Loading...
HomeMy WebLinkAboutPermit M12-195 - BOW LAKE TRANSFER STATION - SCALE HOUSEBOW LAKE SCALE HOUSE 18800 ORILLIA RD S M12 -195 City ("Tukwila Department of Community Development 6300 Southcenter B oulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 3523049037 Address: 18800 ORILLIA RD S TUKW Project Name: BOW LAKE - SCALE HOUSE Permit Number: Issue Date: Permit Expires On: M12 -195 OS/16/2013 11/12/2013 Owner: Name: KING COUNTY- PROPERTY SVCS Address: ADM -ES -0800 , 500 4TH AVE 98004 Contact Person: Name: Address: Email: Contractor: Name: Address: Contractor TOM CREEGAN 201 S JACKSON ST, STE 701 , SEATTLE WA 98104 TOM. CREEGAN @KING C OUNTY. G O V LYDIG CONSTRUCTION INC 11001 E MONTGOMERY DR , SPOKANE WA 99206 License No: LYDIGC *264JC Phone: 206 263 -6476 Phone: 509 534 -0451 Expiration Date: 09/11/2013 DESCRIPTION OF WORK: MECHANICAL SYSTEM CONSISTS OF AIR HANDLING UNIT WITH SPLIT SYSTEM HEAT PUMP FOR HEATING AND AIR CONDITIONING, AUXILIARY ELECTRIC HEATING /PREHEAT COIL, GAS PHASE FILTRATION WITH CARBON MONOXIDE/NITROUS DIOXIDE VENTILATION AIR CONTROL, WITH AUXILIARY ELECTRIC HEATERS AT EACH TRASACTION WINDOW WITH BUILDING PRESSURIZATION AND ECONIMIZER COOLING CAPABILITY. (REFERENCE EXPIRED PERMIT M09 -104) Value of Mechanical: $3,378.00 Type of Fire Protection: UNKNOWN Electrical Service Provided by: Permit Center Authorized Signature: Fees Collected: International Mechanical Code Edition: Date: $233.13 2009 5 -t 9 IS I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this per,it. Signature: //�� Print Name: CK 14oMp144.-61-s This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Date: 571Q/13 doc: IMC -4/10 M12 -195 Printed: 05 -16 -2013 • • PERMIT CONDITIONS Permit No. M12 -195 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: Readily accessible access to roof mounted equipment is required. 6: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 7: Manufacturers installation instructions shall be available on the job site at the time of inspection. 8: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 9: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 10: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. 11: ** *FIRE DEPARTMENT CONDITIONS * ** 12: The attached set of building plans have been reviewed by the Fire Prevention Bureau and are acceptable with the following concerns: 13: H.V.A.C. units rated at greater than 2,000 cfm require auto - shutdown devices. These devices shall be separately zoned in the alarm panel and local U.L. central station supervision is required. (City Ordinance #2328) 14: H.V.A.C. systems supplying air in excess of 2,000 cubic feet per minute to enclosed spaces within buildings shall be equipped with an automatic shutoff. Automatic shutoff shall be accomplished by interrupting the power source of the air- moving equipment upon detection of smoke in the main return-air duct served by such equipment. Smoke detectors shall be labeled by an approved agency for air -duct installation and shall be installed in accordance with the manufacturer's installation instructions. (IMC 606.1, 606.2.1) 15: Remote indicator lights are required on all above ceiling smoke detectors. (City Ordinance #2328) 16: Duct smoke detectors shall be capable of being reset from a single point near the alarm panel. (City Ordinance #2328) 17: Duct detectors shall send a supervisory signal only upon activation. (City Ordinance #2328) 18: All new fire alarm systems or modifications to existing systems shall have the written approval of The Tukwila Fire Prevention Bureau. No work shall commence until a fire department permit has been obtained. (City Ordinance #2328) (IFC 104.2) 19: An electrical permit from the City of Tukwila Building Department Permit Center (206- 431 -3670) is required for this project. 20: Contact The Tukwila Fire Prevention Bureau to witness all required inspections and tests. (City Ordinances #2327 and #2328) 21: .Any overlooked hazardous condition and/or violation of the adopted Fire or Building Codes does not imply approval of doc: IMC -4/10 M12 -195 Printed: 05 -16 -2013 such condition or violation. 22: These plans were reviewed by 1 nspector 511. If you have any questions, please call Tukwila Fire Prevention Bureau at (206)575 -4407. • doc: IMC -4/10 M12-195 Printed: 05 -16 -2013 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htto://www.ci.tukwila.wa.us MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** Site Address: 18800 Orillia Road South, Tukwila, WA Tenant Name: Bow Lake Recycling and Transfer Station ch4 401- King Co Assessor's Tax No.: 3523049037/3523049124 Suite Number: Floor. New Tenant: ❑ Yes Property Owners Name: King County Department of Natural Resources and Parks - Solid Waste Division Mailing Address: 201 South Jackson St, Suite 701 Seattle WA 98104 O..No Name: Tom Creegan Mailing Address: 201 South Jackson St. Suite 701 E -Mail Address: tom.creegan @kingcounty.gov Company Name: Mailing Address: Day Telephone: Seattle City Fax Number: (206) 263-6476 WA 98104 sate (206) 263 -3001 zip Contact Person: E-Mail Address: Contractor Registration Number Company Name: Mailing Address: Contact Person: E-Mail Address: • KPG, Inc. 739 9th Ave North Charlie Conway charlie@kpg:com cur Day Telephone: Fax Number: Expiration Date: State Zip Seattle WA 98109 Company Name: Mailing Address: Contact Person: E-Mail Address: R. W. Beck, Inc city state Day Telephone: (206) 286 -1640 Fax Number: (206) 286 -1639 1001 4th Avenue, Suite 2500 Karl Hufnagel khufnagel @rwbeck.com HAAppacRknsToots- AppGntio,s on 1M2009Applic 1- 2009 •Mchsmcst Ponta ApplioEandoc Revised: 1 -2009 6h Seattle WA 98154 City sate Day Telephone: (206) 695 -4905 Fax Number: (206) 6954701 Page 1 of 2 Valuation of Project (contractor's bid price): S 30378 Scope of Work (please provide detailed information): Scalehouse - Mechanical system consists of air handling unit with split system heat pump for heating and air conditioning, auxiliary electric heating /preheat coil, gas phase filtration, with Carbon Monoxide/Nitrous Dioxide ventilation air control, with auxiliary electric heaters at each transaction window with building pressurization and economizer cooling capability. (Cie AA rl -' ylei El Residential: New ❑ Replacement Commercial: New ❑ Replacement ❑ Fuel Type: Electric ❑ Gas ❑ Other Split System Heat Pump Indicate type of mechanical work being installed and the quantity below: T �'-- vl t ; i #- :7.+ 1 ik; " Lt_^ ` ''��L i��sz- C..Yae =. �.,wi��Gr.Y�.lik�.1.PI al B t y. .}y, iv. s�::.�tt.. �'. Fire Damper y 0 "` ,it7 .�9e�.�A..ne��4.- -.'tr 1c,.r, -. ...,�7bC:e_•e 0-3 HP /100,000 BTU ?" 0 Furnace <100K BTU 0 Air Handling Unit >10,000 CFM Furnace >100K BTU 0 Evaporator Cooler 0 Diffuser 6 3 -15 HP /500,000 BTU O Floor Furnace Ventilation Fan Connected to Single Duct Thermostat 4 15 -30 HP /1,000,000 BTU Suspended/Wall/Floor Mounted Heater 5 Ventilation System U Wood/GasStove 0 30-50 HP/ 1,750,000 BTU 0 Appliance Vent 0 Hood and Duct 0 Emergency Generator 0 50+ HP /I,750,000 BTU 0 Repairer addition to Heat/Refrig/Cooling System 0 Incinerator — Domestic Other Mechanical Equipment 5121.1 T 5Y5TEM HEAT PthM P Air Handling Unit <10,000 CFM 1 Incinerator— Comm/Ind 0 VRA171...4-rt trio GAtJ TWO Go►.1NCen:00S I Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 10512 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR AUTH s : t7.ED AGENT: Date: 3 --('l Signature: Print Name: Mailing Address: Day Telephon • 6 2 6 J 6 Se Zip Date Application Accepted: 114 ( ts_ Date Application Expires: OC I (✓ l 13 Staff Initials: i A lNApp&sussWotms-Applitadtas On 1na2009 ApplinticreP42009 • Mechanical Ptretit Axiiatim8c Revised I,t009 60 Page 2 of 2 City ukwilar Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: hup: /,Svtivw ci a�kwila.wa.us SET RECEIPT • RECEIPT NO: R12 -03347 Initials: JEM Payment Date: 12/19/2012 User ID: 1165 Total Payment: 828.45 Payee: CYNTHIA ADAMS, KING COUNTY (BY PHONE) SET ID: 1218 SET NAME: BOW LAKE "RENWALS" SET TRANSACTIONS: Set Member Amount M12 -195 233.13 M12 -196 139.88 PG12 -219 253.31 PG12 -220 202.13 TOTAL: 2-3T7 -Tr S2'$ , Lic- TRANSACTION LIST: Type Method Description Amount Payment Credit C VISA 828.45 TOTAL: 828.45 ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES PLAN CHECK - NONRES PLUMBING - NONRES 000.322.102.00.0 000.345.830 000.322.103.00.0 298.40 165.70 364.35 TOTAL: 828.45 - INSPECTION RECORD Retain a copy with permit p}t2 -1G'S INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: Type of Inspection: ' Addr ss: t v00 OA 1 LLI A R Date Called: Special Instructions: Date Wanted: a.m. Requester: Phone No: 154Approved per applicable codes. Corrections required prior to approval. COMMENTS: ?er rm.) CiTyvt44, I le nspec or: b V V AAt1 ' ) 7 1.i'.A A ) f� ►L SPECTION FEE RE UIRED. Prior tojext inspection. fee must be at 6300 Southcenter' Blvd.. Suite 100. Call to schedule reinspection. Dater •iL-( 3 Z INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 le_ (206) 431- 3670.: Permit Inspection Request Line (206) 431 -2451 Project: Type of Inspection: Address: /Se30 C �< i- LL / ri /; .) Date Calked: 1- .4)7 fell ,1 -15-2 % . Special Instructions: Date Wanted:. .5- 30- /3 p.m. Requester: Phone No: :25 3 -2.7.5 - 05"°5 Approved per applicable codes. D Corrections required prior to approval. COMMENTS: old/ r: /7 EINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING D,IVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 Z. (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 log Project: ) dI /IOW— x A(C Type)of Inspection: 1/`F % t fame• Ti9 7/01,11 '" /�JI Address: , / cc) RRiel t4 id Called: Special Instructions: Date Wanted:. " 5- 2 0 - /3 4,, p.m. Requester: (.i�Lr Phone No: as,- ass' -eioS l Approved per applicable codes. Corrections required prior to approval. COMMENTS: p74. C AVt-2, /-=57-- oar( C'i /.n/ e7 7-2/Per - _ 9//4 -th - - 4110p,,ive. j.'e? ro -'.4.., -. Ll,,,,,„ ," J l Ir%Sp tor: Datg.: 5 -z0 -/ REINSPECTION FE.0 REQUIRED. Prior to next inspection. fee must be paid at 6300 Southcenter Blvd.. Suite 100. Calt to schedule reinspection. 1 INSPECTION NUMBER INSPECTION RECORD _.Retain a copy with permit PERMIT NUMBERS CITY OF TUKWILA FIRE DEPARTMENT 444 Andover Park East, Tukwila, Wa. 98188 206 - 575 -4407 Project: ,,// k 444/ --e..- Type of nspecti n: qrle c tar / .5--,,, Address: Suite #: / .g O2 Dtdbai LI 5 Contact Person: Special Instructions: Permits: Phone No.: YIApproved per applicable codes. Corrections required prior to approval. COMMENTS: foe?: ec91)1, Needs Shift Inspection: Sprinklers: Fire Alarm: Hood & Duct: Monitor: Pre -Fire: Permits: Occupancy Type: Inspector: 49.F-A73---Li Date: t6c/ i 3 Hrs.: $100.00 REINSPECTION FEE REQUIRED. You will receive an invoice from the City of Tukwila Finance Department. Call to schedule a reinspection. Billing Address Attn: Company Name: Address: City: State: Zip: Word /Inspection Record Form:Doc 6/11/10 T.F.D. Form F.P. 113 4 EXISTING FREE RECYCUNG AREA 1 -5 ON -RAMP PARCEL f: 3523049037 3523049124 RE ;tr<V tL A DEC' 18 2012 PERMIT VERIFY SCALE BAR IS ONE INCH ON ANSI DRAWING DATE CHK'D REVISION OESCRIP11ON King County Department of Natural Resources and Parks Solid Waste Division BOW LAKE RECYCUNG AND TRANSFER STATION SITE FACIUTIES CONTRACT IN' ECK R.W. Beck, Inc. 1001 Fourth Avenue, Suite 2500 Seattle, WA 98154 -1004 (206) 695 -4700 MECHANICAL PERMIT SITE PLAN CITY OF TUKWILA'PERMITS - NOT FOR CONSTRUCTION 2006 Washington State Nonresidential Energy Code Compliance Form Project Summary PRJ -SUM 2006 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Project Info Project Address Bow Lake Recycling i Transfer Station Scale House Date 8/10/2009 18800 Orillia Road, South For Building Department Use FILE env Tukwila, Washington Applicant Name: Tow Creagan, Applicant Address: 201 South Jackson St, Suite 701, Seattle, W1 98101 Applicant Phone: t3o61 263-6476 pw •.._ • - r' REVIEWE(jFOR CODE COMPLIANCE APPROVED MAY 1 3 2013 City of Tukwila BUILDING DIVISION REutty are CITY OF TLIKIMLb DEC 18 2012 PERMIT CENTER M s .^ r 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary MECH -SUM 2008 Washington State Nonresidential Energy Code Compliance Forms Revised Juy 2007 Project Info Project Address Bom. Lake Recycling 4 Transfer Station Sca1e sous oDate 8/10/2009 Equip. ID 18800 Orillia Road South For Building Dept. Use ' • Capaoity2 ' Btu/h. Tukwila, Washington Applicant Name: Ton Creagan, Applicant Address: 201 South Jackson St, Suit. 701, Seattle, R1 98 Applicant Phone: (206) ]63 -6 {76 Project Description Briefly describe mechanical system type and features. Includes Plans HV4c. SYSTEIK I5 A GOA-Ifni-NT VOLUME GUILT VP 412 f AJOL./ J6 UL) IT WfTa -t SuppLLj AND 2ETvgN P *n/ Fox BUILD /N6 P/USS///W/ZA 716w AA/0 0 s4'4c) r ✓E yr /e.Q• TToAJ 15.45E0 OA/ Go /N07 SEA.%54reS We TN /00% r/D)E Ai Q CAP.EI8/i:,Ty) #E4T /7IJ14117 HEAT1ti/o ail-r,/ AU c. L-EC Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 Compliance Option 0 Simple System 0 Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be Incorporated with the mechanical equipment schedules on the plans. For projects without plans, till in the required information below. Brand Name' Cooling Equipment Schedule • • Equip. ID Brand Name' t Model No.1 ' • Capaoity2 ' Btu/h. Total CFM OSA CFM or Econo? SEER or EER IPLV3 Location S.. Sheet 16014 Heating Equipment Schedule : • . •''' I Equip. ID Brand Name Model No.1 Capacity2 Btu/h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency. 8.. Sheet 8014 Fan Equipment Schedule Equip. ID Brand Name' Model No.1 CFM SP/ HP /BHP Flow Controls Location of Service S.. Sheet 11014 tlfavailable. 2Astested accordinglto Table 14-1A through 14-1G. 3If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as apjlirable.r!5 Flow control types: variable airvolume(VAV), constant volume (CV), or variable speed (VS). 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary (back) MECH -SUM System Description See Section 1421 for full description of Simple System qualifications. If Heating/Cooling or Cooling Only: MI Constant vol? Spin system? El Air cooled? • Packaged sys? • <20,000 Btuh? Economizer Included? MI p If Heating Only: • <5000 cfm? • <70% outside air? Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. 2006 Washin on State Nonresidential Ener. Code Com . Iiance Form • Electric Motors MECH -MOT 2008 Washington State Nonresidential Energy Code Compliance Forma Revised July 2007 Project Address Bow Lake Rsoyolinp 4 Transfer Station Scala Roues Date 8/10/2009 Complete the following for all design A & B squirrel-cage, T -frame induction permanently wired polyphase motors from 1 hp to 200 hp having synchronous speeds of 3600, 1800 or 1200 rpm (unless one of the exceptions below applies). For Building Department Use Motor No. or Location HP Type (open/closed) Description of Application or Use Synch. Speed Min.Nom. Full load Efficiency HVAC -81 3 open Supply Ian Blower Motor 1800 86.5% BVIC -81 open Return /Rsliet Ian Blower Motors 1800 82.5% Minimum Nominal Full-Load Efficienc Synchronous Speed (RPM) HP 1.0 1.5 20 3.0 5.0 7.5 10 15 20 25 30 40 50 60 75 100 125 150 200 Open Motors Closed Motors 3,600 1,800 1,200 3,600 1 1,800 1,200 Efficiency (%) Efficiency (96) - 82.5 80.0 75.5 825 80.0 825 84.0 84.0 82.5 84.0 85.5 84.0 84.0 85.5 84.0 84.0 86.5 84.0 86.5 86.5 85.5 87.5 87.5 85.5 87.5 87.5 87.5 87.5 87.5 87.5 88.5 88.5 88.5 89.5 89.5 88.5 89.5 90.2 89.5 89.5 89.5 89.5 91.0 90.2 90.2 91.0 90.2 90.2 91.0 91.0 90.2 91.0 90.2 91.0 91.7 91.7 91.0 924 91.7 91.0 92.4 92.4 91.0 92.4 91.7 91.7 93.0 93.0 91.7 93.0 93.0 924 93.0 93.0 92.4 93.0 93.0 93.0 93.6 93.6 93.0 93.6 93.6 93.0 94.1 93.6 93.0 94.1 93.6 93.0 94.1 94.1 93.6 94.5 94.1 93.6 94.5 94.1 94.5 94.5 94.1 93.6 95.0 94.5 94.5 95.0 95.0 _ 94.5 95.0 94.5 _ 95.0 _ 95.0 95.0 Exceptions: 1. Motors in systems designed to use more than one speed of a multi-speed motor. 2. Motors already included in the efficiency requirements for HVAC equipment (Tables 14- 1 A or 14-1B) . 3. Motors that are an Integral part (i.e. not easily removed and replaced) of specialized process equipment (i.e. equipment which requires a special motor, such as an explosion - proof motor). 4. Motors integral to a listed piece of equipment for which no qualifying motor has been approved (i.e. if the only U.L. listing for the equipment is with a less-efficient motor and there is no energy - efficient motor option). For motors claiming an exception, fist motor and note which exception applies. 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Permit Plans Checklist Nonresidential Energy Code Compliance Forms MECH -CHK Rented Juy 2007 Project Address Bow Lake Recycling 4 Transfer Station Ocala House (Date 8/10/2009 The following information is necessary to check a mechanical permk application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, lie.) I Code Component I Information Required I Location I on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment performance n. a. 1411.4 Pkg. elec. htg.8 clg. List heat pumps on schedule yes 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency X014 n. a. 1411.1 Combustion htg. Indicate intermittent ignition, flue/draft damper & jacket loss 1412 HVAC controls yes 1412.1 Temperature zones Indicate locations on plans X302 yea 1412.2 Deadband control Indicate 5 degree deadband minimum X146 n. a. 1412.3 Humidity control Indicate humidistat M146 yes 1412.4 Automatic setback Indicate thermostat with night setback and 7 diff. day types yes 1412.4.1 Dampers Indicate damper location and auto. controls & max leakage x017 A.A. 1412.4.2 Optimum Start Indicate optimum start controls yes 1412.5 Heat pump control Indicate microprocessor on thermostat schedule M146 a. a. 1412.6 Combustion htg. Indicate modulating or staged control yes 1412.7 Balancing Indicate balancing features on plans x302 1412.8 Ventilation Control Indicate demand control ventilation for high - occupancy areas yes 1422 Thermostat interlock Indicate thermostat interlock on plans )246 yes 1423 Economizers Equipment schedule x146 1413 Air economizers yes 1413.1 Air Econo Operation Indicate 100% capability on schedule 1146 p. a. 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db 840 deg F wb n. a. 1413.2 Water Econo Doc Indicate clg Toad & water econoe & clg tower performance n. a. 1413.3 Integrated operation Indicate capability for partial cooling n. a. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting systems yes 1414.1 Duct sealing Indicate sealing necessary x017 yes 1414.2 Duct insulation Indicate R -value of insulation on duct x017 yes 1415.1 Piping insulation Indicate R -value of insulation on piping x017 - 1416 Completion Requirements yes 1416.2.1 Commissioning Provide commissioning plan x017 yes 1416.2.2 -3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing N017 yes 1416.2.4 Commissioning Indicate O&M manuals, record drawings, staff training X017 yes 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report M017 yea 1434 Separate air sys. Indicate separate systems on plans I Summary Form Mechanical Completed and attached. Equipment schedule with types, 'input/output, efficiency, cfm, hp, economizer I SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -14E4) 1440 Service water htg. yea 1441 Elec. water heater Indicate R -10 insulation under tank X017 n. a. 1442 Shut-off controls Indicate automatic shut -off yes 1443 Pipe Insulation Indicate R -value of insulation on piping x017 n.a. 1452 Heat Pump COP Indicate minimum COP of 4.0 n. a. 1452 Heater Efficiency Indicate pool heater efficiency n. a. 1453 Pool heater controls Indicate switch and 65 degree control n. a. 1454 Pool covers Indicate vapor retardant cover n. a. 1454 Pools 90+ degrees Indicate R -12 pool cover 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Summary MECH -SUM 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Project Info Project Address Bow Lake Recycling & Transfer Station Date 4/4/2013 Seale Facility For Building Dept. Use IN 040% PRMAP Tukwila, WA Applicant Name: Tom Creegan, King County Solid Waste Division" p Applicant Address: 201 S. Jackson St., Suite 701, Seattle, WA 98104 so- Applicant Phone: (206) 263 -6476 Project Briefly describe system type Description mechanical and features. Plans THE HVAC SYSTEM IS A SPLIT SYSTEM HEAT PUMP WITH AUXILIARY ELECTRIC HEAT WHICH OPERATES AT 100% OUTSIDE AIR (THEREFORE NO ECONOMIZER) WITH SUPPLEMENTAL ELECT WALL AND RADIANT HEATERS AT THE TRANSACTION WINDOWS. 100% OUTSIDE AIR IS PROVIDE FOR PRESSURIZATION TO MINIMIZE THE INFILTRATION OF VEHICLE FUMES. ELECTRIC HEAT IS LOCKED OUT DURING COOLING. THE SYSTEM OPERATES CONTINUOUSLY EXCEPT FOR A SHO DURATION SHUTDOWN SATURDAY NIGHT UNTIL SUNDAY MORNING. Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 Includes Compliance Option Q Simple System ® Complex System Q Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. ID Equip Type Brand Name' Model No.1 Capacity2 Btu /h OSA CFM or Econo? SEER or EER IPLV3 Econmizer Option or Exception Heat Recovery Y/N See Sheet M014 Heating Eq ii , ment Schedule Equip. ID Equip Type Brand Na ne1 RE CODE E� FOR VIE , .. _ ..' CO • IANCE C• pacity2 'tu /h OSA cfm or Econo? Input Btuh Output Btuh Efficiency" Heat Recovery Y/N See Sheet MO1 APPROVED HAY 13 2013 Tukwila City of ®6vl�+AnN Fan Equipment SchedOl` ®II'JC Equip. ID Equip Type Brand Name' Model No.1 CFM Sp' HP /BHP Flow Controls Location of Service See Sheet M014 IC D T 11f available. 2 As tested according to Table 14 -1A through 14 -1G. 3 If required. ° COP HSPF, Combustion Efficiency, or F�.1 �(8p le. 5 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). 6 Exception number from SeBbnv CITY OF TUKWILA MAY 0 3 2013 PERMIT CENTER INCOMPLETE !TR #_1_ MIS 1•s 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Summary (back) MECH -SUM 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 System Description See Section 1421 for full description of Simple System ualif jiora . kw /7.-.---4 ;at. , "t yw 1 All Systems: ✓ No humidification? ✓ No Reheat? If Heating /Cooling or Cooling Only: ' Constant vol? ✓ Split system? ✓ <= 84,000 Btuh? ❑ Economizer ✓ Air cooled? ❑ Packaged sys? ❑ <= 135,000 Btuh? ❑ Cooling Cap < =15 Btuh /ft2? ❑ Heating Cap. > 0 & < =10 Btuh/ft2? If Heating Only: ❑ <1000 cfm? ❑ <30% outside air? ❑ Heating Cap. < =10 Btuh /ft2? Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. Yes ( START ) Humidification or Reheat? System Type Heating Only eating /Cooling or Cooling Only Reference Section 1421 Co H • ap < =15 Heat/Cool Eq. with Cap < =10 2 Yes /ft2 ? No Yes • • alifies Economizer Exception tion 1-. t► Simple System Allowed (section 1420) Use Complex Systems (section 1430) Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. 3 • 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential IT Mechanical - Complex Systems Checklist MECH -COMP 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Project Address Bow Lake Recycling 6 Transfer Station Date 4/4/2013 The following additional information is necessary to check a mechanical permit application for a complex mechanical system for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Use the checklist as a reference for notes added to the mechanical drawings (see the MECH -CHK checklist for additional requirements). This information must be on the plans since this is the official record of the permit. Having this information in separate specifications alone is NOT an acceptable altemative. For Building Department Use Applicability (yes, no, na) Code Section Component Information Required • Location on Plans Building Department Notes ADDITIONAL CHECKLIST ITEMS FOR COMPLEX SYSTEMS ONLY N.A. 1431.1 Field assem. sys. Provide calculations for total onsite energy input/output to equip. Yes 1431.2 System Sizing Indicate equipment & system sizing complies with 1431.2 M017R Yes 1432.1 Setback & shut -off Indicate separate systems or show isolation devices on plans M303 N.A. 1432.2.1 Air system reset Indicate automatic temperature reset & operation sequence N.A. 1432.2.2 Hydr. Sys. reset Indicate automatic temperature reset & operation sequence N.A. 1432.3.1 Hydr. Var. Flow Indicate variable flow method for all applicable systems N.A. 1432.3.X Hydronic Isolation Indicate method of isolation for all applicable systems No 1432.4 DDC Capabilities Indicate control capabilities including demand response setpoind adj. No 1432.4 DDC data mgmt Indicate metering and trending capabilities. N.A. 1432.5 Pressure Reset Indicate static pressure reset for VAV systems No 1433 Air Economizer Indicate economizer on equipment schedule or provide calculations to justify exemption. Demonstrate higher efficiency equipment if required. N.A. 1433 Water Economizer Indicate water economizer and provide calculations showing compliance with 1413 if 1433 Exception 3 is utilized N.A. 1434 Separate air sys. Indicate special requirement zones and indicate systems Yes 1435 Simul. htg. & clg. Indicate method of prohibiting simultaneous heating and cooling, or state excpetion and show supporting calculations M303 N.A. 1436 Heat recovery Indicate heat recovery of all applicable systems on plans; complete and attach heat recovery calculations Yes 1437 Elec. motor effic. MECH -MOT or Equip. Schedule with hp, rpm, efficiency SPEC N.A. 1438 Variable speed drives Indicate VS control or equivalent on schedules for all applicable equip. N.A. 1438.1 Heat Rejection Indicate heat rejection equipment types and fan types N.A. 1438.2 Hot Gas Bypass Indicate cooling equipment staging and capacity modulation abilities N.A. 1438.3 Large Volume sys Indicate multiple system rooms & indicate ventilation control N.A. 1439.1 Kitchen Hoods Indicate source and conditioning of make -up air N.A. 1439.2 Laboratory Exhaust Indicate HR, VAV, semi - conditioned makeup, or GERM calc no is circle or any question, provide explanation: 1432.4 DDC Capabilities & Data Management: The Larger Project (Transfer Station and TSO has DDC controls with trending and demand control limiting) the Scale House has DDC controls with trending, no demand control limiting because the system is a 100% outside air system - reducing setpoints during occupied periods would subject transaction operators to reduced temperatures with continual openings of transaction windows during low temperature peak demand conditions. It is considered unhealthy to subject these personnel to these reduced temperature conditions. 1433 Air Economizer: The HVAC system operates continously at 100% outside air for building pressurization to minimize infiltration of motor vehide emissions into the Scale House. The only time the system is not at 100% outside air is from late Saturday night to early Sunday morning. Decision Flowchart Start Here Section 1411.1 Equipment Efficiency Shall Meet Tables 14 -1A through 14-1G Use flowchart to determine how the requirements of the Complex Systems Option apply to the project. Refer to the indicated Code sections for complete information on the requirements. slOil Furna input ? 225,000 uh or Any U eate ny Fuel Fumac input > 225,000 Btuh? ace > 50 with Design > 25 people per 000S Yes 1411.1 IID & Power Venting or Damper. If input >_ 225,000 Btuh then 1412.6 Modulating Controls Required Yes Section 1411.1 0.75% Maximum Jacket Loss ield - Assemble Equipment? Air System Serving Multiple Zones? Yes v Section 1412.8 Ventilation Controls for High- Occupancy Areas Yes Section 1431.1 Calculations of Total On -Site Energy Input & Ouput Required (continued on back) Yes Section 1432.2.1 Supply Air Reset Controls Required 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical - Complex Systems (back) 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential MECH -COMP Revised August 2010 Yes Section 1432.3.2 through 1432.3.5 Device Isolation Required Total umpHP >3H•, or HP>1.5 and ontrol v Yes-• Section 1432.3.1 Variable Flow Design Required dronic Syst Heated or Cooled 300,000 Btu Yes* Section 1432.2.2 Water Temperature Reset Required No 100% outside air system - see Exception Narrative, previous page Mechanical Cooling? Section 1433 Economizer Required C Present Total Cooling > 780kBtuh Section 1432.4 DDC Required With Trending end -Oefaeofl-Reepeaee• 0 No V Yes► Section 1436.1 50% Effective Heat Recovery Required Yes 4 Hour Ops, ter Cooled Conden tuh, & Servi OkB >1,50 Section 1436.3 Condenser Heat Recovery Required emo Refrigeration Condensers > 500kBt See Exception Narrative, previous page. Section 1436.2 Condensate Recovery Required Yes.►. ystem or Zone w/ Simultaneous tg. & Clg.? Yes• Section 1435 Zone Controls Must Reduce Supply Air Quantity Before Reheating /Recooling ystem o1 ystems serving a room have 10,000 CF ppI Section 1436.4 Refrigeration Condenser Heat Recovery Required Section 1438.3 Controls Must Yes• Reduce Airflow When System In Not Heating or Cooling Fan or Pump Motors >= 7.5 HP? Yes• Section 1438 Variable Flow Devices Required otor Incl. in Eqpmt. Covr'd by Tbl 14 -1 A -14- 1G? Multi -speed Motor in Multi - eed system'? Section 1437 Motors Must Meet Efficiencies in Table 14 -4 otal Bld.. Laboratory Exhaust > 5,000 cfm? Yes Yes • Yes• Section 1439.1 No Heating or Cooling for at Least 50% of Make -up Air Yes • Section 1439.2 One Required: a. Heat Recovery per 1439.2 b. 50% VAV Exhaust & Make -up c. 75% Direct Makeup w/ Tempering Only d. Combined Energy Reduction Qer> =Qmin Yes 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Economizer Forms for Nonresidential and Multifamily Residential MECH -ECO Revised August 2010 2009 Washington State Energy Code Compliance Economizer Summary Check box(es) for exceptions being claimed. List the system /equipment that qualifies for each exception. See Section 1433 for full description of Economizer requirements. applicable 4 Full Air Continuous 100% outside air system - economizer is not ❑Ex 1: ❑ c 5: ❑ : 9a: ❑ Ex 2: ❑ c 6: ❑ : 9b: ❑ Ex 3: ❑ r 7: ❑ : 9c: Ex 4: ❑ c8: Decision Flowchart Use this flowchart to determine if project complies with Economizer requirements. If not, the Systems Analysis Option must be used. ( START 100% Air Economizer Yes Reference Section 1433 Continuous 100% outside air system ified Un From Table 14 -1A, :, • S'- - /EER15 %• -r Group R Occ. xception 8: Unit Cap <20,000 Btuh Full Air Economizer - Complies Yes ception :: it Cap <54,000 B it not Exterior 'ace No xception it Cap < 33,000 Bt nit not Exterior o Adjacen :Idg. Cap. w/o economizer <72,000 Btuh or 5 %7 Exception 2: Chilled Water Sys. er 25% over = Idg Cap wo Econ -480,000 Btu or 2i eptio er Cooled Re . aterside Economize ing chiiled b Sys No 1 xception 3 Syste Cap. <= 500 tons Yes Exception 4: Cooling 75% Site HR or Solar -Yes— Exception 5: Special OA Yes - ltration Need xception :. Dehumidification Ye with supporting ry\ Exception 7: Heat Pump Loop etingAllCrit -% No No xception 9: Dedicated Server or Eq Rm erved b 14 -1A or 14-1B quipme Yes xc. 9a: EER 8 IPLV Ye Over C•.e No No xc. 9b. Water Econo ER & IPL Ye P.' Lo. ote C or belt 'f cap >85,00 xception 10: RF System Meeting All Criteria No • Does Not Comply I o RAE 127 is 14 -1A/14 0 Yes • Qualifies for Full Air Economizer Exception - Complies 2009 Washin ton State Ener Code Com.liance Forms for Nonresidential and Multifamil Residential • • Electric Motors MECH -MOT 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Project Address Bow Lake Recycling S Transfer Station Date 4/4/2013 Complete the following for all design A & B squirrel -cage, T -frame induction permanently wired For Building Department Use polyphase motors of 1 hp or more having synchronous speeds of 3600, 1800 or 1200 rpm (unless one of the exceptions below applies). Motor No. or Location HP Type (open /closed) Description of Application or Use Min.Nom. Synch. FuII toad Speed Efficiency HVAC -S1 closed AIR HANDLING UNIT SUPPLY FAN MOTOR 1800 86.5% BF -S1 1- 1/2 closed BLOWER FAN 1800 86.5% BF -S2 1- 1/2 closed BLOWER FAN 1800 86.5% Mnimm Nominal Full-Load Efficiencies (%) As of 12/19/2010 I Open Motors 1 1., Enclosed Nbtors Synchronous Speed (RPM) 3,600 1,800 1,200 I 3,600 1,800 1,200 Motor H P 1.0 77.0 85.5 82.5 77.0 85.5 82.5 1.5 84.0 86.5 86.5 84.0 86.5 87.5 2.0 85.5 86.5 87.5 85.5 86.5 88.5 3.0 85.5 89.5 88.5 86.5 89.5 := .5 5.0 86.5 89.5 89.5 88.5 89.5 89.5 75 88.5 91.0 902 89.5 91.7 91.0 10.0 89.5 91.7 91.7 90.2 91.7 91.0 15.0 90.2 93.0 91.7 91.0 92.4 91.7 20.0 91.0 93.0 92.4 91.0 93.0 91.7 25.0 91.7 93.6 93.0 91.7 93.6 93.0 30.0 91.7 94.1 93.6 91.7 93.6 93.0 40.0 92.4 94.1 94.1 92.4 94.1 94.1 50.0 93.0 94.5 94.1 93.0 94.5 94.1 60.0 93.6 95.0 94.5 93.6 95.0 94.5 75.0 93.6 95.0 94.5 93.6 95.4 95.4 100.0 93.6 95.4 95.0 94.1 95.4 95.0 125.0 94.1 95.4 95.0 95.0 95.4 95.0 150.0 94.1 95.8 95.4 95.0 95.8 95.8 200.0 95.0 95.8 95.4 95.4 96.2 95.8 250.0 95.0 95.8 95.4 95.8 96.2 95.8 300.0 95.4 95.8 95.4 95.8 962 95.8 350.0 95.4 95.8 95.4 95.8 96.2 95.8 400.0 95.8 95.8 95.8 95.8 96.2 95.8 450.0 95.8 962 962 95.8 962 95.8 500.0 95.8 962 96.2 95.8 96.2 95.8 Exceptions: 1. Motors in systems designed to use more than one speed of a multi -speed motor. 2. Motors already included in the efficiency requirements for HVAC equipment (Tables 14- lA or 14 -1B) . 3. Motors that are an integral part (i.e. not easily removed and replaced) of specialized process equipment (i.e. equipment which requires a special motor, such as an explosion - proof motor). 4. Motors integral to a listed piece of equipment for which no qualifying motor has been approved (i.e. if the only U.L. listing for the equipment is with a less- efficient motor and there is no energy - efficient motor option). For motors claiming an exception, list motor and note which exception applies. 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Permit Plans Checklist MECH 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential -CHK Revised August 2010 Project Address How Lake Recycling & Transfer Station (Date 4/4/2013 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, na) Code Section Component Information Required Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment Performance Yes 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency M014 N.A. 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss N.A. 1411.1 Air - cooled chiller Provide total air and water chiller capacity N.A. 1411.2.1 Water - cooled chiller Full -load and NPLV values adjusted for any non- standard condiitons Yes 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule M014 N.A. 1411.5 Unenclosed Heat Indicate radiant heat system and occupancy controls 1412 HVAC Controls Yes 1412.1 Temperature zones Indicate locations on plans M302 Yes 1412.2 Deadband control Indicate 5 degree deadband minimum M303 N.A. 1412.3 Humidity control Indicate humidistat Yes 1412.4 Setback and Shutoff Indicate thermostat with 7 day program capability & required setback M303 Yes 1412.4.1 Dampers Indicate damper location, leakage rate, control type, & max. leakage M014 N.A. 1412.4.2 Optimum Start Indicate optimum start controls N.A. 1412.5 Heat pump control Indicate heat pump thermostant & outdoor lockout on schedule N.A. 1412.6 Combustion heating Indicate modulating or staged control Yes 1412.7 Balancing Indicate balancing features on plans M302 N.A. 1412.8 Ventilation Control Indicate demand control ventilation for high -occupancy areas N.A. 1412.9 Loading Dock & Garage Ventilation Indicate enclosed loading dock & parking garage ventilation system activation and control method. Yes 1422 Thermostat interlock Indicate thermostat interlock on plans M303 N.A. 1432.2.1 Temperature Reset Indicate temperature reset method 1413 Air / Water Economizers N.A. 1412.1 Single zone systems Indicate multiple cooling stage control capability. N.A. 1413.1 Air Econo Operation Indicate 100% capability on schedule N.A. 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb N.A. 1413.2 Wtr Econo Document Indicate max. OSA condition for design clg load & equipment performance data. N.A. 1413.3 Integrated operation Indicate capability for partial cooling N.A. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting Systems Yes 1414.1 Duct sealing Indicate duct design pressures and sealing requirements M017R Yes 1414.1 Duct testing Indicate testing required M017R Yes 1414.2 Duct insulation Indicate R -value of insulation on duct M017R 1415 Piping Systems Yes 1415.1 Piping insulation Indicate R -value of insulation on piping M017R 1416 Completion Requirements Yes 1416.3.2 System Balancing Indicate air and water system balancing requirements M017R Yes 1416.3.3 Functional Testing Provide sequence of operations and test procedures. M017R Yes 1416.3.4 Documentation Indicate O &M manuals, record drawings, staff training M017R Yes 1416.3.5 Comm. Report Indicate requirements for final commissioning report M017R Yes 1416.4 Compliance Chklist Submit to building official upon substantial completion. M017R Yes Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer ATTACHE D 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Permit Plans Checklist Continued MECH -CHK 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Project Address Bow Lake Recycling S Transfer Station 'Date 4/4/2013 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability (yes, no, na) Code Section Component Information Required Location on Plans Building Department Notes SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454) 1440 Service water htg. Yes 1441 Elec. water heater Indicate R -10 insulation under tank M017R N.A. 1442 Shut -off controls Indicate automatic shut -off of circulators or heat trace Yes 1443 Pipe Insulation Indicate R -value of insulation on piping M017R N.A. 1444 Pump Energy Indicate method of pump energy management (Sec 1438) N.A. 1445 Heat Recovery Indicate preheat capacity as % of peak service water demand. N.A. 1452 Heat Pump COP Indicate minimum COP of 4.0 N.A. 1452 Heater Efficiency Indicate pool heater efficiency N.A. 1453 Pool heater controls Indicate switch and 65 degree control N.A. 1454 Pool covers Indicate vapor retardant cover N.A. 1454 Pools 90+ degrees Indicate R -12 pool cover N.A. 1455 Heat Recovery Indicate method and capacity of exhaust air temperature reduction 1460 Cold Storage N.A. 1463 Evaporators Indicate motor type and speed control N.A. 1464 Condensors Indicate condenser cooling type, design wb temp and control N.A. 1465 Compressors Indicate design minimum condensing temp and control. If "no" is indicated for any item in Sections 1401 -1424 or 1440 -1465 _ provide explanation: v 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Envelope Summar Zone 1 Non - Residential ENV -SUM 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Project Info Project Address Bow Lake Recycling 6 Transfer Station Date 4/3/2013 Fenestration Area Calculation Scale Facility For Building Department Use -^ F�� t �.'''` rte° i� F �i`7 Semi - Heated Path Tukwila, WA Applicant Name: Tom Creegan, King County Solid Waste Division Applicant Address: 201 S. Jackson St., Suite 701, Seattle, WA 98104 Applicant Phone: (206) 263 -6476 Project Description El New Building ❑ Addition ❑ Alteration ❑ Change of Use Compliance Option ❑ Prescriptive El Component Performance (See Decision Flowchart (over) for qualifications) ['Seattle EnvStd ❑ Systems Analysis Occupancy Group OO Nonresidential 0 Multifamily Residential (> 3 stories ) Climate Zone ® Climate Zone 1 0 Climate Zone 2 ( See WSEC 302.3 for county list) Fenestration Area Calculation Total Fenestration Electronic version: these values are automatically taken from ENV -UA -1. (rough opening) Gross Exterior (vertical & overhd) divided by Wall Area times 100 equals % Fenestration 207.6 - 2769.0 X 100 = 7.5% Semi - Heated Path 0 yes Allowable if project meets all requirements as defined in section 1310.2. Only allowed as prescriptive path and must be calculated separately from other conditioned spaces. Limited to Q no reduced wall insulation levels. Requires other fuel heating and qualifying thermostat. Envelope Requirements (enter values as applicable) Minimum Insulation R- values Roofs - Insulation Above Deck NA Roofs - Metal Building 25 + 25 batt Roofs - Single Rafter NA Roofs - Attic and All Others NA Walls - Mass Walls - Metal Building Walls - Steel Framed See ENV —UA -1 NA See ENV —UA -1 Walls - Wood Framed and Other NA Floors - Mass NA Floors - Steel Joist NA Floors - Wood Framed and Other NA Maximum F- factors Slabs -on -Grade - Unheated R -10 Slabs -on -Grade - Heated NA Notes: INCOMPLETE� REVIEWED _CODE COMPLIANCE APPROVED Envelope Requirements ( continued ) Maximum U- factors Vertical Fenestration Non -Metal Frame NA Metal Frame 0.3 Entrance Door NA Skylights - Without Curb NA Skylights - With Curb NA Opaque Doors - Swinging 0.370 Opaque Doors - Non - Swinging Maximum SHGC (or SC) Vertical Fenestration Non -North 0.380 North 0.380 NA MAY 13 2013 City of Tukwila BUILDING DIVISION RECEIVED CITY OF TUKWILA MAY 0 3 2013 PERMIT CENTER 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Envelope Summar back Zone 1 Non - Residential ENV -SUM 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Minimum Requirements for Prescriptive Option Use table to determine if project qualifies for the optional Prescriptive Option. All components must meet the stated Climate Zone Climate Zone 1 Climate Zone 2 , '• '' v"{" irli cl r "1 r Occupancy Group Nonresidential Residential, Other than Single - Family Nonresidential Residential Single Opaque Elements Insulation Min. R -Value Roofs Insulation Entirely above Deck R -30 c.i. R -38 c.i. R -38 c.i. R -3 Metal Building R -25 + R -11 Ls R -25 + R -11 Ls R -25 + R -11 Ls R -25 + Single -Rafter R -38 R -38 R -38 R Attic and Other R -38 adv or R -49 R -38 adv or R -49 R -38 adv or R -49 R -38 ad Walls, Above -grade Mass R -5.7 c.i. t R -11.4 c.i. t R -7.6 c.i. R -13 Metal Building R -13 + R -7.5 c.i. R -19 + R -8.5 c.i. R -13 + R -7.5 c.i. R -19 + Steel Framed R -13 + R- 7.5c.i. R -19 + R -8.5 c.i. R -13 + R -7.5 c.i. R -19 + Wood Framed and Other R -21 R -13 + R- 6 c.i. R -13 + R -7.5 c.i., or R -21 + R -2.5 c.i. R -21 + Below Grade Wall Same as above grade Same as above grade Floors Mass R -30 c.i. R -30 c.i. R -30 c.i. R -3 Steel Joist R -38 + R -4 c.i. R -38 + R -4 c.i. R -38 + R -4 c.i. R -38.0 Wood Framed and Other R -30 R -30 R -30 R Slab -On -Grade Floors Unheated R -10 for 24 in. (with thermal break) R -10 for 24 in. (with thermal break). R -10 for 24 in. (with thermal break) R -10 for therms Heated R -10 c.i.(with thermal break) R -10 c.i. (with thermal break) R -10 c.i. (with thermal break) R -10 c.i. (t bn Opaque Doors Maximum U- Factor Swinging U -0.600 U -0.400 U -0.600 U -C Non - Swinging U -0.600 U -0.400 U -0.600 U -C Fenestration 0-40% of Wall Assembly Maximum U- factor (NFRC Rated) Vertical Fenestration Nonmetal framing U -0.32 U -0.32 U -0.32 U -1 Metal framing U -0.40 U -0.40 U -0.4p0 U -1 Entrance doors U -0.60 U -0.60 U -0.60 U -1 Skylights Without curb (i.e. sloped U -0.50 U -0.50 U -0.50 U -1 With curb (i.e. individual unit U -0.60 U -0.60 U -0.60 U -i Fenestration 0-40% of Wall Assembly Maximum SHGC Factor Vertical Fenestration SHGC -0.40 all, OR SHGC -0.45 all PLUS permanent PF > 0.50 on west, south, east No Requirement SHGC -0.40 all, OR SHGC -0.45 all PLUS permanent PF > 0.50 on west, south, east No Requirer Skylights SHGC -0.35 SHGC -0.35 SHGC -0.35 SHGC -0.35 The following definitions apply: c.i. _ contiguous insulation, L$ = liner system (see definitions miry •. it4ti Footnote 1: Zone 1, nonresidential walls may be ASTM C90 concrete:block walls, ungrouted or partially grouted at 32 inches or less on ce vertically and 48 inches or less on center horizontally witA upgouted'cores f il'ed with material having a maximum thermal conductivity c Btu- in/h•ft2• °F. t = : "y ,.., , �. 1 t r• .., • t if•', ( 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Envelope UA Calculations Zone 1 Non - Residential ENV -UA 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Project Address Boa Lake Recycling 6 Transfer station Date 04/03/2013 Occupancy Group Q Nonresidential 0 Multifamily residential Clear For Building Department Use Climate Zone 0 Zone 1 0 Zone 2 Max. Target: Fenestration Area as % gross exterior wall area 7.5% 40.0% Notes: 1: If fenestration area exceeds maximum allowed, then calculate adjusted areas on Target Area Adjustment sheet on the backside of the ENV -SHGC form. 2: U- factors shall come from chapter 10 or calculated per 1332. Building Component Provide assembly ID & page /plan # for each bldg. element Proposed UA U- factor x Area (A) = UA (U x A) Target UA U- factor x Area (A) = UA (U x A) Roofs Y g R= ID: R= ID: R= ID: 0.034 Above Deck Insulation U -0.034 °_° 2 R= ID: R25 Rigid over steel joist w/ R25 Batts R= ID: Calculated U -Value - See Roof Type 90 R= ID: 0.027 539 14.6 0.031 539 16.7 Metal Building U -0.031 t 0R= R= ID: R= ID: ID: 0.027 I Single raft, attic, other U -0.027 Opaque Walls - Above Metal Frm R =R22. 2 ID: Wall Type 26A w/ R4.2 - U -Value Calculated R =822.2 ID: Wall Type 26C w/ R4.2 - U -Value Calculated 0.082 0.063 1056 795 86.6 50.1 0.064 1851 118.5 Steel frame /metal bldg U -0.064 R= ID: See Wall Type 26A & 26C Calculations R= ID: z -15 $R= 3 R= ID: R= ID: ID: R= ID: 0.057 Wood Frame, other U -0.057 I Mass' R= none ID: Wall Type B no insul -see Wall Type 4 Calcs R= ID: See Wall Type 4 Calcs - default from Table R= ID: 10- 5B(1)- perifical edge R= R20 ID: Wall Type A w/ R20 - U -Value Calculated Proposed assembly U- factor from Tables 10 -5 thru 10 -5B 0.816 0.045 65 262 53.0 11.8 0.150 327 49.1 Mass Wall U -0.15 Below Grade Walls R= R20 ID: Wall Type A - calculated R= ID: See Wall Type 4 Calcs R= ID: Proposed assembly U- factor from Tables 10 -5 thru 10 -5B. Do 0.045 NOT use 262 Table 10 -1. 11.8 0.150 262 I 39.3 Assumed to be Mass Wall U -0.15 a) m g no 0 U= ID: Insulated Metal - NREC Default U= ID: Table 10-6C, Foam Insulated - glazing is U= ID: double glazing, low -e included w/ glazing 0.370 121 44.9 0.600 121 I 72.8 All Doors U -0.60 B $ R= R21 ID: R21 Batts in Metal Frame -NREC Default R= ID: from Table 10 -5A(2) for R19 Roof framing & R= ID: cavity only - effective R =9.1, U =0.110 0.110 17 1.8 0.029 17 I 0.5 Floors U -0.029 F- factor x Perimeter = UA(U x A) F- factor x Perimeter = UA (U x A) Slab- on-grade d TO j R =R10 ID: Fully Insulated Slab w/ Thermal Break R= ID: NREC Table 10 -2 R= ID: 0.360 131 47.2 0.540 131 1 70.7 Slab -On -Grade F -0.54 IHeated R= ID: R= ID: Proposed assembly F- factors can use the unheated values in Table 10 -2 0.360 Heated Slab -On -Grade F -0.36 with 1 value pt V 115 ratthterThanbTab a 10-5b values. Plans must c ea y state ootnote requirements. Page 1 Area UA 3248 322 Area I 3248 UA 368 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Envelope UA, continued. Zone 1 Non - Residential ENV -UA Project Address sov Lake Recycling 6 Transfer Station Date 4/3/2013 Fenestration Area as % gross exterior wall area 7.5% Max. Target: 40 .0% For Building Department Use Notes: 1: If fenestration area exceeds maximum allowed, then calculate adjusted areas on Target Area Adjustment sheet on the backside of the ENV -SHGC form. 2: Provide NFRC or Table 10 -6 U- factor (See Section 1312.1) for fenestration assemby (combined frame and glazing performance). Building Component Provide assembly ID & page /plan # for each bldg. element Proposed UA U- factor x Area (A) = UA (U x A) Target UA U- factor x Area (A) = UA (U x A) Vertical Fenestration IMetal Frame U= ID: Fixed Windows - Labeled U= ID: Sliding Windows - Labeled U= ID: Door Glazing - Labeled U= ID: All Scheduled on Drawing A015 0.290 0.290 0.290 146 40 22 42.3 11.6 6.3 0.400 208 83.0 Metal Frame U -0.40 INon - Metal U= ID: U= ID: U= ID: U= ID: 0.320 Non -Metal Frame U -0.32 IMtl entrance U= ID: U= ID: U= ID: U= ID: 0.6001 Metal Entance Door U -0.60 Skylights INo Curb U= ID: U= ID: U= ID: U= ID: 0.500 Without Curb U -0.50 IWith Curb U= ID: U= ID: U= ID: U= ID: 0.600 Including Curb U -0.60 cone CMUU.wal`IS mpeep(i Ta 1pe .- 3 -1 Foa%no e 1 can be va ues� lans must clearly state�Tootnote require requirements. Page 2 Total Page 1 Total To comply: Total 1) Proposed Total UA shall not exceed Target Total UA. 2) Proposed Total Area shall equal Target Total Area. Area UA 208 60 3248 322 3456 382 Area UA 208 83 3248 368 3456 451 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily SHGC Calculation Zone 1 Non - Residential ENV -SHGC 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily R Revised August 2010 Project Address How Lake Recycling 6 Transfer Station Date 04/03/2013 Fenestration Area as % gross exterior wall area 7.5$ Prop ] 40� Max.Target For Building Department Use Prescriptive PF Credit 0 Yes 0 No Vertical North Facing Credit (1323.3 Exp. 2) 0 Yes 0 No Notes: To comply the Proposed total SHGC x A for all fenestration (vertical & skylights) shall not exceed Target total SHGC x A. If the north facing credit is used then the north and non -north must comply separately with skylights being included with the non -north vertical fenestration. Skylights Proposed SHGC List ID & page #, NFRC or glass only SHGC* x Area (A) = SHGC x A Target SHGC SHGC x Area (A) = SHGC x A ID: ID: ID: ID: ID: 0.38 40 15 0.350 Criteria SHGC All 0.35 * Note: Manufacturer's SC may be used in lieu of SHGC. Totals Non - residential compliance is based upon combined skylight and vertical 1.00 Totals! I 8 enestration performance. Residential compliance is based upon skylight only. All Non -North Vertical Fenestration ++ Proposed SHGC List ID & page #, NFRC or glass only SHGC PF PF Adjusted x Area (A) = SHGC x A Mult' SHGC Target SHGC SHGC x Area (A) = SHGC x A ID: Fixed Windows - Labeled 0.38 1.00 0.38 146 55 0.400 208 83.0 ID: Sliding Windows - Labeled 0.38 1.00 0.38 40 15 Criteria SHGC ID: Door Windows - Labeled 0.38 1.00 0.38 22 8 All 0.40 ID: Prescriptive PF 0.45 ID: ID: ID: ID: ID: ID: + +Note: If projection factors or north vertical glazing credit are used Totals 207.6 78. 9 Totals 207.6 83.0 then vertical fenestration must be entered according to orientation. If neither are used then ventical fenestration can be entered in either section. Non -North + Note: Manufacturer's SC may be used in lieu of SHGC. Total 78.9 83.0 ote: Multipliers only apply if prescnptive PF credit not used. North Vertical Fenestration ++ Proposed SHGC List ID & page #, NFRC or glass only SHGC PF PF Adjusted x Area (A) = SHGC x A Mutt" SHGC SHGC Target SHGC x Area (A) = SHGC x A ID: ID: ID: ID: ID: ID: Criteria All Prescrpt P Mixed Orientation 0.40 0.45 North Separate 0.45 0.50 North Total 1 For compliance: Proposed total SHGC x A shall not exceed Target total SHGC x A. If north glazing credit is used then north facing vertical fenestration must comply separately from non -north vertical fenestration and skylights. Area I SHGC x A Area Gran TotaGrand ( 207.6 ! 78.9 ! Total ! 207.6 SHGC x A 83.0 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Tar. et Area Ad'ustment Calculations 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential (Project Address Sow Lake Recycling & Transfer Station JDate Revised August 2010 04/03/2013 If the total fenestration area as a % of gross exterior wall area (calculated on ENV -SUM) exceeds the maximum allowed in Table 13 -1, then this calculation must be submitted Use the resulting areas in the Target UA and SHGC calculations above. SKY= Skylight. Refered to as overhead glazing in WSEC 1333 & 1334 and equations 13 -1 & 13 -2. VF = vertical fenestration. Refered to as vertical glazing in WSEC 1333 & 1334 and equations 13 -1 & 13 -2. NW = net wall (excludes fenestration, BG, and doors.) DBG = Doors and below grade wall. Total Fenestration = SKY + VF. Gross Exterior Wall Area VF + NW + DBG Fenestration -> Opaque -> Gross Exterior Wall Area Proposed Areas Above Grade Walls Doors & BG Walls SKY= VF= 207.6 0 NW= 2178.0 DBG' 383.4 2769.0 Total Fenestration 207.6 Total Fenestration 207.6 X Net AG Wall Area 2178.0 Max Fenestration % (Table 13 -1) 40.0% Maximum Target I 1107.6 100 Excess Fenestration -900.0 Excess Fenestration !C Target Fenestration Excess Fenestration Vertical Fenestration metal frame non -metal frame metal entrance Skylight without curb with curb AG Wall Steel Frame /metal Wood /Other frame Mass Sum of Proposed SHGC Calculation North Vertical Fenestration Non -North Vertical Fenestration Skylights (all) Maximum Target Fenestration Area 1107.6 0 B lesser -900.0 207.6 Target Net Wall Area 2178.0 Proposed Area 207.6 Proposed Area Proposed Area 1851.0 327.0 2385.6 Proposed Area X X x X X X x x X X x Total Fenestration 207.6 Net Wall 2178.0 Target VF Mult. 1.00 Target VF Mult. Target Net Wall Mult. 1.00 1.00 Excess Fenestration Target VF Multiplier 1.00 Target Net Wall Mult. Sum of Target Target VF Mult. 1.00 Target Area 207.6 Target Area Target Area 1851.0 327.0 2385.6 Target Area Apply to all Proposed Fenestration Areas to get Target Fenestration Area Apply to all Proposed Opaque AG Wall Areas to get Target Area Target values in shaded boxes are used in the applicable Target UA calculations on the front. Sum of Proposed must equal Sum of Target. SHGC target values in shaded boxes are used in the applicable Target SHGC calculations above. 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamil Building Permit Plans Checklist ENV -CHK 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Project Address Bow Lake Recycling 6 Transfer Station (Date 4/3/2013 The following information is necessary to check a building permit application for compliance with the building envelope requirements in the Washington State Nonresidential Energy Code. Applicability (yes,no,na) Code Section Component Information Required Location on Plans Building Department Notes GENERAL REQUIREMENTS (Sections 1301 -1314) 1301 Scope Unconditioned spaces identified on plans if allowed N.A. 1310.2 Semi - heated spaces Semi - heated spaces identified on plans if allowed N.A. 1310.3 Cold Storage / refrigerate All refrigerated spaces identified on plans. ENV -RFG completed. 1311 Insulation Yes 1311.1 General installation Indicate installation nethod, densities and clearances to achieve intended R -value of all insulation materials A012 A013 Yes 1311.2 Roof /ceiling insul. Indicate R -value on roof sections for attics and other roofs; Indicate clearances for attic insulation; Indicate baffles if eave vents installed; Indicate face stapling of faced batts A013 N/A N/A Yes 1311.3 Wall insulation Indicate R -value and framing material on wall sections; Indicate face stapling of faced batts; Indicate above grade exterior insulation is protected; Indicate mass of masonry walls if mass wall claimed Indicate loose -fill core insulation for masonry walls as necessary Indicate frequency of grouted cores and bond beams as necessary A012 A11' N/A N/A N/A N/A N.A. 1311.4 Floor insulation Indicate R -value on floor sections; Indicate substantial contact with surface; Indicate supports not more than 24" o.c.; Indicate that insulation does not block airflow through foundation vents. Yes 1311.5 Slab-on-grade floor Indicate R -value on wall section or foundation detail; Indicate slab insulation extends down vertically 24" from top; Indicate above grade exterior insulation is protected Note 1 attached N.A. 1311.6 Radiant floor Indicate R -value on wall section or foundation detail; Indicate slab insulation extends down vertically 36" from the top; Indicate above grade exterior insulation is protected; Indicate insulation also under entire slab where req'd. by Official Yes 1312 Glazing and doors Provide calculation of vertical and overhead glazing area as percent of gross wall area Note 2 1312.1 U- factors Indicate glazing and door U- factors on glazing and door schedule (provide area- weighted calculations as necessary); Indicate if values are NFRC or default, if default then specify frame type, glazing layers, gapwidth, low-e coatings, gas filling AVll A014 A015 1312.2 SHGC & SC Indicate glazing solar heat gain coefficient or shading coefficient on glazing schedule (provide area- weighted calculations by orientation as necessary) 'A011 1313 Moisture control Yes 1313.1 Vapor retarders Indicate vapor retarders applied to warm side of insulation A013 Yes 1313.2 Roof /ceiling vap.ret. Indicate vapor retarder on roof section; or list exception Indicate vap. retard. with sealed seams for non -wood structure A012 Yes 1313.3 Wall vapor retarder Indicate vapor retarder on wall section A013 N. A. 1313.4 Floor vapor retarder Indicate vapor retarder on floor section Yes 1313.5 Crawl space vap. ret. Indicate required grade ground cover with required overlapping. w., a A196 1314 Air leakage Yes 1314.1 Bldg. envel. sealing Indicate sealing, caulking, gasketing, and weatherstripping A011 Yes 1314.2 Glazing/door sealing Specify maximum air leakage rates for fenestration and door products A011 N.A. 1314.3 Assemb. as ducts Indicate sealing, caulking and gasketing N.A. 1314.4 Recessed Lighting Fixtun Indicate IC rating, ASTM E283 cert., and gasketing or caulking to ceiling N.A. 1314.5 Loading Dock Seal Indicate weatherseal at cargo and loading dock doors Yes 1314.6 Continuous Air Barrier Indicate air barrier sealing on all roof, wall & floor details Indicate leakage testing method. Provide testing results to building official. Max. leakage of 0.40 cfm /ft2 at 0.3 inch w.g. A011 A012 A013 PRESCRIPTIVE PERFORMANCE iSections 1320 -1323) N.A. ENV -SUM Form Completed and attached. N.A. 1323 Glazing Indicate number of glazing panes and location of emissivity coating or exception taken COMPONENT PERFORMANCE (Sections 1330 -1338) Yes ENV -SUM, ENV -UA, & ENV-SHGC Forms Completed and attached. attached If no is shown for any question, provide explanation: 2009 Washin ton State Ener. Code Com•liance Forms for Nonresidential and Multifamil ENV -UA INSTRUCTIONS & EXAMPLES 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily ENV -CHK Revised August 2010 FENESTRATION, SKYLIGHTS, & DOORS: Per Energy Code Section 1312.1, • U-factors shall be "determined, certified, and labeled in accordance with RS -31 by a certified independent agency licensed by the National Fenestration Rating Council (NFRC)." If using this approach, provide manufacturer, model number and NFRC rating on the drawings. • "Unlabeled glazing and doors shall be assigned the default U-factor in Table 10-6.". If using this approach, provide all glazing characteristics on the drawings: list number of glazing layers, gap width, low -e coating, gas fill, frame material, thermal break details per footnote 2 to Table 10 -6B. OPAQUE ASSEMBLIES: Per Energy Code Section 1332, • "The U factors for typical construction assemblies are included in Chapter 10. These values shall be used for all calculations." For example: see Table 10 -5A for metal stud walls and metal building walls /roofs, see Table 10 -7A to E for steel truss ceilings, etc. FURTHER INFORMATION: Refer to the Northwest Energy Efficiency Council website at: www.neec.org Below are examples of how the Component Information on ENV -UA -1 are to be completed Building Component List ID & page #, code table # or calculation page # Proposed UA U- factor x Area (A) Typical Example Roofs Other R= 38 ID: R1 /A1.5, T. 10 -7 default 0.031 532 R -38 blown -in attic insulation per default Deck R= 40 ID: R2 /A1.5, T. 10 -7G default 0.025 9885 R -40 uniform thickness rigid insulation per default Walls Opaque R= 13 +7.5 ID: W1 /A1. 6, T. 10 -5A(1) default R= 5 ID: W2 /A1.6 , T .10 -5B (2) default R= ID:, R= ID: 0.064 7587 0.157 923 R -13 cavity + R -7.5 rigid ins. over metal studs per default R -5 rigid ins. at edge of intermediate concrete floors per def 0 m R =11 ID: W4 /A1.6, T. 10 -5 (1) default R= ID: 0.094 512 R -11 cavity ins. between wood studs on conc. wall per def. Doors U= 0.6 ID: Dl /A1.3, T.10 -6 default U= 1.2 ID: D2 /A1.3, T.10 -6 default 0.60 120 1.20 40 Non -NFRC fire -rated exit door per default Non -NFRC warehouse door per default Floors and Slabs Floor R= 30 ID: F1 /A1.7 , T. 10 -4A default R= ID: 0.031 10417 R -30 continuous ins. under concrete floor slab per default Slab R =10 ID: F2/A1.7, T.I0 -2 default 0.700 612 R -10 slab edge ins. for 2 feet without thermal break per def. Fenestration and Skylights ID: W1 /A1.3, NFRC certified ID: W2 /A1.3, T.10 -6 default ID: W3 /Al . 3, T.10 -6 default ID: W3 /A1.3, T.10 -6 default 0.36 12307 0.50 5240 0.65 282 0.78 282 Curtainwall rated, certified, and labeled per NFRC Non -NFRC curtainwall, 2 layer, 0.05emis, argon, TB, fixed Non -NFRC curtainwall, 2 layer, 0.05emis fixed Non -NFRC curtainwall, 2 layer, 0.05emis operable Y c to ID: S1 /Al .3, NFRC certified ID: S2 /A1.3, T.10 -6 default 0.50 453 0.54 .118 Sloped glazing rated, certified, and labeled per NFRC Non -NFRC atrium sloped glazing per default WAN - 125d COA E DOOR . 45 NET -63d 7Yae -57d 19.5 d 11'5',25' . 259 d —Mote - 193 r L3871425' - 241 d irrar - 57 d QRCGS AMC LEVEL WILLS - 639.5 Sr AMC 0008 - 45 SF NET ATTIC IE1EL MALLS 711.[ 292 - 7613 5F GROSS ROOF AREA - 539 SF UA AREA ATTIC PLAN RALDOUSE SCION SCALE FAGOT SORE 1 /4.. 1'-0' TOTAL nAZSf WAYnL&TON GROSS MALL AREA GROSS GLAZING ARM 2.506.5 SF 207.6 SF 1. WONG 2506- • 1001 - eau �. �M.cle SCALE HOUSE AREA TAKEOFFS FOR INDIVIDUAL WALL TYPES, GLAZING, DOORS, PERIMETER, FLOOR ASSEMBLY AND ROOF COOK 21 SF (0..7.2 SF) GROSS ROOK MEL 11N1S - 1 SF GROSS COORS . 96 5F FOED MNOORS - 146 SF MCI DOOR QALIC - 21.6 5F NET COORS . 76.4 5F O1.ERAGE MOORS - 40 SF LET FLOOR LEVEL MALL 711.E 266 - 1056 Sr UA AREA FLOOR PLAN SWIMS( 1555 SAIRM SCALE FMLN SYLE• 1/4' • 1'-0' 8009 /SMELT 16.5 SF ,00111:110001 A011080001100.1111loonsultsm iiiiii swami r. UA AREA FOUNDATION PLAN SCA OIOLDE SOON SCALE - *67 TT CRAB SPACE - 131' ADOYE QgOE NET MALL ME A - 262 5► ABOVE a7A0E NET MALL RITE 6 - 65 5F BELOW GRACE NET WALL TVFE A - 262 SF 1O1E: ALL OF MALL TYPE 6 6 ANTS GRACE 306 OF MALL TYPE A 6 ABM GAGE AND 501 6 M0N GRADE 1/1.1-0'2 0 2 4 6 6 10 Scale FAA rt i 1 ens 66 NMI 0 EMS King County Department of Natural Resources and Parks Solid Waste Division LNS .1....01 .1„a 010 1.0.1/10014 Wa.101110r0M. .1101..1 11 ”..A1..10. WNW LIM RECYCLING NO TRAM M SW15 SITE MUM Ca1QRACT SCALE FACILITY UA AREA PUNS Lem MIMS Olt Odd. didd1 ENV302 LNS LNS ENGINEERS, INC. CONSULTING ENGINEERS 7713 PIONEER WAY SUITE C • GIG HARBOR, WA 98335 253.851.5175 FAX:253.851.7366 LNS@LNSENGINEERS.COM PROJECT: 1?5'143 7/Z44/ 5%rrie PN: PREPARED: Z45 61-M6- 7P.oe DATE 2:- 4e)A 7."- 11'4 A - G4 /1 k-A' 7-"A17-404 2. g'9/ ,)\-- a /9-1-) 3. /2 - 2 0 ,Y6//2 seve: • 6-AA 1%1- - CAST-IN--PLACE CONCRETE WALL TYPE 4" RIGID INSULATION, TYPE 6 .0.,..t...v.„‘ 4. J,/-40- r-74..,-1-7 I 4. 47:01 711P 4 g .z.-. ../. 9 7 .-_, ■:40.N..A.I. -..11.14.*AW.Xres. /180 W. 61041, o 4 5 7tiPE A EF4ezz) -Gi-7,41PE 1) o, /V1c rfea -/ 2' giee; e-,) 69'e /z// 94.5/5 41)/ r/i_26)11-7 r/..,/ V .36,- rive Am 4 4-- ICA rte. 210 4 46. re/pe-_, - 4,50 vc. 4:413147- 4/10 fiv:5614--, e7A.J. 6 // eetetfe,e4 7E_ e), int p e- AiRtre 7,4 ee, e )06 W LNS LNS ENGINEERS, INC. CONSULTING ENGINEERS 7713 PIONEER WAY • SUITE C • GIG HARBOR, WA 98335 253.851.5175 FAX:253.851.7366 LNS @LNSENGINEERS.COM PROJECT: E040 '7"g 77 Al PN: PREPARED: d 4(411I4 / "f LL 244c 26d - 51';f2!: 4/6 DATE • — — EXTERIOR METAL SIDING PANELS, TYPE AS INDICATED ON ELEVATIONS AIR BARRIER APPLIED TO EXTERIOR OF Ali' .. __. PLYWOOD SHEATHING PLYWOOD SHEATHING, TYPE 1 I I I I I l l l l l l l l l l � CONDITIONED " A � � � � � � � , � ' � INTERIOR � r a OC •6 [8 -3/4 "] rt [9 -3/41 it . 600S162-43 ®24" BATT INSULATION, TYPE 1B VAPOR BARRIER, TYPE 3 (26A) OR 1" RIGID INSULATION, TYPE 3 (26C) 5/8" GWB, TYPE 4 opt L c, As Li__ P4AJ&-5 3 ' /2" pty <ooL) 4- 6 ( /' rr E,. i Vii' 7° ` 1, C/cam' =dzz, -. ) /A./rF/ /o% / /z44,1 ( A Z-4. ADO :72 Il r1 6;.f D 0,17 9,/46 (9, 5-r 6.66 /2.,/ 0, 462. 4 — AmLGS rte/ G Gc1 � /ki l 5,/ P )5,77 Z�c L 0).,1_65 / ,k7 rfc 01 Ox P0-5X0' T'66!r, LNS LNS ENGINEERS, INC. CONSULTING ENGINEERS 7713 PIONEER WAY • SUITE C • GIG HARBOR, WA 98335 253.851.5175 FAX:253.851.7366 LNS @LNSENGINEERS.COM PROJECT: 574 ire"' PN: C PREPARED: // MoD 7 p F Q ° Se# L //QV DATE 4 e. t , ©rM f/r ✓ " m6 r44 rea©,. ) 41:1 E ( (D rgPi ( Roy tf / ;ac ?AA/ -7-4 ) 5, A/t BA/ r) g SEE DRAWINGS I SLOPE 4, g- Stel-rr /,v5 UL /N ,-.16/'5'7 S , /1'. pr / /k7 7-Vi 41C �- STANDING SEAM METAL ROOFING ROOFING CLIP ® 2' -O" OC 6 "x6" 14 GAUGE METAL PLATE ® CLIPS 4" RIGID INSULATION, TYPE 4 METAL DECKING R 25 BATT INSULATION, TYPE 1B (SCALEHOUSE ONLY) ROOF JOISTS 37, 24 4, o,z- N,/4 G 774e4 s__ /G' -5 A(a) g tq P. 2-4••/4e = q', /,E>� T/ (/1r' k 50 a '24'b /l,447,9W77111- 7, " 77 /N 74/e ot.. Ore ,2 2' 'gt-F /t/t /0, 3 1 ‘'*,or.‘ * SOLARGAN60 (2) Clear o rzfiv s FED 517;77°4 A1 077 ac SDLA BAN60 SOLAR CONTROL LOW -E GLASS all double glazed low -e glass in windows and doors Fabrication and Availability Solarban 60 glass can be heat - strengthened, tempered and laminated and is readily available as a standard product. Like other high - performance PPG architectural glasses, Solarban 60 glass is available through the more than 50 locations of the PPG Certified Fabricator, PPG Certified Commercial Window Fabricator and PPG Certified Laminator Networks. All PPG Certified Partners are equipped to meet tight construction deadlines and can accelerate the delivery of replacement glass during and after construction. Solarban° 60 Glass Performance - Commercial Insulating }Iristila lit' Vision Unit'RerloimancP mpansons l mcti`.(2 Glass Type Ultra- violet SOLARBAN° 60 Solar•Control:Low.E`Glass Rh/ ARRAN 6f1 /91 STARPHIRC t 75 Transmittance Visible 74 Additional Resources eCO1Og1Ca1 Solarban 60 glass is just one of the DoDGIne ec Wtrcns- EcoLogical Building SolutionsTM from PPG. For more information, or to obtain samples of Solarban 60 glass, call 1- 888 -PPG -IDEA, or visit www.ppgideascapes.ccr;. PPG IdeaScapes m Integrated products, people and services to inspire your design and color vision. 5OG141 4 6#0C) e e.€q,e %% -V4WE 4". 2q Glass Unit Comparisons Using 1/4" (6mm) Glass 5mm) ^irnik.wit11.1 /2 :inc11.(131i)m) ai (space 'all two 1 /4incli (6mm) Ides;;as sltowii tielow Reflectance U -Value (Imperial) Total Sonar Energy 3R Visible Light 11 Total solar Energy 42 SOLARBAN60 (3) SOLEXIA 19 70__ 33..... 11 30 10 61 25 11 11 Winter Night- time 0.29 0.29 0.29 Summer Day- time 0 027" European Shading Sol neat U -Value Coefficient Coefficient 0.46 0 40 1.55 ' 0.44 0.38: Light to Solar Gain MG) 0.27 1.55 0.42 0.36 185 1.85 -I 1.70 SOLARBAN 60 (3) ATLANTICA 5 53 20 10 8 0.29 0.27 1.55 0.35 0.30 1.78 SOLARBAN60 (3) CARIBIA 8 54 20 9 7 0.29 0.27 1.55 0.35 0.31 1.74 SOLARBAN 60 (3) AZURIA 13 54 21 9 7 0.29 0.27 1.55 0.36 0.31 1.75 SOLARBAN 60 (3) Bronze 8 42 20 7 17 0.29 0.27 1.55 0.36 0.31 1.36 SOLARBAN 60 (3) Gray 8 35 18 7 13 0.29 0.27 1.55 0.32 0.28 1.26 SOLARBAN 60 (3) OPTIGRAY 23 3 18 9 5 6 0.29 0.27 1.55 0.21 0.18 1.02 2 11 7 SOLARBAN 60 (3) GRAYLITE VISTAC00L" Glass with SOLARBAN° 60 Solar ContrarLaw =E (3) VISTACOOL (2) AZURIA+ Low-E 11 42 16 20 10 11 0.29 0.29 0.27 0.27 1.55 1.55 0.20 0.30 0.17 0.26 0.64 1.61 VISTACOOL (2) CARIBIA + Low -E 7 42 16 20 ti 0.29 0.27 1.55 0.29 0.25 1.66 VISTACOOL (2) SOLARGRAY+ Low -E 7 27 14 11 SOLARCOOL® Glass (Reflective) wilh:SOLARBAN° 60;Solar COntlal Low -E -(3) SOLARCOOL (2) SOLEXIA + Low -E 3 24 10 24 15 15 0.29 • 0.29 0.27 0.27 1.55 1.55 0.28 0.22 0.24 0.19 1.13 1.26 SOLARCOOL (2) CAR (B!A+ Low -E 2 21 8 19 10 0.29 0.27 1.55 0.19 0.16 1.30 SOLARCOOL (2) AZURIA+ Low -E 4 21 8 19 10 0.29 0.27 1.55 0.19 0.16 1.31 SOLARCOOL (2) Bronze + Low -E 3 17 9 14 18 0.29 0.27 1.55 0.21 0.18 0.92 SOLARCOOL (2) Gray + Low -E SOLARCOOL (2) GRAYLITE + Low -E 2 14 7 11 14 0.29 0.27 1.55 0.19 0.16 0.86 1 4 3 5 10 0.29 0.27 1.55 0.14 0.12 0.36 t Data based on using Starphire glass for both interior and exterior lites. All performance data calculated using LBNL Window 5.2 software, except European U- Value, which is calculated using WinOat version 3.0.1 software. For detailed information on the methodologies used to calculate the aesthetic and performance values in this table, please visit www.ppgideascapes.com or request our Architectural Glass Catalog. PPG VCFP CERTIFIED FABRICATOR. PROGRAM PPG VCCWF PPG ` t) CLP CERTIFIED CONLIERCIALINNDOW FABRICATOR" CERTIFIED LAMINATOR^ PROGRAM `'`I1?' PPG VACFP .I_ -r INTCNOAT,ONAL COMA. FA•R,CATOR'pK000AO ° PPG ,,. ICLP . t,IT11RNATIONALC[MRA,.OL1"WA}O1(- fl 2008 PPG Industries. Inc. All rights reserved. Attentive, Azuria, Azurltle, Caribla, Graylite, Oceans of Color, Optlgray, IdeaScapes, Solarban, Solarhronze, Solarcool, Solargray, Solargreen, Soles, Solexia, Starphire, Sungate, Vlstacool, PPG and the PPG logo are trademarks and the PPG CFP logo, PPG CCWF logo, PPG CLP logo, PPG ICFP logo, PPG ICLP logo and EcoLogical Building Solutions are service marks owned by PPG Industries, Inc. Printed In U.S.A. 7071 4/08 10M /dead apeyp Glass • Coatings • Paint PPG Perfnrrnance.Glamigi; inc ,PPG °Glass 7t chnnlogy GentBr 44>D.Guys`�un Road `: ChesWick,.PA 15024- 1-888-PPG-IDEA • `ppgideascapes:co(n+: ' Applies to both standard and dark color insulation. 2 Thickness divided by k. (k= thermal conductivity) t U =1 divided by total R. 0 * O) O ,,- O (O c 0 O N cn CD 3 (1) a. CD O . (D c g Q) (D N REV 17/08 tld t Thermal Conductivity and Thermal Resistance (According to ASTM C518) Product Thermal Conductivity "k "@ 75 °F btu • in. /hr. •sq.ft. •°F R value per inch 2 11/2" Thick 2" Thick 2'/2" Thick 3" Thick 31/2" Thick 4" Thick 5" Thick 6" Thick R2 R R R R R R R R Firespan 90 0.24' 4.2 6.3 8.3 10.4 12.5 14.6 16.7 20.1 25.0 11 L1 :4? j �F:F.S �i -�; = jf ' s v.�. :"'gym• - a,, Safing 0.24 4.2 6.3 8.3 10.4 12.5 14.6 16.7 20.1 25.0 q'4+` a • ,. aat ,ni. ......'*�. �" �, t } ' ,. ,.4 �S+Yf"R" ° kt �T S7H Li-- .M �:'s'."'+tre�'t{ 7 °'iF'. ..m.';a k� �� �f ''Aw.. 3. �.:v. i ... ,''�',�r„ T ..WjP '�":' µ n..:..e.,r r . `3Ti ^ v, E;'.. , • '... ;... •- ,s:,�.. , r..:s' xpt .�v.. G �'`�f^�Jg`To,„1 ',./.. :,,4'ce�C.,- �� L,- All Other SAFB 0.27 3.7 5.6 7.4 9.3 11.1 13.0 14.8 18.5 Emil F_t,rx ' 1 i p N Q. 3 ^ A , kR"* 3: z .'�` ^•;� `� ra9e:*„�me�'Fssd'9?rist3'" L ` . {} ; :AY All Other FS -15 0.26 3.�8 5.8 7.7 11.5 13 .5 15.4 19.2 23.1 - , ... . n x• � .; , F G0 Ty�,fi ' , 426 ; `}i 1 # r ,t ', p: �9.6 w . F kt, � .' ' h 1 ,,. RainBarrier 30 0.26 3.8 5.8 7.7 9.6 11.5 13.5 15.4 19.2 23.1 � �. F - ..A ain a t r . . .>�. ... ,., : ;..... .. .. S +, 4 � {.r_ <:,�• r .:..:.T 4 � �W ����6 � ,�,... x. n • ia,t 1 r 0- , :i1..: f df 25:0 s r °. ' Applies to both standard and dark color insulation. 2 Thickness divided by k. (k= thermal conductivity) t U =1 divided by total R. 0 * O) O ,,- O (O c 0 O N cn CD 3 (1) a. CD O . (D c g Q) (D N REV 17/08 tld t • ti City f Tukwila of o May 13, 2013 Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Tom Creegan King County 201 S Jackson Street, Ste 201 Seattle, WA 98104 RE: Request for Application Extensions Mechanical Permit Applications M12 -195 & M12 -196 Bowlake Transfer Station Dear Mr.Creegan, This letter is in response to your written request for an extension to Application Numbers M12 -195 and M12 -196. The Building Official has reviewed your letter and will not be extending the expiration dates. The applications were submitted on December 18, 2012 and incomplete letters were sent out in response to both submittals two days later, December 20, 2012. On May 3, 2013, one hundred and thirty -three days later, a response to this letter was received in the Permit Center. Due to the lack of action, it has been determined that an extension is not granted. The applications are currently in the final assembly stage and will soon be approved. You will receive a telephone call by Friday at the latest letting you know these applications are approved and ready for issuance. At that time you will have until the expiration date (June 16 is a Sunday, so by June 14, 2013) to come into the Permit Center and have the permits issued to you. On the date of issuance, the expiration date will be automatically extended an additional 180 days. If you have questions, you can reach me in the Permit Center or Bob Benedicto at 206 431 -3675. File: Permit No. M12 -195 & M12 -196 W.IPermit CenterlExtension LetterslDenia lslApplications \M12 -/95 & M/2 -196 Extension Denial.docx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax 206 -431 -3665 i • Bill Rambo From: Sent: To: Cc: Subject: Attachments: Hi Jennifer, Creegan, Tom <Tom.Creegan @kingcounty.gov> Monday, May 06, 2013 2:51 PM Jennifer Marshall; Jennifer Marshall Bill Rambo; 'CK Humphreys'; Ken Cobley; Rushiddin, Naima; Bill Rambo Permit Extensions M12 -195 and M12 -196 M12 -196 Tukwila permit expiration notice letter 05- 01- 2013.pdf; M12 -195 Tukwila permit expiration notice letter 05- 01- 2013.pdf We have received letters (attached of the pending expiration of two permits for the Bow lake project, M12 -195 and M12 -196. As construction is still ongoing I am requesting that these permits be extended. Thanks for your assistance. Tom -\1—P\f e) d'eceiv ` D e V ‘e/tk) IN0 L.J 19-1(013 (feSfdnS-P 40 S-3- \ 3 ctre 4itavAvil &70-ic t7s d °.c/`-./t/r/i6e toffio-74-, ,ybozo ,r1/1441- to Z013 1 RECEIVED CITY OF TUKWILA MAY 0 6 2013 PERMIT CENTER 05 -01 -2013 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director TOM CREEGAN 201 S JACKSON ST, STE 701 SEATTLE WA 98104 RE: Permit Application No. M12 -195 BOW LAKE - SCALE HOUSE 18800 ORILLIA RD S TUKW Dear Permit Applicant: In reviewing our current application files, it appears that your permit applied for on 12/18/2012, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Your permit application will expire on 06/16/2013. If you still plan to pursue your project, a written request for extension of your application must be submitted to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit application. If it is determined that an extension is granted, your application will be extended for an addtional 90 days from the expiration date and you will be notified by mail. In the event that we do not receive your written request for extension or your request was denied, your permit application will expire, become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, fer Marshall t Technician File: Pennit File No. M12 -195 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206-431 -3670 • Fax 206-431 -3665 December 20, 2012 City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Tom Creegan 201 S Jackson St, Suite 701 Seattle, WA 98104 RE: Incomplete Letter #1 Mechanical Permit Application M12 -195 Bow Lake — Scale House —18800 Orillia Rd S Dear Mr. Creegan, This letter is to inform you that your permit application received at the City of Tukwila Permit Center on December 18, 2012 is determined to be incomplete. Before your application can continue the plan review process the attached /following items from the following department(s) need(s) to be addressed: Building Department: Allen Johannessen at 206 433 -7163 if you have questions concerning the attached comments. 1) Please provide a completed "2009" Washington State Energy Code compliance form. Please address the comment above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plans (only the updated/changed sheets), specifications and /or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 431 -3670. Sincerely, ;,tf Bill Rambo Permit Technician Enclosures File: M12 -195 W: (Permit Center Incomplete Letters120121M12 -195 Incomplete Letter #1.docx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax 206 - 431 -3665 tERR32 re" �c PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -195 DATE: 05 -03 -13 PROJECT NAME: BOW LAKE - SCALE HOUSE SITE ADDRESS: 18800 ORILLIA RD S Original Plan Submittal Response to Correction Letter # X Response to Incomplete Letter # 1 Revision # After Permit Issued DEPARTMENTS: BuiI in !vision mg Public Works Fire Prevention Structural Planning Division ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Incomplete ❑ DUE DATE: 05 -07 -13 Not Applicable n Comments: Permit' Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS ROUTING: Please Route % Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: Approved ❑ Approved with Conditions Notation: REVIEWER'S INITIALS: DUE DATE: 06 -04 -13 Not Approved (attach comments) DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 "PERMIT CORD COPIP1, PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -195 DATE: 12/18/12 PROJECT NAME: BOW LAKE - SCALE HOUSE SITE ADDRESS: 18800 ORILLIA RD S X Original Plan Submittal Response to Correction Letter #_ Response to Incomplete Letter # Revision # after Permit Issued DEPARTMENTS: g(6A ing Division Public Works Ar Aug. 124)-1-1, Fire Prevention Structural Planning Division ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 12/20/12 Complete ❑ Incomplete Not Applicable ❑ Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: LETTER OF COMPLETENESS MAILED: Bldg la' Fire ❑ Ping ❑ PW ❑ Staff Initials: t< TUESITHURS ROUTING: Please Route ❑ Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 01/17/13 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: City of Tukwila REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Web site: http: / /www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: � ! 3 Plan Check/Permit Number: M 1 2— ) "1 ,J Response to Incomplete Letter # ❑ Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: I2DO K6 Project Address: 1 138C-0 r) R. L- L 14 o- 5 Contact Person: ■K. I4 t 1 k (42Et Phone Number: 2O G Cp -Es `K Summary of Revision: �AM" +Y C12 +12\GiIS60 &A-'CL GOY CO fVt4 ev cc FoM,S 4420:1,€1,',447,11 CM OF TUKWILA MAY :03.20131 PERMIT CENTER Sheet Number(s): "Cloud" or highlight all 'a "eas'o revisioi: inclu'diii to Of ree' f -� n�� Received at the City of Tukwila Permit Center by: Entered in Permits Plus on H:\Applications \Forms - Applications On Line\2010 Applications \7 -2010 - Revision Submittal.doc Created: 8 -13 -2004 Revised: 7 -2010 Contractors or Tradespeople Pf ter Friendly Page • General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name LYDIG CONSTRUCTION INC UBI No. 328046357 Phone 5095340451 Status Active Address 11001 E Montgomery Dr License No. LYDIGC *264JC Suite /Apt. License Type Construction Contractor City Spokane Effective Date 4/3/1974 State WA Expiration Date 9/11/2013 Zip 99206 Suspend Date County Spokane Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status LYDIG'J893DQ LYDIG HUNT A JOINT VENTURE Construction Contractor General Unused 3/18/2011 3/18/2015 Active LYDIGDJ906QP LYDIG + DIX A JOINT VENTURE Construction Contractor General Unused 11/17/2010 11/17/2014 Active LYDIGML901JL LYDIG + MCKINSTRY LLC Construction Contractor General Unused 4/13/2010 4/13/2014 Active LYDIGJV912QL LYDIG-MCKINSTRY,A JOINT VNTURE Construction Contractor General Unused 11/13/2009 11/13/2013 Active LYDIGJV937RP LYDIG /GRANT, A JOINT VENTURE Construction Contractor General Unused 12/17/2007 12/17/2013 Active LCIBUBT934RP LCI BUILDERS TWO LLC Construction Contractor General Unused 12/17/2007 12/17/2013 Active LCIBU60936QE LCI BUILDERS ONE LLC Construction Contractor General Unused 11/5/2007 11/5/2013 Active OPUSNCL980P9 OPUS NW CONTRACTORS LLC Construction Contractor General Unused 10/29/2002 10/29/2010 Expired LYDIGGP903CS LYDIG GRANT PLATEAU A JT VENT Construction Contractor General Unused 2/10/2010 2/10/2012 Out Of Business OPUSLJV911JB OPUS /LYDIG A JOINT VENTURE Construction Contractor General Unused 4/2/2009 4/2/2011 Out Of Business HUNTLIJ927KA HUNT /LYDIG II, A JOINT VENTURE Construction Contractor General Unused 5/1/2008 5/1/2010 Out Of Business HUNTLJV940JC HUNT /LYDIG A JOINT VENTURE Construction Contractor General Unused 4/3/2006 4/3/2010 Out Of Business Business Owner Information Name Role Effective Date Expiration Date BRAY, MARK D Cancel Date 01/01/1980 12/17/2007 SWARTZ, LARRY J 7 01/01/1980 12/17/2007 GOTTSCHALK, WILLIAM G Until Cancelled 01/01/1980 12/17/2007 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 7 Safeco Ins Co of America 67s000952 04/20/2012 Until Cancelled $12,000.0005/11 /2012 6 SAFECO INS CO 6336052 09/01/2005 04/20 /2012 $12,000.0008/30 /2005 Assignment of Savings Information No records found for the previous 6 year period https://fortress.wa.gov/lni/bbip/Printaspx 05/16/2013 REVIEWED FOR CODE COMPLIANCE APPROVED MAY 1 3 2013 FILE COPY Permit No. 2 Plan review approval is subject to errors and omissions. Approval of construction documents does not th tit the violation of any adopted code or ordinance. at;krlow ►ed�od. of approved F' ad , • ,� Kirkland' Redmond Bainbridge Island KING COUNTY OFFICIALS: ,.Eiliatt ,_:Bays: Bellevue Lake Sammamish \_Tukwila Vashon Island Issaquah CEDAR HILLS REGIONAL LANDFILL Renton DISPOSAL LOCATION Cedar L BOW LAKE RECYCLING AND TRANSFER STATION PROJECT LOCATION KING COUNTY EXECUTIVE DOW .CONSTANTINE EXISTING BOW LAKE TRANSFER/ `? RECYCLING STATION Fox Island TACOMA Enumclaw SEPARATE PERMIT REQUIRED FOR: 0 Mechanical 111 Electrical Plumbing Gas Piping City of Tukwila. BUILDING DIVISION VICINITY MAP COUNCIL MEMBERS KATHY LAMBERT LARRY PHILLIPS PETE VON REICHBAUER LARRY GOSSETT JANE HAGUE JULIA PATTERSON BOB FERGUSON REAGAN DUNN JAN DRAGO REVISIONS No changes shall brn de to the scope of work without prior approve) of Tukwila Building Division. NOTE:. Revisions will require a new plan submittal and may include additional plan review fees. CITY OF nFr, 18 2012 PERMIT CENTER DESIGNED DRAWN • 6/10/10 1/8/10 VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 1" 1/8/10 FINAL ISSUED FOR CITY OF • TUKWILA .PERMITS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION RESPONSE TO CITY OF TUKWILA CORRECTION • LETTERS 7/31/09 DATE ISSUED FOR CITY OF TUKWILA PERMITS APP'D REVISION DESCRIPTION King County Department of Natural Resources and Parks Solid Waste Division R.W. Beck, Inc. 1001 Fourth Avenue, Suite 2500 Seattle, WA 98154 -1004 (206) 695 -4700 BOW LAKE RECYCLING AND TRANSFER . STATION SITE FACILITIES CONTRACT PROJECT NUMBER: C00405C09 An SAIC Company COVER SHEET, VICINITY, AND LOCATION MAPS DRAWING NUMBER:,. GENERAL 10 SERIES - GENERAL G011 •:COVER SHEET,. VICINITY AND LOCATION MAPS G012 - DRAWING -INDEX • G013 - • DRAWING, INDEX 0014 • - LEGEND • • • G015 ABBREVIATIONS 0016 - GENERAL. NOTES • AND PROJECT AREA -BOUNDARY. G017 EXISTING CONDITIONS. AND SURVEY. CONTROL • • G01•8 GENERAL: ARRANGEMENT SITE PLAN•••AND BUILDING • CONTROLS G019 - MILESTONES 2 AND 3 SITE ENTRANCE TRAFFIC. MANAGEMENT PLAN ' 0020 - • MILESTONE 2 TRAFFIC MANAGEMENT PLAN G021. - • MILESTONE 2 TRAFFIC MANAGEMENT PLAN G022 - MILESTONE • 3 TRAFFIC 'MANAGEMENT PLAN G023 - MILESTONE 3 TRAFFIC MANAGEMENT PLAN 0024 ,i1ILESIONE 3A TRAFFIC MANAGEMENT :PLAN .G025 - MILESTONE 3B TRAFFIC MANAGEMENT PLAN 0026 - MILESTONE 3C TRAFFIC -I+AANAGEMENT PLAN • G027 7- MILESTONE 3D • TRAFFIC MANAGEMENT PLAN G028 - • MILES -TONE 4 EXISTING -SCALE • FACILITY REMOVAL TRAFFIC MANAGEMENT. PLAN. • • G029 CHRL HAUL. AND 'DISPOSAL PLAN CIVIL 10-40 SERIES DEMOLITION GRADING AND TEMPORARY -. °SION AND • SEDIMENT CONTROL • . • • C011 - SITE DEMOLITION .PLAN AND NOTES . C01.2 •-- SITE DEMOLITION PLAN AND • NOTES • C413 EXISTING SCALE FACILITY DEMOLITION PLAN AND: NOTES . C015 MILESTONE 3A/B/C/D DEMOLITION .PLAIN AND NOTES • COI& - MILESTONE 2 SITE GRADING • PLAN C017 - 'PRE-LOAD • AND EAST . SLOPE GRADING PI AN • C.018' - PRE-LOAD AND EAST SLOPE GRADING PLAN C019 - PRE-LOAD. AND _EAST SLOPE GRADING SECTIONS CO20. -- PRE-LOAD AND EAST SLOPE GRADING SECTIONS CO21 • - PRE-LOAD. AND EAST SLOPE GRADING CONTROL SCHEDULE. AND DETAILS • • • .0022 - OVERALL FINAL SITE GRADING PLAN CO23 -.- FINAL SITE GRADING PLAN CO24 L.-. FINAL SITE GRADING .PLAN CO25 -- FINAL SITE GRADING PU-\N CO2f.3 --• FINIAL. SITE GRADING PLAN. CO27 - FINAL SITE GRADING PLAN 0028 - FINAL SITE GRADING PLAN CO29 . FINAL SITE GRADING PLAN C030 - CURBS E & D PROFILES C031 GOBS F & G PROFILES C032 - FINAL SITE GRADING SECTIONS. C033 - FINAL SITE GRADING SECTIONS C034 -7 •FINAL SITE GRADING -SECTIONS C035 - FINAL SITE GRADING SECTIONS • • C036 - FINIAL SITE GRADING CONTROL POINT SCHEDULE • • C037 - • TEMPORARY • EROSION AND SEDIMENT CONTROL GENERAL NOTES C038. 'TEMPORARY 'EROSION AND SEDIMENT CONTROL GENERAL OTES C039 - TEMPORARY EROSION AND SEDIMENT CONTROL PLAN C040 • 7. INITIAL TEMPOIRARY. EROSION AND . SEDIMENT cONTROL. PLAN C041 - PRE-LOAD (IN-PLACE) TEMPORARY EROSION AND SEDIMENT • CONTROL PLAN C042 PRE.-LOAD (IN-41ACE) TEMPORARY EROSION AND. SEDIMENT . CONTROL PLAN , • • 0043 - FINAL TEMPORARY EROSION AND SEDIMENT CO•ITOL, PLAN • C044 FINAL TEMPORARY EROSION AND SEDIMENT CONTROL PLAN 0045 .-- TEMPORARY EROSION. AND SEDIMENT CONTROL DETAILS • .0046 TEMPORARY EROSION .AND SEDIMENT. CONTROL DETAILS 50-70 SERIES - PAVING_ • C051 - MILESTONE 2 SITE :PAVING PLAN • 0052 --- OVERALL FINAL SITE PAVING PLAN • C053 - FINAL SITE' PAVING PLAN. C054 - FINAL SITE PAVING PLAN • C055 - FINAL SITE PAVING PLAN C056 - FINAL SITE PAVING • PLAN C057 - FINAL SITE PAVING PLAN C058 - FINAL SITE PAVING PLAN C059 - . ROAD A PROFILE - STA -A5+00 TO . STA Al 5+00 0060 - ROAD A PROFILE •-4 STA 15+00 TO STA 32+00 C061- - ROAD B PROFILE - STA 0+00. TO. STA 13+00 • 0062. - FINAL SITE PAVING CURB RETURN TABLES C063 -- *FINAL SITE. PAVING CURB • RETURN TABLES. • C064. - PAVEMENT AND SURFACE SECTIONS C065 •• I',ISCELLANEOUS PAVING DETAILS 0066 - 'TYPICAL ROAD OVERLAY SECTIONS 80-100 SERIES - UTILITIES (WATER AND WASTEWATER) • • C081 - • SITE UTILITY SYSTEMS AND KEY • MAP 0082 - SITE WATER SYSTEM PLAN . 0083 - • SITE WATER SYSTEM PLAN • • 84 - I • - IF C085 --I SITE WATER SYSTEM PLAN • C086 C087 C.088 0089 0090 0091 0092 009.3 0094 0095 0096 C097 0.098 ••0099 0100 CI 01 • 0107, '0103 0104 0105 0106 C107 0108 0109 0110 SITE WATER SYSTEM PROFILES - SITE WATER SYSTEM PROFILES • SITE .WATER SYSTEM PROFILES . - SITE MATER SYSTEM PROFILES - SITE WATER SYSTEM PROFILES • - SITE WATER SYSTEM DETAILS SITE WATER SYSTEM DETAILS . - SITE WATER SYSTEM HIGHLINIE WATER DISTRICT STANDARD DETAILS - SITE WATER SYSTEM HIGHLINE WATER DISTRICT STANDARD DETAILS. -4 SITE WATER SYSTEM HIGHLINE WATER DISTRICT STANDARD DETAILS 7 SITE WATER SYSTEM HIGHLINE WATER DISTRICT STANDARD DEI AILS • SITE WATER SYSTEM HIGHLINE WATER DISTRICT STANDARD DETAILS -- SITE WATER SYSTEM NOTES AND SCHEDULES 7: SITE WASTEWATER SYS'IEM PLAN - SITE 'NASTEWATER SYSTEM PLAN -- SITE WASTEV\IATER SYSTEM PLAN 7 SITE WASTEWATER SYSTEM PROFILES --. SITE WASTEWATER SYSTEM PROFILES - SITE WASTEWATER • SYSTEM PROFILES WASTEWATER. LIFT STATION AND WASTEWATER VALVE PLAN, •• ••• SECTIONS„A,ND DETAILS • SITE WASTEWATER SYSTEM SITE VALVE PLAN AND SCHEDULE • SITE . WASTEWATER SYSTEM SITE VALVE DL JAILS siTE WASTEWATER & STORMWATER COMPRESSED AIR MANHOLES . •• UNDERGROUND MULTI-PIPE •. CONDUIT DETAILS - SITE WASTEWATER SYSTEM. NOTES AND SCHEDULES. 1 -10-120 SERIES • • 0111 7-. SURFACE C112. --. 'SURFACE 0113 .-- SURFACE 0114 SURFACE 0'115 - SURFACE - SURFACE 0117 -SURFACE 01180-.- SURFACE 0119 • SURFACE 0120 - SURFACE C121. SURFACE 0.122 7 SURFACE 0173 SURFACE C124 SURFACE • • C125 - 'SURFACE 0176 -4 SURFACE .0127 SURFACE 0128 -' SURFACE - UTILITIES BURFACE •WATER) . WATER WATER WATER WATER WATER WATER WATER WATER ;WATER WATER WATER WATER. WATER WATER WER 'iV/ WATER WALTER SYSTEM PLAN . • SYSTEM PLAN • SYSTEM PLAN SYSTEM PLAN SYSTEM PLAN SYSTEM PLAN SYSTEM PIA SYSTEM PLAN SYSTEM PROFILES SYSTEM PROFILES SYSTEM PROFILES SYSTEM PROFILES SYSTEM PROFILES SYSTEM PROFILES SYSTEM DETAILS. SYSTEM DETAILS- • SYSTEM OIL/wATER SEPARATOR DETAILS SYSTEM STRUCTURE SCHEDULE 130---160 SERIES -- SITE IMPROVEMENTS • - OVERALL PAVEMENT STRIPING, FENCING, AND GUARDRAIL F' AN PLAN PLAN PLAN PLAN PLAN C131 C132 C133 0134 C135 0136 .C137 0138 0139 0140 C141 (;142 C144 ;0145 0146 • • ...CI 47 0148 • PAVEMENT STRIPING, FENCING, PAVEMENT- STRIPING, FENCING, PAVEMENT. STRIPING, FENCING, PAVEMENT STRIPING, FENCING, PAVEMENT STRIPING, FENCING, PAVEMENT STRIPING, FENCING, PAVEMENT -STRIPING DETAILS CURB, GUTTER AND SIDEWALK CURB, GUTTER AND SIDEWALK GUARDRAIL -DETAILS • GUARDRAIL DETAILS FENCE AND GATE DETAIL3 FENCING -AND GATE DETAILS - • MISCELLANEOUS • DETAILS SIGNAGE • INVENTORY SIGNAGE INVENTORY SIGNAGE INVENTORY 0150 SIGNAGE •INVENTORY C131 0152 C153 0154 0155 0156 C157 0158 0159• 0160 0161 AND GUARDRAIL AND GUARDRAIL AND GUARDRAIL AND GUARDRAIL AND GUARDRAIL AND GUARDRAIL DETAILS DETAILS PLAN AND DETAILS .;;Niciut:. A rtAN - ENTRY . AREA SIGNAGE LOCATION PLAIN - ACCESS ROAD & MAIN ST[ 'SCALE AREA SIGNAGE • SIGNAGE • LAYOUT DETAILS SIGNAGE • LAYOUT DETAILS- SIGNAGE LAYOUT DETAILS: SIGNAGE LAYOUT DETAILS .510 NAGE LAYOUT .DETAILS SIGNAGE LAYOUT DETAILS SIGNAGE LAYOUT DETAILS • SIGNAGE INSTALLATION .DETAILS STRUCTURAL • 10 SERIES - GENERAL . 5011 - STRUCTURAL.. NOTES 5012 • STRUCTURAL QUALITY ASSURANCE S013 3014 S015 ' 1 /1) DESIGNED • DRAWN . IKS ABG STANDARD STRUCTURAL DETAILS STANDARD 'STRUCTURAL DETAILS STANDARD . STRUCTURAL • DETAILS • 4cc-Rp STANDARD STRUCTURAL DE I AILS-. DETAILS . 6/10/10 7/31/09 IKS KRH FINAL ISSUED FOR CITY OF TUKWILA PERMITS 1/8/10 IKS KRH MODIFICATIONS .SUBSEQUENT TO. PERMIT APPLICATION 1/8/10 IKS KRH VERIFY SCALE BAR' IS ONE INCH ON ANSI "D" DRAWING 0 1" REV DATE CHK'D APP'D A IKS KRH RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS ISSUED FOR CITY OF TUKWILA PERMITS REVISION DESCRIPTION It At S022 - GUARDRAIL/HANDRAIL DETAILS AND LIGHT GAUGE FRAMING DETAILS S023 -- LIGHT GAUGE FRAMING DETAILS 100 SERIES TRANSFER AND TSO BUILDING S101 - TRANSFER/TSO BUILDING - COMPACTOR • BAY PAN 5102 --I TRANSFER/TSO BUILDING COMPACTOR BAY PLAN . REINFORCEMENT AND JOINT LAYOUT . • S103 - TRANS.FER/TSO BUILDING - TIPPING AND RECEIVING LEVELS FLOOR PLAN 5104 - TRANSFER/TSO BUILDING - TIPPING AND RECEIVING. LEVELS' . FLOOR ELEVATIONS S105 - TRANSFER/TSO BUILDING - TIPPING AND RECEIVING LEVELS MISCELLANEOUS METAL PLAN • 5106 - TRANSFER/ISO BUILDING - GENERAL ARRANGEMENT SECTIONS S107 TRANSFER/T50 BUILDING - TSO FLOOR PLAN DETAIL_ 3108 -- TRANSFER/TSO BUILDING - TSO. FLOOR PLAN DETAIL . REINFORCEMENT 3109 - TRANSFER/TSO . BUILDING -- .TIPPING. AND. RECEIVING LEVELS FLOOR PLAN DETAILS S110 - TRANSFER/TSO BUILDING - COMPACTOR BAY SECTIONS S111 - • TRAN.SFER/TS0 BUILDING COMPACTOR BAY SECTIONS . 5'112 - TRANSFER/TSO BUILDING COMPACTOR . BAY SECTIONS . • S11•3 - TRANSFER/TSO BUILDING - COMPACTOR BAY SECTIONS - • S114 - TRANSFER/TSO BUILDING - COMPACTOR BAY SECTIONS • 5115 - TRANSFER/ISO. BUILDING - COMPACTOR •BAY• WALL SECTIONS S116 - TRANsFER/Tso. BUILDING COMPACTOR BAY WALL SECTIONS .S117 TRANSFER/TSO. BUILDING COMPACTOR BAY WALL SECTIONS . S118 - TRANSFER/TSO BUILDING - COMPACTOR .BAY COLUMNS S119 - TRANSFER/TSO BUILDING WALL SECTIONS AND ELEVATIONS 3120 - TRANSFER/TSO BUILDING - BEAM ELEVATIONS 5121 -- TRANSFER/TSO BUILDING. - BEAM ELEVATIONS 3122 TRANSFER/TSO BUILDING - BEAM ELEVATIONS S12.3 - TRANSFER/TSO BUILDING - BEAM ELEVATIONS S124 - • TRANSFER/TSO BUILDING BEAM ELEVATIONS 3175 -- TRANSFER/TSO BUILDING. BEAM ELEVATIONS 5126. - TRANSFER/TS0 BUILDING. - BEAM ELEVATIONS 5127 - TRANSFER/TSO f3UILDING MISCELLANEOUS SECTIONS 3128 - TRANSFER/TSO BUILDING MISCELLANEOUS SECTIONS. 3129 - "FRANISFER/TS0 BUILDING • MOMENT FRAME FOOTINGS 5130 - TRANSFER/TSO BUILDING MOMENT FRAME FOOTINGS • • • 5131 - TRANSFER/TSO BUILDING - MAIN FRAME FOOTINGS S132 - TRANSFER/TSO BUILDING • - MOMENT FRAME FOOTINGS 3133 7 . TRANSFER/TSO BUILDING TSO COLUMN FOOTINGS • • S134 TRANSFER/TSO BUILDING - A-LINE WALL, 19.-LINE. WALL S135 '-- TRANSFER/TSO BUILDING - P-LINE WALL, 20-LINE WALL, AND 07-LINE WALL 5136 -7 TRANSFER/TSO BUILDING M-LINE WALL . 3137 - TRANSFER/TSO BUILDING - SOUTH PUSH WALL S138 -- TRANSFER/TSO BUILDING 7 TIPPING WALL S139 - -TRANSFER/ISO BUILDING - MISCELLANEOUS SECTIONS S140 - NPA LOADING DOCK RETAINING. WALLS . 5141 NPA LOADING DOCK RETAINING WALLS 3142 - TRANSFER/ISO BUILDING - -SPA WALLS . 5143 RE TRANSFER/TS° . BUILDING - TOP LOAD BAY WEST WALL 5144 TRANSFER/TSO BUILDING - TOP LOAD BAY EAST WALL 3145 - TRANSFER/TSO BUILDING - MISCELLANEOUS METAL ARMOR PLATE S146 - TRANSFER/TSO BUILDING. - MISCELLANEOUS METAL - TOP LOAD & COMPACTOR CHUTES • S147 - • TRANSFER/TSO BUILDING - MISCELLANEOUS. METAL - TOP LOAD BAY • BACK PLATE S148 - • TRANSFER/TSO .BUILDING - MISCELLANEOUS METAL - POST AND CHAIN S149 - TRANSFER/TSO BUILDING - MISCELLANEOUS- METAL - POST AND CHAIN 5150 - TRANSFER/TSO BUILDING' - MISCELLANEOUS METAL - MISCELLANEOUS DETAILS S151,- TRANSFER/TSO BUILDING - TRUCK WASH BULL RAIL, NPA . DEBRIS WALL 200 SERIES -. TRANSFER AND TSO BUILDING 5201 - TRANSFER/TSO BUILDING TIPPING k RECEIVING LEVEL PLAN • • S202 - TRANSFER/TS° BUILDING TSO. LEVEL PLAN • S203 - TRANSFER/TSO -BUILDING ROOF LEVEL PLAN 3204 - TRANSFER/TSO BUILDING ENLARGED FLOOR PLAN EQUIPMENT & • • LOADING LEVELS • • • . 0. • •S705 - TSO BUILDING ENLARGED FLOOR PLAN TSO , LEVEL PLAN . S206 TSO BUILDING ENLARGED FLOOR PLAN ROOF LEVEL PLAN . 3707 - LTS0 BUILDING PENTHOUSE ROOF AND MECHANICAL. PLAN 5208 - TRANSFER BUILDING EAST & WEST WALL .FRAMING ELEVATIONS S209 TRANSFER BUILDING NORTH & SOUTH WALL FRAMING ELEVATIONS 321 O..- . TRANSFER • BUILDING MOMENT FRAME ELEVATIONS . • 3211 - -TRANSFER BUILDING MOMENT FRAME ELEVATIONS King County Department of Natural Resources and Parks Solid Waste Division • S212 5213 S214 S215 S216 S217 S218. S219 S220 S221 5222 5223 S224 S225 5226 5227 S228. S229 S230 S231 S232 S233 5234 S235 5236. S237 5238 5239 S240 S241 5242 S243 S244 5245 S246 S247 S248 5249 5250 S251 5252 TRANSFER TRANSFER TRANSFER TRANSFER TRANSFER TRANSFER TRANSFER TRANSFER BUILDING • MOMENT FRAME ELEVATIONS BUILDING MOMENT FRAME ELEVATIONS BUILDING MOMENT FRAME DETAILS BUILDING MOMENT FRAME DETAILS BUILDING MOMENT FRAME DETAILS BUILDING • MOMENT FRAME DETAILS • BUILDING MOMENT FRAME DETAILS • BUILDING BRACED FRAME. 'ELEVATIONS • • TRANSFER BUILDING BRACED FRAME DETAILS • TSO BUILDING WALL ELEVATIONS . • • TSO BUILDING. BRACED FRAME ELEVATIONS - TSO BUILDING BRACED FRAME ELEVATIONS - TSO BUILDING BRACED FRAME DETAILS - ISO .BUILDING BRACE{) FRAME. DETAILS 1-50 BUILDING BRACED FRAME DETAILS - ISO BUILDING BRACED FRAME DETAILS - TSO BUILDING FAN COLUMN ELEVATIONS AND DETAILS TRANSFER BUILDING HORIZONTAL BRACING PLANS. - TRANSFER BUILDING HORIZONTAL BRACING DETAILS . - TRANSFER BUILDING HORIZONTAL BRACING DETAILS -. TRANSFER • BUILDING HORIZONTAL BRACING • DETAILS • - • TRANSFER BUILDING SKYLIGHT • PLANS AND DETAILS * - TRANSFER BUILDING SKYLIGHT PLAN. AND .DETAILS - TRANSFER/TSO BUILDING SKYLIGHT PLAN AND '.DETAILS -.- TRANSFER BUILDING FRAMING • DETAILS • . - TRANSFER BUILDING FRAMING. DETAILS TRANSFER BUILDING FRAMING DETAILS TRANSFER BUILDING FRAMING DETAILS • - • TRANSFER/TSO BUILDING FRAMING DETAILS - TRANSFER BUILDING FRAMING DETAILS - TRANSFER BUILDING FRAMING DETAILS • • - . TRANSFER BUILDING FRAMING DETAILS - TRANSFER/TSO BUILDING FRAMING 'DETAILS - TRANSFER/TS0 BUILDING FRAMING DETAILS - TRANSFER/TSO -BUILDING FRAMING DETAILS - TRANSFER/TSO BUILDING FRAMING DE IMES - TRANSFER/ISO BUILDING FRAMING 'DUALS - TRANSFER/TSO BUILDING ROOF MECHANICAL SUPPORT PLAN - TRANSFER/ISO BUILDING ROOF MECHANICAL SUPPORT DETAILS. TRANSFER/TSO BUILDING 'ROOF PLAN -- WIND LOADING - TRANSFER/TSO BUILDING ELEVATIONS - WIND & SNOW LOADING NORTH & WEST . . 5253 - TRANSFER/ISO BUILDING ELEVATIONS - WIND LOADING SOUTH EAST • 5254 - TSO BUILDING BREAK ROOM PLAN & DETAILS S255 -. TSO BUILDING STAIR FRAMING • STAIR 'A' . S256 - TRANSFER/ISO BUILDING STAIR FRAMING . STAIR $257 - TRANSFER/TSO, BUILDING STAIR DETAILS 5258 -. TRANSFER/TSO BUILDING .STAIR DETAILS S259 - TRANSFER/TSO BUILDING EXTERIOR STAIR • 5260 - TRANSFER/TSO BUILDING EXTERIOR STAIR S261. - • TRANSFER/ISO BUILDING EXTERIOR STAIR S262 - TRANSFER/TSO BUILDING MISCELLANEOUS S271 - NORTH .PROCESSING AREA FLOOR PLAN S272 - NORTH PROCESSING AREA ROOF PLAN S273 - NORTH PROCESSING AREA WALL ELEVATIONS 5274 - NORTH PROCESSING AREA BRACED FRAME ELEVATIONS S275 NORTH PROCESSING AREA DETAILS 5276 - NORTH PROCESSING AREA DETAILS '13' AND FRAMING - STAIR 1 DETAILS DETAILS DETAILS 300 SERIES - SCALE FACILITY. 5301 - SCALE FACILITY GENERAL ARRANGEMENT PLAN WEST S302 - SCALE FACILITY GENERAL ARRANGEMENT PLAN EAST S303 SCALE' FACILITY .GENERAL ARRANGEMENT SECTIONS' . • 5304 - SCALE FACILITY. GENERAL. ARRANGEMENT SECTIONS. . S305 - SCALE FACILITY FOUNDATION PLAN WEST S306 - SCALE FACILITY FOUNDATION PLAN --- EAST . S307 - SCALE FACILITY FOUNDATION DETAILS S308 - SCALE FACILITY FOUNDATION DETAILS S309. SCALE FACILITY. • UNDERSCALE 'SLAB PLAN S310 - SCALE FACILITY FOUNDATION DETAILS S311 T S.CALE FACILITY SCALE HOUSE PLANS S312 SCALE FACILITY SCALE HOUSE PLANS .- S313 SCALE FACILITY S.CALE HOUSE. SECTIONS S314 - SCALE FACILITY SCALE HOUSE DETAILS • 5315 -. SCALE FACILITY SCALE HOUSE DETAILS. S31.6 - SCALE FACILITY SCALE HOUSE DETAILS S317 - SCALE FACILITY SCALE HOUSE • DE I AILS 5318 - SCALE FACILITY SCALE HOUSE DETAILS S319 SCALE FACILITY SCALE HOUSE DETAILS REVIEWEb FOR. CODE COMPLIANCE APPROVED MAY 1 3 2013 City of Tukwila BUILDING DIVISION 400 SERIES - RECYCLING BUILDING S401 - SOUTH PROCESSING AREA SLABS PLAN. . S402 - SOUTH PROCESSING AREA . SLAB DETAILS 5403 RECYCLING BUILDING FOUNDATION & ROOF PLAN S404 - • RECYCLING BUILDING DETAILS S405 - RECYCLING BUILDING DETAILS An SAIC Company R.W. Beck, Inc. 1001 Fourth Avenue, Suite 2500 Seattle, VVA 98154-1004 (206) 695-4700 BOW LAKE .500 SERIES SITE WALLS S501 - RETAINING WALL G 5502 7; RETAINING WALL H S503 - RETAINING WALL S504 - RETAINING WALL J S505 •-• RETAINING WALL J 5506 -4 RETAINING WALL K S507. - RETAINING WALL L 600 SERIES - MISCELLANEOUS. STRUCTURES ',3601 RAILER YARD TRUCK PADS . S602. - GENERATOR/FUELING STATION FOUNDATION • 5603 - SIGN BRIDGE • • S604 SIGN BRIDGE FOUNDATION 5605 SIGN BRIDGE • • • t■,/11(- UCTURES _ • 5607 - 'CONCRETE BARRIER S608 '- CONCRETE BARRIER (4:;(1 ARCHITECTURAL C.QD5 SL!,•4MARY 051C11 . TSO • BUILDING - CODE SUMMARY - COMPACTOR LEVEL 05201 --. TRANSFER/TSO BUILDING - CODE SUMMARY 7 TIPPING AND • • RECEIVING LEVELS • 05103 7- 1T_ESILBsUILDING --.• CO. DE. R SUMMA. Y - EQUIPMENT AND LOADING 05104 - ISO BUILDING -• CODE SUMMARY - •130 LEVEL C301 SCALE FACILITY & RECYCLING BUILDING CODE SUMMARY FLOOR • PLANTS 10 SERIES - ARCHITECTURAL" GENERAL. • A011 - ARCHITECTURAL GENERAL --- ARCHITECTURAL GENERAL. NOTES - CODE NOTES & LEGEND ARCHITECTURAL GENERAL - WALL TYPES SCHENLE: • ARCHITECTURAL GENERAL SCHEDULE ARCHITECTURAL GENERAL - ARCHITECTURAL GENERAL ARCHITECTURAL GENERAL - /- A012 - A01.3 -- A014 A015 - A016 • 0 - \A/ALL, FLOOR & ROOF TYPES A017A • ARCHITECTURAL GENERAL - Au ARE.I L G A019 - ARCHITECTURAL GENERAL - RECESS SCHEDULES . A020 - ARCHITECTURAL GENERAL - .A021 - ARCHITECTURAL GENERAL - Anw: ARCHITECTURAL GENERAL - .A023 -- ARCHITECTURAL. GENERAL A024 -- ARCHITECTURAL- GENERAL - A025 --- ARCHITECTURAL GENERAL DOOR TYPES & SCHEDULE WINDOW TYPES & SCHEDULE OPENINGS SCHEDULE OPENINGS S^ CHEDULE /C\ I0R F Sc ....DULE FIRE EXTINGUISHER & R. FLOOR INTERIOR SIGNAGE SCHEDULE INTERIOR SIGNAGE TYPES INTERIOR SIGNAGE TYPES & DETAILS. CASEWORK DETAILS CASEWORK DETAILS CASEWORK DETAILS 100 SERIES - TRANSFER 'AND ISO • BUILDINGS A101 - • TSO BUILDING - FLOOR PLAN - COMPACTOR LEVEL A1010 - 1-50 BUILDING- .- HORIZONTAL CLEARANCE PLAN - COMPACTOR LEVEL • A102 TRANSFER/Tso BUILDING - FLOOR PLAN. - TIPPING & RECEIVING LEVELS • • . . A103 150 BUILDING •- FLOOR PLAN ED1JIPMENT & LOADING • LEVELS . A104. ISO BUILDING - FLOOR PLAN TSO LEVEL A105 - • TRANSFER/1-SO BUILDING - ROOF PLAN • A106' BUILDING . ENLARGED ROOF & 'PENTHOUSE • PLANS • A111 • TRANSFER/TSO BUILDING EXTERIOR ELEVATIONS SOUTH & EAST • • . • .A112 TRANSFER/TSO BUILDING R- EXTERIOR ELEVATIONS - NORTH & NEST • A113 1-50 BUILDING • & PENTHOUSE - ENLARGED EXTERIOR ELEVATIONS • A114 • - TRANSFER/TSO BUILDING. - ENLARGED EXTERIOR ELEVATIONS A115 TRANSFER BUILDING - ENLARGED EXTERIOR ELEVATIONS • . A121 - TRANSFER BUILDING - BUILDING SECTIONS - NORTH & SOUTH. A122 TRANSFER BUILDING •- •BUILDING SECTIONS: - . EAST & • WEST A123 ISO BUILDING - LONGITUDINAL BUILDING SECTIONS - COMPACTOR. BAYS A1230 TSO BUILDING LONGITUDINAL COMPACTOR SECTIONS • VERTICAL CLEARANCE PROFILES A124 TSO BUILDING • LATERAL BUILDING SECTION A125 TSO BUILDING - LATERAL BUILDING SECTION A126 - TSO BUILDING - LATERAL BUILDING SECTION A19, - • TSO , BUILDING - BUILDING SECTIONS • A128 - TSO BUILDING BUILDING SECTIONS A129 - ISO BUILDING PENTHOUSE SECTIONS. & DETAILS A131 - TRANSFEIR, BUILDING - WALL SECTIONS A132. TRANSFER BUILDING WALL SECTIONS • . .• A133- TRANSFER/ISO BUILDING - WALL SECTIONS A1•34 TRANSFER/TSO BUILDING - WALL SECTIONS A135 - TRANSFER/ISO BUILDING - WALL SECTIONS, cnyRSGFLTitvjx.LA A136 L TRANSFER/ISO BUILDING - • WALL SECTIONS DEC 8 2012 A137 - TRANSFER/TSO BUILDING 7-• WALL' SECTIONS CEN. TER A138- ISO BUILDING FASCIA SEcTIONS • & DETAILS PROJECT NUMBER: • RECYCLING AND TRANSFER STATION. SITE FACILITIES CONTRACT DRAWING INDEX L(? 195 C00405C09 SHT. OF: ' 2 619 DRAWING NUMBER: G012 1-800-424-5555 ARCHITECTURAL-, CONTINUED 100 SERIES - TRANSFER AND.._L.!- 50_BUILDIN( . A141. -- TSO BUILDING --' STAIR - PLANS A142 -- TRANSFER T SO E3lJILDIN() — STAIR, PLANS A143 -- TRANSFER/ISO BUILDING -- STAIR SECTIONS & DETAILS A144 - TRANSFER/ISO BUILDING - STAIR SECTIONS & DETAILS A145 - TRANSFER/ISO BUILDING -- LADDER EEI._EVATION$ & DETAILS S A146 - -- ISO .BUILDING - E.EVA1 OR HOISTW.' Y - ENLARGED ED PLANS ELEVATIONS A147 - TSO BUILDING - EL :EVAT()R• HOiSTWAY -, ENLARGEE PLAN, ELEVATION SECTIONS A148 ISO. BUILDING - ELEVATOR .HMSWAY -'- DETAIL` A149 -: ISO BUILDING - -- ELEVATOR CAR -- GENERAL ARRANGEMENT A151 -- ISO BUILDING - AREA PLANS "- COMPACTOR LEVEL A152 TRANSFER/ ISO BUILDING - • AREA PLANS - EQUIPMENT & T li l- • LEVELS Al 53 -- TSO EUILDING - AREA PLANS - ISO LEVEL A154 --- ISO BUILDING -- AREA P_ NS. ISO LEVEL. A155 TRANSFER BUILDING . REFLECTED CEILING 1 !..H REECE_iVING - LEVELS _ • - A156 -- ISO BUILDING - REFLECTED CEILING PLAN --- COMPACTOR i}NEL •. .A157 .TRANSFER /ISO BUILDING_ _ REFLECTED CEILING PLANS -" EQUIPMENT & TIPPING. LEVELS - A158 -- iSO BUILDING; REFLECTED CEILING i'L:AN -- ISO LEVEL /A159 "- ISO BUILDING - REFLECTED CEILING: PLAN SO LEVEL. A161 TRANSFER BUILDING. - INTERIOR ELEVATIONS TIPPING RE.CEIViNG LEVELS 'i _r o BUILDING - INTERIOR ELEVATIONS COMPACTOR ,t TOR ANiD EOUIPHENT i_EVE.LS A163 ISO BUILDING - INTERIOR ELEVATIONS - EQUIPMENT LEVEL A164 - ISO BUILDING -ANTERIOR EL _EVAT IONS EQUIPMENT LEVEL._ A1.65 ISO BUILDING ..- INTERIOR ELEVATIONS -- ISO LEVEL. A166 'TS° BUILDING _ INTERIOR EI LEVATIONS ? ` (. l,.E•VEL A167 _ TSC} BUILDING . - INTERIOR ELEVATIONS -. ISO A168 _ ISO BUILDING - INTERIOR ELEVATIONS NS - ISO L EL A171 - TRANSFER/TSO. BUILDING - DOOR DETAILS A172 - TRANSFER /TSO •BUL!:_DiNG - DOOR DETAILS :ILS A173 -- TRANSFER /TSO BUILDING OVERHEAD DOOR DETAILS A174 TRANSFER /ISO. BUILDING -- WINDOW V DUAILS A175 -.. TRANSFER/ISO BUILDING WINDOW DETAILS A176 - - TRANSFE=R /TSO BUILDING OPENING DETAILS A177 TRANSFER/ISO BUILDING - FIRE --‘• STOPPING MEW .0 A181 TRANSFER/ISO BL l LDIIJG DEN LS TRANSFER 8 IL AMC ROOF- . A182 TRANSFER/ISO BUILDING DET , S . 7 "O BUILDING 1-OF A183 TRANSFER/ISO BUILDING As DE : } A184 - , TRANSFER/TS0 BUILDING PLAN DETAILS A185 - 1 Rt SF - R/ )O BUILDING PLAN DETAILS A186 TRANSFER/ISO BUILDING WALL . DETAILS A187 TRANSFER /TSO. BUILDING • WALL DETAILS A188 '- TRANSFER /;SO BUILDING DE AILS A191 "- TRA \SEER /1 SO BUILDING - DETAIL S --- TRANSLUCENT SKYLIGHTS A192 TRANSFER/TSO BUILDING • -- DETAILS - TRANSLUCENT SKYLIGHT` A193 TRANSFER/ISO BUILDING _ DETAILS -"" TRANSLUCENT iNAt_.f_.. ASSEMBLIES A194 - TRANSFER /TSC) BUILDING DETAILS - TRANSLUCENT i W.ALL ASSEMBLIES A195. - -- TRANSFER /ISO BUILDING - METHANE BARRIER .PLAN A196 TRANSFER /ISO BUILDING METHANE BARRIER .DETAILS A197 -- TRANSFE=R /ISO BUILDING - BIRD DETERRENT DETAILS A198.._.. TRANSFER / SO BUILDING - GUTTER & RIDGE. ''VEwr A199 -' •TSO 3UILDING • FINISH DETAIL ;. 200 • SERIES '= PROCESSING AREA A201 T-- NORTH PROCESSING AREA.' A202 • -- NORTH • PROCESSING AREA - A21.1 - NORTH PROCESSING • AREA - A221 --- NORTH PROCESSING AREA .. ELEVATIONS. & •- DETAILS .A231 --- NORTH PROCESSING • AREA' A281: - NORTH PROCESSING AREA • 300 SIR►vS _:-. -SEAL -F FACIE A300 SCALE., FACILITY -- A301 - SCALE FACILITY -- A302 ._-" SCALE FACILITY '-- A3�03 - -• SCALE FACILITY A311 -. SCALE FACILITY NORTH 8x SOUTH' A312 - SCALE FACILITY -- A321 - SCALE • FACILITY --' A331 SCALE FACILITY -- A361 --. SCALE FACILITY -- A371. -- •SCALE FACILITY. A372. SCALE FACILITY - A381 "- SCALE. FACILITY - A391 - SCALE FACILITY • • LEI PLAZA PLAN FLOOR & REFLECTED CEILING PLANS ROOF PAN & DETAILS ME -THANE BARRIER PLAN EXTERIOR ELEVATIONS & PLAZA S`uCIICiLt;-, FLOOR PLAN.. ROOF PLAN • EXTERIOR ELEVATIONS, . - BUILDING SECTIONS, IN' ERIOR 'S µ WALL SECTIONS - DETAILS. EXTERIOR ELEVATIONS • - EAST & WEST BUILDING SECTIONS • - WALL SECTIONS . INTERIOR • ELEVATIONS ' 0 DOOR DE-TA LS WINDOW DETAILS DETAILS PNEUMATIC TUBE SYSTEM DETAILS II LI I SCRUCIL • A401 _.- \E CYCLING BUILDING FLOOR PLAN, REFLECTED CEILING PLAN & • METHANE.. d LAN A402. - IZ4EC YC INC I I X 11� - ROO F P LA,\i • BUILDING SECTIONS t403 RECYC_IvC BUILDING.. EXTERIOR ck 1N ERIOI ..-CVAf iONS • A404 RECYCLING ; II ; 1NC WALL SECTIONS & DETAILS - LANDSCAPE 'IDOL SE1P L1O2 w "I L.104 SITE _LA W.,6''If . OVERALL L-L L N'DSCAI `E._ PLAN.- LANDSCAPE LANDSCAPE PLAN LANDSCAPE PLAN LANDSCAPE PLJAY! •LANDSCAPEE PLAN.. L.105 --" LANDSCAPE._ PLAN _ ► 106 - -- • P1 ANT SCHEDULE AND DETAILS LANDSCAPE r III l LS 1108.. - -- Ll 5, II iS'..A PF D TAILS • L121 .L122 L12:5 i, r i� r . 125 20 1 .7' i L202.• 20l. L203 x P� h ES _ SITE Ii�;I 1� °T1ON IRRIGATION PLAN !ROGATION PLAN I RIR IGA-I 10N P L�t�N !RkTIkHON DETAIL TREE .y1 Rf Pl..AC[MEN I PLAN TREE' RE LACC Mf N I I"',AN r :{ .REPLACEMENT DE TNI_S MECHANICAL 10 • SERIES - GENERAL M011 MECHANICAL LEGENDS. M012 MECHANICAL. SCHEDULE-, SHEET 1 M013 _ 'MECHANICAL SCHEDULES -_ SHEET 2 M014 • MECHANICAL SCHEDULES SHEET 3 M015 MECHANICAL SCHEDULES - SHEET 4 M016 - MECHANICAL SCHEDULES - SHEET 5 M017 NREC COMPLIANCE AND MECHANICAL ABBREVIATIONS M018 -- MECHANICAL DETAILS DUST COLLECTOR DE -AILS 100 SERIES - TRANSFER AND EMPLOYEE BUILDING 1+I 1 f 1 - 'TRA NS ER f IN BUILDING COMPACTOR LEVEL / I iPPING l / RECEIVIN; • LEVEL. -- DRAINAGE PLAN-- N— . tai E M102 "_ TRANSFER/ISO BUILDING COMPACTOR LEVEL/TIPPING/RECEIVING LEVEL -- DRAINAGE PLAN - EAST M1 03 TRANSFER/ISO BUILDING TIPPING/RECEIVING LEVEL 7 MECHANICAL PLAN • . N.41; - -- 'TRANSFER/TSO BUILDING TS { LEVEL/TIPPING/RECEIVING LEVEL L,IPP .F' L ==VEAL . MECHANICAL PLAN M 1.0D _ TRANSFER/ISO BUILDING MECHANICAL ROOF .PLAN 1;:1106 _w.... RANSF-ER /TSO B JIL..DING EXTERIOR ELEVATIONS EAST & WEST M107 .TRANSFER/ISO BUILDING ENLARGED ELEVATION AND WALL SECTION M10 5 TRANSFER BUILDING NORTH PROCESSING AREA MECHANICAL PLAN M109 TRANSFER/..F.7;0 'BUILDING DOWNSPOUT DRAIN, HOSE REEL AND M110 A 1 R TATS=" ER BUILDING PIPE DROP RISE; SUPPORT DETAILS ftL RAINAGE i5C; i7ts`UJu G Girl - I FO ilt'IDA 10N PI AN [1112 - 1 , BUILDING; C:)MPACiOR LEVEL. ENLARGED WATER AND DIRAINAGGE. LAN, 1 v1112p - ISO BUILDING COMPACTOR LEVEL ENLARGED WATER AND DRAINAGE PLAN 10 I•; - ISO BUILDING COMPACTOR LEVEL ENLARGED HVAC PLAN M114 TAO BUIi..:DiNr COI' IPACTOR LEVEL AREA PLUMBING PLAN M 11 :, : a ISO BUILDING COMPACTOR ACTOR LE E:L AREA. PLUMBING BING PLAN M 1 15 __• ISO BUILDING - COMPACTOR LEVEL AREA HVAC PLAN M 1 T 3 -. TSO BUILDING COMPACTOR LEVEL BUILDING SECTIONS M11 .TS0 BUILDING. . COMPACTOR LEVEL VAULT DETAILS M118 * ISO 3UItI DING COMPACTOR • LEVEL BL.IILDiNG SECTIONS . M121 ISO BUILDING TIPPING /RECEIVING.. LEVEL ENLARGED WATER R AND DRAINAGE PLAN M122 ISO BUILDING TIP PI RLCEIA iNC LEVEL EN LARGED HVAC PLAN M123 ISO, BUILDING TIPPING/ /RECEIVING LEVEL ENLARGED P LUMBING PLAN T M124 -- `1ST.) BUILDING. TIPPING/RECEIVING LEVEL AREA PLUMBING PLANS v- -..4 r TRANSFER/ISO BUILDING TIPPING RECEIVING LEVEL MISTING ROOM LAN M125. -- ISO. BUILDING - TIPPING /RECEIVING LEVEL. HPU /DUST COL.,LECI"Q AREA PLUMBING. PL.AN • M125A ISO BUILDING TIPPING/RECEIVING LEVEL LOADING AREA ENLARGED PLUMBING PLANS M12€ L S0 BUILDING 'TIPPING, / RECEIVING LEVEL HPU /DUST COLLECTOR AREA -1VAC -°I...rt1,c t Nu A M127 V1.128 M129 M131 M132 M133 M 1 34 M135 M136 M137 M138 M139 M141 M142 M1.43 M144 M 1 45 M146 M147 M148. v1151. M 1 52 M153 3 M154 M155 Icy 156 M161. M162 M•163 M171 M172 M173 M191 M192 M193 M194 M195 TRANSFER /TS0 BUILDING .TIPPING /RECEIVING LEVEL DUST • COLLECTION SECTIONS • . . TRANSFER /TSO BUILDING TSO ROOF LEVEL SOUTH ELEVATION HVAC TRANSFER /TSO BUILDING COMPACTOR /LOADING AREA SECTIONS TSO BUILDING 'ISO LEVEL ENLARGED WATER AND DRAINAGE PLAN ISO BUILDING ISO LEVEL HVAC FLOOR PLAN - WEST TSO BUILDING ISO LEVEL HVAC FLOOR PLAN - EAST TSO. BUILDING TSO LEVEL MECH ROOM ENLARGED. HVAC PLANS • AND :i :LEVATI0N3 ISO BUILDING ISO LEVEL MECH ROOM ENL=ARGED PIPING PLANS AND ELEVATION ISO BUILDING TSO LEVEL PLUMBING FLOOR. PLAN - WEST ISO BUILDING 1S0 LEVEL PLUMBING FLOOR PLAN -- EAST TRANSFER /TSO BUILDING TSO ROOF LEVEL ENLARGED .HVAC PLAN ISO BUILDING MECHANICAL SHAFT. SECTIONS AND DETAILS • TSO BUILDING V) HVAC DIAGRAMS "- HYDRONIC AND .AIRSIDE TRANSFER /TSO BUILDING RAINWATER /NPW BOOSTER SYSTEM SCHEMATIC DIAGRAM WASTEWATER DRAINAGE CONTROL AND MONITORING SCHEMATIC DIAGRAMS • MISCELLANEOUS CONTROL AND MONITORING SCHEVATIC DIAGRAMS TRANSFER EMPLOYEE BUILDING HYDRONIC SYSTEM DIAGRAM - PART 1 TRANSFER / EMPLOYEE BUILDING. HYDRONIC SYSTEM DIAGRAM - PART 2 . • MECHANICAL SYSTEMS SEQUENCE' OF OPERATIONS MECHANICAL SYSTEMS SEQUENCE OF OPERATIONS TRANSFER/TSO BUILDING WATER SYSTEM SCHEMATIC -- PART 1 TRANSFER/ ISO BUILDING WATER SYSTEM SCHEMATIC - PART, 2 TRANSFER /ISO BUILDING WATER SYSTEM SCHEMATIC - ` PART 3 TRANSFER/ISO BUILDING . WATER SYSTEM SCHEMATIC PART 4 TRANSFER /TS° BUILDING DRAINAGE SYSTEM SCHEMATIC TRANSFER ISO BUILDING WASTE AND VENT RISER DIAGRAM TRANSFER /EMPLOYEE BUILDING DUST AND "ODOR CONTROL- MISTING SYSTEMS PLAN TRANSFER /TSO BUILDING DUST AND ODOR CONTROL MISTING SYSTEMS SECTION TRANSFER /TSO BUILDING DUST AND ODOR CONTROL MISTING •SYSTEMS SCHEMATIC TRANSFER /TSO BUILDING RAINWATER VAULTS . TRANSFER/TS0 BUILDING TIRE WASH /RAINWATER PLAN ,TRANSFER /TSC) BUIL=DING TIRE WASH •VAULTS PLANS AND SECTIONS TRANSFER/ISO BUI LD I NG FI RE SPRINKLER PLA N AND CRITERIA .TS0 BUILDING COMPACTOR LEVEL FIRE -SPRINKLER PLAN TRANSFER /TSO BUILDING TIPPING /RECEIVING LEVEL FIRE SPRINKLER PLAN TRANSFER /TSO BUILDING TSO LEVEL /TIPPING /RECEIVING UPPER LEVEL FIRE SPRINKLER PLAN FIRE PROTECTION SPRINKLER SYSTEM SCHEMATIC DIAGRAMS 300 SERIES - SCALE FACILITY M301 -. SCALE FACILITY PLUMBING PLANS M302. SCALE FACILITY HVAC PLANS M303 - SCALE FACILITY HVAC SECTIONS 400 •SERIES MISCEL \1EOUS STRUCTURES . M401 - -' •RECYCLING BUILDING HVAC -_ & PLUMBING PLANS AND PIPING DIAGRAM M431 - -- FUELING STATION PLAN M432 - FUELING STATION SECTIONS ELECTRICAL 10-50 SERIES ' -- GENERAL . E011 - STANDARD EELECTRiCAL SYMBOLS AND ABBREVIATIONS E012 _ LUMINAIRE SC- 1LDt.3LE E013 - • ENERGY COMPLIANCE FORMS -- LIGHTING E014 -- ELECTRICAL ONE. -LINE DIAGRAM - POWER E015 GAS MONITORING SCHEMATICS 01 - TT ECIIv1 N AT N CIS . 1 +C;: M E017 - TRANSFER /TS° & SCALE FACILITY INTRUSION, FIRE .ALARM Y. DETECTION DIAGRAMS &• DETAILS . . :f E. ,art, J�C: A H i . "S E021 -- ELECTRICAL SCHEDULES -- PANEL SCHEDULES E022 -- . EEL.E:CTRICAL". SCHEDULES --- PANEL SCHEDULES - E023 - ELECTRICAL. SCHEDULES - •EQUIPMENT CONNECTION. SCHEDULES EE024 - ELECTRICAL SCHEDULES . CONDUIT SCHEDULES E030 - ELECTRICAL SITE PLAN - -. LIGHTING L031 ELECTRICAL SITE PLAN - POWER & SIGNAL E032 - TRANSFER /TSO BUILDING - GROUNDING FLOOR PLAN - ELECTRICAL_ E040 -- ELECTRICAL DETAILS • -'- SITE [.041 _ ELECTRICAL DET=AILS "'- SITE [042 -' ELECTRIC=AL. DETAILS '"- GROUNDING /LIGHTNING PROTECTION SYSTE 1 E043 -- ELECTRICAL SECTIONS - LIGHTNING PROTECTION E044 -- ELECTRICAL DETAILS GROUNDING /LIGHTNING PROTECTION SYSTEM E045 - ELECTRICAL DE=TAILS - LIGHTING E046 ELECTRICAL. DETAILS. E047 - ELECTRCCAI- DETAiL E048 TRANSFER/ISO BUILDING ELECTRICAL STAIR SECTIONS YS E049 - TRANSFER. / TSO BUILDING ELECTRICAL ROOM 'SECTIONS IONS EG50 -- TS0 BUILDING - ENLARGED ELECTRICAL ROOM PLAN - COMPACTOR LEVEL [051 TSO BUILDING - ENLARGED 1ROOF: C P[NTI- USF 5i. :ANf" ELECTRICAL E052 w ELECTRICAL DETAILS -- TELECOM 60 -70 SERIES - INSTRUMENTATION • . E060 - INSTRUMENTAi1ON SYMBOLS & ABBREVIATION`? E061 -" INSTRUMENTATION SITE PLAN E062 --" INSTRUMENTATION TRANSFER 'BUILDING. FLOOR PLANS E063 INSTRUMENTATION ENLARGED AREA PLANS #2 E064 - PROCESS & INSTRUMENTATION DII GRAM . 1 E065 ' PROCESS & iNSTRUd1ENTATION DIAGRAM [066 '- PROCESS & INSTRUMENTATION DIAGRAMr.3 E067 -- PROCESS & INSTRUMENTATION !MENTATION DIAGRAM E068 - PROCESS & INSTRUMENTATION DIAGRAM #5 E069 - •PROCESS & INSTRUMENTATION DIAGRAM `6 E070 PROCESS & INSIRLMENTATiON DIAGRAM #7 [071 - MAIN CONTROL PANEL 'MCP' -- DETAILS : ,i•I1) SCHEDULES [072 -- MAIN CONTROL PANEL. 'MCP' -- POWER DISTRIBUTION WIRING . DIAGRAM E073 -- TYPICAL DISCRETE I/O WIRING DIAGRAMS E074 -- TYPICAL ANALOG 1/0 WIRING DIAGRAMS 1/0 DIAGRAMS -- INSTRUMENTATION DETAILS E076 '- CONTROL SYSTEM BLOCK DIAGRAM E077 - INSTRUIVIENTATION CONDUIT AND WIRE SCHEDULE~ 100 SERIES -. TRANSFER /•I 0 BUILDING L 101 TRANSFER TSO BUILD IN G P OW E R SIGNAL r .LEVEL TRANSFER /TSO BUILDING POWER & SIGNAL TIPPING /RECEVING . LEVEL TRANSFER /TSO BUILDING POWER & SIGNAL PLAN -- TRANSFER /TSC} BUILDING. ROOF PLAN -- I:UGI-RIC /3AL ISO BUILDING - ENLARGED FLOOR PLAN -'- POWER COMPACTOR LEVEL E106 ISO BUILDING '-- ENLARGED FLOOR PLAN COMPACTOR _EV E L. E107 - ISO BUILDING - ENLARGED FLOOR PLAN :COMPACTOR LEVEL. TS0 BUILDING; -_ ENT- /;AGED FLOOR PLAN EQUIPMENT & LOADING LEVELS E109 -- ISO BUILDING 'ENLARGED FLOOR PLAN EQUIPMENT & LOADING LEVELS E110 ISO BUILDING - ENLARGED FLOOR PLAN EQUIPMENT & LOADING LEVELS TSO BUILDING --- ENLARGED FLOOR PLANi EQUIPMENT & LOADING LEVELS • [11.2 -" TRANSFER BUILDING ENLARGED FLOOR SIGNAL - EQUIPMENT & LOADING LEVELS TRANSFER BUILDING ENLARGED FLOOR SIGNAL - EQUIPMENT & LOADING LEVELS - •TRANSFER BUILDING - ENLARGED FLOOR SIGNAL _. EQUIPMENT T & LOADING LEVELS [1 15 TS) BUILDING - ENLARGED FLOOR PLAN - ISO LEVEL E116 TSO BUILDING ISO LEVEL L151 .-" 1.50 BUILDING FLOOR PLAN- -- LIGHTING -- COMPACTOR ,E\ /EL --- TSO & TRANSFER BUILDING FLOOR PLAN -- LIGHTII'\Tt EQUIPMENT. & L,OADiNG LEVELS - ISO BUILDING FLOOR PLAN - LIGHTING . TS0 LEVEL E155 - ISO BUILDING - ENLARGED FLOOR PLAN LIGH TIiNG - -- COMPACTOR LEVEL - ISO BUILDING -- ENLARGED FLOOR COMPACTOR LEVEL - TSO BUILDING -- ENLARGED FLOOR COMPACTOR LEVEL E158 - TSO & :TRANSFER BUILDING ENLARGED -. EQUIPMENT & LOADING .LEVELS E159 TSO BUILDING ••• ENLARGED FLOOR PLAN EQUIPMENT &. LOADING LEVELS E160 TSO BUILDING -- ENLARGED FLOOR PI EQUIPMENT & LOADING LEVELS • E161 :.,. TSO & TRANSFER BUILDING - ENLARGED EQUIPMENT. & LOADING LEVELS El 69 -- TSO BUILDING - ENLARGED FLOOR .PLAN LEVEL • E170 - . TSO BUILDING -- ENLARGED FLOOR PLAN LEVEL E102 E103 E104 E105- PLAN --- PLAN - E108 E111 E113 -- [114 R - POWER POW P0\ \! ER POWER -,- POWER COMPACTOR R TSO AND AN 0 AND L..EVEL S1 ;z }f C NAL & S G \I L PLAN POWER n • PLAN -- POWER PLAN - POWER POWER (2I`AL. ENLARGED FLOOR PLAN- _... P M3 AND :i . . -- E152 E153 E156 [157 PLAN - LIGHTING •-. PLAN . -. LIGHTING FLOOR PLANi : LIGHTING AN - LIGHTING 300 SERIES "-- SCALE FAC =ILITY E300 - SCALE FACILITY PLAZA . PLAN F L!GH; 7" IN0 FLOOR PLAN LIGHTING. LIGHTING - _. TSO - L1GI_ `,O i:... 1 �....�., SCALE r r C !LiTY FLOOR & :ROOF- LLEG fR1(AL E302•• -SCALE F..GILITY ATTIC AND :FOUNDATION PLAN ELECTRICAL l_333 SCALE FACILITY - ELECTRICAL DETAILS 40, ERI E - MISCELLANEOUS ;STRUCTURES • .: RECYCLING C LING BUILDING FLOOR PLANS ELECTRICAL • F431 r_ FUELING STATION ELECTRICAL PLAN `T 11‹ AWOG 1 -T ARTWORK SUPPORT SITE PLAN A \''t002 ARTWORK SUPPORT FOUNDATION PLAN A;d 00 .- ARTWORK SUPPORT FRAMING PLAN • .AW004 -- ARTWORK - SUPPORT FOUNDATION DETAILS AW0O5 -- ARTWORK SUPPORT DETAILS REVIEWED FOR CODE COMPLIANCE APPROVED MAY 13 2013 City of Tukwila BUILDING DIVISION R nth w t: CITY OF TUl! ?t?I19 DEC 18 2012 PERMIT CENTER 1- 800 -424 -5555 DESIGNED DRAWN IKS ABG 6/10/10 IKS KRH FINAL .ISSUED FOR CITY OF TUKWILA. PERMITS VERIFY SCALE BAR IS ONE INCH ON A ANSI "D" DRAWING IKS IKS KRH KRH MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS 0 1" REV 7/31/09 IKS KRH DATE CHK'D APP'D ISSUED FOR CITY OF TUKWILA PERMITS REVISION DESCRIPTION King County Department. of Natural Resources and Parks Solid Waste Division An SAIC Company R.W. Beck, Inc. 1001 Fourth Avenue, Suite 2500 Seattle, WA 98154-1004 . (206) 695 -4700 . BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT DRAWING INDEX PROJECT NUMBER: C00405•C09 SHT. 3 OF:• 619 DRAWING NUMBER: GO1.3. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 1 3 2013 City of Tukwila BUILDING DIVISION - 00839 -20000 Bow GREENBERGAB SYMBOLS 2.5% O 0 0 • SURVEY CONTROL CIVIL CONTROL POINT ROAD GEOMETRY POINT STRUCTURAL ANGLE POINT GRADING CONTROL POINT BORE HOLE SIGN ROCKERY EVERGREEN TREE DECIDIOUS TREE CUT /FILL SLOPE GRADE 'INDICATOR DRAINAGE INDICATOR FIRE HYDRANT EXISTING WATER METER EXISTING WATER VAULT EXISTING WATER VALVE WATER VALVE EXISTING STORM DRAIN CATCH BASIN EXISTING SANITARY SEWER MANHOLE EXISTING STORM DRAIN MANHOLE EXISTING YARD DRAIN STORM DRAIN CATCH BASIN TYPE 1 STORM DRAIN CATCH BASIN TYPE 2 WITH GRATE STORM DRAIN. CATCH BASIN TYPE 2 WITH SOLID LID/ SANITARY SEWER . MANHOLE ANCHOR BLOCK CULVERT FLOW DIRECTION TEMPORARY OUTLET PROTECTION EXISTING YARD LIGHT EXISTING LUMINAIRE EXISTING UTILITY POLE EXISTING ELECTRICAL EQUIPMENT LIGHT POLE BASE ELECTRICAL VAULT PIPE OR CONDUIT CAP FENCE GATE SENSITIVE AREA CONTROL POINT LINETYPES 1 PW— PW-- PW- PW- MATCH BOUNDARY PROPERTY BOUNDARY CONSTRUCTION LIMITS WETLAND BOUNDARY CENTER LINE NEAT LINE FENCE EXISTING WATER EXISTING TELEPHONE EXISTING POWER ELECTRICAL CONDUIT POTABLE WATER Ss ss ss ss SANITARY SEWER sD-- SD-- -- SD SD— STORM DRAINAGE D UD UD TSD • TSD D D DRAIN UD UNDERDRAIN TSD . TEMPORARY STORM DRAIN COMPRESSED AIR ENCASEMENT DITCH /SWALE /STREAM. CENTERLINE CONTRACTOR TRAFFIC, TWO -WAY CONTRACTOR TRAFFIC, ONE -WAY COMMERCIAL AND SELF -HAUL TRAFFIC, ONE -WAY ---�- • • ---> — T.> T —> T —i Ilea ele NAWImeei WIMIMINM 0111 mil Ell eIEll IMO NM Ell TRANSFER STATION OPERATIONS TRAFFIC, ONE -WAY REMOVE OBJECT EXISTING GROUND (PROFILE) . CONTOURS RETAINING WALL SILT FENCE ORANGE SAFELY FENCE GEOTEXTILE GEOTEXTILE DRAIN MAT PIPE SLOPE DRAIN (TESC PLANS ONLY) GRIND LINE GUARDRAIL GRADE BREAK LINE DEMOLITION FOOTPRINT BOUNDARY THESE LINETYPES ARE USED IN COMBINATION TO SHOW COMBINED TRAFFIC LANES MATERIALS /// W. W . W 4, 4, 4 4, xN •:: 158C750GQ? o ool/o QOVT �0ao000 §)80-°,(9W6 0000 ��n(.0A r+VMSV ta+AVA DEMOLITION /REMOVAL (PLAN WETLAND AREA .(PLAN) HMA SURFACE (PLAN) HMA PAVEMENT (SECTION) CONCRETE (PLAN AND SECTION) GRAVEL BORROW (SECTION) EMBANKMENT FILL (SECTION) NATIVE SOIL (SECTION) SAND /CDF (SECTION) LIGHTWEIGHT BACKFILL (SECTION) BENTONITE (SECTION) QUARRY SPALLS (PLAN AND SECTION) PIPE BEDDING (SECTION) CSTC (SECTION) CSBC (SECTION) GRAVEL ' BACKFILL (SECTION) GRAVEL BACKFILL FOR DRAINS (SECTION) GRAVEL SURFACE (PLAN) TOPSOIL APPROXIMATE AREAS TO BE COVER WITH STRAW. OR OTHER APPROVED GROUND COVER BMPPRIOR TO COMPLETION OF WORK APPROXIMATE . AREAS TO BE COVER WITH PLASTIC SHEETING FOR LONG TERM SOIL COVER PRIOR TO COMPLETION OF WORK TYPICAL SECTION AND DETAIL REFERENCE SYSTEM SECTION CUT ON DWG 4 AND SHOWN ON 5: ON DWG 5 THIS SECTION IS IDENTIFIED AS: SECTION LETTER SECTION CUT ON DWG 4 AND SHOWN.. ON 4: DWG ON WHICH SECTION APPEARS SECTION LETTER DWG ON WHICH SECTION IS CUT SECTION LETTER DETAILS ARE REFERENCED SECTION APPEARS ON SAME DWG AS CUT 1TY� }r DEC .1 8 2012 IN A SIMILAR MANNER EXISTINGCEPT NUMBERS ARE USED INSTEAD OF LETTERS PLR IIT•0 1 TER 1- 800 -424 -5555 DESIGNED mow DRAWN 1KS ABG D C VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 0 1" 6/10/10 1/8/10 1/8/10 7/31/09. IKS KRH FINAL ISSUED FOR CITY OF TUKWILA PERMITS IKS IKS KRH KRH MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS IKS KRH ISSUED FOR CITY OF TUKWILA PERMITS REV DATE CHK'D APP'D REVISION DESCRIPTION King County. Department of Natural Resources and Parks Solid Waste Division IECK An SAIC Company R.W. Beck, Inc. 1001 Fourth Avenue, Suite 2500 Seattle, WA 98154 -1004 (206) 695 -4700 . BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES ' .CONTRACT M1e).. 195 LEGEND PROJECT NUMBER: C00405C09 SI- T. 4' OF: 619 DRAWING NUMBER: G014 Abbreviations.dwg La.I 4 v 0 N ABBREVIATIONS 0 AT AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS ANCHOR . BOLT(S) ACRYLONITRILE BUTADIENE STYRENE ABOVE ASPHALT CONCRETE, • ABOVE COUNTER AUTOMATIC CIRCUIT BREAKER AMERICAN CONRETE • INSTITUTE ACOUSTICAL ASPHALT CONCRETE PAVEMENT ALGEBRAIC DIFFERENCE . . AMERICANS WITH DISABILITIES ACT .ADJUSTABLE . ABOVE FINISH FLOOR ALUMINUM' APPROXIMATE ARCHITECTURAL ASSEMBLY. AMERICAN SOCIETY FOR TESTING AND MATERIALS ASPHALT TREATED BASE . AUTOMATIC TRANSFER SWITCH AVENUE AASHTO AB.. ABS ABV AC ACB. ACI ACOUST ACP AD ADA.. ADJ AFF ALUM APPROX ARCH ASSY ASTM ATB ATS AVE BFP 81 . BLDG BMP BO BOS BOT BPA BRKT BVC BVCE BVCS BW C CA CAMH CAT CB CC CCP CDF CFM CHKR CHRL CI CIP CJ CL CLR CMP CMU CO COL COM COMM COMP CONC CONF CONN CONST CONT COR CPEP CPJ CSBC CSTC CSW CT . CTJ CTR. CTRSK CW CY D DB. DBL DCW. DDCBPA DET BACKFLOW PREVENTER BLACK IRON BUILDING BEST MANAGEMENT PRACTICE BOTTOM OF BY OTHERS BOTTOM OF .STEEL BOTTOM BACKFLOW PREVENTOR ASSEMBLY BRACKET BEGIN .VERTICAL CURVE BEGIN VERTICAL CURVE ELEVATION BEGIN VERTICAL CURVE STATION BOOT WASH . . CHANNEL, CONDUIT, CONCRETE, CONDENSATE COMPRESSED OUT COMPRESSED AIR MANHOLE CATEGORY CATCH BASIN CENTER TO CENTER . CEMENT CONCRETE PAVEMENT. CONTROLLED DENSITY FILL CUBIC FEET PER 'MINUTE CHECKERED CEDAR HILLS REGIONAL LANDFILL CAST IRON CAST IN PLACE CONSTRUCTION JOINT CENTERLINE CLEAR, CLEARANCE CORRUGATED METAL PIPE CONCRETE MASONRY UNIT CLEAN OUT COLUMN COMMERCIAL COMMUNICATIONS COMPACTOR CONCRETE CONFERENCE CONNECT CONSTRUCTION CONTINUOUS CORNER CORRUGATED POLYETHYLENE PIPE COMPLETE JOINT PENETRATION CRUSHED SURFACING BASE COURSE CRUSHED SURFACING TOP COURSE CONTAMINATED STORMWATER CURRENT TRANSFORMER CONTROL JOINT CENTER COUNTERSINK COLD WATER CUBIC YARD DRAIN DRAINAGE BASIN DOUBLE DEMAND CRITICAL WELD DOUBLE DETECTOR CHECK BACKFLOW PREVENTION ASSEMBLY DETAIL DESIGNED IKS DF DI DIA DIM DO DPR DS DT DWG DWLS E EA ECC ED EEWS EF EFCP EL, ELEV ELEC ENTR EOP EPDM EQ SP EQUIP ESC ETC ETM EVC EVCE EVCS EW EXH EXIST EXP EXT F FCA FCO FD FDC FDN FEX OFF FFE FG FH FHA FIN FIN .GRD FL FLG FLR FLT FM FO FOC FOM FOR FOS FP FRIDGE FRP FS FT FTG FW G GA GAL GALV GE GEN GFCI GL GND GPM GV GWB GYP HB HC HDPE. HI DRINKING FOUNTAIN DUCTILE IRON DIAMETER DIMENSION DOWN DAMPER DOWNSTREAM, DOWNSPOUT DOUBLE TEE DRAWING DOWELS EAST EACH, EXHAUST AIR ECCENTRIC EQUIPMENT DRAIN EMERGENCY EYE WASH STATION EACH FACE, EXHAUST FAN EXHAUST FAN CONTROL PANEL ELEVATION ELECTRICAL ENTRANCE EDGE OF PAVEMENT ETHYLENE . PROPYLENE • DIENE MONOMER EQUAL SPACING EQUIPMENT EROSION AND SEDIMENT CONTROL ET CETERA ELAPSED TIME METER END VERTICAL CURVE END VERTICAL CURVE ELEVATION END VERTICAL CURVE STATION EACH WAY EXHAUST EXISTING EXPANSION EXTERIOR FOOTING FLANGED` COUPLING ADAPTER FLOOR CLEANOUT FLOOR DRAIN FIRE DEPARTMENT CONNECTION FOUNDATION FIRE EXTINGUISHER FINISHED FLOOR, FAR FACE FINISHED FLOOR ELEVATION FINISHED GRADE FIRE HYDRANT FIRE HYDRANT ASSEMBLY FINISHED FINISHED GRADE FLANGE FLANGE. OR FLANGED FLOOR FILTER FORCE MAIN FACE OF FACE OF CONCRETE. FACE OF MASONRY FUEL OIL RETURN FUEL OIL SUPPLY, • FACE OF STEEL FIREPROOF REFRIGERATOR FIBER REINFORCED PLASTIC FAR SIDE, FLOAT SWITCH, FLOW SWITCH FOOT OR FEET FOOTING FIRE WATER GRATING GAUGE, GAGE GALLON GALVANIZED GRATE ELEVATION GENERAL GROUND FAULT CIRCUIT INTERRUPT GLASS, GLAZING GROUND GALLONS PER MINUTE GATE VALVE GYPSUM WALL BOARD GYPSUM HOSE BIBB HOLLOW CORE, HANDICAP HIGH DENSITY POLYETHYLENE HIGH HK HMA. HM HORIZ HPU HRP HRW HT HW HWD HWT HWY HYD 1 -5 ID IE IN INC INFO INSUL INT INV• ISR IW IWWTF JAN JT L LA LAV LB LCB LCK LF LG LL LLH LLV LP LSL LT LVR MAN MATL MAX MB MBC MCC MCP MDO MECH MEZZ MFR MGMT MH MI MIN MISC MJ MON MRGWB MSL MSS MTD MTL N N/A NAT NE NGPA NIC NO NOM NPA NPW NS NTS NW OC OCC OD HOOK HOT MIX ASPHALT HOLLOW METAL HORIZONTAL HYDRAULIC POWER UNIT PEDESTAL— MOUNTED HOSE REEL WALL — MOUNTED HOSE REEL. HEIGHT HOT WATER HIGHLINE WATER DISTRICT HOT WATER TANK HIGHWAY HYDRANT INTERSTATE 5 INSIDE DIAMETER INVERT ELEVATION INCHES INCLUDING INFORMATION INSULATION INTERIOR INVERT INTRINSICALLY SAFE RELAY IRRIGATION WATER . INDUSTRIAL WASTEWATER TREATMENT FACILITY JANITOR JOINT LEACHATE, LENGTH, ANGLE LEASE AREA LAVATORY POUND LEACHATE CATCH BASIN LOCKER LINEAR FEET LANDFILL GAS LIVE LOAD LONG LEG HORIZONTAL LONG LEG VERTICAL. LOW POINT LONG SLOTTED HOLE LEFT, LIGHT LOUVER MANUFACTURER MATERIAL MAXIMUM MOLLY BOLT METAL BUILDING CONTRACTOR MOTOR CONTROL CENTER MOTOR CIRCUIT PROTECTOR MEDIUM DENSITY OVERLAY MECHANICAL MEZZANINE MANUFACTURER MANAGEMENT MANHOLE MALLEABLE IRON MINIMUM MISCELLANEOUS MECHANICAL JOINT MONUMENT MOISTURE RESISTENT GYPSUM WALLBOARD MEAN SEA LEVEL MANUFACTURER'S STANDARDIZATION SYSTEM MOUNTED METAL NORTH NOT APPLICABLE NATURAL NORTHEAST NATURAL GROWTH PROTECTION AREA NOT IN CONTRACT. NUMBER NOMINAL NORTH PROCESSING AREA NON — POTABLE WATER NEAR SIDE NOT TO SCALE. NORTHWEST ON CENTER, OVER CURRENT OCCUPANTS OUTSIDE DIAMETER DRAWN ABG VERIFY SCALE BAR IS ONE . INCH ON ANSI 0D" DRAWING 1" D 6/10/10 C: 1/8/10 B 1/8/10 A 7/31/09 REV. DATE IKS KRH FINAL ISSUED FOR CITY OF TUKWILA PERMITS IKS IKS KRH KRH MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS IKS CHK'D KRH APP'D ISSUED FOR CITY OF TUKWILA PERMITS REVISION DESCRIPTION, ODL ODH OH OL OPNG OPP OPS OS &Y OSA OWS P -LAM PB PBS PC PCF PDC PDH PDV PE PENET PERF PH PI PIV PJ. PKWY PL PLAS. PLC PLT POC PR PRC PRV PSE PSF PSI PT PV PVA PVC PVDF PVI PVMT PW R RA RCP RD REC RED REF REINF REQ RGS RM RO ROW, R/W RSTRM RT S SA SAFB. SC SCH SCV SD SDCO SDMH SE SEC SED SF SH SHR SHT SIM SJ. SK SL SLDG SMH King County Department of Natural Resources and Parks Solid Waste Division OUTSIDE DROP LOW OUTSIDE DROP :- HIGH OVERHEAD OVERLOAD OPENING OPPOSITE OPERATIONS OUTSIDE STEM AND YOKE OFFSITE AREA OIL -WATER SEPARATOR PLASTIC LAMINATE PERIMETER BERM, PULL BOX . PUSH BUTTON STATION PRECAST, POINT OF CURVATURE, PUMPER CONNECTION POUNDS PER CUBIC FOOT POWDER COATED PIPE DEFLECTION, HORIZONTAL PIPE DEFLECTION, VERTICAL PHOTOELECTRIC, POLYETHYLENE PENETRATION PERFORATED ACIDITY POINT OF INTERSECTION, POST INDICATOR POST INDICATOR VALVE PANEL JOINT PARKWAY PLATE, PLACE PLASTER PROGRAM LOGIC CONTROLLER PLATE POINT OF CONNECTION PAIR POINT OF REVERSE CURVATURE PRESSURE REDUCING VALVE PUGET SOUND ENERGY POUND(S) PER SQUARE FOOT POUND(S) PER SQUARE INCH POINT OF TANGENCY PHOTOVOLTAIC, PLUG VALVE. (ECCENTRIC) PHOTOVOLTAIC ARRAY POLYVINYL CHLORIDE, POINT OF VERTICAL CURVATURE POLYVINYLIDENE FLOUR•IDE POINT OF VERTICAL INTERSECTION PAVEMENT POTABLE WATER REVIEWED FOR CODE COMPLIANCE APPROVED MAY 132013 City of Tukwila BUILDING DIVISION RADIUS, RANGE, RISE, RIGHT RETURN AIR REINFORCED CONCRETE PIPE ROOF DRAIN, : ROAD RECEPTACLE REDUCER REFERENCE REINFORCED, :REINFORCEMENT, REINFORCING REQUIRED RIGID GALVANIZED STEEL CONDUIT ROOM ROUGH OPENING . RIGHT OF WAY RESTROOM RIGHT SOUTH, SANITARY, SLOPE, SWITCH SUPPLY AIR SOUND ABSORPTION FIBER BOARD SOLID CORE SCHEDULE .. SECTIONAL CONTROL VALVE STORM DRAIN STORM DRAIN CLEANOUT STORM DRAIN MANHOLE SOUTHEAST . SECTION SEDIMENT SQUARE: FEET SCALE HOUSE SHOWER SHEET SIMILAR CONTRACTION . JOINT SKYLIGHT SLOPE DRAIN SLIDING SEWER MANHOLE hEK An S,AIC Company SNGL SOG SP SPA SPEC SQ SR SS` SS /IND SSL SSMH SSR SST SSWA ST STA STC STD STL SUPT SUSP SW SWP T T &B TBD TD TEMP TESC THK TO TOC TOF TOG TOM TOS TOW TRTD TS TSD ISO TTB TVSS TYP UBC UD •UDCP UG UH UHMW UL UNO UP UR US UT UYH V VAC VC. VCT VDC VERT VEST VNR VPI VTR W.. W/ W/0 WA WC WC(E) WCO WD WH WHS WNDW WNP WP WQ WR R.W. Beck, Inc. 1001 Fourth Avenue, Suite 2500 Seattle, WA 98154 -1004 (206) 695 -4700 SINGLE SLAB ON GRADE SPARE, SPACING, SITE PREPARATION SOUTH PROCESSING AREA SPECIFICATION SQUARE STATE ROUTE SANITARY SEWER SANITARY .SEWER /INDUSTRIAL SHORT SLOTTED HOLE SANITARY SEWER MANHOLE STANDING SEAM ROOF . STAINLESS STEEL SOUTH SOLID WASTE AREA STREET STATION SOUND TRANSMISSION COEFFICIENT STANDARD STEEL STRUCT STRUCTURAL SUPPORT SUSPENDED SOUTHWEST, SPRAY WATER STORM WATER PIPE TANGENT, TOP, TOWNSHIP, TREAD TOP SC BOTTOM TO BE DETERMINED TRENCH DRAIN TEMPORARY TEMPORARY EROSION AND SEDIMENT CONTROL THICK TOP OF TOP OF CONCRETE TOP OF FOOTING TOP OF GRATE TOP OF MASONRY TOP OF STEEL TOP OF WALL TREATED TUBE STEEL TEMPORARY STORM DRAIN TRANSFER STATION. OPERATORS 0 TELEPHONE TERMINAL BOARD TRANSIENT VOLTAGE SURGE SUPPRESSOR. TYPICAL UNIFORM BUILDING CODE UNDER DRAIN UNDERDRAIN COLLECTION PIPE UNDERGROUND UNIT HEATER ULTRA HIGH MOLECULAR WEIGHT UNDERWRITER'S LABORATORY UNLESS NOTED OTHERWISE UTILITY POLE URINAL UPSTREAM UNDERGROUND TELEPHONE UTILITY YARD HYDRANT VENT VOLTS ALTERNATING CURRENT VERTICAL CURVE VINYL COMPOSITION TILE VOLTS DIRECT CURRENT VERTICAL VESTIBULE VENEER VERTICAL POINT OF INTERSECTION VENT THRU ROOF WEST, WATER, WALL WITH WITHOUT WATER WATER CLOSET EXHAUST WALL CAP WALL CLEANOUT WOOD WATER HEATER WELDED HEADED STUD WINDOW WATER NONPOTABLE WORK POINT, WEATHER PROOF WATER QUALITY WATER RESISTANT WS WSDOT WTS WW WWF X STRONG XFMR YD WATER STOP WASHINGTON STATE DEPARTMENT OF TRANSPORTATION• WELDED. THREADED STUD WASTEWATER WELDED WIRE .FABRIC EXTRA STRONG TRANSFORMER• YARD 96' BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT ABBREVIATIONS REC :I'4E:3) CITY OF TUKKti f °. A DEC 182012 PERMIT CENTER PROJECT NUMBER: C00405C09 SHT. OF: 5 619 DRAWING NUMBER: G015 SECTION 35, TOWNSHIP 23N, RANGE 4E GENERAL NOTES 1. LOCATIONS SHOWN FOR EXISTING UTILITIES ARE APPROXIMATE.. VERIFY ALL EXISTING UTILITIES IN THE .FIELD FOR AID IN UTILITY LOCATION, CALL 1 -800- 424 -5555, 48 HOURS (2 WORKING DAYS) PRIOR TO BEGINNING OF CONSTRUCTION. EXISTING UTILITIES, WHETHER SHOWN OR NOT, SHALL BE LOCATED PRIOR TO CONSTRUCTION SO AS TO AVOID DAMAGE OR DISTURBANCE. THE CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY AND COSTS CONNECTED THEREWITH TO PROTECT, MAINTAIN AND REPAIR, WHERE • NECESSARY. 2. CONTRACTOR SHALL. ARRANGE A PRECONSTRUCTION CONFERENCE WITH THE CITY OF TUKWILA AND HIGHLINE WATER DISTRICT INSPECTORS PRIOR TO BEGINNING. ANY WORK. 3. AT LEAST 48 HOURS (2 WORKING DAYS) BEFORE STARTING PROJECT SITE WORK, NOTIFY THE CITY OF TUKWILA UTILITIES INSPECTOR AT 206 -433 -0179. REQUEST A CITY OF TUKWILA PUBLIC WORKS UTILITY INSPECTION AT LEAST 24 HOURS (1 WORKING DAY) IN ADVANCE BY CALLING 206 - 433 -0179. 4. AT LEAST 72 HOURS (3 WORKING DAYS) BEFORE STARTING PROJECT WATER UTILITY WORK, NOTIFY HIGHLINE WATER DISTRICT AT 206- 824 -0375. REQUEST A HIGHLINE WATER DISTRICT UTILITY INSPECTION AT LEAST 72 HOURS (3 WORKING DAYS) IN .ADVANCE BY CALLING 206- 592 -8944. LW 2445 +33.3 (215' RT) N 161925.88 E 1285046:93 CONSTRUCTION LIMITS /07;-;‹,"z r/ - .'.�4�� v i 0 0 CONSTRUCTION LIMIT POINTS AL, POINT NORTHING EASTING DESCRIPTION 1 160565.38 1284825.91 2 160596.60 1` 284824.97 3 160689 57 1284880.73 START OF EXISTING FENCE 4 161414.24 1284980.38 START ALONG FACE WALL A 5 162425.03 1285134.39 END ALONG FACE WALL A 6 162460.34 1285179.49 START ALONG. FACE WALL D 7 .162468.93 1285287.10 END ALONG FACE WALL D 8 162425.15 1285385.38 START ALONG FACE WALL` C 9 162086.77 1285546.55 END ALONG FACE WALL C 10 161672.90 1285870.86 AT PROPERTY LINE 11 161198.36 1285832.01 AT PROPERTY LINE 12 161088.38 1284969:08 AT FENCELINE 13 161226.77 1285034.83 AT FENCELINE 14 . 160851.9 6 1284972.77 15 160695.10 1284955.82 16 160557.62 1284907.27 17 160501.37 1,2848.70.35 1 W. PROPERTY . LINE GENERAL NOTES, CONTINUED 5. CONTRACTOR ASSUMES SOLE RESPONSIBILITY FOR . WORKER SAFETY, AND DAMAGE TO STRUCTURES AND IMPROVEMENTS RESULTING FROM CONSTRUCTION OPERATIONS. ALL. TRENCH. EXCAVATION OPERATIONS SHALL MEET OR EXCEED ALL APPLICABLE SHORING LAWS FOR TRENCHES. ALL TRENCH SAFETY SYSTEMS SHALL MEET WISHA REQUREMENTS. 6. CONTRACTOR SHALL MAINTAIN THE PERMITS, THE CONTRACT DOCUMENTS, A CURRENT COPY OF THE CITY OF TUKWILA DEVELOPMENT GUIDELINES AND DESIGN` CONSTRUCTION STANDARDS AND A COPY OF. THE HIGHLINE WATER DISTRICT DESIGN, DEVELOPMENT AND CONSTRUCTION STANDARDS FOR EXTENSIONS . TO THE WATER SYSTEM AT THE JOB SITE. 7. ALL WORK SHALL CONFORM TO THE CONTRACT DOCUMENTS. ANY CHANGES FROM THE APPROVED PLANS REQUIRE PREAPPROVAL FROM THE OWNER'S PROJECT REPRESENTATIVE. WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL LAWS. •MAINTAIN A SET OF THESE APPROVED .PLANS ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 8. ALL SURVEYING SHALL BE DONE UNDER THE DIRECTION OF A WASHINGTON LICENSED LAND SURVEYOR. VERTICAL DATUM SHALL BE NAVD • 1988. HORIZONTAL DATUM SHALL BE WASHINGTON STATE (GRID) COORDINATES, NORTH ZONE, USING NAD 83/91 SURVEY CONTROL AND TIED TO ANY TWO WSDOT HORIZONTAL CONTROL MONUMENTS. . LW 2455 +00.0 9. REPLACE OR RELOCATE ALL SIGNS DAMAGED OR REMOVED (215' RT) DUE TO CONSTRUCTION. w prIo 0zr oo 1 E WED FOR CODE COMPLIANCE APPROVED MAY 13 2013 R RETAIN, REPLACE OR RESTORE EXISTING VEGETATION IN. RIGHTS -OF -WAY, EASEMENTS, AND ACCESS TRACTS. 11. WORK IN ROADWAYS . A. ALL WORK IN ROADWAYS SHALL MEET TMC 11. City of Tukwila BUILDING DIVISION LW 2455 +00.0 (700' RT) )l DESIGNED IKS a DRAWN 6/10/10 IKS KRH JF C VERIFY SCALE. BAR IS ONE INCH ON ANSI "D" DRAWING 0 1" B A REV 1/8/10 1/8/10 7/3.1/09 DATE IKS IKS IKS CHK'D KRH KRH KRH APP'D FINAL ISSUED FOR CITY OF TUKWILA. PERMITS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS ISSUED FOR CITY OF TUKWILA PERMITS REVISION DESCRIPTION King County Department of Natural Resources and Parks Solid Waste Division BOW 1W IECK RM. Beck, Inc. 1001 Fourth Avenue, Suite 2500 Seattle, WA 98154 -1004 (206) 695 -4700 B. PRIOR TO ANY ACTIVITY IN CITY OF TUKWILA RIGHT -OF -WAY, THE CONTRACTOR SHALL PROVIDE THE CITY OF TUKWILA A TRAFFIC CONTROL PLAN FOR REVIEW AND APPROVAL. THE TRAFFIC CONTROL PLAN SHALL INCLUDE THE LOCATION, ADDRESS AND DESCRIPTION OF TRAFFIC FLOW DURING THE WORK AND SHALL MEET MUTCD REQUIREMENTS. C. FIRE, PEDESTRIAN, AND VEHICULAR ACCESS SHALL BE MAINTAINED AT ALL TIMES, EXCEPT WHEN CONTRACTOR HAS PERMISSION FROM THE OWNER AND THE 'CITY OF. TUKWILA DIRECTOR TO CLOSE AN ACCESS. D. ALL ROADWAYS SHALL BE KEPT FREE OF DIRT AND DEBRIS USING STREET SWEEPERS. . E. INSTALL STEEL PLATES OVER ANY TRENCH, AT ANY TIME WORK IS STOPPED AND THE TRENCH IS LEFT OPEN. 12. CONTRACTOR SHALL FLAG CONSTRUCTION LIMITS. 13. JOINT USE AREAS WITHIN THE PROJECT SITE, AS SHOWN IN THE DRAWINGS, MAY BE USED BY THE OWNER, THE CONTRACTOR AND ITS SUBCONTRACTOR OR SUPPLIERS, AND THE TRANSFER STATION CUSTOMERS. CONTRACTOR MAY USE THESE JOINT USE AREAS FOR SUCH ACTIVITIES AS DESCRIBED IN THE SITE TRAFFIC MANAGEMENT AND CONTRACTOR STAGING PLANS AS SHOWN IN THE DRAWINGS. SUCH ACTIVITIES INCLUDE, BUT ARE NOT LIMITED TO, CONTRACTOR PARKING AND STAGING, EGRESS AND INGRESS OF MATERIALS AND EQUIPMENT, DEMOLITION, PAVING, AND STRIPING.. THE OWNER AND TRANSFER STATION CUSTOMERS MAY USE THESE JOINT AREAS FOR ON -GOING TRANSFER STATION OPERATIONS. JOINT USE AREAS WILL BE MANAGED BY THE OWNER. CONTRACTOR SHALL MAINTAIN SOLE RESPONSIBILITY AND CONTROL FOR THEIR OPERATIONS WITHIN THE JOINT USE AREAS.. (i4cts- = 100' -0" Scale R :1.4AbL.$) CITY OF Tt,IK M: ,,A. DEC 18 2012 PERMIT CENTER 100 200 LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT Feet PROJECT NUMBER: C00405C09 An SAIC Company GENERAL NOTES AND PROJECT AREA BOUNDARY SHT. OF: 6 619. DRAWING NUMBER: 17800424-5555. G016 L. O g 0 0 N GREENBERGAB Jun .10, CONTROL POINT TABLE ID # NORTHING EASTING HC 1.7 -7 (WSDOT)* 165,203.5902 1,285,446,2510 HC 17 -8 (WSDOT) 161,774.6040 1,285,016.9050 * NOT SHOWN ON PLANS SECTION 35., TOWNSHIP 23N, RANGE 4E DRIVING ::RANGE. GENERAL NOTES 1. SEE SPEC SECTION 01140 -WORK RESTRICTIONS FOR PROTECTION OF EXISTING FEATURES. 2 SEE UTILITES DWGS FOR APPROXIMATE EXISTING UTILITIES LOCATIONS. EXISTING-. - WALL A EXISTING :a WALL F :: . EXISTING CONDITIONS AND SURVEY CONTROL. / SCALE: 1 " = 80' SURVEY CONTROL 1. HORIZONTAL DATUM: WASHINGTON COORDINATE SYSTEM, NORTH ZONE .NAD83/91 PROJECT CONTROL ESTABLISHED USING GLOBAL POSITIONING FAST - STATIC (GPS) METHODS. CONTROL WAS EXTENDED THROUGH THE PROJECT REACH BY WASHINGTON STATE DEPARTMENT OF TRANSPORTATION SURVEY CONTROL MONUMENTS. d' 0 2. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM 1988, C) NAVD88.. VERTICAL CONTROL WAS EXTENDED THROUGH THE PROJECT 00. REACH USING PUBLISHED BENCHMARKS FROM THE WASHINGTON STATE DEPARTMENT OF. TRANSPORTATION (VIA ELECTRONIC LEVELING). 3. SOURCE OF MAPPING: SURVEYS PERFORMED BY DUANE HARTMAN AND ASSOCIATES: ON MAY 4, 2007; AUGUST 16, 2007; FEBRUARY 12, 2008; AND OTHERS. 4. SURVEY CONTROL DISTURBED DURING CONSTRUCTION SHALL BE COORDINATED THROUGH THE WASHINGTON STATE DEPARTMENT OF NATURAL RESOURCES IN ACCORDANCE WITH RCW 58.24.040 AND WAC 332 -120. 'v ski;:•::: 17-7 (WSDOT) �.....:�_ APPROX 1/2 MILE NORTH EXISTING WALL D - �.; { %i, � �... •-,.`' ...._ `..."'280- --= =. ;.- 80 = 80' -0" 80 fikiCtiil E; CITY OF TUKyt a` 1 n 18 2012 PERMIT CENTER 160 Scale (qs- - Feet FINAL ISSUED FOR CITY OF TUKWILA PERMITS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION VERIFY SCALE BAR IS ONE INCH ON ANSI • "D" DRAWING 0 1" RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS ISSUED FOR CITY OF TUKWILA PERMITS REVISION • DESCRIPTION King County Department of Natural Resources and Parks Solid Waste Division R.W. Beck, Inc: 1001 Fourth Avenue, Suite 2500 Seattle, WA 98154- 1004 (206) 695 -4700 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT PROJECT NUMBER: C00405C09 OF: 7 619 DRAWING NUMBER: G017 GENERAL NOTES 1. BUILDING LOCATIONS ARE AS FOLLOWS. E ENTRAN BUILDING SURVEY CONTROLS TRANSFER/ISO BUILDING: GRID REFERENCE INTERSECTION A/11 N 162085.845, E 1285191.512 GRID ROTATION: 73.39 SCALE FACILITY: GRID .REFERENCE INTERSECTION A/1 N 161535.380, E 1285094.790 GRID ROTATION: 87.21 RECYCLiNG BUILDING: SOUTHWEST CORNER N 161754.555, E 1285241.611 NORTHWEST CORNER N 161794.764, E 1285286.144 • 1 CNI 1 C) 00 1 0 0 0 w co 0 00 0 O. - FUELING FACILITY AND ENGINE GENERATOR SET 8 0 8 DRIVIN 0 VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING FINAL ISSUED FOR CITY OF TUKWILA. PERMITS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS ISSUED FOR CITY OF TUKWILA PERMITS REVISION DESCRIPTION. King County Department of Natural Resources and Parks Solid Waste Division R.W. Beck, Inc. 1001 Fourth Avenue, Suite 2500 •Seattle, WA 98154-1004 (206) 695-4700 101111 rff IME wIw LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT 0 LL GENERAL ARRANGEMENT SITE PLAN AND BUILDING CONTROLS LL - RWBECK SO 2010 - 2:45pm - P:\0239.2 P \0239.2 KEY TO OPENI\G SCHEDULE: 1. OPENING SCHEDULE IS PROVIDED AS A CONVENIENCE TO ASSIST IN COORDINATION OF THE WORK OF TRADES. CONTRACTOR IS RESPONSIBLE FOR VERIFYING TYPE, NUMBER AND PLACEMENT OF OPENINGS, WHETHER LISTED ON THE OPENING SCHEDULE OR NOT 2. LOCATION OF PENETRATION SHALL BE REVIEWED IN THE FIELD WITH PROJECT REPRESENTATIVE. 3. OPENINGS BETWEEN ROOMS OR SPACES ARE IDENTIFIED BY THE NUMBERS ASSIGNED TO THE TWO ROOMS OR SPACES AND BY A DISCRETE OPENING NUMBER AS DESCRIBED BELOW: A. ON THE OPENING SCHEDULE, THE LOWER NUMBERED ROOM OR SPACE IS LISTED FIRST. FOR VERTICAL PENETRATIONS, ROOMS OR SPACES ON LOWER LEVELS ARE LISTED FIRST. B. ON PLANS AND ELEVATIONS, THE DISCRETE OPENING NUMBER IS LISTED WITHIN A PENTAGON ICON. IF ONE OF THE ROOMS OR SPACES IS NOT EVIDENT ON THE PLAN OR ELEVATION, ITS NUMBER IS LISTED BELOW THE PENTAGON ICON. C. EXTERIOR SPACES ARE INDICATED THUS: EXW OPENINGS THROUGH ABOVE —GRADE EXTERIOR WALLS EXR OPENINGS THOUGH ROOFS EXS OPENINGS THROUGH SOFFITS SUW OPENINGS THROUGH SUB — GRADE WALLS SUF OPENINGS THROUGH SUB —GRADE FLOORS D. DISCRETE OPENING NUMBERS ARE ASSIGNED TO THE FOLLOWING SERIES: 01 -29 ARCHITECTURAL /STRUCTURAL 30 -59 MECHANICAL 60 -89 ELECTRICAL 90 -99 COMPACTOR EQUIPMENT E. EXAMPLES: 107- 109 -92 A COMPACTOR EQUIPMENT OPENING IN THE WALL BETWEEN THE HPU ROOM AND THE LOADING AREA C05- 102 -66 AN ELECTRICAL OPENING IN THE FLOOR BETWEEN THE ELECTRICAL ROOM AND THE MULTIPURPOSE ROOM C01- EXW -31 A MECHANICAL OPENING IN A SUBGRADE EXTERIOR WALL AT THE COMPACTOR BAY OPENING SCHEDULE FROM — TO NO FROM — TO NO NOMINAL SIZE LOCATION DETAIL /SECTION DESCRIPTION NOTES PENET TYPE HEIGHT AFF PLAN /ELEVATION DETAIL PENET TYPE HEIGHT AFF PLAN /ELEVATION DETAIL a w Z CO d _ J Gi 40 4" DIA WALL COMPACTOR LEVEL — TSO BUILDING C01—SUF 34 41 6" DIA FLOOR M114 M111 4" NPW RAINWATER SUCTION LINE 42 SIZE INDICATED IS NOMINAL PIPE DIAMETER 35 M114 4" DIA FLOOR M111 4" NPW INSULATED PIPE 48 , SOIL WASTE LINE M115 SIZE INDICATED IS NOMINAL PIPE DIAMETER 36 6" DIA FLOOR C06 SPACE ABOVE RESTROOMS /BREAK ROOM M111 13 "x13" WALL M115 SOIL WASTE CLEANOUT SIZE INDICATED IS NOMINAL PIPE DIAMETER 37 SIZE INDICATED IS NOMINAL DUCT SIZE 4" DIA FLOOR WALL M111 BACKWATER VALVE CLEANOUT C06 SPACE ABOVE RESTROOMS /BREAK ROOM SIZE INDICATED IS NOMINAL PIPE DIAMETER 38 24" DIA 12 "x24" FLOOR M111 E/M117 BASKET DRAIN BD -1 5" DIA CEILING 39 4" DIA FLOOR M111 HPU FEEDER — 3 ", P008 61 5" DIA CEILING LEACHATE WASTE CLEANOUT SIZE INDICATED IS NOMINAL PIPE DIAMETER 40 SEE DETAIL FLOOR 62 M111 3/M109 E106 BOOT WASH 41 63 12 "x24" FLOOR E106 M111 E/M117 BASKET DRAIN BD -1 C01 —008 31 42 WALL SEE DETAIL FLOOR M111 ` A/M117 C01 -108 COMPACTOR BAY VAULT NO 1 4" DIA CEILING 43 8" DIA FLOOR M111 2" FEEDER TO DUST COLLECTOR DISC. SW - P015 C01 -109 60 4" DIA LEACHATE WASTE CLEANOUT E106 44 SEE DETAIL FLOOR FEEDER TO 2T1 — 2 -1/2 ", P028 M111 B/M117 6'x10' CEILING COMPACTOR BAY VAULT NO 2 45 12 "x24" FLOOR 6'x10' M111 E/M117 - BASKET DRAIN BD -1 46 30 4" DIA FLOOR M111 M111 METHANE VENT METHANE VENT 31 SIZE INDICATED IS NOMINAL PIPE DIAMETER 47 M111 4" DIA FLOOR M11.1 LEACHATE WASTE SIZE INDICATED IS NOMINAL PIPE DIAMETER _ 12 "x24" BACKWATER VALVE CLEANOUT , M111 SIZE INDICATED IS NOMINAL PIPE DIAMETER 48 6" DIA FLOOR M111 4" DIA FLOOR M111 LEACHATE WASTE SIZE INDICATED IS NOMINAL PIPE DIAMETER 49 SIZE INDICATED IS NOMINAL PIPE DIAMETER 6" DIA FLOOR 14" DIA M111 M112A SOIL WASTE CLEANOUT 10" FIRE SPRINKLER SIZE INDICATED IS NOMINAL PIPE DIAMETER 50 4" DIA SEE DETAIL FLOOR M111 4" DOMESTIC WATER SERVICE SIZE INDICATED IS NOMINAL PIPE DIAMETER HEATING WATER MANHOLE 6" DIA WALL 51 SEE DETAIL FLOOR ,F/M117 M111 D/M117 60 4" DIA WALL 16' -0" COMPACTOR BAY DRY VALVE VAULT 52 SEE DETAIL FLOOR 61 M111 3/M109 E101 BOOT WASH 53 62 6" DIA FLOOR E101 M111 SOIL WASTE CLEANOUT CO1A —STC SIZE INDICATED IS NOMINAL PIPE DIAMETER 54 WALL 4" DIA FLOOR M111 4" NPW INSULATED PIPE 37 SOIL WASTE LINE WALL SIZE INDICATED IS NOMINAL PIPE DIAMETER C01 —EXW 55 6" DIA WALL SIZE INDICATED IS NOMINAL DUCT SIZE M112 36 . 6" DIA CEILING M112A LEACHATE WASTE LINE SIZE INDICATED IS NOMINAL PIPE DIAMETER C01 —ELEV 30 SIZE INDICATED IS DRAIN PIPE SIZE 6 "x6" WALL CEILING M113 4" DOMESTIC WATER SERVICE _SIZE INDICATED IS NOMINAL DUCT SIZE C01 —0O3 32 M112A 6 "x6" WALL M113 3" NPW INSULATED PIPE 39 4" DIA CEILING M112A _I SIZE INDICATED IS NOMINAL DUCT SIZE C01 —004 31 6 "x6" WALL 40 M113 CEILING M112A 10" FIRE SPRINKLER RISER 56 41 4" DIA CEILING M112A M112A • 4" NPW 4" SOIL WASTE CO1A -120 UNISEX TOILET 104 PLUMBING CHASE C01 —005 ,- } } 30 6 "x6" WALL M113 MANHOLE SIZE INDICATED IS MANHOLE SIZE 34 4" DIA CEILING M103 SIZE INDICATED IS NOMINAL DUCT SIZE 57 4" DIA CEILING SIZE INDICATED IS DRAIN PIPE SIZE 35 4" DIA CEILING M103 4" RAINWATER SUCTION FLOOR CLEANOUT SIZE INDICATED IS NOMINAL PIPE DIAMETER 58 SIZE INDICATED IS NOMINAL PIPE DIAMETER 4" DIA CEILING 12 "x24" FLOOR _ E/M117 4" FLOOR DRAIN BASKET DRAIN BD -1 SIZE INDICATED IS DRAIN PIPE SIZE 60 SEE DETAIL 5" DIA WALL 22' -0" E050 TOP LOAD BAY VAULT 32 SEE DETAIL HPU FEEDER - 3 ", P008 61 3/M109 5" DIA WALL 22' -0" E050 33 SEE DETAIL FLOOR M111 3/0109 HPU FEEDER - 3 ", P009 62 5" DIA WALL 22' -0" E050 FLOOR M111 3/0109 — HPU FEEDER — 3 ", P010 63 CO2 —EXW 5" DIA WALL 22' -0" E050 2" NPW INSULATED PIPE HPU FEEDER — 3 ", P011 64 6" DIA 16 "x4" WALL 18' -0" E050 3" NPW INSULATED PIPE 52 48 "x36" BRANCH CIRCUIT AND TELECOMM CONDUIT BLOCK —OUT 65 16 "x4" WALL 14' -0" El 05 SIZE INDICATED IS NOMINAL GRILLE SIZE 53 12 "x12" WALL •M114A BRANCH CIRCUIT AND TELECOMM CONDUIT BLOCK —OUT 66 4" DIA WALL 16' -0" E050 4" DIA WALL M112 FEEDER TO 4N1 - 2 ", P032 67 SUB -GRADE WALL UP THROUGH FLOOR — BLOCKOUT 4" DIA WALL 16' —0" E050 6" RAINLEADER SUB —GRADE WALL UP THROUGH FLOOR — BLOCKOUT TELECOMM TO E115 — 2 ", T331 68 6" DIA 4" DIA WALL 16' -0" E050 ELECTRICAL SERVICE ENTRANCE CONDUIT, 4 ", P001 61 6" DIA TELECOMM TO' E115 — 2 ", T331 6� A 4" DIA A - A ...0-._ ALL 16,E X50 �_.�+..ri 62 6" DIA WALL 12' -0" E050 FEEDER TO 2T1 — 2 -1 2 ", P028 / 6079 REGISTERED ARCHITECT DO LAS L. BRINLEY STATE OF WASHINGTON DESIGNED C. CONWAY DRAWN J. PALMER 6/10/10 CC DB FINAL ISSUED FOR CITY OF TUKWILA PERMITS C 1/8/10 CC DB MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 0 11 „ B 1/8/10 CC DB RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS. A 7/31/09 CC DB ISSUED FOR CITY OF TUKWILA PERMITS REV DATE CHK'D APP'D REVISION DESCRIPTION OPENING SCHEDULE FROM — TO NO NOMINAL SIZE LOCATION DETAIL /SECTION DESCRIPTION NOTES PENET TYPE HEIGHT AFF PLAN /ELEVATION DETAIL co m COMPACTOR LEVEL — TSO BUILDING CONTINUED C01 —006 40 4" DIA WALL M114A 1-1/4" TEPID WATER INSULATED PIPE 41 8" DIA WALL M114 4" NPW INSULATED PIPE 42 8" DIA WALL M114 _ 4" NPW INSULATED PIPE 48 24" DIA WALL M115 24" ROUND EXHAUST DUCT C06 SPACE ABOVE RESTROOMS /BREAK ROOM 49 13 "x13" WALL M115 9 "x9" - 2" LINED SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 54 24" DIA WALL M115 24" ROUND EXHAUST DUCT C06 SPACE ABOVE RESTROOMS /BREAK ROOM C01 —007 30 24" DIA WALL M115 60 5" DIA CEILING E106 HPU FEEDER — 3 ", P008 61 5" DIA CEILING E106 HPU FEEDER - 3 ", P009 62 5" DIA CEILING E106 HPU FEEDER - 3", P010 63 5" DIA CEILING E106 HPU FEEDER - 3 ", P011 C01 —008 31 24" DIA WALL M115 C01 -108 60 4" DIA CEILING E106 2" FEEDER TO DUST COLLECTOR DISC. SW - P015 C01 -109 60 4" DIA CEILING E106 FEEDER TO 2T1 — 2 -1/2 ", P028 C01 -111 01 6'x10' CEILING 02 6'x10' CEILING CO1A —SUF 30 4" DIA FLOOR M111 METHANE VENT SIZE INDICATED IS NOMINAL PIPE DIAMETER 31 4" DIA FLOOR M111 LEACHATE WASTE SIZE INDICATED IS NOMINAL PIPE DIAMETER 32 - 12 "x24" FLOOR M111 BASKET DRAIN BD -1 3S, 4" DIA FLOOR M111 LEACHATE WASTE CLEANOUT SIZE INDICATED IS NOMINAL PIPE DIAMETER CO1A —SUW 42 14" DIA WALL M112A 10" FIRE SPRINKLER VERIFY SIZE WITH SPRINKLER CONTRACTOR 43 4" DIA WALL M112A 4" DOMESTIC WATER SERVICE SIZE INDICATED IS NOMINAL PIPE DIAMETER 44 6" DIA WALL M112A 6" RAINWATER SUCTION LINE SIZE INDICATED IS NOMINAL PIPE DIAMETER 60 4" DIA WALL 16' -0" E101 FEEDER TO 4N1 — 2 ", P032 61 4" DIA WALL 16' -0" E101 TELECOMM TO E115 — 2 ", T331 62 4" DIA WALL 16' -0" E101 TELECOMM TO E115 - 2 ", T331 CO1A —STC 36 8" DIA WALL M121 4" NPW INSULATED PIPE 37 42 "x24" WALL M113 DUCT SIZE INDICATED IS NOMINAL DUCT SIZE CO1A -105 36 . 6" DIA CEILING M112A 6" HUB DRAIN SIZE INDICATED IS DRAIN PIPE SIZE 37 8" DIA CEILING M112A 4" DOMESTIC WATER SERVICE INSULATED PIPE 38 6" DIA CEILING M112A 3" NPW INSULATED PIPE 39 4" DIA CEILING M112A _I FLOOR DRAIN SIZE INDICATED IS DRAIN PIPE SIZE 40 14" DIA CEILING M112A 10" FIRE SPRINKLER RISER VERIFY SIZE WITH SPRINKLER CONTRACTOR 41 8" DIA CEILING M112A 4" NPW INSULATED PIPE CO1A -120 01 18" DIA CEILING MANHOLE SIZE INDICATED IS MANHOLE SIZE 34 4" DIA CEILING M103 FLOOR DRAIN SIZE INDICATED IS DRAIN PIPE SIZE 35 4" DIA CEILING M103 METHANE VENT SIZE INDICATED IS NOMINAL PIPE DIAMETER CO2 —SUF 30 12 "x24" FLOOR M111 E/M117 BASKET DRAIN BD -1 31 SEE DETAIL FLOOR M1.11 ,C/M117 TOP LOAD BAY VAULT 32 SEE DETAIL FLOOR M111 3/M109 BOOT WASH 33 SEE DETAIL FLOOR M111 3/0109 COMPRESSED AIR MANHOLE CAMH -1 34 SEE DETAIL FLOOR M111 3/0109 — COMPRESSED AIR MANHOLE CAMH -2 CO2 —EXW 30 6" DIA WALL M112 2" NPW INSULATED PIPE CO2 -006 39 6" DIA WALL M114A 3" NPW INSULATED PIPE 52 48 "x36" WALL M115 EXHAUST GRILLE /PLENUM SIZE INDICATED IS NOMINAL GRILLE SIZE 53 12 "x12" WALL •M114A EXHAUST LOUVER SIZE INDICATED IS NOMINAL LOUVER SIZE C05— SUW —SUF 30 4" DIA WALL M112 4" RAINLEADER SUB -GRADE WALL UP THROUGH FLOOR — BLOCKOUT 32 6" DIA WALL M112 6" RAINLEADER SUB —GRADE WALL UP THROUGH FLOOR — BLOCKOUT C05 —SUW 60 6" DIA WALL 12' -0" E050 [049 ELECTRICAL SERVICE ENTRANCE CONDUIT, 4 ", P001 61 6" DIA WALL 12' -0" E050 E049 ELECTRICAL SERVICE ENTRANCE CONDUIT, 4 ", P001 62 6" DIA WALL 12' -0" E050 E049 ELECTRICAL SERVICE ENTRANCE CONDUIT, 4 ", P001 63 6" DIA WALL 13' -0" E050 E049 ELECTRICAL SERVICE ENTRANCE CONDUIT, 4 ", P001 64 6" DIA WALL 13' —O" E050 E049 ELECTRICAL SERVICE ENTRANCE CONDUIT, 4 ", P001 65 6" DIA WALL 13' —O" E050 E049 ELECTRICAL SERVICE ENTRANCE CONDUIT, 4 ", P001 RFVIFWFD FOR 66 6" DIA WALL 13' -O" E050 E049 CODE COMPLIANCE ELECTRICAL SERVICE ENTRANCE CONDUIT, 4 ", P001 67 6" DIA WALL 12' —O" E050 E049 APPROVED TELECOMM SERVICE ENTRANCE CONDUIT, 4" 68 6" DIA WALL 12' —O" E050 E049 MAY 1 ���� TELECOMM SERVICE ENTRANCE CONDUIT, 4" R ays d t } 69 6" 6 DIA WALL 12 —0 E050 E049 CITY �FTi�'I��r'�3�;t;, TELECOMM SERVICE ENTRANCE CONDUIT, 4" 70 6" DIA WALL 12' -0" E050 E049 TELECOMM CONDUIT, — SCALEHOUSE, T305 BAG 18 t012 71 6" DIA WALL 12' -O" E050 E049 City of Tukwila BUILDING DIVISION TELECOMM CONDUT, 44:: " - SCALEHOUSE, T305 PERMIT atro 72 6" DIA WALL 12' -0" E050 E049 TELECOMM CONDUIT, 4" — FUTURE MAINTENCE, T328 73 6" DIA WALL 12' -0" E050 E049 TELECOMM CONDUIT, 4" — FUTURE MAINTENCE, T328 74 6" DIA WALL 12' -0" E050 E049 _ _ TELECOMM CONDUIT, 4" - FUTURE S PROCESSING BLDG, T327 C05 -102 60 6" DIA CEILING E050 E049 TELECOMM CONDUIT, 4" CONDUIT ALIGNS INSIDE WALL, T332 61 6" DIA CEILING E050 E049 TELECOMM CONDUIT, 4" CONDUIT ALIGNS INSIDE WALL, T332 CONTINUED ON A017 King County Department of Natural Resources and Parks Solid Waste Division 753 9th Avenue N Seattle, WA 98109 (206) 286 -1640 www.kpg.com 1117 Broadway Suite 501 Tacoma, WA 98402 (253) 627 -0720 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT ARCHITECTURAL GENERAL OPENINGS SCHEDULE M CI PROJECT NUMBER: SHT. C00405C09 323 OF: 619 DRAWING NUMBER: A016 J Z LL c n 1 ...._ - ....... - - - - OPENING SCHEDULE FROM - TO N NO N NOMINAL SIZE L LOCATION D DETAIL /SECTION D DESCRIPTION N NOTES PENET TYPE F- Z L.L. Q J z 0 J CO J J EQUIPMENT L LEVEL - TSO BUILDING CONTINUED FROM A017 103 -218 3 31 8 8" DIA C CEILING M M124 F FIRE SPRINKLER A ALLOCATED SPACE FOR SPRINKLER RISER 32 8 8" DIA C CEILING M M124 F FIRE SPRINKLER A ALLOCATED SPACE FOR SPRINKLER RISER 33 8 8" DIA C CEILING M M124 F FIRE SPRINKLER A ALLOCATED SPACE FOR SPRINKLER RISER 34 2 2" DIA C CEILING M M124 _ DRAIN S SIZE INDICATED IS DRAIN PIPE SIZE 104 3 30 1 13 "x10" C CEILING M M122 C _FLOOR D CEILING EXHAUST FAN S SIZE INDICATED IS NOMINAL FAN SIZE 105 -110 3 30 8 8 "x6" W WALL M M122 E EXHAUST DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE 31 4 4 "DIA W WALL M M124 2 2" NPW I INSULATED 32 4 4" DIA W WALL M M124 1 1-1/2" TEPID WATER I INSULATED 105 -112 3 33 8 8 "DIA W WALL M M193 F FIRE SPRINKLER S SUBJECT TO FIRE SPRINKLER DESIGN 34 8 8" DIA W WALL M M193 _ FIRE SPRINKLER S SUBJECT TO FIRE SPRINKLER DESIGN 106 -215 3 30 2 2" DIA C CEILING M M124 S _ F SHOWER DRAIN S SIZE INDICATED IS DRAIN PIPE SIZE 107 -109 3 30 3 36 "x36" W WALL M M126 T TRANSFER GRILLE OPENING S SIZE INDICATED IS NOMINAL GRILLE SIZE 31 3 36 "x20" W WALL M M126 E EXHAUST GRILLE OPENING S SIZE INDICATED IS NOMINAL GRILLE SIZE 108 —EXW 3 30 4 48" DIA C CEILING M M127 D DUST COLLECTOR EXHAUST OUT S SIZE INDICATED IS NOMINAL DUCT SIZE 31 3 36" DIA C CEILING M M127 C COMPACTOR LEVEL EXHAUST OUT S SIZE INDICATED IS NOMINAL DUCT SIZE 108 —EXR 3 31 4 4" DIA C CEILING M M105 4 4" METHANE VENT. THRU ROOF 32 4 40" DIA C CEILING M M104 D DUST COLLECTOR INTAKE IN 108 -109 3 31 3 36" DIA W WALL M M126 E EXHAUST DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE 32 8 8" DIA W WALL M M125 4 4" NPW I INSULATED PIPE 33 4 4" DIA W WALL M M125 1 1 -1 /2" TEPID WATER I INSULATED PIPE 108 -111 3 30 4 4" DIA W WALL M M103 _ _ 2" NPW I INSULATED PIPE 31 8 8" DIA W WALL M M125 _ _ 2 NPW I INSULATED PIPE 32 4 4" DIA W WALL M M124 1 _4" N 1 -1/2" TEPID WATER I INSULATED PIPE 33 8 8 "DIA W WALL M M194 F FIRE SPRINKLER S SUBJECT TO FIRE SPRINKLER DESIGN .34 8 8" DIA W WALL M M194 F FIRE SPRINKLER S SUBJECT TO FIRE SPRINKLER DESIGN 108 -205 3 30 6 6" DIA W WALL M M137 2 2" CWR I INSTALL THRU WALL W/ ACOUSTIC WALL SEAL 31 6" DIA W WALL M M137 2 2" CWS I INSTALL THRU WALL W/ ACOUSTIC WALL SEAL 109 -EXW 3 30 S SEE NOTE [ [ WALL M M126 1 1,4/A17E 3 3/A176 2 2/A173 I INTAKE LOUVER 1 19' -6" WIDE x 5' -2" HIGH 31 S SEE NOTE W WALL M M126 1 1/A176,3/A176 2 2/A176 E EXHAUST LOUVER - 2 28'-1" WIDE x 8' -0" HIGH 109 -116 3 32 1 13 "x10" C CEILING M M126 C CEILING EXHAUST FAN S SIZE INDICATED IS NOMINAL FAN SIZE 109 -119 3 30 6 6" DIA C CEILING M M126 S SUPPLY DIFFUSER S SIZE INDICATED IS NOMINAL DUCT SIZE 109 -202 6 60 4 4" DIA C CEILING ` E E109 F FEEDER TO 2T1 - 2 -1/2 ", P028 109 -207 3 32 I I 4" DIA W WALL M M124 4 4" SOIL WASTE I INTO ROOM 207 PLUMBING CHASE 110 —SUF 3 30 2 2" DIA F FLOOR M M112A F FLOOR DRAIN S SIZE INDICATED IS DRAIN PIPE SIZE 110 3 30 1 13 "x10" C CEILING , M M122 C CEILING EXHAUST FAN S SIZE INDICATED IS NOMINAL FAN SIZE 110 -111 3 31 4 4" DIA W WALL M M124 , 1-1 /2" TEPID WATER I INSULATED PIPE 32 4 4" DIA W WALL M , 1 2" NPW I INSULATED PIPE 110 -120 3 31 1 12 "x12" W WALL 7 7' -0" M M122 E EXHAUST LOUVER S SIZE INDICATED IS NOMINAL DUCT SIZE 116 —UP 3 30 8 8" DIA C CEILING M M124 4 4" NPW UP THRU CHASE LID I INSULATED PIPE 31 8 8" DIA C CEILING M M124 4 4" VENT UP THRU CHASE LID I INSULATED PIPE LEVEL 2 — TSO BUILDING 201 -202 3 30 1 18" DIA W WALL M M133 S SUPPLY DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE 31 2 24 "x24" W WALL M M134 R RETURN AIR OPENING S SIZE INDICATED IS NOMINAL DUCT SIZE 202 —CH1 3 37 1 16" DIA W WALL M M133 V VENTILATION AIR SUPPLY DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE 202 =203 3 38 1 16" DIA W WALL M M133 ` S SUPPLY DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE 202 -220 3 32 1 14" DIA W WALL M M133 S SUPPLY DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE 33 1 16" DIA W WALL M M133 R RETURN DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE 34 1 14" DIA W WALL M M133 S SUPPLY DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE 35 1 12" DIA W WALL M M133 S SUPPLY DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE 36 2 26 "x18" W WALL M M133 R RETURN AIR DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE 60 4 4" DIA W WALL 1 10' -6" E E116 F FEEDER TO 2T1 — 2 -1 /2 ", P028 203 —CH 1 3 30 1 16" DIA W WALL M M133 V VENTILATION AIR SUPPLY DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE 203 -220 3 31 2 26 "x18" W WALL r M133 T TRANSFER AIR OPENING S SIZE INDICATED IS NOMINAL DUCT SIZE 204 -205 3 30 1 10" DIA W WALL M r M RETURN DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE 204 -220 3 31 1 10" DIA W WALL M M133 S SUPPLY DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE 205 -206 3 32 1 12" DIA W WALL , M133 R RETURN DUCT S SIZE INDICATED IS NOMINAL DUCT SIZE , M N 0 m 6079 REGISTERED ARCHITECT DO LAS L. BRINLEY STATE OF WASHINGTON DESIGNED S. FISCHER DRAWN J. PALMER 6/10/10 1/8/10 CC CC DB DB FINAL ISSUED FOR CITY OF TUKWILA PERMITS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION OPENING SCHEDULE FROM - TO NO NOMINAL SIZE LOCATION DETAIL /SECTION DESCRIPTION NOTES J t .77c CD CO W Q J J C Z - : , (/7 LEVEL 2 - TSO BUILDING CONTINUED 208 32 6 "x6" CEILING M133 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 208 -209 33 10" DIA WALL M133 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE v. 208 -210 34 12" DIA WALL M132 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 35 6" DIA WALL M133 EXHAUST DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 208 -220 36 14'„ DIA WALL M133 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 209 -210 36 12"x8" WALL M134 TRANSFER OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 210 —EXR 31 6" DIA CEILING M132 M132 EXHAUST. DUCT UP TO ROOF CAP RC —T1 SIZE INDICATED IS NOMINAL DUCT SIZE 210 -211 . 30 6" DIA WALL M132 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE „ 211 30 $ x8 CEILING M132 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 211 -EXR 31 14" DIA CEILING M105 M132 DUCT RISER TO EF -T4 SIZE INDICATED IS NOMINAL DUCT SIZE 212 30 8 "x8" CEILING M133 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 31 6" DIA CEILING M133 _ SUPPLY DIFFUSER SIZE INDICATED IS NOMINAL DUCT SIZE 212 —EXR 32 4" DIA CEILING M105 M136 4" PLUMBING VENT THRU ROOF SIZE INDICATED IS VENT PIPE SIZE 212 -213 33 12" DIA WALL M132 EXHAUST DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 34 14" DIA WALL M133 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 212 -219 35 16" DIA WALL M132 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 36 8 "x6" WALL M132 WALL SUPPLY REGISTER SIZE INDICATED IS NOMINAL REGISTER SIZE I 60 6" DIA WALL 9' -6" E116 TELECOMM CONDUIT, 4 ", T332 61 6" DIA WALL 9' -6" E116 TELECOMM CONDUIT, 4 ", T332 62 6" DIA WALL 9' -6" E116 TELECOMM CONDUIT, 4 ", T332 63 6" DIA _ WALL 9' -6" E116 TELECOMM CONDUIT, 4 ", T332 213 30 8 "x8" CEILING M132 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 31 6" DIA CEILING M132 4" PLUMBING VENT THRU ROOF SIZE INDICATED IS VENT PIPE SIZE 213 -219 32 8 "x6" WALL M132 WALL SUPPLY REGISTER SIZE INDICATED IS NOMINAL REGISTER SIZE 33 14" DIA WALL M132 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 214 -215 30 8" DIA WALL , M132 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 215 31 8 "x8" CEILING M132 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 216 -217 30 12" DIA WALL M132 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 217 31 8 "x8" CEILING M132 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 218 31 8 "x8" CEILING M132 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE SCALE FACILITY — SCALEHOUSE SUF —CRAWL 30 2" DIA FLOOR M301 FLOOR DRAIN SIZE INDICATED IS DRAIN PIPE SIZE 31 2" DIA FLOOR M301 FLOOR DRAIN SIZE INDICATED IS DRAIN PIPE SIZE 32 4" DIA FLOOR M301 METHANE VENT SIZE INDICATED IS NOMINAL PIPE DIAMETER CRAWL —SUW 30 6" DIA _ SLEEVE M302 REFRIGERATION SLEEVE CRAWL 31 12 "x12" WALL M302 DUCT OPENING SIZE INDICATED IS NOMINAL DUCT SIZE CRAWL —CHASE 32 20 "X1O" FLOOR M302 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE CRAWL -501 33 9" DIA FLOOR ` M302 FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 34 9" DIA FLOOR M302 FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 35 9" DIA FLOOR M302 FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 36 9" DIA FLOOR M302 FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE CRAWL -503 01 2'x2' FLOOR 37 9" DIA FLOOR M302 REVIEWED FUR FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 38 16 "x8" FLOOR M302 CODE COMPLIANCE FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE NPPROVED 39 16 "x8" FLOOR M302 FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 40 16 "x8" FLOOR M302 �,, y 13 1013 FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 501 —EXR 33 4" DIA CEILING M301 4" METHANE VENT THRU ROOF SIZE INDICATED IS NOMINAL PIPE DIAMETER 501 -ATTIC 41 10" DIA CEILING M302 City of Tukwila ` DUCT RISER SIZE INDICATED IS NOMINAL DUCT SIZE 42 10" DIA CEILING M302 Bt III %NG IStO DUCT . RISER SIZE INDICATED IS NOMINAL DUCT SIZE 503 —ATTIC 01 2'- 6 "x4' -6" CEILING 503 -505 51 20 "x20" DOOR M302 DOOR GRILLE 52 20 "x20" DOOR M302 DOOR GRILLE 504 —ATTIC 47 6 "x6" ; CEILING M302 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 505 —ATTIC 48 16 "x16" CEILING M302 RETURN GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 506 -ATTIC 49 6 "x6" CEILING M302 , EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 507 —ATTIC 50 6 "x6" CEILING M302 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE ATTIC —EXW 45 24 "x24" WALL M302 LOUVER SIZE INDICATED IS NOMINAL LOUVER SIZE 46 24 "x12" WALL M302 LOUVER SIZE INDICATED IS NOMINAL LOUVER SIZE ATTIC —EXR 44 14" DIA ROOF M302 FRESH AIR INTAKE DUCT SIZE INDICATED IS NOMINAL DUCT SIZE RECYCLING BUILDING 601 -SUF 31 SEE DWG FLOOR M401 A /M401 TRENCH DRAIN 32 2" DIA FLOOR M401 FLOOR DRAIN SIZE INDICATED IS DRAIN PIPE SIZE I°GIzi41:iv i7.0 33 4" DIA FLOOR M401 METHANE VENT SIZE INDICATED IS NOMINAL PIPE DIAMETER eITY OF TURIN!), , 34 4" DIA FLOOR M401 METHANE VENT SIZE INDICATED IS NOMINAL PIPE DIAMETER DEC 10 601 -EXR 35 4" DIA CEILING M401 4" METHANE VENT THRU ROOF SIZE INDICATED IS NOMINAL PIPE DIAMETER 2OIZ 36 4" DIA _ CEILING M401 4" METHANE VENT THRU ROOF SIZE INDICATED IS NOMINAL PIPE DIAMETER PERMIT CENTER PENET TYPE HEIGHT AFF PLAN /ELEVATION VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 0 1" 1/8/10 CC DB RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS 7/31/09 CC DB ISSUED FOR CITY OF TUKWILA PERMITS REV DATE CHK'D APP'D REVISION DESCRIPTION King County Department. of Natural Resources and Parks Solid Waste Division" KPG 753 9th Avenue N Seattle, WA 98109 (206) 286 -1640 www.kpg.com 1117 Broadway Suite 501 Tacoma, WA 98402 (253) 627 -0720 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT ARCHITECTURAL GENERAL OPENINGS SCHEDULE PROJECT NUMBER: C00405C09 SHT. 325 OF: 619 DRAWING NUMBER: AO 17A 0 W C!) J z LL al 0 LL.1 w 0 a MECHANICAL LEGEND SYMBOL DESCRIPTION COMPRESSED AIR CA 4 UNDERGROUND PNEUMATIC RACEWAY A CA COMPRESSED AIR OUTLET PRESSURE SWITCH COLD WATER - FCO NON- POTABLE WATER NPW C HOT WATER (120.0) -- HOT WATER (140°) - -140 DESIGNATION NOTES THIS SHEET) " HOT WATER CIRCULATING (120 °) - - - WASTE ►, VENT RAIN WATER RW --- LEACHATE WASTE ' LW —^ RAINWATER SUCTION RWS - TEPID WATER (85°) TW . °A # TEPID WATER RETURN TWR THERMOSTAT, # INDICATES EQUIPMENT SERVED CONDENSER WATER SUPPLY --. CWS #' CONDENSER WATER RETURN CWR CARBON MONOXIDE SENSOR # INDICATES EQUIPMENT SERVED C HEATING WATER SUPPLY HWS CARBON DIOXIDE SENSOR # INDICATES EQUIPMENT SERVED HEATING WATER RETURN HWR ® FUEL OIL SUPPLY (B20) FOS +' CFM FUEL OIL RETURN (B20) --- FOR 16x10 MEDIUM PRESSURE HIGH VOLUME MISTING MPHV -- HIGH PRESSURE LOW VOLUME MISTING HPL1 - DUCT (WIDTH, HEIGHT), L INDICATES UNED DUCT (DIMENSIONS CLEAR INSIDE) FIRE SPRINKLER F ,-.- - T --9.--- - HYDRAULIC OIL C HO C CONDENSATE ---^ -- C( FIRE DEPARTMENT PUMPER CONNECTION PIV POST INDICATIOR VALVE W/ TAMPER SWITCH D4 - -111 -- UNION DUCT SECTION (SUPPLY) CHECK VALVE Pli �1 BUTTERFLY VALVE • . 0 BALL VALVE (� OL E P- RELIEF OR SAFETY VALVE VOLUME DAMPER (MANUAL) W/ REMOTE OPERATOR. GATE VALVE D4 BALANCE VALVE RSLRZCZJ- FLEXIBLE DUCT REDUCED PRESSURE BACKFLOW PREVENTER _ PRESSURE REGULATOR CRG ..4..... M SOLENOID VALVE —J PDI -'A' WATER HAMMER ARRESTOR. LETTER INDICATES PLUMBING & DRAINAGE- INSTITUTE SIZE. • . I —0 POC POINT OF CONNECTION THRUST BLOCK SEE DWG C093 7 DESIGNED DRAWN LNS NBD VERIFY - SCALE BAR IS ONE INCH ON ANSI "D" DRAWING O 1" MECHANICAL LEGEND. SYMBOL DESCRIPTION WATER FLOW METER CS 4 THERMOMETER IN THERMOWELL VELOCITY SENSOR PRESSURE GAUGE WITH SNUBBER AND ISOLATION VALVE POC PRESSURE SWITCH WCO PS FCO FLOOR CLEANOUT CO C PRESSURE SENSOR C METHANE VENT 0 TEMPERATURE SENSOR IN THERMOWELL DESIGNATION NOTES THIS SHEET) " M'. MOTORIZED CONTROL VALVE ►, -I I- MOTORIZED BUTTERFLY VALVE ROOF TOP DUCT SUPPORT (SUP) FLOW CONTROL VALVE S `— •opr■■w..w. FCV -w- ,...,w �- 'MOP' "Wm' -- NUMBER, Pv O-EUN, D `4011111111, ".11111.11/ ® ar w # w M . W mow• ..�� r P • W N w'.' ors 0w P" . , 1167 mow- SERVED. °A # TEMPERATURE SENSOR WITH LOCAL ADJUSTMENT. # INDICATES EQUIPMENT SERVED 0 # THERMOSTAT, # INDICATES EQUIPMENT SERVED ®R # REVERSE ACTING THERMOSTAT # INDICATES EQUIPMENT SERVED #' MOTION SENSOR # INDICATES EQUIPMENT SERVED '� # CARBON MONOXIDE SENSOR # INDICATES EQUIPMENT SERVED C 0 # CARBON DIOXIDE SENSOR # INDICATES EQUIPMENT SERVED � (1,2 # NITROUS OXIDE SENSOR # INDICATES . EQUIPMENT SERVED ® SPEED CONTROLLER # INDICATES EQUIPMENT SERVED +' CFM SIDEWALL SUPPLY REGISTER 16x10 SWR SIDEWALL RETURN REGISTER '~" —CFM 10/4L DUCT (WIDTH, HEIGHT), L INDICATES UNED DUCT (DIMENSIONS CLEAR INSIDE) DUCT (FIRST FIGURE, SIDE SHOWN) 20/12 4 UNED DUCT, INSIDE DIMENSION (FIRST FIGURE, SIDE SHOWN) 1" LINER EXCEPT WHERE INDICATED, I.E. 20/12L (2") 20/12L E2 DUCT SECTION (SUPPLY) Pli DUCT SECTION (EXHAUST, .RETURN, OR OUTSIDE AIR) 0 ROUND. DUCT, ROUND OL E P- VOLUME DAMPER (MANUAL) W/ REMOTE OPERATOR. - R ..- .v�rv® • ....p.- ,..m. -imp www w'MI NNW w FLEXIBLE CONNECTION RSLRZCZJ- FLEXIBLE DUCT FF8 "4� CFM CD -# # INDICATES TYPE OF DIFFUSER PER SCHEDULE Is CRG ..4..... M CEILING RETURN, EXHAUST OR TRANSFER GRILLE OR REGISTER —J FIRE DAMPER S �-- .... L.N. .` .r. COMBINATION FIRE /SMOKE DAMPER ® AIM. ..■ .® .illi. Aims..mi.. AIM.. ANIMA - -- SR .--- CORRIDOR COMBINATION FIRE /SMOKE DAMPER. MECHANICAL LEGEND SYMBOL DESCRIPTION REFRIGERANT LINE SET _ _ - - f► �. # Allii■A i -_ vf VELOCITY SENSOR POC POINT OF. CONNECTION WCO WALL CLEANOUT FCO FLOOR CLEANOUT CO SURFACE CLEANOUT METHANE VENT 0 OPENING NUMBER (SEE OPENING B DESIGNATION NOTES THIS SHEET) " ROOF TOP DUCT • SUPPORT (ANCHORED) S ROOF TOP DUCT SUPPORT (SUP) S `— •opr■■w..w. -w- ,...,w �- 'MOP' "Wm' -- GENERAL NOTES 1. WHERE CONNECTIONS. TO EXTERIOR UTILITIES ARE INDICATED, RESPECTIVE DIV. 21, DIV. 22, DIV. 23 • CONTRACTOR SHALL VERIFY POINT OF CONNECTION AND MAKE CONNECTION TO EXTERIOR UTILITY. 2. EQUIPMENT SHALL BE PROVIDED AS SCHEDULED /INDICATED BY MANUFACTURER AND MODEL NUMBER OR APPROVED EQUAL. OPENING DESIGNATION NOTES: 1 OPENINGS BETWEEN ROOMS OR SPACES ARE IDENTIFIED BY THE SYMBOL WITH DISCRETE OPENING. NUMBERS ASSIGNED TO THE TWO ROOMS OR SPACES. 2. REFER TO OPENING SCHEDULE ON SHEETS A016 AND A017 FOR NUMBERING NOMENCLATURE. 3. OPENINGS ARE SCHEDULED FOR PENETRATIONS WHICH ARE FOUR (4) INCHES OR GREATER IN SIZE. 4. OPENINGS FOR CEILING REGISTERS, GRILLES AND DIFFUSERS ARE NOT INCLUDED IN THE OPENING SCHEDULE. 5. OPENINGS FOR PENETRATIONS LESS THAN FOUR (4) INCHES IN SIZE ARE NOT INCLUDED IN THE OPENING SCHEDULE. 6. OPENINGS FOR PENETRATIONS IN CONCRETE SHALL BE CAST -IN -PLACE FOR SIZES EIGHT (8) INCHES OR GRATER. OPENINGS LESS THAN EIGHT (8) INCHES MAY BE CAST -IN -PLACE OR DRILLED. LINE SIZE DESIGNATION FIRST # LEFT TO LAST # RIGHT FIRST # TOP TO LAST # BOTTOM FIRST # TOP TO LAST # BOTTOM FIRST # LEFT TO LAST # RIGHT SEISMIC ISOLATION NOTES SEE DWG A103 AND ASSOCIATED REFERENCED DRAWINGS FOR SEISMIC ISOLATION NOTES AND REQUIREMENTS. 2. IN ALL LOCATIONS WHERE MECHANICAL ITEM PENETRATE THROUGH SEISMIC JOINTS, WHETHER SPECIFICALLY INDICATED ON THE DRAWINGS OR NOT, PROVIDE FLEXIBLE TRANSITIONS WHICH PERMITS THE MOTIONS SET FORTH IN THE STRUCTURAL DRAWINGS AND MAINTAINS THE FIRE RATINGS OF THE WALL, FLOOR OR ROOF ASSEMBLIES PENETRATED. 6/10/10 JAR LNS FINAL ISSUED FOR CITY OF TUKWILA PERMITS C 1/8/10 JAR LNS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION B 1./8/10 JAR LNS RESPONSE TO CITY OF, TUKWILA CORRECTION LETTERS A REV 7/31/09 DATE JAR CHK'D LNS APP'D ISSUED FOR CITY OF TUKWILA PERMITS REVISION DESCRIPTION . King County Department of Natural Resources and Parks Waste Division LNS LNS ENGINEERS, INC. 7713 PIONEER WAY SUITE C GIG HARBOR, WASHINGTON 98335 PHONE: 253.851 .51 75 REVIEWED FOR CODAPCE PROVED MAY 13 2013 City of Tukwila BUILDING DIVISION M 9 s CITY orto ?, Ft PEC 1: 8 2012 PERMIT CET °ER. 1 -500 -424 -5555 H Li BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT MECHANICAL LEGENDS PROJECT NUMBER: C00405C09 SHT. OF 454 DRAWING NUMBER: M01.1 619 LL 0) 0 N ri 2 ,r 0 0 0 REMARKS: O PROVIDE FACTORY MOUNTED VARIABLE FREQUENCY DRIVE WITHIN WEATHER PROOF CONTROL PANEL. O UNIT SHALL BE OF WEATHER PROOF CONSTRUCTION FOR ROOF CURB INSTALLATION. ROOF CURB PROVIDES SEISMIC RESTRAINT. O INSTALL DIV. 28 SUPPLY DUCT SMOKE DETECTOR. 0 UNIT SHALL BE PROVIDED WITH SPLIT POWER CONNECTION, ONE CIRCUIT FOR DUCT HEATER, ONE CIRCUIT FOR FAN MOTORS. O HEATING /COOLING PERFORMANCE IS ARI LISTING INFORMATION FOR HEAT PUMP CONDENSING UNIT CU -S1. ® UNIT SHALL HAVE SPLIT SYSTEM HEAT PUMP HEATING /COOLING WITH 100% OUTSIDE AIR ECONOMIZER. O UNIT SHALL HAVE INTERNAL SPRING ISOLATION FOR FAN(S). ® ELECTRIC DUCT HEATER SHALL BE FACTORY INSTALLED AND PROVIDED WITH SCR CONTROL 0 -10VDC OR 4 -20MA. O UNIT SHALL BE ANCHORED TO FLOOR WITH A MINIMUM OF SIX(6) (3 PER SIDE) - 1/2* ANCHOR BOLTS. SEE THRU BOLT DETAIL ON S013. MAKE ATTACHMENTS TO UNIT AT SECTION SPLITS. PR a VID R LIEF D P S N THE U -T1 RE EF P U FOR CON RE CE 20 NTI 41. 14 ' ELI F OD -_- . - FAN SCHEDULE A. A NDLI G U NI 1 L SERVICE TYPE MINIMUM CFM STATIC PRESSURE IN W.G. WHEEL ELECTRICAL LOAD SHEDDING WEIGHT SYMBOL MANUFACTURER MODEL N0. CONFIGURATION SUPPLY FAN RETURN FAN DX COOLING COIL HEAT PUMP HEATING HOT WATER HEATING COIL DUCT HEATER ELECTRICAL LOAD SHEDDING FILTERS MIN..O..A. CFM WEIGHT (LBS) REMARKS CFM RPM TOTAL SP (IN.) WP V PH CFM RpM TOTAL SPIN) HP V PH ( TOTAL CAPACITY PACITY MBH) SENS CAPAC TY (MBH) u EAT (F) SEER EAT (F) _ HIGH TEMP (MBH) L (F) - LOW TEMP (MBH) lA T (F) HSPF CAPACITY (BTUH) EAT ( °F) LAT ( °F) GPM EWT ( °F) P.D. (F.) KW V PH MCA V PH STARTER DISCONNECT DB WB EF -T3 AAON RM- 008 -3- 000 -EJN VARIABLE VOLUME 100% 'O.A; _ 33.35 1629 2.7 3 460 3 - - - - - - - - - - - _ - - - - - 154,000 20 5.8 30 110 14 _ - - 4 460 3 DIV. 23 MANUF. DIV. 26 NO 30 MERV 95 13 2495 835 � 0 0 ®' l;! AHU-T1 2 208 3 600 1576 1.0 1 208 1 3 46.6 35.4 84 67 4 14.7 55 � 43.8 90 28.4 78 8.7 025 - - - - - 15.75 208. 3 55 208. 3 DIV. DN. 26 NO MERV .13 400 2443 4. 5 6 7 8 9 10 0 0 0 0 0 0 0 HVAC -St MON M2 -H- 005- R- 8- A- A -0 -C -0 HORIZONTAL INDOOR ' CONSTANT VOLUME 1150 1979 2.1 1200 23 DIV 26 NO 25 - - - INFRA -RED RADIENT HEATER EF -T8 COOK MODEL GC240 TOILET 110 TOILET 110 EXHAUST CEILING CABINET FAN 100 ■ - 65W 120 1 1200 BAS DIV 23 DIV 26 NO 25 YES - - INFRA -RED. RADIENT HEATER EF -T9 COOK MODEL 195SQNB HPU ROOM 109 HPU ROOM EXHAUST HORIZONTAL IN -UNE 4,000 0.75 19.5 " 1 -1/2 460 3 1065 DIV 26 DIV 26 NO 300 SPRING THRUST REMARKS: O PROVIDE FACTORY MOUNTED VARIABLE FREQUENCY DRIVE WITHIN WEATHER PROOF CONTROL PANEL. O UNIT SHALL BE OF WEATHER PROOF CONSTRUCTION FOR ROOF CURB INSTALLATION. ROOF CURB PROVIDES SEISMIC RESTRAINT. O INSTALL DIV. 28 SUPPLY DUCT SMOKE DETECTOR. 0 UNIT SHALL BE PROVIDED WITH SPLIT POWER CONNECTION, ONE CIRCUIT FOR DUCT HEATER, ONE CIRCUIT FOR FAN MOTORS. O HEATING /COOLING PERFORMANCE IS ARI LISTING INFORMATION FOR HEAT PUMP CONDENSING UNIT CU -S1. ® UNIT SHALL HAVE SPLIT SYSTEM HEAT PUMP HEATING /COOLING WITH 100% OUTSIDE AIR ECONOMIZER. O UNIT SHALL HAVE INTERNAL SPRING ISOLATION FOR FAN(S). ® ELECTRIC DUCT HEATER SHALL BE FACTORY INSTALLED AND PROVIDED WITH SCR CONTROL 0 -10VDC OR 4 -20MA. O UNIT SHALL BE ANCHORED TO FLOOR WITH A MINIMUM OF SIX(6) (3 PER SIDE) - 1/2* ANCHOR BOLTS. SEE THRU BOLT DETAIL ON S013. MAKE ATTACHMENTS TO UNIT AT SECTION SPLITS. PR a VID R LIEF D P S N THE U -T1 RE EF P U FOR CON RE CE 20 NTI 41. 14 ' ELI F OD -_- . - FAN SCHEDULE SYMBOL SYMBOL MANUFACTURER MODEL N0. LOCATION SERVICE TYPE MINIMUM CFM STATIC PRESSURE IN W.G. WHEEL ELECTRICAL LOAD SHEDDING WEIGHT VIBRATION ISOLATION SEISMIC RESTRAINT REMARKS SIZE HP V PH RPM STARTER DISCONNECT (LBS) TYPE STATIC DEFL EF -T1 COOK . MODEL 36AFBC T50 EQUIP LEVEL ROOM 108 COMPACTOR/ YARD WASTE GEN..EXHAUST HORIZONTAL IN -UNE 18,000 1.5 36 ". 15 460 3 797 DIV 26 DIV 26 NO 606 SPRING THRUST 3" CABLE KING ELECTRIC DEC 1215 -SS EF -T2 COOK MODEL.60AFBC TSO ROOF LEVEL TRANSFER STATION GEN. EXHAUST HORIZONTAL IN -UNE 45,000 1.5 60 " 25 460 3 797 VFD DIV 23 DIV 26 NO 1654 SPRING RU » 3 INTEGRAL TO ISOLATORS KING ELECTRIC N. E DEC 1215 -SS EF -T3 COOK MODEL 60AFBC TSO ROOF LEVEL TRANSFER STATION GEN. EXHAUST HORIZONTAL IN LINE 45,000 1.5 60 " 25 460 3 797 VFD DIV 23 DIV 26 NO 1654 SPRING THRUST 3" INTEGRAL TO ISOLATORS KING ELECTRIC SBF 31205 EF -T4 COOK MODEL 12OACEB TSO ROOF LEVEL TSO GENENERAL EXHAUST ROOFTOP CENTRIFUGAL 870 0.5 12" 1 /3 120 1 1160 �S 2 DIV 23 DIV 26 NO 100 - - CURB MOUNT 0 EF -T5 COOK MODEL GN420 COMPACTOR LEVEL. MENS RESTROOM COMPACTOR LEVEL RESTROOM EXHAUST IN -LINE CABINET FAN 200 0.375 - 172W 120 . 1 1075 BAS 23 DIV 26 NO 30 SPRING 0.75" CABLE CEILING RADIENT HEATER EF -T6 COOK MODEL GC240 TOILET 116 ;rEXHAUST CEILING CABINET FAN 100 025 - 65W 120 1 1200 DIBAS 23 V DIV 26 NO 25 - - - INFRA -RED RADIENT HEATER EF -T7 COOK MODEL GC240 TOILET' 104 TOILET 104 EXHAUST CEILING CABINET FAN. 100 0:25 - 65W 120 1 1200 23 DIV 26 NO 25 - - - INFRA -RED RADIENT HEATER EF -T8 COOK MODEL GC240 TOILET 110 TOILET 110 EXHAUST CEILING CABINET FAN 100 0.25 - 65W 120 1 1200 BAS DIV 23 DIV 26 NO 25 YES - - INFRA -RED. RADIENT HEATER EF -T9 COOK MODEL 195SQNB HPU ROOM 109 HPU ROOM EXHAUST HORIZONTAL IN -UNE 4,000 0.75 19.5 " 1 -1/2 460 3 1065 DIV 26 DIV 26 NO 300 SPRING THRUST 0.75" CABLE ELECTRIC UNIT HEATER -T10 COOK MODEL GC420 ELECTRIC ROOM 115 TRANSFORMER HEAT EXHAUST CEILING CABINET FAN 275 0EF ,20 - 170W 120 1 935 DN BAS 23 DIV 26 NO 30 - - _ EF -T11 . COOK MODEL 42XLPH NORTH PROCESSING AREA GENERAL EXHAUST PROPELLER WALL FAN 8,000 0.375 " 42" 1 -1 /2 460 3 540 DIV 26 DIV 26. NO 482 - _ WALL MOUNT 02 SF -T1 COOK MODEL 365SQN -HP COMPACTOR LEVEL COMPACTOR LEVEL SUPPLY CENTRIFUGAL IN -UNE 5,000 0.5 36" 5 460 3 1340 DIV 26 DIV 26 NO 397 SPRING 0.75 INTEGRAL TO ISOLATORS C EF -S1 COOK MODEL GN240 SCALE FACILITY MEZZ TOILET /STORAGE EXHAUST. IN -UNE CABINET FAN 100 0.25 - 54W 120 1 1260 DN 23 DIV 26 NO 25 SPRING 0.75" CABLE EF -S2 COOK MODEL GN240 SCALE FACILITY MEZZ ELECTRICAL ROOM EXHAUST IN -LINE CABINET FAN 100 0,25 - 54W 120 1 1260 DIV 23 DIV 26 NO 25 SPRING 035" CABLE BF -S1' COOK MODEL 225SQNB SCALE FACILITY VEHICLE TAIL PIPE BLOWER CENTRIFUGAL IN -UNE FAN 4 000 0.75 22.5" 1 208 1 725 VFD DN 23 DIV 26 NO 350 SPRING 2" INTEGRAL TO ISOLATORS BF -S2 COOK MODEL 225SQNB SCALE FACIUTY VEHICLE TAIL PIPE BLOWER CENTRIFUGAL IN -UNE FAN 4 000 0.75 22.5" 1 208 1 725 VFD DIV 23 DIV 26 NO 350 SPRING 2" INTEGRAL TO ISOLATORS ELMARISS: . PROVIDE WITH CURB MOUNT BACKDRAFT DAMPER: 20 PROVIDE WITH EXHAUST WALL CAP, 12x6 ". ELECTRIC HEATER SCHEDULE SYMBOL DESCRIPTION MANUFACTURER MODEL NO. AREA SERVED ELECTRICAL LOAD SHEDDING REMARKS KW /W VOLTS PHASE DISCONNECT EWH T1 WALL HEATER KING 1215 -SS ELECTRIC DEC COMPACTOR BAY UNISEX TOILET C07 500 W 120 1 DIV. 26 NO 1 0 EWH� -T2 WALL HEATER KING ELECTRIC DEC 1215 -SS COMPACTOR BAY UNISEX TOILET C08 500 W 120 1 DIV. 26 NO EWH -T3 WALL HEATER giLG ELECTRIC 1215 -SS TIPPING FLOOR TOILET 116 500 W 120 1 DN. 26 NO EWH -T4 WALL HEATER KING ELECTRIC DEC 1215 -SS TIPPING FLOOR ROOM 104 500 W 120. 1 DIV. 26 NO EWH -15 WALL HEATER KING ELECTRIC DEC 1215 -SS TIPPING FLOOR ROOM 110 500 W 120 1 DIV. 26 NO 01 EW H -T6 WALL HEATER KING ELECTRIC N. E DEC 1215 -SS FIRE SPRINKLER RISER #2 500 W 120 1 DN. 26 NO 0 EWH -S1 WALL HEATER KING ELECTRIC DEC 1215 --SS - SCALE -HOUSE TOILET 500 W 120 1 DIV. 26 NO BH -S1 BASE BOARD HEATER KING ELECTRIC SBF 31205 gJ...TRANS_ H : ACTION WINDOW 500 W 120 1 ` DIV. 26 NO BH -S2 BASE BOARD HEATER KING ELECTRIC KIN 31205 gTIJ.S -- ACTION WINDOW 500 W 120 t DIV. 26 NO IRH -R1 RADIENT ' HEATER FOSTORIA 223 -60- THSS -208V RECYCLE WARMING ROOM 602 3.2 KW 208 1 DIV. 26 NO RH -S1 CEWNG RADIENT HEATER MARKEL CP 807 SCALE- HOUSE- TRANS- ACTION WINDOW 750. W 208 1 • DIV. 26 • NO RH -S2 CEILING RADIENT HEATER MARKEL CP 807 SCALE- HOUSE- TRANS- ACTION WINDOW 750 W 208 1 DIV. 26 NO � ® RH -T1 CEILING RADIENT HEATER. MARKEL CP 123 TSO 209 SUPERVISOR OFFICE 375 W 120 1 DIV. 26 NO IRH T1 INFRA -RED RADIENT HEATER FOSTORIA 223 -60- THSS -480V. TIPPING FLOOR SOUTH EMPLOYEE WARMING AREA 6 KW 480 ° 3 DIV. 26 YES 5 IRH -T2 INFRA -RED RADIENT HEATER FOSTORIA 223 -60- THSS -480V RECIEVING FLOOR SOUTH EMPLOYEE WARMING AREA 6 KW 480 3 DIV. 26 Y 05 IRH -T3 INFRA -RED RADIENT HEATER 223 -6 IA 223 -60- THSS -480V TIPPING FLOOR NORTH. EMPLOYEE WARMING AREA 6 KW 480 3 DIV. 26 • YES 0 ® IRH -T4 INFRA -RED RADIENT HEATER FOSTORIA 223 -60- THSS -480V COMPACTOR LEVEL COMPACTOR #1 6 KW 480 3 DIV. 26 YES 0 0 IRH -T5 INFRA -RED. RADIENT HEATER 223 6 IA 223 - 0- THSS -480V COMPACTOR LEVEL COMPACTOR #2 6 KW 480 3 DIV. 26 YES 0 06 UH -T1 ELECTRIC UNIT HEATER . KING 4805-3MP ELECTRIC KB 4805-3M TSO EQUIPMENT ROOM 105 5 KW 480 3 DIV. 26 . NO , 0 0 UH -T2 ELECTRIC UNIT HEATER KING ELECTRIC KB 4805 -3MP TSO MISTING AREA ROOM 106 5 KW 480 3 DIV. 26 NO 0 0 c ROAM: SM: 0 PROVIDE WITH INTEGRAL THERMOSTAT. 0 PROVIDE WITH REMOTE THERMOSTAT, INTERLOCKED THROUGH BAS. O PROVIDE TWO -STAGE HEAT. SEPARATE CIRCUITS REQUIRED FOR EACH STAGE. O CONTROL BY ROOM TEMPERATURE SENSOR - INTERLOCKED THROUGH BAS. ACTIVATE BY MOTION SENSOR, THROUGH BAS, WITH LOCKOUT ABOVE 50'F (ADJUST PROVIDE WITH SUSPENSION HARDWARE. REVIEWED FOR CODE COMPLIANCE APPROVED MAY .13 2013 LE) City of Tukwila BUILDING. DIVISION V 0 W ce 0 m 0) 0 00 J +SID b t ) CITY OF T IK v'v. .P DEC '18 20.12 PERMIT CENTER DESIGNED LNS DRAWN NBD 6/10/10 JAR LNS FINAL ISSUED FOR 'CITY OF TUKWILA PERMITS 1/8/10 JAR LNS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION VERIFY SCALE BAR IS ONE INCH ON A ANSI "D" DRAWING 0 1" REV. 1/8/10 JAR LNS RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS 7/31/09 JAR LNS ISSUED FOR CITY OF TUKWILA PERMITS DATE CHK'D APP'D REVISION DESCRIPTION King County Department of Natural Resources and Parks Solid Waste. Division LNS LNS ENGINEERS, INC. 7713 PIONEER WAY • SUITE C GIG HARBOR, WASHINGTON 98335 PHONE: 253.851.51 75 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT MECHANICAL SCHEDULES - SHEET 3 MP19s PROJECT NUMBER: C00405C09 SHT. OF: 457 . 61.9 DRAWING • NUMBER: M014 z LL Sri 0 2 CO June 3, 2010 0 co c WATER TO WATER HEAT PUMP SCHEDULE SYMBOL FLORIDA HEAT PUMP MODEL NO LOCATION SERVICE REFRIG. (F s) HEATING ELECTRICAL WEIGHT LBS ( ) REMARKS CAPACITY (BTUH) SOURCE '(30% , GLYCOL LOAD COP KW VOLTAGE /PH MCA MCP STARTER DISCONNECT LOAD SHEDDING o F ` ) GPM A. a F low-Fri GPM r WWHP -T1 WW122 -4 TSO LEVEL MAKE -UP HEATING HEATING R =410A (103) 174,780 70 61 30.0 11.9 100 110 30.0 13.6 5.38 9.53 460/3 21.8 30.0 INTEGRAL DIV. 26. NO 520 SENSIBLE WWHP-T2 WW024 -2 TSO EQUIPMENT LEVEL TANK HEATING R -41 QA (3.0) 36,200 70 61 6.2 4.1 100 110 5.0 3.4 4.98 /13 265/1 14.0 25.0 INTEGRAL DN. 26 NO 250 3.0 70 62 11.0 4.5 1/10 0.9 3.3 265/1 5.0 15 INTEGRAL DIV. 26 NO 24x20x4 13 129 ' 3/4" 3/4" 3/4" / SPRING 0.75" CABLE C 1 1. PROVIDE FOUR(4) • RUBBER IN SHEAR SEISMIC ISOLATORS ANCHORED TO CONCRETE FLOOR. SEE DETAIL 6/M018. MISCELLANEOUS HYDRONIC EQUIPMENT SCHEDULE EQUIP NO DESCRIPTION MANUFACTURER, MODEL CAPACITY ELECTRICAL WEIGHT POUNDS REMARKS POWER VOLT PHASE STARTER DISCONNECT LOAD SHEDDING DC -T1 DRY COOLER COLMAC COIL AFV- 45108- 1124L- 030- 1 -DT -D 140 MBH 9.8 RA 460 3 DIV 23 DIV 26 NO 1,160 LWT (° F} 6 EB -T1 ELECTRIC BOILER LATHER S60LW -4803 205 MBH 60 KW 480 3 DIV. 23 DIV. 26 NO 550 3, 5 ST-11 STORAGE TANK RIVERSIDE HYDRONICS V- 2000A -P1 2000 GAL - - - - - - 22,000 2 4 +C -T2 SENSIBLE RIVERSIDE HYDRONICS Wg - HHP -T1 - TSO COMPACTOR LEVEL COMPACTOR . LEVEL BREAK ROOM 5,400 400 BF STORAGE TANK -P V- 475A 1 475 GAL 79 61 - 79 3.0 - 12.4 2 4 66 3.0 70 62 11.0 4.5 1/10 0.9 3.3 265/1 5.0 15 REMARKS: 1. CAPACITY AT .95'F DB 2. AS ETNK 3. • ROVIDE W/ -STEP CONTROL 4. TANK SHALL BE ANCHORD TO . CONCRETE FLOOR. SEE DETAIL 5/M018. 5. ANCHOR TO CONCRETE FLOOR. SEE DETAIL 6/M018. 6. PROVIDE SIX(6) RUBBER -IN -SHEAR SEISMIC ISOLATORS ANCHORED TO ROOF CURBS.` SEE DETAIL B/M138. HYDRONIC HEAT PUMP SCHEDULE EQUIP ID MANUFACTURER MODEL NO SYMBOL FLORIDA HEAT PUMP MODEL N0. LOCATION SERVICE REFRIG. ( #�S) CFM ESP (INCHES} MIN O,A, CFM COOLING HEATING ELECTRICAL LOAD SHEDDING FILTER WEIGHT LBS (LBS) PIPING CONNECTION 19,000 VIBRATION ISOLATION SEISMIC . RESTRAINT REMARKS P CAPACITY (BTUH) o EAT (0F) EWT (" F) LWT (° F} GPM P.D. (FT) EER CAPACITY (BTUH) EAT 0 F) GPM EWT 0 F) LWT 0 F) P.D. (F} COP BLOWER COMPRESSOR RLA VOLTAGE /PH MCA MCP STARTER DISCONNECT SIZE MERV CWS CWR C / IYPE STAT DEFL TOTAL SENSIBLE pg Wg HP FLA HHP -T1 EC012 -2 TSO COMPACTOR LEVEL COMPACTOR . LEVEL BREAK ROOM _ 2.010A (2'66) 400 0.25 100 11,600 8,670 79 61 70 79 3.0 11.0 12.4 15,100 66 3.0 70 62 11.0 4.5 1/10 0.9 3.3 265/1 5.0 15 INTEGRAL DIV. 26 NO 24x20x4 13 129 ' 3/4" 3/4" 3/4" / SPRING 0.75" CABLE I 1 HHP -T2 EC036 -4 TSO EQUIPMENT MULTI- PURPOSE R -410A (3.88) 1,200 0.25 350 40,250 30,200 83 64 70 79 9.0 9.1 13.8 49,300 66 9.0 70 63 9.1 4.4 1/2 2.0 5.4 460/3 8.8 15 INTEGRAL DIV. 26 NO 24x20x4 13 253 « 3/4 « 3/4 3/4 3/4" ) SPRING « 035. CABLE ' 2, 3 HHP -T3 ... EC036 -4 TSO EQUIPMENT RM 202 LOCKER � :ROOMS R -410A (3.$8) 1,300 0.25 520 - 38,950 29,100 81 71 70 79 9.0 9.1 13.8 37,000 64 9A 70 63 9.1 4.5 1/2 2 0 5.4 460/3 8.8 15 INTEGRAL DIV. 26 NO 24x20x4 13 253 3/4" 3/4" 3/4" / SPRING 035" CABLE I 1 HHP-T4 ECO24 -4 TSO EQUIPMENT RM 202 OFFICE. 209 BREAK ROOM R -41 QA (3.t3} 800 0.25 240 26,900 20,000 •79 64 70 81 6.0 12.3 13.8 30,750 66 6.0 70 • 62 12.3 4.4 1/4 0.9 3.6 460/3 5.4 10 INTEGRAL DIV. 26 NO 24x20x4 13 205 3/4" 3/4" 3/4" / / SPRING 0.75" CABLE I I 1 HHP-T5 ECO24 -4 TSO EQUIPMENT RM 202 SERVER ROOM 206 R- 3. 13) ( ) 800 0.25 20 24,750 18,450 75 71 70 83 6.0 12.3 13:8 30,000 70 6.0 70 62 12.3 4.3 1/4 0.9 3.6 460/3 5.4 10 INTEGRAL DIV, 26 NO 24x20x4 13 205 3/4" 3/4" 3/4" / ■ SPRING 035" CABLE ( HHP, -T6 EC018 -2 TSO EQUIPMENT RM 202 CIRCULATION OFFICE 205 & 204 R -410A (2.8) 650 0.25 100 18,500 13,800 77 63. 70 81 4.0 117 12.5 24,600 68 4.0 70 61 117 4.4 1/4 1.6 7.1 265/1 10.5 15. INTEGRAL DIV. 26 NO 24x20x4 13 180 3/4" 3/4" 3/4" SPRING 0.75" CABLE I 1 HHP -T7 EC036 -4 TSO EQUIPMENT RM 202 COMFRENCE ROOM 203 R -410A (3.88) 1,200 025 80 39,600 29,600 82 63 70 87 12.0 102 14.0 49,000 63 9.0 70 62 9.1 4.5 1/2 2:0 5.4 460/3 8.8 15 INTEGRAL DIV. 26 NO 24x20x4 13 253 3/4" 3/4" 3/4" / SPRING 0.75" CABLE ) 1• 3 C REMARKS: 1. SPACE TEMPERATURE SENSOR TO INCLUDE PROVISIONS FOR LOCAL ADJUSTABIUTY OF SETPOINT - DDC SYSTEM TO INCLUDE RANGE OF ADJUSTABIUTY. 2• TEMPERATURE TO BE MAINTAINED BY AVERAGE OF LOCKER ROOM TEMPERATURES - DDC SYSTEM TO PROVIDE SETPOINT CONTROL (NO LOCAL SETPOINT ADJUSTMENT). 3. VENTILATION RATE TO BE CONTROLLED BY ROOM CO2 SENSOR FOR HIGH OCCUPANCY ROOMS. HEAT PUMP INDOOR UNIT (DUCTLESS SPLIT) EQUIP ID MANUFACTURER MODEL NO CAPACITY BTUH /HEAT CAPACITY BTUH /COOL CFM ELECTRICAL WEIGHT LBS ( ) LOCATION SERVED REMARKS MCA VOLTS /PH MOCP STARTER DISCONNECT LOAD SHEDDING _ HP T1 MITSUBISHI PKA- A18GAL 19,000 18,000 320 0 425 1 • 208 1 / 15 INTEGRAL DIV. 26 NO 35 MACHINE ROOM 1, 2, 3, 4 99 COMPACTOR LEVEL 1, 2, 3 PU - A18NFi�1 CU -S1 g� A- 048 -2 -B -1 46,000 45,500 14.7 8.7 20 460/3 30 INTEGRAL DIV. 26 REMARKS: 1, PROVIDE WITH WIRED ' WALL MOUNT CONTROLLER. 2. INTERLOCK WITH CU -T1. 3. . WAU. MOUNTED, BOTTOM OF UNIT 7' -6" AFF. 4. PROVIDE WITH ACCESSORY CONDENSATE PUMP.. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 132013 City of Tukwila ILDING DIVISION CONDE`ISING UNIT SCHEDULE EQUIP ID MANUFACTURER MODEL NO. CAPACITY - • BTUH SEER HSPF ELECTRICAL 0 WEIGHT (LBS) LOCATION REMARKS HEATING COOLING MCA VOLTS PH MOCP STARTER DISCONNECT LOAD SHEDDING CU -T1 /".'"--r UB18N 19,000 18,000 14.1 9.5 13.0 208/1 20 INTEGRAL DIV. 26 NO 99 COMPACTOR LEVEL 1, 2, 3 PU - A18NFi�1 CU -S1 g� A- 048 -2 -B -1 46,000 45,500 14.7 8.7 20 460/3 30 INTEGRAL DIV. 26 NO 260 SCALE 4 REMARKS: 1. INTERLOCK WITH HP -T1 2. UNIT SHALL BE MOUNTED ON WALL SUPPORT BRACKET W/ FOUR (4) RUBBER -IN -SHEER ISOLATORS. TE: 0 H .V -S . PROVID F UR 4) - UB o ER N HEA ISOLATORS AN HO' ED TO CONCRETE PAD. ROOF CAP SCHEDULE SYMBOL MANUFACTURER MODEL NO. ROOF OPENING FREE AREA (FT) CURB CAP SIZE REMARKS RC -T1 PR -8 COOK 9 "0 0.94 18" X 18" 1 2 REMARKS: 1, SEE DWG AXXX FOR ROOF CURB 2. SECURE ROOF CAP TO CURB W FOUR (4) • #10 - 1 -INCH STAINLESS. STEEL FASTENERS (ONE EACH SIDE). Mii s CITY OF TO10?M DEC 18 2012 PERMIT CENTER DESIGNED LNS DRAWN NBD 6/10/10 JAR LNS FINAL ISSUED FOR CITY OF TUKWILA PERMITS C 1/8/10 JAR LNS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 0 1" 1/8/10 JAR LNS RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS A 7/31/09 JAR LNS ISSUED FOR CITY OF TUKWILA PERMITS. DATE CHK'D APP'D REVISION DESCRIPTION King County Department of Natural Resources and Parks Solid Waste Division LNS LNS ENGINEERS, INC. 7713 PIONEER WAY • SUITE 0 GIG HARBOR, WASHINGTON 98335 PHONE: 253.851 .51 75 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT MECHANICAL SCHEDULES SHEET 4 PROJECT NUMBER: C00405C09 SHT. OF: 458 619 DRAWING NUMBER: M015 1-800-424-5555 w 0 cad \2007 \07785.bow — Take —ts \BOW —. a 0 N M 0) • 0 0) HEAT EXCHANGER SCHEDULE SYMBOL MANUFACTURER MODEL NO. LOCATION SERVICE HOT SIDE COLD SIDE REMARKS FLOW RATE (GPM) ENTERING FLUID. TEMP ( °F) LEAVING FLUID TEMP ( °F) FLUID TYPE MAX. PD. (FT -H20) FLOW RATE (GPM) ENTERING FLUID TEMP ( °F) LEAVING FLUID TEMP ( °F) FLUID TYPE MAX. PD. (FT-H20) WEIGHT HX -F1 MUELLER ACCU -THERM FUEL STORAGE FUEL STORAGE TANK HEATING 5 110 95 30% GLYCOL 1.0.0 10 40 48 B20 DIESEL 10.0 2.4 BLADDER 120 VAV -T2 ET -T4 JOHN WOOD Jon-22-413 TSO CO6 NON-POTABLE BOOSTER PUMP 264 264 BLADDER 3050 1, 2 DET -T1 AMTROL THERM -X -TROL ST -42 TSO 105 DOMESTIC HOT WATER 20 .8.6 BLADDER 260 • 1 DET -R1 AMTROL THERM -X -TROL ST -12 WAgN2 MIG DOMESTIC HOT WATER 4.4 1.9 BLADDER 70 24 - AMTROL ERM- X -TROL THERM-X-TROL TH ST -5 SCALE HOUSE ATTIC EXPANSION TANK SCHEDULE SYMBOL MANUFACTURER MODEL NO LOCATION SERVICE TANK VOL (GAL) ACCEPTANCE VOL (GAL) TYPE FULL WEIGHT (POUNDS) REMARKS ET -T1 AMTROL EXTROL AX -200V TSO LOADING AREA 109. CONDENSER WATER SYSTEM 110 34 BLADDER 1175 1 ET -T2 AMTROL EXTROL AX -15V TSO LOADING AREA 109. MAKEUP AIR HEATING 8 2.4 BLADDER 120 1 ET -T3 AMTROL EXTROL AX -15V TSO C06 FUEL HEATER 8 2.4 BLADDER 120 VAV -T2 ET -T4 JOHN WOOD Jon-22-413 TSO CO6 NON-POTABLE BOOSTER PUMP 264 264 BLADDER 3050 1, 2 DET -T1 AMTROL THERM -X -TROL ST -42 TSO 105 DOMESTIC HOT WATER 20 .8.6 BLADDER 260 • 1 DET -R1 AMTROL THERM -X -TROL ST -12 WAgN2 MIG DOMESTIC HOT WATER 4.4 1.9 BLADDER 70 24 - AMTROL ERM- X -TROL THERM-X-TROL TH ST -5 SCALE HOUSE ATTIC DOMESTIC HOT WATER 2.0 0.9 BLADDER 45 350 REMARKS:. 1. ANCHORED TO CONCRETE FLOOR WITH FOUR (4) ANCHOR BOLT. SEE DETAIL :6/M018. 2. EXPANSION TANK ET -T4' SHALL BE CHARGED TO MATCH THE DISCHARGED PRESSURE OF BP -T1. VAV TERMINAL UNIT SCHEDULE TAG TITUS SIZE CFM STATIC PRESSURE. NC LEVELS CONTROL POWER REMARKS UNIT INLET OUTLET MAX MIN. INLET DOWN MIN. oP RAD. DIS VOLTS PH VAV -T1 DESV 7 7 "0 12X10 600 80 1.25 0.25 0.124 27 27 24 - 1 VAV -T2 DESV 9 9 "16 14X12 870 870 1.25 0.25 0.035 24 22 24 - 1 VAV -T3 DESV 5 5 "0 12X8 200 65 1.25 0.25 0.032 25 22 24 - 1 VAV -T4 DESV 8 8 "0 12X10 770 350 1.25 0.25 0.038 29 27 24 - 2 VAV -T5 DESV 6 6 "0 12X8. 400 400 1.25 0.25 0.130 28 25 24 - 2 A VAV -T6 DESV 8 8 "o 12 0 710 10 1.25 6.2 0.038 27 27 24 - 30 3 VAV -T7 DESV 4 4 "0 6 "0 50 50 1.25 0.25 0.032 25 22 24 - -4111r VAV -TB DESV 4 4 "0 6"911 50 50 1..25 0.25 0.032 25 22 24 - 2 AIR SEPARATOR SCHEDULE SYMBOL MANUFACTURER MODEL NO. . LOCATION SERVICE CAPACITY GPM REMARKS AS -T1 AMTROL FILTER 3AS -L TSO LOADING AREA 109 CONDENSER • WATER SYSTEM 82 HP AS -T2 AMTROL . FILTER 109 TSO MECH RM 118 MAKEUP AIR HEATING 30 GRUNDFOS UPS 80 -160 F AS -T3 AMTROL FILTER 109 MECH. RM C09 FUEL STORAGE TANK HEATING 82 Y HYDRONIC SYSTEM PUMP SCHEDULE SYMBOL MANUFACTURER MODEL N0. LOCATION SERVICE TYPE GPM HEAD (FT) ELECTRICAL LOAD SHEDDING MOTOR EFFICIENCY (MIN) REMARKS HP RPM VOLTAGE /PH STARTER DISCONNECT P -T1 GRUNDFOS UPS 80 -160 F TSO EQUIPMENT LEVEL HYDRONIC HEAT PUMP PRIMARY LOOP IN -UNE 82 Y " \ 3 1800 460/3 1 DIV. 26 DIV. 26 NO 4 86.5% FROM NREC 40 P -T2 GRUNDFOS UP 43 -75 F TSO EQUIPMENT LEVEL HYDRONIC HEAT PUMP BOILER LOOP IN -UNE 15 12 1/6 + 1800 1 115/1 BAS RELAY DIV. 23 DIV. 26 NO ' NA P -T3A . GRUNDFOS UPS 40 -80/2 F TSO EQUIPMENT . LEVEL HYDRONIC HEAT T PUMP HPU HEAT EXCHANGE IN -UNE 30 20 3 4 / 1800 115/1 I / BAS RELAY DIV. 23 DIV. 26 NO NA P -T38 GRUNDFOS UPS 40 -80/2 F ISO EQUIPMENT LEVEL HYDRONIC HEAT PUMP HPU HEAT EXCHANGE IN -UNE 30 20 3/4 i' ! 1800 ' 115/1 BAS RELAY DIV. 23 DIV. 26 NO NA P T4 GRUNDFOS UPS 40 -240 F TSO EQUIPMENT LEVEL HYDRONIC HEAT PUMP ROOFTOP HEAT COIL IN -UNE 30 45 I 1 -1/ 1800 i 460/3 DIV. 26 DIV. 26 NO 84.0% FROM NREC p_48 GRUNDFOS UPS 32 -160 F TSO EQUIPMENT LEVEL HYDRONIC HEAT PUMP. DRY COOLER IN -UNE / 30 C 1 3/4 1 1800 i 115/1 I BAS RELAY DIV. 23 DIV. 26 NO ! NA 0 30 GRUNDFOS UP 26 -99 F I SO EQUIPMENT LEVEL FUEL STORAGE TANK HEATER IN-LINE 5 29 i 1 /6 1 115/1 I B AS DDjV. 23�Y DIV 26 NO , NA REMARKS: 1, MINIMUM EFFICIENCY PER THE 2006 NREC. Man: 1. PROVIDE ONE, 110V CIRCUIT FOR TSO UPPER LEVEL VAV UNITS T1, T2 &T 3. BAS CONTRACTOR SHALL PROVIDE TRANSFORMER FOR . CONTROL POWER TO EACH VAV. 2. PROVIDE ONE 110V CIRCUIT FOR TS0 EQUIPMENT LEVEL VAV UNITS T4, T5, T7 & T8. BAS CONTRACTOR SHALL PROVIDE TRANSFORMER FOR CONTROL POWER TO ALL VAV UNITS. 3. PROVIDE ONE 110V CIRCUIT FOR TSO COMPACTOR LEVEL VAV UNIT T6. BAS CONTRACTOR SHALL PROVIDE TRANSFORMER FOR CONTROL POWER TOVAV UNIT.. AIR TERMINAL SCHEDULE SYMBOL DESCRIPTION CD -1 CEIUNG SUPPLY DIFFUSER - TITUS MODEL MCD, BORDER TYPE 3, 24X24 MODULE FOR LAY -IN CEIUNG CD -2 CEIUNG SUPPLY DIFFUSER - TITUS MODEL MCD, BORDER TYPE 1 FOR HARD -UD CEIUNG CD -3 CEIUNG SUPPLY DIFFUSER - TITUS MODEL TMRA-M, ALUMINUM, ROUND WITH ADJUSTABLE CONE FR -1 FLOOR REGISTER - TITUS MODEL TAF -D FLOOR DIFFUSER FR -2 FLOOR REGISTER - . TITUS MODEL TAF -R FLOOR DIFFUSER :;:1;:L SIDEWALL SUPPLY REGISTER - .TITUS MODEL 1700RL, ALUMINUM W/ TYPE C BORDER AND DIRECTIONAL BLADES SG -1 SIDEWALL SUPPLY GRILLE - TITUS MODEL 301FS, ALUMINUM, 1/2" BLADE SPACING, ADJUSTABLE EG -1 EXHAUST GRILLE - TITUS MODEL 355RL. STEEL, 1/2" BLADE SPACING, 35' FIXED DEFLECTION EG -2 . EXHAUST GRILLE - TITUS MODEL 355FL ALUMINUM, 1/2" BLADE SPACING, 35' FIXED DEFLECTION, SURFACE -MOUNT FOR HARD UD CEIUNG OR WALL EXHAUST GRILLE - TITUS MODEL 63FL. HEAVY DUTY ALUMINUM, 1/2" BLADE SPACING, 30' DEFLECTION RG -1 RETURN GRILLE - TITUS MODEL 355FL. ALUMINUM, 1/2" BLADE SPACING, 35' FIXED DEFLECTION TG -1 FILTER TRANSFER GRILLE, DOOR MOUNT - TITUS MODEL 350FLF2 - 2" FILTER TG -2 TRANSFER GRILLE - TITUS MODEL 355FL. ALUMINUM, 1/2" BLADE SPACING, 35' FIXED DEFLECTION REMARKS: 1. ALL TERMINALS:. SIZE AS NOTED ON DRAWINGS REVIEWED FOR CODE COMPLIANCE APPROVED MAY 1 3 2013 City of Tukwila BUILDING DIVISION 0 DESIGNED LNS DRAWN 6/10/10 JAR LNS FINAL ISSUED FOR CITY : OF TUKWILA PERMITS NBD C 1/8/10 JAR LNS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION VERIFY SCALE BAR IS ONE INCH ON. ANSI "D" DRAWING 0 1 B 1/8/10 JAR LNS RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS A REV 7/31/09 DATE JAR CHK'D: LNS APP'D ISSUED FOR CITY OF TUKWILA PERMITS REVISION DESCRIPTION King County Department of Natural Resources and Parks S Waste Division LNS LNS ENGINEERS, INC. 7713 PIONEER WAY • SUITE C GIG HARBOR, WASHINGTON 98335 PHONE: 253.851 .5175 BOW LAKE RECYCLING AND TRANSFER • STATION SITE FACILITIES CONTRACT MECHANICAL SCHEDULES SHEET 5 IREGtiv CITY OF TO KIM , DEC 1' 8 2012 PERMIT CENTER PROJECT NUMBER: 1- 800 -424 -5555 C00405C09. BHT. OF: 459 619 DRAWING NUMBER: M016 V 0 cc 0 w m ♦ v, ce 0 cc J J z LL ABBREVIATION SYMBOL DESCRIPTION WHA WATER HAMMER. ARRESTOR EMERGENCY VENT O.C. ON CENTER B20 BIODIESEL (20 %) TYPICAL ROUND W,H,L WIDTH, HEIGHT, LENGTH CFM CUBIC FEET PER MINUTE WITH AT ABOVE FINISHED' FLOOR IE GPM PSI INVERT ELEVATION GALLON ABBREVIATION SYMBOL DESCRIPTION WB WET BULB P.D. PRESSURE DROP MCA MAXIMUM CURRENT AMPS RLA RUN LOAD AMPS MOCP MAXIMUM OVER CURRENT PROTECTION MCP MAXIMUM CURRENT PROTECTION 0.A. OUTSIDE AIR LEIS POUNDS W.G. WATER GAUGE HSPF HEATING SEASONAL PERFORMANCE. FACTOR SEER ENERGY EFFICIENCY RATIO GALLONS PER MIN COP MBH BTUH POUND PER SQUARE INCH COEFICIENT . OF PERFORMANCE THOUSAND BRITISH , THERMAL UNITS PER. HOUR BRITISH THERMAL UNITS PER HOUR METHANE VENT PSIG STAT DEFL POUNDS PER SQUARE INCH (GAUGE) STATIC DEFLECTION SCADA SUPERVISORY CONTROL AND DATA ACQUISI11ON DDC MANUF. BUILDING AUTOMATION SYSTEM DPI. HP DIRECT DIGITAL CONTROL MANUFACTURER DIVISIION HORSE POWER Kw /w FT, FTC NC FULL LOAD AMPS KILOWATTS/WATTS FEET, SQUARE FEET NO NORMALLY CLOSED NORMALLY OPEN, NUMBER, NO RPM SP ESP IN V TRAP PRIMER VALVE REVOLUTIONS PER MINUTE STATIC PRESSURE. EXTERNAL .STATIC PRESSURE INCH PH of VOLT PHASE EAT LAT LWT DB DEGREE FAHREHEIT ENTERING AIR TEMP LEAVING AIR. TEMP ENTERING WATER TEMP LEAVING WATER TEMP DRY BULB DESIGNED DRAWN LNS NBD NREC - 2006 1 • MECHANICAL EQUIPMENT MINIMUM EFFICIENCIES SHALL COMPLY WITH THE 2006 NREC AS SCHEDULED ON THE DRAWINGS. 2. THE CONDITIONED AREAS OF THE BUILDING ARE PROVIDED WITH INDIVIDUAL SPACE TEMPERATURE CONTROL FOR EACH PIECE OF EQUIPMENT WITH A MINIMUM OF ONE TEMPERATURE CONTROL ZONE ON EACH OCCUPIED FLOOR OF THE BUILDINGS. 3. PROVIDE TEMPERATURE CONTROL CAPABILITIES THROUGH THE BUILDING DIRECT DIGITAL CONTROL SYSTEM FOR A MINIMUM . DEADBAND CONTROL OF 5 DEGREES F FOR ALL CONDITIONED AREAS WITH HEATING AND COOUNG CAPABILITY AND PROVIDE LOCKOUT OF AUXILIARY" OR SUPPLEMENTAL HEATING DURING THE COOUNG MODE. 4. THE BUILDING DIRECT DIGITAL CONTROL SYSTEM PROVIDES 7 -DAY PROGRAMMABLE CONTROL WITH NIGHT SETBACK CAPABILITY: THE BUILDING WILL BE CONTINUOUSLY OCCUPIED SUNDAY THROUGH SATURDAY EXCEPT. FOR A SCHEDULED SHUTDOWN WHICH WILL OCCUR ON SATURDAY EVENING. 5. EACH MECHANICAL SYSTEM SHALL BE PROVIDED WITH OUTSIDE AIR WITH 100% SHUTDOWN CAPABILITY DURING UN- OCCUPIED PERIODS WITH MOTORIZED . DAMPER CONTROL ON OUTSIDE AIR INTAKES: MOTORIZED DAMPERS SHALL HAVE A MAXIMUM LEAKAGE OF 10 CFM /SF OF DAMPER AREA AT 1.0 INCHES W.G. AND GRAVITY BACKDRAFT DAMPERS SHALL NOT . EXCEED 40 CFM /SF (ALL UNDER 24 INCHES IN EITHER DIRECTION) WHEN TESTED IN ACCORDANCE WITH AMCA STANDARD 500. 6. BALANCING DAMPERS SHALL BE PROVIDED AS INDICATED ON THE DRAWINGS FOR EACH SUPPLY, RETURN AND EXHAUST AIR TERMINAL. 7. MULTI- PURPOSE ROOM 102 AND CONFERENCE ROOM 203 IN THE TSO BUILDING ARE EACH PROVIDED WITH CARBON DIOXIDE MONITORING FOR DEMAND VENTILATION CONTROL. 8. PROVIDE DUCT SEALING PER NREC 1414.1 AND SECTION 23 3113 - HVAC METAL DUCTS. 9. . PROVIDE DUCT INSULATION PER NREC 1414.2 AND SECTION 23 07 00 - HVAC INSULATION. 10. PROVIDE HVAC HEATING WATER, CONDENSATE AND REFRIGERANT PIPE INSULATION PER NREC 1415.1 AND SECTION 23 07 00 HVAC INSULATION. 11. PROVIDE PLUMBING PIPE INSULATION PER NREC 1415.1 AND SECTION 22 07 00- PLUMBING INSULATION. 12. COMMISSIONING OF THE HVAC SYSTEMS IS BEING PROVIDED AS REQUIRED BY NREC SECTION 1416.2: ALL OTHER MECHANICAL SYSTEMS ", TO VERIFY EQUIPMENT PERFORMANCE AND SEQUENCE OF OPERATION. COMMISSIONING WILL INCLUDE: 1. COMMISSIONING PLAN 2. SYSTEM TESTING AND BALANCING 3. EQUIPMENT FUNCTIONAL PERFORMANCE TESTING 4. CONTROLS PERFORMANCE TESTING COMMISSIONING REPORTS WILL BE PROVIDED PER NREC 1416.4.2.5: "COMMISSIONING REPORTS" AND WILL COMPLY WITH THIS NREC SECTION BY INCLUDING: 1. A PREUMINARY COMMISSIONING REPORT 2. POST CONSTRUCTION DOCUMENTATION 3. A FINAL COMMISSIONING REPORT 13. DOMESTIC HOT WATER CIRCULATING LOOPS SHALL BE PROVIDED WITH DDC PROGRAMMED RETURN WATER TEMPERATURE CONTROL TO SHUT -OFF PUMPS DURING PERIODS' ON NON -USE. 14. ELECTRIC WATER HEATERS INSTALLED . ON CONCRETE FLOORS SHALL BE PLACED ON R10 (MINIMUM) RIGID INSULATION. 6/10/10 JAR LNS FINAL ISSUED FOR CITY OF TUKWILA PERMITS 1/8/10 JAR LNS. MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION VERIFY SCALE BAR IS ONE INCH ON A ANSI "D DRAWING 0 1" REV DATE 1/8/10 JAR LNS RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS 7/31/09 JAR LNS ISSUED FOR CITY OF TUKWILA PERMITS CHK'D APP'D REVISION DESCRIPTION Kirig:CoUflt• y Department of Natural Resources and Parks Solid Waste Division LNS REVIEWED FOR CODE COMPLIANCE APPROVED MAY 13 2013 City of Tukwila BUILDING DIVISION LNS ENGINEERS, INC. 7713 PIONEER WAY • SUITE C GIG HARBOR, WASHINGTON 98335 PHONE: 253.851.5175 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT NREC COMPLIANCE AND MECHANICAL ABBREVIATIONS MY OE TUK'I;j;,A DEC 782012 PERMIT CENTER PROJECT NUMBER: C00405C09 1- 800 -424 -5555 SHT. 460 OF: 619 DRAWING NUMBER: M017 STRAP HANGERS HANGER STRAPS 60" MAX. (1524 mm SCREWS SCREWS MAY BE OMITTED IF HANGER LOOPS UNLESS FOOT OF STRAP IS PLACED UNDER A BOTTOM REINFORCEMENT 1" MIN. (25 mm) LOAD RATED FASTENERS ANGER -� BAND OF SAME SIZE AS HANGER STRAP HANGER RODS OR STRAPS 36" DIA. MAX. HANGERS MUST NOT DEFORM DUCT SHAPE 24" DIA. MAX. BAND ONE HALF - ROUND MAY BE USED IF DUCT SHAPE IS MAINTAINED TRAPEZE HANGERS STRAP OR ANGLE SIZE BOLTS FOR LOAD ALTERNATE LOCATION (VERIFY UPPER TRAPEZE LOAD ANGLES CAPACITY) REINFORCEMENT MAY BE USED FOR ATTACHMENT IF IT QUALIFIES FOR BOTH DUTIES. LOWER HANGER ATTACHMENTS NO SCALE 16x16 ACCESS DOOR (WEATHER SEALED) 24x24 DUCT DROP DO NOT EXCEED ALLOWABLE LIMITS. 11 24x24 EG -3 SECURED TO COVER PLATE. SEE DETAIL 6/A181 EXHAUST INLET TRANSFER BUILDING ROOF NO SCALE DESIGNED LNS VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 0 1" VOLUME DAMPER CONTINUOUS WELDED FLASHING. EXTEND DOWN 4" FROM TOP OF CURB SEE DETAIL 6/A181 FOR CURB DETAIL 6 M1.05 ANCHOR ATTACHMENTS TO STRUCTURE SHALL BE MADE WITH BEAM CLAMPS, WELD ATTACHMENT OR EXPANSION BOLTS. POWDER DRIVEN FASTENERS AND EPDXY FASTENERS ARE NOT PERMITTED FLEXIBLE ONNECTION TRANSITION CABLE RESTRAINT CABLE (4) '�I�i�� FPN I I� AIR FLOW L 1 TYPICAL IN -LINE FAN PANDUIT STRAPS — (MACHINE TENSIONED) (NP) SPIN —IN FITTING W/ VOLUME DAMPER NO SCALE INSULATED FLEX DUCT —� T —BAR FRAME CEILING 6/10/10 JAR LNS FINAL ISSUED FOR CITY OF TUKWILA PERMITS 1/8/10 JAR LNS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION 1/8/10 JAR LNS RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS 7/31/09 JAR LNS ISSUED FOR CITY OF TUKWILA • PERMITS DIFFUSER HANGER — (TYP) RIGID ROUND INLET FITTING PATTERN CONTROLLERS TYPICAL REVIEWED FOR CODE COMPLIANCE APPROVED MAY 13 2013 City of Tukwila BUILDING DIVISION GENERAL NOTE: FLEX DUCT TO BE SAME SIZE AS DIFFUSERS NECK: MAXIMUM FLEX DUCT LENGTH TO BE 6 FEET IN STRETCHED POSITION. REFER TO SCHEDULE /SPECIFICATIONS FOR DIFFUSER TYPE. WHERE DUCTWORK IS EXPOSED (NO CEILING) FLEX DUCT SHALL NOT BE USED. WHERE FLEX DUCT IS INSTALLED ABOVE •SUSPENDED CEILING WITH OPEN PERIMETERS (CLOUD CEILINGS) FLEX DUCT SHALL NOT BE VISIBLE FROM STANDING POSITION. LAY -IN CEILING DIFFUSER NO SCALE REV DATE CHK'D APP'D REVISION DESCRIPTION King County Department of Natural Resources and Parks Solid Waste Division -- ATYPICAL LNS AT WIND VELOMETER ONLY ROOFTOP PROVIDE 3/4" SCH40 -316 SST PIPE SECURED TO PIPE COLUMN W/ (4) 316 SST WORM DRIVE CLAMPS T 1 NOTE: SEE DWG S250 FOR 1 SUPPORT INFORMATION -- SUPPORTS SEE STRUCTURAL DWGS TRANSFER BUILDING ROOF NO SCALE 3/16" TEFLON BONDED TO DUCTWORK (FULL CIRCUMFERENCE) NOTE: PROVIDE 5" WIDE BAND WELDED TO DUCT (FOR BONDING TEFLON) IF SPIRAL LOCK —SEAM DUCT IS PROVIDED) SLIP ROOFTOP DUCT SUPPORT (INSIDE TO OUT) — DUCT — TEFLON RING — TEFLON RING -- SUPPORT RING 3/1 6" TEFLON BONDED TO SUPPORT RING (FULL CIRCUMFERENCE) \b\ ANCHORED ROOFTOP DUCT SUPPORT (INSIDE TO OUT) — DUCT — SUPPORT RING .....iii. 5" MIN MECHANICAL DUCT 4 0.125" RADIAL CLEARANCE SLIP ROOFTOP DUCT SUPPORT SYMBOL: 5" MIN /— [DUCT �ICAL SUPPORT RING) PIPE COLUMN SADDLE TO COL. CONN. NO SCALE NOTE: ALL METAL COMPONENTS SHALL BE GALVANIZED STEEL UNO LNS ENGINEERS, INC. 7713 PIONEER WAY • SUITE C GIG HARBOR, WASHINGTON 98335 PHONE: 253.851 .51 75 WELD DUCT TO SUPPORT RING BENT PLATE AND SUPPORTS 7— BENT STRUCTURAL DWGS SECTION ANCHORED. ROOFTOP DUCT SUPPORT A SYMBOL: I s BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT MECHANICAL DETAILS Mla���gs CITY OF T IKoli DEC 18 2012 PERMIT CENTER PROJECT NUMBER: C00405C09 1- 800 -424 -5555 SHT. OF 462 619 DRAWING NUMBER: M019 P: \cad \2007 \0778 — June 3, 2010 — 0 HYDRONIC HEAT PUMP UNITS ■ HEAT PUMPS HHP T1`IHHP -T3 /HHP -T4 /HHP -T5 /HHP -T6 • OPERATE UNDER PROGRAM. CONTROL TO MAINTAIN SPACE TEMPERATURE (70F 75F, ADJUSTABLE). • MONITOR FAN STATUS, MODE AND SPACE TEMPERATURE. ■ ROOM TEMPERATURE SENSORS. SHALL BE LOCALLY ADJUSTABLE WITHIN PROGRAM LIMITS EXCEPT FOR HHP -T3 HHP -T3 SHALL BE CONTROLLED BY AVERAGE OF MEN'S AND WOMEN'S LOCKER ROOM TEMPERATURES - DISPLAY AVERAGE TEMPERATURE • HEAT PUMPS HHP -T2 AND T7 • OPERATE UNDER PROGRAM CONTROL T0 MAINTAIN SPACE TEMPERATURE (70F - 75F, ADJUSTALBE) ■ MODULATE RESPECTIVE VAV TERMINAL UNITS FROM MINIMUM TO MAXIMUM IN RESPONSE TO ROOM CO2 LEVEL. ■ MONITOR/DISPLAY FAN STATUS, MODE, SPACE TEMPERATURE AND CO2 LEVEL. HYDRONIC SYSTEM • HYDRONIC WATER CIRCULATING PUMP P -1 SHALL OPERATE UNDER PROGRAM CONTROL TO SUPPLY WATER TO ALL HYDRONIC HEAT PUMPS CIRCULATING WATER THROUGH THE WATER STORAGE TANK. 1 PROVIDE PUMP STATUS. ■ HYDRONIC HEAT PUMPS SHALL BE DISABLE UPON LOSS OF FLOW, GENERATE ALARM. ■ WATER STORAGE TANK ■ SHALL BE MAINTAINED AT 50F - 80F, RESET WITH OUTSIDE AIR TEMPERATURE. ■ PUMPS P -3A AND P -3B SHALL BE ENABLED BY RESPECTIVE ENABLE SWITCHES FOR EACH COMPACTOR FLUID COOLER (DRY CONTACT ENABLE SWITCHES BY SSI) AND SHALL CIRCULATE WATER THROUGH THEIR RESPECTIVE COMPACTOR FLUID COOLER HEAT EXCHANGERS IN RESPONSE TO TANK TEMPERATURE SETPOINT. • ACTIVATE PUMP P -5 AND DRY COOLER DC -T1 IF TANK UPPER LIMIT TEMPERATURE IS REACHED: • ACTIVATE PUMP P -2 AND ELECTRIC BOILER EB -T1 IF LOW TANK TEMPERATURE LIMIT IS REACHED. ■ IF TANK TEMPERATURE EXCEEDS 80F, HYDRONIC HEAT PUMP HEATING MODES SHALL BE DISABLED. MONITORDISPLAY THE FOLLOWING: • FLUID COOLER HEAT EXCHANGER OIL INLET AND OUTLET TEMPERATURES (STRAP ON SENSORS) (EACH CIRCUIT) ■ FLUID COOLER HEAT EXCHANGER WATER INLET AND OUTLET TEMPERATURES (INSERTION WELLS) (EACH CIRCUIT) • PUMP STATUS (EACH PUMP) ■ STORAGE TANK TEMPERATURES (UPPER, MIDDLE AND LOWER INSERTION WELLS) • STORAGE. TANK SETPOINT ■ PRIMARY LOOP TEMPERATURE (INSERTION WELL) DRY COOLER STATUS • DRY COOLER INLET/OUTLET TEMPERATURE (INSERTION WELLS) • WATER TO WATER HYDRONIC HEAT PUMP WWHP -T1 SYSTEM ■ PUMP P-4 SHALL BE ENERGIZED BELOW 55F OUTSIDE AIR TEMPERATURE (ADJUSTABLE) AND WWHP -T1 SHALL BE E NABLED WITH PROOF OF FLOW (P -1 FLOW AND P-4 FLOW) TO MAINTAIN AHU -T1 HEATING WATER SUPPLY TEMPERATURE SETPOINT. • MONITOR/DISPLAY P -4 STATUS, HEATING WATER SUPPLY TEMPERATURE AND SETPOINT AND WWHP T1 STATUS (HEATING ONLY MODE). ■ WATER TO WATER HYDRONIC HEAT PUMP WWHP -T2 SYSTEM ■ PUMP P -6 SHALL BE ENERGIZED BELOW 55F OUTSIDE AIR TEMPERATURE (ADJUSTABLE) AND WWHP -T2 SHALL BE ENABLED WITH PROOF OF FLOW (P -1 FLOW AND P -6 FLOW) TO MAINTAIN FUEL STORAGE TANK TEMPERATURE SETPOINT. ■ DISPLAY P -6 STATUS, FUEL STORAGE TANK TEMPERATURE AND SETPOINT AND WWHP -T2. STATUS (HEATING ONLY MODE). TRANSFER BUILDING DOMESTIC HOT WATER SYSTEM 0 BUILDING DOMESTIC WATER DELIVERY 1 ELECTRIC WATER HEATERS HW-T1 AND. HW -T2 SHALL OPERATE CONTINUOUSLY. ■.. MONITOR/DISPLAY EACH TANK DISCHARGE WATER TEMPERATURE (INSERTION WELL). • MONITOR/DISPLAY MIXED TEMPERATURE (INSERTION WELL) ■ MONITOR/DISPAY WATER HEATER STEP CONTROL (EACH WATER HEATER IS 2 -STEP. • BUILDING DOMESTIC HOT WATER CIRCULATING PUMP SHALL BE CONTROLLED BY AQUASTAT SET AT 115F (INSERTION WELL) (ADJUSTABLE). CIRCULATING PUMP SHALL OPERATE A MINIMUM OF 5 MINUTES EACH HOUR. • MONITOR/DISPLAY PUMP STATUS AND RETURN WATER TEMPERATURE. ■ PROVIDE LOAD SHED CAPABILTIY OF WATER HEATER BY SIGNAL FROM DIV 26 EMERGENCY GENERATOR SYSTEM. ■ ON ACTIVATION OF EMERGENCY GENERATOR, LOCK OUT WATER HEATER OPERATION (MAINTAIN CIRCULATING PUMP OPERATION) 0 BUILDING TEPID WATER DELIVERY • CIRCULATING PUMP SHALL BE CONTROLLED BY AQUASTAT SET AT 85F (INSERTION WELL) (ADJUSTABLE). CIRCULATING PUMP SHALL OPERATE A MINIMUM OF 5 MINUTES EACH HOUR. MONITOR/DISPLAY PUMP STATUS AND RETURN WATER TEMPERATURE. • MONITOR/DISPLAY TEPID WATER SUPPLY TEMPERATURE (INSERTION WELL) GENERATE ALARM IF TEPID WATER SUPPLY TEMPERATURE DROPS BELOW 80F. SCALE FACILITY HVAC SYSTEM (SEE SHEET M302 FOR SEQUENCE OF OPERATION) 0 MONITOR/DISPLAY THE FOLLOWING: • SUPPLY AND RETURN FAN STATUS • OUTSIDE AIR TEMPERATURE • MIXED AIR TEMPERATURE DISCHARGE TEMPERATURE AND SETPOINT (BETWEEN ELECTRIC HEATER AND HEAT PUMP COIL) • SUPPLY AIR TEMPERATURE • MODE (HEATING /COOLING STAGES) ■ DEFROST MODE ■ EMERGENCY HEAT MODE (GENERATE ALARM IF EMERGENCY HEAT MODE IS REQUIRED) • ROOM TEMPERATURE AND SETPOINT ■ OUTSIDE AIR, RETURN AIR AND RELIEF AIR DAMPER POSITIONS (EACH DAMPER SHALL BE CONTROLLED INDEPENDENTLY, NO LINKED DAMPERS). • BLOWER FAN BF -S1 AND BF -S2 (EACH): ■ STATUS VFD CONTROLLER SETPOINT (4 -STEP CONTROL) 0 FUELING STATION AREA ■ PROVIDE ALARM. CONTACT FROM OIL STOP VALVE • PROVIDE INTERFACE WITH FUEL STORAGE TANK HEATING MODE. DRY CONTACT WILL BE AVAILABLE FOR CONTROL INTERFACE. ■ PROVIDE FUEL OIL HEATING SUPPLY AND RETURN TEMPERATURES (INSERTION SENSORS IN THERMAL WELLS ON FUEL OIL LINES). EMERGENCY GENERATOR LOAD SHED SEQUENCE OF OPERATION 1. PROVIDE INTERFACE WITH DIV. 26 EMERGENCY /STANDBY GENERATOR TO ACCOMPLISH THE FOLLOWING LOAD SHEDDING: A. UPON RECEIPT OF SIGNAL FROM "SHUTDOWN RELAY" THE FOLLOWING SHALL BE SHUT DOWN THROUGH THE BAS 1) WH -T1 (30 KW) 2) WH -T2 (30 KW) 3) MS -T1 (3 HP) 4) MS -T2 (15 HP) 5) MS -T3 (1 %2 HP) 6) IRH -T1 TO IRH -T5 (30 KW TOTAL) 7) EB -T1 (60 KW) 8) EF -T2 (25 HP) 9) EF -T3 (25 HP) 10) BP -T1 (60 HP) B. UPON RECEIPT OF SIGNAL THAT LOAD MAY BE ADDED THROUGH "LOAD INCREASE RELAY", ENABLE THE FOLLOWING EQUIPMENT TO OPERATE BY STAGING ON /ENABLING ON AT 2 MINUTE INTERVALS IN THE FOLLOWING ORDER OF PRIORITY 1) EB -T1 (1ST STAGE) 2) EB -T2 (2ND STAGE) 3) WH -T1 4) EF -T2 (SOFT START) 5) EF -T3 (SOFT START) 6) BP -T1 7) WH-T2 C. UPON RECEIPT OF LOAD DECREASE SIGNAL THROUGH "LOAD DECREASE RELAY ", REDUCE LOAD IN REVERSE ORDER (LAST ON, FIRST OFF) D. UPON RECEIPT OF SIGNAL THROUGH "NORMAL POWER RESTORED RELAY ", RESTORE ALL EQUIPMENT TO ENABLE OPERATION IN ONE MINUTE INTERVALS REVIEWED FOR CODE COMPLIANCE APPROVED MAY132013 City of T ukwila DIVISION (Rs Rk (; ivl;L) CITY OF TI.IKI DEC 18 2012 PERMIT CENTER REV. C - FULL SHEET REPLACEMENT 1- 800 -424 -5555 DESIGNED DRAWN . LNS NBD 6/10/10 JAR LNS FINAL ISSUED FOR CITY OF TUKWILA PERMITS C 1/8/10 JAR LNS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION VERIFY SCALE BAR IS ONE INCH ON. ANSI "D" DRAWING 0 1" B 1/8/10 JAR LNS RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS A REV 7/31/09 DATE JAR LNS ISSUED FOR CITY OF TUKWILA PERMITS CHK'D APP'D REVISION DESCRIPTION King County Department of Natural. Resources and Parks Solid Waste D eis -ion • LNS LNS ENGINEERS, INC. 7713 PIONEER WAY • SUITE C GIG HARBOR, WASHINGTON 98.335 PHONE: 253.851.5175 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT . MECHANICAL SYSTEMS SEQUENCE OF OPERATIONS PROJECT NUMBER: C00405C09 SHT. OF 511 619 DRAWING NUMBER: M148 ROOM KEY RM NO RM 'NAME 501 CONTROL ROOM 502 BREAK AREA 503 HALL 504 • TOILET 505 SERVER CLOSET. 506 STORAGE 507 • ELECTRICAL ,M303 BF —S2 SPEED CONTROL 48 "x48" HOUSE KEEPING PAD. SEE DWG S301 IUSTAB 48 "x48" HOUSE . KEEPING PAD. SEE DWG S301 6x6 EG 7 CF HALL. 503 ;IEEE T (2» RETURN AIR GRILLE IN T —BAR CEILING BELOW W/ 6" HIGH I CAN AND 10 "o UP THROUGH ATTIC FLOOR (TYP OF 2) 52 SPEED CONTROL C 0 ›- W 0 u_ uJ 0 co %sr J J DX PIPING TO COIL OFFSET IN— DUCT CHASE 10/20 UP TO 12 "0 AIRFLOW MONITOR AND • 14"0 FRESH FRESH AIR INTAKE HVAC SYSTEM FLOOR PLAN SCALEHOUSE SOUTH SCALE FACILITY SCALE: 1/4" = 1' -0" 10 "0 RETURN DUCT ABOVE DOOR 12" RETURN DUCT TIGHT TO ROOF AIR HANDLING UNIT 2500# ON SUPPORT RAILS FULL LENGHT OF UNIT SIDEWALL EXHAUST LOUVER — 24x24 0 CFM MIN 600 CFM MAX SIDEWAtC EXHAUST ■ LOUVER — 24x12 W/ TWO (2) 12x12 CONNECTIONS 100 CFM EACH �.. 3t 0 HVAC SYSTEM ATTIC PLAN 6x6 SG -1 30 CFM -- WO FR -2 100 CFM 10"O FR -2, 75 CFM WITH 10/10L UP TO FLOOR DECK W/ FLANGE CONNECTION TO DECK. FILL AND SEAL VOIDS AT METAL DECK FLUTES WITH SHEET METAL INSERTS AND DUCT SEALANT (TYP OF 2 ® 75CFM AND 3 © 100 CFM). rDX PIPING 10 "o FR -2 100 CFM 6" PVC —I SLEEVE 16 "x8" FR -1 240 CFM, WITH 18/12L UP TO FLOOR DECK W/ FLANGE CONNECTION TO DECK. FILL AND SEAL VOIDS AT METAL DECK FLUTES WITH SHEET METAL INSERTS AND DUCT SEALANT. (TYP OF 3) HVAC SYSTEM FOUNDATION PLAN CITY OF TU14 ;t:s4 << . DEC 18 2012 . PERMIT CET °ER, 6 8 10 0 N .N c 7 Scale DESIGNED DRAWN C 1 1/8/10 1/8/10 FINAL ISSUED FOR CITY OF TUKWILA PERMITS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS A 7/31/09 REV DATE ISSUED FOR CITY OF T.UKWILA PERMITS. CHK'D I APP'D I REVISION DESCRIPTION King County Department of Natural Resources and Parks Solid Waste Division LNS ENGINEERS, INC. 7713 PIONEER WAY • SUITE C GIG HARBOR, WASHINGTON 98335 PHONE: 253.851 .51 75 . BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT SCALE FACILITY HVAC PLANS PROJECT NUMBER: C00405C09 SHT. OF: 530 619 DRAWING NUMBER:. J z ROOF LEVEL EXHAUST -I ✓— EXHAUST LOUVER 0 CFM - MIN. 750 CFM - MAX. 1- 800 -424 -5555 DISCHARGE PLENUM —® . ®. ®. ® ® U u. ; lit q e 0 e ❑ e ❑ RETURN SECTION CEILING RETURN/ EXHAUST 400 CFM SUPPLY FAN — ' ELECTRIC COIL ./� MERV 13. FILTER 750 WATT RADIANT • HEATER, INDEPENDANTLY CONTROLLED AT EACH TRANSACTION WINDOW SERVER EXHAUST 750 CF RETURN /EXH FAN — RETURN/EXH DAMPER SECTION OUTSIDE AIR /RETURN AIR SECTION MECHANICAL LEVEL r— 600 WATT BASEBOARD `HEATER W/ INTEGRAL THERMOSTAT AT EACH TRANSACTION WINDOW SCALE HOUSE FLOOR LEVEL F -S DISCHARGE 000 CFM (ADJUSTABLE) SEQUENCE OF OPERATION 1. HVAC -1 OPERATES CONTINUOUSLY TO MAINTAIN SPACE TEMPERATURE SETPOINTS, 70T HEATING, 74'F COOLING WITH 400 CFM MINIMUM OUTSIDE AIR FOR SCALE HOUSE PRESSURIZATION 2. INTERFACE WITH • GAS MONITORING SYSTEM (DIV 26) TO ACTIVATE 100% OUTSIDE • AIR PURGE WHEN AN ALARM CONDITION IS PRESENT IN THE SCALE FACILITY. STOP WHEN CONDITION CLEARS. - - - - - - - - - - 3. SUPPLY AIR TEMPERATURE SENSOR ON DISCHARGE OF ELECTRIC HEAT MAINTAINS MINIMUM • HEAT PUMP COIL ENTERING AIR TEMPERATURE OF 55F (ADJUSTABLE). SPACE TEMPERATURE SENSOR CONTROLS HEAT PUMP HEATING /COOLING. 4. ALL ELECTRIC HEAT LOCKED OUT DURING COOLING MODE, ENABLED,eU N�, DBAND 5. BF -S1 AND BF -S2 SHALL BE CONTROLLED BY LOCAL SPEED CONTROL SWITCH AT SECTION CD O >- Liu LL w m C/) O co J 0 NORTH /SOUTH SECTION SOUTH SCALE HOUSE SCALE: 1/4" = 1' —O" RESPECTIVE TRANSACTION WORK STATIONS FOR .VEHICLE EXHAUST FUME DISSIPATION. SS-11 STORM COLLAR • • • I YAM.. r- 10 20 .y i.. 52 ciw'. v. • :. iwi Et e •° a ❑e ❑ e° I 1 1 2 - 9 ❑el❑ 8 ❑eI I ❑e. ❑eI ❑ 18 "0 MITERED TEE W/ TURNING VANES AND 1/2" MESH DISCHARGE SCREEN (TYP OF 2) FLANGED DUCT CONNECTION FOR ID/ DISCHARGE POSITION ADJUSTMENT ITOILET 504 STORAG 506 ELEC. 507 C/) ce 0 SUPPORT FRAME -- 18 "0 MITERED TEE - W/ TURNING VANES FOR REFERENCE ONLY SEE SHEET SUPPORT PAD -1 P SEE S ? ?? SEISMIC SPRING -ISOLATION- - (TYP-OF 4)- SEISMIC SPRING - - - ISOLATION- TYP1 i LL. 0 SUPPORT PAD SEE S ? ?? a. \ / \ /\ \ / \/ / \ / \ / \ / // // /\/\/ // -- -WEST �ET10�t M302 s004 — June 3, 2010 — ' ' . , i., .... 'r ,,;,„:..,..7' e 't / \��* � R�/ \/ �./ '/ / �.�/7/ / / \ / \ / /.\ / / \ .,/ \,/ \ / \ / \/ / s/k `\ /^/ \ ._i/ . \) / i� `� /�� hr\X\ii\!r\X \ii\r <�./\\ii�!. \X ii \!r\ \\ .i\ .\ \ii\!X\ii\!r\i\i\ii\i\i\.i\.i \.. i\ , \ii\ .\\.i\ ;r SECTION EAST/WEST SECTION SOUTH SCALE HOUSE SCALE: 1/4" = 1' -O" ;M302 RlbG i,v MY OF TUKI.A3 :1:, IIEC 18 2012 PERMIT CENTER 'DESIGNED VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 0 �< 1" 6/10/10 C 1 1/8/10 B 1 1/8/10 FINAL ISSUED FOR CITY OF TUKWILA PERMITS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS A 1 7/31/09 DATE ISSUED FOR CITY OF TUKWILA PERMITS CHK'D APP'D REVISION DESCRIPTION King County Department of Natural Resources and Parks Solid Waste Division BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT PROJECT NUMBER: C00405C09 LNS ENGINEERS, INC. 771 3 PIONEER WAY • SUITE C GIG HARBOR, WASHINGTON 98335 PHONE: 253.851.5175 SCALE FACILITY HVAC SECTIONS SHT. OF: DRAWING NUMBER: SS OEM z LL el e •° a ❑e ❑ e° I 1 1 2 - 9 ❑el❑ 8 ❑eI I ❑e. ❑eI ❑ 18 "0 MITERED TEE W/ TURNING VANES AND 1/2" MESH DISCHARGE SCREEN (TYP OF 2) FLANGED DUCT CONNECTION FOR ID/ DISCHARGE POSITION ADJUSTMENT ITOILET 504 STORAG 506 ELEC. 507 C/) ce 0 SUPPORT FRAME -- 18 "0 MITERED TEE - W/ TURNING VANES FOR REFERENCE ONLY SEE SHEET SUPPORT PAD -1 P SEE S ? ?? SEISMIC SPRING -ISOLATION- - (TYP-OF 4)- SEISMIC SPRING - - - ISOLATION- TYP1 i LL. 0 SUPPORT PAD SEE S ? ?? a. \ / \ /\ \ / \/ / \ / \ / \ / // // /\/\/ // -- -WEST �ET10�t M302 s004 — June 3, 2010 — ' ' . , i., .... 'r ,,;,„:..,..7' e 't / \��* � R�/ \/ �./ '/ / �.�/7/ / / \ / \ / /.\ / / \ .,/ \,/ \ / \ / \/ / s/k `\ /^/ \ ._i/ . \) / i� `� /�� hr\X\ii\!r\X \ii\r <�./\\ii�!. \X ii \!r\ \\ .i\ .\ \ii\!X\ii\!r\i\i\ii\i\i\.i\.i \.. i\ , \ii\ .\\.i\ ;r SECTION EAST/WEST SECTION SOUTH SCALE HOUSE SCALE: 1/4" = 1' -O" ;M302 RlbG i,v MY OF TUKI.A3 :1:, IIEC 18 2012 PERMIT CENTER 'DESIGNED VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 0 �< 1" 6/10/10 C 1 1/8/10 B 1 1/8/10 FINAL ISSUED FOR CITY OF TUKWILA PERMITS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS A 1 7/31/09 DATE ISSUED FOR CITY OF TUKWILA PERMITS CHK'D APP'D REVISION DESCRIPTION King County Department of Natural Resources and Parks Solid Waste Division BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT PROJECT NUMBER: C00405C09 LNS ENGINEERS, INC. 771 3 PIONEER WAY • SUITE C GIG HARBOR, WASHINGTON 98335 PHONE: 253.851.5175 SCALE FACILITY HVAC SECTIONS SHT. OF: DRAWING NUMBER: SS OEM z LL