Loading...
HomeMy WebLinkAboutPermit M12-180 - WESTFIELD SOUTHCENTER MALL - SOMA INTIMATESSOMA INTIMATES 260 SOUThCENTER MALL M12 -180 City of/Tukwila 1 Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 2061131 -3670 Inspection Request Line: 206- 431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 9202470010 Address: 260 SOUTHCENTER MALL TUKW Project Name: SOMA INTIMATES Permit Number: M12 -180 Issue Date: 01/25/2013 Permit Expires On: 07/24/2013 Owner: Name: WESTFIELD PROPERTY TAX DEPT Address: PO BOX 130940 , CARLSBAD CA 92013 Contact Person: Name: MARY RYAN Address: PO BOX 3749 MISSION VIEJO CA 92690 Email: MARY @PERMITRESOURCES.COM Contractor: Name: EVERGREEN REFRIGERATION LLC Address: 727 S KENYON ST , SEATTLE WA 98108 Contractor License No: EVERGRL954R2 Phone: 949 582 -3735 Phone: 206 763 -1744 Expiration Date: 01/06/2014 DESCRIPTION OF WORK: Value of Mechanical: $12,000.00 Type of Fire Protection: SPRINKLERS /AFA Electrical Service Provided by: Permit Center Authorized Signature: Fees Collected: $330.56 International Mechanical Code Edition: 2009 (C 1 Date: 1 — — 13 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this permit. Signature: Date: Print Name: This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. ,for.. IMC -4/1 n M12 -1Rn Printari. n1- 7S -7011 1 • PERMIT CONDITIONS Permit No. M12-180 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: Readily accessible access to roof mounted equipment is required. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Remove all demolition rubble and loose miscellaneous material from lot or parcel of ground, properly cap the sanitary sewer connections, and properly fill or otherwise protect all basements, cellars, septic tanks, wells, and other excavations. Final inspection approval will be determined by the building inspector based on satisfactory completion of this requirement. 8: Manufacturers installation instructions shall be available on the job site at the time of inspection. 9: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 10: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431 - 3670). 11: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 12: ** *FIRE DEPARTMENT CONDITIONS * ** 13: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 14: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2328) 15: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 16: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2328) 17: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2328) 18: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2328) 19: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2328) (IFC 104.2) 20: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. rimer•.• IMf:.4 /1n M12 -1RO PrintM. n1 -2F -2018 21: Contact The Tukwila Fire Preved" In Bureau to witness all required inspections tests. (City Ordinances #2327 and #2328) 22: Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of such condition or violation. 23: These plans were reviewed by Inspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. tine. IM(: -4/10 M12 -1Rn Printp.1 n1 -75 -2013 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov Mechanical Permit No. Project No. Date Application Accepted: :Date Application Expires: (For office use 609' MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. **please print** Site Address: Tenant Name: Soo King Co Assessor's Tax Suite Numb Ne Tenant: PROPERTY OWNER : , Name: WI/c/b 6/41. i--,ve_ -7- ) Address: j/ / 1,14,44,,,..,,4 city, 4,,,„p a StatevAL ZiAQA._ 1 CONTACT PERSON — person receiving all project communication , Namek44/ /Iry ..70644//16-4 vx e Address: "Ito O. ,...? 7 y_ / /. Ci, .rsielv A-0 State: ex_. Zip:yd ‘ Phone: Ci-3a7.36- - 9f19-76 Emalk4-4v 0 bdoomt ,-8e.0e4e-e. 6 i . 4 0: CIU)2111)01,0 *# Floor: k. Yes I=1 No MECHANICAL CONTRACTOR INFORMATION Company Name: efk-340 dc- eAl, 1 ., fAddres6/ 3 _ e-, r 0 3. • e), .../../ M .. CityWER 4,....,14/ //f, State0 ;Zip4/..,?,) Phon6 ysv Contr Reg No.: et 3 0 g & Exp Date: Tukwila Business License No.: 6 cY?7/4. Valuation of project (contractor'sbid price): $ 4:7?/ -2, -0 - Describe the scope of work in d //t/ 47 Use: Residential: New Commercial: New El Replacement ottniA rfAAVAL - o if / Av t d,44/ rite e_ eE-v El Replacement Fuel Type: Electric TE‘ Gas Other: HAApplications\ Forms-Applications On Line \2011 Applications Mechanical Permit Application Revised 8-9-11.docx Revised: August 2011 bh Page 1 of 2 k5V-tec Indicate type of mechanical work being installed and the quantity below: Unit Type Qty; Furnace <100k btu Furnace >100k btu 10' Floor furnace I Suspended/wall/floor mounted heater I Appliance vent Repair or addition to heat/refrig/cooling system I Air handling unit <10,000 cfm Unit Type Qty handling unit >10,000 cfm Evaporator cooler 10' Ventilation fan connected to single duct I Ventilation system I Hood and duct Incinerator — domestic I Incinerator — comm/industrial PERMIT APPLICATION NOTES - Unit Type Qty Fire damper Diffuser 10' Thermostat I Wood/gas stove Emergency generator Other mechanical equipment I ILIU / 6 000 c F Boiler /Compressor Qty hp /100,000 btu 3 -15 hp /500,000 btu 15 -30 hp /1,000,000 btu 30-50 hp /1,750,000 btu 50+ hp /1,750,000 btu Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING f " NER OR AUTHORIZED AGENT: Signature: /r it Print Name: Mailing Address: B L ?71- 1i/'SC/vv H:\Applications \Forms - Applications On Line \2011 Applications\ Mechanical Permit Application Revised 8- 9- 11.docx Revised: August 2011 bh Date: //--/a Day Telephone: ,-�7� 6' k/c, o ems— ��4CI° City / State Zip Page 2 of 2 • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 9202470010 Permit Number: M12 -180 Address: 260 SOUTHCENTER MALL TUKW Status: APPROVED Suite No: Applied Date: 11/19/2012 Applicant: SOMA INTIMATES Issue Date: Receipt No.: R13 -00569 Payment Amount: $264.45 Initials: WER Payment Date: 01/25/2013 01:37 PM User ID: 1655 Balance: $0.00 Payee: EVERGREEN REFRIGERATION LLC TRANSACTION LIST: Type Method Descriptio Amount Payment Check 005773 264.45 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES 000.322.102.00.00 264.45 Total: $264.45 dnr• Raraint -na Printpd n1 -25 -9011 City of Twilar 1 Department of Community Development 6300 Southcenter Boulevard, Suite # 100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: hitt, :Mvww. ci. tukwila. wa. us SET RECEIPT Copy Reprinted on 11 -19 -2012 at 09:43:58 11/19/2012 RECEIPT NO: R12 -03149 Initials: JEM User ID: 1165 Payee: PERMIT RESOURCES, INC. Payment Date: 11/19/2012 Total Payment: 1,461.30 SET ID: S000001828 SET NAME: Tmp set/Initialized Activities SET TRANSACTIONS: Set Member Amount D12 -367 1,251.67 EL12 -1088 102.31 M12 -180 66.11 PG12 -202 41.21 TOTAL: 1,251.67 TRANSACTION LIST: Type Method Description Amount Payment Check 21601 1,461.30 TOTAL: 1,461.30 ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PLAN - NONRES 000.345.832.00.0 PLAN CHECK - NONRES 000.345.830 TOTAL: 102.31 1,358.99 1,461.30 �-s INSPECTION NO. CITY OF TUKWILA 6300 Southcenter Blvd., #100, Tukwil Permit Inspection Request Line (206) INSPECTION RECORD Retain a copy with permit ftitt'2-- ( NO. BUILDING DIVISION �(�l a. WA 98188 (206) 431 - 3670.' 431 -2451 �— 1 Project-:-' )0 �t�t, -- .- �T Type of Inspection: �-°- SAO ice_ s6 ci(4 °aii Address: '1 ioo St MA-11 Dat Calle t. x-e_ , 6-ert ,1 Special Instructions: 7„.....?....D__Itl.. / Date Wanted:. -7 a.m. 3--- [.- i ". / p.m. Requester: PhQne IN .2 -7 G; 7 4 ` G Approved per applicable codes. Corrections required prior to approval. COMMENTS: 0 A- ge_fr.' 14-----(71--,3A (Q k, s kc./' ,..6 J (;n,) Al Inspector: A Date: CJ REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. // #4 INSPECTION RECORD-. Retain a copy with permit., INSPECTION NO. ' PERMIT NO CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 5. (206):431- 3670 Permit Inspection Request Line (206) 431 -2451 Project • �0M.A- 1 �1 Type of Inspe DucA,. im • .riot s ___ Address; d C A f Date, Called: \:. : rj d 6ff • Special Instructions: Date 1Nanted wi° <a m. �` p Requester: - '. Phone No: - - Approved per applicable codes. COMMENTS: ElCorrections required prior to approval: f Inspector: C, r /111 U Date: n REINSPECTION FEE REQUIRED. Pr or'to next inspection fee: must-be` paid at 6300 Southcenter Blvd., Suite 100. Call to schedule.reinspection: INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431-2451 fitt2 -(80 Pro 'get: r e Tltp of Inspection: }r % 4 j „ ,e.-e_12 Address: 7Jn Sc MA-1, ! Date Called:! Special Instructions: Date Wanted] !) Requester: Phone ' S 3 -50(0-142-4r1 Approved per applicable codes. Corrections required prior to approval. ._. COMMENTS: D /i i ! 1 A' ^ -- J t✓ J T! J j C_e- ` Lam*' -"--- (A--- 1 4f/ tl K1 L9 u Cr 3lu -- ST (( it ==> '- e d f."1-61° L14,-- , i _S-'a Lei ry n A Inspe',ctor: \ II Date: r n REINSPECTION FEE REQUIRED'Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila: WA 98188 v;, (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 M12 -I ?O Pro e Tye of Inspection: , 0 6 (4-- kJ W60, d A 4 � A4 o - m Tj : ti A Address: 1■(42 et S<_- MCI Date Called: Special Instructions: I Date Wanted- / /�a.m. Requester: Phjo/ne No: °Z--1 ..14 e5 0 Approved per applicable codes. Corrections required prior to approval. COMMENTS: o f -v r- 6.-v ac% Inspector( Date. — s 3 ❑ REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 _ (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Projct= A ,} .. T.ypj'of Inspection: _ ,( Address: � J J Mil Date Called: Special Instructions: Date Wanted: _� r 2. ! ,(a m. p.m. Requester: "J Ji Phone 3 _ge . --`11-14 Approved per applicable codes. Corrections required prior to approval. COMMENTS: 1 /A- , - ' fk Ji , ` — e A- l,J y � r - ( � T J J\J r c,) a.. i9 (�� p D ky- 6 1 Inspector: Date r�r { n REINSPECTION FEE I SQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION NUMBER Col [ INSPECTION RECORD Retain a copy with permit 3� D1 -3 7 - oa/' PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206- 575 -4407 Project: �Or'" 1 6 Sprinklers: Fire Alarm: Type of Inspection: • c- / SY" / �i N44_ Address: c, ,60 s . (. Suite #: ,,, ' -,_ d* Contact Person: Special Instructions: Dtc Phone No.: Approved per applicable codes. Corrections required prior to approval. COMMENTS: Sprinklers: Fire Alarm: , Monitor: Pre -Fire: Permits: Occupancy Type: se — Dtc t/ `. P Ci-.. - ow_ Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: 5"d Ala 1( 15 Date: -121(/3 Hrs.: I $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: City: State: Word /Inspection. Record Form.Doc 6/11/10 Zip: T.F.D. Form F.P. 113 EAGLE TEST & BALANCING COMPANY AABC CERTIFIED 815 E. Main Cushing. OK 74023 Phone: (918) 225 -1668 Fax: (913) 225 -1687 TEST AND BALANCE REPORT 13047S. E. 471h PL. Bellevue, WA 98006 Phone: (425) 747 -9256 Fax: (423) 641 -5662 Prol • tt: 5 A' AS ASsk otion: Architect Engineer seceevv‘kAtxx. Contractor. Ci 1_Ue6 esciet .cle (util --CUKWILA -, Project Number. CZ go This is to certify that Eagle Test & Balance has balanced the systems described herein to their optimum performance capabilities. The testing and balancing has been performed in accordance with the standard requirements and procedures of the Associated Air Balance Council and the results of these test are herein recorded. Associated Air Balance Council Certification Number. 93 -02 -01 Date: Test & Balance Engineer Stephen D. Barnes Form #89010 CITY OFTU RECEIVED KW►L4 MAR 19 2013 PERMIT CENTER Project g31M.ilc System' NMI sa.4ec Date Page of AIR DISTRIBUTION TEST SHEET Terminal Number Room Number Terminal Factor resign Test —FPM or CFM Final Type - . Size FPM CFM - Test 1 Test 2 Test 3 FPM CFM JtA, SD -1 I z" 1.C7 1-444D 58o 14st) LSO 2 -. ' f . i-i- o 5 y h 1130 3 5V-0 y v 436 .., o z-I 1D 4i6 C I 5' L-I(Wb ycoo G r1' JL 'st' -2 [0" LIM 5 O Ws 15 1 wAtitoki 51)-4 6)" SO LSD 55 55 $ Not.) SV -3 , tSo 25D ((cG l (S - 3 0 ISO 31 b nob '1 CoO i 4 I , Remarks SO??L? AK -r kepr-AZve 12.GD Form #89040 e .. , r - Qbk - 104 N CiNt ) T'IO Project Name .EILA.sc Date Page of AIR MOVING EQUIPMENT TEST SHEET SYSTEM 11-1) — 1 (OE 63 Actual Equipment Location TZO o F Total CFM - Fan Area Served C.l HO 1.--C. 6FACET. Equipment Manufacturer Tr-40E- j(3 Model WSG 051 OE3Y�- Pt(SI Serial Number 13601 Z5B 21.1 -1S Motor Sheave & No. Grooves . Specified Actual Specified Actual Total CFM - Fan 3600 "2)046 Total CFM - Outlet j(3 -OctS R/A CFM _ 24 OD 21.1 -1S - O/A CFM (QOD (02b Total Static Pressure (TotaUExtemal) 0,1S'` O. (0.3° Inlet Pressure 11 ZS — 0,'41" Motor Service Factor Discharge Pressure t ,� -I- D, 119" Starter Heater Elements Fan RPM S Z(b 1.(f7 G Motor Sheave & No. Grooves . Specified Actual Specified Actual Motor Manufacturer ANStVAnir MAVAT{ttii Motor HP/BHP '' C, Phase S - Voltage ZOO, 2) t- ZID -Zl[ Amperage -. (to 3, ∎ ' 3,1-;,D Motor RPM 11 ZS ---"+ Motor Service Factor I . S - t ,� Starter Heater Elements —' —'--"' Motor Sheave & No. Grooves . 1 V OD ?(%'' Fan Sheave & No. Grooves AY-(01.1% I" Belts '' C, _IV.?✓"5 Remarks Form #89030 Anualusuc Project Name So M'A Date. Page of EXHAUST FAN DATA SHEET SYSTEM Equipment, LKocadon Area Served Equipment .Manufacturer LAJAtnig-y erlal;Niumber Total, Specified Actual Total.l Fan.: -) -Total .Static Pressure' Specified otai/External) . ; lfilet;Ptessu e: :: ,-.#100arge Pressu Fan _i#PM d£2" t pecified Actual ;Motor Mat ufacturer . 'Motor HPIBHP • . P1 ase • AnJ • Specified -Actual: ■ '1/oitage :Amperage .. - Motor RPM ; • Motor :SeMcei f ctor Starer:HKeaterElements. • (20 otor:. fieBV a &: No. `GrQOVes :Fan Sheave & NO Grooves Belts 'Not-alWays teguired or applicable: Remarks % N CC-DeIV Form #89031 CHICO'S® WHITE H O L S I BLACK' M A R K E T AIR BALANCE REVIEW CHECKLIST SYSTEMS: ACCEPTABLE (CHECK) NOT APPLICABLE ( X ) ❑❑fxs❑❑❑ ❑❑g1❑❑❑ ❑❑0❑❑❑ 00;g0004, 0 f 4 1 0 0 ❑,❑❑ ❑g1❑❑❑ ❑cgI❑❑❑ ❑g,❑❑ EuKEIE ❑ ❑ SOD ❑l.❑❑❑ L❑.❑❑ ❑❑ ,1❑❑ NJ ❑ ❑ ❑XI❑❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ J -0 ❑❑0❑ 0000❑ ❑ ❑g❑ z❑❑ cst. 74 ❑ 00X0 STORE # : 53S i INTIMATES CENTER: Sc1Lrh 1 C�Niti CONTRACTOR: UL& €/Vln I I.I IR IN,. CD DATE: OSA2. /1 S FAX #:1Laj2S�( APPLICABLE SYSTEMS - CHECK ALL THAT APPLY (SEE SYSTEM INDEX) REPORT PREPARED BY INDEPENDENT CONTRACTOR REPORT PREPARED BY CERTIFIED AABC. NEBB OR TABB LICENSED CONTRACTOR SERIAL NUMBER OF EACH PIECE OF EQUIPMENT TESTED MAKE 8. MODEL # OF EACH PIECE OF EQUIPMENT TESTED MOTOR NAME PLATE DATA MANUFACTURER OF MOTOR HP VOLTAGE AMPS KILOWATTS (KW) RPM SERVICE FACTOR (SF) SHEAVE SIZE/BORE SIZE NUMBER 8 SIZE OF BELTS FIELD MEASUREMENTS ACTUAL FIELD VOLTAGE AMP DRAW (EACH PHASE FOR 3 PHASE MOTORS) KILOWATTS STATIC PRESSURE - SUCTION SIDE STATIC PRESSURE - DISCHARGE SIDE FAN RPM CONDENSOR/CHILLED/HEATING SUPPLY WATER TEMPERATURE CONDENSOR/CHILLEDIHEATING RETURN WATER TEMPERATURE CONDENSOR/CHLLEDMEATING WATER GPM SUPPLY AIR TEMPERATURE DESIGN CFM'S AND ACTUAL CFM'S (WITHIN 10% OF DESIGN) AS FOLLOWS: AT EACH SUPPLY DIFFUSER . . cal .. . TOTAL SUPPLY TOTAL RETURN/RELIEF TOTAL OUTSIDE AIR EACH DIFFUSER/GRILLE INDEXED TO PLAN SYSTEM INDEX 1. VAV 2. VAV - FAN POWERED 3. ROOF TOP 4. SPLIT DX OR BUILT UP CW 5. RETURN AIR/RELIEF FAN OR SMOKE EXHAUST 6. ELECTRIC HEATER 7. BATH EXHAUST FAN UA UNACCEPTABLE ❑ THE NB REPORT SUBMITTED FOR THE ABOVE LOCATION HAS BEEN REJECTED. NOTE CHECKS IN COLUMN HEADED "UA" (UNACCEPTABLE) & REMARKS BELOW. ❑ THE A)B REPORT SUBMITTED FOR THE ABOVE LOCATION IS APPROVED. Date of Report: APPROVED BY: REMARKS: DATE: CC: Revised 2010.1206 CUseesUanicaMppDetaHneePTagptTgpp_mms6981 zipIClieoBAtBolas Geckletffi 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Summary Washington State Energy C nce Forms for Nonresidential and Multifamily Residential MECH -SUM Revised February 2011 Project Inf �� �� �1� . �,t ..)r r�vr.,V.,. le. GOB , Project Address WESTFIELD SOUTHCENTER MALL Date 11/8/2012 •'�A 2800 SOUTHCENTER MALL, SPACE: 116 For Building Dept. Use TUKWILA, WA 98188 ,- r'* �� Applicant Name: SHREMSHOCK ENGINEERING INC n !0,, ' Applicant Address: 6130 S. SUNBURY RD WESTERVILLE OH, 43081 Applicant Phone: 614- 545 -4550 Project Briefly describe system type Description mechanical and features. Plans New rooftop heat pump system. New insulated ductwork in return air plenum. New air devices. Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 a Includes Compliance Option Q Simple System *Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' Capacity2 Btu /h OSA CFM or Econo? SEER or EER IPLV3 Econmizer Option or Exception Heat Recovery Y/N RTU -1 HP Trane WSC090 88 Econo 11 12.00 Econo N Heating Equipment Schedule Equip. ID Equip Type Brand Name' Model No.1 Capacity2 Btu /h OSA cfm or Econo? Input Btuh Output Btuh Efficiency' Heat Recovery Y/N RTU -1 HP Trane WSC090 42 Econo 53 53 3.4 COP N u_ RE . IEWED - OR CODE COMPLI , NCE AI' PROVE Fan Equipment Schedule JA 1 1 6 20 3 Equip. ID Equip Type Brand Name' M• • • I'No.1 CFM Sp1 HP /BHP Flow Controls Location of Service Ciap MINI; BUILDING of DIV! a ION VIII OF TUKWILA 11f available. 2 As tested according to Table 14 -1A through 14-1G. 3 If required. 4 COP HSPF, Combustion Efficiency, or AFUE, as applicable. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable �pP.ad,4[S1..D6 Exception number from Section 1433. CITY OF TUKWI1 NOV 1.92012 pt PERMIT CENTER 11P 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Summary (back) MECH -SUM 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised February 2011 System Description See Section 1421 for full description of Simple System qualifications. All Systems: a No humidification? ' No Reheat? If Heating /Cooling or Cooling Only: 4 Constant vol? ❑ Split system? ❑ <= 84,000 Btuh? j Economizer 4 Air cooled? ✓ Packaged sys? 0 <= 135,000 Btuh? ❑ Cooling Cap < =15 Btuh /ft2? ❑ Heating Cap. > 0 & < =10 Btuh /ft2? If Heating Only: ❑ <1000 cfm? ❑ <30% outside air? ❑ Heating Cap. < =10 Btuh /ft2? Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. ( START ) ap < =15 Heat/Cool Eq. with Cap < =10 ft2, or Yes Yes Heating /Cooling or Cooling Only Heating Only (Reference Section 1421 Yes Yes Yes Yes Yes Yes- Yes Simple System Allowed (section 1420) • apes Economizer Exception ion 1 Yes Use Complex Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical - Complex Systems Checklist MECH -COMP Revised February 2011 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Project Address WESTFIELD SODTHCENTER MALL Date 11/8/2012 The following additional information is necessary to check a mechanical permit application for a complex mechanical system for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Use the checklist as a reference for notes added to the mechanical drawings (see the MECH -CHK checklist for additional requirements). This information must be on the plans since this is the official record of the permit. Having this information in separate specifications alone is NOT an acceptable altemative. For Building Department Use Applicability (yes, no, na) Code Section Component Information Required Location on Plans Building Department Notes ADDITIONAL CHECKLIST ITEMS FOR COMPLEX SYSTEMS ONLY N.A. 1431.1 Field assem. sys. Provide calculations for total onsite energy input/output to equip. N.A. 1431.2 System Sizing Indicate equipment & system sizing complies with 1431.2 N.A. 1432.1 Setback & shut -off Indicate separate systems or show isolation devices on plans N.A. 1432.2.1 Air system reset Indicate automatic temperature reset & operation sequence N.A. 1432.2.2 Hydr. Sys. reset Indicate automatic temperature reset & operation sequence N.A. 1432.3.1 Hydr. Var. Flow Indicate variable flow method for all applicable systems N.A. 1432.3.X Hydronic Isolation Indicate method of isolation for all applicable systems N.A. 1432.4 DDC Capabilities Indicate control capabilities including demand response setpoind adj. N.A. 1432.4 DDC data mgmt Indicate metering and trending capabilities. N.A. 1432.5 Pressure Reset Indicate static pressure reset for VAV systems Yes 1433 Air Economizer Indicate economizer on equipment schedule or provide calculations to justify exemption. Demonstrate higher efficiency equipment if required. 0 N.A. 1433 Water Economizer Indicate water economizer and provide calculations showing compliance with 1413 if 1433 Exception 3 is utilized N.A. 1434 Separate air sys. Indicate special requirement zones and indicate systems N.A. 1435 Simul. htg. & clg. Indicate method of prohibiting simultaneous heating and cooling, or state excpetion and show supporting calculations N.A. 1436 Heat recovery Indicate heat recovery of all applicable systems on plans; complete and attach heat recovery calculations N.A. 1437 Elec. motor effic. MECH -MOT or Equip. Schedule with hp, rpm, efficiency N.A. 1438 Variable speed drives Indicate VS control or equivalent on schedules for all applicable equip. N.A. 1438.1 Heat Rejection Indicate heat rejection equipment types and fan types N.A. 1438.2 Hot Gas Bypass Indicate cooling equipment staging and capacity modulation abilities N.A. 1438.3 Large Volume sys Indicate multiple system rooms & indicate ventilation control N.A. 1439.1 Kitchen Hoods Indicate source and conditioning of make -up air N.A. 1439.2 Laboratory Exhaust Indicate HR, VAV, semi - conditioned makeup, or CERM calc If " is circled for any question, provide explanation: Decision Flowchart Start Here Section 1411.1 Equipment Efficiency Shall Meet Tables 14- 1Athrough 14-1G s/Oil Fuma input > 225,000 h or Any U ' eate Use flowchart to determine how the requirements of the Complex Systems Option apply to the project. Refer to the indicated Code sections for complete information on the requirements. Yes 1411.1 IID & Power Venting or Damper. If input > 225,000 Btuh then 1412.6 Modulating Controls Required Yes Section 1411.1 0.75% Maximum Jacket Loss Yes Section 1412.8 Ventilation Controls for High - Occupancy Areas Yes Section 1431.1 Calculations of Total On -Site Energy Input & Ouput Required Section 1432.2.1 Supply Air Reset Controls Required (continued on back) 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical - Complex Systems (back) 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential MECH -COMP Revised February 2011 Hydronic System Section 1432.3.2 through 1432.3.5 Device Isolation Required Total ump HP > 3 H', or HP >1.5 and ntrol v Section 1432.3.1 Variable Flow Design Required dronic Sys Heated or Cooled 300,000 Btu Yes♦ Section 1432.2.2 Water Temperature Reset Required u N 0 Mechanical Cooling? Section 1433 Economizer Required C Present Total Cooling > 780kBtuh Section 1432.4 DDC Required With Trending and Demand Response No Supply OSA > =5000 CFM Section 1436.1 50% Effective Heat Recovery Required Steam System Yes♦ Section 1436.2 Condensate Recovery Required No No 4 Hour Ops, ter Cooled Conden tuh, & Servi OkB >1,50 No ? Yeses ater Section 1436.3 Condenser Heat Recovery Required emo Refrigeration Condensers > 500kBt Yes* Section 1436.4 Refrigeration Condenser Heat Recovery Required No ystem or Zone w/ Simultaneous tg. & Clg.? Ye s► Section 1435 Zone Controls Must Reduce Supply Air Quantity Before Reheating /Recooling ystem o ystems serving a room have 10,000 CF ppl Yes--110- Section 1438.3 Controls Must Reduce Airflow When System In Not Heating or Cooling 0 No Section 1438 Variable Flow Devices Required otor Incl. in Egpmt Covr'd by Tbl 14- 1A -14- 1G? Section 1437 Motors Must Meet Efficiencies in Table 14-4 No DONE Section 1439.1 No Heating or Cooling for at Least 50% of Make -up Air Yes Section 1439.2 One Required: a. Heat Recovery per 1439.2 b. 50% VAV Exhaust & Make -up c. 75% Direct Makeup w/ Tempering Only d. Combined Energy Reduction Qer>=Qmin Yes 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Economizer MECH -ECO 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised February 2011 Economizer Summary Check box(es) for exceptions being claimed. List the system /equipment that qualifies for each exception. See Section 1433 for full description of Economizer requirements. - Full Air Econo: RTU -1 ❑ Ex 1: ❑ Ex 5: ❑ Ex 9a: ❑ Ex 2: ❑,Ex 6: ❑ Ec 9b: ❑ Ex 3: ❑ Ex 7: ❑ Ex 9c: Ex 4: ❑ Ex 10: Decision Flowchart Cx8: Use this flowchart to determine if project complies with Economizer requirements. If not, the Systems Analysis Option must be used. Yes (Reference Section 1433 Full Air Economizer Complies Yes— ception +: it Cap <54,000 B it not Exterior 'ace No ception . it Cap < 33,000 B nit not Exterior o djacen Idg. Cap. w/o economizer <72,000 Btuh or 5 %7 Exception 2: Chilled Water Sys. er 25% over ptio er Cooled Re . Waterside Economize ing chiiled b Sys 0 No Exception 4: Cooling 75% Site HR or Solar ception Dehumidification with supporting rgy ana • Exception 7: Heat Pump Loop ting All Crite ' No No Yes Ye No No 0 Yes Ye„ ception 10: RF System Meeting All Criteria No No Does Not Comply Qualifies for Full Air Economizer Exception - Complies 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Electric Motors MECH -MOT 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised February 2011 Project Address WESTF1ELD SOUTHCENTER MALL Date 11/8/2012 Complete the following for all design A & B squirrel -cage, T -frame induction permanently wired polyphase motors of 1 hp or more having synchronous speeds of 3600, 1800 or 1200 rpm (unless one of the exceptions below applies). For Building Department Use Motor No. or Location HP Type (open /closed) Description of Application or Use Synch. Speed Min.Nom. Full load Efficiency RTU -1 1 open Rooftop unit fan for supply air 1200 82.5% Ninitresn No rinaf Fail -Load Efficiencies ) As of 12/i912010 Exceptions: 1. Motors in systems designed to use more than one speed of a multi -speed motor. 2. Motors already included in the efficiency requirements for HVAC equipment (Tables 14- 1A or 14-1B) . 3. Motors that are an integral part (i.e. not easily removed and replaced) of specialized process equipment (i.e. equipment which requires a special motor, such as an explosion - proof motor). 4. Motors integral to a listed piece of equipment for which no qualifying motor has been approved (i.e. if the only U.L. listing for the equipment is with a less- efficient motor and . there is no energy - efficient motor option). For motors claiming an exception, list motor and note which exception applies. Open Motors Enclosed P9olors Synchronous Speed (RPt.1 ) 3,600 1,600 1200 3,600 1,300 .1,200 Motor H P 1.0 77.0 85.5 82.5 77.0 855 F25 15 84.0 86.5 865 84.0 865 g- L5 2.0 55.5 86.5 87.5 855 86 88.5 3 0 8° 5 89 fib v 88 = gg 50 86.5 89.5 89.5 88.5 89.5 = =.5 75 88.5 91.0 90.2 89.5 91.7 .91.0 10.0 . 89.5 91.7 91.7 90.2 91.7 91.0 15.0 902 93.0 91.7 91.0 92.4 91.7 20.0 91.0 93.0 92.4 91.0 93.0 91.7 250 91.7 .93.6 93.0 91.7 93.6 93.0 30.0 21.7 94.1 93.6 91.7 23.6 93.0 40.0 92.4 94.1 94.1 92.4 94.1 94.1 50.0 93.0 94.5 94.1 93.0 94.5 94.1 600 93.6 95.0 94.5 93.6 . 93.0 91.5 75.0 93.6 95.0 . 94.5 23.6 95.4 95.4 100.0 93.6 95.4 95.0 94.1 98.4 95.0 12E0 94.1 95.4 95.0. 95.0 95.4 . ' 5.0 1500 .94.1 95.8 95.4 95.0 95.8 96.8 200.0 95.0 95.8 95.4 95.4 96.2 95.8 250.0 95.0 95.8 95.4 95.8 96.2 95.8 300.0 95.4. 95.8 95.4 95.8 96.2 . 95.8 350.0 95.4 95.8 95.4 . 95.8 95.2 95.8 400.0 95.8 95.8 95.8 95.8 96.2 95.8 450.0 95.8 962 96.2 95.8 95.2 95.8 500.0 95.8 96.2 962 95.8 . 962 95.8 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Permit Plans Checklist MECH for Nonresidential and Multifamily Residential -CHK 2009 Washington State Energy Code Compliance Forms Revised February 2011 Project Address WESTFIELD SOUTHCENTER MALL IDate 11/8/2012 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, na) Code Section Component Information Required Location on Plans_ Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment Performance Yes 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency M2.0 N.A. 1411.1 Combustion htg. Indicate intermittent ignition, flue/draft damper & jacket loss N.A. 1411.1 Air - cooled chiller Provide total air and water chiller capacity N.A. 1411.2.1 Water - cooled chiller Full -load and NPLV values adjusted for any non - standard conditions Yes 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule M2.0 N.A. 1411.5 Unenclosed Heat Indicate radiant heat system and occupancy controls 1412 HVAC Controls Yes 1412.1 Temperature zones Indicate locations on plans M1.0 Yes 1412.2 Deadband control Indicate 5 degree deadband minimum M4.1 N.A. 1412.3 Humidity control Indicate humidistat Yes 1412.4 Setback and Shutoff Indicate thermostat with 7 day program capability & required setback Ml • 0 Yes 1412.4.1 Dampers Indicate damper location, leakage rate, control type, & max. leakage MS • 0 N.A. 1412.4.2 Optimum Start Indicate optimum start controls Yes 1412.5 Heat pump control Indicate heat pump themiostant & outdoor lockout on schedule M1.0 N.A. 1412.6 Combustion heating Indicate modulating or staged control Yes 1412.7 Balancing Indicate balancing features on plans M1.0 N.A. 1412.8 Ventilation Control Indicate demand control ventilation for high - occupancy areas N.A. 1412.9 Loading Dock & Garage Ventilation Indicate enclosed loading dock & parking garage ventilation system activation and control method. N.A. 1422 Thermostat interlock Indicate thermostat interlock on plans N.A. 1432.2.1 Temperature Reset Indicate temperature reset method 1413 Air / Water Economizers Yes 1412.1 Single zone systems Indicate multiple cooling stage control capability. M2.0 Yes 1413.1 Air Econo Operation Indicate 100% capability on schedule M2.0 N.A. 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb N.A. 1413.2 Wtr Econo Document Indicate max. OSA condition for design clg load & equipment performance data. Yes 1413.3 Integrated operation Indicate capability for partial cooling M4.1 N.A. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting Systems Yes 1414.1 Duct sealing Indicate duct design pressures, sealing, and testing requirements M4.1 Yes 1414.1.2 Low press. duct test Indicate applicable low pressure duct systems shall be leak tested M4.1 N.A. 1414.1.3 High press. duct test Indicate high pressure duct systems shall be leak tested, and identify the location of this ductwork on plans Yes 1414.2 Duct insulation Indicate R -value of insulation on duct M4.1 1415 Piping Systems Yes 1415.1 Piping insulation Indicate R -value of insulation on piping M4.0 1416 Completion Requirements Yes 1416.3.2 System Balancing Indicate air and water system balancing requirements M4.1 Yes 1416.3.3 Functional Testing Provide sequence of operations and test procedures. M4.1 Yes 1416.3.4 Documentation Indicate O &M manuals, record drawings, staff training M4.1 Yes 1416.3.5 Comm. Report Indicate requirements for final commissioning report M4.1 Yes 1416.4 Compliance Chklist Submit to building official upon substantial completion. M4.1 Yes Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer M2.0 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Permit Plans Checklist Continued MECH -CHK 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised February 2011 Project Address WESTFIELD souxacENTEE HALL (Date 11/8/2012 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, na) Code Section Component Information Required Location on Plans Building Department Notes SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454) 1440 Service water htg. Yes 1441 Elec. water heater Indicate R -10 insulation under tank M4.0 N.A. 1442 Shut -off controls Indicate automatic shut -off of circulators or heat trace Yes 1443 Pipe Insulation Indicate R -value of insulation on piping M4.0 N.A. 1444 Pump Energy Indicate method of pump energy management (Sec 1438) N.A. 1445 Heat Recovery Indicate preheat capacity as % of peak service water demand. 1460 Heated Pools N.A. 1452 Heat Pump COP Indicate minimum COP of 4.0 N.A. 1452 Heater Efficiency Indicate pool heater efficiency N.A. 1453 Pool heater controls Indicate switch and 65 degree control N.A. 1454 Pool covers Indicate vapor retardant cover N.A. 1454 Pools 90+ degrees Indicate R -12 pool cover N.A. 1455 Heat Recovery Indicate method and capacity of exhaust air temperature reduction COLD STORAGE (Sections 1460 -1465) 1460 Cold Storage N.A. 1463 Evaporators Indicate motor type and speed control N.A. 1464 Condensors Indicate condenser cooling type, design wb temp and control N.A. 1465 Compressors Indicate design minimum condensing temp and control. If "no" is indicated for any item in Sections 1401 -1424 or 1440 -1465 , provide explanation: • • 12/20/2012 Tukwila Building Division 6200 Southcenter Blvd. Tukwila, WA 98188 Attn: Allen Johannessen, Plans Examiner RE: Soma Intimates Westfield Southcenter Mall Store #5381 260 Southcenter Mall Space #: 116 Tukwila, WA 98188 Arch Project No.: #120421.R01 Dear Mr. Johannessen, Itemized below are responses to the review comments, dated 11/30/2012: Architectural Comments: 1. Comment: On the structural plans provide quality control inspection notes or table specifying type of "Special Inspections" required for assembly of structural (steel) components for this project. Special inspections shall be conducted by a third party inspection agency. (IBC Section 1704) Response: Added special inspections notes to detail `N' on sheet S1.0 2. Comment: Add reference to structural steel notes: "structural steel fabrication shall be done by a certified WABO steel fabricator ". Response: Added note to detail 'J' on sheet S2.0 Fire Comments: 1. Comment: The permit application show (3) Fire Dampers to install. Fire damper locations could not be located on the plan. Please show on the plan and cloud location of the Fire dampers. Also provide manufactures specification for the fire dampers. Response: There are no fire dampers in the space, the permit application will be corrected. Thank you, Amanda Wells Shremshock Architects, Inc. CORRECTION LTR #. MP1SO SHREMSHOCK Architects & Engineers 6130 S. Sunbury Rd. Westerville_ OH 43081 t 614 545 4550 888 373 4130 f 614 545 4555 shremshock.com RECEIVED CITY OF TUKWILA JAN 0 9 2013 PERMIT CENTER December 3, 2012 1 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Mary Ryan Permit Resources PO Box 3749 Mission Viejo, CA 92690 RE: Correction Letter #1 Mechanical Permit Application Number M12 -180 Soma Intimates — 260 Southcenter Mall Dear Ms. Ryan, This letter is to inform you of corrections that must be addressed before your development permit can be approved. All correction requests from each department must be addressed at the same time and reflected on your drawings. I have enclosed comments from the Building Department. At this time the Fire Department has no comments. Building Department: Allen Johannessen at 206 433 -7163 if you have questions regarding the attached comments. Please address the attached comments in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plans, specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, I can be reached at (206) 431 -3670. Sincerely, Je fe Ma hall Pe o it ec ician e No. M12- 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax 206 - 431 -3665 Tukwila Building Division Allen Johannessen, Plan Examiner Building Division Review Memo Date: November 30, 2012 Project Name: SOMA Intimates Permit #: M12 -180 Plan Review: Allen Johannessen, Plans Examiner The Building Division conducted a plan review on the subject permit application. Please address the following comments in an itemized format with revised plans, specifications and/or other applicable documentation. (GENERAL NOTE) PLAN SUBMITTALS: (Min. size 1 1 x 17 to maximum size of 24x36; all sheets shall be the same size). (If applicable) Structural Drawings and structural calculations sheets by a registered engineer shall be original signed wet stamped, not copied. Architectural design sheets and documents by a registered architect shall also be original signed wet stamped, not copied. 1. The permit application shows (3) Fire Dampers to install. Fire damper locations could not be located on the plan. Please show on the plan and cloud location of the Fire dampers. Also provide manufacturers specification for the fire dampers. Should there be questions concerning the above requirements, contact the Building Division at 206 - 431 -3670. No further comments at this time. • 1 PE;J� n � 4 �f1 • }? PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -180 DATE: 01 -09 -13 PROJECT-NAME: SOMA INTIMATES SITE ADDRESS: 260 SOUTHCENTER MALL Original Plan Submittal Response to Incomplete Letter # X Response to Correction Letter # 1 Revision # After Permit Issued D PARTME S:0 4 4 Lit ing Division Ili Public Works ❑ Fire Prevention Structural Planning Division 111 Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete DUE DATE: 01 -10 -13 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: ❑ No further Review Required DATE: APPROVALS OR CORRECTIONS: DUE DATE: 02 -07 -13 Approved n Approved with Conditions X Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit: Center Use Only :.� CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 'EMIT COORD COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -180 DATE: 11/19/12 PROJECT NAME: SOMA INTIMATES SITE ADDRESS: 260 SOUTHCENTER MALL X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # after Permit Issued DEPARTMENTS: uildin• 'ivision Public Works Fire Prevention Structural Planning Division ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ DUE DATE: 11/20/12 Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route REVIEWER'S INITIALS: DATE: Structural Review Required ❑ No further Review Required ❑ APPROVALS OR CORRECTIONS: DUE DATE: 12/18/12 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) NI Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials: • City of Tukwila REVISION SUBMITTAL;` Phone Number: Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Web site: http: / /www.TukwilaWA.gov Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: I ' o /5 • Plan Check/Permit Number: M12-180 ❑ Response to Incomplete Letter # • Response to Correction Letter # 1 ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: Soma Intimates Project Address: 260 Southcenter Mall Contact Person: fIZY \/A14 911. P a. 3 3 7# Summary of Revision: 1 ) E 12. GC PIK-6 E ILA- • /_- Li`T►crU,e0-- '(11i WP i Ci 402- 00 11 Li-ukciW Lei91-g" n 0.m 'nuM p -t c.,t i rL-t . $IECE:.'IaCT CITY OF TUKWRA I•JAt4 D:92013 PERMIT CENTER Sheet Number(s): `I 0 G- M-LAL -er 11-44-=, l 6(-H` "Cloud" or highlight all areas of revision including date of revision Received at the City of Tukwila Permit Center by: N_ ___Entered t---19's Entered in Permits Plus on C: \Users \jennifer -m \Desktop \Revision Submittal Form.doc Revised: May 2011 Contractors or Tradespeople Peter Friendly Page • General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name EVERGREEN REFRIGERATION LLC UBI No. 602512953 Phone 2067631744 Status Active Address 727 5 Kenyon St License No. EVERGRL954R2 Suite /Apt. License Type Construction Contractor City Seattle Effective Date 1/6/2006 State WA Expiration Date 1/6/2014 Zip 98108 Suspend Date County King Specialty 1 General Business Type Limited Liability Company Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status EVERGHH910J0 EVERGREEN HOME HEATING & ENGY Construction Contractor General Unused 4/20/2009 4/20/2013 Active EVERGI'201D7 EVERGREEN REFRIGERATION INC Construction Contractor General Unused 3/27/1980 7/31/2006 Re Licensed Business Owner Information Name Role Effective Date Expiration Date EVERGREEN REFRIGERATION LLC Partner /Member . 12/22/2005 Bond Amount PATTON, DAVID Partner /Member 01/06/2006 WA15097 PATTON, RODGER Partner /Member 01/06/2006 PATTON, MATTHEW Partner /Member 01/06/2006 TRAVELERS CAS & SURETY CO Bond Information Page 1 of 1 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 2 Merchants Bonding Co (Mutual) WA15097 01/01/2012 Until Cancelled $12,000.00 12/15/2011 1 TRAVELERS CAS & SURETY CO 104667361 01/01/2006 Until Cancelled $12,000.00 01/03/2006 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 3 AMERICAN FIRE AND CASUALTY COM BAW54192293 07/31/2010 07/31/2013 $1,000,000.00 07/29/2012 2 Continental Western Ins Co CWP2640663 07/31/2006 07/31/2010 $1,000,000.00 03/23/2009 Summons /Complaint Information No unsatisfied complaints on file within prior 6 year period Warrant Information No unsatisfied warrants on file within prior 6 year period Infractions /Citations Information No records found for the previous 6 year period https://fortress.wa.gov/lni/bbip/Print.aspx 01/25/2013 . ALL I-IVAC WORK (MATERIALS, FABRICATION INSTALLATION, ETC. SHALL COMPLY IN -I 21. PRIOR TO MAKING ANY PIPE OR DUCT ROOF PENETRATION AND /OR POSITIONING OF ANY EQUIPMENT ( , , , ) THE G APPLICABLE SECTIONS OF ALL STATE AND LOCAL CODES (MECHANICAL CODE BUILDING.. CODE ON THE ROOF, ALL TI-IE PROPOSED LOCATIONS AND /OR PENETRATIONS SHALL MATCH LOCATIONS, ENERGY CODE, ETC.) AND THE LATEST EDITION OF SMACNA. AS INDICATED ON THE LANDLORD APPROVED PLANS AND BE APPROVED BY LANDLORD'S CONSTRUCTION FIELD COORDINATOR. 2. CONTRACTOR IS REQUIRED TO READ THE SPECIFICATIONS AND REVIEW DRAWINGS FOR ALL I 22. ALL EQUIPMENT TO BE SUPPORTED FROM STRUCTURAL MEMBERS. NO IN EIGNT GAN BE PLACED ON D VISIONS OF WORK AND IS RESPONSIBLE TO COORDINATE AND SCHEDULE ALL WORK WITH AND BETWEEN ALL SUBCONTRACTORS AND TO PROVIDE ALL SUBCONTRACTORS WITH A COMPLETE SET TI-{E ROOFING MATERIALS OR INSULATION. OF BID DOCUMENTS. FURTI- IERMORE, THIS CONTRACTOR SHALL BE RESPONSIBLE TO FIELD VERIFY AND COORDINATE WORK BETWEEN ALL TRADES, LANDLORD REQUIREMENTS, CEILING HEIGI -ITS AND 23. CONTRACTOR SHALL BE REQUIRED TO FURNISH TEMPORARY WEATHERPROOFING OF ALL ROOF EXISTING CONDITIONS PRIOR TO THE START OF WORK OR ORDERING OF EQUIPMENT. PENETRATIONS, UNTIL LANDLORD'S ROOFING CONTRACTOR HAS MADE THE FINAL PATCH. 3. CONTRACTOR SHALL VISIT JOB SITE AND BE FAMILIAR WITH LANDLORDS REQUIREMENTS AND 24. CONTRACTOR 5HALL FURNISH AIR BALANCING REPORTS TO TENANT FOR ALL HVAC EQUIPMENT. EXISTING CONDITIONS. NO ALLOWANCE WILL BE MADE FOR EXTRAS DUE TO CONTRACTOR'S FAILURE CONTRACTOR MUST CAREFULLY FOLLOW SPECIFICATIONS FOR AIR BALANCE WORK. TO VISIT THE JOB SITE AND/OR FAILURE TO PREDETERMINE ALL REQUIREMENTS IMPOSED BY THE LANDLORD, EXISTING CONDITIONS OR OTHER AUTHORITIES. 25. VERIFY DUCT ROUTING AS EARLY IN THE JOB PROCESS AS POSSIBLE. IF MINOR GRANGES ARE REQUIRED,' NOTIFY TENANT'S CONSTRUCTION MANAGER IMMEDIATELY. 4. DUCT DIMENSIONS ARE NOMINAL CLEAR INSIDE DIMENSIONS. DUCT LAYOUTS ARE SCHEMATIC. FIELD COORDINATE ALL DUCT RUNS. PRIOR TO DUCT FABRICATION NO EXTRAS SHALL BE AWARDED FOR 26. CONTRACTOR SHALL FURNISH AND INSTALL ACCESS PANELS AS DIRECTED AND AS SPECIFIED BY ( ) TENANT FOR ALL EQUIPMENT OR OTHER ITEMS REQUIRING ACCESS. VERIFY AND COORDINATE DUCT. REVISIONS CAUSED BY LACK OF COORDINATION. PLACEMENT OF ACCESS NITH EQUIPMENT SERVICE CLEARANCES AND WITH TENANT'S CONSTRUCTION B. VERIFY ALL CONDITIONS IN FIELD PRIOR TO BID. REFER TO RESPONSIBILITY SCHEDULE ON SHEET MANAGER. G1.2 FOR MORE INFORMATION, 27. CONTRACTOR SHALL PROVIDE A FIRE WATCH AND PORTABLE- FIRE EXTINGUISHER (MINIMUM SIZE . ALIGNMENT /PLACEMENT OF HVAC DEVICES IS CRITICAL. COORDINATE ALIGNMENT WITR THE 2A:20BC), WHENEVER AN7 WELDING IS DONE WITI -TIN TIIE DEMISED PREMISES_ TI-4E PERSON A HI U A RC TEGT R L REFLECTED CEILING PLAN AND LIGHTING PLAN. PERFORMING THE FIRE WATCH SHALL REMAIN IN THE SPACE FOR AT LEAST ONE (1) HOUR AFTER THE COMPLETION OF ANY WELDING. TI-415 SHALL BE COORDINATED THROUGH THE LOCAL FIRE 7. BALANCE SYSTEMS TO GEM'S S NOTED ON PLANS. DEPARTMENT. . CONTRACTOR IS TO PROVIDE AND INSTALL FIRE -RATED PIPE SLEEVES AND SEALS ON ALL PIPING 28. ALL MECI- IANICAL EQUIPMENT, PIPES AND DUCTS, PENETRATING AND /OR LOCATED ON ROOF SHALL 1. GENERAL CONTRACTOR SHALL INSTALL AN ADJUSTABLE PROGRAMMABLE THERMOSTAT AS FURNISHED BY CHICO S FAS NATIONAL ACCOUNT REPRESENTATIVE. THERMOSTAT SHALL INCLUDE REMOTE SENSOR CAPABILITIES. THERMOSTAT SHALL BE HONEYWELL VISIONPRO MODEL #TB822OU1003. GENERAL CONTRACTOR TO FURNISH AND INSTALL CONTROL WIRING' BETWEEN HVAC EQUIPMENT AND THERMOSTAT. CONTRACTOR SHALL PROVIDE ALL MANUALS AND INSTRUCTIONS TO THE STORE MANAGER (INSTRUCT THE STORE MANAGER ON OPERATION UPON ( TURNOVER) AND THE PROJECT MANAGER (FOR THE CLOSEOUT PACKAGE). 2. GENERAL CONTRACTOR SHALL INSTALL A REMOTE SENSOR FOR EACH THERMOSTAT AS FURNISHED BY CHICO'S FAS NATIONAL ACCOUNT REPRESENTATIVE WHERE INDICATED. HONEYWELL MODEL #G7189U. EXTEND CONTROL WIRING FROM SENSOR TO THERMOSTAT AND CONNECT PER MANUFACTURER'S INSTRUCTIONS. i 3. RTU -1: GENERAL CONTRACTOR 5HALL INSTALL AN ELECTRIC HEAT PUMP ROOFTOP UNIT WITH FACTORY OWNER: chico!s 11215 METRO PARKWAY FT. MYERS, FL. 33966 FABRICATED 14 HIGH ROOF ,CURB AS FURNISHED BY CHICOS FAS NATIONAL ACCOUNT REPRESENTATIVE. CONTRACTOR SHALL FURNISH AND INSTALL ALL REQUIRED STRUCTURAL SUPPORT S. E STEEL, REFER TO STRUCTURAL DETAILS ON SHEET All .4. >FI VERIFY AND COORDINATE EXACT LOCATION OF NEW U WITH FIELD V FY R TE X T L T F E RTU T LANDLORD AND EXISTING CONDITIONS. ALL ROOF WORK TO BE PERFORMED BY LANDLORD APPROVED ROOFING CONTRACTOR AT � � � THIS CONTRACTORS EXPENSE. LABEL ROOFTOP UNIT PER LANDLORD'S REQUIREMENTS. FURNISH AND INSTALL 3 SETS OF FILTERS, CHANGE FILTER AFTER FINAL STORE CLEANING AND AGAIN PRIOR TO AIR BALANCE. SEE ROOFTOP HVAC UNIT SCHEDULE ON SHEET M2.0 FOR MORE INFORMATION. AWARDED CONTRACTOR MUST ARRANGE DELIVERY SCHEDULE THROUGH KRIS ATE. AN WITH CORM= AT R. MU. 415-2499 VE I WITHIN MODEL NU NUMBERS AND LE OF CCONSTRUCTION TO SGREDULE DELIVER? DATE. !GENERAL CONTRACTOR. MUST VERIFY MODEL NUMBERS AND ELECTRICAL REQUIREMENTS PRIOR TO INSTALLATION. 4. SUPPLY AND RETURN AIR CONNECTIONS AT RTU -1 SHALL BE MADE FULL SIZE OF EQUIPMENT OPENING. PROVIDE FLEx1aLE coNNECTIONS AND TRANSITION ro pucT slzE' SNOwN. ` 5. INSTALL CONDENSATE DRAIN FROM RTU-1. MINIMUM DRAIN SIZE TO BE .1 . CONDENSATE DRAIN TO BE TRAPPED WITH A TRAP DEPTH OF 1.5'xUNIT TOTAL STATIC PRESSURE (MINIMUM 5" DEEP). DRAINS SHALL BE EXTENDED TO THE NEAREST ROOF DRAIN. PIPING SHALL BE UV RESISTANT PVC WITH CHEMICALLY WELDED JOINTS. 6. RETURN AIR DUCT SMOKE DETECTOR FURNISHED AND WIRED BY LANDLORD APPROVED FIRE ALARM CONTRACTOR AND INSTALLED BY GENERAL CONTRACTOR. UPON DETECTION OF SMOKE, DETECTOR SHALL SIGNAL LANDLORD'S FIRE ALARM SYSTEM AND RTU SHALL SHUT DOWN. CONTRACTOR SHALL PROVIDE UNIT WITH KEYED REMOTE TEST /RESET STATION. FIELD VERIFY AND COORDINATE ALL REQUIREMENTS WITH LANDLORD AND EXISTING CONDITIONS PRIOR TO BID AND INCLUDE ALL MATERIAL AND LABOR COSTS FOR THIS WORK IN BID. 7. INSTALL AIR DEVICE LOCATED IN LOWER DRYWALL CEILING BELOW PLATFORM. RUN PLATFORM. DUCT FROM DEVICE IN LOWER CEILING' THROUGH JOIST SPACE AND UP TIGHT TO WALL ABOVE PLATFORM. COORDINATE VERTICAL DUCT WITH PLATFORM ACCESS. 8. EF -b GENERAL CONTRACTOR TO INSTALL NEW EXHAUST FAN, COMPLETE WITH INTEGRAL BACKDRAFT DAMPER, AS 1.3081 THAT PENETRATES A FIRE -RATED PARTITION. BE PAINTED TO MATCH COLOR OF ROOF. USE THE APPROPRIATE COATS OF PRIMER PRETREATMENT, PRIOR TO FINAL COAT. THE FINAL COAT OF THE ROOF MATCHING COLOR SHALL BE APPROVED BY . SPIN -IN FITTINGS IN ITI -TOUT MANUAL BALANCING DAMPERS TO BE USED FOR ALL ROUND BRANCH ` LANDLORD'S TENANT CONSTRUCTION COORDINATOR.. TENANT'S STORE SPACE NUMBER SHALL BE TAPS ABOVE INACCESSIBLE DRYWALL CEILINGS WITH BALANCING REQUIRED WITHIN 2 FT. OF PERMANENTLY STENCILED ON ONE SIDE OF ANY ROOF - MOUNTED HVAC UNIT, WITH MINIMUM DIFFUSER WITH PLASTER FRAME. FLEX DUG? AT AIR OUTLETS TO BE MAX. 5' -0" LONG AND - (3") G THREE INCH (3) HIGH LETTERS. INSULATED. 29. NO ROOF WORK OF ANY KIND GAN BE ALLOWED PRIOR TO AN ON -51TE MEETING WITH THE 10. ALL ROOF CUTTING, PATCHING AND -FLASI -11 NG- REQUIRED SHALL BE BY A LANDLORD APPROVED , LANDLORD'S TENANT CONSTRUCTION COORDINATOR. ROOFING CONTRACTOR AT THIS CONTRACTOR'S EXPENSE. COORDINATE ROOF PENETRATIONS WITH LANDLORD'S REPRESENTATIVE. 30. REFER TO ARCHITECTURAL SHEET A11.4 FOR STRUCTURAL SUPPORT DETAILS FOR MECHANICAL EQUIPMENT. 11. GENERAL CONTRACTOR SI-IALL PROVIDE LANDLORD AND TENANT WITH AS -BUILT DRAWINGS, ALL EQUIPMENT SHOP DRAWINGS, INFORMATION ON THERMOSTATS, CONTROL NIRING DIAGRAMS AND OTHER PERTINENT INFORMATION AT COMPLETION OF PROJECT. 12. THI5 CONTRACTOR SHALL FURNISH AND INSTALL STRUCTURAL STEEL REQUIRED TO SUPPORT EQUIPMENT AND SHALL COORDINATE LOCATIONS AND REQUIREMENTS WITH THE LANDLORD'S REPRESENTATIVE. COST OF THIS WORK AND ANY STRUCTURAL ENGINEERING FEES REQUIRED SHALL BE INCLUDED IN THIS BID, 13. CONTRACTOR SHALL ENSURE THAT ALL EQUIPMENT, PIPING AND /OR DUCTWORK NOT BEING USED OR DROWN TO REMAIN IS FULLY REMOVED AND NOT ABANDONED. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION. 14. ALL LOW PRESSURE RECTANGULAR DUCTWORK SHALL BE LINED AND ALL ROUND DUCT SHALL BE WRAPPED NI T1-4 A MIN. R -VALUE OF 4.2, 1.0 PCF INSULATION. REFER TO SPECIFICATIONS FOR MORE INFORMATION. 15. COORDINATE BOX -OUT LOCATIONS FOR ALL DRYWALL MOUNTED AIR DEVICES WITH CEILING FRAMING. OT USED SCHEDULED AND AS FURNISHED BY CI ICO'S FAS NATIONAL ACCOUNT REPRESENTATIVE. EXHAUST CAPACITY SHALL BE 75 CFM AT 0.5" S.P. INSTALL AND SECURE PER MANUFACTURE'S INSTRUCTIONS EXTEND TO NEW ROOF PENETRATION WITH ROOF CAP AND CURB 10' -0" FROM ANY BUILDING AIR INTAKE. FIELD VERIFY EXACT LOCATION AND REQUIREMENTS. ALL ROOF WORK SHALL BE PERFORMED BY LANDLORD APPROVED ROOFING CONTRACTOR AT SD U� Z C T THERMOSTAT © SENSOR DUCT SMOKE DETECTOR .J ,- .4 -�- DISC. DISCONNECT 1 ACCESS DOOR DN. DOWN DPR. DAMPER SPIN -IN FITTING EA. EACI -I EC. ELECTRICAL THIS CONTRACTOR'S EXPENSE. 9. SPRINKLER CONTRACTOR SHALL ALARM SYSTEM. THE SPRINKLER SYSTEM AS REQUIRED TO I"EET COORDINATE WITH LANDLORD 10. SPRINKLER HEADS SHOWN FOR AMOUNT AND LOCATION OF PLAN, ALIGN WITH LIGHT FIXTURES 11. EXISTING UTILITIES (DUCTWORK, REUSE AS MUCH AS POSSIBLE FROM THE EXISTING SPRINKLER SYSTEM AND HEADS IN TI-4E STORE FRONT AND SALES AREA ARE TO BE WHITE. MODIFY CODE. PROVIDE INSPECTIONS TEST CONNECTION PER LANDLORD REQUIREMENTS. AND AUTHORITY HAVING JURISDICTION. REFERENCE ONLY. FIRE PROTECTION PROFESSIONAL TO DETERMINE ACTUAL HEADS. COORDINATE WITH LANDLORD AND TENANT. LAYOUT TO BE SIMILAR WITH IF POSSIBLE. PIPING, CONDUIT, ETC.) TO REMAIN. TYPE AND ELEVATION ARE NOTED. FIELD C Jlr- UNDERCUT DOOR --Z DUCT OFFSET + SPIN -IN FITTING N/ CONTRACTOR + MAN. BAL. DPR. EX. EXI5TING EXH. EXHAUST CONNECT TO EXISTING F. DPR. FIRE DAMPER VERIFY EXACT LOCATION AND SIZE. 12. INSTALL SPRINKLER HEAD LOCATED IN LOWER DRYWALL CEILING BELOW PLATFORM. RUN PIPING FROM DEVICE IN LOWER CEILING THROUGH JOIST SPACE AND UP TIGHT TO WALL ABOVE PLATFORM. COORDINATE VERTICAL PIPE WITH PLATFORM ACCESS. 13. SPRINKLER HEAD TO BE LOCATED NIGH ABOVE RESTROOM PLATFORM AREA. 14. AIR DEVICE TO BE USED FOR ACCESS TO SMOKE DETECTOR AND BALANCE DAMPER LOCATED ABOVE CEILING. CONTRACTOR SHALL MAINTAIN MINIMUM CLEARANCES REQUIRED TO PROVIDE MAINTENANCE ACCESS TO DEVICES FIELD VERIFY AND COORDINATE EXACT LOCATION AND ALL REQUIREMENTS. 15. GENERAL CONTRACTOR TO FURNISH AND INSTALL LINED RETURN AIR DUCT AS HIGH AS POSSIBLE. CONTRACTOR SHALL FURNISH AND INSTALL A MANUAL BALANCE DAMPER SET TO CFM INDICATED IN RETURN AIR DUCT AND A 1/2 "x1 /2" WIRE MESH SCREEN OVER OPEN END OF DUCT. FLEX. FLEXIBLE ® UPRIGHT SPRINKLER HEAD FLR. FLOOR SUPPLY DUCT - UP • CONCEALED SPRINKLER GC. GENERAL 4`` SUPPLY DUCT - DN 16. ANY EXISTING WALL, FLOOR OR CEILING SURFACE THAT IS DAMAGED DURING CONSTRUCTION SHALL- BE REPAIRED TO MATCH NEW AND /OR EXISTING CONDITIONS AT THIS CONTRACTOR'S EXPENSE. 17. SPRINKLER CONTRACTOR SHALL MODIFY SPRINKLER HEADS AND PIPING FOR NEW MODIFICATIONS. ; RUN HYDRAULIC CALCULATIONS AS REQUIRED. REFER TO SPECIFICATIONS. DESIGN NEW LAYOUT TO MEET NFPA 13, LOCAL AUTHORITY HAVING JURISDICTION AND LANDLORD'S REQUIREMENTS. 18. CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, SERVICES, TOOLS, TRANSPORTATION, INCIDENTALS AND DETAILS NECESSARY TO PROVIDE A COMPLETE AND FULLY OPERATIONAL MECHANICAL SYSTEM AS SHOWN ON THE DRAWINGS, CALLED FOR IN THE SPECIFICATIONS AND AS REQUIRED BY THE JOB CONDITIONS. ALL WORK NOT SPECIFICALLY NOTED AS BEING PROVIDED BY THE LANDLORD SHALL BE PROVIDED BY THE CONTRACTOR. FIELD VERIFY,, AND COORDINATE. SEPARATE PERMIT REQUIRED FOR: �� Electrical Plumbing Gas Piping cy £3f Tukwila a '" he-, - '1a,!'a"1 DIVISION HEAD CONTRACTOR RA OR EXH. DUCT UP X" ROUND DUCT HP. HORSEPOWER ''��- AB. ABOVE MAX. MAXIMUM RA OR EXH. DUCT DN MCA. MINIMUM CIRCUIT JZ�% INTIMATES AD. ACCESS DOOR ELBOW TURNING VANES AFF. ABOVE FINISHED MOUNTED TY MTD. MOUNT FLOOR - -- FIRE DAMPER (F.D.) NTS. NOT TO SCALE ABU. AIR HANDLING UNIT OA. OUTSIDE AIR Z J Z MANUAL BALANCE ARCH. ARCHITECT DAMPER BDD. BACK DRAFT DAMPER Pc. PLUMBING ....__ STORE NO: 5381 BEL. BELOW CONTRACTOR --. Z Z TRANSITION BLDG. BUILDING RA. RETURN AIR REVISIONS ICI SUPPLY DIFFUSER CFM. CUBIC FEET PER RTU. ROOFTOP UNIT SA. SUPPLY AIR N+� changes sha61 be made to the scope of vwlark without prior approval of Tukwila Building Division. , PROJECT LOCATION: WESTFIELD SOUTHCENTER MALL 2800 SOUTHCENTER MALL SPACE NO.: 116 TU KW I LA, WA 98188 MINUTE .RETURN GRILLE CLG. CEILING TV. TURNING VANES CONT. CONTINUATION TYP. TYPICAL I 19. CONTRACTOR SHALL COMPLETELY INSTALL THE LISTED ACCESSORIES PER MANUFACTURERS RECOMMENDATIONS INCLUDING ALL TEMPERATURE CONTROL CONNECTIONS. 20. ANY REQUIRED ROOF PENETRATIONS SHALL BE PERFORMED IN COORDINATION WITH LANDLORD'S ROOFING CONTRACTOR AND AS OUTLINED IN HVAC DESIGN AND CONSTRUCTION CRITERIA. NI-1. WATER NEATER DTE: Revisions WIII require a neW plan submIttz I and may include additional plan review fees. CONTR. CONTRACTOR EXHAUST GRILLE COOOD. COORDINATE W/ WITH DIFF. DIFFUSER MECHANICAL PLAN GENERAL NOTES L HVAC LEGEND AND ABBREVIATIONS G C DESIGN TYPE:. LINEN & LACE MECHANICAL PLAN CODED NOTES 0 C.°I) O - !ILEc0PY - ) NOTE: TENANT G.G. 5HALL FIELD VERIFY EXISTING ROOF FOR CONSTRUCTION AND SUPPORTS AT EXISTING RTU'S. G.C. TO PROVIDE INFORMATION TO ARCHITECT AND WHBM P.M. PRIOR TO UNIT INSTALL. STRUCTURAL REVIEW AND APPROVAL IS REQUIRED AS THERE IS AN INCREASE IN UNIT WEIGHTS. TI-115 SHOULD BE DONE IMMEDIATELY UPON ARRIVING ON SITE TO KEEP CONSTRUCTION SCHEDULE. NEW RTU -1 = 993 LBS. - ) CONTRACTOR SHALL FURNISH AND INSTALL ALL REQUIRED SEISMIC AND STRUCTURAL SUPPORTS FOR ALL HVAC EQUIPMENT, DUCT, PIPING, ETC. PROVIDE LATERAL SUPPORT AS REQUIRED PER IBC 2009 SEISMIC DESIGN CATEGORY D. FIELD VERIFY AND COORDINATE ALL REQUIREMENTS WITH AUTHORITY HAVING JURISDICTION. REVISIONS: REQUIRED BY: DATE CONTRACTOR SHALL FURNISH AND INSTALL ALL REQUIRED SEISMIC AND STRUCTURAL SUPPORTS FOR ALL FIRE PROTECTION DEVICES, EQUIPMENT, PIPING, ETC.. PROVIDE LATERAL SUPPORT AS REQUIRED PER IBC 2009 SEISMIC DESIGN CATEGORY D. FIELD VERIFY AND COORDINATE ALL REQUIREMENTS WITH AUTHORITY HAVING JURISDICTION. %5 E ADJACENT TENANT M� 2.0/ M� N.I.C. J. j 10 MIN_ V _ _ _ j �_ • INDICATES NO REVISION TO THIS SHEET V TORY - - r -I I ` �� (I pith... °� 10 ® ,RG HGFR ^= 6 i�� RG -2 • • • • 9 • 1 DRAWN BY: WRG CHECKED BY. JTP 5p 51�� 10 ) (TYP, EF -1 8 75 LE '�I I I Ill, -Mu >vFi ��' ' 42 :4, 7, � b e': .. 141/ c;' W 3 W �- slap #r'-i'14' r • tai' E e, „tom " L• / y � �/ !� / (� l`� It �' ,, q D- 5D -1 JO (TYP) SD -1 11 SPRINKLER PIPE EX. FIRE SPRINKLER PIPE 4.40 HEIGHT UNKNOWN + ■ 9 0 HEIGHT UNKNOWN 8 6 "� UP I . ' _ - __ ■ P F t / FP F' l l • I FP FP FP FP FP FP 2 - Z FP FP FP Z t 124 JD � 20x16 • 1x14 14x141Y _ - - ' s� • FR �' - - - - �- �D e= ie III = -` F K 12 A TYP ( �.) __,% 10 "� • L` r 26 "x16" - - 10 "� rook' 10 w (Y Q REVIEWED FOR o • CODE COMPLIANCE U E - APPROVED 0 Z JAN l 2013 _I < E (TYP)! M2.0 M2.0 , _ MA (._ d • 2 e v , • ( ( , ) �� ADJACENT TENANT SD -2 l - - • _ - - ;- 1 • - -- 1 j _ N.I.C. - - 400 fi� 9 Y INON�SALESJ 1 TI - 9 L __J CI __- ( ) 1 - SD -1 J - r �n� E TYP) FR ( ) 440 SALES 12" ,� 12 "� �, �, M2.0 DRAWING TITLE: MECHANICAL 0 I - - • � _ - - - CI ®f u mla I�ISI(�N • (._ - I y gT; �r ````1, /�jJ� ��i II z ° E 4 ) � r -I I■+ I =�DUL?ING -- T SD s- • 611 I Irk i L 10 (TYP) I` milt No. F ��I zs n review approval is subject to errs and am npro°ual of construction documents des not authorize r �y or� o any adopted i � o!a y dopted ordnance. Rer 1pt of approved Fri Copy and cc la ln ed: ilk- .► Z • - • ~ (`) • �- o _) • ) �i �. -- ///l�w���'1 • O _) FR Y a_ - _ 1 )RTU -1 SD -3 `., 150 �� � , H 6) � F -_ ISSUED: 11 /07/2012 40G� III - B E I - RECEIVED , CV NOV 1 � 9 2012 PERMIT CENTER NORTH , -_ 440 (TYP) 440 M2.0 M2.0 15 ) 2, 1 L _j { 14 ) RG -2 • _ SD -4 1 I `.) • 50 i _ � I , , , A s: I . = � � - � PROJECT NO: e 1 20421 `. - Ll B (TYP) , T2s . l ` 15 M2.0 • • a HALLWAI' ' < _i - - - - - -- -- 26 "x16" - - Gixy t�i°l1'trkwila t A'�±+ ^ BUILDING DIVISION M2.0 RG -3 - I I■ P DRAWING NO: ■ ` 1 111:..IP •7 N J ®RTU -1 TYP MALL SERVICE CORRIDOR ( ) RTU -1 �® M2.0 M2.0 N.I.G. OT USED MECHANICAL PLAN „ 1 '- 0 " 1/4 - A City Name Seattle IAP Location Washington Latitude 47.5 Longitude 122.3 Elevation 449.0 Summer Design Dry -Bulb 85.0 Summer Coincident Wet -Bulb 65.0 Summer Daily Range 18.3 Winter Design Dry-Bulb 23.0 Winter Design Wet -Bulb 19.2 Atmospheric Clearness Number 1.05 Average Ground Reflectance 0.20 Soil Conductivity 0.800 Local Time Zone (GMT +1- N hours) 8.0 Consider Daylight Savings Time No Simulation Weather Data N/A Current Data is 2001 ASHRAE Handbook Design Cooling Months January to December Deg. Deg. ft °F °F °F °F °F BTU /(hr -ft °F) hours TITUS INDUSTRIES AIR DISTRIBUTION DEVICES DESIGN COOLING DESIGN HEATING SIZE COOLING DATA AT Jun 1500 COOLING OADB1WB 84.0 °F /65.0 °F HEATING DATA AT DES HTG HEATING OA DB 1 WB 23.0 °F /19.2 °F ZONE LOADS Details Sensible (BTUIhr) Latent (BTUIhr) Details Sensible (BTU /hr) Latent (BTU /hr) Window & Skylight Solar Loads 0 ft2 0 - 0 ft2 - - Wall Transmission 0 ft2 0 - 0 ft2 0 600 Roof Transmission 2211 ft2 3969 - 2211 ft2 12261 - Window Transmission 0 ft2 0 - 0 ft2 0 - Skylight Transmission 0 ft2 0 - 0 ft2 0 A Door Loads Oft2 0 - 0ft2 0 - Floor Transmission 2211 ft2 0 - 2211 ft2 0 - Partitions 0 ft2 0 - 0 ft2 0 - Ceiling 0 ft2 0 - 0 ft2 0 - Overhead Lighting 2084 W 4276 - 0 0 - Task Lighting 2794 W 8189 - 0 0 - Electric Equipment 1700 W 5436 - 0 0 - People 65 16250 13000 0 0 0 Infiltration - 0 0 - 0 0 Miscellaneous - 0 0 - 0 0 Safety Factor 10% / 10% 3812 1300 20% 2452 0 » Total Zone Loads - 41931 14300 - 14713 0 Zone Conditioning - 41852 14300 - 14154 0 Plenum Wall Load 0% 0 - 0 0 - Plenum Roof Load 70% 9262 - 0 0 - Plenum Lighting Load 30% 2133 - 0 0 - Return Fan Load 2925 CFM 0 - 2925 CFM 0 - Ventilation Load 600 CFM 5890 - 600 CFM 29243 0 Supply Fan Load 3000 CFM 1668 - 3000 CFM - - Space Fan Coil Fans - 0 - - 0 - Duct Heat Gain / Loss 5% 2097 - 5% 736 - » Total System Loads - 62902 14300 - 44133 0 Central Cooling Coil - 62902 14300 - 0 0 Central Heating Coil - 0 - - 44133 » Total Conditioning - 62902 14300 - 44133 0 Key: Positive values are clg Toads Negative values are htg loads Positive values are htg loads Negative values are clg Toads TITUS INDUSTRIES AIR DISTRIBUTION DEVICES SYMBOL CATALOG NUMBER SIZE MOUNTING MATERIAL FINISH DPR. BORDER STYLE MOD. NECK CEILING OTHER STEEL ALUM. SD -1 TITUS OMNI 24 "x24" 12 "0 • FEAT PUMP mt3H1 • COP A B B 600 SD -2 TITUS OMNI 24 "x24" 10(P 940 _ 820 208 41.85 A B B 85:2 SD -3 TITUS OMNI 24 "x24" BO 75 TOTAL. 2,255 A - C SD -4 TITUS OMNI 12 "x12" 614 . • A _ C SD -5 TITUS OMNI 12 "x12" 6 "4 . . A - A RG -1 TITUS OMNI 24 n x24 15 " A - G RG -2 TITUS 355RL 24 "x12" 22 "x10" • • A - B RG -3 TITUS OMNI 12 "x12" B"cp • • A - C NOTES. 1, SYMBOL KEY: FIRST LETTER: S- SUPPLY R- RETURN E- EXHAUST. SECOND LETTER: D- DIFFUSER R- REGISTER G- GRILLE. 2. CATALOG NUMBERS REFER TO TITUS AIR DEVICES. 3. PROVIDE DIRECTIONAL BLOW FOR AIRFLOW OTHER THAN 4 -NAY. 4. FINISH: "A" - SEE ARCHITECTURAL SHEETS FOR FINISH COLOR, IF NO COLOR SPECIFIED PROVIDE STANDARD WHITE. "B" - NHITE - G.C. TO FIELD PAINT TO MATCH CEILING OR WALL NITH ENAMEL FINISH. "C" - FLAT BLACK. 5. DAMPERS 5I-ALL BE OPERABLE FROM FACE: "A" - OPPOSED BLADE RECTANGULAR MANUAL BALANCING DAMPER. "B" - ROUND MANUAL BALANCE DAMPER. "Cu - FIRE DAMPER W /VOLUME CONTROL. "D" - YOUNG'S REGULATOR DAMPER MODEL #5020 -CC 6. BORDER STYLE: "A" - SURFACE MOUNTED "B" - LAY -IN, PROVIDE WITH PLASTER FRAME FOR DRYWALL CEILING MOUNTING, SEE DETAIL "B" ON THIS SHEET. "C" - LAY -IN FRAME FOR T -BAR CEILING. 7. PROVIDE BOOT FOR DUCT MOUNTING. ROOFTOP HVAC UNIT SCHEDULE UNIT NO. MFR MODEL NO. CFM O.A. CFM EXT. S.P. COOLING DATA MOTOR HEATING DATA FILTERS MCA MOCP WEIGHT (LBS.) REMARKS TOTAL COOLING MBN SENSIBLE COOLING MBH EER WATTS HP R.P.M. VOLTS PHASE FEAT PUMP mt3H1 ELECTRIC NEATER KW COP RTU -1 TRANS WSCO9O 3 000 ' 600 0.75" 87.83 67.12 11.1 940 _ 820 208 41.85 15.6 3,4 2" 85:2 100 993 ..400 EF -1 75 TOTAL. 2,255 Ol UNIT SHALL COME WITH THE FOLLOWING FACTORY INSTALLED OPTIONS: ECONOMIZER, BAROMETRIC RELIEF DAMPER, THROUGH THE BASE ELECTRICAL CONNECTION, NON -FUSED DISCONNECT, UNPOWERED GFCI RECEPTACLE (WIRED BY CONTRACTOR), HIGH EFFICIENCY MOTOR, BELT DRIVE FAN, TOOL -LESS HAIL 1-11G1-1/LOW PRESSURE N (TXV, FROSTAT, REFRIGERATION. CONTROLS TR ( , HI G CUTOUTS, ETC.), SUPPLEMENTAL ELECTRIC NEATER AND COMPARATIVE ENTHALPY CONTROL. O7.5 -TON ELECTRIC HEAT PUMP WITH SUPPLEMENTAL ELECTRIC HEAT ROOFTOP UNIT PROVIDED BY CHICO'S FAS NATIONAL ACCOUNTS REPRESENTATIVE AND INSTALLED BY GENERAL CONTRACTOR. REVIEWED FOR CODE COMPLIANCE APPROVED JAN 16 2013 City of Tukwila BUILDING DIVISION O UNIT SHALL COME WITH TI-4E FOLLOWING FACTORY ACCESSORIES TO BE FIELD INSTALLED BY CONTRACTOR: 14" HIGH ROOF CURB, ECONOMIZER HOOD (SOME FIELD ASSEMBLY REQUIRED), BAROMETRIC RELIEF 1-IOOD (SOME FIELD ASSEMBLY REQUIRED), COMPARATIVE ENTHALPY CONTROL (SOME FIELD WIRING REQUIRED). GHIGO S FAS NATIONAL WITH FIELD VERIFY INSTALLATION REQUIREMENTS ACCOUNT REPRESENTATIVE AND PROVIDE ALL LABOR AND MISCELLANEOUS MATERIALS FOR A COMPLETELY FUNCTIONAL HEAT PUMP ROOFTOP UNIT. O CONTRACTOR SHALL FURNISH AND INSTALL ALL REQUIRED STRUCTURAL STEEL TO SUPPORT NEW UNIT. REFER TO SHEET A11.4 FOR STRUCTURAL SUPPORT DETAILS AND REQUIREMENTS. ROOF WORK TO BE PERFORMED BY LANDLORD APPROVED ROOFING CONTRACTOR AT THIS CONTRACTOR'S EXPENSE. CONTRACTOR SHALL FURNISH AND INSTALL THREE COMPLETE SETS OF FILTERS. EXHAUST FAN SCHEDULE UNIT NO. MFR., MODEL NO. TYPE C.F.M. S.P. IN. W.G. WHEEL R.P.M. MOTOR SERVING REMARKS H.P. ATTS RPM VOLTS 1 - PiASE EF -1 GROAN LI50 CLG. EXH. 75 0.5 1500 70 1750 120 1 RESTROOM O.4 0.15 CFM /FT2 8 2 1 CONTROL WITH LIGHT SWITCH. BASED ON BROAN, FURNISHED AND INSTALLED BY GENERAL CONTRACTOR. OPROVIDE WITH DISCONNECT SWITCH, INTEGRAL BAGKDRAFT DAMPER AND SPEED CONTROL MOUNTED ON FAN. OUTSIDE AIR REQUIREMENT SCHEDULE ASHRAE OUTSIDE AIR REQUIREMENTS OCCUPANT CLASS SQ. FT. (A) OCCUPANT LOAD CFM PER OCCUPANT (B) OA CFM REQD. (Ax8) ACT OA CFM FROM UNIT SALES 1, 426 - 0.3 CFM /FT 2 428 RTU -1 FITTING ROOMS 350 - 0.20 CFM /FT2 70 NON -SALES 320 - 0.15 CFM /FT2 48 HALLWAY 50 - 0.05 CFM /FT2 3 TOTAL 549 600 TOILET 65 1 75 * 75 * EF -1 75 TOTAL. 2,255 * - EXHAUST OWNER: chico's 11215 METRO PARKWAY FT. MYERS, FL. 33966 ARCHITECT / ENGINEER: 0 0 O 0 O 0 O 0 E E 112 E2 .: . t) 49- f: 614 545 4555 THE ENGINEER ASSUMES NO RESPONSIBILITY OR LIABILITY FOR THE USE OF THESE PLANS FOR ANY PROJECT OTHER THAN SPECIFICALLY AUTHORIZED BY THEM AND SIGNED AND SEALED FOR SUCH SPECIFIC LOCATION IN THE STATE SHOWN ON THE SEAL. THIS BUILDING USE IS ONLY APPLICABLE IN AREAS MEETING THE STATED DESIGN CRITERIA. HVAC LOAD CALCULATIONS R MECHANICAL SCHEDULES 2.4(:)T USED „ HOLE= ROD SIZE + 1/16 ", TYP. 1 1 /4" PLATE 1/8 "x 3" LONG 135 °tl5° 9/16 "0 HOLE TYP. \' SEISMIC CABLE CONN. DBL CLAMP AIRCRAFT GABLE (PLACE AT TOP CHORD JOIST PANEL POINTS) SEISMIC CABLE CONN. SEISMIC CABLE DETAILS EXIST JOIST N.T.S. UNISTRUT PIOOD FRAMING OR EQUIVALENT, BETWEEN STRUCTURE WITH STEEL BEAM CLAMP AT EACH END BUILDING STRUCTURE ++ 1/2" EYE BOLT WITH LOCKING NUTS ON EACI-4 SIDE (TYP) SIZE PER ASTM E 488 WITH LENGTH TO BE EIGHT TIMES DIA. MIN. ADJUSTABLE TURNBUCKLE DOUBLE CLAMP (TYP) MIN.1 /2" DIA. THREADED ROD PER SMACNA TYPICAL IN 4 PLACES EQUIPMENT UNISTRUT PIOOD FRAMING OR EQUIVALENT MANUFACTURER PROVIDED MOUNTING BRACKET HOLE = ROD SIZE +1/16" (TYP) PLATE I /8 "x 3" LONG OR 135 ° ±15° NOTE: ANCHORAGE SHALL MEET ALL REQUIREMENTS OF LOCAL CODE. REFER TO MECHANICAL CODE CHAPTER 6 AND SMACNA SEISMIC RESTRAINT MANUAL. EXIST ROOF BEAM EXIST OPEN WEB JOIST PLACE AT TOP CHORD JOIST PANEL POINTS ASTM A 603 GALVANIZED STEEL CABLES IN FOUR DIRECTIONS HAVING END ASSEMBLIES WITH THIMBLES, BRACKETS, SWIVEL AND TWO CLAMPING BOLTS FOR CABLE ENGAGEMENT. 9/16" DIA. HOLE (TYP) MAIN DUCTWORK ANCHORAGE DETAIL N.T.S. INSULATED ROUND DUCT TO S.A. MAIN. CURB MOUNTED A/C UNIT USE GALVANIZED VANES FOR GALVANIZED OR ALUMINUM DUCTS (TYP.) UNIT BASE RAIL NEOPRENE GASKET TREATED WOOD NAILER SECURED TO CURB DUCT TI-RU ROOF ROOF FACTORY CURB 14" HIGH MIN. INSULATION LAG BOLTS 18 GAUGE TIE DOWN RESTRAINT COUNTERFLASNING 12" REFLECTIVE TAPE. INSULATION STRIP BY G.G. (HARD INSULATION INSET FOR TOE KICK PROTECTION) FLEXIBLE CONNECTION (MAX. 5 FT.). VOLUME DAMPER. 11 'JI -1 /d" 1A -1 /d" 13 -1/4" OUTSIDE DIMENSION -lc- t 1 , I -`( NI- is in � 23 ", 19 ", 17" OR 11" INSIDE DIMENSION { 1 24 ", 20 ", 18" OR 12" 1 -1/2" 7-"C" CHANNEL REINFORCING BY G.G. AROUND OPENING u MOUNTING SCREW FIELD INSTALLED rDRYWALL CEILING -STEEL MOUNTING I -I /8" -/ FRAME NOTE: ROUGH -IN OPENING SIZES: CONTACT MANUFACTURER FOR INFORMATION. red DRYWALL MOUNTING FRAME DETAIL STRAP CLAMP • RECEIVED (TYPICAL). CITY OF TUKVVILA NOV 19' 2012 PERMIT CENTER FIRE DAMPER WHERE REQUIRED. ROOFING 111111 Ai THERMAL INSULATING BLANKET WHERE REQUIRED. FLEXIBLE CONNECTION ii;;; :ii ;iii? 1;11;;1 ;liiil LEVELING OF CURB BY G.C. SHIM HERE TO LEVEL CURB BASE FRAME OPENING WITH STEEL CHANNEL NOTE: PROVIDE RUBBER FLOOR MATTS AROUND ALL ROOFTOP EQU IPMENT 3/8" THROUGH BOLT, WASHERS, LOCKWASNERS, AND NUT, 2 MINIMUM EACI-4 CHANNEL SQUARE ELBOW WITH TYPE "A" DOUBLE THICKNESS VANES. DUCT SIZE 36 "x36" OR UNDER. SQUARE ELBOW WITH SINGLE THICKNESS VANES. SUPPLY AIR DIFFUSER. DRYWALL CEILING. PLASTER FRAME. RTU CURB ASSEMBLY DETAIL TURNING VANE DETAIL DIFFUSER MOUNTING DETAIL ALL DUCT LINER TRANSVERSE EDGES TO BE COATED WITH ADHESIVE IN ACCORDANCE WITH SMACNA STANDARDS (TYP.). J FLANGED AND GASKETED JOINT OR DUCT CONNECTION AND RE- INFORCEMENT IN ACCORDANCE WITH SMACNA 2" W.G. CLASS, SEAL TRANSVERSE JOINTS AND LONGITUDINAL SEAMS 1 ACCORDANCE WITH SMACNA CLASS "B" (TYP.). TAPE DOWN EXTERNAL INSULATION. FASTEN WITH MIN. (3) SHEET METAL SCREWS, SEAL WITH DUCT TAPE AND MASTIC. ROUND RIGID DUCT. MAIN DUCT FLOW I" ACOUSTICAL LINING. ROUND DUCT TAKE -OFF DETAIL MINIMUM INSTALLED R VALUE OF 4.2. CONICAL OR BELLMOUTH SPIN- IN,FITTING, SEAL AIR TIGHT WITH MASTIC. VOLUME DAMPER LOCATION WHERE ABOVE LAY -IN CEILING. PROVIDE WITH LOCKING QUADRANT. Jcma INTIMATES STORE NO: 5381 PROJECT LOCATION: WESTFIELD SOUTHCENTER MALL 2800 SOUTHCENTER MALL SPACE NO.: 116 TUKWILA, WA 98188 DESIGN TYPE: LINEN & LACE REVISIONS: REQUIRED BY: DATE • INDICATES NO REVISION TO THIS SHEET DRAWN BY: WRG CHECKED BY: JTP DRAWING TITLE: MECHANICAL SCHEDULES & DETAILS DATE ISSUED: 11/07/2012 PROJECT NO: 120421 DRAWING NO: M2.0 21 05 00 FIRE PROTECTION GENERAL PROVISIONS A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL A R T L FIRE R PROTECTION SYSTEM, COMPLETE AS INDICATED ON TI-4E DRAWINGS AND AS REQUIRED BY CODE AND AS SPECIFIED HEREIN. B. THE GENERAL CONTRACTOR, UNLESS OTHERWISE NOTED IS TO PROVIDE POWER WIRING FOR EACH ITEM OF ELECTRICAL EQUIPMENT AND MAKE FINAL CONNECTIONS TO MOTORS. C. ALL FINISH PAINTING IS TO BE PERFORMED BY THE GENERAL CONTRACTOR, EXCEPT AS NOTED ELSEWHERE. GENERAL CONTRACTOR, AT TI-IIS CONTRACTOR'S EXPENSE, SHALL RESTORE TO ORIGINAL CONDITION ANY PAINTING DEFACED DURING CONSTRUCTION AND AFTER ORIGINAL PAINTING. D. ALL WORK SI -IALL CONFORM TO CODES, RULES, AND REGULATIONS: 1. NATIONAL ELECTRIC CODE. 2. STANDARD FOR TNE INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS, NFPA 9OA. 3. CODE FOR SAFETY TO LIFE FROM FIRE IN BUILDINGS AND STRUCTURES, NFPA 101. 4. FEDERAL OCCUPATIONAL SAFETY AND HEALTH STANDARDS. 5. STATE MECHANICAL CODE. 6. STATE BUILDING CODE 7. STATE INDUSTRIAL COMMISSION REQUIREMENTS. 8. LOCAL BUILDING CODE REQUIREMENTS. 9. BUILDING INSURING AGENCY REQUIREMENTS. 10. STATE PLUMBING CODE. 11. NFPA. E. ALL PERMITS REQUIRED BY LAWS, ORDINANCES AND BUILDING CODES HAVING JURISDICTION SHALL BE OBTAINED AT THE PROPER TIME BY AND AT THE EXPENSE OF THIS CONTRACTOR. F. CONTRACTOR SHALL OBTAIN ALL INSPECTIONS REQUIRED BY ALL LANS, ORDINANCES AND PUBLIC AUTI- IORITY HAVING JURISDICTION AND SHALL OBTAIN CERTIFICATES OF SUCI-4 INSPECTIONS AND SUBMIT SAME TO THE ARCHITECT AND SHALL PAY ALL FEES, CHARGES, ASSESSMENTS AND OTI -IER EXPENSES IN CONNECTION THEREWITH. G. THE MATERIALS AND EQUIPMENT INSTALLED IN THE WORK SHALL MEET TI-4E REQUIREMENTS OF THE CONTRACT DOCUMENTS AND NO MATERIALS OR. EQUIPMENT SHALL BE ORDERED UNTIL REVIEWED BY THE ENGINEER, LANDLORD AND /OR ARCHITECT. H. CATALOG DATA FOR EQUIPMENT REVIEWED BY THE ARCHITECT SHALL NOT SUPERSEDE THE ENGINEER'S CONTRACT DOCUMENTS. THE REVIEW OF THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM DRAWINGS OR SPECIFICATIONS, PROVIDING PROPER CLEARANCE, FABRICATION PROCESS AND COORDINATION NITH OTHER TRADES. I. PROVIDE INSTRUCTION TO LANDLORD'S OPERATING PERSONNEL AS NECESSARY, SHOWING LOCATIONS AND PROPER OPERATION OF MAJOR ITEMS OF EQUIPMENT AND SYSTEM COMPONENTS AND REFERRING TO THE OPERATING INSTRUCTION MANUAL DESCRIBED BELOW AS A GUIDE. J. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO TNE BUILDING LANDLORD. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT. K. ANY REFERENCE TO TENANT OR TENANT'S CONSTRUCTION MANAGER OR FURNISHED BY ANY OF THE ABOVE REFERS TO SOMA INTIMATES INC. L. REFER TO RESPONSIBILITY SCHEDULE ON SHEET G1.2 FOR INFORMATION IN REGARD TO RESPONSIBILITY OF WORK OR ITEMS WHICH MAY AFFECT ID. M. DEMOLITION 1. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF EXISTING WORK. FIELD VERIFY AND COORDINATE ANY EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT AND PROTECT EQUIPMENT TO REMAIN DURING CONSTRUCTION. N. WARRANTY AND GUARANTEE 1. CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND LABOR PROVIDED UNDER THIS CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT NO ADDITIONAL COST ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT DISCOVERED WITHIN 12 MONTI4S FROM THE DATE OF CERTIFICATE OF OCCUPANCY. THIS GUARANTEE SHALL EXTEND TO LABOR AND MISCELLANEOUS MATERIALS REQUIRED FOR THE INSTALLATION OF EQUIPMENT. THE CONTRACTOR 15 RESPONSIBLE TO VERIFY, COORDINATE AND FOLLOW ALL PROPER HANDLING AND INSTALLATION TECI- JNIQUES W1TH MANUFACTURERS) IN ORDER TO MAINTAIN MANUFACTURER'S WARRANTY. 21 05 13 COMMON WORK RESULTS FOR FIRE SUPPRESSION A. MODIFY THE EXISTING SPRINKLER SYSTEM AND FURNISH ALL MATERIALS, LABOR, TOOLS, ADMINISTRATION, TRANSPORTATION, INCIDENTALS AND APPURTENANCES WHICH ARE REQUIRED TO COMPLETE IN EVERY DETAIL AND LEAVE IN WORKING ORDER ALL ITEMS OF WORK CALLED FOR HEREIN OR SHOWN ON THE ACCOMPANYING DRAWINGS. CONTRACTOR 15 RESPONSIBLE FOR CONNECTING TO THE LANDLORD'S FIRE ALARM SYSTEM. COORDINATE WITH LANDLORD'S APPROVED FIRE ALARM AND SPRINKLER CONTRACTORS. B. INCLUDE ANY MINOR ITEMS OF WORK NECESSARY TO PROVIDE A COMPLETE AND FULLY OPERATIVE FIRE PROTECTION SYSTEM. C. CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT HAZARD CLASSIFICATION, AS WELL AS, THE QUANTITY, SPACING, AND PROTECTED AREA LIMITATION OF SPRINKLER HEADS. CONTRACTOR SHALL FURTHER BE RESPONSIBLE FOR CONFIRMING HIS DETERMINATION WITH THE LANDLORD'S INSURING AGENCY AND THE LOCAL FIRE AUTHORITY HAVING JURISDICTION OVER THE PROJECT. D. WHERE APPLICABLE, LOCATE SPRINKLER HEADS IN CENTER OF CEILING TILE, USE ARMOVER ON ALL SPRINKLER BRANCH LINES TO ACCOMPLISH EXACT LOCATION OF HEAD. E. PROVIDE AN NFPA -13 APPROVED AUTOMATIC FIRE SPRINKLER SYSTEM IN BUILDING. SYSTEM SHALL BE APPROVED BY THE LOCAL AND STATE FIRE MARSHAL'S OFFICE. F. THE INSTALLING CONTRACTOR SHALL BE LICENSED AND CERTIFIED IN THE INSTALLATION OF AUTOMATIC SPRINKLER SYSTEMS IN T1-415 STATE. G. CONTRACTOR SHALL OBTAIN AND PAY FOR ANY INSPECTION FEES, CHARGES, AND ANY OTHER GOVERNMENTAL FEES APPLICABLE. H. CONTRACTOR SHALL FILE ALL NECESSARY DRAWINGS, SPECIFICATIONS, CONTRACTOR'S MATERIAL AND TEST CERTIFICATES. I. CONTRACTOR SHALL OBTAIN A CERTIFICATE OF INSPECTION AND APPROVAL AND SUBMIT TO THE ARCHITECT PRIOR TO THE REQUEST FOR FINAL PAYMENT. J. CONTRACTOR SHALL PROVIDE ALL PRODUCTS AND LABOR REQUIRED TO COMPLETE THE INSTALLATION OF ALL FIRE PROTECTION SPRINKLER SYSTEMS. K. FIRE PROTECTION PIPING AND EQUIPMENT LAYOUT SHALL BE COORDINATED WITH ALL EQUIPMENT, BOTH KNOWN AND UNKNOWN, AND EQUIPMENT INCLUDED UNDER OTHER DIVISIONS OF THE SPECIFICATIONS. L. ALL FIRE PROTECTION PIPING SHALL BE INSTALLED AS CONCEALED WORK, WHERE APPLICABLE. M. TI-4E ARCHITECT RESERVES THE RIGHT TO CHANGE TI-4E LOCATION OF ANY SPRINKLER HEAD DURING THE SUBMITTAL PROCESS EVEN IF THE MOVE SHOULD REQUIRE ADDITIONAL HEADS. N. FILL ANNULAR SPACE BETWEEN SLEEVE AND PIPE OR INSULATION ON ALL PENETRATIONS THROUGH FIRE RATED WALLS. FIRESTOPPING MATERIALS SHALL BE UL CLASSIFIED AND MEET THE REQUIREMENTS OF ASTM. THE METHOD OF INSULATION SHALL CONFORM TO UL FIRE RESISTANCE DIRECTORY. 0. CEILING GRID SYSTEMS SHALL NOT BE USED TO SUPPORT FIRE PROTECTION ITEMS, PIPING, OR ANY OTHER EQUIPMENT. EACH UTILITY AND THE CEILING GRID SYSTEM SHALL BE A SEPARATE INSTALLATION AND EACH SHALL BE INDEPENDENTLY SUPPORTED FROM THE BUILDING STRUCTURE. WHERE INTERFERENCE OCCURS, IN ORDER TO SUPPORT EQUIPMENT OR CEILING GRID SYSTEM, CONTRACTOR MUST INSTALL TRAPEZE TYPE HANGERS OR SUPPORTS WHICH SHALL NOT BE LOCATED WHERE THEY INTERFERE WITH ACCESS TO FIRE DAMPERS, VALVES, LIGHT FIXTURES, AND OTHER MECHANICAL OR ELECTRICAL ITEMS. P. INSTALL ALL SPRINKLER HEADS IN ROOMS IN AN ESTHETIC MANNER. SPRINKLER ARRANGEMENT SHALL BE PARALLEL AND PERPENDICULAR TO THE BUILDING WALLS. COORDINATE WITH ARCHITECT AND TENANT. Q. CONTRACTOR SHALL VERIFY THE LOCATION OF UTILITIES AND NOTE CONDITIONS WHICH WOULD AFFECT THE WORK. ALL DISCREPANCIES SHALL THEN BE REPORTED TO THE LANDLORD'S TENANT COORDINATOR PRIOR TO THE BID AWARD. R. INSTALLATION WILL NOT BE CONSIDERED COMPLETE UNLESS AND UNTIL WRITTEN ACCEPTANCE IS RECEIVED FROM TI-4E STATE FIRE MARSHAL AND THE LANDLORD'S INSURING AGENCY. S. CONTRACTOR TO MAINTAIN ONE SET OF DRAWINGS ON THE JOB TO BE USED STRICTLY FOR RECORDING ANY INSTALLATION DEVIATIONS FROM THE CONTRACT DRAWINGS. T. CONTRACTOR IS RESPONSIBLE FOR DAILY CLEAN -UP AND REMOVAL OF FIRE PROTECTION DEBRIS FROM THE SITE WEEKLY. THE. PREMISES SHALL BE KEPT IN A NEAT AND ORDERLY CONDITION. U, CONTRACTOR SHALL REVIEW AND FOLLOW ALL LANDLORD REQUIREMENTS. THE SUBMITTING OF A BID AUTOMATICALLY IMPLIES THAT THESE REQUIREMENTS HAVE BEEN REVIEWED AND ARE IN TNE BID PRICE AND INFORM LANDLORD IN ADVANCE OF ANY DOWN TIME. 21 05 16 SHOP DRAWINGS A. CONTRACTOR SHALL SUBMI T F O R T H E ARCH! I E CT S AN D LA N DLOR D R EVI EW SIX (6) COMPLETE COPIES OF THE CATALOG DATA AND /OR SHOP DRAWINGS FOR THE LISTED ITEMS OF EQUIPMENT AND ALL COMPONENTS TO BE USED IN THE WORK, INCLUDING SPECIFIC PERFORMANCE DATA, MATERIAL DESCRIPTION, RATING, CAPACITY, WORKING PRESSURE, MATERIAL GAUGE OF THICKNESS, BRAND NAME, CATALOG NUMBER AND GENERAL TYPE. THE SUBMISSION SHALL BE COMPILED BY CONTRACTOR AND REVIEWED BY ENGINEER BEFORE ANY OF THE EQUIPMENT 15 ORDERED. 1. SPRINKLERS (AS REQUIRED) 2. VALVES (AS REQUIRED) 3. TAMPER SWITCHES (AS REQUIRED) 4. WATER FLOW SWITCHES (AS REQUIRED) 5. HYDRAULIC CALCULATIONS (AS REQUIRED) 6. CONNECTIONS TO LANDLORD'S FIRE ALARM SYSTEM B. WHEN SUBMITTED FOR THE ARCHITECT'S REVIEW, SHOP DRAWINGS SHALL 'BEAR GENERAL CONTRACTOR'S CERTIFICATION THAT THEY HAVE REVIEWED, CHECKED AND APPROVED THE SHOP DRAWINGS, THAT THEY ARE IN HARMONY WITH THE REQUIREMENTS OF THE PROJECT AND WITH THE PROVISIONS OF THE CONTRACT DOCUMENTS AND THAT THEY HAVE VERIFIED ALL FIELD MEASUREMENTS AND CONSTRUCTION CRITERIA, MATERIALS, CATALOG NUMBER AND FIELD MEASUREMENTS AND SIMILAR DATA. CONTRACTOR SHALL ALSO CERTI FY THAT THE WORK REPRESENTED BY THE SHOP DRAWINGS 15 RECOMMENDED BY CONTRACTOR AND THE CONTRACTOR'S GUARANTEE WILL FULLY APPLY. G. ALL CONTRACTORS SUBMITTING PROPOSALS FOR TH15 WORK SHALL FIRST EXAMINE THE SITE AND ALL CONDITIONS THEREIN. ALL PROPOSALS SHALL TAKE INTO CONSIDERATION ALL SUCI-4 CONDITIONS AS THEY MAY AFFECT THE WORK UNDER THIS CONTRACT. THE SUBMITTING OF A BID AUTOMATICALLY IMPLIES THAT THIS EXAMINATION OF THE SITE HAS BEEN DONE. 21 05 19 TESTS A. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TESTING OF SPRINKLER PIPING PER NFPA. B. TEST SPRINKLER PIPING WITH A HYDROSTATIC TEST AT 200 PSI FOR 2 HOURS WITI -1 NO VISIBLE LEAKAGE. C. TEST ALARMS, FLOW SNITCHES, AND TAMPERPROOF SWITCHES AND ADJUST AS NECESSARY. D. CONTRACTOR AND LANDLORD SHALL SIGN CERTIFICATES, INDICATING WITNESSING OF ALL TESTS REQUIRED BY NFPA -13 FOR ABOVE GROUND PIPING. E. REPAIR ANY LEAKING JOINTS AND REPAIR ANY DAMAGE TO THE FACILITY THAT TI-4E LEAK MAY NAVE CREATED. CLEAN, PAINT, OR REPLACE ANY DAMAGED COVERINGS AS REQUIRED TO MEET THE LANDLORD'S APPROVAL. F. NOTIFY TI-4E LANDLORD IN WRITING FOR ANY SCHEDULING OF ANY TESTS OR DOWNTIME OF THE EXISTING SPRINKLER SYSTEM. 21 05 25 SUPPORTS, ANCHORS, AND SEALS A. UL LISTED HANGERS, BEAM CLAMPS, HANGER RODS, PIPE ATTACHMENTS, AND PIPE SLEEVES SHALL BE PER SP -58. EQUAL MANUFACTURERS TO BE SIMPLEX GRINNELL, B -LINE, OR MICHIGAN HANGERS. B. ALL HANGER ASSEMBLIES SHALL BE UL AND FM APPROVED. C. HANGER SPACING SHALL MEET NFPA -13 MINIMUM REQUIREMENTS. 21 05 26 INTERIOR PIPE TUBE AND FITTINGS AND - SPRINKLER HEADS A. SPRINKLER HEADS: 1. ALL SPRINKLER HEADS SHALL BE NEW, QUICK RESPONSE, U.L. LISTED, F.M. LISTED AND APPROVED AUTOMATIC SPRAY TYPE AS MANUFACTURED BY STAR, RELIABLE, SIMPLEX- GRINNELL, VIKING, OR CENTRAL SPRINKLER GO. 2. ALL SPRINKLER HEADS SHALL BE RATED FOR 165 °F UNLESS INDICATED OTHERWISE ON DRAWINGS OR REQUIRED BY LOCAL GODES. 3. "SALES" AREA SPRINKLER HEADS ARE TO BE FULLY RECESSED /CONCEALED ADJUSTABLE SCREW TYPE WITH WHITE COVER PLATE TO MATCH CEILING. 4. "NON- SALES" AREA WITH FINISHED CEILING ARE TO BE SEMI - RECESSED TYPE, ROUGH BRASS FINISH. 5. "NON- SALES" NO CEILING SPRINKLER HEADS ARE TO BE CHROME UPRIGHT, ADJUSTABLE SCREW TYPE. 6. "MALL BULKHEAD" AREA SPRINKLER HEADS ARE TO BE FULLY CONCEALED ADJUSTABLE SCREW TYPE WITH WHITE COVER PLATE TO MATCH CEILING. B. PIPING: 1. SCHEDULE 40, BLACK STEEL PIPE, ASTM A -53 FOR FERROUS PIPING, WELDED AND SEAMLESS, ANSI B- 36 -10 -70 FOR WROUGHT STEEL PIPE. 2. CAST IRON OR MALLEABLE IRON SCREWED FITTINGS FOR PIPES 2 INCHES AND SMALLER. SCREWED OR CAST IRON FLANGED JOINTS FOR PIPES LARGER THAN 2 INCHES. 3. GALVANIZED OR BLACK MALLEABLE IRON WITH BRASS SEAT SCREWED UNIONS FOR PIPES 2 INCHES AND SMALLER. 4. VICTAULIC TYPE COUPLINGS ARE ACCEPTABLE, WHERE APPROVED BY CODE AND THE LANDLORD. B. HANGERS SHALL COMPLY WITH LANDLORD AND CODE REQUIREMENTS. C. SPRINKLER SPACING SHALL NOT EXCEED 130 SQ. FT. IN "SALES" AREAS AND 100 5Q. FT. IN "STOCK" AREAS. COMPLY WITH LANDLORD'S DESIGN CRITERIA. PIPE SIZING SHALL BE BASED ON NFPA ORDINARY HAZARD. D. ALL SPRINKLER LINES SHALL BE INSTALLED CONCEALED, AVOIDING INTERFERENCE WITH OTHER TRADES. E. WHERE POSSIBLE, REWORK THE EXISTING SPRINKLER SYSTEM TO MEET TI-4E NEW REQUIREMENTS OF THIS DESIGN. F. PROVIDE AND INSTALL A VALVED TEST CONNECTION IN AN ACCESSIBLE LOCATION FOR THE SPRINKLER SYSTEM AS REQUIRED OR REQUESTED BY THE LANDLORD, LOCAL INSPECTOR, OR INSURANCE CARRIER. G. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE CAUSED BY LEAKS IN ANY OF THE EQUIPMENT INSTALLED. ALL REPAIRS OR REPLACEMENT OF DAMAGES SHALL BE BY THIS CONTRACTOR AT T1-11S CONTRACTOR'S EXPENSE. H. PROPERLY COMPLETED AND SIGNED "SPRINKLER CONTRACTOR'S MATERIAL AND TEST CERTIFICATES" SHALL BE FURNISHED TO THE LANDLORD, AND AUTHORITIES HAVING JURISDICTION. 21 05 30 SPRINKLER PIPING SPECIALTIES A. PROVIDE ALL NECESSARY DRAINS. COORDINATE THE EXACT LOCATION WITH THE ARCHITECT AND LANDLORD PRIOR TO ANY INSTALLATION. B. TI-415 CONTRACTOR 15 TO BECOME INFORMED OF THE EXACT DIMENSIONS OF FINISHED WORK WHERE PIPES, DUCTS AND EQUIPMENT ARE TO BE PLACED AND WILL ARRANGE THE WORK ACCORDINGLY, ASSUMING ALL RESPONSIBILITY FOR PROPER LOCATION AND COORDINATION OF THE WORK. REVIEWED FOR CODE COMPLIANCE APPROVED JAN 16 2013 City of Tukwila BUILDING DIVISION 22 05 00 PLUMBING GENERAL PROVISIONS A. PRO V1 ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED T O INSTALL V R N TALL A PLUMBING SYSTEM COMPLETE AS INDICATED ON THE DRAWIN S AND AS REQUIRE AND Y G D BY CODE ND AS SPECIFIED HEREIN. B. THE GENERAL CONTRACTOR, UNLESS OTHERWISE NOTED IS TO PROVIDE POWER WIRING FOR EACH ITEM OF ELECTRICAL EQUIPMENT AND MAKE FINAL CONNECTIONS TO MOTORS. C. ALL FINISH PAINTING 15 TO BE PERFORMED BY TNE GENERAL CONTRACTOR, EXCEPT AS NOTED ELSEWHERE. GENERAL CONTRACTOR, AT THIS CONTRACTOR'S EXPENSE, SHALL RESTORE TO ORIGINAL CONDITION ANY PAINTING DEFACED DURING CONSTRUCTION AND AFTER ORIGINAL PAINTING. D. ALL WORK SHALL CONFORM TO GODES, RULES, AND REGULATIONS: 1. NATIONAL ELECTRIC CODE. 2. STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS, NFPA 9OA. 3. CODE FOR SAFETY TO LIFE FROM FIRE IN BUILDINGS AND STRUCTURES, NFPA 101. 4. FEDERAL OCCUPATIONAL SAFETY AND HEALTH STANDARDS. 5. STATE MECHANICAL CODE, 6. STATE BUILDING CODE 7. STATE INDUSTRIAL COMMISSION REQUIREMENTS. 8. LOCAL BUILDING CODE REQUIREMENTS. 9. SUILDING INSURING AGENCY REQUIREMENTS. 10. STATE PLUMBING CODE. 11. NFPA. E. ALL PERMITS REQUIRED BY LAWS, ORDINANCES AND BUILDING CODES HAVING JURISDICTION SHALL BE OBTAINED AT THE PROPER TIME BY AND AT THE EXPENSE OF THI5 CONTRACTOR. F. CONTRACTOR SHALL OBTAIN ALL INSPECTIONS REQUIRED BY ALL LAWS, ORDINANCES AND PUBLIC AUTHORITY HAVING JURISDICTION AND SHALL OBTAIN CERTIFICATES OF SUCH INSPECTIONS AND SUBMIT SAME TO THE ARCHITECT AND SHALL PAY ALL FEES, CHARGES, ASSESSMENTS AND OTHER EXPENSES IN CONNECTION THEREWITH. G. PIPING AND EQUIPMENT LAYOUT IS SCHEMATIC. EXACT LOCATIONS ARE DETERMINED BY STRUCTURAL AND OTHER CONDITIONS. DESIGN OF SYSTEM MAY NOT BE CHANGED. ONLY EXACT LOCATION OF PIPING AND DUCTS MAY BE REVISED TO SUIT CONSTRUCTION CONDITIONS AND AID IN COORDINATION WITH WORK OF OTHER CONTRACTORS. H. THE MATERIALS AND EQUIPMENT INSTALLED IN THE WORK SHALL MEET THE REQUIREMENTS OF THE CONTRACT DOCUMENTS AND NO MATERIALS OR EQUIPMENT SHALL BE ORDERED UNTIL REVIEWED BY THE ENGINEER, LANDLORD AND /OR ARCHITECT. I. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS PER THE DOCUMENTS PROVIDED BY THE TENANT /CONTRACTOR. J. CATALOG DATA FOR EQUIPMENT REVIEWED BY TNE ARCHITECT SHALL NOT SUPERSEDE TI-1E ENGINEER'S CONTRACT DOCUMENTS. THE REVIEW OF THE ENGINEER SHALL NOT RELIEVE TI-4E CONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM DRAWINGS OR SPECIFICATIONS, PROVIDING PROPER CLEARANCE, FABRICATION PROCESS AND COORDINATION WITH OTHER TRADES. K. WHEN SUBMITTED FOR THE ARCHITECT'S REVIEW, SHOP DRAWINGS SHALL BEAR THE CONTRACTOR'S CERTIFICATION THAT THE CONTRACTOR 1-IA5 REVIEWED, CHECKED AND APPROVED THE SI-40P DRAWINGS, THAT THEY ARE IN HARMONY WITH THE REQUIREMENTS OF THE PROJECT AND WITH THE PROVISIONS OF THE CONTRACT DOCUMENTS AND THAT THE CONTRACTOR HAS VERIFIED ALL FIELD MEASUREMENTS AND CONSTRUCTION CRITERIA, MATERIALS, CATALOG NUMBERS AND SIMILAR DATA. CONTRACTOR SHALL ALSO CERTIFY THAT THE WORK REPRESENTED BY THE SHOP DRAWINGS IS RECOMMENDED BY THE CONTRACTOR AND THE CONTRACTOR'S GUARANTEE WILL FULLY APPLY. L. ALL CONTRACTORS SUBMITTING PROPOSALS FOR THIS WORK SI -IALL FIRST EXAMINE THE SITE AND ALL CONDITIONS THEREIN. ALL. PROPOSALS SHALL TAKE INTO CONSIDERATION ALL SUCH CONDITIONS AS MAY AFFECT THE WORK UNDER THIS CONTRACT. THE SUBMITTING OF A BID AUTOMATICALLY IMPLIES THAT T1-41S EXAMINATION OF SITE HAS BEEN DONE. M. CONTRACTOR SHALL VERIFY LOCATION OF UTILITIES AND NOTE CONDITIONS WHICH WOULD AFFECT THE WORK. ALL DISCREPANCIES SHALL THEN BE REPORTED PRIOR TO THE BID AWARD. N. WITHIN 90 DAYS AFTER. THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING LANDLORD. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DISTRIBUTION SYSTEM INCLUDING SIZES. 0. ANY REFERENCE TO TENANT OR TENANT CONSTRUCTION MANAGER, OR FURNISHED BY ANY OF THE ABOVE, REFERS TO SOMA INTIMATES INC. P. REFER TO RESPONSIBILITY SCHEDULE ON SHEET G1.2 FOR INFORMATION IN REGARD TO RESPONSIBILITY OF WORK OR ITEMS WHICH MAY AFFECT BID. Q. TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS 1. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, T1-4E EXACT EQUIPMENT SHALL BE USED. THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. 2. CONTRACTOR SHALL SUBMIT ONLY SUBSTITUTION REQUESTS TO TENANT CONSTRUCTION MANAGER FOR APPROVAL. SUBMISSIONS SHALL BE MADE EARLY ENOUGH IN PROJECT TO ALLOW FOUR (4) WORKING DAYS FOR TENANT CONSTRUCTION MANAGER'S REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BEAR THE STAMP OF THE CONTRACTOR AND THE SUB- CONTRACTOR SHOWING THAT HE HAS REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE BEEN TAKEN. R. DEMOLITION CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF EXISTING WORK. FIELD VERIFY AND COORDINATE ANY EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT AND PROTECT EQUIPMENT TO REMAIN DURING CONSTRUCTION. S. WARRANTY AND GUARANTEE I. CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND LABOR PROVIDED UNDER T1-I15 CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT NO ADDITIONAL COST ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT DISCOVERED WITHIN 12 MONTHS FROM THE DATE OF CERTIFICATE OF OCCUPANCY. THIS GUARANTEE SHALL EXTEND TO LABOR AND MISCELLANEOUS MATERIALS REQUIRED FOR THE INSTALLATION OF EQUIPMENT. THE CONTRACTOR 15 RESPONSIBLE TO VERIFY, COORDINATE AND FOLLOW ALL PROPER HANDLING AND INSTALLATION TECHNIQUES WITH MANUFACTURER(S) IN ORDER TO MAINTAIN MANUFACTURER'S WARRANTY. 2. CHICO'S FAS NATIONAL ACCOUNTS REPRESENTATIVE 51-4ALL PROVIDE A COMPLETE 12 MONTH WARRANTY FOR ALL PARTS ON EQUIPMENT OR MATERIALS PROVIDED THROUGH CHICO'S FAS NATIONAL ACCOUNT REPRESENTATIVE STARTING ON TI-4E STORE OPENING DATE. THIS WARRANTY SHALL INCLUDE ALL COSTS TO REPAIR OR REPLACE ANY DEFECTIVE PART WITH THE EXCEPTION OF DAMAGE RESULTING FROM MANUFACTURER'S WRITTEN INSTRUCTIONS. 22 06 00 PLUMBING BASIC MATERIALS AND METHODS A. PROVIDE AND ERECT THE FOLLOWING PIPING AS SHOWN ON TI-4E DRAWINGS AND /OR AS REQUIRED. I. SANITARY BUILDING DRAIN AND VENT PIPING SHALL BE SERVICE WEIGHT CAST IRON SOIL PIPE. 2. SCHEDULE 40 PVC PIPING CAN BE USED FOR SANITARY WASTE AND VENT PIPING WHERE LOCAL CODE ALLOWS AND WITH APPROVAL FROM LANDLORD. PVC NOT ALLOWED IN RETURN AIR PLENUM. 3. DOMESTIC HOT AND COLD WATER USE TYPE "L" HARD COPPER PIPE. B. CONTRACTOR I5 TO BECOME INFORMED OF THE EXACT DIMENSIONS OF FINISHED WORK NHERE PIPES ARE TO BE PLACED AND WILL ARRANGE THE WORK ACCORDINGLY, ASSUMING ALL RESPONSIBILITY FOR PROPER LOCATION. IN THE ERECTION OF THE MAINS, SPECIAL CARE SHALL BE USED PROVIDING SUPPORT AND PROPER ALLOWANCES SHALL BE MADE FOR EXPANSION. C. ALL PIPE LINES MUST BE PROVIDED WITH A SUFFICIENT NUMBER OF FITTINGS OR UNIONS TO MAKE POSSIBLE DISASSEMBLY WITHOUT BREAKAGE OF FITTINGS. D. ALL EXPOSED PIPING SHALL BE NEAT AND CAREFULLY ALIGNED WITH TNE STRUCTURAL ELEMENTS OF THE BUILDING. NO OFFSETS OR OBLIQUE BENDS WILL BE PERMITTED. DRAWINGS ARE DIAGRAMMATIC AND SHOULD NOT BE USED FOR LAYOUT WORK. E. ALL LOW POINTS IN WATER PIPING TO HAVE DRAIN VALVES WITH STANDARD HOSE ATTACHMENTS. HOT AND GOLD NATER PIPING 15 TO PITCH TOWARD THE NEAREST DRAIN VALVE. F. ALL PIPES TO BE INSTALLED SHALL BE LOCATED AT SUFFICIENT DISTANCE FROM WALLS, OTHER PIPES, CONDUIT, DUCTWORK AND OTHER OBSTACLES TO AVOID INTERFERENCE AND TO PERMIT THE APPLICATION OF FULL THICKNESS OF INSULATION SPECIFIED. G. MECHANICAL JOINT TYPE PIPING SHALL BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS. 22 13 16 HOT AND COLD WATER, SANITARY WASTE AND VENT PIPING A. BUILDIN DRAIN, SOIL NASTE AND VENT LINES SHALL H G T V L E BE SERVICE WEIGHT CAST IRON 1- IUBLESS PIPE WITH STAINLESS STEEL AT COUPLINGS. SCHEDULE 40 PVC MAY BE USED FOR SANITARY WASTE AND VENT PIPING WHERE ALLOWED BY LOCAL CODE AND WITH APPROVAL OF LANDLORD. PVC NOT ALLOWED IN RETURN AIR PLENUM. B. VENT STACKS SHALL EXTEND THROUGH THE BUILDING, TERMINATING 12" ABOVE THE ROOF. STANDARD FLASHING .SHALL BE EXTENDED 12" IN ALL DIRECTIONS FROM THE VENT TERMINAL AND TURNED DOWN INTO VENT. FLASHING UNITS AS MADE BY STONEMAN CAULK TYPE NO. 51110 -4 MAY BE USED IN LIEU OF FIELD FABRICATED FLASHING. C. HORIZONTAL RUNS SHALL BE GIVEN AS STEEP A PITCH TOWARD THE OUTLET AS CONDITIONS WILL PERMIT BUT NOT LESS THAN 1/8" PER FOOT. D. FULL "Y" BRANCH FITTINGS AND EXTENSION- WITH BRASS NIPPLES AND FINISHED SCREW PLUGS FOR CLEANOUTS SHALL BE PLACED IN ACCESSIBLE POSITIONS AT ENDS OF HORIZONTAL LINES OF PIPE AND AT FOOT OF ALL VERTICAL LINES OF PIPE OR ELSEWHERE, AS MAY BE REQUIRED BY THE CODE E. WHERE CLEANOUTS OCCUR IN FINISHED AREAS, THEY SHALL BE RECESSED AND COVERS TO BE FLUSH WITH THE FLOOR OR WALL. F. I40T AND COLD WATER PIPING, SHA G, GROUND, , LL BE TYPE L iI HARD COPPER TUBE WITH SOLDER FITTINGS. EXPOSED PIPING AT FIXTURES SHALL CHROME PLATED BRASS. G. ALL COPPER TUBING SHALL HAVE SWEAT JOINTS AND BE CLEAN OF SCALE AND FOREIGN MATTER BEFORE INSTALLATION. ALL ENDS OF TUBING TO BE SWEATED SHALL BE REAMED, GLEANED AND BURNISHED TO REMOVE DIRT AND OXIDE. HARD 95 -5 SOLDER SHALL BE USED AND APPLIED TO TNE JOINTS ACCORDING TO STANDARD PRACTICE AND /OR MANUFACTURER'S RECOMMENDATIONS. SUITABLE ADAPTERS SHALL BE USED AT CONNECTION TEQUIPMENT. H. EACH HOT AND COLD ;WATER BRANCI-4 SHALL BE PROVIDED WITH A GATE VALVE SHUT -OFF AND EACH FIXTURE SHALL BE PROVIDED WITH A STOP VALVE. 22 41 16 STERILIZATION! A. STERILIZE NEW DOMESTIC WATERLINES AFTER INSTALLATION. B. FURNISI4 A CERTIFICATE OF STERILIZATION AND APPROVAL FOR HUMAN CONSUMPTION TO BE SIGNED BY A PROFESSIONAL ENGINEER REGISTERED IN THI5 STATE, REGULARLY EMPLOYED BY THE TESTING LABORATORY. CERTIFICATE MUST BE GIVEN TO THE ENGINEER AND TENANT BEFORE FINAL PAYMENT WILL BE MADE. C. STERILIZATION SHALL BE BY MEANS OF CHLORINE INJECTED INTO THE NATER SYSTEM NEAR. THE SOURCE AND OUTLETS THROUGHOUT TI-4E SYSTEM SHALL BE TESTED TO PROVE PRESENCE OF MINIMUM REQUIREMENTS. LEAVE CI- ILORINE IN FOR 24 HOURS AND FLUSH OUT SYSTEM UPON COMPLETION OF WORK. SEND DOCUMENTATION ON OFFICIAL LETTERHEAD OF TESTING LABORATORY TO TENANT AND ENGINEER AFTER STERILIZATION. D. STERILIZATION SHALL BE PERFORMED UNDER THE IMMEDIATE SUPERVISION OF A WATER TESTING LABORATORY - REGULARLY ENGAGED IN THE SERVICE AND SHALL BE DONE ACCORDING TO THEIR INSTRUCTIONS. E. PROVIDE CERTIFICATE OF STERILIZATION IN FINAL CLOSE OUT PACKAGE TO BE DELIVERED TO TENANT PROJECT MANAGER. 22 53 00 ELECTRIC WATER HEATER A. INSTALL ELECTRIC WATER HEATER AND ACCESSORIES, AS FURNISHED BY CHIGO'S FAS NATIONAL ACCOUNT REPRESENTATIVE, AND AS INDICATED ON THE DRAWINGS. B. INSTANTANEOUS TYPE ELECTRIC WATER HEATER HARD WIRED TO ELECTRICAL POWER. C. FURNISH AND INSTALL A THERMOSTATIC MIXING VALVE THAT READS IN DEGREES FAHRENHEIT AND SET TO PROVIDE MAXIMUM 105 °F HOT NATER TO LAV FAUCET. 22 57 00 PLUMBING FIXTURES AND EQUIPMENT A. VALVES TO BE AS FOLLOWS: 1. 125 LB. S.W.P. GATE, GLOBE AND CHECK VALVES: 2. BALL (2 -1/2" AND SMALLER) - ALL BRONZE, TEFLON STEM SEALS AND SEAT, 1/4 TURN SHUT -OFF, VINYL COVERED HANDLES. 3. CHECK (2 -1/2" AND SMALLER) - ALL BRONZE, SCREWED, HORIZONTAL SWING CHECK WITH BRONZE DISC. B. VALVES SHALL BE MILWAUKEE. EQUAL PRODUCTS BY CRANE, HAMMOND, POWELL, WALWORTH, NORTHERN INDIANA BRASS COMPANY OR STOCKHAM MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. C. UNIONS TO BE AS FOLLOWS: I. UNIONS FOR COPPER PIPE TO BE 150LB., ALL BRONZE, SOLDER END TYPE BY CHASE. EQUAL PRODUCTS BY CRANE, MUELLER OR NORTHERN INDIANA BRASS COMPANY MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. 2. DIELECTRIC UNIONS BETWEEN FERROUS AND COPPER SHALL BE INSULATED TO PREVENT METAL -TO -METAL CONTACT AND SHALL BE MANUFACTURED BY CAPITAL MANUFACTURING COMPANY OF COLUMBUS, OHIO. EQUAL PRODUCTS BY PATROL OR PECO SALES COMPANY D. WATER CLOSETS, URINALS AND LAVATORIES SHALL BE VITREOUS CHINA BY AMERICAN STANDARD AS FURNISHED BY CHICO'S FAS NATIONAL ACCOUNTS REPRESENTATIVE, AND INSTALLED BY CONTRACTOR. INSTALL PER ADA REQUIREMENTS. 22 57 13 INSULATION A. PIPE INSULATION AND APPURTENANCES AND COVERINGS ON PIPES USED IN CHASES, SHAFTS OR OTHER CONCEALED SPACES IN TYPES 1 AND 2 CONSTRUCTION SHALL HAVE A FLAME SPREAD RATING NOT EXCEEDING TWENTY -FIVE (25) AND IN TYPE 3 AND 4 CONSTRUCTION NOT EXCEEDING SEVENTY -FIVE (75) AND A SMOKE DEVELOPED RATING NOT EXCEEDING FIFTY (50). B. INSULATION SHALL BE SCHULLER MICRO -LOK 650 FIBERGLASS WITH FACTORY APPLIED ALL SERVICE JACKET WITH SELF- SEALING TAPE. INSULATION SHALL LIMIT HEAT LOSS TO 25 BTU /HR. /SQ.FT. OF PIPE SURFACE WITH 55 DEGREES AMBIENT, AND SHALL BE 1/2" THICK ON COLD WATER PIPING AND 1" THICK ON HOT WATER PIPING. APPLY INSULATION ALL THE NAY TO POINT OF CONNECTION AT EACH PIECE OF EQUIPMENT INCLUDING HOT WATER HEATER. C. GLUE IN PLACE WITH SCHULLER U -GLUE. D. PIPE FITTINGS, ELBOWS AND VALVES SHALL BE INSULATED WITH SCHULLER ZESTON INSULATION AND HAVE FACTORY PRE - MOLDED PVC COVERS. BUTT THE JOINTS TOGETHER AND WRAP WITH 3" WIDE STRIP TAPE, SEAL IN PLACE WITH SCHULLER U -GLUE. E. INSULATION SHALL NOT BE APPLIED UNTIL THE GENERAL CONSTRUCTION HAS PROGRESSED SUFFICIENTLY TO INSURE AGAINST PHYSICAL OR MOISTURE DAMAGE TO THE INSULATION. ALL INSULATION DAMAGED THROUGH FAILURE TO OBSERVE THIS DIRECTIVE SHALL BE REPLACED BY CONTRACTOR AT CONTRACTOR'S EXPENSE. F. INSTALL ALL INSULATION ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. G. INSTALL INSULATION OVER ALL LANDLORD PIPING WITHIN DEMISED PREMISES. H. INSULATION SHALL NOT BE APPLIED OVER FLANGES, JOINTS AND SEAMS IN PIPING. CONTINUE INSULATION TO POINT OF CONNECTION AT EQUIPMENT OR FIXTURE. I. INSULATION SHALL BE SCHULLER. EQUAL PRODUCT BY ARMSTRONG, CERTAINTEED, OWENS- CORNING OR KNAUF MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. 22 58 00 PLUMBING SYSTEM TESTING A. SYSTEM TESTING SHALL PROVIDE FOR THE FOLLOWING: I. TEST NEN INTERIOR DOMESTIC WATER SYSTEM. 2. TEST ALL SOIL, WASTE, AND VENT PIPING. 3. FURNISH ALL PUMPS FOR AIR AND WATER PRESSURE TESTS ALONG WITH GAUGES AND ANY OTHER REQUIRED TEST EQUIPMENT. B. UNDERGROUND LINES TO BE TESTED BEFORE CONCEALED. CONTRACTOR SHALL REPAIR ANY LEAKS AND ALL DAMAGE RESULTING THEREFROM. I. CHANGES IN AMBIENT TEMPERATURE WILL BE TAKEN INTO ACCOUNT WHEN TESTING UNDERGROUND PIPING, I- IOWEVER, THE VARIOUS SYSTEMS SHALL BE THOROUGHLY INSPECTED FOR LEAKS BEFORE HYDROSTATIC PRESSURE TESTS ARE CONCLUDED. 2. INTERIOR WATER PIPING: HYDROSTATIC TEST AT 125 PSI ANNA PROCEDURES. 3. SOIL, WASTE, AND VENT PIPING SHALL BE WATER AND SMOKE OR AIR TIGHT (STATE PLUMBING CODE). C. MEASURE LEAKAGE BY METERING WATER REQUIRED TO MAINTAIN LINE PRESSURE. REMOVE AIR BEFORE TESTING. D. REPAIR ANY LEAKING JOINTS AND DEMONSTRATE ACCEPTABLE LEAKAGE TO SATISFACTION OF TENANT'S REPRESENTATIVE AND APPROVING AUTHORITY. FLUSH ALL PIPING BEFORE PLACING INTO OPERATION . ti1121136 REGk1vEU CITY OF TUKWILA NOV 1; 9 2012 PERMIT CENTER OWNER: chico's 11215 METRO PARKWAY FT. MYERS, FL. 33966 ARCHITECT 1 ENGINEER: U 0 z w CC 2 Ln 0 • 0 O 0 O 0 E a• Ei co o c 3 f: 614 545 4555 THE ENGINEER ASSUMES NO RESPONSIBILITY OR LIABILITY FOR THE USE OF THESE PLANS FOR ANY PROJECT OTHER THAN SPECIFICALLY AUTHORIZED BY THEM AND SIGNED AND SEALED FOR SUCH SPECIFIC LOCATION IN THE STATE SHOWN ON THE SEAL. THIS BUILDING USE IS ONLY APPLICABLE IN AREAS MEETING THE STATED DESIGN CRITERIA. Jana INTIMATES STORE NO: 5381 PROJECT LOCATION: WESTFIELD SOUTHCENTER MALL 2800 SOUTHCENTER MALL SPACE NO.: 116 TUKWILA, WA 98188 DESIGN TYPE: LINEN & LACE REVISIONS: REQUIRED BY: DATE * INDICATES NO REVISION TO THIS SHEET DRAWN BY: WRG CHECKED BY: JTP DRAWING TITLE: MECHANICAL SPECIFICATIONS DATE ISSUED: 11/07/2012 PROJECT NO: 120421 FIRE PROTECTION AND PLUMBING SPECIFICATIONS DRAWING NO: M4.0 23 0500 GENERAL PROVISIONS FOR HVAC QUI TO INSTALL A N PERFORM ALL LABOR RE RED T T f MATER IALS AND EQUIPMENT AND PERF R A. PROV DE ALL T R HEATING, VENTILATING, AIR CONDITIONING SYSTEM, COMPLETE AS INDICATED ON THE DRAWINGS, AS REQUIRED BY CODE AND AS SPECIFIED HEREIN. B. THE GENERAL CONTRACTOR, UNLESS OTHERWISE NOTED IS TO PROVIDE POWER WIRING FOR EACH ITEM OF ELECTRICAL EQUIPMENT AND MAKE FINAL CONNECTIONS TO MOTORS. C. ALL FINISH PAINTING 15 TO BE PERFORMED BY THE GENERAL CONTRACTOR, EXCEPT AS NOTED ELSEWHERE. GENERAL CONTRACTOR, AT THIS CONTRACTOR'S EXPENSE, SHALL RESTORE TO ORIGINAL CONDITION ANY PAINTING DEFACED DURING CONSTRUCTION AND AFTER ORIGINAL PAINTING. D. ALL WORK SHALL CONFORM TO CODES, RULES, AND REGULATIONS 1. NATIONAL ELECTRIC CODE. 2. STANDARD FOR THE INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS, NFPA 90A. 3. CODE FOR SAFETY TO LIFE FROM FIRE IN BUILDINGS AND STRUCTURES, NFPA 101. 4. FEDERAL OCCUPATIONAL SAFETY AND HEALTH STANDARDS. 5. STATE MECHANICAL CODE. 6 STATE BUILDIN G CODE 7. STATE INDUSTRIAL COMMISSION REQUIREMENTS: 8. LOCAL BUILDING CODE REQUIREMENTS, 9. BUILDING INSURING AGENCY REQUIREMENTS. 10. STATE PLUMBING CODE. 11. NFPA. E. ALL PERMITS REQUIRED BY LAWS, ORDINANCES AND BUILDING CODES HAVING JURISDICTION SHALL BE OBTAINED AT THE PROPER TIME BY AND AT THE EXPENSE OF THIS CONTRACTOR. F. CONTRACTOR SHALL OBTAIN ALL INSPECTIONS REQUIRED BY ALL LAWS, ORDINANCES AND PUBLIC AUTHORITY HAVING JURISDICTION AND SHALL OBTAIN CERTIFICATES OF SUCH INSPECTIONS AND SUBMIT SAME TO THE ARCHITECT AND SHALL PAY ALL FEES, CHARGES, ASSESSMENTS AND OTHER EXPENSES IN CONNECTION THEREWITH. G. PIPING AND EQUIPMENT LAYOUT 15 SCHEMATIC. EXACT LOCATIONS ARE DETERMINED BY STRUCTURAL AND OTHER CONDITIONS. DESIGN OF SYSTEM MAY NOT BE CHANGED. ONLY EXACT LOCATION OF PIPING AND DUCTS MAY BE REVISED TO SUIT CONSTRUCTION CONDITIONS AND AID IN COORDINATION WITH WORK OF OTHER CONTRACTORS. H. THE MATERIALS AND EQUIPMENT INSTALLED IN THE WORK SHALL MEET THE REQUIREMENTS OF THE CONTRACT DOCUMENTS AND NO MATERIALS OR EQUIPMENT 5I -IALL BE ORDERED UNTIL REVIEWED BY THE ENGINEER, LANDLORD AND /OR ARCHITECT. I. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS PER THE DOCUMENTS PROVIDED BY THE TENANT /CONTRACTOR. J. CATALOG DATA FOR EQUIPMENT REVIEWED BY THE ARCHITECT SHALL'NOT SUPERSEDE THE ENGINEER'S CONTRACT DOCUMENTS. THE REVIEW OF THE ENGINEER SHALL NOT RELIEVE THE CONTRACTOR FROM RESPONSIBILITY FOR DEVIATIONS FROM DRAWINGS OR SPECIFICATIONS, PROVIDING PROPER CLEARANCE, FABRICATION PROCESS AND COORDINATION WITH OTHER TRADES. K. WHEN SUBMITTED FOR THE ARCHITECT'S REVIEW, SH0P DRAWINGS SHALL BEAR THE CONTRACTOR'S CERTIFICATION THAT THE CONTRACTOR HAS REVIEWED, CHECKED AND APPROVED THE SHOP DRAWINGS, THAT THEY ARE IN HARMONY WITH THE REQUIREMENTS OF THE PROJECT AND WITH THE PROVISIONS OF THE CONTRACT DOCUMENTS AND THAT THE CONTRACTOR HAS VERIFIED ALL FIELD MEASUREMENTS AND CONSTRUCTION CRITERIA, MATERIALS, CATALOG NUMBERS AND SIMILAR DATA. CONTRACTOR SHALL ALSO CERTIFY THAT THE WORK REPRESENTED BY THE 51-10P DRAWINGS 1S RECOMMENDED BY THE CONTRACTOR AND THE CONTRACTOR'S GUARANTEE WILL FULLY APPLY. L. ALL CONTRACTORS SUBMITTING PROPOSALS FOR THIS WORK SHALL FIRST EXAMINE THE SITE AND ALL CONDITIONS THEREIN. ALL PROPOSALS SHALL TAKE INTO CONSIDERATION ALL SUCH CONDITIONS AS MAY AFFECT THE WORK UNDER THIS CONTRACT. THE SUBMITTING OF A BID AUTOMATICALLY IMPLIES THAT THIS EXAMINATION OF SITE HAS BEEN DONE. M. CONTRACTOR SHALL VERIFY LOCATION OF UTILITIES AND NOTE CONDITIONS NHICH WOULD AFFECT THE WORK. ALL DISCREPANCIES SHALL THEN BE REPORTED PRIOR TO THE BID AWARD. N. PROVIDE INSTRUCTION TO LANDLORD'S OPERATING PERSONNEL AS NECESSARY, SHOWING LOCATIONS AND PROPER OPERATION OF MAJOR ITEMS OF EQUIPMENT AND SYSTEM COMPONENTS AND •REFERRING TO THE OPERATING INSTRUCTION MANUAL DESCRIBED BELOW AS A GUIDE. 0. COMPILE WRITTEN MANUAL OF OPERATING INSTRUCTIONS INCLUDING COPIES OF SHOP DRAWINGS AND A LISTING OF EQUIPMENT SUPPLIERS. ASSEMBLE IN 8 -1/2" X 11" HARD BACKED INDEXED BINDER. MATERIAL SHALL BE AS FOLLOWS: 1. TITLE PAGE: TITLE OF JOB, LANDLORD /TENANT, ADDRESS, DATE, SUBMISSION, CONTRACTOR AND ENGINEER. 2. INDEX 3. LIST OF MAJOR. EQUIPMENT USED IN PROJECT ACCOMPANIED BY CONTRACTOR PURCHASE ORDER NUMBERS AND SUPPLIERS NAMES AND ADDRESSES. 4. ONE COPY OF EACH SHOP DRAWING GROUPED BY TYPES OF EQUIPMENT (I.E., ROOFTOP UNITS, FANS, ETC. ) 5. SECTION FOR EACH SYSTEM INCLUDING: a. BRIEF DESCRIPTION OF SYSTEM OPERATION WITH LOCATION OF MAJOR COMPONENTS. b. HVAC SYSTEM MAINTENANCE AND CALIBRATION INFORMATION, INCLUDING WIRING DIAGRAMS AND SCHEMATICS. P. SUBMIT A COMPLETED COPY TITLED "HVAC OPERATING INSTRUCTION MANUAL" ON THE BINDING EDGE OF BINDER TO ARCHITECT FOR APPROVAL. AFTER ARCHITECT'S REVIEW AND ANY CORRECTIONS REQUIRED ARE COMPLETED, SUBMIT A COPY OF THE MANUAL TO THE LANDLORD. Q. WITHIN 90 DAYS AFTER THE DATE OF SYSTEM ACCEPTANCE, RECORD DRAWINGS OF THE ACTUAL INSTALLATION SHALL BE PROVIDED TO THE BUILDING LANDLORD. RECORD DRAWINGS SHALL INCLUDE AS A MINIMUM THE LOCATION AND PERFORMANCE DATA ON EACH PIECE OF EQUIPMENT, GENERAL CONFIGURATION OF DUCT DISTRIBUTION SYSTEM INCLUDING SIZES, AND THE AIR DESIGN FLOW RATES. R. ANY REFERENCE TO TENANT OR TENANT CONSTRUCTION MANAGER, OR FURNISHED BY ANY OF THE ABOVE, REFERS TO SOMA INTIMATES INC. 5. REFER TO RESPONSIBILITY SCHEDULE ON SHEET G1.2 FOR INFORMATION IN REGARD TO RESPONSIBILITY OF WORK OR ITEMS WHICH MAY AFFECT BID. T. TRADE NAMES, MANUFACTURERS AND SHOP DRAWINGS 1. WHERE TRADE NAMES AND MANUFACTURERS ARE USED ON THE DRAWINGS OR IN THE SPECIFICATIONS, THE EXACT EQUIPMENT SHALL BE USED. THE USE OF ANY UNAUTHORIZED EQUIPMENT SHALL BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE 2. CONTRACTOR SHALL SUBMIT ONLY SUBSTITUTION REQUESTS TO TENANT CONSTRUCTION . MANAGER FOR APPROVAL. SUBMISSIONS SHALL BE MADE EARLY ENOUGH IN PROJECT TO ALLOW FOUR (4) WORKING DAYS FOR TENANT CONSTRUCTION MANAGER'S REVIEW WITHOUT CAUSING DELAYS OR CONFLICTS TO THE JOB'S PROGRESS. SUBMITTALS SHALL BEAR THE STAMP OF THE CONTRACTOR AND THE SUB- CONTRACTOR SHOWING THAT HE HAS REVIEWED AND CONFIRMED THAT THE SUBMITTALS ARE IN CONFORMANCE WITH THE CONTRACT DRAWINGS AND SPECIFICATIONS OR INDICATE WHERE EXCEPTIONS HAVE BEEN TAKEN. U. DEMOLITION 1. CONTRACTOR SHALL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF EXISTING IAIORK. FIELD VERIFY AND COORDINATE ANY EXISTING EQUIPMENT REQUIRED TO BE LEFT INTACT AND PROTECT EQUIPMENT TO REMAIN DURING CONSTRUCTION. V. FINAL HVAC INSPECTIONS 1. ASIDE FROM NORMAL INTERIM INSPECTIONS OF WORK IN PLACE, TENANT SHALL HAVE AN i INDEPENDENT CONTRACTOR INSPECT THE FINISHED INSTALLATION UPON COMPLETION FOR COMPLIANCE WITN TI-1E PLANS, SPECIFICATIONS AND CODES. THE INSTALLING CONTRACTOR WILL BE RESPONSIBLE TO BRING ALL ITEMS REPORTED BY TI-4E INDEPENDENT CONTRACTOR UP TO PLANS AND SPECIFICATION REQUIREMENTS. W. WARRANTY AND GUARANTEE 1. CONTRACTOR SHALL GUARANTEE ALL MATERIALS AND LABOR PROVIDED UNDER THIS CONTRACT AND SHALL MAKE GOOD, REPAIR OR REPLACE AT NO ADDITIONAL COST ANY DEFECTIVE WORK, MATERIAL, OR EQUIPMENT DISCOVERED WITHIN 12 MONTHS FROM THE DATE OF CERTIFICATE OF OCCUPANCY. THIS GUARANTEE SHALL EXTEND TO LABOR AND MISCELLANEOUS MATERIALS REQUIRED FOR THE INSTALLATION OF EQUIPMENT FURNISHED THROUGH TENANT NATIONAL ACCOUNTS REPRESENTATIVE, BUT SHALL NOT OVERLAP WITH WARRANTY PROVIDED BY MANUFACTURER. THE CONTRACTOR I5 RESPONSIBLE TO VERIFY, COORDINATE AND FOLLOW ALL PROPER HANDLING AND INSTALLATION TECHNIQUES WITH MANUFACTURER(S) IN ORDER TO MAINTAIN MANUFACTURER'S WARRANTY. 2. CHICO'S FAS NATIONAL ACCOUNTS REPRESENTATIVE SHALL PROVIDE A COMPLETE 12 MONTH WARRANTY FOR ALL PARTS ON EQUIPMENT OR MATERIALS PROVIDED THROUGH CHICO'S FAS NATIONAL ACCOUNTS REPRESENTATIVE STARTING ON THE STORE OPENING DATE. THIS WARRANTY SHALL INCLUDE ALL COSTS TO REPAIR OR REPLACE ANY DEFECTIVE PART WITH THE EXCEPTION OF DAMAGE RESULTING FROM HANDLING OR INSTALLATION THAT IS NOT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN INSTRUCTIONS. 23 05 01 HVAC BASIC MATERIALS AND METHOD A . T HIS CONTRACTOR IS TO BECOME I NFOR M ED O F T HE EXACT DIMENSIONS O F FIN W O RK NHERE PIPES, DUCTS AND EQUIPMENT ARE TO BE PLACED AND WILL ARRANGE THE WORK ACCORDINGLY, ASSUMING ALL RESPONSIBILITY FOR PROPER LOCATION AND COORDINATION OF THE WORK. B. IN THE ERECTION OF THE DUCTWORK, SPECIAL CARE SHALL BE USED PROVIDING SUPPORT. C. ALL DUCTWORK SHALL BE PLACED 50 AS TO AVOID INTERFERENCE WITH PLUMBING PIPES, ELECTRIC CONDUITS OR PIPES OF OTHER CONTRACTORS, D. ALL DUCTWORK MUST BE PROVIDED WITH SUFFICIENT DISTANCE FROM WALLS, PIPES AND OTHER OBSTACLES TO PERMIT THE APPLICATION OF FULL TI- 1ICKNESS OF INSULATION SPECIFIED. E. THIS CONTRACTOR SHALL PERFORM AN ACCURATE AND COMPLETE BALANCE OF AIR SYSTEMS AS PART OF TI-415 CONTRACT, WHICH SHALL BE COMPLETED BEFORE FINAL ACCEPTANCE OF THE WORK OF TI-11S CONTRACT. AIR BALANCE SHALL BE SUBCONTRACTED TO A CERTIFIED MEMBER OF ASSOCIATED AIR BALANCE COUNCIL. F. VIBRATION ISOLATION DEVICES 1. VIBRATION ISOLATION DEVICES SHALL BE FURNISHED AND INSTALLED WITH SUPPORTS BETWEEN VIBRATING EQUIPMENT AND THE STRUCTURE (FANS, AIR HANDLERS, ETC.) BY TI-115 CONTRACTOR. 2. VIBRATING EQUIPMENT HUNG FROM STRUCTURE SHALL BE ISOLATED WITH RUBBER AND SPRING DEVICES, VIBRATING EQUIPMENT SUPPORTED FROM FLOOR OR DECK SHALL BE ISOLATED WITH HOUSED SPRING MOUNT DEVICES. 3. EXAMINE DEAD LOAD AND OPERATING LOAD CONDITIONS WHEN SELECTING DEVICES, ADJUST FOR PROPER ALIGNMENT AND LOADING. AVOID "GROUNDING" THE ISOLATOR. 4. CHECK HANGER ROD SIZE FOR ALLOWABLE LOADS AT THE ISOLATING DEVICE AND AT THE UPPER AND LOWER ATTACHMENTS TO STRUCTURES, DUCTS, EQUIPMENT, ETC. 5. CONSULT MANUFACTURER FOR APPLICATION DATA. 23 0593 TESTING, ADJUSTING AND BALANCING FOR HVAC A. ALL AIR DISTRIBUTION SYSTEMS ARE TO BE BALANCED IN ACCORDANCE WITN GENERALLY ACCEPTED ENGINEERING STANDARDS BY AN INDEPENDENT THIRD PARTY CONTRACTOR CERTIFIED BY THE G G ASSOCIATED AIR BALANCE COUNCIL (AABC). DUCTED AIR RATES ARE TO BE MEASURED AND ADJUSTED TO DELIVER FINAL FLOW RATES WITHIN 10% OF DESIGN RATES. GENERAL CONTRACTOR TO DO ALL ADJUSTMENTS REQUIRED TO BALANCE THE SYSTEM WITHIN THE DESIGN PARAMETERS. UNITS RPMS ARE TO BE ADJUSTED FIRST TO GET THE UNIT TO THE LOWEST RPMS TO DELIVER THE REQUIRED CFM TO THE DIFFUSERS, THEN THE DAMPERS TO THE DIFFUSERS ARE TO BE ADJUSTED TO BALANCE TI-4E SYSTEM. GENERAL CONTRACTOR 15 TO PROVIDE ALL LABOR AND MATERIALS REQUIRED TO BALANCE THE SYSTEM. B. AFTER CORRECTING BALANCE OF ALL AIR SYSTEMS TO WITHIN 10% OF• DESIGNED VALUES, SUBMIT FINAL AIR BALANCE REPORTS TO ARCH ITECT, ENGINEER AND CHICO'S. FINAL BALANCE REPORT MUST INDICATE AIR VALUES WITHIN 10% OF DESIGN, OR MUST STATE THE REASON THAT THE APPROPRIATE BALANCE COULD NOT BE ACHIEVED. C. GENERAL CONTRACTOR SHALL REVIEW AIR BALANCE REPORT PRIOR TO SUBMISSION OF REPORT TO ENGINEER AND ARCHITECT. IF ENGINEER OR ARCHITECT REVIEN THE AIR BALANCE REPORT MULTIPLE TIMES DUE TO THE CONTRACTOR NOT FOLLOWING THESE GUIDELINES OR SENDING A PRELIMINARY REPORT FOR REVIEW IN LIEU OF THE FINAL REPORT, THE CONTRACTOR WILL BE BACKCHARGED FOR ALL REVIEWS BEYOND THE FIRST. D. VERIFY CONTROLS DURING BALANCING, INCLUDING HUMIDITY CONTROLS WHERE APPLICABLE. 23 06 00 CEILING EXHAUST FANS A. GENERAL CONTRACTOR PROVIDED CEILING EXHAUST FANS BASED ON GROAN SHALL BE OF THE CENTRIFUGAL DIRECT DRIVE TYPE. THE FAN HOUSING SHALL BE CONSTRUCTED OF HEAVY GAUGE GALVANIZED. STEEL. THE HOUSING INTERIOR SHALL BE LINED WITH 1/2" ACOUSTICAL INSULATION. THE OUTLET DUCT COLLAR SHALL INCLUDE AN ALUMINUM BACKDRAFT DAMPER AND SHALL BE ADAPTABLE FOR HORIZONTAL DISCHARGE. B. THE ACCESS FOR WIRING SHALL BE EXTERNAL. THE MOTOR DISCONNECT SHALL BE INTERNAL AND OF THE PLUG TYPE. C. THE MOTOR SHALL BE MOUNTED ON VIBRATION ISOLATORS. THE FAN WHEEL SHALL BE OF THE FORWARD CURVED CENTRIFUGAL TYPE AND DYNAMICALLY BALANCED. D. ALL FANS SHALL BEAR THE AMCA CERTIFIED RATINGS SEAL FOR SOUND AND AIR PERFORMANCE AND SHALL BE U.L. LISTED. CAPACITIES AS SHOWN ON THE DRAWINGS. E. WIRING BY THE GENERAL CONTRACTOR. F. FANS SHALL BE GROAN OR EQUAL TO MODELS SHOWN ON SHEET M2.0. 23 07 00 HVAC INSULATION A. DUCT INSULATION AND APPURTENANCES SHALL HAVE A FLAME SPREAD RATING NOT EXCEEDING TWENTY -FIVE (25) AND A SMOKE DEVELOPED RATING NOT EXCEEDING FIFTY (50). B. RECTANGULAR DUCTWORK CONCEALED FROM VIEW 51-IALL HAVE 1" THICK FIBERGLASS DUCT LINER LAMINATED AND PINNED TO DUCT WITH 1.0 PCF DENSITY AND R- VALUE OF 4.2 MIN. ONENS-CORN I NG COMMERCIAL GRADE FIBERGLASS DUCT LINER. C. ROUND DUCTWORK CONCEALED FROM VIEW SHALL HAVE FLEXIBLE FIBERGLASS DUCT WRAP LAMINATED TO FOIL REINFORCED KRAFT VAPOR BARRIER FACING WITH 2" STAPLING FLANGE AND MIN. INSTALLED R -VALUE OF 4.2. OWENS- CORNING COMMERCIAL GRADE FIBERGLASS DUCT WRAP TYPE 100. D. EXPOSED ROUND AND RECTANGULAR DUCTWORK SHALL HAVE NO INSULATION. E. ALL DUCTWORK IN UNCONDITIONED SPACES SHALL HAVE INSULATION DUCT WRAP WITH A MINIMUM INSTALLED R -VALUE OF 5.0. CONDITIONED SPACES SHALL HAVE INSULATION DUCT WRAP WITH A MINIMUM INSTALLED R- VALUE OF 4.2. F. INSULATION SHALL NOT BE APPLIED UNTIL THE GENERAL CONSTRUCTION HAS PROGRESSED SUFFICIENTLY TO INSURE AGAINST PHYSICAL OR MOISTURE DAMAGE TO THE INSULATION. ALL INSULATION DAMAGED THROUGH FAILURE TO OBSERVE TI-415 DIRECTIVE SHALL SE REPLACED AT THIS CONTRACTOR'S EXPENSE. G. HANGER RODS MUST BE PERPENDICULAR TO DUCTWORK BEFORE INSULATION 15 INSTALLED. H. INSTALL ALL INSULATION ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. I. INSULATION SHALL BE. APPLIED OVER FLANGES, JOINTS AND SEAMS IN PIPING AND DUCTWORK. J. ALL JOINTS AND SEAMS IN INSULATION SHALL BE PROPERLY SEALED TO MAINTAIN VAPOR BARRIER INTEGRITY. K. INSULATION SHALL BE OWENS- CORNING. EQUAL PRODUCT BY ARMSTRONG, CERTAINTEED, SCHULLER OR KNAUF MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. 23 31 13 HVAC AIR DISTRIBUTION AND RETURN SYSTEMS A. PROVIDE AND INSTALL. DUCTWORK AND PLENUMS OF SIZE AND LOCATION AS SHOWN ON DRAWINGS. STATIC DUCTS FOR AIR VELOCITIES LESS THAN 2000 FP M AND T ATIC PRESSURE IN DUCT 2" OR LESS SHALL BE CONSTRUCTED OF GALVANIZED SHEET METAL. THE GAUGE OF STEEL USED IN ALL DUCTS SHALL BE AS FOLLOWS: 1. WHERE GREATER RECTANGULAR DIMENSION 15 12" OR LESS USE 26 GAUGE. 2. WHERE GREATER RECTANGULAR DIMENSION IS FROM 12" THROUGH 30" USE 24 GAUGE. 3. Ni-ERE GREATER RECTANGULAR DIMENSION IS FROM 31" THROUGH 54" USE 22 GAUGE. 4. WHERE GREATER RECTANGULAR DIMENSION 15 FROM 55" THROUGH 84" USE 20 GAUGE. B. TRANSVERSE JOINTS AND BRACING TO CONFORM TO "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE" (CURRENT SMACNA). C. ALL DUCTS SHALL BE RIGID AND SHALL BE CROSS - BROKEN, PROPERLY STIFFENED WITH SUITABLE BRACES, TOES, OR ANGLES TO KEEP THEM TRUE TO SHAPE AND PREVENT BUCKLING. ALL VERTICAL DUCTS SHALL BE OF STRONG ENOUGH CONSTRUCTION TO CARRY 100 L85. SUSPENDED LOAD FROM H ANGERS W I T ROUT BUCKL IN G. SOLDE R ALL JO IN TS W H ERE NECESSARY TO INSURE TIGHT HT WORK. SEAMS OF ALL DUCTS AND JOINTS SHALL BE HAMMERED TO A SMOOTH SURFACE ON THE INSIDE. D. CONSTRUCTION INCLUDING HANGERS AND SUPPORTING SYSTEMS OF ALL DUCTWORK SHALL ALSO BE IN ACCORDANCE WITH "HVAC DUCT CONSTRUCTION STANDARDS - METAL AND FLEXIBLE" (CURRENT SMACNA). E. FLEXIBLE CONNECTIONS SHALL BE INSTALLED ON THE OUTLET AND INTAKE OF AIR HANDLING UNITS AND FANS. THESE CONNECTIONS SHALL BE AT LEAST 6" LONG, MADE OF NFPA 90A APPROVED FLAMEPROOF FABRIC. F. FURNISH AND INSTALL VOLUME CONTROLLER AND EXTRACTOR AT ALL BRANCH TAKEOFFS IN SUPPLY AND RETURN FROM MAIN DUCTS TO ALL BRANCH DUCTS WHERE SHOWN. UNIT SHALL BE OF TWO GAUGES HEAVIER THAN THE DUCT. G. PROVIDE MANUAL ADJUSTING LEVER FOR EACH UNIT. UNITS SHALL MOVE FROM FULL OPEN TO FULLY CLOSED POSITION TO CONTROL AIR DIRECTION AND VOLUME. FURNISH AND INSTALL TURNING VANES IN ALL ELBOWS OF RECTANGULAR DUCTS. TI-4E BLADES TO BE HOLLOW - FORMED DOUBLE TH I CKNE SS V ANES. INSTALL SUPPLY AND RETURN REGISTERS, GRILLES AND DIFFUSERS AS SHOWN ON TI-4E DRAWINGS AND SCHEDULE. J. FLEXIBLE SUPPLY AIR DUCTWORK WITH 1" THICK FIBERGLASS BLANKET INSULATION WITH METALIZED FILM VAPOR BARRIER OUTER JACKET. FLEXIBLE DUCT IN RETURN AIR PLENUM TO BE CLEARLY LABELED "CLASS 1" EVERY FOUR FEET. FLEXIBLE DUCT LENGTH MAY NOT EXCEED FIVE FEET. INSULATION SHALL HAVE MIN. INSTALLED R -VALUE OF 4.2. K. METAL DUCTWORK - NO FIBERGLASS DUCT ALLOWED. L. DUCT CONSTRUCTION SHALL BE AS FOLLOWS: 1. EXCEPT WHERE OTHERWISE INDICATED, CONSTRUCT ALL LON PRESSURE DUCT IN ACCORDANCE WITH THE LATEST EDITION OF SMACNA STANDARDS WITH THE FOLLOWING PRESSURE CLASSIFICATIONS: a. SUPPLY DUCTS: 2" W.G. POSITIVE. b. RETURN AND EXHAUST DUCTS: 2" W.G. NEGATIVE. 2. SEAL ALL LON PRESSURE DUCTS PER SMACNA CLASS B AND ALL MEDIUM PRESSURE DUCTS TO SMACNA CLASS A. 3. REGARDLESS OF ABOVE DUCT CONSTRUCTION AND SEALANT PRESSURE CLASSIFICATIONS, MAXIMUM DUCT AIR LEAKAGE WILL NOT EXCEED 5% AS REQUIRED FOR FINAL AIR BALANCE APPROVAL. M. ROUND DUCTWORK SHALL BE GALVANIZED STEEL WITH SPIRAL LOCK SEAM CONSTRUCTION FOR ALL SIZES 12" DIAMETER AND LARGER. ROUND DUCTWORK SIZES 10" DIAMETER AND SMALLER MAY BE SNAP -LOCK CONSTRUCTION. ALL SNAP -LOCK SEAMS SHALL BE SEALED AS DESCRIBED IN THESE,. SPECIFICATIONS. ROUND FITTINGS SHALL BE GALVANIZED STEEL WITH SPOT WELDED AND BONDED CONSTRUCTION. DUCTWORK SHALL BE AS MANUFACTURED BY UNITED MCGILL, SEMCO, OR APPROVED EQUAL. N. ALL JOINTS AND SEAMS SHALL BE SEALED WITH 2" WIDE, GLASS- FIBER FABRIC REINFORCED TAPE. JOINTS ALSO SHALL BE RIVETED OR CONNECTED WITN SHEET METAL SCREWS. LIQUID SEALANTS BY UNITED MCGILL CORP., DOW CORNING, MIRACLE ADHESIVES AND SUREBOND INC. WILL BE ACCEPTED IN LIEU OF TAPE. 0. DUCT TRANSITIONS SHALL NOT EXCEED 30 DEGREES SLOPE EXCEPT AS SPECIFICALLY NOTED OTHERWISE. 23 33 00 DAMPERS A. RECTANGULAR DUCT GALVANIZED STEEL MANUAL BALANCE AND MOTORIZED DAMPER 6" WIDE 16 GAUGE OPPOSED BLADES, CHANNEL FRAME WITH BRACED CORNERS, CONCEALED LINKAGE, TEFLON FILLED BEARINGS, 3/8" DIAMETER AXLE, 6" LONG CONTROL SHAFT. MOTORIZED DAMPER TO HAVE REPLACEABLE BUTYL RUBBER SEALS INSTALLED ALONG THE TOP, BOTTOM AND SIDES OF THE FRAME, AS WELL AS, ALONG ALL SIDES OF EACH BLADE. B. ROUND GALVANIZED STEEL MANUAL BALANCE DAMPER WITH SINGLE 16 GAUGE BLADE, CHANNEL FRAME, STAINLESS STEEL SLEEVE BEARINGS PRESSED INTO FRAME, 3/8" DIAMETER AXLE EXTENDED 6" FOR CONTROL SHAFT, BLADE STOP. G. EQUIP DAMPERS WITH LOCKING QUADRANTS. D. INSTALL BALANCE DAMPERS WHERE SHOWN ON THE DRAWINGS AND ELSEWHERE AS NECESSARY TO OBTAIN PROPER SYSTEM BALANCE. E. CHECK DAMPERS FOR PROPER OPERATION BEFORE AND AFTER INSTALLATION. F. DAMPERS SHALL BE RUSKIN. EQUAL PRODUCT BY AMERICAN WARMING AND VENTILATING, LOUVERS AND DAMPERS, OR PREFCO MAY BE FURNISHED AT THE CONTRACTOR'S OPTION. 23 37 13 AIR DISTRIBUTION DEVICES A. SQUARE CEILING SUPPLY AIR DIFFUSER - STEEL SQUARE CEILING DIFFUSER, REMOVABLE PLAQUE FACE PANEL, ROUND NECK, VOLUME CONTROL DAMPER TITUS MODEL OMNI. B. SQUARE CEILING RETURN AIR REGISTER - STEEL SQUARE CEILING DIFFUSER, REMOVABLE PLAQUE FACE PANEL, ROUND NECK, VOLUME CONTROL DAMPER, TITUS MODEL OMNI. C. RECTANGULAR CEILING RETURN AIR REGISTER - STEEL RECTANGULAR CEILING GRILLE, LOUVERED FACE, RECTANGULAR. NECK, VOLUME CONTROL DAMPER, TITUS MODEL 355RL. D. FINISHES - FURNISH ALL AIR DISTRIBUTION DEVICES WITH PRIME COATED AND WHITE BAKED ENAMEL FINISH COAT UNLESS SPECIFIED OTI- IERWISE. E. COORDINATE AIR DISTRIBUTION DEVICE LOCATIONS WITH ALL AFFECTED CONTRACTORS BEFORE INSTALLING DUCTWORK. SIGNIFICANT DEVIATIONS IN LOCATIONS FROM THOSE SHOWN ON THE DRAWINGS MUST BE APPROVED BY ARCHITECT BEFORE INSTALLATION. F. SUSPEND CEILING AIR DEVICES FROM STRUCTURE ON WIRE HANGERS OR FROM RIGID DUCTWORK. CEILING MUST NOT BE USED TO SUPPORT AIR DISTRIBUTION DEVICES. G. SECURELY FASTEN SIDE WALL AIR DEVICES TO RIGID DUCTWORK OR STRUCTURE. H. AIR DISTRIBUTION DEVICES FURNISHED AND INSTALLED BY THE GENERAL CONTRACTOR SHALL BE TITUS OR EQUAL TO MODEL SHOWN ON SHEET M2.0. 23 74 13 ROOFTOP PACKAGED HVAC UNITS ASSEMBLED AIR TO AIR ELECTRIC COOLING HEAT PUMP WITI -I FACTORY L R T R R A. UNIT SHALL BE FACT G SUPPLEMENTAL ELECTRIC HEATING UN IT WITH REFRIGERATION SYSTEM, AIR HANDLING SYSTEM. CASING AND CONTROLS. B. CABINET SHALL SE GALVANIZED STEEL, BONDERIZED AND COATED WITH BAKED ENAMEL. UNIT SHALL BE ARRANGED FOR ALL EXTERIOR CONNECTIONS TO BE WITHIN ROOF CURB. CABINET SHALL BE LINED WITH 1" THICK NEOPRENE- COATED FIBERGLASS WITH EASILY REMOVABLE SERVICE PANELS TO ALL OPERATING COMPONENTS. C. REFRIGERATION SYSTEM SHALL INCLUDE RECIPROCATING SERVICEABLE HERMETIC COMPRESSORS, CONDENSERS, INTERTNINED CIRCUIT EVAPORATOR COIL, EXPANSION VALVES, SERVICE VALVES, VIBRATION ISOLATORS, CRANKCASE HEATERS, SIGHT GLASSES, FILTER DRIERS, I-10T GAS MUFFLERS, AND REFRIGERANT PIPING. SAFETY CONTROLS SHALL INCLUDE FUSIBLE PLUG, LOW AND H +GH PRESSURE THERMOSTATS, COMPRESSOR MOTOR OVERLOADS, TIMER TO PREVENT SHORT CYCLING COMPRESSORS. D. E. F. CONDENSER FANS SHALL BE VERTICAL DISCHARGE PROPELLER TYPE DIRECT DRIVEN BY INHERENTLY PROTECTED, PERMANENTLY LUBRICATED MOTORS. W ITH COILS SHALL BE ALUMINUM. PLATE FINS MECHANICALLY ON ED T O SEAMLESS COPPER TUBES BONDED ALL JOINTS BR A ZED, COILS SHALL BE COATED WH N N I H IN FIVE ( 5 ) MI LE S OF COAST . INDOOR BLOWER SHALL BE FORWARD- CURVED, CENTRIFUGAL, BELT- DRIVEN TYPE, EQUIPPED NITH PERMANENTLY LUBRICATED BEARINGS. G. CONTROLS: 1. THE COOLING SYSTEM SHALL BE PROTECTED WITH HIGH PRESSURE THERMOSTATS, LOW PRESSURE THERIj IOSTATS, LOSS -OF- CHARGE PROTECTION, INDOOR COI L FREEZE THERMOSTATS, AND CURRENT AND TEMPERATURE SENSITIVE OVERLOAD DEVICES. 2. ALL DEVICES SHALL BE WIRED TO PREVENT COMPRESSOR RESTART UNTIL RESET OF CIRCUIT BREAKER. 3. THIS CONTRACTOR SHALL INSTALL HEATING /COOLING "5" SENSOR(S) AND "T" THERMOSTAT(S) PER PLAN TO PROVIDE CONTROL OF STAGED COOLING AND STAGED HEATING WITH AUTOMATIC CHANGEOVER AND "FAN ON" CONTROL. MOUNT DEVICES AT 45" AFF TO BOTTOM PER ADA. PROVIDE INITIAL PROGRAMMING OF SYSTEM. COORDINATE PROGRAMMING REQUIREMENTS WITH CI- IICO'S FAS NATIONAL ACCOUNT REPRESENTATIVE, AND PROGRAMMING SECTION BELOW. 4. WHEN THERMOSTAT /SENSOR CALLS FOR COOLING, FIRST STAGE OF COMPRESSOR SHALL ENERGIZE UNTIL SPACE TEMPERATURE 15 SATISFIED. AFTER TEN MINUTES, SECOND STAGE OF COMPRESSOR SHALL ENERGIZE UNTIL SPACE TEMPERATURE 15 SATISFIED. 5. WHEN THERMOSTAT /SENSOR CALLS FOR HEATING, UNIT HEAT PUMP HEAT WILL ENERGIZE UNTIL SPACE TEMPERATURE 1S SATISFIED. AFTER TEN MINUTES, SUPPLEMENTAL ELECTRIC HEAT SHALL ENERGIZE UNTIL SPACE TEMPERATURE 15 SATISFIED. 6. FAN SHALL ENERGIZE AND RUN CONTINUOUSLY DURING OCCUPIED HOURS. 7. HVAC CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT CONTROL ELEMENTS ARE CALIBRATED, ADJUSTED, AND IN PROPER WORKING CONDITION. H. PROGRAMMING OF CONTROLS /SEQUENCE OF OPERATION: 1. CONTRACTOR SHALL PROVIDE PROGRAMMING OF I-IVAG CONTROL SYSTEM PER MANUFACTURER'S INSTRUCTIONS AND AS REQUIRED TO MEET THE BELOW OPERATION. 2. SPACE TEMPERATURE SETPOINT - UNOCCUPIED SETPOINTS SHALL BE 78 °F COOLING AND 60 °F HEATING. WARM -UP /OCCUPIED SETPOINTS SHALL BE 72 °F COOLING AND 67 °F HEATING. SETPOINTS SHALL BE LOCKED OUT TO PREVENT ADJUSTMENT MORE THAN 3 °F UP OR DONN FROM DEFAULT. 3. ALL SETPOINTS ARE ADJUSTABLE - PRIOR TO PROGRAMMING OF CONTROLS SYSTEM, VERIFY SETPOINTS WITH TENANT CONSTRUCTION REPRESENTATIVE. 4. UNIT OPERATION - DURING OCCUPIED HOURS, FAN SHALL RUN CONTINUOUSLY ( "FAN ON ") AND UNIT SHALL STAGE COOLING OR HEATING. DURING UNOCCUPIED HOURS, FAN SI -IALL RUN ONLY WHEN HEATING OR COOLING ARE CALLED FOR ( "FAN AUTO "). OCCUPIED /UNOCCUPIED /WARM -UP - UNOCCUPIED MODE SHALL BE SET FOR ONE HOUR AFTER MALL CLOSING TO ONE HOUR PRIOR TO MALL OPENING. UNOCCUPIED MODE SHALL HAVE MANUAL OVERRIDE. 6. REFER TO CONTROLS SECTION ABOVE FOR ADDITIONAL REQUIREMENTS. I. PROVIDE CIRCUIT TO PREVENT COMPRESSOR SHORT CYCLING AS A RESULT OF A RAPID CHANGE IN THERMOSTAT SETTING AND AUTOMATICALLY PREVENT COMPRESSOR RESTART AT LEAST FIVE MINUTES AFTER SHUTDOWN. J. CONTRACTOR 15 RESPONSIBLE FOR INSTALLING ALL CONTROLS, CONTROL WIRING AND TO MAKE OPERATIONAL. K. ROOFTOP UNITS SHALL BE TRANE AS FURNISHED BY CHIGO'S FAS NATIONAL ACCOUNTS REPRESENTATIVE, AND INSTALLED BY CONTRACTOR. UPON DELIVERY OF UNITS, CONTRACTOR SHALL VERIFY ALL EQUIPMENT IS AS SPECIFIED ON DRAWINGS INCLUDING ALL ELECTRICAL REQUIREMENTS, ACCESSORIES AND OTHER REQUIREMENTS. ANY DISCREPANCIES MUST BE REPORTED TO TENANT CONSTRUCTION MANAGER WITHIN THE FIRST TWENTY -FOUR (24) HOURS AFTER DELIVERY. CONTACT KRIS RYAN AT TRANE, (866)- 415 -2499. REVIEWED FOR CODE COMPLIANCE APPROVED JAN 16 2013 City of Tukwila BUILDING DIVISION sa RECEIVED CITY OF TUK'MLA NOV 1.9 2012 PERMIT CENTER OWNER: chico's 11215 METRO PARKWAY FT. MYERS, FL. 33966 ARCHITECT / ENGINEER: info@shremshock.com 03 0 m d c= O cs . N awi N vi C W D� U z,° O .D _C d. • Ln E N 0 L M „, (lam www.shremshock.com f: 614 545 4555 THE ENGINEER ASSUMES NO RESPONSIBILITY OR LIABILITY FOR THE USE OF THESE PLANS FOR ANY PROJECT OTHER THAN SPECIFICALLY AUTHORIZED BY THEM AND SIGNED AND SEALED FOR SUCH SPECIFIC LOCATION IN THE STATE SHOWN ON THE SEAL. THIS BUILDING USE IS ONLY APPLICABLE IN AREAS MEETING THE STATED DESIGN CRITERIA. Jcma INTIMATES STORE NO: 5381 PROJECT LOCATION: WESTFIELD SOUTHCENTER MALL 2800 SOUTHCENTER MALL SPACE NO.: 116 TUKWILA, WA 98188 DESIGN TYPE: LINEN & LACE REVISIONS: REQUIRED BY: DATE * INDICATES NO REVISION TO THIS SHEET DRAWN BY: WRG CHECKED BY: JTP DRAWING TITLE: M ECHANICAL SPECIFICATIONS DATE ISSUED: 11/07/2012 PROJECT NO: 120421 HVAC SPECIFICATIONS DRAWING NO: M4.1