Loading...
HomeMy WebLinkAboutPermit M12-197 - SHOWALTER MIDDLE SCHOOLSHOWALTER MIDDLE SCHOOL 4628 S 144 ST M12 -197 City ("Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206-431-3670 Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov MECHANICAL PERMIT Parcel No.: 1523049164 Address: 4628 S 144 ST TUKW Project Name: SHOWALTER MIDDLE SCHOOL Permit Number: M12 -197 Issue Date: 01/03/2013 Permit Expires On: 07/02/2013 Owner: Name: TUKWILA SCHOOL DISTRICT Address: 4640 S 144TH ST , TUKVVILA WA 98168 Contact Person: Name: MARK HANKIN Address: PO BOX 24567 , SEATTLE WA 98124 Email: MARKHAN @MCKINSTRY.COM Contractor: Name: MCKINSTRY CO LLC Address: PO BOX 24567 , SEATTLE WA 98124 Contractor License No: MCKINCL942DW Phone: 206 - 832 -8104 Phone: 206 762 -3311 Expiration Date: 03/16/2014 DESCRIPTION OF WORK: INSTALLATION OF HI- EFFICIENCY SERVER ROOM AC UNIT Value of Mechanical: $8,178.00 Type of Fire Protection: UNKNOWN Electrical Service Provided by: Permit Center Authorized Signature: Fees Collected: $293.81 International Mechanical Code Edition: 2009 „Di, '4, Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or the • erformance of work. I am authorized to sign and obtain this mechanical permit and agree to the conditions on the back of this pe Signature: Print Name: Date: i "5/ `3 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. rinr. IMr. -4/10 M17 -197 Printeut 01 -03 -9013 PERMIT CONDITIONS Permit No. M12-197 1: ** *BUILDING DEPARTMENT CONDITIONS * ** 2: No changes shall be made to the approved plans unless approved by the design professional in responsible charge and the Building Official. 3: All permits, inspection records, and approved plans shall be at the job site and available to the inspectors prior to start of any construction. These documents shall be maintained and made available until final inspection approval is granted. 4: Readily accessible access to roof mounted equipment is required. 5: All construction shall be done in conformance with the approved plans and the requirements of the International Building Code or International Residential Code, International Mechanical Code, Washington State Energy Code. 6: Manufacturers installation instructions shall be available on the job site at the time of inspection. 7: All electrical work shall be inspected and approved under a separate permit issued by the City of Tukwila Building Department (206 -431- 3670). 8: VALIDITY OF PERMIT: The issuance or granting of a permit shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the building code or of any other ordinances of the City of Tukwila. Permits presuming to giveiauthority to violate or cancel the provisions of the code or other ordinances of the City of Tukwila shall not be valid. The issuance of a permit based on construction documents and other data shall not prevent the Building Official from requiring the correction of errors in the construction documents and other data. Inn. IMC -4/1(1 i M12 -197 Printari. M -fl -9(113 • CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 http://www.TukwilaWA.gov • Mechanical Permit No. Project No. Date Application Accepted: Date Application Expires: (For office use only) MECHANICAL PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *please print ** SITE LOCATION King Co Assessor's Tax No.: 152304 -9108 Site Address: 4628 South 144th Street Suite Number: Floor: New Tenant: ❑ Yes ® ..No Tenant Name: Showalter Middle School PROPERTY OWNER Name: Mark Hankin Name: Tukwila School District City: Seattle State: WA zip: 98124 Address: 4640 South 144th Street Email: markhan @mckinstry.com City: Tukwila State: WA Zip: 98168 CONTACT PERSON — person receiving all project communication Name: Mark Hankin Address: p0 24567 City: Seattle State: WA zip: 98124 Phone: (206) 832 -8104 Fax: Email: markhan @mckinstry.com MECHANICAL CONTRACTOR INFORMATION Company Name: McKinstry Co. Address: PO Box 24567 City: Tukwila State: WA Zip: 98168 Phone: (206) 762 -3311 Fax: Contr Reg No.: MCKINCL942DW Exp Date: 03/16/2014 Tukwila Business License No.: BUS - 0101413 Valuation of project (contractor's bid price): $ 8,178 Describe the scope of work in detail: Installation of Hi- Efficiency Server Room AC unit Use: Residential: New ❑ Replacement ❑ Commercial: New ® Replacement ❑ Fuel Type: Electric Gas ❑ Other: H :VApplicauons\Fortns- Applications On Line \2011 Apphcanons\Mechanical Pernut Application Revised 8 -9 -1 I.docx Revised: August 2011 bh Page 1 of 2 Indicate type of mechanical work being installed and the quantity below: Unit Type Qty Furnace <100k btu Furnace >100k btu Floor furnace Suspended/wall/floor mounted heater Appliance vent Repair or addition to heat/refrig/cooling system Air handling unit 1 <10,000 cfm ` Unit Type Qty, Air handling unit >10,000 cfm Evaporator cooler Ventilation fan connected to single duct Ventilation system Hood and duct Incinerator — domestic Incinerator — comm/industrial Unit Type Qty Fire damper Diffuser Thermostat Wood /gas stove Emergency generator Other mechanical equipment Boiler /Compressor Qty 0 -3 hp /100,000 btu 3 -15 hp /500,000 btu 15 -30 hp /1,000,000 btu 30 -50 hp /1,750,000 btu 50+ hp /1,750,000 btu PERMITAPPLICATION NOTES Value of construction — in all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the permit center to comply with current fee schedules. Expiration of plan review — applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The building official may grant one extension of time for additional periods not to exceed 90 days each. The extension shall be requested in writing and justifiable cause demonstrated. Section 105.3.2 International Building Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING 0 Signature: Print Name: UTHORIZED AGENT: Mark Hankin Mailing Address: PO Box 24567 H:\Applicanons\Forms- Applicanons On lane \2011 Applications\Mechanical Permit Application Revised 8 -9 -1 Ldocx Revised: August 2011 bh Date: l / 2- Day Telephone: (206) 83 ; -8114 Seattle City WA State 98124 Zip Page 2 of 2 • J1 L4 a City of Tukwila ,f,-,10 � Department of Community De velo P ment - �' t7 6300 Southcenter Boulevard, Suite #100 P- 61i Tukwila, Washington 98188 / Phone: 206-431-3670 Fax: 206-431-3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 1523049164 Permit Number: M12 -197 Address: 4628 S 144 ST TUKW Status: PENDING Suite No: Applied Date: 12/19/2012 Applicant: SHOWALTER MIDDLE SCHOOL Issue Date: Receipt No.: R12 -03349 Payment Amount: $293.81 Initials: WER Payment Date: 12/19/2012 02:24 PM User ID: 1655 Balance: $0.00 Payee: MCKINSTRY CO TRANSACTION LIST: Type Method Descriptio Amount Payment Check 12321 293.81 Authorization No. ACCOUNT ITEM LIST: Description Account Code Current Pmts MECHANICAL - NONRES PLAN CHECK - NONRES 000.322.102.00.00 235.05 000.345.830 58.76 Total: $293.81 rinr.• RPCPint -f1R PrintPrl• 17- 1Q -7f117 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO: CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 Project: c. t 4 C., t.pJ at LTg1? S I' A Wt Type of Inspection: _ Roc,iec, . • 1;- s--1-" Address: `-i Ga. B S 1141-.1 `31- Date Called: •" Special Instructions: Date Wanted:. b— 3 0— 1 : -. `a.m.. p.m. Requester: Phone No: 0)„ 0(_ -2 5,5- — 43(5 . Approved per applicable codes. Corrections required prior to approval. COMMENTS: („,04:6 r,, ( , ?, c",- ;.[-SV SL t LA-710,A) ` l t� ` t w. 1 . _ . to (- (c l 1- tnspe or: Date: REIN PECTION FEE REQUIRED. Prior paid 6300 Southcenter Blvd.. Suite 100. next inspection.'fee must;be = Call to schedule.reinspection. • • pE T CO D COPY PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: M12 -197 DATE: 12 -19 -12 PROJECT NAME: SHOWALTER MIDDLE SCHOOL SITE ADDRESS: 4628 S 144 ST X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # After Permit Issued DEPARTMENTS: t3u Ii ding ivision Public Works ❑ Aw■ NIN 1(1-m.1-4. l 1- Fire Prevention Structural ❑ Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 12 -20 -12 Complete Incomplete Not Applicable n Comments: Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES/THURS ROUTING: Please Route Structural Review Required REVIEWER'S INITIALS: ❑ No further Review Required DATE: APPROVALS OR CORRECTIONS: DUE DATE: 01 -17 -13 Approved n Approved with Conditions E4 Not Approved (attach comments) ❑ Notation: REVIEWER'S IN TIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 Contractors or Tradespeople titer Friendly Page • General /Specialty Contractor A business registered as a construction contractor with L &I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name MCKINSTRY CO LLC UBI No. 602569922 Phone 2067623311 Status Active Address Po Box 24567 License No. MCKINCL942DW Suite /Apt. License Type Construction Contractor City Seattle Effective Date 3/16/2006 State WA Expiration Date 3/16/2014 Zip 98134 Suspend Date County King Specialty 1 General Business Type Limited Liability Company Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status LYDIGML901JL LYDIG + MCKINSTRY LLC Construction Contractor General Unused 4/13/2010 4/13/2014 Active WESTVI *121RF WESTVENT INC Construction Contractor General Unused 12/6/1988 9/1/1994 Archived MCKIN* 372ND MCKINSTRY CO Construction Contractor General Unused 8/20/1963 1/2/2008 Re Licensed Business Owner Information Name Role Effective Date Expiration Date PEDERSEN, JAMIE D Agent 03/16/2006 Bond Amount ALLEN, DEAN CHARLES Partner /Member 03/16/2006 929519469 MOORE, DOUGLAS JAMES Partner /Member 03/16/2006 ALLEN, DAVID EDWARD Partner /Member 03/16/2006 WESTERN SURETY CO TEPLICKY, JOSEPH WILLIAM Partner /Member 03/16/2006 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 3 Western Surety Co 929519469 03/01/2011 Until Cancelled 01/23/2012 $12,000.0002/24 /2011 2 WESTERN SURETY CO 929511574 09/09/2010 Until Cancelled $12,000.0009/02 /2010 1 TRAVELERS CAS & SURETY CO 104702039 01/03/2006 Until Cancelled 03/01/2011 $12,000.00 03/16/2006 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 6 Zurich American Ins Co GLA 3999903 01/31/2013 01/31/2014 $2,000,000.00 01/02/2013 5 Zurich American Ins Co GLA-3999903 01/31/2012 01/31/2013 $2,000,000.00 12/16/2011 4 ZURICH AMERICAN INS CO GLA3999903 01/31/2011 01/31/2012 $2,000,000.00 12/20/2010 3 ZURICH AMERICAN INS CO CP0399990301 01/31/2009 01/31/2011 $2,000,000.0012 /07/2009 2 CP03999903 01/31/2008 01/31/2009 $2,000,000.00 01/31/2008 https://fortress.wa.gov/lniibbip/Print.aspx 01/03/2013 \ \MCKINSTRY \SEATTLE \SPG \SPG JOBS \ENGINEERING - SPG \SPG SALES PROPOSALS \ALIREZA SADIGH \TUKWILA SCHOOL DISTRICT \80098 \DRAFTING \DWG'S \MO PIPING & PLUMBING SYMBOLS & ABBREVIATIONS CD CDS - -- --CDR - -- --CHR -CHS C FITTINGS -D DN -+o UP I- DN -+oi- UP ] CAP 1 WCO FCO EQUIPMENT Q - u COND CDS CDR CHR CHS CW G HW HWC HWR HWS RL RS V V W ELBOW DOWN ELBOW UP TEE DOWN TEE UP PIPE CAP BREAK SYMBOL WALL CLEANOUT FLOOR CLEANOUT PUMP SHOCK ARRESTOR FLOW SWITCH FLOW METER PRESSURE GAUGE EXPANSION TANK Y- STRAINER CONDENSATE DRAIN PIPE CONDENSER WATER SUPPLY CONDENSER WATER RETURN CHILLED WATER RETURN CHILLED WATER SUPPLY COLD WATER NATURAL GAS HOT WATER HOT WATER RECIRC HOT WATER RETURN HOT WATER SUPPLY REFRIGERANT LIQUID LINE REFRIGERANT SUCTION LINE VENT ABOVEGROUND VENT UNDER GROUND WASTE ABOVE GROUND WASTE UNDER GROUND SLOPE -Di- FLOW DIRECTION - fl---a- REDUCER; INCREASER -- UNION --�- FLANGE -es- FLEX CONNECTION MOTOR VALVE PRESSURE REDUCING VALVE CONTROL VALVE RELIEF VALVE BALL VALVE GATE VALVE BUTTERFLY VALVE CHECK VALVE SPRING LOADED CHECK VALVE FD • RD Q OFD FS 0 11!11 AIRVENT AUTO AIRVENT MANUAL THERMOMETER PIPE SLEEVE FLOOR DRAIN ROOF DRAIN OVERFLOW DRAIN FLOOR SINK 3 -WAY MOTOR VALVE 3 -WAY GATE VALVE DIAPHRAGM VALVE PLUG VALVE ANGLE GLOBE VALVE NEEDLE VALVE BALANCING VALVE HOSE BIBB GENERAL NOTES: 1. VERIFY LOCATIONS AND DIMENSIONS OF ALL EQUIPMENT AND COORDINATE ALL WORK PRIOR TO START OF CONSTRUCTION. 2. OBTAIN APPROVAL OF STRUCTURAL ENGINEER PRIOR TO INSTALLATION OF PENETRATIONS NOT PREVIOUSLY COORDINATED OR AGREED UPON, I.E. ANCHOR BOLT DEPTHS, ETC. • CONCRETE EQUIPMENT CURBS, PIPING RAT SLABS, SUMP BASINS, AND HOUSEKEEPING PADS ARE SHOWN FOR APPROXIMATE LOCATION AND SIZE AND ARE TO BE PROVIDED BY THE GENERAL CONTRACTOR. WHERE PROVIDED, REFER TO STRUCTURAL INFO FOR ADDm0NAL DETAILS. 4. COMPLETION AND COMMISSIONING FOR MECHANICAL SYSTEMS: A. PROVIDE RECORD DRAWINGS OF THE ACTUAL INSTALLATION TO THE OWNER (PER 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.3.4.2) B. PROVIDE TO THE OWNER ALL NECESSARY SYSTEMS DOCUMENTATION . (PER 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.3.4.1) C. BALANCE ALL HVAC SYSTEMS AND PROVIDE TO THE OWNER A WRITTEN BALANCING REPORT (PER 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.3.2) D. SYSTEMS /EQUIPMENT /CONTROLS FUNCTIONAL TESTING SHALL BE PERFORMED IN ACCORDANCE WITH APPROVED PLANS (PER 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.3.3). E. PERFORMANCE OF ALL NEW BUILDING MECHANICAL SYSTEMS WILL COMPLY WITH OR EXCEED THE MINIMUM REQUIREMENTS AS SET FORTH IN THE 2009 SEATTLE SUPPLEMENT TO THE 2009 WASHINGTON STATE ENERGY CODE SECTION 1410 - GENERAL REQUIREMENTS. 5. MINIMUM VENTILATION QUANTITIES WILL COMPLY WITH OR EXCEED THE 2009 INTERNATIONAL MECHANICAL CODE 6. ALL MOTORS WILL COMPLY WITH CHAPTER 15 OF THE 2009 WASHINGTON STATE ENERGY CODE. FOR ADDRIONAL DETAILS, SEE EQUIPMENT SCHEDULES CONTAINED WITHIN THIS DRAWING SET. 7. ALL SYSTEMS WILL BE INSULATED AS PRESCRIBED IN CHAPTER 14, TABLE 14 -5 OF THE 2009 WASHINGTON STATE ENERGY CODE. FOR ADDft1ONAL DETAILS, SEE DUCTWORK AND PIPING SPECIFICATION MATRICES CONTAINED WITHIN THIS DRAWING SET. 8. VERIFY THAT ALL NECESSARY INFORMATION HAS BEEN PROVIDED PRIOR TO CONNECTION OF EQUIPMENT FURNISHED BY THE OWNER OR OTHERS. 9. FOR ADDTiIONAL SYSTEM AND EQUIPMENT SEISMIC REQUIREMENTS, REFER TO STRUCTURAL INFORMATION (WHERE PROVIDED) AND PROJECT SPECIFIC SEISMIC DESIGN INFORMATION SHEET CONTAINED WITHIN THIS DRAWING SET. 10. REFER TO CML DRAWINGS FOR UTILITY WORK 5' -0" BEYOND THE BUILDING UNE 11. ALL WORK SHALL BE NEW AND PROVIDED UNDER THIS CONTRACT UNLESS SPECIFICALLY MARKED AS EXISTING, EXIST, OR (E). AIR HANDLING UNIT SCHEDULE (SPLIT SYSTEM INDOOR UNIT) TAG `# FC-1 BASIS OF DESIGN MANUF. Mitsubishi Electric MODEL PKA -A3OKA NOMINAL TONNAGE 2 1/2 MATCHING OUTDOOR UNIT CU -1 AREA SERVED Media Rm.A161 TOTAL COOLING BTUH 30,000 SENSIBLE COOLING BTUH 24,000 CFM 775 COOLING COIL EAT (DEG F DB l WB) : 85/67 VOLTAGE /:PHASE 208-230 1 1 NUMBER OF REFRIGERANT CIRCUITS 1 CONTROL COOLING ONLY T-STAT EQUIPMENT WEIGHT (LBS) 46 EQUIPMENT DIMENSIONS (LxWxH)' 46"011"x14" CONFIGURATION WALL MOUNT DRAIN TYPE Pumped UNIT STARTER 1 >DISCONNECT/ INTERLOCK BY ELEC; 110 V. SERVICE OUTLET WITHIN '25' BY ELEC. Condensing Unit Schedule (Split System -'Out Door Unit) TAG :# CU-1 BASIS OF DESIGN MANUF. Mitsubishi Electric MODEL PUY- A30NHA3 NOMINAL TONNAGE 21/2 MATCHING INDOOR UNIT FC -1 AREA SERVED Equip. Rm TOTAL COOLING BTUH 30,000 SENSIBLE COOLING BTUH 24,000 SEER 15.5 SEER CODE MTV; 13 VOLTAGE/PHASE 208-230/1 ph FACTORY SUPPLIED REFRIGERANT R410A EQUIPMENT DIMENSIONS (HxWxD) 37 1x13 "x37" EQUIPMENT WEIGHT (LBS) 163 AMBIENT OPERATION. TO 0 DEG F NONE UNIT STARTER / DISCONNECT/ INTERLOCK BY ELEC. UNITHOUSEKEEPING PAD NONE 1.10 V. SERVICE OUTLET WITHIN 25' BY ELEC. LEGAL DESCRIPTION: W 500 FT OF S 629.84 FT OF SE 1/4 OF SE 1/4 & S- 1/2 OF SW 1/4 OF SE 1/4 LESS W 190 FT OF E 565 FT OF S 320 FT LESS CO RDS- PARCEL 11: 152304 -9108 Q(Ovn V� con �IGV A�V' Orvi 60;6( ckki ON) 4 G-Adt r 1� Q I st C w/h cstA. 2a°1 REVIEWED FOR CODE COMPLIANCE APPROVED DEC 2 8 2012 1, City of 'la BUILDIN VISION VICINITY MAP ID, HVAC PIPING SPECIFICATION (MEG); LATEST kLVISIUN: 1- 1V -lu11 PIPING SYSTEM TEMP RANGE ID CATEGORY SERVICE DESCRIPTION MANUFACTURER, PRODUCT OR EQUAL PRESSURE TEST PROCEDURE SEISMIC INSULATION MEDIA TEST PRESSURE DURATION CODE IMPORTANCE i COND CONDENSATE PIPING TO DRAIN HVAC CONDENSATE DRAIN SLOPE TO INDIRECT WASTE N/A WATER PLUGS & FILL MIN 15 MINUTES; VISUAL CHECKS FOR LEAKS 2006 UPC, SECTION 723.0 1.0 VARIES NORMAL OPERATING PRESSURE ATMOSPHERIC CONDENSATE DRAINS ALL 0.23 -0.27 75 MATERIAL SIZES THRU 3" COPPER TUBE TYPE L ASTM B88 PER SUBMITTAL JOINTS ST; THREADED AT SPECIALTIES AS APPLICABLE W PER SUBMITTAL FITTINGS W WROT COPPER/BRONZE ST JOINT PER SUBMITTAL FLANGES, UNIONS, & COUPLINGS CLASS 150 CAST BRASS / WROT COPPER PER SUBMITTAL REF REFRIGERANT PIPING REFRIGERANT PIPING FOR HEATING AND COOLING NITROGEN 1.5 TIMES MAX OPERATING PRESSURE, BUT NOT LESS THAN 100 PSI 1 HOUR )0)00( 1.0 PER W.S.E.0 SEE INSULATION SCHEDULE NORMAL OPERATING PRESS & TEMP: UP TO 100 PSI; F TO F; SET RELIEF TO )00( PSI PIPE MATERIAL SIZES THRU 3 " COPPER TUBE ACR/MED TYPE L ASTM B88 PER SUBMITTAL JOINTS SILVER BRAZED NITROGEN PURGE PER SUBMITTAL FITTINGS WROT COPPER/BRONZE SWT JOINT PER SUBMITTAL SPECIALTIES MISC. PROJECT SPECIFIC REQUIREMENTS AIR 150% OF 1/2 HOUR PER 500 2006 IFGC, 1.5 NA PIPE & EQUIPMENT INSULATION SCHEDULE PIPING SYSTEM TEMP RANGE THERMAL CONDUCTANCE MEAN RATING TEMPERATURE INSULATION MATERIAL INSULATION THICKNESS BY PIPE SIZE INSUL. Runouts to 2" 3/4" or Less 1" to <1 -1/2" 1 -1/2" to <4" 4" to <8" 8" or Larger HANGERS REFRIGERANT SUCTION ALL 0.27 -0.276 75 CLOSED CELL N/A 0.38 in 0.50 in 0.50 in 0.75 in 0.75 in NOTES 3 & 4 CONDENSATE DRAINS ALL 0.23 -0.27 75 FIBERGLASS 0.50 in 0.50 in 0.50 in 0.50 in 1.00 in 1.00 in NOTES 1, 2, & 4 NOTES 1 FOR PIPING CLAMPED TO UNISTRUT SUPPORTS, UTILIZE RIGID INSERTS WITH SHEETMETAL SHIELDS CONTINUOUS THROUGH THE HANGER; UTILIZE CALCIUM SILICATE INSERTS OR STYRENE INSERTS 2 FOR PIPING SUPPORTED FROM CLEVIS HANGERS, IF RIGID INSERTS ARE NOT UTILIZED THE INSULATION SHALL FULLY ENCLOSE THE HANGER AND BE SEALED AT THE TOP AROUND THE SUPPORT ROD; IF RIGID INSERTS ARE UTILIZED THE INSULATION SHALL BE CONINUOUS THROUGH THE HANGER; INSERT MATERIAL TO BE CALCIUM SILICATE INSERTS OR STYRENE INSERTS 3 UTILIZE RIGID INSERTS AND SHEETMETAL SHIELDS; INSULATION TO BE CONTINUOUS THROUGH THE HANGER; UTILIZE CALCIUM SILICATE INSERTS OR STYRENE INSERTS . 4 JACKETING: METAL JACKETING (SEALED WEATHER TIGHT) WILL BE APPLIED ON ALL EXTERIOR INSULATION EXPOSED TO WEATHER (I.E. ROOFTOP PIPING). PVC JACKET WITH RIGID INSULATION WILL BE USED INDOORS ON HORIZONTAL PIPING AT OR NEAR THE FLOOR WHEN SUBJECT TO POTENTIAL FOOT TRAFFIC. PVC JACKETING WILL BE UTILIZED ON ALL EXPOSED INSULATION WITHIN 6 FEET OF THE FLOOR ELEVATION (I.E. MECHANICAL ROOMS AND GARAGE HOSE BIBBS); PVC IS RECOMMENDED INSTEAD OF METAL IN EXPOSED AREAS DO TO ITS RESILIENCY- METAL JACKETING WILL DENT AND REMAIN DEFORMED WHEREAS PVC WILL POP BACK TO ORIGINAL CONDITION No changes shall be mad® to the of work without prior approval of Tukwila Building Division. NOTE: Revisions will require a new plan subnVItal and may include additional plan review fees. SEPARATE PERMIT REQUIRED FOR: ci Mechanical rqt� Electrical �w Plumbing a, Gas Piping City of Tukwila BUILDING DIVISION 5/8" & 3/8" REFRIGERATION PIPING TO CU -1 ON ROOF (FIELD VERIFY) 3/4" PUMPED CONDENSATE TO ROOF LIBRARIAN'S OFFICE A158 1 s PARTIAL FLOOR PLAN -HVAC SCALE: vas = 1' -0" � I !. ,, --CAS VTR ATTACH CONDENSING UNIT TO ROOF 1 2" RD & OFD 5/8" & 3/8" REFRIGERATIO PIPING TO SERVER ROOM (INSULATED) ,1- 3/4" CONDENSATE TO INDOOR UNIT CU -1 CU --A03' 2" RD & OFD 3" RD & OFD (TYP. U PARTIAL ROOF PLAN -HVAC • SCALE: 1/8" = 1' -0" PROJECT: instry ife Of Your Building SEATTLE: 5005 3RD AVENUE S PO BOX 24567 SEATTLE, WA 98124 1- 800 - 669 -6223 PORTLAND: 16790 NE MASON ST PORTLAND, OR 97230 503 -331 -0234 www.mckinstry.com SCHOWALTER MIDDLE SCHOOL 4628 SOUTH 144TH STREET TUKWILA, WASHINGTON 98168 REGISTRATION: FILE COPY nNo.. MD_ Phi► review a •.,. • i �x is Approval of con rtc violation of any d approved to ard Ions. does not authcrlis Recaipt .• :• •aj;► ISSUES: - 12/17/12 MECHANICAL PERMIT NO. DATE McKINSTRY DIVISION: DESIGNED BY: DRAWN BY: CHECKED BY: JOB NUMBER: DATE: SCALE: SHEET TITLE: DESCRIPTION SPG ENGINEERING MH LC AS 80098 12/17/12 AS SHOWN LEGEND, ABBREVIATIONS GENERAL NOTES, MECHANICAL AND HVAC PLAN SHEET NUMBER: Ml-il97 Mo. RECEIVED CITY OF TUKWILA DEC 19 2012 0 ERMIT CENTER