Loading...
HomeMy WebLinkAboutPermit PG12-062 - BOEING #9-101 - TEMP WASH BAYBOEING #9 -101 TEMPORARY WASH BAY 9725 EAST MARGINAL wys PG1 2-062 ,w�,qs' ,. \yZ Department of Communi Development 0 6300 Southcenter Boulevard, Suite #100 y Tukwila, Washington 98188 Phone: 206 - 431 -3670 $ Inspection Request Line: 206 - 431 -2451 Web site: http: / /www.TukwilaWA.gov City oikukwila • PLUMBING /GAS PIPING PERMIT Parcel No.: 0003400018 Address: 9725 EAST MARGINAL WY S TUKW Project Name: BOEING #9 -101 - TEMP WASH BAY Permit Number: Issue Date: Permit Expires On: PG 12 -062 05/22/2012 11/18/2012 Owner: Name: BOEING COMPANY THE Address: PROPERTY TAX DEPT , PO BOX 3707 M/C 20 -00 98124 Contact Person: Name: Address: Email: Contractor: Name: CONNIE HARDIN 4600 S 134 PL , SEATTLE WA 98168 C ONNIEH @HOLADAYPARKS. C OM HOLADAY PARKS, INC. Address: PO BOX 69208 , SEATTLE, WA 98188 Contractor License No: HOLADPI379NO Phone: 206 250 -4530 Phone: 206 248 -9700 Expiration Date: 09/03/2013 DESCRIPTION OF WORK: INSTALL HOT WATER HEATER, EXPANSION TANK, SUMP PUMP, STORAGE TANK, AND BACKFLOW PREVENTER. Value of Plumbing /Gas Piping: Fees Collected: Electrical Service Provided by: Permit Center Authorized Signature: I hereby certify that I have read and governing this work will be complie $0.00 Uniform Plumbing Code Edition: 2009 International Fuel Gas Code Edition: 2009 $190.31 The granting of this permit does not pre constructi• • the pe •rma . e •f wor on the ba k of t pe t. \1 Date: 0S/22- J 1 L ed this permit and know the same to be true and correct. All provisions of law and ordinances whether specified herein or not. e to give authority to violate or cancel the provisions of any other state or local laws regulating I am authorized to sign and obtain this plumbing /gas piping permit and agree-to the co. ditions Signature: Date: Print Name: io r\ r -e This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended or abandoned for a period of 180 days from the last inspection. doc: UPC -4/10 PG 12 -062 Printed: 05 -22 -2012 PERMIT CONDITIONS Permit No. PG 12 -062 1: ** *PLUMBING AND GAS PIPING * ** 2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila Building Division. 3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing inspector. 4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas Code. 5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved. 6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code. Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection. 7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless, adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the conditioned space shall be insulated to minimum R -3. 8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be protected by steel nail plates not less than 18 guage. 9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing piping shall be directly embedded in concrete or masonry. 10: All pipes penetrating floor /ceiling assemblies and fire - resistance rated walls or partitions shall be protected in accordance with the requirements of the building code. 11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill, frozen earth, or construction debris. 12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the jurisdiction. doc: UPC -4/10 PG12 -062 Printed: 05 -22 -2012 433S9 • CITY OF TUKWILA Community Development Department Permit Center 6300 Southcenter Blvd, Suite 100 Tukwila, IPA 98188 http: / /www.TukwilaW A.gov Plumbing /Gas Permit No. PG `2 __ t(' 2 Project: No Date Application Accepted: Date Application Expires: •oql 0- to 2 [t (For office use only) PLUMBING / GAS PIPING PERMIT APPLICATION Applications and plans must be complete in order to be accepted for plan review. Applications will not be accepted through the mail or by fax. * *Please Print ** SITE LOCATION Site Address: Tenant Name: King Co Assessor's Tax No.: 0003400018 9725 East Marginal Way S BTE - Temp Wash Bay Suite Number: PROPERTY OWNER Name: Connie Hardin Name: The Boeing Company Address: 4600 S 134th PI Address: PO Box 3707 City: Seattle State: WA City: Seattle State: Wa Zip: 98124 CONTACT PERSON .= person receiving all project , communication Name: Connie Hardin Address: 4600 S 134th PI City: Seattle State: WA Zip: 98168 Phone: (206) 250 -4530 Fax: (206) 248 -8700 Email: connieh @holadayparks.com Tukwila Business License No.: Floor: 1st New Tenant: ❑ Yes ®..No PLUMBING CONTRACTOR INFORMATION Company Name: Holaday Parks, Inc Address: 4600 S 134th PI City: Seattle State: Wa Zip: 98168 Phone: (206) 250 -4530 Fax: (206) 248 -8700 Contr Reg No.: 1- IOLADP1379N0 ExP Date: 09/30/2013 Tukwila Business License No.: • Valuation of Project (contractor's bid price): $ 30,000 Scope of Work (please provide detailed information): Hot water heater, expansion tank, sump pump, storage tank, and backflow preventer. Building Use (per Int'I Building Code): Occupancy (per Intl Building Code): Utility Purveyor: Water: H: \Applications \Forms- Applications On Line \2011 Applications \Plumbing Permit Application Revised 8- 9- 11.docx Revised: August 2011 bh Sewer: Page 1 of 2 Indicate type of plumbing fixtures and /or gas piping outlets being installed and the quantity below: Fixture Type Qty Bathtub or combination bath/shower Dishwasher, domestic with independent drain Shower, single head trap Sinks Rain water system — per drain (inside building) 1 Grease interceptor for commercial kitchen ( >750 gallon capacity) Each additional medical gas inlets /outlets greater than 5 1 Atmospheric -type vacuum breakers not included in lawn sprinkler back Flow protections (1 -5) i v4 S. ton 1 1 Fixture Type Qty Bidet Drinking fountain or water cooler (per head) Lavatory Urinal Water heater and /or vent 1 Repair or alteration of water piping and /or water treatment equipment Backflow protective device other than atmospheric- type vacuum breakers 2 inch (51 mm) diameter or smaller 1 Atmospheric -type vacuum breakers not included in lawn sprinkler backflow protections over 5 i PERMIT APPLICATION NOTES - Fixture Type Qty Clothes washer, domestic Food -waste grinder, commercial Wash fountain Water closet Industrial waste treatment interceptor, including trap and vent, except for kitchen type grease interceptors Repair or alteration of drainage or vent piping Backflow protective device other than atmospheric -type vacuum breakers over 2 inch (51 mm) diameter Gas piping outlets i Fixture Type Qty Dental unit, cuspidor Floor drain Receptor, indirect waste Building sewer and each trailer park sewer Each grease trap (connected to not more than 4 fixtures - <750 gallon capacity Medical gas piping system serving 1 -5 inlets /outlets for a specific gas Each lawn sprinkler system on any one meter including backflow protection devices 561Apadrmtle-- i Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject to possible revision by the Permit Center tb comply with current fee schedules. Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation. The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition). I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND 1 AM AUTHORIZED TO APPLY FOR THIS PERMIT. BUILDING Signature: Print Name: Connie Hardin Mailing Address: 4600 S 134th P1 H:\Applications \Forms - Applications On Line \2011 Applications\Plumbing Permit Application Revised 8- 9- 11.docx Revised: August 2011 bh Date: Day Telephone: (206) 250 -4530 Seattle City Wa 98168 State Zip Page 2 of 2 • • City of Tukwila Department of Community Development 6300 Southcenter Boulevard, Suite #100 Tukwila, Washington 98188 Phone: 206 - 431 -3670 Fax: 206 - 431 -3665 Web site: http: / /www.TukwilaWA.gov RECEIPT Parcel No.: 0003400018 Permit Number: PG12 -062 Address: 9725 EAST MARGINAL WY S TUKW Status: APPROVED Suite No: Applied Date: 04/25/2012 Applicant: BOEING #9 -101 - TEMP WASH BAY Issue Date: Receipt No.: R12 -01647 Payment Amount: $190.31 Initials: JEM Payment Date: 05/22/2012 12:21 PM User ID: 1165 Balance: $0.00 Payee: CONNIE HARDIN, HOLADAY PARKS FAB INC TRANSACTION LIST: Type Method Descriptio Amount Payment Credit Crd VISA Authorization No. 03943G ACCOUNT ITEM LIST: Description 190.31 Account Code Current Pmts PLAN CHECK - NONRES PLUMBING - NONRES 000.345.830 38.06 000.322.103.00.00 152.25 Total: $190.31 doe: Receipt -06 Printed: 05 -22 -2012 INSPECTION RECORD Retain a copy with permit INSPECTION NO. PERMIT NO. CITY OF TUKWILA BUILDING DIVISION (� 6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670 Permit Inspection Request Line (206) 431 -2451 t-r' PGr2 -O(2. Proje t: t Ty,p1 of Inspection: [ Ades w S e .44A-ro r N 4�eWc ateCalled: uAa ( I Special Instructions: 14 irtijiR.Ws: 0.14,044‘4. - ©r� PA Fo "P, (d g d AV) �,'It nave Date Wanted :. m. Requester: Phone No. ( 2d Co - s.s44 -52s( Approved per applicable codes. Corrections required prior to approval. COMMENTS: P lat ++ ( Ne Inspector: a4V Datei ❑ REINSPECTION FEE REQUIRED. Prior to next inspection, fee must be paid at 6300 Southcenter Blvd., Suite 100. Call to schedule reinspection. . t' PG /2 -cep Dave Larson From: Connie Hardin <connieh @holadayparks.com> Sent: Tuesday, May 15, 2012 10:40 AM To: Dave Larson Subject: Permit PG12 -062 Boeing 9 -101 RPBA Hi Dave. The RPBA is 1 1/2" Watts 009M2 QT. Let me know if you need anything else. Thanks. Connie RECEIVED MAY 15 2012 PERMIT CENTER 1 •PERMIT COORD COP PLAN REVIEW /ROUTING SLIP ACTIVITY NUMBER: PG12 -062 DATE: 04/25/12 PROJECT NAME: BOEING #9 -101 - TEMP WASH BAY SITE ADDRESS: 9725 EAST MARGINAL WY S X Original Plan Submittal Response to Incomplete Letter # Response to Correction Letter # Revision # after Permit Issued t. DEPARTMENTS: � C, wilding Division S 1- -- )t\i'lic Works AV1-- . Structural Fire Prevention n Planning Division Permit Coordinator DETERMINATION OF COMPLETENESS: (Tues., Thurs.) Complete Comments: DUE DATE: 04/26/12 Incomplete ❑ Not Applicable Permit Center Use Only INCOMPLETE LETTER MAILED: LETTER OF COMPLETENESS MAILED: Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: TUES /THURS ROUTING: Please Route Fr REVIEWER'S INITIALS: Structural Review Required No further Review Required n DATE: APPROVALS OR CORRECTIONS: DUE DATE: 05 /24/12 Approved n Approved with Conditions n Not Approved (attach comments) ❑ Notation: REVIEWER'S INITIALS: DATE: Permit Center Use Only CORRECTION LETTER MAILED: Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials: Documents /routing slip.doc 02/29/12 Contractors or Tradespeople Peter Friendly Page all , Page 1 of 2 General /Specialty Contractor A business registered as a construction contractor with L01 to perform construction work within the scope of its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of account and carry general liability insurance. Business and Licensing Information Name HOLADAY PARKS INC UBI No. 578004089 Phone 2062489700 Status Active Address 4600 S 134Th Pl License No. HOLADP1379NO Suite /Apt. License Type Construction Contractor City Seattle Effective Date 1/21/1983 State WA Expiration Date 9/3/2013 Zip 98168 Suspend Date County King Specialty 1 General Business Type Corporation Specialty 2 Unused Parent Company Other Associated Licenses License Name Type Specialty 1 Specialty 2 Effective Date Expiration Date Status HOLADI "00105 HOLADAY PARKS INC Electrical Contractor Hvac /Rfrg Ltd Energy Unused 9/25/2000 4/21/2013 Active HOLADPF376N0 HOLADAY PARKS FABRCTRS INC Construction Contractor General Unused 8/20/1963 1/1/1983 Archived Business Owner Information Name Role Effective Date Expiration Date PARKS, GERALD T JR Chief Executive Officer 01/21/1983 VAN DER VEEN, JULIE ELIZABETH Member 08/26/2011 CONNELL, DANIEL AARON Member 08/26/2011 GIRI, BUIT Member 08/26/2011 KIEL, RINALD HOWARD Member 08/26/2011 WHITMYRE, CHRISTIAN Member 08/26/2011 BECK, DAVID CLARENCE Vice President 01/21/1983 OCONNOR, BONNY K Vice President 01/21/1983 NAILON, JUNE ANNETTE Vice President 01/21/1983 VAN DER VEEN, ERIC M Vice President 11/04/2010 PIZZEY, GRACE KATHERINE Vice President 08/26/2011 NELSON, MICHAEL Secretary 01/01/1980 11/04/2010 PARKS, DAVID L Treasurer 01/01/1980 11/04/2010 TALBOT, PAUL Treasurer 01/01/1980 11/04/2010 Bond Information https://fortress.wa.gov/lni/bbip/Print.aspx 05/22/2012 3 "CA tt..4" SAN__.._ _2"SAIV............ s_47SAN I _nCW (TP) 1 TUNNEL #6 PLA\ SCALE: 1/8 " =1' -0" CO \STRUCTIO\ NOTES (CONY) 4. COORDINATE COMPRESSED AIR PIPING SHUTDOWN THROUGH BOEING CONSTRUCTION MANAGER AND PROJECT ADMINISTRATOR. 5. PROVIDE PIPE LABELS AND FLOW ARROWS FOR ALL NEW PIPING. 13 14 FOR REVIEW SEPARATE PERMIT REQUIRED FOR: echanicat LT Electrical ❑ Plumbing Boaas Piping City Tukwila Y o a EU LDING DIVISION_ LEGEND A CW D G HW PW IWP v RWL SAN VAC P SAN COMPRESSED AIR DOMESTIC COLD WATER DRAIN GAS DOMESTIC HOT WATER SUPPLY PROCESS WATER INDUSTRIAL WASTE PUMPED VENT RAIN WATER LEADER SANITARY WASTE VACUUM PUMPED SANITARY GENERAL NOTES PRIMER WATER LINES FROM DRAIN TRAP PRIMER VALVE BOX. 2. COMPRESSED AIR AND PROCESS VACUUM PIPING SYSTEMS: INSTALLATION OF COMPRESSED AIR AND PROCESS VACUUM -PIPING SYSTEMS SHALL BE IN ACCORDANCE WITH "FAGIUTIES MECHANICAL STANDARD D38106 -20 USING THE FOLLOWING DEVELOPMENTAL CENTER SITE – SPECIFIC PREFERENCES: PIPE: ASTM B -88 SEAMLESS COPPER, TYPE L, HARD DRAWN. FITTINGS: 2" AND SMALLER: WROUGHT OR CAST COPPER SOLDERED OR PROPRESS SOCKET FITTINGS. BRAZED JOINTS BELOW GROUND. REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOT:: Revisions will require a new plan submittal and may include additional plan review fees. 2 -1/2" OR LARGER: TYPE L COPPER ROLL– GROOVED FITTINGS AND DUCTILE IRON ROLL– GROOVED COUPLINGS WITH EPDM GASKETS, RIGID D SYSTEM. VALVES: 2" AND SMALLER: BRONZE TWO –PIECE BALL VALVE, THREADED END. APOLLO 70 -100. PROVIDE WITH THREADED ADAPTER FITTINGS. 2-1/2" AND LARGER: ELASTOMER –LINED LUGGED BUTTERFLY VALVE. FURNISH WITH 1 25# COPPER FLANGE ADAPTERS. DEMCO 211xx 3. TESTING OF NEW COMPRESSED AIR AND PROCESS VACUUM PIPING SHALL USE COMPRESSED AIR OR NITROGEN AT 150 PSIG FOR 1 HOUR. THERE SHALL BE NO LOSS IN PRESSURE. CHECK EACH JOINT WITH SOAPY WATER. REFEREE TIFF 109 - 101 -4518 CE DRAWINGS PLUMBING PLAN & MACHINE FOUNDATION 9- 101 —TNM01 SUMP PUMP LOCATION CO\ FI COPY Permit No. t 1 1- 04,2 Phr review approval Is abject to ettrors and omissions. ;,{ ! of construction documents does not autho ze t= t . fA +olio of an adopted code or ordinance. Receipt j i11�►� + ,'f f is ack nawledged: o ppro 8' By Date: ar' -c-L- City Of 1tikwils BUILDING DIVISION craMI u LA APR 2 5 2012 PERMIT CENTER �2- 0t4 STRUCTION \OTES REVIEWED FOR CODE COMPLIANCE APPROVED MAY 1 p 2012' III uN4— City of Tukwila BUILDING DIVISION r -S / -V T T 4 "HUB DRAT`4'bENT.......2AC 1 "CA TNM110 5s 4 "SAN " CW » . ?_CW. » _� CA TNM114 TNM116 • , •. ;�, TNM120 TNM121 NM122 TNM123 iii TNM125 1 Ailik v... 2 "CW i. I 1, I ' is ` 1 » 4 SAN I - TRENCH 1 -1/4 "A UP` 1 "VAC UP TNM131 ' ,' FE k`;• , • 2'VAC , ; ,;I I; TRENCH --►, �. is !•3 i; . `' € s ` • TNM134 TNM127 M584 TRENCH- -� >: >' €..... h" AIR TO UTILITIES HATCH " 1 "CA � CA, TERMINATE W BALL VALVEi € � � TNM142 12" OFF FLOOR [ t I, TNM145 TNM146 ;: TNM127 M584 5. 3 "SAN n UP I l'. 2" ABANDONED 1-1/4"A UP OPEN ENDS E , r. I, TRENCH 4 ' I . » = 3CA � 1 CA :. 1 STORM DRAIN I 2" ABAND. E .. ` is --i E i q� 3 "SAN f 2v E s.. l° / E °"°"° • — '' t......_ A / ' — �� IFi 4 E1 h" TO UTILITIES HATCH : F" 1-1/4"A UP • n f 2 2vgc — 1 .= n �: 1 2A � .. ■ 3 • POC r,. _.._ .. . w€ _._ {. Wes_... u' HB ? CA `3 `• : o n-+ �W ■ , AVAC I ��N I SAN - =A... �� acH + t - ► `': :: 1-1/2"A n 1 -1 /2 CW . _:.. -� TUNNEL #6 �._I ,— VAC I TUNNEL #6 $� E .. E E� ► "SAN 1 "q 1 -1/4 "A _l —t 11 ) 4 J, ), NORTH TUNNEL 1-1 €' WALL SECTION Ank CAPPED PLUGGED Z :€ v) 1''gl; 0s1 .v F "1 1 "DN.NTO 4n :: '• ;; 1 /2'VAC 1"VAC UP MOISTURE TRA 2 "— ;: 1"VAC UP TNM127 1 -1/2 "A E M515 1-1/2"A "CW UP TNM51 ::: " ice` . `' , Its ! ° :(' �.�., ' 1 TNM127 1 "VAC UP 1 -1/4 "A UP 1-1/2"VAC h•• ._ ''' 1 "VAC UP x" - —.• : ,,•, :.x„ t v)� ., -� Q •:: "CA CAPPED ,r:::...... I .t.......: 4_-1-1/4"A UP I ..E ACCESS THRU!` . = `f ` „" PARKER EZ —MATE SOCKET W /VALVE IN TRENCH. IN TRENCH CAPPED 1 -1/4 " A UP @_ E €° i " , .. D CA `- IN T NCH TRENCH ----.1: ;` E Z .; I h: I fii I.,- POCJ —1/2 "A U I': TRENCH —.; _' ._ '` LAI4 PLUGGED 1 "VAC UP CAPPED 1j,,._11/2"CW UP TRENCH COVER. 3 ,, TRENCH ,• ' .: tiz NU '' ` 4 "SAN; I)` i. ? ' =1 n AIR TO Ye UTILITIES HATCH �,3 ti i ifpl- CW F' C € _ IIEt �: 3,. i, t9} ld .l...X "VENT ,_�..1. "CW. .1..4 "SAN ................ _2"SAIV............ s_47SAN I _nCW (TP) 1 TUNNEL #6 PLA\ SCALE: 1/8 " =1' -0" CO \STRUCTIO\ NOTES (CONY) 4. COORDINATE COMPRESSED AIR PIPING SHUTDOWN THROUGH BOEING CONSTRUCTION MANAGER AND PROJECT ADMINISTRATOR. 5. PROVIDE PIPE LABELS AND FLOW ARROWS FOR ALL NEW PIPING. 13 14 FOR REVIEW SEPARATE PERMIT REQUIRED FOR: echanicat LT Electrical ❑ Plumbing Boaas Piping City Tukwila Y o a EU LDING DIVISION_ LEGEND A CW D G HW PW IWP v RWL SAN VAC P SAN COMPRESSED AIR DOMESTIC COLD WATER DRAIN GAS DOMESTIC HOT WATER SUPPLY PROCESS WATER INDUSTRIAL WASTE PUMPED VENT RAIN WATER LEADER SANITARY WASTE VACUUM PUMPED SANITARY GENERAL NOTES PRIMER WATER LINES FROM DRAIN TRAP PRIMER VALVE BOX. 2. COMPRESSED AIR AND PROCESS VACUUM PIPING SYSTEMS: INSTALLATION OF COMPRESSED AIR AND PROCESS VACUUM -PIPING SYSTEMS SHALL BE IN ACCORDANCE WITH "FAGIUTIES MECHANICAL STANDARD D38106 -20 USING THE FOLLOWING DEVELOPMENTAL CENTER SITE – SPECIFIC PREFERENCES: PIPE: ASTM B -88 SEAMLESS COPPER, TYPE L, HARD DRAWN. FITTINGS: 2" AND SMALLER: WROUGHT OR CAST COPPER SOLDERED OR PROPRESS SOCKET FITTINGS. BRAZED JOINTS BELOW GROUND. REVISIONS No changes shall be made to the scope of work without prior approval of Tukwila Building Division. NOT:: Revisions will require a new plan submittal and may include additional plan review fees. 2 -1/2" OR LARGER: TYPE L COPPER ROLL– GROOVED FITTINGS AND DUCTILE IRON ROLL– GROOVED COUPLINGS WITH EPDM GASKETS, RIGID D SYSTEM. VALVES: 2" AND SMALLER: BRONZE TWO –PIECE BALL VALVE, THREADED END. APOLLO 70 -100. PROVIDE WITH THREADED ADAPTER FITTINGS. 2-1/2" AND LARGER: ELASTOMER –LINED LUGGED BUTTERFLY VALVE. FURNISH WITH 1 25# COPPER FLANGE ADAPTERS. DEMCO 211xx 3. TESTING OF NEW COMPRESSED AIR AND PROCESS VACUUM PIPING SHALL USE COMPRESSED AIR OR NITROGEN AT 150 PSIG FOR 1 HOUR. THERE SHALL BE NO LOSS IN PRESSURE. CHECK EACH JOINT WITH SOAPY WATER. REFEREE TIFF 109 - 101 -4518 CE DRAWINGS PLUMBING PLAN & MACHINE FOUNDATION 9- 101 —TNM01 SUMP PUMP LOCATION CO\ FI COPY Permit No. t 1 1- 04,2 Phr review approval Is abject to ettrors and omissions. ;,{ ! of construction documents does not autho ze t= t . fA +olio of an adopted code or ordinance. Receipt j i11�►� + ,'f f is ack nawledged: o ppro 8' By Date: ar' -c-L- City Of 1tikwils BUILDING DIVISION craMI u LA APR 2 5 2012 PERMIT CENTER �2- 0t4 STRUCTION \OTES REVIEWED FOR CODE COMPLIANCE APPROVED MAY 1 p 2012' III uN4— City of Tukwila BUILDING DIVISION r -S / -V T T T T� TNM115 TNM110 TNM111 TNM112 TNM113 TNM114 TNM116 TNM117 TNM118 TNM119 TNM120 TNM121 NM122 TNM123 TNM124 TNM125 TNM126 ;:TNM127- NM128 TNM129 TNM130 TNM131 TNM132 TNM133 TNM134 TNM135 TNM136 1NM137 TNM138 TNM139 TNM140 TNM140 TNM142 TNM143 TNM` TNM145 TNM146 4' 0 4' 16' SCALE: 1/8"=1'-0" KEY PLAN SCALE NONE WOOD HARBINGER NEN Mechanical and Electrical Engineers Bellevue, WA =MN NUNN MIMI MINI SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE K BTE TEST FRAME WASH BAY — 90% IFR WH_12031.002 WH GV 04.16.12 E MIC EXPANSION J #180450 -00 M.WONG RWS 12.11.08 L BTE TEST FRAME WASH BAY — 100% IFR WH_12031.002 WH GV 04.19.12 F ASSEMBLY AREA — 90% IFR WH_11047.015 WH GV 11.03.11 M BTE TEST FRAME WASH BAY — 100% IFR WH_12031.002 WH GV 04.23.12 G ASSEMBLY AREA — IFC WH_11047.015 WH GV 11.10.11 D BUILD OUT HANGER 130233 -04 M.WONG RWS 10.04.04 H BL -0 JOIN TOOL — 90% IFR WH_11047.022 WH. GV 12.15.11 FIELD VERIFIED & UPDATED S.RUDELL 10.03.08 J PICKED UP REDLINES WH LEG 02.06.12 Q� - BOE /NG' ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN TRECKED DATE SUBTITLE TUNNEL #6 PIPING /PLUMBING & UNDERGROUND PLAN CURRENT REVISION 14786 SYMBOL DATE 04.23.12 APPROVED BY DEPT. DATE ENCINEER CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER BTE TEST FRAME BUILDING 9 -101 COL. W– Z/11 -15 DEV. CENTER, WA SHEET TNMI27 JOB NO. COMP N0. DWG NO. 9- 101– TNM127 CPECK: 4/12/2012 8:46:51 AM FOR REVIEW v 6 (TYP 3 PLACES) 1 I ... I I _--__ 1 I I I ! 3 I 1 I I I --•. - .. I ` I € I 1 I € = 1 d1 j 1M127 M603 1 - '1 I I I I E ! ___...__._.__ _ 1 " VAC DN 1 - __.__...._..._._____..___._ 1 -1/4 "A DN 1 "VAC DN I I (SIMI R) j = •I f I i 1M127 __..._......._____ \ v 1 I E 1..... M603 ___.__.___.........._.___....._......_____...._.. __.___..._._____.____.______.1 II �I � 1 1 -1/4 "A DN ........-._.._______......_._.__._________.__. t ;.. 1 .._....1 WW .... ....r ........ �= 1 1 "VAC DN ,� 1 "VAC DN '1 6 : „CW WATER HEATER 1 1-1/4"A DN I....._ �__ 1 M 127 M604 1A 1 -1 /2 "A DN 1 "CW [ .... ...__ 1 -1 /2 "HW 1 „PW_ t I 1 -1 2 "HW _ 40 STORAGE - –-- —a I r-._� € 1 = TANK KW '` 16 > WATER HEATER —" � '�. N N. 2" PW \ DEWATERING ..: -'J£ ' ,, L,,, ., -1 /2" �..fr CW DN 1 PUMP 4 • M127 SK -M606 . F' I1 ,f I................ •s I I I ! 1 I 1 III \\ s,.. -..' f� • 1 I - .- ....... - - "; I f I I I LW_ .., j i L - --� FIRST FLOOR PLAN SCALE: 1/8"= 1 -0" 11 12, REVIEWED FOR CODE COMPLIANCE APPROVED MAY 1 A 2012 City of Tukwila BUILDING DIVISION 4' LEGE \D GENERAL NOTES 1. COMPRESSED AIR AND PROCESS VACUUM PIPING SYSTEMS: INSTALLATION OF COMPRESSED AIR AND PROCESS VACUUM PIPING SYSTEMS SHALL BE IN ACCORDANCE WITH FACILITIES MECHANICAL STANDARD D38106 -20 USING THE FOLLOWING DEVELOPMENTAL CENTER SITE - SPECIFIC PREFERENCES: PIPE: ASTM B -88 SEAMLESS COPPER, TYPE L, HARD DRAWN. FITTINGS: 2" AND SMALLER: WROUGHT OR CAST COPPER SOLDERED OR PROPRESS SOCKET FITTINGS. BRAZED JOINTS BELOW GROUND. 2-1/2" OR LARGER: TYPE L COPPER ROLL- GROOVED FITTINGS AND DUCTILE IRON ROLL- GROOVED COUPLINGS WITH EPDM GASKETS, RIGID SYSTEM. VALVES: 2" AND SMALLER: BRONZE TWO -PIECE BALL VALVE, THREADED END. APOLLO 70 -100. PROVIDE WITH THREADED ADAPTER FITTINGS. 2 -1/2" AND LARGER: ELASTOMER -LINED LUGGED BUTTERFLY VALVE. FURNISH WITH 125# COPPER FLANGE ADAPTERS. DEMCO 211 xx 2. TESTING OF NEW COMPRESSED AIR AND PROCESS VACUUM PIPING SHALL USE COMPRESSED AIR OR NITROGEN AT 150 PSIG FOR 1 HOUR. THERE SHALL BE NO LOSS IN PRESSURE. CHECK EACH JOINT WITH SOAPY WATER 40"0 VERTICAL STORAGE TANK, 500 GALLON CAPACITY. LITTLE GIANT 5M5P -18 SUBMERSIBLE UTILITY PUMP. FREESTANDING SUMP 2'x2'x3' 6 > AO SMITH DSE -100 54KW, 480V, 3 PH, ASME RATED FOR WATER SERVICE DIAGRAM, SEE 1M127 SK -M606 CONSTRUCTION NOTES PROVIDE TWO ADDITIONAL VACUUM QUICK DISCONNECTS ON THE EXISTING UTILITY STAND 1M110 1M111 1M112 1 M113 1M114 1M116 11M122i 1M123 f 1M128 1M129 1M117 R6CEIVEL CITY OFTIJKVVILA APR 2 5 2012 PERMIT CENTER 8' 16' MI MI SCALE: 1 /8 " =1 7f i 1 M134 1M139 1 1M115 1M121 1M124 1M125 1M126 1M130 1M131 ! 1M132 1M135 1M136 1M137 1M138 1M140 1M141 1M142 1M143 11144 I 1M145 1M146 ( 1 SC AI 17' N.M.S. f'i 3 PL A N — WOOD HARBINGER Mechanical and Electrical Engineers Bellevue, WA IMM SYM REVISION L BTE TEST FRAME WASH BAY - 100% IFR WH_12031.002 BY WH APPROVED DATE GV 04.19.12 M C D BTE TEST FRAME WASH BAY RELOCATE (2) 10' TTU'S SURPLUS CO -CURED TTU - 100% IFR WH_12031.002 J #130185 -10 J #130185 -12 E ASSEMBLY AREA - 90% IFR WH_11047.015 WH C. HARRAH C. HARRAH WH GV 04.23.12 6.12.03 6.16.03 SYM F G REVISION BY APPROVED DATE ASSEMBLY AREA - IFC WH_11047.015 WH GV 11.10.11 H J BL -0 JOIN TOOL - 90% IFR WH_11047.022 BL -0 JOIN TOOL IFC WH_11047.022 PICKED UP REDLINES WH WH WH GV GV LEG 12.15.11 12.21.11 02.06.12 GV 11.03.11 K BTE TEST FRAME WASH BAY - 90% IFR WH_1 2031.002 WHG GV 04.16.12 QiE /NG° Cr'- BO ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN CHECKED APPROVED BY DEPT. DATE DATE ENGINEER SUBTITLE FIRST FLOOR PLUMBING PLAN CURRENT REVISION SYMBOL 14786 DATE 04.23.12 CHECKED APPROVED APPROVED TITLE MECHANICAL MASTER BTE TEST FRAME BUILDING 9 -101.1 COL. W- Z/11 -15 D.0 SHEET 1M127 JOB NO. 130185 -12 COMP NO. DWG NO. 9- 101 -1M127 CPECK: 4/16/2012 9:15:34 AM FROM CONDENSATE 10' -0" AFF TO OUTSIDE CONTROL ROOM AHU AIR GAP FITTING 1/2" TRAP PRIMER 3" P -TRAP 3 "V — CLEANOUT (E)FINISHED FLOOR DETAIL i SCALE: NONE 1M115 M606 QUAD RECEPTACLE CLEANING SOLUTION MIXING BOX (PROVIDED BY BOEING) UNISTRUT RACK HOSE BIBBS WITH VACUUM BREAKER Itl\— EXPANSION TANK AMTROL ST -12C TANK VOLUME 6.4 GALLONS MAX ACCEPTANCE VOLUME 3.2 GALLONS 1. WATER HEATER PRESSURE RELIEF VALVE AND RPBA DISCHARGE, ROUTE TO SUMP PUMP LOCATED IN TUNNEL #6 AND CONNECT USING AN AIR -GAP TYPE FITTINGS. 2. SEISMICALLY RESTRAIN WATER HEATER IN ACCORDANCE WITH THE REQUIREMENTS OF THE 2009 INTERNATIONAL BUILDING CODE. 3. PROVIDE MINIMUM R -10 INSULATION UNDER ELECTRIC WATER HEATER PER THE 2009 EDITION OF THE WASHINGTON STATE ENERGY CODE. 1 "PW 2 "PW FROM WASH BAY >PW> FINISHED FLOOR SUMP PUMP NOTES: 2 "PW 4" 3 "V 500 GALLONS TANK 1 "BALL VALVE NORMALLY CLOSED CAP, COORDINATE CONNECTION AND THREAD WITH BOEING SEISMICALLY RESTRAIN 500 GALLONS TANK IN ACCORDANCE WITH THE REQUIREMENTS OF THE 2009 INTERNATIONAL BUILDING CODE. 2. 2 "PW PIPE FROM WASH BAY AREA SHALL BE SLOPED IN DIRECTION OF FLOW AT A MAXIMUM SLOPE ALLOWED BY FIELD CONDITIONS. DETAIL - WATER HEATER r-Li- iM1151M606 SCALE: NONE SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE BTE TEST FRAME CONTROL ROOM - IFP WH_12031.003 WH ACP 04.13.12 A BTE TEST FRAME WASH BAY - 90% IFR WH_12031.002 WH GV 04.16.12 B BTE TEST FRAME WASH BAY - 100% IFR WH_12031.002 WH GV 04.19.12 C BTE TEST FRAME WASH BAY - 100% IFR WH_12031.002 WH GV 04.23.12 �BOE /NG' ACCEPTABILITY THIS DESIGN AND /OR SPECIFICATION IS APPROVED DRAWN C. PECK DATE 04.13.12 APPROVED BY DEPT. DATE CHECKED G. VERSEGI ENGINEER G. VERSEGI 04.13.12 04.13.12 SUBTITLE LEGEND GENERAL \OTES REFERENCE DRAWINGS CONSTRUCTION NOTES REVIEWED FOR CODE COMPLIANCE APPROVED MAY 1 2012 • City of Tukwila BUILDING DIVISION FOR REVIEW ASSWA APR 2 5 2012 PERMIT CENTER PLUMBING DETAILS AND SECTIONS WOOD HARBINGER Mechanical and Electrical Engineers Bellevue, WA CURRENT REVISION 14786 SYMBOL DATE 04.23.12 CHECKED C. LARSON 04.13.12 APPROVED APPROVED TITLE MECHANICAL MASTER BTE TEST FRAME BUILDING 9 -101.1 D.C. SHEET M606 JOB NO. 10152501 COMP NO. DWG NO. 9- 101.1 -M606 0 0 N CPECK: 04/11