Loading...
HomeMy WebLinkAboutPermit M12-196 - BOW LAKE TRANSFER STATION - RECYCLING BUILDINGBOW LAKE RECYCLING BUILDING 18800 ORILLIA RD S M12 -196 City oilkukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 3523049037 Address: 18800 ORILLIA RD S TUKW Project Name: BOW LAKE - RECYCLING BUILDING Permit Number: Issue Date: Permit Expires On: M12 -196 05/16/2013 11/12/2013 Owner: Name: KING COUNTY- PROPERTY SVCS Address: .ADM-ES-0800 , 500 4TH AVE 98004 Contact Person: Name: Address: Email: Contractor: Name: Address: TOM CREEGAN 201 S JACKSON ST, STE 701 , SEATTLE WA 98104 TOM. CREEGAN @KINGCOUNPY. GOV Phone: 206 263 -6476 LYDIG CONSTRUCTION INC Phone: 509 534 -0451 11001 E MONTGOMERY DR , SPOKANE WA 99206 Contractor License No: LYDIGC *264JC Expiration Date: 09/11/2013 DESCRIPTION OF WORK: INSTALLATION OF ELECTRIC RADIANT HEATER WITH THERMOSTAT IN WARMING ROOM. (REFERENCE EXPIRED PERMIT M09 -105) Value of Mechanical: $446.00 Type of Fire Protection: UNKNOWN Electrical Service Provided by: Permit Center Authorized Signature: Fees Collected: $139.88 International Mechanical Code Edition: 2009 J1, Date: 17 I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the performance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this pe Signature: I/ Print Name: C i 1iV*wf t'k- This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. Date: ■.57 (C 13 doc: IMC -4/10 M12-196 Printed: 05 -16 -2013 • • PERMIT CONDITIONS Permit No. M12 -196 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All mechanical work shall be inspected and approved under a separate permit issued by the City of Tukwila Permit Center (206/431- 3670). 4: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Manufacturers installation instructions shall be available on the job site at the time of inspection. 7: All plumbing and gas piping work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206- 431- 3670). 8: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206-431-3670). 9: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to give authority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. doc: IMC -4/10 M12 -196 Printed: 05 -16 -2013 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 h t t p: /l t wv w. ci. t uk w ila . wa. u s MI2 -I`1U MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print" Site Address: 18800 Orillia Road South, Tukwila, WA Tenant Name: Bow Lake Recycling and Transfer Station King Co Assessor's Tax No.: 3523049037/3523049124 Suite Number. Floor New Tenant: ❑ Yes J ..No property Owners Name: King County Department of Natural Resources and Parks - Solid Waste Division Mailing Address: 201 South Jackson St, Suite 701 Name: Tom Creegan Mailing Address: 201 South Jackson St. Suite 701 Seattle city WA 98104 sum Zip Day Telephone: (206) 263 -6476 Seattle WA 98104 E -Mail Address: tom.creegan @kingcounty.gov Company Name: Mailing Address: TBD City Sum Fax Number: (206) 263 -3001 Zip Contact Person: E -Mail Address: Contractor Registration Number: Company Name: KPG, Inc. City Day Telephone: Fax Number: Expiration Date: Sum Zip Mailing Address: 739 9th Ave North Contact Person: Charlie Conway E-Mail Address: Charlie @kpg.com Company Name: Mailing Address: Contact Person: E -Mail Address: R. W. Beck, Inc Seattle ty Day Telephone: Fax Number. WA 98109 Sate Zip (206) 286 -1640 (206) 286 -1639 1001 4th Avenue, Suite 2500 Seattle WA 98154 Karl Hufnagel khufnagel @rwbeciccom Kuoo +Fays-Aawieaders on Lind2009 Applindmdl•2009 • Meduniol Pamir epgiotic.aoe Revised WON bh City Sam Day Telephone: (206) 6954905 Fax Number: (206) 695-4701 Zip Page 1 of Valuation of Project (contractor's bid price): S • 444, Scope of Work (please provide detailed information): Warming Room - Electric Radiant Heater with Thermostat Use: Residential: New ❑ Replacement ❑ Commercial: New ❑ Replacement ❑ Fuel Type: Electric 0 Gas ❑ Other: Indicate type of mechanical work being installed and the quantity below: -ti _ `5"G` -=7- -.� �fYdF ♦4- C��}jy{^,a�� 1 Ste __ }l.(�+��d"?�i1 ) 1.(f...s`__i.. _c.�J�".^.3v- �]$'CC.itid �::.C.'L...lul.G� % %fG .- -.�i�. �."`ii -�6At 19`e t ry� ( '.i. . .�c'c ]i 4.N��: % ?� �1]�]30.7w�4✓�i�� Fire Damper "o:.� " 4.^ �.y' I�. .� ii-5s 0-3 HP /I00,000 BTU ,I :br!=.,� ir1Aa14i Furnace <100K BTU 0 Air Handling Unit >10,000 CFM 0 Furnace >100K BTU 0 Evaporator Cooler 0 Diffuser 0 3 -15 HP /500,000 BTU 0 Floor Furnace , 0 Fan Connected to Single Duct 0 Thermostat 1 15 -30 HP /1,000,000 BTU 0 Suspauled/Wall/Floor Mounted Heater 1 Ventilation System o Wood/Gas Stove 0 30-50 HP /1,750,000 BTU 0 Appliance Vent 0 Hood and Duct 0 Emergency Generator 0 50+HP /1,750,000 BTU 0 Repair or addition to Heat/Refrig/Cooling System 0 Incinerator - Domestic 0 Other Mechanical Equipment 0 Air Handling Unit <10,000 CFM 0 Incinerator - Comm/Ind Value of Construction - In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review - Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in carting and justifiable cause demonstrated. Section 105.32 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWNER OR A . - D AGENT: Signature: Print Name: Mailing Address: Date: 2 " ti --c9 / Date Application Accepted: " 16I I It_ Date Application Expires: Ay---,1 1 Staff Initials: HAApptio=0091 ens- Applicatimt 0911=122009 Appliatiuel1-2009 - 1.1==== Pmnit Appliadandoc Revisod mow bh age2of2 City oi'ukwilar Department of Community Development 6300 Southcerter Boulevard, Suite 4100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206 -431 -3665 Web site: http: /Svww.ci.tukwila.wa.us SET RECEIPT RECEIPT NO: R12 -03347 Initials: JEM Payment Date: 12/19/2012 User ID: 1165 Total Payment: 828.45 Payee: CYNTHIA ADAMS, KING COUNTY (BY PHONE) SET ID: 1218 SET NAME: BOW LAKE "RENWALS" SET TRANSACTIONS:. Set Member Amount M12 -195 233.13 M12 -196 139.88 PG12 -219 253.31 PG12 -220 202.13 TOTAL: Dj'U TRANSACTION LIST: Type Method Description Amount Payment Credit C VISA 828.45 TOTAL: 828.45 ACCOUNT ITEM LIST: . Description Account Code Current Pmts MECHANICAL - NONRES PLAN CHECK - NONRES PLUMBING - NONRES 000.322.102.00.0 000.345.830 000.322.103.00.0 TOTAL: 298.40 165.70 364.35 828.45 INSPECTION NO. INSPECTION RECORD Retain a copy with permit . 1 2-1% PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -367 Permit Inspection Request Line (206) 431 -2451 Project: ` Type of Inspection: Address: g 000 OQRILLIA Date Called: N Special Instructions: Date Wanted— , (0` I a(m Requester: • Phone No: aApproved per applicable codes. ElCorrections required, prior to approval. COMMENTS: - AST /o te4c Km! REI SPECTION FEE REQUIJ ED. Prior to next inspection. fee must be pai t 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. ,-) COSTING FREE -- • ,._ _ RECYCLING AREA .. - ,...., ---_ . . .... - ---•_... 1-5 ON-RAMP SITE ENTRANCE EXISTING CELL TOWER ACCESS ROAD • - — - T. • • • . . ., „ • • • t° - • INTERS/Art 5 SCALE HOUSE • SITE ADDRESS 16800 ORIWA ROAD SOUTH TUKWILA. WA- 98188 PARCEL #: 3523049037 3523049124 • - - POPPPP gt COPIV . . • • , PROPERTY LINE --I- -5 -.0001.01na Atitauits ' r.T• . _ " - . . . • -■ • , • - • - ••• , ',REC;EIV OITY. 0.F TUKWILA "!. • :1 '.DEC. 8 2012 i.:PERMITgENTER •••••••.::„. VICINITY MAP . • • • -- • - - - • . . . • PLAN GENERAL ARRANGEMENT SCALE = 80' 1 =80 -0. 80 0 80 160 Scale Feet DESIGNED I5 . ORAvrti AG . VERIFY SCALE BAR IS ONE INCH ON ANSI -Ill. DRAWING r _ 5/5/0g IKS MN CITY Of TUKYALA MECI-1ANICAL PERMIT REV DATE CHK'D APP'D REVISION DESCRIPTION 0 La King County Department of Natural Resources! and Parks Solid Waste Division R.W. Beck, Inc. 1001 Fourth Avenue, Suite 2500 Seattle, WA 98154-1004 (206) 6954700 BOW LAKE RECYCUNG AND TRANSFER STATION sin FACILITIES CONTRACT MECHANICAL PERMIT SITE PLAN PROJECT PANDER C00405C09 OF: 1 CRAPRIC PRAIllat 0 1- 0) ec 0 0 1- u _ 0 cn w ce 0 1— u- 0 2006 Washington State Nonresidential Energy Code Compliance Form Project Summary PRJ -SUM 2008 Washington State Nonresidential Energy Code Compliance Forms Revised July 2007 Project Info Project Address Bow Lake Recycling & Transfer Station Warning Room Date 8/10/2009 18800 Orillia Road South For BUi i g 9:4. -• u!r -nt Use E CO P Masow IPA ik P _ Tukwila, Washington Applicant Name: Ton Creagan, pea Applicant Address: 201 South Jackson St, Suite 701, Seattle, WI 98104 Applicant Phone: (206) 263 -6676 r• REVIEWED FOR CODE COMPLIANCE APPROVED MAY 13 2013 City of Tukwila BUILDING DIVISION CITY OF Tt1KIMI A DEC 18 2012 PERMIT CENTER 10.7 I 610 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary MECH -SUM 2008 Washington Seats Nonresidential Energy Code Compliance Forms Revised July 2007 Project Info el Iff,L. Project Address Bow Lake Recycling 6, Tran.i.r Station Warning Ro.gate 8/10/2009 Capacity2 Btu/h 18800 Orillia Road south OSA CFM or Econo7 For Building Dept. Use IPLV3 Tukwila, Washington NOT APPLICABLE Applicant Name: Ton Creagan, Applicant Address: 201 South Jackson St, Suit. 701, Seattle, WA 98 Applicant Phohb: 1106) 263 -6476 Project Description Briefly describe mechanical system type and features. Includes Plans M(cCHANICAt. SKSTEM CO!0SISTS of Et.EcTtZ(G RADrA&IT 1.(AA1 ER . FZE c Y f: LE WARM' 14 6 R oory 15 coN Tuvvousim Avktt_A6L F-43R ocC PCA4cY —kO SO-T ,$ACk "TEl PE/tATJQE VVNTILAT'OA> Rao t/f PEP BY OPERAS' Lbo,L AND W btipt .J. Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 Compliance Option 0 Simple System Q Complex System Q Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex systems.) Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. ID Brand Name' Model No.' Capacity2 Btu/h Total CFM OSA CFM or Econo7 SEER or EER IPLV3 Location NOT APPLICABLE NOT APPLICABLE ,, • Heating Equipment Schedule Equip. ID Brand Name' Model No.' Capacity2 Btu/h Total CFM OSA cfm or Econo? Input Btuh Output Btuh Efficiency' NOT APPLICABLE ass SsssT 5014 ,, Fan Equipment Schedule Equip. ID Brand Name' Model No.' CFM SP' HP/BHP Flow Controls Location of Service NOT APPLICABLE ,, f If available. 2 Asstested according to Table 14-1A through 14-16. 1 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as rw� appli i le. 5 Flow control types:'variableair volume(VAV), constant volume (CV), or variable speed (VS). a e _v 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Summary (back) MECH -SUM System Description See Section 1421 for full description of Simple System qualifications. If Heating/Cooling or Cooling Only: • Constant vol? Split system? • Air cooled? • Packaged sys? • <20,000 Btuh? Economizer included? • MI If Heating Only: 0 <5000 cfm? • <70% outside air? Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. ( START ) Heating Only Heating /Cooling or Cooling Only Reference Section 1421) Reference Section 1423 !Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance In determining which Complex Systems requirements are applicable to this project. 2006 Washin. on State Nonresidential Ener. Code Com.Iiance Form Electric Motors 2008 Washington State Nonresidential Energy Code Compliance Forms MECH -MOT Revised July 2007 Project Address Gov Lake Recycling a Transfer Station Warning Rooa Date 8/10/2009 Complete the following for all design A & B squirrel -cage, T -frame induction permanently wired polyphase motors from 1 hp to 200 hp having synchronous speeds of 3600, 1800 or 1200 rpm (unless one of the exceptions below applies). For Building Department Use Motor No. or Location HP Type (open/closed) Description of Application or Use Synch. Speed Min.Nom. Full load Efficiency NOT APPLIC&BLI Minimum Nominal Full -Load Efficiency Open Motors Closed Motors Exceptions: 1. Motors in systems designed to use more than one speed of a multi -speed motor. 2. Motors already Included in the efficiency requirements for HVAC equipment (Tables 14- 1. or 14-113) to . 3. Motors that are an integral part ciali not easily removed and replaced) of specialized process equipment (i.e. equipment which requires a special motor, such as an explosion - proof motor). 4. Motors integral to a listed piece of equipment for which no qualifying motor has been approved (Le. if the only U.L. listing for the equipment is with a less - efficient motor and there is no energy- efficient motor option). For motors claiming an exception, list motor and note which exception applies. Synchronous Speed (RPM) 3,600 1,800 1,200 3,600 l 1,800 1,200 HP Efficiency (%) Efficiency y (96) 1.0 - 825 80.0 75.5 82.5 80.0 1.5 82.5 84.0 84.0 - 82.5 84.0 85.5 20 84.0 84.0 85.5 84.0 84.0 86.5 3.0 84.0 86.5 86.5 85.5 87.5 87.5 5.0 85.5 87.5 87.5 87.5 87.5 87.5 7.5 87.5 88.5 88.5 88.5 89.5 89.5 10 88.5 89.5 90.2 89.5 89.5 89.5 15 89.5 91.0 90.2 90.2 91.0 90.2 20 90.2 91.0 91.0 90.2 91.0 90.2 25 91.0 91.7 91.7 91.0 924 91.7 30 91.0 92.4 92.4 91.0 92.4 91.7 40 91.7 93.0 93.0 91.7 93.0 93.0 50 924 93.0 93.0 92.4 93.0 93.0 60 93.0 93.6 93.6 93.0 93.6 93.6 75 93.0 94.1 93.6 93.0 - 941 93.6 100 1 93.0 94.1 94.1 93.6 945 94.1 125 93.6 945 94.1 94.5 94.5 94.1 150 93.6 95.0 945 94.5 95.0 95.0 200 94.5 95.0 945 95.0 95.0 95.0 2006 Washington State Nonresidential Energy Code Compliance Form Mechanical Permit 2006 Washington State Nonresidential Plans Checklist MECH -CHK Revised Jury 2007 Energy Code Compliance Forms Project Address Bow Lake Recycling & Transfer Station Wareing Roos (Date 8/10/2009 The following Information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Applicability) (yes, no, n.a.) I 11 Code po Section Component ' e9 Information R wired I Location on Plans I Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment performance M.A. 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule yes 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency n. a. 1411.1 Combustion Mg. Indicate intermittent ignition, flue/draft damper & jacket loss 1412 HVAC controls yes 1412.1 Temperature zones Indicate locations on plans M401 n • a . 1412.2 Deadband control Indicate 5 degree deadband minimum n. a. 1412.3 Humidity control Indicate humidistat n. a. 1412.4 Automatic setback Indicate thermostat with night setback and 7 Jiff. day types n. a. 1412.4.1 Dampers Indicate damper location and auto. controls & max. leakage n. a. 1412.4.2 Optimum Start Indicate optimum start controls 11.11. 1412.5 Heat pump control Indicate microprocessor on thermostat schedule 0.14. 1412.6 Combustion Mg. Indicate modulating or staged control • a.a. 1412.7 Balancing Indicate balancing features on plans 1412.8 Ventilation Control Indicate demand control ventilation for high- occupancy areas n. a. 1422 Thermostat interlock Indicate thermostat interlock on plans M.O.. 1423 Economizers Equipment schedule 1413 Air economizers 0.a. 1413.1 Air Econo Operation Indicate 100% capability on schedule n • a • 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb o. a . 1413.2 Water Econo Doc Indicate clg bad & water econoe & clg tower performance n. a . 1413.3 Integrated operation Indicate capability for partial cooling M.A. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting systems n • a . 1414.1 Duct sealing Indicate sealing necessary 0... 1414.2 Duct insulation Indicate R -value of insulation on duct ft.*. 1415.1 Piping insulation Indicate R -value of insulation on piping 1416 Completion Requirements yes 1416.2.1 Commissioning Provide commissioning plan M017 yes 1416.2.2 -3 Sys.Bal & Func.Test Indicate air and water system balancing & functional testing Zan yes 1416.2.4 Commissioning Indicate O &M manuals, record drawings, staff training M017 yes 1416.2.5 Comm. Report Indicate requirements for prelim. & final commissioning report Mo17 M.A. 1434 Separate air sys. Indicate separate systems on plans yes I 'Mechanical Summary Form Completed and attached. Equipment schedule with types, input/output, efficiency, cfm, hp, economizer ATTACHE D SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454) 1440 Service water htg. yes 1441 Elec. water heater Indicate R -10 insulation under tank M017 n. a. 1442 Shut -off controls Indicate automatic shut -off yes 1443 Pipe Insulation Indicate R -value of insulation on piping M017 o. a. 1452 Heat Pump COP Indicate minimum COP of 4.0 M.A. 1452 Heater Efficiency Indicate pool heater efficiency n. a . 1453 Pool heater controls Indicate switch and 65 degree control M.A.. 1454 Pool covers Indicate vapor retardant cover 6.41. 1454 Pools 90+ degrees Indicate R -12 pool cover F609 OV--= P 6) r aaQ Oqp `?6( "k 6\ - /),53-jY �L1v �- 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Summary MECH -SUM 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Project Info Project Address Bow Lake Recycling & Transfer Station Date 4/3/2013 Recycle Building For Building Dept. Use Tukwila, WA Applicant Name: Tom Creegan, King County Solid Waste Division �� �® Applicant Address: 201 S. Jackson St., Suite 701, Seattle, WA 981 Applicant Phone: (206) 263 -6476 Project Description Briefly describe mechanical system type and features. 4 Includes Plans ��.. Recycle Building is provided with electric radiant heat c ntrolled by a single line- voltage thermostat. The building does not have cooling, the building does not have an airside system. The thermostat serves as t manual isolation device per NREC Section 1432.1. The building operate continuously 24 hours per day. Drawings must contain notes requireing compliance with commissioning requirements - Section 1416 Compliance Option Q Simple System Q Complex System 0 Systems Analysis (See Decision Flowchart (over) for qualifications. Use separate MECH -SUM for simple & complex Equipment Schedules The following information is required to be incorporated with the mechanical equipment schedules on the plans. For projects without plans, fill in the required information below. Cooling Equipment Schedule Equip. ID Equip Type Brand Name' d r`Nled�l' D RAW CODE COMPLIANCE FCar,t 1. OSA CFM or Econo? SEER or EER 3 IPLV3 Econmizer Option or Exception° Heat Recovery Y/N APPROVED MAY 13 X013 City of Ttuwiid Heating Equipment Schedu C3UILiJiP�C DI N .--- Equip. ID Equip Type Brand Name' Model No.' Capacity2 Btu /h OSA cfm or Econo? Input Btuh Output Btuh Efficiency's Heat Recovery Y/N IRS -R1 ELEC FOSTORIA OCS -46 5120 NA 5120 5120 COP = 1 N See Sheet M014 Fan Equipment Schedule Equip. ID Equip Type Brand Name' Model No.' CFM SP' HP /BHP Flow Controls Location of Service 'If available. 2 As tested according to Table 14 -1A through 14 -1G. 3 If required. 4 COP, HSPF, Combustion Efficiency, or AFUE, as applicable. 6 Flow control types: variable air volume(VAV), constant volume (CV), or variable speed (VS). 6 Exception number from SecticREttivED CITY OF TUKWILA MAY 0 3 2013 PERMIT CENTER INCOMPLETE TR #�� M1�= iq y e 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Summary (back) MECH -SUM 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 System Description See Section 1421 for full description of Simplefi t9, qualifications. At Qs41 11 " G � " - All Systems: .i No humidification? 4 No Reheat? If Heating /Cooling or Cooling Only: ❑ Constant vol? ❑ Split system? ❑ <= 84,000 Btuh? ❑ Economizer ❑ Air cooled? ❑ Packaged sys? ❑ <= 135,000 Btuh? ❑ Cooling Cap < =15 Btuh /ft2? ❑ Heating Cap. > 0 & < =10 Btuh /ft2? If Heating Only: g J <1000 cfm? ✓ <30% outside air? ❑ Heating Cap. < =10 Btuh /ft2? Decision Flowchart Use this flowchart to determine if project qualifies for Simple System Option. If not, either the Complex System or Systems Analysis Options must be used. ( START ) /Humidification I ` or Reheat? Yes % 1 Cool Cap < =15 B 2, or Heat/Cool Eq. wit\h No Heatap < =1 ? Yes System Type Heating /Cooling or Cooling Only Air Cooled, onstant Volu Heating Only 1000 cfm? Nom\ % O�> - Heatin Cap <= 10.- Yes ... NBtuh /ft2 Reference Section 1421 /Package Unit Cap <= 135,00% \, Btuh Yes Yes Total CFM Serving \Single Roo < 0,00 Y:s No 11- -- < Split 84 00 Btuh? \ No Yes No alrfies for Econo N Economizer Included ?� Exception % No (s lion 1833) Yes • Simple System Allowed (section 1420) Yes • • • V Use Complex Systems (section 1430) i Complex Systems Refer to MECH -COMP Mechanical Complex Systems for assistance in determining which Complex Systems requirements are applicable to this project. 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical - Complex Systems Checklist MECH - -COMP Revised August 2010 Project Address Bow Lake Recycling S Transfer Station D Date 4/3/2013 The following additional information is necessary to check a mechanical permit application for a complex mechanical system for compliance with the mechanical requirements in the Washington State Nonresidential Energy Code. Use the checklist as a reference for notes added to the mechanical drawings (see the MECH -CHK checklist for additional requirements). This information must be on the plans since this is the official record of the permit. Having this information in separate specifications alone is NOT an acceptable alternative. For Building Department Use Applicability C Code L Component I Information Required o Location B Building Department ADDITIONAL CHECKLIST ITEMS FOR COMPLEX SYSTEMS ONLY N.A. 1 1431.1 F Field assem. sys. P Provide calculations for total onsite energy input/output to equip. 1431.2 S System Sizing I Indicate equipment & system sizing complies with 1431.2 M M017R Yes 1 1432.1 S Setback & shut -off I Indicate separate systems or show isolation devices on plans M M401 N.A. 1 1432.2.1 A Air system reset I Indicate automatic temperature reset & operation sequence N.A. 1 1432.2.2 H Hydr. Sys. reset I Indicate automatic temperature reset & operation sequence N.A. 1 1432.3.1 H Hydr. Var. Flow I Indicate variable flow method for all applicable systems N.A. 1 1432.3.X H Hydronic Isolation I Indicate method of isolation for all applicable systems N.A. 1 1432.4 D DDC Capabilities I Indicate control capabilities including demand response setpoind adj. N.A. 1 1432.4 D DDC data mgmt I Indicate metering and trending capabilities. N.A. 1 1432.5 P Pressure Reset I Indicate static pressure reset for VAV systems N.A. 1 1433 A Air Economizer I Indicate economizer on equipment schedule or provide calculations to justify exemption. Demonstrate higher efficiency equipment if required. N.A. 1 1433 W Water Economizer I Indicate water economizer and provide calculations showing compliance with 1413 if 1433 Exception 3 is utilized N.A. 1 1434 S Separate air sys. I Indicate special requirement zones and indicate systems N.A. 1 1435 S Simul. htg. & clg. I Indicate method of prohibiting simultaneous heating and cooling, or state excpetion and show supporting calculations N.A. 1 1436 H Heat recovery I Indicate heat recovery of all applicable systems on plans; complete and attach heat recovery calculations N.A. 1 1437 E Elec. motor effic. M MECH -MOT or Equip. Schedule with hp, rpm, efficiency N.A. 1 1438 V Variable speed drives I Indicate VS control or equivalent on schedules for all applicable equip. N.A. 1 1438.1 H Heat Rejection I Indicate heat rejection equipment types and fan types N.A. 1 1438.2 H Hot Gas Bypass I Indicate cooling equipment staging and capacity modulation abilities N.A. 1 1438.3 L Large Volume sys I Indicate multiple system rooms & indicate ventilation control N.A. 1 1439.1 K Kitchen Hoods I Indicate source and conditioning of make -up air N.A. 1 1439.2 L Laboratory Exhaust Indicate HR, VAV, semi - conditioned makeup, or CERM calc or any question, provide explanation: Decision Flowchart ( Start Here Section 1411.1 Equipment Efficiency Shall Meet Tables 14 -1A through 14 -1G Use flowchart to determine how the requirements of the Complex Systems Option apply to the project. Refer to the indicated Code sections for complete information on the requirements. G slOil Furr'4ce input >_ 225,000 uh or Any U eater. Yes 1411.1 IID & Power Venting or Damper. If input > 225,000 Btuh then 1412.6 Modulating Controls Required ny Fuel Fumac input > 225,000 Btuh? Yes Section 1411.1 0.75% Maximum Jacket Loss ace50 with Design > 25 people per - V 000SF- Yes Section 1412.8 Ventilation Controls for High - Occupancy Areas • 0 /Field - Assembled Equipment? Yes Section 1431.1 Calculations of Total On -Site Energy Input & Ouput Required Air System Serving Multiple Zones? Yes Section 1432.2.1 Supply Air Reset Controls Required I (continued on back) Yes► 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical - Complex Systems (back) MECH -COMP 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Hydronic System Yes Section 1432.3.2 through 1432.3.5 Device Isolation Required Mechanical Cooling? Section 1433 Economizer Required Total ump HP > 3 H or HP >1.5 and control v C Present Total Cooling > 780kBtuh Section 1432.3.1 Yes-0- Variable Flow Design Required Supply OSA > =5000 CFM Section 1436.1 50% Effective Heat Recovery Required Steam System Section 1432.4 DDC Required With Trending and Demand Response Yes. dronic Syste Heated or Cooled 300,000 Btuh Section 1436.2 Condensate Recovery Required >1,50 yes* ater Section 1436.3 Condenser Heat Recovery Required emot Refrigeration Condensers > 500kBt Yes* Section 1436.4 Refrigeration Condenser Heat Recovery Required ?stem or Zones w/ Simultaneous Htg & Clg v/ Section 1435 Zone Controls Must Reduce Supply Air Quantity Before Reheating/Recooling / Fan or Pump ` Motors >= 7 5 —Ye HP? Section 1438 Variable Flow Devices Required � ystem oil ystems serving N a room have 10,000 CF ppl Yes-• Section 1438.3 Controls Must Reduce Airflow When System In Not Heating or Cooling n 0 T Yes* Section 1432.2.2 Water Temperature Reset Required iFNotor Inc' in • Multi -speed pi�Egpmt Covrd by — No--►; Motor in Multi- i—No–• Tbl 14- 1A -14- 7 -speed system?/ 1G? otal Bld- Laboratory Exhaust> 5,000 cfm? i itchen Exhaust, Hood > 1,000 j - .\cfm? ✓ DONE e Yes Yes Section 1437 Motors Must Meet Efficiencies in Table 14 -4 Yes Section 1439.1 No Heating or Cooling for at Least 50% of Make -up Air Yes • Section 14392 One Required: a. Heat Recovery per 1439.2 b. 50% VAV Exhaust & Make -up c. 75% Direct Makeup w/ Tempering Only d. Combined Energy Reduction Qer> =Amin Yes 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Economizer MECH -ECO 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Economizer Summary Check box(es) for exceptions being claimed. List the system /equipment that qualifies for each exception. See Section 1433 for full description of Economizer requirements. ❑Full Air NOT APPLICABLE - NO AIRSIDE/NO COOLING ❑Ex 1: ❑ t 5: ❑ : 9a: ❑ Ex 2: ❑ c 6: ❑ : 9b: ❑ Ex 3: ❑ c 7: ❑ : 9c: Ex 4: ❑ r8: Decision Flowchart Use this flowchart to determine if project complies with Economizer requirements. If not, the Systems Analysis Option must be used. ( START ) 100% Air conomizer Yes Reference Section 1433 J • Full Air Economizer - Complies ified Un m Table 14-1A, , /EER 15% Code Exception 8: Group R Occ. —Yes Unit Cap <20,000%� —Yes Btuh ception .: it Cap <54,000 B It not Exterior xception Idg. Cap. it Cap < 33,000 Btu Ye w/o economizer nit not Exterior o <72,000 Btuh or djacen 5 %? No Exception 2: Chilled Water Sys. er25 %over Yes Idg Cap wo Econ 480,000 Btu or 2 eptioit er Cooled Re . Waterside Economize ing chiiled b Sys xception 3 Syste Cap. <= 500 tons Yes Yes- — • No No Exception 4: Cooling 75% Site HR or Solar Exception 5: Special OA iltration Need xception :. Dehumidification with supporting rgy ana Exception 7: Heat Pump Loop eting All Grit= Yes • No xception 9: erved b' Dedicated Server or Ye 14-1A or 14-1B Eq Rm quipme xc. 9a: EER 8 IPLV Ye • Over •.e No No No Water Econo Ye ER & IPLy/ r Code xception 10: RF System Meeting All Criteria c • . RAE 127 is 14- 1A/14- IP P ote C or bett 'f cap >85,00 Btu No V Does Not Comply Yes v • Qualifies for Full Air Economizer Exception - Complies 2009 Washington State Enerav Code Comaliance Forms for Nonresidential and Multifamily Residential Electric Motors MECH -MOT 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Project Address Bow Lake Recycling 6 Transfer Station Date 4/3/2013 Complete the following for all design A & B squirrel -cage, T -frame induction permanently wired polyphase motors of 1 hp or more having synchronous speeds of 3600, 1800 or 1200 rpm (unless one of the exceptions below applies). For Building Department Use Motor No. or Location HP Type (open /closed) Description of Application or Use Synch. Speed Min.Nom. Full load Efficiency NOT APPLICABLE - NO MOTORS Mninarn Norrirral FilIL.oad Efficiencies (%) As of 12/19/2010 Exceptions: 1. Motors in systems designed to use more than one speed of a multi -speed motor. 2. Motors already included in the efficiency requirements for HVAC equipment (Tables 14- 1A or 14-1B) . 3. Motors that are an integral part (i.e. not easily removed and replaced) of specialized process equipment (i.e. equipment which requires a special motor, such as an explosion - proof motor). 4. Motors integral to a listed piece of equipment for which no qualifying motor has been approved (i.e. if the only U.L. listing for the equipment is with a less- efficient motor and there is no energy - efficient motor option). For motors claiming an exception, list motor and note which exception applies. Open Motors I Enclosed Nbtors Synchronous Speed (RPh1) 3,600 1,800 1,200 I 3,600 1,800 1,200 Motor HP 1.0 77.0 85.5 82.5 77.0 85.5 82.5 1.5 84.0 86.5 86.5 84.0 86.5 87,5 2.0 85.5 86.5 87.5 855 86.5 ::.$ 3.0 85.5 89.5 88.5 86.5 89.5 ;e .5 3.0 86.5 89.5 89.5 88.5 89.5 89.5 7.5 88.5 91.0 90.2 89.5 91.7 gt 0 10.0 89.5 91.7 91.7 90.2 91.7 91.0 15.0 90.2 93.0 91.7 91.0 92.4 91.7 20.0 91.0 93.0 92.4 91.0 93.0 91.7 25.0 91.7 93.6 93.0 91.7 93.6 93.0 30.0 91.7 94.1 93.6 91.7 93.6 93.0 40.0 92.4 94.1 94.1 92.4 94.1 94.1 50.0 93.0 94.5 94.1 93.0 94.5 94.1 60.0 93.6 95.0 94.5 93.6 95.0 94.5 75.0 93.6 95.0 94.5 93.6 95.4 95.4 100.0 93.6 95.4 95.0 94.1 95.4 95.0 125.0 94.1 95.4 95.0 95.0 95.4 95.0 150.0 94.1 95.8 95.4 95.0 95.8 95.8 200.0 95.0 95.8 95.4 95.4 96.2 95.8 250.0 95.0 95.8 95.4 95.8 96.2 95.8 300.0 95.4 95.8 95.4 95.8 96.2 95.8 350.0 95.4 95.8 95.4 ' 95.8 96.2 95.8 400.0 95.8 95.8 95.8 95.8 96.2 95.8 450.0 95.8 96.2 96.2 95.8 96.2 95.8 500.0 95.8 96.2 96.2 95.8 96.2 95.8 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Permit Plans Checklist 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential MECH -CHK Revised August 2010 Project Address Bow Lake Recycling & Transfer Station (Date 4/3/2013 The following _information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the WashingtonState Nonresidential Energy Code. Applicability (yes, no, na) Code Section Component Information Required Location on Plans Building Department Notes HVAC REQUIREMENTS (Sections 1401 -1424) 1411 Equipment Performance N.A. 1411.1 Minimum efficiency Equipment schedule with type, capacity, efficiency N.A. 1411.1 Combustion htg. Indicate intermittent ignition, flue /draft damper & jacket loss N.A. 1411.1 Air - cooled chiller Provide total air and water chiller capacity N.A. 1411.2.1 Water - cooled chiller Full -load and NPLV values adjusted for any non - standard condiitons N.A. 1411.4 Pkg. elec. htg.& clg. List heat pumps on schedule N.A. 1411.5 Unenclosed Heat Indicate radiant heat system and occupancy controls 1412 HVAC Controls Yea 1412.1 Temperature zones Indicate locations on plans M401 N.A. 1412.2 Deadband control Indicate 5 degree deadband minimum N.A. 1412.3 Humidity control Indicate humidistat -Yee NO 1412.4 Setback and Shutoff Indicate thermostat with 7 day program capability & required setback M401 N.A. 1412.4.1 Dampers Indicate damper location, leakage rate, control type, & max. leakage N.A. 1412.4.2 Optimum Start Indicate optimum start controls N.A. 1412.5 Heat pump control Indicate heat pump thermostant & outdoor lockout on schedule N.A. 1412.6 Combustion heating Indicate modulating or staged control N.A. 1412.7 Balancing Indicate balancing features on plans N.A. 1412.8 Ventilation Control Indicate demand control ventilation for high - occupancy areas N.A. 1412.9 Loading Dock & Garage Ventilation Indicate enclosed loading dock & parking garage ventilation system activation and control method. N.A. 1422 Thermostat interlock Indicate thermostat interlock on plans N.A. 1432.2.1 Temperature Reset Indicate temperature reset method 1413 Air / Water Economizers N.A. 1412.1 Single zone systems Indicate multiple cooling stage control capability. N.A. 1413.1 Air Econo Operation Indicate 100% capability on schedule N.A. 1413.1 Wtr Econo Operation Indicate 100% capacity at 45 degF db & 40 deg F wb N.A. 1413.2 Wtr Econo Document Indicate max. OSA condition for design clg load & equipment performance data. N.A. 1413.3 Integrated operation Indicate capability for partial cooling N.A. 1413.4 Humidification Indicate direct evap or fog atomization w/ air economizer 1414 Ducting Systems N.A. 1414.1 Duct sealing Indicate duct design pressures and sealing requirements N.A. 1414.1 Duct testing Indicate testing required N.A. 1414.2 Duct insulation Indicate R -value of insulation on duct 1415 Piping Systems N.A. 1415.1 Piping insulation Indicate R -value of insulation on piping I 1416 Completion Requirements 1416.3.2 System Balancing Indicate air and water system balancing requirements 1416.3.3 Functional Testing Provide sequence of operations and test procedures. 1416.3.4 Documentation Indicate O &M manuals, record drawings, staff training 1416.3.5 Comm. Report Indicate requirements for final commissioning report 1416.4 Compliance Chklist Submit to building official upon substantial completion. Yea ll Mechanical Summary Form (Completed and attached. Equipment schedule with types, input/output, I efficiency, cfm, hp, economizer l I 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Mechanical Permit Plans Checklist Continued MECH -CHK 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Project Address Bow Lake Recycling 6 Transfer Station (Date 4/3/2013 The following information is necessary to check a mechanical permit application for compliance with the mechanical requirements in the Washington- State Nonresidential Energy Code. Applicability (yes, no, na) Code Section Component ( IInformation Required Location on Plans Building Department Notes SERVICE WATER HEATING AND HEATED POOLS (Sections 1440 -1454) 1440 ' Service water htg. Yes 1441 Elec. water heater Indicate R -10 insulation under tank M401 N.A. 1442 Shut -off controls Indicate automatic shut -off of circulators or heat trace Yes 1443 Pipe Insulation Indicate R -value of insulation on piping M017R N.A. 1444 Pump Energy Indicate method of pump energy management (Sec 1438) N.A. 1445 Heat Recovery Indicate preheat capacity as % of peak service water demand. N.A. 1452 Heat Pump COP Indicate minimum COP of 4.0 N.A. 1452 Heater Efficiency Indicate pool heater efficiency N.A. 1453 Pool heater controls Indicate switch and 65 degree control N.A. 1454 Pool covers Indicate vapor retardant cover N.A. 1454 Pools 90+ degrees Indicate R -12 pool cover N.A. 1455 Heat Recovery Indicate method and capacity of exhaust air temperature reduction 1460 Cold Storage N.A. 1463 Evaporators Indicate motor type and speed control N.A. 1464 Condensors Indicate condenser cooling type, design wb temp and control N.A. 1465 Compressors Indicate design minimum condensing temp and control. If "no" is indicated for anv item in Sections 1401 -1424 or 1440 -1465. provide explanation: 1312.4 - RECYCLE BUILDING OPERATES CONTINUOUSLY WITH CONTROL BY A LINE VOLTAGE THERMOSTAT - EXCEPTION 1412.4.c.2: EQUIPMENT FULL LOAD CAPACITY IS LESS THAN 2 kW AND CONTROLLED BY READILY ACCESSABLE MANUAL OFF -HOUR CONTROLS. 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Envelope Summar Zone 1 Non - Residential ENV -SUM 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Project Info Project Address Bow Lake Recycling 6 Transfer Station Date 4/3/2013 Recycle Building For Building Department Use �1�' �'^ cop Energy Code Compliance Applicant Name: LNs Engineers, Inc., Larry Storset Applicant Address: 7713 Pioneer Way, Gig Harbor, WA Applicant Phone: 253 -851 -5175 Project Description El New Building ❑ Addition ❑rAlteration ❑ Change of Use Compliance Option ❑ Prescriptive 0 Component Performance (See Decision Flowchart (over) for qualifications) ❑ Seattle EnvStd ❑ Systems Analysis Occupancy Group 0 Nonresidential 0 Multifamily Residential (> 3 stories ) Climate Zone 0 Climate Zone 1 0 Climate Zone 2 ( See WSEC 302.3 for county list) Fenestration Area Calculation Total Fenestration Electronic version: these values are automatically taken from ENV -UA -1. (rough opening) Gross Exterior (vertical & overhd) divided by Wall Area times 100 equals % Fenestration 37.2 - 441.0 X 100 = 8.4% Semi- Heated Path 0 yes Allowable if project meets all requirements as defined in section 1310.2. Only allowed as O no prescriptive path and must be calculated separately from other conditioned spaces. Limited to reduced wall insulation levels. Requires other fuel heating and qualifying thermostat. Envelope Requirements (enter values as applicable) Minimum Insulation R- values Roofs - Insulation Above Deck R20 Rigid Roofs - Metal Building NA Roofs - Single Rafter NA Roofs - Attic and All Others NA Walls - Mass NA Walls - Metal Building R21 w/ R5 Walls - Steel Framed NA Walls - Wood Framed and Other NA Floors - Mass NA Floors - Steel Joist NA Floors - Wood Framed and Other NA Maximum F -fact rs Slabs -on -Grade - Unheated R -10 full Vertical Fenestration Slabs -on -Grade - Heated NA Notes: INCOMPLETE REVIEWEE ODE COMP APPROVED Envelope Requirements ( continued ) Maximum U- factors Vertical Fenestration Non -Metal Frame NA Metal Frame 0 .3 Entrance Door NA Skylights - Without Curb NA Skylights - With Curb NA Opaque Doors - Swinging NA Opaque Doors - Non - Swinging NA Maximum SHGC (or SC) Vertical Fenestration Non -North 0.380 MO 0.380 S lift 6s:p NA MAY 1 3 2013 City of Tukwila BUILDING DIVISION MU19b RECEIVED CITY OF TUKWILA MAY 0 3 2013 PERMIT CENTER gtri 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Envelope Summar back Zone 1 Non - Residential ENV -SUM 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Minimum Requirements for Prescriptive Option Use table to determine if project qualifies for the optional Prescriptive Option. All components must meet the stated Climate Zone Climate Zone 1 Climate Zone 2 ccupancy Group Nonresidential Residential, Other than Single- Family Nonresidential Residential Single 64041,EleVia6 Insulation Min. R -Value Roofs , ° , . -. ,tEjli Insulation Entirely above Deck _ R -30 c.i. R -38 c.i. R -38 c.i. R -3 Metal Building R -25 + R -11 Ls R -25 + R -11 Ls R -25 + R -11 Ls R -25 + Single -Rafter R -38 R -38 R -38 R Attic and Other R -38 adv or R -49 R -38 adv or R -49 R -38 adv or R -49 R -38 ad Walls, Above grade Mass R -5.7 c.i. i R -11.4 c.i. i R -7.6 c.i. R -13 Metal Building R -13 + R -7.5 c.i. R -19 + R -8.5 c.i. R -13 + R -7.5 c.i. R -19 + Steel Framed R -13 + R- 7.5c.i. R -19 + R -8.5 c.i. R -13 + R -7.5 c.i. R -19 + Wood Framed and Other R -21 R -13 + R- 6 c.i. R -13 + R -7.5 c.i., or R -21 + R -2.5 c.i. R -21 + Below Grade Wall Same as above grade Same as above grade Floors Mass R -30 c.i. R -30 c.i. R -30 c.i. R -3 Steel Joist R -38 + R-4 c.i. R -38 + R -4 c.i. R -38 + R -4 c.i. R -38.0 - Wood Framed and Other R -30 R -30 R -30 R Slab -On -Grade Floors Unheated R -10 for 24 in. (with thermal break) R -10 for 24 in. (with thermal break). R -10 for 24 in. (with thermal break) R -10 for therma Heated R -10 c.i.(with thermal break) R -10 c.i. (with thermal break) R -10 c.i. (with thermal break) R -10 c.i. (\ bn Opaque Doors Maximum U- Factor Swinging U -0.600 U -0.400 U -0.600 U -C Non - Swinging U -0.600 U -0.400 U -0.600 U -C Fenestration 0 -40% of Wall Assembly Maximum U- factor (NFRC Rated) Vertical Fenestration Nonmetal framing U -0.32 U -0.32 U -0.32 U -i Metal framing U -0.40 U -0.40 U -0.4p0 U -i Entrance doors U -0.60 U -0.60 U -0.60 U -i Skylights Without curb (i.e. sloped U -0.50 U -0.50 U -0.50 U -i With curb (i.e. individual unit U -0.60 U -0.60 U -0.60 U -1 Fenestration 0-40% of Wall Assembly Maximum SHGC Factor Vertical Fenestration SHGC -0.40 all, OR SHGC -0.45 all PLUS permanent PF > 0.50 on west, south, east No Requirement SHGC -0.40 all, OR SHGC -0.45 all PLUS permanent PF > 0.50 on west, south, east No Requirer Skylights SHGC -0.35 SHGC -0.35 SHGC -0.35 SHGC -0.35 The following definitions apply: c.i. = continuous insulation, Ls = liner system (see definitions Footnote 1: Zone 1, nonresidential walls may be ASTM C90 concrete block walls, ungrouted or partially grouted at 32 inches or less on ce vertically and 48 inches or less on center horizontally, with ungrouted cores filled with material having a maximum thermal conductivity ( Btu -in/h• f12• °F. • 4 r - 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Envelope UA Calculations Zone 1 Non - Residential 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential ENV -UA Project Address Bow Lake Recycling 6 Transfer Station Date 04/03/2013 Occupancy Group ® Nonresidential 0 Multifamily residential Clear For Building Department Use Climate Zone ® Zone 1 0 Zone 2 Fenestration Area as % gross exterior wall area 8.4% Max. Target: 40.0% Notes: 1: If fenestration area exceeds maximum allowed, then calculate adjusted areas on Target Area Adjustment sheet on the backside of the ENV -SHGC form. 2: U- factors shall come from chapter 10 or calculated per 1332. Building Component Provide assembly ID & page /plan # for each bldg. element Proposed UA U- factor x Area (A) = UA (U x A) Target UA U- factor x Area (A) = UA (U x A) 1 Roofs Y A R= ID: R= ID: R= ID: 0.034 Above Deck Insulation U- 0,034" m °_° 2 R=20.0 ID: Roof w/ R19.5 Rigid above deck R= ID: Table 10 -7F, no framining insulation plus R= ID: continous rigid insulation on roof deck 0.049 86 4.2 0.031 86 2.7 Metal Building U -0.031 R= ID: R= ID: R= ID: 0.027 Single raft, attic, other U-0,027 1 Opaque Walls - Above IMetal Frm R= ID: Wall R21 Batt w/ wood sheathing and R5 R= ID: Rigid Insulation & Metal Studs @ 24" oc R= ID: Table 10 -5A R= ID: 0.062 372 23.1 0.064 372 1 23.8 Steel frame/metal bldg U -0.064 wood /Oth R= ID: R= ID: R= ID: R= ID: 0.0571 Wood Frame, other U -0.057 Mass' R= ID: 6" concrete stem wall w/ R5 rigid R= ID: Table 10 -5B(1) R= ID: R= ID: Proposed assembly U- factor from Tables 10 -5 thru 10 -5B 0.160 18 2. 9 0.150 18 2.7 Mass all U -0.15 IGBelow rade Walls R= ID: R= ID: R= ID: Proposed assembly U- factor from Tables 10 -5 thru 10 -5B. Do NOT use Table 10 -1. 0.150 Assumed to be. Mass Wall., U -0.15 2 e a o° 0 U= ID: Insulated metal door w/ 1/2" glazing U= ID: NREC Table 10 -6 Default Insulated Metal U= ID: 0.600 14 8.3 0.6001 14 8.3 All Doors U-0.60 0 $ u- R= ID: R= ID: R= ID: 0.029 Floors U -0.029 F- factor x Perimeter = UA(U x A) F- factor x Perimeter = UA (U x A) 3 Slab -on -grade a°i r D R=10. 0 ID: Fully insulated slab on grade R= ID: NREC Table 10 -2 R= ID: 0.360 38 13.7 0.540 38 20.5 Slab -On -Grads F-0.54 IHeated R= ID: R= ID: Proposed assembly F- factors can use the unheated values in Table 10 -2 0.360 Heated Slab -On -Grade F -0.36 iic 1 uept 0.15rratete�o anb1 abl 10 - bbtvalu s. Plans must y clearl sa ue c ea y state ootnote requirements. Page 1 Area UA 528 52 Area I 528 UA 58 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Envelope UA, continued. Zone 1 Non - Residential ENV -UA Project Address Bow Lake Recycling S Transfer Station Date 4/3/2013 Fenestration Area as % gross exterior wall area 8.4% Max. Target: 40.0% For Building Department Use Notes: 1: If fenestration area exceeds maximum allowed, then calculate adjusted areas on Target Area Adjustment sheet on the backside of the ENV -SHGC form. 2: Provide NFRC or Table 10 -6 U- factor (See Section 1312.1) for fenestration assemby (combined frame and glazing performance). Building Component Provide assembly ID & page /plan # for each bldg. element Proposed UA U- factor x Area (A) = UA (U x A; Target UA U- factor x Area (A) = UA (U x A) Vertical Fenestration Metal Frame U=0.290 ID: Solarban 60 Window or equal U. 0.290 ID: Solarban 60 Window or equal U= ID: U= ID: 0.290 0.290 30 7 8.7 2.1 0.400 37 14.9 Metal Frame U -0.40 Non -Metal U= ID: U= ID: U= ID: U= ID: 0.320 Non -Metal Frame U -0.32 IMtl entrance U= ID: U= ID: U= ID: U= ID: 0.600 Metal Entance Door U -0:60 Skylights No Curb U= ID: U= ID: U= ID: U= ID: 0.500 Without Curb U-0.50 IWith Curb U= ID: U= ID: U= ID: U= ID: 0.600 Including Curb U -0.60 one 1 CMU walls meeti g able 13 -1 Footnote lb can be en erect with U -value f 0,15 rather than Tab e. 0 b values lans must clearly state footnote requirements. Page 2 Total Page 1 Total To comply: 1) Proposed Total UA shall not exceed Target Total UA. 2) Proposed Total Area shall equal Target Total Area. Total Area UA 37 11 528 52 565 63 Area UA 37 15 528 58 565 73 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily SHGC Calculation Zone 1 Non - Residential ENV -SHGC 2009 Washington State Energy Code Compliance Fo Project Address Bow Lake Recycling & Transfer Station Date 04/03/2013 Fenestration Area as % gross exterior wall area 8.4% Prop 40� Max.Target For Building Department Use Prescriptive PF Credit 0 Yes OO No Vertical North Facing Credit (1323.3 Exp. 2) 0 Yes O No Notes: To comply the Proposed total SHGC x A for all fenestration (vertical & skylights) shall not exceed Target total SHGC x A. If the north facing credit is used then the north and non -north must comply separately with skylights being included with the non -north vertical fenestration. Skylights Proposed SHGC List ID & page #, NFRC or glass only SHGC* x Area (A) = SHGC x • Target SHGC SHGC x Area (A) = SHGC x A ID: ID: ID: ID: ID: 0.38 7 3 0.350 Criteria SHGC All 0.35 Note: Manufacturer's SC may be used in lieu of SHGC. Totals Non - residential compliance is based upon combined skylight and vertical Totals ion performance. Residential compliance is based upon skylig only. All Non -North Vertical Fenestration ++ Proposed SHGC List ID & page #, NFRC or glass only SHGC PF PF Adjusted x Area (A) = SHGC x P Mult' SHGC Target SHGC SHGC x Area (A) = SHGC x A ID: Solarban 60 Window 0.38 1.00 0.38 30 11 0.400 37 14. 9 ID: Door Glazing 0.38 1.00 0.38 7 3 Criteria SHGC ID: All 0.40 ID: Prescriptive PF 0.45 ID: ID: ID: ID: ID: ID: + +Note: If projection factors or north vertical glazing credit are used Totals 37.2 14 .1 Totals I 37.2 14.9 then vertical fenestration must be entered according to orientation. If neither are used then ventical fenestration can be entered in either section. Non -North + Note: Manufacturer's SC may be used in lieu of SHGC. Total 14 .1 14 . 9 North Vertical Fenestration ++ Proposed SHGC List ID & page #, NFRC or glass only SHGC PF PF Adjusted x Area (A) = SHGC x P Mult' SHGC Target SHGC SHGC x Area (A) = SHGC x A ID: ID: ID: ID: ID: ID: Criteria Mixed North Orientation Separate Alt 0.40 0.45 Prescrpt P 0.45 0.50 North Total I I For compliance: Proposed total SHGC x A shall not exceed Target total SHGC x A. If north glazing credit is used then north facing vertical fenestration must comply separately from non -north vertical fenestration and skylights. Area I SHGC x A Grand I 37.2 14.1 Total Area SHGC x A Grand I 37 2 Total 14.9 -139.2 J 37.2 1.00 , 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Tare et Area Ad'ustment Calculations 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential 'Project Address How Lake Recycling & Transfer Station Date Revised August 2010 04/03/2013 If the total fenestration area as a % of gross exterior wall area (calculated on ENV -SUM) exceeds the maximum allowed in Table 13 -1, then this calculation must be submitted Use the resulting areas in the Target UA and SHGC calculations above. SKY= Skylight. Refered to as overhead glazing in WSEC 1333 & 1334 and equations 13 -1 & 13 -2. VF = vertical fenestration. Refered to as vertical glazing in WSEC 1333 & 1334 and equations 13 -1 & 13 -2. NW = net wall (excludes fenestration, BG, and doors.) DBG = Doors and below grade wall. Total Fenestration = SKY + VF. Gross Exterior Wall Area VF + NW + DBG Fenestration -> Opaque -> Gross Exterior Wall Area Proposed Areas Above Grade Walls Doors & BG Walls SKY= VF= 37.2 0 NW= 390.0 DBG. 13.8 441.0 Total Fenestration 37.2 X Max Fenestration % (Table 13 -1) 40.0% Maximum Target - 176.4 Total Fenestration 37.2 Net AG Wall Area 390.0 100 Maximum Target Fenestration Area 176.4 Excess Fenestration 0 ) lesser -139.2 Excess Fenestration / Target Fenestration Excess Fenestration Vertical Fenestration metal frame non -metal frame metal entrance Skylight without curb with curb AG Wall Steel Frame /metal Wood /Other frame Mass Sum of Proposed SHGC Calculation North Vertical Fenestration Non -North Vertical Fenestration Skylights (all) 37.2 Target Net Wall Area 390.0 Proposed Area 37.2 Proposed Area Proposed Area 372.0 18.0 427.2 Proposed Area X X X X X X X X X X X Total Fenestration Net Wall 390.0 Target VF Mult. 1.00 Target VF Mult, Target Net Wall Mult. 1.00 1.00 Excess Fenestration Target VF Multiplier Target Net Wall Mult. Sum of Target Target VF Mult. 1.00 Target Area 37.2 Target Area Target Area 372.0 18.0 427.2 Target Area Apply to all Proposed Fenestration Areas to get Target Fenestration Area Apply to all Proposed Opaque AG Wall Areas to get Target Area Target values in shaded boxes are used in the applicable Target UA calculations on the front. Sum of Proposed must equal Sum of Target. SHGC target values in shaded boxes are used in the applicable Target SHGC calculations above. 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Building Permit Plans Checklist ENV -CHK 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamily Residential Revised August 2010 Project Address Bow Lake Recycling & Transfer Station (Date 4/3/2013 The following _information is necessary to check a building permit application for compliance with the building envelope requirements in the Washington State Nonresidential Energy Code. Applicability (yes,no,na) Code Section Component Information Required Location on Plans Building Department Notes GENERAL REQUIREMENTS (Sections 1301 -1314) 1301 Scope Unconditioned spaces Identified on plans if allowed • N.A. 1310.2 Semi - heated spaces Semi- heated spaces identified on plans if allowed N.A. 1310.3 Cold Storage / refrigerate _All refrigerated spaces Identified on plans. ENV -RFG completed. 1311 Insulation Yes 1311.1 General installation Indicate installation nethod, densities and clearances to achieve Intended R -value of all insulation materials A001 Yea 1311.2 Roof /ceiling insul. Indicate R -value on roof sections for attics and other roofs; Indicate clearances for attic insulation; Indicate baffles if eave vents installed; Indicate face stapling of faced batts A013 N/A N/A Yes 1311.3 Wall insulation Indicate R -value and framing material on wall sections; Indicate face stapling of faced batts; Indicate above grade exterior insulation is protected; Indicate mass of masonry walls if mass wall claimed Indicate loose -fill core insulation for masonry walls as necessary Indicate frequency of grouted cores and bond beams as necessary A012 N/A N/A N/A N/A N/A N.A. 1311.4 Floor Insulation Indicate R -value on floor sections; Indicate substantial contact with surface; Indicate supports not more than 24" o.c.; Indicate that insulation does not block airflow through foundation vents. A013 N/A N/A N/A Yes 1311.5 Slab -on -grade floor Indicate R -value on wall section or foundation detail; Indicate slab insulation extends down vertically 24" from top; Indicate above grade exterior insulation is protected A013 N/A N/A N.A. 1311.6 Radiant floor Indicate R -value on wall section or foundation detail; Indicate slab insulation extends down vertically 36" from the top; Indicate above grade exterior insulation is protected; Indicate insulation also under entire slab where req'd. by Official Yea 1312 Glazing and doors Provide calculation of vertical and overhead glazing area as percent of gross wall area Yes 1312.1 U- factors Indicate glazing and door U- factors on glazing and door schedule (provide area - weighted calculations as necessary); Indicate if values are NFRC or default, if default then specify frame type, glazing layers, gapwidth, low-e coatings, gas filling A°11 A014 A015 Yes 1312.2 SHGC & SC Indicate glazing solar heat gain coefficient or shading coefficient on glazing schedule (provide area - weighted calculations by orientation as necessary) A01.1 1313 Moisture control Yee 1313.1 Vapor retarders Indicate vapor retarders applied to warm side of insulation A013 Yes 1313.2 Roof /ceiling vap.ret. Indicate vapor retarder on roof section; or list exception Indicate vap. retard. with sealed seams for non -wood structure A013 Yes 1313.3 Wall vapor retarder Indicate vapor retarder on wall section A013 Yes 1313.4 Floor vapor retarder Indicate vapor retarder on floor section A013 N.A. 1313.5 Crawl space vap. ret. Indicate required grade ground cover with required overlapping. 1314 Air leakage Yes 1314.1 Bldg. envel. sealing Indicate sealing, caulking, gasketing, and weatherstripping A011 Yes 1314.2 Glazing/door sealing Specify maximum air leakage rates for fenestration and door products A011 N.A. 1314.3 Assemb. as ducts Indicate sealing, caulking and gasketing N/A N.A. 1314.4 Recessed Lighting Fixture Indicate IC rating, ASTM E283 cert., and gasketing or caulking to ceiling N/A N.A. 1314.5 Loading Dock Seal Indicate weatherseal at cargo and loading dock doors N/A N.A. 1314.6 Continuous Air Barrier _Provide Indicate air barrier sealing on all roof, wall & floor details Indicate leakage testing method. testing results to building official. Max. leakage of 0.40 cfm/ft2 at 0.3 inch w.g. N/A PRESCRIPTIVE PERFORMANCE ISections 1320 -1323) No , ENV -SUM Form Completed and attached. No 1323 Glazing Indicate number of glazing panes and location of emissivity coating or exception taken COMPONENT PERFORMANCE (Sections 1330 -1338) Yes ENV -SUM, ENV -UA, & ENV-SHGC Forms Completed and attached. attached If ''no" is shown for any question, provide explanation: 2009 Washin ton State Ener• Code Compliance Forms for Nonresidential and Multifamil ENV -UA INSTRUCTIONS & EXAMPLES ENV -CHK 2009 Washington State Energy Code Compliance Forms for Nonresidential and Multifamil Revised August 2010 FENESTRATION, SKYLIGHTS, & DOORS: Per Energy Code Section 1312.1, • U factors shall be "determined, certified, and labeled in accordance with RS -31 by a certified independent agency licensed by the National Fenestration Rating Council (NFRC)." If using this approach, provide manufacturer, model number and NFRC rating on the drawings. • "Unlabeled glazing and doors shall be assigned the default U-factor in Table 10 -6.': If using this approach, provide all glazing characteristics on the drawings: list number of glazing layers, gap width, low -e coating, gas fill, frame material, thermal break details per footnote 2 to Table 10 -6B. OPAQUE ASSEMBLIES: Per Energy Code Section 1332, • "The U- factors for typical construction assemblies are included in Chapter 10. These values shall be used for all calculations." For example: see Table 10 -5A for metal stud walls and metal building walls /roofs, see Table 10 -7A to E for steel truss ceilings, etc. FURTHER INFORMATION: Refer to the Northwest Energy Efficiency Council website at: www.neec.org Below are examples of how the Component Information on ENV -UA -1 are to be completed Building Component List ID & page #, code table # or calculation page # Proposed UA U- factor x Area (A) Typical Example Roofs Other R= 38 ID: R1/A1.5, T.10 -7 default 0.031 532 R -38 blown -in attic insulation per default Deck R =40 ID: R2 /A1.5, T. 10 -7G default 0.025 9885 R -40 uniform thickness rigid insulation per default Walls Opaque R= 13 +7.5 ID: W1 /A1. 6, T. 10 -5A(1) default R= 5 ID: W2 /A1. 6 , T.10 -5B (2) default R= ID: R= ID: 0.064 7587 0.157 923 R-I 3 cavity + R -7.5 rigid ins. over metal studs per default R -5 rigid ins. at edge of intermediate concrete floors per def O ro R =11 ID: W4 /A1. 6, T.10-5 (1) default R= ID: 0.099 512 R -I I cavity ins. between wood studs on conc. wall per def. Doors U= 0.6 ID: Dl /A1.3, T.10 -6 default U= 1.2 ID: D2 /A1.3, T.10 -6 default 0.60 120 1.20 40 Non -NFRC fire -rated exit door per default Non -NFRC warehouse door per default Floors and Slabs Floor R= 30 ID: F1 /A1 .7, T. 10 -4A default R= ID: 0.031 10417 R -30 continuous ins. under concrete floor slab per default Slab R =10 ID: F2 /Al . /, T.10 -2 detault 0.700 612 R -10 slab edge ins. for 2 feet without thermal break per def. Fenestration and Skylights Vertical ID: W1 /A1.3, NFRC certified ID: W2 /A1.3, T.10 -6 default ID: 143/A1.3, T. 10 -6 default ID: W3 /A1.3, T.10 -6 default 0.36 12307 0.50 5240 0.65 282 0.78 282 Curtainwall rated, certified, and labeled per NFRC Non -NFRC curtainwall, 2 layer, 0.05emis, argon, TB, fixed Non -NFRC curtainwall, 2 layer, 0.05emis fixed Non -NFRC curtainwall, 2 layer, 0.05emis operable Yx ID: Sl /A1.3, NFRC certified ID: S2 /A1.3, T. 10 -6 default 0.50 453 0.54 118 Sloped glazing rated, certified, and labeled per NFRC Non -NFRC atrium sloped glazing per default May 13, 2013 • City of Tukwila Jim Haggerton, Mayor Department of Community Development Jack Pace, Director Tom Creegan King County 201 S Jackson Street, Ste 201 Seattle, WA 98104 RE: Request for Application Extensions Mechanical Permit Applications M12 -195 & M12 -196 Bowlake Transfer Station Dear Mr.Creegan, This letter is in response to your written request for an extension to Application Numbers M12 -195 and M12 -196. The Building Official has reviewed your letter and will not be extending the expiration dates. The applications were submitted on December 18, 2012 and incomplete letters were sent out in response to both submittals two days later, December 20, 2012. On May 3, 2013, one hundred and thirty -three days later, a response to this letter was received in the Permit Center. Due to the lack of action, it has been determined that an extension is not granted. The applications are currently in the final assembly stage and will soon be approved. You will receive a telephone call by Friday at the latest letting you know these applications are approved and ready for issuance. At that time you will have until the expiration date (June 16 is a Sunday, so by June 14, 2013) to come into the Permit Center and have the permits issued to you. On the date of issuance, the expiration date will be automatically extended an additional 180 days. If you have questions, you can reach me in the Permit Center or Bob Benedicto at 206 431 -3675. File: Permit No. M12 -195 & M12 -196 W :IPermit CenterlExtension LetterslDenialsU4pplicationsIM12 -195 & M12 -196 Extension DeniaLdocx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax 206 - 431 -3665 • • Bill Rambo From: Sent: To: Cc: Subject: Attachments: Hi Jennifer, Creegan, Tom <Tom.Creegan @kingcounty.gov> Monday, May 06, 2013 2:51 PM Jennifer Marshall; Jennifer Marshall Bill Rambo; 'CK Humphreys'; Ken Cobley; Rushiddin, Naima; Bill Rambo Permit Extensions M12 -195 and M12 -196 M12 -196 Tukwila permit expiration notice letter 05- 01- 2013.pdf; M12 -195 Tukwila permit expiration notice letter 05- 01- 2013.pdf We have received letters (attached)(warningjof the pending expiration of two permits for the Bow lake project, M12 -195 and M12 -196. As construction is still ongoing I am requesting that these permits be extended. Thanks for your assistance. Tom -1DA0( Irec e w Ve '11-14e-S 0 3- \ 3 °"4R thr` r' MiVeitu iNoL, eS2dnS-P 40 rco wp L /33 N4-ki , L ' - E -eZi, -fit .ct/u/i6e — 7t) _,nitezzt 1 RECEIVED CITY OF TUKWILA MAY 0 6 2013 PERMIT CENTER 05 -01 -2013 wi a .71tn Haggerton,.Mayor epartment:of Cornmunity Development idekPace; Director TOM CREEGAN 201 S JACKSON ST, STE 701 SEATTLE WA 98104 RE: Permit Application No. M12 -196 BOW LAKE - RECYCLING BUILDING 18800 ORILLIA RD S TUKW Dear Permit Applicant: In reviewing our current application files, it appears that your permit applied for on 12/18/2012, has not been issued by the City of Tukwila Permit Center. Per the International Building Code, International Mechanical Code, Uniform Plumbing Code and /or National Electrical Code every permit application not issued within 180 days from the date of application shall expire and become null and void. Your permit application will expire on 06/16/2013. If you still plan to pursue your project, a written request for extension of your application must be submitted to the Permit Center at least seven (7) days before it is due to expire. Address your extension request to the Building Official and state your reason(s) for the need to extend your permit application. If it is determined that an extension is granted, your application will be extended for an addtional 90 days from the expiration date and you will be notified by mail. In the event that we do not receive your written request for extension or your request was denied, your permit application will expire, become null and void and your project will require a new permit application, plans and specifications, and associated fees. Thank you for your cooperation in this matter. Sincerely, jirc igt.Pj uV` fer Marshall it Technician File: Permit File No. M12-196 6300 Southcenter Boulevard Suite # 100 • Tukwila, Washington 981$8-■ Phone 206.431 -3670 • Fax 206- 431 -3665 • City of Tukwila Jim Haggerton, Mayor r2 Department of Community Development Jack Pace, Director 9oa - December 20, 2012 Tom Creegan 201 S Jackson St, Suite 701 Seattle, WA 98104 RE: Incomplete Letter #1 Mechanical Permit Application M12 -196 Bow Lake — Recycling Building —18800 Orillia Rd S Dear Mr. Creegan, This letter is to inform you that your permit application received at the City of Tukwila Permit Center on December 18, 2012 is determined to be incomplete. Before your application can continue the plan review process the attached/following items from the following department(s) need(s) to be addressed: Building Department: Allen Johannessen at 206 433 -7163 if you have questions concerning the attached comments. 1) Please provide a completed "2009" Washington State Energy Code compliance form. Please address the comment above in an itemized format with applicable revised plans, specifications, and/or other documentation. The City requires that two (2) sets of revised plans (only the updated/changed sheets), specifications and/or other documentation be resubmitted with the appropriate revision block. In order to better expedite your resubmittal a `Revision Submittal Sheet' must accompany every resubmittal. I have enclosed one for your convenience. Revisions must be made in person and will not be accepted through the mail or by a messenger service. If you have any questions, please contact me at the Permit Center at (206) 431 -3670. Sincerely, Bill Rambo Permit Technician Enclosures File: M12 -196 W:IPermit Centerllncomplete Letters12012IM12 -196 Incomplete Letter #1.docx 6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone 206 - 431 -3670 • Fax 206 - 431 -3665 ?OMIT CO PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -196 DATE: 05 -03 -13 PROJECT NAME: BOW LAKE - RECYCLING BUILDING SITE ADDRESS: 18800 ORILLIA RD S Original Plan Submittal X Response to Incomplete Letter # 1 Response to Correction Letter # Revision # After Permit Issued DEPARTMuENTSO: ill Public Works ❑ Fire Prevention Structural n Planning Division ❑ Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete 17 Incomplete DUE DATE: 05-07-13 Not Applicable Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials TUES/THURS ROUTING: Please Route Structural Review Required nNo further Review Required REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 06 -04 -13 Approved ❑ Approved with Conditions X Not Approved (attach comments) n Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents/routing slip.doc 2 -28 -02 •PERMIT COORD COP. PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -196 DATE: 12/18/12 PROJECT NAME: BOW LAKE - RECYCLING BUILDING SITE ADDRESS: 18800 ORILLIA RD S X Original Plan Submittal Response to Correction Letter # Response to Incomplete Letter # Revision # after Permit Issued DEPARTMENTS: Building Division Public Works 4wAJ/4 Fire Prevention Structural Planning Division ❑ Permit Coordinator ❑ DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete ❑ Incomplete Kr DUE DATE: 12/20/12 Not Applicable ❑ Comments: Permit Centerse Only INCOMPLETE LETTER MAILED: �'%1,— LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg Fire ❑ Ping ❑ PW ❑ Staff Initials:. TUES/THURS ROUTING: Please Route ❑ Structural Review Required ❑ No further Review Required ❑ REVIEWER'S INITIALS: DATE: APPROVALS OR CORRECTIONS: DUE DATE: 01/17/13 Approved ❑ Approved with Conditions ❑ Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use OnIy CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: • City of Tukwila REVISION SUBMITTAL Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Web site: http: / /www.ci.tukwila.wa.us Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through the mail, fax, etc. Date: / 3 / : Plan Check/Permit Number: P -1 Er Response to Incomplete Letter # 1 ❑ Response to Correction Letter # ❑ Revision # after Permit is Issued ❑ Revision requested by a City Building Inspector or Plans Examiner Project Name: ipc,) L A K Project Address: 1 U Boo (:)2 t C. 1— 1 A g() . . Contact Person: (i< }-ru ti P Ffit 1'S Phone Number: 2 Ca- .2-2C. • 8 '7-`,b Summary of Revision: e20✓ b s it --)60 E "C-1. c, °mi. (Li i-a c a c$4-xis arm wow A MAY .0.3.2013' PERMIT CENTER Sheet Number(s): " Cloud" or highlight all areas of °''` °' Received at the City of Tukwila Permit Center by: Entered in Permits Plus on — 3-- ( H:Wppbcations\Forms- Applications On Line\2010 Applications \7-2010 - Revision Submtttal.doc Created: 8 -13 -2004 Revised: 7 -2010 Contractors or Tradespeople Pr er Friendly Page General /Specialty Contractor A business registered as a construction contractor with Lill to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name LYDIG CONSTRUCTION INC UBI No. 328046357 Phone 5095340451 Status Active Address 11001 E Montgomery Dr License No. LYDIGC'264JC Suite /Apt. License Type Construction Contractor City Spokane Effective Date 4/3/1974 State WA Expiration Date 9/11/2013 Zip 99206 Suspend Date County Spokane Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status LYDIG'J893DQ LYDIG HUNT A JOINT VENTURE Construction Contractor General Unused 3/18/2011 3/18/2015 Active LYDIGDJ906QP LYDIG + DIX A JOINT VENTURE Construction Contractor General Unused 11/17/2010 11/17/2014 Active LYDIGML901JL LYDIG + MCKINSTRY LLC Construction Contractor General Unused 4/13/2010 4/13/2014 Active LYDIGJV912QL LYDIG MCKINSTRY,A JOINT VNTURE Construction Contractor General Unused 11/13/2009 11/13/2013 Active LYDIGJV937RP LYDIG /GRANT, A JOINT VENTURE Construction Contractor General Unused 12/17/2007 12/17/2013 Active LCIBUBT934RP LCI BUILDERS TWO LLC Construction Contractor General Unused 12/17/2007 12/17/2013 Active LCIBUB0936QE LCI BUILDERS ONE LLC Construction Contractor General Unused 11/5/2007 11/5/2013 Active OPUSNCL980P9 OPUS NW CONTRACTORS LLC Construction Contractor General Unused 10/29/2002 10/29/2010 Expired LYDIGGP903CS LYDIG GRANT PLATEAU A JT VENT Construction Contractor General Unused 2/10/2010 2/10/2012 Out Of Business OPUSLJV911J6 OPUS /LYDIG A JOINT VENTURE Construction Contractor General Unused 4/2/2009 4/2/2011 Out Of Business HUNTLIJ927KA HUNT /LYDIG II, A JOINT VENTURE Construction Contractor General Unused 5/1/2008 5/1/2010 Out Of Business HUNTLJV940JC HUNT /LYDIG A JOINT VENTURE Construction Contractor General Unused 4/3/2006 4/3/2010 Out Of Business Business Owner Information Name Role Effective Date Expiration Date BRAY, MARK D Cancel Date 01/01/1980 12/17/2007 SWARTZ, LARRY J 7 01/01/1980 12/17/2007 GOTTSCHALK, WILLIAM G Until Cancelled 01/01/1980 12/17/2007 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 7 Safeco Ins Co of America 67s000952 04/20/2012 Until Cancelled $12,000.0005/11 /2012 6 SAFECO INS CO 6336052 09/01/2005 04/20/2012 $12,000.0008/30 /2005 Assignment of Savings Information No records found for the previous 6 year period https: // fortress .wa.gov /lni/bbip/Print.aspx 05/16/2013 REVIEWED FOR CODE COMPLIANCE APPROVED MAY 13 2013 AVv- voila Plan review approval is subject to errors and omissior+s. Approval of construction documents does rot auti? :4 3 the volation.of any adopted code or ordinance. Rocalpt of approved F Id C y an d corditions is acknowledged: Kirkland Date., .5'/r(: /t3 City Of ltrkwila BUILDING DIVISION Redmond Bainbridge Island KING COUNTY OFFICIALS: ,Elliott -Bay Bellevue Lake Sammamish Tukwila Vashon Island Renton Issaquah CEDAR HILLS REGIONAL LANDFILL DISPOSAL LOCATION "N — Cedar BOW LAKE RECYCLING AND TRANSFER STATION PROJECT LOCATION KING COUNTY EXECUTIVE DOWCONSTANTINE TACOMA LOCATION MAP SEPARATE PERMIT REQUIRED FOR: ❑ Mechanical la Electrical Plumbing Gas Piping City of Tukwila BUILDING DIVISION COUNCIL MEMBERS KATHY LAMBERT LARRY PHILLIPS PETE VON REICHBAUER LARRY:GOSSEU JANE HAGUE JULIA PATTERSON • BOB FERGUSON REAGAN DUNN JAN DRAGO ORILLIA RD S VICINITY MAP REVISIONS No changes shall ho made to the scope . of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan submittal and may include additional plan review fees. • 1 �Ir:� L'iv is CI'T'Y OF'I°tlli?'..., DEC 1 8 2012 PERIVMIT CENTER DESIGNED DRAWN VERIFY SCALE • BAR IS ONE INCH ON .ANSI "D" DRAWING 0„ 1" D 6/10/10 C 1/8/10 B . 1/8/10 A 7/31/09. REV DATE FINAL ISSUED FOR CITY OF .TUKWILA PERMITS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION RESPONSE TO CITY OF TUKWILA: CORRECTION LETTERS ISSUED FOR CITY OF TUKWILA PERMITS . APP'D REVISION DESCRIPTION King County Department of Natural Resources and Parks Solid Waste Division R.W. Beck, • Inc. . . . 1001 Fourth Avenue, Suite 2500 Seattle, WA 98154 -1004 (206) 695 -4700 BOW .LAKE RECYCLING. AND TRANSFER ..STATION SITE FACILITIES CONTRACT PROJECT NUMBER: C00405C09 An S.AIC Company •COVER SHEET, VICINITY, AND LOCATION MAPS DRAWING NUMBER: tical \CADD \100: Percent Facilities \F_G014 — Legend.dwg Project \Data and An C 0 0C v J 0 co 0 00 0 M rn M 0 0 0) U) a 0o 0 0 N N .0 c GREENBERGA SYMBOLS �\ J 2.5% a 0 n 0 SURVEY CONTROL CIVIL CONTROL POINT ROAD GEOMETRY POINT STRUCTURAL ANGLE POINT GRADING CONTROL POINT BORE HOLE. SIGN ROCKERY EVERGREEN TREE DECIDIOUS TREE CUT /FILL SLOPE GRADE 'INDICATOR DRAINAGE INDICATOR FIRE HYDRANT EXISTING WATER METER EXISTING WATER VAULT EXISTING WATER VALVE WATER VALVE EXISTING STORM DRAIN CATCH BASIN EXISTING SANITARY SEWER MANHOLE EXISTING STORM DRAIN MANHOLE EXISTING YARD DRAIN STORM DRAIN CATCH BASIN TYPE 1 STORM DRAIN CATCH BAS IN TYPE 2 WITH GRATE STORM DRAIN CATCH BASIN TYPE 2 WITH SOLID LID/ SANITARY SEWER MANHOLE ' ANCHOR BLOCK CULVERT FLOW DIRECTION TEMPORARY OUTLET PROTECTION EXISTING YARD LIGHT EXISTING LUMINAIRE EXISTING UTILITY POLE EXISTING ELECTRICAL EQUIPMENT LIGHT POLE BASE ELECTRICAL VAULT PIPE OR CONDUIT CAP FENCE GATE SENSITIVE AREA CONTROL POINT LI N ETYPES. - P x x x W_ _.._ W T T P P E E E E Pw ' PW-- -- PW PW— - SS SS. SS ss - SD-- SD ------ SD- SD— D D D D UD UD UD TSD TSD TSD.. 250 — 248 MAJOR R Y Nil NA sar mil r Nil ri mil mil rWi Nil MIalNMre sill rEll MATCH BOUNDARY PROPERTY BOUNDARY CONSTRUCTION LIMITS WETLAND BOUNDARY CENTER LINE NEAT LINE FENCE . EXISTING WATER EXISTING TELEPHONE EXISTING POWER ELECTRICAL CONDUIT POTABLE WATER SANITARY SEWER STORM DRAINAGE DRAIN UNDERDRAIN TEMPORARY STORM DRAIN COMPRESSED AIR ENCASEMENT DITCH /SWALE /STREAM. CENTERLINE CONTRACTOR TRAFFIC, TWO -WAY CONTRACTOR TRAFFIC, ONE —WAY COMMERCIAL AND SELF —HAUL TRAFFIC, ONE -WAY TRANSFER STATION OPERATIONS TRAFFIC, ONE —WAY REMOVE OBJECT EXISTING GROUND (PROFILE) CONTOURS RETAINING WALL SILT FENCE ORANGE SAFETY FENCE GEOTEXTILE GEOTEXTILE DRAIN MAT PIPE SLOPE DRAIN (TESL 'PLANS ONLY) GRIND LINE GUARDRAIL GRADE BREAK LINE DEMOLITION FOOTPRINT BOUNDARY THESE LINETYPES ARE USED IN COMBINATION TO SHOW COMBINED TRAFFIC LANES MATERIALS /// w w w w w w w • w Z/X77. ,--,( C.c to ooVo ooV �ppoppo 2O0m0N00A0 cUco IIIHII= IIIIII= IIIIII= IIIIII =III \' \ f WOWS DEMOLITION /REMOVAL (PLAN) WETLAND AREA (PLAN) HMA SURFACE (PLAN) HMA PAVEMENT (SECTION) CONCRETE (PLAN ' AND SECTION) GRAVEL BORROW (SECTION) EMBANKMENT FILL (SECTION) NATIVE SOIL (SECTION) SAND /CDF (SECTION) LIGHTWEIGHT BACKFILL (SECTION) BENTONITE (SECTION) QUARRY SPALLS (PLAN AND SECTION) PIPE BEDDING (SECTION) CSTC (SECTION) CSBC (SECTION) GRAVEL BACKFILL (SECTION) GRAVEL BACKFILL FOR DRAINS (SECTION) GRAVEL SURFACE (PLAN) TOPSOIL REVIEWED FOR CODE COMPLIANCE APPROVED MAY 132013 City of Tukwila BUILDING DIVISION APPROXIMATE AREAS TO BE COVER WITH STRAW OR OTHER APPROVED GROUND COVER BMPPRIOR TO COMPLETION OF WORK APPROXIMATE AREAS TO BE COVER WITH PLASTIC SHEETING FOR LONG TERM SOIL COVER PRIOR TO COMPLETION OF WORK TYPICAL SECTION: AND DETAIL REFERENCE SYSTEM SECTION CUT ON DWG 4 AND SHOWN ON 5: ON DWG 5 THIS SECTION IS IDENTIFIED AS: SECTION CUT ON DWG 4 AND SHOWN ON 4: SECTION LETTER DWG ON WHICH SECTION APPEARS SECTION LETTER DWG ON WHICH SECTION IS CUT SECTION LETTER SECTION APPEARS ON SAME DWG AS CUT CITY OF TUK.':1 DEC T 8 2012 DETAILS ARE REFERENCED IN A SIMILAR MANNER EXISTINGCEPT NUMBERS ARE USED INSTEAD OF LETTERSPERMIT CENTER 6 c) DESIGNED DRAWN IKS ABG D C VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 0 ' 1" REV 6/10/10 IKS. 1/8/10 IKS 1/8/10 IKS 7/31/09 IKS DATE CHK'D KRH FINAL ISSUED FOR CITY OF TUKWILA PERMITS KRH KRH MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION RESPONSE TO ' CITY OF TUKWILA CORRECTION LETTERS KRH ISSUED FOR CITY . OF TUKWILA PERMITS APP'D REVISION DESCRIPTION King County Department of Natural Resources and Parks Solid Waste Division 3W An SAIC Company R.W. Beck, Inc. 1001 Fourth Avenue, Suite 2500 Seattle, WA 98154 -1004 (206) 695 -4700 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT LEGE PROJECT NUMBER: C00405C09 SHT. OF: 4 619 1- 800 - 424 -5555 DRAWING NUMBER: G014 ABBREVIATIONS AT AASHTO AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS AB . • ANCHOR . BOLT(S) ABS • ACRYLONITRILE. BUTADIENE STYRENE_ ABV ABOVE AC ASPHALT CONCRETE, ABOVE COUNTER ACB . AUTOMATIC CIRCUIT BREAKER ACI AMERICAN CONRETE INSTITUTE ACOUST ACOUSTICAL ACP . ASPHALT CONCRETE PAVEMENT AD • ALGEBRAIC DIFFERENCE ADA.• AMERICANS WITH DISABILITIES ACT ADJ ADJUSTABLE AFF . ABOVE FINISH FLOOR • 0 ALUM ALUMINUM APPROX APPROXIMATE ARCH. ARCHITECTURAL ASSY ASSEMBLY ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS ATB. ASPHALT TREATED BASE ATS AUTOMATIC TRANSFER SWITCH AVE AVENUE BFP • . BACKFLOW PREVENTER BI BLACK IRON BLDG BUILDING . BMP BEST MANAGEMENT PRACTICE BO BOTTOM OF BY OTHERS BOS BOTTOM OF STEEL • . BOT BOTTOM BPA BACKFLOW PREVENTOR ASSEMBLY BRKT . BRACKET . BVC BEGIN VERTICAL CURVE BVCE BEGIN VERTICAL CURVE ELEVATION BVCS • BEGIN VERTICAL CURVE STATION BW BOOT WASH C CHANNEL, CONDUIT, CONCRETE, CONDENSATE CA COMPRESSED OUT CAMH COMPRESSED AIR MANHOLE CAT CATEGORY CB • . CATCH BASIN CC • CENTER TO CENTER CEMENT CONCRETE PAVEMENT . CDF CONTROLLED DENSITY FILL CFM CUBIC FEET PER MINUTE. CHKR • CHECKERED CHRL CEDAR HILLS REGIONAL LANDFILL CI CAST IRON CIP • CAST IN PLACE CJ CONSTRUCTION JOINT CL CENTERLINE CLR • CLEAR, CLEARANCE CMP CORRUGATED METAL PIPE CMU • CONCRETE MASONRY UNIT CO CLEAN OUT COL •. COLUMN COM COMMERCIAL COMM COMMUNICATIONS COMP COMPACTOR CONC CONCRETE CONF CONFERENCE CONNO CONNECT 0 CONST CONSTRUCTION CONT CONTINUOUS COR CORNER CPEP • CORRUGATED POLYETHYLENE PIPE CPJ COMPLETE JOINT PENETRATION CSBC CRUSHED SURFACING BASE COURSE CSTC CRUSHED SURFACING TOP COURSE CSW CONTAMINATED STORMWATER . CT CURRENT TRANSFORMER CTJ • CONTROL JOINT CTR. CENTER CTRSK COUNTERSINK CW COLD WATER CY CUBIC YARD D DB. DBL DCW DD.CBPA DET• DRAIN DRAINAGE BASIN DOUBLE DEMAND CRITICAL WELD DOUBLE DETECTOR CHECK BACKFLOW PREVENTION ASSEMBLY DETAIL DF DI DIA DIM DO DPR DS DT DWG DWLS E- EA ECC ED EEWS EF EFCP EL, ELEV ELEC ENTR EOP EPDM EQ SP EQUIP ESC ETC ETM EVC EVCE EVCS EW EXH EXIST EXP EXT. F FCA FCO FD FDC FDN FEX FF FFE FG FH FHA FIN FIN GRD FL FLG FLR FLT FM FO FOC FOM FOR FOS FP FRIDGE FRP FS FT FTG FW G GA GAL GALV GE GEN GFCI GL GND GPM GV GWB GYP HB HC HDPE HI DRINKING FOUNTAIN DUCTILE IRON DIAMETER DIMENSION DOWN DAMPER DOWNSTREAM, DOWNSPOUT DOUBLE TEE DRAWING DOWELS EAST EACH, EXHAUST AIR ECCENTRIC EQUIPMENT DRAIN EMERGENCY EYE WASH STATION EACH FACE, EXHAUST FAN EXHAUST FAN CONTROL PANEL ELEVATION ELECTRICAL ENTRANCE EDGE OF PAVEMENT ETHYLENE PROPYLENE DIENE MONOMER EQUAL SPACING EQUIPMENT EROSION AND SEDIMENT CONTROL ET CETERA ELAPSED TIME METER END VERTICAL CURVE END VERTICAL CURVE ELEVATION END VERTICAL CURVE STATION EACH WAY EXHAUST EXISTING EXPANSION EXTERIOR FOOTING FLANGED COUPLING ADAPTER FLOOR CLEANOUT FLOOR DRAIN 0. FIRE DEPARTMENT CONNECTION FOUNDATION FIRE EXTINGUISHER FINISHED FLOOR, FAR FACE FINISHED FLOOR ELEVATION FINISHED GRADE FIRE HYDRANT FIRE HYDRANT ASSEMBLY FINISHED FINISHED GRADE FLANGE FLANGE OR FLANGED FLOOR FILTER FORCE MAIN FACE OF FACE OF . CONCRETE FACE OF MASONRY FUEL OIL RETURN FUEL OIL SUPPLY, FACE OF STEEL FIREPROOF • REFRIGERATOR FIBER REINFORCED PLASTIC FAR SIDE, FLOAT SWITCH, FLOW . SWITCH FOOT OR FEET FOOTING FIRE WATER GRATING GAUGE, GAGE GALLON GALVANIZED GRATE ELEVATION GENERAL GROUND FAULT CIRCUIT INTERRUPT GLASS, GLAZING GROUND GALLONS PER MINUTE . GATE VALVE GYPSUM WALL BOARD GYPSUM HOSE BIBB HOLLOW CORE, HANDICAP HIGH DENSITY POLYETHYLENE HIGH HK HMA HM HORIZ HPU HRP HRW HT HW HWD. HWT HWY HYD 1 -5 ID IE IN INC INFO INSUL INT INV ISR IW IWWTF JAN JT L LA LAV LB LCB LCK LF LG LL LLH LLV LP LSL LT LVR MAN MATL MAX MB MBC MCC MCP MDO MECH MEZZ MFR MGMT MH MI MIN MISC MJ MON MRGWB MSL MSS MTD MTL N N/A NAT NE NGPA NIC NO NOM NPA NPW NS NTS NW OC OCC OD HOOK HOT MIX ASPHALT HOLLOW METAL HORIZONTAL HYDRAULIC POWER UNIT PEDESTAL — MOUNTED HOSE REEL WALL — MOUNTED HOSE REEL HEIGHT HOT WATER HIGHLINE WATER DISTRICT HOT WATER TANK HIGHWAY HYDRANT INTERSTATE 5 INSIDE DIAMETER INVERT ELEVATION INCHES INCLUDING INFORMATION INSULATION INTERIOR INVERT INTRINSICALLY SAFE RELAY IRRIGATION WATER INDUSTRIAL WASTEWATER TREATMENT FACILITY JANITOR JOINT LEACHATE, LENGTH, ANGLE LEASE AREA LAVATORY POUND LEACHATE CATCH BASIN LOCKER LINEAR FEET LANDFILL GAS LIVE LOAD LONG LEG HORIZONTAL LONG LEG VERTICAL LOW POINT LONG SLOTTED HOLE LEFT, LIGHT LOUVER REVIEWED FOR CODE COMPLIANCE APPROVED MAY 132013 City of Tukwila BUILDING DIVISION MANUFACTURER . MATERIAL MAXIMUM MOLLY BOLT METAL BUILDING CONTRACTOR MOTOR CONTROL CENTER MOTOR CIRCUIT PROTECTOR MEDIUM DENSITY OVERLAY MECHANICAL MEZZANINE . MANUFACTURER MANAGEMENT MANHOLE MALLEABLE IRON MINIMUM . MISCELLANEOUS MECHANICAL JOINT MONUMENT MOISTURE RESISTENT GYPSUM WALLBOARD MEAN SEA LEVEL MANUFACTURER'S STANDARDIZATION SYSTEM MOUNTED METAL NORTH NOT APPLICABLE NATURAL NORTHEAST NATURAL GROWTH PROTECTION AREA NOT IN CONTRACT. . NUMBER NOMINAL NORTH PROCESSING AREA NON- POTABLE WATER NEAR SIDE NOT TO SCALE NORTHWEST ON CENTER, OVER CURRENT OCCUPANTS OUTSIDE DIAMETER ODL ODH OH OL OPNG OPP OPS OS &Y OSA OWS P -LAM PB PBS PC PCF PDC PDH PDV PE PENET PERF PH PI PIV PJ. PKWY PL PLAS. PLC PLT POC PR PRC PRV PSE PSF PSI PT PV PVA PVC PVDF PVI PVMT PW R RA RCP RD REC RED REF REINF REQ RGS RM RO ROW, R/W RTTRM. RT S SA SAFB. SC SCH SCV SD SDCO SDMH SE SEC SED SF SH SHR SHT SIM SJ. SK SL SLDG SMH OUTSIDE DROP — LOW OUTSIDE DROP HIGH OVERHEAD OVERLOAD . OPENING OPPOSITE OPERATIONS OUTSIDE STEM AND YOKE OFFSITE AREA OIL —WATER SEPARATOR PLASTIC LAMINATE PERIMETER. BERM, PULL BOX PUSH BUTTON STATION PRECAST, POINT OF CURVATURE, PUMPER CONNECTION POUNDS PER CUBIC FOOT POWDER COATED PIPE DEFLECTION, HORIZONTAL PIPE DEFLECTION, VERTICAL PHOTOELECTRIC, POLYETHYLENE PENETRATION PERFORATED ACIDITY . POINT OF. INTERSECTION, POST INDICATOR POST INDICATOR VALVE PANEL JOINT PARKWAY PLATE, PLACE PLASTER PROGRAM LOGIC CONTROLLER PLATE POINT OF CONNECTION PAIR POINT OF REVERSE CURVATURE PRESSURE REDUCING VALVE PUGET SOUND ENERGY POUND(S) PER. SQUARE FOOT POUND(S). PER SQUARE INCH POINT OF TANGENCY PHOTOVOLTAIC, PLUG VALVE. (ECCENTRIC) PHOTOVOLTAIC ARRAY POLYVINYL CHLORIDE, POINT OF VERTICAL CURVATURE POLYVINYLIDENE FLOURIDE POINT OF VERTICAL INTERSECTION . PAVEMENT POTABLE WATER RADIUS, RANGE, RISE, RIGHT RETURN AIR REINFORCED CONCRETE PIPE ROOF DRAIN, : ROAD RECEPTACLE 0 REDUCER REFERENCE REINFORCED, REINFORCEMENT, REINFORCING REQUIRED RIGID GALVANIZED STEEL CONDUIT ROOM ROUGH OPENING. . RIGHT OF WAY RESTROOM RIGHT SOUTH, SANITARY, SLOPE, SWITCH SUPPLY AIR SOUND ABSORPTION FIBER BOARD SOLID CORE SCHEDULE SECTIONAL CONTROL VALVE STORM DRAIN STORM DRAIN CLEANOUT STORM DRAIN MANHOLE SOUTHEAST SECTION SEDIMENT SQUARE: FEET: SCALE HOUSE SHOWER SHEET SIMILAR CONTRACTION JOINT . SKYLIGHT SLOPE DRAIN SLIDING SEWER MANHOLE SNGL SOG SP. SPA SPEC SQ SR. SS` SS /IND SSL SSMH SSR SST SSWA ST STA STC STD STL SUPT SUSP SW SWP T T &B TBD TD TEMP TESC THK TO TOC TOF TOG TOM TOS TOW TRTD TS TSD ISO TTB. TVSS TYP UBC UD UDCP UG UH UHMW UL UNO UP� UR US UT UYH V VAC VC VCT VDC VERT VEST VNR VPI VTR W.� WI W/O WA WC WC(E) WCO WD WH WHS WNDW WNP WP WQ WR SINGLE SLAB ON GRADE SPARE, SPACING, SITE PREPARATION SOUTH PROCESSING AREA SPECIFICATION SQUARE STATE . ROUTE SANITARY SEWER SANITARY SEWER /INDUSTRIAL SHORT SLOTTED HOLE SANITARY SEWER MANHOLE STANDING SEAM ROOF STAINLESS STEEL SOUTH` SOLID WASTE AREA STREET STATION SOUND TRANSMISSION COEFFICIENT STANDARD STEEL STRUCT STRUCTURAL SUPPORT SUSPENDED SOUTHWEST, SPRAY WATER STORM WATER PIPE TANGENT, TOP, TOWNSHIP, TREAD TOP & BOTTOM TO BE DETERMINED TRENCH DRAIN TEMPORARY TEMPORARY EROSION AND SEDIMENT CONTROL THICK TOP OF TOP OF CONCRETE TOP OF FOOTING TOP OF GRATE TOP OF MASONRY TOP OF STEEL TOP OF WALL TREATED TUBE STEEL TEMPORARY STORM DRAIN TRANSFER STATION, OPERATORS TELEPHONE TERMINAL BOARD TRANSIENT VOLTAGE SURGE SUPPRESSOR TYPICAL UNIFORM BUILDING CODE UNDER DRAIN UNDERDRAIN COLLECTION PIPE UNDERGROUND UNIT HEATER ULTRA HIGH MOLECULAR WEIGHT UNDERWRITER'S LABORATORY UNLESS NOTED OTHERWISE UTILITY POLE URINAL UPSTREAM UNDERGROUND TELEPHONE UTILITY YARD HYDRANT VENT VOLTS ALTERNATING CURRENT VERTICAL CURVE VINYL 'COMPOSITION TILE VOLTS DIRECT CURRENT VERTICAL VESTIBULE VENEER VERTICAL POINT OF INTERSECTION VENT THRU ROOF WEST, WATER, WALL WITH WITHOUT WATER . WATER CLOSET EXHAUST WALL CAP WALL CLEANOUT WOOD 0 WATER HEATER WELDED HEADED STUD WINDOW WATER NONPOTABLE WORK POINT, WEATHER PROOF WATER QUALITY WATER RESISTANT WS WSDOT WTS WW WWF X STRONG XFMR YD WATER STOP . WASHINGTON STATE DEPARTMENT OF TRANSPORTATION WELDED. THREADED STUD WASTEWATER WELDED WIRE FABRIC EXTRA STRONG TRANSFORMER YARD CITY OF TO KV.T. ' DEC 18 2012 PERMIT CENTER DESIGNED IKS VERIFY SCALE BAR IS ONE . INCH ON ANSI "D" DRAWING 0 1" 6/10/10 C; B 1/8/10 1/8/10 IKS KRH FINAL ISSUED FOR CITY OF TUKWILA PERMITS IKS . IKS KRH MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION KRH RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS A REV. 7/31/09 DATE IKS CHK'D KRH APP'D ISSUED FOR CITY OF TUKWILA PERMITS REVISION DESCRIPTION, King County Department of Natural Resources and Parks Solid Waste Division An 'SAIC Company R.VV. Beck, Inc. . 1001 Fourth Avenue, Suite 2500 Seattle, WA 98154 -1004 (206) 695 -4700 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT ABBREVIATIONS PROJECT NUMBER: C00405C09 SHT. OF; 5 619 DRAWING NUMBER: G015 SECTION. 35, TOWNSHIP 23N, RANGE 4E GENERAL NOTES SEE SPEC SECTION 01140 -WORK RESTRICTIONS FOR PROTECTION OF EXISTING FEATURES. SURVEY CONTROL 1 HORIZONTAL DATUM: WASHINGTON COORDINATE SYSTEM, NORTH ZONE NAD83/91 .PROJECT CONTROL ESTABLISHED USING GLOBAL LS1 POSITIONING FAST- STATIC (GPS) METHODS. CONTROL WAS "d' EXTENDED THROUGH THE PROJECT REACH BY WASHINGTON STATE CV DEPARTMENT OF TRANSPORTATION SURVEY `CONTROL MONUMENTS.• 2. SEE UTILITES DWGS FOR APPROXIMATE EXISTING UTILITIES LOCATIONS. EXISTING FREE RECYCLING AREAr`= CD 2. VERTICAL DATUM: NORTH AMERICAN VERTICAL DATUM 1988, p NAVD88.. VERTICAL CONTROL WAS EXTENDED THROUGH THE PROJECT CO REACH USING PUBLISHED BENCHMARKS FROM THE WASHINGTON STATE DEPARTMENT OF. TRANSPORTATION (VIA ELECTRONIC t-- LEVELING). XISTING TIRE ;WASH f 3. SOURCE OF MAPPING: SURVEYS PERFORMED BY DUANE HARTMAN AND ASSOCIATES: ON MAY 4, 2007; AUGUST 16, 2007; FEBRUARY 12, 2008; AND OTHERS. 4. SURVEY CONTROL DISTURBED DURING CONSTRUCTION SHALL BE COORDINATED THROUGH THE WASHINGTON STATE DEPARTMENT. OF NATURAL RESOURCES IN ACCORDANCE WITH RCW 58.24.040 AND WAC 332 -120. it.itt Say �q . 1 \\4, ,, ,,,rei., ViiN 0 EXISTING WALL F REVIEWED FOR •``: CODE COMPLIANCE APPROVED Mt"( 13 2013 • 1 City=of Tukwila UILDING DIVVISIO HC 17 -7 (WSDOT) APPROX 1/2 MILE NORTH ..ry 2so CONTROL POINT TABLE ID # . NORTHING EASTING HC 17-7 . (WSDOT)* 165,203.5902 . 1,285,446.2510 HC 17 =8 (WSDOT) 161,774.6040 1,285,016.9050 ELEV. 286.500' 290.711' 0 230 � EXISTING WASTEW ER - `r''.. / �----- HOLDING TANK -_ _.,_..; 75° `. ` .._._ ` l :PROPERTY BOUNDARY- j _,CONSTRUCTION LIMITS 'EXISTING'. FACILITY. :�):�9. \\- < SEWER :VAULT. - )�\ - i 8 c 2 O 8p 80 0' --0" U) Ct W 0 CITY OF TI.WW , i.0 :A DEC 18 .2012 PERMIT CENTER 80 . 160 t ipp Scale 0 Feet 0 Icr VERIFY SCALE BAR IS ONE INCH ON ANSI • "D" DRAWING 0 1" FINAL ISSUED FOR CITY OF TUKWILA PERMITS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS ISSUED FOR CITY OF TUKWILA PERMITS REVISION DESCRIPTION King County Department of Natural Resources and Parks Solid Waste Division R.W. Beck, Inc: • . 1001 Fourth Avenue, Suite 2500 Seattle, VVA 98154 -1004 (206) 695 -4700 BOW LAKE RECYCLING AND TRANSFER STATION SITE • FACILITIES CONTRACT PROJECT NUMBER: C00405C09 SHT. 7 OF: 619 EXISTING CONDITIONS AND SURVEY CONTROL DRAWING NUMBER: G017. L.I. BUILDING LOCATIONS ARE AS FOLLOWS. 265 .7.. 264x. , H• ..63` O x62 Y r. X261: X259 -. BUILDING SURVEY CONTROLS TRANSFER/TSO BUILDING: GRID REFERENCE INTERSECTION A/11 N 162085.845, E 1285191:512 GRID ROTATION: 73.39 SCALE FACILITY: . GRID REFERENCE INTERSECTION A/1 N 161535.380, E 1285094.790 GRID ROTATION: 87.21 RECYCLING BUILDING: SOUTHWEST CORNER N 161754.555, E 1285241.611 NORTHWEST CORNER N 161794.764, E 1285286.144 REVIEWED FOR CODE COMPLIANCE APPROVED MAY132013 L 8 LI 1 • 8 a 0 v 9 S V tX 1 N 0 r 0 ii mum !WM rMraiMi1111111■w11111111 It Cfm N CITY OF 1)!O F °. DEC 18 2012 PERMIT CENTER 80 160 GREENBERGAB 6/10/10 1/8/10 VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING FINAL ISSUED FOR CITY OF TUKWILA PERMITS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS 7/31/09 :DATE KRH APP'D ISSUED FOR .CITY OF TUKWILA PERMITS REVISION DESCRIPTION King COU:flty Department of Natural Resources and Parks. Solid Waste Division R.W. Beck, Inc. 1001 Fourth Avenue, Suite 2500 Seattle, WA .98154 -1004 (206) 695 -4700 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT GENERAL ARRANGEMENT SITE PLAN AND BUILDING CONTROLS J z LL : \0239.2 - _ RWBECK BO E N 0 N O KEY TO OPENING SCHEDULE: 1. OPENING SCHEDULE IS PROVIDED AS A. CONVENIENCE TO ASSIST IN COORDINATION OF THE WORK OF TRADES. CONTRACTOR IS RESPONSIBLE FOR VERIFYING TYPE, NUMBER AND PLACEMENT OF OPENINGS, WHETHER LISTED ON THE OPENING SCHEDULE OR NOT 2. LOCATION OF PENETRATION SHALL BE REVIEWED IN THE FIELD WITH PROJECT REPRESENTATIVE. 3. OPENINGS BETWEEN ROOMS OR SPACES ARE IDENTIFIED BY THE NUMBERS ASSIGNED TO THE TWO ROOMS OR SPACES AND BY A DISCRETE OPENING NUMBER AS DESCRIBED BELOW: A. ON THE OPENING SCHEDULE, THE LOWER NUMBERED ROOM OR SPACE IS LISTED FIRST. FOR VERTICAL PENETRATIONS, ROOMS OR SPACES ON LOWER LEVELS ARE LISTED FIRST. B. ON PLANS AND ELEVATIONS, THE DISCRETE OPENING NUMBER IS LISTED WITHIN A PENTAGON ICON. IF ONE OF THE ROOMS OR SPACES IS NOT EVIDENT ON THE PLAN OR ELEVATION, ITS NUMBER IS LISTED BELOW THE PENTAGON ICON. C. EXTERIOR SPACES ARE INDICATED THUS: EXW OPENINGS THROUGH ABOVE -GRADE EXTERIOR WALLS EXR OPENINGS THOUGH ROOFS EXS OPENINGS THROUGH SOFFITS SUW OPENINGS THROUGH SUB —GRADE WALLS SUF OPENINGS THROUGH SUB —GRADE FLOORS D. DISCRETE OPENING NUMBERS ARE ASSIGNED TO THE FOLLOWING SERIES: 01 -29 30 -59 60 -89 90 -99 ARCHITECTURAL /STRUCTURAL MECHANICAL ELECTRICAL COMPACTOR EQUIPMENT E. EXAMPLES: 107- 109 -92 A COMPACTOR EQUIPMENT OPENING IN THE WALL BETWEEN THE HPU ROOM AND THE LOADING AREA C05-102-66 AN ELECTRICAL OPENING IN THE FLOOR BETWEEN THE ELECTRICAL ROOM AND THE MULTIPURPOSE ROOM C01— EXW -31 A MECHANICAL OPENING IN A SUBGRADE EXTERIOR WALL AT THE COMPACTOR BAY OPENING SCHEDULE FROM — TO NO NOMINAL SIZE LOCATION DETAIL /SECTION DESCRIPTION NOTES w o m w w m -' a_ z Q cn COMPACTOR LEVEL — TS0 BUILDING C01 —SUF 34 6" DIA FLOOR M111 RAINWATER SUCTION LINE SIZE INDICATED IS NOMINAL PIPE DIAMETER 35 4" DIA FLOOR M111 SOIL WASTE LINE SIZE INDICATED IS NOMINAL PIPE DIAMETER 36 6" DIA FLOOR M111 SOIL WASTE CLEANOUT SIZE INDICATED IS NOMINAL PIPE DIAMETER 37 4" DIA FLOOR M111 BACKWATER VALVE CLEANOUT SIZE INDICATED IS NOMINAL PIPE DIAMETER 38 12 "x24" FLOOR M111 E/M117 BASKET DRAIN BD -1 39 4" DIA FLOOR M111 LEACHATE WASTE CLEANOUT SIZE INDICATED IS NOMINAL PIPE DIAMETER 40 SEE DETAIL FLOOR M111 3/M109 BOOT WASH 41 12 "x24" FLOOR M111 E/M117 BASKET DRAIN BD -1 42 SEE DETAIL FLOOR M111 A/M117 COMPACTOR . BAY VAULT NO 1 43 8" DIA FLOOR M111 LEACHATE WASTE CLEANOUT 44 SEE DETAIL FLOOR M111 B/M117 COMPACTOR BAY VAULT NO 2 45 12 "x24" FLOOR M111 E/M117 BASKET DRAIN BD -1 46 4" DIA FLOOR M111 METHANE VENT SIZE INDICATED IS NOMINAL PIPE DIAMETER 47 4" DIA FLOOR M111 BACKWATER VALVE CLEANOUT SIZE INDICATED IS NOMINAL PIPE DIAMETER 48 6" DIA .FLOOR M111 LEACHATE WASTE SIZE INDICATED IS NOMINAL PIPE DIAMETER 49 6" DIA FLOOR M111 SOIL WASTE CLEANOUT SIZE INDICATED IS NOMINAL PIPE DIAMETER 50 SEE DETAIL FLOOR M111 F/M117 HEATING WATER MANHOLE 51 SEE DETAIL FLOOR M111 D/M117 COMPACTOR BAY DRY VALVE VAULT 52 SEE DETAIL FLOOR M111 3/M109_ BOOT WASH 53 6" DIA FLOOR M111 SOIL WASTE CLEANOUT SIZE INDICATED IS NOMINAL PIPE DIAMETER 54 4" DIA FLOOR M111 SOIL WASTE LINE SIZE INDICATED IS NOMINAL PIPE DIAMETER C01 -EXW 55 6" DIA WALL M112 LEACHATE WASTE LINE SIZE INDICATED IS NOMINAL PIPE DIAMETER C01 -ELEV 30 6 "x6" WALL M113 SIZE INDICATED IS NOMINAL DUCT SIZE C01 —0O3 32 6 "x6" • WALL _, M113 SIZE INDICATED IS NOMINAL DUCT SIZE C01 —004 31 6"x6" WALL M113 56 4" DIA CEILING M112A 4" SOIL WASTE UNISEX TOILET 104 PLUMBING CHASE C01 —005 30 6 "x6" WALL M113 SIZE INDICATED IS NOMINAL DUCT SIZE 57 4" DIA CEILING 4" RAINWATER SUCTION FLOOR CLEANOUT SIZE INDICATED IS NOMINAL PIPE DIAMETER 58 4" DIA CEILING 4" FLOOR DRAIN SIZE INDICATED IS DRAIN PIPE SIZE 60 5" DIA WALL 22' -0" E050 HPU FEEDER — 3 ", P008 61 5" DIA WALL 22' -0" E050 HPU FEEDER — 3 ", P009 62 5" DIA WALL 22' -0" E050 HPU FEEDER - 3 ", P010 > 63 5" DIA WALL 22' -0" E050 _ HPU FEEDER — 3 ", P011 64 16 "x4" WALL 18' -0" E050 BRANCH CIRCUIT AND TELECOMM CONDUIT BLOCK -OUT 65 16 "x4" WALL 14' -0" E105 BRANCH CIRCUIT AND TELECOMM CONDUIT BLOCK —OUT i 66 4" DIA WALL 16' -0" E050 FEEDER TO 4N1 - 2 ", P032 67 4" DIA WALL 16' -0" E050 TELECOMM TO E115 — 2 ", T331 68 4" DIA WALL 16' -0" E050 TELECOMM TO' E115 - 2 ", T331 6� w 4" DIA e _ WALL 16 —'0" E050, FEEDER TO 2T1 - 2 -1 /2 ", P028 O - -� A___J �� _s_../ FROM — TO N NO N NOMINAL SIZE L LOCATION D DETAIL /SECTION D DESCRIPTION N NOTES HEIGHT AFF PLAN /ELEVATION DETAIL DETAIL n c co 6079 'REGISTERED ARCHITECT DO LAS L BRINLEY STATE OF WASHINGTON DESIGNED C. CONWAY DRAWN J. PALMER 6/10/10 CC DB FINAL ISSUED FOR CITY OF TUKWILA PERMITS C 1/8/10 CC DB MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 0 - 1 B 1/8/10 CC DB RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS A REV 7/31/09 DATE CC CHK'D DB ISSUED FOR CITY OF TUKWILA PERMITS APP'D REVISION DESCRIPTION OPENING SCHEDULE FROM — TO N NO N NOMINAL SIZE L LOCATION D DETAIL /SECTION D DESCRIPTION N NOTES IPENET TYPE HEIGHT AFF PLAN /ELEVATION DETAIL n c co King County Department of Natural Resources and Parks Solid Waste Division MPG!. 753 9th Avenue N Seattle, WA 98109 (206) 286 -1640 www.kpg.com 1117 Broadway Suite 501 Tacoma, WA 98402 (253) 627 -0720 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT ARCHITECTURAL GENERAL OPENINGS SCHEDULE t4Ii (qb PROJECT NUMBER: C00405C09 SHT. OF: 323 619 DRAWING NUMBER: A016 0 W VJ J Z LL- ■ OPENING SCHEDULE FROM — TO NO NOMINAL SIZE LOCATION DETAIL /SECTION DESCRIPTION NOTES PENET TYPE w z HEIGHT AFF PLAN /ELEVATION t in —i LEVEL 2 - TS0 BUILDING CONTINUED EQUIPMENT LEVEL — TSO BUILDING CONTINUED FROM A017 103 -218 31 8" DIA CEILING M124 FIRE SPRINKLER ALLOCATED SPACE FOR SPRINKLER RISER 32 8" DIA CEILING M124 WALL M133 FIRE. SPRINKLER ALLOCATED SPACE FOR SPRINKLER RISER 33 8" DIA CEILING M124 208 -210 34 12" DIA WALL FIRE SPRINKLER ALLOCATED SPACE FOR SPRINKLER RISER 34 2" DIA CEILING M124 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 35 FLOOR DRAIN SIZE INDICATED IS DRAIN PIPE SIZE 104 30 13 "x10" CEILING M122 EXHAUST DUCT SIZE INDICATED IS NOMINAL DUCT SIZE CEILING EXHAUST FAN SIZE INDICATED IS NOMINAL FAN SIZE 105 -110 30 8 "x6" WALL M122 EXHAUST DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 31 4"DIA WALL M124 WALL M134 2" NPW INSULATED 32 4" DIA WALL M124 210 —EXR 31 6" DIA CEILING ± 1 -1/2" TEPID WATER INSULATED 105 -112 33 8 "DIA WALL M193 EXHAUST DUCT UP TO ROOF CAP RC —T1 SIZE INDICATED IS NOMINAL DUCT SIZE 210 -211 . 30 FIRE SPRINKLER SUBJECT TO FIRE SPRINKLER DESIGN 34 8" DIA WALL M193 SUPPLY DUCT FIRE SPRINKLER SUBJECT TO FIRE SPRINKLER DESIGN 106 -215 30 2" DIA CEILING M124 M132 SHOWER DRAIN SIZE INDICATED IS DRAIN PIPE SIZE 107 -109 30 36 "x36" WALL M126 CEILING M105 M132 TRANSFER GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 31 36 "x20" WALL M126 212 30 8 "x8" CEILING EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 108 -EXW 30 48" DIA CEILING M127 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 31. 6" DIA DUST COLLECTOR EXHAUST OUT SIZE INDICATED IS NOMINAL DUCT SIZE 31 36" DIA CEILING M127 SUPPLY DIFFUSER SIZE INDICATED IS NOMINAL DUCT SIZE COMPACTOR LEVEL EXHAUST OUT SIZE INDICATED IS NOMINAL DUCT SIZE 108 —EXR 31 4" DIA CEILING M105 M136 4" METHANE VENT THRU ROOF SIZE INDICATED IS VENT PIPE SIZE 32 40" DIA CEILING M104 WALL M132 DUST COLLECTOR INTAKE IN 108 -109 31 36 "" DIA WALL M126 14" DIA WALL M133 EXHAUST DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 32 8" DIA WALL M125 SIZE INDICATED IS NOMINAL DUCT SIZE 212 -219 35 16" DIA 4" NPW INSULATED PIPE 33 4" DIA : WALL M125 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 1-1/2" ` TEPID WATER INSULATED PIPE 108 -111 30 4" DIA WALL M103 WALL SUPPLY REGISTER 2" NPW INSULATED PIPE 31 8" DIA WALL M125 El 16 4" NPW INSULATED PIPE 32 4" DIA WALL M124 WALL 9' -6,, El 16 1-1/2" TEPID WATER INSULATED PIPE 33 8 "DIA WALL M194 62 6" DIA WALL 9' -6" FIRE SPRINKLER SUBJECT TO FIRE SPRINKLER DESIGN 34 8" DIA WALL M194 TELECOMM CONDUIT, 4 ", T332 63 6" DIA FIRE SPRINKLER SUBJECT TO FIRE SPRINKLER DESIGN 108 -205 30 6" DIA WALL M137 TELECOMM CONDUIT, 4 ", T332 213 2" CWR INSTALL THRU WALL W/ ACOUSTIC WALL SEAL 31 6" DIA WALL M137 2" CWS INSTALL THRU WALL W/ ACOUSTIC WALL SEAL 109 —EXW 30 SEE NOTE WALL M126 M132 ,4/A17 3/A176 2/A173 INTAKE LOUVER 19' -6" WIDE x 5' -2" HIGH 31 SEE NOTE WALL M126 8 "x6" 1/A176 3/A176 2/A176 EXHAUST LOUVER 28'-1" WIDE x 8' -0" HIGH 109 -116 32 13 "x10" CEILING M126 33 14" DIA WALL CEILING EXHAUST FAN SIZE INDICATED IS NOMINAL FAN SIZE 109 -119 30 6" DIA CEILING M126 SIZE INDICATED IS NOMINAL DUCT SIZE 214 -215 30 8" DIA SUPPLY DIFFUSER SIZE INDICATED IS NOMINAL DUCT SIZE 109 -202 60 4" DIA CEILING E109 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 215 31 FEEDER TO 2T1 — 2-1/2", P028 109 -207 32 4" DIA WALL M124 EXHAUST GRILLE OPENING 4" SOIL WASTE INTO ROOM 207 PLUMBING CHASE 110 —SUF 30 2" DIA FLOOR M112A M132 FLOOR DRAIN SIZE INDICATED IS DRAIN PIPE SIZE 110 30 13 "x10" CEILING M122 M132 CEILING EXHAUST FAN SIZE INDICATED IS NOMINAL FAN SIZE 110 -111 31 4" DIA WALL M124 CEILING M132 1 -1/2" TEPID WATER INSULATED PIPE 32 4" DIA WALL M124 SCALE FACILITY - SCALEHOUSE SUF —CRAWL 30 2" DIA 2,, NPW INSULATED PIPE 110 -120 31 12 "x12" WALL 7' -0" M122 FLOOR DRAIN SIZE INDICATED IS DRAIN PIPE SIZE 31 EXHAUST LOUVER SIZE INDICATED IS NOMINAL DUCT SIZE 116 —UP 30 8" DIA CEILING M124 FLOOR DRAIN SIZE INDICATED IS DRAIN PIPE SIZE 4" NPW UP THRU CHASE LID INSULATED PIPE 31 8" DIA CEILING M124 4" VENT UP THRU CHASE LID INSULATED PIPE LEVEL 2 - TSO BUILDING 201 -202 30 18" DIA WALL M302 M133 FOR REFRIGERATION SLEEVE SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 31 31 24 "x24" WALL M302 M134 , tr. CAM' _ DUCT OPENING RETURN AIR OPENING SIZE INDICATED IS NOMINAL DUCT SIZE ) i •. 202 —CH1 37 16 DIA WALL CO M133 SUPPLY DUCT. SIZE INDICATED IS NOMINAL DUCT SIZE VENTILATION AIR SUPPLY DUCT • SIZE INDICATED IS NOMINAL DUCT SIZE 202 -203 38 16 DIA WALL M133 Zpi3 FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 202 -220 32 14" DIA WALL AY M133 FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 35 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 33 16 DIA WALL _ M133 _ SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 36 9" DIA FLOOR RETURN DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 34 14 DIA WALL SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE M133 01 2'x2' FLOOR SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 11.DIN 35 12" DIA WALL M133 9" DIA FLOOR M302 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 36 26 "x18" WALL 38 M133 FLOOR M302 RETURN AIR DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 60 4" DIA WALL 10' -6" E116 M302 _ FEEDER TO 2T1 — 2-1/2 P028 203 —CH1 30 16" DIA WALL FLOOR M133 M302 VENTILATION AIR SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 203 -220 31 26 "x18" WALL CEILING M133 M301 TRANSFER AIR OPENING SIZE INDICATED IS NOMINAL DUCT SIZE 204 -205 30 10" DIA WALL CEILING M133 M302 RETURN DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 204 -220 31 10" DIA WALL M133 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE ■ ■ 1,. ■ ■ ■ ■ ■ 205 -206 32 12" DIA WALL M133 RETURN DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 205 -220 33 10" DIA WALL M302 M133 DOOR GRILLE SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 206 -220 33 16" DIA WALL M133 _ DOOR GRILLE RETURN DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 6 "x6" 34 14" DIA WALL M133 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 505 —ATTIC SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE CEILING 60 5" DIA WALL 9' -6" E116 RETURN GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 506 - ATTIC 49 6 "x6" TELECOMM CONDUIT, 4" SLEEVE, T332 61 5" DIA WALL 9' -6" E116 SIZE INDICATED IS NOMINAL GRILLE SIZE 507 —ATTIC 50 6 "x6" CEILING TELECOMM CONDUIT, 4" SLEEVE, T332 M302 62 5" DIA WALL 9' -6" El 16 ATTIC -EXW 45 24 "x24" WALL TELECOMM CONDUIT, 4" SLEEVE, T332 63 5" DIA WALL 9' -6" El 16 24 "x12" WALL M302 TELECOMM CONDUIT, 4" SLEEVE, T332 64 4" DIA WALL 10' -6„ E116 ROOF M302 FEEDER TO 2T1 — 2 -1/2 ", P028 207 30 6 "x6" CEILING FLOOR , M133 M401 A/M401 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 207 -208 31 6" DIA WALL M401 M133 FLOOR DRAIN EXHAUST DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 6079 REGISTERED ARCHITECT: DO LAS L. BRINLEY• STATE OF WASHINGTON DESIGNED S. FISCHER OPENING SCHEDULE FROM — TO NO NOMINAL SIZE LOCATION DETAIL /SECTION DESCRIPTION NOTES PENET TYPE HEIGHT AFF PLAN /ELEVATION o w z in LEVEL 2 - TS0 BUILDING CONTINUED 208 32 6 "x6" J CEILING 1 M133 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 208 -209 33 10" DIA WALL M133 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 208 -210 34 12" DIA WALL M132 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 35 6" DIA WALL M133 EXHAUST DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 208 -220 36 14» DIA WALL M133 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 209 -210 36 12 "x8" WALL M134 , TRANSFER OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 210 —EXR 31 6" DIA CEILING ± M132 M132 EXHAUST DUCT UP TO ROOF CAP RC —T1 SIZE INDICATED IS NOMINAL DUCT SIZE 210 -211 . 30 6" DIA WALL M132 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 211 30 8 "x8" CEILING M132 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE ■ 211 -EXR 31 14" DIA CEILING M105 M132 DUCT RISER TO EF—T4 SIZE INDICATED IS NOMINAL DUCT SIZE 212 30 8 "x8" CEILING M133 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 31. 6" DIA CEILING M133 SUPPLY DIFFUSER SIZE INDICATED IS NOMINAL DUCT SIZE 212 -EXR 32 4" DIA CEILING M105 M136 4" PLUMBING VENT THRU ROOF SIZE INDICATED IS VENT PIPE SIZE 212 -213 33 12" DIA WALL M132 EXHAUST DUCT SIZE INDICATED 1S NOMINAL DUCT SIZE N 34 14" DIA WALL M133 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 212 -219 35 16" DIA WALL M132 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 36 8" x6 WALL M132 WALL SUPPLY REGISTER SIZE INDICATED IS NOMINAL REGISTER SIZE I 60 6" DIA WALL 9' -6" El 16 TELECOMM CONDUIT, 4 ", T332 ti 61 6" DIA WALL 9' -6,, El 16 TELECOMM CONDUIT, 4 ", T332 / 62 6" DIA WALL 9' -6" El 16 TELECOMM CONDUIT, 4 ", T332 63 6" DIA WALL 9' -6" E 1 1 6 TELECOMM CONDUIT, 4 ", T332 213 30 8 "x8" CEILING M132 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 31. 6" DIA CEILING M132 4" PLUMBING VENT THRU ROOF SIZE INDICATED IS VENT PIPE SIZE 213 -219 32 8 "x6" WALL M132 WALL SUPPLY REGISTER SIZE INDICATED IS NOMINAL REGISTER SIZE 33 14" DIA WALL M132 r SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 214 -215 30 8" DIA WALL M132 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 215 31 8 "x8" CEILING M132 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 216 -217 30 12" DIA WALL M132 SUPPLY DUCT SIZE INDICATED IS NOMINAL DUCT SIZE 217 I 31 8 "x8" CEILING M132 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 218 31 8 "x8" CEILING M132 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE SCALE FACILITY - SCALEHOUSE SUF —CRAWL 30 2" DIA FLOOR M301 • FLOOR DRAIN SIZE INDICATED IS DRAIN PIPE SIZE 31 2" DIA FLOOR M301 FLOOR DRAIN SIZE INDICATED IS DRAIN PIPE SIZE 32 4" DIA FLOOR M301 METHANE VENT SIZE INDICATED IS NOMINAL PIPE DIAMETER CRAWL —SUW 30 6" DIA SLEEVE M302 FOR REFRIGERATION SLEEVE CRAWL 31 12 "x12" WALL M302 IZ= ` tr. CAM' MAANCE DUCT OPENING SIZE INDICATED IS NOMINAL DUCT SIZE CRAWL —CHASE 32 20"X10" FLOOR M302 CO SUPPLY DUCT. SIZE INDICATED IS NOMINAL DUCT SIZE CRAWL -501 33 9" DIA FLOOR M302 3 Zpi3 FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 34 9" DIA FLOOR M302 AY FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 35 9" DIA FLOOR M302 _ FLOOR REGISTER _ SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 36 9" DIA FLOOR M302 City O11utcwiSl DIVI- 0 N FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE CRAWL -503 01 2'x2' FLOOR g 11.DIN 37 9" DIA FLOOR M302 FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 38 16 "x8" FLOOR M302 FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 39 `16 "x8" FLOOR M302 FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 40 _ 16 "x8" FLOOR M302 FLOOR REGISTER SIZE INDICATED IS NOMINAL FLOOR REGISTER SIZE 501 —EXR 33 4" DIA CEILING M301 4" METHANE VENT THRU ROOF SIZE INDICATED IS NOMINAL PIPE DIAMETER 501 —ATTIC 41 10" DIA CEILING M302 DUCT RISER SIZE INDICATED IS NOMINAL DUCT SIZE 42 10" DIA CEILING M302 DUCT RISER SIZE INDICATED IS NOMINAL DUCT SIZE 503 -ATTIC 01 2'- 6 "x4' -6" CEILING 503 -505 51 20 "x20" DOOR M302 DOOR GRILLE 52 20 "x20" DOOR M302 _ DOOR GRILLE 504 -ATTIC 47 6 "x6" CEILING , M302 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 505 —ATTIC 48 16 "x16" CEILING M302 RETURN GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 506 - ATTIC 49 6 "x6" CEILING M302 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE 507 —ATTIC 50 6 "x6" CEILING M302 EXHAUST GRILLE OPENING SIZE INDICATED IS NOMINAL GRILLE SIZE ATTIC -EXW 45 24 "x24" WALL M302 LOUVER SIZE INDICATED IS NOMINAL LOUVER SIZE 46 24 "x12" WALL M302 LOUVER SIZE INDICATED IS NOMINAL LOUVER SIZE ATTIC —EXR 44 14" DIA ROOF M302 FRESH AIR INTAKE DUCT SIZE INDICATED IS NOMINAL DUCT SIZE RECYCLING BUILDING 601 —SUF 31 • SEE DWG FLOOR M401 A/M401 TRENCH DRAIN 32 2" DIA FLOOR M401 FLOOR DRAIN SIZE INDICATED IS DRAIN PIPE SIZE SIZE INDICATED IS NOMINAL PIPE DIAMETER a��,)Irj vickt'j 33 4" DIA FLOOR M401 METHANE VENT 34 4" DIA FLOOR M401 METHANE VENT SIZE INDICATED IS NOMINAL PIPE DIAMETER 18 2012 601 —EXR 35 4" DIA CEILING M401 4" METHANE VENT THRU ROOF DEC SIZE INDICATED IS NOMINAL PIPE DIAMETER 36 1 . 4" DIA CEILING M401 4" METHANE VENT THRU ROOF SIZE INDICATED IS NOMINAL PIPE DIAMETER PERMIT CENTER' DRAWN J. PALMER 6/10/10 CC DB FINAL ISSUED FOR CITY OF TUKWILA PERMITS C 1/8/10 CC DB MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 0 1" B 1/8/10 CC DB RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS A REV 7/31/09 DATE CC CHK'D DB APP'D ISSUED FOR CITY OF TUKWILA PERMITS REVISION DESCRIPTION King County Department of Natural Resources and Parks Solid Waste Division K 753 9th Avenue N Seattle, WA 98109 (206) 286 -1640 www.kpg.com 1117 Broadway Suite 501 Tacoma, WA 98402 (253) 627 -0720 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT ARCHITECTURAL GENERAL OPENINGS SCHEDULE vR;L' ICI PROJECT NUMBER: C00405C09 SHT. OF: 325 619 DRAWING NUMBER: AO 17A 7� L 3 -v, 0 2 0 0 0 DESIGNED LNS MECHANICAL LEGEND MECHANICAL LEGEND SYMBOL DESCRIPTION DESCRIPTION • • REFRIGERANT LINE SET . COMPRESSED MR CA PRESSURE GAUGE WITH SNUBBER AND ISOLATION VALVE UNDERGROUND PNEUMATIC RACEWAY, A CA PS COMPRESSED AIR OUTLET Wco . COLD WATER - FCO FLOOR CLEANOUT NON- POTABLE WATER --- NPW ---- -- M HOT WATER (120 °) MOTORIZED CONTROL VALVE - - at • HOT WATER 040°) -140 MOTORIZED BUTTERFLY VALVE HOT WATER CIRCULATING (120 °) - - - 3 " �--. WASTE FCV TOP. DUCT SUPPORT. (SUP) VENT , .. . ,. w ,.i ® # Mw ,E..,NW, INW ��. -w - W so '- •- s 'r SERVED. RAIN WATER RW 0 # THERMOSTAT, # INDICATES EQUIPMENT SERVED LEACHATE WASTE LW ® # MOTION SENSOR # INDICATES EQUIPMENT SERVED RAINWATER SUCTION RWS � �7i* TEPID WATER (85 °) TW NITROUS OXIDE SENSOR # INDICATES EQUIPMENT SERVED # TEPID WATER RETURN TWR --0- x CFM SIDEWALL SUPPLY REGISTER CONDENSER. WATER SUPPLY CWS SIDEWALL RETURN REGISTER 10/4L CONDENSER WATER RETURN CWR --- In 20/12. 4 HEATING WATER SUPPLY HWS UNED DUCT, INSIDE. DIMENSION (FIRST FIGURE, SIDE SHOWN) 1" LINER EXCEPT WHERE INDICATED, I.E. 20/12L (2') HEATING WATER RETURN HWR - FUEL OIL SUPPLY (B20) FOS DUCT SECTION (SUPPLY) FUEL OIL RETURN (B20) - FOR DUCT SECTION (EXHAUST, RETURN, OR OUTSIDE AIR) G 0 , MEDIUM PRESSURE HIGH VOLUME MISTING MPH OL E ' P ' ---", R w w ■ w W•��WvWw•' HIGH :PRESSURE LOW : VOLUME MISTING HPLV F ---- IU l5b- FIRE SPRINKLER # INDICATES. TYPE OF DIFFUSER PER SCHEDULE HYDRAULIC OIL HO CONDENSATE J C `"c CFM . FIRE DEPARTMENT PUMPER CONNECTION . D4 S �-- POST INDICATIOR VALVE W/ TAMPER SWITCH -11F- SR 0— UNION CHECK VALVE .-1 BUTTERFLY VALVE BALL VALVE • REUEF OR SAFETY VALVE GATE VALVE 1>4 • BALANCE VALVE -' —RD4— REDUCED PRESSURE BACKFLOW PREVENTER PRESSURE REGULATOR SOLENOID VALVE PDI -'A' • WATER HAMMER ARRESTOR. LETTER INDICATES PLUMBING & DRAINAGE INSTITUTE SIZE. POC POINT OF CONNECTION w_ THRUST BLOCK SEE DWG C093 C . J DESIGNED LNS MECHANICAL LEGEND SYMBOL DESCRIPTION DESCRIPTION WATER FLOW METER REFRIGERANT LINE SET THERMOMETER IN THERMOWEUL PRESSURE GAUGE WITH SNUBBER AND ISOLATION VALVE PRESSURE SWITCH PS POINT OF CONNECTION Wco CID PRESSURE SENSOR C. FCO FLOOR CLEANOUT QTEMPERATURE SENSOR IN THERMOWELL SURFACE CLEANOUT M METHANE VENT MOTORIZED CONTROL VALVE - r4 at M MOTORIZED BUTTERFLY VALVE -11-- A ROOF TOP DUCT SUPPORT (ANCHORED) �--. FLOW CONTROL VALVE FCV TOP. DUCT SUPPORT. (SUP) NUMBER, POUND , .. . ,. w ,.i ® # Mw ,E..,NW, INW ��. -w - W so '- •- s 'r SERVED. ®A TEMPERATURE SENSOR WITH LOCAL ADJUSTMENT. # INDICATES EQUIPMENT SERVED 0 # THERMOSTAT, # INDICATES EQUIPMENT SERVED R # REVERSE ACTING THERMOSTAT # INDICATES EQUIPMENT SERVED ® # MOTION SENSOR # INDICATES EQUIPMENT SERVED # CARBON MONOXIDE SENSOR # INDICATES EQUIPMENT SERVED C � �7i* CARBON DIOXIDE SENSOR # INDICATES EQUIPMENT SERVED # NITROUS OXIDE SENSOR # INDICATES EQUIPMENT SERVED # SPEED CONTROLLER # INDICATES EQUIPMENT SERVED --0- x CFM SIDEWALL SUPPLY REGISTER 1 16x1 o SWR -•-1,— SIDEWALL RETURN REGISTER 10/4L DUCT (WIDTH,, HEIGHT), L INDICATES UNED DUCT (DIMENSIONS CLEAR INSIDE) DUCT (FIRST FIGURE, SIDE SHOWN) In 20/12. 4 UNED DUCT, INSIDE. DIMENSION (FIRST FIGURE, SIDE SHOWN) 1" LINER EXCEPT WHERE INDICATED, I.E. 20/12L (2') 20/12L F I DUCT SECTION (SUPPLY) mi DUCT SECTION (EXHAUST, RETURN, OR OUTSIDE AIR) G 0 ROUND DUCT, ROUND --I OL E ' P ' ---", R w w ■ w W•��WvWw•' VOLUME DAMPER (MANUAL) W/ REMOTE OPERATOR ..WW W FLEXIBLE CONNECTION IU l5b- FLEXIBLE DUCT # INDICATES. TYPE OF DIFFUSER PER SCHEDULE FA �� 8 "4� CFM CD -# s CRG CEILING RETURN, EXHAUST OR TRANSFER GRILLE OR REGISTER CFM --A FIRE DAMPER S �-- COMBINATION FIRE /SMOKE DAMPER CORRIDOR COMBINATION FIRE /SMOKE DAMPER SR 0— • MECHANICAL LEGEND SYMBOL DESCRIPTION REFRIGERANT LINE SET • IV VELOCITY SENSOR POC POINT OF CONNECTION Wco WALL CLEANOUT FCO FLOOR CLEANOUT CO SURFACE CLEANOUT - - - METHANE VENT at OPENING NUMBER (SEE OPENING B DESIGNATION . NOTES THIS SHEET) A ROOF TOP DUCT SUPPORT (ANCHORED) �--. TOP. DUCT SUPPORT. (SUP) iROOF GENERAL NOTES WHERE CONNECTIONS TO EXTERIOR UTILITIES ARE INDICATED, RESPECTIVE DIV. 21, DIV. 22, :DIV. 23 CONTRACTOR SHALL VERIFY POINT OF CONNECTION AND MAKE CONNECTION TO EXTERIOR UITUITY. 2. EQUIPMENT SHALL BE PROVIDED AS SCHEDULED /INDICATED BY MANUFACTURER AND MODEL NUMBER OR APPROVED EQUAL. OPENING DESIGNATION NOTES: 1. OPENINGS BETWEEN ROOMS OR SPACES ARE IDENTIFIED BY THE SYMBOL Q WITH DISCRETE • OPENING NUMBERS ASSIGNED TO THE TWO ROOMS OR SPACES. 2. REFER TO OPENING SCHEDULE ON SHEETS A016. AND A017 FOR NUMBERING NOMENCLATURE. 3. . OPENINGS ARE SCHEDULED FOR PENETRATIONS WHICH ARE FOUR (4) INCHES OR GREATER IN SIZE. 4. OPENINGS FOR CEILING REGISTERS, GRILLES AND DIFFUSERS ARE NOT INCLUDED IN THE OPENING SCHEDULE. 5. OPENINGS FOR PENETRATIONS . LESS THAN FOUR (4) INCHES IN SIZE ARE NOT INCLUDED IN THE OPENING SCHEDULE, 6. OPENINGS FOR PENETRATIONS IN CONCRETE SHALL BE CAST -IN -PLACE FOR SIZES EIGHT (8) INCHES OR GRATER. OPENINGS LESS THAN EIGHT (8) INCHES MAY BE CAST -IN -PLACE OR DRILLED, LINE SIZE DESIGNATION FIRST # LEFT TO LAST # RIGHT FIRST # TOP TO LAST # BOTTOM FIRST # TOP TO LAST # BOTTOM J FIRST # LEFT TO LAST # RIGHT. SEISMIC ISOLATION NOTES SEE DWG A103 AND ASSOCIATED REFERENCED DRAWINGS FOR SEISMIC ISOLATION NOTES AND REQUIREMENTS. 2. IN ALL LOCATIONS WHERE MECHANICAL ITEM PENETRATE THROUGH SEISMIC JOINTS, WHETHER SPECIFICALLY INDICATED ON THE DRAWINGS OR NOT, PROVIDE FLEXIBLE TRANSITIONS WHICH PERMITS THE MOTIONS SET FORTH IN THE STRUCTURAL DRAWINGS AND MAINTAINS THE FIRE RATINGS OF THE WALL, FLOOR OR ROOF ASSEMBLIES PENETRATED. REVIEWED FOR CODE COMPLIANCE APPROVED MAY 132013 City of Tukwila BUILDING DIVISION M�qf� RE ; :d'v CITY OF T"s:IKV1p ,, nEo 18 2012 PERMIT CENTER 1- 800 -424 -5555 DRAWN NBD 6/10/10 JAR LNS FINAL ISSUED FOR CITY OF TUKWILA PERMITS 1/8/10 JAR. LNS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 0 1" B 1/8/10 JAR LNS RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS A 7/31/09 JAR LNS ISSUED FOR CITY OF TUKWILA PERMITS REV DATE CHK'D APP'D REVISION DESCRIPTION ,King CoUnty Department of Natural Resources and Parks Soiid Waste Division LNS LNS ENGINEERS, :INC. 7713 PIONEER WAY • SUITE C GIG HARBOR, WASHINGTON 98335 PHONE: 253.851.5175 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT MECHANICAL LEGENDS PROJECT NUMBER: C00405C09 SHT. OF: 454 619 DRAWING NUMBER: MO11 3 0 w a 0 0 ) c a c REMARKS: 0 . PROVIDE FACTORY MOUNTED VARIABLE FREQUENCY- DRIVE WITHIN WEATHER PROOF CONTROL PANEL. ® UNIT SHALL BE OF WEATHER PROOF CONSTRUCTION FOR ROOF CURB INSTALLATION. ROOF CURB PROVIDES SEISMIC RESTRAINT. 0 INSTALL DIV. 28 SUPPLY DUCT SMOKE DETECTOR. 0 UNIT SHALL BE PROVIDED WITH SPUT POWER CONNECTION, ONE. CIRCUIT FOR DUCT HEATER, ONE CIRCUIT FOR FAN MOTORS. ® HEATING /COOUNG PERFORMANCE IS ARI USTING INFORMATION FOR HEAT PUMP CONDENSING UNIT CU -S1. UNIT SHALL HAVE. SPLIT SYSTEM HEAT PUMP HEATING /COOLING WITH 100% OUTSIDE AIR ECONOMIZER. 0 UNIT SHALL HAVE INTERNAL SPRING ISOLATION FOR FAN(S), ® ELECTRIC DUCT HEATER SHALL BE FACTORY INSTALLED ' AND PROVIDED WITH SCR CONTROL, 0 -10VDC OR 4 -20MA. ® UNIT SHALL BE ANCHORED TO FLOOR WITH A MINIMUM OF SIX(6) (3 PER. SIDE) 1/2" ANCHOR BOLTS. SEE THRU BOLT DETAIL ON S013. MAKE ATTACHMENTS TO UNIT AT SECTION SPLITS. PR'VID R UEF D P'RS N THE U -T1 RE EF`P U FOR CON .RE CE 20 NTI TI 1 N EU F OD REVIEWED FOR CODE COMPLIANCE APPROVED MAY 1 3 2013 City of Tukwila BUILDING DIVISION FAN SCHEDULE SYMBOL SYMBOL A NDLI G UNI 0-1 SERVICE I L MINIMUM CFM STATIC PRESSURE IN. W.G. WHEEL ELECTRICAL SYMBOL MANUFACTURER MODEL 'N0. CONFIGURATION SUPPLY FAN RETURN FAN [ DX COOLING COIL HEAT PUMP HEATING HOT WATER HEATING COIL DUCT HEATER RPM ELECTRICAL LOAD SHEDDING FILTERS MIN.. O.A. CFM WEIGHT (LBS) REMARKS CFM RPM TOTAL SP (IN.) Hp V PH CFM RPM . TOTAL SPIN) HP V. PH TOTAL C ' ACITY MBH SENS CAPAC TY MBH EAT °F ( ) SEER EAT (F) HIGH -TEMP (MBH) LAT (F) LOW -TEMP (MBH) LAT a (F) HSPF CAPACITY (BTUH) EAT' o (F) LAT (F) GPM EWT : o (F) P.D. (FT) KW V PH MCA V PH STARTER DISCONNECT DB WB AHU-T1 AAON RM- 008 -3- 000 -EJN VARIABLE VOLUME 100% O.A. 3335 1629 2,7 3 460 60" 25 460 3 797 VFp DIV 23 ; NO 1654 SPRING THRUST - - - - - - - - 154,000 20 5.8 30 110 14 - _ _ 4 460 3 MANUF. DIV. 23 DIV. 26 NO 3036 MERV 13 2495 835 ® ® �' Q HVAC -S1 AAQN M2 -H- 005- R- 8- A- A -0 -C -0 HORIZONTAL INDOOR CONSTANT VOLUME E 1150 1979 2.1 2 208 3 600 1576 1.0 1 208 3 ` 46.6 35:4 84 67 14.7 55 43.8 90 28.4 78 8.7 - - - - - - 15.75 208 3 55 208 3 DIV. 23 MANUF. DIV. 26 NO 30% MERV 13 400 2443 4 5 6 7 8 9 10 0 0 ®0 O. 120 1 1200 DBAS 23 DIV 26 NO 25 - - _ INFRA -RED RADIENT HEATER EF -T8 COOK MODEL GC240 ;r?Er IL 0 I ■ 100 0.25 - 65W 120 1 1200 BAS DIV 23 DIV 26 NO 25 - - _ INFRA-RED INFRA -RED NEATER EF -T9 COOK MODEL 195SQNB HPU ROOM 109 HPU ROOM EXHAUST HORIZONTAL IN -UNE 4,000 ` 0.75 19.5 1 -1 /2 460 3 1065 DIV 26 DIV 26 NO 300 SPRING THRUST 035" CABLE ELECTRIC UNIT HEATER EF -T10 COOK MODEL. GC420 ELECTRIC ROOM 115 REMARKS: 0 . PROVIDE FACTORY MOUNTED VARIABLE FREQUENCY- DRIVE WITHIN WEATHER PROOF CONTROL PANEL. ® UNIT SHALL BE OF WEATHER PROOF CONSTRUCTION FOR ROOF CURB INSTALLATION. ROOF CURB PROVIDES SEISMIC RESTRAINT. 0 INSTALL DIV. 28 SUPPLY DUCT SMOKE DETECTOR. 0 UNIT SHALL BE PROVIDED WITH SPUT POWER CONNECTION, ONE. CIRCUIT FOR DUCT HEATER, ONE CIRCUIT FOR FAN MOTORS. ® HEATING /COOUNG PERFORMANCE IS ARI USTING INFORMATION FOR HEAT PUMP CONDENSING UNIT CU -S1. UNIT SHALL HAVE. SPLIT SYSTEM HEAT PUMP HEATING /COOLING WITH 100% OUTSIDE AIR ECONOMIZER. 0 UNIT SHALL HAVE INTERNAL SPRING ISOLATION FOR FAN(S), ® ELECTRIC DUCT HEATER SHALL BE FACTORY INSTALLED ' AND PROVIDED WITH SCR CONTROL, 0 -10VDC OR 4 -20MA. ® UNIT SHALL BE ANCHORED TO FLOOR WITH A MINIMUM OF SIX(6) (3 PER. SIDE) 1/2" ANCHOR BOLTS. SEE THRU BOLT DETAIL ON S013. MAKE ATTACHMENTS TO UNIT AT SECTION SPLITS. PR'VID R UEF D P'RS N THE U -T1 RE EF`P U FOR CON .RE CE 20 NTI TI 1 N EU F OD REVIEWED FOR CODE COMPLIANCE APPROVED MAY 1 3 2013 City of Tukwila BUILDING DIVISION FAN SCHEDULE SYMBOL SYMBOL MANUFACTURER MODEL NO LOCATION. SERVICE TYPE MINIMUM CFM STATIC PRESSURE IN. W.G. WHEEL ELECTRICAL LOAD SHEDDING WEIGHT VIBRATION ISOLATION SEISMIC RESTRAINT REMARKS SIZE HP V PH RPM STARTER DISCONNECT (LBS) TYPE STATIC DEFL EF -T1 COOK MODEL 36AFBC TSO EQUIP LEVEL ROOM 108 COMPACTOR/ YARD WASTE GEN. EXHAUST HORIZONTAL IN -UNE 18,000 1.5 » 36 15 460 3 797 DN 26 DIV 26 NO 606 SPRING THRUST 3 CABLE KING ELECTRIC DEC 1215 -SS EF -T2 COOK MODEL 60AFBC ISO ROOF LEVEL TRANSFER STATION GEN. EXHAUST HORIZONTAL ` IN -UNE 45,000 1.5 60 25 460 3 797 VFD DIV 23 DIV 26 NO 1654 SPRING THRUST 3' INTEGRAL TO ISOLATORS KING ELECTRIC DEC 1215 -SS EF -T3 K MODEL 60AFBC MODEL TS0 ROOF LEVEL TRANSFER STATION GEN. EXHAUST HORIZONTAL 1N -UNE 45,000 1.5 60" 25 460 3 797 VFp DIV 23 DIV 26 NO 1654 SPRING THRUST " INTEGRAL TO ISOLATORS KING ELECTRIC SBF 31205 EF -T4 COOK MODEL 12OACEB TSO ROOF LLyLL TS0 GENENERAL EXHAUST ROOFTOP CENTRIFUGAL 870. 0.5 12" 1/3 120 1 1160 DIV 23 DIV 26 NO 100 - - CURB MOUNT FOSTORIA 223 -60- THSS -208V EF -T5 C00 K MODEL 014420 COMPACTOR LEVEL MENS RESTROOM COMPACTOR LEVEL RESTROOM EXHAUST IN-LINE CABINET FAN 200 0.375 - 172W 120 1 1075 BAS DIV 23 DIV 26 NO 30 SPRING 0.75" CABLE CEIUNG ` RADIENT HEATER EF -T6 COOK MODEL GC240 TOILET .116. TOILET TOILET EXHAUST CEIUNG CAl3INEf FAN 100 0.25 - 65W 120 1 1200 BAS DIV 23 DIV 26 NO 25 - - - INFRA -RED RADIENT HEATER EF -T7 COOK MODEL GC240 TOILET 104 TOILET 104 EXHAUST CEILING CABINET FAN 100 0.25 - 65W 120 1 1200 DBAS 23 DIV 26 NO 25 - - _ INFRA -RED RADIENT HEATER EF -T8 COOK MODEL GC240 ;r?Er IL 0 TOILET 110 EXHAUST CEIUNG CABINET FAN 100 0.25 - 65W 120 1 1200 BAS DIV 23 DIV 26 NO 25 - - _ INFRA-RED INFRA -RED NEATER EF -T9 COOK MODEL 195SQNB HPU ROOM 109 HPU ROOM EXHAUST HORIZONTAL IN -UNE 4,000 ` 0.75 19.5 1 -1 /2 460 3 1065 DIV 26 DIV 26 NO 300 SPRING THRUST 035" CABLE ELECTRIC UNIT HEATER EF -T10 COOK MODEL. GC420 ELECTRIC ROOM 115 TRANSFORMER HEAT EXHAUST CEIUNG CABINET FAN 275 0.20 - 170W 120 1 935 BAS DIV 23 DIV 26 NO 30 - C EF -T11 COOK MODEL 42XLPH NORTH PROCESSING AREA GENERAL EXHAUST PROPELLER WALL FAN 8,000 0.375 42" 1 -1 /2 460 3 540 DIV 26 DIV 26 NO 482 _ _ WALL MOUNT SF-T1 COOK MODEL 365SQN -HP COMPACTOR LEVEL COMPACTOR LEVEL SUPPLY CENTRIFUGAL IN -LINE. 8,000 0.5 36 36" 5 460 3 1340 DIV 26 DIV 26 NO 397 SPRING » 0.75 INTEGRAL TO ISOLATORS C EF -S1 COOK MODEL GN240 SCALE FACILITY MEZZ TOILET /STORAGE EXHAUST IN -UNE CABINET FAN 100 0.25 - 54W 120 1 1260 BAS DIV 23 DIV 26 NO 25 SPRING 0.75" CABLE EF -S2 COOK MODEL GN240 SCALE FACILITY MEZZ ELECTRICAL ROOM EXHAUST IN -LINE CABINET FAN 100 0.25 - 54W i 20 1 1260 �S DN 23 DIV 26 NO 25 SPRING 0.75" CABLE BF -S1 COOK MODEL 225SQNB SCALE FACIUTY VEHICLE TAIL PIPE BLOWER CENTRIFUGAL IN -UNE FAN 4 000 0.75 22.5" 1 208 1 725 VFD DIV 23 DIV 26 NO 350 SPRING 2" INTEGRAL TO ISOLATORS BF -S2 COOK MODEL 225SQNB SCALE FACILITY VEHICLE TAIL PIPE BLOWER CENTRIFUGAL CE UNE FAN 4 000 0.75 22.5" 1 208 1 725 VFD DIV 23 DIV 26 NO 350 SPRING 2" 2 INTEGRAL TO ISOLATORS REMARKS: PROVIDE WITH CURB MOUNT BACKDRAFT DAMPER. ® PROVIDE WITH EXHAUST WALL CAP, 12 "x6". ELECTRIC HEATER SCHEDULE SYMBOL DESCRIPTION MANUFACTURER MODEL NO. AREA SERVED ELECTRICAL LOAD SHEDDING REMARKS KW /W VOLTS PHASE DISCONNECT EWH -T1 WALL HEATER KING DEC ELECTRIC 1215 - SS COMPACTOR BAY UNISEX TOILET CO7 500 W 120 1 DIV. 26 NO ®1 NH -T2 . WALL HEATER KING ELECTRIC DEC 1215 -SS COMPACTOR BAY UNISEX TOILET COS 500 W 120 1 DIV. 26 NO ®1 EWH -T3 WALL HEATER KING ELECTRIC DEC 1215 -SS TIPPING FLOOR TOILET 116 500 W 120 1 DN. 26 NO EWH -T4 WALL HEATER KING ELECTRIC DEC 1215 -SS TIPPING FLOOR ROOM 104 500 W 120 1 ON. 26 N0. ®1 EWH T5 WALL HEATER KING ELECTRIC DEC 1215 -SS TIPPING FLOOR ROOM 11O 500 W 120 1 DIV. 26 NO Q EWH -T6 WALL HEATER KING ELECTRIC DEC 1215 -SS FIRE SPRINKLER RISER #2 500 W 120 1 DIV. 26 NO ®1 EWH -S1 WALL HEATER KING ELECTRIC DEC 1215 SS SCALE -HOUSE TOILET 500 W 120 1 ; DIV. 26 NO t O BH -St BASE BOARD HEATER KING ELECTRIC SBF 31205 H g-TRANS- ACTION WINDOW 500 W 120 1 DIV. 26 NO ®2 BH -S2 BASE BOARD HEATER KING ELECTRIC SBF 31205 SCALE - HOUSE- TRANS- ACTION WINDOW 500 W 120 1 DIV. 26 NO ®2 IRH -R1 RADIENT HEATER FOSTORIA 223 -60- THSS -208V RECYCLE WARMING ROOM 602 3.2 KW 208 1 DIV. 26 NO CEILING RADIENT HEATER MARKEL CP 807 SCALE- HOUSE- TRANS- HOUSE-TRANS- ACTION WINDOW 750 W 208 1 DIV. 26. NO �2 CEIUNG ` RADIENT HEATER MARKEL CP 807 SCALE- HOUSE- TRANS- ACTION ACTION WINDOW 750 W 208 1 DIV. 26 NO RH-T1 CEIUNG RADIENT HEATER MARKEL CP 123 TSO 209 SUPERVISOR OFFICE 375 W 1.20 1 . DIV. 26 NO ®4 IRH-T1 INFRA -RED RADIENT HEATER 223 -6 IA 223 -60- THSS -480V TIPPING FLOOR SOUTH EMPLOYEE WARMING AREA 6 . KW 480 3 ON. 26 YES ® . IRH -T2 INFRA -RED RADIENT HEATER FOSTORIA 223 -6O- THSS -48OV RELIEVING FLOOR SOUTH EMPLOYEE WARMING ARE�4 6 KW 480 3 DIV. 26 YES 5 ® ® ® IRH -T3 INFRA -RED RADIENT HEATER 223 -6 IA 223 -60- THSS -480V TIPPING FLOOR NORTH EMPLOYEE WARMING AREA 6 KW 480 3 DIV. 26 YES 0 IRH -T4 INFRA -RED RADIEI�IT HEATER 223 -6 IA 223 -60- THSS -480V COMPACTOR LEVEL COMPACTOR #1 6 KW 480 3 DN. 26 YES IRH -T5 INFRA-RED INFRA -RED NEATER FOSTORIA 223 -60- THSS -480V COMPACTOR LEVEL COMPACTOR #2 6 KW 480 3 DIV. 26 . YES Q ® UN-TT ELECTRIC UNIT HEATER KING ELECTRIC KB 4805 -3MP • TSO EQUIPMENT ROOM 105 5 KW 480 ' DIV. 26 • . NO . . 0 ® UH -T2 ELECTRIC UNIT HEATER KING ELECTRIC KB 4805 -3MP TSO MISTING AREA ROOM 106 5 KW 480 3 DIV. 26 NO O ® C REMARKS: 0 PROVIDE WITH INTEGRAL THERMOSTAT. ® PROVIDE WITH REMOTE THERMOSTAT, INTERLOCKED THROUGH BAS. ®3 PROVIDE TWO -STAGE HEAT. SEPARATE CIRCUITS REQUIRED FOR EACH STAGE. CONTROL BY ROOM TEMPERATURE SENSOR - INTERLOCKED THROUGH BAS. ACTIVATE BY MOTION SENSOR, THROUGH BAS, WITH LOCKOUT ABOVE 50'F (ADJUSTABLE). PROVIDE WITH SUSPENSION HARDWARE. CITY OF TII ?;'P1 ., DEC 18 2012 PERMIT CENTER DESIGNED LNS DRAWN NBD • 6/10/10 JAR LNS FINAL ISSUED FOR CITY OF TUKWILA PERMITS c 1/8/10 JAR LNS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 0 II 1" 1/8/10 JAR LNS RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS A 7/31/09 JAR LNS ISSUED. FOR CITY OF TUKWILA PERMITS REV DATE CHK'D APP'D REVISION DESCRIPTION King Department of Natural Resources and Parks Soli! Waste Division LNS LNS ENGINEERS, INC. 771 3 PIONEER WAY • SUITE C GIG HARBOR, WASHINGTON 98335 PHONE: 253.851 .51 75 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT MECHANICAL SCHEDULES SHEET 3 PROJECT NUMBER: C00405C09 SHT. OF: 457 619 DRAWING NUMBER: M014 — . 9:49 AM — P: \cad \2007 \07785.bow — take —ts \BOW- LAKE - PERMIT— ABC — NEW \F_M017.dwg Ins004 — •June 3, 2010 ABBREVIATION SYMBOL DESCRIPTION WHA . WATER HAMMER ARRESTOR EV EMERGENCY VENT O.C. ON CENTER B20 BIODIESEL (20%) lYP TYPICAL . I�3 ROUND W,H,L WIDTH, HEIGHT, LENGTH CFM CUBIC FEET PER MINUTE W/ WITH HSPF AT AFF ABOVE FINISHED FLOOR IE INVERT 'ELEVATION MBH GALLON GPM GALLONS PER MIN PSI POUND PER SQUARE INCH PSIG POUNDS PER SQUARE INCH (GAUGE) STAT DEFL STATIC DEFLECTION SCADA SUPERVISORY CONTROL AND DATA ACQUISITION BAS BUILDING AUTOMATION SYSTEM DDC DIRECT DIGITAL CONTROL MANUF. MANUFACTURER DIV. DMSIION HP HORSE POWER FLA FULL LOAD AMPS KW /W KILOWATTS/WATTS FT, Fr FEET, SQUARE FEET NC NORMALLY CLOSED NO NORMALLY OPEN, NUMBER, NO TT'V TRAP PRIMER VALVE RPM REVOLUTIONS PER MINUTE SP STATIC PRESSURE ESP EXTERNAL STATIC PRESSURE IN INCH V VOLT PH PHASE ° F DEGREE FAHREHEIT EAT ENTERING AIR TEMP . LAT LEAVING AIR. TEMP EWT ENTERING WATER TEMP LWT LEAVING WATER TEMP DB DRY BULB DESIGNED LNS ABBREVIATION SYMBOL DESCRIPTION WB WET BULB P.D. PRESSURE DROP MCA MAXIMUM CURRENT AMPS RLA RUN LOAD AMPS MOCP MAXIMUM OVER CURRENT PROTECTION MCP MAXIMUM CURRENT PROTECTION 0.A. OUTSIDE AR LBS POUNDS W.G. WATER GAUGE HSPF HEATING SEASONAL PERFORMANCE FACTOR SEER ENERGY EFFICIENCY RATIO COP COEFICIENT OF PERFORMANCE MBH THOUSAND BRITISH. THERMAL UNITS PER HOUR BTUH BRITISH THERMAL UNITS PER HOUR MV METHANE VENT NREC - 2006 1 • MECHANICAL EQUIPMENT MINIMUM EFFICIENCIES SHALL COMPLY WITH THE 2006 NREC AS SCHEDULED ON THE DRAWINGS. 2. THE CONDITIONED AREAS OF THE BUILDING ARE PROVIDED WITH INDIVIDUAL SPACE TEMPERATURE CONTROL FOR EACH ,PIECE OF EQUIPMENT WITH A MINIMUM OF ONE TEMPERATURE CONTROL ZONE ON EACH OCCUPIED FLOOR OF THE BUILDINGS. 3. PROVIDE TEMPERATURE CONTROL CAPABILITIES THROUGH THE BUILDING DIRECT DIGITAL CONTROL SYSTEM FOR A MINIMUM DEADBAND CONTROL OF 5 DEGREES F FOR ALL CONDITIONED AREAS WITH HEATING AND COOUNG CAPABILITY AND PROVIDE LOCKOUT OF AUXILIARY OR SUPPLEMENTAL HEATING . DURING THE COOUNG MODE. 4. THE BUILDING DIRECT DIGITAL CONTROL SYSTEM PROVIDES 7 -DAY • PROGRAMMABLE CONTROL WITH NIGHT SETBACK CAPABILITY. THE BUILDING WILL BE CONTINUOUSLY OCCUPIED SUNDAY THROUGH SATURDAY EXCEPT FOR A SCHEDULED SHUTDOWN WHICH WILL OCCUR ON SATURDAY EVENING. 5. EACH MECHANICAL SYSTEM SHALL BE PROVIDED WITH OUTSIDE AIR. WITH 100% SHUTDOWN CAPABILITY DURING UN- OCCUPIED PERIODS WITH MOTORIZED DAMPER CONTROL ON OUTSIDE AIR INTAKES. MOTORIZED DAMPERS SHALL HAVE A MAXIMUM . LEAKAGE OF 10 CFM /SF OF DAMPER AREA AT 1.0 INCHES W.G. AND GRAVITY BACKDRAFT DAMPERS SHALL NOT EXCEED 40 CFM /SF (ALL UNDER 24 INCHES IN EITHER DIRECTION) WHEN TESTED IN ACCORDANCE WITH AMCA STANDARD 500. 6. BALANCING DAMPERS SHALL BE PROVIDED AS INDICATED ON THE DRAWINGS FOR EACH SUPPLY, RETURN AND EXHAUST 'AIR TERMINAL. 7. MULTI - PURPOSE ROOM 102 AND CONFERENCE ROOM 203 IN THE ISO BUILDING ARE EACH PROVIDED WITH CARBON DIOXIDE MONITORING FOR DEMAND VENTILATION. CONTROL. 8. PROVIDE DUCT SEALING PER NREC 1414.1 AND SECTION 23 3113 - HVAC METAL DUCTS. 9. PROVIDE DUCT INSULATION PER NREC ' 1414.2 AND SECTION 23 07 00 - HVAC INSULATION. 10. PROVIDE HVAC HEATING WATER, CONDENSATE AND REFRIGERANT PIPE INSULATION PER NREC 1415.1 AND SECTION 23 07 00 - HVAC INSULATION. 11: PROVIDE PLUMBING PIPE INSULATION PER NREC 1415.1 AND SECTION 22 07 00 - PLUMBING INSULATION. 12. COMMISSIONING OF THE HVAC SYSTEMS IS BEING PROVIDED AS REQUIRED BY NREC SECTION 1416.2: ALL OTHER MECHANICAL SYSTEMS ", TO VERIFY EQUIPMENT, PERFORMANCE AND SEQUENCE OF OPERATION. COMMISSIONING WILL INCLUDE: 1. COMMISSIONING PLAN 2. SYSTEM TESTING AND BALANCING 3. EQUIPMENT FUNCTIONAL PERFORMANCE TESTING 4. CONTROLS PERFORMANCE TESTING COMMISSIONING REPORTS WILL BE PROVIDED PER NREC 1416.4.2.5: "COMMISSIONING REPORTS" AND WILL COMPLY WITH THIS NREC SECTION BY INCLUDING: 1. A PREUMINARY COMMISSIONING REPORT 2: POST CONSTRUCTION DOCUMENTATION 3. A FINAL COMMISSIONING REPORT 13. DOMESTIC HOT WATER CIRCULATING LOOPS SHALL BE PROVIDED WITH DDC PROGRAMMED RETURN WATER TEMPERATURE CONTROL TO SHUT -OFF PUMPS DURING PERIODS ON NON -USE. 14. ELECTRIC WATER HEATERS INSTALLED ON CONCRETE FLOORS SHALL BE PLACED ON R10 (MINIMUM) RIGID INSULATION. ;DRAWN NBD 6/10/10 1/8/10 JAR LNS FINAL ISSUED FOR CITY OF TUKWILA PERMITS JAR LNS. MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION 1/8/10 JAR LNS VERIFY SCALE BAR _ IS ONE INCH ON A ANSI "0" DRAWING 0 1" REV DATE CHK'D APP'D 7/31/09 JAR LNS RESPONSE TO CITY OF . TUKWILA CORRECTION LETTERS ISSUED FOR CITY OF TUKWILA PERMITS REVISION DESCRIPTION King County Department of Natural Resources and Parks Solid Waste Division LNS LNS ENGINEERS, INC. 771.3. PIONEER WAY • SUITE .0 GIG HARBOR, WASHINGTON 98335 PHONE: 253.851.5175 REVIEWED FOR CODE COMPLIANCE APPROVED MAY 13 2013 City of Tukwila BUILDING DIVISION MIS cuo BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT NREC COMPLIANCE AND MECHANICAL ABBREVIATIONS • fEC 1: 8 2012 PERMIT CENTER PROJECT NUMBER: C00405C09 SHT. OF: 460' 619 1 -500 -424 -5555 0 W Et 0 LL m 0 co J DRAWING NUMBER: M017 U 0 W cn z LL Ins004 — June 3, 2010 — 10:50 SEE WARNING SHELTER PIPING DIAGRAM THIS SHEET FOR PIPING ARRANGEMENT FINISH FLOOR ELEV = 267.79 .1awaN / /M•.*wy......a.. NY.aaa..N..a.aa..a mama... WARMING ROOM 602 1 I uniniiriunuruirmnfiiriuini 4" M THAN E VTR OFFSET AT ROOF TO OID STANDING SEAM -1/4 • BUILDING T II = 262. 6 " CO RECYCLING BUILDING PLUMBING PLAN RECYCLING BUILDING RECLCYING YARD SCALE: 1/4" = 1' -0" 2 "FD -1 SUF `TD-1 i TRENCH SUF N BLIND SUMP NO • ' INAGE) aaa• II. aR. N�K. f. M. N4. N... Y. NN. M. R ..a.Pa.a.N.a coma* NFN.R..N..N...P aRa. Na..NY1a... N. Nam. . a.m. WARMING ROOM 602 3" FCO RECYCLE AREA 601 I IIIIIIIIIIIIIIIIII III!IIIIIIIIIIIiII III I` — 2- STAGE, • 2- CIRCUIT, 208V/1 PH LINE VOLTAGE THERMOSTAT WARMING ROOM 602 HVAC PLAN RECYCLING BUILDING RECLCYING YARD SCALE: 1 /4" = 1' -0" itk soONAL DESIGNED RECYCLING BUILDING FOUNDATION PLUMBING PLAN RECYCLING BUILDING RECLCYING 'YARD SCALE: 1/4" = 1' -0" FLOOR THICKNESS PER STRUCTURAL DRAWINGS TRENCH SUPPORT LEVELING RODS MINIMUM . CONCRETE THICKNESS PER DRAIN MANUFACTURER OR STRUCTURAL DRAWINGS, WHICHEVER IS GREATER TRENCH DRAIN SECTION SCALE: 1" 1, -0" REVIEWED FOR CODE COMPLIANCE APPROVED MAY 13 2 (113 City of Tukw ila BUILDING DIVISION ROUTE PIPING ABOVE DROP CEILING OR WITHIN WALL 1/2" ROUTE PIPING ABOVE DROP CEILING OR T TRAP PRIMER TRAP PRIMER LINE TO FD -1 3 4' 1 -1/2' 2" VTR - OFFSET AT ROOF L TO AVOID STANDING SEAM --t P -3 3 "FC0 • 2" 2 "FD • 6 "C0 • 6" TO SANITARY SEWER WARMING ROOM 602 WASTE & VENT RISER NO SCALE MV -R1 THERMOSTATIC MIXING VALVE SET AT 115'F EXPANSION TANK DET -R1 n 1/2" 3/4 "— HB WARMING ROOM 602 PIPING DIAGRAM NO SCALE V WH -R1 SET AT 1 0'F 11 \.•••" MV -R2 ANSI APPROVED MIXING VALVE SET AT 80'F EW -1 3/4" RELIEF TO EXTERIOR -1/4" BUILDING WATER SUPPLY R10 RIGID INSULATION UNDER. WATER HEATER W/ 3/4" FIRE TREATED PLYWOOD TOP AND SIDES. M(.2..(61&9 RL 1 t; CITY OF TUKVI,T1 DEC 1' 8` 2012 PERMIT CENTER 1- 800 -424 -5555 LNS DRAWN NBD 6/10/10 JAR LNS FINAL ISSUED FOR CITY OF TUKWILA PERMITS 1/8/10 JAR LNS MODIFICATIONS SUBSEQUENT TO PERMIT APPLICATION VERIFY SCALE BAR IS ONE INCH ON ANSI "D" DRAWING 0 1 ". 1/8/10 JAR LNS RESPONSE TO CITY OF TUKWILA CORRECTION LETTERS 7/31/09 JAR LNS ISSUED FOR CITY OF TUKWILA PERMITS REV DATE CHK'D APP'D REVISION DESCRIPTION Ding County Department of Natural Resources and Parks Solid Waste Division LNS LNS ENGINEERS, INC. 7713 PIONEER WAY • SUITE 0 GIG HARBOR, WASHINGTON 98335 PHONE: 253.851.5175 BOW LAKE RECYCLING AND TRANSFER STATION SITE FACILITIES CONTRACT RECYCLING BUILDING HVAC & PLUMBING PLANS AND PIPING DIAGRAM PROJECT NUMBER: C00405C09 SHT. OF: 532 619 DRAWING NUMBER: M401