07/10/12 Not Approved (attach comments) n DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 02/29/12 Contractors or Tradespeople ainter Friendly Page • Page 1 of 2 General /Specialty Contractor A business registered as a construction contractor with L8I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name MACDONALD /MILLER FAC SOL INC UBI No. 602254260 Phone 2067684180 Status Active Address Po Box 47983 License No. MACDOFS980RU Suite /Apt. License Type Construction Contractor City Seattle Effective Date 12/31/2002 State WA Expiration Date 12/31/2012 Zip 98106 Suspend Date County King Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status DIVCOI *988RC DIVCO INCORPORATION Construction Contractor General Unused 12/3/2002 11/7/2012 Active LINFOAR980QG LINFORD AIR a REFRIGERTN INC Construction Contractor General Unused 11/7/2002 11/7/2004 Archived ENCOMMS984CA ENCOMPASS MECHANICAL SERVICES Construction Contractor General Unused 2/1/2002 2/1/2004 Archived MACDOMR026RU MACDONALD MILLER RSDNTL INC Construction Contractor General Unused 12/31/1998 12/31/2001 Archived DIVCOI*031L4 DIVCO INC Construction Contractor General Unused 6/24/1997 8/1/2003 Archived MACDOMR0760P MACDONALD MILLER RESIDENTIAL Construction Contractor General Unused 9/17/1993 12/30/1998 Archived DIVCOEC188LC DIVCO ENERGY CONTROL COMPANY Construction Contractor General Unused 6/3/1982 5/26/1997 Archived MACDOM *248J9 MACDONALD MILLER CO Construction Contractor General Unused 4/29/1976 2/1/2002 Archived Business Owner Information Name Role Effective Date Expiration Date GOUGH, DAVID ANTHONY Director 12/29/2010 NOEL, STEPHANIE W Member 05/14/2010 SIMONDS, DERRICK R President 05/14/2010 WEBSTER, MARK E Vice President 05/14/2010 https://fortress.wa.gov/lni/bbip/Printaspx 06/25/2012 J: \722 \5107 FD II FL 3 STIa \00 \Eng \Dwg \SHTS \722 Monday, June 04, 2012 1:39:01 PM FILE COPY Permit No, MO- -01) City Of liakwila BUILDING DIVISION C 4 PER SCHEDULE .., SYMBOL DESCRIPTION - POWERED NOTES SYMBOL DESCRIPTION -NON POWERED NOTES 1 1/2 HOUR FIRE /SMOKE DAMPER: LOW VELOCITY, VERTICAL OR 1,2 1 1/2 HOUR DYNAMIC FIRE DAMPER: CURTAIN STYLE, VERTICAL FSD -1 1 HORIZONTAL, 3 -V BLADE,LEAKAGE CLASS 2, 120V ACTUATOR, 2 FD- 1 ® OR HORIZONTAL , 165° F FUSABLE LINK, BLADE IN AIR STREAM, POSITION, FAIL CLOSED, 165° F FUSABLE LINK, GREENHECK GREENHECK DFD 150 TYPE AOR EQUAL. FSD 212 OR EQUAL. 1 1/2 HOUR DYNAMIC FIRE DAMPER: CURTAIN STYLE, VERTICAL 1 1/2 HOUR FIRE /SMOKE DAMPER: MEDIUM VELOCITY, VERTICAL 1,2 FD -2 ® OR HORIZONTAL, 165° F FUSPBLE LINK, BLADE OUT OF AIR FSD -2 0. OR HORIZONTAL, AIRFOIL BLADE, LEAKAGE CLASS 2, 120V ACTUATOR, 2 POSITION, FAIL CLOSED, 165° F FUSABLE LINK, STREAM, GREENHECK DFD 150 TYPE B OR EQUAL. GREENHECK FSD 312 OR EQUAL. 3 HOUR DYNAMIC FIRE DAMPER: CURTAIN STYLE, VERTICAL FD -3 © OR HORIZONTAL, 165° F FUSABLE LINK, BLADE IN AIR 3 HOUR FIRE /SMOKE DAMPER: LOW VELOCITY, VERTICAL OR 1,2 STREAM, GREENHECK DFD 350 TYPE A OR EQUAL. FSD -3 O HORIZONTAL, 3V BLADE, LEAKAGE CLASS 2, 120V ACTUATOR, 2 POSITION, FAIL CLOSED, 165° F FUSABLE LINK, GREENHECK 3 HOUR DYNAMIC FIRE DAMPER: CURTAIN STYLE, VERTICAL FSD 231 OR EQUAL. FD -4 • OR HORIZONTAL, 165° F FUSPBLE LINK, BLADE OUT OF AIR STREAM, GREENHECK DFD 350 TYPE B OR EQUAL. 3 HOUR FIRE /SMOKE DAMPER: MEDIUM VELOCITY, VERTICAL 1,2 FSD -4 O OR HORIZONTAL, AIR FOLD BLADE, LEAKAGE CLASS 1, 120V ACTUATOR, 2 POSITION, FAIL CLOSED, 165° F FUSABLE LINK, 1 1/2 HOUR DYNAMIC FIRE DAMPER: LOW VELOCITY, NARROWLINE, VERTICAL -FOR INSTALLATION BETWEEN 2 GREENHECK FSD 311 OR EQUAL. FD -5 • TRANSFER GRILLES IN A WALL ASSEMBLY, 165° F FUSABLE LINK, GREENHECK DFD -110 OR EQUAL. 1 1/2 HOUR TUNNEL CORRIDOR FIRE/SMOKE DAMPER: 1,2 FSD -5 1 LOW VELOCITY, 3V BLADE, LEAKAGE CLASS 2, 120V FD -6 • CEILING RADIATION DAMPER: GREENHECK CRD -2 OR EQUAL. ACTUATOR, 2 POSITION, FAIL CLOSED, 165° F FUSABLE LINK, GREENHECK CFSD 212 -1 OR EQUAL. BACKDRAFT DAMPER: GREENHECK WD 330 (VERT) OR WD -100 BDD (HORIZONTAL) OR EQUAL. 1 1/2 HOUR OUT OF WALL FIRE/SMOKE DAMPER: LOW 1,2 FSD -6 1 VELOCITY, VERTICAL , 3V BLADE, LEAKAGE CLASS 2, 120V BAR BAROMETRIC RELIEF DAMPER: (.05 OPNG PRESSURE SHOWN) ACTUATOR, 2 POSITION, FAIL CLOSED, 165° F FUSABLE LINK, RUSKIN CBD2. NO SUBSTITUTE ALLOWED. GREENHECK OF SD 212 OR EQUAL. �- VOLUME DAMPER: SHOP FABRICATED, W /LOCKING QUADRANT. SD- 1 O SMOKE DAMPER: GREENHECK SMD 202 OR EQUAL. 1,2 SD -2 O SMOKE DAMPER: GREENHECK SMD 202 OR EQUAL. 1,2 MOTORIZED CONTROL DAMPER -LOW VELOCITY GREENHECK 3 MD -1 M VCD -23 OR EQUAL. MD -2 O MOTORIZED CONTROL DAMPER: MEDIUM VELOCITY AIRFOIL BLADES GREENHECK VCD -33 OR EQUAL. 4 SCD- 1 SC SMOKE CONTROL MOTORIZED DAMPER: LOW VELOCITY 1,2 GREENHECK SMD 202 OR EQUAL. SCD -2 <> SMOKE CONTROL MOTORIZED DAMPER: MEDIUM VELOCITY AIRFOIL BLADE, GREENHECK SMD 301 OR EQUAL. 1,2 NOTES: __....,. 10 1. ACTUATOR BY MECHANICAL CONTRACTOR, WIRING BY ELECTRICAL CONTRACTOR 2. INTERLOCK OF SMOKE DAMPER TO FIRE ALARM SYSTEM BY ELECTRICAL CONTRACTOR 3. CONTROL FROM LOCAL DETECTOR 4. CONTROL FROM DUCT DETECTOR No ftrtgee be fl ) to the fAVIrli without prior approval of kwita Building I 'Vieion. 5. OPEN /CLOSED POSITION INDICATOR 6. DAMPER FAILS OPEN NOTE:ftslons will require n new plan , I.s wnd includeaddt!on�l .anreviewf . �` ,-rn r- +-- �- rr�au�rr"Ir�n�r, 7. DAMPER FAILS CLOSED DESCRIPTION BARE SHEETMETAL DESCRIPTION SYMBOL ROUND SHEETMETAL WRAPPED W/ INSULATION (2 ") 120W SOUNDLINE SHEETMETAL (1" LINING) 14x12SL CLEANROOM QUALITY DUCTWORK 14x12C SHEETMETAL WRAPPED W/ INSULATION (2 ") BARE ROUND SHEETMETAL EXPOSED QUALITY SHEETMETAL 14x12W 120 BARE FLAT OVAL SHEETMETAL FLAT OVAL FLAT SHEETMETAL W/ INSULATION (2 ") 14x120 14x120W 14x12Q DUCTBOARD (1" FIBERGLASS) 14x12DB EXAMPLE OF NEW 14x12 EXAMPLE OF NOT IN CONTRACT (NIC) 14x12 EXAMPLE OF DEMO EXAMPLE OF EXISTING X X X X X X X 14X12 FLEX DUCT �nrvtnr�- FLEX CONNECTOR 3 SYMBOL OSIZE CFM SIZE MANUFACTURER & MODEL NUMBER SHOEMAKER 900 H F/B SIZE AS NOTED TYPE T -BAR LAY -IN MODULAR CORE DIFFUSER NOTES EXISTING 1 SHOEMAKER 480 -FR AS NOTED T -BAR LAY -IN MODULAR CORE DIFFUSER 1 M -M METAL EGGCRATE M -M METAL EGGCRATE 12/24 RETURN /EXH 1 24/24 RETURN /EXH 1 NOTES: 1. PROVIDE WITH INTEGRAL CEILING FIRE DAMPERS TO MAINTAIN CEILING FIRE RATING. ABBV A AC AFF AL BDD BOB BOD BOTT BTU BTUH BWG BWR C CAP CC CFM CHWR CHWS COMB CONN CWR CWS DB DIFF DMPR DN EC EGC EER ELEV EMS FULL NAME ----------------------------------- COMPRESSED AIR LINE AIR CONDITIONING UNIT ABOVE FINISHED FLOOR ALUMINUM BACKDRAFT DAMPER BOTTOM OF BEAM BOTTOM OF DUCT BOTTOM BRITISH THERMAL UNITS BRITISH THERMAL UNITS PER HOUR BOTTOM WALL GRILLE BOTTOM WALL REGISTER CONDENSATE CAPACITY CONTROLS CONTRACTOR CUBIC FEET PER MINUTE CHILLED WATER RETURN CHILLED WATER SUPPLY COMBUSTION CONNECT CONDENSER WATER RETURN CONDENSER WATER SUPPLY DUCT BOARD DIFFUSER DAMPER DOWN ELECTRICAL CONTRACTOR EGGCRATE ENERGY EFFICIENCY RATIO ELEVATION ENERGY MANAGEMENT SYSTEM ABBV FULL NAME ESP EXH EXTR FAC FD FLA FOB FOT FSD G GALV GC GPM GR GWB HG HP HWR HWS ID INT LIQ M -M MBH MC MCA MD MIN MT MUA NOM EXTERNAL STATIC PRESSURE EXHAUST EXTRACTOR FIRE ALARM CONTRACTOR FIRE DAMPER FULL LOAD AMPS FLAT ON BOTTOM FLAT ON TOP FIRE SMOKE DAMPER GAS LINE GALVANIZED GENERAL CONTRACTOR GALLONS PER MINUTE GRILLE GYPSUM WALL BOARD HOT GAS LINE HORSE POWER HOT WATER RETURN HOT WATER SUPPLY INSIDE DIMENSION INTERLOCK LIQUID LINE MACDONALD- MILLER ONE THOUSAND BTUH MECHANICAL CONTRACTOR MINIMUM CIRCUIT AMPACITY MOTORIZED DAMPER MINIMUM MOUNT MAKE -UP AIR NOMINAL ABBV OSA OBD OD RA REG REQ'D RIO SA SCD SD SL SM SP SS SSSC STL SUC SUSP TSTAT TC TOD TOS TV TWG TWR TYP UNO VD VFD 0 FULL NAME OUTSIDE AIR OPPOSED BLADE DAMPER OUTSIDE DIMENSION RETURN AIR REGISTER (GRILLE WITH DAMPER) REQUIRED ROUGH IN ONLY SUPPLY AIR SMOKE CONTROL DAMPER SMOKE DAMPER SOUND LINING SHEET METAL STATIC PRESSURE START /STOP SOLID STATE SPEED CONTROLLER STEEL SUCTION LINE SUSPENDED THERMOSTAT TEMPERATURE CONTROL TOP OF DUCT TOP OF STEEL TURN VANES TOP WALL GRILLE TOP WALL REGISTER TYPICAL UNLESS NOTED OTHERWISE VOLUME DAMPER VARIABLE FREQUENCY DRIVE VOLTAGE PHASE & DUCT DIAMETER 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS,AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2009 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE AND STATE AND LOCAL CODES AND ORDINANCES. 3. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2009 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM. 4. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT. 5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, PER 2009 WSEC. - DUCT WRAP, WHERE INDICATED, SHALL BE 1 1/2" 0.75 LB /CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL VAPOR BARRIER (R-4.2 MIN.). - SOUND LINING, WHERE INDICATED, SHALL BE 1" 1.5 LB /CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 6000 FPM (R-4.2 MIN.). - DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID FRK FACED El 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT (R-4.3 MIN.). AIR DUCT (R-4.3 MIN.). 6. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER, 1 1/2" FIBERGLASS INSULATION, AND NON - PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE A UL 181 LISTED CLASS 1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 12' IN LENGTH UNLESS NOTED OTHERWISE. 7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2009 IBC. 8. PROVIDE FIRE DAMPERS, SMOKE DAMPERS AND FIRE /SMOKE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.5 OF THE 2009 IBC. PROVIDE CEILING FIRE DAMPERS WHERE INDICATED ON PLANS AND AS REQUIRED BY SECTION 716.6.2 OF THE 2009 IBC. INSTALL FIRE DAMPERS SMOKE DAMPERS AND FIRE/SMOKE DAMPERS IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS, THE TERMS OF THEIR LISTING, AND THE REQUIREMENTS OF THE CODE. 9. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 10. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. MINIMUM ACCESS DOOR SIZE FOR VALVES AND DAMPERS TO BE 18" X 18 ". 11. MOTORS STARTERS NOT LISTED AS BEING PROVIDED IN THE HVAC EQUIPMENT SCHEDULES FIRE TO BE PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. 12. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES. 13. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY, HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM. 14. COMMISSIONING IS REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC) SECTION 1416 AND WITH LEED NC -2.1 FUNDAMENTAL BUILDING SYSTEMS COMMISSIONING AND ADDITIONAL COMMISSIONING. 15. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER APN# 2954900440 LEGAL DESCRIPTION: PORGUNDRAKERS INTERURBAN ADDPARCEL 2 LESS BEG MOSTWLY CORNER OF PARCEL 1 TH N 63 -35-49 E 237.32 FTTH S 26 -24 -11 E 227.32 FTTO COMMON COR BTW PARCELS 1 & 2TH N 63 -35-49 E 252.25 FT TH N 26 -24 -11 W 77.65 FTTH N 56 -15 -11 W 234.09 FTTH N 31 -12-43 W 82.39 FT TOINTSN WITH NWLY LN OF PARCEL 2 TH S 58 -47 -17 E 102.77 FTTH S 55 -39 -53 W 63.16 FTTH S 48 -39 -58 W 55.63 FTTH S 39 -21 -15 W 88.24 FT TH S 30 -04 -58 W 85.21 FTTO MOST WLY COR OF PARCEL 2TH S 37 -36-40 E 20.92 FTTO POB - OF CITY OF TUKWILA SHORT PLAT NO 79- 7- SSRECORDING NO 7908210370 SDSHORT PLAT BEING A POR OFGUNDAKERS INTERURBAN ADD IN SW 1/4 OF NW 1/4 OFSEC 24 -23 -04 -- AS PER CITYOF TUKWILA BDRY LINE ADJNO 90 -2 -BLA RECORDING NO 9008151101 TITLE PROJECT ENGINEER ACCOUNT MANAGER PRODUCTION MANAGER AIR BALANCE FOREMAN REFRIGERATION FOREMAN NAME TITLE NAME PERRY CHRISTIAN BROCK LEE DARYL ANDERSON STEVE BAKER DEAN GRASSER COMPANY MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER NAME TITLE PHONE NUMBER 206 - 768 -4284 206 - 768 -3838 206 - 768 -4216 206 - 768 -3824 206 - 768 -4270 EMAIL PERRY.CH RI STIAN @MACM I LLER.COM BROCK.LEE @MACMILLER.COM DARYL.AND ERSON @MACMI LLER.COM STEVE.BAKER@MACMILLER.COM DEAN.GRASSER @MACMILLER.COM TM0.01 SCHEDULES - HVAC TM0.02 SCHEDULES - HVAC TM0.01S SITE PLAN TM2.03 THIRD FLOOR PLAN - HVAC TM2.04 ROOF PLAN - HVAC TM3.01 ELEVATIONS - HVAC DEMO (1) EXHAUST FAN & ASSC. DUCTWORK AND (8) DIFFUSERS /GRILLS. RELOCATE (52) DIFFUSERS, RELOCATE (11) THERMOSTATS RELOCATE (2) SOUNDLINED RETURN AIR BOOTS. INSTALL (2) NEW VAV BOXES, (1) NEW DUCTLESS SPLIT SYSTEM, (12) SOUNDLINED RETURN AIR BOOTS, (2) NEW THERMOSTATS AND MISC. SUPPLY DUCT WORK. SEPARATE PERMIT REQUIRED FOR: El Mechanical pig Electrical Plumbing :Gas Piping City of Tukwila ,BUILDING DIVISION S IO N FORT DENT WAY VICINITY MAP NO SCALE REVIEWED FOR CODE COMPLIANCE APPROVED JUN 2 2 2012 • VI, t City of T ita BUILDING ISION CITY JUN 07 2012 PERMIT CENTER LA 0 0 0 U CO 0 CO rnti Q(0 'S~ CO N E C/)0 m � c) E CD a"' 2 8 QN ai 0 tid ENGINEER: P CHRISTIAN CHECKED 8Y: B GEZON CAD: D LAMBERT I t0 O MACDOFS980RU Z EXPIRES: 07 -06 -12 DRAWING NUMBER: C- 0832 -72251 SHEET NUMBER: Q REVISIONS: w Q 0 REVISIONS: LAST REVISED: 06 -04 -12 DATE PLOTTED: 06 -04 -12 ISSUE DATE: 06 -04 -12 07 -00 TM0.01 Sila \oo \Eng \Dwg \s FORT DENT PARK Monday, June 04, 2012 1:39:20 PM 0 TUKWILA PARK CITY R V JUN 0 7 2012 PERMIT CENTER 4 tar) o,- 0. . D 0 N Q co r::: 05 . 0) co X o LL -1:S D ...1 cn N 0 CO 0 U) < 0 0 0 I O Q a '� z :.--.Ni L C) v U„� N J G tin 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 EXPIRES: 07 -06 -12 REVISIONS: 1 1 1 1 1 1 1r1 0 0 0 Pn 1- w 1 1 1 1 1 1 1\ REVISIONS: ENGINEER: LAST REVISED: P CHRISTIAN 06 -04 -12 CHECKED BY: DATE PLOTTED: B GEZON 06 -04 -12 CAD: ISSUE DATE: D LAMBERT 06 -04 -12 DRAWING NUMBER: 0- 0832 - 7225107 -00 SHEET NUMBER: TMO.O1 S M cd N 0 cc 0 ATTACH CONDENSING UNIT TO WOOD SLEEPER USING LAG SCREWS AT CORNERS, SEAL PENETRATIONS (TYP.4) NEOPRENE PAD ROOFING MOPPED UP (4) "SIDES OF SLEEPER. CANT STRIP BY M.C. AIR FLOW CONDENSING UNIT LAG BOLT /ANCHOR BOLT IN 4 "x4" PRESSURE TREATED WOOD SLEEPER, 22 GAUGE GALVANIZED CAP BY M.C. CONDENSING UNIT DETAIL N.T.S. FITTING: GENERAL NOTES PIPING INDIRECT DRAIN PIPING SIZE MATERIAL SCHEDULE: MATERIAL JOINT 1/2" - 2 -1/2" COPPER/DWV/TYPE M Ili ;J L -` L r 11 PIPING INSULATION SCHEDULE 1 PIPE SIZE INSULATION TYPE INSULATION THICKNESS CONDUCTIVITY RANGE 1 1/8" - 1" 1 Ii 1/2" CONDENSING UNIT LAG BOLT /ANCHOR BOLT IN 4 "x4" PRESSURE TREATED WOOD SLEEPER, 22 GAUGE GALVANIZED CAP BY M.C. CONDENSING UNIT DETAIL N.T.S. FITTING: GENERAL NOTES PIPING INDIRECT DRAIN PIPING SIZE MATERIAL SCHEDULE: MATERIAL JOINT 1/2" - 2 -1/2" COPPER/DWV/TYPE M LEAD FREE SOLDER REFRIGERATION 1/8" - 4 -1/8" COPPER TUBE, ACR BRAZED PIPING INSULATION SCHEDULE PIPING TYPE PIPE SIZE INSULATION TYPE INSULATION THICKNESS CONDUCTIVITY RANGE REFRIGERATION SUCTION 1/8" - 1" FIBERGLASS, ARMAFLEX 1/2" 0.23 - 0.27 1 -1/8" + FIBERGLASS, ARMAFLEX 1" 0.23 - 0.27 REFRIGERATION MIXED (DOWNSTREAM OF TXV) 1/8" - 7/8" ARMAFLEX 1" 0.23 - 0.27 - ALL PIPING INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND AN ASTM SMOKE DEVELOPED RATING OF 50 OR LESS. - ELASTOMERIC INSULATIONS WHICH MEET THESE RATINGS MAY BE USED AS A SUBSTITUTE FOR FIBERGLASS. - PROVIDE A VAPOR BARRIER COVERING ON ALL CHILLED WATER PIPING AND COIL CONDENSATE PIPING INSULATION. - PROVIDE A COVERING FOR ALL FIBERGLASS INSULATION WITHIN THE BUILDING. - PROVIDE A VINYL JACKET FOR ALL INSULATION EXPOSED TO SIGHT WITHIN THE BUILDING EXCEPT MECHANICAL ROOMS. - PROVIDE REMOVABLE LACED INSULATION PAD OVER ALL CONTROL VALVES, WHERE NOT LOCATED WITHIN A MECHANICAL ROOM. - PROVIDE ALUMINUM JACKET ON ALL INSULATED PIPING OUTSIDE BUILDING. - AT PIPE HANGERS PROVIDE RIGID INSULATION BETWEEN PIPE AND HANGER. 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE MECHANICAL CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2006 IBC, IMC, AND UPC AS AMENDED BY THE STATE OF WASHINGTON AND LOCAL AUTHORITIES. 3. ALL PIPE SIZES NOTED ON DRAWINGS ARE MINIMUMS. 4. SLOPE ALL INDIRECT DRAINS AT 2% UNLESS OTHERWISE NOTED ON DRAWINGS. OBTAIN APPROVAL FROM CODE AUTHORITY BEFORE INSTAL_ING PIPING AT LESS THAN 2% (EVEN IF LESSER SLOPE IS INDICATED ON DRAWINGS). 5. HANGERS AND SUPPORTS FOR PIPING SHALL BE IN ACCORDANCE WITH THE 2006 IMC AND IBC AS AMENDED BY THE STATE OF WASHINGTON AND LOCAL AUTHORITIES. 6. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 7. PROVIDE SHUT -OFF VALVES AT ALL EQUIPMENT CONNECTIONS. 8. PROVIDE UNION, GROOVED OR FLANGED CONNECTION AT EQUIPMENT FOR FUTURE REMOVAL AND SERVICING. 9. FOR CONDENSATE PIPING PROVIDE TRAPS WITH A MINIMUM SEAL 2" GREATER THAN THE FAN OPERATING STATIC PRESSURE AT ALL COOLING COIL CONNECTIONS. 10. PROVIDE MINIMUM 1" AIR BREAK FOR ALL CONDENSATE PIPE TERMINATIONS AT DRAINS. 11. PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS. VER ROOM LOAD MATRIr RVER AS ROOM # 1 AREA (SF) 322 1 70 LIGHTS (W /SF) 1.0 GENERAL INFORMATION PEOPLE ( #) 0 NOTES CUSTOMER INFORMATION UNIT i MFG & MODEL NO. QUANTITY BTU EACH 1 4000 WATTS EACH 1172 MAX HEAT LOAD (BTU) 4000 MAX HEAT LOAD (KW) 1.2 TOTAL: 4000 1.2 SENS. TONS 0.3 0.3 1 ENVIRONMENTAL INFORMATION ITEM ENVELOPE LIGHTS MAX LOAD (BTU) 0 MAX LOAD (KW) SENS. TONS 0.0 0.0 239 0.1 0.0 PEOPLE 0 0.0 0.0 TOTAL: 239 CAC EQUIPMENT INFORMATION 0.1 0.0 UNIT MFG & MODEL NO. T NOM. TONS MAX SENS. CAPACITY MAX CAPA- CITY (KW) SENS. TONS IAC -301 FUJITSU ASUI2RLS 1 1 TOTAL: LOAD EVALUATION 7150 2.1 0.6 2 7150 I 2.1 0.6 TOTAL CURRENT LOAD: LOADS (BTU) (KW) 4239 1.2 SENS. TONS 0.4 FUTURE EXPANSION: 2119 0.6 0.2 3 TOTAL FUTURE LOAD: 6358 TOTAL CAC CAPACITY: 7150 SURPLUS /(DEFICIENT) CAPACITY: 792 1.9 2.1 0.2 0.5 0.6 0.1 NOTES: 1. BASED ON NAMEPLATE WATTAGE AS SUPPLIED BY DATED 2. NO REDUNDANT CAC UNITS HAVE BEEN PROVIDED. 3. BASED ON 50% GROWTH, OR BASED ON STATED # BTU'S HUMIDITY CONTROL N +1 REDUNDANCY AUTO SWITCH -OVER EXTERNAL ALARMING /MONITORING FM 200 SYSTEM HYDROGEN GAS MONITORING NO NO NO NO NO NO APPROVED BY: VIA E -MAIL. DATE: SYMBOL DESCRIPTION GATE VALVE ABBREVIATION GV � 1 GLOBE VALVE GLV px) BALL VALVE - FULL PORTED BV SILENT CHECK VALVE CV BUTTERFLY VALVE BFV BUTTERFLY VALVE W/ MEMORY STOP BFVM kn v, Pl FLEXIBLE CONNECTION ® REDUCED PRESSURE BACKFLOW PREVENTER RPBP - UNION UNION IC III SYMBOL DESCRIPTION A ® SOLENOID VALVE - - - - GAS COCK CIRCUIT SETTER VALVE =20E71 HORIZONTAL EXPANSION TANK ABBREVIATION SV GC CS HET =I VERTICAL EXPANSION TANK ® AIR SEPARATOR OD AIR PURGER END SUCTION CENTRIFUGAL PUMP VET AIR SEP AP ES PUMP STRAINER I a Pm PRESSURE RELIEF VALVE e" °" PRESSURE REDUCING VALVE PRESSURE / TEMPERATURE TAP STRN RV PRV P &T I VERTICAL IN -LINE CENTRIFUGAL PUMP 4.4131 SUCTION DIFFUSER Q TEMERATURE GAUGE A COMPRESSED AIR C CONDENSATE PIPING VI PUMP SUC DIFF TG lT" BULB WELL MANUAL AIR VENT AUTOMATIC AIR VENT Q ■-* FIN PRESSURE GAUGE rr-,r THERMOMETER D4, BALL VALVE W/ 3/4" HOSE ADAPTOR p CONCENTRIC REDUCER ECCENTRIC REDUCER 1 t - 1 TWO -WAY CONTROL VAVLE BW CHWS CHILLED WATER SUPPLY PIPING MAV CHWR CHILLED WATER RETURN PIPING AV CWS CONDENSER WATER SUPPPLY PIPING PG CWR CONDENSER WATER RETURN PIPING THERM BV W/ HA CR ER G GAS PIPING L REFRIGERANT LIQUID LINE S REFRIGERANT SUCTION UNE HWS HEATING WATER SUPPLY PIPING 2WAY HWR HEATING WATER RETURN PIPING I ® THREE -WAY CONTROL VALVE 3WAY rw Ft F :c R R rV: Q E UNIT INLET FAN VALVE CFM HEATER FAN NO. MFG & MODEL NO. SIZE CFM MAX MIN KW DT CFM VOLT /PH STGS HP VOLT /PH SPD NOTES VAV -300 ENVIROTECH CVEH II 8 - - - 3 - 277/1 - 1/4 277/1 - EXSITING 2 VAV -301 ENVIROTECH CVEH II 8 810 740 110 6.5 25 810 460/3 - 1/4 277/1 - EXSITING 2 VAV -302 ENVIROTECH CVEH 11 8 710 645 105 5 22 710 277/1 - 1/4 277/1 - EXSITING 2 VAV -303 ENVIROTECH CVEH II 8 565 720 180 4 22 565 277/1 - 1/4 277/1 - EXSITING 2 VAV -304 ENVIROTECH CVEH II 8 325 270 70 3 29 325 277/1 - 1/4 277/1 - EXSITING 2 VAV -305 ENVIROTECH CVEH II 8 700 640 105 6.5 29 700 460/3 - 1/4 277/1 - REBALANCE, EXSITING 2 VAV -306 ENVIROTECH CVEH 11 6 - - - 3 - - 277/1 - 1/4 277/1 - - VAV -307 ENVIROTECH CFFQEH II 12 1280 1170 200 7.5 18 1280 460/3 - 1/4 277/1 - REBALANCE, EXSITING 2 VAV -308 ENVIROTECH CVEH II 8 870 800 160 5 18 870 277/1 - 1/4 277/1 - REBALANCE, EXSITING 2 VAV -309 ENVIROTECH CVEH II 8 755 690 - 6.5 27 755 460/3 - 1/4 277/1 - EXSITING 2 VAV -310 ENVIROTECH CVEH II 8 860 790 115 6.5 24 860 460/3 - 1/4 277/1 - EXSITING 2,5 VAV -311 ENVIROTECH CVEH II 8 750 690 140 6.5 27 750 460/3 - 1/4 277/1 - REBALANCE, EXSITING 2 VAV -351 ENVIROTECH CVEH II 10 915 840 230 7 24 915 460/3 - 1/4 277/1 - REBALANCE, EXSITING 2 VAV -352 ENVIROTECH CVEH II 10 1000 910 250 7.5 24 1000 460/3 - 1/4 277/1 - REBALANCE, EXSITING 2 VAV -353 ENVIROTECH CVEH II 8 620 570 160 4 20 620 277/1 - 1/4 277/1 - REBALANCE, EXSITING 2 VAV -354 ENVIROTECH CVEH 11 8 800 730 200 3 12 800 277/1 - 1/4 277/1 - EXSITING 2 VAV -355 ENVIROTECH CVEH II 8 740 680 190 3 13 740 277/1 - 1/4 277/1 - EXSITING 2 VAV -356 ENVIROTECH CVEH II 6 430 400 110 3 22 430 277/1 - 1/4 277/1 - EXSITING 2 VAV -357 ENVIROTECH CVEH II 8 700 640 180 4.5 20 700 277/1 - 1/4 277/1 - EXSITING 2 VAV -358 ENVIROTECH CFFQEH II 6 455 380 95 3 21 455 277/1 - 1/4 277/1 - EXSITING 2 VAV -359 ENVIROTECH CVEH II 8 925 770 295 6.5 22 925 460/3 - 1/4 277/1 - EXSITING 2 VAV -360 ENVIROTECH CVEH II 8 790 660 - 7 28 790 • 460/3 - 1/4 277/1 - EXSITING 2 VAV -361 ENVIROTECH CVEH II 8 600 550 150 5 26 600 277/1 - 1/4 277/1 - REBALANCE, EXSITING 2 VAV -362 ENVIROTECH CVEH II 8 700 640 180 6.5 29 700 460/3 - 1/4 277/1 - REBALANCE, EXSITING 2 VAV -363 ENVIROTECH CVEH II 6 245 200 - 2 26 245 277/1 - 1/6 277/1 - EXSITING 2 VAV -364 ENVIROTECH CVEH II 8 750 625 - 3 13 750 277/1 - 1/6 277/1 - EXSITING 2 VAV -365 ENVIROTECH CVEH II 10 1050 960 270 6.5 19 1050 277/1 - 1/6 277/1 - EXSITING 2 VAV -366 ENVIROTECH CVEH 11 8 500 540 200 4 25 500 277/1 - 1/4 277/1 - REBALANCE, EXSITING 2 VAV -367 ENVIROTECH CVEH II 8 540 565 180 4 23 540 277/1 - 1/4 277/1 - REBALANCE, EXSITING 2 VAV -368 ENVIROTECH CFREH 0811 8 580 500 105 4 22 580 277/1 2 1/4 277/1 - REBALANCE, EXSITING 3 VAV -369 ENVIROTECH CFREH 0811 8 630 500 200 4 20 630 277/1 2 1/4 277/1 - REBALANCE, EXSITING 3 VAV -370 ENVIROTECH CFR1218E 12 1420 1300 360 8 18 1420 277/1 2 1/4 277/1 - NEW 1,6 VAV -371 ENVIROTECH CFRO611E 6 400 370 100 3 24 400 277/1 2 1/4 277/1 - NEW 1,6 NOTES: 1. DISCONNECT BY ELECTRICAL. 2. EXISTING SERIES FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE DEPENDENT. 3. SERIES FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE INDEPENDENT, FACTORY OPTIONS INCLUDE: - FACTORY INSTALLED 1" THROW -AWAY FILTERS - CONTROLS BY OTHERS. - W SCR CONTROL FOR MOTOR. - 24V TRANSFORMER, 48 VA MIN RATING 4. EXISTING UNIT TO BE RELOCATED TO CORRECT CROSS ZONING. COMFORT BALANCE UNIT. EC TO DISCONNECT & RECONNECT LINE VOLTAGE WIRING. MM TO RECONNECT LOW VOLTAGE WIRING. RECONNECT TO EXISTING DIFFUSER. 5. REBALANCE ONLY (1) SUPPLY DIFFUSER IN OPTISTAFFING SPACE AS NOTED ON THE DRAWINGS. REVIEWED FOR 6. SERIES FAN POWERED TERMINAL UNIT WITH HEAT -, SIZE AS LISTED, PRESSURE INDEPENDENT, FACTORY OPTIONS INCLUDE: CODE COMPLIANCE - EXTENDED DAMPER 1/2" DIAM. SHAFT - FACTORY INSTALLED 1" THROW -AWAY FILTERS APPROVED - CONTROLS BY OTHERS - FACTORY PROVIDE WIRING HARNESS WITH LOW VOLTAGE INTERLOCK CONDUCTORS EXTENDED FROM HIGH VOLTAGE CABINET TO LOW VOLTAGE CONTROLS CABINET. JUN 2 2 2012 - 1" MATT -FACED UNIT INSULATION - VARIABLE SPEED FAN CONTROL - 24V TRANSFORMER, 50 VA MIN RATING - HEAT STAGING & FAN CONTROL THROUGH FACTORY WIRED RELAYS City of Tukwila BUILDING DIVISION - AUTO RESET 120 °F HIGH LIMIT TSTAT ` - NON MAGNETIC QUIET ACTING HEATER CONTACTOR NOTE TO ELECTRICAL: - 460V /3PH TERMINAL UNITS REQUIRE A FOUR WIRE POWER FEED IN ORDER TO SUPPLY 277V/1 PH POWER TO THE FAN MOTOR. 1� UNIT NO. EF -301 AREA SERVED SERVER ROOM 310 MFG & MODEL NO. TYPE BROAN LOSONE L700L IN -LINE CFM ESP RPM FLA 640 0.375 1098 HP 300W VOLT /PH 115/1 BDD Y WT LBS 32 NOTES EXISTING 1,2,3,4,5 EF-302 SERVER ROOM 302 BROAN LOSONE L700L IN -LINE 640 0.375 1098 300W 115/1 Y 32 EXISTING 1,2,3,4,5 EF -303 DEMO EF -304 BREAKROOM EF -305 SERVER/STORAGE BROAN LOSONE L700L IN -LINE 640 0.375 1098 300W 115/1 Y 32 EXISTING 1,2,3,4,5 NOTES: 1. POWER WIRING AND DISCONNECT SWITCH BY ELECTRICAL CONTRACTOR. 2. MOTOR STARTER BY ELECTRICAL CONTRACTOR. 3. INTEGRAL BACKDRAFT DAMPER, SPEED CONTROLLER MOUNTED ON FAN BY E.C. 4. HIGH EFFICIENCY MOTORS. 5 THERMOSTAT (MOUNT AT 48" AFF) SET AT 80 DEG F PROVIDED BY MMFS, CONNECTED BY E.C. UNIT NO. MANUFACTURER IAC -301 FUJITSU TOTAL SENS. CLG. CLG. HTG. MBH MBH SEER MBH HSPF INDOOR UNIT OUTDOOR UNIT ELECTRICAL WT ELECTRICAL WT MODEL VOLT /PH MAX LBS MODEL VOLT /PH SCA LBS 12.2 7.2 25.0 16 12.0 ASUI2RLS 208/1 10.0 NOTES 27 AOUI2RLS 208/1 6.2 88 NEW 1 -8 NOTES: 1. ELECTRICAL TO PROVIDE INDIVIDUAL DISCONNECT FOR INDOOR AND OUTDOOR UNITS. 2. CONTROL WITH A STAND ALONE 24/7 PROGRAMMABLE T -STAT. 3. R410A REFRIGERANT. 4. SINGLE POINT POWER CONNECTION AT OUTDOOR UNIT. LINE VOLTAGE CONNECTION BETWEEN INDOOR AND OUTDOOR UNITS BY MECHANICAL CONTRACTOR. 5. COOLING CAPACITIES BASED ON 80EDB, 67WB, 95° OUTDOOR TEMPERATURE. 6. MEETS WSEC 2009 SECTION 1433 EXCEPTION (9A) WITH 15% PREMIUM EFFICIENT CONDENSING SECTION. 7. CONFIRM E QU IPMENT V OLTAG E S O N SITE, CONFIRM SINGLE PHASE PRIOR TOEQUIPMENT ORDER, MAX REFERS TO MAXIMUM CURRENT, SCA REFERS TO STARTING CURRENT AMPS. 8. PROVIDE 3/4" TYPE L COPPER CONDENSATE DRAIN TO NEAREST APPROVED WASTE RECEPTICLE, PROVIDE WITH CONDENSATE PUMP IF REQUIRED. MI CITY JUN 072012 PERMIT CENTER Q) CO o� co co rn� a� a) 0 E CD 0 CD co (/) LL (1)o a) ,-co > Q� »_tom 00 N N Dai • 0 ti d 0 PERMIT SET I I I I l< co O L. 0 0 O z U j EXPIRES: 07 -06 -12 ENGINEER: P CHRISTIAN CHECKED BY: B GEZON CAD: D LAMBERT DRAWING NUMBER: C- 0832 -72251 SHEET NUMBER: REVISIONS: w 0 LAST REVISED: 06 -04 -12 DATE PLOTTED: 06 -04 -12 ISSUE DATE: 06 -04 -12 07 -00 TM0.02 12x12 430 8x8 185 1 • 10x10 10x10 '185 -185 D� (E) 10x 1 145 Oa 8x8 170 14/12 SL RA BOOT c0 80 FIELD TO BALANCE THIS EXISTING DIFFUSER ONLY REVIEWED FOR CODE COMPLIANCE APPROVED JUN 2 2 2012 City of Tukwila BUILDING DIVISION 7 08x8 150 C_ I, N 100W TEL,/ ELEC. ■ I � 80W 080 \/ 200 ------- ..� 080 200 0 100 300 -16/10 DB l 16/10 DB- s 120 Z 2/18 R/A OPNG -'' SOUND ATTENUATOR UP TO AC -1 6 6 L OMEN st • 1 JAN. 60W 304 It 80W 14/12 SL RA BOOT 2 IR GRILLE 80 80 1150 16/10 DB 8x CAP •7iG1111J: L�111 16 4/18 /12f BCC N7 10x1. 225 12x12 NG 20/12; DB 160 N: 12/12 SL . \lam • ► _ 1 TT c 12x 3X611 ann? ►�►�: E.F- X303.', 1`i . 1 • I;/10-DI`3 100 10x10 365 010x10 0 10x10 010x10 . 08x8 400 245 (TYP 2) THIRD FLOG R PLAN' >hsI" tIax a g Monday. June 04. 2012 20' <rs gittWOIWWIttII NOM H , 10x10 010x10 12O`µ1 M gg ftrailA CITY -JUN D72012 PERMIT CBNjER 1/8" = 1 -0" z 0 CD H CO CO 0 Ns rnCO D Q 0 (0 ~ CD co � a) N E (n c a28.0 fn o N Q 7 °E2 a(0 z w1-- c) al) 0_ N N J N. N f-- .c o I` d 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 •- 0 (0 0 EXPIRES: 07 -06 -12 REVISIONS: w 0 z 0 N ENGINEER: LAST REVISED: P CHRISTIAN 06 -04 -12 CHECKED BY: B GEZON DATE PLOTTED: 06 -04 -12 CAD: ISSUE DATE: D LAMBERT 06 -04 -12 DRAWING NUMBER: C- 0832 - 7225107 -00 SHEET NUMBER: DM2.03 1:40:23 PM N N 0 N 0 0 2x12 430 0 8x8 185 10x10 Q185 010x10 185 10X10?! 145 I ?1: 11::: (EJ REVIEWED FOR CODE COMPLIANCE CE APP JUN 222012 (6) Q X14/12 SL it RA BOOT 80 80W DECA 8x8 z City of Tukwila BUILDING DIVISION FIELD TO BALANCE THIS EXISTING DIFFUSER ONLY 1 70 cxa -120W 100W 80 0 8x8 150 I 1 140W t1I`_ 6x6 176.rt �,+a 2/18 R/A OPNG —'' x I' 16/10 DB -!�� l{0/ U --- SOUND ATTENUATOR UP TO AC -1 WOMEN 19 S L,M 6 22/12, SM DN JAN, 2:12\ �50 14/12 S L RA BOOT 36/18 R/A OPNG FIRE -- HOSE IR GRILLE 8x8 200 14/12; DB x 80 6x6 120W 10x14 1DB-1 CAP .140 IAC -+301 18/14SL DECK 8x8 l 200 Xrutal 16/10 DB �I fif it `1 1 1(70....... o- TC v 12x12 12x12 10x10 0280 390 s)250 0250 6x16 SL 100 10x10' 330 0 If 10x10 10x10 350 • 0 270 \ T F 5' 10x CO 335 OR �eN 20' CAP NO I H " -10x10 10x10 335 \–/ 305 12 4 1!2SL 12x12 400 12x12, 340 KEYED NOTS 012x12 SL RETURN AIR BOOT 0 24x12SL RETURN AIR BOOT 10 STAND ALONE 24/7 THERMOSTAT 0 ROUTE 3/4" CONENSATE TO NEAREST APPROVED WASTE RECEPTICLE. 0 1/4"0 LIQUID, 3/8"0 SUCTION LINES UP TO OAC -301. 12x12 340 (TYP 2) 10x10 315 10x10 265 M12O5 R %KIRA cITY JUN 0 7 2012 PERMIT CENTER 12x12 0400 1/8" = 1 -0" ■ 0 Z o� rn(0 7 Qj N co c N ALL (/) 7 o c 0) a'C0 00 Q) N C r- .macmiller.com I I O col O 1- o! w 1 1 1 1 1 1 I\ WA Lic No: MACDOFS980RU EXPIRES: 07 -06 -12 w ENGINEER: P CHRISTIAN CHECKED BY: B GEZON CAD: D LAMBERT REVISIONS: w a Z 0 0) LAST REVISED: 06 -04 -12 DATE PLOTTED: 06 -04 -12 ISSUE DATE: 06 -04 -12 DRAWING NUMBER: 0- 0832 - 7225107 -00 SHEET NUMBER: TM2.03 Monday. June 04. 2012 1:43:39 PM t7 7 AC -1 • (FJ CG) .11 REFRIGERANT LINES DN TO IAC -301 T JF- -1L OAC -301 MOUNT UNIT TO SLEEPERS BY M.C. AC -2 REVIEWED FOR CODE COMPLIANCE APPROVED JUN 2 2 2012 City of Tukwila BUILDING DIVISION . ___ _ _ _. __. _. _ - -- -- - - - - -- -- 11 IF MIS -o88 err JUN 0 7 2012 PERMIT CENTER 1/8" = 1 -0" L o� d) tf � � — a 2 O N ' CO " CD N 03 0 O C 7 CD O O . _ 0 0 0 CO • N � N Lim • O N- EL z .macmiller.com 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 WA Lic No: MACDOFS980RU EXPIRES: 07 -06 -12 REVISIONS: I I 1 I I I INI Q W 0 0 co O (!) 1- m L1J fl 1 1 1 1 1 1 l< REVISIONS: ENGINEER: LAST REVISED: P CHRISTIAN 06 -04 -12 CHECKED BY: DATE PLOTTED: B GEZON 06 -04 -12 CAD: ISSUE DATE: D LAMBERT 06 -04 -12 DRAWING NUMBER: 0- 0832 - 722 - 5017 -00 SHEET NUMBER: TM2.04 !============ 1:44:17 PM Monday, June 04, 2012 0 I II 1 II I , 1 11 II 1 It 1 ir I 11 11 II 1 f 11 11,1 11 11 11 11 I 11 II 1 it 1 I 1! II II . t 11 ..„........... 1 .„,2;,........__...................................I.,:-.========,,,,,,ii,.........,,,,,,,,,,,=,,,,,,,,, T I !; -,-Jr.j.E=======, =— 11 REVIEWED FOR CODE COMPLIANCE APPROVED JUN 2 2 2012 City of Tukwila BUILDING DIVISION 66'-0" a OAC-301 AC-1 // 4'-6" _ IL 0 SOUTHWEST ELEVATION TM3.01 1/8" = 1'-0" m 1.0 a 9 R CLT' SnialiA JUN 07 2012 PERMIT COM 1/8" = 1-0" 1 1 1 1 1 1 1 1 1 1 1 1 1 1 CD 0 cn 1- a.ww EXPIRES: 07 -06 -12 ENGINEER: P CHRISTIAN CHECKED BY: B GEZON CAD: P CHRISTIAN Id 0 REVISIONS: Id 0 REVISIONS: LAST REVISED: 06-04-12 DATE PLOTTED: 06-04-12 ISSUE DATE: 0 6 — 0 4-12 DRAWING NUMBER: C-0832-722-5017-00 SHEET NUMBER: TM3.01