HomeMy WebLinkAboutPermit PG12-189 - CITY OF TUKWILA - POOLCITY OF TUKWILA
POOL
4414 S 144 ST
PG12 -189
City o•E•Tukwila
•
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206-431-3670
Inspection Request Line: 206 - 431 -2451
Web site: http: / /www.TukwilaWA.gov
PLUMBING /GAS PIPING PERMIT
Parcel No.: 1523049106
Address: 4414 S 144 ST TUKW
Project Name: CITY OF TUKWILA - POOL
Permit Number: PG12 -189
Issue Date: 11/13/2012
Permit Expires On: 05/12/2013
Owner:
Name: TUKWILA SCHOOL DISTRICT
Address: 4640 144TH ST , SEATTLE WA 98168
Contact Person:
Name: DAVE ROBINAUGH
Address: 5005 THIRD AV S , SEATTLE WA 98134
Email: DAVERO @MCKINSTRY.COM
Contractor:
Name: MCKINSTRY CO LLC
Address: PO BOX 24567 , SEATTLE WA 98124
Contractor License No: MCKINCL942DW
Phone: 206 - 832 -8352
Phone: 206 762 -3311
Expiration Date: 03/16/2014
DESCRIPTION OF WORK:
REPLACE WATER CLOSETS, FLUSHOMETER VALVES, LAVATORIES, SHOWER TOWERS AND
THERMOSTATIC MIXING VALVES. REPLACE DOMESTIC HOT WATER TANK AND GAS REGULATOR.
PROVIDE NEW GAS REGULATOR FOR BOILER AND INSTALL REGULATOR VENT TO EXTERIOR.
Value of Plumbing /Gas Piping: $91,000.00 Uniform Plumbing Code Edition: 2009
Fees Collected: $777.00 International Fuel Gas Code Edition: 2009
Electrical Service Provided by:
Permit Center Authorized Signature:
I hereby certify that I have read and e
governing this work will be complied whether specified herein or not.
Date:
11,Eit
ed this permit and know the same to be true and correct. All provisions of law and ordinances
The granting of this permit does not presume to give authority to violate or cancel the provisions of any other state or local laws regulating
construction or th �rformance of w. • . I am authorized to sign and obtain this plumbing /gas piping permit and agree to the conditions
on the back of t p�rmit.
Signature:
Print Name:
Ax),--A'zro/612-4'f
Date: g / "DL/ ?pi Z
This permit shall become null and void if the work is not commenced within 180 days from the date of issuance, or if the work is suspended
or abandoned for a period of 180 days from the last inspection.
rinr.• IIPC -4110
Pr12 -1A9 Printari• 11- 1'1 -2n17
PERMIT CONDITIONS
Permit No. PG 12 -189
1: ** *PLUMBING AND GAS PIPING * **
2: No changes shall be made to applicable plans and specifications unless prior approval is obtained from the Tukwila
Building Division.
3: All permits, inspection records and applicable plans shall be maintained at the job and available to the plumbing
inspector.
4: All plumbing and gas piping systems shall be installed in compliance with the Uniform Plumbing Code and the Fuel Gas
Code.
5: No portion of any plumbing system or gas piping shall be concealed until inspected and approved.
6: All plumbing and gas piping systems shall be tested and approved as required by the Plumbing Code and Fuel Gas Code.
Tests shall be conducted in the presence of the Plumbing Inspector. It shall be the duty of the holder of the permit to
make sure that the work will stand the test prescribed before giving notification that the work is ready for inspection.
7: No water, soil, or waste pipe shall be installed or permitted outside of a building or in an exterior wall unless,
adequate provision is made to protect such pipe from freezing. All hot and cold water pipes installed outside the
conditioned space shall be insulated to minimum R -3.
8: Plastic and copper piping running through framing members to within one (1) inch of the exposed framing shall be
protected by steel nail plates not less than 18 guage.
9: Piping through concrete or masonry walls shall not be subject to any load from building construction. No plumbing
piping shall be directly embedded in concrete or masonry.
10: All pipes penetrating floor /ceiling assemblies and fire - resistance rated walls or partitions shall be protected in
accordance with the requirements of the building code.
11: Piping in the ground shall be laid on a firm bed for its entire length. Trenches shall be backfilled in thin layers to
twelve inches above the top of the piping with clean earth, which shall not contain stones, boulders, cinderfill,
frozen earth, or construction debris.
12: The issuance of a permit or approval of plans and specifications shall not be construed to be a permit for, or an
approval of, any violation of any of the provisions of the Plumbing Code or Fuel Gas Code or any other ordinance of the
jurisdiction.
(Inn* 11PC -4 /1(1
P(117 -1RSi Printpri• 11 -13 -7017
CITY OF TUK A
Community Development Department
Permit Center
6300 Southcenter Blvd., Suite 100
Tukwila, WA 98188
http://www.TukwilaWA.gov
Plumbing/Gas Permit No. i Y �9q
Project No.
Date Application Accepted: 10-(0-(2--,
Date Application Expires: Z-(— ([)' 13
(For office use only)
PLUMBING / GAS PIPING PERMIT APPLICATION
Applications and plans must be complete in order to be accepted for plan review.
Applications will not be accepted through the mail or by fax.
* *Please Print **
SITE LOCATION
Site Address:
Tenant Name:
4414 South 144th
City of Tukwila
PROPERTY OWNER
Name: Dave Robinaugh
Address:
Name: City of Tukwila
City: Seattle State: WA
Address: 4414 South 144th
Phone: (206) 832 -8352 Fax:
City: Tukwila
State: WA
Zip: 98168
CONTACT PERSON - person receiving all project
communication
Name: Dave Robinaugh
Address:
Address: 5005 3rd Ave S
City: Seattle State: WA
Zip: 98134
Phone: (206) 832 -8352 Fax:
Email: davero @mckinstry.com
Phone:
King Co Assessor's Tax No.: 1523049106
Suite Number: - Floor:
New Tenant: ❑ Yes m ..No
PLUMBING CONTRACTOR INFORMATION
Company Name:
Address:
City:
State:
Zip:
Phone:
Fax:
Contr Reg No.:
Exp Date:
Tukwila Business License No.:
Valuation of Project (contractor's bid price): $ 90,000
Scope of Work (please provide detailed information):
Replace water closets, flushometers, lavatories, shower towers, and thermostatic mixing valves. Replace domestic hot water tank
and gas regulator. Provide new gas regulator for boiler and install regulator vent to exterior.
1(000 9,45
Building Use (per Int'I Building Code).
Occupancy (per Int'I Building Code):
Utility Purveyor: Water: District 125 Sewer- Valley View
H:\Applications\Forms- Applications On Line12011 Applications\Plumbing Permit Application Revised 8 -9 -1 I.docx
Revised: August 2011
bh
Page 1 of 2
•
Indicate type of plumbing fixtures and /or gas piping outlets being installed and the quantity below:
Fixture Type
Qty
Bathtub or combination
bath/shower
Dishwasher, domestic with
independent drain
Shower, single head trap
Sinks
99
Rain water system — per
dram (Inside budding)
!'
Grease interceptor for
commercial kitchen ( >750
gallon capacity)
Each additional medical
gas inlets/outlets greater
than 5
2B
Atmospheric -type vacuum
breakers not included in
lawn sprinkler backflow
protections (1 -5)
2
Fixture Type
Qty
Bidet
Drinking fountain or water
cooler (per head)
Lavatory
Water closet
99
Urinal
!'
Water heater and/or vent
Repair or alteration of
water piping and/or water
treatment equipment
2B
Backflow protective device
other than atmospheric -
type vacuum breakers 2
inch (51 mm) diameter or
smaller
2
Atmospheric -type vacuum
breakers not included in
lawn sprinkler backflow
protections over 5
Fixture Type
Qty
Clothes washer,
domestic
Food -waste grinder,
commercial
Wash fountain
Water closet
4'
Industrial waste
treatment interceptor,
including trap and vent,
except for kitchen type
grease interceptors
Repair or alteration of
drainage or vent piping
Backflow protective
device other than
atmospheric -type
vacuum breakers over 2
inch (51 mm) diameter
Gas piping outlets
2
Fixture Type
Qty
Dental unit, cuspidor
Floor drain
Receptor, Indirect waste
Building sewer and each
trailer park sewer
Each grease trap
(connected to not more
than 4 fixtures - <750
gallon capacity
Medical gas piping
system serving 1 -5
inlets/outlets for a specific
gas
Each lawn sprinkler
system on any one meter
including backflow
protection devices
vi'..
1
PERMIT APPLICATION NOTES -
Value of Construction — In all cases, a value of construction amount should be entered by the applicant. This figure will be reviewed and is subject
to possible revision by the Permit Center to comply with current fee schedules.
Expiration of Plan Review — Applications for which no permit is issued within 180 days following the date of application shall expire by limitation.
The Building Official may grant one extension of time for an additional period not to exceed 180 days. The extension shall be requested in writing
and justifiable cause demonstrated. Section 103.4.3 International Plumbing Code (current edition).
I HEREBY CERTIFY THAT I HAVE READ AND EXAMINED THIS APPLICATION AND KNOW THE SAME TO BE TRUE UNDER
PENALTY OF PERJURY BY THE LAWS OF THE STATE OF WASHINGTON, AND I AM AUTHORIZED TO APPLY FOR THIS PERMIT.
BUILDING 0
Signature:
ER OR AUTHORIZED GENT:
Date: 10/10/2012
Print Name: Dave Robinaugh Day Telephone: (206) 832 -8352
Mailing Address: 5005 3rd Ave S
H:Wpplications\Fom¢- Applications On Line12011 Applications'Plumbing Permit Application Revised 8- 9.11.docx
Revised: August 2011
bh
Seattle WA 98134
City State Zip
Page 2 of 2
•
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206-431-3665
Web site: http: / /www.TukwilaWA.gov
Parcel No.: 1523049106
Address: 4414 S 144 ST TUKW
Suite No:
Applicant: CITY OF TUKWILA - POOL
RECEIPT
Permit Number: PG12 -189
Status: APPROVED
Applied Date: 10/10/2012
Issue Date:
Receipt No.: R12 -03088
Payment Amount: $621.60
Initials: JEM Payment Date: 11/13/2012 09:16 AM
User ID: 1165 Balance: $0.00
Payee: PARKS ACCT NO. 11263001.1000.107
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Other
Authorization No.
ACCOUNT ITEM LIST:
Description
621.60
Account Code Current Pmts
GAS - NONRES
PLUMBING - NONRES
000.322.103.00.00 96.60
000.322.103.00.00 525.00
Total: $621.60
rinn• Re int -nR
Printcu1• 11- 11 -7f117
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 -431 -3665
Web site: http: / /www.TukwilaWA.gov
RECEIPT
Parcel No.: 1523049106 Permit Number: PG12 -189
Address: 4414 S 144 ST TUKW Status: PENDING
Suite No: Applied Date: 10/10/2012
Applicant: CITY OF TUKWILA - POOL Issue Date:
Receipt No.: R12 -02827
Payment Amount: $155.40
Initials: WER Payment Date: 10/10/2012 02:45 PM
User ID: 1655 Balance: $621.60
Payee: ANDREW GRAY
TRANSACTION LIST:
Type Method Descriptio Amount
Payment Credit Crd MC
Authorization No. 02848P
ACCOUNT ITEM LIST:
Description
155.40
Account Code Current Pmts
PLAN CHECK - NONRES
000.345.830 155.40
Total: $155.40
doc: Receiot -06 Printed: 10 -10 -2012
3
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
PC42-9
Project - •
(iIit� v1 iuhee✓,lA
Type of Inspection:
rinlAL..-
Address:
Ly,y s //4/ sr
Date Called:
_
Special Instructions:
Date Wanted:.
v2 — 2-6-/ 5
rn.
p.M7
Requester:
Phone No:
Approved per applicable codes. Corrections required prior to approval.
COMMENTS:
2.."`A -1 ( /€9- 3vrp /e,0 �,:; #, iq/
nspect
41•c -, C f
Date
` ?- 2 , /3
n R INSPECTION FEE REQUIR D. Prior to next inspection, fee must be
pa d at 6300 Southcenter Blvd.. Suite 100. Call to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
'i12 - I gcj
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 it.. (206) 431 -3670
Permit Inspection'Request Line (206) 431 -2451
Project:
0 rTgl O1 7t1kluILA
Type of Inspection:
L Ptui4,t6 --G #S
6 1 17 <w'1,Ji Jt-5 Aic l- ,"i 1
Address:
L -ILI(4 1NLi S-1
Date Called:
` O'1 �,0 t \e J 1‘ 41�.
Special Instructions:
Date Wanted:.
a.m.
Requester:
Phone No:
, oC.- 30-4r4 -12
❑ Approved per applicable codes.
Corrections required prior to approval. S
COMMENTS: A
6 1 17 <w'1,Ji Jt-5 Aic l- ,"i 1
eeryvv 00/\.‘t NI Ii C.
L& 1APDtdrl+9 I
` O'1 �,0 t \e J 1‘ 41�.
iii‘d.54A (1,('f , t 4
J
n„ C
tel
NS ? ?CTION FEE REQUIRE. Prior to
p /id ( 6300 Southcenter Blvd.. Suite 100.
Date:
2 -zL-- i
nett inspection. fee must be
ll to schedule reinspection.
INSPECTION RECORD
Retain a copy with permit
INSPECTION NO. PERMIT NO.
CITY OF TUKWILA BUILDING DIVISION
6300 Southcenter Blvd., #100, Tukwila. WA 98188 (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
Project: �
0 i op 4 [ 1 i,l rlw►1 r1
Typenof Inspection:
,idl,cj k -- `.%
Address:
4_I ill 4 5 / i-I L/ s1i-
Date Called:
600N
Special Instructions:
Date : Wante
1 2. (l–, OZ.—
m,
:m.
Requester:
Phone No:
ElApproved per applicable codes. Corrections required prior to approval.
COMMENTS: `J, 4 .
(1) Poo l 0 ✓rr.&J
?t-'$.5td' ,-�
600N
-,
tbr:
41 / 't 0LAJrAl
/RNSPETION FE EQUIRED /Prior to next inspection, fee must be
paid at 6300 Southcen N Blvd., Suite 100. Call to schedule reinspection.
°1? /17//7
t (p
INSPECTION RECORD
Retain a copy with permit
INSPECTION N0. PERMIT NO.
CITY OF TUKWILA BUILDING - DIVISION
6300 Southcenter Blvd., #100, Tukwila: WA 98188 r, (206) 431 -3670
Permit Inspection Request Line (206) 431 -2451
Project:
0 1 VA (D 11ltLL&) L A
Type of Inspection: -
`01tLH-r.hJ - 114v+l'!'')..
Address: '
VIA -kIL( S tLi y S-i
Date Called:
_
Special Instructions:
_ -
- (l (...UL I (.0 t
Date Wanted:
I1)2.7
a. m.
Requester:
Phone No:
,Ztl ( -73D
Approved per applicable codes.
Corrections required prior to approval.
COMMENTS: -
Inspect��o�rr:
T( -
n I INSPECTION FEE REQUI ED. Prior to next inspection .fee must be
paid at 6300 Southcenter Blvd., Suite 100. Call to echedule_reinspection.
1 -1 /2 BF -PASS
UPSTREAM --
150LATION VALVE
(NORMALLY CLOSED)
----- _ -__ -� CONNECT TO BAS
GAS METER
BY PSE
BADGER PULE
STRAINER
TURBO SERIES
METERS
COUPUNG
ADAPTOR
POOL FILL METER
NOT TO SCALE
IEECHANIC4L ROOM
4700 CFH 0 2 P51
Tr (50 IF)
1 -1/2 (10 LF)
2 (40 IF)
IPRV -1 U1 p (ARV -21
J
DOMESTIC
WATER
HEATER
500 4TH
BOILER
4200 HEM
L
FROM
BACKROW
PREVENTER
KEY NOTES
0 REFERENCE 4/45.0 FOR CAS PRV INSTAUADON 1ETAL
GAS PIPING DIAGRAM
NOT TO SCALE
HVAC SYSTEM MAKE
UP WATER ASSEMBLY
NOTES:
1. BOSIS OF DESIGN: WESSEL5
2. REFERENCE MUTING WATER APING DIAGRAM 4462 FOR PIPE SIZES.
3. REFERENCE 4/45.2 & 5/445.2 FOR CONNECTION DETAILS.
PRESSURE GAUGE
0 -100 P51
P/T PORT
ISOLATION VALVE
SERVICE ISOLA ION VALVE 00.6110N VALVE
SADDLE (N001146LY OPEN) (NORMALLY OPEN)
PIPE OFF TOP OF
MAKE -UP WATER LANE
SDATION VALVE
z-
43
EXPANSION TANK DETAIL
NOT TO SCALE
CHARGING VALVE
EXPANSION TANK
rum GAS PIPING,
REFERENCE GAP PIPING
DVGRMI FOR PIPE SIZES
SHUTOFF COCK
OR BALL VALVE
WITHIN 6' -0' OF
EQUIPMENT
" DIRT LEG
DRAIN PPE FROM
80TT041 OF
FILTER TARN 81111
VALVE FOR
FLOW CONTROL
TO FILTER
TANK
DRAIN PIPE FOR FILTER
TANN OVER FLOW
6' STEEL PIPE
BASKET FILTER
BCD: HAY5ARD 6"
SB PVC SIUPLE0 STRAINER
R0 EPDM. OFFSET BASKET
FILTER FROM END CAP TO
ALLOW ACCESS FOR
MAINTENANCE
CONCRETE SUB J
GAS REGULATOR VENT PIPED TO EXTERIOR (VENTS TO
BE PIPED SEPARATELY) PIPE SIZE PER MANUFACTURER
MID APPUCABLE CODES. MINIMUM VENT PPE SIZE TO
BE 11(E SAME AS VENT OUTLET ON REGULATOR.
INCREASER AS REQUIRED
TO EQUIPMENT
GAS PRESSURE REGULATOR W/VENT, PER EQUIPMENT
MANUFACTURER REGULATOR TO BE INSTALLED AT
LEAST 10 PPE DIAMETERS FROM BOILER MAW CAS
VALVE
REDUCER AS REQUIRED
REMOVABLE 0140 CAP
FOR MAINTENANCE
ALIGN END CAPS TO
ALLOW FOR CLEAN OUT
OF PPE
NOTES (PER IFGC 4107t
1. THE MP REGULATOR SHALL BE APPROVED AND SHALL BE SUITABLE FOR THE INLET AND OUTLET GAS PRESSURES FOR T.HE APPLICATION.
2 THE MP REGULATOR SHALL MAINTAIN A REDUCED OUTLET PRESSURE UNDER LOCKUP (N0 -FLOW) CONDITIONS.
3 THE CAPACITY OF 7110 MP REGULATOR. DETERMINED BY PUBLISHED RATINGS OF R5 MANUFACTURER, SHALL BE ADEQUATE TO SUPPLY THE
APPLIANCES SERVED.
4 THE MP PRESSURE REGULATOR SHALL BE PROVIDED WITH ACCESS. WHERE LOCATED INDOORS THE REGULATOR SHALL BE VENTED TO THE
OUTDOORS OR BE EQUIPPED WITH A LEN(- UNITING DEVICE, IN EITHER CASE COMPLYING WITH SECTION 410.3.
5 A TEE FIRING WITH ONE OPENING CAPPED OR PLUGGED SHALL BE INSTALLED BETWEEN THE IIP REGULATOR AND ITS UPSTREAM SHUTOFF VALVE
SUCH TEE FRANC SHALL BE POSITIONED TO ALLOW CONNECTION OF A PRESSURE - MEASURING INSTRUMENT MID TO SERVE AS A SEDIMENT TRAP.
6. A TEE FITTING WITH ONE OPENING UPPED OR PLUGGED SHALL BE INSTALLED NOT 1E55 THAN 10 PPE DIAMETERS DOWNSTREAM OF THE MP
REGULATOR OUTLET. SUCH A TEE FITTING SHALL BE POST110NED TO ALLOW CONNECTION OF A PRESSURE - MEASURING DACE.
`10 RE IN WITH
MORONIC SYSTEM
UPSTREAM OF AIR
SEPARATOR
atik
NOT TO
SCALE
111 'i[v.
11001
1. BL515 OF DESIGN: SPIRDVENT
2. REFERENCE 2/45.2 FOR BRACING DETAIL
AIR / DIRT SEPARATOR DETAIL
NOT TO SCALE
FLANGED
CONNECTION AT
BASKET FILTER
(17?)
PROVIDE LOW POINT W WIRING
TO PREVENT M051UR FROM
TRAVELING DOWN WORE MID
INTO UNIT
ALIGN PIPE TO
SLOPE 0 1/4' / FT
ALONG ENTIRE LENGTH
CONTROL 804NG
FLOW
METER
PVC V,
C PPE
PIPE
OI
2
THRO BOLT
FRO4 FIANCE
TO FLANGE
4'I SCH
PVC PIPE 80
DRAIN TO
SUMP PT
REUR OVABLE END UAITENANCE CAP
FO
ro OPEN 3%S
NLLY OPEN MIFIUUY STRAIGHT
GATE VALVE PIPE
FLANGED CONNECTION
FOR METER INSTALLATION
KEY NOTES
0 INSTALL METER PER MANUFACTURES RECD<MENOATIONS.
2X0
TO ANY VALVE,
TEE OR ELBOW
GROUNDING RINGS
HORIZONTAL
-\
ELECTRODE PLANE
- -0 -
CORRECT
POOL DRAIN METER INSTALLATION DETAIL
NOT TO SCALE
3/4' DRAIN VALVE WITH
WALE ADAPTER AND CAP
WELD NECK FIANCE (IMP) H
PROVIDE CHAIN OPERATOR
P VALVE IS 84" AFF AND
PIPE S 6' OR LARGER OW)
CIRCUIT BALANCING VALVE
FLANGED CHECK VALVE
SILENT NON- SLAMMING
4f I
MINIMUM 24" SPOOL PIECE
5 PPE DIA P POSSIBLE
wax SPHERE
FLEX CONNECTION (TYP)
1/2 INSTRUMENT PIPING (TIP)
1/Y BAIL VALVE (TYP
PULP FLANGE TAP (TIP)
PROVIDE SPOOL PIECE P
NEEDED FOR CLEARANCE
ALIGNMENT REWIRED
PR10R TO STARTUP
REFERENCE 3/445.2
FOR CONNECTION
DETAILS
WI-STRUT MID STRAP WITH EXPANSION
ANCHORS INTO 51A8 FOR PPE BRACING.
LOCATE STRAP AGAINST INSIDE CORNER
OF PIPE TO RESTRICT MOVEMENT ALONG
EWE OF PIPE
VERTICAL
ELECTRODE PLWEJ '
INCORRECT
Of Year Bulling
REVIEWED FOR
CODE COMPLIANCE
APPROVED
NOV 0 8 2012
City of Tukwila
BUILDING DIVISION
SEE FL00R PUNS FOR PPE SIZES
ALL VALVES ARE FULL SIZE OF PIPE
STRAINER
1620140 FINED PRESSURE GAUGE
WITH NEEDLE O')U00N VALVE
SUBMITTAL TO SPECIFY PRESSURE
RANGE LOCATE 2 -0' AFF MAX
1/2• P/T PORT (TIP 2)
LUG STYLE BUTTERFLY
ISOLATION VALVE (TYP)
REDUCER SPOOL (TYP)
SUCTION DIFFUSOR, MATCH
INLET TO PIPE SZE
MAINTAIN CLEAR ACCESS FOR
STRAINER REMOVAL SPACE PROVIDE
FINE MESH CONSTRUCTION STRAINER
DURING STARTUP REMOVE BEFORE
BALANCING
3/4' DRAM WITH BALL VALVE
HOSE ADAPTER AND CAP
SUPPORT LEG
HOUSEKEEPING PAD
E1D�s:
1 GAUGE TAPS IN PUMP AND SUCTION DIFFUSER MAY BE USED INSTEAD OF PROVIDING THREAD- 0-LE1S FOR PRESSURE GAUGE
2. PROVIDE MINIMAL DISIANCE BETWEEN HOUSEKEEPING PAD AND INERTIA BASE, I -1/2' MINIMUM, OR PER ACOUSTICAL ENGINEER.
3. PRE -EXTEND FLEXIBLE CONNECTORS ON PUMP DISCHARGE PER MANUFACTURERS INSTALLATION INSTRUCTIONS.
4. USE FIAT FACE FLANGE AND FULL FACE GASKET AT CLASS 125 OR 250 FIANCE FACES. USE RASED FACE FIANCE AT CLASS 150
OR 300 FLANGE FACES.
END SUCTION PUMP DETAIL WITH INERTIA
BASE CONSTANT VOLUME PUMP (NO VFD)
NOT TO SCALE
CORRECTION
P&12
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE. WA 98124
1- 800 -669 -6223
PDRTIAND:
16790 NE MASON ST
PORTIAND. OR 97230
503- 331 -0234
.w.mctimiry.com
PROJECT:
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
1
POOL
REGISTRATION:
RECtisit .)
CITY OF TUK\MLwA
NOV 0 6 2012
PERMIT CENTER
REVISIONS
8/7/12 50% DD
9/4/12 757. CD'S
9/26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
1&10/29/12 REVISION 1_
N0. DATE DESCRIPTION
MCKINSTRY DMS10N:
ENGINEERING
DESIGNED BY: ARLISS MERRELL
DRAWN 87: TIM WHITE
CHECKED BY: SETH DAVIS
JOB NUMBER: C1O256
DATE: 7/31/12
SCALE: AS SHOWN
SHEET TITLE:
MECHANICAL DETAILS
NU R:
M5.0
For Th
U6Stly •
ife 01 roar Building
6 November 2012
Re: Tukwila Building Division
Dear Dave Larson, Senior Plan Examiner:
1
McKinstry and its consultants have reviewed the Code Review comments issues on
25 October 2012 and offer the following responses. Please also see the revised
drawings associated with the revisions mentioned below.
1. ADA showers are to remain. Only plumbing fixtures are being replaced.
2. Detail has been revised. Please see Revision 1, dated 10 -29 -2012 for updated
notes on 4/M5.0.
3. Regarding the backflow device on sheet MD6.1, this equipment, and associated
piping, is existing per the record mechanical drawings dated 6 -29 -1990. The
RPBP is shown for reference purposes, there is no work being performed on
the RPBP.
4. There are no new backflow devices being installed as part of this scope. There
are no known issues with the existing backflow devices.
Sincerely,
David Robinaugh
McKinstry Co
Enclosures: Revised sheet M5.0
RECEIVED
CITY OF TUKIJILA
NOV 0 6 2012
PERMIT CENTER
5005 3id Ave S. • Seattle, WA 98134. 206 - 762 -3311
Colorado • California • Idaho • Kansas • Minnesota • Montana • Oregon • Texas • Washington • Wisconsin
City of Tukwila
Jim Haggerton, Mayor
Department of Community Development Jack Pace, Director
October 26, 2012
Dave Robinaugh
McKinstry Company
5005 Third Av S
Seattle, WA 98134
RE: Correction Letter #1
Plumbing /Gas Piping Permit Application Number PG12 -189
City of Tukwila Pool — 4414 S 144 St
Dear Mr. Robinaugh,
This letter is to inform you of corrections that must be addressed before your mechanical permit can be
approved. All correction requests from each department must be addressed at the same time and
reflected on your drawings. I have enclosed comments from the Building Department. The Planning and
Public Works Department have no comments at this time.
Building Department: Dave Larson at 206 431 -3678 if you have questions regarding the
attached memo.
Please address the attached comments in an itemized format with applicable revised plans,
specifications, and /or other documentation. The City requires that two (2) sets of revised plans,
specifications and /or other documentation be resubmitted with the appropriate revision block.
In order to better expedite your resubmittal, a `Revision Submittal Sheet' must accompany every
resubmittal. I have enclosed one for your convenience. Corrections /revisions must be made in person
and will not be accepted through the mail or by a messenger service.
If you have any questions, please contact me at (206) 431 -3670.
Sincerely,
Bill Rambo
Permit Technician
encl
File: PGI2 -189
W:\Pennit Center \Correction Letters\2012\PG12 -189 Correction Letter #1.doc
6300 Southcenter Boulevard, Suite #100 • Tukwila, Washington 98188 • Phone: 206 - 431 -3670 • Fax: 206 - 431 -3665
•
Tukwila Building Division
Dave Larson, Senior Plan Examiner
Building Division Review Memo
Date: October 25, 2012
Project Name: City of Tukwila Pool
Permit # PG12 -189
Plan Review: Dave Larson, Senior Plans Examiner
The Building Division conducted a plan review on the subject permit application. Please address the
following comments in an itemized format with revised plans, specifications and /or other applicable
documentation.
(GENERAL NOTE)
PLAN SUBMITTALS: (Min. size 11x17 to maximum size of 24x36; all sheets shall be the same size).
(If applicable) Structural Drawings and structural calculation sheets shall be stamped and signed.
1. There are two showers, one men's and one women's, that are shown as ADA showers. If one or
both are completely replaced they will need to meet current accessibility standards. Please
confirm and if applicable, provide specific details that meet section 608 of ICC /ANSI A117.1.
2. Please revise detail 4 on sheet M5.0 to include all 6 requirements noted in the IFGC section
410.2 MP Regulators.
3. Page MD6.1 has a backflow device (RPBP) with a bypass loop. It is not clear what the scope of
work is. The loop needs to be protected with an additional backflow device or the loop should be
removed if not needed.
4. Are there any new backflow devices? Please provide make and model number with spec sheets.
If using existing backflow devices is the required testing up to date?
Should there be questions concerning the above information please contact the Building Division at 206-
431 -3670.
OPERMIT COORD COFi
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: PG12 -189 DATE: 11/06/12
PROJECT NAME: CITY OF TUKWILA - POOL
SITE ADDRESS: 4414 S 144 ST
Original Plan Submittal
Response to Correction Letter #
X Response to Incomplete Letter #
Revision # after Permit Issued
DEPARTMENTS:
Building Division I ��
Public Works
Fire Prevention
Structural
Planning Division
❑ Permit Coordinator ❑
DETERMINATION OF COMPLETENESS: (Tues., Thurs.) DUE DATE: 11/08/12
Complete
Incomplete ❑ Not Applicable ❑
Comments:
Permit Center Use Only
INCOMPLETE LETTER MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
LETTER OF COMPLETENESS MAILED:
TUESITHURS ROUTING:
Please Route ❑ Structural Review Required ❑ No further Review Required
REVIEWER'S INITIALS: DATE:
APPROVALS OR CORRECTIONS:
Approved ❑
DUE DATE: 12/06/12
Approved with Conditions [ Not Approved (attach comments) ❑
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Only
CORRECTION LETTER MAILED:
Departments issued corrections: Bldg ❑ Fire ❑ Ping ❑ PW ❑ Staff Initials:
PEA CO D COO
PLAN REVIEW /ROUTING SLIP
ACTIVITY NUMBER: PG12 -189 DATE: 10 -10 -12
PROJECT NAME: CITY OF TUKWILA - POOL
SITE ADDRESS: 4414 S 144 ST
X Original Plan Submittal
Response to Correction Letter #
Response to Incomplete Letter #
Revision # After Permit Issued
DEPAR ME TS:
L- r ev<t 10- S-4)--
BEM i g DI ision Fire Prevention
N�* 19. s ►'1--
Public Works
Structural
Planning Division
❑ Permit Coordinator
DETERMINATION OF COMPLETENESS: (Tues., Thurs.)
Complete
n
Incomplete
DUE DATE: 10-11 -12
Not Applicable ❑
Comments:
Permit Center Use Only
INCOMPLETE LETTER MAILED:
Departments determined incomplete: Bldg ❑ Fire ❑
LETTER OF COMPLETENESS MAILED:
Ping ❑ PW ❑ Staff Initials:
TUES/THURS ROUTING:
Please Route n Structural Review Required
n No further Review Required
REVIEWER'S INITIALS:
DATE:
APPROVALS OR CORRECTIONS:
Approved ❑ Approved with Conditions ❑
DUE DATE: 11 -08 -12
Not Approved (attach comments)
Notation:
REVIEWER'S INITIALS:
DATE:
Permit Center Use Only
CORRECTION LETTER MAILED:
Departments issued corrections:
Bldg Fire ❑
Ping ❑ PW ❑ Staff Initials: VV
Documents /routing slip.doc
2 -28 -02
• •
City of Tukwila
Department of Community Development
6300 Southcenter Boulevard, Suite #100
Tukwila, Washington 98188
Phone: 206 - 431 -3670
Fax: 206 - 431 -3665
Web site: http://www.ci.tukwila.wa.us
REVISION SUBMITTAL
Revision submittals must be submitted in person at the Permit Center. Revisions will not be accepted through
the mail, fax, etc.
Date: 11 I.4.12-017_
20
❑ Response to Incomplete Letter #
Plan Check/Permit Number: PG 12 -189
Response to Correction Letter #
1
Revision requested by a City Building Inspector or Plans Examiner
Project Name: City of Tukwila - Pool
Project Address: 4414 S 144 St
Contact Person:b ve- "iac‘o� (•�
Summary of Revision:
l-7..11," — Sv YeAASic9✓' I ?iep- — alADA 4 l•ems4.4f.
Phone Number: 2b(0-8B2_-gSs .
4ECEIVEb UI
NOV 062012,
PERMIrCENTEA
Sheet Number(s): 1-k . (D
"Cloud" or highlight all areas of revision including date of revision
Received at the City of Tukwila Permit �� Center by:
Entered in Permits Plus on t1, Y "`�'
✓1r
\applications \forms- applications on line\revision submittal
Created: 8 -13 -2004
Revised:
Contractors or Tradespeople Printer Friendly Page
•
General /Specialty Contractor
A business registered as a construction contractor with MI to perform construction work within the scope of
its specialty. A General or Specialty construction Contractor must maintain a surety bond or assignment of
account and carry general liability insurance.
Business and Licensing Information
Name MCKINSTRY CO LLC UBI No. 602569922
Phone 2067623311 Status Active
Address Po Box 24567 License No. MCKINCL942DW
Suite /Apt. License Type Construction Contractor
City Seattle Effective Date 3/16/2006
State WA Expiration Date 3/16/2014
Zip 98134 Suspend Date
County King Specialty 1 General
Business Type Limited Liability Company Specialty 2 Unused
Parent Company
Other Associated Licenses
License
Name
Type
Specialty
1
Specialty
2
Effective
Date
Expiration
Date
Status
LYDIGML901JLLYDIG+
MCKINSTRY LLC
Construction
Contractor
General
Unused
4/13/2010
4/13/2014
Active
WESTVI'121RF
WESTVENT INC
Construction
Contractor
General
Unused
12/6/1988
9/1/1994
Archived
MCKIN "372ND
MCKINSTRY CO
Construction
Contractor
General
Unused
8/20/1963
1/2/2008
Re
Licensed
Business Owner Information
Name
Role
Effective Date
Expiration Date
PEDERSEN, JAMIE D
Agent
03/16/2006
Bond Amount
ALLEN, DEAN CHARLES
Partner /Member
03/16/2006
929519469
MOORE, DOUGLAS JAMES
Partner /Member
03/16/2006
ALLEN, DAVID EDWARD
Partner /Member
03/16/2006
WESTERN SURETY CO
TEPLICKY, JOSEPH WILLIAM
Partner /Member
03/16/2006
Bond Information
Page 1 of 2
Bond
Bond Company Name
Bond Account Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Bond Amount
Received Date
3
Western Surety Co
929519469
03/01/2011
Until Cancelled
01/23/2012
$12,000.00
02/24 /2011
2
WESTERN SURETY CO
929511574
09/09/2010
Until Cancelled
$12,000.00
09/02 /2010
1
TRAVELERS CAS 8
SURETY CO
104702039
01/03/2006
Until Cancelled
03/01/2011
$12,000.00
03/16/2006
Assignment of Savings Information No records found for the previous 6 year period
Insurance Information
Insurance
Company Name
Policy Number
Effective Date
Expiration Date
Cancel Date
Impaired Date
Amount
Received Date
5
Zurich
American Ins Co
GLA-3999903
01/31/2012
01/31/2013
$2,000,000.00
12/16/2011
4
ZURICH
AMERICAN INS
CO
GLA3999903
01/31/2011
01/31/2012
$2,000,000.00
12/20/2010
3
ZURICH
AMERICAN INS
CO
CP0399990301
01/31/2009
01/31/2011
$2,000,000.0012
/07/2009
2
ZURICH
AMERICAN INS
CO
CP03999903
01/31/2008
01/31/2009
$2,000,000.00
01/31/2008
1
DTC052D7193C0F07
01/31/2006
01/31/2009
$1,000,000.00
01/08/2008
https://fortress.wa.gov/lni/bbip/Printaspx
11/13/2012
ABBREVIATIONS
GENERAL
AD
AW
AFT
AFG
AG
AMP
ARCH
AUTO
AUX
BD
BHP
BLDG
BOP
85
6U
H
CA
CAB
COND
C/L
CLG
CFM
CLG
CO
CO2
COL
CONC
COND
CONN
CONSTR
COMM
CTL
DET
DIA
DIAG
DIM
DISCH
DIV
DN
DS
DWDI
DWG
DWV
EA
EC
EL
EEC
BEV
EQUIP
ESP
EXH
EXIST
(F)
FA
F
FDC
FDN
FIG
FIN
FIO
FLEX
FIG
RR
FO
FP
FPM
FT
FTG
FURN
GALV
GC
GEN
GPM
GwB
HP
HR
HS
HTG
MR
ID
LAB
tr
MAX
MBH
MED
MEZZ
MFR
MH
MIN
MSC
MTO
N/A
NEG
NIC
NO
NOM
NETS
OA
OC
OD
OVHD
POC
PRELIM
PSI
PSIG
QTY
R
RAD
REQD
RPM
SECT
SF
SIM
SPEC
SQ
STD
STRUC
ACCESS DOOR
ADJUSTABLE
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ABOVE GROUND
AMPERE
ARCHITECT; ARCHITECTURAL
AUTOMATIC
AUXILIARY
BOARD
BRAKE HORSEPOWER
BUILDING
BOTTOM OF PIPE
BOTRTOM
SCREEN
BRMSH THERMAL UNIT
BRITISH THERMAL UNITS PER HOUR
COMPRESSED AIR
CABINET
CONDENSATE
CENTER LINE
CEIUNG
CUBIC FEET PER MINUTE
CEIUNG
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
CONCRETE
CONDENSER; CONDENSATE
CONNECT; CONNECTION
CONSTRUCTION
CONTRACTOR
CONTROL
DETAIL
DIAMETER
DIAGONAL
DIMENSION
DISCHARGE
DMSION
D SCONNECT SWITCH; DOOR SWITCH
DOUBLE WIDTH, DOUBLE INLET
DRAWING
DRAIN, WASTE, VENT
EXISTING
EACH
ELECTRICAL CONTACTOR; END CAP
ELEVATION
ELECTRICAL
ELEVATION
ELECTRICAL PANEL; END PLUG
EQUIPMENT
EXTERNAL STATIC PRESSURE
EXHAUST
EXISTING
FUTURE
FAHRENHEIT
FIRE ALARM
FLOOR CLEANOUT
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIGURE
FINISH
FURNISHED AND INSTALLED BY OWNER
FLEXIBLE
FLANGE
FLOOR
FUEO. OIL
ARE PROTECTION
FEET PER MINUTE
FOOT; FEET
FOOTING
FURNISH
GGAALL.VANIZED
GENERAL CONTRACTOR
GENERATOR
GALLONS PER MINUTE
GYPSUM WALL BOARD
HIGH
HORSEPOWER; HIGH PRESSURE
HEATING RETURN
HEATING SUPPLY
HEATING
HEATER
INSIDE DIAMETER /DIMENSION
LABORATORY
UNFAL FOOT
MAKE -UP AIR UNIT
MAXIMUM
1000 BRITISH THERMAL UNITS PER HOUR
MEDIUM
MEZZANINE
MANUFACTURER
MANHOLE
MINIMUM; MINUTE(S)
MISCELLANEOUS
MOUNTED
NOT APPLICABLE
NORMALLY CLOSED
NEGATIVE
NOT IN CONTRACT
NORMALLY OPEN; NUMBER
NOMINAL
NOT TO SCALE
OVERALL
ON CENTER
OUTSIDE DIAMETER
OVERHEAD
POINT OF CONNECTION
PRELIMINARY
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH GAUGE
QUANTITY
RELOCATED
RADIUS
REQUIRED
REVOLUTIONS PER MINUTE
SECTION
SQUARE FOOT
SIMILAR
SPECIFICATION
SQUARE
STANDARD
STRUCTURAL
inD
TOC
TOS
TYP
UG
UNO
VAV
VD
VEER
VED
VSD
w
w/o
HVAC
AC
ACT
AHU
BDD
BOD
CC
CRU
CT
CV
DB
DIFF
DMPR
EA
EAT
ECG
EF
FCU
FD
FM
FP
FEU
GRD
HC
HR
IWAC
TO BE DETERMINED
TENANT IMPROVEMENTS
TOP OF CONCRETE
TOP OF
TYPICAL STEEL
UNDERGROUND
UNLESS NOTED OTHERWISE
VARIABLE AIR VOLUME
VOLUME DAMPER
IFY
VARIABLE FREQUENCY DRIVE
VARIABLE SPEED DRNE
WITH
WITHOUT
AIR CONDITIONING
ACOUSTICAL CEILING TILE
AIR HANDLING UNIT
BACKDRAFT DAMPER
BOTTOM OF DUCT
COOLING COIL
COMPUTER ROOM UNIT
COOLING TOWER
CONSTANT VOLUME
DRY BULB
DIFFUSER
DAMPER
EXHAUST AIR
ENTERING AIR TEMPERATURE
EGGCRATE GRILLE
EXHAUST FAN
FAN COIL UNIT
FIRE DAMPER
FREQUENCY MODULATION
FIRE PROTECTION; FAN POWERED
FAN TERMINAL UNIT
GRILLE, REGISTER, DIFFUSER
HEATING COIL
HEATING RETURN
HEATING, VENTILATION AND
AIR CONDITIONING
LAT LEAVING AIR TEMPERATURE
LD LINEAR DIFFUSER
MC
MECH
MOD
MUA
MECHANICAL CONTRACTOR
MECHANICAL
MOTOR OPERATED DAMPER; MODULATING
MAKE UP AIR
OA OVERALL; OUTSIDE AIR
0BD OPPOSED BLADE DAMPER
RA
RAT
RCP
RIu
SA
SAT
SD
SF
S/FD
SLSM
SM
SP
TDH
TG
TOD
TSP
UH
WB
WC
WG
RETURN AIR •
RETURN AIR TEMPERATURE
REFLECTED CEILING PLAN
ROOF TOP UNIT
SUPPLY AIR
SUPPLY AIR TEMPERATURE
SMOKE DAMPER
SUPPLY FAN
SMOKE FIRE DAMPER
SOUND UNED
SOUND UNED SHEET 'METAL
SHEET METAL
STATIC PRESSURE
TOTAL DYNAMIC HEAD
TRANSFER GRILLE
TOP OF DUCT
TOTAL STATIC PRESSURE
UNIT HEATER
WET BULB
WATER COLUMN
WATER GAUGE
PLUMBING
AD AREA DRAIN
CO
DCW
DHW
DHWC
DSP
EWC
FD
IE
IN WC
RV
NPCW
ORL
PD
PERF
PI.BG
PRV
RPBP
SD
SS
VTR
WC
WSP
PIPING
BP
CD
CHW
CHR
CHS
CT
EWT
FM/
LWT
TOP
CLEAN OUT; CARBON MONOXIDE
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RECIRCULATION
DRY STANDPIPE
ELECTRICAL WATER COOLER
FLOOR DRAIN
INVERT ELEVATION
INCHES WATER COLUMN
IONIZED WATER; INDIRECT WASTE
NON POTABLE COLD WATER
OVERFLOW RAINWATER LEADER
PLANTER DRAIN; PRESSURE DROP
PERFORATED
PLUMBING
PRESSURE REDUCING VALVE
REDUCED PRESSURE
BACKFLOW PREVENTER
STORM DRAIN
SANITARY SEWER
VENT THROUGH ROOF
WASTE
WATER CLOSET
WATER HEATER
WET STANDPIPE
BACKFLOW PREVQNTFJR
CONDENSATE DRAIN
CHILLED WATER
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CONICAL TEE
ENTERING WATER TEMPERATURE
FIRE HOSE VALVE
LEAVING WATER TEMPERATURE
TOP OF PIPE
PIPING IDENTIFICATION
HVAC
PLUMBING
A
COND
-CDR-
CDS
CHS
-CHR-
G
115
RL
ST
GRW
GAW
10
RR
NP
ORL
PSD
RWL
—101/L—
SD
SS
UD�
_V_,.
W
W
PIPING FITTINGS
ItI
10
Il
IX' x
LT
}}I
t
. .f 1 1
VALVES
PI A
oI
Pail
IJ4
PIPING ACCESSORIES
4AV
Li
O
�4.
WATTS/LF
RPBP
Y
0
NMI
11111
A
COND
CDR
CDS
CHS
CHR
G
HR
HS
RL
RS
sr
GRW
GAW
HW
HWC
ID
IRR
NPCW
ORL
PW
D
RWL
RWL
SD
SS
UP
V
w
COMPRESSED AIR PIPE
'CONDENSATE DRAIN PIPE
CONDENSER WATER RETURN PIPE
CONDENSER WATER SUPPLY PIPE
CHILLED WATER SUPPLY PIPE
CHILLED WATER RETURN PIPE
NATURAL GAS PIPE
HEATING WATER RETURN PIPE
HEATING WATER SUPPLY PIPE
REFRIGERANT UQUID PIPE
REFRIGERANT SUCTION PIPE
STEAM SUPPLY
COLD WATER PIPE (POTABLE)
GREASE WASTE
GARAGE WASTE
HOT WATER PIPE (POTABLE)
HOT WATER CIRCULATING (POTABLE)
INDIRECT DRAIN
IRRIGATION WATER PIPE
NON - POTABLE CW PIPE
OVERFLOW RAINWATER LEADER
PUMPED WASTE
PUMPED STORM DRAIN
RAINWATER LEADER BELOW GRADE
RAINWATER LEADER
STORM DRAIN PIPE
SANITARY SEWER PIPE (SITE)
UNDERDRAIN PIPE
VENT PIPE (SANITARY)
WASTE PIPE
WASTE PIPE BELOW GROUND
TEE W /PIPE UP
TEE DOWN W /ELBOW
TEE UP W/ ELBOW
TEE UP
TEE DOWN
90' ELBOW UP
90' ELBOW DN
CAP
UNION
FLANGE
R.EX HOSE CONNECTION
DOUBLE BELLOWS FLEX CONNECTION
SINGLE BELLOWS FLEX CONNECTION
FLOW ARROW
CONCENTRIC REDUCER
ECCENTRIC REDUCER
SLOPE SYMBOL
BREAK OR CONTNUATION SYMBOL
DOWN SPOUT NOZZLE
CLE/NOUT
45' ELBOW
45 ELBOW
90' EL BOW
90' ELBOW
CROSS
TEE
WYE
TAP
HOSE CONNECTION
MOTORIZED 2 -WAY VALVE
MOTORIZED 3 -WAY VALVE
PRESSURE REDUCING VALVE
CONTROL VALVE
RELIEF VALVE
BALI. VALVE
3 -WAY GATE VALVE
BUTTERFLY VALVE
DIAPHRAGM VAVVE
CHECK VALVE
NEEDLE VALVE
GLOBE VALVE
GLOBE VALVE ANGLE
GLOBE VALVE 3 -WAY
GATE VALVE
PLUG VALVE
BALANCING VALVE
HOSE BBB
PUMP
MANUAL AIR VENT
AUTOMATIC AIR VENT
HIGH CAPACITY AIR VENT
SHOCK ARRESTOR
FLOW SWITCH
VACUUM BREAKER
PRESSURE GAUGE
TEMPERATURE SENSOR
TEMPERATURE INDICATOR
AUTO FLOW VALVE
FLOW METER
Y STRAINER
Y STRAT � iNER W/ BALL. VALVE
PIPE SLEEVE
STEAM TRAP
PETES PLUG
HEAT 'TRACING
SUCTION DIFFUSER W/ STRAINER
REDUCED PRESSURE
BACKFLOW PREVENTOR
FUNNEL. DRAIN
FLOOR DRAIN
ROOF DRAIN
ROOF OVERFLOW DRAIN
FLOOR SINK
REVISIONS
No changes shall be made to the scope
of work without prior approval of
Tukwila Building Division.
NOT Revisions will require a new plan submtltal
end may include additional plan review fees.
DUCTWORK ACCESSORIES
=]:13
{HOC
BIRDSCREEN OR SCREENED OPENING
SUPPLY GRIUE
RETURN OR EXHAUST GRILLE
VOLUME DAMPER
MOTOR OPERATED DAMPER
AIRFLOW MONITOR
REMOTELY OPERATED VOLUME DAMPER
(YOUNG REGULATOR OR APPROVED)
BACK DRAFT DAMPER
COORDINATE WITH CEIUNG APPURTENANCES.
FLEX CONNECTION
FIRE DAMPER THROUGH WALL
---� FIRE DAMPER THROUGH FLOOR
FIRE /SMOKE DAMPER THROUGH WALL
FIRE /SMOKE DAMPER THROUGH FLOOR
ACCESS DOORS
•
12x12 SL
12x12 2 *SL
ormemoomallo
—I 1
DUCTWORK
RECTANGUIAR DUCT
RECTANGULAR DUCT
RECTANGULAR DUCT
RECTANGULAR DUCT
r ACOUSTICALLY LINED DUCT
2' ACOUSTICALLY UNED DUCT
CHANGE OF ELEVATION RISE(R) DROP(D)
TRANSITION
TURNING VANES
SMOKE DETECTOR
RETURN / EXHAUST / OUTSIDE AIR
SUPPLY / TRANSFER AIR
TERMINAL UNITS - SEE SCHEDULE FOR TYPE
SUPPLY AIR DUCT
TURNING UP OR TOWARD
SUPPLY AIR DUCT
TURNING DOWN OR AWAY
EXHAUST OR RETURN AIR DUCT
TURNING UP OR TOWARD
EXHAUST OR RETURN AIR DUCT
TURNING DOWN OR AWAY
F—Gb ROUND DUCT
TURNING UP OR TOWARD
ROUND DUCT
TURNING DOWN OR AWAY
OVAL DUCT
TURNING UP OR TOWARD
OVAL DUCT
TURNING DOWN OR AWAY
FLEXIBLE DUCT
HVAC - ANNOTATION
VAV BOX TAG
1 -23
S-C8-09-A
000
S -C8 -1 A
FLOOR 1 - DISCRETE BOX
SEE BELOW •
PRIMARY .CFM
FAN CFM
ACOUSTICAL ACCESSORIES (IF REQ'D)
KW OF AUX. HEAT.
VAV BOX SIZE; SEE SCHED.
SERIES ARLLE. FANPPWEERRED BOX�)(P)
GRILLE /REGISTER/DIFFUSER
DOUBLE LINE
CEIUNG SUPPLY AIR DIFFUSER
CEIUNG SUPPLY AIR DIFFUSER
(SHOWN WITH THROW ARROWS)
CEIUNG RETURN, EXHAUST
OR TRANSFER AIR GRILLE
UNEAR DIFFUSER ( CEIUNG)
UNEAR DIFFUSER (WAU.)
LOUVER PLAN VIEW
LOUVER (ELEVATION VIEW)
CONTROLS LEGEND
DEVICE/POINT
SEPARATE PERMIT
REQUIRED FOR:
4Methardcal
Et Electrical
D Plumbing
D Gas Plpkig
City of Tukwila
BUILDING DIVISION
A
ADS
AMS
ATB
CO
CPA
CS
DPS
DS
sD
DSO
EC
EA
EAV
EF
E/P
9i'
FZ
FHV
H
HL
LL
MA
MOD.
OR [3741,044-
D9:1
El
NC
NO
OS
OA
9 OR at4r '
I1
PA
PF
PS
RA
S
SA
SAV
55
SP
TS
VFD
NUMBER
ALARM
AIR DIRT SEPARATOR
AR FLOW MEASURING STATION
AIR TERMINAL BOX
CARBON DIOXIDE SENSOR
CARBON DIOXIDE
CARBON MONOXIDE
CONTROL POINT ADJUSTMENT
CURRENT SENSING RELAY
MC CONTROL RELAY
DIFFERENTIAL PRESSURE SENSOR
VICINITY MAP
DIFFERENTIAL PRESSURE SENSOR
DOOR SENSOR
DUCT SMOKE DETECTOR
DUCT SMOKE DETECTOR
ELECTRIC HEATING COIL
EXHAUST AIR
EXHAUST AIR VALVE
EXHAUST FAN
ELECTRONIC TO PNEUMATIC SIGNAL CONVERSION.
FAN OR PUMP
FINAL FILTER
FREEZE STAT
FUME HOOD VALVE
HUMIDITY SENSOR
HUMIDITY SENSOR
HIGH LIMIT
LOW UMIT
MIXED AIR
MODULATING SIGNAL
MOTOR OPERATED DAMPER
MOTOR OPERATED CONTROL VALVE
MOTOR STARTER
NORMALLY CLOSED
NORMALLY OPEN
OCCUPANCY SENSOR
OUTSIDE AIR
PNEUMATIC OPERATED DAMPER
PNEUMATIC OPERATED CONTROL VALVE
PRIMARY AIR
PRE FILTER
PRESSURE SENSOR
PUMP
RETURN AIR
STATUS
SUPPLY AIR
SUPPLY AIR VALVE Date, 1 t ('�
LEGAL DESCRIPTION
1 W 190 FT OF E 565 FT OF S 320 FT OF SW 1/4 OF SE 1/4 LESS CORD
DRAWING INDEX
SHEET NUMBER
SHEET TITLE
MO.0
MECHANICAL LEGEND
MO.1
GENERAL NOTES AND BASIS OF DESIGN
MD2.0
FLOOR PLAN - MECHANICAL DEMO
M2.0
FLOOR PLAN - MECHANICAL
M2.1
ROOF PLAN - MECHANICAL
•
M3.0
ENLARGED BOILER ROOM MECHANICAL PLANS
M3.1
ENLARGED FILTER ROOM MECHANICAL PLANS
2
LA: ' • IR . ` R ROOM MECHANICAL PLANS
5.
ME HANICAL ' ETAILS
.1
' EC- ' CAL ' AI S
M5.2
EQUIPMENT CONNECTION DETAILS
M6.0
HEATING WATER PIPING AND CONTROLS DIAGRAMS
MD6,1
PLUMBING ONE -LINE DIAGRAM -DEMO
M6.1
PLUMBING ONE -LINE DIAGRAM
M7.0
EQUIPMENT SCHEDULES
M7.1
EQUIPMENT SCHEDULES
M7.2
EQUIPMENT SCHEDULES
GENERAL INFORMATION SYMBOLS
X
•
FILE COPY _.
Permit No., ff-71(2---'1 ,
Pim review approval is subject to errors and omissions.
Approval of constuctIon documents does not authollz3
the v,olation of an adopted •. _ or ordinance. Receipt
Of cpprOVed .
Ir` W
By -
START /STOP
SASH POSITION SENSOR
TEMPERATURE SENSOR
TEMPERATURE SENOR
VARIABLE FREQUENCY DRIVE
VARIABLE FREQUENCY DRIVE
City Of'�ukwffa
BUILDING DIVISION
EQUIPMENT TAG
IEF-2-11
REVIEWED FOR
CODE COMPLIANCE
APPROVED
NOV 0 8 2012
City o Tu Wila
BUILDIN VISION
NEW MECHANICAL WORK
EXISTING MECHANICAL WORK
DEMO MECHANICAL WORK
DETAIL OR DIAGRAM NUMBER
SHEET NUMBER
WHERE DETAIL /DIAGRAM SHOWN
PLAN NUMBER
SHEET NUMBER WHERE, PLAN SHOWN
REVISION NUMBER -- DENOTES NUMBER AND DATE
WHEN REVISION OR ISSUE OCCURED
REVISION CLOUD - DENOTES AREA OF CHANGE
DETAIL REFERENCE OUTLINE
WITH NUMBER AND SHEET LOCATION
DRAWING NOTE REFERENCE
POINT OF CONNECTION
POINT OF DEMOLMON
•-- CONSECUINE
EQUIP. f
FLOOR OF EQUIP.
LOCATION
EQUIPMENT
DESIGNATION
EQUIPMENT TAG
RECEIVED
CITY OF TUKWILA
OCT 1 0 2012
PERMIT CENTER
?Gp 189
For Th
instry
Ile Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1 -800- 669 -6223
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 -331 -0234
www.mckinsttry.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
POOL
RINIMMINIIIMAROMINIMMINIMMIN
REVISIONS:
817/12 50% Do
9/4/12 75% CD'S
9/26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
ENGINEERING
ARUSS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31/12
AS SHOWN
MECHANICAL LEGEND
SHEET NUMBER:
M0.0
GENERAL NOTES:
1. THE CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE AND DETERMINE NE EXACT EXTENT OF WORK, COORDINATION, DEMOLITION, TEMPORARY
CONSTRUCTION, TEMPORARY FACILITIES, ETC, NECESSARY TO COMPLETE THE PROJECT AS INDICATED IN THE CONTRACT DOCUMENTS.
2. INTERRUPTIONS OF SERVICES (POWER, WATER, HVAC, ETC.) AND WORK IN OCCUPIED TENANT SPACES MUST BE SCHEDULED THRU THE BUILDING
MANAGER A MINIMUM OF 24 HOURS IN ADVANCE. ANY INTERRUPTIONS OR CONSTRUCTION WHICH WILL AFFECT NORMAL OPERATION OF THE BUILDING
OR TENANTS MUST BE SCHEDULED, WITH THE BUILDING MANAGER'S APPROVAL ON AN AFTER -HOURS BASIS.
3. MECHANICAL CONTRACTOR IS RESPONSIBLE FOR TEMPORARY HEAT DURING CONSTRUCTION. PERMANENT MECHANICAL EQUIPMENT SHALL NOT BE USED
FOR TEMPORARY HEAT WITHOUT PROTECTION FROM DUST ACCUMULATION, WRITTEN ACCEPTANCE OF DUST RELATED WARRANTY COSTS, AND PRIOR
APPROVAL BY THE MECHANICAL ENGINEER,
4. FURNISH LABOR, MATERIALS, EQUIPMENT, APPARATUS AND APPURTENANCES REQUIRED FOR A COMPLETE WORKING AND COORDINATED SYSTEM.
MATERIALS, EQUIPMENT, APPARATUS, AND APPURTENANCES SHALL MATCH EXISTING BUILDING STANDARDS IN QUALITY, TYPE AND FINISH, UNLESS
OTHERWISE NOTED.
5. VERIFY PHYSICAL DIMENSIONS OF EQUIPMENT. COORDINATE THE EXACT LOCATIONS OF NEW MECHANICAL MD PLUMBING EQUIPMENT WITH THE
LOCATIONS OF LIGHTING FIXTURES, PIPING, AND OTHER CONSTRUCTION, TO ALLOW FOR PROPER ACCESS TO SERVICE AND MAINTAIN EQUIPMENT PRIOR
TO START OF CONSTRUCTION.
6. COORDINATE THE LOCATION OF DUCTWORK AND PIPING WITH .OTHER TRADES. PROVIDE OFFSETS IN DUCTWORK AND PIPING AS REQUIRED AT NO
ADDITIONAL COST TO OWNER.
7. TRADES TO LEAVE 36" CLEARANCE IN FRONT OF MECHANICAL EQUIPMENT ACCESS PANELS FOR SERVICING.
8. INSTALL DUCTWORK AND PIPING TO ALLOW MINIMUM ACCESS OF 6" ABOVE AND TO THE SIDE OF THE ELECTRICAL CABLE TRAYS.
9. SUPPORT CONDUIT, PIPING, AND DUCTWORK INDEPENDENTLY. SUPPORTS ARE INDEPENDENT OF PART1TiON AND CEILING SYSTEM SUPPORTS.
10. IN NO INSTANCE SHALL OTHER TRADES HANG OR SUPPORT EQUIPMENT, CEILING WIRES, LIGHT FIXTURE HANGERS, ETC., FROM HVAC EQUIPMENT,
DUCTWORK, OR PIPING. .
11. CUTTING, FRAMING, PATCHING, AND PAINTING OF WALL, CEILING, AND FLOOR OPENINGS : SHALL BE BY GENERAL CONTRACTOR. THIS INCLUDES OPENINGS
THROUGH AREA SEPARATION WALLS
12. OBTAIN WRITTEN APPROVAL OF. STRUCTURAL ENGINEER PRIOR TO INSTALLATION OF PENETRATIONS IF NOT SHOWN ON DRAWINGS.
13. REFER TO STRUCTURAL DRAWINGS FOR EQUIPMENT SUPPORTS. REFER TO THE SPECIFICATIONS MATRIX FOR ADDITIONAL SEISMIC INFORMATION.
14. UNIT WEIGHTS AND LOCATIONS HAVE BEEN COORDINATED TO DETERMINE BUILDING STRUCTURAL ADEQUACY. IF IT IS NECESSARY TO RELOCATE A UNIT,
NOTIFY MCKINSTRY ENGINEERING DEPARTMENT FOR RE-- COORDINATION.
15. PROVIDE SEISMIC RESTRAINTS AND ANCHORAGE PER SMACNA AND THE INTERNATIONAL BUILDING CODE FOR DUCTWORK, PIPING, AND EQUIPMENT.
16. CONCRETE EQUIPMENT CURBS, FLASHINGS, SLEEPERS, CONCRETE STATIONS, EMBED PLATES, PIPING RAT SLABS, SUMP BASINS, AND HOUSEKEEPING
PADS ARE SHOWN FOR APPROXIMATE LOCATION AND SIZE AND WILL BE PROVIDED BY THE GENERAL CONTRACTOR.
17. CUTTING AND PATCHING OF ROOF OPENINGS SHALL BE BY THE GENERAL CONTRACTOR.
18. SLEEPERS, HOUSEKEEPING PADS, EMBED PLATES, AND CANT STRIPS SHALL BE BUILT AND FASTENED TO THE ROOF BY THE GENERAL CONTRACTOR.
TOP OF THE CURB MUST BE FLAT TO PROVIDE AN ACCEPTABLE SEALING SURFACE. MAXIMUM ALLOWABLE DEVIATION FROM LEVEL SHALL BE %? IN 10'.
ROOF CURBS AND SLEEPERS MUST BE SECURELY FASTENED TO STRUCTURAL SUPPORT MEMBERS.
19. LOUVERS, BOTH DUCTED AND NON- DUCTED, ARE TO BE FURNISHED AND INSTALLED BY THE GENERAL CONTRACTOR. LOUVERS ARE SHOWN ON THESE
PLANS BOTH FOR COORDINATION, AND TO INDICATE THE REQUIRED LEVEL OF PERFORMANCE. LOUVERS OF ALTERNATE MAKE AND /OR TYPE MAY BE
SUBSTITUTED ONLY IF THEY HAVE BOTH PRESSURE DROP AND WATER CARRY-OVER PERFORMANCE EQUAL TO OR BETTER THAN THE LOUVERS SPECIFIED.
LOUVERS MUST CONTAIN THE FREE AREA REQUIREMENT INDICATED ON THE MECHANICAL PLANS. OTHER LOUVER MODELS WITH EQUAL OR BETTER FREE
AREA, . WATER CARRY-OVER, AND PRESSURE DROP MAY BE SUBSTITUTED IF APPROVED BY THE MECHANICAL ENGINEER AND ARCHITECT.
20. ALL CRANE LIFTING AND SETTING OF EQUIPMENT, PIPING, DUCTWORK, ETC. IS TO BE PERFORMED BY GENERAL CONTRACTOR. EQUIPMENT REQUIRES
SPECIFIC RIGGING TO PREVENT DAMAGE. SEE EQUIPMENT SUBMITTALS FOR UFTING INSTRUCTIONS.
21. BEFORE MAKING CONNECTIONS TO THE EQUIPMENT FURNISHED BY THE OWNER OR OTHERS, VERIFY THAT EXACT INFORMATION IS PROVIDED.
22. PROVIDE PIPE, EQUIPMENT, AND VALVE LABEUNG FOR IDENTIFICATION. MATCH OWNERS EXISTING LABELING SCHEME IF APPUCABLE,
23. UGHT FIXTURE CLEARANCE: COORDINATE LOCATIONS OF MECHANICAL WORK TO PROVIDE CLEARANCES OVER UGHTING FIXTURES FOR REMOVAL AND
REPLACEMENT.
24. PROVIDE MODIFICATIONS TO THE EXISTING SPRINKLER SYSTEM FOR ALL REMODEL AREAS.
25. PROVIDE FIRE SAFE PENETRATIONS OF FIRE RATED CONSTRUCTION.
26. MINIMUM VENTILATION QUANTITIES SHALL COMPLY WITH OR EXCEED THE 2009 INTERNATIONAL MECHANICAL CODE WITH THE WASHINGTON STATE
AMENDMENTS.
SUBMITTAL NOTES;
1. PROVIDE A HVAC /PLUMBING EQUIPMENT AND COMPONENT SUBMITTAL PACKAGE. INCLUDE IN THE PACKAGE SUBMITTALS FOR ITEMS INCLUDED ON THE
SCHEDULE AND /OR SPECIFICATION. SHEETS. ALSO INCLUDE SUBMITTALS FOR VALVES, GAUGES, DAMPERS, COILS AND INSTRUMENTATION. PIECEMEAL SUBMITTALS ARE
PIECEMEAL SUBMITTALS ARE NOT ACCEPTABLE.
2. PROVIDE CONTROLS SUBMITTAL PACKAGE. INCLUDE IN THE PACKAGE SUBMITTALS FOR SEQUENCE OF OPERATIONS, SYSTEM DIAGRAMS, ARCHITECTURE
DIAGRAMS, PLANS, PLUS EQUIPMENT AND COMPONENTS.
3. THE PIPING CONTRACTOR SHALL PROVIDE FULL SUBMITTALS OF PIPING AND DEVICES FOR APPROVAL PRIOR TO PURCHASE AND INSTALLATION.
4. PROVIDE CONTRACTOR PREPARED SHOP DRAWINGS OF CONTRACTOR FABRICATED SHEET METAL SYSTEMS. DRAWINGS SHALL BE PREPARED AT 1/4"
SCALE USING COMPUTER AIDED DESIGN (CAD) SOFTWARE UNLESS INDICATED OTHERWISE. DRAWINGS SHALL SHOW EXACT LOCATION OF EQUIPMENT
AND DUCTWORK, EACH SECTION OF SHOP FABRICATED DUCT AND LOCATION OF FIELD JOINTS, SUPPORTS, AND BUILDING ATTACHMENTS, AND
SEISMIC RESTRAINT LOCATIONS.
ELECTRICAL COORDINATION NOTES;
1. WHERE INDICATED ON THE EQUIPMENT SCHEDULES, THE EQUIPMENT COMES COMPLETE FROM THE FACTORY WITH MOTOR CONTROLS AS REQUIRED.
ELECTRICIAN SHALL PROVIDE SERVICE AND A DISCONNECT PER CODE, AND POWER WIRING, INCLUDING CONNECTING TO EQUIPMENT.
2. WHERE INDICATED ON EQUIPMENT SCHEDULES, THE EQUIPMENT REQUIRES FIELD INSTALLED MOTOR STARTERS. ELECTRICAL CONTRACTOR SHALL FURNISH
AND INSTALL MOTOR • STARTERS (OR CONTACTORS WHERE INDICATED). PROVIDE SERVICE AND DISCONNECT PER CODE, AND POWER WIRING, INCLUDING
CONNECTING TO EQUIPMENT. HOLDING COIL CIRCUIT SHALL BE POWERED BY ELECTRICAL CONTACTOR (120V UNLESS INDICATED OTHERWISE). STARTERS
SHALL BE. PROVIDED WITH H -O -A SWITCH, EXCEPT SMOKE CONTROL FANS SHALL NOT HAVE HAND OFF POSI11ONS ON THE STARTERS AS .NOTED ABOVE.
3. REFER TO ELECTRICAL DRAWINGS FOR ELECTRICAL CHARACTERISTICS OF THE MECHANICAL EQUIPMENT, UNLESS OTHERWISE NOTED.
DEMOLITION NOTES;
1. DEMOLITION DRAWINGS ARE INCLUDED TO • GIVE A COMMON BASIS FOR BIDDING AND MAY NOT SHOW EVERY ITEM TO BE DEMOLISHED. VISIT SITE TO
DETERMINE AND COORDINATE THE EXACT EXTENT OF DEMOLITION TO FACEPLATE WORK INDICATED BY THE CONTRACT DOCUMENTS. REWORK EXISTING
TERMINATIONS, CONNECTIONS, ETC., TO ACCEPT NEW WORK. PRIOR TO START OF ANY DEMO WORK, VERIFY EXISTING CONDITIONS AND NOTIFY ENGINEER
OF ANY DISCREPANCIES FOR . RESOLUTION.
2. REMOVE EXISTING HVAC EQUIPMENT AS INDICATED, INCLUDING ASSOCIATED PIPING, CONTROL SYSTEMS, AND APPURTENANCES.
3. REMOVE EXISTING DUCTWORK AS INDICATED, CAP EXISTING OPENINGS NOT BEING REUSED.
5. REMOVE EXISTING PIPING SERVING ITEMS TO BE REMOVED. CAP OR PLUG BRANCH LINES NOT BEING REUSED.
6. GIVE OWNER THE OPPORTUNITY TO RETAIN ANY REMOVED ITEMS THAT ARE NOT BEING REUSED. DISPOSE OF OTHER ITEMS LEGALLY.
7. CLEAN AND REFURBISH ITEMS INDICATED TO BE REMOVED AND REUSED PRIOR TO REUSE.
PIPING NOTES;
1. BACKFLOW DEVICES, CROSS CONTROL DEVICES, VACUUM BREAKER AND DOUBLE CHECK VALVES TO BE A TYPE APPROVED BY THE STATE OF
WASHINGTON HEALTH SERVICES DMSION.
2. INSTALL AIR VENTS AT HIGH POINTS IN HYDRONIC PIPING. INSTALL DRAIN VALVES IN LOW POINTS IN HYDRONIC PIPING.
3. PROVIDE FLANGES OR UNIONS AT PIPING CONNECTIONS TO EQUIPMENT, COILS, TRAPS, CONTROL VALVES, AND OTHER COMPONENTS TO ALLOW FOR
MAINTENANCE.
4. PROVIDE REDUCERS AS REQUIRED FROM UNE PIPE SIZE TO EQUIPMENT, TRAP, COIL, AND CONTROL VALVE CONNECTION SIZES.
5. PROVIDE OFFSETS FOR BRANCH UNES TO EQUIPMENT TO ALLOW FOR SERVICE AND MAINTENANCE OF EQUIPMENT.
6. PROVIDE DIELECTRIC UNIONS AT CONNECTIONS OF DISSIMILAR PIPE MATERIALS.
7. PIPE SUPPLY WATER UNES TO BOTTOM OF COILS LEAVING AIR SIDE TO OBTAIN COUNTERFLOW ARRANGEMENT.
8. PROVIDE PRESSURE AND TEMPERATURE TEST PORTS AT SUPPLY AND RETURN PIPING CONNECTIONS TO EQUIPMENT.
9. SIZE BALANCING /MEASURING VALVES IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. DO NOT PROVIDE VALVES LARGER THAN UNE SIZE.
10. SYSTEM FILL:
0. AFTER COMPLETION OF PIPING SYSTEM INSTALLATION AND PRESSURE TESTING, AND BEFORE MAKING CONNECTIONS TO EQUIPMENT, REMOVE TRACES
OF DIRT, OIL, PIPE JOINT COMPOUND, ETC. BY FLUSHING PIPE SYSTEM WITH MCKINSTRY APPROVED CLEANER AND RUNNING CIRCULATION PUMPS.
DRAIN, RE -FILL, AND RE -FLUSH SYSTEM IN ORDER TO REMOVE ALL TRACES OF CHEMICAL CLEANER.
b. AFTER SYSTEM HAS BEEN THOROUGHLY CLEANED AND PRESSURE TESTED, FILL WITH A MIXTURE OF WATER AND THE APPROPRIATE CORROSION
INHIBITORS. SUBMIT MIXTURE AND SEND TO MANUFACTURER'S LABORATORY FOR ANALYSIS. ADD WATER AND /OR INHIBITOR AS DIRECTED BY LAB
REPORT. SUBMIT FINAL LAB REPORT TO MCKINSTRY ENGINEERING DEPARTMENT.
c. RUN PUMPS TO CIRCULATE UNTIL THOROUGHLY MIXED AND AIR HAS BEEN PURGED FROM SYSTEM. THEN, DRAW A SAMPLE OF
MIXTURE AND SEND TO MANUFACTURER'S LABORATORY FOR ANALYSIS. ADD WATER AND /OR INHIBITOR AS DIRECTED BY LAB REPORT. SUBMIT
FINAL LAB REPORT TO MCKINSTRY ENGINEERING DEPARTMENT.
d. PRESSURIZE SYSTEM ACCORDING TO THE FOLLOWING SCHEDULE AND LEAVE FILL VALVE CLOSED:
HEATING WATER SYSTEM FILL PRESSURE: 25 PSIG
HEATING WATER SYSTEM REUEF VALVE SETTING: 50 PSIG
PLUMBING NOTES;
1. INSTALL PIPED UTILITIES ON WARM SIDE OF BUILDING INSULATION WHERE THE SERVICE IS SUBJECT TO FREEZING TEMPERATUR
REVCp PL FOR CE
CODE
APPROVED
NOV 0 8 2012
2. PROVIDE INDIRECT DRAIN PIPING FROM REDUCED PRESSURE BACKFLOW PREVENTER (RPBP) TO NEAREST DRAIN. INSTALL FUNN
I REQUIRED.
City of Tukwila
DIVISION
3. PROVIDE CLEANOUTS AS REQUIRED BY PLUMBING CODE. INSTALL CLEANOUTS IN THE FLOOR OR WALL OF THE FLOOR ABOVE FOR PIPES THAT ARE
DIFFICULT TO ACCESS. LOCATE FLOOR CLEANOUTS IN CORRIDORS, TOILET OR JANITOR ROOMS WHEREVER POSSIBLE.
SHEET METAL NOTES;
1. PROVIDE DUCTWORK IN ACCORDANCE WITH SMACNA HVAC DUCT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE, SECOND EDITION, 2005 ( SMACNA
HVACDCS).
2. DUCT SIZES INDICATED ARE INSIDE CLEAR DIMENSIONS.
3. PROVIDE A MANUAL VOLUME DAMPER FOR EACH SUPPLY, RETURN, AND EXHAUST OPENING EXCEPT WHERE PROHIBITED BY CODE. INSTALL AS FAR
FROM INLET OR OUTLET AS POSSIBLE.
4. PROVIDE FLEXIBLE CONNECTION AT EACH DUCT CONNECTION TO FANS, AIR HANDUNG UNITS, AND SIMILAR EQUIPMENT. DO NOT INSTALL ON EQUIPMENT
LOCATED IN FIRE RATED CORRIDOR CEILING.
5. DUCT SMOKE DETECTORS: LOCATE DUCT SMOKE DETECTORS IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. COORDINATE
LOCATION REQUIREMENTS WITH ELECTRICAL.
WASHINGTON STATE ENERGY CODE NOTES;
1. PROVIDE COMMISSIONING PLAN IN ACCORDANCE WITH 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.3.1.
2. PROVIDE SYSTEMS TESTING AND BALANCING IN ACCORDANCE WITH 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.3.2.
3. PROVIDE SYSTEMS, EQUIPMENT, AND CONTROLS FUNCTIONAL TESTING IN ACCORDANCE WITH 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.3.3.
4. PROVIDE SUPPORTING DOCUMENTATION IN ACCORDANCE WITH 2009 WASHINGTON STATE ENERGY CODE 1416.3.4 INCLUDING OPERATION AND
MAINTENANCE MANUALS, HVAC CONTROL SYSTEM MAINTENANCE AND CALIBRATION INFORMATION, HVAC CONTROL SEQUENCE OF OPERATIONS,
COMMISSIONING REPORT, AND RECORD DRAWINGS. , ,
5. PROVIDE OWNER SYSTEMS OPERATION TRAINING IN ACCORDANCE WITH 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.3.4.3.
6. PROVIDE COMMISSIONING COMPUANCE FORM IN ACCORDANCE WITH 2009 WASHINGTON STATE ENERGY CODE SECTION 1416.4.
7. MOTORS SHALL COMPLY WITH CHAPTER 15 OF THE 2009 WASHINGTON STATE ENERGY CODE. FOR ADOIFIONAL DETAILS, SEE EQUIPMENT SCHEDULES
CONTAINED WITHIN THIS DRAWING SET.
8. SYSTEMS SHALL BE INSULATED AS PRESCRIBED IN CHAPTER 14, TABLE 14 -5 OF THE 2009 WASHINGTON STATE ENERGY CODE. FOR ADDMONAL
DETAILS, SEE DUCTWORK AND PIPING SPECIFICATION MATRICES CONTAINED WITHIN THIS DRAWING SET.
RESPONSIBILITY MATRIX
EQUIPMENT
FURNISH
RECEIVE
INSTALL
WIRE
START -UP
DEMO OF EXISTING EQUIPMENT
-
-
MC /EC
-
-
WATER HEATER, PUMPS, SUPPLY FAN, MOTORS
McK
McK
MC
EC
MC /CCN
BOILER BURNER
V
V
V
EC
V /CC
GAS REGULATORS
MC
MC
MC
-
MCN
PIPING, VALVES, SENSOR WELLS, APPURTENANCES
MC
MC
MC
-
MC
DAMPERS, ACTUATORS
CC
CC
CC /MC
CC
CC /MC
COMBUSTION AIR DUCTING, FLUE DUCTING
MC
MC
MC
-
MC
MOTOR STARTERS
MC
MC
EC
EC
EC
CONTROL VALVES
CC
CC
MC
CC
MC /CC
INSULATION
MC
MC
MC •
. -
-
SENSORS
CC
CC
CC
CC
CC
FLOW METERS
CC
CC
MC
CC
MC /CC
WALL MODIFICATIONS
GC
GC
GC
-
-
LINE VOLTAGE WIRING
EC
EC
• EC
EC
EC
LOW VOLTAGE WIRING
CC
CC
CC
CC
CC
INTEGRATION WITH BAS
CC
CC
CC
CC
CC
COMMISSIONING/TESTING/BALANCING
CA
NOTES:
GC - GENERAL CONTRACTOR
CA - COMMISSIONING AGENT
MC - MECHANICAL CONTRACTOR
CC - CONTROLS CONTRACTOR
McK - MCKINSTRY
V - VENDOR
EC - ELECTRICAL CONTRACTOR
MECHANICAL BASIS OF DESIGN
ITEM #
SYSTEM
CRITERIA
CRITERIA SOURCE
CODE BASIS FOR PROJECT ,
1 -1
CODE
2009 INTERNATIONAL MECHANICAL CODE WITH WA STATE AMENDMENTS '
CITY OF TUKWILA
1 -2
CODE
2009 WASHINGTON STATE ENERGY CODE
CITY OF TUKWILA
1 -3
CODE
2009 INTERNATIONAL BUILDING CODE WITH WASHINGTON STATE AMENDMENTS
CITY OF TUKWILA
1-4
CODE
2009 INTERNATIONAL FIRE CODE WITH WASHINGTON STATE AMENDMENTS
CITY OF TUKWILA
1-5
CODE
2009 INTERNATIONAL FUEL GAS CODE WITH WASHINGTON STATE AMENDMENTS
CITY OF TUKWILA
1-6
CODE
2009 INTERNATIONAL PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS
CITY OF TUKWILA
1 -7
CODE
2010 WASHINGTON STATE BOILER AND UNFIRED PRESSURE VESSLE CODE
CITY OF TUKWILA
LOAD BASIS FOR PROJECT
2 -1
OSA TEMP
WINTER OSA DESIGN TEMP = 21 °F DB
2009 WSEC
2-2
INDOOR TEMP '
INDOOR HEATING DESIGN TEMP = 86 °F •
DESIGN APPROACH
2 -3
OSA TEMP
SUMMER OSA DESIGN TEMP = 79 °F DB
2009 WSEC
BASIS FOR BUILDING ENVELOPE
3 -1
ROOF 1
MANUFACTURED CONCRETE PANELS (U- VALUE =0.1)
CONFIRMED ON SITE
3 -2
WALL 1
8" CONCRETE BLOCK W/ 4" FACE BLOCK (U VALUE =0.07)
CONFIRMED ON SITE
3-3
WINDOW 1
INSULATED GLASS (U-VALUE-1.04, SC -0.5)
CONFIRMED ON SITE
3-4
FLOOR 1
POURED CONCRETE (U VALUE -0.1)
CONFIRMED ON SITE
BASIS FOR LOAD CALCULATIONS
4 -1
VENTILATION
QUANTITIES
MINIMUM OUTSIDE AIR VALUES BASED ON ASHRAE 62:1 REQUIREMENTS FOR
POOLS AND SPECTATOR AREAS
DESIGN APPROACH
4-2
INFILTRATION
INFILTRATION RATE OF 0.5 ACH USED IN BUILDING LOAD CALCULATIONS
DESIGN APPROACH
•
BASIS FOR GAS PIPING DESIGN
5 -1
GAS FIRED
EQUIPMENT
BOILER BURNER IS DERATED FROM 4405 CFH TO 4200 CFH TO MEET CONNECTED
LOAD, BUILDING LOAD CALCULATIONS AND GAS METER CAPACITY.
DESIGN APPROACH
5 -2
GAS METER
GAS METER CAPACITY IS 4700 CFH AT 2 PSI.
DESIGN APPROACH
BASIS FOR MISCELLANEOUS ITEMS
6 -1
NATATORIUM
SPACE PRESSURE
NATATORIUM SPACE IS POSITLVELY PRESSURIZED WITH NO SOURCE OF
POWERED RELIEF, RESULTING IN CONTAMINATION OF SURROUNDING SPACES
WITH CHLORINATED AIR. RELIEF PATH IS VIA (4) LOUVERS IN EXTERIOR WALL.
ADDITION OF A RELIEF FAN IS NOT INCLUDED IN THE SCOPE OF THIS PROJECT.
CONFIRMED ON SITE
6-2
LOCKER ROOM
HEATING WATER
COIL
LOCKER ROOM HEATING COIL LEAKS FROM PREVIOUS DAMAGE
CONFIRMED ON SITE
6-3
ADA
REQUIREMENTS
ADA COMPLIANT PLUMBING FIXTURES ARE BEING INSTALLED. EXISTING ADA
SPACES ARE NOT BEING UPGRADED TO FULL COMPLIANCE UNDER THIS SCOPE.
DESIGN APPROACH
6-4
AIR HANDLER
AIR HANDLER SUPPLY FAN IS BEING REPLACED. FAN IS SIZED TO MATCH
AIRFLOW MEASUREMENTS OF 20,800 CFM TAKEN ON SITE AND MAINTAIN A
MINIMUM OF 6 ACH. SPACE VOLUME OF 200,000 SQ FT REQUIRES A MINIMUM
AIRFLOW OF 20,000 CFM TO MAINTAIN 6 ACH.
DESIGN APPROACH
6 -5
DISCHARGE AIR
TEMPERATURE
AIR HANDLER CONTROLS SPECIFIED TO ACHIEVE 100F DISCHARGE AIR
TEMPERATURE,
DESIGN APPROACH
6-6
SEISMIC
CONNECTION DETAILS ARE BASED ON A SEISMIC IMPORTANCE FACTOR OF 1.5
DESIGN APPROACH
6 -7
MECHANICAL
ROOM EXHAUST
THE MECHANICAL ROOM EXHAUST FAN IS DISABLED. MECHANICAL ROOM IS NOT
BEING EXHAUSTED TO REMOVE CHLORINATED AIR. EQUIPMENT IN MECHANICAL
SPACE .EXHIBITS SIGNS OF EXTENSIVE CORROSION. REPLACEMENT OF THE
EXHAUST FAN IS NOT WITHIN THE BASE SCOPE OF THIS PROJECT.
CONFIRMED ON SITE
6-8
FUEL SYSTEM
BOILER WILL OPERATE ON NATURAL GAS.
CONFIRMED ON SITE
6 -9
DOMESTIC WATER
HEATER
DOMESTIC WATER HEATER SIZING IS BASED ON FIXTURE COUNT AND FLOW
RATES WITH A 640 GALLON PER HOUR RECOVERY RATE AT A WATER
TEMPERATURE RISE OF 90F.
DESIGN APPROACH
6 -10
LOCKER ROOM
FANS
THE SUPPLY AND EXHAUST FANS ARE CONSTANT VOLUME AND THE SYSTEM
SUPPLIES 100% OUTSIDE AIR TO THE LOCKER ROOMS, LOBBY, FIRSTAID,
JANITOR AND MANAGERS OFFICE.
DESIGN APPROACH
6 -11
POOL FILL WATER
METER
WATER METER INSTALLATION DETAIL IS SHOWN WITH BY -PASS PIPING FOR
MAINTENANCE OF THE METER.
DESIGN APPROACH
BASIS FOR HEATING SYSTEM DESIGN
7 -1
HEATING WATER
PUMP
PUMP SIZED TO MATCH EXISTING PUMP FLOW. EXISTING PUMP DIFFERENTIAL
PRESSURE MEASURED AT 39.6 FT H20. PUMP HEAD CALCULATION PERFORMED
TO VERIFY PUMP HEAD REQUIREMENTS. AVAILABLE PUMP HEAD HAS BEEN
INCREASED FROM EXISTING EQUIPMENT.
DESIGN APPROACH
7 -2
SYSTEM VOLUME
BASED ON INFORMATION PROVIDED ON THE MECHANICAL PLANS DATED
6/29/1990. HEATING COIL VOLUMES NOT LISTED, VOLUMES CALCULATED USING
3RD PARTY SOFTWARE AND USED W SIZING OF EXPANSION TANK
DESIGN APPROACH
7 -3
BOILER BURNER
SIZING CRITERIA
HEATING WATER PLANT SIZE IS BASED ON SPECIFIED HEATING WATER PUMP
CAPACITIES AT 20° AT. (180 °F SUPPLY AND 160°F RETURN)
DESIGN APPROACH
7-4
HEATING WATER
SYSTEM
HEATING WATER SYSTEM IS A VARIABLE FLOW CONFIGURATION WITH CONSTANT
VOLUME PUMPS. PUMPS WILL RIDE THE PUMP CURVE TO MEET CHANGES IN
DEMAND.
DESIGN APPROACH
7 -5
FREEZE
PROTECTION
THE HEATING WATER LOOP CONSISTS OF 100% WATER WITH NO ADDITIVES FOR
FREEZE PROTECTION. SEE CONTROLS SEQUENCE FOR FREEZE PROTECTION
STRATEGY.
PER OWNER
7-6
MINIMUM
FLOW
MINIMUM FLOW OF 57 GPM FOR THE BOILER IS BASED ON THE BURNER MINIMUM
OUTPUT OF 570 MBH AT 206 AT
PER OWNER
7 -7
BOILER SUPPLY
TEMPERATURE
'THE BOILER DESIGN SUPPLY WATER TEMPERATURE IS 180 °F.
PER OWNER
BASIS FOR ADDITIONAL ALTERNATE ITEMS '
8 -1
GENERAL
"ADD ALTERNATE" ITEMS LISTED IN DRAWING SET ARE IDENTIFIED FOR
BUDGETARY PRICING PURPOSES. MINIMAL ENGINEERING HAS BEEN DONE TO
VERIFY FEASABLITY, ADDITIONAL DESIGN WILL BE REQUIRED IF THE MEASURES
ARE ADOPTED AS PART OF THIS PROJECT PHASE.
DESIGN APPROACH
8 2
GENERAL
SUPPLY FAN IS SIZED FOR AN ADDITIONAL 1" W.C. EXTERNAL STATIC PRESSURE
FOR FLEXIBILITY IN THE INSTALLATION OF FUTURE HEAT RECOVERY. ADDITIONAL
MODIFICATIONS TO THE AIR HANDLING SYSTEM WILL BE REQUIRED IF HEAT
RECOVERY IS TO BE IMPLEMENTED IN THE FUTURE.
DESIGN APPROACH
8-3
GENERAL
REFERENCE CONSULTANTS DRAWINGS FOR POOL RELATED CONTROLS AND
EQUIPMENT. THESE ITEMS ARE NOT ADDRESSED IN THE MECHANICAL SCOPE.
DESIGN APPROACH
8-4
GENERAL
POTENTIAL LEAK IN HEATING WATER SYSTEM UNDER POOL DECK IS NOT BEING
ADDRESSED IN THE SCOPE OF THIS PROJECT.
DESIGN APPROACH
,..... ._!... _,.a,
RECEIVED
CITY OF TUKWILA
OCT 10 2012
PERMIT CENTER
P&telft,lect
For Th
instry
ife Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1 -800 -669 -6223
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 - 331 -0234
www.mckinstry.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
(Th
TRACK
POOL
MOMMENIMOMIIIMMEMEMINIME
REVISIONS:
8/7/12 50% DD
9/4/12 75% CD'S
9/26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
ENGINEERING
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31/12
AS SHOWN
SHEET TITLE:
GENERAL NOTES AND
BASIS OF DESIGN
SHEET NUMBER:
M0.1
WOMEN' __LOCKER ROOM
PIPES BELOW
BLEACHERS BACK
TO MECHANICAL
ROOM
SUPPLY DIFFUSER t=, ,._,:
AT END OF
BLEACHERS
C
STAINLESS STEEL
PIPING CHASE
EXISTING SUPPLY
DIFFUSER ALONG
WALL ABOVE
BLEACHERS
a
STAFF
ENTRY
ATTENDANT
0.ERflL
.\\\
7.7-1777.1"
0
FIRST
t;lU
NATATORIUM,
J
RETURN GRILLE
HIGH IN WALL --°'
SUPPLY DUCT
11
II
MCC :HANICAL Room
LOCKER ROOM Q
SUPPLY FAN
OUTSIDE AIR INTAKE
INS LOC KER __ROOM
ELEC. ROOM
1
{ N O'--O"
L
N 6O' -8"
LOCKER ROOM®
EXHAUST FAN
1
RELIEF LOUVERS
(TYP. OF 4)
FLOOR PLAN DEMO - MECHANICAL
SCALE: 1/8" = 1'-0" 0 4' 8' 16'
KEY NOTES
O DEMOLISH SHOWER HEADS, VALVES AND APPURTENANCES.
® DEMOUSH LOCKER ROOM SUPPLY AND RETURN FAN MOTORS.
® DEMOUSH WATER CLOSETS, LAVATORIES, CARRIERS, LAVATORY TRAPS,
AND ASSOCIATED APPURTENANCES.
• DEMOUSH URINAL FLUSHOMETERS.
O DEMOLISH SI1OWERHEADS, VALVES AND TOWER ASSEMBLIES.
® DEMOLISH THERMOSTATIC MIXING VALVES, RETAIN CABINET.
7Q DEMOLISH FAUCET.
` ® ADD ALTERNATE: DEMOUSH ISOLATION VALVES. CONFIRM QUANTITY AND IDENTIFY ADDITIONAL VALVES
NOT SHOWN ON PLANS.
• DEMOUSH THERMOSTAT.
04 DEMOLISH SHOWER PAN AND SURROUND.
11 ADD ALTERNATE: DEMOLISH HEATING COIL AND ASSOCIATED THERMOSTAT.
12 DEMOUSH HEATING COIL CONTROL VALVE.
J
RETURN GRILLE
LOW IN WALL
REVIEWED FOR
CODE COMPLIANCE
APPROVED
NOV 082012
City of Tukwila
BUILDING DIVISION
STOP VALVES, P— TRAPS, CARRIERS
PG1-1%-
RECEIVED
CITY OF TUKWILA
OCT 1 0 2012
PERMIT CE1y-1°
For Tft
instry
fe Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800 -- 669 -6223
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503- 331 -0234
www.mckinstry,com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
REVISIONS:
8/7/12 50% DD
914/12 75% CD'S
9/26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
POOL
TRACK
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
ENGINEERING
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31/12
AS SHOWN
SHEET TITLE:
FLOOR PLAN - MECHANICAL
DEMO
SHEET NUMBER:
MD2.0
N 32' --0°
N 447-0"
N 60'_8r,
PIPES BELOW
BLEACHERS BACK
TO MECHANICAL
ROOM
SUPPLY DIFFUSERS
AT END OF
BLEACHERS
1,1
STAINLESS STEEL
PIPING CHASE
SUPPLY
DIFFUSER ALONG
WALL ABOVE
BLEACHERS
WOMEN'S LOCKER ROOM
®3 SH -3,
H -2
s d"- . -WC 1 _
0§- __WC -2 O
---- WC -1'2
fJ� l.N . W.._., ......_- _.._.»...._- ........, -.
' ,E S
STAFF
.J®
o
E.IIT RY
A l I EiNDANT
M N') LOCK R
MANAGER
CONTROL
FIRST
AID
M -1
LOCKER ROOM
SUPPLY FAN MOTOR
DRAGE
& JANITOR
c.,,, N 12' -0"
! O' -On
ROOM
LOCKER ROOM®
RETURN FAN MOTOR
M -2
ELEC. ROOM
N 6O'• -8'
NATATORIUM
RELIEF LOUVERS (TYP OF 4) .
FLOOR PLAN - MECHANICAL
SCALE: 1/8" = 1'--0" o 4' 8'. 16'
REVIEWED FOR
CODE COMPLIANCE
APPROVED
NOV 0 8 2012
City of Tukwila
BUILDING DIVISION
RETURN GRILLE
HIGH IN WALL --
SUPPLY DUCT
KEY NOTES
M ECI1411 ,\L ROOM
RETURN GRILLE
LOW IN WALL
1
0 PROVIDE CONTROL VALVES FOR HEATING COILS. REFERENCE M7.2 FOR EQUIPMENT SCHEDULES.
® PROVIDE WATER CLOSETS, FLUSHOMETERS, LAVATORIES, STOP VALVES, CARRIERS, P -TRAPS AND FIXTURES. REFERENCE M7.0 FOR
EQUIPMENT SCHEDULES.
3®. PROVIDE SHOWER HEADS, VALVES AND RISER FIXTURES. CLEAN OUT DRAIN LINES BACK TO THE NEXT ACCESSIBLE CLEAN OUT
POINT. REFERENCE M7.0 FOR EQUIPMENT SCHEDULES.
® CONFIGURE MOTOR INSTALLATION TO ALLOW FOR SERVICING AND MAINTENANCE WITHOUT REMOVING SURROUNDING EQUIPMENT.
PROVIDE ACCESS HATCH IN EXHAUST DUCT FOR BELT REPLACEMENT. PROVIDE MOTORS FOR SUPPLY AND RETURN FANS.
REFERENCE M7.0 FOR EQUIPMENT SCHEDULES
®5 PROVIDE FLUSHOMEIERS.
® PROVIDE SPOOL PIECE AS REQUIRED TO CONNECT HOT WATER INLET TO HOT WATER OUTLET. CAP COLD WATER LINE.
®7 PROVIDE SHOWER HEADS AND VALVES. REFERENCE M7.0 FOR EQUIPMENT SCHEDULES.
® PROVIDE SHOWER PAN AND SURROUND. COORDINATE REQUIREMENTS WITH OWNER.
9® ADD ALTERNATE: PROVIDE HEATING WATER COIL AND TEMPERATURE SENSOR.
10 PROVIDE FAUCET. REFERENCE EQUIPMENT SCHEDULES ON M7.0 FOR DETAILS.
11 PROVIDE ISOLATION VALVES. CONFIRM QUANTITY AND SIZE: IDENTIFY ADDITIONAL VALVES NOT SHOWN ON PLANS.
12 PROVIDE ADDITIONAL HOLE IN SINK BASIN FOR MOUNTING FIXTURE.
RECEIVED
CITY OF TUKWILA
OCT 10 2012
PERMIT CENTER
pGP isct
For Th
instry
fe Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800- 669 -6223
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 -331 -0234
www.mckinstry.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
POOL
TRACK
REVISIONS:
8/7/12 50% DD
9/4/12 75% CD'S
9/26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
ENGINEERING
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31/12
AS SHOWN
SHEET TITLE:
FLOOR PLAN - MECHANICAL
SHEET NUMBER:
M2.0
0
w
N O' -0s"
0
N E 2r —On
N
EF -1
MECHANICAL ROOM
EXHAUST FAN /0
BOILER FLUE
(2 -DOMESTIC WATER
HEATER FLUE --
REVIEWED FOR
CODE COMPLIANCE
APPROVED
NOV 0 8 2012
Cit. Y
of Tukwila
BUILDING DIVISION
N O' —On
ROOF PLAN - MECHANICAL
SCALE: 1/8" = 1' -0"
4'
8'
16'
KEY NOTES
0 ADD ALTERNATE: REPLACE MECHANICAL ROOM EXHAUST FAN.
U2 REFERENCE 3/M5.1 FOR DETAILS. .
1)&r).- gq
RECEIVED
CITY OF TUKWILA
OCT 102012
PERMIT CENTER
For Th
instry
ife Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800 -669 -6223
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503-331-0234
www.mckinstry.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
'■
TRACK
POOL
REVISIONS:
8/7/12 50% DD
9/4/12 75% CD'S
9/26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
ENGINEERING
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31/12
AS SHOWN
SHEET TITLE:
• ROOF PLAN - MECHANICAL
SHEET NUMBER:
M2.1
DEMOLITION KEY NOTES
• DEMOLISH DOMESTIC WATER HEATER, GAS PRV. PRV VENT LINES AND ASSOCIATED APPURTENANCES.
® DEMOLISH BOILER BURNER, GAS PRV AND ASSOCIATED APPURTENANCES.
O OEMOUSH DOMESTIC HOT WATER RECIRCULATING PUMP.
O DEMOLISH PIPE' SECTION FOR METER INSTALLATION.
0 DEMOLISH PIPE SECTION FOR AIR SEPARATOR INSTALLATION.
® DEMOLISH PUMP, TRIPLE DUTY VALVE AND APPURTENANCES.
ED -0
STAIRCASE TO ABOVE.._
BOILER ---''
PH
IIMitIE!
.rLilI
CHEMICAL
T FEEDER
3/4"
6 "0
6 "0 FLUE UP
FLOOR DRAIN
2" GAS
FLOOR DRAIN
CL
tt
1/2" DIAMETER
PVC CONDENSATE
DRAIN
SINK
EXISTING
ELECTRICAL
PANELS
(4) 24X30 WPL -1
(2) HIGH & LOW
MOUNTED IN DOOR
GAS LINE FROM METER
BOILER ROOM MECHANICAL DEMO PLAN ea
SALE: 1/4" = ,•-0
KEY NOTES
0 PROVIDE COMBUSTION AIR DUCT TO BOILER BURNER. PROVIDE BIRD SCREEN AND 90' TURN DOWN AT
TERMINATION TO EXTERIOR. REFERENCE 4/M5.1 FOR DETAILS.
®2 ROUTE DUCT UP SIDE OF BUILDING TO ROOF. USE EXISTING ,PENETRATION IN WALL, SEAL AND
WEATHERPROOF PENETRATION. PROVIDE RAIN CAP AT TERMINATION. REFERENCE 3/M5.1 FOR DETAILS.
® PROVIDE THERMOSTATIC MIXING VALVE. REFERENCE 2/M5.1 FOR DETAILS..
® CORE WALL FOR COMBUSTION AIR DUCT PENETRATION. '
®5 ADD ALTERNATE: BLANK OFF (2) UPPER LOUVERS IN DOOR. PAINT TO MATCH DOOR. (INCLUDE WITH
MECHANICAL ROOM EXHAUST FAN ALTERNATE).
® PROVIDE WATER METER ON DRAIN LINE. REFERENCE 2/M5.0 FOR INSTALLATION DETAILS.
®7 REFERENCE 6/M5.0 FOR DETAILS.
® REFERENCE 7/M5.0 FOR PUMP INSTALLATION DETAILS.
® REFERENCE 3/M5.0 FOR GAS PIPING DIAGRAM.
10 PROVIDE BOILER BURNER AND PRV. REFERENCE EQUIPMENT SCHEDULES ON M7.0 AND M7.1.
11 ROUTE PRV VENT TO EXTERIOR, SIZE PIPE PER MANUFACTURERS RECOMMENDATIONS. REFERENCE
4 /M5.0 FOR DETAILS.
WH
REVIEWED FOR
CODE COMPLIANCE
APPROVED
NOV 0 8 2012
City of Tukwila
BUILDING DIVISION
STAIRCASE TO ABOVE-
BOILER ✓'
`/ BUCKET
Z. FILTER
3/4"
FLOOR DRAIN
WATER HEATER
FLUE VENT
EXISTING
ELECTRICAL
PANELS
24X30 LOUVERS LOW
MOUNTED IN DOOR ®5
FLOOR DRAIN
1/2" DIAMETER
PVC CONDENSATE
DRAIN
ri CL
BOILER ROOM MECHANICAL PLAN
SCALE: 1/4" = 1' —O"
6" PVC COMBUSTION
AIR DUCT
GAS LINE FROM METER
PGtoL
18q
RECEIVED
CITY OF TUKWILA
OCT 1 0 2012
PERMIT CENTER
For Th
instry
le Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800 -669 -6223
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503- 331 -0234
www.mckinstry.com
UNIIIMMEININIMMEMMI
PROJECT:
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
TRACK
POOL
REVISIONS:
8/7/12 50% DD
9/4/12 75% CD'S
9/26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
ENGINEERING
DESIGNED BY:.
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31/12
AS SHOWN
SHEET TITLE:
ENLARGED BOILER ROOM
MECHANICAL PLANS
SHEET NUMBER:
M3.0
2 -1/2" HS &
HR UP
2"HWUP
3/4" HWC DN.—'
3 "CWUP
3" CW POOL FILL-
3" CW DN. -- --�'��
°WATER METER
1
----- 3" CW CONN. f'
.� TO EXISTING CW
\ /
I\
\ / 4" HWF
\ HWR UP
X
/ \
\'7,k1R DN.
HS
2" CW DN. TO
POOL MAKE -UP
2—WAY
CONTROL°
VALVE I
3—WAY I
CONTROI L
VALVE0
C
1
fff
2 -1/2" CW DN.
3/4" HWC DN.
2" HW DN.
4" HS DN.
FILTER ROOM DEMO PLAN (1—.)
KEY NOTES DEMOLITION
O DEMOUSH WATER METER.
® DEMOLISH EXPANSION TANK.
® DEMOLISH CONTROL VALVES.
EXPANSION TAN
2 -1/2" HS &
HR UP
2" HW UP 1
3/4" HWC DN /' 1
3" CW UP
3" CW POOL Fl
3" CW DN
«3" CW CONN.
TO EXISTING CW
1%. /
\ / 4" HS
'\ / / HR UP
N. X
/ \
/ , HR\ \
f4 NUR DN.
HS \
N.
ICV -6I
2 —WAY O
CONTROL
VALVE
3 —WAY
dfl -3>3 W "100d
0.1. 'ND MO 2
FILTER ROOM PLAN
•
SCALE: 1/4" 1' -O"
KEY NOTES
2 -1/2" CW DN:
3/4" HWC DN.
2" HW DN.
4" HS DN.
0 PROVIDE POOL MAKE —UP WATER METER. PROVIDE INLET AND OUTLET STitA1GHT PIPE LENGTHS PER
MANUFACTURERS RECOMMENDATIONS. REFERENCE 1/°15.0 FOR DETAILS.
0 PROVIDE EXPANSION TANK. REFERENCE 5A1.5.0 FOR DETAILS.
3° PROVIDE CONTROL VALVES.
ET-1(
RE ED FOR
CODE COMPLIANCE
APPROVED
NOV 082012
City of Tukwila
BUILDING DIVISION
PL(A:-.109
RECEIVED
CITY OF TUKWILA
OCT 10 2012
PERMIT CENTER
For Th
instry
ife Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1-800-669-6223
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503-331-0234
www.mckinstry.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
POOL
REVISIONS:
8/7/12 50% DD
9/4/12 75% CD'S
9)26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
ENGINEERING
ARUSS MERRELL
TIM WHITE
SETH • DAVIS
C10256
7/31/12
AS SHOWN
SHEET TITLE:
ENLARGED FILTER ROOM
MECHANICAL PLANS
SHEET NUMBER:
M3.1
SUPPLY FAN
z
LADDER
L.
1
1
RETURN D
ABOVE --
AIR HANDLER MECHANICAL ROOM PLAN ELEVATION - DEMO
•
SCALE: 1/4" = 1'--0"
FAN MECHANICAL ROOM ELEVATION - DEMO
•
SCALE: 1/4" =
DEMOLITION KEY NOTES
DEMOLISH SUPPLY FAN WITH INERTIA BASE, MOTOR AND SPRING ISOLATION.
ADD ALTERNATE: DEMOUSH HEATING COIL AND ASSOCIATED BRANCH PIPING.
DEMOUSH RETURN AIR CONTROL DAMPER IN DUCT BELOW.
REMOVE PLENUM WALL AND ASSOCIATED ACCESS DOOR. RETAIN FOR REINSTALLATION.
DEMOLISH OUTSIDE AIR CONTROL DAMPER, ACTUATORS AND ASSOCIATED PNEUMATICS.
FLOOR GRID. TO BE REINSTALLED AFTER CONTROL DAMPER IS INSTALLED.
DEMOUSH RETURN AR CONTROL DAMPER AND ACTUATOR IN RETURN AIR DUCT ABOVE
PNEUMATICS
REMOVE 36W1X22"H
AND ASSOCIATED
OUTSIDE
AIR LOWER
48"W x 50"H
DUCT CONNECTION
1
LADDER
RETURN
ABOVE
r7
1
1
1
0
RETURN DUCT
864W x 6611 BELOW
DUCT CONNECTION
TO COIL
LJ
0
2
AIR HANDLER MECHANICAL ROOM PLAN
SCALE: 1/4" = 11--0"
srEEL BAR FLOOR
FAN MECHANICAL ROOM ELEVATION
•
SCALE: 1/4" = 1' -0"
KEY NOTES
O MOUNT SUPPLY FAN AND MOTOR ON INERTIA BASE WI1H SPRING ISOLATION (FURNISHED WUH SUPPLY
FAN). CONTRACTOR TO CONFIRM POSITIVE CONNECTION MD NOTIFY STRUCTURAL ENG!NEER.L
® FLEXIBLE DUCT CONNECTION.
® NOT USED.
® BASE SCOPE CLEAN AND FLUSH AR/WATER SIDES OF EXISTING HEATING COIL
ADD ALTERNATE PROVIDE HEATING COIL CONNECT TO EXISTING BRANCH PIPING.
® PROVIDE 1WO 461X82"H HI —PRO POLYESTER COATED CONTROL DAMPERS.
• REINSTALL ACCESS DOOR.
✓ PRC IDE 381WX2611 HI —PRO POLYESTER COATED CONTROL DAMPER.
® REINSTALL PLENUM WW1.
09 PROVIDE 721X22"H H1 —PRO POLYESTER COATED CONTROL DAMPER ABOVE.
OUTSIDE
AIR DAMPER
SHEET NOTES
. REFERENCE CONTROLS DIAGRAMS ON M6.0 FOR ADDITIONAL. INFORMATION.
▪ REMOVE HEATING COIL, FILTER BANK, AIR KANDLER CABINET AND OUTSIDE AIR LOWER AS
NECESSARY TO REMOVE AND REPLACE SUPPLY FAN THROUGH OUTSIDE AIR OPENING. RETAIN PARTS
FOR REINSTALLATION, REPLACE OBIS DAMAGED DURING REMOVAL
3. DEMOLISH ABANDONED PNEUMATIC LINES.
4. INSTALLED EQUIPMENT AND MATERIALS TO BE CORROSION RESISTANT, SUffABLE FOR USE WDH A
CHLORINATED ENVIRONMENT.
REVIEWED FOR
CODE COMPLIANCE
APPROVED
NOV 0 8 2012
City of Tukwila
BUILDING DIVISION
RECEIVED
CITY OF TUKWILA
OCT 10 2012
PERMIT CENTER
•
For Th
instry
life Of Your Building
•
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800 - 669 -6223
INMENN
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 -331 -0234
www.mokinstty.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
POOL
REVISIONS:
8/7/12 50% DD
9/4/12 75% CD'S
9/26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
ENLARGED AIR HANDLER
MECHANICAL ROOM PLANS
ENGINEERING
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31/12
AS SHOWN
SHEET NUMBER:
M3.2
GAS SUPPLY
GAS SHUT —OFF VALVE
DIRT LEG
DWH -1
GAS
WATER
HEATER
(140T)
FLUE SEE HVAC PLANS
FOR SIZE AND ROUTING
T & P RELIEF
VALVE (TYP)
2"
THERMOSTATIC MIXING VALVE
BOD: LEONARD 1M- 830 —RF /TC
SHUT —OFF VALVE (TYP.)
3/4"
NION (TYP)
F-
r
ECK VALVE (TYP)
ST -1
STORAGE
TANK
(140`F)
"
HOSE END
DRAIN VALVE (TYP)
FLOOR
CONDENSATE DRAIN,
ROUTE TO NEAREST
FLOOR DRAIN
NOTES:
1. SEE PLANS OR RISER FOR PIPE SIZES.
2. T &P VALVES FURNISHED WITH TANKS.
3. REFERENCE 1/M5.2 FOR CONNECTION DETAILS.
ROUTE T &P RELIEF DRAINS
TO NEAREST FLOOR DRAIN
GAS WATER HEATER
STORAGE TANK CONNECTION DETAIL
SCALE: NOT TO SCALE
PVC VENT PIPE SEE
EQUIPMENT SCHEDULE FOR
VENT DIAMETER
LISTED "BIRD — PROOF"
VENT CAP
VENT CAP HEIGHT
BRACE VENT. TO
STRUCTURE
ROOF STRUCTURE (TIP)
EXTERIOR WALL
NOTES:
1. VENT CONE HEIGHT TO BE A MINIMUM OF 3' -0" ABOVE ROOF LINE AND AT LEAST 2'
HIGHER THAN ANY PORTION OF THE BUILDING WITHIN 10'.
2. REFER TO MANUFACTURERS INSTRUCTIONS AND IFGC 503.6.4 "GAS VENT TERMINATION"
FOR ADDITIONAL REQUIREMENTS.
3. VENT CONE HEIGHT TO BE • A MINIMUM OF 4' —O" ABOVE COMBUSTION AIR INTAKES.
�
3 TYPICAL VENT DISCHARGE DETAIL
— J NOT TO SCALE
DRAIN PAN
4 COLD WATER
2
HOT WATER
2"
Iq S HOT WATER RECIRC.
1 \--3/4"
EXPANSION TANK
EXTERIOR WALL
WEATHERPROOF GAP
BETWEEN DUCT AND
WALL.
PROVIDE 90' TURNDOWN
WITH BIRD SCREEN AT
TERMINATION OF
COMBUSTION AIR DUCT
1
HOT
WATER
SOURCE
J.
COLD
SUPPLY II I
HOT WATER
TO FIXTURES
2"
1 BALL VALVE FOR
SETUP
HOT WATER
RECIRC
I
r
TEMPERED
CIRCULATOR
KEY NOTES
01 FURNISH WITH TEST CONNECTION FOR SETUP.
O REFERENCE MANUFACTURERS LITERATURE FOR BALANCING AND SETUP REQUIREMENTS. INITIAL SUPPLY
WATER SET POINT TO BE 120'F.
AQUASTAT
HEAT
TRAP
CHECK
VALVE
CHECK
VALVE
V�......wr....rrr...r w .nom.
BALANCING
VALVE
3/4"
ISOLATION
VALVE
3/4" J.
TEMPERED
RETURN
THERMOSTATIC MIXING VALVE INSTALLATION DETAIL
SCALE: NOT TO SCALE
SEE M3.0 FOR
LOCATION AND SIZE.
TYPICAL COMBUSTION AIR DETAIL
NOT TO SCALE
1)G
REVIEWED FOR
CODE COMPLIANCE
APPROVED
NOV 082012
City of Tukwila
BUILDING DIVISION
'39
RECEIVED
CITY OF TUKWILA
OCT 10 2012
PERMIT CENTER
For Th
instry
fe Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800 -669 -6223
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 -331 -0234
www.mckinstry.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
POOL
TRACK
REVISIONS:
8/7/12 50% DD
9/4/12 75% CD'S
9126/12 90% CD'S
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
ENGINEERING
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31/12
AS SHOWN
MECHANICAL DETAILS
SHEET NUMBER:
M5.1
EDGE OF HOUSEKEEPING PAD
HSS 5x3x3/16 TYP UNO
43x3x3/16x0' -3"
HSS TO HSS (TYP)
1
w
N
41
PLAN
fR
1
1
V
1 -1/2" WIDE x 16 ga
BENT STRAP (TYP)
HSS 5x3 AT TOP OF FRAME
CAP R WITH SEAL WELD TOP
AND BOTTOM. (TYP.)
2" MIN.
<TYP SHARP TO 1455 ]
2" MIN.
HORIZONTAL HSS PER PLAN (TYP)
(ALIGN W /STRAPS)
STRAP PER PLAN (TYP)
HOT WATER HEATER BY OTHERS
VERT HSS PER PLAN
2" MIN.r 12" MIN.
4 PER PLAN (TYP)
HOUSEKEEPING PAD
ELEVATION
REM
1. SPECIAL INSPECTION REQUIRED PER IBC CHAPTER 17.
2. t =GAUGE OF MATERIAL.
� WATER HEATER ATTACHMENT DETAIL
NOT TO SCALE
PROVIDE (4) 1/2" 0 HILTI TZ EXPANSION
ANCHORS W/3 -1/4" EMBEDMENT
ANCHORAGE SCHEDULE
TAG
HIM TZ ANCHOR
EMBEDMENT
NEOPRENE PAD & HG BUSHING
COMMENTS
PUMPS: P -1
CS 1/2" 0
3 --1/4"
MASON SUPER W HG-50
40 FT
EQUIPMENT LEG
BASE RAIL OR
FACTORY CURB
HOUSEKEEPING
PAD
TOC
NEOPRENE ISOLATION
PER SCHEDULE
CONCRETE SLAB
KEY NOTES:
O PROVIDE MASON TYPE HGV -50 BUSHING MASON SUPER W PADS
0 PROVIDE CONNECTION AT EA CORNER TYP, UNO
CONCRETE ANCHOR
PER SCHEDULE
SEISMIC ATTACHMENT DETAIL
NOT TO SCALE
TOLCO FIG 909 1" PIPE ONLY
TOLCO FIG 980 1" THRU 2" IPPE.
OR 12 GA CHANNEL EA END
LONGITUDINAL BRACE AND
CONNECTION TO STRUCTURE ARE
SIMILAR TO TRANSVERSE BRACES
BRACE PER TABLE 1
ALTERNATE BRACE UTILIZE FIG
216, TOLCO FIG 4A IF
TRANSVERSE BRACE IS NOT
LOCATED AT GRAVITY HANGER
STRUCTURE - PROVIDE HILTI J " DIA 12 ANCHOR W/ 3 -1/4" EMBED (MIN.)
SINGLE PIPE TRANSVERSE USING PIPE BRACING ELEVATION DETAIL
STRUCTURE - PROVIDE HIL11 )" DIA 12 ANCHOR W/ 3 -1/4" EMBED (MIN.)
ti
TYPICAL PIPE TO HANGER
ATTACHMENT. UTILIZE STRUT
MANF CLAMP OR BENT ROD
WW MSS SP -58 -2009
45
45 f15 »
SINGLE PIPE LINGITUDINAL USING PIPE BRACING SECTION DETAIL
LONGITUDINAL BRACE AND
CONNECTION TO STRUCTURE
ARE SIMILAR TO TRANSVERSE
BRACES.
LONGITUDINAL BRACE SHALL UTILIZE TOLCO
FIG 4L OR TOLCO FIG 4A WITH FIG 980.
FOR COPPER TUBE UTILIZE COOPER B -LINE
83373CT AS LONGITUDINAL BRACE.
PIPE OD CONDUIT RIGID BRACING SEISMIC DETAIL
NOT TO SCALE
PANSION TANK
CONCRETE
HOUSEKEEPING
PAD
KEY NOTE:
0 SEE 4/M5.2 FOR ADDED INFO. PROVIDE (1) CONCRETE ANCHOR AT EA ANGLE (3) LOCATIONS MIN TYP.
TYPICAL EXPANSION TANK PARTIAL PLAN
NOT TO SCALE
ALLOWABLE BRACE LOADS
mammy
Rim BRACE
M✓��
WEIGHT PER FT AT BRACE SPACING (LB /F1')
A B
SESMIC ROD
CLAMP SPACING
10 FT
20 FT
30 FT
40 FT
LOCAl1ON
MPRB -r p
SCH 40 1"
w
7 FT •
. 46.5
23.2
15.4
11.6
1/2"
12"
MPRB 1.5" P
SCH 40 1.5"
10 FT
74.8
37.4
24.9
18.7
1/2"
12"
1. USE 12 GA GALVANIED OR CADNIUM•PLATED STRUT
2. THE LB /FT VALUES INDICATED IN TABLE ARE DERIVED USING FPH =1.0. THE LB /FT
VALUE MAY BE MODIFIED Ui1UZING THE TRUE ACCELERATION VALUE OBTAINED FROM
THE MECHANICAL SEISMIC DESIGN SHEET. VALUES ARE MODIFIED AS FOLLOWS:
(1 /FPH, ACTUAL) *(LB /FT)= ALLOWABLE BRACE LB /FT.
3. COMPONENT SIZES CALCULATED USING ALLOWABLE STREET DESIGN (ASD).
4. LOADS MUST BE PRESENTED TO SER FOR REVIEW.
GENERAL NOTES:
1. DO NOT MIX RIGID BRACING WITH CABLE BRACING IN THE SAME DIRECTION ON ANY PIPE RUN UNTIL AFTER A CHANGE
IN DIRECTION AT AN ELBOW.
2. PIPING SHALL BE HUNG AT MAXIMUM GRAVITY HANGER INTERVALS AS OUTLINED IN 2009 IMC, 2009 IFGC, OR MSS
SP-69.
3. BRACE SPACING AND TRAPEZE SUPPORT ANGLE SHALL BE SELECTED UTILIZING THE "MCKINSTRY PIPE HANGING AND
BRACING' CALCULATOR.
4. BRACE DESIGN SHALL BE CONSISTENT WITH THE METHODS OUTLINED IN THE "MCKINSTRY PIPE BRACING LAYOUT
PROCEDURE'.
5. DO NOT USE RIGID BRACING FOR VIBRATION ISOLATED PIPING. SEE CABLE BRACE DETAIL IF VIBRATION ISOLATION IS
REQUIRED.
6. DESIGN IN ACCORDANCE WM-I 2009 IBC AND ASCE <7 -05 CRITERIA.
7. DETAIL IS DESIGNED TO ACCOMMODATE PIPING, PLUMBING, OR ELECTRICAL CONDUIT.
8. WHEN LARGE PIPE REQUIRES BRACING, PLEASE SEE MCKINSTRY ENGINEERING FOR APPLICABLE DETAILS.
9. ATTACH TO EXISTING UNISTRUT, CONTRACTOR TO COORDINATE.
10. SEE STRUCTURAL ENGINEER IF CONNECTION DEVIATES FROM DETAIL
REVIEWED FOR
CODE COMPLIANCE
APPROVED
NOV 0 8 2012
City of Tukwila
BUILDING DIVISION
1/2 "0 HILTI TZ ANCHOR
HOUSEKEEPING
PAD
CONCRETE SLAB
L3X3X3/16 X O' -3 ",
FIT FLUSH AGAINST
WALL OF TANK
RECEIVED
CITY OF TUKWILA
OCT 1 0 2012
PERMIT CENTER
CO EXPANSION TANK ANCHORAGE & SEISMIC DETAIL
NOT TO SCALE
instry
ife Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800 -669 -6223
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 -331 -0234
www.mckinstry.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
TRACK
POOL
EXPIRES 9-23-2014
REVISIONS:
8/7/12 50% DO
9/4/12 75% CD'S
9/26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
ENGINEERING
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31 /12
AS SHOWN
SHEET TITLE:
EQUIPMENT CONNECTION
DETAILS
SHEET NUMBER:
M5.2
EXPANSION
TANK
/-
low
PNEUMATIC
VALVE
PRV
ASSEMBLY
® i 4"
P -2 1
11
POOL
HEAT
EXCHANGER
4"
HC-6
POOL
AHU
,(COIL
3/4" 3/4" 3/4..
HC--5.
ill
LLOBBY �J LAID J
f r i
HC-4
r
1
HC -2
3/4"
HC -3
11
REDUCED PRESSURE
BACKFLOW PREVENTER
L
NPCW
(Th\HEATING WATER PIPING DIAGRAM - DEMO
_} NOT TO SCALE
NATATORIUM SPACE
TUKWILA POOL SEQUENCE OF OPERATIONS
THE PURPOSE OF THIS DOCUMENT IS TO DESCRIBE THE SEQUENCE OF OPERATIONS FOR THE CONTROL SYSTEM. THE
CONTROLS CONTRACTOR SHALL PROVIDE CONTROL DEVICES, WIRING, PROGRAMMING AND APPURTENANCES
NECESSARY TO PROVIDE A CONTROL SYSTEM TO EXECUTE THE INTENT DESCRIBED. THE SEQUENCE OF OPERATIONS
IS NOT A PROGRAMMING GUIDE. THE CONTROLS CONTRACTOR IS RESPONSIBLE FOR THE FUNCTION OF THE SYSTEMS
AND PROGRAM MING REQUIRED IN ORDER TO ACHIEVE FULLY FUNCTIONAL OPTIM IZED SYSTEMS. THE FRONT END
CONTROLS TERMINAL SHALL BE PROGRAMMED TO SHOW MONITORED CONTROL POINTS ASSOCIATED WITH THE
HEATING WATER AND AIRSIDE SYSTEMS.
1. GENERAL
1:1. THE BURNER CONTROL PANEL ASSOCIATED WITH THE BOILER SHALL CONTROL AND MONITOR THE BOILER
OPERATION. REFERENCE MANUFACTURER LITERATURE FOR DETAILS OF OPERATION AND INSTALLATION.
1.2. THE BUILDING AUTOMATION SYSTEM (BAS) ENABLES AND MONITORS THE BURNER CONTROL PANEL, AIR
HANDLER SUPPLY FAN AND HEATING WATER PUMPS.
1.3. SET POINTS AND VALUES INDICATED SHALL BE GRAPHICALLY ADJUSTABLE VIA THE OPERATOR WORKSTATION.
1.4. THE SPACE TEMPERATURE SET POINT SHALL BE 86 °F.
1.5. THE INITIAL LOCKER ROOM OUTSIDE AIR PRE -HEAT COIL DISCHARGE AIR TEMPERATURE SET POINT SHALL BE
90 °F. .
1,5.1.ADDITIONAL COIL INITIAL DISCHARGE AIR TEMPERATURE SET POINTS SHALL BE 90 °F.
1.6. PROVIDE TUNING AS REQUIRED TO OPTIMIZE SYSTEM PERFORMANCE.
1.7. THE CONTROLS CONTRACTOR SHALL BE RESPONSIBLE FOR THE FOLLOWING:
1.7.1. GENERATING THE SEQUENCE OF OPERATION.
1.7.2. GENERATING THE CONTROL DIAGRAM COMPLETE WITH SYSTEM CONTROLS COMPONENTS.
1.7.3. TESTING AND VERIFICATION OF THE SEQUENCE OF OPERATION BEFORE FUNCTIONAL TESTING WITH THE
COMMISSIONING AGENT.
17.4. PERFORMING FUNCTIONAL PERFORMANCE TESTING WITH THE COMMISSIONING AGENT.
1.8. THE MECHANICAL CONTRACTOR SHALL PROVIDE INITIAL BOILER SETUP.
1.9, THE CONTROLS CONTRACTOR SHALL PROVIDE BAS CONNECTION TO BOILER BURNER.
1.10. CONTROLS CONTRACTOR TO SUBMIT DRAWINGS AND SEQUENCE OF OPERATION TO COM M ISSIONING AGENT AND
MCKINSTRY FOR APPROVAL PRIOR TO INSTALLATION AND PROGRAMMING.
1.11. CONTROLS CONTRACTOR SHALL REFERENCE MCKINSTRY CONTROL PROVIDER PERFORMANCE STANDARD FOR
PROJECT EXPECTATIONS AND WORK WITH COMMISSIONING AGENT FOR ADHERENCE.
1..12. OPERATE HEATING WATER SYSTEM PER EXISTING SEQUENCE FOR ITEMS NOT SPECIFICALLY ADDRESSED
BELOW.
2. SET POINTADJUSTMENT
2.1: A WARNING SCREEN SHALL BE GENERATED EACH TIME AN ADJUSTABLE SET POINT IS MODIFIED. THE WARNING
SHALL READ "MODIFICATIONS OF THIS VALUE MAY ALTER SYSTEM ENERGY PERFORMANCE."
2.2. THE SYSTEM SHALL OFFER THE USER THE OPTION OF "PERMANENT VALUE ADJUSTM ENT" OR "TEMPORARY VALUE
ADJUSTMENT."
2.2.1.AT THE END OF EACH DAY, ALL "TEMPORARY VALUE ADJUSTMENT" INPUTS SHALL REVERT TO LAST
"PERMANENT VALUE" INPUT. IF THERE ARE NO "PERMANENT VALUE" INPUTS, THEN REFERENCE DEFAULT
VALUE USED IN INITIAL PROGRAMMING.
2.3. A LOG SHALL BE MAINTAINED THAT CATALOGS ANY SET POINT VALUE THAT HAS BEEN ADJUSTED. AT A MINIMUM,
THE LOG SHALL CAPTURE:
2.3.1.USER ID, TIME OF DAY, AND DATE.
2.3.2.SET POINT THAT WAS MODIFIED.
2.3.3.SELECTION OF "PERMANENT" OR "TEMPORARY" VALUE ADJUSTMENT.
2.3.4.LAST "PERMANENT INPUT" VALUE OF SET POINT PRIOR TO CHANGE.
2.4. SET POINT ADJUSTED VALUE.
3. BOILER BURNER CONTROL PANEL
3.1. ENABLE AND DISABLE BURNER CONTROL PANEL THROUGH THE BAS SYSTEM. THIS COMMAND SHALL BE
HARDWIRED TO THE BURNER.
3,2. THE BOILER SUPPLY TEMPERATURE SET POINT SHALL REMAIN AS EXISTING.
3.3. PROVIDE OFFSETS, DEAD BANDS, TIME DELAYS AND SAFETIES FOR FULLY FUNCTIONAL AND/OPTIMIZED SYSTEM
THAT LIMITS SHORT CYCLING.
3.4. WHEN THE HEATING WATER SYSTEM IS ENABLED THE BURNER SHALL OPERATE TO MAINTAIN THE BOILER
LEAVING WATER SUPPLY SET POINT.
4. HEATING WATER SYSTEM
4.1. THE HEATING WATER SYSTEM COMPONENTS SHALL BE ENABLED IF THERE IS A CALL FOR SPACE HEATING OR
LOCKER
ROOMS
OSA 4
ong
PNEUMATIC
VALVE
HC -1
i
Ii Q
OSA
DEMOLITION KEY NOTES
O ADD ALTERNATE: DEMOUSH HEATING COIL.
0 DEMOLISH PIPE SECTION FOR MR SEPARATOR INSTALLATION.
00 ADD ALTERNATE: DEMOUSH POOL AHU COIL.
® DEMOLISH PNEUMATIC VALVES.
... �' BAS
SPACE SPACE
>7-0,
<SA<
SPACE
SPACE
EXPANSION
TANK
P -9
BOILER
N„,
'y BAS
OUTSIDE OUTSIDE
BAS
1
�-- POT
' FEEDER
TO
POOL 6
FROM V
1 POOL
P -5
`
r- AS -1 I2 \
®'
® P--2) 1
4..
POOL
HEAT
EXCHANGER 1
1
..= ...- J 1
�.r .rte " 1
I �• 1
■ 1 1 /♦
1 / 4" `w %% 1 1 / /i ,
4
HC -6
POOL j j
3 COIL i i
! 1 --- -x--11
s ( �
3/4"
of �
11
---- bNO
PRV
ASSEMBLY
`I BAS I
.MMM • MOM.
HC -6
1 BAS r HWR
HWS
AIR HANDLER ROOM
r
J LFILTER ROOM
r
[BOILER ROOM
NATAORIUM AIR HANDLING UNIT SYSTEM DIAGRAM
NOT TO SC
THE POOL IS CALLING FOR HEAT.
4.1.1. POOL TEMPERATURE SENSOR TO PROVIDE SIGNAL TO GAS.
4.2. THE BAS SHALL ENABLE/DISABLE THE HEATING WATER PUMP ON A CALL FOR HEATING FROM ANY ZONE.
4.3. RESET THE SUPPLY WATER TEMPERATURE TO THE HEATING COILS BASED ON DEMAND.
4.3.1. MODULATE THE 3 -WAY MIXING VALVE FOR THE HEATING WATER LOOP (CV -7) TO MAINTAIN THE SUPPLY
WATER TEMPERATURE SET POINT.
4.4. ON A CALL FOR HEATING, MODULATE THE HEATING WATER VALVE FOR THE RESPECTIVE ZONE TO MAINTAIN
THE SPACE TEMPERATURE.
4.5. A SUMMARY OF THE HEATING WATER VALVE POSITIONS ASSOCIATED WITH THE HEATING COILS SHALL BE
GENERATED BY THE BAS EVERY 5 MINUTES. UPON DAILY START THE VALVE POSITION WILL NOT BE POLLED
UNTIL THE FIRST 15 MINUTES OF OPERATION HAS BEEN COMPLETED.
4.6. WHEN THE MOST OPEN VALVE IS GREATER THAN 90% OPEN, RAISE THE SUPPLY HEATING WATER SET POINT BY
TWO DEGREES.
4.7. WHEN THE MOST OPEN VALVE IS LESS THAN 75% OPEN LOWER THE SUPPLY HEATING WATER SET POINT TWO
DEGREES.
4.7.1.PROVIDE THE ABILITY TO INCLUDE /EXCLUDE ZONES USED IN POLLING AT THE OPERATOR WORKSTATION.
4.8. THE MAXIMUM VALUE OF THE HEATING WATER SUPPLY TEMPERATURE RESET SHALL BE 180 DEGREES F.
4.9. THE MINIMUM VALUE OF THE HEATING WATER SUPPLY TEMPERATURE RESET SHALL BE 160 DEGREES F.
4.10. CONTINUE TO OPERATE THE HEATING WATER PUMP FOR 5 MINUTES AFTER THE BOILER HAS BEEN DISABLED.
4.11. IF THE BOILER RETURN WATER TEMPERATURE FALLS BELOW 140 °F OPERATE THE BOILER PUMP (P -9) TO
MAINTAIN A MINIMUM RETURN WATER TEMPERATURE TO THE BOILER OF 150 °F.
6. PRIMARY SUPPLY FAN
5.1. THE AIR HANDLER SUPPLY FAN SHALL BE ENABLED AND DISABLED VIA THE OPERATOR WORKSTATION.
5.1.1.THE SUPPLY FAN VFD SHALL BE USED TO BALANCE THE SYSTEM.
5.1.2.THE SUPPLY FAN OPERATES CONTINUOUSLY.
5.2. ON A CALL FOR SPACE HEATING THE HEATING WATER COIL ASSOCIATED WITH THE PRIMARY AIR HANDLER
SHALL MODULATE TO MAINTAIN THE SPACE TEMPERATURE.
5,2.1.THE SPACE TEMPERATURE SHALL BE THE AVERAGE OF THE TWO SENSORS IN THE SPACE.
5.3. THE OUTSIDE AIR DAMPERS AND RETURN AIR DAMPERS SHALL MODULATE TO MAINTAIN AN AVERAGE RELATIVE
HUMIDITY BETWEEN 40% AND 60% IN THE NATATORIUM.
5.3.1. NATATORIUM HUMIDITY VALUE SHALL BE THE AVERAGE OF THE TWO SENSORS IN THE SPACE.
5.3.2. MAINTAIN A MINIMUM OUTSIDE AIR REQUIREMENT OF 5,600 CFM DURING OCCUPIED HOURS.
5.3.3. MAINTAIN A MINIMUM OUTSIDE AIR REQUIREMENT OF 0 CFM DURING UNOCCUPIED HOURS.
5.4. ON A CALL FOR COOLING, ENABLE ECONOMIZER COOLING IF THE OUTSIDE AIR TEMPERATURE IS LESS THAN THE
SPACE TEMPERATURE AND THE SPACE TEMPERATURE IS GREATER THAN 86 °F.
5.4.1 MODULATE THE OUTSIDE AIR DAMPER AND RETURN AIR DAMPERS IN SEQUENCE TO PROVIDE
ECONOMIZER COOLING WHILE MAINTAINING THE SPACE HUMIDITY REQUIREMENTS.
5.5 THE OUTSIDE AIR DAMPER POSITIONS SHALL BE FIELD DETERMINED BY THE TAB AGENT BASED ON MAINTAINING
THE MINIMUM OUTSIDE AIRFLOWS.
LOCKER ROOM SUPPLY AND EXHAUST FAN SYSTEM
6.1. THE SUPPLY AND EXHAUST FANS SHALL BE ENABLED AND DISABLED VIA THE BAS.
6.2. OPERATE THE FANS DURING OCCUPIED HOURS.
6.2.1.ON A CALL FOR HEATING DURING UNOCCUPIED HOURS, ENABLE THE FANS AND MODULATE THE
RESPECTIVE HEATING WATER COIL VALVE TO MAINTAIN THE SPACE TEMPERATURE.
6.2.2.CLOSE THE OUTSIDE AIR DAMPER WHEN THE FANS ARE DISABLED.
7. FREEZE PROTECTION
7.1. IF THE FREEZE STAT FOR SF -1 IS TRIGGERED, SHUTDOWN THE SUPPLY FAN AND CLOSE THE OUTSIDE AIR
DAMPER.
7.2. IF THE FREEZE STAT FOR THE LOCKER ROOM FAN IS TRIGGERED, SHUT DOWN THE SUPPLY AND EXHAUST FANS
AND CLOSE THE OUTSIDE AIR DAMPER.
8. DOMESTIC HOT WATER SYSTEM
8.1 THE DOMESTIC WATER HEATER SHALL BE ENABLED AND DISABLED VIA THE BAS..
8.2 OPERATE THE SHUTTLE PUMP (P -4) TO MAINTAIN A WATER TEMPERATURE OF 140 °F IN THE STORAGE TANK (ST-
1).
8.3 OPERATE THE DOMESTIC HOT WATER RECIRCULATION PUMP (P-3) VIA THE INTERNAL CONTROLS TO MAINTAIN A
TEMPERATURE AT THE PUMP OF 100 °F DURING OCCUPIED HOURS.
9. BAS INTERFACE WITH THE HEATING WATER SYSTEM
9.1 PROVIDE: HARDWARE AND SOFTWARE REQUIRED TO ALLOW THE BAS SYSTEM TO INTERFACE WITH THE
CONTROLLED EQUIPMENT. COORDINATE REQUIREMENTS WITH THE EQUIPMENT MANUFACTURER FOR THE
REDUCED PRESSURE
BACKFLOW PREVENTER
L
3/4"
of T
-- 3/4"
_ 3/4"
01
LBATijPOM OJ LBBY
1�
CV-5I
C
NO
NPCW
1 fir^
I.1
r
LOCKER
ROOMS
r 1.4 BAS
{7__ 1 /
1
OSA
/1
0r
�. '
.00
HEATING WATER PIPING DIAGRAM
NOT TO SCALE
KEY NOTES
® ADD ALTERNATE: PROVIDE HOT WATER COIL FOR LOCKER ROOMS.
® PROVIDE AIR SEPARATOR. REFERENCE 6/M5.0 FOR CONNECTION DETAILS.
® ADD ALTERNATE:. PROVIDE HOT WATER COIL FOR AIR HANDLER.
® FURNISH CONTROL VALVES (BY C.C.). INSTALLED BY MECHANICAL CONTRACTOR.
®5 PROVIDE EXPANSION TANK. REFERENCE 5/M5.0 FOR DETAILS.
® ADD ALTERNATE: PROVIDE MECHANICAL ROOM EXHAUST FAN AND TEMPERATURE
SENSOR. CONNECT TO BAS.
REFERENCE POOL SCOPE DOCUMENTS FOR PUMP INFORMATION:
® ADD ALTERNATE: PROVIDE HOT WATER COIL.
O. PROVIDE HUMIDITY SENSORS WITH A RELATIVE HUMIDITY RANGE OF 20% --95X.
10 LOCATE VALVES FOR SYSTEM PRESSURE TESTING JUST INSIDE MECHANICAL ROOM.
11 REFERENCE ELECTRICAL. DRAWINGS FOR SUPPLY FAN INTEGRATION WITH THE SMOKE
AND FIRE DETECTION SYSTEM.
12 HARD WIRE FREEZE STAT TO SHUT DOWN SUPPLY FAN.
13 USE AVERAGE OF' BOTH SENSORS FOR TEMPERATURE AND HUMIDITY CONTROL
14 HARD WIRE FREEZE STAT TO SHUT DOWN SUPPLY AND EXHAUST FANS.
OSA
INTERFACE. THE BAS SYSTEM SHALL SPECIFICALLY MONITOR OR PROVIDE THE FOLLOWING:
9.1.1 BOILER ENTERING AND LEAVING WATER TEMPERATURES
9.1.2 PRIMARY LOOP SUPPLY WATER TEMPERATURE
9.1.3 PRIMARY LOOP RETURN WATER TEMPERATURE
9,1.4 SECONDARY LOOP SUPPLY WATER TEMPERATURE
9.1.5 BOILER START /STOP COMMAND
9.1.6 BOILER BURNER FIRING RATE
9.1.7 HEATING WATER SUPPLY TEMPERATURE SET POINT
9.1.8 BOILER BURNER STATUS
9.1.9 BOILER BURNER ALARM STATUS
9.1.10 BOILER BURNER ENABLE/DISABLE
9.1.11 HEATING WATER PUMP COMMAND
9.1.12 HEATING WATER PUMP STATUS
9.1.13 SUPPLY FAN MOTOR STATUS
10 ALARMING
10.1 ALARMS SHALL BE MONITORED AND CONTROLLED PER THE OWNERS STANDARDS. ADDITIONAL ALARMS ADDED
PER OWNER REQUIREMENTS. ,
10.2 ALARMS SHALL BE ADDED TO THE ALARMS GRAPHICS SUMMARY PAGE(S) IN THE BAS.
10.3 "BOILER SHORT CYCLING ": GENERATE AN ALARM WHEN ANY BOILER IS COMMANDED TO STOP AND START
MORE THAN FIVE TIMES OVER A TIME PERIOD OF ONE HOUR.
10.4 "BOILER FAILURE ": GENERATE AN ALARM WHEN THE BOILER BURNER COMMAND DOES NOT MATCH'THE BOILER
BURNER STATUS. A TIME DELAY SHALL BE OBSERVED AFTER A CHANGE IN COMMAND TO ALLOW EQUIPMENT
START -UP OR SHUT DOWN.
10.5 "DISCHARGE AIR TEMPERATURE OUT OF RANGE ": GENERATE AN ALARM WHEN THE DISCHARGE AIR
TEMPERATURE FALLS BELOW THE FREEZE PROTECTION LOW LIMIT ABOVE
10.6 "VALVE FAILURE ": GENERATE AN ALARM IF THE STATUS OF A CONTROL VALVE POSITION DOES NOT MATCH THE
COMMANDED POSITION.
10.7 "DAMPER FAILURE ": GENERATE AN ALARM IF THE STATUS OF A DAMPER POSITION DOES NOT MATCH THE
COMMANDED POSITION.
10.8 "LOW RETURN WATER TEMPERATURE ": GENERATE AN ALARM IF THE RETURN WATER TEMPERATURE TO THE
BOILER FALLS BELOW 140°F.
11 TRENDS
11.1 CONTROL POINTS MONITORED BY THE BAS ARE CAPABLE OF BEING TRENDED.
11.2 THE BAS SYSTEM SHALL PRODUCE TRENDS FOR THE FOLLOWING CONTROL POINTS:
11.2.1 BOILER ENTERING AND LEAVING WATER TEMPERATURES .
11.2.2 BOILER FIRING RATE
11.2.3 OUTSIDE AIR TEMPERATURE
11.2.4 SUPPLY FAN MOTOR STATUS
11.2.5 SPACE TEMPERATURE
11.2.6 INDOOR AND OUTDOOR RELATIVE HUMIDITY
11.3 TREND DATA SHALL BE RECORDED OVER 15 MINUTE TIME INTERVALS AND SHALL BE COMPILED IN A SINGLE
TREND STUDY.
11.4 THE MOST RECENT THREE MONTHS OF TRENDS SHALL BE REMOTELY ACCESSIBLE. OLDER DATA SHALL BE
MADE AVAILABLE UPON REQUEST.
REVIEWED FOR
CODE COMPLIANCE
APPROVED
NOV 0 8 2012
City of Tukwila
BUILDING DIVISION
PG1),
12 SAFETY PROTOCOL
12,1 BOILER BURNER SAFETY OPERATIONS SHALL BE INTEGRAL TO THE OPERATION OF THE BOILER. THERE SHALL
BE NO BAS SAFETY INTERACTION REQUIRED.
l 9 9
RECEIVED
CITY OF TUKWILA
OCT 10 2012
PERMIT CENTER
For Th
instry
le Of Your Buliding
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800 - 669 -6223
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 - 331 -0234
www.mckinstry.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
TRACK
POOL ,, J
REVISIONS:
8/7/12 50% DD
9/4/12 75% CD'S
9/26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN- BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
ENGINEERING
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31/12
AS SHOWN
HEATING WATER PIPING
AND CONTROLS DIAGRAMS
SHEET NUMBER:
M6.0
FROM CITY
WATER
314"
WATER
HEATER
MEN'S LOCKER ROOM
314"
TO POOL FILL
314"
112"
SHOWER
(ADA)
314"
314" 1 -112"
WATER
CLOSET
WOMEN'S SINGLE USE
I MEN'S STAFF
314"
_�
J
F FIRST AID
DRINKING
FOUNTAIN
314 " —
HOSE
BIB
DRINKING
FOUNTAIN
WOMEN'S STAFF
ArnaribarimeaWral
REVIEVVED FOR
CODE COMPLIANCE
APPROVED •
NOV 0 8 2012
City of Tukwila
BUILDING DIVISION
PLUMBING ONE -LINE DIAGRAM DEMO KEY NOTES
SCALE: NOT TO SCALE
SCALE: NOT TO SCALE
DEMOLISH FLUSHOMETERS.
DEMOLISH FLUSHOMETERS.
U2 ADD ALTERNATE: DEMOLISH ISOLATION VALVES. INCLUDE ISOLATION VALVES NOT IDENTIFIED ON
MECHANICAL PLANS AND NOTE ON AS —BUILT DRAWINGS.
SERVICE SINK
JANITOR CLOSET
WASHER
%(;i..i e
RECEIVED
CITY OF TUKWILA
OCT 1 0 2012
PERMIT CENTER
instry
fe Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1 -800 -669 -6223
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 - 331 -0234
www.mckinstry.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
POOL �.
TRACK
REVISIONS:
8/7/12 50% DD
9)4/12 75% CD'S
9/26/1,2 90% CD'S
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
ENGINEERING
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31/12
AS SHOWN
SHEET TITLE:
PLUMBING ONE -LINE
DIAGRAM -DEMO
SHEET NUMBER:
MD6.1
FROM CITY
WATER
SHEET NOTES
1. PIPE SIZES SHOWN ARE BASED ON INFORMATION FROM
THE MECHANICAL DRAWINGS DATED 6 -29 -1990 AND ARE
FOR REFERENCE ONLY. DOCUMENT DISCREPANCIES ON
AS —BUILT DRAWINGS.
M
L -1
U-1
1-1
U ; MEN'S SINGLE USE
•
. ,0101
1 MEN'S LOCKER ROOM
EXPANSION
TANK
WC-1
314 " --\
f
r
\40,441k-
1114"
•
WOMEN'S LOCKER ROOM .
L___ —�_W ._.__.__.
•
SH-3
•
•
314"
HOSE
BIB
314"—
1 -112"
DRINKING
FOUNTAIN
"
h
17
1 -112"
L -1
SH -1
WOMEN'S STAFF
WOMEN'S SINGLE USE
PLUMBING ONE -LINE DIAGRAM
.— SCALE: NOT TO SCALE
_J
DRINKING
FOUNTAIN
KEY NOTES
SERVICE SINK
LJANITOR CLOSET
REVIEWED FOR
CODE COMPLIANCE
APPROVED
NOV 0 8 2012
City of Tukwila
BUILDING DIVISION
O PROVIDE FLUSHOMETERS.
® PROVIDE ISOLATION VALVES. INCLUDE ISOLATION VALVES NOT IDENTIFIED ON MECHANICAL DRAWINGS.
® PROVIDE FIXTURE.
® PROVIDE FIXTURE, SHOWER PAN AND SURROUND.
® PROVIDE SPOOL PIECE FOR HOT WATER LINE AND CAP.
® REPAIR LEAK IN SUPPLY PIPING, COORDINATE ISSUE WITH OWNER FOR DETAILS.
69
RECEIVED
CITY OF TUKWILA
OCT 10 2012
PERMIT CENTER
For Th
instry
le Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1- 800-669 -6223
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 - 331 -0234
www.mckinstry.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
TRACK
POOL \.
IMMOOMMOMMOMMENIMIMMONNIN
REVISIONS:
8/7/12 50% DD
9/4/12 75% CD'S
9/26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
MilliMOMMINMEMMONNIMEM
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
SHEET TITLE:
ENGINEERING
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31/12
AS SHOWN
PLUMBING ONE -LINE
DIAGRAM
SHEET NUMBER:
M6.1
FAN SCHEDULE
DESCRIPTION
UNIQUE TAG #
SF -1
LOCATION OF FAN (ROOFTOP / ROOM NAME 1 PLAN GRID COORDINATES)
FAN MECH ROOM
BLADE TYPE (PROP / B1/ FC 1 PLUG / MIXED./ DIAMETER)
MIXED
DRIVE TYPE AND HOUSING (BELT / DIRECT ; CABINET / SWSI / INLINE ; CW / CCW )
BELT, INLINE
CONTROL OF FAN (VARIABLE SPEED / CONSTANT / STAGED ARRAY)
CONSTANT
AREA OF BUILDING 1 SYSTEM SERVED
NATATORIUM
MANUFACTURER DATA
MANUFACTURER
GREENHECK
MODEL NUMBER (INCL. CLASS, ARRANGEMENT, ROTATION WHERE APPLICABLE)
QEI -33 -II -200
MATERIALS OF CONSTRUCTION (UL 762 GREASE / SPARK RESISTANT/ ENAMEL PAINT)
HI -PRO POLLYESTER COAT
MOTOR DESCRIPTION (ODP 1 TEFC / ECM)
TEFC
FAN MOTOR EFFICIENCY (BY NEMA STANDARD MG -1, %)
91
AGENCY LISTING (UL / ETL)
UL
PHYSICAL DIMENSIONS
LENGTH x WIDTH x HEIGHT (IN.)
65x50x77
INLET / OUTLET DIMENSIONS (IN.)
46146
ACCESS & SERVICE CLEARANCE (FRONT / REAR 1 LEFT / RIGHT / TOP, IN)
42/6/0/0/6
OPERATING WEIGHT (LBS)
1644
PERFORMANCE ,
DESIGN AIRFLOW (CFM)
21,000 CFM
DESIGN TOTAL STATIC PRESSURE ( "W.C.)
3.5
DESIGN FAN SPEED (RPM)
1177
DESIGN FAN BRAKE HORSEPOWER (BHP)
16.8
ELECTRICAL DATA
VOLTAGE 1 PHASE (V /1e OR V /313)
208/3
POWER RATING OF MOTOR PROVIDED (MHP)
20
MOTOR EFFICIENCY
93%
ALTERNATE POWER SOURCE REQUIRED
N/A
VARIABLE FREQUENCY DRIVE REQUIRED
YES
VARIABLE FREQUENCY DRIVE PROVIDED BY
ELECT
DISCONNECT PROVIDED BY
ELECT
CODE REQUIRED ELECTRICAL OUTLET PROVIDED BY
ELECT
ACOUSTICAL & SEISMIC
FAN SPRING ISOLATION REQUIRED?
YES
SEISMIC ATTACHMENT METHOD (BOLT TO SLAB / WAFFLE PAD / SPRINGS & SNUBBERS)
SPRINGS & SNUBBERS
DUCT CONNECTION ISOLATION REQUIREMENTS
FLEX DUCT
MANUFACTURER'S CERTIFICATE OF SEISMIC COMPLIANCE INCLUDED PER IBC 1708.4
YES
SOUND POWER AT DESIGN CONDITION (RE 10 -12W) PER ARI 370 -2001:
N/A
FOR 63 Hz BAND (INLET / DISCHARGE, dB):
79 /87
FOR 125 Hz BAND (INLET / DISCHARGE, dB):
88 /89
FOR 250 Hz BAND (INLET / DISCHARGE, dB):
93 /92
FOR 500 Hz BAND (INLET / DISCHARGE, dB):
; 90196
FOR 1000 Hz BAND (INLET / DISCHARGE, dB):
86 /90
FOR 2000 Hz BAND (INLET / DISCHARGE, dB):
82 /86
FOR 4000 Hz BAND (INLET / DISCHARGE, dB):
78/81
FOR 8000 Hz BAND (INLET / DISCHARGE, dB):
69 /72
NOTES
1. VFD REQUIRED PER WSEC, USE FOR SYSTEM BALANCING.
1. FURNISH WITH INERTIA BASE AND 1" SPRING ISOLATION.
GAS BURNER
DESCRIPTION
UNIQUE TAG#
B-1
LOCATION OF BURNER (FLOOR #, ROOM NAME)
MECHANICAL ROOM
QUANTITY
1
SYSTEM SERVED
HEATING WATER
FUEL (NATURAL GAS / DIGESTOR GAS/ PROPANE / OTHER)
NATURAL GAS
VENT METHOD (DIRECT / SIDEWALL / VERTICAL POSITIVE / VERTICAL NEGATIVE)
DIRECT
WILL COMBUSTION AIR BE DUCTED TO BURNER? (YES / NO)
YES
MANUFACTURER DATA ,
MANUFACTURER
RIELLO
MODEL NUMBER
RS 100 /E
COMBUSTION AIR APPROVED MATERIAL
PVC
BUILDING AUTOMATION SYSTEM INTERFACE PROVIDED?
YES
ARE ALARM CONTACTS PROVIDED FOR BULDING SYSTEM MONITORING?
YES
PHYSICAL DIMENSIONS
OVERALL LENGTH x WIDTH x HEIGHT WITHOUT HOUSEKEEPING PAD (IN.)
33"x22"x22"
OPERATING WEIGHT, INCLUDE FLUID (LBS.)
150
GAS CONN. SIZE, TYPE (IN.)
3" NPT
PERFORMANCE
NATURAL GAS MINIMUM INPUT PRESSURE (IN. W.G.)
8"
NATURAL GAS MAXIMUM INPUT PRESSURE (IN. W.G.)
14"
NATURAL GAS MAXIMUM INPUT FLOW (MBH)
4,405
ELECTRICAL
QUANTITY OF ELECTRICAL CONNECTIONS (INCLUDING PUMP IF REQUIRED)
1
VOLTAGE /PHASE (FOR EACH CONNECTION)
208/3
STANDBY ELECTRICAL POWER REQUIRED (YES /NO) ?
NO
DISCONNECT PROVIDED BY:
ELECTRICAL
NOTES:
1. GAS REGULATOR TO BE FURNISHED BY MECHANICAL CONTRACTOR
2. PROVIDE BURNER WITH 1E2 MOTOR
3. DERATE BURNER FROM 4405 MBH TO 4200 MBH MAXIMUM INPUT FLOW
MOTOR SCHEDULE
TAG #
M -1
M -2
MANUFACTURER
LEESON
LEESON
-
MODEL NUMBER
C184T17WB8A
C145T17WB22A
QUANTITY
1
1
SERVICE.
LOCKER ROOM
SUPPLY FAN
LOCKER ROOM '
EXHAUST FAN
MOTOR HORSEPOWER
5
2
BRAKE HORSEPOWER
2.81'
1.25
RPM
1800
1800
VOLTAGE /PHASE
208V /3PH
208V /3PH
FRAME
184T
145T
QUANTITY OF ELECTRICAL CONNETIONS
1
1
WIDTH x DEPTH x HEIGHT
8.5 "x10 "x17"
7.4 "x14 "x7.3"
WEIGHT
90
48 LB
NOTES
1,3
2,3
NOTE:
1. PROVIDE MOTOR AND FAN SHEAVE TO BALANCE SUPPLY FAN TO 3180 CFM
2. PROVIDE MOTOR AND FAN SHEAVE TO BALANCE EXHAUST FAN TO 3980 CFM
3. MOTORS TO BE SUITABLE FOR USE IN A HUMID CHLORINATED ENVIRONMENT.
PLUMBING FIXTURE SCHEDULE
TAG
WC -1
WC -2
L -1
L-2
L -3
L-4
SH -1
SH -2
SH -3
U -1
DESCRIPTION
WATER CLOSET
ADA WATER CLOSET
LAVATORY
ADA LAVATORY
LAVATORY FAUCET
LAVATORY FAUCET
SHOWER
ADA SHOWER
SHOWER
N/A
LOCATION
LOCKERS /BATHROOMS
LOCKER ROOMS
LOCKERS /BATHROOMS/
STAFF
LOCKER ROOMS
FIRST AID
JANITOR ROOM
MEN'S STAFF
LOCKER ROOMS
-
LOCKER ROOMS
MEN'S
LOCKERS /BATHROOM
MANUFACTURER
ZURN
ZURN
ZURN
ZURN
N/A
N/A
ZURN
ACCESS
ACORN
N/A
MODEL
Z5615
Z5615
Z5314
Z5314
N/A
N/A
Z 7101 -LHSS
• .
Z7000 -HW13 -1.75
SHOWER -WARE
700 SERIES
N/A
TYPE
WALL HUNG
WALL HUNG
WALL HUNG
WALL HUNG
N/A
N/A
PRESSURE
BALANCE
CARTRIDGE,
BLADE HANDLE,
INTEGRAL STOPS
•
HAND HELD WITH METAL
HOSE AND MOUNTING BAR
CAPITAL
COLUMN
N/A
DIMENSIONS
N/A
N/A
20 "x18"
20 "x18"
N/A
N/A
N/A
N/A
N/A
N/A
SEAT
OLSONITE IOCC OR ZURN
5955SS -EL, ELONGATED, OPEN
FRONT, SOLID PLASTIC SEAT
OLSONITE 10CC OR ZURN
5955SS -EL, ELONGATED,
OPEN FRONT, SOLID PLASTIC
SEAT
N/A
WA
N/A
.
N/A
N/A
N/A
N/A
N/A
FLUSH VALVE
ZURN Z6000- AV -WS1, BRASS
WITH CHROME FINISH, MANUAL
FLUSH
ZURN Z6000- AV -WS1, BRASS
WITH CHROME FINISH,
MANUAL FLUSH
N/A
WA
N/A
N/A
N/A
NIA
N/A
ZURN Z6003- AV -WS1,
BRASS WITH CHROME
FINISH, MANUAL FLUSH
FLOW RATE
1.6 GALLONS PER FLUSH
1.6 GALLONS PER FLUSH
0.5 GPM
0.5 GPM
0.5 GPM
N/A
1.75 GPM
1.75 GPM
1.6 GPM
1 GALLON PER FLUSH
CARRIER
ZURN 1200 SERIES
ZURN 1200 SERIES
ZURN 1200 SERIES
ZURN 1200 SERIES
N/A
N/A
N/A
N/A
N/A
N/A
FAUCET MANUFACTURER
N/A
N/A
ZURN
ZURN
ZURN
ZURN
• N/A
ZURN
N/A
NIA
FAUCET MODEL
N/A
NIA
Z86500 -3M
Z86500 -3M
Z871C4
Z841N1
N/A
N/A
N/A
N/A
FAUCET DESCRIPTION
N/A
N/A
SELF CLOSING
METERING FAUCETS, 4"
SPOUT
SELF CLOSING METERING
FAUCETS, 4" SPOUT
POLISHED CHROME
PLATED 8" BRASS
DECK FAUCET
POLISHED CHROME-
PLATED CAST BRASS
SERVICE SINK FAUCET
N/A
PRESSURE BALANCE
CARTRIDGE, BLADE
HANDLE, INTEGRAL STOPS
, N/A
N/A
SHOWER HEAD
MANUFACTURER
N/A
N/A
N/A
N/A
N/A
N/A
ZURN
ZURN
ACORN
SHOWER HEAD MODEL
N/A
N/A
N/A
N/A
N/A
N/A
Z-7006-88
N/A
N/A
SHOWER HEAD DESCRIPTION
N/A •
N/A
N/A
N/A
N/A
N/A
CHROME PLATED
SHOWER HEAD
NON-ADJUSTABLE SPRAY
PATTERN
SOLID BRASS,
TRIPLE CHROME
PLATED
'
DRAIN
N/A
NIA
ZURN Z8743 GRID
STRAINER OR
APPROVED
ZURN Z8743 GRID STRAINER
OR APPROVED
N/A
WA
N/A
N/A
N/A
N/A
TRAP
N/A
N/A
1 -1/2" 17 GAUGE,
CHROME PLATED
1 -1/2" 17 GAUGE, CHROME
PLATED
1 -1/2" 17 GAUGE,
CHROME PLATED
N/A
N/A
N/A
N/A
N/A
TRAP PRIMER
N/A
N/A
N/A
N/A
N/A
N/A
N/A
•
N/A
N/A
N/A
SUPPLIES
N/A
N/A
20" CHROME SUPPLIES
W/ 3/8" COMP. FITTINGS,
ANGLE STOPS AND
ESCUTCHEON PLT,
KEYLESS
(COMMERCIAL)
20" CHROME SUPPLIES W/ 3/8"
COMP. FITTINGS, ANGLE
STOPS AND ESCUTCHEON
PLT, KEYLESS (COMMERCIAL)
W/ 3/8" COMP.
FITTINGS, ANGLE
STOPS AND
ESCUTCHEON PLT,
KEYLESS
(COMMERCIAL)
N/A
N/A
N/A
N/A
N/A
NOTES
1
1
1,5
1,5
2,3,4,6
1
NOTES
1. TOILETS AND WATER CLOSETS ARE TO BE MANUAL FLUSH
2. DISCHARGE HEIGHT OF ACORN SHOWERS TO BE 6' -0"
3. PROVIDE FOUR - SHOWER STATIONS.
4. PROVIDE COLUMN EXTENSION FOR WATER CONNECTIONS FROM ABOVE.
5. 4" ON CENTER FAUCET AND HOLES
6. PROVIDE DRAIN BASE WITH DOME GRATE
PUMP SCHEDULE
TAG #
P -1
P -3
P-4
AREA
MECHANICAL ROOM
MECHANICAL
ROOM
MECHANICAL
ROOM
BASIS OF DESIGN
B &G
B &G
B &G
MODEL NUMBER
1510 SERIES 2BC
e3- 6 /BUXRC
e5-6 /BUXRC
SERVICE
BUILDING HEATING
WATER LOOP
DHW CIRCULATION
DHW CIRCULATION
LOCATION
MECHANICAL ROOM
BOILER ROOM
BOILER ROOM
GPM
130
3
3
FT. TOTAL HEAD
62
5
5
FT. NPSH
6
-
--
MAX FLUID PRESSURE PSIG
175
150
150
MOTOR HP
5
28W
28W
BRAKE HP
4.25
N/A
N/A
VOLTAGE /PHASE
208V /3PH
115 / 1
115 / 1
MOTOR EFFICIENCY '
PER WSEC
PER WSEC
PER WSEC
RPM
1,750
-
-
VFD
NO
NO.
NO
VFD BYPASS
NO
NO
NO
EMERGENCY POWER
NO
NO
NO
ELECTRICAL CONNECTION
BY ELECT
BY ELECT
BY ELECT
WEIGHT (LBS.)
250 LBS
<10LBS
<10LBS
REMARKS
3.5
1,2,4,5
1,2,4,5
NOTES:
1. FURNISH WITH TIMER
2. FURNISH'WITI-I INTERNAL ADJUSTABLE TEMPERATURE SENSOR
3. FURNISH SUCTION DIFFUSER
4. FURNISH WITH ISOLATION VALVES FOR SERVICE
5. REFERENCE POOL CONSULTANT DRAWINGS FOR ADDITIONAL PUMPS BEING INSTALLED.
GAS WATER HEATER SCHEDULE
TAG #
DWH -1
ST-1
MANUFACTURER
A.O.SMITH
A.O.SMITH
MODEL NUMBER
CYCLONE XI BTH 500
TJV 200 -M
QUANTITY
1
1
SERVICE
DOMESTIC HOT
WATER
DOMESTIC HOT
WATER
CAPACITY (GALLONS)
130
200
ENTERING WATER TEMPERATURE
40 °F
N/A
LEAVING WATER TEMPERATURE
130 °F
N/A
WATER CONNECTION SIZE (NPT) . •
1 1/2"
2"
GALLONS PER HOUR RECOVERY @ 100
DEGREE TEMPERATURE RISE
640
WA
GAS INPUT CAPACITY
499,900 BTUH
N/A
MINIMUM GAS PRESSURE
5" W.G.
NIA
MAXIMUM GAS PRESSURE
10" W.G.
N/A
GAS CONNECTION SIZE (NPT)
1 -1/2"
N/A
CONCENTRIC VENT
NO
N/A
FLUE PIPE MATERIAL
• PVC
N/A
FLUE PIPE DIAMETER
6"
. N/A
PRESSURE RELIEF VALVE SETTING (PSI)
150
-
150
ELECTRIC REQUIREMENTS
120/1/60
N/A
QUANTITY OF ELECTRICAL CONNETIONS
1
N/A
BLOWER ELECTRIC REQUIREMENTS
2.2 AMPS
N/A
IGNITER ELECTRIC REQUIREMENTS
4.0 AMPS
N/A
WIDTH x DEPTH x HEIGHT
33x76
32x77
WEIGHT WITH WATER
1934 LBS
2220 LBS
ASME TANK
YES
YES
NOTES
1
N/A
NOTE:
1. PROVIDE CONDENSATE NEUTRALIZATION KIT
For Th
instry
ife Of Your Building
REVIEWED FOR
CODE COMPLIANCE
APPROVED
NOV 082012
City of Tukwila
BUILDING DIVISION
METER SCHEDULE
TAG #
WM -1
WM -2
AREA
MECHANICAL ROOM
MECHANICAL ROOM
BASIS OF DESIGN
BADGER
ONICON
MODEL NUMBER
TSM 450
F3200
METER TYPE
RECORDALL TURBO
SERIES FLOW METER
j IN -LINE WAFER STYLE
ELECTROMAGNETIC
FLOW METER
SERVICE
POOL FILL METER
POOL DRAIN METER
LOCATION
POOL FILTER ROOM
BOILER MECHANICAL
ROOM
CONNECTION SIZE
• 3"
4"
DIMENSIONS (LxWxH)
12 "x7.5 "x9"
6 "Lx6 "W
OPERATIONAL RANGE
5 -550 GPM
4 -812 GPM
REMARKS
s 1,2,3
3,4
NOTES:
1. FURNISH WITH RECORDALL TRANSMITTER REGISTER
2. FURNISH WITH INTEGRAL STRAINER
3. CONNECT TO BAS
4. FURNISH WITH 316SS GROUNDING RINGS AND INTERNAL TEFLON COATING
°Kg
RECEIVED
CITY OF TUKWILA
OCT 1 0 2012
PERMIT CENTER
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1.800 -- 669 --6223
MENNIMMININNEMIN
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503 -331 --0234
www.mckinstry.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
POOL
TRACK
REVISIONS: .
8/7/12 50% DD
9/4/12 75% CD'S
9/26/12 90% CD'S .
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED 8Y:
DRAWN 8Y:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
ENGINEERING
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31/12
AS SHOWN
SHEET TITLE:
EQUIPMENT SCHEDULES
SHEET NUMBER:
M7.0
HVAC PIPING SPECIFICATION (WSEC); LATEST REVISION: 9- 29 -2011
ID
CATEGORY
SERVICE DESCRIPTION
MANUFACTURER, PRODUCT OR
EQUAL
PRESSURE TEST PROCEDURE
SEISMIC
INSULATION
MEDIA
TEST
PRESSURE
DURATION
CODE
IMPORTANCE
IP
8" or Larger
HANGERS
DOMESTIC COLD WATER
ALL
0.23 -0.27
75
FIBERGLASS
0.50 in
0.50 in
0.50 in
HS&R
HEATING HOT WATER
HVAC HEATING
NOTES 1, 2, & 4
WATER
1.5 TIMES MAX
OPERATING •
PRESSURE, BUT
NOT LESS THAN
100 PSI
15 MINUTES
2p091MC
SECTION 1208
1.0
PER W.S.E.0
SEE INSULATION
SCHEDULE
INSERTS AT HANGERS
INSERTS
AS
NORMAL OPERATING PRESS & TEMP:
UP TO 100 PSI; 140 F TO 200 F; RELIEF TO REMAIN AS EXISTING
1.50 in
1.50 in
1.50 in
NOTES 1, 2, & 4
PIPE MATERIAL SIZES THRU 2"
COPPER TUBE TYPE L ASTM B88 r
PER SUBMITTAL
JOINTS
SWT; THREADED AT SPECIALTIES AS APPLICABLE
PER SUBMITTAL
FITTINGS
WROT COPPER/BRONZE SWT JOINT
PER SUBMITTAL
FLANGES, UNIONS, & COUPLINGS
CAST BRASS / WROT COPPER; CLASS 150
PER SUBMITTAL
WYE STRAINERS
BRONZE BODY
KECKLEY E150 pm)/ F150 (FPT)
EXPANSION JOINTS
COMPENSATION FITTING AND /OR PIPING LOOP
METRALOOP; DME; GLOBAL CM / CMS
VALVES - ISOLATION
2 -PC BALL - FPT
MILWAUKEE BA -400, NIBCO T-585-70
VALVES - ISOLATION
2 -PC BALL - SWT
MILWAUKEE BA -450, NIBCO S-585-70
VALVES - CHECK
HORIZONTAL SWING, BRONZE BODY - THREADED
MILWAUKEE -510 / - 1510 -T, NIBCO - 433 -Y
VALVES - BALANCE
CIRCUIT SETTER WITH TEST PORTS
ARMSTRONG CBV; B &G CB
VALVES - AUTO-BALANCE
AUTO -FLOW CONTROL
GRISWOLD / BELL & GOSSETT
VALVES - DRAINING
2 -PC BALL - HOSE END WITH CAP & CHAIN .
MILWAUKEE BA- 100HTA / BA- 150HTH
FLEX CONNECTIONS - PUMPS 1 AHUs
BRAIDED FLEX .
PER SUBMITTAL
FLEX CONNECTIONS - TERMINAL UNITS
HOSE KIT- BRAIDED FLEX, STRAINER, VALVES, PT PLUGS
PER SUBMITTAL .
PRESSURE GAUGES
SYSTEM PRESSURES STD 0 -150 PSI (OIL-FILLED AT ROTATING
EQUIP)
TRERICE 600 CB, 4.5"
THERMOMETERS
SYSTEM TEMPERATURE STD 0 -100 F
TRERtCE BX 1 WITH THERMO WELL
PIPE MATERIAL 2 -1/2" AND UP
CARBON STEEL PIPE ASTM A53B ERW SCH STD ASME 16.5
PER SUBMITTAL
JOINTS
GROOVED
PER SUBMITTAL
JOINTS
BUTT WELD ASME B16.3 - STATE ON PLANS TO WELD INSIDE
CONCEALED SHAFTS AND ABOVE NON ACCESSIBLE CEILINGS?
PER SUBMITTAL
FITTINGS
CARBON STEEL STD WT BUTT WELD / GROOVED
PER SUBMITTAL
FLANGES
CARBON STEEL; CLASS 150
PER SUBMITTAL
COUPLINGS
ZERO -FLEX GROOVED
PER SUBMITTAL
WYE STRAINER
CAST IRON; CLASS 125
KECKLEY STYLE A
EXPANSION JOINTS
COMPENSATION FITTING AND /OR PIPING LOOP
METRALOOP; DME; GLOBAL CM / CMS
VALVES - ISOLATION
BUTTERFLY CLASS 150 LUG BODY
MILWAUKEE CL 223E / CL -323E
VALVES - ISOLATION
BUTTERFLY - GROOVED
ANVIL AN-7721 /,AN -7722
VALVES - CHECK
SWING / SPRING
MILWAUKEE F 2974(M), SILENT CHECK 1800
VALVES - PLUG
CAST IRON; CLASS 125 (AT PUMP DISCHARGE WHEN NO VFD)
RESUN 1431
VALVES - BALANCE
CIRCUIT SETTER WITH TEST PORTS
ARMSTRONG CBV; B&G CB
VALVES - AUTO - BALANCE
AUTO -FLOW CONTROL
GRISWOLD / BELL & GOSSETT
COND
CONDENSATE PIPING TO DRAIN
HVAC CONDENSATE DRAIN SLOPE TO INDIRECT WASTE
N/A
WATER
PLUGS & FILL .
MIN15
MINUTES;
VISUAL CHECKS
FOR LEAKS
2009 UPC,
SECTION 723.0
1.O
VARIES
NORMAL OPERATING PRESSURE
ATMOSPHERIC
MATERIAL SIZES THRU 3"
COPPER TUBE TYPE L ASTM B88
PER SUBMITTAL
JOINTS
ST; THREADED AT SPECIALTIES AS. APPLICABLE
W
PER SUBMITTAL
FITTINGS
WROT COPPER/BRONZE SWT JOINT
PER SUBMITTAL
FLANGES, UNIONS, & COUPLINGS
CLASS 150 CAST BRASS/ WROT COPPER
PER SUBMITTAL
LPG,
MPG
LOW PRESSURE NATURAL GAS
MEDIUM PRESSURE NATURAL GAS
FUEL. GAS DISTRIBUTION
NA
AIR
150% OF
WORKING
PRESSURE BUT
NOT LESS THAN 3
PSIG
1/2 HOUR PER
500 CUBIC FEET
OF PIPE
VOLUME, NOT
MORE THAN 24
HOURS
2009 IFGC,
SECTION 406
1.5
NA
NORMAL OPERATING PRESSURE:
0 TO 5 PSI
PIPE MATERIAL SIZES THRU 2"
CARBON STEEL PIPE A538 ERW SCH STD ASME 16.5
PER ,SUBMITTAL
JOINTS,
THREADED AND COUPLED, PIPE SEALANT
PER SUBMITTAL
FITTINGS, UNIONS, & COUPLINGS
MALLEABLE IRON, UNION CLASS 150 ASME B16.3
PER SUBMITTAL
FLEX CONNECTIONS
AGA APPROVED
GLOBAL FLEX UN SERIES
VALVES - ISOLATION
BALL
MILWAUKEE BB2 -100 OR NIBCO T-585-70-UL
VALVES - ISOLATION
PLUG
RESUN R- 1430; NORDSTROM EQUAL
ALTERNATE SIZES THRU 2"
PIPE MATERIAL
ASTM A240 TYPE 300 CORRUGATED SS TUBING
GASTITE
JOINTS ALTERNATE
PROPRIETARY FLARED FITTINGS
GASTITE
FITTINGS ALTERNATE
PROPRIETARY FLARED FITTINGS
GASTITE
ALTERNATE SIZES 2 -112" AND UP
PIPE MATERIAL
CARBON STEEL PIPE A53B ERW SCH STD ASME 16.5
PER SUBMITTAL
JOINTS
BUTT WELD
PER SUBMITTAL
FITTINGS
BUTT WELD ASME B16.9
PER SUBMITTAL
FLANGES, UNIONS, & COUPLINGS
CLASS 150; FORGED STEEL .
PER SUBMITTAL
FLEX CONNECTIONS
AGA APPROVED
GLOBAL FLEX UN SERIES
VALVES - ISOLATION
PLUG
RESUN R -1431; NORDSTROM EQUAL
PIPE & EQUIPMENT INSULATION SCHEDULE
PIPING SYSTEM
TEMP
RANGE
THERMAL
CONDUCTANCE
MEAN RATING
TEMPERATURE
INSULATION
MATERIAL
INSULATION THICKNESS BY PIPE SIZE
INSUL.
Runoul's to 2"
3/4" or Less
1" to <1 -112"
1- 112" to <4"
4" to <8"
8" or Larger
HANGERS
DOMESTIC COLD WATER
ALL
0.23 -0.27
75
FIBERGLASS
0.50 in
0.50 in
0.50 in
1.00 in
1.00 in
1.00 in
NOTES 1, 2, & 4
DOMESTIC HOT WATER
> 105
0.24 -0.28
100
FIBERGLASS
1.00 in
1.00 in
1.00 in
1.50 in
1.50 in
1.50 in
NOTES 1, 2, & 4
HEATING WATER
141 -200
0.25 -0.29
125
FIBERGLASS
1.50 in
1.50 in
1.50 in
1.50 in
2.00 in
2.00 in
NOTES 3 & 4
CONDENSATE DRAINS
ALL
0.23 -0.27
75
FIBERGLASS
0.50 in
0.50 in
0.50 in
0.50 in
1.00 in
1.00 in
NOTES 1, 2, & 4
NOTES
1 FOR PIPING CLAMPED TO UNISTRJJT SUPPORTS, UTILIZE RIGID INSERTS WITH SHEETMETAL SHIELDS CONTINUOUS THROUGH THE HANGER;
UTILIZE CALCIUM SILICATE INSERTS OE STYRENE INSERTS
2 FOR PIPING SUPPORTED FROM CLEVIS HANGERS, IF RIGID INSERTS ARE NOT UTILIZED THE INSULATION SHALL FULLY ENCLOSE
THE HANGER AND BE SEALED AT THE TOP AROUND THE SUPPORT ROD; IF RIGID INSERTS ARE UTILIZED THE INSULATION SHALL BE
CONINUOUS THROUGH THE HANGER; INSERT MATERIAL TO BE CALCIUM SILICATE INSERTS OR STYRENE INSERTS
3 UTILIZE RIGID INSERTS AND SHEETMETAL SHIELDS; INSULATION TO BE CONTINUOUS THROUGH THE HANGER; UTILIZE CALCIUM SILICATE
INSERTS OR STYRENE INSERTS
4 JACKETING: METAL JACKETING (SEALED WEATHER TIGHT) WILL BE APPLIED ON ALL EXTERIOR INSULATION EXPOSED TO WEATHER
(LE. ROOFTOP PIPING). PVC JACKET WITH RIGID INSULATION WILL BE USED INDOORS ON HORIZONTAL PIPING AT OR NEAR THE FLOOR
WHEN SUBJECT TO POTENTIAL FOOT TRAFFIC. PVC JACKETING WILL BE UTILIZED ON ALL EXPOSED INSULATION WITHIN 6 FEET OF THE
FLOOR ELEVATION (LE. MECHANICAL ROOMS AND GARAGE HOSE BIBBS); PVC IS RECOMMENDED INSTEAD OF METAL IN EXPOSED AREAS
DO TO ITS RESILIENCY - METAL JACKETING WILL DENT AND REMAIN DEFORMED WHEREAS PVC WILL POP BACK TO ORIGINAL CONDITION
EXPANSION TANK SCHEDULE
DESCRIPTION
TAG
- ET-2
LOCATION
MECHANICAL ROOM
QUANTITY
1
TYPE AND ARRANGEMENT (CLOSED / BLADDER / DIAPHRAGM)
BLADDER
SYSTEM SERVED
- HEATING WATER
BASIS OF DESIGN
AS APPROVED FOR CONSTRUCTION OR AS PROPOSED?
PROPOSED
MANUFACTURER
ITT
MODEL NUMBER
D -100V
MATERIALS OF CONSTRUCTION
STEEL
ASME RATING .
YES
PHYSICAL DIMENSIONS
DIAMETER x HEIGHT (IN)
16x69
SERVICE CLEARANCE (FRONT/ REAR/ LEFT/ RIGHT / TOP) (IN)
18
OPERATING WEIGHT, TANK AND WATER (LBS)
632
CONNECTION SIZE
. 1/2"
PERFORMANCE
SYSTEM VOLUME (GAL)
500
SYSTEM LOWER TEMPERATURE ( °F)
50
SYSTEM HIGHER TEMPERATURE ( °F)
200
SYSTEM PRESSURE AT LOWER TEMPERATURE (PSIG)
25
SYSTEM PRESSURE AT HIGHER TEMPERATURE (PSIG)
45
EXPANSION TANK VOLUME REQUIRED (GAL)
52
EXPANSION TANK VOLUME SELECTED (GAL)
55
TANK ACCEPTANCE VOLUME REQUIRED / MAXIMUM (GAL)
19/22.6
RELIEF VALVE SETTING (PSIG)
50 '
SEISMIC
SEISMIC ATTACHMENTS:
YES
QUANTITY OF MOUNTING POINTS
PER MFG
FACTORY CERTIFIED STAMPED CALCULATIONS INCLUDED PER IBC -1621
PER STRUCTURAL
AIR! DIRT SEPARATOR SCHEDULE
TAG #
AS -1
LOCATION
BOILER ROOM
SERVES
HEATING WATER SYSTEM
BASIS OF DESIGN
MANUFACTURER
SPIROTHERM
MODEL NUMBER
'PHYSCIAL
VDN 500
DIMENSIONS AND WEIGHT
DIAMETER/HIGHT
12.8" / 41.7"
INLET SIZE - INCHES
5
OUTLET SIZE - INCHES
5
TYPE OF INLET CONNECTION
FLANGED
TYPE OF OUTLET CONNECTION
FLANGED
SLOWDOWN DRAIN CONNECTION - INCHES
1
OPERATING WEIGHT - POUNDS
325
PERFORMANCE
FLUID TYPE
WATER
CAPACITY - GALLONS PER MINUTE
263
ACTUAL PRESSURE DROP - FEET OF HEAD
0.8
VERTICAL STRAINER
YES
BRACKETS FOR SEISMIC BRACING
YES
CONSTRUCTION MATERIALS
SHELL
CARBON STEEL
ASME SECTION VIII, DIVISON 1
YES
MAXIMUM WORKING PRESSURE - PSIG
150
MAXIMUM OPERATING TEMPERATURE - F
270
NVItS
1. PROVIDE MBV -1 MANUAL BLOW DOWN VALVE •
2. PROVIDE PIPE TRANSITIONS AT FLANGED CONNECTIONS
moo,•,- P..___
REVIEWED FOR
CODE COMPLIANCE
APPROVED
NOV 0 8 21312
City of Tukwila
BUILDING DIVISION
GAS PRESSURE REDUCING VALVE
BASIS OF DESIGN
MAX INDIVIDUAL
LOAD (BTU /HR)
OPERATING TEMP
RANGE ( °F)
PIPE SIZE (NPT)
VENT
CONNECTION SIZE
(NPT)
INLET GAS
PRESSURE
STANDARD
SPRING
ORIFICE SIZE
NOTES
TAG #
MAKE
MODEL
QTY
PRV -1
ITRON
B31R •
1
500,000
LO -20 HIGH 150
1 -1/2"
1"
2 PSI •
5.5 - 8 IN. WC
5/16"
1
PRV -2
ITRON
B34R
1
4,200,000
LO -20 HIGH 150
2"
1"
2 PSI
8 -14 IN. WC
7/8"
1
1. VALVE PROVIDED BY MECHANICAL CONTRACTOR
PGiai tcy
RECEIVED
CITY OF TUKWILA
OCT 1 0 2012
PERMIT CENTER
instry
ife Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, WA 98124
1--800 -669 -6223
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503- 331 -0234
www.mckinstry.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
miummatirrimmimum
TENNIS COURT
PARKING
REGISTRATION:
POOL
TRACK
REVISIONS:
8/7/12 50% DD
9/4/12 75% CD'S
9/26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
N0. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
JOB NUMBER:
DATE:
SCALE:
ENGINEERING
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31/12
AS SHOWN
SHEET TITLE:
EQUIPMENT SCHEDULES
SHEET NUMBER:
M7.1
PLUMBING SPECIFICATION (WSEC); LATEST REVISION: 8 -31 -11
ID
CATEGORY
SERVICE DESCRIPTION
MANUFACTURER, PRODUCT OR
EQUAL
PRESSURE TEST PROCEDURE
SEISMIC
INSULATION
MEDIA
TEST
PRESSURE
DURATION
CODE
IMPORTANCE
1p
FLOW
CV
VALVE
MODULATING /
POSITION
TAG
SERVED
SIZE
SIZE
CW 8z HW
HWC
(POTABLE)
COLD WATER (DOMESTIC)
HOT WATER (DOMESTIC)
HOT WATER CIRCULATION
DOMESTIC HOT AND COLD WATER SERVICE
MODEL
AIR
OR
WATER
100% OF
OPERATING.
PRESSURE
15 MINUTES
OR
MFG SPEC
UPC
CHAPTER 6
NSF 61
UPC APPENDIXA
IAPMO
INSTALLATION
STANDARDS
1.0
PER W.S.E.0
SEE INSULATION
SCHEDULE
NO INSERTS AT
HANGERS
USE INSERTS AT
CLAMPS
INSERTS TO BE
STYRENE
OPERATING PRESSURE
UP TO 100 PSI; SET RELIEF TO 100 PSI
NOTES
CV-1
HC-1
1
PIPE MATERIAL SIZES THRU 2"
COPPER TUBE TYPE L ASTM B88
PER SUBMITTAL
JOINTS
SWT; THREADED AT SPECIALTIES WHERE APPLICABLE
PER SUBMITTAL
FITTINGS •
WROT COPPER / CAST BRONZE SWT JOINT
PER SUBMITTAL
VALVES - ISOLATION
BALL TYPE - SWT
MILWAUKEE BA-485B; NIBCO S- 585 -70
SPECIALTIES
MISC.
PROJECT SPECIFIC REQUIREMENTS
CV-2
HC-2
1
PIPE MATERIAL SIZES 2 -1/2" THRU 4"
COPPER TUBE TYPE L ASTM B88
PER SUBMITTAL
JOINTS
GROOVED
PER SUBMITTAL.
FITTINGS
WROT COPPER / CAST BRONZE SWT JOINT
PER SUBMITTAL
VALVES - ISOLATION
BUTTERFLY
VICTAULIC SERIES 608
SPECIALTIES .
MISC. '
PROJECT SPECIFIC REQUIREMENTS
CV-3
HC-3
1
1 -1/2"
1"
CCV
ALTERNATE SIZES THRU 2"
BELIMO
B223
PIPE MATERIAL .
COPPER TUBE TYPE L ASTM B88
PER SUBMITTAL
10.0
10
1.05
ALTERNATE SIZES 2 -1/2" THRU 4"
YES
1,2,3,4
PIPE MATERIAL
COPPER TUBE TYPE L ASTM B88
PER SUBMITTAL
1"
1/2"
CCV
ALTERNATE (DCW ONLY TO COMPLY
WITH NSF 61) - SIZES 2 -1/2" AND UP
BELIMO
B214
PIPE MATERIAL
STAINLESS STEEL PIPE TYPE 304L SCH 105 A312 SEAMLESS
PER SUBMITTAL
JOINTS ALTERNATE
GROOVED
PER SUBMITTAL
FITTINGS ALTERNATE
GROOVED TYPE 304 STAINLESS STEEL
PER SUBMITTAL
VALVES - ISOLATION
GROOVED -END; BUTTERFLY; UPC - APPROVED
ANVIL AN- 7721 -3; VICTAULIC SERIES 300
1 -1/4"
3/4"
CCV
ALTERNATE (PLASTIC) SIZES THRU 2"
BELIMO
B218
PIPE MATERIAL
PEXASTM F876 /ASTM F877
PER SUBMIT'T'AL
JOINTS
INSERT TYPE (BRASS) W/ EXPANSION COLLAR
PER SUBMITTAL
FITTINGS
PIPE INSERT + EXPANSION COLLAR ASTM F1807/ASTM F1960
PER SUBMITTAL
VALVES - ISOLATION
BALL
MILWAUKEE BA -4845; NIBCO 5- 585 -70
SPECIALTIES
MISC.
PROJECT SPECIFIC REQUIREMENTS
HEATING COIL
BELIMO
B261
W
SANITARY WASTE - ABOVE GROUND
CAST IRON SANITARY WASTE
70.0
WATER
OR
AIR
WATER
10 FT HEAD
FILL SYSTEM
FROM LOWEST
TO HIGHEST
POINT OF TEST
SECTION
DO NOT USE AIR
FOR PLASTIC
PIPE TESTING
VISUAL
INSPECTION WITH
NO LEAKS
UPC
CHAPTER 7
1.0
NIA
OPERATING PRESSURE
UP TO 5 PSI
4"
4"
GLOBE
MIXING
PIPE MATERIAL ALL SIZES
CAST IRON NO -HUB ASTM 'D2665
PER SUBMITTAL
JOINTS
NHCI COUPLINGS - STANDARD
PER SUBMITTAL
FITTINGS
CAST IRON DRAIN PATTERNS
PER SUBMITTAL
SPECIALTIES
CLEAN -OUT FITTINGS
PER PLUMBING SCHEDULE
ALTERNATE ALL SIZES
PIPE MATERIAL
PVC SCH DWV OR ABS SCH DWV
PER SUBMITTAL
JOINTS
SOLVENT WELD
PER SUBMITTAL
FITTINGS
SOLVENT WELD DWV FITTINGS
PER SUBMITTAL
SPECIALTIES
MISC.
PER PLUMBING SCHEDULE
CONTROL VALVE SCHEDULE
VALVE
UNIT
Q..Y
PIPE
VALVE
VALVE
VALVE
VALVE
VALVE
CLOSE -OFF
MIN. BODY
SPRING RETURN
FLOW
CV
VALVE
MODULATING /
POSITION
TAG
SERVED
SIZE
SIZE
TYPE
FUNCTION
DESIGN
MODEL
RATING (PSI)
RATING (PSI)
TYPE
GPM
ACTUAL
DP(PSI)
OPEN -CLOSE
FEEDBACK
NOTES
CV-1
HC-1
1
1 -1/2"
1 -1/2"
CCV
HEATING COIL
BELIMO
B338
200
400 •
SPRING RETURN
21.7
19
1.30
MODULATING
YES
1,2,3,4
CV-2
HC-2
1
1"
1/2"
CCV
HEATING COIL
BELIMO
B214
200
600
SPRING RETURN
5.6
5
1.05
MODULATING
YES
1,2,3,4
CV-3
HC-3
1
1 -1/2"
1"
CCV
HEATING COIL
BELIMO
B223
200
600
SPRING RETURN
10.0
10
1.05
MODULATING
YES
1,2,3,4
CV-4
HC-4
1
1"
1/2"
CCV
HEATING COIL
BELIMO
B214
200
600
SPRING RETURN
5.6
5
1.05
MODULATING
YES
1,2,3,4
CV-5
HC -5
1
1 -1/4"
3/4"
CCV
HEATING COIL .
BELIMO
B218
200
600
SPRING RETURN
7,4
7
1.12
MODULATING
YES
1,2,3,4
CV-6
HC-6
1
3"
2 -1/2"
CCV
HEATING COIL
BELIMO
B261
100
400
SPRING RETURN
70.0
60
1.38
MODULATING
YES
1,2,3,4
CV-7
SPACE HEATING
LOOP
1
4"
4"
GLOBE
MIXING
BELIMO
G7100
150
250
SPRING RETURN
130.0
190
0.47
MODULATING
YES
1,2,3
NOTES:
1. VALVE FURNISHED BY CONTROL CONTRACTOR.
2. VALVE INSTALLED BY MECHANICAL CONTRACTOR.
3. VALVE WIRED BY CONTROLS CONTRACTOR.
4. PIPE SIZES ARE ESTIMATED BASED ON FLOW, MECHANICAL AS -BUILT DRAWINGS NOT AVAILABLE. PROVIDE ACTUAL PIPE SIZES DURING CONSTRUCTION FOR AS -BUILT DRAWINGS.
HVAC DUCT SPECIFICATION
(WSEC)" LATEST REVISION: 8-31 -11
PRESSURE CLASS
DUCT MATERIALS
FITTINGS
FLEX
CONNECTION! FLEX
DUCT
V
SEAL CLASS
CLEANLINESS
DURING
CONSTRUCTION
INSULATION
(INDOOR, OUTDOOR)
LINING
MATERIALS
SEISMIC
CRITERIA
SEISMIC
IMPORTANCE
FACTOR IP
NOTES
DUCT SYSTEM
SMACNA +1/2" OR +1"
PRESSURE
NOTE: MCKINSTRY BUILDS
ALL LOW PRESSURE
DUCTWORK IN ACCORDANCE
WITH +1" SMACNA
GUIDELINES TO MAXIMIZE
PRODUCTION EFFICIENCY
GALVANIZED DUCT; GAUGE AND
REINFORCEMENT SHALL BE
SMACNA OR BETTER
RECTANGULAR MAY BE S +DRIVE
ROUND MAY BE SNAPLOCK.
ELBOWS: PURI4ASED ADJUSTABLE ELBOWS
IN ACCORDANCE WITH SMACNA +1"
STANDARDS
CL RADIUS OF 1.0 DIA ON DUCTS LARGER
THAN 24"
SPIN -IN / ATTO BRANCHES OK
12 -FOOT MAX LENGTH WITH NO
OFFSETS; USE THERMAFLEX;
GKM, OR EQUAL
+1" SMACNA SEAL
CLASS LEVEL C
+1/2" NO SEAL
FOLLOW BASIC "LEVEL
A" SMACNA
FOLLOW BASIC "LEVEL
B" SMACNA
FOLLOW BASIC "LEVEL
C" SMACNA
ENGINEER TO SPECIFY
WITHIN CONDITIONED SPACE: R-
3.3
WHEN NOT IN A CONDITIONED
SPACE, USE R -7 WITH
APPROVED VAPOR/WEATHER
BARRIER
IN CONCRETE OR GROUND: R-
5.3
LINING WHERE
INDICATED ON THE
PLANS
ENGINEER TO
CONSIDER LINING
WHEN VELOCITY IS
1,400 FPM OR
GREATER
SEISMIC SUPPORT PER
APPLICABLE CODE / LOCAL
JURISDICTION. SEE MECHANICAL
SEISMIC SHEET WHEN
APPLICABLE.
IP = 1.0 .
IP = 1.5
(LAB
PRESSURIZATION)
.
NOTES 1, 2, 3,
4, 5
'HVAC SUPPLY
LOW PRESSURE
TERMINALS TO
DIFFUSERS
FAN COL UNITS TO
DIFFUSERS
HEAT PUMPS TO
DIFFUSERS
GALVANIZED DUCT; GAUGE AND
REINFORCEMENT SHALL BE
SMACNA OR BETTER
RECTANGULAR TO HAVE TDF
CONNECTIONS
ROUND MAY BE SNAPLOCK
ELBOWS: CENTERLINE RADIUS OF 1.5 DIA OR
MITERED 90S WITH VANES OR PURCHASED
ADJUSTABLE ELBOWS IN ACCORDANCE WITH
SMACNA +1"
CL RADIUS OF 1.0 DIA ON DUCTS LARGER
THAN 24" DIA
TAPS: CONICAL OR BOOT -STYLE
FLEXAT EQUIP CONNECTIONS -SMACNA
TO COMPLY WTTti SMACNA
APPLICABLE PRESSURE CLASS
SEAL
CLASS LEVEL C
FOLLOW BASIC "LEVEL
A" SMACNA
FOLLOW BASIC "LEVEL
B" SMACNA
FOLLOW BASIC "LEVEL
C" SMACNA
ENGINEER 10 SPECIFY
WITHIN CONDITIONED SPACE: R-
7
NOT WITHIN CONDITIONED
SPACE: R-5.3
OSA DUCT W/ GREATER THAN
2800 CFM UPSTREAM OF
MOTORIZED DAMPER SHALL BE
INSULATED TO BUILDING
ENVELOPE R VALUES
LINING WHERE
INDICATED ON THE
PLANS
ENGINEER TO
CONSIDER LINING
WHEN VELOCITY IS
1,400 FPM OR
GREATER
SEISMIC SUPPORT PER
APPLICABLE CODE / LOCAL
JURISDICTION. SEE MECHANICAL
SEISMIC SHEET WHEN
APPLICABLE.
_
IP = 1.0
IP = 1.5
(LAB
PRESSURIZATION)
NOTES 1, 2, 3,
4, 5
HVAC OA INTAKE
LOUVER CAN /
PLENUMS
UPSTREAM OF
MOTORIZED DAMPER
SMACNA *2"
GALVANIZED DUCT; GAUGE AND
REINFORCEMENT SHALL BE
SMACNA OR BETTER
RECTANGULAR TO HAVE S &D
CONNECTIONS, ROUND MAY BE
SPIRAL
ELBOWS: CENTERLINE RADIUS OF 1.5 DIA OR •
MITERED 90S WITH VANES OR PURCHASED
ADJUSTABLE ELBOWS IN ACCORDANCE WITH
SMACNA +1"
CL RADIUS OF 1.0 DIA ON DUCTS LARGER
THAN 24" DIA
TAPS: CONICAL OR BOOT -STYLE
SPIN -IN / ATTO BRANCHES OK
3 -FOOT MAX LENGTH WITH NO
OFFSETS; USE THERMAFLEX;
GKM, OR EQUAL;
FLEX AT EQUIP CONNECTIONS
TO COMPLY WITH SMACNA
APPLICABLE PRESSURE CLASS
SMACNA SEAL
CLASS LEVEL C
FOLLOW BASIC "LEVEL
A" SMACNA
FOLLOW BASIC "LEVEL
B" SMACNA
FOLLOW BASIC "LEVEL
C" SMACNA
ENGINEER TO SPECIFY
WITHIN CONDITIONED SPACE:
NO INSULATION REQUIRED
NOT WITHIN CONDITIONED
SPACE: R-7 WITH APPROVED
VAPOR/WEATHER BARRIER
IN CONCRETE OR GROUND: R-
5.3
1" LINING ONLY
WHERE INDICATED
ON PLANS
SEISMIC SUPPORT PER
APPLICABLE CODE / LOCAL
JURISDICTION. SEE MECHANICAL
SEISMIC SHEET WHEN
APPLICABLE.
IP = 1.0
IP = 1.5
(LAB
PRESSURIZATION)
NOTES 1, 2, 3,
4, 5
HVAC RETURN
LOW PRESSURE
SMACNA -1/2" OR -1"
PRESSURE
NOTE: MCKINSTRY BUILDS
ALL LOW PRESSURE
DUCTWORK IN ACCORDANCE
WITH +1" SMACNA
GUIDELINES TO MAXIMIZE
PRODUCTION EFFICIENCY
CONDENSING BOILER
FLUE
PRESSURE STACK PER
BOILER MANUFACTURER'S
SPECIFICATIONS
HEAT FAB SAFE T VENT, PVC
HEAT FAB SAFE T VENT (BY SELKIRK), PVC
N/A
PER MANUFACTURER
INSTALLATION
INSTRUCTIONS
FOLLOW BASIC "LEVEL
B" SMACNA
N/A
INTEGRAL TO HEAT
FAB SAFE -T VENT
SEISMIC SUPPORT PER
APPLICABLE CODE / LOCAL
JURISDICTION. SEE MECHANICAL
SEISMIC SHEET WHEN
APPLICABLE.
IP = 1.5
NOTES 1, 2, 3
NOTES:
1. ALL DUCTWORK TO BE FABRICATED IN ACCORDANCE WITH McKINSTRY DUCT CONSTRUCTION STANDARDS / SUBMITTALS WHICH MEET OR EXCEED SMACNA GUIDELINES
2. ALL DIMENSIONS SHOWN ON PLANS ARE INSIDE CLEAR DIMENSIONS.
3. THE MECHANICAL ENGINEER RESERVES THE RIGHT TO AUTHORIZE DEVIATIONS TO THESE STANDARDS TO ACCOMMODATE UNIQUE SITUATIONS AS APPLICABLE
REVIEWED FOR
CODE COMPLIANCE
APPROVED.
NOV 0 8 2012
City of Tukwila
BUILDING DIVISION F
p&p...18/
RECEIVED
CITY OF TUKV/ILA
OCT 10 2012
PERMIT CENTER
For Th
instry
ife Of Your Building
SEATTLE:
5005 3RD AVENUE S
PO BOX 24567
SEATTLE, . WA 98124
1 -800- 669 -6223
PROJECT:
PORTLAND:
16790 NE MASON ST
PORTLAND, OR 97230
503-331-0234
www.mckinstry.com
TUKWILA POOL
POOL MODIFICATIONS
4414 SOUTH 144TH
TUKWILA, WASHINGTON 98168
TENNIS COURT
PARKING
REGISTRATION:
(Th
TRACK
POOL .,.�
REVISIONS:
8/7/12 50% DD
9/4/12 75% CD'S
9/26/12 90% CD'S
10/8/12 PERMIT DRAWINGS
NO. DATE DESCRIPTION
McKINSTRY DIVISION:
DESIGNED BY:
DRAWN BY
CHECKED BY:
JOB NUMBER:.
DATE:
SCALE:
ENGINEERING
ARLISS MERRELL
TIM WHITE
SETH DAVIS
C10256
7/31 /12
AS SHOWN
SHEET TITLE:
EQUIPMENT SCHEDULES
SHEET NUMBER:
M7.2