Loading...
HomeMy WebLinkAboutPermit M12-111 - BIG LOTSBIG LOTS 17348 SOUTHCENTER PY M12 -111 City oftukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 3523049005 Address: 17348 SOUTHCENTER PY TUKW Project Name: BIG LOTS Permit Number: M12 -111 Issue Date: 09/10/2012 Permit Expires On: 03/09/2013 Owner: Name: KIR TUKWILA 050 LLC /KIMCO Address: PROPERTY TAX DEPARTMENT , 3333 NEW HYDE PARK STE 100 11042 Contact Person: Name: LAUREL WALYGA Address: 379 CAMPUS DR, STE 150 , SOMERSET NJ 08873 Email: LWALYGA @CORE - ENG.COM Contractor: Name: MERIT MECHANICAL INC. Address: 9630 153 AV NE , REDMOND, WA 98052 Contractor License No: MERITMI163CM Phone: 732 667 -9500 Phone: 425 883 -9224 Expiration Date: 06/01/2013 DESCRIPTION OF WORK: MODIFY DUCTWORK, NEW TEMP SENSOR, AND NEW DIFFUSERS FOR NEW TENANT FIT OUT OF EXISTING RETAIL SPACE. Value of Mechanical: $6,500.00 Type of Fire Protection: SPRINKLERS /AFA Electrical Service Provided by: Permit Center Authorized Signature: Fees Collected: $269.31 International Mechanical Code Edition: 2009 Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this permit. Signature: Print Name: M t 01. l Date: 011,o1-z.47,? This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IMC -4/10 M12 -111 Printed: 09 -10 -2012 • • PERMIT CONDITIONS Permit No. M12-111 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: Readily accessible access to roof mounted equipment is required. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 8: Manufacturers installation instructions shall be available on the job site at the time of inspection. 9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 12: ** *FIRE DEPARTMENT CONDI'T'IONS * ** 13: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 14: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2328) 15: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 16: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2328) 17: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2328) 18: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2328) 19: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2328) (IFC 104.2) 20: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this doc: IMC -4/10 M12 -111 Printed: 09 -10 -2012 project. • 21: All electrical work and equipment shall conform strictly to the standards of the National Electrical Code. (NFPA 70) 22: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 23: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 24: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. doc: IMC -4/10 M12 -111 Printed: 09 -10 -2012 • at CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd.. Suite 100 Tukwila. (1:1 98188 http: / /m%tv.TukwilaW Mechanical Permit. No. Project No. Mt2t11 Date Application Accepted: Date Application Expires: oli 0)11- tl 12 tFor office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *please print ** SITE LOCATION Site Address: I ItJ It King Co Assessor's Tax No.: 352304 -9005 outhCenter Parkway- Parkway Superceni Tenant Name: Big Lots Suite Number: Floor: 1 PROPERTY OWNER Name: Laurel Walyga Kimco City: Somerset State: NJ Zip: 08873 Address: 17600 Southcenter Blvd Email: lwalyga@core-eng.com City: Tukwila State: WA Zip: 98188 CONTACT PERSON — person receiving all project communication Name: Laurel Walyga Address: 379 Campus Drive, Suite 150 City: Somerset State: NJ Zip: 08873 Phone: (732) 667 -9500 Fax: (732) 667 -9501 Email: lwalyga@core-eng.com New Tenant: m Yes ❑..No MECHANICAL CONTRACTOR INFORMATION Company Name: TBD Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of project (contractor's bid price): $ Describe the scope of work in detail: Tenant fit out of existing retail space. Modify ductwork, new temp sensor and new diffusers 6,500 Use: Residential: Fuel Type: New ❑ Replacement ❑ �r t5� v�� ew ❑ Replacement ❑ ! ` 5c Electric ❑ Gas ❑ Other: H: \Applications \Forms - Applications On Line \201 I Applications \Mechanical Permit Application Revised 8 -9 -I I.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu 2 Floor furnace Suspended /wall /floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system 1 Air handling unit <10,000 cfm Unit Type Qty Air handling unit >10,000 cfm 2 Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct 1 Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser 2 Thermostat Wood/gas stove Emergency generator Other mechanical equipment 1 Boiler /Compressor Qty 0 -3 hp/ 100,000 btu 3 -15 hp /500.000 btu 15 -30 hp /1.000,000 btu 30 -50 hp /1,750,000 btu 50+ hp /1.750.000 btu PERMIT APPLICATION NOTES Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3 .2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWN Signature: rr Print Name: /o(e/ 1 Day Telephone�3cg' {O 7 O Mailing Address: S19 CaNDLt V �. Sk e lri1U &Aterse-t- �ta O 73 UT IZED AGENT: Date: 770/01 -1 Applications \Forms - Applications On Line \2011 Applications \Mechanical Permit Application Revised 3 -9 -1 I. does Revised August 2011 bh Page 2 of 2 • City of Tukwila • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 3523049005 Permit Number: M12 -111 Address: 17348 SOUTHCENTER PY TUKW Status: APPROVED Suite No: Applied Date: 07/18/2012 Applicant: BIG LOTS Issue Date: Receipt No.: R12 -02570 Payment Amount: $215.45 Initials: WER Payment Date: 09/10/2012 02:59 PM User ID: 1655 Balance: $0.00 Payee: MERIT MECHANICAL TRANSACTION LIST: Type Method Descriptio Amount Payment Check 24725 215.45 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES 000.322.102.00.00 215.45 Total: $215.45 doc: Receipt -06 Printed: 09 -10 -2012 Cif of Tukwila. Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: //www. ci. tukwila. wa. us SET RECEIPT RECEIPT NO: R12 -02150 Initials: JEM User ID: 1165 Payee: WD PARTNERS Payment Date: 07/18/2012 Total Payment: 2,163.29 SET ID: S000001778 SET NAME: Tmp set/Initialized Activities SET TRANSACTIONS: Set Member Amount D12 -239 D12 -240 EL12 -0671 M12 -111 TOTAL: 1,761.11 292.95 55.37 53.86 1,761.11 TRANSACTION LIST: Type Method Description Amount Payment Check 77868 2,163.29 TOTAL: 2,163.29 ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PLAN - NONRES 000.345.832.00.0 PLAN CHECK - NONRES 000.345.830 TOTAL: 55.37 2,107.92 2,163.29 INSPECTION RECORD Retain a copy with permit INSPECTIONNO.. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 4_, 6300 Southcenter.Blvd.,‘#100, Tukwila. WA 98188 (206) 431 -367 Permit- Inspection- Request Line (206) 431 -2451 Project:- Type of Inspection: .- Itv112 -11 •' -GI (. 1) 1S S ONO '.s t7ct<eIGe. Address: 1'?3 =1•'_. Seca; -t-P� Date Called: Special Instructions: r (ca53 _CSI Date Wanfted:. r 10 t i to 1 17 a.m. p.m. Requester: Phone No: 1{25 -04-12 -G705 Approved per applicable codes. El Corrections required prior to approval. COMMENTS:: c>er M,= ez kp(eTE Inspector / l Date REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. G J INSPECTION RECORD ",. Retain a copy with permit INSPECTION NO:. PERMIT NO. CITY -OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 981881 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Projec • Type of Inspection: e C../e) Address :.. - Date Called: Special Instructions: ,...:: i Date Wanted: '� a / ' f -5 1 Z..._ p.m. Requester: Phone No: -7,A9 t0_.-'7 ® -/3 3 Z- Approved per applicable codes. Corrections required prior to approval. COMMENTS: - - P-04(4 - 6-41-M Gikt R I Inspector: )01 Date: REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. C /71/2 -/1/ CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 \1., (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: B. e le ,5 Type of Inspection:, iej41 -, A../ / Address: ,r 7 3 4/ ,:5C.9 roL 7)V Date Called: • Special Instructions: Date Wanted:. fe) - //- - /L? ra m: `- --R.M, Requester: Phone No: V`z,5- 4/ 445 -/L eV Approved per applicable codes. Corrections required prior to approval. COMMENTS: Inspecf`or: `1 \ Date: n REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO: CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd_, #100, Tukwila. WA 98188 ' (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 ry7/2 Project: 13/ LOS Type of Inspection: /)2/(01- ..L 2/L Address: /73 1/8 - O eAfl "P / Date Called: Special Instructions: Date Wanted:. = a.m /D _?-_ /Z-- al.m. Requester: Phone No: /Z�•_ 4/4/5 - /:2 �3`t/ : • Approved per applicable codes. El Corrections required prior to approval..- COMMENTS: A Inspe or: Date: n REINSPECTION FEE REQUIRED. Prior to next inspection. fee °must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinsp ection- INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 630 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Permit (206) 431 -367 mil Inspection Request Line (206) 431 -2451 Project: C 1- / ' `�� ff . ` CO N Type of Inspection: , Address. 19 34g SL tikw4-y Date Called: Jae ? u =-_ . Special Instructions: P ' Date Wanted: .m Requester: Phone No:�. ... t s,-p4 ElApproved per applicable codes. O Corrections required 'prior to approval. COMMENTS: k flr J Insp clog r: rl MME .. Soffit --': It n REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection:. Date: 110ERMIT COORS CORIII PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -111 PROJECT NAME: BIG LOTS DATE: 07/18/12 SITE ADDRESS: 17-6,,SOUTHCENTER PY Response to Incomplete Letter # Revision # after Permit Issued X Original Plan Submittal Response to Correction Letter # DEPARTMENTS: ision Public Works ,dun fJ�c. 111 Fire Prevention Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete DUE DATE: 07/19/12 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: DUE DATE: 08/16/12 Approved Approved with Conditions Not Approved (attach comments) Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Contractors or Tradespeople Pryer Friendly Page General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name MERIT MECHANICAL INC UBI No. 600517946 Phone 4258839224 Status Active Address 9630 153Rd Avenue Ne License No. MERITMI163CM Suite /Apt. License Type Construction Contractor City Redmond Effective Date 2/14/1984 State WA Expiration Date 6/1/2013 Zip 98052 Suspend Date County King Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status AUTOMMC044QH AUTOMATED MECH CONTROLS INC Construction Contractor General Unused 11/8/1996 6/1/2010 Expired Business Owner Information Name Role Effective Date Expiration Date KIRKWOOD, RODERICK V President 02/14/1984 Bond Amount KIRKWOOD, JOAN M Secretary 02/27/2006 08358695 FRICKBERG, WILLIAM MICHAEL Vice President 02/27/2006 nd Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 10 FIDELITY Et DEPOSIT CO OF MD 08358695 02/01/2010 Until Cancelled $12,000.00 01/20/2010 9 ARCH INS CO SU1041124 02/01/2009 Until Cancelled 02/01/2010 $12,000.00 01/12/2009 8 TRAVELERS CAS & SURETY CO 081S103546895BCM 07/22/2001 Until Cancelled 02/01/2009 $12,000.0003/07 /2002 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 27 Travelers Property Cas Co of A VTC2JC0828K6148TILL1 11/01/2011 11/01/2012 $2,000,000.00 10/25/2011 26 CEOXINGTON INS 014180670 11/01/2010 11/01/2011 $2,000,000.0010 /29/2010 25 CEOXINGTON INS 049159165 11/01/2009 11/01/2010 $2,000,000.00 11/02/2009 24 CEOXINGTON INS 004052434 11/01/2008 11/01/2009 $2,000,000.0011 /04/2008 23 ACE AMERICAN HD0G23734941 03/03/2008 03/03/2009 $2,000,000.0003 /10/2008 22 CONTINENTAL WESTERN INS CO CWP2545786 11/01/2007 11/01/2008 $1,000,000.00 10/31/2007 21 CONTINENTAL WESTERN INS CO CWP2545786 11/01/2005 11/01/2007 $1,000,000.0010 /18/2006 https: // fortress .wa.gov /lni/bbip /Print.aspx 09/10/2012 KEYED NOTES: EXISTING RTU SHALL BE REUSED. MODIFY DUCT AS SHOWN OR CONNECT TO CONCENTRIC DIFFUSER. VERIFY EXACT LOCATION. O EXISTING SMOKE DETECTORS TO BE REUSED. VERIFY FUNCTIONALITY. REPLACE ANY SMOKE DETECTORS NOT FUNCTIONING PROPERLY. OEXISTING RESTROOM AND JANITOR ROOM TO REMAIN. CLEAN ALL FIXTURES AND LEAVE IN LIKE NEW CONDITION. REPLACE AS NECESSARY. O EXISTING GAS METER AND ALL EXISTING PIPING TO REMAIN. VERIFY CONDITION OF METER, CHECK CONNECTIONS FOR LEAKS AND REPLACE AS NECESSARY. EXISTING DUCT TO REMAIN. REBALANCE DIFFUSERS AS SHOWN. (TYP) EXISTING RESTROOM EXHAUST FAN SHALL BE REUSED. REUSE EXISTING CONTROLS. VERIFY EXACT LOCATION OF EXHAUST FAN. O7 NEW DZC TEMPERATURE SENSOR TO BE MOUNTED AT 60" A.F.F. SEE SHEET E -4 FOR MORE INFORMATION. • CONNECT NEW DIFFUSER INTO EXISTING DUCT. MODIFY DUCT AS NECESSARY FOR NEW CONNECTION. NEW CONCENTRIC DIFFUSER. MAKE CONNECTION FROM DUCT TO DIFFUSER WITH FLEXIBLE DUCT. ADJUST AIR PATTERN FOR EVEN THROW. SEE SHEET M -2 FOR MOUNTING INFORMATION. NOTE TO MECHANICAL CONTRACTOR: ANY HVAC EQUIPMENT NOTED TO BE NEW OR REPLACED, WILL BE SUPPLIED BY BIG LOTS - CONTACT TOM THOMAS FOR SPECIFIC EQUIPMENT LISTING. ALL OTHER HVAC EQUIPMENT TO BE VERIFIED AS EXISTING AND TO BE PUT INTO GOOD WORKING CONDITION. THIS MAY BE A REQUIREMENT OF THE LEASE AS A LANDLORD RESPONSIBILITY. ±2560 MBH —G BIG LOTS LOAD (E)UH (E)16" _44(Ei (E)SD (E)SD 1250 1250 1250 1250 FAI (E)SD 1250 SD -1 150 SD -1 100 RTU #7 12" 71(E)SD 1250 !!' (E)1 6 " j/_(E)16 " h(E)SD 1250 (E)SD 7 1250 1/-(E)16v (E)20" SD -1 530 0 (E) RTU #70 r(E)16" (E)SD 1250 (E)RG (E)RG zc RTU #4® (E)RG (TYP) (E)20" (E)20" (E)16" ERG (E)SD 1250 1250 1250 (E)SD 1250 fr.( E)16" SD O 0 0 (E)SD 1400 E)14" (E)SD 1350 (E)16" (E)16" t •� (E)SD 1350 (E)16" 1 T I(E)16" (E)SD 1400 (E)20" (E) RG 0 (E) RG (E)SD 1000 one 1 SD -1 340 (E)SD 1000 IY1 3 SD SEPARATE PERMIT REQUIRED FOR: ❑ Mechanical L7l�tectrical (numbing (was Piping City of Tukwila BUILDING DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: i avisian, will require a new plan submittal and may include additional plan review fees. (E)14" SD -1 10" 340 .0-11g340 10 SD-1 340 SD-1 340 10" r 0 10 10" (E)SD 1000 0 0 FILE COPY Permn nom. I'1 I 2.1" I I Rpm review approval is subject to errors and omissions. vat of construction documents does not authorize ti tc .::31ation of any adopted code or ordinance. Receipt o1, , g. proved Field ,•y = = is acknowledged: Date:. City Of lUkwila BUILDING DIVISION wd 7007 DISCOVERY BLVD DUBLIN, OH 43017 814.634.7000 T WDPARTNERS.COM ISSUE DATES CLIENT REVIEW 07 -01 -2012 PERMIT 07 -05 -2012 BID 07 -05 -2012 CONSTRUCTION 08 -10 -2012 WD PROJECT NUMBER RF0126 REVIEWED FOR CODE COMPLIANCE APPROVED JUL 2 7 2012 City of Tukwila BUILDING DIVISION 18x12 SD -1 340 10" N 16x12 J SD-1 200 RECEEV,E .. CITY OFTUKWL.A JUL. 182012 PERMIT cENTER� =r1-4 u A n i i r A I DI AM SD -1 • 200 1• SD-1 150 MIQHU J z 0 LU UL 10 20 12 W 0 cc cc < Z w u co ovc z co wwco < D cn<0Q c -_ y /CC o Li I— 0 0 0 cc 0 z cc w 0 (INCLUDES FURNITURE DEPT.) TOTAL: 27,497 N LL) DRAWN BY: 0 C w J U cr) U CO Z Q CN7 NI- W000 O Z CC 0 J m 0 12 O FO W c O O co co N d' w 0 0 SHEET: nA_1 HVAC LEGEND GENERAL SD -1 -NI— TYPE r CFM DIFFUSER DESIGNATION 300 MANUAL VOLUME DAMPER VD - TV TURNING VANE r'`•, 0 THERMOSTAT 0 DIGITAL ZONE CONTROL NEW DUCTWORK BY HVAC CONTRACTOR e POINT OF ATTACHMENT TO EXISTING CO SUPPLY AIR la RETURN AIR EXHAUST FAN • DUCT TRANSITION OR TAKEOFF (E) EXISTING R RELOCATE EXISTING DUCTWORK TO REMAIN SD DUCT SMOKE DETECTOR ® REMOTE TEST STATION GAS UNIT HEATER FLEXIBLE CONNECTION TRANSFER GRILLE 1 - SIDEWALL REGISTER ±2560 MBH —G BIG LOTS LOAD (E)UH (E)16" _44(Ei (E)SD (E)SD 1250 1250 1250 1250 FAI (E)SD 1250 SD -1 150 SD -1 100 RTU #7 12" 71(E)SD 1250 !!' (E)1 6 " j/_(E)16 " h(E)SD 1250 (E)SD 7 1250 1/-(E)16v (E)20" SD -1 530 0 (E) RTU #70 r(E)16" (E)SD 1250 (E)RG (E)RG zc RTU #4® (E)RG (TYP) (E)20" (E)20" (E)16" ERG (E)SD 1250 1250 1250 (E)SD 1250 fr.( E)16" SD O 0 0 (E)SD 1400 E)14" (E)SD 1350 (E)16" (E)16" t •� (E)SD 1350 (E)16" 1 T I(E)16" (E)SD 1400 (E)20" (E) RG 0 (E) RG (E)SD 1000 one 1 SD -1 340 (E)SD 1000 IY1 3 SD SEPARATE PERMIT REQUIRED FOR: ❑ Mechanical L7l�tectrical (numbing (was Piping City of Tukwila BUILDING DIVISION REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOTE: i avisian, will require a new plan submittal and may include additional plan review fees. (E)14" SD -1 10" 340 .0-11g340 10 SD-1 340 SD-1 340 10" r 0 10 10" (E)SD 1000 0 0 FILE COPY Permn nom. I'1 I 2.1" I I Rpm review approval is subject to errors and omissions. vat of construction documents does not authorize ti tc .::31ation of any adopted code or ordinance. Receipt o1, , g. proved Field ,•y = = is acknowledged: Date:. City Of lUkwila BUILDING DIVISION wd 7007 DISCOVERY BLVD DUBLIN, OH 43017 814.634.7000 T WDPARTNERS.COM ISSUE DATES CLIENT REVIEW 07 -01 -2012 PERMIT 07 -05 -2012 BID 07 -05 -2012 CONSTRUCTION 08 -10 -2012 WD PROJECT NUMBER RF0126 REVIEWED FOR CODE COMPLIANCE APPROVED JUL 2 7 2012 City of Tukwila BUILDING DIVISION 18x12 SD -1 340 10" N 16x12 J SD-1 200 RECEEV,E .. CITY OFTUKWL.A JUL. 182012 PERMIT cENTER� =r1-4 u A n i i r A I DI AM SD -1 • 200 1• SD-1 150 MIQHU J z 0 LU UL 10 20 12 W 0 cc cc < Z w u co ovc z co wwco < D cn<0Q c -_ y /CC o Li I— 0 0 0 cc 0 z cc w 0 (INCLUDES FURNITURE DEPT.) TOTAL: 27,497 N LL) DRAWN BY: 0 C w J U cr) U CO Z Q CN7 NI- W000 O Z CC 0 J m 0 12 O FO W c O O co co N d' w 0 0 SHEET: nA_1 DIVISION 15 - MECHANICAL BASIC MECHANICAL REQUIREMENTS A. NOTE 1. DRAWINGS AND GENERAL PROVISIONS OF CONTRACT, INCLUDING GENERAL AND SUPPLEMENTARY CONDITIONS AND ALL OTHER SPECIFICATION SECTIONS, APPLY TO THIS AND THE OTHER SECTIONS OF DIVISION 15. 2. THE CONTRACTOR FOR THIS DIVISION OF WORK IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL DIVISIONS OF WORK AND IS RESPONSIBLE FOR THE COORDINATION OF THEIR WORK AND THE WORK OF THEIR SUBCONTRACTORS WITH ALL DIVISIONS OF WORK. IT IS THIS CONTRACTORS RESPONSIBILITY TO PROVIDE THEIR SUBCONTRACTORS WITH A COMPLETE SET OF BID DOCUMENTS. 3. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE COMPLETION AND INSPECTION OF THEIR WORK AND THE WORK OF THEIR SUBCONTRACTORS TO COMPLY WITH THE SCHEDULE AND THE PROJECT COMPLETION DATE. 4. THIS CONTRACTOR SHALL VISIT THE SITE PRIOR TO SUBMITTAL OF BID TO DETERMINE CONDITIONS AFFECTING THE WORK. ANY ITEMS WHICH ARE NOT COVERED IN THE BID DOCUMENTS OR ANY PROPOSED SUBSTITUTIONS SHALL BE LISTED SEPARATELY AND QUALIFIED IN THE CONTRACTORS BID. SUBMITTAL OF BID SHALL SERVE AS EVIDENCE OF KNOWLEDGE OF EXISTING CONDITIONS AND ANY MODIFICATIONS WHICH ARE REQUIRED TO MEET THE INTENT OF THE DRAWINGS AND SPECIFICATIONS. FAILURE TO VISIT THE SITE DOES NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY IN PERFORMANCE OF WORK. 5. REFER TO RESPONSIBILITY SCHEDULE ON THE MECHANICAL DRAWINGS FOR INFORMATION IN REGARD TO RESPONSIBILITY OF WORK OR ITEMS WHICH MAY AFFECT BID. B. GENERAL REQUIREMENTS 1. THIS CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE MECHANICAL SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING BY THE LANDLORD OR BIG LOTS SHALL BE PROVIDED BY THE MECHANICAL CONTRACTOR. CLOSELY COORDINATE THE ENTIRE INSTALLATION WITH THE LANDLORD AND THE G.C. CONSTRUCTION MANAGER, AS REQUIRED. 2. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO SUPPLEMENT EACH OTHER AND ANY MATERIAL OR LABOR CALLED FOR IN ONE SHALL BE FURNISHED AND INSTALLED EVEN THOUGH NOT SPECIFICALLY MENTIONED IN BOTH. ANY MATERIAL OR LABOR WHICH IS NEITHER SHOWN ON THE DRAWINGS NOR CALLED FOR IN THE SPECIFICATIONS, BUT WHICH IS OBVIOUSLY NECESSARY TO COMPLETE THE WORK, AND WHICH IS USUALLY INCLUDED IN WORK OF SIMILAR CHARACTER, SHALL BE FURNISHED AND INSTALLED AS PART OF CONTRACT. 3. WHERE THE DRAWINGS OR SPECIFICATIONS CALL FOR ITEMS WHICH EXCEED CODES OR THE LANDLORD'S TENANT CRITERIA, THE CONTRACTOR IS RESPONSIBLE FOR FURNISHING AND INSTALLING THE SYSTEM WITH THE MORE STRINGENT REQUIREMENTS AS DESIGNED AND DESCRIBED ON THESE DRAWINGS, UNLESS SPECIFICALLY NOTED OTHERWISE. 4. ALL MECHANICAL WORK SHALL BE INSTALLED SO AS TO BE READILY ACCESSIBLE FOR OPERATING, SERVICING, MAINTAINING, AND REPAIRING. THIS CONTRACTOR IS RESPONSIBLE FOR PROVIDING SUFFICIENT SERVICE ACCESS TO ALL EQUIPMENT. 5. ALL WORK SHALL BE PERFORMED IN A NEAT PROFESSIONAL MANNER USING GOOD ENGINEERING AND CONSTRUCTION PRACTICES. 6. UNLESS SPECIFICALLY NOTED OTHERWISE, MATERIALS, PRODUCTS, AND EQUIPMENT, INCLUDING ALL COMPONENTS THEREOF, SHALL BE NEW, UNDERWRITERS LABORATORIES LISTED AND LABELED AND SIZED IN CONFORMITY WITH REQUIREMENTS OF STATE AND LOCAL CODES, WHICHEVER IS MORE STRINGENT. 7. ALL OF THE EXISTING EQUIPMENT IS TO BE CLEANED, AND SURVEYED FOR OPERATION AND A COPY OF THIS SURVEY SHALL BE SENT TO BIG LOTS TEN DAYS BEFORE THE FINAL INSPECTION. ANY REPAIRS THAT NEED TO BE MADE NEED TO BE QUOTED AND SENT WITH THE SURVEY ALL OF THE REPAIRS WILL BE MADE UNDER A CHANGE ORDER. 8. THE HVAC CONTRACTOR WILL BE RESPONSIBLE TO CHANGE ALL AIR FILTERS AND CLEAN ALL OF THE CONDENSER COILS, EVAPORATOR COILS, AND RETURN AIR CHAMBERS OF THE EQUIPMENT TEN DAYS BEFORE THE SOFT OPENING OF THIS STORE. THIS DATE WILL BE SPECIFIED IN THE LETTER OF AGREEMENT ATTACHED TO THE CONTRACT DOCUMENT. 9. ALL OF THE WORK MUST BE COMPLETED TEN DAYS BEFORE THE SOFT OPENING OF THIS STORE. INCLUDING ALL FINAL INSPECTIONS, LIFE SAFETY, AND FIRE MARSHALL VISIT. C. CODES N 1. ALL WORK SHALL CONFORM TO THE LANDLORDS' CRITERIA, THE STATES, COUNTY'S, CITY'S AND LOCAL CODES AND ORDINANCES, SAFETY AND HEALTH CODES, NFPA CODES, ENERGY CODES AND ALL OTHER APPLICABLE. CODES AND REQUIREMENTS. THIS CONTRACTOR SHALL INQUIRE INTO AND COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, AND REGULATIONS. THIS CONTRACTOR SHALL INCLUDE ANY CHANGES REQUIRED BY CODES IN THE BID AND IF THESE CHANGES ARE NOT INCLUDED IN THE BID, THEY MUST BE QUALIFIED AS A SEPARATE LINE ITEM IN THE BID AFTER CONTRACT IS ISSUED, NO ADDITIONAL COST DUE TO CODE ISSUES SHALL BE REIMBURSED BY BIG LOTS TO THE CONTRACTOR. D. LICENSES, PERMITS, INSPECTIONS & FEES 1. THIS CONTRACTOR SHALL OBTAIN AND PAY FOR ALL LICENSES, PERMITS, INSPECTIONS, AND FEES REQUIRED OR RELATED TO THEIR WORK. 2. FURNISH TO G.C.'S CONSTRUCTION MANAGER ALL CERTIFICATES OF INSPECTION AND FINAL INSPECTION APPROVAL AT COMPLETION OF PROJECT E. TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS 1. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE USED AS A MINIMUM FOR THE BASE BID. ANY PROPOSED SUBSTITUTIONS MUST BE PRE - QUALIFIED, LISTED IN THIS CONTRACTOR'S BID AND HAVE A COST SAVINGS FOR BIG LOTS OF AT LEAST $500 PER TYPE OF EQUIPMENT. ADDITIONALLY, ONLY MANUFACTURERS CONSIDERED AS AN EQUAL OR BETTER IN ALL ASPECTS TO THAT SPECIFIED WILL BE REVIEWED. ALL SUBSTITUTIONS ARE SUBJECT TO APPROVAL IN WRITING, THROUGH SHOP DRAWINGS PROCESS, BY BIG LOTS HVAC REPRESENTATIVE PRIOR TO ACCEPTANCE. BIG LOTS RESERVES THE RIGHT TO REJECT ANY PROPOSED SUBSTITUTIONS. THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. 2. MECHANICAL CONTRACTOR SHALL SUBMIT ONLY SUBSTITUTION REQUESTS TO BIG LOTS HVAC REPRESENTATIVE FOR APPROVAL. SUBMISSIONS SHALL BE MADE EARLY ENOUGHIN PROJECT TO ALLOW FOUR (4) WORKING DAYS FOR BIG LOTS HVAC REPRESENTATIVE REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BEAR THE SIGNATURE OF BIG LOTS HVAC REP. AND THE SUB - CONTRACTOR SHOWING THAT THEY HAVE REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE BEEN TAKEN. F. GUARANTEE 1. THIS CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND WORK PROVIDED UNDER THEIR CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT THEIR OWN EXPENSE, ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT WHICH MAY BE DISCOVERED WITHIN A PERIOD OF 12 MONTHS FROM THE DATE OF ACCEPTANCE (IN WRITING) OF THE INSTALLATION BY G.C.'S CONSTRUCTION MANAGER. EXTENDED WARRANTIES ARE AS SPECIFIED WITH INDIVIDUAL EQUIPMENT. 2. THIS CONTRACTOR SHALL PROVIDE A COMPLETE 12 -MONTH WARRANTY FOR ALL PARTS ON EQUIPMENT PROVIDED BY THIS CONTRACTOR AND G.C.'S VENDORS. THIS CONTRACTOR SHALL NOT BEAR ADDITIONAL WARRANTIES BEYOND A COMPLETE WORKING SYSTEM, AND AS SUCH, NO ADDITIONAL MONIES SHOULD BE INCLUDED IN THE BID. G. RECORD DRAWINGS 1. THIS CONTRACTOR SHALL MAINTAIN ONE COPY OF DRAWINGS ON THE JOB SITE TO RECORD DEVIATIONS FROM CONTRACT DRAWINGS, SUCH AS: A. LOCATION OF CONCEALED PIPING VALVES AND DUCTS. B. REVISIONS, ADDENDUMS, AND CHANGE ORDERS. C. SIGNIFICANT DEVIATIONS MADE NECESSARY BY FIELD CONDITIONS, APPROVED EQUIPMENT SUBSTITUTIONS, AND CONTRACTOR'S COORDINATION WITH OTHER TRADES. 2. AT-COMPLETION OF THE PROJECT AND BEFORE FINAL APPROVAL THE CONTRACTOR SHALL MAKE ANY FINAL CORRECTIONS TO DRAWINGS AND CERTIFY THE ACCURACY OF EACH PRINT BY SIGNATURE THEREON. ONE COPY OF THE MOST RECENT SET OF DRAWINGS WITH TEMPERATURE CONTROL DRAWINGS INCLUDED SHALL BE STAMPED "DO NOT REMOVE" AND PLACED IN DRAWING TUBE LOCATED NEXT TO THE ELECTRICAL PANELS. H. DISCREPANCIES IN DOCUMENTS 1. DRAWINGS (PLANS, SPECIFICATIONS, AND DETAILS) ARE DIAGRAMMATIC AND INDICATE THE GENERAL LOCATION AND INTENT OF THE . MECHANICAL SYSTEMS. WHERE DRAWINGS, EXISTING SITE CONDITIONS, SPECIFICATIONS OR OTHER TRADES CONFLICT OR ARE UNCLEAR, ADVISE G.C.'S CONSTRUCTION MANAGER, IN WRITING OF VARIATIONS TO CONTRACT DOCUMENTS PRIOR TO SUBMISSION OF BID. OTHERWISE, G.C. CONSTRUCTION MANAGER'S INTERPRETATION OF CONTRACT DOCUMENTS OR CONDITIONS SHALL BE FINAL WITH NO ADDITIONAL COMPENSATION PERMITTED. I. PHASING REQUIREMENTS 1. THIS CONTRACTOR IS TO INCLUDE IN HIS BID ALL NECESSARY SERVICE REQUIRED TO KEEP THE OPERATING PHASE OF THE STORE'S HVAC, PLUMBING AND SPRINKLER SERVICE IN OPERATION. CONTRACTOR MUST SCHEDULE WITH G.C.'S CONSTRUCTION MANAGER AND THE LANDLORD ONE WEEK PRIOR TO ANY SHUT DOWN OF THE HVAC, PLUMBING OR FIRE PROTECTION SYSTEMS. J. DEMOLITION 1. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF THE DEMOLITION OF EXISTING WORK AND THE DEMOLITION PROVIDED BY G.C.. COORDINATE WITH G.C. ANY EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT. 2. EACH CONTRACTOR SHALL VERIFY SCOPE OF WORK WITH G.C. FOR THE REMOVAL OF ALL EXISTING FIRE PROTECTION, PLUMBING FIXTURES, PIPING, HVAC UNITS, REFRIGERANT RECAPTURE, EXHAUST FANS, ETC. AND ASSOCIATED ROOF CURBS NOT BEING REUSED ON THIS PROJECT, UNLESS SPECIFICALLY NOTED OTHERWISE. CONTRACTOR MUST VERIFY WITH THE LANDLORD ALL PRESUMED ABANDONED EQUIPMENT, PIPES, DUCTWORK, AND EQUIPMENT PRIOR TO REMOVAL. ROOF CURBS SHALL BE REMOVED AND THE ROOF PATCHED. ALL EXTRANEOUS ITEMS IN THE SPACE OR ON THE ROOF NOT APPLICABLE TO THE NEW WORK MUST BE REMOVED AND ROOF/WALL/FLOOR PATCHED /REPAIRED TO MATCH EXISTING STRUCTURE. EXISTING ABANDONED PIPES, DUCTS, OR EQUIPMENT IN THE FLOOR, EMBEDDED IN CONCRETE, OR OTHERWISE INACCESSIBLE ARE TO BE CUT OFF AND SEALED BELOW OR WITHIN FLOOR OR WALL LEVEL WHEN THEY ARE NOT TO BE REUSED IN THIS PROJECT. IF REQUIRED BY LANDLORD OR CODES, ABANDONED PIPING AND /OR DUCTWORK MUST BE REMOVED TO POINT OF ORIGIN. CONFIRM THE EXTENT OF DEMOLITION WITH G.C. PRIOR TO BID AND INCLUDE IN BID PROPOSAL AS DIRECTED BY G.C. K. SLEEVES 1. THIS CONTRACTOR SHALL PROVIDE SLEEVES TO PROTECT EQUIPMENT OR FACILITIES IN THE INSTALLATION. EACH SLEEVE SHALL EXTEND THROUGH IT'S RESPECTIVE FLOOR, WALL OR PARTITION AND SHALL BE CUT FLUSH WITH EACH SURFACE EXCEPT SLEEVES THAT PENETRATE THE FLOOR, WHICH SHALL EXTEND 2" ABOVE THE FLOOR. CONTRACTOR MUST COORDINATE THROUGH THE LANDLORD ANY CORE DRILLING OR CUTTING OF OPENINGS IN MASONRY FLOORS OR WALLS. 2. ALL SLEEVES AND OPENINGS THROUGH FIRE RATED WALLS AND /OR FLOORS SHALL BE FIRE SEALED WITH CALCIUM SILICATE, SILICONE "RTV" FOAM, "3M" FIRE RATED SEALANTS OR EQUAL, SO AS TO RETAIN THEIR FIRE RATING. 3. SLEEVES IN BEARING AND MASONRY WALLS, FLOORS, AND PARTITIONS SHALL BE STANDARD WEIGHT STEEL PIPE FINISHED WITH SMOOTH EDGES. FOR OTHER THAN MASONRY PARTITIONS, THROUGH SUSPENDED CEILINGS, OR FOR CONCEALED VERTICAL PIPING, SLEEVES SHALL BE NO. 22 U.S.G. GALVANIZED STEEL MINIMUM. L. HANGERS 1. HANGERS SHALL INCLUDE ALL MISCELLANEOUS STEEL SUCH AS ANGLE IRON, BANDS, C- CLAMPS WITH RETAINING CLIPS, CHANNELS, HANGER RODS, ETC., NECESSARY FOR THE INSTALLATION OF WORK. 2. HANGERS SHALL BE FASTENED TO BUILDING STEEL, CONCRETE, OR MASONRY, BUT NOT TO PIPING. HANGING FROM METAL DECK IS NOT PERMITTED. HANGERS MUST BE ATTACHED TO BAR JOIST EVERY 4' WITH 1" GALVANIZED STRAP WRAPPED AROUND BAR JOIST WITH AT LEAST (2) #8 SHEET METAL SCREWS ON EACH SIDE. WHERE INTERFERENCES OCCUR, AND IN ORDER TO SUPPORT DUCTWORK OR PIPING, THE CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL BE LOCATED WHERE THEY DO NOT INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, AND OTHER EQUIPMENT. HANGER TYPES AND INSTALLATION METHODS ARE ALSO SUBJECT TO LANDLORD CRITERIA. DIVISION 15 - MECHANICAL SECTION 15500 HEATING, VENTILATION, AND AIR CONDITIONING A. SCOPE OF WORK 1. THIS CONTRACTOR SHALL FURNISH ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION AND FACILITIES NECESSARY FOR, REASONABLY IMPLIED AND INCIDENTAL TO, THE FURNISHING,INSTALLATION, COMPLETION AND TESTING OF ALL THE WORK FOR THE MECHANICAL SYSTEMS AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS, AND AS REQUIRED BY JOB CONDITIONS, TO INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING: A. HVAC UNITS, EQUIPMENT, AND APPURTENANCES (UNLESS NOTED OTHERWISE). B. DUCTWORK, FITTINGS, DAMPERS, AND INSULATION. C. CURBS, ROOFING, AND STEEL FRAMING FOR SUPPORT (AS APPLICABLE, REFER TO PLANS). D. CONDENSATE PIPING SYSTEMS (AS APPLICABLE, REFER TO PLANS). E. TESTING, ADJUSTING, AND BALANCING. 2. BEFORE STARTING WORK, THIS CONTRACTOR SHALL VISIT THE JOBSITE AND EXAMINE THE ARCHITECTURAL, STRUCTURAL, MECHANICAL AND ELECTRICAL PLANS AND SPECIFICATIONS TO SEQUENCE, COORDINATE, AND INTEGRATE THE VARIOUS ELEMENTS OF THE HVAC SYSTEM, MATERIALS, AND EQUIPMENT WITH OTHER CONTRACTORS TO AVOID INTERFERENCES AND CONFRONTATIONS. 3. RELOCATION OF EXISTING DUCT MAINS OR BRANCHES TO MEET STORE DESIGN CRITERIA MUST BE INCLUDED IN BID PROPOSAL. B. HVAC EQUIPMENT 1. PRIMARY HEATING AND AIR CONDITIONING UNITS ARE TO BE FURNISHED BY G.C. AS SCHEDULED UNLESS NOTED OTHERWISE. REFER TO PLANS AND SCHEDULES FOR REQUIREMENTS. ALL EQUIPMENT SHALL INCLUDE A FIVE (5) YEAR COMPRESSOR AND TEN (10) YEAR HEAT EXCHANGER WARRANTY. 2. ALL EQUIPMENT SHALL BE COMPLETE IN EVERY RESPECT WITH ALL DEVICES, APPURTENANCES, AND ACCESSORIES PROVIDED TO MEET THE DESIGN INTENT AND OPERATION OF THE SYSTEMS SHOWN ON THE DRAWINGS AND SPECIFIED HEREIN. 3. EQUIPMENT SHALL BE INSTALLED AND START -UP PERFORMED IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTRUCTIONS. ALL AIR CONDITIONING EQUIPMENT MUST BE TRAPPED IN ACCORDANCE WITH MANUFACTURERS DATA. SEE DRAWINGS FOR ADDITIONAL DETAILS. C. METAL DUCTWORK - NO FIBERGLASS DUCT ALLOWED 1. NO DUCTWORK SHALL BE FABRICATED PRIOR TO JOB SITE VISIT AND APPROVAL BY G.C.. SIGNIFICANT DEVIATIONS IN ROUTING OR SIZING OF THE DUCTWORK/PIPING SYSTEMS MUST BE CLOUDED AND NOTED ON THE SHOP DRAWINGS. THESE SIGNIFICANT DEVIATIONS MUST BE APPROVED BY BIG LOTS ENGINEER PRIOR TO FABRICATION OR INSTALLATION. 2. EXCEPT AS OTHERWISE INDICATED, FABRICATE AND INSTALL RECTANGULAR AND ROUND DUCTWORK WITH GALVANIZED STEEL, IN ACCORDANCE WITH SMACNA "HVAC DUCT CONSTRUCTION STANDARDS" OF THE LATEST EDITION. WHERE OTHER CODES ARE ENFORCED, (IE. UMC, BOCA, ETC.) USE THE MOST STRINGENT CODE FOR DUCT CONSTRUCTION STANDARDS. 3. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT DUCT SYSTEMS TO THE FOLLOWING PRESSURE CLASSIFICATIONS: SUPPLY DUCTS: 2" W.G., POSITIVE RETURN AND EXHAUST DUCTS: 2" W.G., NEGATIVE EXCEPT WHERE OTHERWISE INDICATED, USE DUCT SEALANTS OF THE FOLLOWING PRESSURE CLASSIFICATIONS: SUPPLY DUCTS CLASS B - 3" W.G. RETURN AND EXHAUST DUCTS: CLASS C - 2" W.G. IN ACCORDANCE WITH THESE CONSTRUCTION AND SEALANT PRESSURE CLASSIFICATIONS, MAXIMUM DUCT AIR LEAKAGE WILL NOT EXCEED 5% AS REQUIRED FOR FINAL AIR BALANCE APPROVAL. 4. MEDIUM PRESSURE DUCT A. WHERE DUCTWORK IS SPECIFICALLY NOTED AS MEDIUM PRESSURE, IT SHALL BE CONSTRUCTED IN ACCORDANCE WITH SMACNA STANDARDS FOR A PRESSURE RATING OF 4 INCHES WATER COLUMN MINIMUM OR GREATER AS REQUIRED BY LANDLORD. B. ALL GAUGES AND REINFORCEMENT MUST MEET WITH THE LATEST EDITION OF SMACNA STANDARDS FOR MEDIUM PRESSURE DUCT AND WITH THE LANDLORD'S CRITERIA. C. CONNECTION TO THE LANDLORD'S MEDIUM PRESSURE DUCTWORK SHALL BE MADE WITH "LO- LOSS" SADDLE TEE TAPS BY UNITED MCGILL CORP., OR AS OTHERWISE REQUIRED BY THE LANDLORD. D. ALL OTHER ITEMS FROM METAL DUCTWORK SPECIFICATION SECTION APPLY TO THIS SECTION, WITH THE EXCEPTION THAT ALL MEDIUM PRESSURE DUCTWORK MUST BE WRAPPED INSULATION, NOT LINED. 5. ROUND AND FLAT OVAL DUCTWORK SHALL BE GALVANIZED STEEL WITH SPIRAL LOCKSEAM CONSTRUCTION. ROUND DUCTWORK SIZES 12" DIAMETER AND SMALLER IN CONCEALED AREAS MAY BE SNAP -LOCK CONSTRUCTION. ALL SNAP -LOCK SEAMS SHALL BE SEALED AS DESCRIBED IN THESE SPECIFICATIONS. DUCT AND FITTINGS SHALL BE G90 GALVANIZED STEEL CONFORMING TO ASTM A -653 AND A -924. ALL FITTINGS THAT ARE SPOT WELDED OR BUTTON PUNCHED CONSTRUCTION SHALL BE INTERNALLY SEALED. 6. AS A MINIMUM, CROSS BREAK ALL FLAT SURFACES OR REINFORCE WITH A BEAD APPROXIMATELY 3/8" WIDE X 3/16" DEEP ON 12" CENTERS TO PREVENT VIBRATIONS, REGARDLESS OF DUCT GAUGE. 7. INSTALL DOUBLE THICKNESS TURNING VANES IN ALL 90 DEGREE ELBOWS OVER 36" IN LENGTH. INSTALL SINGLE THICKNESS TURNING VANES IN ALL OTHER ELBOWS. TURNING VANES NOT REQUIRED IN RADIUS TYPE ELBOWS. 8. INSTALL RIGID ROUND AND RECTANGULAR METAL DUCT WITH SUPPORT SYSTEMS INDICATED IN SMACNA STANDARDS. SUPPORT HORIZONTAL DUCTS WITHIN 2 FEET OF EACH ELBOW AND WITHIN 4 FEET OF EACH BRANCH INTERSECTION USING DOUBLE STRAP HANGERS ON EACH SIDE OF FITTING. SUPPORT VERTICAL DUCTS AT A MAXIMUM INTERVAL OF 16 FEET AND AT EACH FLOOR. NO WOOD SHALL BE USED TO SUPPORT OR BRACE DUCTS. PROVIDE SWAY AND SEISMIC BRACING AS REQUIRED BY STATE AND LOCAL CODES. 9. WHERE DUCTS PASS THROUGH ROOFS AND FLOORS, PROVIDE AS MINIMUM 1- 1/2 "X1 -1/2" X1/8" STEEL ANGLE FRAMES AT EACH SIDE OF OPENING. THE ANNULAR SPACE BETWEEN DUCT AND ANGLE FRAMES SHALL BE CAULKED WITH SILICONE SEALANT OR FIREPROOFED AS REQUIRED BY ASSEMBLY FIRE RATING. 10. ALL JOINTS AND SEAMS SHALL BE SEALED WITH 2" WIDE, GLASS- FIBER- FABRIC REINFORCED TAPE. JOINTS ALSO SHALL BE RIVETED OR CONNECTED WITH SHEET METAL SCREWS. LIQUID SEALANTS BY UNITED MCGILL CORP., DOW CORNING, MIRACLE ADHESIVES AND SUREBOND INC. WILL BE ACCEPTED IN LIEU OF TAPE. NOTE: LINDAB FACTORY GASKETED JOINTS DO NOT REQUIRE ADDITIONAL SEALER. 11. SOFT ELASTOMER BUTYL GASKET WITH ADHESIVE BACKING SHALL BE USED TO SEAL FLANGED JOINTS. 12. DUCT TRANSITIONS SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS SPECIFICALLY NOTED OTHERWISE. 13. PROVIDE ACCESS TO ALL MOTORIZED ZONE DAMPERS, FIRE DAMPERS, CONTROLS, AND OTHER ITEMS IN DUCTWORK THAT REQUIRE SERVICE OR INSPECTION. IF THE ACCESS PANEL LOCATION IS EXPOSED TO THE SALES AREA, IT MUST BE APPROVED BY G.C.'S CONSTRUCTION MANAGER PRIOR TO INSTALLATION. LAY -IN SUPPLY AND RETURN AIR DIFFUSERS, GRILLES AND REGISTERS WITH PLASTER FRAMES MAY BE USED AS ACCESS LOCATIONS WHEN WITHIN 3' -0" OF DEVICE. 14. DUCTWORK SHALL BE INSTALLED WITH INSIDE CLEAR DIMENSIONS UNLESS NOTED ON DRAWINGS. WHERE DUCTWORK SIZE IS LARGER THAN CONNECTED DEVICE (IE. DIFFUSER, REGISTER) SMOOTH DUCT TRANSITIONS ARE TO TAKE PLACE JUST PRIOR TO DEVICE CONNECTION. REFER TO DETAILS. 15. N/A D. FLEXIBLE CONNECTIONS 1. FLEXIBLE COLLARS SHALL BE FURNISHED AND INSTALLED IN ALL BETWEEN VIBRATING EQUIPMENT (FANS, AIR HANDLERS, ROOFTOP UNITS, ETC.) AND DUCTS OR CASINGS. ALSO, FURNISH AND INSTALL FLEXIBLE CONNECTIONS WHERE DUCTS CROSS BUILDING EXPANSION JOINTS. 2. FLEXIBLE CONNECTIONS SHALL BE CONSTRUCTED OF NEOPRENE - COATED FLAMEPROOF FABRIC. PROVIDE ADEQUATE JOINT FLEXIBILITY TO ALLOW FOR MOVEMENT AND PREVENT THE TRANSMISSION OF VIBRATION. E. VIBRATION ISOLATION DEVICES 1. VIBRATION ISOLATION DEVICES SHALL BE FURNISHED AND INSTALLED IN ALL SUPPORTS BETWEEN VIBRATING EQUIPMENT (FANS, AIR HANDLERS, ETC.) AND STRUCTURE. THE BID. 2. VIBRATING EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH RUBBER AND SPRING DEVICES. VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DECK SHALL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. 3. EXAMINE DEAD LOAD AND OPERATING LOAD CONDITION WHEN SELECTING DEVICES. ADJUST FOR PROPER ALIGNMENT AND LOADING.AVOID TWO "GROUNDING" THE ISOLATOR. 4. CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES, DUCTS, EQUIPMENT, ETC. 5. CONSULT MANUFACTURER FOR APPLICATION DATA. F. FLEXIBLE AIR DUCT 1. FLEXIBLE AIR DUCT SHALL BE 1" INSULATED CLASS 1 AND RATED FOR THE OPERATING PRESSURE OF THE SYSTEM. DUCT CONSTRUCTION MATERIAL (PLASTIC, CLOTH, ALUMINUM) MUST ADHERE TO LOCAL CODES AND LANDLORD'S REQUIREMENTS AND BE INCLUDED AS SUCH IN 2. FLEXIBLE AIR DUCT SHALL BE ATTACHED PER DETAILS. FLEXIBLE AIR DUCT MAY ONLY BE USED IN CONCEALED VERTICAL APPLICATIONS WITHOUT PRIOR APPROVAL FROM G.C.'S CONSTRUCTION MANAGER UNLESS NOTED OTHERWISE. 3. FLEXIBLE DUCT SHALL NOT EXTEND OVER 14' -0" IN LENGTH AT ANY ONE LOCATION. G. MANUAL DAMPERS 1. FURNISH AND INSTALL MANUAL LOCKING QUADRANT VOLUME CONTROL DAMPERS WITH HANDLE OPERATORS AS SHOWN ON PLANS TO FACILITATE AIR BALANCING. H. FIRE DAMPERS & SMOKE FIRE DAMPERS 1. FIRE DAMPERS SHALL BE RUSKIN MODEL NO. FD36, FD6OFA OR FDR25. 2. PROVIDE FIRE DAMPERS WITH ACCESS DOORS INSTALLED WHERE REQUIRED BY ALL LOCAL CODES. 3. COMBINATION SMOKE FIRE DAMPERS SHALL BE RUSKIN MODEL NO. FSD36, FSD6OFA, OR FSDR25. I. DUCTWORK INSULATION 1. FURNISH AND INST, -I_L INSULATION PRODUCTS IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS, AND IN ACCORDANCE WITH RECOGNIZED INDUSTRY PRACTICES. INSULATION MUST COMPLY WITH 2. DUCTWORK SIZES SHOWN ON DRAWINGS ARE INSIDE CLEAR DIMENSIONS. INCREASE DUCTWORK SIZES AS REQUIRED FOR INTERNALLY LINED DUCT TO MAINTAIN INSIDE CLEAR DIMENSIONS. 3. INSULATE ALL OF THE FOLLOWING DUCTWORK: CONCEALED SUPPLY DUCTWORK THAT IS NOT INTERNALLY LINED UNTREATED OUTSIDE AIR DUCTWORK LOCATED WITHIN THE INTERIOR SPACE SUPPLY & RETURN DUCTWORK INSULATION SHALL BE 2" REINFORCED FOIL FACED, VAPOR SEALED FIBREGLASS. INSTALLED THERMAL RESISTANCE SHALL BE AT LEAST 6.0 FOR INTERIOR DUCTWORK AND 8.0 FOR EXTERIOR DUCTWORK, OR AS REQUIRED BY LOCAL CODES. PROVIDE EXTERIOR DUCTWORK INSULATION WITH WEATHERPROOF JACKETING WHEN APPLICABLE. LINER MAY BE USED IN LIEU OF FIBERGLASS WRAP. 4. ALL INSULATION AND LINING SHALL HAVE A FLAME SPREAD RATING OF NOT MORE THAN 25 AND A SMOKE DEVELOPED RATING OF NO HIGHER THAT 50 WHEN TESTED IN ACCORDANCE WITH ASTM C 411, OR AS REQUIRED BY LOCAL CODES. J. CURBS AND STEEL FRAMING FOR SUPPORT 1. THIS CONTRACTOR WILL FURNISH AND INSTALL ALL NECESSARY CURBS AND BLOCKING REQUIRED TO INSTALL ALL HVAC EQUIPMENT AS DESCRIBED OR IMPLIED ON THE DRAWINGS. CURBS SHALL BE A MINIMUM OF 14" HIGH OF THE SAME MANUFACTURER OF THE EQUIPMENT SUPPORTED, UNLESS NOTED OTHERWISE. INSULATE UNDER THE COMPRESSOR SECTION. ALL CURBS MUST BE INSTALLED SO THAT TOP OF CURBS ARE "DEAD" LEVEL. ALL PENETRATIONS OF EXISTING STRUCTURE SHALL BE DONE IN ACCORDANCE TO THE LANDLORD'S GUIDELINES AT THIS CONTRACTOR'S EXPENSE. COORDINATE STEEL FRAMING REQUIREMENTS, ROOF PENETRATIONS, AND ROOF FLASHING WITH G.C. TO DETERMINE SCOPE OF WORK PRIOR TO BID. THIS CONTRACTOR MUST RECEIVE WRITTEN APPROVAL BEFORE ANY ADDITIONAL WORK TAKES PLACE. 2. WHEN APPLICABLE THE HVAC CONTRACTOR IS RESPONSIBLE TO GET THIS DRAWING STAMPED BY A MECHANICAL ENGINEER AND HAVE A STRUCTURAL STUDY OF THE ROOF STRUCTURE, OF THE SITE, FOR PROPER SUPPORT OF THE UNITS BY A STRUCTURAL ENGINEER, THIS IS TO BE SUBMITTED TO BIG LOTS IN WRITING BEFORE ANY WORK STARTS. ALL OF ROOFTOP PENETRATIONS TO BE FRAMED WITH 2.5" ANGLE IRON ON ALL SIDES, AT LEAST .025" THICK. ALL EXHAUST FAN OPENINGS TO BE FRAMED WITH 1.5" ANGLE IRON, AT LEAS .025" THICK ALL FOUR SIDES. THE HVAC CONTRACTOR IS ALSO RESPONSIBLE FOR ALL STRUCTURAL STEEL AND LABOR TO INSTALL IT. THE HVAC CONTRACTOR IS ALSO RESPONSIBLE FOR ALL PERMITS, MECHANICAL, STRUCTURAL PERTAINING TO STRUCTURAL STEEL, AND ENGINEERING FEES LISTED ABOVE. THE HVAC CONTRACTOR WILL ALSO BE RESPONSIBLE FOR HAVE IN THE ROOF PENETRATIONS FLASHED BY THE LANDLORDS ROOFER. K. CONDENSATE PIPING 1. INTERIOR CONDENSATE PIPING SHALL BE TYPE "L" DRAWN COPPER TUBE WITH 95 -5 TIN - ANTIMONY SOLDERED JOINTS AND WROUGHT COPPER FITTINGS WITH DIELECTRIC SEPARATION BETWEEN DISSIMILAR METALS. DRAIN SHALL TERMINATE AT A CODE APPROVED LOCATION. ALTERNATE PIPING MATERIALS ARE ACCEPTABLE AS A SUBSTITUTION WHEN THEIR USE IS PERMITTED BY THE LANDLORD, LOCAL CODES AND BUILDING DEPARTMENT OFFICIALS AND DOES NOT AFFECT OTHER TRADES.SUBSTITUTIONS MUST BE LISTED AND QUALIFIED IN BID. 2. EXTERIOR CONDENSATE PIPING SHALL BE SCHEDULE 40 U.V. RESISTANT PVC PIPING. PVC JOINTS SHALL BE SLIP FIT. DRAIN SHALL TERMINATE AT A CODE APPROVED LOCATION. 3. INSULATE ALL INTERIOR CONDENSATE PIPING WITH 1" THICK (K =0.23 @ 75 F) PIPE INSULATION WITH AN ALL SERVICE JACKET TO MEET LOCAL CODES AND UL FLAME SPREAD AND SMOKE DEVELOPED RATINGS. 4. INSTALL ALL NECESSARY PIPE HANGERS, AND SADDLES TO PROPERLY SUPPORT ALL CONDENSATE PIPING. HANGERS SHALL SUIT TYPE OF PIPING PROVIDED AND BE SPACED AT A MAXIMUM SPAN OF 5 FEET. PROVIDE SWAY AND SEISMIC BRACING WHERE REQUIRED BY CODES. L. REFRIGERANT PIPING A. THIS CONTRACTOR SHALL FURNISH AND INSTALL A COMPLETE REFRIGERANT PIPING SYSTEM BETWEEN THE INDOOR FAN UNITS AND OUTDOOR FAN UNITS. REFRIGERANT PIPING SHALL BE TYPE "L" HARD DRAWN COPPER TUBING (ASTMB88). TUBING SHALL BE CLEAN, CAPPED AND NITROGEN CHARGED. B. ALL FITTING AND JOINTS SHALL BE WROUGHT COPPER OR CAST BRONZE (ANSI B16.22). ALL COPPER TO COPPER JOINTS SHALL BE BRAZED WITH A COPPER- PHOSPHORUS ALLOY AND ALL OTHER JOINTS SHALL BE BRAZED WITH SILFOS -5 ALLOY. C. ALL ELBOWS SHALL BE LONG RADIUS TYPE. 3. INSTALLATION A. SUCTION LINES SHALL HAVE ADEQUATE LIFT TRAPS AND /OR DOUBLE SUCTION RISERS TO MEET THE REQUIREMENTS OF FIELD CONDITIONS AND EQUIPMENT MANUFACTURER'S RECOMMENDATIONS. B. BRAZE ALL JOINTS WITH SILFOS -5 STARTING AT THE INDOOR UNIT AND WORKING TOWARD THE OUTDOOR UNIT. THE SEALS ON THE OUTDOOR UNIT SHALL BE BROKEN LAST. A NITROGEN BLEED SHALL BE USED DURING ALL BRAZING AND ANY TIME THE SYSTEM IS OPEN. ALL OPEN LINES SHALL BE CAPPED AND SEALED BEFORE LEAVING THE SITE DURING CONSTRUCTION. PRESSURE TEST FOR LEAKS WITH AN INERT GAS UP TO 245 PSIG. REDO LEAKING JOINTS AND RETEST UNIT SYSTEM IS TIGHT. EVACUATE ENTIRE SYSTEM TO 200 MICRONS OF MERCURY. CHARGE SYSTEM WITH 25 PSI OF R -22 AND AN INERT GAS TO 245 PSI AND RETEST SYSTEM WITH HALIDE LEAK DETECTOR. ALL LEAKING JOINTS MUST BE COMPLETELY RESEALED UNTIL NO LEAKS EXIST. TURN ON CRANK CASE HEATERS 24 HRS PRIOR TO STARTING COMPRESSOR TO BE SURE ALL REFRIGERANT LIQUID IS OUT OF THE COMPRESSOR. C. UPON COMPLETION OF TESTING, BUT BEFORE THE REFRIGERANT PIPING INSULATION IS APPLIED, THE PIPING MUST BE INSPECTED BY A REPRESENTATIVE OF THE LOCAL GOVERNING AUTHORITY AS NECESSARY. D. INSULATE THE REFRIGERANT SUCTION LINES AND CONDENSATE LINES ONLY WITH RUBATEX OR ARMSTRONG 1 INCH THICK PIPE INSULATION WITH FLAME SPREAD RATING OF NOT MORE THAN 50 IN ACCORDANCE WITH INDUSTRY STANDARDS. DO NOT INSULATE THE HOT GAS (LIQUID) LINES OR ANY HOT GAS BYPASS LINES IF APPLICABLE. 4. INSPECTION A. CONTRACTOR MUST PREPARE AND SUBMIT A COMPLETE PIPING SCHEMATIC TO THE LOCAL CARRIER FIELD REPRESENTATIVE FOR APPROVAL PRIOR TO BEGINNING INSTALLATION. UPON COMPLETION OF PIPING, THIS CONTRACTOR MUST CALL THE LOCAL CARRIER INSPECTOR FOR FIELD INSPECTION OF WORK PERFORMED AT G.C.'S EXPENSE. ALL ITEMS FOUND TO BE INADEQUATE FOR PROPER PERFORMANCE BY CARRIER FIELD REPRESENTATIVE MUST BE CORRECTED AT NO ADDITIONAL CHARGES TO G.C. OR BIG LOTS M. TEMPERATURE SYSTEM 1. ALL EXISTING AND NEW EQUIPMENT TO HAVE NEW IN DUCT SMOKE DETECTORS AND KEYED RESETS INSTALLED. SEE THE DETAIL FOR LOCATION AND WIRING DIAGRAM. THE SMOKE DETECTORS ARE TO BE INSTALLED AS EARLY IN THE PROJECT AS POSSIBLE TO ALLOW THE FIRE ALARM COMPANY TO HOOK UP THE DETECTOR TO THE FIRE PANEL AT THEIR CONVENIENCE. THE SMOKE DETECTORS SHALL BE A TRANE SYSTEM SENSOR TYPE AND THE TEST STATIONS ARE FIREX MODEL 3PB53, AVAILABLE THROUGH GRANGER. THERE WILL BE SUBSTITUTIONS OF THESE PARTS ALLOWED. THE HVAC CONTRACTOR WILL BE RESPONSIBLE FOR WIRING THESE DETECTORS FOR POWER, UNIT SHUTDOWN, AND THE KEY RESETS. IF YOUR LOCAL CODE REQUIRES THAT ALL OF THE UNITS SHUT DOWN ON CALL FROM ONE OF THE SMOKE DETECTORS, THE FIRE ALARM CONTRACTOR SHALL BE RESPONSIBLE FOR ALL PARTS AND LABOR TO MAKE THIS POSSIBLE. THE ELECTRICAL CONTRACTOR IS RESPONSIBLE FOR ALL ELECTRICAL CONDUIT, BOXES, WIRE, AND OTHER PARTS. THE MANUFACTURERS INSTRUCTICNS SHALL BE FOLLOWED WITHOUT ANY OMISSIONS. 2. THERMOSTATS INSTALLED BY THE MECHANICAL CONTRACTOR SHALL BE TEMPORARY TYPE, NON - PROGRAMMABLE CONNECTED TO ALL THE ROOF TOP UNITS VIA 18 -10 TSTAT WIRE THE MECHANICAL CONTRACTOR IS RESPONSIBLE FOR THE LOW VOLTAGE WIRING FROM ALL TEMPORARY TSTAT LOCATIONS IN THE STORE TO ALL RTU LOCATIONS ON THE ROOF. TSTAT MOUNTING SHALL BE 60" AFF. IF THE STORE HAS AN EMS SYSTEM DIFFERENT FROM BIG LOTS STANDARD SITE CONTROLS SYSTEM THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING THIS SYSTEM FROM THE HVAC EQUIPMENT ONLY. IF THE HVAC EQUIPMENT HAS LINE VOLTAGE CONTROLS, THE HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR CONVERTING TO A 24 VOLT CONTROL SYSTEM INCLUDING ALL WIRING, RELAYS, BOX'S, AND CONDUIT. 3. TEMPORARY TSTAT SHALL BE REPLACED, BY THE EMS CONTRACTOR, WITH PERMANENT DIGITAL ZONE CONTROLS (DZC). DZC SHALL BE MOUNTED AT 60" A.F.F. EMS CONTRACTOR SHALL PLACE THE TEMP. STATS IN THE EMS CABIN AIR BALANCE QTY. UNIT SUPPLY RETURN OUTSIDE EXHAUST RESULT SERVING 1 (E)RTU -1 3000 2400 600 - +600 WAREHOLSE /RR 1 (E)RTU -2 5000 4000 1000 - +1000 WAREHOUSE 1 (E)RTU -3 5000 3750 1250 - -11250 SALES 1 (E)RTU -4 5000 3750 1250 - +1250 SALES 1 (E)RTU -5 6000 4800 1200 - +1200 SALES /OFFICE 1 (E)RTU -6 6000 4800 1200 A +1200 SALES 1 (E)RTU -7 1600 1280 320 - +320 SALES 250 A DOUBLE DEFLECTION CD-1 AF34X 34 "x34" 4 -14" o 1 (EfEF -1 (E)RTU -4 - - -450 -450 RESTROOMS 1 - 4 -16" o 12.5 o 110 A - C 6 THRU 7.5 TON CD -3 AF46X 46 "x46" 4 -18" o 460 30 o 42'7 50 A - C 8.5 THRU 10 TON CD -4 AF52X 52 "x52" 4 -20" o 2100 o (E)RTU -6 A - C 12.5 THRU 15 TON CD -5 AF58X 58 "x58" 6 -18" o TOTAL - - 6820 -450 +6370 - 0. TESTING, ADJUSTING, AND BALANCING 1. TESTING, ADJUSTING AND BALANCING OF HVAC WORK SHALL BE PERFORMED BY AN AABC, NEBB, NBI, OR NCI CERTIFIED CONTRACTOR. THE HVAC CONTRACTOR SHALL INCLUDE THE COST IN BID FOR TESTING AND BALANCING WORK. 2. TESTING, ADJUSTING, AND BALANCING REPORT MUST BE COMPLETE AND TURNED OVER TO THE BIG LOTS HVAC REPRESENTATIVE 1 WEEK PRIOR TO MERCHANDISING DATE. THE HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR SCHEDULING THEIR WORK AND THE WORK OF THEIR SUBCONTRACTORS WITH G.C. TO ALLOW ADEQUATE TIME FOR THE AIR BALANCING WORK TO BE COMPLETED. 3. THE HVAC CONTRACTOR SHALL COMPLETE THE AIR BALANCE REVIEW START -UP VERIFICATION CHECKLIST BELOW AND FAX A COPY AS NOTED TO THE AIR BALANCER. A COPY SHALL ALSO BE PROVIDED TO THE BIG LOTS HVAC REPRESENTATIVE AT THIS TIME. 4. THE HVAC CONTRACTOR SHALL BE PRESENT FOR AIR BALANCE TO VERIFY ACCESSIBILITY TO ALL DEVICES, VERIFY ALL OPERATING SEQUENCES AND INSTALL NEW FILTERS IN ALL UNITS JUST PRIOR TO THE AIR BALANCE. HVAC CONTRACTOR SHALL INSTALL A NEW SET OF FILTERS AFTER PROJECT IS COMPLETE. 5. THE HVAC CONTRACTOR MAY ACT AS THE AIR BALANCING CONTRACTOR PROVIDED THEY HOLD ONE OF THE LISTED AIR BALANCING CERTIFICATIONS. IN THIS CASE, THE HVAC CONTRACTOR MAY BE SUBJECT TO HAVE THIER BALANCING REPORT REVIEWED BY AN INDEPENDANT AGENCY. IN THE EVENT OF ANY DISCREPANCIES, THE HVAC CONTRACTOR SHALL BE RESPONSIBLE FOR ANY INCURRED CHARGES DUE TO CORRECTIONS. END OF SECTION 1 1. REFER TO THE DRAWINGS FOR SCOPE OF WORK. 5500 AIR DISTRIBUTION DEVICE SCHEDULE NOTES: 1. SYMBOL KEY - FIRST LETTER: M= MULTI - DIRECTIONAL 5. DAMPERS SHALL BE OPERABLE FROM FACE S =SUPPLY, R= RETURN, C= CONCENTRIC, M =MULTI DIRECTION "A" OPPOSED BLADE #AG -35. SECOND LETTER: D= DIFFUSER, R= REGISTER, G= GRILLE "B" RADIAL OPPOSED BLADE #D -75. 2. CATALOG NUMBERS S & R REFER TO TITUS AIR DEVICES. "C" RUSKIN CFD OR CFDR FIRE DAMPER W /VOLUME CONTROL. CATALOG NUMBERS FOR CONCENTRICS DIFFUSERS AND "D" YOUNG'S REGULATOR, DPR MODEL# 5020 -CC MULTI - DIRECTIONAL DIFFUSERS REFER TO EP CUSTOM 6. BORDER STYLE - PRODUCTS, INC. "A" SURFACE MOUNTED 3. CONTACT EP CUSTOM PRODUCTS, INC. AT 704 -483 -8745 OR WWW.EPCUSTOMPRODUCTS.COM FOR ORDERING OPTIONS. VERIFY LOCATION OF SMOKE DETECTORS, TYPE OF CONNECTION, AND ADAPTOR PANS. "B" LAY -IN, PROVIDE WITH TITUS MODEL #XY -13363 FRAME FOR DRYWALL CEILING MOUNTING, "C" LAY -IN FRAME FOR T-BAR CEILING. 7. MANUFACTURERS - 4. FINISH- OTHER MANUFACTURERS ACCEPTABLE EXCEPT FOR "A" STANDARD WHITE FINISH.. CONCENTRIC AND MULTI- DIRECTIONAL DIFFUSERS. "B" UNPAINTED.. SYMBOL CATALOG NUMBER SIZE MOUNTING MATERIAL FINISH DPR. BORDER STYLE REMARKS MOD. NECK CLG. OTHER STEEL ALUM. SD -1 TMS 12 x12 24 "x24" SEE M -1 0 BIG LOTS o 6 A - C OR B SURFACE MOUNT FOR CASH /COUNT SW -1 300RS 14 "x8" 12"x6" 4962 o o 1520 A *VENTILATION BASED ON EXHAUST RATE BIG LOTS TOTAL OA REQ'D. = 5459 BIG LOTS TOTAL OA PROVIDED = 6820 A DOUBLE DEFLECTION SW -2 300RS 18 "x8" 16 "x6" 200 4 0 110 A 67 A DOUBLE DEFLECTION SW -3 300RS 20"x12" 18 "x10" o o 40 A 250 A DOUBLE DEFLECTION CD-1 AF34X 34 "x34" 4 -14" o 1195 0 (E)RTU -4 A 1250 C 3 THRU 5 TON CD -2 AF4OX 40"x40" 4 -16" o 12.5 o 110 A - C 6 THRU 7.5 TON CD -3 AF46X 46 "x46" 4 -18" o 460 30 o 42'7 50 A - C 8.5 THRU 10 TON CD -4 AF52X 52 "x52" 4 -20" o 2100 o (E)RTU -6 A - C 12.5 THRU 15 TON CD -5 AF58X 58 "x58" 6 -18" o 175.5 0 80 A - C 15 THRU 20 TON CD -6 AF64X 64 "x64" 6 -20" o 1.5 HP o 125 A - C 20 THRU 25 TON RG -1 50F 24 "x24" SEE M -1 0 o A - A 2'X2' PAN, EGGCRATE ACCEPTABLE RG -2 50F 12 "x12" SEE M -1 0 0 A - A SURFACE MOUNT EG -1 50R -SS 24 "x24" SEE M -1 o o _ A - C MD -1 2 -WAY- o o A _ _ 2 WAY MULTI - DIRECTIONAL DRUM DIFFUSER MD -2 3 -WAY- - - o o A 3 WAY MULTI- DIRECTIONAL DRUM DIFFUSER MD -3 4 -WAY- - o 0 A - - 4 WAY MULTI - DIRECTIONAL DRUM DIFFUSER EXHAUST FAN SCHEDULE MARK LOCATION MANUFACT. MODEL # EX. AIR (CFM) ST. PRESS. " OF W.G. POWER VOLTS/ PHASE WEIGHT. (LBS) NOTES (E)EF -1 RESTROOM VERIFY BALANCE T0450 VERIFY VERIFY 120/1 - -- 1 5 747 0.06 G 230 65 BIG LOTS RESTROOMS* 6 EXHAUST FAN SCHEDULE NOTES: ROOM SERVED. WHITE GRILLE. FLEX DUCT CONNECTORS TO ISOLATE UNIT VIBRATIONS. HOODED WALL CAP. VENT FOR WALL TERMINATION. RISE THERMOSTAT. 1. FAN TO BE TIED INTO LIGHT SWITCH FOR 2. PROVIDE WITH BACKDRAFT DAMPER AT UNIT, 3. PROVIDE WITH ISOLATION HANGERS. INSTALL 4. PROVIDE GREENHECK MODEL WC-10 X 3 5. PROVIDE GREENHECK MODEL BV168 BRICK 6. FAN TO RUN UPON MAKE OF THERMOSTAT. 7. PROVIDE WITH LINE VOLTAGE CLOSE ON AMC VENTILATION SCHEDULE 2009 MECHANICAL CODE TABLE 403. SPACE AREA P /1000 FIXTURES SF #P OR CFM /SF CFM /P OA CFM SUPPLY REQ'D OA BIG LOTS SALES 15 20604 0.12 7.5 4990 4798 BIG LOTS OFFICE 5 747 0.06 G 230 65 BIG LOTS RESTROOMS* 6 347 - _70 800A -450 EX -210 BIG LOTS WAREHOUSE / CORRIDOR _ 4962 0.12 - 1520 596 *VENTILATION BASED ON EXHAUST RATE BIG LOTS TOTAL OA REQ'D. = 5459 BIG LOTS TOTAL OA PROVIDED = 6820 MECHANICAL EQUIPMENT SCHEDULE MARK CFM O.A. CFM S.P. VOLTS/ PHASE FAN BHP MCA/ MOCP EER/ SEER HEATING COOLING MANUFACTURER/ MODEL WEIGHT (LBS) REMARKS INPUT MBH OUTPUT MBH NOM. TONS TOTAL MBH SENS. MBH ENT. D.B. ENT. W.B. (E)RTU -1 3000 600 460 30 2 HP 21.7 9 0 150 120 7.5 86.0 64.0 80 67 YORK DH090N15P4AAA1A 1051 - (E)RTU -2 5000 1000 460 30 5 HP 40 9.0 250 200 12.5 140 110 80 67 YRK DH150NE0P4AAA1A 1195 (E)RTU -3 5000 1250 460 30 5 HP 40 9.0 250 200 12.5 140 110 80 67 YRK DH150NE0P4AAA1A 1195 (E)RTU -4 5000 1250 - 460 30 5 HP 33.4 40 9.0 250 200 12.5 140 110 80 67 YORK DH150N20P4AAA1A 1195 (E)RTU -5 6000 1200 - 460 30 5 HP 42'7 50 10.0 300 240 15.0 175.5 125.1 80 67 YORK D1 HG180N24046ECA 2100 (E)RTU -6 6000 1200 - 460 30 5 HP 42.7 50 300 240 15.0 175.5 125.1 80 67 D1HG180N24046ECA 2100 (E)RTU -7 1600 320 - 460 30 1.5 HP 12.8 125 99 4 46.5 36.0 80 67 YORK D1HG048N09946B08 610 0 •IIIP� 00 _ . _ _ ROOFTOP AIR CONDITIONING UNIT SCHEDULE NOTES: AMBIENT OUTDOOR TEMPERATURE OF 95 DEG. F. PRIOR TO TEST AND BALANCE WORK. 1 AND ACCESSORIES 1. COOLING CAPACITIES SHOWN ARE BASED ON AN 2. CONTRACTOR SHALL INSTALL ALL NEW FILTERS 3. FACTORY ECONOMIZER 4. FACTORY NON -FUSED DISCONNECT SWITCH 5. FACTORY GFCI OUTLET - NON POWERED 6. FACTORY ROOF CURB 7. WEIGHTS INCLUDE UNIT, ROOF CURB, ECONOMIZER, 8. 9. M1211I yid 7007 DISCOVERY BLVD DUBLIN, OH 43017 614.634.7000 T WDPARTNERS.COM ISSUE DATES CLIENT REVIEW 07 -01 -2012 PERMIT 07 -05 -2012 BID 07 -05 -2012 CONSTRUCTION 08 -10 -2012 WD PROJECT NUMBER BLTRF0126 EXHAUST FAN ROOF CURB 10 "0/ TO CEILING 14/14 DUCT UP TO THE CURB REST ROOM EXHAUST DETAIL N.T.S. ROOFING ROOF TRUSS Z 0 W EC RTU ADAPTOR PANS ROOF CURB SUPPLY DUCT FULL SIZE I I I DRUM DIFFUSER ROOFING ROOF TRUSS ACCESS DOOR SMOKE DETECTOR `RETURN DUCT FULL SIZE NOTE: VERIFY WITH I LOCAL AUTHORITIES HAVING JURISDICTION ON LOCATION OF SMOKE DETECTORS. CONTRACTOR TO VERIFY RETURN, SUPPLY, OR BOTH. DURM DIFFUSER DETAIL SCH 40 PVC PIPING N.T.S. METAL STRAPPING GALVANIZED SCREWS PRESSURE TREATED WOOD BLOCKING ROOFING MASTIC SEALER OR CONSTRUCION ADHESIVE MAXIMUM SPACING SHALL BE 4'A' 2: PIPING SHALL BE SLOPED TO APPROVED OUTLET CU FACTORY WO 14" HIGH FACTORY ROOF CURB REVIEWED FOR CODE COMPLIANCE APPROVED !JUL 2 7 2012 City of Tukwila BUILDING DIVISION THROUGH WIT NAILER AND CURB 410E 3 PER LONG SIDE AND SIDE, BASE MIL ON UNIT RECEIVED CITY OF TUKWILA JUL 18 2012 PERMIT CENTER METAL DECKING ( TYPICAL ) BOLT SETS: I /2', (2) PER SIDE, THRU BASE OF CURB AND FRAME (1700 LBS, TENSION, 2200 LBS. SHEAR CAPACITY.) STRUCTURAL SUPPORT FRAME FOR UNIT a DECKING AT FULL PERIMETER OF FACTORY CURB 31X3' X N. ANGLE IRON AT ENDS OLT CURB TO BAR JOISTS AND LE IRON FOR NEW LOCATIONS. M• Y EKISTINO STEEL FOR EXISTING UNIT 'CATIONS TO BE REUSED. LU 0 a CC CC LU 0- 0- Z cc W 1- co CC Z W LU 00 < -,1 ,- fn<0< ri � co �y o </ W - I- W 0 0 0 W cc 0 z cc 0 W 0 O W 0 W v. cc O 1- z O NL` co `^ 0 VJ J 2 TOTAL: 27,497 N U) DRAWN BY: _0 -1 CO O 0_ N Z_W CN 0 Lt 0 O z fr 0 < O O) J - D w 0- J m O W=E ,J CC IZ 0 O 00 ) Co � U U 1: MECHANICAL CONTRACTOR SHALL FURNISH ROOF OPENING SIZES AND LOCATIONS FOR STRUCTURAL SUPPORT FRAMING. 2: SYSTEM SHALL BE CAPABLE OF WITHSTANDING WIND FORCE IN ACCORDANCE WITH THE 200E FLORIDA BUILDING CODES. RIE.00WN SYSTEM HAS BEEN DESIGNED FOR 148 MPH WIND FORCE MINIMUM). 3: FACTORY HURRICANE CLIPS ALSO ACCEPTABLE. INSTALL AS PER MANUFACTURES INSTRUCTIONS. RTU CURB/TIE DOWN DETAIL N.T.S. RACC'uA kilt-NA I mr1TCe SHEET: nn_') 0 0 0 0 KEYED NOTES: EXISTING ROOF TOP UNIT TO BE REUSED. CONTRACTOR TO INSPECT EXISTING RTU. SEE GENERAL NOTES FOR RTU WORK. REPAIR AND REPLACE AS REQUIRED. REBALANCE TO QUANTITIES SHOWN ON SHEET M -2. VERIFY EXACT LOCATION. CONTRACTOR TO INSPECT EXISTING EXHAUST FANS. SEE GENERAL NOTES THIS SHEET FOR EXHAUST FAN WORK. REPAIR AND REPLACE AS REQUIRED. REBALANCE TO QUANTITIES SHOWN ON SHEET M -2. VERIFY EXACT LOCATIONS. EXISTING DUCT WORK TO REMAIN. CONTRACTOR TO REMOVE, CLEAN, REPAINT, AND REINSTALL EXISTING DIFFUSERS AND GRILLES, DESIGNATED (E). CONTRACTOR TO REMOVE EXISTING DUCT WORK AND ASSOCIATED DIFFUSERS AND GRILLES, DESIGNATED (D). DISPOSE OF REMOVED MATERIALS PROPERLY. CAP ALL OPENINGS AIR TIGHT WHERE DUCT IS REMOVED. CONTRACTOR TO INSPECT, CLEAN AND VERIFY FUNCTIONALITY EXISTING UNIT HEATER. REPAIR AND REPLACE AS REQUIRED. VERIFY EXACT LOCATION. GENERAL NOTES: ROOF TOP UNIT REUSE REQUIREMENTS 1. INITIAL INSPECTION AND CORRECTIVE ACTION. O OBTAIN, IF POSSIBLE, THE MAINTENANCE RECORDS OF THE UNIT. PROVIDE WITH FINAL INSPECTION REPORT TO CLIENT. HIGHLIGHT TROUBLE COMPONENTS AND ADVISE WHICH ONES ARE OUT OF WARRANTY. O VISUALLY INSPECT AND CORRECT UNIT FOR: *DIRTY FILTERS - REPLACE WITH NEW PLEATED FABRIC TYPE AND PROVIDE AND AN ADDITIONAL SET FOR INSTALLATION PRIOR TO TURN OVER. *DIRT AND DEBRIS BUILT UP IN CONDENSER COIL - CHEMICALLY CLEAN COIL , BRUSH OUT FINS. *DIRT AND DEBRIS BUILT UP ON FAN BLADES. - CHEMICALLY CLEAN *DIRT AND DEBRIS BUILT UP IN EVAPORATOR COIL- CHEMICALLY CLEAN COIL. *DIRT AND DEBRIS BUILT UP ON HEAT EXCHANGER - GAS HEAT - CHEMICALLY CLEAN AND CHECK FOR LEAKS AND CORROSION. *DIRT AND DEBRIS BUILT UP IN OUTSIDE AIR DAMPER AND ACTUATOR. - CLEAN DAMPER AND ACTUATOR, LUBRICATE AND MAKE SURE DAMPER IS OPERATIONAL. *IF ECONOMIZER, ENSURE THAT OUTSIDE STAT AND /OR DIFFERENTIAL TEMPERATURE CONTROLLER IS FULLY OPERATIONAL. *CORROSION ON OUTSIDE CABINET OF UNIT. - CLEAN, PAINT AND PATCH AS REQUIRED. *INSPECT ALL ACCESS PANELS - REPLACE DEFECTIVE GASKETS-AND MISSING SCREWS AND LATCHES. *ENSURE THAT UNIT AND ROOF CURB PROVIDED AIR TIGHT SEAL - CORRECT ANY AIR LEAKAGE AT UNIT. 2. MECHANICAL INSPECTION AND CORRECTIVE ACTION REQUIREMENTS. O SUPPLY FAN MOTOR - *CHECK THAT MOTOR IS WIRED CORRECTLY. *CHECK THAT FAN IS ALIGNED PROPERLY, MAKE SURE THAT IT DOES NOT HAVE EXCESSIVE VIBRATION OR CREATING EXCESSIVE NOISE WHILE OPERATING. *REPLACE BELT IF BELT DRIVEN. - USE V NOTCHED BELT TYPE IF POSSIBLE. *SET NEW BELT AT FACTORY RECOMMENDED TENSION. *LUBRICATE AS REQUIRED OR AS PER LUBRICATION LABEL ON UNIT. *CHECK AIR FLOW FROM FAN AT SUPPLY AIR DUCT THAT IT IS WITHIN 350 -400 CFM PER TON RANGE REQUIRED FOR TONNAGE OF UNIT O COMPRESSOR - *PERFORM AN ELECTRICAL AND AN OIL TEST ON THE REFRIGERANT FOR MOISTURE AND /OR ACID IS PRESENT. - INSTALL A NEW FILTER /DRYER. *CHECK TEMPERATURE OF CASING. IF CASING IS INDICATING EXCESSIVE TEMPERATURES REPLACEMENT MIGHT BE NECESSARY. REPORT FINDINGS WITH RECOMMENDATIONS TO OWNER. *PRESSURE CHECK SYSTEM TO SPECIFICATIONS FROM MANUFACTURER. *CHECK FOR AND REPAIR ANY LEAKS IN SYSTEM. RECHARGE IF REQUIRED OR IF OVERCHARGED SUBMIT RECOMMENDATIONS TO OWNER FOR RECTIFYING. O CONDENSER FAN AND MOTOR - *CHECK THAT FAN IS ALIGNED PROPERLY, AND OPERATING PROPERLY. *REPLACE IF REQUIRED. EXHAUST FAN INSPECTION INITIAL INSPECTION AND CORRECTIVE ACTION. O OBTAIN IF POSSIBLE THE MAINTENANCE RECORDS OF THE UNIT. PROVIDE WITH FINAL INSPECTION REPORT TO CLIENT. HIGHLIGHT TROUBLE COMPONENTS AND ADVISE WHICH ONES ARE OUT OF WARRANTY. O VISUALLY INSPECT AND CORRECT UNIT FOR: *DIRT AND DEBRIS BUILT UP ON FAN BLADES. - CHEMICALLY CLEAN *DIRT AND DEBRIS BUILT UP IN BACKDRAFT DAMPER. - CLEAN DAMPER, LUBRICATE AND MAKE SURE DAMPER IS OPERATIONAL. *ENSURE THAT UNIT AND ROOF CURB PROVIDED AIR TIGHT SEAL - CORRECT ANY AIR LEAKAGE AT UNIT. 2. MECHANICAL INSPECTION AND CORRECTIVE ACTION REQUIREMENTS. O EXHAUST FAN MOTOR - *CHECK THAT MOTOR IS WIRED CORRECTLY. *CHECK THAT FAN IS ALIGNED PROPERLY, MAKE SURE THAT IT DOES NOT HAVE EXCESSIVE VIBRATION OR CREATING EXCESSIVE NOISE WHILE OPERATING: *REPLACE BELT IF BELT DRIVEN. - USE V NOTCHED BELT TYPE IF.POSSIBLE. *SET NEW BELT AT FACTORY RECOMMENDED TENSION. *LUBRICATE AS REQUIRED OR AS PER LUBRICATION LABEL ON UNIT. - *CHECK AIR FLOW FROM FAN AT EXHAUST AIR DUCT. REBALANCE CFM ACCORDING TO PLAN. (E)16" 4 LEJsD 1250 (TYP) LEjtJH ===o 11 11 1 (D)SD (TYP) (D)EF 11 JL (E)SD 1250 1250 IT�I 1250 1.) (E)SD 1250 (TYP) O Iw (D)SD IM (E)EF -1. (TYP) (D)SD 11 L —11 (D)RG II I I I I II r71(7)R-Gir _ 121 11(D)RG 1 (D)EG 11 I i II ( D)SD � 1 *(D)SD (D)EG 11 (E) RTU #1 11 (D)SD 11 11 thD)(1) EF II (TYP) (TYP) _ (E)SD 1250 jr( E)1 6' (E)SD 1250 _(E)16" lr( E)1 6" E SD 1250 (D)SD - j2)88" (TYP) (E)20" (E)20" D (E) RTU #4 (E) RG (E)RG D (E) RTU #7 (D)SD E)16" -v i (D)SD II 0 (E) RTU #3 l.(E)RG (E) RG (E)20" r1250 20. (TYP) r(E)16" I (E)16" ®(E)SD 1250 (E)SD 1250 1'-• (E)1 6" (E)SD 1250 hDTZ IY9 JI L� D D (TYP) O(E)SD 1400 14 (D)SD (D)14„ (D)8„ 11 �_ 31H II - - T— I � II � II 11 I cJJ II �(D)SD@ II II D- (TYP) )SD ( (E)SD, 1350 (E)16" (E)20" .III I (E)SD — 1000 (E)SD 1000 r(E)16" (E)RG I Ty III (E)RG (E)SD 1350 1(E)16" T I(E)16" (E)SD 1400 (E)20" (E) RTU #5 (TYP) (E) RG (E)RG (E) RTU #60 � I D r (E)14" (D)16" E SD 300 �D)20" - f- - _ I — L wd 7007 DISCOVERY BLVD DUBLIN, OH 43017 614.634.7000 T WDPARTNERS.COM ISSUE DATES CLIENT REVIEW 07 -01 -2012 PERMIT 07 -05 -2012 BID 07 -05 -2012 CONSTRUCTION 08 -10 -2012 OJECT NUMBER F0126 E SD 1000 (TYP) D (D)SDO -® (TYP) D (D)20" REVIEWED FOR CODE COMPLIANCE * APPROVED IJUL 2 7 2012 City of Tukwila BUILDING DIVISION 16D)SE (D)SD (®D O (TYP) RECEIVED CITY OF TUKWILA JUL 1 8 ~2012 PERMIT CENTER nFnnnI ITInnN PI AN z 0 0) w LLI a 0 cc cc z� w W pp zco w CO : i< D -aoa C° �y� ^� �L W LL T I— w a O 0 LU CC z cc 0 0 (INCLUDES FURNITURE DEPT.) TOTAL: 27,497 L() DRAWN BY: 0 J Uo_ N zw 0 wzO O z cc O J — w0-Jm cc D O co o O O co co to1- N w 0 0 SHEET: NA-q