Loading...
HomeMy WebLinkAboutPermit PG12-013 - NATIONAL UNIVERSITYNATIONAL UNIVERSITY 152 SOUTHCENTER MALL PG12 -013 City okukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -43 1 -3670 Inspection Request Line: 206 -431 -2451 Web site: http: / /www.TukwilaWA.gov PLUMBING /GAS PIPING PERMIT Parcel No.: 9202470010 Address: 152 SOUTHCENTER MALL TUKW Project Name: NATIONAL UNIVERSITY Permit Number: PG12 -013 Issue Date: 05/11/2012 Permit Expires On: 11/07/2012 Owner: Name: WESTFIELD PROPERTY TAX DEPT Address: PO BOX 130940 , CARLSBAD CA 92013 Contact Person: Name: LESLIE LOMBARD Address: 3701 WILSHIRE BL, STE 414 , LOS ANGELES CA 90010 Email: LESLIEL @URBAN - CONCEPTS.COM Contractor: Name: WILLIAMS MECHANICAL INC Address: 3903 SMITH AV , EVERETT WA 98201 -4549 Contractor License No: WILLIMI088PA Phone: 323 966 -2610 Phone: 425 303 -0828 Expiration Date: 10/01/2013 DESCRIPTION OF WORK: INSTALLATION OF NEW SINK, HOSE BIB, TOILET ROOM FIXTRES, WATER HEATERS, AND PIPING TO THESE FIXTURES. Value of Plumbing /Gas Piping: Fees Collected: Electrical Service Provided by: Permit Center Authorized Signature: $4,000.00 $206.06 Uniform Plumbing Code Edition: 2009 International Fuel Gas Code Edition: 2009 LUrra Date: I hereby certify that I have read and examined this permit and know the same to be true and correct. All provisions of law and ordinances governing this work will be complied with, whether specified herein or not. The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating construction or • - - - - • ance of wor . I am . • thorized to sign and obtain this plumbing /gas piping permit and agree to the conditions on the bac Signature: Print Name. w pk-K2 This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. this permit. Date: SIN ( doc: UPC -4/10 PG12 -013 Printed: 05 -11 -2012 PERMIT CONDITIONS Permit No. PG12-013 1: ** *PLUMBING AND GAS PIPING * ** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R -3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor /ceiling assemblies and fire - resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: All new plumbing fixtures installed in new construction and all remodeling involving replacement of plumbing fixtures and fittings in all residential, hotel, motel, school, industrial, commercial use or other occupancies that use significant quantities of water shall comply with Washington States Water Efficiency and Conservation Standards in accordance with RCW 19.27.170 and the 2006 Uniform Plumbing Code Section 402 of Washington State Amendments. 13: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. doc: UPC -4/10 PG12-013 Printed: 05 -11 -2012 CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd., Suite 100 Tukwila, WA 98188 htto://www.TukwilaWA.gov Plumbing/Gas Permit No. Project No. Date Application Accepted: Date Application Expires: (For office use only) PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION King Co Assessor's Tax No.: 'Y597000245 Site Address: Southcenter Mall Suite Number: 612 Floor: 1 Tenant Name: National University PROPERTY OWNER Name: Leslie Lombard Name: Westfield, LLC City: Los Angeles State: CA Zip: 90010 Address: 11602 Wilshire Blvd. 1 lth Floor Email: lesliel @urban - concepts.com City: Los Angeles State: CA Zip: 90025 CONTACT PERSON — person receiving all project communication Name: Leslie Lombard Address: 3701 Wilshire Blvd. Ste. 414 City: Los Angeles State: CA Zip: 90010 Phone: (323) 966 -2610 Fax: Email: lesliel @urban - concepts.com New Tenant: 0 Yes ❑ .. No PLUMBING CONTRACTOR INFORMATION Company Name: Address: City: State: Zip: Phone: Fax: Contr Reg No.: Exp Date: Tukwila Business License No.: Valuation of Project (contractor's bid price): $ 1- 1 t 000 Scope of Work (please provide detailed information): Installation of new sink, hose bib, toilet room fixtures, water heaters, and piping to these fixtures. Building Use (per Int'1 Building Code): Occupancy (per Int'l Building Code): Utility Purveyor: Water: office B H:1ApphcationsWornts- Applications On Line \20I1 Applications\Plumbing Permit Application Revised 8 -9 -1 I.doc, Revised: August 2011 bh Sewer: Page 1 of 2 • • Indicate type of plumbing fixtures and/or gas piping outlets being installed and the quantity below: Fixture Type Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain 1 Shower, single head trap 1 Sinks 1 Rain water system — per drain (inside building) 2 Grease interceptor for commercial kitchen ( >750 gallon capacity) Each additional medical gas inlets/outlets greater than 5 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections (1 -5) Fixture Type Qty Bidet Drinking fountain or water cooler (per head) 1 Lavatory 1 Urinal Water heater and/or vent 2 Repair or alteration of water piping and/or water treatment equipment Backflow protective device other than atmospheric - type vacuum breakers 2 inch (51 mm) diameter or smaller Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial 1 Wash fountain Water closet Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 nun) diameter Gas piping outlets Fixture Type Qty Dental unit, cuspidor Floor drain 1 Receptor, indirect waste Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1 -5 inlets/outlets for a specific gas Each lawn sprinkler system on any one meter including backflow protection devices PERMIT APPLICATION NOTES - Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center to comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING OWN R R AUTHORIZED AGENT: Signature: Print Name: Leslie Lombard Date: - II Day Telephone: (323) 966 -2610 Mailing Address: 3701 Wilshire Blvd. Ste 414 Los Angeles CA 90010 City State Zip H:Wpplications\Forms- Applications On Line \201 I Applications\Plumbing Permit Application Revised 8 -9 -1 I.docx Revised: August 2011 bh Page 2 of 2 City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -43 1 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 9202470010 Permit Number: PG 12 -013 Address: 152 SOUTHCENTER MALL TUKW Status: APPROVED Suite No: Applied Date: 01/25/2012 Applicant: NATIONAL UNIVERSITY Issue Date: Receipt No.: R12 -01542 Initials: User ID: WER 1655 Payment Amount: $164.85 Payment Date: 05/10/2012 09:32 AM Balance: $0.00 Payee: SCOTT BROOKS TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 113700 ACCOUNT ITEM LIST: Description 164.85 Account Code Current Pmts PLUMBING - NONRES 000.322.103.00.00 164.85 Total: $164.85 doc: Receiot -06 Printed: 05 -10 -2012 Ciff of Tukwila. • Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 -431 -3670 Fax: 206-431-3665 Web site: http: //www.ci.tukwila.wa.us SET RECEIPT RECEIPT NO: R12 -00253 Initials: JEM Payment Date: 01/25/2012 User ID: 1165 Total Payment: 170.39 Payee: LESLIE LOMBARD SET ID: S000001681 SET NAME: Tmp set/Initialized Activities SET TRANSACTIONS: Set Member Amount EL12 -0062 M12 -012 PG12 -013 TOTAL: 70.42 58.76 41.21 70.42 TRANSACTION LIST: Type Method Description Amount Payment Credit C VISA 170.39 TOTAL: 170.39 ACCOUNT ITEM LIST: Description Account Code Current Pmts ELECTRICAL PLAN - NONRES 000.345.832.00.0 PLAN CHECK - NONRES 000.345.830 70.42 99.97 TOTAL: 170.39 INSPECTION RECORD Retain a copy with permit PERMIT NO. INSPECTION NO. CITY OFTUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 r`, (206) 431 -367 Permit Inspection Request Line (206) 431. -2451 P6. 17 -61, Project: Type of Inspection: Address: Date Called: Special Instructions: Date W//anted::a 075 Requester: Phone No: SApproved per applicable codes. a Corrections required prior to approval. Cr' COMMENTS: Post;-t" l law? /F ' //-%;kie Date 2 5- /p REINSP ` CTION FEE REQUIRED. for to r xt inspection, fee must be paid • 6300 Southcenter Blvd.. Suit 100: Call to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO... . PERMIT NO.0 CITY. OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 9688 (206) 431 -367 Permit Inspection Request Line (206) 431 -2451 P6(2_0(3 P,ro ect , ki , �n LAI JO'S. Type. f Inspection: k L G et 11-4'013, Address:. . i . (( 1` Date Called: _ Special :Instructions: _: Date Wanted : ( . G r� ' a.m. _ 1 �p.m. Requester: Phone No: / 0 2 - (004 --- i S39 Approved per applicable codes. Corrections required prior to approval. COMMENTS:_ ki (4,1f- Inspector: k Dater REINSPECTION FEE REQUIRED. Prior to next inspection. fee must be paid at.6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection. INSPECTION RECORD R tain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 12_1(206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 % Project: tI Arl Z)1%1 Ai ?.J t.IL1, .if D.1-11-1 Type of Inspection: t.c.i IA — T ?1 t vs14 t rV C. Address: l-52. -A►-k lac∎- hl4e,r VOA l 1 bate Called: `---.1 Special Instructions: Date Wanted:. -5 - z-0- ca._ Vim: "1:1:m: Requester: / Phone No: Approved per applicable codes. L Corrections required prior to approval. COMMENTS:' p J } j () cc \ —>1\1 l/tt1;t�ZtS \� tove2A 0 k (10.1-7k ULM (AC,, REINS CTION FEE REQUIRE t . Prior to ne inspection, fee must be paid 6300 Southcenter Blvd., Suite 100. C•ll to schedule reinspection. INSPECTION RECORD Retain a copy with permit INSPECTION NO.. • PERMIT NO. CITY OF TUKWILA BUILDING DIVISION 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 /36/2 --r'/ 3 Project: A/411/ 7 Type of Inspection: oQr3-?/i1,1 Address: Date Called: Special Instructions: - Date Wanted:. _' 1rj _ /2 m) p.m. Requester: Phone No: • y - 755/— ar /5" ' Approved per applicable codes. E Corrections required prior to approval. COMMENTS: Date: RpfNSPECTION FEE R QUIRED. Pri6r to next inspection. fee must be raid at 6300 Southcente Blvd.. 5714 100. Call to schedule reinspection. HERMIT COORD COPY. PLAN REVIEW /ROUTIN -G SLIP ACTIVITY NUMBER: PG12 -013 PROJECT NAME: NATIONAL UNIVERSITY DATE: 01/25/12 SITE ADDRESS: 152 SOUTHCENTERFMALL :. X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued DEPARTMENTS: '^ B i i g ivisiono �— `—�-� iub lic W rk's Fire Prevention Structural Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete 1 Comments: Incomplete DUE DATE: 01/26/12 Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: LETTER OF COMPLETENESS MAILED: TUES/THURS ROUTING: Please Route Structural Review Required n REVIEWER'S INITIALS: No further Review Required DATE: APPROVALS OR CORRECTIONS: Approved Notation: REVIEWER'S INITIALS: Approved with Conditions DUE DATE: 02/23/12 Not Approved (attach comments) DATE: Permit. Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 2 -28 -02 Contractors or Tradespeople Prjier Friendly Page • General /Specialty Contractor A business registered as a construction contractor with L8I to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name WILLIAMS MECHANICAL INC UBI No. 601413863 Phone 4253030828 Status Active Address 3903 Smith Ave License No. WILLIMI088PA Suite /Apt. License Type Construction Contractor City Everett Effective Date 10/1/1992 State WA Expiration Date 10/1/2013 Zip 982014549 Suspend Date County Snohomish Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status WILLIPH136Q4PLUMBING WILLIAMS & HTG INC Construction Contractor Boiler /Steam Fit /Prot Piping Plumbing 11/24/1987 11/19/1992 Archived Business Owner Information Name Role Effective Date Expiration Date WILLIAMS, DEBORAH KAY Agent 09/27/2011 Bond Amount WILLIAMS, BRADLEY PATRICK President 01/01/1980 1977877 WILLIAMS, DEBORAH KAY Secretary 01/01/1980 WILLIAMS, DEBORAH KAY Treasurer 09/27/2011 INS CO OF THE WEST ZUCCARINI, MICHAEL J Agent 01/01/1980 01/01/1980 Bond Information Page 1 of 2 Bond Bond Company Name Bond Account Number Effective Date Expiration Date Cancel Date Impaired Date Bond Amount Received Date 4 CHCE HANOVER INS. 1977877 10/01/2010 Until Cancelled $12,000.0009/15 /2010 3 INS CO OF THE WEST 2271807 10/01/2007 Until Cancelled 10/23/2010 $12,000.00 10/01/2007 2 CBIC 634038 09/30/2001 10/01/2007 $6,000.0009/25/2001 Assignment of Savings Information No records found for the previous 6 year period Insurance Information Insurance Company Name Policy Number Effective Date Expiration Date Cancel Date Impaired Date Amount Received Date 17 CHARTER OAK FIRE INSURANCE COM 4TC00427P552C0F09 09/30/2010 09/30/2012 $1,000,000.0009 /13/2011 16 CONTINENTAL WESTERN INSURANCE CWP2643064 09/30/2007 09/30/2010 $1,000,000.0009 /23/2009 15 CONTINENTAL WESTERN INS CO CWP2643064 09/30/2006 09/30/2007 $1,000,000.00 09/26/2006 14 WEST AMERICAN INS CO BK053242160 09/30/2004 09/30/2007 $1,000,000.00 09/18/2006 https://fortress.wa.gov/lni/bbip/Print.aspx 05/11/2012 PLUMBING EQUIPMENT SCHEDULE SYMBOL SERVICE LOCATION MANUFACTURER REMARKS ROOF DRAINS L -1 BELOW SINK CHRONOMITE M -20L 4160 WATTS = HEATING ELEMENT INSTANT -FLOW MODEL WITH 0.5 GPM FLOW CONTROL, 208/1/60 (FACTORY SET FOR 110 DEGREES) Alk, v ABOVE GRND. BELOW GRND. K5 -I BELOW SINK CHRONOMITE M -30 6.240 WATTS = HEATING ELEMENT INSTANT -FLOW MODEL WITH 1.0 GPM FLOW CONTROL, 208/1/60 (FACTORY SET FOR 110 DEGREES) lWH ( 2 I PIPE MATERIAL SCHEDULE SYMBOL WATER SAN. SEWER SAN. VENT NAT. GAS ROOF DRAINS CONDENSATE DRAINS MATERIAL BUILDING EXTERIOR ABOVE GRND. BELOW GRND. BUILDING EXTERIOR ABOVE GRND. BELOW GRND. ABOVE GRND. BELOW GRND. ABOVE GRND. BELOW GRND. ABOVE GRND. BELOW GRND. I COPPER TYPE 'M' 2.5 - - - - - - LAV 1 - 1 - X COPPER TYPE 'L' - X - - - KITCHEN SINK 1.5 - 1 - 1.8 - - COPPER TYPE 'K' - - X HOSE BIBB 25 - 1 - 25 - - - - CI SOIL PIPE 4 FITTINGS - EXISTING * J ' H a O SCHEDULE 40_ BLK STEEL co C\I Q III x X POLYETHYLENE SCHEDULE 40 . G l • ,- PVC SCHEDULE 40 X MARK DATE DESCRIPTION 12.16.11 PLAN CHECK SUBMITTAL ABS DWV SCHEDULE 40 PROJECT NO: 11145 CAD DWG FILE: PvC DWv SCHEDULE 40 CHK'D BY: COPYRIGHT: SHEET TITLE X P-1 SHEET OF • W / "MG' FITTINGS FILE COPY Permit No., P(.7 Plan review approval is subject to ergs and ondssions, Approval of construction documents does not authorts ntc Volation o f an . , Code tr ordinance. R ipt Of • By —41070/...114611 Pr4a6*'.. Ir City Of Tbkwila BUILDING DIVISION REVIEWED FOR CODE COMPLIANCE APPROVED JAN 3 0 2012 City of BUILDING 'ia VISION WATER SYSTEM DATA SYMBOL F. U. NEW EXISTING DEMO FIXTURES PUB PRI PUB PRI TOT PUB PRI TOT PUB PRI TOT WATER CLOSET 2.5 - I - 2.5 - - - - - - LAV 1 - 1 - 1 - - - - - - KITCHEN SINK 1.5 - 1 - 1.8 - - - - - - HOSE BIBB 25 - 1 - 25 - - - - - - EXISTING w J H a O z co C\I Q III . G l • ,- 2 A ER MARK DATE DESCRIPTION 12.16.11 PLAN CHECK SUBMITTAL PROJECT NO: 11145 CAD DWG FILE: DRAWN BY: JWM CHK'D BY: COPYRIGHT: SHEET TITLE PLUMBING - LEGEND, NOTES & SCHEDULES P-1 SHEET OF FIXTURE UNIT SUB TOTAL NEW = 15 EXISTING = - DEMO = 0 NET FIXTURE UNIT TOTAL CHANGE (NEW - DEMO) FU = 1.5 - 0 = 15 GPM = 6 OTHER WATER REQUIRED (SAME METER) FU = - GPM = - EXIST. WATER REQUIRED (SAME METER) FU = - GPM = - TOTAL WATER REQUIRED (SAME METER) FU = - GPM = - BASED ON INTERNATIONAL PLUMBING CODE 2009 EDITION PLUMBING FIXTURE SCHEDULE SYMBOL FIXTURE MINIMUM BRANCH SIZES (IN.) EQUAL TO MFR. 4 REMARKS CW HW v 5 OR W WC -I WATER CLOSET 4ANDICAPPED 1/2 - 2 4 AMER. STD. w 2235.128US CADET, VITREOUS CHINA, ELONGATED BOWL, LOW CONSUMPTION (1.28 GPF), TANK TYPE, WHITE, IT RIM NIGH, WITH OLSONITE "95 OPEN FRONT SEAT L -1 LAVATORY WALL -HUNG HANDICAPPED 1/2 1/2 1 1/2 2 AMER. STD. *0355.012 LUCERNE, VITREOUS CHINA, WHITE, WITH CONCEALED ARM SUPPORT, CHICAGO NO. 802- 665ABCP SELF-CLOSING FAUCET, CHROME GRID DRAIN, MOUNT AT ADA HEIGHT K5 -1 KITCHEN SINK 1/2 1/2 1 1/2 2 "JUST" ADA COMPLIANT MODEL SBW- 1919 -A -GR (DRAIN HOLE R OR L TO FIT ROUGH PLUMBING) 4- 1-1OLES, PROVIDE: "JUST" NO. 1114 -KS MAIN FAUCET. "BRASSTECH" MODEL 1058 CHROME DECK MOUNTED WATER DISPENSER. PROVIDE "CULLIGAN" PREFERRED MODEL 350 WATER FILTER WITH TEE PIPED TO WATER DISPENSER, COFFEE MAKER AND ICE MAKER MOUNT PER ADA 4 LOCAL CODES. 1-115-1 HOSE BIBB 3/4 - - - ACORN +'8121 -CP, WITH VACUUM BREAKER AND LOOSE REMOVABLE HANDLE CM COFFEE MAKER 3/8 - - - PROVIDE COLD WATER SUPPLY WITH SADDLE VALVE AND BACKFLOW DEVICE MOUNTED AT 44' AFF IM ICE MAKER 3/8 - - - PROVIDE COLD WATER SUPPLY WITH SADDLE VALvE AND BACKFLOW DEVICE MOUNTED AT 44' APP FD -1 FLOOR DRAIN 1/2 - 1 1/2 2 ZURN MODEL Z -415 WITH B- STRAINER AND TRAP PRIMER CONNECTION TP TRAP PRIMER 1/2 - _ _ PRECISION PLUMBING PRODUCTS, INC. TRAP PRIMER VALvE *P-2 WITH ELMDOR ACCESS DOOR. A/C UNIT COOLING COIL DRAIN PAN 2' MINIMUM VENT MN TOTAL STATIC PRESSURE 1' GREATER THAN 1/2 OF FAN TOTAL STATIC PRESSURE CONDENSATE DRAIN TRAP DETAIL (Th2 NO SCALE PLUMBING PLAN CHECK NOTES . AREA SEPARATION WALLS A. ALL PLUMBING PENETRATIONS OF FIRE OR FIRE RESISTIVE ASSEMBLIES WILL BE METAL, LESS THAN OR EQUAL TO 4' DIAMETER, AND WILL BE FIRE STOPPED WITH A MATERIAL COMPLYING WITH THE CURRENT CODES. B. NO RANGE HOOD VENTS, DRYER VENTS, COMBUSTION VENTS OR HEATING DUCTS ARE PERMITTED IN AREA SEPARATION WALLS. ENERGY CONSERVATION (PLUMBING) A. ALL WATER HEATERS/BOILERS SHALL BE LISTED IN TI-4E ENERGY COMMISSION LIST OF APPROVED WATER HEATERS/BOILERS. B. ALL PLUMBING FIXTURES, FAUCETS AND SHOWER HEADS SHALL COMPLY WITH CEC MAXIMUM FLOW REQUIREMENTS (FAUCETS - MAX 22 GPM, URINALS - MAX 1.0 GPF, SHOWERHEAD - MAX 25 GPM). PROVIDE MIXING VALVE AT SHOWER CONTROLS. PROVIDE ULTRA LOW FLUSH TOILETS (MAX 1.6 GPF). C. ALL SERVICE NOT WATER PIPING SHALL BE INSULATED IN ACCORDANCE WITH THE CURRENT ENERGY CODE. D. A MAINTENANCE LABEL 51-IALL BE AFFIXED TO ALL EQUIPMENT AND A MAINTENANCE MANUAL SHALL BE PROVIDED FOR THE OWNER'S USE. THE LABEL SHALL INDICATE ROUTINE MAINTENANCE REQUIRED OR 51-IALL REFERENCE BY NUMBER WHICH OPERATING MANUALS EXPLAIN MAINTENANCE REQUIREMENTS IN GREATER DETAIL. E. ALL EQUIPMENT MUST COMPLY WITH THE STATE OF GEORGIA ENERGY CODE. HEATERS FOR DOMESTIC 140T WATER AND /OR POOLS SHALL MEET THESE REQUIREMENTS. COMPLIANCE CERTIFICATES SHALL BE PROVIDED WITH EQUIPMENT SUBMITTALS. F. ALL LAVATORY FAUCETS IN COMMERCIAL AND INDUSTRIAL BUILDING RESTROOMS SHALL BE SELF - CLOSING TYPE. LAVATORY FAUCETS IN PUBLIC RESTROOMS (OTHER THAN COMMERCIAL AND INDUSTRIAL AREAS) SHALL BE SELF - CLOSING TYPE OR SHALL BE PROVIDED WITH A RESTRICTING DEVICE ON HOT WATER LINE WITH A MAXIMUM RATE OF 05 GPM. MATERIALS A. ALL SANITARY SYSTEM MATERIALS SHALL BE LISTED BY AN APPROVED AGENCY B. BUILDING DRAIN AND VENT PIPING MATERIALS SHALL COMPLY WITH THE CURRENT INTERNATIONAL PLUMBING CODE. 4. HOSE BIBBS A. ALL 140SE BIBB5 SHALL HAVE PERMANENTLY MOUNTED VACUUM BREAKERS. THERMAL EXPANSION REQUIREMENTS A. ALL WATER HEATERS/BOILERS SHALL COMPLY WITH CURRENT IPC CHAPTER 5 6. CROSS CONNECTIONS A. CROSS CONNECTION PROTECTION SHALL BE PROVIDED AT ALL POTABLE WATER SUPPLIED APPLIANCES AND EQUIPMENT. 1. MEDIUM PRESSURE NATURAL GAS A. LABEL MEDIUM PRESSURE NATURAL GAS PIPING EVERY FIVE FEET. 8. CPVC PIPING A. STATE HEALTH 4 SAFETY CODE SECTION 17921.9 BANS THE USE OF CHLORINATED POLYVINYL CHLORIDE (CPVC) FOR INTERIOR WATER SUPPLY PIPING. LEAD FREE FIXTURES A. ALL PIPING AND FIXTURES SHALL BE IN COMPLIANCE WITH WASHINGTON STATE ASSEMBLY BILL. L -1 4 KS I 1/2' CW IN WALL IN -LINE FLOW CONTROL DEVICE 3/8' BRAIDED ST. STEEL FLEXIBLE CONNECTOR No changes shall be made to the scope of work without prior approval of Tukwila Building Division. A MOT:: nevisions will require a new plan submittal R end y include additional plan review fees. I REVISIONS ELECTRIC WATER — 14EATER MOUNTED ON WALL ELECTRICAL WIRING BY ELECTRICAL CONTRACTOR 3 -WAY VALVE (1 INLET, 2 OUTLETS) 1/2' CW SUPPLY IN, 3/S' COMPRESSION FITTINGS TO WH -I 4 TO SINK ELECTRICAL JUNCTION BOX SY ELECTRICAL CONTRACTOR NOTE: SEPARATE PERMIT REQUIRED FOR Mechanical :ate 04asPlumbing Piping City of Tukwila 1B11ILDING DIVISION I. WATER HEATER IS A U.L. LISTED, NON - STORAGE, INSTANTANEOUS HEATER HAVING AN INSIDE DIAMETER NOT GREATER THAN 3' AND DOES NOT REQUIRE A P 4 T RELIEF VALVE OR DRAIN LINE. ELECTRIC WATER HEATER DETAIL REC:tly r CITY OF TU tLA JAN 2,5 2012 PERMIT CENTER NO SCALE 2 -013 space planning + interior design j studio 5580 Warbler Way La jolla, California 92037 ph: 619.977.7152 fx: 858.456.0605 e: jjorgo @san.rr.com LEGEND ABBR SYMBOL DESCRIPTION W ORS co N-- co 0) SOIL OR WASTE PIPING ABOVE GRADE U) W OR 5 SOIL OR WASTE PIPING BELOW GRADE - -- v - - - -- VENT PIPING CW DOMESTIC COW WATER PIPING — — — HW HOT WATER PIPING — - - I-IWR ' HOT WATER RETURN PIPING -- 50v —EXI— i SHUT OFF VALVE FCO ' FLOOR CLEANOUT c CD CONDENSATE DRAIN PIPING CD— TP —Tp— ' TRAP PRIMER PIPING G i NATURAL GAS PIPING G POC • 1 POINT OF CONNECTION WCO ' WALL CLEANOUT — 11 N.IM.C. < 2 Ct NOT IN MECHANICAL CONTRACT IE INVERT ELEVATION WH D WATER HEATER B/G BELOW GRADE (E) EXISTING PLUMBING PLAN CHECK NOTES . AREA SEPARATION WALLS A. ALL PLUMBING PENETRATIONS OF FIRE OR FIRE RESISTIVE ASSEMBLIES WILL BE METAL, LESS THAN OR EQUAL TO 4' DIAMETER, AND WILL BE FIRE STOPPED WITH A MATERIAL COMPLYING WITH THE CURRENT CODES. B. NO RANGE HOOD VENTS, DRYER VENTS, COMBUSTION VENTS OR HEATING DUCTS ARE PERMITTED IN AREA SEPARATION WALLS. ENERGY CONSERVATION (PLUMBING) A. ALL WATER HEATERS/BOILERS SHALL BE LISTED IN TI-4E ENERGY COMMISSION LIST OF APPROVED WATER HEATERS/BOILERS. B. ALL PLUMBING FIXTURES, FAUCETS AND SHOWER HEADS SHALL COMPLY WITH CEC MAXIMUM FLOW REQUIREMENTS (FAUCETS - MAX 22 GPM, URINALS - MAX 1.0 GPF, SHOWERHEAD - MAX 25 GPM). PROVIDE MIXING VALVE AT SHOWER CONTROLS. PROVIDE ULTRA LOW FLUSH TOILETS (MAX 1.6 GPF). C. ALL SERVICE NOT WATER PIPING SHALL BE INSULATED IN ACCORDANCE WITH THE CURRENT ENERGY CODE. D. A MAINTENANCE LABEL 51-IALL BE AFFIXED TO ALL EQUIPMENT AND A MAINTENANCE MANUAL SHALL BE PROVIDED FOR THE OWNER'S USE. THE LABEL SHALL INDICATE ROUTINE MAINTENANCE REQUIRED OR 51-IALL REFERENCE BY NUMBER WHICH OPERATING MANUALS EXPLAIN MAINTENANCE REQUIREMENTS IN GREATER DETAIL. E. ALL EQUIPMENT MUST COMPLY WITH THE STATE OF GEORGIA ENERGY CODE. HEATERS FOR DOMESTIC 140T WATER AND /OR POOLS SHALL MEET THESE REQUIREMENTS. COMPLIANCE CERTIFICATES SHALL BE PROVIDED WITH EQUIPMENT SUBMITTALS. F. ALL LAVATORY FAUCETS IN COMMERCIAL AND INDUSTRIAL BUILDING RESTROOMS SHALL BE SELF - CLOSING TYPE. LAVATORY FAUCETS IN PUBLIC RESTROOMS (OTHER THAN COMMERCIAL AND INDUSTRIAL AREAS) SHALL BE SELF - CLOSING TYPE OR SHALL BE PROVIDED WITH A RESTRICTING DEVICE ON HOT WATER LINE WITH A MAXIMUM RATE OF 05 GPM. MATERIALS A. ALL SANITARY SYSTEM MATERIALS SHALL BE LISTED BY AN APPROVED AGENCY B. BUILDING DRAIN AND VENT PIPING MATERIALS SHALL COMPLY WITH THE CURRENT INTERNATIONAL PLUMBING CODE. 4. HOSE BIBBS A. ALL 140SE BIBB5 SHALL HAVE PERMANENTLY MOUNTED VACUUM BREAKERS. THERMAL EXPANSION REQUIREMENTS A. ALL WATER HEATERS/BOILERS SHALL COMPLY WITH CURRENT IPC CHAPTER 5 6. CROSS CONNECTIONS A. CROSS CONNECTION PROTECTION SHALL BE PROVIDED AT ALL POTABLE WATER SUPPLIED APPLIANCES AND EQUIPMENT. 1. MEDIUM PRESSURE NATURAL GAS A. LABEL MEDIUM PRESSURE NATURAL GAS PIPING EVERY FIVE FEET. 8. CPVC PIPING A. STATE HEALTH 4 SAFETY CODE SECTION 17921.9 BANS THE USE OF CHLORINATED POLYVINYL CHLORIDE (CPVC) FOR INTERIOR WATER SUPPLY PIPING. LEAD FREE FIXTURES A. ALL PIPING AND FIXTURES SHALL BE IN COMPLIANCE WITH WASHINGTON STATE ASSEMBLY BILL. L -1 4 KS I 1/2' CW IN WALL IN -LINE FLOW CONTROL DEVICE 3/8' BRAIDED ST. STEEL FLEXIBLE CONNECTOR No changes shall be made to the scope of work without prior approval of Tukwila Building Division. A MOT:: nevisions will require a new plan submittal R end y include additional plan review fees. I REVISIONS ELECTRIC WATER — 14EATER MOUNTED ON WALL ELECTRICAL WIRING BY ELECTRICAL CONTRACTOR 3 -WAY VALVE (1 INLET, 2 OUTLETS) 1/2' CW SUPPLY IN, 3/S' COMPRESSION FITTINGS TO WH -I 4 TO SINK ELECTRICAL JUNCTION BOX SY ELECTRICAL CONTRACTOR NOTE: SEPARATE PERMIT REQUIRED FOR Mechanical :ate 04asPlumbing Piping City of Tukwila 1B11ILDING DIVISION I. WATER HEATER IS A U.L. LISTED, NON - STORAGE, INSTANTANEOUS HEATER HAVING AN INSIDE DIAMETER NOT GREATER THAN 3' AND DOES NOT REQUIRE A P 4 T RELIEF VALVE OR DRAIN LINE. ELECTRIC WATER HEATER DETAIL REC:tly r CITY OF TU tLA JAN 2,5 2012 PERMIT CENTER NO SCALE 2 -013 space planning + interior design j studio 5580 Warbler Way La jolla, California 92037 ph: 619.977.7152 fx: 858.456.0605 e: jjorgo @san.rr.com JMA JAMES MANN & ASSOCIATES MECHANICAL - PLUMBING CONSULTING ENGINEERS 11413 PINEHURST DRIVE, SUITE 100 LAKESIDE, CA 92040 819 581 -9950 FAX 819 581 -9940 N >1 W U co W 11 (11/) < co N-- co 0) U) 1 < z O > V Z 0 J > Z9zz(.9 1:: Q 2 _ U (n Q < 2 Ct 0 D < Q Z W 0 Z w J H a O z co C\I Q III . G l • ,- 2 A ER MARK DATE DESCRIPTION 12.16.11 PLAN CHECK SUBMITTAL PROJECT NO: 11145 CAD DWG FILE: DRAWN BY: JWM CHK'D BY: COPYRIGHT: SHEET TITLE PLUMBING - LEGEND, NOTES & SCHEDULES P-1 SHEET OF C100-M RR MOUNTED BELOW FIXTURE, SEE SERVICE CORRIDOR 1 C 100-K ) CONFERENCE MANAGER 100 -J 1" CW (E) 4' W (E) 1 1 1 1 100-6 ( 100 -E II ADVISOR #3 II ADVISOR #1 3/4' CW I 3/4' CD ADVISOR #4 (100-H) ADJ. TENANT 1 1 E100-D) COFFEE /PRINT ADVISOR #2 100-F TP 'W FD -1 - 3/4' CW L -1 MOUNTED BELOW FIXTURE, SEE 1001 STORAGE HB -I CM IM 100-C) LOUNGE E 1 oo -B) MEDIA BAR (100-A) RECEPTION • 2' V SEE FIXTURE SCHEDULE FOR ALL BRANCH PIPE SIZING (TYPICAL) 2' VTR ADJ. TENANT PARTIAL FIRST FLOOR PLAN SCALE: I/4" = I' -O" 0 0 SHEET NOTES POC TO EXISTING 4' W AND 1' CW STUBOUTS (FIELD VERIFY FOC WITH MALL STAFF PRIOR TO SAWCUTTING)) TERMINATE 3/4' CD FROM FC -I TO HOUSE SIDE OF SINK P -TRAP, SEE PROVIDE WATER PROOF MEMBRANES IN ALL RESTROOM FLOOR PENETRATIONS (TYPICAL) PROVIDE 5OV FOR CW SHUTOFF TO SUITE (IF NOT ALREADY EXISTING) ROUTE 1/2' CW PIPING FROM TRAP PRIMER BELOW FLOOR TO FD -I NEW FAN COIL UNIT BY MECHANICAL, SEE M- SHEETS 0 MALL REVIEWED FOR CODE COMPLIANCE APPROVED JAN 3 0 2012 City of Tukwila BUILDING DIVISION FGP.*o (3 v CITY RE(� OF ti TU LA JAN 2 2012 PERMIT CENTER space planning + interior design j studio 5580 Warbler Way La jolla, California 92037 ph: 619.977.7152 fx: 858.456.0605 e: jjorgo @san.rr.com JMA JAMES MANN & ASSOCIATES MECHANICAL - PLUMBING CONSULTING ENGINEERS 11413 PINEHURST DRIVE, SUITE 100 LAKESIDE, CA 92040 619 581 -9950 FAX 619 581 -9940 >-z; N _ U") f: Ct 0 < 121. (I) 1 r W oo 0 o J r CO Z < O) >z—JaO V 0> Z CEO - z z D 2 < i: LU U ol) Q a Q 2 D < Z o E u) Z WW 0 OZH W N 0 U (1) D 0 U) - 1 0ti Q� 9 G Z r . G . ' 2 E i ♦V S. ER MARK DATE DESCRIPTION 12.16.11 PLAN CHECK SUBMITTAL PROJECT NO: 11145 CAD DWG FILE: DRAWN BY: JWM CHK'D BY: COPYRIGHT: SHEET TITLE PLUMBING - PARTIAL FIRST FLOOR PLAN R.2 SHEET OF SECTION 15100 BASIC PLUMBING MATERIALS AND METHODS PART 1 - GENERAL 1.01 SUMMARY A. Work Included: Basic mechanical requirements governing materials and workmanship Incorporating plumbing systems and related trades as specified herein. 1.02 RELATED WORK NOT IN CONTRACT A. Electrical work including conduit, starters, disconnect switches and all line voltage wiring. Not wiring diagrams for additional electrical Items. B. Poured -in -place concrete and structural supports for mechanical equipment. Cutting and /or framing as required for openings. C. Painting. D. Fees for installation of sewer services, water services and meters. 1.05 REFERENCES A. Materials and workmanship shall comply with the following references, which are incorporated into the text by common abbreviation only. Supplements which have been adopted by the governing agencies shall take precedence. UPC - Uniform Plumbing Code (Current Edition) Including supplements IMC - International Mechanical Code (Current Edition) Including supplements NEC - National Electric Code (Current Edition) NFPA - National Fire Protection Association Standards (current editions) IBC - International Building Code (current edition) Including supplements Seattle Non - Residential Energy Code MEP Tenant Criteria Mall Building Standards B. Plumbing System components and installation shall comply with the nationally recognized standards for the types of equipment and fixtures used including, but not limited to, Underwriters Laboratories' (UL) and the American Society of Plumbing Engineers (ASPE) Data Book. 1.04 SUBMITTALS A. Product Data: Submit six copies of Manufacturer's data for each item to be incorporated into the work. Data shall be bound into a vinyl binders of I" capacity and shall include an index at the front listing all of the contents. B. Shop Drawings: Submit shop drawings showing related dimensions, accurately scaled to established references and points of verification. Show sizes, materials, connections, elevations and related information. C. Record Drawings: Contractor shall maintain accurate "as- built" marked -up drawings throughout the construction period. Prior to final acceptance, the Contractor shall submit (I) complete reproducible "as- built" set of drawings, dated and signed. Plumbing contractor shall also provide Autocad based files of the As- Builts ". D. Substitutions and Product Options: No substitutions shall be allowed unless there is prior written approval by the Architect. 1.05 PROJECT /SITE CONDITIONS A. All construction shall comply with the tenant construction standards. It shall be the Contractor's responsibility to obtain this document from the Building Management. B. The Contractor shall field verify all P.0.C..'s and site conditions prior to starting work. Any conflicts with the plumbing design shall be communicated to the Building Management immediately. C. Prior to installation of plumbing components, the Contractor shall verify that related installations and materials are complete to ensure no interruption or interference by delinquent trades. Notify Owner of all such delinquencies and obtain review and direction prior to proceeding, or accept responsibility for correction of faulty /defective installations. D. Prior to installation of any sewer lines, verify the elevation, size and material of the existing sewer pipe or stub -out at the point of connection. If the elevation of the existing sewer pipe is such that the new sewer pipe cannot be installed without maintaining proper slope, Immediately Inform the Architect. E. All valves, volume dampers, motors and any device that requires adjustment or servicing shall not be located in an inaccessible location. These devices shall be located adjacent to lay -in ceilings or be provided with access panels if required to be Installed over drywall ceilings or shafts. F. Permits and Fees: This Contractor shall arrange, apply for and pay for all permits, inspections, fees, and licenses required for this work by any legally constituted public authority. This Contractor shall furnish the Owner with final certificate of inspection at the completion of the work. F. Cleaning of Equipment and Premises: This Contractor shall thoroughly clean all equipment and apparatus and leave in satisfactory condition for finish painting. If equipment has been supplied with the factory finish, the Contractor shall also be responsible for touch -up work and /or refinishing if required. During construction of the job, this Contractor shall be responsible for clean up of cartons, scrap or debris caused by this work. 1.06 SEQUENCING AND SCHEDULING A. Contractor shall be responsible for scheduling the work of related trades to ensure timely and orderly progress of the total work to be performed. 1.07 GUARANTEES A. New materials and equipment to be guaranteed free from defects and faulty workmanship fora minimum period of one year from date of occupancy. PART 2 - PRODUCTS See Section 15400 and drawings. PART 3 - EXECUTION See Section 15400 and drawings. END OF SECTION SECTION 15400 PLUMBING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. The Drawings and the general provisions of the Contract, including the General and Supplementary Conditions and other Division I Specification Sections, apply to the work of this section. B. Plumbing system shall be installed in accordance with the building shell plans, building standards and imprpvement specifications. 1.02 WORK INCLUDED A. Sanitary soil, waste and vent piping. B. Condensate drain piping. C. Domestic cold water and hot water piping. D. Plumbing equipment, fixtures and trim. E. Insulation. F. Record drawings and guarantee PART 2 - MATERIALS 2.01 PERFORMANCE AND ENERGY REQUIREMENTS A. Provide performance characteristics, physical size and arrangements of equipment and fixtures and other products as shown and scheduled on the drawings. 5. Energy consumption of equipment shall not exceed the limits set forth in the Energy Code. C. Contractor shall install only water heater(s) on State approved list. 2.02 PIPE AND FITTINGS A. Soil, waste, vent and vent rainwater piping, above ground: No -hub cast iron soil pipe with neoprene sleeves and stainless steel couplings. B. Soil, waste, vent and vent rainwater piping, underground: No -hub cast iron soil pipe with neoprene sleeves and MG couplings, conforming to CISPI Sandard 510. C. Domestic water piping, above ground: Seamless hard drawn copper tubing, type "L ", with wrought copper fittings and joints above ground with 615/5 solder (100% lead -free solder). D. Domestic water piping, below ground: Seamless soft drawn copper tubing, type "K ", with wrought copper fittings and Joints below ground with BAG1 silver solder (I00% lead -free solder). I. Pipe shall be Incased with a "Plasticskeeve" manufactured by Specialty Products, for pipe sizes 1/2" through 2 ". 2. Single short lengths of tube, may be tape wrapped with 10 MIL.x2" wide polyethylene tape. E. Natural gas piping above grade: Schedule 40, ASTM A -50, black steel pipe with malleable iron threaded fittings. F. Waste from sinks in 5lence Lab, up to five feet from the sink discharge, shall be "Fused 11" polypropylene acid waste system with electrofusion connections. 2.03 ACCESSORIES A. B. Unions: Walworth, Crane, Stockham or equal. 250 Ib. class. Dielectric Unions: Watts. C. Cleanouts: I. Floor type: Smith #4023 series or equal. 2. Wail type: Smith #4452 or #4552 series, or equal. 3. Grade type: Smith #4255 series or equal. D. Valves: Water, 2 inch and smaller: Ball valves Crane #01502, Nibco 5 -580, or equal. E. Valve access boxes and panels: Provide valve access panels for all valves and trap primers located in concealed areas. Set flush with finished wall, floor or ceiling. Those in finished walls shall have door or plate removed during construction or be otherwise suitably covered to protect finish. 2.04 INSULATION A. Insulate domestic hot water supply piping with 5/4" Manville "Micro -Lok 650" insulation or equal. 2.05 CLEANING PIPING SYSTEM A. The entire piping system shall be cleaned and placed in operation in accordance with IPC and the Health Department requirements. 2.06 PLUMBING FIXTURES, TRIM, DRAINS, AND EQUIPMENT A. As scheduled on drawings. PART 5 - EXECUTION 3.01 GENERAL A. Installation of plumbing systems to be performed in a net and workmanlike manner and in strict conformance with the Uniform Plumbing Code and Manufacturer's printed instructions. B. Provide necessary hangers, valves, unions and other accessories as required to provide a complete and operable system. C. Pipe hangers and supports shall be provided at intervals and locations per International Plumbing Cocie. Supports shall be rod type hangers or 'C' channel with appropriate pipe clamps as manufactured by Michigan Hanger Company and Unistrut. Perforated tape or plumber's tape Is not approved for pipe hangers or supports. All copper piping shall be isolated from clamps and hangers with Stoneman "Trisolators ". They shall also be isolated from the building structure, other piping, studs and all ferrous metal with I -inch hair felt strips properly attached to the piping. D. Conduct all required tests In strict conformance with local code. END OF SECTION REVIEWED FOR CODE COMPLIANCE APPROVED JAN 3 0 2012 City of Tukwila BUILDING DIVISION I� ribv ij CITY OF TUi.A JAN 2,5 2012 PERMIT CENTER space planning + interior design j studio 5580 Warbler Way La jolla, California 92037 ph: 619.977/152 fx: 858.456.0605 e: jjorgo @san.rr.com JM A JAMES MANN & ASSOCIATES MECHANICAL - PLUMBING CONSULTING ENGINEERS 11413 PINEHURST DRIVE, SUITE 100 LAKESIDE, CA 92040 819 581 -9950 FAX 819 681 -9940 N ›- CO . W V 0 (1) CL (X) (1) 00 Z 1 < 0) z O V z _ 2 W < D U co ct O <ELLf Q O (i) Z WW J (ZH8� co < W N HoO si.- ,,, (i) D 0 (/) o N --,______..„- -v ir., s G • � ///) A, ER MARK DATE DESCRIPTION 12.16.11 PLAN CHECK SUBMITTAL PROJECT NO: 11145 CAD DWG FILE: DRAWN BY: JWM CHK'D BY: COPYRIGHT: SHEET TITLE PLUMBING SPECIFICATIONS P-3 SHEET OF