Loading...
HomeMy WebLinkAbout2011-07-01 - Application - 2010-2011 Small Drainage / SEPA Review CITY OF TUKWILA NOTICE OF APPLICATION PROJECT INFORMATION The City of Tukwila Public Works Department has filed an application for SEPA/Environmental Review of 2010 /2011 Small Drainage Program. The SEPA application includes nine projects: two projects are for construction of new storm drainage improvements, seven projects are for maintenance of existing storm drainage facilities. A map of each the nine project locations and a project description for each location is included below. Projects applied for include: Ell -006 (SEPA Application) Other known required permits include: Hydraulic Project Approval (HPA) from the Washington Department of Fish and Wildlife. Studies required with the applications include: None. FILES AVAILABLE FOR PUBLIC REVIEW The application is available for review at the City of Tukwila, Department of Community Development (DCD), located at 6300 Southcenter Blvd 4100. OPPORTUNITY FOR PUBLIC COMMENT Your written comments on the project are requested. They must be delivered to DCD at the address above or postmarked no later than 5:00 P.M., Friday, July 1, 2011. Tukwila has reviewed the project for probable adverse environmental impacts and expects to issue a determination of non significance (DNS) using the optional DNS process in WAC 197 -11 -355. This may be your only opportunity to comment on the environmental impacts of the project. If timely comments do not identify probable significant adverse impacts that were not considered by the anticipated determination the DNS will be issued without a second comment period. APPEALS You may request a copy of any decision, information on hearings, and your appeal rights by calling DCD at (206) 431 -3670. For further information on this proposal, contact Jaimie Reavis at (206) 431 -3659, Jaimie.ReavisnaTukwilaWA.izov or visit our offices at 6300 Southcenter Boulevard, Suite 4100, Monday through Friday, 8:30 a.m. to 5:00 p.m. Application Filed: June 3, 2011 Notice of Completeness Issued: June 10, 2011 Notice of Application Issued: June 17, 2011 Below is a description of the location of the project site, followed by a brief project description for each location. Site 1 ll'efls Tritckiirti: Public Storiu Drahw" c Easciucirt oirlirolicrn located (It] -"O East hlurtiiirul LI'ui (tuxliurcel 3-15000 00), City maintenance crews have identified a e s 126rnt public storm drain on this site that is severely corroded and damaged by an 1), overlying stricture. The project proposal is to replace and re -route approximately 250 feet of storm drain around the existing stricture to provide continued function. The existing pipe will be abandoned in place. Project Locatbn S 1 28tta 5t ,bite 2 TIM iri1a It iteri wtioi wl Bo ide 'ctrcT: Public Riglrt oaf tiI u�° ctt crhhro�� iiucrtc <trEEt c�cTcTrE, 11 '00 Tularila International Boirlei'ar(l City maintenance crews have identified 80 linear feet of storm drain pipe and 2 catch basins that require replacement due to age and damage. The lower pipe reach collects flow from a private storm water facility for the adjacent office t 59 9 park as well as an intermittent unnamed tributary to Riverton Creek. During high flows, the inlet frequently plugs, resulting in slope erosion and debris flows onto Tukwila SJTE 2 International Blvd. The project proposal is to restore the berm, install an improved trash rack, and replace rock tl i erosion protection on the overflow down the slope. The riprap on this slope extends far beyond this localized drainage, so it appears to be providing a general slope AMSS ROM buttress function as well. i Site 3 EaStAIcrrtiiircrl PublicRitiht r oaf Llcr�' gl'EaStA IM. k iirul (It the y iirtcr frith South 9-1th Mace, This project proposes to install 2 catch Iir.l basins and approximately 200 feet of 12 inch pipe to provide roadway drainage to address the problem of ponding within the right -of -way. Project Location 0 1- gi p% O' 11 Site 44th 41vinre :South: Public Ritiht c?f 44th 41vinre :South bettrear :South 1221l(l Street cl19cl South 124th Street. No formal storm drainage collection system exists on 44th K Ave. S between S 122" Street and S 124 Street. This results in numerous puddles and the potential for runoff from the public right -of -way to damage private residential properties during periods of high rainfall. The purpose of the proposed improvements is to provide a new conveyance 2t system. r t1, r 124th St 1 I Project Locatbn Site 9 Evergreen Foo(h Public :S'torrn Dr(lir (we Parcel E(lSenlellt Orr thel)r-o1)e/ -t6 loc(ltc(l (It 13SOO PIN 340601040 Trrkirilu lrlterrlcrtioiwl B/w (oxl)(rrcel S 135th St "340001040). w I�diip� City maintenance crews have identified 265 linear feet of 30 -inch storm drain pipe that requires rehabilitation or replacement due to age and damage. Trenchless rehabilitation is being used to minimize impacts where feasible, but a portion of S 1 3Tth this project will require removal and replacement due to the severity of pipe damage. The pipe that Project Location requires replacement is currently routed above grade with a number of separated joints, down the slope to a rock outfall into an unnamed tributary to Southgate Creek. Site 6 :South 12211(l Street: Public Ritiht cif 11'm c?f South Street betireen 2n(1.4ivinte South (liO 431 :South, City maintenance crews have identified 240 linear 5a feet of CMP storm drain pipe that is failing due to i ti S t�7nd age and corrosion. The pipe is still in good enough condition for sliplining, so the City would like to perform the slipline before more damage occurs. I Project Location Site 7 10th 41vinte :South: Public Ritiht (It ulr n oxiruute str ect u(Urcss 13- 10th 41vinte :South, City maintenance crews have identified 225 linear feet of SZZ CMP storm drain pipe that is failing due to age and corrosion. The pipe is still in good enough condition for sliplining, so the City would like to perform the slipline before more damage occurs. IM, k St S I -1, c! Sk fyr 4 t'ud I K =Y' s; Project Locatbn Site witr of Structure Floir 10thirr retiiolwl (letcutioli l lciliti loc(lte(l (It -1250 :Southcei ter Bhv(l (ox l)(rr ce/ 22230-1905S), Sound Transit permitted and —J constricted this outfall stricture on S 15011 ST Gilliam Creek in 2009 and turned the facility over to Tukwila for ATE s ACCESS THROUGH APARTMENT PARKRIG AREA maintenance. The stricture is highly S 152ND ST a prone to plugging with debris and has no trash rack. Additionally, the stricture 34UTHGENTER 8 L has no safe access for workers to remove debris from the control SOUlliCENTER BLVD. r� stricture. To address these issues, this 5 154TH IN PROJECT LOCATION project proposes installation of a ladder and platform for maintenance access to tr �r the flow control stricture, as well as 518 S 156TH ST installation of a trash rack to prevent 1 debris from clogging the stricture. Site 9 Gilliuru (_'reek- Tr-(V, h R(Ick: Public Ritiht (It the 1101-th ,'idc of the irrtc1 Purkrm frith This 8 -foot diameter culvert is prone to plugging with fallen trees and branches during the winter. The City proposes to install a trash rack on the existing culvert entrance to keep debris out of the pipe and improve the ease of maintenance. [Lua 5 Blac/D Uak., R" Project Locatbn