Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Permit M12-147 - PDS TECH
PDS TECH 12720 GATEWAY DR M12 -147 City oiltII'ukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 -431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: Address: 2716000070 12720 GATEWAY DR TUKW Project Name: PDS TECH INC Permit Number: M12 -147 Issue Date: 10/04/2012 Permit Expires On: 04/02/2013 Owner: Name: EPROPERTY TAX INC DEPT #207 Address: PO BOX 4900 , SCOTTSDALE AZ 85261 Contact Person: Name: Address: Email: DARLA DOLL 7717 DETROIT AV SW , SEATTLE WA 98106 DARLA. D O L L@ MAC MILLER. C O M Contractor: Name: MACDONALD /MILLER FAC SOL INC Address: PO BOX 47983 , SEATTLE, WA 98106 Contractor License No: MACDOFS980RU Phone: 206 - 768 -4278 Phone: 206 -768 -4180 Expiration Date: 12/31/2012 DESCRIPTION OF WORK: RELOCATE (11) EXISTING DIFFUSERS AND (4) GRILLES. ADD (7) NEW DIFFUSERS AND (8) NEW GRILLES. ADD (1) NEW DUCTLESS SPLIT SYSTEM AND REFRIGERANT PIPING BETWEEN THE INDOOR AND OUTDOOR UNIT. MISC DUCTWORK PER PLANS. Value of Mechanical: $12,242.00 Type of Fire Protection: UNKNOWN Electrical Service Provided by: Permit Center Authorized Signature: I hereby certify that I have read and governing this work will be complie Fees Collected: $342.81 International Mechanical Code Edition: 2009 Date: ed this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. The granting of this permit does not p to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this permit. Date: (91c-(1( This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: IMC -4/10 M12 -147 Printed: 10 -04 -2012 PERMIT CONDITIONS Permit No. M12-147 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 5: Ventilation is required for all new rooms and spaces of new or existing buildings and shall be in conformance with the International Building Code and the Washington State Ventilation and Indoor Air Quality Code. 6: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IMC -4/10 M12 -147 Printed: 10 -04 -2012 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.ci.tukwila.wa.us Mechanical Permit No. Project No. (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *please print ** SITE LOCATION King Co Assessor's Tax No.: 359700 -0245 Site Address: 12720 GATEWAY DRIVE TUKWILA, WA 98168 Tenant Name: GATEWAY BLDG #7 - PDS TECH Property Owners Name: CBRE Mailing Address: 20415 72ND AVE S STE# 210 Suite Number: 100 New Tenant: Floor: 1 & RF ❑ Yes m..No KENT WA 98032 City State Zip CONTACT PERSON — who do we contact when your permit is ready to be issued Name: DARLA DOLL Mailing Address: 7717 DETROIT AVE SW Day Telephone: (206) 768 -4278 SEATTLE WA 98106 E -Mail Address: DARLA.DOLL @MACMILLER.COM City State Fax Number: (206) 768 -4279 Zip MECHANICAL CONTRACTOR INFORMATION Company Name: MACDONALD MILLER Mailing Address: 7717 DETROIT AVE SW SEATTLE WA 98106 Contact Person: DARLA DOLL E -Mail Address: DARLA.DOLL @MACMILLER.COM Contractor Registration Number: MACDOFS980RU City State Day Telephone: (206) 768 -4278 Fax Number: (206) 768 -4279 Expiration Date: 12/31/2012 Zip ARCHITECT OF RECORD — All plans must be stamped by architect of record Company Name: N/A Mailing Address: City Day Telephone: Fax Number: Contact Person: E -Mail Address: State Zip ENGINEER OF RECORD — All plans must be stamped by engineer of record Company Name: MACDONALD MILLER Mailing Address: 7717 DETROIT AVE SW Contact Person: NASH PATWARDHAN SEATTLE WA 98106 E -Mail Address: NASH.PATWARDHAN @MACMILLER.COM H:Wpplications\Forms- Applications On Line\2010 Applications \7.2010 - Mechanical Permit Application.doc Revised: 7.2010 bh City State Day Telephone: (206) 768 -4128 Fax Number: (206) 768 -4129 Zip Page 1 of 2 • • Valuation of project (contractor's bid price): $ 12,242.00 Scope of work (please provide detailed information): RELOCATE (11) EXISTING DIFFUSERS AND (4) GRILLES. ADD (7) NEW DIFFUSERS AND (8) NEW GRILLES. ADD (1) NEW DUCTLESS SPLIT SYSTEM AND REFRIGERANT PIPING BETWEEN THE INDOOR & OUTDOOR UNIT. MISC DUCTWORK PER PLANS Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement Fuel Type: Electric m Gas ❑ Other: Indicate type of mechanical work being installed and the quantity below: Unit Type: Qty Unit Type: Qty Unit Type: Qty Bioler /Compressor Qty furnace <100k btu air handling unit >10,000 cfm fire damper 0 -3 hp /100,000 btu furnace >100k btu evaporator cooler diffuser 3 -15 hp /500,000 btu floor furnace ventilation fan connected to single duct thermostat 15 -30 hp /1,000,000 btu suspended/wall/floor mounted heater ventilation system wood/gas stove 30 -50 hp /1,750,000 btu appliance vent hood and duct emergency generator 50+ hp/1,750,000 btu repair or addition to heat/refrig/cooling system Incinerator — domestic other mechanical equipment air handling unit <10,000 cfm 1 incinerator — comm/ind PERMIT APPLICATION: NOTES Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 international building code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWN UTHORIZED T: Signature: Date: 09/26/2012 Print Name: DARLA DOLL Day Telephone: (206) 768 -4278 Mailing Address: 7717 DETROIT AVE SW SEATTLE WA 98106 City Date Application Accepted: 9_.2_ _ f� Date Application Expires: ) 6� 1 3 State Zip Staff Initials: vWL H:\Applications\Forms- Applications On Line\2010 Applications \7 -2010 - Mechanical Permit Application.doc Revised: 7 -2010 bh Page 2 of 2 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov Parcel No.: 2716000070 Address: 12720 GATEWAY DR TUKW Suite No: Applicant: PDS TECH RECEIPT Permit Number: M12 -147 Status: PENDING Applied Date: 09/26/2012 Issue Date: Receipt No.: R12 -02709 Initials: WER User ID: 1655 Payment Amount: $342.81 Payment Date: 09/26/2012 02:36 PM Balance: $0.00 Payee: MACDONALD MILLER FACILITY SOLUTIONS TRANSACTION LIST: Type Method Descriptio Amount Payment Check 3441 342.81 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES PLAN CHECK - NONRES 000.322.102.00.00 274.25 000.345.830 68.56 Total: $342.81 doc: Receiot -06 Printed: 09 -26 -2012 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 i 2 -I -I 7 Project: Type of Inspection: Address: 1:1720 Gi;Cc4.14C1 Date Called: Special Instructions: F a i�'i %w { ' 3 "'0 1 Date Wanted:. a.m. Requester: --410 ,,,,,1 (4,--4--.0,,,,,,i Phone No: / _ ?2°>6f -r-'S / In — G o `7 Approved per applicable codes. Corrections required prior to approval. COMMENTS: 4 n ..cif c_, N 4 -/, f J ..- . r�- r9 f?,% t�' P e (' 6--.1.10 --410 ,,,,,1 (4,--4--.0,,,,,,i Ij S'pECT FEE REQUIRED. Prior toxt inspection. fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. Date: INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 /JC_ "2-/z/7 Project: ?i) 5 7W9/7/ / --L Type of Inspection: 1?17/6/1 -2" i Address: /02 720 c..,A t<4,A Q ,) P Date Called: Special Instructions: Date Wanted:. /0 /1,,g/'? ,41n rri�. Requester: Phone No: 64 -S.7/ -ZGG- Approved per applicable codes. ElCorrections required prior to approval. COMMENTS: Inspector^ a--)-19)C Date fJ n REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. Inspector^ a--)-19)C Date fJ n REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECOR N b Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: pt S. - cck -i_lJC Type of Inspection;, a .<<rli -, ,k.... r. rr 40JAt 0 /'e - 1.1- ;74- ,f 1. .3'✓ — 4,N mA-4 Address: /' [ �w �/� ,\ 1 22-2-Lc C./kf Vv./°icj JQ Date Called: 3.) if '1 " 1/ i Special Instructions:, _ Date Wanted: 1 Ict - t7 p.m. Requester: Phone No: Approved per applicable codes. Corrections required prior to approval. 3 COI TMkNTS: , 6) Wi ,c h - .,%., — +Pret/-0, r. rr 40JAt 0 /'e - 1.1- ;74- ,f 1. .3'✓ — 4,N mA-4 . .',`i ;; , -= std eoleec i 3.) if '1 " 1/ i In pectin: (J>" i1. i RE SPECTION FEE REgUIRED. Prior/to next inspection. fee must be p . id at 6300 Southcenter lvd.. Suite 100. Call to schedule reinspection. Date: 1 l c) /)Q /ice �.. '"-^- '+..f"`_. 7.-.7 r`+J"`,- ..�_;r"ci''"`: ^--. tti.., n.- n..,.*--... He. +r^-,.,.-_.f.�w_..,.w..- ro..__ • - pr � :1$' ST A R Pn` C • SERVER,ROO /� + 14.4. R1X SERVERrSASED F ' ° GENERAL INFORMATION ROOM # AREA (SF) LIGHTS (W /SF) PEOPLE (#) NOTES SERVER 99 1.0 0 CUSTOMER INFORMATION UNIT MFG & MODEL NO. QUANTITY BTU EACH WATTS EACH MAX HEAT LO. 0 BTU MAX HEAT OAD W SENS. TONS e il 1 SWITCH C3K- PWR- 1150WAC 1 3939 1154 3939 12 03 11 2 ROUTER 1 153 45 153 0 0 0 0 f,- 3 BATTERY BACK -UP APC BX1000G 1 410 120 410 0.1 0 0 4 CISCO ASA 5505 1 3960 1160 3960 12 0 3 5 DELL POWER CONNECT 3324 2 546 160 1092 0 3 0 1 Assumption 6 DLINK DSS 16+ 2 410 120 820 02 01 7 DLINK DES -1026G 24 PORT 1 40 12 40 0 0 0 0 8 NETGEAR PROSAFE 24 PORT JFS524 1 440 129 440 0 1 0.0 3 9 CISCO CATALYST 3560 24 PORT 2 546 160 1092 0.3 0.1 10 CISCO ROUTER 2811 1 717 210 717 0.2 0.1 11 ADTRAN NETVANTA 3200 1 21 6 21 0.0 0.0 12 DELL POWEREDGE 2900 1 1580 463 1580 0.5 0.1 3 13 DELL OPTIPLEX GX620 1 330 97 330 0.1 0.0 14 IBM RS /6000 43P 150 1 796 233 796 0.2 0.1 15 IBM RS/6000 44P 170 1 796 233 796 02 0,1 16 DELL PRECISION 380 1 320 94 320 0 1 00 17 APC UPS XS 1300 1 180 53 180 0 1 0.0 18 APC UPS RS 1500 1 180 53 180 01 00 TOTAL: 16866 4.9 1.4 ENVIRONMENTAL INFORMATION ITEM MAX LOAD (BTU) MAX LOAD WW) SENS. TONS ENVELOPE 0 0.0 0.0 LIGHTS 338 0.1 0.0 PEOPLE 0 0.0 0.0 TOTAL: 338 0.1 0.0 I� CAC EQUIPMENT INFORMATION CO UNIT MFG & MODEL NO. NOM. TONS MAX SENS- CAPACITY MAX CAPA- CITY (KW) SENS. TONS AC- 1 /OU -1 FUJITSU ASU24CL1 /AOU24CL1 2 18000 53 1.5 TOTAL: 18000 5.3 1.5 ' LOAD EVALUATION LOADS (BTU) (KW) SENS. TONS TOTAL CURRENT LOAD: 17204 5.0 1.4 ION!" FUTURE EXPANSION: 0 0.0 t 0.0 TOTAL FUTURE LOAD: 17204 5.0 1.4 TOTAL CAC CAPACITY: 18000 5.3 1.5 SURPLUS/(DEFICIENT) CAPACITY: 796 0.2 0.1 r . 1 NOTES: 1. BASED BTUH 2. NO FUTURE 3. BASED ON APPROVED VALUES PROVIDED BY CUSTOMER. EXPANSION. 50% OF NAMEPLATE WATTAGE. HUMIDITY CONTROL N +I REDUNDANCY AUTO SWITCH -OVER EXTERNAL ALARMING/MONITORING FM 200 SYSTEM HYDROGEN GAS MONITORING BY: . ' 11 I X_. Li 7 DATE: 08 -29-12 NO NO NO NO NO NO VIEWED FOR E COMPLIANCE PPROVED CT 032012 of Tukwila ING DIVISION RECEIVED CITY OF TUKWILA SEP 2 6 2012 PERMIT CENTER Entered Values TRACE® 700 version 6.2.7 By MacDonald - Miller C py Project Name: Dataset Name: Location: Building Owner: Program User: Company: Comments: Cooling Design Period: Peak Hour Override: Daylight Savings Period: Summer Period: Cooling Methodology: Heating Methodology: Infiltration Methodology: Outside Film Methodology: Terrain Methodology: Room Circ Rate: Wall Load To Plenum: Building Orientation: Simulation Hours: Calendar Code: Energy Simulation Period: PDS Tech TI 1st Fir C:\ Users \patwardhan \Documents \TRACE 700 Projects \7326798 -00 Gateway Bldg 7 PDS TI 1st Flr\PDS.TRC 12720 Gateway Dr, Tukwila, WA CBRE NP MacDonald Miller Facility Solutions Refere to 7386215 for envelope information January thru December 0 CLTD -CLF (ASHRAE TFM) UATD Vary with wind speed Vary with wind speed Center of a large city Medium YES 0 degrees from north Reduced year Standard (1978) January thru December Project Name: PDS Tech TI 1st Fir Location: Summer Design Dry Bulb: Summer Design Wet Bulb: Winter Design Dry Bulb: Seattle, Washin 82.00 °F 67.00 °F 24.00 °F Summer Clearness Number: 0.95 Winter Clearness Number: 0.95 Summer Ground Reflectance: Winter Ground Reflectance: 0.20 0.20 Carbon Dioxide Level: 400 Force VAV Min => Nominal Ventilation at Design: Allow Energy Recovery/Transfer at Design: Retest Design Peaks: Calculate Building Block Loads: MP- 1L17 No No Yes No PP t�;jOpE COWEU F OR A NCE APPROVED OCT 0 3 2012 BUILDING City DIVISION DIVISION RECEIVED CITY OF TUKWILA SEP 2 6 2012 PERMIT CENTER TRACE® 700 v6.2.7 Dataset Name: C: \Users\patwardhan\Documents \TRACE 700 Projects \7326798 -00 Gateway Bldg 7 PDS TI Entered Values - Project Information ENTERED VALUES ROOM BY ROOM By MacDonald - Miller Room Description: 002 - Conference Zone Description: VAV- Conference 002 GENERAL INFORMATION Floor Area: 318 ft2 Fir-Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Flr: Slab Cnstr Type: 8* LW Concrete Room Mass: Time delay based on actual mass Ceiling R- Value: 1.786 hrft2• °F /Btu Is There Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Humidistat Location:Room CO2 Sensor Location:None Room Type:Conditioned Floor Multiplier: 1 Room Multiplier: 1 PEOPLE People Type: Conference Room # of People: 8 People People Sensible: 245 Btu /h People Latent : 155 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: % Load to RA: Lighting Schedule: Lighting Amount: Ballast Factor: SUSFLUOR 30 % Cooling Only (Design) 1.OW /sgft 1.0 • Vent Type: Vent Value: Vent Schedule: Infil Type: Infil Value: Infil Schedule: Vav Min Airflow: Vav Min Sched: Supply: Aux Supply: Room Exhaust: Rm Exh Sched: Cooling Ez: Heating Ez: Er: System Description: RTU 60 TON WEST ZONE AIRFLOW INFORMATION Cooling (Peop- based) Conference/ meeting 5.00 cfm /person Vent - Midrise Bldg Pressurized, Poor Const. 0.50 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated Heating (Area - based) Conference/ meeting 0.06 cfm /sq ft Pressurized, Poor Const. 0.50 air changes /hr To be calculated To be calculated Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc 100 % 80 % 100 % Area/ Const Type / Description Amount Dir Tilt Schedule U Value Btu /h•ft2• °F Alpha Glass Type / Energy Type Area Shade U Value External ft2 Coef Btu /h•ft2• °F Shading Internal Shading Adj Temp/ Grnd Refl Pct Pct Pct Rad Sen/ Rm/ Ret/ Frc/ Cool Heat Perm Loss Tmp Tmp Len Coef N -Wall 190 ft2 Opening - 1 Misc Load 1 0.5 W /sq ft AV 1.2 Mbh Heat Pick Up -2.5 Btuh /sq ft Floor - 1 0 0 8* LW Block, 3* Ins Window Cooling Only (Design) Cooling Only (Design) Heating Only Design 0.0620 0.90 Double Coated 1/4* None None None Project Name: PDS Tech TI 1st Fir Dataset Name: C: \Users\patwardhan\Documents \TRACE 700 Projects \7326798 -00 Gateway Bldg 7 PDS TI 84 0.55 0.50 Overhang - None None 0.00 100 100 100 100 100 100 0 60.00 0 60.00 0 60.00 16 0.70 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 Entered Values - Rooms Page 1 of 11 Room Description: 003 -Office GENERAL INFORMATION Floor Area: 120 ft2 Fir-Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Flr: Slab Cnstr Type: 8* LW Concrete Room Mass: Time delay based on actual mass Ceiling R- Value: 1.786 hr•ft2• °F /Btu Is There Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Humidistat Location:Room CO2 Sensor Location:None Room Type:Conditioned Floor Multiplier: 1 Room Multiplier: 1 ENTERED VALUES ROOM BY ROOM By MacDonald - Miller Zone Description: VAV- Office 3 4, 5 & 6A PEOPLE People Type: General Office Space # of People: 1 People People Sensible: 250 Btu /h People Latent : 200 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: % Load to RA: Lighting Schedule: Lighting Amount: Ballast Factor: SUSFLUOR 30 % Cooling Only (Design) 1.OW /sgft 1.0 Vent Type: Vent Value: Vent Schedule: Infil Type: Infil Value: Infil Schedule: Vav Min Airflow: Vav Min Sched: Supply: Aux Supply: Room Exhaust: Rm Exh Sched: Cooling Ez: Heating Ez: Er: System Description: RTU 60 TON WEST ZONE AIRFLOW INFORMATION Cooling (Peon-based) Office space 5.00 cfm /person Vent - Midrise Bldg Pressurized, Poor Const. 0.50 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated Heating (Area - based) Office space 0.06 cfm /sq ft Pressurized, Poor Const. 0.50 air changes /hr To be calculated To be calculated Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc Area/ Description Amount Dir Tilt Schedule Const Type / U Value Btu /h•ft2• °F Alpha 0.0620 0.90 N -Wall 138 ft2 Opening - 1 Misc Load 1 0.5 W /sq ft 1 PC 500.0 Btuh 1 Ptr 350.0 Btuh Heat Pick Up -2.5 Btuh /sq ft Floor - 1 0 0 8* LW Block, 3* Ins Window Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) Heating Only Design Glass Type / Energy Type Area Shade U Value External ft2 Coef Btu /h•ft2• °F Shading Internal Shading Adj Temp/ Grnd Refl Double Coated 1/4* None None None None Project Name: PDS Tech TI 1st Fir Dataset Name: C: \Users\patwardhan \Documents \TRACE 700 Projects \7326798 -00 Gateway Bldg 7 PDS TI 61 0.55 0.50 Overhang - None None 0.00 Pct Pct Sen/ Rm/ Cool Heat Tmp Tmp 100 100 100 100 100 100 100 100 100 % 80 % 100 % Pct Rad Ret/ Frc/ Perm Loss Len Coef 0 60.00 0 60.00 0 60.00 0 60.00 11 0.70 TRACED 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 Entered Values - Rooms Page 2 of 11 Room Description: 004 -Office GENERAL INFORMATION Floor Area: 139 ft2 Fir -Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Fir: Slab Cnstr Type: 8* LW Concrete Room Mass: Time delay based on actual mass Ceiling R- Value: 1.786 heft2. °F /Btu Is There Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Humidistat Location:Room CO2 Sensor Location:None Room Type:Conditioned ENTERED VALUES ROOM BY ROOM By MacDonald - Miller Zone Description: VAV- Office 3 4, 5 & 6A System Description: RTU 60 TON WEST ZONE Floor Multiplier: 1 Room Multiplier: 1 PEOPLE People Type: General Office Space # of People: 1 People People Sensible: 250 Btu /h People Latent : 200 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: SUSFLUOR % Load to RA: 30 % Lighting Schedule: Cooling Only (Design) Lighting Amount: 1.0 W /sq ft Ballast Factor: 1.0 Vent Type' Vent Value. Vent Schedule. Infil Type. Infil Value. Infil Schedule. Vav Min Airflow. Vav Min Sched: Supply. Aux Supply Room Exhaust. Rm Exh Sched. • Cooling Er Heating Ez. Er. AIRFLOW INFORMATION Cooling (Peop- based) Office space 5.00 cfm /person Vent - Midrise Bldg Pressurized, Poor Const. 0.50 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated Heating (Area - based) Office space 0.06 cfm /sq ft Pressurized, Poor Const. 0.50 air changes /hr To be calculated To be calculated Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc 100 % 80 % 100 % Area/ Description Amount Dir Tilt Schedule Const Type / U Value Btu /h•ft2• °F Alpha Glass Type / Energy Type Area Shade U Value ft2 Coef Btu /h•ft2• °F External Shading Internal Shading Adj Temp/ Grnd Refl Pct Pct Pct Rad Sen/ Rm/ Ret/ Frc/ Cool Heat Perm Loss Tmp Tmp Len Coef N -Wall 167 ft2 Opening - 1 E -Wall 58 ft2 Opening - 1 Misc Load 1 0.5 W /sq ft 1 PC 500.0 Btuh 1 Ptr 350.0 Btuh Heat Pick Up -2.5 Btuh /sq ft Floor - 1 0 0 8* LW Block, 3* Ins 0.0620 0.90 Window Double Coated 1/4* 74 0.55 90 0 8* LW Block, 3* Ins 0.0620 0.90 Window Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) Heating Only Design Double Coated 1/4* 26 0.55 None None None None Project Name: PDS Tech TI 1st Fir Dataset Name: C: \Users\patwardhan \Documents \TRACE 700 Projects \7326798 -00 Gateway Bldg 7 PDS TI 0.50 Overhang - None None 0.00 0.50 Overhang - None None 0.00 100 100 100 100 100 100 100 100 0 60.00 0 60.00 0 60.00 0 60.00 18 0.70 ' TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 Entered Values - Rooms Page 3 of 11 Room Description: 005 -Office ENTERED VALUES ROOM BY ROOM By MacDonald - Miller Zone Description: VAV- Office 3 4, 5 & 6A GENERAL INFORMATION Floor Area: 124 ft2 Fir-Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Fir: Slab Cnstr Type: 8* LW Concrete Room Mass: Time delay based on actual mass Cei ing R- Value: 1.786 hr•ft2- °F /Btu Is Ttjere Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Humidistat Location:Room CO2 Sensor Location:None Room Type:Conditioned Floor Multiplier: 1 Room Multiplier: 1 PEOPLE People Type: General Office Space # of People: 1 People People Sensible: 250 Btu /h People Latent : 200 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: % Load to RA: Lighting Schedule: Lighting Amount: Ballast Factor: SUSFLUOR 30 % Cooling Only (Design) 1.OW /sgft 1.0 Vent Type: Vent Value: Vent Schedule: Infil Type: Infil Value: Infil Schedule: Vav Min Airflow: Vav Min Sched: Supply: Aux Supply: Room Exhaust: Rm Exh Sched: Cooling Ez: Heating Ez: Er: System Description: RTU 60 TON WEST ZONE AIRFLOW INFORMATION Cooling (Peop- based) Heating (Area - based) Office space Office space 5.00 cfm /person 0.06 cfm /sq ft Vent - Midrise Bldg Pressurized, Poor Const. 0.50 air changes /hr 0.50 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated To be calculated To be calculated Pressurized, Poor Const. Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc 100 % 80 % 100 % Description N -Wall Opening - 1 Misc Load 1 1PC 1Ptr Heat Pick up Floor - 1 Area Amount 143 ft2 0.5W /sgft 500.0 Btuh 350.0 Btuh -2.5 Btuh /sq ft Const Type / Dir Tilt Schedule 0 0 8* LW Block, 3* Ins Window Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) U Value Btu /h•ft2- °F Alpha 0.0620 0.90 Glass Type / Energy Type Area Shade U Value External ft2 Coef Btu /h•ft2• °F Shading Internal Shading Adj Temp/ Grnd Refl Pct Pct Pct Rad Sent Rm/ Ret/ Frc/ Cool Heat Perm Loss Tmp Tmp Len Coef Double Coated 1/4* None None None None Project Name: PDS Tech TI 1st Fir Dataset Name: C: \Users\patwardhan \Documents \TRACE 700 Projects \7326798 -00 Gateway Bldg 7 PDS TI 63 0.55 0.50 Overhang - None None 0.00 100 100 100 100 100 100 100 100 0 60.00 0 60.00 0 60.00 0 60.00 12 0.70 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 Entered Values - Rooms Page 4 of 11 Room Description: 006A -Open Office ENTERED VALUES ROOM BY ROOM By MacDonald - Miller Zone Description: VAV- Office 3 4, 5 & 6A System Description: RTU 60 TON WEST ZONE GENERAL INFORMATION Floor Area: 370 ft2 Fir -Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Flr: Slab Cnstr Type: 8* LW Concrete Room Mass: Time delay based on actual mass Ceiling R- Value: 1.786 hr•ft2• °F /Btu Is Tdere Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Humidistat Location:Room CO2 Sensor Location:None Room Type:Conditioned Floor Multiplier: 1 Room Multiplier: 1 PEOPLE People Type: General Office Space # of People: 6 People People Sensible: 250 Btu /h People Latent : 200 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: % Load to RA: Lighting Schedule: Lighting Amount: Ballast Factor: SUSFLUOR 30 % Cooling Only (Design) 1.OW /sgft 1.0 Vent Type: Vent Value: Vent Schedule: Infil Type: Infil Value: Infil Schedule: Vav Min Airflow: Vav Min Sched: Supply: Aux Supply: Room Exhaust: Rm Exh Sched: Cooling Ez: Heating Ez: Er: AIRFLOW INF Cooling (Peop- based) Office space 5.00 cfm /person Vent - Midrise Bldg Pressurized, Poor Const 0.50 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated • RMATION Heating (Area - based) Office space 0.06 cfm /sq ft Pressurized, Poor Const. 0.50 air changes /hr To be calculated To be calculated Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc 100 % 80 % 100 % Area/ Description Amount Dir Tilt Schedule N -Wall 620 ft2 Opening - 1 Misc Load 1 0.5 W /sq ft 6PCs 3,000.0 Btuh Heat Pick Up -2.5 Btuh /sq ft Floor - 1 Const Type / U Value Btu /h•ft2• °F Alpha Glass Type / Energy Type Area Shade U Value External ft2 Coef Btu /h-ft2- °F Shading Internal Shading Adj Temp/ Grnd Refl Pct Pct Pct Rad Sen/ Rm/ Ret/ Frc/ Cool Heat Perm Loss Tmp Tmp Len Coef 0 0 8* LW Block, 3* Ins Window Cooling Only (Design) Cooling Only (Design) Heating Only Design 0.0620 0.90 Double Coated 1/4* None None None Project Name: PDS Tech TI 1st Fir Dataset Name: C: \Users\patwardhan\Documents \TRACE 700 Projects \7326798 -00 Gateway Bldg 7 PDS TI 220 0.55 0.50 Overhang - None None 0.00 100 100 100 100 100 100 0 60.00 0 60.00 0 60.00 50 0.70 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 Entered Values - Rooms Page 5 of 11 Room Description: 006B -Open Office ENTERED VALUES ROOM BY ROOM By MacDonald - Miller Zone Description: VAV- Office 6B,9A & 10 System Description: RTU 60 TON WEST ZONE GENERAL INFORMATION Floor Area: 297 ft2 Fir -Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Flr: Slab Cnstr Type: 8* LW Concrete Room Mass: Time delay based on actual mass Cei ing R- Value: 1.786 hr-ft2-°F/Btu Is Tllere Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Humidistat Location:Room CO2 Sensor Location:None Room Type:Conditioned Floor Multiplier: 1 Room Multiplier: 1 PEOPLE People Type: General Office Space # of People: 3 People People Sensible: 250 Btu /h People Latent : 200 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: SUSFLUOR % Load to RA: 30 % Lighting Schedule: Cooling Only (Design) Lighting Amount: 1.0 W /sq ft Ballast Factor: 1.0 Vent Type: Vent Value: Vent Schedule: Infil Type: Infil Value: Infil Schedule: Vav Min Airflow: Vav Min Sched: Supply: Aux Supply: Room Exhaust: Rm Exh Sched: Cooling Ez: Heating Ez: Er: AIRFLOW INFORMATION Cooling (Peop- based) Office space 5.00 cfm /person Vent - Midrise Bldg Pressurized, Poor Const. 0.50 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated Heating (Area - based) Office space 0.06 cfm /sq ft Pressurized, Poor Const. 0.50 air changes /hr To be calculated To be calculated Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc 100 % 80 % 100 % Description W -Wall Opening - 1 Misc Load 1 3PCs Heat Pick Up 1 Plotter 1 Copier 1Ptr Floor - 1 Area/ Amount Dir 372 ft2 270 0.5 W /sq ft 1,500.0 Btuh -2.5 Btuh /sq ft 1,000.0 Btuh 1,000.0 Btuh 1,000.0 Btuh Const Type / Tilt Schedule 0 8* LW Block, 3* Ins Window Cooling Only (Design) Cooling Only (Design) Heating Only Design Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) U Value Btu /h•ft2- °F Alpha 0.0620 0.90 Glass Type / Energy Type Area Shade U Value External ft2 Coef Btu /h-ft2- °F Shading Internal Shading Adj Temp/ Grnd Refl Pct Pct Pct Rad Sen/ Rm/ Ret/ Frc/ Cool Heat Perm Loss Tmp Tmp Len Coef Double Coated 1/4* None None None None None None Project Name: PDS Tech TI 1st Fir Dataset Name: C: \Users\patwardhan \Documents \TRACE 700 Projects \7326798 -00 Gateway Bldg 7 PDS TI 138 0.55 0.50 Overhang - None None 0.00 100 100 0 60.00 100 100 0 60.00 100 100 0 60.00 100 100 0 60.00 100 100 0 60.00 100 100 0 60.00 30 0.70 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 Entered Values - Rooms Page 6 of 11 Room Description: 009A -Open Office ENTERED VALUES ROOM BY ROOM By MacDonald - Miller Zone Description: VAV -Office 6B,9A & 10 System Description: RTU 60 TON WEST ZONE GENERAL INFORMATION Floor Area: 350 ft2 Fir-Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Fir: Slab Cnstr Type: 8* LW Concrete Room Mass: Time delay based on actual mass Ceiling R- Value: 1.786 hr•ft2• °F /Btu Is There Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Floor Multiplier: Humidistat Location:Room Room Multiplier: CO2 Sensor Location:None Room Type:Conditioned PEOPLE People Type: General Office Space # of People: 3 People People Sensible: 250 Btu /h People Latent : 200 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: % Load to RA: Lighting Schedule: Lighting Amount: Ballast Factor: SUSFLUOR 30 % Cooling Only (Design) 1.OW /sgft 1.0 Vent Type: Vent Value: Vent Schedule: Infil Type: Infil Value: Infil Schedule: Vav Min Airflow: Vav Min Sched: Supply: Aux Supply: Room Exhaust: Rm Exh Sched: Cooling Ez: Heating Ez: Er: AIRFLOW INFORMATION Cooling (Peop- based) Office space 5.00 cfm /person Vent - Midrise Bldg Pressurized, Poor Const. 0.50 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated Heating (Area- based) Office space 0.06 cfm /sq ft Pressurized, Poor Const. 0.50 air changes /hr To be calculated To be calculated Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc 100 % 80 % 100 % Description W -Wall Opening - 1 Misc Load 1 0.5 W /sq ft 3PCs 1,500.0 Btuh Heat Pick Up -2.5 Btuh /sq ft Floor - 1 Area/ Amount Dir Tilt Schedule 372 ft2 270 Const Type / Project Name: PDS Tech TI 1st Fir Dataset Name: C: \Users\patwardhan\Documents \TRACE 700 Projects \7326798 -00 Gateway Bldg 7 PDS TI Alternative - 1 Entered Values - Rooms Page 7 of 11 U Value Btu /h•ft2• °F Alpha Glass Type / Energy Type Area Shade U Value ft2 Coef Btu /h•ft2• °F External Shading Internal Shading Adj Temp/ G rnd Refl Pct Pct Pct Rad Sen/ Rm/ Ret/ Frc/ Cool Heat Perm Loss Tmp Tmp Len Coef 0 8* LW Block, 3* Ins Window Cooling Only (Design) Cooling Only (Design) Heating Only Design 0.0620 0.90 Double Coated 1/4* None None None 138 0.55 0.50 Overhang - None None 0.00 100 100 100 100 100 100 0 60.00 0 60.00 0 60.00 30 0.70 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Room Description: 010 -Office GENERAL INFORMATION Floor Area: 136 ft2 Fir -Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Flr: Slab Cnstr Type: 8* LW Concrete Room Mass: Time delay based on actual mass Ceiling R- Value: 1.786 hr•ft2- °F /Btu Is There Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Floor Multiplier: Humidistat Location:Room Room Multiplier: CO2 Sensor Location:None Room Type:Conditioned ENTERED VALUES ROOM BY ROOM By MacDonald - Miller Zone Description: VAV- Office 6B,9A & 10 System Description: RTU 60 TON WEST ZONE PEOPLE People Type: General Office Space # of People: 1 People People Sensible: 250 Btu /h People Latent : 200 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: SUSFLUOR % Load to RA: 30 % Lighting Schedule: Cooling Only (Design) Lighting Amount: 1.0 W /sq ft Ballast Factor: 1.0 Vent Type. Vent Value. Vent Schedule: Infil Type. Infil Value Infil Schedule: Vav Min Airflow. Vav Min Sched: Supply Aux Supply. Room Exhaust Rm Exh Sched Cooling Ez: Heating Ez: Er: AIRFLOW INFORMATION Cooling (Peoo- based) Heating (Area - based) Office space Office space 5.00 cfm /person 0.06 cfm /sq ft Vent - Midrise Bldg Pressurized, Poor Const. 0.50 air changes /hr 0.50 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated To be calculated To be calculated Pressurized, Poor Const. Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc 100 % 80 % 100 % Description W -Wall Opening - 1 Misc Load 1 1PC 1 Ptr Heat Pick Up Floor - 1 Area/ Amount Dir Tilt Schedule Const Type / U Value Btu /h •ft2• ° F Alpha Glass Type / Energy Type Area Shade U Value External ft2 Coef Btu /h•ft2• °F Shading Internal Shading Adj Temp/ Grnd Refl Pct Pct Pct Rad Ser Rm/ Ret/ Frc/ Cool Heat Perm Loss Tmp Tmp Len Coef 155 ft2 270 0 8* LW Block, 3* Ins Window Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) Heating Only Design 0.5W /sgft 500.0 Btuh 350.0 Btuh -2.5 Btuh /sq ft 0.0620 0.90 Double Coated 1/4* None None None None Project Name: PDS Tech TI 1st Fir Dataset Name: C: \Users\patwardhan \Documents \TRACE 700 Projects \7326798 -00 Gateway Bldg 7 PDS TI 55 0.55 0.50 Overhang - None None 0.00 100 100 100 100 100 100 100 100 0 60.00 0 60.00 0 60.00 0 60.00 13 0.70 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 Entered Values - Rooms Page 8 of 11 Room Description: 001 - Reception GENERAL INFORMATION Floor Area: 289 ft2 Fir -Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Flr: Slab Cnstr Type: 8* LW Concrete Room Mass: Time delay based on actual mass Ceiling R- Value: 1.786 hrft2• °F /Btu Is There Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Floor Multiplier: Humidistat Location:Room Room Multiplier: CO2 Sensor Location:None Room Type:Conditioned ENTERED VALUES ROOM BY ROOM By MacDonald - Miller Zone Descri tion: VAV -Office 6C, 7 and Reception) p System Description: RTU 60 TON WEST ZONE PEOPLE People Type: General Office Space # of People: 3 People People Sensible: 250 Btu /h People Latent : 200 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: SUSFLUOR % Load to RA: 30 % Lighting Schedule: Cooling Only (Design) Lighting Amount: 1.0 W /sq ft Ballast Factor: 1.0 Vent Type: Vent Value: Vent Schedule: Infil Type: Infil Value: Infil Schedule: Vav Min Airflow: Vav Min Sched: Supply: Aux Supply: Room Exhaust: Rm Exh Sched: Cooling Ez: Heating Ez: Er: AIRFLOW INFORMATION Cooling (Peop - based) Heating (Area - based) Office space Office space 5.00 cfm /person 0.06 cfm /sq ft Vent - Midrise Bldg Pressurized, Poor Const. 0.00 air changes /hr 0.00 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated To be calculated To be calculated Pressurized, Poor Const. Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc 100 % 80 % 100 % Description Misc Load 1 1PC 1PTR Area/ Amount Dir 0.5W /sgft 500.0 Btuh 350.0 Btuh Const Type / Tilt Schedule Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) Room Description: 006C -Open Office U Value Btu /h•ft2• °F Alpha Glass Type / Energy Type Area Shade U Value ft2 Coef Btu /h-ft2. °F External Shading Internal Shading Adj Temp/ Grnd Refl Pct SeN Cool Tmp None None None Zone Description: VAV- Office 6C, 7 and Reception) GENERAL INFORMATION Floor Area: 1,814 ft2 Fir -Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Flr: Slab Cnstr Type: 8* LW Concrete Room Mass: Time delay based on actual mass Ceiling R- Value: 1.786 hr-ft2-°F/Btu Is Tljere Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Floor Multiplier: Humidistat Location:Room Room Multiplier: CO2 Sensor Location:None Room Type:Conditioned PEOPLE People Type: General Office Space # of People: 12 People People Sensible: 250 Btu /h People Latent : 200 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: % Load to RA: Lighting Schedule: Lighting Amount: Ballast Factor: SUSFLUOR 30 % Cooling Only (Design) 1.0W /sgft 1.0 Vent Type: Vent Value: Vent Schedule: Infil Type: Infil Value: Infil Schedule: Vav Min Airflow: Vav Min Sched: Supply: Aux Supply: Room Exhaust: Rm Exh Sched: Cooling Ez: Heating Ez: Er: 100 100 100 Pct Rm/ Heat Tmp 100 100 100 Pct Rad Ret/ Frc/ Perm Loss Len Coef 0 60.00 0 60.00 0 60.00 System Description: RTU 60 TON WEST ZONE AIRFLOW INFORMATION Cooling (Peop - based) Heating (Area - based) Office space Office space 5.00 cfm /person 0.06 cfm /sq ft Vent - Midrise Bldg Pressurized, Poor Const. 0.00 air changes /hr 0.00 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated To be calculated To be calculated Pressurized, Poor Const. Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc 100 ck 80 % 100 % Description Misc Load 1 12PCs Area/ Amount Dir Const Type / Tilt Schedule U Value Btu /h•ft2• °F Alpha Glass Type / Energy Type Area Shade U Value ft2 Coef Btu /h•ft2- °F External Shading Internal Shading Adj Temp/ Grnd Refl Pct Pct Pct Rad SeN Rm/ Ret/ Frc/ Cool Heat Perm Loss Tmp Tmp Len Coef 0.5W /sgft 6,000.0 Btuh Cooling Only (Design) Cooling Only (Design) None None Project Name: PDS Tech TI 1st Fir Dataset Name: C:\Users\patwardhan\Documents \TRACE 700 Projects \7326798 -00 Gateway Bldg 7 PDS TI 100 100 0 60.00 100 100 0 60.00 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 Entered Values - Rooms Page 9 of 11 ENTERED VALUES ROOM BY ROOM By MacDonald - Miller Room Description: 007 - Storage Zone Description: VAV- Office 6C, 7 and Reception) System Description: RTU 60 TON WEST ZONE GENERAL INFORMATION Floor Area: 112 ft2 Fir-Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Fir: Slab Cnstr Type: 8* LW Concrete Room Mass: Time delay based on actual mass Ceiling R- Value: 1.786 hrft2• °F /Btu Is There Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Humidistat Location:Room CO2 Sensor Location:None Room Type:Conditioned Floor Multiplier: 1 Room Multiplier: 1 PEOPLE People Type: General Office Space # of People: 0 People People Sensible: 250 Btu /h People Latent : 200 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: % Load to RA: Lighting Schedule: Lighting Amount: Ballast Factor: SUSFLUOR 30 % Cooling Only (Design) 1.OW /sgft 1.0 Vent Type: Vent Value: Vent Schedule: Infil Type. Infil Value Infil Schedule Vav Min Airflow: Vav Min Sched* Supply. Aux Supply. Room Exhaust: Rm Exh Sched: Cooling Ez. Heating Ez: Er AIRFLOW INFORMATION Cooling (Peop- based) Storage rooms 0.00 cfm /person Vent - Midrise Bldg Pressurized, Poor Const. 0.00 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated Heating (Area - based) Storage rooms 0.12 cfm /sq ft Pressurized, Poor Const. 0.00 air changes /hr To be calculated To be calculated Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc 100 % 80 % 100 % Description Misc Load 1 Area/ Const Type / Amount Dir Tilt Schedule U Value Btu /h•ft2• °F Alpha Glass Type / Energy Type Area Shade U Value ft2 Coef Btu /h•ft2• °F External Shading Internal Shading Adj Temp/ Grnd Refl Pct Pct Pct Rad Sen/ Rm/ Ret/ Frc/ Cool Heat Perm Loss Tmp Tmp Len Coef 0.5 W /sq ft Cooling Only (Design) Room Description: 009B -Open Office None Zone Description: VAV -Office 9B, 11 &12 100 100 0 60.00 System Description: RTU 60 TON WEST ZONE GENERAL INFORMATION Floor Area: 632 ft2 Flr -Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Flr: Slab Cnstr Type: 8' LW Concrete Room Mass: Time delay based on actual mass Ceiling R- Value: 1.786 hrft2• °F /Btu Is Ttiere Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Humidistat Location:Room CO2 Sensor Location:None Room Type:Conditioned Floor Multiplier: 1 Room Multiplier: 1 PEOPLE People Type: General Office Space # of People: 4 People People Sensible: 250 Btu /h People Latent : 200 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: SUSFLUOR % Load to RA: 30 Lighting Schedule: Cooling Only (Design) Lighting Amount: 1.0 W /sq ft Ballast Factor: 1.0 Vent Type: Vent Value: Vent Schedule: Infil Type: Infil Value: Infil Schedule: Vav Min Airflow: Vav Min Sched. Supply: Aux Supply Room Exhaust: Rm Exh Sched: Cooling Ez: Heating Ez: Er: AIRFLOW INFORMATION Cooling (Peop - based) Office space 5.00 cfm /person Vent - Midrise Bldg Pressurized, Poor Const. 0.00 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated Heating (Area - based) Office space 0.06 cfm /sq ft Pressurized, Poor Const. 0.00 air changes /hr To be calculated To be calculated Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc 100 % 80 % 100 % Description Misc Load 1 4PCs Ptr Copier Fax Areal Amount Dir Tilt Schedule Const Type / U Value Btu /h•ft2• °F Alpha Glass Type / Energy Type Area Shade U Value ft2 Coef Btu /h-ft2- °F External Shading Internal Shading Adj Temp/ Grnd Refl Pct Pct Pct Rad Sen/ Rm/ Ret/ Frc/ Cool Heat Perm Loss Tmp Tmp Len Coef 0.5W /sgft 2,000.0 Btuh 3,000.0 Btuh Cooling Only (Design) Cooling Only (Design) Cooling Only (Design) None None None Project Name: PDS Tech TI 1st Fir Dataset Name: C: \Users\patwardhan \Documents \TRACE 700 Projects \7326798 -00 Gateway Bldg 7 PDS TI 100 100 0 60.00 100 100 0 60.00 100 100 0 60.00 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 Entered Values - Rooms Page 10 of 11 ENTERED VALUES ROOM BY ROOM By MacDonald - Miller Room Description: 011 - Storage Zone Description: VAV- Office 9B, 11 &12 GENERAL INFORMATION Floor Area: 89 ft2 Fir -Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Flr: Slab Cnstr Type: 8* LW Concrete Room Mass: Time delay based on actual mass Ceiling R- Value: 1.786 hr•ft2• °F /Btu Is TFjere Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Humidistat Location:Room CO2 Sensor Location:None Room Type:Conditioned Floor Multiplier: 1 Room Multiplier: 1 PEOPLE People Type: General Office Space # of People: 0 People People Sensible: 250 Btu /h People Latent : 200 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: SUSFLUOR % Load to RA: 30 % Lighting Schedule: Cooling Only (Design) Lighting Amount: 1.0 W /sq ft Ballast Factor: 1.0 Vent Type: Vent Value: Vent Schedule: Infil Type: Infil Value: Infil Schedule: Vav Min Airflow: Vav Min Sched: Supply: Aux Supply: Room Exhaust, Rm Exh Sched. Cooling Ez. Heating Ez: Er: System Description: RTU 60 TON WEST ZONE AIRFLOW INFORMATION Cooling (Peop - based) Heating (Area - based) Storage rooms Storage rooms 0.00 cfm /person 0.12 cfm /sq ft Vent - Midrise Bldg Pressurized, Poor Const. 0.00 air changes /hr 0.00 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated To be calculated To be calculated Pressurized, Poor Const. Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc 100 % 80 % 100 % Area/ Const Type / Description Amount Dir Tilt Schedule Misc Load 1 0.5 W /sq ft Cooling Only (Design) Room Description: 012 -Break Room U Value Btu /h•ft2• °F Alpha Glass Type / Energy Type Area Shade U Value ft2 Coef Btu /h•ft2. °F External Shading Internal Shading Adj Temp/ Grnd Refl Pct Pct Pct Rad SeN Rm/ Ret/ Frc/ Cool Heat Perm Loss Tmp Tmp Len Coef None Zone Description: VAV- Office 9B, 11 &12 GENERAL INFORMATION Floor Area: 124 ft2 Fir -Fir Height: 12.4 ft Plenum Height: 4.0 ft Height Above Flr: Slab Cnstr Type: 8* LW Concrete Room Mass: Time delay based on actual mass Ceiling R- Value: 1.786 hrft2• °F /Btu Is There Carpet ?: YES Design Clg DB / Drift Point: 72.0 °F / 90.0 °F Design Htg DB / Drift Point: 70.0 °F / 55.0 °F Design Relative Humidity: 50 % Moisture Capacitance: None Clg Tstat: None Htg Tstat: None Thermostat Location:Room Humidistat Location:Room CO2 Sensor Location:None Room Type:Conditioned Floor Multiplier: 1 Room Multiplier: 1 PEOPLE People Type: General Office Space # of People: 4 People People Sensible: 250 Btu /h People Latent : 200 Btu /h People Schedule: Cooling Only (Design) Workstation: 0.0 workstation /person LIGHTS Lighting Type: Fluorescent, 70% to space, 30% to return Fixture Type: SUSFLUOR % Load to RA: 30 % Lighting Schedule: Cooling Only (Design) Lighting Amount: 1.0 W /sq ft Ballast Factor: 1.0 Vent Type. Vent Value: Vent Schedule: Infil Type: Infil Value: Infil Schedule: Vav Min Airflow: Vav Min Sched: Supply: Aux Supply: Room Exhaust. Rm Exh Sched: Cooling Ez: Heating Ez: Er: System Descri P 100 100 0 60.00 tion: RTU 60 TON WEST ZONE AIRFLOW INFORMATION Cooling (Peop- based) Heating (Area- based) Office space Office space 5.00 cfm /person 0.06 cfm /sq ft Vent - Midrise Bldg Pressurized, Poor Const. 0.00 air changes /hr 0.00 air changes /hr Heating Only (Design) 0.00 % Clg Airflow Available (100 %) To be calculated To be calculated To be calculated To be calculated Pressurized, Poor Const. Available (100 %) Std 62.1 -2004 Ceiling clg supply, ceiling return Ceiling supply > Trm +15 °F(8 °C), ceiling return RA is fully mixed before recirc 100 % 80 % 100 % Description Misc Load 1 Break Room Area/ Const Type / Amount Dir Tilt Schedule U Value Btu /h•ft2• °F Alpha Glass Type / Energy Type Area Shade U Value ft2 Coef Btu /h•ft2• °F External Shading Internal Shading Adj Temp/ Grnd Refl Pct Pct Pct Rad SeN Rm/ Ret/ Frc/ Cool Heat Perm Loss Tmp Tmp Len Coef 0.5 W /sq ft Cooling Only (Design) 3.0 Mbh Cooling Only (Design) None None Project Name: PDS Tech TI 1st Fir Dataset Name: C: \Users\patwardhan\Documents \TRACE 700 Projects \7326798 -00 Gateway Bldg 7 PDS TI 100 100 0 60.00 100 100 0 60.00 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 Entered Values - Rooms Page 11 of 11 Room Checksums By MacDonald - Miller 001 - Reception COOLING COIL PEAK Peaked at Time: Outside Air: Mo /Hr: 7 / 14 OADB/WB /HR: 81 / 67 / 79 Space Plenum Sens. + Lat. Sens. + Lat Btu/ Btu/ Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond PartitiorVDoor Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 690 1,350 1,343 3,384 75 0 0 0 3,459 296 0 0 Net Percent Total Of Total Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 986 1,350 1,343 0 0 0 0 0 0 0 0 0 0 0 21 29 29 296 3,680 80 -75 0 -29 0 0 0 191 0 838 0 0 0 -29 110 0 0 0 0 0 18 0 0 0 -1 2 0 0 0 0 4,598 100.00 CLG SPACE PEAK Mo /Hr: 7 / 24 OADB: 67 Space Percent Sensible Of Total Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 690 750 1,343 0 0 0 0 0 0 0 0 0 0 0 24 26 47 2,784 97 93 0 0 0 3 0 0 0 2,877 100.00 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond PartitiorVDoor Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -56 0 0 0 -56 Coil Peak Percent Tot Sens Of Total Btu/ ( %) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -1,635 70.90 0 0 0 0.00 42 -1.82 0 0.00 0 0.00 0 0.00 -713 30.91 0 0.00 0 0.00 -2,305 100.00 Total Capacity ton MBh Main Clg 0.4 4.6 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.4 4.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr /Ib 3.5 154 74.6 61.3 60.9 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.4 50.7 49.9 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass ft2 ( %) Floor 289 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 Ret/OA 74.6 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 74.1 0.0 0.0 0.0 AIRFLOWS Cooling 154 154 154 0 0 0 0 0 154 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 2 2 154 0 32 32 0 0 154 63 0 0 0 0 ENGINEERING CKS % OA cfm /ft2 cfm /ton ft2 /ton Btu/hr-ft2 No. People Cooling 21.0 0.53 401.92 754.23 15.91 3 Heating 21.0 0.53 -12.26 HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F 3.5 154 74.1 95.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 -3.5 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 System Checksums Report Page 1 of 14 Room Checksums By MacDonald - Miller 002 - Conference COOLING COIL PEAK Peaked at Time: Outside Air: Space Sens. + Lat. Btu /h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => 0 0 0 1,414 325 15 0 0 0 0 1,754 Mo /Hr: 7 / 15 OADB/WB /HR: 82 / 67 / 76 Plenum Sens. + Lat Btu/ 1 18 CLG SPACE PEAK Mo /Hr: 7 / 15 OADB: 82 Net Percent Space Percent Total Of Total Sensible Of Total Btu /h ( %) Btu /h ( %) o 0 0 0 0 0 0 0 0 0 0 0 1,414 15 1,414 22 325 3 325 5 33 0 15 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,772 19 1,754 28 760 326 1,085 11 760 12 3,200 0 3,200 34 1,960 31 1,743 0 1,743 18 1,743 28 5,702 326 6,028 64 4,462 71 80 -80 0 0 80 1 0 0 1,466 16 0 0 0 0 0 0 0 0 0 0 0 0 0 0 7,537 -52 -52 -1 240 3 0 0 0 0 0 0 0 0 0 0 0 211 9,454 100.00 6,297 100.00 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Peak Space Sens Btu /h Coil Peak Percent Tot Sens Of Total Btu /h ( %) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -2,019 -2,019 37.86 -127 -299 5.60 0 0 0.00 -515 -515 9.66 0 0 0.00 -1,125 -1,125 21.10 -3,786 -3,959 74.22 0 0 0.00 0 0 0.00 -795 -795 14.91 -795 -795 14.91 -61 0 0.00 0 -2,986 55.99 0 0 0 0 0 0.00 54 -1.02 0 0 00 0 0.00 0 0.00 2,352 -4410 0 0 00 0 0.00 -4,643 -5,333 100 00 COOLING COIL SELECTION Total Capacity Sens Cap. ton MBh MBh Main Clg 0.8 9.5 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.8 9.5 7.4 0.0 0.0 Coil Airflow Enter DB/WB/HR cfm °F °F gr /Ib 337 74.4 60.9 59.6 0 0.0 0.0 0.0 0 0.0 0.0 Leave DB/WB/HR °F °F gr /Ib 54.4 51.0 50.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass ft2 (° /C) Floor 318 Part 0 Int Door 0 ExFIr 16 Roof 0 0 0 Wall 190 84 44 Ext Door 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 Ret/OA 74.4 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 76.3 0.0 0.0 0.0 AIRFLOWS Cooling 337 337 337 0 59 59 0 0 337 59 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 169 169 337 0 59 59 22 0 337 81 0 0 0 0 ENGINEERING CKS % OA cfm /ft2 cfm /ton ft2 /ton Btu /hr•ft2 No. People Cooling 17.5 1.06 427.88 403.64 29.73 8 Heating 17.5 1.06 -21.82 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm °F °F -6.9 337 76.3 95.0 0.0 0 0.0 0.0 Main Htg Aux Htg Preheat Humidif Opt Vent Total 0.0 0 0.0 0.0 0.0 0.0 -6.9 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 System Checksums Report Page 2 of 14 Room Checksums By MacDonald - Miller 003 -Office COOLING COIL PEAK Peaked at Time: Outside Air: Space Sens. + Lat. Btu /h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Mo /Hr: 7 / 15 OADB/WB /HR: 82 / 67 / 76 Plenum Net Percent Sens. + Lat Total Of Total Btu /h Btu /h ( %) o 0 0 0 o 0 0 0 0 0 0 0 1,001 0 1,001 28 233 0 233 7 11 13 24 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1,246 13 1,259 35 287 123 410 11 450 0 450 13 1,055 0 1,055 30 1,791 123 1,914 54 30 -30 0 0 0 0 303 8 0 0 0 0 0 0 0 0 -11 -11 0 109 3 0 0 0 0 0 0 0 0 0 0 0 3,067 95 3,574 100.00 CLG SPACE PEAK Mo /Hr: 7 / 15 OADB: 82 Space Sensible Btu /h 0 0 0 1,001 233 11 0 0 0 0 1,246 287 250 1,055 1,591 30 0 0 0 2,867 Percent Of Total ( %) 3 4 3 5 100.00 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu /h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Coil Peak Percent Tot Sens Of Total Btu /h ( %) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -1,465 -1,465 84.71 -92 -217 12.53 0 0 0.00 -357 -357 20.67 0 0 0.00 -425 -425 24.55 -2,339 -2,464 142.45 0 0 0.00 0 0 0.00 -300 -300 17.35 -300 -300 17.35 -23 0 0.00 0 -617 35.65 0 0 0 0 0 0.00 14 -0.80 0 0.00 0 0.00 0 0.00 1,637 -94.66 0 0.00 0 0.00 -2,662 -1,730 100.00 Total Capacity ton MBh Main Clg 0.3 3.6 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.3 3.6 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr /Ib 3.2 154 73.560.2 0.0 0 0.0 0.0 0.0 0 57.7 0.0 Leave DB/WB/HR °F °F - gr /Ib 54.4 51.9 54.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass Floor 120 Part 0 Int Door 0 ExFir 11 Roof 0 Wall 138 Ext Door 0 ft2 ( %) 0 0 61 44 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 Ret/OA 73.5 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 82.3 0.0 0.0 0.0 AIRFLOWS Cooling 154 154 154 0 12 12 0 0 154 12 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil M inStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 97 97 154 0 12 12 8 0 154 21 0 0 0 0 ENGINEERING CKS Cooling % OA 7.9 cfm /ft2 1.28 cfm /ton 515.35 ft2 /ton 402.88 Btu /hrft2 29.79 No. People 1 Heating 7.9 1.28 -17.80 HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -2.1 154 82.3 0.0 0 0.0 0.0 0 0.0 0.0 0.0 -2.1 Lvg °F 95.0 0.0 0.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 System Checksums Report Page 3 of 14 Room Checksums By MacDonald - Miller 004 -Office COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 14 Outside Air: OADB/WB/HR: 81 / 67 / 79 Space Sens. + Lat. Btu /h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Plenum Net Percent Sens. + Lat Total Of Total Btu /h Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 0 2,224 0 2,224 43 337 0 337 7 32 41 73 1 0 0 0 0 0 0 0 0 0 0 0 0 0 2,593 41 2,634 51 332 142 474 9 450 0 450 9 1,087 0 1,087 21 1,869 142 2,012 39 36 -36 0 0 0 0 346 7 0 0 0 0 0 0 0 0 -12 -12 0 164 3 0 0 0 0 0 0 0 0 0 0 0 4,499 135 5,143 100.00 CLG SPACE PEAK Mo /Hr: 7 / 12 OADB: 78 Space Percent Sensible Of Total Btu/ ( %) 2,41 16 2 2,59 0 0 0 56 4 0 0 0 0 0 60 332 8 250 6 1,087 25 1,669 39 37 1 0 0 0 0 0 0 4,306 100.00 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Peak Space Sens Btu /h Coil Peak Percent Tot Sens Of Total Btu /h ( %) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -2,398 -2,398 99.68 -150 -355 14.75 0 0 0.00 -585 -585 24.32 0 0 0.00 -492 -492 20.44 -3,625 -3,830 159.19 0 0 0.00 0 0 0.00 -348 -348 14.44 -348 -348 14.44 -27 0 0.00 0 -674 28.03 0 0 0 0 0 0.00 15 -0.64 0 0.00 0 0.00 0 0.00 2,430 101.02 0 0.00 0 0.00 -4,000 -2,406 100.00 Total Capacity ton MBh Main Clg 0.4 5.1 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.4 5.1 COOLING COIL SELECTION Sens Cap. Coil Airflow Enter DB/WB/HR MBh cfm °F °F gr./lb 4.7 0.0 0.0 231 73.3 60.0 57.4 0 0.0 0.0 0.0 0 0.0 0.0 Leave DB/WB /HR °F °F gr/lb 54.4 52.1 55.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass ft2 ( %) Floor 139 Part 0 Int Door 0 ExFlr 18 Roof 0 0 0 Wall 225 100 44 Ext Door 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 Ret/OA 73.3 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 83.7 0.0 0.0 0.0 AIRFLOWS Cooling Heating 231 146 231 146 231 231 0 0 13 13 13 13 0 10 0 0 231 231 13 23 0 0 0 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups ENGINEERING CKS OA cfm /ft2 cfm /ton ft2 /ton Btu /hr•ft2 No. People Cooling 5.8 1.66 537.85 324.33 37.00 1 Heating 5.8 1.66 -20.59 HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -2.9 231 83.7 95.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 -2.9 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 System Checksums Report Page 4 of 14 Room Checksums By MacDonald - Miller 005 -Office COOLING COIL PEAK Peaked at Time: Outside Air: Space Sens. + Lat. Btu /h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Mo /Hr: 7 / 15 OADB/WB/HR: 82 / 67 / 76 Plenum Net Percent Sens. + Lat Total Of Total Btu /h Btu /h ( %) o o 0 0 0 0 0 0 0 0 0 0 1,037 0 1,037 31 242 0 242 7 12 14 25 1 0 0 0 0 0 0 0 0 0 0 0 0 0 1,290 14 1,304 39 296 127 423 13 450 0 450 14 752 0 752 23 1,498 127 1,625 49 31 -31 0 0 0 0 309 9 0 0 0 0 0 0 0 0 -11 -11 0 100 3 0 0 0 0 0 0 0 0 0 0 0 2,820 98 3,326 100.00 CLG SPACE PEAK Mo /Hr: 7 / 15 OADB: 82 Space Percent Sensible Of Total Btu /h ( %) 0 0 0 0 0 0 1,037 40 242 9 12 0 0 0 0 0 0 0 0 0 1,290 49 296 250 752 1,298 11 10 29 50 31 1 0 0 0 0 0 0 2,620 100.00 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu /h 0 0 0 0 -1,518 -95 0 -370 0 -439 -2,422 Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => 0 0 0 0 -24 0 0 0 -2,446 Coil Peak Percent Tot Sens Of Total Btu /h ( %) 0 0 0 0 -1,518 -225 0 -370 0 -439 -2,551 0.00 0.00 0.00 0.00 93.42 13.82 0.00 22.79 0.00 27.00 157.03 0 0.00 0 0.00 0 0.00 0 0.00 0 -629 0 0 14 0 0 0 1,541 0 0 0.00 38.70 0 0.00 -0.87 0.00 0.00 0.00 -94.86 0.00 0.00 -1,625 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. ton MBh MBh Main CIg 0.3 3.3 3.0 Aux CIg 0.0 0.0 0.0 Opt Vent 0.0 0.0 0.0 Total 0.3 3.3 Coil Airflow Enter DB/WB/HR cfm °F °F gr/lb 140 73.6 60.3 57.9 0 0.0 0.0 0.0 0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 54.4 51.8 54.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass ft2 ( %) Floor 124 Part 0 Int Door 0 ExFIr 12 Roof 0 0 0 Wall 143 63 44 Ext Door 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 Ret/OA 73.6 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 81.8 0.0 0.0 0.0 AIRFLOWS Cooling 140 140 140 0. 12 12 0 0 140 12 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 89 89 140 0 12 12 9 0 140 21 0 0 0 0 ENGINEERING CKS Cooling Heating 8.9 8.9 1.13 1.13 505.91 447.33 26.83 -16.47 1 % OA cfm /ft2 cfm /ton ft2 /ton Btu /hr•ft2 No. People HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm °F °F Main Htg -2.0 140 81.8 95.0 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif 0.0 0 0.0 0.0 Opt Vent 0.0 0 0.0 0.0 Total -2.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 System Checksums Report Page 5 of 14 Room Checksums By MacDonald - Miller 006A -Open Office COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 15 Outside Air: OADB/WB /HR: 82 / 67 / 76 Space Sens. + Lat. Btu /h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Plenum Net Percent Sens. + Lat Total Of Total Btu/ Btu /h (%) 0 0 0 0 0 0 0 0 0 0 0 0 3,463 3,463 25 3,463 834 834 6 834 71 61 132 1 71 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4,367 61 4,428 32 4,367 CLG SPACE PEAK Mo /Hr: 7 / 15 OADB: 82 Space Percent Sensible Of Total Btu /h ( %) 884 379 1,263 9 884 2,700 0 2,700 20 1,500 3,631 0 3,631 27 3,631 7,215 379 7,594 56 6,015 94 -94 0 0 94 0 0 1,295 9 0 0 0 0 0 0 0 0 0 0 0 -46 -46 0 399 3 0 0 0 0 0 0 0 0 0 0 0 11,676 300 13,671 100.00 0 0 0 33 8 0 0 0 0 42 8 14 35 57 0 0 0 10,476 100.00 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/ Btu /h ( %) -5,28 -57 -1,61 -1,30 -8,76 -925 -925 -71 0 0 0 -9,765 0 0 0 0 -5,280 -1,133 0 -1,610 0 -1,309 -9,332 0.00 0.00 0.00 0.00 77.71 16.68 0.00 23.70 0.00 19.27 137.35 0 0.00 0 0.00 -925 13.61 -925 13.61 0 -2,638 0 0 52 0 0 0 6,049 0 0 0.00 38.84 0 0.00 -0.77 0.00 0.00 0.00 -89.03 0.00 0.00 -6,794 100.00 Main Clg Aux Clg Opt Vent COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR cfm °F °F gr /Ib ton MBh MBh Leave DB/WB/HR °F °F gr /Ib 1.1 13.7 11.8 561 73.7 60.3 58.0 54.4 51.6 53.4 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Total 1.1 13.7 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass Floor 370 Part 0 Int Door 0 ExFlr 50 Roof 0 Wall 620 Ext Door 0 ft2 ( %) 0 0 220 35 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 Ret/OA 73.7 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 81.5 0.0 0.0 0.0 AIRFLOWS Cooling 561 561 561 0 52 52 0 0 561 52 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil M i nStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 355 355 561 0 52 52 26 0 561 78 0 0 0 0 ENGINEERING CKS % OA cfm /ft2 cfm /ton ft2 /ton Btu /hrft2 No. People Cooling 9.3 1.52 492.29 324.78 36.95 6 Heating 9.3 1.52 -22.53 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm °F °F Main Htg -8.3 561 81.5 95.0 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif Opt Vent Total 0.0 0.0 -8.3 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 System Checksums Report Page 6 of 14 Room Checksums By MacDonald - Miller 006B-Open Office COOLING COIL PEAK Peaked at Time: Mo /Hr: Outside Air: OADB/WB /HR: Space Sens. + Lat. Btu /h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 0 Plenum Sens. + Lat Btu/ 0 0 8,672 475 98 9 0 0 0 0 9,245 97 710 304 1,350 0 5,007 0 7,066 304 -73 0 73 0 0 7/17 80/65/69 CLG SPACE PEAK Mo /Hr: 7 / 18 OADB: 78 Net Percent Space Percent Total Of Total Sensible Of Total Btu /h (%) Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 0 8,672 48 9,558 58 475 3 388 2 195 1 134 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 9,342 52 10,080 61 1,014 6 710 4 1,350 8 750 5 5,007 28 5,007 30 7,370 41 6,466 39 0 0 74 0 587 3 0 0 0 0 0 0 0 0 0 0 0 0 0 -28 -28 0 633 4 0 0 0 0 0 0 0 0 0 0 0 16,385 300 17,905 100.00 16,620 100.00 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Peak Space Sens Btu /h 0 0 0 0 -3,300 -327 0 -966 0 -1,051 -5,643 0 0 -743 -743 -57 0 0 0 -6,443 Coil Peak Percent Tot Sens Of Total Btu/ ( %) 0.00 0.00 0.00 0.00 -3,30 37.99 -66 7.65 0.00 -96 11.12 0.00 -1,051 12.10 -5,981 68.85 0 0.00 0 0.00 -743 8.55 -743 8.55 0 0.00 -1,659 19.10 0 0 0 0.00 36 -0.41 0 0.00 0 0.00 0 0.00 -340 3.91 0 0.00 0 0.00 -8,686 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr /Ib Main Clg 1.5 17.9 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 1.5 17.9 17.0 890 73.0 59.8 56.6 0.0 0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.4 52.5 56.6 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass ft2 (%) Floor Part Int Door ExFIr Roof Wall Ext Door 297 0 0 30 0 0 372 138 0 0 0 37 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 ReUOA 73.0 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 85.0 0.0 0.0 0.0 AIRFLOWS Cooling 890 890 890 0 16 16 0 0 890 16 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop/Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 235 235 890 0 33 33 21 0 890 54 0 0 0 0 ENGINEERING CKS % OA cfm /ft2 cfm /ton ft2 /ton Btu /heft2 No. People Cooling 3.7 3.00 596.32 199.05 60.29 3 Heating 3.7 3.00 -32.81 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm °F °F Main Htg -9.8 890 85.0 95.0 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif Opt Vent Total 0.0 0.0 -9.8 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 System Checksums Report Page 7 of 14 Room Checksums By MacDonald - Miller 006C -Open Office COOLING COIL PEAK Peaked at Time: Outside Air: Mo /Hr: 7 / 14 OADB/WB/HR: 81 / 67 / 79 Space Plenum Sens. + Lat. Sens. + Lat Btu/ Btu /h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/ ( %) 4,334 1,857 6,191 24 5,400 0 5,400 21 9,096 0 9,096 36 18,829 1,857 20,687 81 473 -473 0 0 0 0 4,376 17 0 0 0 0 0 0 0 0 -153 -153 -1 648 3 0 0 0 0 0 0 0 0 19,302 0 0 0 1,232 25,558 100.00 CLG SPACE PEAK Mo /Hr: 7 / 24 OADB: 67 Space Percent Sensible Of Total Btu/ ( %) 4,334 25 3,000 18 9,096 53 16,429 97 585 3 0 0 0 0 0 0 17,014 100.00 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/ Btu /h ( %) -35 -350 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 O 0.00 0 0.00 O 0.00 0 0.00 -8,534 65.78 0 0 0 0.00 217 -1.68 O 0.00 0 0.00 0 0.00 -4,657 35.90 O 0.00 0 0.00 -12,974 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. Coil Airflow Enter DB/WB/HR ton MBh MBh cfm °F °F gr /Ib Main Clg 2.1 25.6 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 2.1 25.6 Leave DB/WB/HR °F °F gr /Ib 20.5 911 74.4 61.1 60.3 54.4 51.1 51.6 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass Floor 1,814 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 ft2 (%) 0 0 0 0 Ext Door 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 Ret/OA 74.4 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 75.6 0.0 0.0 0.0 AIRFLOWS Cooling 911 911 911 0 0 0 0 0 911 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 13 13 911 0 169 169 0 0 911 325 0 0 0 0 ENGINEERING CKS Cooling Heating 18.5 18.5 0.50 0.50 427.65 851.71 14.09 -10.69 12 % OA cfm /ft2 cfm /ton ft2 /ton Btu /hrft2 No. People HEATING COIL SELECTION Main Htg Aux Htg Preheat Humidif Opt Vent Total CapacityCoil Airflow MBh cfm -19.4 0.0 0.0 0.0 0.0 -19.4 911 0 0 0 0 Ent Lvg °F °F 75.6 95.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 System Checksums Report Page 8 of 14 Room Checksums By MacDonald - Miller 007 - Storage COOLING COIL PEAK Peaked at Time: Outside Air: Spac Sens. + La Btu/ Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> 268 0 191 459 29 0 0 0 488 Mo /Hr: 7 / 14 OADB/WB /HR: 81 / 67 / 79 Plenum Sens. + Lat Btu /h 0 0 0 0 0 0 0 0 115 0 0 115 -29 0 -12 0 0 0 73 Net Percent Total Of Total Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 382 41 0 0 191 21 573 62 0 0 348 38 0 0 0 0 0 0 -12 -1 19 2 0 0 0 0 0 0 0 0 928 100.00 CLG SPACE PEAK Mo /Hr: 7 / 24 OADB: 67 Space Sensible Btu /h 0 0 0 0 0 0 0 0 0 0 0 Percent Of Total ( %) 268 54 0 0 191 39 459 93 36 7 0 0 0 0 0 0 495 100.00 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/ Btu/ ( %) Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -22 0 0.00 0 -679 105.74 0 0 0 0 0 0.00 17 -2.72 0 0.00 0 0.00 0 0.00 19 -3.02 0 0.00 0 0.00 -22 -642 100.00 Total Capacity ton MBh Main Clg 0.1 0.9 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.1 0.9 COOLING COIL SELECTION Sens Cap. MBh 0.7 0.0 0.0 Coil Airflow Enter DB/WB/HR cfm °F °F gr /Ib 26 77.2 63.6 67.6 0 0.0 0.0 0.0 0 0.0 0.0 Leave DB/WB/HR °F °F gr/lb 54.4 51.6 53.2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass ft2 ( %) Floor 112 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 Ret/OA 77.2 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 55.2 0.0 0.0 0.0 AIRFLOWS Cooling 26 26 26 0 0 0 0 0 26 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 1 1 26 0 13 13 0 0 26 26 0 0 0 0 ENGINEERING CKS % OA cfm/ft2 cfm /ton ft2 /ton Btu /hr•ft2 No. People Cooling 50.7 0.24 342.36 1,447.59 8.29 0 Heating 50.7 0.24 -10.34 HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -1.2 26 55.2 0.0 Lvg °F 95.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 -1.2 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 Alternative - 1 System Checksums Report Page 9 of 14 Room Checksums By MacDonald - Miller 009A -Open Office COOLING COIL PEAK Peaked at Time: Outside Air: Space Sens. + Lat. Btu /h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Mo /Hr: 7 / 18 OADB/WB /HR: 78 / 63 / 64 CLG SPACE PEAK Mo /Hr: 7 / 18 OADB: 78 Plenum Net Percent Space Percent Sens. + Lat Total Of Total Sensible Of Total Btu /h Btu /h ( %) Btu /h ( %) o o 0 0 0 0 o o 0 0 0 0 0 0 0 0 0 0 9,725 0 9,725 62 9,725 69 392 0 392 2 392 3 133 134 267 2 133 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10,250 134 10,384 66 10,250 73 836 358 1,195 8 836 6 1,350 0 1,350 9 750 5 2,097 0 2,097 13 2,097 15 4,283 358 4,642 29 3,683 26 87 -87 0 0 87 1 0 0 213 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -15 -15 0 534 3 0 0 0 0 0 0 0 0 0 0 0 14,620 390 15,757 100.00 14,020 100.00 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu/ Btu /h ( %) -3,30 -32 -96 -1,23 -5,831 0 0 -875 -875 -68 0 0 0 -6,773 0 0.00 0 0.00 0 0.00 0 0.00 -3,300 43.39 -664 8.74 0 0.00 - 966 12.70 0 0.00 -1,238 16.28 -6,168 81.11 0 0.00 0 0.00 -875 11.51 - 87 -1,82 4 1,21 -7,60 11.51 0.00 23.93 0 0.00 -0.53 0.00 0.00 0.00 -16.02 0.00 0.00 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. ton MBh MBh Main Clg 1.3 15.8 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 1.3 15.8 15.1 0.0 0.0 Coil Airflow cfm 751 0 0 Enter DB/WB/HR Leave DB/WB /HR °F °F gr /Ib °F °F gr /Ib 72.9 59.6 56.3 54.4 52.1 55.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass Floor 350 Part 0 Int Door 0 ExFIr 30 Roof 0 Wall 372 Ext Door 0 ft2 ( %) 0 0 138 37 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 Ret/OA 72.9 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 84.3 0.0 0.0 0.0 AIRFLOWS Cooling 751 751 751 0 18 18 0 0 751 18 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups 0 Heating 247 247 751 0 36 36 25 0 751 61 0 0 0 0 ENGINEERING CKS % OA cfm/ft2 cfm /ton ft2 /ton Btu /heft' No. People Cooling 2.4 2.14 571.59 266.55 45.02 3 Heating 4.8 2.14 -25.14 HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -8.8 751 84.3 95.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 -8.8 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 4Iternative - 1 System Checksums Report Page 10 of 14 Room Checksums By MacDonald - Miller 009B-Open Office COOLING COIL PEAK Peaked at Time: Outside Air: Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Mo /Hr: 7 / 14 OADB/WB/HR: 81 / 67 / 79 Space Plenum Sens. + Lat. Sens. + Lat Btu/ Btu /h Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => 0 0 0 0 0 0 0 0 Net Percent Total Of Total Btu/ ( %) 1,510 647 2,157 18 1,800 0 1,800 15 6,079 0 6,079 51 9,388 647 10,036 85 165 -165 0 0 0 0 1,501 13 0 0 0 0 0 0 0 0 -52 -52 0 335 3 0 0 0 0 0 0 0 0 0 0 0 9,553 430 11,819 100.00 CLG SPACE PEAK Mo /Hr: 7 / 24 OADB: 67 Space Percent Sensible Of Total Btu/ ( %) 1,510 17 1,000 11 6,079 69 8,588 98 204 2 0 0 0 0 0 0 8,792 100.00 HEATING COIL PEAK Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Mo /Hr: OADB: Space Peak Space Sens Btu /h 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -122 0 0 0 -122 Heating Design 24 Coil Peak Percent Tot Sens Of Total Btu/ (° /a) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -2,928 50.66 0 0 0 0.00 75 -1.29 0 0.00 0 0.00 0 0.00 -2,926 50.63 0 0.00 0 0.00 -5,779 100.00 Main Clg Aux Clg Opt Vent Total COOLING COIL SELECTION Total Capacity Sens Cap. ton MBh MBh 1.0 0.0 0.0 11.8 0.0 0.0 1.0 11.8 10.1 0.0 0.0 Coil Airflow Enter DB/WB/HR cfm °F °F gr /Ib 471 73.9 60.6 58.9 0 0.0 0.0 0.0 0 0.0 0.0 Leave DBIWB/HR °F °F gr /Ib 54.4 51.7 53.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass Floor 632 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 Ext Door 0 ft2 ( %) 0 0 0 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 Ret/OA 73.9 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 79.6 0.0 0.0 0.0 AIRFLOWS Cooling 471 471 471 0 0 0 0 0 471 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 4 4 471 0 58 58 0 0 471 111 0 0 0 0 ENGINEERING CKS % OA cfm /ft2 cfm /ton ft2 /ton Btu /heft2 No. People Cooling 12.3 0.74 477.87 641.67 18.70 4 Heating 12.3 0.74 -12.63 HEATING COIL SELECTION CapacityCoil Airflow Ent Lvg MBh cfm °F °F Main Htg -8.0 471 79.6 95.0 Aux Htg 0.0 0 0.0 0.0 Preheat 0.0 0 0.0 0.0 Humidif Opt Vent Total 0.0 0.0 -8.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 4lternative - 1 System Checksums Report Page 11 of 14 Room Checksums By MacDonald - Miller 010 -Office COOLING COIL PEAK Peaked at Time: Outside Air: Space Sens. + Lat. Btu /h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Mo /Hr: 7 / 17 OADB/WB /HR: 80 / 65 / 69 Plenum Net Percent Sens. + Lat Total Of Total Btu /h Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 0 3,492 0 3,492 56 191 0 191 3 43 40 83 1 0 0 0 0 0 0 0 0 0 0 0 0 0 3,726 40 3,766 61 325 139 464 7 450 0 450 7 1,082 0 1,082 17 1,857 139 1,996 32 33 -33 0 0 0 0 235 4 0 0 0 0 0 0 0 0 -11 -11 0 219 4 0 0 0 0 0 0 0 0 0 0 0 5,616 135 6,206 100.00 CLG SPACE PEAK Mo /Hr: 7 / 18 OADB: 78 Space Sensible Btu /h 0 0 0 3,850 156 58 0 0 0 0 4,064 325 250 1,082 1,657 34 0 0 0 5,755 Percent Of Total ( %) 0 0 0 67 3 1 0 0 0 0 71 6 4 19 29 0 0 0 100.00 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Peak Coil Peak Percent Space Sens Tot Sens Of Total Btu /h Btu /h ( %) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -1,320 -1,320 43.26 -143 -283 9.28 0 0 0.00 -403 -403 13.19 0 0 0.00 -481 -481 15.77 -2,346 -2,487 81.50 0 0 0.00 0 0 0.00 -340 -340 11.14 -340 -340 11.14 -26 0 0.00 0 -665 21.80 0 0 0 0 0 0.00 15 -0.50 0 0.00 0 0.00 0 0.00 426 -13.95 0 0.00 0 0.00 -2,712 -3,051 100.00 Total Capacity ton MBh Main Clg 0.5 6.2 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.5 6.2 COOLING COIL SELECTION Sens Cap. MBh 5.9 0.0 0.0 Coil Airflow Enter DB/WB/HR cfm °F °F gr /Ib 308 73.159.8 56.7 0 0.0 0.0 0.0 0 0.0 0.0 Leave DB/WB /HR °F °F gr/lb 54.4 52.5 56.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass Floor 136 Part 0 Int Door 0 ExFIr 13 Roof 0 Wall 155 Ext Door 0 0 0 ft2 ( %) 0 0 55 35 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 Ret/OA 73.1 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 84.7 0.0 0.0 0.0 AIRFLOWS Cooling 308 308 308 0 7 7 0 0 308 7 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 99 99 308 0 13 13 10 0 308 23 0 0 0 0 ENGINEERING CKS % OA cfm /ft2 cfm /ton ft2 /ton Btu/hr-ft2 No. People Cooling 4.3 2.27 595.73 262.99 45.63 1 Heating 4.3 2.27 -25.73 HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total -3.5 308 84.7 0.0 Lvg °F 95.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 -3.5 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 4lternative - 1 System Checksums Report Page 12 of 14 Room Checksums By MacDonald - Miller 011 - Storage COOLING COIL PEAK Peaked at Time: Mo /Hr: 7 / 14 Outside Air: OADB/WB /HR: 81 / 67 / 79 Space Plenum Sens. + Lat. Sens. + Lat Btu/ Btu/ Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Net Percent Total Of Total Btu/ ( %) 213 91 304 41 0 0 0 0 152 0 152 21 365 91 456 62 23 -23 0 0 0 0 277 38 0 0 0 0 0 0 0 0 -10 -10 -1 15 2 0 0 0 0 0 0 0 0 0 0 0 388 58 738 100.00 CLG SPACE PEAK HEATING COIL PEAK Mo /Hr: 7 / 24 OADB: 67 Space Percent Sensible Of Total Btu /h ( %) 0 0 0 0 0 0 0 0 0 0 0 213 5 0 152 3 365 9 29 0 0 0 393 100.00 Mo /Hr: Heating Design OADB: 24 Space Peak Space Sens Btu /h Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass/Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total = => Internal Loads Lights People Misc Sub Total =_> Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => Coil Peak Percent Tot Sens Of Total Btu /h ( %) 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 0 0 0.00 -17 0 0.00 0 -540 105.74 0 0 0 0 0 0.00 14 -2.72 0 0.00 0 0.00 0 0.00 15 -3.03 0 0.00 0 0.00 -17 -511 100.00 COOLING COIL SELECTION Total Capacity Sens Cap. ton MBh MBh Main Clg 0.1 0.7 Aux Clg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.1 0.7 0.6 0.0 0.0 Coil Airflow Enter DB/WB/HR cfm °F °F gr /Ib 21 77.2 63.6 67.6 0 0.0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 54.4 51.6 53.2 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass Floor 89 Part 0 Int Door 0 ExFIr 0 Roof 0 Wall 0 ft2 ( %) 0 0 0 0 Ext Door 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 Ret/OA 77.2 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 55.2 0.0 0.0 0.0 AIRFLOWS Cooling 21 21 21 0 0 0 0 0 21 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 1 1 21 0 11 11 0 0 21 21 0 0 0 0 ENGINEERING CKS % OA cfm /ft2 cfm /ton ft2 /ton Btu /heft2 No. People Cooling 50.7 0.24 342.35 1,447.59 8.29 0 Heating 50.7 0.24 -10.34 HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -0.9 21 55.2 95.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 -0.9 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 4lternative - 1 System Checksums Report Page 13 of 14 Room Checksums By MacDonald - Miller 012 -Break Room COOLING COIL PEAK Peaked at Time: Mo /Hr: Outside Air: OADB/ VB/HR: Space Plenum Sens. + Lat. Sens. + Lat Btu/ Btu/ Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Dehumid. Ov Sizing Ov /Undr Sizing Exhaust Heat Sup. Fan Heat Ret. Fan Heat Duct Heat Pkup Underflr Sup Ht Pkup Supply Air Leakage Grand Total = => 7/14 81 /67/79 Net Percent Total Of Total Btu /h (%) 0 0 0 0 0 0 0 0 0 0 0 296 127 423 7 1,800 0 1,800 29 3,212 0 3,212 51 5,308 127 5,435 86 32 -32 0 0 0 0 711 11 0 0 0 0 0 0 0 0 -25 -25 0 173 3 0 0 0 0 0 0 0 0 0 0 0 5,340 70 6,294 100.00 CLG SPACE PEAK Mo /Hr: 7 / 24 OADB: 67 Space Percent Sensible Of Total Btu/ (%) 296 1,000 2 3,212 7 4,508 9 40 0 0 0 4,548 100.00 HEATING COIL PEAK Mo /Hr: Heating Design OADB: 24 Envelope Loads Skylite Solar Skylite Cond Roof Cond Glass Solar Glass /Door Cond Wall Cond Partition/Door Floor Adjacent Floor Infiltration Sub Total =_> Internal Loads Lights People Misc Sub Total = => Ceiling Load Ventilation Load Adj Air Trans Heat Ov /Undr Sizing Exhaust Heat OA Preheat Diff. RA Preheat Diff. Additional Reheat System Plenum Heat Underflr Sup Ht Pkup Supply Air Leakage Grand Total =_> Space Peak Space Sens Btu/ Coil Peak Percent Tot Sens Of Total Btu/ (%) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 0.00 0 0.00 0 0.00 0 0.00 -24 0 0.00 0 -1,387 48.08 0 0 0 0 0 0.00 36 -1.25 0 0.00 0 0.00 0 0.00 -1,534 53.18 0 0.00 0 0.00 -24 -2,885 100.00 Total Capacity ton MBh Main CIg 0.5 6.3 Aux CIg 0.0 0.0 Opt Vent 0.0 0.0 Total 0.5 6.3 COOLING COIL SELECTION Sens Cap. MBh 5.1 0.0 0.0 Coil Airflow Enter DB/WB/HR cfm °F °F gr/lb 243 73.8 60.5 58.7 0 0.0 0.0 0.0 0 0.0 0.0 Leave DB/WB /HR °F °F gr /Ib 54.4 51.3 52.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Project Name: PDS Tech TI 1st Fir Dataset Name: PDS.TRC AREAS Gross Total Glass ft2 ( %) Floor 124 Part 0 Int Door 0 ExFIr 0 Roof 0 0 0 Wall 0 0 0 Ext Door 0 0 0 TEMPERATURES Cooling SADB 55.0 Ra Plenum 72.8 Return 72.8 Ret/OA 73.8 Fn MtrTD 0.1 Fn BIdTD 0.2 Fn Frict 0.4 Heating 95.0 69.4 87.4 80.2 0.0 0.0 0.0 AIRFLOWS Cooling 243 243 243 0 0 0 0 0 243 0 0 0 0 0 Diffuser Terminal Main Fan Sec Fan Nom Vent AHU Vent Infil MinStop /Rh Return Exhaust Rm Exh Auxiliary Leakage Dwn Leakage Ups Heating 1 1 243 0 27 27 0 0 243 54 0 0 0 0 ENGINEERING CKS % OA cfm /ft2 cfm /ton ft2 /ton Btu /hr•ft2 No. People Cooling 11.3 1.96 464.15 236.40 50.76 4 Heating 11.3 1.96 -31.87 HEATING COIL SELECTION CapacityCoil Airflow Ent MBh cfm °F Main Htg Aux Htg Preheat Humidif Opt Vent Total Lvg °F -4.0 243 80.2 95.0 0.0 0 0.0 0.0 0.0 0 0.0 0.0 0.0 0.0 -4.0 0 0.0 0.0 0 0.0 0.0 TRACE® 700 v6.2.7 calculated at 01:52 PM on 08/23/2012 4lternative - 1 System Checksums Report Page 14 of 14 PEW4TCO.*xa, PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -147 PROJECT NAME: PDS TECH INC SITE ADDRESS: 12720 GATEWAY DR X Original Plan Submittal DATE: 09 -26 -12 Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: B II Ing Ivlsion gp Public Works ❑ AK A/4 c -1-4\ "Fire Prev ntion Structural n Planning Division Permit Coordinator n 1 DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ DUE DATE: 09 -27 -12 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required ❑ No further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 10 -25 -12 Approved ❑ Approved with Conditions X Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 Contractors or Tradespeople) ter Friendly Page Page 1 of 2 General /Specialty Contractor A business registered as a construction contractor with L&I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name Phone Address Suite /Apt. City State Zip County Business Type Parent Company MACDONALD /MILLER FAC SOL INC 2067684180 Po Box 47983 Seattle WA 98106 King Corporation UBI No. Status License No. License Type Effective Date Expiration Date Suspend Date Specialty 1 Specialty 2 602254260 Active MACDOFS980RU Construction Contractor 12/31/2002 12/31/2012 General Unused Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status DIVCOI *988RC DIVCO INCORPORATION Construction Contractor General Unused 12/3/2002 11/7/2012 Active LINFOAR980QG LINFORD AIR & REFRIGERTN INC Construction Contractor General Unused 11/7/2002 11/7/2004 Archived ENCOMMS984CA ENCOMPASS MECHANICAL SERVICES Construction Contractor General Unused 2/1 /2002 2/1/2004 Archived MACDOMR026RU MACDONALD MILLER RSDNTL INC Construction Contractor General Unused 12/31/1998 12/31/2001 Archived DIVCOI *031L4 DIVCO INC Construction Contractor General Unused 6/24/1997 8/1/2003 Archived MACDOMR0760P MACDONALD MILLER RESIDENTIAL L Construction Contractor General Unused 9/17/1993 12/30/1998 Archived DIVCOEC188LC DIVCO ENERGY CONTROL COMPANY Construction Contractor General Unused 6/3/1982 5/26/1997 Archived MACDOM *248J9 MACDONALD MILLER CO Construction Contractor General Unused 4/29/1976 2/1/2002 Archived Business Owner Information Name Role Effective Date Expiration Date GOUGH, DAVID ANTHONY Director 12/29/2010 HOEL, STEPHANIE W Member 05/14/2010 SIMONDS, DERRICK R President 05/14/2010 WEBSTER, MARK E Vice President 05/14/2010 https://fortress.wa.gov/lni/bbip/Print.aspx 10/04/2012 er 24, 2012 4:53:45 PM UNIT NO. MFG & MODEL NO. AREA SERVED FANS SUPPLY CFM MIN OA (CFM) SUPPLY MOTOR (HP) ESP (IN) RPM POWER EXH MOTOR WEIGHT (LBS) ELECTRICAL VOLT/ PH MCA NOTES RTU -101 CARRIER 48AKTO5ODSQ611 HM EAST WING 20,000 3680 1 @30HP 1.2 1242 11700 CFM 4 @1HP EA 6658 460/3 150 EXISTING 1-4 RTU -102 CARRIER 48A3T060DSV611HM WEST WING 24,000 7200 1 @30HP 1.2 1010 17,550 CFM 6 @1HP EA 8521 460/3 174 EXISTING 1, 2, 3, 5 RTU -103 CARRIER 48TJD014 SERIES# 601 QE SERIAL# 4194G30497 2ND FLR SOUTH 5,000 1@ 4.2 BHP 1.2 1140 1287 460/3 36 EXISTING UNIT NO. COOLING HEATING FILTERS COOLING TOTAL (TONS) COOLING TOTAL (MBH) COOLING SENS (MBH) EER/ SEER IPLV REFER TYPE HEAT INPUT (MBH) HEAT OUTPUT (MBH) STAGES ( #) AFUE ( %) QTY SIZE (IN) MERV RTU -101 50 600 456 9.3/ 9.5 R -22 800 656 5 82 RTU -102 60 682 544 10.10/ 9.5 R-410A 1164 954 9 82 RTU -103 12.5 158 118 8.6/ 8.85 R -22 225 180 2 80 NOTES: 1. ELECTRICAL DISCONNECT SWITCH AND POWER WIRING BY ELECTRICAL CONTRACTOR. 2. VFD MOTORS 3. FEATURES AND OPTIONS INCLUDED: - COMFORTLINK CONTROLS WITH VISUAL SCROLLING MARQUEE DISPLAY - HIGH GAS HEAT WITH STAINLESS STEEL HEAT EXCHANGER/BURNER - AUCU COND AND EVAP - DIFFERENTIAL DRY -BULB ECONOMIZER - FACTORY INSTALLED POWER EXHAUST - HOT GAS BYPASS - BACNET TRANSLATOR CONTROLS INTERFACE - RETURN AIR SMOKE DETECTOR - 115V FACTORY WIRED CONVENIENCE OUTLET '- CO2 SENSOR 4. MAXIMUM SOUND POWER LEVEL OF 99 DECIBELS RATED IN ACCORDANCE WITH ARI STANDARD 270. 5. MAXIMUM SOUND POWER LEVEL OF 100 DECIBELS RATED IN ACCORDANCE WITH ARI STANDARD 270. UNIT NO. MANUFACTURER TOTAL CLG. MBH SENS. CLG. MBH SEER HTG. MBH HSPF INDOOR UNIT OUTDOOR UNIT MODEL ELECTRICAL VOLT /PH WT MCA LBS MODEL ELECTR CAL WT VOLT /PH MCA LBS NOTES AC -1/ OU -1 FUJITSU ASU24CL1 /AOU24CL1 24.0 18.0 17.5 ASU24CL1 208 -230/1 35 AOU24CL1 208 -230/1 10.5 100 NEW 1,2,3,4,6,7 NOTES: 1. ELECTRICAL TO PROVIDE INDIVIDUAL DISCONNECT FOR INDOOR AND OUTDOOR UNITS. 2. CONTROL WITH A STAND ALONE WIRED 24/7 PROGRAMMABLE T -STAT. 3. R410A REFRIGERANT. 4. SINGLE POINT POWER CONNECTION AT OUTDOOR UNIT. LINE VOLTAGE CONNECTION BETWEEN INDOOR AND OUTDOOR UNITS BY ELECTRICAL CONTRACTOR. 5. COOLING CAPACITIES BASED ON 80EDB, 67WB, 95° OUTDOOR TEMPERATURE. 6. ROUTE 3/8" PUMPED CONDENSATE TO NEAREST APPROVED RECEPTACLE. POWER TO CONDENSATE PUMP BY E.C. 7. MEETS WSEC 2009 SECTION 1433 EXCEPTION (9A) WITH 15% PREMIUM EFFICIENT CONDENSING SECTION. ABBV FULL NAME ABBV FULL NAME ABBV FULL NAME A AC AFF AL BDD BOB BOD BOTT BTU BTUH BWG BWR C CAP CC CFM CHWR CHWS COMB CONN CWR CWS DB DIFF DMPR DN EC EGC EER ELEV EMS COMPRESSED AIR LINE AIR CONDITIONING UNIT ABOVE FINISHED FLOOR ALUMINUM BACKDRAFT DAMPER BOTTOM OF BEAM BOTTOM OF DUCT BOTTOM BRITISH THERMAL UNITS BRITISH THERMAL UNITS PER HOUR BOTTOM WALL GRILLE BOTTOM WALL REGISTER CONDENSATE CAPACITY CONTROLS CONTRACTOR CUBIC FEET PER MINUTE CHILLED WATER RETURN CHILLED WATER SUPPLY COMBUSTION CONNECT CONDENSER WATER RETURN CONDENSER WATER SUPPLY DUCT BOARD DIFFUSER DAMPER DOWN ELECTRICAL CONTRACTOR EGGCRATE ENERGY EFFICIENCY RATIO ELEVATION ENERGY MANAGEMENT SYSTEM ESP EXH EXTR FAC FD FLA FOB FOT FSD G GALV GC GPM GR GWB HG HP HWR HWS ID INT LIQ M -M MBH MC MCA MD MIN MT MUA NOM EXTERNAL STATIC PRESSURE EXHAUST EXTRACTOR FIRE ALARM CONTRACTOR FIRE DAMPER FULL LOAD AMPS FLAT ON BOTTOM FLAT ON TOP FIRE SMOKE DAMPER GAS LINE GALVANIZED GENERAL CONTRACTOR GALLONS PER MINUTE GRILLE GYPSUM WALL BOARD HOT GAS LINE HORSE POWER HOT WATER RETURN HOT WATER SUPPLY INSIDE DIMENSION INTERLOCK LIQUID LINE MACDONALD- MILLER ONE THOUSAND BTUH MECHANICAL CONTRACTOR MINIMUM CIRCUIT AMPACITY MOTORIZED DAMPER MINIMUM MOUNT MAKE -UP AIR NOMINAL OSA OBD OD RA REG REQ'D RIO SA SCD SD SL SM SP SS SSSC STL SUC SUSP TSTAT TC TOD TOS TV TWG TWR TYP UNO VD VFD 0 OUTSIDE AIR OPPOSED BLADE DAMPER OUTSIDE DIMENSION RETURN AIR REGISTER (GRILLE WITH DAMPER) REQUIRED ROUGH IN ONLY SUPPLY AIR SMOKE CONTROL DAMPER SMOKE DAMPER SOUND LINING SHEET METAL STATIC PRESSURE START /STOP SOLID STATE SPEED CONTROLLER STEEL SUCTION LINE SUSPENDED THERMOSTAT TEMPERATURE CONTROL TOP OF DUCT TOP OF STEEL TURN VANES TOP WALL GRILLE TOP WALL REGISTER TYPICAL UNLESS NOTED OTHERWISE VOLUME DAMPER VARIABLE FREQUENCY DRIVE VOLTAGE PHASE & DUCT DIAMETER DESCRIPTION SYMBOL DESCRIPTION SYMBOL BARE SHEETMETAL 14/12 ROUND SHEETMETAL WRAPPED W/ INSULATION (2 ") 120W SOUNDLINE SHEETMETAL (1" LINING) 14/12SL CLEANROOM QUALITY DUCTWORK 14/12C SHEETMETAL WRAPPED W/ INSULATION (2") 14/12W BARE FLAT OVAL SHEETMETAL 14/120 BARE ROUND SHEETMETAL 120 FLAT OVAL FLAT SHEETMETAL W/ INSULATION (2 ") 14/120W EXPOSED QUALITY SHEETMETAL 14/12Q DUCTBOARD (1" FIBERGLASS) 14/12DB EXAMPLE OF NEW 14/12 EXAMPLE OF NOT IN CONTRACT (NIC) 1 4/1 2 EXAMPLE OF DEMO FLEX DUCT EXAMPLE OF EXISTING 1 4/1 2 FLEX CONNECTOR 3 SYMBOL MANUFACTURER & MODEL NUMBER SIZE TYPE NOTES /7\ SIZE CFM SHOEMAKER 825 PERF FACED OR EQUAL AS NOTED T -BAR LAY -IN MODULAR CORE DIFFUSER EXISTING ® SIZE CFM RETURN/EXH EXISTING /TA SIZE CFM SHOEMAKER 701 -MA AS NOTED T -BAR LAY -IN MODULAR CORE DIFFUSER M -M METAL EGGCRATE 12/24 RETURN/EXH N M -M METAL EGGCRATE 24/24 RETURN/EXH NOTES: 1. DIFFUSERS TYPICALLY LABELED WITH EXTERIOR DIMENSIONS, 24x24 FOR SQUARE DIFFUSERS AND 6x48 FOR SLOT DIFFUSERS. 'ER R VER`BA! GENERAL INFORMATION ROOM # SERVER AREA (SF) LIGHTS (W /SF) PEOPLE ( #) 99 1.0 0 CUSTOMER INFORMATION UNIT MFG & MODEL NO. QUANTITY BTU EACH WATTS EACH MAX HEAT LOAD (BTU) MAX HEAT LOAD (KW) SENS. TONS 1 2 3 4 5 6 7 8 9 10 11 12 SWITCH C3K- PWR- 1150WAC ROUTER BATTERY BACK -UP APC BX1000G CISCO ASA 5505 DELL POWER CONNECT 3324 DLINK DSS 16+ DLINK DES -1026G 24 PORT NETGEAR PROSAFE 24 PORT JFS524 CISCO CATALYST 3560 24 PORT CISCO ROUTER 2811 ADTRAN NETVANTA 3200 DELL POWEREDGE 2900 1 3939 1154 3939 1.2 0.3 1 153 45 153 0.0 0.0 1 1 2 410 120 410 0.1 0.0 3960 1160 3960 1.2 0.3 546 160 1092 0.3 0.1 2 410 120 820 0.2 0.1 1 40 12 40 0.0 0.0 1 440 129 440 0.1 0.0 2 546 160 1092 0.3 0.1 1 717 210 717 0.2 0.1 1 21 6 21 0.0 0.0 1 1580 463 1580 0.5 0.1 13 14 15 16 17 18 DELL OPTIPLEX GX620 IBM RS /600043P 150. IBM RS /6000 44P 170 DELL PRECISION 380 APC UPS XS 1300 APC UPS RS 1500 1 1 1 1 1 1 330 796 796 320 180 180 97 330 0.1 0.0 233 796 0.2 0.1 233 796 0.2 0.1 94 320 0.1 0.0 53 180 0.1 0.0 53 180 0.1 0.0 TOTAL: 16866 4.9 1.4 ENVIRONMENTAL INFORMATION ITEM MAX LOAD (BTU) MAX LOAD (KW) SENS. TONS ENVELOPE LIGHTS PEOPLE 0 0.0 0.0 338 0.1 0.0 0 0.0 0.0 TOTAL: 338 0.1 0.0 CAC EQUIPMENT INFORMATION UNIT MFG & MODEL NO. NOM. TONS MAX SENS. CAPACITY MAX CAPA- CITY (KW) SENS. TONS AC-1/0U-1 FUJITSU ASU24CL1 /AOU24CL1 2 18000 5.3 1.5 TOTAL: 18000 5.3 1.5 LOAD EVALUATION LOADS (BTU) (KW) SENS. TONS TOTAL CURRENT LOAD: 17204 5.0 1.4 NOTES: 1. BASED BTUH VALUES PROVIDED BY CUSTOMER. 2. NO FUTURE EXPANSION. 3. BASED ON 50% OF NAMEPLATE WATTAGE. HUMIDITY CONTROL N +1 REDUNDANCY AUTO SWITCH -OVER EXTERNAL ALARMING /MONITORING FM 200 SYSTEM HYDROGEN GAS MONITORING NO NO NO NO NO NO FUTURE EXPANSION: 0 0.0 0.0 TOTAL FUTURE LOAD: TOTAL CAC CAPACITY: SURPLUS /(DEFICIENT) CAPACITY: 17204 5.0 1.4 18000 5.3 1.5 796 0.2 0.1 APPROVED BY: DATE: 08 -29-12 SEPARATE PERMIT REQUIRED FOR: 0 Mechanical Electrical Olt Plumbing Gas City of Tukwila BUILDING DIVISION REVISIONS No changes shalt be made to the se of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan revle,, fees. 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2009 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE AND STATE AND LOCAL CODES AND ORDINANCES. 3. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2009 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM. 4. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT. 5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, PER 2009 WSEC. - DUCT WRAP, WHERE INDICATED, SHALL BE 1 1/2" 0.75 LB /CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL VAPOR BARRIER (R-4.2 MIN.). - SOUND LINING, WHERE INDICATED, SHALL BE 1" 1.5 LB /CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 6000 FPM (R-4.2 MIN.). - DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID FRK FACED El 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT (R-4.3 MIN.). AIR DUCT (R-4.3 MIN.). 6. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER, 1 1/2" FIBERGLASS INSULATION, AND NON - PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE A UL 181 LISTED CLASS 1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 12' IN LENGTH UNLESS NOTED OTHERWISE. 7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2009 IBC. 8. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. MINIMUM ACCESS DOOR SIZE FOR VALVES AND DAMPERS TO BE 18" X 18 ". 9. MOTORS STARTERS NOT LISTED AS BEING PROVIDED IN THE HVAC EQUIPMENT SCHEDULES ARE TO BE PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. 10. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES. 11. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY, HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM. 12. COMMISSIONING IS REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC) SECTION 1416 AND WITH LEED NC -2.1 FUNDAMENTAL BUILDING SYSTEMS COMMISSIONING AND ADDITIONAL COMMISSIONING. 13. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER v t § 4. PIPING x MPER H DU ..: Y UNIT NO. MFG & MODEL NO. TYPE INLET SIZE VALVE CFM CONTROLS LOCATION NOTES MAX MIN VVT -101 NAILOR3001 INSULATION 12 1005 300 RIGHT EXISTING, 1,2,4 VVT -102 NAILOR3001 12 480 140 RIGHT EXISTING, 1,2,4 VVT -103 NAILOR3001 1" 12 1000 300 RIGHT EXISTING, 1,2,4 VVT -104 NAILOR3001 1 -1/8" + 12 860 330 LEFT EXISTING, 1,2,4 VVT -105 NAILOR3001 0.23 - 0.27 12 520 160 RIGHT EXISTING, 1,2,4 VVT -106 NAILOR3001 - ELASTOMERIC INSULATIONS WHICH MEF.=T THESE RATINGS MAY BE USED AS A SUBSTITUTE FOR FIBERGLASS. 12 350 110 LEFT EXISTING, 1,2,4 VVT -107 NAILOR 3001 CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 8 460 140 RIGHT EXISTING, 1,2,4 VVT -10B NAILOR3001 6. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN 12 640 190 LEFT EXISTING, 1,2,4 VVT -109 NAILOR 3001 COIL CONNECTIONS. City of T ila 12 870 260 RIGHT EXISTING, 1,2,4 VVT -110 NAILOR3001 14 1100 330 RIGHT EXISTING, 1,2,4 WT -111 NAILOR 3001 8 340 100 LEFT EXISTING, 1,2,4 VVT -112 NAILOR 3001 8 220 70 LEFT EXISTING, 1,2,4 VVT -113 NAILOR3001 12 840 250 RIGHT EXISTING, 1,2,4 VVT -114 NAILOR3001 12 900 330 RIGHT EXISTING, 1,2,4 VVT -115 NAILOR3001 12 530 160 LEFT EXISTING, 1,2,4 VVT -116 NAILOR3001 12 460 330 RIGHT EXISTING, 1,2,4 VVT -117 NAILOR3001 12 210 60 LEFT EXISTING, 1,2,4 VVT -118 NAILOR3001 8 50 20 LEFT EXISTING, 1,2,4 VVT -119 NAILOR 3001 12 300 90 LEFT EXISTING, 1,2,4 VVT -120 NAILOR 3001 10 180 50 LEFT EXISTING, 1,2,4 VVT -121 NAILOR 3001 10 360 110 RIGHT EXISTING, 1,2,4 VVT -122 NAILOR 3001 12 550 170 RIGHT EXISTING, 1,2,4 VVT -123 METAL INDUSTRIES 598 C 10 1020 320 RIGHT EXISTING VVT, 1,3,5,6 VVT -124 METAL INDUSTRIES 598 C 10 920 310 RIGHT EXISTING VVT, 1,3,5,6 WT -125 METAL INDUSTRIES 598 C 10 760 320 RIGHT EXISTING VVT, 1,3,5,6 VVT -126 METAL INDUSTRIES 598 D 12 1300 330 RIGHT EXISTING VVT, 1,3,5,6 VVT -127 METAL INDUSTRIES 598 D 12 1290 330 RIGHT EXISTING VVT, 1,3,5,6 VVT -128 METAL INDUSTRIES 598 B 8 490 150 RIGHT EXISTING VVT, 1,3,5,6 VVT -129 METAL INDUSTRIES 598 B 8 380 150 RIGHT EXISTING VVT, 1,3,5,6 VVT -130 METAL INDUSTRIES 598 C 10 1070 210 RIGHT EXISTING WT, 1,3,5,6 VVT -131 METAL INDUSTRIES 598 D 12 1230 370 RIGHT EXISTING VVT, 1,3,5,6 VVT -132 METAL INDUSTRIES 598 B 8 550 170 RIGHT EXISTING VVT, 1,3,5,6 VVT -133 METAL INDUSTRIES 598 D 12 1230 370 RIGHT EXISTING VVT, 1,3,5,6 VVT -134 METAL INDUSTRIES 598 D 12 1050 320 RIGHT EXISTING WT, 1,3,5,6 WT -135 METAL INDUSTRIES 598 A 6 180 70 RIGHT EXISTING WT, 1,3,5,6 VVT -136 METAL INDUSTRIES 598 B 8 460 150 RIGHT EXISTING WT, 1,3,5,6 VVT -137 METAL INDUSTRIES 598 B 8 410 180 RIGHT EXISTING VVT, 1,3,5,6 VVT -138 METAL INDUSTRIES 598 C 10 480 330 RIGHT EXISTING VVT, 1,3,5,6 VVT -139 METAL INDUSTRIES 598 D 12 1220 330 RIGHT EXISTING VVT, 1,3,5,6 * LOCATION OF CONTROLS ON VVT BOX BASED ON LOOKING IN DIRECTION OF AIRFLOW (AIR HITTING BACK OF HEAD) NOTES: 1. FACTORY TOGGLE INTERLOCKING DISCONNECT 2. W/ LOW VELOCITY MULTIPOINT AVERAGING FLOW SENSOR 3. W/ FACTORY STANDARD MULTIPOINT AVERAGING FLOW SENSOR 4. CONFIGURED FOR FIELD MOUNTED STAEFA DDC CONTROLS PROVIDED BY MECHANICAL CONTRACTOR 5. ORDERED W/ FACTORY STANDARD RIGHT -HAND CONFIGURATION. FIELD TO FLIP BOX IN FIELD AS NECESSARY TO MAINTAIN CONTROL BOX CLEARANCES. 6. W/ FACTORY MOUNTED DDC CONTROLS PROVIDED BY FACTORY. UNIT NO. MANUFACTURER TOTAL CLG. MBH SENS. CLG. MBH SEER HTG. MBH HSPF INDOOR UNIT OUTDOOR UNIT MODEL ELECTRICAL VOLT /PH WT MCA LBS MODEL ELECTR CAL WT VOLT /PH MCA LBS NOTES AC -1/ OU -1 FUJITSU ASU24CL1 /AOU24CL1 24.0 18.0 17.5 ASU24CL1 208 -230/1 35 AOU24CL1 208 -230/1 10.5 100 NEW 1,2,3,4,6,7 NOTES: 1. ELECTRICAL TO PROVIDE INDIVIDUAL DISCONNECT FOR INDOOR AND OUTDOOR UNITS. 2. CONTROL WITH A STAND ALONE WIRED 24/7 PROGRAMMABLE T -STAT. 3. R410A REFRIGERANT. 4. SINGLE POINT POWER CONNECTION AT OUTDOOR UNIT. LINE VOLTAGE CONNECTION BETWEEN INDOOR AND OUTDOOR UNITS BY ELECTRICAL CONTRACTOR. 5. COOLING CAPACITIES BASED ON 80EDB, 67WB, 95° OUTDOOR TEMPERATURE. 6. ROUTE 3/8" PUMPED CONDENSATE TO NEAREST APPROVED RECEPTACLE. POWER TO CONDENSATE PUMP BY E.C. 7. MEETS WSEC 2009 SECTION 1433 EXCEPTION (9A) WITH 15% PREMIUM EFFICIENT CONDENSING SECTION. ABBV FULL NAME ABBV FULL NAME ABBV FULL NAME A AC AFF AL BDD BOB BOD BOTT BTU BTUH BWG BWR C CAP CC CFM CHWR CHWS COMB CONN CWR CWS DB DIFF DMPR DN EC EGC EER ELEV EMS COMPRESSED AIR LINE AIR CONDITIONING UNIT ABOVE FINISHED FLOOR ALUMINUM BACKDRAFT DAMPER BOTTOM OF BEAM BOTTOM OF DUCT BOTTOM BRITISH THERMAL UNITS BRITISH THERMAL UNITS PER HOUR BOTTOM WALL GRILLE BOTTOM WALL REGISTER CONDENSATE CAPACITY CONTROLS CONTRACTOR CUBIC FEET PER MINUTE CHILLED WATER RETURN CHILLED WATER SUPPLY COMBUSTION CONNECT CONDENSER WATER RETURN CONDENSER WATER SUPPLY DUCT BOARD DIFFUSER DAMPER DOWN ELECTRICAL CONTRACTOR EGGCRATE ENERGY EFFICIENCY RATIO ELEVATION ENERGY MANAGEMENT SYSTEM ESP EXH EXTR FAC FD FLA FOB FOT FSD G GALV GC GPM GR GWB HG HP HWR HWS ID INT LIQ M -M MBH MC MCA MD MIN MT MUA NOM EXTERNAL STATIC PRESSURE EXHAUST EXTRACTOR FIRE ALARM CONTRACTOR FIRE DAMPER FULL LOAD AMPS FLAT ON BOTTOM FLAT ON TOP FIRE SMOKE DAMPER GAS LINE GALVANIZED GENERAL CONTRACTOR GALLONS PER MINUTE GRILLE GYPSUM WALL BOARD HOT GAS LINE HORSE POWER HOT WATER RETURN HOT WATER SUPPLY INSIDE DIMENSION INTERLOCK LIQUID LINE MACDONALD- MILLER ONE THOUSAND BTUH MECHANICAL CONTRACTOR MINIMUM CIRCUIT AMPACITY MOTORIZED DAMPER MINIMUM MOUNT MAKE -UP AIR NOMINAL OSA OBD OD RA REG REQ'D RIO SA SCD SD SL SM SP SS SSSC STL SUC SUSP TSTAT TC TOD TOS TV TWG TWR TYP UNO VD VFD 0 OUTSIDE AIR OPPOSED BLADE DAMPER OUTSIDE DIMENSION RETURN AIR REGISTER (GRILLE WITH DAMPER) REQUIRED ROUGH IN ONLY SUPPLY AIR SMOKE CONTROL DAMPER SMOKE DAMPER SOUND LINING SHEET METAL STATIC PRESSURE START /STOP SOLID STATE SPEED CONTROLLER STEEL SUCTION LINE SUSPENDED THERMOSTAT TEMPERATURE CONTROL TOP OF DUCT TOP OF STEEL TURN VANES TOP WALL GRILLE TOP WALL REGISTER TYPICAL UNLESS NOTED OTHERWISE VOLUME DAMPER VARIABLE FREQUENCY DRIVE VOLTAGE PHASE & DUCT DIAMETER DESCRIPTION SYMBOL DESCRIPTION SYMBOL BARE SHEETMETAL 14/12 ROUND SHEETMETAL WRAPPED W/ INSULATION (2 ") 120W SOUNDLINE SHEETMETAL (1" LINING) 14/12SL CLEANROOM QUALITY DUCTWORK 14/12C SHEETMETAL WRAPPED W/ INSULATION (2") 14/12W BARE FLAT OVAL SHEETMETAL 14/120 BARE ROUND SHEETMETAL 120 FLAT OVAL FLAT SHEETMETAL W/ INSULATION (2 ") 14/120W EXPOSED QUALITY SHEETMETAL 14/12Q DUCTBOARD (1" FIBERGLASS) 14/12DB EXAMPLE OF NEW 14/12 EXAMPLE OF NOT IN CONTRACT (NIC) 1 4/1 2 EXAMPLE OF DEMO FLEX DUCT EXAMPLE OF EXISTING 1 4/1 2 FLEX CONNECTOR 3 SYMBOL MANUFACTURER & MODEL NUMBER SIZE TYPE NOTES /7\ SIZE CFM SHOEMAKER 825 PERF FACED OR EQUAL AS NOTED T -BAR LAY -IN MODULAR CORE DIFFUSER EXISTING ® SIZE CFM RETURN/EXH EXISTING /TA SIZE CFM SHOEMAKER 701 -MA AS NOTED T -BAR LAY -IN MODULAR CORE DIFFUSER M -M METAL EGGCRATE 12/24 RETURN/EXH N M -M METAL EGGCRATE 24/24 RETURN/EXH NOTES: 1. DIFFUSERS TYPICALLY LABELED WITH EXTERIOR DIMENSIONS, 24x24 FOR SQUARE DIFFUSERS AND 6x48 FOR SLOT DIFFUSERS. 'ER R VER`BA! GENERAL INFORMATION ROOM # SERVER AREA (SF) LIGHTS (W /SF) PEOPLE ( #) 99 1.0 0 CUSTOMER INFORMATION UNIT MFG & MODEL NO. QUANTITY BTU EACH WATTS EACH MAX HEAT LOAD (BTU) MAX HEAT LOAD (KW) SENS. TONS 1 2 3 4 5 6 7 8 9 10 11 12 SWITCH C3K- PWR- 1150WAC ROUTER BATTERY BACK -UP APC BX1000G CISCO ASA 5505 DELL POWER CONNECT 3324 DLINK DSS 16+ DLINK DES -1026G 24 PORT NETGEAR PROSAFE 24 PORT JFS524 CISCO CATALYST 3560 24 PORT CISCO ROUTER 2811 ADTRAN NETVANTA 3200 DELL POWEREDGE 2900 1 3939 1154 3939 1.2 0.3 1 153 45 153 0.0 0.0 1 1 2 410 120 410 0.1 0.0 3960 1160 3960 1.2 0.3 546 160 1092 0.3 0.1 2 410 120 820 0.2 0.1 1 40 12 40 0.0 0.0 1 440 129 440 0.1 0.0 2 546 160 1092 0.3 0.1 1 717 210 717 0.2 0.1 1 21 6 21 0.0 0.0 1 1580 463 1580 0.5 0.1 13 14 15 16 17 18 DELL OPTIPLEX GX620 IBM RS /600043P 150. IBM RS /6000 44P 170 DELL PRECISION 380 APC UPS XS 1300 APC UPS RS 1500 1 1 1 1 1 1 330 796 796 320 180 180 97 330 0.1 0.0 233 796 0.2 0.1 233 796 0.2 0.1 94 320 0.1 0.0 53 180 0.1 0.0 53 180 0.1 0.0 TOTAL: 16866 4.9 1.4 ENVIRONMENTAL INFORMATION ITEM MAX LOAD (BTU) MAX LOAD (KW) SENS. TONS ENVELOPE LIGHTS PEOPLE 0 0.0 0.0 338 0.1 0.0 0 0.0 0.0 TOTAL: 338 0.1 0.0 CAC EQUIPMENT INFORMATION UNIT MFG & MODEL NO. NOM. TONS MAX SENS. CAPACITY MAX CAPA- CITY (KW) SENS. TONS AC-1/0U-1 FUJITSU ASU24CL1 /AOU24CL1 2 18000 5.3 1.5 TOTAL: 18000 5.3 1.5 LOAD EVALUATION LOADS (BTU) (KW) SENS. TONS TOTAL CURRENT LOAD: 17204 5.0 1.4 NOTES: 1. BASED BTUH VALUES PROVIDED BY CUSTOMER. 2. NO FUTURE EXPANSION. 3. BASED ON 50% OF NAMEPLATE WATTAGE. HUMIDITY CONTROL N +1 REDUNDANCY AUTO SWITCH -OVER EXTERNAL ALARMING /MONITORING FM 200 SYSTEM HYDROGEN GAS MONITORING NO NO NO NO NO NO FUTURE EXPANSION: 0 0.0 0.0 TOTAL FUTURE LOAD: TOTAL CAC CAPACITY: SURPLUS /(DEFICIENT) CAPACITY: 17204 5.0 1.4 18000 5.3 1.5 796 0.2 0.1 APPROVED BY: DATE: 08 -29-12 SEPARATE PERMIT REQUIRED FOR: 0 Mechanical Electrical Olt Plumbing Gas City of Tukwila BUILDING DIVISION REVISIONS No changes shalt be made to the se of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan revle,, fees. 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE HVAC CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2009 EDITIONS OF THE INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL FIRE CODE AND STATE AND LOCAL CODES AND ORDINANCES. 3. DUCT CONSTRUCTION AND HANGING SHALL COMPLY WITH CHAPTER 6 OF THE 2009 IMC AND WITH CURRENT SMACNA STANDARDS. EARTHQUAKE BRACE ALL DUCTS 28" DIA AND LARGER WHICH ARE SUSPENDED MORE THAN 12" BELOW STRUCTURAL SYSTEM. 4. JOINTS OF MEDIUM AND HIGH VELOCITY DUCT SYSTEMS SHALL BE SEALED WITH GASKETS OR LISTED MASTIC TYPE DUCT SEALANT. 5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS, PER 2009 WSEC. - DUCT WRAP, WHERE INDICATED, SHALL BE 1 1/2" 0.75 LB /CU FT FIBERGLASS DUCT INSULATION WITH A FACTORY APPLIED REINFORCED ALUM. FOIL VAPOR BARRIER (R-4.2 MIN.). - SOUND LINING, WHERE INDICATED, SHALL BE 1" 1.5 LB /CU FT FIBERGLASS DUCT LINING COATED TO PREVENT FIBER EROSION AT VELOCITIES UP TO 6000 FPM (R-4.2 MIN.). - DUCT BOARD, WHERE INDICATED, SHALL BE 1" RIGID FRK FACED El 475 FIBERGLASS DUCT BOARD SYSTEM, UL 181 LISTED AS A CLASS 1 AIR DUCT (R-4.3 MIN.). AIR DUCT (R-4.3 MIN.). 6. FLEX DUCTS SHALL CONSIST OF A REINFORCED VAPOR BARRIER, 1 1/2" FIBERGLASS INSULATION, AND NON - PERFORATED INTERIOR LINER WITH WIRE HELIX. DUCT SHALL BE A UL 181 LISTED CLASS 1 AIR DUCT. FLEX DUCTS SHALL ONLY BE USED WHERE SHOWN AND SHALL NOT EXCEED 12' IN LENGTH UNLESS NOTED OTHERWISE. 7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH SECTION 1613 OF THE 2009 IBC. 8. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILY ACCESSIBLE LOCATIONS. UNLESS SHOWN ON ARCHITECTURAL DRAWINGS, REQUIRED ACCESS PANELS SHALL BE PROVIDED AND INSTALLED BY THE GENERAL CONTRACTOR. MINIMUM ACCESS DOOR SIZE FOR VALVES AND DAMPERS TO BE 18" X 18 ". 9. MOTORS STARTERS NOT LISTED AS BEING PROVIDED IN THE HVAC EQUIPMENT SCHEDULES ARE TO BE PROVIDED AND INSTALLED BY ELECTRICAL CONTRACTOR. 10. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO BE PROVIDED TO THE BUILDING OWNER. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT AND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER DESIGN FLOW RATES. 11. OPERATING AND MAINTENANCE MANUALS TO BE PROVIDED TO THE BUILDING OWNER THAT INCLUDE: SUBMITTAL DATA, NAMES AND ADDRESSES OF AT LEAST ONE SERVICE AGENCY, HVAC CONTROLS SYSTEM MAINTENANCE AND CALIBRATION INFORMATION AND A COMPLETE OPERATIONAL NARRATIVE FOR EACH SYSTEM. 12. COMMISSIONING IS REQUIRED ON THIS PROJECT IN ACCORD WITH WASHINGTON STATE ENERGY CODE (WSEC) SECTION 1416 AND WITH LEED NC -2.1 FUNDAMENTAL BUILDING SYSTEMS COMMISSIONING AND ADDITIONAL COMMISSIONING. 13. A COMPLETE REPORT OF TEST PROCEDURES AND RESULTS SHALL BE PREPARED AND FILED WITH THE OWNER v t PIPING MATERIAL SCHEDULE: PIPING SIZE MATERIAL JOINT INDIRECT DRAIN 1/2" - 2 -1/2" COPPER/DWV/TYPE M LEAD FREE SOLDER REFRIGERATION 1 /8" - 4 -1/8" COPPER TUBE, ACR BRAZED PIPING INSULATION SCHEDULE PIPING PIPE INSULATION INSULATION CONDUCTIVITY TYPE SIZE TYPE THICKNESS RANGE 1/2" - 1" FIBERGLASS, ARMAFLEX 1/2" 0.23 - 0.27 COIL CONDENSATE PIPING 1 -1/8" + FIBERGLASS, ARMAFLEX 1" 0.23 - 0.27 1/8" - 1" FIBERGLASS, ARMAFLEX 1/2" 0.23 - 0.27 REFRIGERATION SUCTION 1 -1/8" + FIBERGLASS, ARMAFLEX 1" 0.23 - 0.27 REFRIGERATION MIXED (DOWNSTREAM OF TXV) ` , 1/8" - 7/8" ARMAFLEX 1" 0.23 - 0.27 - ALL PIPING INSULATION AND COVERINGS SHALL HAVE AN ASTM FLAME SPREAD RATING OF 25 OR LESS AND AN ASTM SMOKE DEVELOPED RATING OF 50 OR LESS. - ELASTOMERIC INSULATIONS WHICH MEF.=T THESE RATINGS MAY BE USED AS A SUBSTITUTE FOR FIBERGLASS. - PROVIDE A VAPOR BARRIER COVERING ON ALL CHILLED WATER PIPING AND COIL CONDENSATE PIPING INSULATION. - PROVIDE A COVERING FOR ALL FIBERGLASS INSULATION WITHIN THE BUILDING. - PROVIDE A VINYL JACKET FOR ALL INSULATION EXPOSED TO SIGHT WITHIN THE BUILDING EXCEPT MECHANICAL ROOMS. - PROVIDE REMOVABLE LACED INSULATION PAD OVER ALL CONTROL VALVES, WHERE NOT LOCATED WITHIN A MECHANICAL ROOM. - PROVIDE ALUMINUM JACKET ON ALL INSULATED PIPING OUTSIDE BUILDING. - AT PIPE HANGERS PROVIDE RIGID INSULATION BETWEEN PIPE AND HANGER. 1. THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERY OFFSET WHICH MAY BE REQUIRED. THE MECHANICAL CONTRACTOR IS TO COORDINATE WITH ALL OTHER TRADES AND IS TO VERIFY ALL CLEARANCES BEFORE COMMENCING WORK. 2. MATERIALS, METHODS, AND INSTALLATION SHALL COMPLY WITH THE PROVISIONS OF THE 2009 IBC, IMC, AND UPC AS AMENDED BY THE STATE OF WASHINGTON AND LOCAL AUTHORITIES. 3. ALL PIPE SIZES NOTED ON DRAWINGS ARE MINIMUMS. 4. SLOPE ALL INDIRECT DRAINS AT 2% UNLESS OTHERWISE NOTED ON DRAWINGS. OBTAIN APPROVAL FROM CODE AUTHORITY BEFORE INSTALLING PIPING AT LESS THAN 2% (EVEN IF LESSER SLOPE IS INDICATED ON DRAWINGS). 5, HANGERS AND SUPPORTS FOR PIPING SHALL BE IN ACCORDANCE WITH THE 2009 IMC AND IBC AS AMENDED BY THE STATE OF WASHINGTON AND LOCAL AUTHORITIES. 6. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOORS SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS SO AS TO MAINTAIN THE INTEGRITY AND RATING OF THE FLOOR OR WALL. 7. PROVIDE CHROME PLATE ESCUTCHEON PLATES AT ALL EXPOSED WALL AND CEILING PENETRATIONS, REVIEWED FOR CODE COMPLIANCE 8. PROVIDE SHUT -OFF VALVES AT ALL EQUIPMENT CONNECTIONS. APPROVED 9. PROVIDE UNION, GROOVED OR FLANGED CONNECTION AT EQUIPMENT FOR FUTURE REMOVAL AND SERVICING. OCT 0 3 2012 10. FOR CONDENSATE PIPING PROVIDE TRAPS WITH A MINIMUM SEAL 2" GREATER THAN THE FAN OPERATING STATIC PRESSURE AT ALL COOLING )1 � - COIL CONNECTIONS. City of T ila 11. PROVIDE MINIMUM 1" AIR BREAK FOR ALL CONDENSATE PIPE TERMINATIONS AT DRAINS. • BUILDING D ISION 12. PROVIDE DIELECTRIC CONNECTIONS BETWEEN DISSIMILAR METALS. 13. HEAT TRACING OF PIPING, WHERE INDICATED, SHALL BE PROVIDED AND INSTALLED BY THE MECHANICAL CONTRACTOR. COORDINATE ELECTRICAL SUPPLY FOR HEAT TRACE WITH ELECTRICAL CONTRACTOR. 14. TRENCHING, BACKFILLING AND COMPACTING FOR UNDERGROUND PIPING SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR UNLESS STATED OTHERWISE IN CONTRACT DOCUMENTS. TITLE PROJECT ENGINEER ACCOUNT MANAGER SHEET METAL FOREMAN AIR BALANCE FOREMAN REFRIGERATION FOREMAN LINE VOLT ELECTRICAL FOREMAN CONTROLS FOREMAN COMMISSIONING FOREMAN DDC CONTROLS COORDINATOR FACILITIES DIRECTOR GENL PROJ MANAGER NAME NACHIKET PATWARDHAN STEVE FLINK TIM FELTON RON LANDBERG DEAN GRASSER ED ADAMS LINDSEY ANDREWS BRIAN WHEELER BRIAN WHEELER GREG COLEMAN DAVID KEHLE COMPANY MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER MACDONALD MILLER CBRE D.K. ARCHITECTS PHONE NUMBER 206 - 768 -4128 253 - 680 -3172 206 -407 -2692 206 -571 -2661 206 - 768 -4270 206 - 396 -9321 206 - 768 -4208 206 - 571 -2659 206 -571 -2659 253 - 398 -9007 206 -433 -8997 EMAIL NACH IKET.PATWARDHAN @MACMI LLER.COM STEV E. FL I N K @MACM I LLER. COM TIM.FELTON@MACMILLER.COM RON.LANDBERG@MACMILLER.COM DEAN.GRASSER @MACM I LLER.COM ED.ADAMS@MACMILLER.COM LI N DSEY.ANDREWS @MACM I LLER.COM BRIAN.WHEELER@MACMILLER.COM BRIAN.WHEELER@MACMILLER.COM NAME TITLE TM0.01 SCHEDULES - HVAC TM0.01 S SITE MAP DM2.01 1ST FLOOR DEMO PLAN NAME TITLE TM2.01 1ST FLOOR PLAN VIEW TM2.03 ROOF PLAN RELOCATE (11) EXISTING DIFFUSERS AND (4) EXISTING GRILLES RELOCATE (6) EXISTING T- STATS. ADD (7) NEW DIFFUSERS AND (8) NEW GRILLES. ADD (1) NEW DUCTLESS SPLIT SYSTEM WITH WIRED T -STAT. ADD REFRIGERANT PIPING BETWEEN THE INDOOR AND OUTDOOR UNIT. AIR BALANCE (7) WT ZONES AND (1) SPLIT SYSTEM. MISC DUCTWORK. Permit No., ;•, M\2_L1• Flan review approval is subject to errors and omissions. nrimvp,I of cnnstruction documents does not authorize the v o ation of any adopted code or ordinance. Receipt of approved Field Copy and conditions is ackno 1edged: By0 -(-.9 Date:. iO /4 /i a- Tukwila BUILDINCity Of TuG DIVISION DUWAMISH RIVER 48TH AVE S INTERURBAN AVE S S 133RD ST VICINITY MAP NO SCALE „y MRH7 RECEIVED CITY OF TUKWILA SEP 2 6 2012 PERMIT CENTER E 0 0 E 0 E 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I I I I.I,1 I I CV • M rn c0 0 0 In 0 0 In H � w w D_ CL 4` I ICC co rn (1) LL 0 0 Z .U_ EXPIRES: 07 -06 -14 w Q 0 REVISIONS: w 0 REVISIONS: ENGINEER: N PATWARDHAN CHECKED BY: B GEZON CAD: R VILLANUEVA DRAWING NUMBER: E -0182- 7326798 -00 SSUED FOR CONSTRUCTION LAST REVISED: 09 -24 -12 DATE PLOTTED: 09 -24 -12 ISSUE DATE: 09 -24 -12 SHEET NUMBER: TMQ.O1 3 0 W Gateway Bldg 7 —PDS Tech TI O E 0 0 co O D AV R V R 60000/0 / V V / 1 ,55' J 5 9 I 0” jog' 1o" REVIEWED FOR CODE COMPLIANCE APPROVED OCT 0 3 2012 City of Tukwila BUILDING DIVISION s RECEIVED CITY OF TUKWILA SEP 26 2012 PERMIT CENTER 3/32" = 1' -0" -6 co 0 0 -- 00I 0 0 0N- OC O Q O O co co Wu_ 0) O Ca) 0 � 0 0 N O 'N7 d E O 0 a) E 0 t6 E N1 N rn 0 O CO 0) LL 0 CQ Z 0 J EXPIRES: 07 -06 -14 IL 0 REVISIONS: W 0 REVISIONS: ENGINEER: N PATWARDHAN CHECKED BY: B GEZON CAD: R VILLANUEVA DRAWING NUMBER: E -0182 -73267 SHEET NUMBER: z 0 0 Et z 0 0 0 L_ 0 w LAST REVISED: 09 -24 -12 DATE PLATTED: 09 -24 -12 ISSUE DATE 09 -24 -12 98 -00 TMO.O1 S J: \732 \6798 Gateway Bldg 7 —PDS Tech 11 Eng SF\00 \Eng \Dwg \SHTS \7326 t `A �Jr t 3 24x24 1 24x24 80 02 A 4x24 85 024x24 '1 85 24x24 100 24x24 24x24 24x24 70 100 A 24x24 100 I 24x24 1100 24x24 80 60 (TYP 4 24x24 1 LIX 12 4111111C4:i ►7n1• 8o 16/16 S:L-` WT -104 WT -105A • VVT-107 1 24x24 250 24x24 TRANSFER IT'STAT -291 24x24 210 COPIER WT -103 24x24 24x24 24x24 O 12x24 6x48 `.. a ._ —.s.. 1 TRUNK DUCTS UP 1 , 12x12 24x24 6x48 2g 24 M"!! 100 \ -- !'_ !► 4': 24x24 6x6 ' �)_ �� II" I o 50 01:602)16 6x I 17 12x24 40 Q i 1 .� � 18x18 TRANSFER A- o MT 6" AFF ©x24 ¢ 4 IT'STAT -361 24x24 C.L. 10' -0" AFF STA 140 RA 12x24 24x12 ATCH 80% FM. OILET R 2) 300 iT'STAT -371 WT -111 22x18 irJlerr TRU 101/11111. 4 /III I 1111- MU N �W% 2 �i� �� s MEM WA50 WT -122 6x48 50 IT'STAT -301 6x48 45 6x48 px10 EXH UP 00 24x24 C.L. 10' -0" AFF 6x48 300 24x24 C.L. 10' -1' AFF 80 rr��rr1TC! 11' -2" AFF 24x24 (TYP 4) 80 (T(P 3) AWNING 24x24 600 (TYP 2) 330 330 24x24 220 230 350 24x24 250 24x24 12x24 (TYP 4 250 120 (TYP 2) 1 80 (TYP 4) I T'STAT -1 11 F, 80 (TIP 3) 100 (TYP 4) 0 12x24 (TIP 4) 80 (TYP 4) 24x24 20x12 RA 140 24 4 24x24 230 CYR 4) 24x24 600 (TIP 2) (TYP 2) 80 (TYP 5) 24x24 WT -124 KE1 101111111111111111111111111111 12x24 24x24 24x24 .�y �4'p4 / 17130 24x24 (TIP 4) 230 60024(TYP 2) / r( 120�r2) 16x16 RA 24x24 FCU -103 WT -125 80 (TYP 4) 80 (TYP 4) 24x24 ii�irrlaM 80 (TYP 24x24 ' 170 11 140 1 P 3) IT'STAT -081 0 IT'STAT -071 24x24 1 s0 (TYP 4) 120 (TYP 2) 24x0 24 (TYP 2) 60 12x24 (TYP 2) WT -137 24x24 140 EA 100 24x24 10x10 EX AIR UP 24 1 120 012x12 470 16x16 EA P 100 24x24 24x24 T'STAT -031 12x24 TRANSFER (TYP 3) 12x24 (TYP 4) 100/(3) 24x24 24x24 24x24 80 (TYP 4) I- LAG NOT S. ABANDONED EQUIPMENT. OUTSIDE AIR INTAKE. RADIANT CEILING PANEL. RETURN AIR BOOT ABOVE CEILING. DUCT CONFIGURATION COULD NOT BE VERIFIED. PRESUMED LOCATION OF ZONE DAMPER. COULD NOT BE VERIFIED. NO T'STAT FOUND FOR THIS ZONE DAMPER. TT REVIEWED FOR CODE COMPLIANCE APPROVED OCT 0 3 2012 City of Tukwila BUILDING DIVISION 24x24 230 24x24 190 24x24 220 6x48 310 3 ILO W c, o 0 I o O o U 0 LI or- co co rnr-- Qo co A0 CV � X N (/) LL 0 N o > M N- 0 (.0 Q •^- 0 h D_ E O 0 4) E 0 E RECEIVED CITY OF TUKWILA SEP 2 6 2012 PERMIT CENTER 1/8" = 1' -0„ 1 1 I 1 1 I I NI LO cV I 0) O N_1 DO I 0 0 N w 0_ I<N1 z 0 w 0 0 0 O 00 0) L_ 0 0 2 z U a EXPIRES: 07 -06 -14 W 0 REVISIONS: w 0 REVISIONS: ENGINEER: N PATWARDHAN CHECKED BY: B GEZON CAD: R VILLANUEVA Z 0 U VJ Z 0 U 0 LL 0 w LAST REVISED: 09 -24 -12 DATE PLOTTED: 09-24-12 ISSUE DATE: 09 -24 -12 DRAWING NUMBER: E -0182- 7326798 -00 SHEET NUMBER: DM2.01 24x24 190 24x24 80 0 24x24 �` 85 A 24 24x$� 24x24 24x24 24x24 24x24 24x24 24x24 24x24 80 -60 (TYP 4 24x24 r]1�•irilvi i WT -134 16/16 2x24 (TYP 2 12x24 80IICL 4x24 100 WT-105A VVT -107 VVT -102 INSTALL ABOVE TURN JRE- HEIGHT :.. CAP,m_k. COPIER rA 4 i 100 24x24 250 24x24 TRANSFER 24x24 210 0 24x24 24x24 24x24 T'STAT -251 24x24 200 RA VV-r-114 0 12x24 1401 AC•-' 1. 24x24 C.L. 10,-0" AFF T'.�.. DUCTS I!► 12x12 8" PUMPED CONDENSATE SINK TAIL PIECE„ 24x24 01 2x24 140 , 6x48 60 12x24 24x24 230 24x24 140 RA x48 380 140 RA 12x24 190 24x24 300 24x12 XHAUST VERIFY LY (ITy'T IT'STAT -371 6x48 80 0 SA /II♦ 6x48 IT'STAT -301 6x48 45 111111 1► 9:11 6x6;! 80 (TYP 4) 6x10 EXH UP 6x48 300 24x24 C.L. 1 O' -0" AFF 140 SA I I A 6x48 300 Inv =MS G.L. 10' -1 " AFF N 24x24 1 1' -2" AFF 24x 124 0 (TYP 4) 80 (TYP 3) AWNING ■i Q 0 (N 2x24 24x-24 s00 (TYP 2 ) 120 (TYP 2) 80 (TYP 4) I T'STAT -111 24x24 20x12 RA 0- 0 24x2 N 80 (TYP 3) 24x24 230 {TYP 4) 24x24 600 (TYP 2) 120 (TYP 2) 80 (TYP 5) 24x24 100 (TYP 4) 0 12x24 (TYP 4) 80 (TYP 4) 12x24 24x24 FCU -103 WT -125 24x24 ( ) 230 �TYP 4 24x24 600 (TYP 2) 2) 80 (TYP 4) 80 (TYP 4) 24x24 t p3EICSoll l 11111 140 80 (TYP 24x24 IT'STAT -OBI 24x24 190 (TYP 4) 120 (TYP 2) IT'STAT -071 24x24 FCU -104 WT -137 24x24 24x24 260 10x10 EX AIR UP 120 12x12 470 24x24 24x24 t�7rs - #xl 12x24 (TYP 4) 100 ((3) 24x24 24x24 24x24 80 (TYP 4) 2x24 TRANSFER (TYP 3) 16x16 EA P 100 24x24 (TYP 2) 600 t 12x24 (TYP 2) /J' 330 330 -GAG NOT 24x24 220 ABANDONED EQUIPMENT. OUTSIDE AIR INTAKE. RADIANT CEILING PANEL. RE I URN AIR BOOT ABOVE CEILING. DUCT CONFIGURATION COULD NOT BE VERIFIED. PRESUMED LOCATION OF ZONE DAMPER. COULD NOT BE VERIFIED. NO T'STAT FOUND FOR THIS ZONE DAMPER. 230 L Ji G 350 24x24 250 24x24 REVIEWED FOR CODE COMPLIANCE APPROVED OCT 0 3 2012 City of Tukwila BUILDING DIVISION 12x24 (TYP 4 x24 250 TAT 6x48 310 RECEIVED CITY OF TUKWILA SEP 2 6 2012 PERMIT CENTER 1/8" = 1' -0" 4 L. o � W cco Qco o �CD 1 a)o CD N 7:5 rCi U)� co Orn 07 U 0 Np •V u O " Z U_ J 1 1 1 1 1 1 1 07 0 0 1- W cvr 1 001 0 REVIEW SET K<- EXPIRES: 07 -06 -14 w 0 REVISIONS: LL.I 0 REVISIONS: Z 0 U vJ Z 0 U OC 0 LL 0 w ENGINEER: LAST REVISED: N PATWARDHAN 09 -24 -12 CHECKED BY B GEZON DATE PLOTTED: 09 -24 -12 CAD: ISSUE DATE R VILLANUEVA 09 -24 -12 DRAWING NUMBER: E- 0182- 7326798 -00 SHEET NUMBER: TM2.01 /; ; 12x24 12x24 x48 110 24x24 145 4x24 90 120 EXH DUCT THRU ROOF 24x24 TRANSFER (TYP 2) 24x24 14/14 SL 80 VAV -201 A 24x24 120 (TYP 2) B.O.D. AFF 12x24 VVT -205 VAV-202 WT -243 12x24 VVT -204 II►�.yG —. .WT 202 18x18 TRANSFER �44 �MT 6" AFF 1WT -203 24x24 24x24 145 T CONNECTED x24 FILTER GRILLE 80 11 8x8 1 1 170 II 1I- - -- 240 1 WT -2371 WT -216 WTEL218 24x24 180 12x24 8x8 210 R 24x24 1700 180 RA 80 3) 200 RA 140 TYP 2 WT -217 360 (TYP 3) REFER PIING AND lf`ELECTRIC •� ' :DUIT DN ASE TO 1 ='`T GFL .C. OOR. rte 24x24 /! 24x24 I 24x24 4Namm 4x24 120 00 24x24 120 RA DN 0 O 12x24 A 24x24 -- 100 WT -207 P 3) .x2.4 ' 110 24x24 WT -2081 6x48 360 38x18 SA 80 (TYP 4) 24x24 Lt. rki 24x24 (off F2x24 12x24 24x24 170 TRUNK DUCTS 24x24 RUNK U CTi DUCTS BALAN OF EXHAUST°` °CFM. FIELD VERIFY TOILET ARM (T`f -P =2 ELECTRIC. CONDUIT REFER PIPINGv UP TH THE ROOF TOO pU -1 .... 10' —6" AFF : r. 6x48 280 DU 24x24 TRUNK DUCTS UP 38x2 O 12 ;1.2, 44x20 12x12 6x48 180 RA FCU -201 CARPE 24x24 180 24x24 18x18 EXH D 24x24 OM 4 18x18 EXH UP air WT -209 180 6x48 105 6x48 16x10 EXH :112x24 (TYP 2) 18x18 EXH 18x18 EXH 12x24 12x24 24x24 V T -234 24x24 24x24 80 (TYP 2) 6x4 8 180 24x24 24x24 100W 24x24 24x24 24x24 24x24 24x24 100w 2x24 12;(2 12x24 x6,14-08 . f 4) TYP 4 C.L. 10' -2" WT -224 6x48 3) 10 (TYP 3 90 (TYP 4) 6x48 540 140 (TYP 4) 12x24 (TYP 4 24x24 1q�\( 100 100W 100 80 CAPPED C.L. 1 1 ' —0" AFF 24x24 TRANSFER 24x24 24x2 6x48 280 6x48 290 TYP 4) TYP 4) I OFF BOTTOM OF DUCT TEE 18x18 TRA MT 6" AFF TYP 4) 6x48 (TYP 5 400 90 (TIP 5) 24x24 60 24x24 '6'0- 16186 ) CAPPED 24x24 TRANSFER 80 (TYP 4) 24x24 24x24 100 24x12 24x24 TRANSFER 80 6x48 70 MI II 6x48 230 CDT 5) 90 (TYP 6) ® 48x24 (OPEN RETURN) 24x12 RLJCi S 80 (TYP 8 6x48 260 260 (I P 4 TYP 4) 1 SHEET NOTES: ® FIELD LOCATE T -STAT FOR VVT -228 AND RELOCATE IF NECESSARY. ® PROVIDED DUCTED RETURN ON PARALLEL VAV BOX. I 120 SA / 1 90 (TYP 3) 6x48 270 TYP 3) 2' -LAG NOT -S- CONTROL POWER TRANSFORMER FOR PARKER /CARRIER CONTROLS, ABOVE CEILING. DIFFUSER NOT MOUNTED CORRECTLY. AIR DISCHARGED INTO CEILING CAVITY. DUCT NOT SECURELY FASTENED TO GRILLE. DIFFUSER NOT CONNECTED. REIURN TO CEILING SPACE. FAN COIL UNIT. MOUNTED ABOVE CEILING SPACE. FAN POWERED VAV UNIT. DUCT CONFIGURATION COULD NOT BE VERIFIED. GRILLES CONNECTED TO FAN COIL UNIT IN SHIPPING /RECEIVING AREA CEILING SPACE. (SEE FLAG NOTE 5) GRILLE CONNECTED FROM BOTTOM OF DUCT. i> 60 TON MONITOR T —STAT. 120 SA DUCT BETWEEN RISERS TO SA DUCT. 7 REVIEWED FOR (ODE COMPLIANCE APPROVED OCT 0 3 2012 City of Tukwila BUILDING DIVISION 5 OLUTIONS 0 LL 0 CO 0 I"- r- oc) co O ' Q O Qj O N _ O CD L (0 O O C • rn QCD 00 4) N O C ui 0 ,N= • a E O U N E U E I I I I I I r1 r1 I I N1.7 0 co 0 0 1- M w 0 0 J RECEIVED CITY OF TUKWILA SEP 2 6 2012 PERMIT CENTER 1/8" = 1' -0" REVIEW SET O 03 0 LL 0 2 U_ J EXPIRES: 07 -06 -14 w 0 REVISIONS: Iil 0 REVISIONS: z 0 F- 0 z 0 U 0 u_ 0 w co ENGINEER: LAST REVISED: N PATWARDHAN 09 -24 -12 CHECKED BY: DATE PLOTTED: B GEZON 09 -24 -12 CAD: ISSUE DATE: R VILLANUEVA 09 -24 -12 DRAWING NUMBER: E -0182- 7326798 -00 SHEET NUMBER: TM2.02 3' t 6 0 REFER PIPING ROUTED TO THE INDOOR UNIT ELECTRICAL CONDUIT TO THE INDOOR UNIT BY E.C. CONDENSING UNIT INSTALLED ON SLEEPER WITH NEOPRENE ISOLATION. SLEEPERS PROVIDED AND INSTALLED BY G.C. ALL CUTTING AND PATCHING OF THE ROOF BY G.C. SCREEN ALL REPLACE RTU -102 RECONNECT NEW UNIT TO EXISTING NATURAL GAS LINE AND ELECTRICAL SERVICE A -A GI- N SCREEN WALL - RAC \OTl -S: 1. NOT ALL ROOF - MOUNTED EQUIPMENT IS SHOWN. FLAG NO S 50 TON MODEL CARRIER 48AKTO5DSQ61 1 HM. [EXISTING] CARRIER WEATHER MAKER SINGLE- PACKAGED 60 -TON ROOFTOP UNIT. MODEL# 48DF -064. SERIES# 640PA. SERIAL# Y883274. [EXISTING] REPLACE W/ 60 TON MODEL CARRIER 48A3T060DSV61 1 HM. CARRIER WEATHER MAKER SINGLE - PACKAGED ROOFTOP UNIT. MODEL# 48TJD014. SERIES# 601 QE. SERIAL# 4194630497. [EXISTING] y/ D REVIEWED FOR CODE COMPLIANCE APPROVED OCT 0 3 2012 City of Tukwila BUILDING DIVISION 114"-/ SOLUTIONS 0 LL o ti CO C < Nac a) c) CD co N E U)1j U N U) 0 0 co S E c Q � n• O CO L 4) N 1- C c- 0 ■ D_ I I I RECEIVED CITY OF TUKWILA SEP 2 6 2012 PERMIT CENTER 1/8" = 1' -0" I I I 111 I I< REVIEW SET WA Lic No: MACDOFS980RU EXPIRES: 07 -06 -14 W F- 0 REVISIONS: Id 0 REVISIONS: ENGINEER: LAST REVISED: z 0 U Cn z 0 U 0 LL 0 w C!) CO N PATWARDHAN 09 -24 -12 CHECKED BY: B GEZON DATE PLATTED: 09 -24 -12 CAD: ISSUE DATE R VILLANUEVA 09 -24 -12 DRAWING NUMBER: E- 0182- 7326798 -00 SHEET NUMBER: TM2.03 PREFABRICATED CLOSED -CELL FOAM /STRUT SUPPORT MFG: MICHIGAN MOD: PIPE PIER GALV. STRUT PIPE CLAMP PIPE ROOF GLUE /MOP SUPPORT TO ROOF BY G.C. DETAIL - PIPING ON ROOF N.T.S. NEOPRENE PAD SHEET METAL SLEEPER CAP BY M M FS SLEEPER PROVIDED AND INSTALLED BY G.0 ROOF FLASHING BY G.C. ROOF MEMBRANE ROOF CUTTING AND PATCHING BY G.C. CONDENSING UNIT INSTALLATION DETAIL N.T.S. THIS SIDE OPEN WITH HEMMED EDGES FILL CAVITY W /FOAM INSULATION AND SEAL AROUND PIPING W /CAULK 1/2"x1/2" TURNED EDGE SECURE LID WITH SHEETMETAL SCREWS ROOF CUTTING AND PATCHING BY OTHERS SECURE TO STRUCTURE PIPING ROOF JACK N.T.S. REVIEWED FOR CODE COMPLIANCE APPROVED OCT 0 3 2012 City of Tukwila BUILDING DIVISION Mt)lM 7 co to CO • CO Q~ ai 0 _ N N �u O 7 O ccj2 ti 2 (0 L 0 4) N a 45 .~- 0 H D_ I,_I rl I I Ln r N N) I I CO CO 0 0 REVIEW SET EXPIRES: 07 -06 -14 W 0 REVISIONS: W 0 REVISIONS: Co RECEIVED CITY OF TUKWILA SEP 26 2012 PERMIT CENTER ENGINEER: N PATWARDHAN CHECKED BY: B GEZON CAD: R VILLANUEVA DRAWING NUMBER: E -0182- 7326798 -00 z 0 F- 0 DC F- z 0 U 0 LL 0 w LAST REVISED: 09 -24 -12 DATE PLOTTED: 09 -24 -12 ISSUE DATE: 09 -24 -12 SHEET NUMBER: TM6.01